Risk Based Inspection A Key Component to Generating Value from a Mechanical Integrity Program API Singapore 2012

Size: px
Start display at page:

Download "Risk Based Inspection A Key Component to Generating Value from a Mechanical Integrity Program API Singapore 2012"

Transcription

1 the global leader in asset performance management solutions Risk Based Inspection A Key Component to Generating Value from a Mechanical Integrity Program API Singapore 2012

2 Agenda Introduction Achieving Value with RBI Risk Based Mechanical Integrity Work Process Examples of Value Achieved 2

3 Operator s Obligation to Stakeholders Ensure Safe, Sustainable Operation Regulatory Compliance Safety Environmental Protection Maximize Profitability Optimize Equipment Reliability Improve Plant Availability 3

4 Property Damage Losses Exceeding $10MM 4

5 Property Damage Losses Exceeding $10MM 5

6 The Impact of Equipment Failures Equipment failures cost the US Process Industry over $4 Billion per year 2/3 of those costs are associated with failures of static equipment The average facility has a risk of $25 million per year due to failures of static equipment 2/3 of those costs are associated with piping failures 6

7 The Dilemma Under-managing an integrity program results in the high costs of unanticipated failures Over-inspecting assets results in excess cost with little if any improvement in confidence of equipment condition Getting it right will create significant, measurable value 7

8 Reality and Response Business Pressure Risk Based Asset Integrity Program Low tolerance for failures 8

9 Achieving Value In every plant where there is a managed, time based inspection program it will be possible to simultaneously reduce the risk and reduce the inspection costs by using a risk based approach. Value comes from: Reducing risk Reducing inspection costs Reducing maintenance costs Improving plant availability 9

10 Generating Value through Risk Reduction The intent of RBI is to focus inspection resources on critical equipment to prevent failures Preventing critical or catastrophic equipment failures is the highest value of an RBI Program When an RBI program predicts a high risk, inspection confirms the risk and steps are taken to reduce the risk, value has been created 10

11 Generating Value through Risk Reduction Probability can be measured in Events per Year Consequence can be measured in Dollars per Event Risk can be quantified in Dollars per Year 11

12 Value from Reducing Inspection Cost Inspections on lower risk items are candidates to reduce or eliminate Inspections that do not increase the confidence in the condition of the equipment are candidates to reduce or eliminate Inspections on higher risk items may have to be increased or added 12

13 Observations of Time Based Programs Optimum Inspection Extent 13

14 Value from Reducing Maintenance Cost Turnaround cost savings Reducing the number of pressure vessels to be opened for inspection during future turnarounds Extending the turnaround interval Shortening the turnaround Duration Reduce the cost of maintenance preparation, access, and cleaning prior to inspections Reduce the frequency of relief valve maintenance 14

15 Value from Increased Availability Shortening the turnaround Duration Reduced number of outages due to unanticipated failures 15

16 MECHANICAL INTEGRITY WORK PROCESS 16

17 Work Process Steps Define Mitigation Strategy Perform Risk Analysis Execute Strategy Identify Potential Degradation Mechanisms Evaluate and Communicate Results Core Analysis Collect or Update Asset Data Recommendation Management Asset Taxonomy Event History Asset Criticality 17

18 People Process People Process Risk Analyst Risk Analyst Calculate Risk Determine Production Loss Consequence Inspection Specialist Corrosion Specialist Risk Analyst Inspection Specialist Define Inspection Strategies Group and Select Equipment for Inspection Risk Analyst Risk Analyst Review and Validate Risk Results Define Acceptable Risk Inspection Specialist Corrosion Specialist Inspection Specialist Team Leader Develop Recommendations Develop Activity Work Packages Plan and Prioritize Shutdown Inspections People Process Corrosion Specialist Corrosion Specialist Corrosion Specialist Define Corrosion Loops Define Integrity Operating Windows Define Degradation Mechanisms People Inspection Specialist Team Leader Process Manage and Perform Inspections People Inspection Specialist Inspection Specialist Process Specialist Inspection Specialist Inspection Specialist Process Define Components Collect Design and Process Data Review Inspection /Repair History and Assign Inspection Confidence Field Verify Equipment People Inspection Specialist FFS consultant Work Process Item Evaluate Inspection Results Make Recommendations to resolve conditions that do not meet acceptance criteria 18

19 CASE STUDIES VALUE ACHIEVED 19

20 Example of Value Achieved The Client US Refinery 8 process units, 2,300 equipment items Client Needs Get all equipment into a manageable, compliant MI Program Convert from conventional API Code based approach to Risk Based approach Optimize the inspection activities required during an upcoming Turnaround 20

21 Example of Value Achieved The Results The 4 month study cost approximately $400,000 The return on investment yielded a payback in less than 12 months The investment yielded a value exceeding $2,500,000 in Turnaround cost savings The investment quickly delivered almost $7,000,000 in risk reduction savings Subsequent RBI studies at this and other refineries have produced over $160,000,000 in risk reduction along with expectations for ongoing savings from Turnaround plans while optimizing inspection costs 21

22 Example of Value Achieved 22

23 Case Study - Value Achieved The Client 38 year old Ethylene Plant with integrity program in place but 85% of availability losses over prior 5 years associated with Mechanical Integrity Goals Reduce High Potential Incidents by 90% Reduce Leak Repair Clamps by 90% Reduce NDE locations on piping by 50% Reduce RV shop tests by 40% 23

24 Measures of Costs Reduction Actual Inspection and Maintenance Cost Reductions ($1.2 million / yr) Reduced RV Maintenance Reduced Internal Inspections Optimum number of NDE Inspections All Project Goals Achieved 24

