Pipeline Safety Seminar Distribution Pipe Segment Risk Assessment and Replacement Panel Discussion
|
|
- Esmond Richardson
- 5 years ago
- Views:
Transcription
1 Pipeline Safety Seminar Distribution Pipe Segment Risk Assessment and Replacement Panel Discussion Central Hudson Gas & Electric Karl Reer, Director, Gas Distribution Engineering
2 Central Hudson Gas & Electric About 75,000 Customers 1,200 Miles of Distribution Main 56,500 Gas Services Combination Company 825 Employees
3 All gas assets recorded in GIS 2008 to 2010
4 Resulting Benefits Include Pipe Material Inventory Tracking and Location Information Improved Leak Mapping and Attribute Association with Pipe Segments Can Readily Map Leak Prone Pipe Can Implement Feature Specific Inspection and Maintenance programs
5 Resulting Benefits (continued) Enables use of GIS Asset based inspection and compliance software Instant electronic access to all map records in the field Enables use of risk assessment and pipe replacement software such as MRP.
6 Pipe Inventory: Plastic: 618 Miles Steel: 495 Miles of which 343 Miles is monitored and protected against corrosion Cast Iron: 64 Miles Wrought Iron: 23 Miles 239 Miles of main that can be considered leak prone
7 Pipe Material Leak Rates: Plastic: 12/100Miles/Year Steel: 41/100Miles/Year Cast Iron: 137/100Miles/Year Wrought Iron: 105/100Miles/Year
8 Replacement Program Drivers: Gas fuel prices dropped due to increased production made possible by fracking. Major incidents occurred at a number of companies involving cast iron pipe. DIMP Requirements MAOP Rules Interpretation Changes Positive regulatory support
9 Drivers (continued): Aging Infrastructure Growing number of below grade leaks found each year Regulatory interest in project management and capital investment decisions
10 Program Requirements: Audit ready Best use of limited (fixed) resources Provide risk assessment for each pipe segment Can be traced back to asset data base and leak repairs. Flexible enough to address new threats
11 Program Elements Risk Model We are using MRP, a GL software product, to model and rank pipe segment risk The standard risk model provided in this program utilizes a 5 year leak history, pipe inventory age, operating pressure, diameter, and material. The model is flexible enough to take other factors into consideration
12 Definitions Condition Score: the predicted number of below grade leaks per mile/per year for the individual pipe segment Risk Score: estimated probability of an incident/mile/year for each pipe segment Banded Score: sum of normalized condition, risk, and ancillary consideration scores
13 Banded Risk Score Formula BS= CS(WFCS) + RS (WFRS) + A1(10)(WF1) +A2(10)(WF2) + A3(10)(WF3)+..+An(10)(WFn) BS= Banded Score WFXX= Weighting Factor sum of WFs =1.0 CS= Condition score RS=Risk score A1 to An= alternate factor indicator (0 or 1)
14 Pivot Table Showing Pipe Section Risk Calc.
15 Alternate Factors Business District CPSystem Status Main Feeder Route Proximity to a district regulator station Inside a flood plain Diameter
16 Alternate Factors: Anything that can be assigned an attribute value in the Distribution main Pipe feature class in GIS yes or no (0 or 1) value Inclusion in the risk model and at what weighting factor determined by SME committees
17 Project Selection Steps Input data is provided to the software detailing capital budget availability for each of the next 5 years, pro-forma pipe replacement unit costs, and the like. Software identifies all segments that are candidates for replacement. Adjacent and geographically close segments are grouped together into projects. Cost estimates for each project are verified and corrected with SMEs
18 Project Ranking and Funding Projects are given a final rank score Score = Total BS*(10,000)/(Total Cost) Essentially results in a number defined as banded score (risk) eliminated per $10,000 invested. Projects are funded in order of highest score to lowest.
19 Model Output The 2013 model run identified 300 projects to replace 590 of the sections of leak prone pipe in the GIS data base. 18 of these were funded for construction in 2014 representing the bulk of the 23 projects identified for construction.
20 Evaluation (continued) We will be doing an analysis of the condition score of segments selected for replacement and comparing them to the average for the material segment pool.
21 Project List By Priority - Steel
22 A portion of the 2014 budget sheet
23 Model and Program Evaluation The model can predict numbers of leaks experienced over time as a function of capital investment dollars The primary measurement of success is a comparison of predicted leak rates against actuals over time.
