1 Challenges Related to Implementation of Investments for Tariff Purposes Case Study: Northern Utilities Cast Iron Replacement Program, Rate Recovery and Tracking Mechanism (CIRP, TIRA and EVM) CHRISTINE COOK CAROL MACLENNAN MAINE PUBLIC UTILITIES COMMISSION SEPTEMBER 9, 2014

2 Cast Iron Replacement Program (CIRP) Background Cast iron pipe in the Northern Utilities system Leak statistics and Commission safety concerns Monitoring program prior to CIRP Replacement program prior to CIRP Opportunistic Estimated time to completely remove all cast iron and unprotected steel from service: xx years Commission ordered 14-year replacement program beginning in

3 Cast Iron Replacement Program Commission Concerns Safety concerns associated with aging infrastructure Prior experience and events Leak statistics and incidents Cost of replacement program Methods of controlling costs Rate recovery, including the need to develop a cost recovery mechanism that could work outside of rate case Ensuring value received for costs incurred 3

4 Cast Iron Replacement Program Company Concerns Rate recovery and regulatory lag, ability to recover costs as they were incurred Avoidance of frequent rate cases Financial integrity of the company and continued access to capital markets, both equity and debt Continued compliance with existing and anticipated borrowed debt covenants Strain on other resources 4

5 Cast Iron Replacement Program Public Advocate Concerns Fundamental need to accelerate the pace of replacement of cast iron and bare steel pipe Cost-Benefit analysis of proposed program Ratepayer impact Near-term Long-term Rate impact of cast iron program in addition to rate impact expected from base rate case Northern Utilities had not had a rate case for 28 years 5

6 Cast Iron Replacement Program Scope 75 miles of cast iron, bare steel and wrought iron pipe replacement 38 miles of system conversion from low to intermediate pressure 3 miles of required system improvements 116 critical valve and 80 system valve installations low pressure drip removals 107 service renewals and tie-overs 10,345 meter relocations 6,000 meter replacements 13 regulator station retirement or conversion 6

7 Cast Iron Replacement Program Scope Replacement of aged mains combined with upgrade of existing low pressure system in Portland that comprised 57% of Northern s system Cost estimates provided in 2009 dollars, total estimated cost of $64 million 14-year program ensures Northern can maintain appropriate leverage ratio and fund expenditures for CIRP and other system capital investments Upgrade to intermediate pressure provides opportunity for 2% per year growth 7

8 Base Rate Case and CIRP Cost Recovery Consistent with statutory requirements, Commission determined that Northern would recover prudently incurred costs of the program through a mechanism developed in a base rate case Incorporated guiding principles for development of the recovery mechanism, including: Northern would be permitted to recover costs through an accelerated recovery mechanism The mechanism would include an incentive for Northern to control costs and meet construction benchmarks The mechanism would include a cap on the magnitude of the rate adjustment 8

9 Targeted Infrastructure Replacement Adjustment TIRA Approved in connection with 2013 Northern rate case Provides for annual adjustments to distribution base rates to recover costs associated with CIRP Approved for four-year term ( ) Contains a Rate Impact Cap such that distribution rate increase may not exceed 4% annually. Any excess is carried forward Requires that EVM performance indices remain above 100% or TIRA rate adjustment is suspended Contains Earnings Sharing Mechanism to return any excess earnings to customers 9

10 TIRA Revenue Requirement Annual TIRA adjustment calculated as a percentage change to current base rates based on the TIRA Revenue Requirement Subject to 4% Rate Impact Cap TIRA Revenue Requirement is the sum of: Annual depreciation expense Estimated property tax expense An operation and maintenance expense offset Allowed return for eligible CIRP facilities at a pre-tax rate of return of 11% 10

11 Earned Value Management (EVM) Program Tracking Earned value management is a project management technique for measuring project performance and progress. It combines measurements of scope, schedule and costs 11

12 EVM EVM requires the development of a scope of work for a project, a schedule for the work and a budget Scope of work is broken down into definable elements or a category of work Each category of work has a budget estimate which enables it to be defined in terms of planned value Once project work is underway, the earned value is determined by multiplying the number of units completed by the budgeted unit value of work The earned value (EV) can then be compared: To planned value (PV) to see if the project is ahead or behind on schedule To actual cost (AC) of the work completed to see if the project is above or below budget 12

13 EVM Cost and Schedule Variances 13

14 EVM Performance Metrics 14

15 CIRP Performance After three years of performance ( ), the CIRP remains ahead of schedule and under budget The EVM statistics for the CIRP through

16 16

17 17

18 Questions? Carol MacLennan Christine Cook Maine Public Utilities Commission 18

Northern Illinois Gas Company

Northern Illinois Gas Company d/b/a Nicor Gas Company 1st Revised Sheet No. 85 Applicable to All Rates, Except Rates 17, 19 and 21 Section A Applicability. The Qualifying Infrastructure Plant Surcharge shall be determined in accordance

More information

Rider QIP. Qualifying Infrastructure Plant. Applicable to Service Classification Nos. 1, 2, 4 and 8 and Riders FST, SST, and P

Rider QIP. Qualifying Infrastructure Plant. Applicable to Service Classification Nos. 1, 2, 4 and 8 and Riders FST, SST, and P Fifteenth Revised Sheet No. 130 (Canceling Fourteenth Revised Sheet No. 130) Page 1 of 11 The Surcharge shall be determined in accordance with the provisions of this rider. The Surcharge Percentage shall