25 Case Study - Value Achieved Cumulative Risk over Time 2003 Risk - $ per Year 2007 Expected after 2008 TAR Asset Count 25

26 Case Study - Value Achieved The Client Chemical Manufacturer in US Pilot project for one Operating Unit Client Needs Get all equipment into a manageable, compliant MI program Convert from conventional API code based approach to Risk Based 26

27 Case Study - Value Achieved The Results Compliant Mechanical Integrity program for fixed equipment and piping, including all anticipated degradation mechanisms 15 year inspection plan developed with 75% reduction in inspection locations and longer inspection intervals Greater than $1,350,000 savings in inspection costs over the next 10 years Over $11,500,000 in total value achieved over the next 10 years 27

28 Case Study - Value Achieved RBI (Today's Dollars) Traditional (Today's Dollars) RBI Implementation Costs (Today's Dollars)

29 Questions? 29

Guide for the Extension of Boiler Internal Inspections

Guide for the Extension of Boiler Internal Inspections State of Tennessee Department of Labor and Workforce Development Division of Workplace Regulations and Compliance Boiler Unit Tennessee Board of Boiler Rules 220 French Landing Drive Nashville, Tennessee

More information

ANSI API RP-754 Quarterly Webinar

ANSI API RP-754 Quarterly Webinar ANSI API RP-754 Quarterly Webinar September 13, 2016 Process Safety Performance Indicators for the Refining and Petrochemical Industries 1 Purpose of RP 754 Quarterly Webinars To support broad adoption

More information

Controlling Risk Ranking Variability Using a Progressive Risk Registry

Controlling Risk Ranking Variability Using a Progressive Risk Registry Controlling Risk Ranking Variability Using a Progressive Risk Registry 32nd Annual National VPPPA Safety & Health Conference/Expo September 1, 2016 Agenda What is a Progressive Risk Registry? How does

More information

ASSET INTEGRITY INTELLIGENCE. ADVANCEMENTS IN CUI DETECTION AND OVERVIEW OF MsS GUIDED WAVE. ADAM GARDNER, NDE Specialist at PinnacleART

ASSET INTEGRITY INTELLIGENCE. ADVANCEMENTS IN CUI DETECTION AND OVERVIEW OF MsS GUIDED WAVE. ADAM GARDNER, NDE Specialist at PinnacleART ASSET INTEGRITY INTELLIGENCE ADVANCEMENTS IN CUI DETECTION AND OVERVIEW OF MsS GUIDED WAVE ADAM GARDNER, NDE Specialist at PinnacleART VOLUME 22, ISSUE 6 NOVEMBER DECEMBER 2016 ADVANCEMENTS IN CUI DETECTION

More information

WATER ASSET MANAGEMENT PLAN

WATER ASSET MANAGEMENT PLAN WATER ASSET MANAGEMENT PLAN Georgetown Charter Township Ottawa County, Michigan November 2017 Where we re going: System Goals INTRODUCTION About this Document This document is our Water Asset Management

More information

Scorecard Item No(s) Title: and API 510 & API 570, Deferrals Date: August 22, 2017

Scorecard Item No(s) Title: and API 510 & API 570, Deferrals Date: August 22, 2017 Ballot ID: Scorecard Item No(s) Title: [tbd] 570-096 and 570-097 API 510 & API 570, Deferrals Date: August 22, 2017 Purpose: Source: Revision: 5 Impact: Rationale: Proposal: Name: Company: Phillips 66

More information

Contents Capital and Debt

Contents Capital and Debt Contents Capital and Debt Capital Expenditures and the Construction Fund... 6-3 Routine Capital Spending... 6-3 Non-routine Capital Spending... 6-3 Impact of Capital Spending on Annual Budget... 6-4 Capital

More information

(Ord ) Chapter RISK MANAGEMENT Background and findings Purpose and goals. Page 1.

(Ord ) Chapter RISK MANAGEMENT Background and findings Purpose and goals. Page 1. Chapter 450-8 - RISK MANAGEMENT Sections: 450-8.002 - Background and findings. The board of supervisors of Contra Costa County finds as follows: (a) Recent incidents in Contra Costa County at industrial

More information

ORDINANCE NO N.S.

ORDINANCE NO N.S. ORDINANCE NO. 1-13 N.S. AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF RICHMOND AMENDING CHAPTER 6.43 OF THE RICHMOND MUNICIPAL CODE RELATING TO INDUSTRIAL SAFETY WHEREAS, on December 18, 2001, the City

More information

Risk Based Inspection for Boilers

Risk Based Inspection for Boilers การอบรมส มมนา เร อง Risk Based Inspection for Boilers 7 ม ถ นายน 2557 น าเสนอโดย สมาคมว ศวกรหม อไอน าแห งประเทศไทย ร วมก บ Lloyd s Register International (Thailand) Ltd. Risk Based Inspection for Boilers

More information

Why a Near-Miss is Never a Leading Indicator. or why we need to think in system outcomes. Ian Travers, Principal Consultant, Process Safety

Why a Near-Miss is Never a Leading Indicator. or why we need to think in system outcomes. Ian Travers, Principal Consultant, Process Safety Why a Near-Miss is Never a Leading Indicator or why we need to think in system outcomes Ian Travers, Principal Consultant, Process Safety Why Measure All systems [to control risks] deteriorate over time,

More information

Economic and Technical Evaluations for Engineering and Maintenance Projects. Germany, Munich, relexa hotel München.

Economic and Technical Evaluations for Engineering and Maintenance Projects. Germany, Munich, relexa hotel München. Training Course : Economic and Technical Evaluations for Engineering and Maintenance Projects Training Course For One Week In Germany, Munich, relexa hotel München Which Be Held As Under Details : Tel.