24 Measurement of Success
25 Issues to work on: Model calibration adjusting condition and risk scores to match experienced conditions would improve the output. Tracking leak rates for leak prone steel pipe would allow for better calibration Model does not do a great job of leak or consequence prediction on pounds pressure cast
26 Below Grade Leak Management 100% of leak prone pipe is on an annual survey cycle Cast Iron frost survey is continuous once started All distribution leak work completed by 9/1 each year
27 Leak Management (continued) Targets set for workable backlog (Class 2 and 2A) each year at the start of the frost cycle. Targets set for total leak inventories.
28 Thank you! Questions?
Pipeline Regulatory Issues
Pipeline Regulatory Issues Pete Chace GPS Program Manager (614) 644-8983 Peter.chace@puc.state.oh.us Changes to the GPS Section Staff Expansion Hiring 2 new Gas Pipeline Safety Inspectors. Intent is that
More informationNorthern Illinois Gas Company
d/b/a Nicor Gas Company 1st Revised Sheet No. 85 Applicable to All Rates, Except Rates 17, 19 and 21 Section A Applicability. The Qualifying Infrastructure Plant Surcharge shall be determined in accordance
More informationWATER ASSET MANAGEMENT PLAN
WATER ASSET MANAGEMENT PLAN Georgetown Charter Township Ottawa County, Michigan November 2017 Where we re going: System Goals INTRODUCTION About this Document This document is our Water Asset Management
More informationINVESTOR UPDATE. September 2018
INVESTOR UPDATE September 2018 FORWARD-LOOKING STATEMENTS Statements contained in this presentation that include company expectations or predictions should be considered forward-looking statements that
More informationRider QIP. Qualifying Infrastructure Plant. Applicable to Service Classification Nos. 1, 2, 4 and 8 and Riders FST, SST, and P
Fifteenth Revised Sheet No. 130 (Canceling Fourteenth Revised Sheet No. 130) Page 1 of 11 The Surcharge shall be determined in accordance with the provisions of this rider. The Surcharge Percentage shall
More informationAs presented at the Institute of Municipal Engineering of South Africa (IMESA) conference 2013
Paper title: OUTCOMES FROM A SEWER MAINTENANCE BACKLOG INVESTIGATION As presented at the Institute of Municipal Engineering of South Africa (IMESA) conference 2013 Morné Pienaar a a Aurecon Port Elizabeth,
More informationARKANSAS PUBLIC SERVICE COMMISSION
First Revised Sheet No. 4-2.1/6 Replacing: Original Sheet No. 4-2.1/6 2. MAIN REPLACEMENT PROGRAM RIDER (RIDER MRP) 2.1. The primary purpose of Rider MRP is to support the expedited replacement of cast-iron
More informationHeader Tile ATTACHMENT 2. City of Saskatoon
Header Tile ATTACHMENT 2 2 Building Better Infrastructure The Administration evaluates the condition of the City s assets in order to develop annual programs to maintain the assets at a minimum cost. Where
More informationChallenges Related to Implementation of Investments for Tariff Purposes
Challenges Related to Implementation of Investments for Tariff Purposes Case Study: Northern Utilities Cast Iron Replacement Program, Rate Recovery and Tracking Mechanism (CIRP, TIRA and EVM) CHRISTINE
More informationINVESTOR MEETINGS. NYC & Boston March 4-6, 2019
INVESTOR MEETINGS NYC & Boston March 4-6, 2019 FORWARD-LOOKING STATEMENTS Statements contained in this presentation that include company expectations or predictions should be considered forward-looking
More informationAMERICAN GAS ASSOCIATION FINANCIAL FORUM. Phoenix, Arizona May 20 22, 2018
AMERICAN GAS ASSOCIATION FINANCIAL FORUM Phoenix, Arizona May 20 22, 2018 PIERCE NORTON President and Chief Executive Officer FORWARD-LOOKING STATEMENTS Statements contained in this presentation that include
More informationSTATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY. Docket No DIRECT TESTIMONY OF AMOS F. BARNES and BRIAN K.
STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY Docket No. -0- DIRECT TESTIMONY OF AMOS F. BARNES and BRIAN K. HAWLEY Capital Program and Gas Operations ON BEHALF OF THE SOUTHERN CONNECTICUT
More information4101: Existing boilers and pressure vessels.