More information

Lesson 7 The Project Budget

Lesson 7 The Project Budget MBA, Msc, Bsc, PMP, CSM, PMI-ACP Indike Manthilake MBA, Msc, Bsc, CSM, PMI-ACP indikem@unitedmotors.lk.com Lesson 7 The Project Budget Agenda Estimate Costs and income Creating a Preliminary Budget Budget

More information

INVESTOR UPDATE. September 2018

INVESTOR UPDATE. September 2018 INVESTOR UPDATE September 2018 FORWARD-LOOKING STATEMENTS Statements contained in this presentation that include company expectations or predictions should be considered forward-looking statements that

More information

Cost Management Mock Exam. Lab for PMP Exam Prep Course Part 2 #347 Instructor: Neal L. Rowland, PMP

Cost Management Mock Exam. Lab for PMP Exam Prep Course Part 2 #347 Instructor: Neal L. Rowland, PMP Cost Management Mock Exam Lab for PMP Exam Prep Course Part 2 #347 Instructor: Neal L. Rowland, PMP 10 Practice Questions Move at Your Own Pace Question 1 You are project manager for a $2.3M project that

More information

INVESTOR MEETINGS. NYC & Boston March 4-6, 2019

INVESTOR MEETINGS. NYC & Boston March 4-6, 2019 INVESTOR MEETINGS NYC & Boston March 4-6, 2019 FORWARD-LOOKING STATEMENTS Statements contained in this presentation that include company expectations or predictions should be considered forward-looking

More information

RATEMAKING S IMPACT ON INVESTMENT LEVELS

RATEMAKING S IMPACT ON INVESTMENT LEVELS RATEMAKING S IMPACT ON INVESTMENT LEVELS Chuck Cohen Lucretia Smith September 9, 2014 1 Statutory Requirement Commission required to provide utility with both amount sufficient to provide for depreciation

More information

SOCALGAS REBUTTAL TESTIMONY OF MARIA MARTINEZ (PIPELINE INTEGRITY FOR TRANSMISSION AND DISTRIBUTION) JUNE 18, 2018

SOCALGAS REBUTTAL TESTIMONY OF MARIA MARTINEZ (PIPELINE INTEGRITY FOR TRANSMISSION AND DISTRIBUTION) JUNE 18, 2018 Company: Southern California Gas Company (U904G) Proceeding: 2019 General Rate Case Application: A.17-10-007/-008 (cons.) Exhibit: SCG-214 SOCALGAS REBUTTAL TESTIMONY OF MARIA MARTINEZ (PIPELINE INTEGRITY

More information

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION IN RE: THE NARRAGANSETT ELECTRIC : COMPANY d/b/a NATIONAL GRID 2016 : GAS INFRASTRUCTURE, SAFETY, AND : DOCKET NO. 4540 RELIABILITY

More information

AMERICAN GAS ASSOCIATION FINANCIAL FORUM. Phoenix, Arizona May 20 22, 2018

AMERICAN GAS ASSOCIATION FINANCIAL FORUM. Phoenix, Arizona May 20 22, 2018 AMERICAN GAS ASSOCIATION FINANCIAL FORUM Phoenix, Arizona May 20 22, 2018 PIERCE NORTON President and Chief Executive Officer FORWARD-LOOKING STATEMENTS Statements contained in this presentation that include

More information

S T A T E O F M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * *

S T A T E O F M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * * S T A T E O F M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * * In the matter of the application of DTE Gas ) Company for authority to increase its ) Case No. Main Replacement Program

More information

Boston & New York City February 26-28, Investor Meetings

Boston & New York City February 26-28, Investor Meetings Boston & New York City February 26-28, 2018 Investor Meetings Forward-Looking Statements Statements contained in this presentation that include company expectations or predictions should be considered

More information

NiSource Reports Third Quarter 2018 Earnings

NiSource Reports Third Quarter 2018 Earnings November 1, 2018 FOR ADDITIONAL INFORMATION Media Ken Stammen Investors Randy Hulen Sara Macioch Corporate Media Relations Vice President, Investor Relations Manager, Investor Relations (614) 460-5544

More information

NEW HORIZONS ONLINE LIVE. Project Management Professional (PMP ) PMBOK Guide 6th Edition DAY 4

NEW HORIZONS ONLINE LIVE. Project Management Professional (PMP ) PMBOK Guide 6th Edition DAY 4 NEW HORIZONS ONLINE LIVE Project Management Professional (PMP ) PMBOK Guide 6th Edition DAY 4 2 3 4 5 6 Other PMP Topics Cost Ranges Rough Order of Magnitude (ROM) (often done in the initiating process

More information

ARKANSAS PUBLIC SERVICE COMMISSION

ARKANSAS PUBLIC SERVICE COMMISSION First Revised Sheet No. 4-2.1/6 Replacing: Original Sheet No. 4-2.1/6 2. MAIN REPLACEMENT PROGRAM RIDER (RIDER MRP) 2.1. The primary purpose of Rider MRP is to support the expedited replacement of cast-iron

More information

CONTROL COSTS Aastha Trehan, Ritika Grover, Prateek Puri Dronacharya College Of Engineering, Gurgaon