More information

(Ord. No N.S., I, ; Ord. No N.S., I, )

(Ord. No N.S., I, ; Ord. No N.S., I, ) Chapter 6.43 - INDUSTRIAL SAFETY Sections: 6.43.010 - Summary. This chapter imposes regulations which supplement the requirements of California Health and Safety Code, Article 2 (commencing with Section

More information

Since 1958, Banjo Nominees have provided expert industrial and mechanical businesses 24 hours a day, 7 days a week.

Since 1958, Banjo Nominees have provided expert industrial and mechanical businesses 24 hours a day, 7 days a week. Since 1958, Banjo Nominees have provided expert industrial and mechanical businesses 24 hours a day, 7 days a week. We specialise in the maintenance of plumbing systems ensuring that your business is compliant

More information

SIL and Functional Safety some lessons we still have to learn.

SIL and Functional Safety some lessons we still have to learn. SIL and Functional Safety some lessons we still have to learn. David Craig, Amec This paper reflects AMEC s recent experience in undertaking functional safety assessments (FSA) (audits against IEC 61511)

More information

Quiz Answer Key - The Inspector s Calc s

Quiz Answer Key - The Inspector s Calc s Quiz Answer Key - The Inspector s Calc s 1. Most math mistakes are the result of: b. the inspector s failure to write the formula. 2. When completing a calculation, always: c. add the appropriate units.

More information

Supersedes: 9/01/11 (Rev.5) Preparer: Owner: Approver: Team Member, North America Process Safety Center of Expertise

Supersedes: 9/01/11 (Rev.5) Preparer: Owner: Approver: Team Member, North America Process Safety Center of Expertise Procedure No.: BC032.019 Page: 1 of 12 Preparer: Owner: Approver: Team Member, North America Process Safety Center of Expertise Manager, North America Process Safety Center of Expertise Sr. Vice President,

More information

Imperial earns $196 million in the second quarter of 2018

Imperial earns $196 million in the second quarter of 2018 Q2 News Release Calgary, July 27, 2018 Imperial earns $196 million in the second quarter of 2018 Nearly $900 million of cash generated from operations; more than $1 billion returned to shareholders Renewed

More information

Paper Number:

Paper Number: Paper Number: 2015-03 Aim Corrosion Management: Perfect Key Performance Indicators Sankara Papavinasam, Ph.D., FNACE, FASTM CorrMagnet Consulting Inc. 6, Castlemore Street Ottawa, Ontario, Canada, K2G

More information

NARUC. Summer Committee Meetings. Committee On Gas

NARUC. Summer Committee Meetings. Committee On Gas NARUC Summer Committee Meetings Committee On Gas NARUC Summer Committee Meetings Committee On Gas PHMSA NUTS & BOLTS PART I PHMSA Serious Pipeline Incidents PHMSA Serious Transmission Incidents PHMSA Serious

More information

Developments Towards a Unified Pipeline Risk Assessment Approach Essential Elements

Developments Towards a Unified Pipeline Risk Assessment Approach Essential Elements Developments Towards a Unified Pipeline Risk Assessment Approach Essential Elements Why Standardize? A certain amount of standardization in any process can be beneficial to stakeholders. In the case of

More information

Development and Implementation of a High Energy Piping Program. Prepared by: Matthew C. Dowling

Development and Implementation of a High Energy Piping Program. Prepared by: Matthew C. Dowling Development and Implementation of a High Energy Piping Program Prepared by: Matthew C. Dowling Applus RTD Power Technical Services Provide Engineering consulting services to the Power and Pipe Line industries

More information

What is LOPA and Why Should I Care?

What is LOPA and Why Should I Care? What is LOPA and Why Should I Care? John M. Johnson Risk Management Professionals U.S. (877) 532-0806 www.rmpcorp.com John M. Johnson Risk Management Professionals Chemical Engineering B.S. University

More information

Safety of Machinery and Special Scheme of Inspection s Requirement towards Industry Competitiveness in Malaysia

Safety of Machinery and Special Scheme of Inspection s Requirement towards Industry Competitiveness in Malaysia Modern Applied Science; Vol. 10, No. 11; 2016 ISSN 1913-1844 E-ISSN 1913-1852 Published by Canadian Center of Science and Education Safety of Machinery and Special Scheme of Inspection s Requirement towards

More information

TransCanada s Risk Management System for Pipeline Integrity Management

TransCanada s Risk Management System for Pipeline Integrity Management TransCanada s Risk Management System for Pipeline Integrity Management Warren Peterson Louis Fenyvesi CORS March 19, 2009 Pipeline Risk & Integrity Management Enabler The PRIME project was started in 1998

More information

Pipeline Regulatory Issues

Pipeline Regulatory Issues Pipeline Regulatory Issues Pete Chace GPS Program Manager (614) 644-8983 Peter.chace@puc.state.oh.us Changes to the GPS Section Staff Expansion Hiring 2 new Gas Pipeline Safety Inspectors. Intent is that

More information

Summary of 2 nd Edition Changes

Summary of 2 nd Edition Changes API-754, Process Safety Performance Indicators for the Refining and Petrochemical Industries, Second Edition Summary of 2 nd Edition Changes Kelly Keim EMRE Global Technology Sponsor for Process Safety

More information

PIPELINE INVESTIGATION REPORT P07H0014 CRUDE OIL PIPELINE RUPTURE

PIPELINE INVESTIGATION REPORT P07H0014 CRUDE OIL PIPELINE RUPTURE PIPELINE INVESTIGATION REPORT P07H0014 CRUDE OIL PIPELINE RUPTURE ENBRIDGE PIPELINES INC. LINE 3, MILE POST 506.2217 NEAR GLENAVON, SASKATCHEWAN 15 APRIL 2007 The Transportation Safety Board of Canada

More information

How the industry uses incident data from multiple sources to improve safety

How the industry uses incident data from multiple sources to improve safety How the industry uses incident data from multiple sources to improve safety Tim Overton Group Head of Process Safety BP Sources of information Industry Benchmarking Metrics Published Learning reports (e.g.