ACTION: Final DATE: 07/13/2018 11:08 AM 4101:4-9-01 Existing boilers and pressure vessels. (A) All existing boilers and pressure vessels and the associated equipment, controls, devices, and safeguards
More informationPACP Based Asset Management
PACP Based Asset Management Objectives of Asset Management Maintain function or level of service as cost effectively as possible Maintain individual components (assets) at lowest life cycle cost possible
More informationAPPENDIX J. CIP Renewal and Replacement Process. Revision History
APPENDIX J CIP Renewal and Replacement Process Revision History Revision Date Approval Reason 0 09/30/05 Original 1 05/25/11 2 09/27/12 3 03/26/14 4 11/14/16 E. Yong Updated Clearinghouse process and replaced
More informationOptimal Risk-Based Life-Cycle Cost Scheduling of Water & Sewer Main Replacements
Optimal Risk-Based Life-Cycle Cost Scheduling of Water & Sewer Main Replacements The firefighter who was driving the firetruck when it fell into the Valley Village sinkhole caused by a broken water line
More informationThe Use of Clementine at South West Water to reduce sewer flooding incidents
The Use of Clementine at South West Water to reduce sewer flooding incidents Tony Hoar - Business Performance Manager Ben Plastow - Data Quality Analyst Presentation Topics (Tony) Overview of South West
More informationINTERNAL SERVICE FUND ~ Geographic Information Systems
Department of Development Aeronautics Building Inspection Economic Development Geographic Information Systems Planning & Zoning Building Maintenance The mission of the Geographic Information System (GIS)
More informationTABLE OF CONTENTS APPENDIX A APPENDIX B
TABLE OF CONTENTS I. EXECUTIVE SUMMARY... 3 II. PGW OVERVIEW... 11 III. BENCHMARKING PGW S CURRENT INFRASTRUCTURE... 15 Amount of Cast Iron and Unprotected Steel Pipe... 12 Potential for Pipeline Failure...
More information1301. Guidelines for Ascertaining The Fair Market Value of Pipelines
Chapter 13. Pipelines 1301. Guidelines for Ascertaining The Fair Market Value of Pipelines A. General 1. Pipelines, except those regulated pipelines, which are assessed as public service properties as
More informationNARUC. Summer Committee Meetings. Committee On Gas
NARUC Summer Committee Meetings Committee On Gas NARUC Summer Committee Meetings Committee On Gas PHMSA NUTS & BOLTS PART I PHMSA Serious Pipeline Incidents PHMSA Serious Transmission Incidents PHMSA Serious
More informationS T A T E OF M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * *
S T A T E OF M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * In the matter of the application of Michigan Consolidated Gas Company ) for authority to increase its rates, amend ) Case
More informationBob Beard UGI Utilities. October 17,
Bob Beard UGI Utilities October 17, 2012 23 Agenda Keys to Success Service Territory Financial Performance Customer Growth Infrastructure Management Looking Forward October 17, 2012 24 Keys to Success
More informationS T A T E O F M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * *
S T A T E O F M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * * In the matter of the application of DTE Gas ) Company for authority to increase its ) Case No. Main Replacement Program
More informationPIPELINE RISK ASSESSMENT
PIPELINE RISK ASSESSMENT The Essential Elements (First published in Pipeline & Gas Journal May, 2012) An initiative through collaboration of DNV and W. Kent Muhlbauer info usa@dnv.com www.dnvusa.com 614.761.1214
More informationHYDROSTATIC TEST PLAN
Engineering and Projects HYDROSTATIC TEST PLAN Terminal Piping Enbridge Pipelines Inc. Tank 80 at Regina Terminal AFE: 1241021C80 Rev Date Status Description Initiator Approver 1 06/12/15 Issued Issued
More informationThree waters A GIS-BASED METHOD FOR SUPPORTING OPERATIONAL EVENTS MANAGEMENT IN WATER SUPPLY SYSTEM
Three waters Marcin Dąbrowski, PhD Eng. Silesian University of Technology Gliwice, Poland A GIS-BASED METHOD FOR SUPPORTING OPERATIONAL EVENTS MANAGEMENT IN WATER SUPPLY SYSTEM Operational events commonly
More informationCase Study: Key Performance Indicators implementation in gas transmission pipeline. María José Gutiérrez Argentina
