1 Dunkirk Gas Corporation Exhibit 6 Economic Effects of Proposed Facility

2 EXHIBIT 6: ECONOMIC EFFECTS OF PROPOSED FACILITY This Exhibit addresses the requirements of 16 NYCRR 86.7 regarding the direct and indirect economic effects of the Project in the Chautauqua County, City of Dunkirk, Town of Dunkirk and Town of Pomfret region. This evaluation includes only the pipeline and associated aboveground facilities. Secondary economic effects related to adding natural gas to the Dunkirk Generating Station are not included in this Application. 6.1 Introduction and Summary of Findings Construction of the (the Project ) will require a contract work force of as many as 70 workers in various disciplines assigned to carry out the process of right-of-way preparation, trenching, pipe installation, inspection and restoration. Construction activities along the pipeline are anticipated to take between 4 and 6 months. The Applicant expects that generally, construction will progress linearly along the pipeline route with the exception of special crossings (i.e., major highways, streams, wetlands, rails or other roadways) or specific locations that may require horizontal direction drilling ( HDD ) or jack and boring construction methods. The Project s cost and the relatively short duration of its installation will not impact the local economy sufficiently to induce any significant changes in the local residential, commercial, or industrial land use patterns. In addition, the underground installation of the new pipeline will not permanently displace any existing land uses, disrupt any retail or industrial establishments or otherwise cause a loss of business income. The proposed site for the metering station and regulating station will also not result in any changes. Therefore, no mitigation measures are proposed. 6.2 Demographics The will be located within the City of Dunkirk and Towns of Dunkirk and Pomfret, Chautauqua County, New York. The population of these jurisdictions, according to Census 2010, is presented in Table 6-1. Dunkirk Gas Corporation 6-1 Exhibit 6: Economic Effects of Proposed Facility

3 Table 6-1. Population of Communities Along the Proposed Pipeline Jurisdiction Population (2013 Estimate) Chautauqua County 133,080 1 City of Dunkirk 12,328 2 Town of Dunkirk 1,300 2 Town of Pomfret 14,616 2 Source: 1 U.S. Census Bureau American Fact Finder. County Totals Dataset: Population, Population Change and Estimated Components of Population Change: April 1, 2010 to July 1, EST2013-Alldata.csv. Access June 18, U.S. Census Bureau, American Fact Finder. Annual Estimates of the Resident Population: April 1, 2010 to July 1, Population Estimates. Accessed June 18, Construction Effects and Mitigation Land use pattern changes are typically induced by a significant change in one or more influential variables such as: (1) large-scale physical improvements to some aspect of the local infrastructure; (2) a change in the regulatory environment; (3) or major employment and/or income growth trends in the local economy. Given an adequate level of demand, such changes tend to enhance land for development, induce construction that responds to the demand, and hence cause changes in residential, commercial and/or industrial land use patterns. The proposed pipeline and associated facilities will not result in any perceptible change in local infrastructure. The increased reliability in the local electric distribution system facilitated by the proposed project will support continued, modest growth in the Project area. The Project itself will require only minimum land use changes at the aboveground facilities (i.e., the regulating station metering station and mainline valves). The Applicant does not expect any indirect land use changes or land development Construction Schedules and Major Phases The overall construction period for the proposed pipeline and associated facilities is estimated to last approximately 4 to 6 months. The major phases of Project construction and their approximate durations are listed below: Dunkirk Gas Corporation 6-2 Exhibit 6: Economic Effects of Proposed Facility