More information

Managing And Mitigating Risk In PT Pertamina (Persero) to balance Aggressive Growth Strategies with Prudent Risk Management Frameworks

Managing And Mitigating Risk In PT Pertamina (Persero) to balance Aggressive Growth Strategies with Prudent Risk Management Frameworks Managing And Mitigating Risk In PT Pertamina (Persero) to balance Aggressive Growth Strategies with Prudent Risk Management Frameworks Jakarta, 26th February 2013 AGENDA Vision and Mission Where are the

More information

Advances in Layer of Protection Analysis. Wayne Chastain, P.E. Eastman Chemical Company

Advances in Layer of Protection Analysis. Wayne Chastain, P.E. Eastman Chemical Company Advances in Layer of Protection Analysis Wayne Chastain, P.E. Eastman Chemical Company Agenda Overview of Layer of Protection Analysis Guidelines for Initiating Events and Independent Protection Layers

More information

BENCHMARK ANALYSIS ON- LAND PIPELINE SAFETY SYSTEMS

BENCHMARK ANALYSIS ON- LAND PIPELINE SAFETY SYSTEMS BENCHMARK ANALYSIS ON- LAND PIPELINE SAFETY SYSTEMS Elise DeCola, Nuka Research and Planning Group, LLC Interspill 2015 Abstract Onshore pipelines provide a critical transportation mode for liquid petroleum

More information

PROPERTY RISK ENGINEERING IN THE CHEMICAL SECTOR. August 2016

PROPERTY RISK ENGINEERING IN THE CHEMICAL SECTOR. August 2016 PROPERTY RISK ENGINEERING IN THE CHEMICAL SECTOR August 2016 PROPERTY RISK ENGINEERING IN THE CHEMICAL SECTOR When chemical sector professionals in Europe think of chemical site safety, they normally think

More information

Rémi Bourgault Clerk of the Standing Committee on Natural Resources House of Commons 131 Queen Street, Room 6-32 Ottawa, Ontario, K1A 0A6

Rémi Bourgault Clerk of the Standing Committee on Natural Resources House of Commons 131 Queen Street, Room 6-32 Ottawa, Ontario, K1A 0A6 Rémi Bourgault Clerk of the Standing Committee on Natural Resources House of Commons 131 Queen Street, Room 6-32 Ottawa, Ontario, K1A 0A6 25 March 2015 Dear Mr. Bourgault, The Canadian Energy Pipeline

More information

Practical Water Utility Asset Management Plans

Practical Water Utility Asset Management Plans Kevin Campanella, Utility Planning Leader, Burgess & Niple September, 2016 Practical Water Utility Asset Management Plans Inconsistency Treatment plants One tracked pencils, another didn t track small

More information

Acquisition of Stronghold

Acquisition of Stronghold Acquisition of Stronghold Investor Conference Call Presentation July 21, 2017 Forward Looking Statement Disclaimer This presentation (and oral statements regarding the subject matter of this presentation)

More information

Crawford & Company. Total Property Solution

Crawford & Company. Total Property Solution Crawford & Company Total Property Solution Crawford & Company A Total Property Solution Crawford is the world s largest provider of claims management solutions to the risk management and insurance industry

More information

DRM : EnergyNorth Natural Gas, Inc. dlbla Liberty Utilities Comments on Proposed Changes to Puc 500 Rules for Gas Service

DRM : EnergyNorth Natural Gas, Inc. dlbla Liberty Utilities Comments on Proposed Changes to Puc 500 Rules for Gas Service Liberty U ilities Sarah B. Knowlton Assistant General Counsel Phone: 603/328-2794 E-Mail: sarah.knowlton@libertyutilities.com Debra A. Rowland Executive Director New Hampshire Public Utilities Commission

More information

RISK MANAGEMENT POLICY

RISK MANAGEMENT POLICY RISK MANAGEMENT POLICY Page 1 of 5 1. PREFACE: In accordance with Section 134(3)(n) of the Companies Act, 2013, a Company is required to include a statement indicating development and implementation of

More information

Valley Creek Trunk Sewer (VCTS) Evaluation Status. Tredyffrin Township Board of Supervisors Meeting

Valley Creek Trunk Sewer (VCTS) Evaluation Status. Tredyffrin Township Board of Supervisors Meeting Valley Creek Trunk Sewer (VCTS) Evaluation Status Tredyffrin Township Board of Supervisors Meeting June 16, 2014 Copyright 2011 by CH2M HILL, Inc. Company Confidential 2 2 Aerial View of VCTS Traverses

More information

Ahsan Jamal. Case Study IDENTIFYING AND MANAGING KEY RISKS IN CONSTRUCTION PROJECTS

Ahsan Jamal. Case Study IDENTIFYING AND MANAGING KEY RISKS IN CONSTRUCTION PROJECTS Ahsan Jamal Case Study IDENTIFYING AND MANAGING KEY RISKS IN CONSTRUCTION PROJECTS Introduction For the last couple of years, we have seen enormous growth in the construction industry of Pakistan due to

More information

risk management and assessment for business Risk Reduction Practical Solutions Egyptian Petroleum Ministry, Cairo, Egypt 14 th October 2014

risk management and assessment for business Risk Reduction Practical Solutions Egyptian Petroleum Ministry, Cairo, Egypt 14 th October 2014 Risktec Solutions risk management and assessment for business Risk Reduction Practical Solutions Egyptian Petroleum Ministry, Cairo, Egypt 14 th October 2014 Gareth Book, Director, Risktec Solutions Risk