Paper Number: 2015-07 Case Study: Key Performance Indicators implementation in gas transmission pipeline María José Gutiérrez Argentina Abstract Corrosion is a major threat that affects many assets of
More informationAssistance and Guidance Report
Assistance and Guidance Report Sam M. McCall, Ph.D., CPA, CGFM, CIA, CGAP City Auditor TPD Take-home Vehicles Report #1001 October 9, 2009 Summary This report provides additional information as follow
More informationQuantitative Risk Modelling, Calibration and Continuous Improvement CK UMACHI RISK MANAGEMENT ENGINEER - TIMP PACIFIC GAS & ELECTRIC
Quantitative Risk Modelling, Calibration and Continuous Improvement CK UMACHI RISK MANAGEMENT ENGINEER - TIMP PACIFIC GAS & ELECTRIC Agenda Relative vs Quantitative Risk Models PG&E s Risk Model History
More informationHandout 1.1 Essential Records
Essential Records Session 1 Handout 1.1 Handout 1.1 Essential Records PRIORITY FOR ACCESS* Priority 1: First 1 12 hours Could be either Priority 1 or Priority 2 Priority 2: First 12 72 hours Priority 2
More informationBoston & New York City February 26-28, Investor Meetings
Boston & New York City February 26-28, 2018 Investor Meetings Forward-Looking Statements Statements contained in this presentation that include company expectations or predictions should be considered
More informationPIPELINE INVESTIGATION REPORT P07H0014 CRUDE OIL PIPELINE RUPTURE
PIPELINE INVESTIGATION REPORT P07H0014 CRUDE OIL PIPELINE RUPTURE ENBRIDGE PIPELINES INC. LINE 3, MILE POST 506.2217 NEAR GLENAVON, SASKATCHEWAN 15 APRIL 2007 The Transportation Safety Board of Canada
More informationEnvironmental Impairment Liability
PROPOSAL FORM Environmental Impairment Liability Fixed Facilities, Pipelines & Storage Tanks & Goods in Transit Pollution Liability (road) Underwritten by The Hollard Insurance Co. Ltd, an authorised Financial
More informationDIRECT TESTIMONY OF PAUL E. HAERING (CAPITAL PLAN)
BEFORE THE NEW YORK STATE PUBLIC SERVICE COMMISSION ----------------------------------------------------------------------------x Proceeding on Motion of the Commission as to the Rates, Charges, Rules
More information2016 Collection Systems Workshop. Asset Management for Small to Midsized Communities
2016 Collection Systems Workshop FISHBECK, THOMPSON, CARR & HUBER, INC. Asset Management for Small to Midsized Communities Ohio Water Environment Association May 18 2016 An asset management program identifies
More informationA/V Sponsored by. Stop by Booth 405 and ask how Opvantek can help you prevent excavation damage
A/V Sponsored by Stop by Booth 405 and ask how Opvantek can help you prevent excavation damage Using Predictive Analytics to Guide Daily Damage Prevention Activities Ashley Donnini Director, Damage Prevention
More informationCharging arrangements for new connection services. Our latest proposals. December 2017.
Charging arrangements for new connection services. Our latest proposals. December 2017. 1 April 2018 to 31 March 2019 1 Index. Charging arrangements 1. Introduction... 2. You have a choice... Water charging
More informationAPPLICATION FOR WATER SERVICE EXISTING METER
PO Box 716 3810 North Highway 281 Mineral Wells, TX 76068 (940)327-0700 www.northruralwsc.com Membership No. APPLICATION FOR WATER SERVICE EXISTING METER Please complete this application to reservice an
More informationSection II: Vulnerability Assessment and Mitigation
Section II: Vulnerability Assessment and Mitigation 1. Hazard Vulnerability Analysis (facility name) should conduct a thorough Hazard Vulnerability Analysis to help determine what events or incidents may
More informationENBRIDGE ENERGY LIMITED PARTNERSHIP SPECIAL USE PERMIT
Page 1 of 6 Chequamegon- Nicolet National Forest ENBRIDGE ENERGY LIMITED PARTNERSHIP SPECIAL USE PERMIT Fact Sheet July 5, 2017 Situation: Enbridge Energy Limited Partnership (Enbridge) has requested to
More informationQ. 2 Forecast Statement: Rupees
SUGGESTED ANSWERS SPRING 25 EXAMINATIONS 1 of 7 Q. 2 Forecast Statement: Hotels Marts Budgeted gross contribution margin 496,000 464,000 ( each) Budgeted variable costs: Sales reps commission (W-2) 34,560