CONTROL COSTS Aastha Trehan, Ritika Grover, Prateek Puri Dronacharya College Of Engineering, Gurgaon CONTROL COSTS Aastha Trehan, Ritika Grover, Prateek Puri Dronacharya College Of Engineering, Gurgaon Abstract- Project Cost Management includes the processes involved in planning, estimating, budgeting,

More information

DISTRIBUTION SYSTEM IMPROVEMENT CHARGE (DSIC)

DISTRIBUTION SYSTEM IMPROVEMENT CHARGE (DSIC) ISSUED: _August 3, 2006 EFFECTIVE: December 5, 2006 UNITED WATER DELAWARE, INC. P.S.C. No. 6 - Water Original Sheet No. 11 1. General Description DISTRIBUTION SYSTEM IMPROVEMENT CHARGE (DSIC) Purpose:

More information

LOCAL DISTRIBUTION ADJUSTMENT CLAUSE

LOCAL DISTRIBUTION ADJUSTMENT CLAUSE Page 1 of 35 Section 1.0 PURPOSE... 1 2.0 APPLICABILITY... 2 3.0 ENERGY EFFICIENCY COSTS ALLOWABLE FOR LDAC... 3 4.0 ENVIRONMENTAL RESPONSE COSTS ALLOWABLE FOR LDAC... 5 5.0 SERVICE QUALITY PENALTY ALLOWABLE

More information

CS 413 Software Project Management LECTURE 9 COST MANAGEMENT FOR SOFTWARE PROJECT III

CS 413 Software Project Management LECTURE 9 COST MANAGEMENT FOR SOFTWARE PROJECT III LECTURE 9 COST MANAGEMENT FOR SOFTWARE PROJECT III Earned Value Management Earned value management (EVM) is a way of measuring your performance (and the performance of your project team) at any given date

More information

Pipeline Safety Seminar Distribution Pipe Segment Risk Assessment and Replacement Panel Discussion

Pipeline Safety Seminar Distribution Pipe Segment Risk Assessment and Replacement Panel Discussion Pipeline Safety Seminar Distribution Pipe Segment Risk Assessment and Replacement Panel Discussion Central Hudson Gas & Electric Karl Reer, Director, Gas Distribution Engineering Central Hudson Gas & Electric

More information

PROJECT MANAGEMENT BODY OF KNOWLEDGE

PROJECT MANAGEMENT BODY OF KNOWLEDGE A Guide to the PROJECT MANAGEMENT BODY OF KNOWLEDGE (PMBOK GUIDE ) Sixth edition Chapter 7 Project Cost Management PMBOK is a registered mark of the Project Management Institute, Inc Slide # 1 3FOLD Education

More information

Self-Assessment Questions for Module 07 Project Cost Management

Self-Assessment Questions for Module 07 Project Cost Management Self-Assessment Questions for Module 07 Project Cost Management Question 1: Which of the following regarding Analogous Estimating and Parametric Estimating is incorrect? A.) Parametric Estimating uses

More information

Bob Beard UGI Utilities. October 17,

Bob Beard UGI Utilities. October 17, Bob Beard UGI Utilities October 17, 2012 23 Agenda Keys to Success Service Territory Financial Performance Customer Growth Infrastructure Management Looking Forward October 17, 2012 24 Keys to Success

More information

Phoenix January 11-12, Evercore ISI Utility CEO Conference

Phoenix January 11-12, Evercore ISI Utility CEO Conference Phoenix January 11-12, 2018 Evercore ISI Utility CEO Conference Forward-Looking Statements Statements contained in this presentation that include company expectations or predictions should be considered

More information

Professional Development Seminar Series

Professional Development Seminar Series Professional Development Seminar Series Feb, 2019 2019. All rights reserved. online@3foldtraining.com. www.pmexamstudy.com. www.3foldtraining.com. PMP Exam Review Agenda Introduction to Definition Context

More information

Project Control. Ongoing effort to keep your project on track Prerequisite to good control is a good plan Four primary activities:

Project Control. Ongoing effort to keep your project on track Prerequisite to good control is a good plan Four primary activities: Project Control 1 Project Control Ongoing effort to keep your project on track Prerequisite to good control is a good plan Four primary activities: 1. Planning performance Software Development Plan, schedule,

More information

Earned Value Management Guide

Earned Value Management Guide 1 Earned Value Management Guide Earned Value Management (EVM) is a project management technique that objectively tracks physical accomplishment of work. More elaborately: EVM is used to track the progress

More information

PMP Exam Preparation Course. Madras Management Training W.L.L All Rights Reserved

PMP Exam Preparation Course. Madras Management Training W.L.L All Rights Reserved Project Cost Management 1 Project Cost Management Processes 1. Estimate Costs 2. Determine Budget 3. Control Costs In some projects, especially with smaller scope, cost estimation and cost budgeting are

More information

LIBERTY UTILITIES (NEW ENGLAND NATURAL GAS COMPANY) CORP. d/b/a LIBERTY UTILITIES. M.D.P.U. No. 1002L Cancels M.D.P.U. No. 1002K Page 1 of 39

LIBERTY UTILITIES (NEW ENGLAND NATURAL GAS COMPANY) CORP. d/b/a LIBERTY UTILITIES. M.D.P.U. No. 1002L Cancels M.D.P.U. No. 1002K Page 1 of 39 Cancels M.D.P.U. No. 1002K Page 1 of 39 Section 1.01: Purpose... 1 1.02: Applicability... 1 1.03: Local Distribution Adjustment Factor ( LDAF )... 2 1.04: General Definitions... 2 1.05: Energy Efficiency