More information

THE NEED TO CONVERT MAINTENANCE AND ENGINEERING TO A FINANCIAL BASIS

THE NEED TO CONVERT MAINTENANCE AND ENGINEERING TO A FINANCIAL BASIS Using Financial/Decision Analysis Risk Optimization to Prioritize Maintenance Expenditures, Justify Maintenance Spending and Maximise the NPV Savings of The Maintenance Function David A. Mauney Structural

More information

FY 2017 Analysts and Investors Briefing. Pilipinas Shell Petroleum Corporation

FY 2017 Analysts and Investors Briefing. Pilipinas Shell Petroleum Corporation FY 2017 Analysts and Investors Briefing Disclaimer NOT FOR PUBLICATION OR DISTRIBUTION, DIRECTLY OR INDIRECTLY, IN OR INTO THE UNITED STATES References in this presentation to our Company or the Corporation

More information

6 th Floor G. Mennen Williams Building Environmental Quality 525 W. Ottawa Street Constitution Hall

6 th Floor G. Mennen Williams Building Environmental Quality 525 W. Ottawa Street Constitution Hall June 27, 2014 SUBMITTED VIA ELECTRONIC MAIL Hon. Bill Schuette Hon. Dan Wyant Attorney General Director Michigan Dept. of Attorney General Michigan Department of 6 th Floor G. Mennen Williams Building

More information

13 NCAC is amended with changes as published in 31:09 NCR as follows:

13 NCAC is amended with changes as published in 31:09 NCR as follows: 1 1 1 1 1 1 1 1 0 1 0 1 1 NCAC 1.01 is amended with changes as published in 1:0 NCR 0- as follows: 1 NCAC 1.01 DEFINITIONS The following definitions shall apply throughout the rules Rules in this Chapter

More information

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor September 11, :30 a.m.

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor September 11, :30 a.m. REVISED AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor September 11, 2013 9:30 a.m. Minutes Approval of Minutes: Regular Commission Meeting August 14,

More information

Stormwater System Asset Management Plan. June 2018

Stormwater System Asset Management Plan. June 2018 Stormwater System Asset Management Plan June 2018 City Council Citizens, stakeholders Strategic Priorities Level of Service Goals Performance Measures What actions are needed to meet Level of Service Goals

More information

Optimal Risk-Based Life-Cycle Cost Scheduling of Water & Sewer Main Replacements

Optimal Risk-Based Life-Cycle Cost Scheduling of Water & Sewer Main Replacements Optimal Risk-Based Life-Cycle Cost Scheduling of Water & Sewer Main Replacements The firefighter who was driving the firetruck when it fell into the Valley Village sinkhole caused by a broken water line

More information

Business Management Manual Number: POL Version: 2 Effective Date: 3/2/2018

Business Management Manual Number: POL Version: 2 Effective Date: 3/2/2018 Number: POL- 0005 Version: 2 Effective Date: 3/2/2018 1.0 QUALITY POLICY Sentry Equipment is dedicated to exceeding the expected requirements of all interested parties. Through strategic planning, methodical

More information

Engineering maintenance of safety instrumented functions

Engineering maintenance of safety instrumented functions Engineering maintenance of safety instrumented functions Early involvement improves operations and maintenance through the safety life cycle Fast Forward The work required to design an adequate platform

More information

A. These rules and regulations are promulgated pursuant to the authority conferred by R.I. Gen. Laws

A. These rules and regulations are promulgated pursuant to the authority conferred by R.I. Gen. Laws 216-RICR-50-05-7 TITLE 216 DEPARTMENT OF HEALTH CHAPTER 50 ENVIRONMENTAL HEALTH SUBCHAPTER 05 - WATER QUALITY PART 7 Clean Water Infrastructure Plans 7.1 AUTHORITY A. These rules and regulations are promulgated

More information

ORA DATA REQUEST ORA-SCG-062-DAO SOCALGAS 2019 GRC A SOCALGAS RESPONSE DATE RECEIVED: DECEMBER 27, 2017 DATE RESPONDED: JANUARY 19, 2018

ORA DATA REQUEST ORA-SCG-062-DAO SOCALGAS 2019 GRC A SOCALGAS RESPONSE DATE RECEIVED: DECEMBER 27, 2017 DATE RESPONDED: JANUARY 19, 2018 Exhibit Reference: SCG-04 Testimony and Workpapers SCG Witness: G. Orozco-Mejia Subject: Gas Distribution Capital Expenditures, Regulator Stations Please provide the following: 1. Referring to Ex. SCG-04

More information

ASSET RISK MANAGEMENT Asset Health Framework

ASSET RISK MANAGEMENT Asset Health Framework ASSET RISK MANAGEMENT Asset Health Framework 15 C O P Y R I G H T 2013 T R A N S P O W E R N E W Z E A L A N D L I M I T E D. A L L R I G H T S R E S E R V E D Preface This document has been prepared to

More information

9. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. Each Participating TO shall enter into a Transmission Control Agreement with the

9. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. Each Participating TO shall enter into a Transmission Control Agreement with the First Revised Sheet No. 121 ORIGINAL VOLUME NO. I Replacing Original Sheet No. 121 9. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. 9.1 Nature of Relationship. Each Participating TO shall enter into

More information

Facts You Should Know About Your Water Service

Facts You Should Know About Your Water Service Facts You Should Know About Your Water Service The York Water Company That good York water. We re proud of our product. Of all the products available today, ours is one of the purest, safest, and most