More informationNotification of Fire Breaks, Leaks, or Blow-Outs, and 3.71, relating to Pipeline Tariffs. The
Railroad Commission of Texas Page 1 of 19 The Railroad Commission of Texas (Commission) proposes amendments to 3.20, relating to Notification of Fire Breaks, Leaks, or Blow-Outs, and 3.71, relating to
More informationPRELIMINARY STATEMENT
PRELIMINARY STATEMENT 1. These responses and objections are made without prejudice to, and are not a waiver of, SDG&E and SoCalGas right to rely on other facts or documents in these proceedings. 2. By
More informationVirginia Department of Education
Virginia Department of Education Module Ten Transparencies Driver Responsibilities: Making Informed Choices Topic 1 -- Insuring Vehicle Topic 2 -- Purchasing Vehicle Topic 3 -- Trip Planning Topic 4 Virginia
More informationFocused, Managed Growth
Focused, Managed Growth Pure Technologies Ltd. Corporate Presentation March, 2015 www.puretechltd.com Forward-Looking Statements This presentation contains forward-looking statements, including, without
More informationBorrowing Costs. Contents. Accounting Standard (AS) 16 (issued 2000)
Accounting Standard (AS) 16 (issued 2000) Borrowing Costs Contents OBJECTIVE SCOPE Paragraphs 1-2 DEFINITIONS 3-5 RECOGNITION 6-22 Borrowing Costs Eligible for Capitalisation 8-12 Excess of the Carrying
More informationLabor Chapter ALABAMA DEPARTMENT OF LABOR ADMINISTRATIVE CODE CHAPTER GENERAL PROVISIONS TABLE OF CONTENTS
Labor Chapter 480-7-1 ALABAMA DEPARTMENT OF LABOR ADMINISTRATIVE CODE CHAPTER 480-7-1 GENERAL PROVISIONS TABLE OF CONTENTS 480-7-1-.01 Definition Of Terms 480-7-1-.02 Adoption Of Codes And Standards Ed.
More informationSOCALGAS REBUTTAL TESTIMONY OF MARIA MARTINEZ (PIPELINE INTEGRITY FOR TRANSMISSION AND DISTRIBUTION) JUNE 18, 2018
Company: Southern California Gas Company (U904G) Proceeding: 2019 General Rate Case Application: A.17-10-007/-008 (cons.) Exhibit: SCG-214 SOCALGAS REBUTTAL TESTIMONY OF MARIA MARTINEZ (PIPELINE INTEGRITY
More informationCanadian River Municipal Water Authority Sanford, Texas
Canadian River Municipal Water Authority Sanford, Texas Comprehensive Annual Financial Report Fiscal Year Ended September 30, 2017 CANADIAN RIVER MUNICIPAL WATER AUTHORITY Comprehensive Annual Financial
More informationPhoenix January 11-12, Evercore ISI Utility CEO Conference
Phoenix January 11-12, 2018 Evercore ISI Utility CEO Conference Forward-Looking Statements Statements contained in this presentation that include company expectations or predictions should be considered
More informationWATER SUPPLY COMPANIES AND IRRIGATION SYSTEMS SUPPLEMENTAL APPLICATION (Complete in addition to ACORD General Liability Application)
WATER SUPPLY COMPANIES AND IRRIGATION SYSTEMS SUPPLEMENTAL APPLICATION (Complete in addition to ACORD General Liability Application) Date: Name of Applicant: State/Area of Operations: Website Address:
More informationPURE TECHNOLOGIES LTD. Jefferies 2014 Global Industrials Conference August 14, 2014
TSX: PUR global innovative sustainable infrastructure management solutions PURE TECHNOLOGIES LTD. Jefferies 2014 Global Industrials Conference August 14, 2014 Forward-Looking Statements This presentation
More informationProperty Owners Insurance Proposal Form
Property Owners Insurance Proposal Form It is essential that you make fair presentation of the risk that should include a full and unrestricted disclosure including every material fact and circumstance
More informationPropane and Fuel Oil Dealers Supplemental
Propane and Fuel Oil Dealers Supplemental Applicant Name: Requested Effective Date:_ Insured s Website: Section I Summary of Operations Please provide a narrative of the Insureds operations (Include all
More informationFocused, Managed Growth
Focused, Managed Growth Pure Technologies Ltd. June, 2015 www.puretechltd.com Forward-Looking Statements This presentation contains forward-looking statements, including, without limitation, statements
More informationMANAGEMENT PROCEDURE FOR DISTRIBUTION PIPE REPLACEMENT
MANAGEMENT PROCEDURE FOR DISTRIBUTION PIPE REPLACEMENT Policy Ref: T/PM/REP/2 Title: Management procedure for distribution pipe replacement Author: Ian Aldridge Job title: Engineering Policy Manager Issue