More information

M A N I T O B A ) Order No. 92/05 ) THE PUBLIC UTILITIES BOARD ACT ) June 7, 2005

M A N I T O B A ) Order No. 92/05 ) THE PUBLIC UTILITIES BOARD ACT ) June 7, 2005 www.pub.gov.mb.ca M A N I T O B A ) Order No. 92/05 ) THE PUBLIC UTILITIES BOARD ACT ) June 7, 2005 BEFORE: Graham F. J. Lane, C.A., Chairman S. Proven, P.H.Ec., Member THE TOWN OF LAC DU BONNET WATER

More information

Water Distribution System Improvement Charges: A Review of Practices

Water Distribution System Improvement Charges: A Review of Practices Water Distribution System Improvement Charges: A Review of Practices Kathryn J. Kline, Senior Associate Researcher National Regulatory Research Institute NRRI Colloquium NARUC Annual Meeting Baltimore,

More information

PMP Exam Prep Coaching Program

PMP Exam Prep Coaching Program PMP Exam Prep Coaching Program Project Part 1 Presented by Vinai Prakash, PMP 1 Project Plan Estimate s Determine Budget 2 Vinai Prakash, PMCHAMP.COM 1 Process of monitoring the status of the project to

More information

Critical Path and Earned Value Management

Critical Path and Earned Value Management Critical Path and Earned Value Management Two elegantly simple metrics, both rich with meaning, have been part of project management since the very beginning of the profession: 1. Critical Path Method

More information

Earned Value Management An Overview March 2014

Earned Value Management An Overview March 2014 Earned Value Management An Overview March 2014 SAVE International Cascadia Chapter Introduction What is Earned Value? Why is Earned Value important? What is required? Earned Value Definitions & Process

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF THE APPLICATION ) OF NEW MEXICO GAS COMPANY, INC. ) FOR APPROVAL OF REVISIONS TO ITS ) RATES, RULES, AND CHARGES PURSUANT ) TO ADVICE

More information

Gas Distribution Asset Management Plan Update

Gas Distribution Asset Management Plan Update Gas Distribution Asset Management Plan Update Information Disclosure 2014 Date: 30 June 2014 Vector Gas Distribution Page 1 of 33 CONTENTS 1. Introduction... 3 2. Update to Network Development Planning...

More information

NISOURCE INVESTOR DAY MARCH 8, NiSource NYSE: NI nisource.com

NISOURCE INVESTOR DAY MARCH 8, NiSource NYSE: NI nisource.com NISOURCE INVESTOR DAY MARCH 8, 2017 Forward Looking Statements Forward-Looking Statements This presentation contains forward-looking statements within the meaning of federal securities laws. Investors

More information

EVMi 101: EARNED VALUE MANAGEMENT FUNDAMENTALS

EVMi 101: EARNED VALUE MANAGEMENT FUNDAMENTALS EVMI - BUILDING & EDUCATING PROJECT STAFF MEMBERS WHO EXECUTE AND DELIVER PROJECTS & PROGRAMS SUCCESSFULLY ACROSS ALL INDUSTRIES EVMi 101: EARNED VALUE MANAGEMENT FUNDAMENTALS COURSE HIGHLIGHTS EVMI 101:

More information

Irish Water Customer Information Note

Irish Water Customer Information Note Irish Water Customer Information Note Reference: CER/17009 Date Published: 20/01/2017 The CER, Irish Water s Economic Regulator The CER The Commission for Energy Regulation (CER) is Ireland s independent

More information

TABLE OF CONTENTS APPENDIX A APPENDIX B

TABLE OF CONTENTS APPENDIX A APPENDIX B TABLE OF CONTENTS I. EXECUTIVE SUMMARY... 3 II. PGW OVERVIEW... 11 III. BENCHMARKING PGW S CURRENT INFRASTRUCTURE... 15 Amount of Cast Iron and Unprotected Steel Pipe... 12 Potential for Pipeline Failure...

More information

Joint GDN. Report. December Contact Name. SGN Axis House. Newbridge EH28 8TG

Joint GDN. Report. December Contact Name. SGN Axis House. Newbridge EH28 8TG 1 Joint GDN Shrinkage and Leakage Model Review 2014/15 Consultation Report December 2014 Date of Publication: 23 December 2014 Contact Name and Details : David Simpson Network Support Manager SGN Axis

More information

NHPUC No. 1 Water Eighth Ninth Revised Page 16 Aquarion Water Company of New HampshireSuperseding Seventh Eighth Revised Page 16

NHPUC No. 1 Water Eighth Ninth Revised Page 16 Aquarion Water Company of New HampshireSuperseding Seventh Eighth Revised Page 16 NHPUC No. 1 Water Eighth Ninth Revised Page 16 Aquarion Water Company of New HampshireSuperseding Seventh Eighth Revised Page 16 WATER INFRASTRUCTURE AND CONSERVATION ADJUSTMENT In addition to the net

More information

Earned Value Management. Danielle Kellogg. Hodges University

Earned Value Management. Danielle Kellogg. Hodges University Earned Value Management 1 EARNED VALUE MANAGEMENT Earned Value Management Danielle Kellogg Hodges University Earned Value Management 2 Abstract Earned Value Management has been used with enterprise-level

More information

Earned Value Management - EVM

Earned Value Management - EVM Earned Value Management (EVM) technique used to track the Progress and Status of a Project & Forecast the likely future performance of the Project. Earned Value Management (EVM) technique integrates the