4 Site preparation 2 months Trenching and Pipelaying 2-3 months Hydrostatic Testing 0.5 month Metering and Regulating Station Construction 3-4 months Final grading and restoration 1 months Number of Workers by Construction Discipline The construction work force for the proposed pipeline will average approximately 50 construction workers (essentially all contractors) during the 4 to 6 months of construction. The trenching, pipe laying and backfilling will be done by three to six person crews working at multiple locations along the rights-of-way. The metering and regulating stations construction will involve, on average, 10 workers (contractors) per day for up to 6 months, with a peak construction staff of 20 workers for a period of approximately 1 months if work proceeds simultaneously at both metering and regulating stations Mitigation It is estimated that the Project will be constructed in approximately 4 to 6 months. Because the new pipeline and associated facilities do not constitute large-scale infrastructure improvements, will not result in any changes in land use regulations, and will induce only minor income and employment growth, these facilities will not generate adverse alterations to the residential, commercial, or industrial land-use patterns of any area adjacent to the pipeline route. Therefore, no mitigation of the economic effects of construction is necessary. 6.4 Operational Effects and Mitigation The proposed pipeline and associated facilities will not require additional full-time employees for the operation and maintenance. One less than full time employee will manage and oversee the operation and maintenance of the proposed pipeline and associated faculties. Therefore, there will be no direct economic impact from the operation of the pipeline and associated facilities. The Project is essential to ensure the future sustainability of the Dunkirk Generating Station to Dunkirk Gas Corporation 6-3 Exhibit 6: Economic Effects of Proposed Facility

5 continue to maintain safe and reliable power generation at a reasonable cost. By facilitating the addition of natural gas fuel at the Dunkirk Generating Station, the Project will support reliability needs, reduce emissions, help relieve Western New York electric transmission congestion, reduce costs for consumers, retain local jobs, create temporary construction jobs, stabilize the local property tax base, and improve the local economy. For the reasons cited above, construction and operation of the Project will cause no foreseeable adverse alterations to the residential, commercial, or industrial land use patterns in the proximate area. Dunkirk Gas Corporation 6-4 Exhibit 6: Economic Effects of Proposed Facility

People, Partners and Pipelines The Line 3 Replacement Program and Working with Enbridge.

People, Partners and Pipelines The Line 3 Replacement Program and Working with Enbridge. People, Partners and Pipelines The Line 3 Replacement Program and Working with Enbridge. Ryan Champney- Director, Facilities & Terminals Major Projects Barry Horon - Director, Supply Chain Management,

More information

2. Group 1: Cashel, Cahir and Thurles Co. Tipperary.

2. Group 1: Cashel, Cahir and Thurles Co. Tipperary. 2. Group 1: Cashel, Cahir and Thurles Co. Tipperary. 2.1. Cashel, Co. Tipperary 2.1.1. Summary Details: Cashel is situated on the N8 Cork to Dublin National primary Route and N74 Secondary Route and is

More information

OHIO TURNPIKE CROSSING PERMIT REQUEST INFORMATION UNDERGROUND CROSSING

OHIO TURNPIKE CROSSING PERMIT REQUEST INFORMATION UNDERGROUND CROSSING OHIO TURNPIKE CROSSING PERMIT REQUEST INFORMATION UNDERGROUND CROSSING The Ohio Turnpike Commission requests that four (4) copies of the following information be submitted; TO: Chief Engineer Ohio Turnpike

More information

Baltimore Gas and Electric Company Gas Extensions

Baltimore Gas and Electric Company Gas Extensions Baltimore Gas and Electric Company Gas 15 8. Extensions 8.1 General 8.11 General Statement Regarding Extensions: The Company extends its gas lines in accordance with the general practice described in these

More information

Special Conditions, Regulations and Instructions for Right of Way Permit Applications

Special Conditions, Regulations and Instructions for Right of Way Permit Applications Special Conditions, Regulations and Instructions for Right of Way Permit Applications The Department of Environmental Services (DES) issues public right of way (PROW) permits to contractors with a valid

More information

Portland General Electric Company P.U.C. Oregon No. E-18 Original Sheet No. C-1 RULE C CONDITIONS GOVERNING CUSTOMER ATTACHMENT TO FACILITIES

Portland General Electric Company P.U.C. Oregon No. E-18 Original Sheet No. C-1 RULE C CONDITIONS GOVERNING CUSTOMER ATTACHMENT TO FACILITIES P.U.C. Oregon No. E-18 Original Sheet No. C-1 RULE C CONDITIONS GOVERNING CUSTOMER ATTACHMENT TO FACILITIES 1. Acceptance of Electricity Service By establishing or requesting a POD or by continuing an

More information

PIPELINE / WIRE LINE PROCESS INSTRUCTIONS

PIPELINE / WIRE LINE PROCESS INSTRUCTIONS PIPELINE / WIRE LINE PROCESS INSTRUCTIONS Licensing Process: 1. Once the application package is received by Jones Lang LaSalle Brokerage, Inc. (JLL), the application and drawing will be forwarded to the