More informationREIMBURSEMENT GUIDELINES AND BILLING PROCEDURES FOR UTILITY ADJUSTMENTS
REIMBURSEMENT GUIDELINES AND BILLING PROCEDURES FOR UTILITY ADJUSTMENTS Right of Way Division October, 2003 Table of Contents INTRODUCTION...3 GENERAL...3 GENERAL REQUIREMENTS...3 GUIDELINES...3 FINAL
More informationRisk Based Inspection A Key Component to Generating Value from a Mechanical Integrity Program API Singapore 2012
the global leader in asset performance management solutions Risk Based Inspection A Key Component to Generating Value from a Mechanical Integrity Program API Singapore 2012 Agenda Introduction Achieving
More informationTURN-SCGC Data Request TURN-SCGC-014 regarding the response to TURN-SCGC-02 and TURN-SCGC-03
TURN-SCGC Data Request TURN-SCGC-014 regarding the response to TURN-SCGC-02 and TURN-SCGC-03 QUESTION 14.1: 14.1. Please send a more readable version of the following figures: Figure 1, Figure 3, and Figure
More informationOTTAWA COUNTY FLOODPLAIN DEVELOPMENT PERMIT APPLICATION
OTTAWA COUNTY FLOODPLAIN DEVELOPMENT PERMIT APPLICATION TO COMPLY WITH FLOODPLAIN MANAGEMENT REGULATIONS AND TO MINIMIZE POTENTIAL FLOOD DAMAGE, IF YOU ARE BUILDING WITHIN AN IDENTIFIED FLOOD HAZARD AREA,
More informationWe re Hard at Work. Investor Relations Presentation. DA Davidson & Co. 12 th Annual E&C Conference September 2013 TUBULAR PRODUCT TS.
www.lbfoster.com RAIL PRODU UCTS TUBULAR PRODUCTS Investor Relations Presentation DA Davidson & Co. 12 th Annual E&C Conference September 2013 We re Hard at Work CONSTRU UCTION PRODUCT TS www.lbfoster.com
More informationPG&E Corporation. Fourth Quarter Earnings Call February 16, 2012
PG&E Corporation Fourth Quarter Earnings Call February 16, 2012 This presentation is not complete without the accompanying statements made by management during the webcast conference call held on February
More informationBudgeted production = (expected sales) + (expected ending inventory) (expected beginning inventory)
The correct answer is: 86,000 units. Budgeted production is calculated as follows: Budgeted production = (expected sales) + (expected ending inventory) (expected beginning inventory) The expected ending
More informationProperty Owners Insurance Proposal Form
Property Owners Insurance Proposal Form This proposal form is NOT for use by Commercial Customers If you do not answer any questions honestly, accurately or withhold information we may refuse to pay your
More information7. OPERATING EXPENDITURE
7. OPERATING EXPENDITURE Box 7 1 Key messages operating expenditure JGN s opex program delivers critical activities to support the operation and maintenance of our assets, and the continued efficient administration
More informationGarfield County NHMP:
Garfield County NHMP: Introduction and Summary Hazard Identification and Risk Assessment DRAFT AUG2010 Risk assessments provide information about the geographic areas where the hazards may occur, the value
More informationCommercial Insurance Proposal Form
Commercial Insurance Proposal Form It is essential that you make fair presentation of the risk that should include a full and unrestricted disclosure including every material fact and circumstance (a material
More informationNetwork Output Measures Health & Risk Reporting Methodology & Framework
Network Output Measures Health & Risk Reporting Methodology & Framework A common methodology framework, adopted by all Gas Distribution Networks, for the assessment, forecasting and regulatory reporting
More informationDunkirk Gas Corporation. Dunkirk Natural Gas Pipeline Project. Exhibit 6. Economic Effects of Proposed Facility
Dunkirk Gas Corporation Exhibit 6 Economic Effects of Proposed Facility EXHIBIT 6: ECONOMIC EFFECTS OF PROPOSED FACILITY This Exhibit addresses the requirements of 16 NYCRR 86.7 regarding the direct and
More informationCitizens Fiscal Sustainability Task Force March 19, 2015
Page 1 FY 2015-16 Citizens Fiscal Sustainability Task Force March 19, 2015 Page 2 Meeting Agenda 1. Minutes of the Task Force Meeting held March 11, 2015 2. Continued discussion of City finances and fiscal
More informationDevelopments Towards a Unified Pipeline Risk Assessment Approach Essential Elements