More information

WATER ASSET MANAGEMENT PLAN

WATER ASSET MANAGEMENT PLAN WATER ASSET MANAGEMENT PLAN Georgetown Charter Township Ottawa County, Michigan November 2017 Where we re going: System Goals INTRODUCTION About this Document This document is our Water Asset Management

More information

PMP. Preparation Training. Cost Management. Your key in Successful Project Management. Cost Management Processes. Chapter 7 6/7/2005

PMP. Preparation Training. Cost Management. Your key in Successful Project Management. Cost Management Processes. Chapter 7 6/7/2005 PMP Preparation Training Your key in Successful Project Management Akram Al-Najjar, PMP Cost Management Processes Chapter 7 Cost Management Slide 2 1 AGENDA What is Cost Management? Cost Management Processes

More information

Smart Bet? Illinois Courts and Smart Meters

Smart Bet? Illinois Courts and Smart Meters Smart Bet? Illinois Courts and Smart Meters Orijit Ghoshal Energy Law 2010 Illinois Courts and Smart Meters Presentation Overview 1. The Commission 2. The Program 3. The Study 4. The Court 5. The Future

More information

DIRECT TESTIMONY OF PAUL E. HAERING (CAPITAL PLAN)

DIRECT TESTIMONY OF PAUL E. HAERING (CAPITAL PLAN) BEFORE THE NEW YORK STATE PUBLIC SERVICE COMMISSION ----------------------------------------------------------------------------x Proceeding on Motion of the Commission as to the Rates, Charges, Rules

More information

CONSOLIDATED EDISON, INC.

CONSOLIDATED EDISON, INC. CONSOLIDATED EDISON, INC. American Gas Association Financial Forum May 21-23, 2017 Available Information On May 4, 2017, Consolidated Edison, Inc. issued a press release reporting its 1Q 2017 earnings

More information

Investor Overview November 2016

Investor Overview November 2016 Investor Overview November 2016 1 About This Presentation This presentation contains certain forward-looking statements that management believes to be reasonable as of today s date only. Actual results

More information

STATE OF MICHIGAN BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION

STATE OF MICHIGAN BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION STATE OF MICHIGAN BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION In the matter of the application of DTE GAS COMPANY for authority to increase its rates, amend its rate schedules and rules governing the

More information

INSE 6230 Total Quality Project Management

INSE 6230 Total Quality Project Management Lecture 5 Project Cost Management Project cost management introduction Estimating costs Budget Earned Value Management (EVM) EVM projections 2 IT projects have a poor track record for meeting budget goals

More information

Application of Earned Value Management (EVM) for Effective Project Control

Application of Earned Value Management (EVM) for Effective Project Control Application of Earned Value Management (EVM) for Effective Project Control Course No: B02-012 Credit: 2 PDH Boris Shvartsberg, Ph.D., P.E., P.M.P. Continuing Education and Development, Inc. 9 Greyridge

More information

QUALITY CONTROL PROCESS

QUALITY CONTROL PROCESS 1.0 SCOPE The Enterprise Project Management Office (EPMO) established overarching Quality Policy, Quality Objectives in the 0100-0100-005-QMS EPMO QUALITY MANUAL. This procedure defines specific EPMO Information

More information

IN THE COMMONWEALTH COURT OF PENNSYLVANIA

IN THE COMMONWEALTH COURT OF PENNSYLVANIA IN THE COMMONWEALTH COURT OF PENNSYLVANIA Tanya J. McCloskey, : Acting Consumer Advocate, : Petitioner : : v. : : Pennsylvania Public Utility : Commission, : No. 1012 C.D. 2014 Respondent : Argued: June

More information

STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY. Docket No DIRECT TESTIMONY OF AMOS F. BARNES and BRIAN K.

STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY. Docket No DIRECT TESTIMONY OF AMOS F. BARNES and BRIAN K. STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY Docket No. -0- DIRECT TESTIMONY OF AMOS F. BARNES and BRIAN K. HAWLEY Capital Program and Gas Operations ON BEHALF OF THE SOUTHERN CONNECTICUT

More information

PG&E Corporation. First Quarter Earnings Call. May 2, 2013.

PG&E Corporation. First Quarter Earnings Call. May 2, 2013. PG&E Corporation First Quarter Earnings Call May 2, 2013 This presentation is not complete without the accompanying statements made by management during the webcast conference call held on May 2, 2013.

More information

Baltimore Gas and Electric Company Gas Extensions

Baltimore Gas and Electric Company Gas Extensions Baltimore Gas and Electric Company Gas 15 8. Extensions 8.1 General 8.11 General Statement Regarding Extensions: The Company extends its gas lines in accordance with the general practice described in these

More information

SJI Reports Q3 Earnings; Maintains 2016 Guidance

SJI Reports Q3 Earnings; Maintains 2016 Guidance FOR IMMEDIATE RELEASE Telephone: 609-561-9000 Investor Relations/Media Contact: Marissa Travaline x4227 e-mail: mtravaline@sjindustries.com SJI Reports Q3 Earnings; Maintains 2016 Guidance FOLSOM, NJ,

More information

The Four Pillars of project management

The Four Pillars of project management The Four Pillars of project management Background This article is intended to give a round up of key practical project management practices to the novice as well as to the experienced. About 90% of this