More information

CHAPTER 67. SERVICE OUTAGES 67.1. General provisions. ANNEX A (a) Electric, gas, water and telephone utilities holding certificates of public convenience under 66 Pa.C.S. 1101 and 1102 (relating to organization

More information

Wholesale Service Standards Non-Household

Wholesale Service Standards Non-Household Wholesale Service Standards Non-Household 2017-18 WHOLESALE SERVICE GUARANTEE SCHEME 2017/18 1. COMMENCEMENT 1.1 This scheme comes into force on the 1 April 2017 and is South West Water Limited s guarantee

More information

Water Service Asset Management Plan

Water Service Asset Management Plan Water Service Asset Management Plan November 2016 Joel Shaw, P.Eng. 1435 Water Street Kelowna, BC V1Y 1J4 TEL (250) 469-8739 jshaw@kelowna.ca kelowna.ca Document Control Rev No Date Revision Details Author

More information

STEGE SANITARY DISTRICT. Calendar Year 2016 Performance Report

STEGE SANITARY DISTRICT. Calendar Year 2016 Performance Report STEGE SANITARY DISTRICT Calendar Year 216 Performance Report JANUARY 217 STEGE SANITARY DISTRICT Calendar Year 216 Performance Report The Stege Sanitary District Performance Report gives a good sense

More information

NATURAL GAS RATE INCREASE

NATURAL GAS RATE INCREASE NATURAL GAS RATE INCREASE 1 2 WHAT WE DO? Natural Gas Utility Natural Gas Operations 3 4 Operation and Maintenance (O&M) Leak Survey Cathodic Protection Measurement/Regulators Meter Station Maintenance

More information

Straits of Mackinac and Line 5 Pipeline

Straits of Mackinac and Line 5 Pipeline Straits of Mackinac and Line 5 Pipeline Stakeholder Briefing Corporate Enbridge Agenda Meeting Administration Safety Moment Public Affairs Risk Management Integrity Marine Pollution Control T&T Marine

More information

Client Risk Solutions Going beyond insurance. Risk solutions for Energy. Oil, Gas and Petrochemical. Start

Client Risk Solutions Going beyond insurance. Risk solutions for Energy. Oil, Gas and Petrochemical. Start Client Risk Solutions Going beyond insurance Risk solutions for Energy Oil, Gas and Petrochemical Start Partnering to Reduce Risk AIG s Client Risk Solutions (CRS) partners with organizations to build

More information

Charbon Public Notification Procedure

Charbon Public Notification Procedure Page 1 of 7 PURPOSE This procedure focuses on the notification process to external stakeholders, in the event of a pollution as a result of operations at Charbon. External stakeholders include neighbouring

More information

Specification Design Life Requirements and Implications Relative to Boilers

Specification Design Life Requirements and Implications Relative to Boilers Specification Design Life Requirements and Implications Relative to Boilers Summary This paper discusses and addresses the following: Background regarding usage of specification design life requirements;

More information

A Review of an Exposure Assessment Strategy. Applied to Dockworkers in the Petroleum Industry

A Review of an Exposure Assessment Strategy. Applied to Dockworkers in the Petroleum Industry A Review of an Exposure Assessment Strategy Applied to Dockworkers in the Petroleum Industry Ted Grigorieff Project Report submitted to the Graduate College of Engineering and Mineral Resources at West

More information

Risk-oriented approach to design of the industrial safety system: problems, solutions

Risk-oriented approach to design of the industrial safety system: problems, solutions Risk-oriented approach to design of the industrial safety system: problems, solutions Kireeva Elena Vadimovna 1 and Kireev Maxim Sergeevich 2 1 Plekhanov Russian University of Economics, Department of

More information

Updated Financial Analysis Final Draft

Updated Financial Analysis Final Draft Solar Market Pathways: San Francisco Solar and Storage for Resilience Project December 2017 Final Draft Important Notice This report was prepared by Arup North America Ltd. ( Arup ) in its capacity as

More information

COLORADO DEPARTMENT OF LABOR AND EMPLOYMENT DIVISION OF OIL AND PUBLIC SAFETY BOILER AND PRESSURE VESSEL REGULATIONS

COLORADO DEPARTMENT OF LABOR AND EMPLOYMENT DIVISION OF OIL AND PUBLIC SAFETY BOILER AND PRESSURE VESSEL REGULATIONS COLORADO DEPARTMENT OF LABOR AND EMPLOYMENT DIVISION OF OIL AND PUBLIC SAFETY BOILER AND PRESSURE VESSEL REGULATIONS 7 C.C.R. 1101-5 Effective: July 1, 2017 ARTICLE 1 GENERAL PROVISIONS... 3 ARTICLE 2

More information

Material and Service Guarantees and Liquidated Damages

Material and Service Guarantees and Liquidated Damages Request for Tender, Volume I: Conditions of Contract, Annex LTSA-4: Material & Service Guarantees & LDs 1/7 Annex LTSA-4 Material and Service Guarantees and Liquidated Damages 1 General This Annex sets

More information

Managing Interest Rate Risk (I): GAP and Earnings Sensitivity

Managing Interest Rate Risk (I): GAP and Earnings Sensitivity Managing Interest Rate Risk (I): GAP and Earnings Sensitivity Interest Rate Risk Interest Rate Risk The potential loss from unexpected changes in interest rates which can significantly alter a bank s profitability

More information

Creating a Culture of Continuous Improvement

Creating a Culture of Continuous Improvement Creating a Culture of Continuous Improvement A L I G N I N G P E O P L E TO A S T R O N G S A F E T Y C U LT U R E W H I L E P R OT E C T I N G P R O F I T S T H R O U G H T H E R E D U C T I O N O F L

More information

Organizations shall be accredited by TSSA to perform repairs without the acceptance of a TSSA Inspector pursuant to the provisions set forth below.