Developments Towards a Unified Pipeline Risk Assessment Approach Essential Elements Why Standardize? A certain amount of standardization in any process can be beneficial to stakeholders. In the case of
More informationOverview of the Northern Gateway Pipelines Project March 2013
Overview of the Northern Gateway Pipelines Project March 2013 New Market Access Required to Earn Full Value Petroleum Landscape: Global Demand Growth Going Up but USA Demand Going Down USA Supply Going
More informationCNAM Risk Management for Utility Managers
CNAM 2013 Heather McGinnity PEng. Region of Peel Project Manager Roop Lutchman, PEng. GHD Leader, Business Consulting May 07 th, 2013 Agenda 1. Introduction 2. Risk Management Framework 3. Case Study (Lake
More informationPress Release December 15, 2016
ISRA VISION AG: 2015/2016 financial year Strong, double-digit growth for the full year: Revenues +15 %, EBT +15 % ISRA with high growth rates in the 2015 / 2016 financial year Revenues and EBT exceed forecast
More informationNew York City March 3, Morgan Stanley MLP/Diversified Natural Gas, Utilities & Clean Tech Conference
New York City March 3, 2016 Morgan Stanley MLP/Diversified Natural Gas, Utilities & Clean Tech Conference Forward-Looking Statements Statements contained in this presentation that include company expectations
More informationscheme code rf-1 Performance Award Scheme for Distribution Companies (Consideration year )
scheme code rf-1 Performance Award Scheme for Distribution Companies (Consideration year 2013-14) 1.0 Preamble This scheme has been formulated in which the awards are proposed to be given to the three
More informationUtilities - Water and Sewer Funds
Utilities - Water and Sewer Funds Summary of Expenditures by Fund: Water Funds: Actual Adopted Amended Adopted Amended Estimated Proposed Water Administration $ 158,511 $ 199,100 $ 199,100 $ 198,400 (0.4)
More informationFire Operations AUDIT OF. HIGHLIGHTS Highlights of City Auditor Report #0612, a report to the City Commission and City management.
April 25, 2006 Sam M. McCall, CPA, CGFM, CIA, CGAP City Auditor HIGHLIGHTS Highlights of City Auditor Report #0612, a report to the City Commission and City management. WHY THIS AUDIT WAS CONDUCTED Fire
More informationSTATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES
STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES In the Matter of the Petition of Public Service Electric and Gas Company for Approval of an Increase in Electric and Gas Rates and for Changes in the Tariffs
More informationROBIN PEGLER INVESTMENT ANALYST TEL & FAX (011) PO BOX GREENSIDE PSV HOLDINGS LTD (JSE Code PSV)
ROBIN PEGLER INVESTMENT ANALYST TEL & FAX (011) 646 5396 PO BOX 84566 GREENSIDE 2034 E-MAIL: rpegler@eject.co.za 7 February 2008 PSV HOLDINGS LTD (JSE Code PSV) RESULTS FOR THE SIX MONTHS ENDED 31 AUGUST
More informationBy Shayne C. Kavanagh and Jennifer Belknap Williamson
Risk-Aware Infrastructure Maintenance By Shayne C. Kavanagh and Jennifer Belknap Williamson This article is part of an ongoing series about financial sustainability, based on GFOA s new financial sustainability
More informationDRM : EnergyNorth Natural Gas, Inc. dlbla Liberty Utilities Comments on Proposed Changes to Puc 500 Rules for Gas Service
Liberty U ilities Sarah B. Knowlton Assistant General Counsel Phone: 603/328-2794 E-Mail: sarah.knowlton@libertyutilities.com Debra A. Rowland Executive Director New Hampshire Public Utilities Commission
More informationComprehensive Flood Mitigation for 12,000 Properties
Comprehensive Flood Mitigation for 12,000 Properties Lori Rafferty, PE, CFM, Louisville MSD & Louie Greenwell, GISP, CFM, T&M Associates Association of State Floodplain Managers 2014 State Conference June
More informationLOCAL MAJOR BRIDGE PROGRAM
LOCAL MAJOR BRIDGE PROGRAM The Local Major Bridge Program provides federal funds to counties and municipal corporations for bridge replacement or bridge major rehabilitation projects. A Local Major Bridge
More informationHomeComfort. Terms & Conditions