More information

PHILADELPHIA GAS WORKS GAS SERVICE TARIFF

PHILADELPHIA GAS WORKS GAS SERVICE TARIFF Ninety Fifth Revised Page No. 1 PHILADELPHIA GAS WORKS Canceling Ninety Fourth Revised Page No. 1 PHILADELPHIA GAS WORKS GAS SERVICE TARIFF Issued by: Craig White President and CEO PHILADELPHIA GAS WORKS

More information

NJSEM Energy Supply Aggregation and Sustainability Services

NJSEM Energy Supply Aggregation and Sustainability Services NJSEM Energy Supply Aggregation and Sustainability Services Presented by Robert Chilton Executive V.P. GABEL ASSOCIATES, INC. NJSEM MEMBERSHIP New Jersey Sustainable Energy Joint Meeting (NJSEM) - Over

More information

Utility Rate Public Hearing City Council Meeting

Utility Rate Public Hearing City Council Meeting Utility Rate Public Hearing City Council Meeting January 19, 2016 1 Utility Services Recommendation 1. Adopt utility financial policy resolution 2. Provide direction on ratepayer assistance program 3.

More information

A Case for Project Revenue Management. Peter Varani PMP

A Case for Project Revenue Management. Peter Varani PMP A Case for Project Revenue Management Peter Varani PMP A Case for Project Revenue Management PMBOK GUIDE (4 th edition) Cost 845 Revenue 3 Unisys Annual Report (2008) Cost 174 Revenue 152 2 Balanced Approach

More information

0,-1 New Jersey. Natural Gas. D i Esq. March 28, 2019 VIA FEDERAL EXPRESS OVERNIGHT DELIVERY

0,-1 New Jersey. Natural Gas. D i Esq. March 28, 2019 VIA FEDERAL EXPRESS OVERNIGHT DELIVERY 0,-1 New Jersey Natural Gas March 28, 2019 VIA FEDERAL EXPRESS OVERNIGHT DELIVERY The Honorable Aida Camacho-Welch, Secretary New Jersey Board of Public Utilities 44 South Clinton A venue, 3 rd Floor,

More information

James A. Wrisley, President 9070 Lakes Blvd. West Palm Beach FL (561)

James A. Wrisley, President 9070 Lakes Blvd. West Palm Beach FL (561) Earned Value Management Results in Early Visibility and Management Opportunities March 21, 2007 James A. Wrisley, President 9070 Lakes Blvd. West Palm Beach FL 33412 (561) 694-1646 E-mail: wrisley@pmassoc.com

More information

Gas Operations. Joe McGoldrick, EVP & President Gas Operations

Gas Operations. Joe McGoldrick, EVP & President Gas Operations Gas Operations Joe McGoldrick, EVP & President Gas Operations Cautionary Statement Regarding Forward- Looking Information This presentation contains statements concerning our expectations, beliefs, plans,

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF OHIO ) ) ) APPLICATION OF COLUMBIA GAS OF OHIO, INC.

BEFORE THE PUBLIC UTILITIES COMMISSION OF OHIO ) ) ) APPLICATION OF COLUMBIA GAS OF OHIO, INC. BEFORE THE PUBLIC UTILITIES COMMISSION OF OHIO In the Matter of the Application of Columbia Gas of Ohio, Inc. for Approval of an Alternative Form of Regulation. ) ) ) Case No. 16-2422-GA-ALT APPLICATION

More information

Monitoring and Controlling RCC Work in Delayed Construction Projects

Monitoring and Controlling RCC Work in Delayed Construction Projects Monitoring and Controlling RCC Work in Delayed Construction s Nimesh Gujarati, Dr. B S Balapgol Post Graduate Student (Construction and Management), DYPCOE, Akurdi, Pune-44, Maharashtra, India Principal,

More information

CHESAPEAKE UTILITIES CORPORATION

CHESAPEAKE UTILITIES CORPORATION CHESAPEAKE UTILITIES CORPORATION Fourth Quarter 2015 Earnings Conference Call Friday, February 26, 2016 December 9 & 10, 2015 Forward Looking Statements and Other Disclosures Safe Harbor Statement: Some

More information

PUBLIC SERVICE C O~~ISSION OF WEST VIRGINIA CHARLESTON. Case No G-390P

PUBLIC SERVICE C O~~ISSION OF WEST VIRGINIA CHARLESTON. Case No G-390P PUBLIC SERVICE C O~~ISSION OF WEST VIRGINIA CHARLESTON Case No. 18-0780-G-390P HOPE GAS, INC., doing business as DOMINION ENERGY WEST VIRGINIA, a public utility, Clarksburg, Harrison County. Surcharge

More information

Project Management Certification. Multiple Choice Questions

Project Management Certification. Multiple Choice Questions Project Management Certification (PMP) Project Management Certification (PMP) Multiple Choice Questions QUESTION 1 In Project Cost Management, which input is exclusive to the Determine Budget process?