Organizations shall be accredited by TSSA to perform repairs without the acceptance of a TSSA Inspector pursuant to the provisions set forth below. BOILERS AND PRESSURE VESSELS SAFETY DIVISION December 1, 1999 Rev. 2 ACCREDITATION OF OWNER/USER SELF-INSPECTION REPAIR PROGRAM Administrative Requirements Organizations shall be accredited by TSSA to

More information

New-Generation, Life-Cycle Asset Management Tools

New-Generation, Life-Cycle Asset Management Tools New-Generation, Life-Cycle Asset Management Tools Dr.-Ing. Robert Stein Executive Partner: Prof. Dr.-Ing. Stein & Partner GmbH and S & P Consult GmbH Company Background 1 Prof. Dr.-Ing. Stein & Partner

More information

The amendments to these regulations are created pursuant to , and (1)(a) of the Colorado Revised Statutes (CRS).

The amendments to these regulations are created pursuant to , and (1)(a) of the Colorado Revised Statutes (CRS). DEPARTMENT OF LABOR AND EMPLOYMENT BOILER AND PRESSURE VESSEL REGULATIONS 7 CCR 1101-5 [Editor s Notes follow the text of the rules at the end of this CCR Document.] ARTICLE 1 Section 1-1 GENERAL PROVISIONS

More information

Stochastic SIL Verification for Complex Safety Instrumented Systems

Stochastic SIL Verification for Complex Safety Instrumented Systems Stochastic SIL Verification for Complex Safety Instrumented Systems Sara Shahidi and Dr. Mehran Pourzand, Monaco Engineering Solutions Limited To ensure a Safety Instrumented System (SIS) is capable of

More information

Reducing Project Lifecycle Cost with exsilentia

Reducing Project Lifecycle Cost with exsilentia Reducing Project Lifecycle Cost with exsilentia Kate Hildenbrandt Iwan van Beurden exida Sellersville PA, 18960, USA khildenbrandt@exida.com January 2017 1 Abstract The international functional safety

More information

Your Finance Department (FY 2015 Proposed Budget pages 73-81)

Your Finance Department (FY 2015 Proposed Budget pages 73-81) Your Finance Department (FY 2015 Proposed Budget pages 73-81) 1 Your Finance Department The Department has the same proportion of budget allocation as staffing (4%) 2 FY 2015 Addition: Risk Analyst for

More information

Successfully Managing Property Losses

Successfully Managing Property Losses Successfully Managing Property Losses Deductibles First $25,000 is the College s or Dept. s obligation $25,001 to $250,000 is the University s obligation $250,001 to $1,000,000,000 is actual insurance

More information

Facility Management Triage

Facility Management Triage 5 November, 2010 Facility Management Triage A Risk-Based Approach for Identifying & Prioritizing Maintenance & Repair projects Albert Antelman, Senior Fellow Institute for Responsible Infrastructure Stewardship

More information

112(r)(1 )GDC Inspection Checklist

112(r)(1 )GDC Inspection Checklist UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION III 1650 Arch Street Philadelphia, Pennsylvania 19103-2029 SUBPART A - GENERAL INFORMATION (Y=Yes, N=No, P=Partial, A= Not Applicable) 112(r)(1 )GDC

More information

KPI = Key Performance Indicator

KPI = Key Performance Indicator KPI Familiarisation KPI = Key Performance Indicator Objectives Improve personnel s understanding of KPIs and what they indicate. + = Improve personnel s awareness of maintenance performance. What is a

More information

European Technology Development Ltd

European Technology Development Ltd European Technology Development Ltd BOILER TUBE FAILURE PREVENTION AND MANAGEMENT Acronym: BTF Guidelines ETD Report No: 1180-tp-175 Lead Authors: F Akther, C A Smith Report Checked by: Dr D G Robertson

More information

COLLECTION SYSTEM OPERATING COST REDUCTION

COLLECTION SYSTEM OPERATING COST REDUCTION COLLECTION SYSTEM OPERATING COST REDUCTION Utilize the attached spreadsheet to organize operational data into a financial evaluation. The results will provide the basis for shifting money from reoccurring

More information

Conference Paper A New Cost Management Policy for Your Organization: An Integrated Approach Woomi Chase Ken Odom Tom Dauber

Conference Paper A New Cost Management Policy for Your Organization: An Integrated Approach Woomi Chase Ken Odom Tom Dauber Conference Paper A New Cost Management Policy for Your Organization: An Integrated Approach Woomi Chase Ken Odom Tom Dauber Denver, CO June 2014 1 Table Of Contents Introduction Program/Project Structure

More information

Earnings Conference Call Third Quarter 2018 November 8, 2018

Earnings Conference Call Third Quarter 2018 November 8, 2018 Earnings Conference Call Third Quarter 2018 November 8, 2018 02 Safe Harbor Some of the matters discussed in this news release may contain forward-looking statements that are subject to certain risks,

More information

2016 Statewide Retrocommissioning Policy & Procedures Manual

2016 Statewide Retrocommissioning Policy & Procedures Manual 2016 Statewide Retrocommissioning Policy & Procedures Manual Version 1.0 Effective Date: July 19, 2016 Utility Administrators: Pacific Gas and Electric San Diego Gas & Electric Southern California Edison

More information

Board of Education Work Session Division of Supporting Services

Board of Education Work Session Division of Supporting Services Board of Education Work Session Division of Supporting Services Lawrence W. Fryer, Jr. February 2, 2009 PRINCE GEORGE S COUNTY PUBLIC SCHOOLS www.pgcps.org Prince George s County Board of Education Verjeana