HomeComfort Terms & Conditions 4th December 2013 ScottishPower HomeComfort Terms & Conditions 1 DEFINITIONS Where the following words and phrases appear in these terms and conditions, they will have the
More information104 W. Avenue E * Midlothian, TX Phone: (972) Fax: (972) Hours: 8 A.M. to 5 P.M. (M-F)
104 W. Avenue E * Midlothian, TX 76065 Phone: (972) 775-7130 Fax: (972) 775-7160 Hours: 8 A.M. to 5 P.M. (M-F) Please visit our website (www.midlothian.tx.us/utilitybilling) for important water saving
More informationSTEEL PIPE NIPPLES WELDED
STEEL NIPPLES WELDED Price Sheet SPF.PNW-5.18 Effective: May 7, 2018 Cancels Price Sheet SPF.PNW-2.18 of February 5, 2018 FOR THE MOST CURRENT PRODUCT / PRICING INFORMATION ON ANVIL PRODUCTS, PLEASE VISIT
More informationSTEEL PIPE COUPLINGS
STEEL PIPE COUPLINGS Price Sheet PC-5.11 Effective: May 16, 2011 Cancels Price Sheet PC-2.11 of February 7, 2011 FOR THE MOST CURRENT PRODUCT/PRICING INFORMATION ON ANVIL PRODUCTS, PLEASE VISIT OUR WEBSITE
More informationApplying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA
Applying for a Kinder Morgan Canada Proximity Permit Design and Construction Guidelines CANADA A Guide to Applying for a Kinder Morgan Canada Proximity Permit Kinder Morgan Canada operates the Trans Mountain
More informationProperty Inspection Guidelines
Property Inspection Guidelines www.tridentinsurance.net Lines of Business: Property, General Liability, Worker s Compensation, Public Official Liability Risk Control Strategy/Key Issues: Provide a tool
More informationMunicipal Gas Utility of the City of Cedar Falls, Iowa Service Policy September 2016 Table of Contents
Municipal Gas Utility of the City of Cedar Falls, Iowa Service Policy September 2016 Table of Contents GENERAL... 2 CODES AND REGULATIONS... 2 IOWA UTILITIES BOARD REGULATION... 2 CHARACTER OF SUPPLY...
More informationCanadian Oil Sands. Energy and Economic Security. February 21, Cindy Schild, API Senior Manager Downstream Operations
Canadian Oil Sands Cindy Schild, API Senior Manager Downstream Operations February 21, 2012 Energy and Economic Security Overview Security of Supply Energy Security Economic Security Pipeline Transportation
More informationCH ENERGY GROUP, INC. & CENTRAL HUDSON GAS & ELECTRIC CORP. QUARTERLY FINANCIAL REPORT. for the period ended
CH ENERGY GROUP, INC. & CENTRAL HUDSON GAS & ELECTRIC CORP. QUARTERLY FINANCIAL REPORT for the period ended JUNE 30, 2015 FINANCIAL STATEMENTS QUARTER ENDED JUNE 30, 2015 TABLE OF CONTENTS CH Energy Group,
More informationEfficient Capital Replacement Planning The Economic Optimization Approach. March 26, 2018
Efficient Capital Replacement Planning The Economic Optimization Approach March 26, 2018 DO YOU HAVE AGING INFRASTRUCTURE? Dahuloe Break the old paradigms How Long does a Sewer Main Last? -Clay Pipe -Cast
More informationQueensland Gas Pipeline Basis of Preparation
Queensland Gas Pipeline Basis of Preparation Public 31 October 2018 OVERVIEW OVERVIEW The Australian Energy Regulator (AER) issued a non-scheme pipeline financial reporting guideline (the guideline) in
More informationPre-Earthquake, Emergency and Contingency Planning August 2015
RiskTopics Pre-Earthquake, Emergency and Contingency Planning August 2015 Regions that are regularly exposed to seismic events are well-known, e.g. Japan, New Zealand, Turkey, Western USA, Chile, etc.
More informationNew York City Transit
New York City Transit MTA New York City Transit 2008 Preliminary Budget July Financial Plan 2008 2011 MISSION STATEMENT The mission of MTA New York City Transit is to provide customers with safe, reliable
More informationHomeComfort. Terms & Conditions. ScottishPower Energy Retail Limited (company number SC190287), has a place of business
HomeComfort Terms & Conditions SCP2702 (RRD 9/11) ScottishPower Energy Retail Limited (company number SC190287), has a place of business at Cathcart Business Park, Spean Street, Cathcart, Glasgow G44 4BE.
More informationPeter Farrer welcomed everyone to the meeting and introduced key SW representatives.
Note of Bathgate Public Meeting 6.3.16 Peter Farrer welcomed everyone to the meeting and introduced key SW representatives. Mark McEwen ran through the actions arising from the previous meeting. It was
More information