More information

Cumulative trends Problems and issues since last report

Cumulative trends Problems and issues since last report Project Progress Report Format Progress since last report Current status of project 1. Schedule 2. Cost 3. Scope Cumulative trends Problems and issues since last report 1. Actions and resolution of earlier

More information

europe GENEVA 2009 Haute école de gestion de Genève Geneva School of Business Administration EVA Europe 2009 was jointly organised by Gold Sponsors

europe GENEVA 2009 Haute école de gestion de Genève Geneva School of Business Administration EVA Europe 2009 was jointly organised by Gold Sponsors eva europe GENEVA 2009 2009, CERN, HEG, Authors - This material is provided courtesy of EVA Europe 2009, the European organisation for nuclear research(cern), the Geneva School of Business administration

More information

ORDER NUMBER G IN THE MATTER OF the Utilities Commission Act, RSBC 1996, Chapter 473. and

ORDER NUMBER G IN THE MATTER OF the Utilities Commission Act, RSBC 1996, Chapter 473. and Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 bcuc.com P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 ORDER NUMBER G-48-19 IN THE MATTER OF the Utilities Commission Act, RSBC 1996, Chapter

More information

30 April 2 May 2018 ICC Sydney Unlocking the Future through Systems Engineering. sete2018.com.au BRETT THIELE

30 April 2 May 2018 ICC Sydney Unlocking the Future through Systems Engineering. sete2018.com.au BRETT THIELE 30 April 2 May 2018 ICC Sydney Unlocking the Future through Systems Engineering BRETT THIELE A Standardised Data Set to Support Research on Earned Value and Earned Schedule Management Techniques Motivation

More information

TOWN OF ATIKOKAN WATER & WASTEWATER FINANCIAL PLAN. May 30, Atikokan Public Works Water & Wastewater Services

TOWN OF ATIKOKAN WATER & WASTEWATER FINANCIAL PLAN. May 30, Atikokan Public Works Water & Wastewater Services TOWN OF ATIKOKAN WATER & WASTEWATER FINANCIAL PLAN May 30, 2016 Atikokan Public Works Water & Wastewater Services WATER & WASTEWATER FINANCIAL PLAN TOWN OF ATIKOKAN Table of Contents 1.0 Introduction ----------------------------------------------------------

More information

Earned Schedule schedule performance

Earned Schedule schedule performance Earned Schedule schedule performance analysis from EVM measures Walt Lipke PMI - Oklahoma City Chapter +1 405 364 1594 waltlipke@cox.net $$ The idea is to determine the time at which h the EV accrued should

More information

EA March 7, 2008

EA March 7, 2008 EA 2008-1 March 7, 2008 2004-2006 PERFORMANCE BENCHMARKS FOR NATURAL GAS UTILITIES I. INTRODUCTION Summary data of gas utility financial profiles and performance appear in this Energy Analysis. The intent

More information

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DG LIBERTY UTILITIES (ENERGYNORTH NATURAL GAS) CORP. d/b/a LIBERTY UTILITIES

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DG LIBERTY UTILITIES (ENERGYNORTH NATURAL GAS) CORP. d/b/a LIBERTY UTILITIES STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DG 16-447 LIBERTY UTILITIES (ENERGYNORTH NATURAL GAS) CORP. d/b/a LIBERTY UTILITIES Managed Expansion Program Rates Order Approving Rates and Tariffs

More information

ONTARIO POWER GENERATION REPORTS 2013 FIRST QUARTER FINANCIAL RESULTS

ONTARIO POWER GENERATION REPORTS 2013 FIRST QUARTER FINANCIAL RESULTS May 16, 2013 ONTARIO POWER GENERATION REPORTS 2013 FIRST QUARTER FINANCIAL RESULTS [Toronto]: Ontario Power Generation Inc. (OPG or Company) today reported its financial and operating results for the three

More information

Thomas Carlos Consulting. Simple Earned Value Management

Thomas Carlos Consulting. Simple Earned Value Management Thomas Carlos Consulting Simple Earned Value Management Financial analysis that goes one step beyond Budget versus Actual Presented by Tom Carlos, PMP September 11, 2008 Thomas Carlos Consulting, Roseville,

More information

S T A T E OF M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * *

S T A T E OF M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * S T A T E OF M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * In the matter of the application of Michigan Consolidated Gas Company ) for authority to increase its rates, amend ) Case

More information

Town Hall Meeting Community Utilities of Indiana, Inc. Wednesday, Wednesday 29, :00PM - 8:00PM at Seasons Lakehouse 1048 N.

Town Hall Meeting Community Utilities of Indiana, Inc. Wednesday, Wednesday 29, :00PM - 8:00PM at Seasons Lakehouse 1048 N. Town Hall Meeting Community Utilities of Indiana, Inc. Wednesday, Wednesday 29, 2018 7:00PM - 8:00PM at Seasons Lakehouse 1048 N. Lakeshore Drive, Crown Point, Indiana Community Utilities of Indiana, Inc.

More information

- ABSTRACT - The value of upstream firms Are reserves currently discounted at 10% or 40%?

- ABSTRACT - The value of upstream firms Are reserves currently discounted at 10% or 40%? - ABSTRACT - The value of upstream firms Are reserves currently discounted at 10% or 40%? August, 2013 Executive Summary PV 10 2P, the Present Value of Future Cash Flows of 2P reserves (Proven+Probable)

More information

Request for Public Comment and Status of Proceeding to Investigate Approaches to Mitigate Solar Development Volatility

Request for Public Comment and Status of Proceeding to Investigate Approaches to Mitigate Solar Development Volatility Executive Summary Request for Public Comment and Status of Proceeding to Investigate Approaches to Mitigate Solar Development Volatility The purpose of this document is to advance stakeholder discussion

More information

Appendix B. The EnergyRM EE PPA

Appendix B. The EnergyRM EE PPA Appendix B The EnergyRM EE PPA Description One specific variant of an EE PPA that is being discussed in Oregon and the Northwest is a model proposed by EnergyRM and Equilibrium Capital, which will be referred

More information

North Shore Gas Company. Billing and Price Book. Published September 2016

North Shore Gas Company. Billing and Price Book. Published September 2016 North Shore Gas Company Billing and Price Book Published September 2016 TABLE OF CONTENTS CHARGES FOR SERVICE WORK 1 WARRANTY POLICY 1 PARTS REPLACEMENT 1 INVESTIGATIONS NO CHARGE 2 REPAIRS TO COMPANY

More information

Authorized By: New Jersey Board of Public Utilities, Richard S. Mroz, President, Joseph L.