More information

Strategic Business Plan Department of Water Resources. Gwinnett County Department of Water Resources

Strategic Business Plan Department of Water Resources. Gwinnett County Department of Water Resources g w i n n e t t c o u n t y Strategic Business Plan Department of Water Resources Gwinnett County Department of Water Resources A Message from the Director The Department of Water Resources Strategic Business

More information

PRIORITY RESPONSE PROGRAM

PRIORITY RESPONSE PROGRAM PRIORITY RESPONSE PROGRAM An unexpected fire. A sudden earthquake. A devastating hurricane. Or maybe just a busted pipe. Disaster can strike anytime, anywhere. What will you do? The answer is simple. STAY

More information

Special Council Meeting to be held at Council Chambers, City Hall 171 Main Street, Penticton, B.C. Tuesday, July 24, 2018 at 4:30 p.m.

Special Council Meeting to be held at Council Chambers, City Hall 171 Main Street, Penticton, B.C. Tuesday, July 24, 2018 at 4:30 p.m. Agenda Special Council Meeting to be held at Council Chambers, City Hall 171 Main Street, Penticton, B.C. Tuesday, July 24, 2018 at 4:30 p.m. 1. Call Special Council Meeting to Order 2. Adoption of Agenda

More information

Appendix ENERGY PARTNERS, L.P.

Appendix ENERGY PARTNERS, L.P. Appendix Investor Relations Contacts Institutional Investors / Sell-side Analysts David Kinder Peter Staples VP, Corporate Development & Treasurer Treasury & Investor Relations Manager Phone (713) 369-9469

More information

POLICY ON LEAKS UP TO OWNER AND REPLACEMENT OF LEAD WATER SERVICE PIPES I. POLICY STATEMENT 1 II. RESPONSIBILITIES 1

POLICY ON LEAKS UP TO OWNER AND REPLACEMENT OF LEAD WATER SERVICE PIPES I. POLICY STATEMENT 1 II. RESPONSIBILITIES 1 POLICY ON LEAKS UP TO OWNER AND REPLACEMENT OF LEAD WATER SERVICE PIPES TABLE OF CONTENTS I. POLICY STATEMENT 1 II. RESPONSIBILITIES 1 A. Operations 1 B. Contractor Services 1 C. Account Services 1 D.

More information

PIPELINE RISK ASSESSMENT

PIPELINE RISK ASSESSMENT PIPELINE RISK ASSESSMENT The Essential Elements (First published in Pipeline & Gas Journal May, 2012) An initiative through collaboration of DNV and W. Kent Muhlbauer info usa@dnv.com www.dnvusa.com 614.761.1214

More information

THE HYBRID PERFORMANCE BASED PAVEMENT MANAGEMENT STRATEGY

THE HYBRID PERFORMANCE BASED PAVEMENT MANAGEMENT STRATEGY THE HYBRID PERFORMANCE BASED PAVEMENT MANAGEMENT STRATEGY Travis Gilbertson, Opus International Consultants Ltd, Christchurch, NZ ABSTRACT Hybrid performance based road management and maintenance contracts

More information

AMP2016. i t r i g e s t. c o w w w. p u b l i c s e c t o r d i g e s t. c o m. The 2016 Asset Management Plan for the Township of Hamilton

AMP2016. i t r i g e s t. c o w w w. p u b l i c s e c t o r d i g e s t. c o m. The 2016 Asset Management Plan for the Township of Hamilton AMP2016 i t r i g e s t. c o w w w. p u b l i c s e c t o r d i g e s t. c o m The 2016 Asset Management Plan for the Township of Hamilton SUBMITTED BY THE PUBLIC SECTOR DIGEST INC. (PSD) WWW.PUBLICSECTORDIGEST.COM

More information

Pillar III Disclosures

Pillar III Disclosures Pillar III Disclosures As on 31 December 216 1. 1.1. 1.2. 1.3. 2. 2.1. 2.2. 3. 3.1. 3.2. 3.3. 4. 4.1. 4.2. 4.2.1. 4.3. 4.4. 4.4.1. 4.4.2. 4.5. 5. 5.1. 5.2. 5.3. 5.4. 5.5. 5.6. 5.7. 5.8. 6. 6.1. 6.2. 7.

More information

Introduction. The Assessment consists of: A checklist of best, good and leading practices A rating system to rank your company s current practices.

Introduction. The Assessment consists of: A checklist of best, good and leading practices A rating system to rank your company s current practices. ESG / CSR / Sustainability Governance and Management Assessment By Coro Strandberg President, Strandberg Consulting www.corostrandberg.com September 2017 Introduction This ESG / CSR / Sustainability Governance

More information

Introduction to Process Safety & Risk Assessment

Introduction to Process Safety & Risk Assessment Introduction to Process Safety & Risk Assessment Protection Layers University of West Indies October 4, 2013 Seminar Contents Overview of Trinidad & Tobago Process Industry Basic Concepts and Process Safety

More information

Labor Chapter ALABAMA DEPARTMENT OF LABOR ADMINISTRATIVE CODE CHAPTER GENERAL PROVISIONS TABLE OF CONTENTS

Labor Chapter ALABAMA DEPARTMENT OF LABOR ADMINISTRATIVE CODE CHAPTER GENERAL PROVISIONS TABLE OF CONTENTS Labor Chapter 480-7-1 ALABAMA DEPARTMENT OF LABOR ADMINISTRATIVE CODE CHAPTER 480-7-1 GENERAL PROVISIONS TABLE OF CONTENTS 480-7-1-.01 Definition Of Terms 480-7-1-.02 Adoption Of Codes And Standards Ed.

More information