More information

~U.C. Case ~hib~t EXhthit 3

~U.C. Case ~hib~t EXhthit 3 (~~i\1r ~U.C. Case ~hib~t EXhthit 3 7- SERVICE AND MAIN EXTENSIONS ~ 7(A) Definitions. The following are definitions of terms used in these provisions relative to main and service extensions and are applicable

More information

residential property. A one-call notification system may be for a region of the state or statewide in scope, unless federal law provides otherwise.

residential property. A one-call notification system may be for a region of the state or statewide in scope, unless federal law provides otherwise. CHAPTER 62 ARTICLE 14 Excavation Damage to Pipelines and Underground Utility Lines Section 62-14-1 Purpose and intent. 62-14-2 Definitions. 62-14-3 Excavation. 62-14-4 Emergency excavation. 62-14-5 Marking

More information

SPECIAL SPECIFICATION. Atmos Energy - Natural Gas Distribution System

SPECIAL SPECIFICATION. Atmos Energy - Natural Gas Distribution System 2004 Specifications CSJ 2374-02-110, etc. SPECIAL SPECIFICATION 5191 Atmos Energy - Natural Gas Distribution System 1. Description. This Item will govern the installation of approximately two thousand

More information

Municipal Gas Utility of the City of Cedar Falls, Iowa Service Policy September 2016 Table of Contents

Municipal Gas Utility of the City of Cedar Falls, Iowa Service Policy September 2016 Table of Contents Municipal Gas Utility of the City of Cedar Falls, Iowa Service Policy September 2016 Table of Contents GENERAL... 2 CODES AND REGULATIONS... 2 IOWA UTILITIES BOARD REGULATION... 2 CHARACTER OF SUPPLY...

More information

Standard Specifications for Work on Railroad Property

Standard Specifications for Work on Railroad Property Standard Specifications for Work on Railroad Property Section 1. Section 2. Section 3. Section 4. Section 5. Section 6. Section 7. Section 8. Section 9. Section 10. Section 11. Section 12. Section 13.

More information

Environmental Analysis, Chapter 4 Consequences, and Mitigation

Environmental Analysis, Chapter 4 Consequences, and Mitigation Environmental Analysis, Chapter 4 4.14 Economic and Fiscal Impacts This section evaluates potential impacts to local and regional economies during construction and operation of each project alternative.

More information

KANSAS CITY POWER & LIGHT COMPANY P.S.C. MO. No. 2 Fourth Revised Sheet No Canceling P.S.C. MO. No. 2 Third Revised Sheet No. 1.

KANSAS CITY POWER & LIGHT COMPANY P.S.C. MO. No. 2 Fourth Revised Sheet No Canceling P.S.C. MO. No. 2 Third Revised Sheet No. 1. P.S.C. MO. No. 2 Fourth Revised 1.30 2 Third Revised 1.30 9. EXTENSION OF FACILITIES SECTIONS 9.01 THROUGH 9.11 SHALL BE APPLICABLE TO FACILITY EXTENSION AGREEMENTS EXECUTED ON AND AFTER JANUARY 1, 2018.

More information

THE NARRAGANSETT ELECTRIC COMPANY POLICY 2 LINE EXTENSION POLICY FOR RESIDENTIAL DEVELOPMENTS

THE NARRAGANSETT ELECTRIC COMPANY POLICY 2 LINE EXTENSION POLICY FOR RESIDENTIAL DEVELOPMENTS THE NARRAGANSETT ELECTRIC COMPANY POLICY 2 LINE EXTENSION POLICY FOR RESIDENTIAL DEVELOPMENTS When a developer, contractor, builder or other customer ( Developer ) proposing to construct a residential

More information

RULE H NEW SERVICE ATTACHMENTS AND DISTRIBUTION LINE INSTALLATIONS OR ALTERATIONS

RULE H NEW SERVICE ATTACHMENTS AND DISTRIBUTION LINE INSTALLATIONS OR ALTERATIONS Idaho Power Company First Revised Sheet No. H-1 I.P.U.C. No. 29, Tariff No. 101 Original Sheet No. H-1 This rule applies to requests for electric service under Schedules 1, 3, 4, 5, 7, 9, 19, 24, 45, and

More information

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 2nd Revised CPUC Sheet No. 224 Canceling 1 st Revised CPUC Sheet No.