Authorized By: New Jersey Board of Public Utilities, Richard S. Mroz, President, Joseph L. PUBLIC UTILITIES BOARD OF PUBLIC UTILITIES INFRASTRUCTURE INVESTMENT AND RECOVERY Proposed New Subchapter: N.J.A.C. 14:3-2A Authorized By: New Jersey Board of Public Utilities, Richard S. Mroz, President,

More information

Two SWIFT Case Studies

Two SWIFT Case Studies Two SWIFT Case Studies City of Bedford, TX (2015) City of Keller, TX (2016) Project Team William Moriarty, P.E. Thomas Hoover, P.E. Pioneers 1. First SWIFT application submitted 2. First Water Conservation

More information

WATER AND SEWERAGE CORPORATION BENCHMARKING STUDY (USING WORLD BANK MODEL) DATA REFERENCE GUIDE. Mr. Armbrister Research Department Central Bank

WATER AND SEWERAGE CORPORATION BENCHMARKING STUDY (USING WORLD BANK MODEL) DATA REFERENCE GUIDE. Mr. Armbrister Research Department Central Bank WATER AND SEWERAGE CORPORATION BENCHMARKING STUDY (USING WORLD BANK MODEL) DATA REFERENCE GUIDE ITEM NO. No. 5 - GDP per capita No. 6 Exchange rate No. 7 Average Annual Inflation No. 8 Minimum Annual Salary

More information

4101: Existing boilers and pressure vessels.

4101: Existing boilers and pressure vessels. ACTION: Final DATE: 07/13/2018 11:08 AM 4101:4-9-01 Existing boilers and pressure vessels. (A) All existing boilers and pressure vessels and the associated equipment, controls, devices, and safeguards

More information

JCI Energy Savings Performance Contract (ESPC) Services AMI System & Water Meter Replacements Water System SCADA Upgrades Acoustic Leak Survey August

JCI Energy Savings Performance Contract (ESPC) Services AMI System & Water Meter Replacements Water System SCADA Upgrades Acoustic Leak Survey August JCI Energy Savings Performance Contract (ESPC) Services AMI System & Water Meter Replacements Water System SCADA Upgrades Acoustic Leak Survey August 7, 2018 2 What is ESPC? Energy Savings Performance

More information

Second Quarter 2018 Conference Call. August 2, 2018

Second Quarter 2018 Conference Call. August 2, 2018 Second Quarter 2018 Conference Call August 2, 2018 TC PipeLines, LP Second Quarter 2018 Conference Call Nathan Brown, President Janine Watson, VP and General Manager Chuck Morris, Principal Financial Officer

More information

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION. DW Temporary and Permanent Rate Case

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION. DW Temporary and Permanent Rate Case STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DW 12-170 Temporary and Permanent Rate Case Request for Financing Approval HAMPSTEAD AREA WATER COMPANY, INC. Order Approving Settlement Agreement on

More information

EA December 29, 2004

EA December 29, 2004 1 EA 2004-05 December 29, 2004 2001-2003 PERFORMANCE BENCHMARKS FOR NATURAL GAS UTILITIES I. INTRODUCTION Summary data of gas utility financial profiles and performance appear in this Energy Analysis.

More information

UGI UTILITIES, INC. GAS DIVISION

UGI UTILITIES, INC. GAS DIVISION UGI UTILITIES, INC. GAS DIVISION BOOK III BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION Information Submitted Pursuant to Section. et seq of the Commission s Regulations UGI GAS STATEMENT NO. PAUL

More information

DRM : EnergyNorth Natural Gas, Inc. dlbla Liberty Utilities Comments on Proposed Changes to Puc 500 Rules for Gas Service

DRM : EnergyNorth Natural Gas, Inc. dlbla Liberty Utilities Comments on Proposed Changes to Puc 500 Rules for Gas Service Liberty U ilities Sarah B. Knowlton Assistant General Counsel Phone: 603/328-2794 E-Mail: sarah.knowlton@libertyutilities.com Debra A. Rowland Executive Director New Hampshire Public Utilities Commission

More information

Performance-Based Ratemaking

Performance-Based Ratemaking Performance-Based Ratemaking Rhode Island Utility Business Models Discussion April 24, 2017 Tim Woolf Consultant for the Division of Public Utilities and Carriers Outline Financial incentives under traditional

More information

The Mystery of Earned Value - An Oil & Gas Owner s Perspective

The Mystery of Earned Value - An Oil & Gas Owner s Perspective The Mystery of Earned Value - An Oil & Gas Owner s Perspective 15 June 2011 William Harroun Head of Programme Controls, BG Group What we are going to cover Cost and progress reporting before --- Earned

More information