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 2nd Revised CPUC Sheet No. 224 Canceling 1 st Revised CPUC Sheet No. SOUTH LAKE TAHOE, CALIFORNIA 2nd Revised CPUC Sheet No. 224 Canceling 1 st Revised CPUC Sheet No. 224 A. Applicability Under the provisions of this rule Utility shall make extensions and alterations of

More information

TULLAHOMA UTILITIES BOARD TULLAHOMA, TENNESSEE INVITATION TO BID FOR UNDERGROUND TRENCH LESS CONDUIT INSTALLATION

TULLAHOMA UTILITIES BOARD TULLAHOMA, TENNESSEE INVITATION TO BID FOR UNDERGROUND TRENCH LESS CONDUIT INSTALLATION TULLAHOMA UTILITIES BOARD TULLAHOMA, TENNESSEE INVITATION TO BID FOR UNDERGROUND TRENCH LESS CONDUIT INSTALLATION The Tullahoma Utilities Board is currently seeking sealed proposals for underground trench

More information

RULE H NEW SERVICE ATTACHMENTS AND DISTRIBUTION LINE INSTALLATIONS OR ALTERATIONS (Continued)

RULE H NEW SERVICE ATTACHMENTS AND DISTRIBUTION LINE INSTALLATIONS OR ALTERATIONS (Continued) IDAHO POWER COMPANY NINTH REVISED SHEET NO. H-5 CANCELS P.U.C. ORE. NO. E-27 EIGHTH REVISED SHEET NO. H-5 2. General Provisions (Continued) RULE H NEW SERVICE ATTACHMENTS AND DISTRIBUTION LINE INSTALLATIONS

More information

Applying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA

Applying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA Applying for a Kinder Morgan Canada Proximity Permit Design and Construction Guidelines CANADA A Guide to Applying for a Kinder Morgan Canada Proximity Permit Kinder Morgan Canada operates the Trans Mountain

More information

RIGHT-OF-WAY PERMIT APPLICATION

RIGHT-OF-WAY PERMIT APPLICATION PERMIT EXPIRES 180 DAYS AFTER DATE OF ISSUANCE. RIGHT-OF-WAY PERMIT APPLICATION DESCRIPTION OF WORK: (Mark all applicable) Pavement Cut: Directional Bore: Sewer / Water Connection: Driveway Apron: Sidewalk

More information

Electric Service Information Sheet Georgia Power Company

Electric Service Information Sheet Georgia Power Company Electric Service Information Sheet Georgia Power Company Project: Location: Developer: (Name of S/D or Customer) (Street Address or road Name) (Developer s Name) Georgia Power Company (the Company) will

More information

Investor Day Natural Gas & Pipeline Duke Austin President

Investor Day Natural Gas & Pipeline Duke Austin President Investor Day Natural Gas & Pipeline Duke Austin President Forward Looking Statement Disclaimer This presentation (and oral statements regarding the subjects of this presentation) includes forwardlooking

More information

RE: PROPOSED MANAWATU DISTRICT PLAN CHANGE 55 HEARINGS

RE: PROPOSED MANAWATU DISTRICT PLAN CHANGE 55 HEARINGS 30 November 2016 File: 13/134 DDI: 09 917 4305 Email: kblair@burtonconsultants.co.nz Manawatu District Council Private Bag 10 001 FEILDING 4743 Attention: Hearing Committee: Plan Change 55 By email only:

More information

Big Chino Water Ranch Project Impact Analysis Prescott & Prescott Valley, Arizona

Big Chino Water Ranch Project Impact Analysis Prescott & Prescott Valley, Arizona Big Chino Water Ranch Project Impact Analysis Prescott & Prescott Valley, Arizona Prepared for: Central Arizona Partnership August 2008 Prepared by: 7505 East 6 th Avenue, Suite 100 Scottsdale, Arizona

More information

Telephone PA P.U.C. - No. 14. FRONTIER COMMUNICATIONS OF PENNSYLVANIA, INC. Section 5 Original Sheet 1 CONSTRUCTION AND ATTACHMENT CHARGES

Telephone PA P.U.C. - No. 14. FRONTIER COMMUNICATIONS OF PENNSYLVANIA, INC. Section 5 Original Sheet 1 CONSTRUCTION AND ATTACHMENT CHARGES Original Sheet 1 GENERAL The rates otherwise provided for in this tariff are based on furnishing service immediately adjacent to existing lines and facilities of the Telephone Company and on the use of

More information

ROAD CROSSING AGREEMENT FOR SUB-SURFACE FACILITIES. - and - NAME ADDRESS CITY, POSTAL CODE

ROAD CROSSING AGREEMENT FOR SUB-SURFACE FACILITIES. - and - NAME ADDRESS CITY, POSTAL CODE Vulcan County File: [Type text] Applicant File: [Type text] ROAD CROSSING AGREEMENT FOR SUB-SURFACE FACILITIES THIS AGREEMENT made the [Type text]day of [Type text]2009. BETWEEN: VULCAN COUNTY a municipal

More information

Portland General Electric Company P.U.C. Oregon No. E-18 Original Sheet No. I-1 RULE I LINE EXTENSIONS

Portland General Electric Company P.U.C. Oregon No. E-18 Original Sheet No. I-1 RULE I LINE EXTENSIONS P.U.C. Oregon No. E-18 Original Sheet No. I-1 RULE I LINE EXTENSIONS 1. Purpose This rule establishes procedures and defines respective cost responsibilities to provide a Line Extension to a builder, developer,

More information

Why is a maintenance dig initiated?

Why is a maintenance dig initiated? Enbridge s Line 10 Maintenance digs A critical component in preventing pipeline incidents Our goal at Enbridge is, and will always be, the prevention of all incidents. Prevention is a key element of our

More information

By Shayne C. Kavanagh and Jennifer Belknap Williamson

By Shayne C. Kavanagh and Jennifer Belknap Williamson Risk-Aware Infrastructure Maintenance By Shayne C. Kavanagh and Jennifer Belknap Williamson This article is part of an ongoing series about financial sustainability, based on GFOA s new financial sustainability

More information

RATE INFORMATION. A. The rates adopted by the Authority will be in accordance with of the Code of Virginia, as amended.

RATE INFORMATION. A. The rates adopted by the Authority will be in accordance with of the Code of Virginia, as amended. Page 1 of 8 Section 1. PURPOSE The purpose of this policy to explain how the Bedford Regional Water Authority ( Authority ) implements the adopted Rates policy and to provide explanation for each of the

More information

GLNG PROJECT - ENVIRONMENTAL IMPACT STATEMENT

GLNG PROJECT - ENVIRONMENTAL IMPACT STATEMENT 7 Values and Management of Impacts J:\Jobs\42626220\07 Deliverables\EIS\FINAL for Public Release\7. Values and Management of Impacts\7-12 Visual Amenity\07 12 Visual Amenity (Section 7.12) FINAL PUBLIC.doc

More information

Management Discussion and Analysis ( MD&A ) The 2017 Operating Performance of TRC Construction Public Company Limited and Its Subsidiaries

Management Discussion and Analysis ( MD&A ) The 2017 Operating Performance of TRC Construction Public Company Limited and Its Subsidiaries 1 Management Discussion and Analysis ( MD&A ) The 2017 Operating Performance of TRC Construction Public Company Limited and Its Subsidiaries (Unit : Million Baht) 9-Month the 4 th Qtr 2017 2016 Change

More information

PWC SCHEDULE OF DEPOSITS, FEES AND CHARGES. Table of Contents

PWC SCHEDULE OF DEPOSITS, FEES AND CHARGES. Table of Contents PWC SCHEDULE OF DEPOSITS, FEES AND CHARGES Table of Contents I. DEFINITIONS... 2 II. DEPOSITS... 3 A. Establishment of Credit... 3 B. Deposit Refunds... 4 III. CUSTOMER SERVICE FEES AND CHARGES... 4 A.

More information

THE NARRAGANSETT ELECTRIC COMPANY POLICY 1 LINE EXTENSION POLICY FOR INDIVIDUAL RESIDENTIAL CUSTOMERS

THE NARRAGANSETT ELECTRIC COMPANY POLICY 1 LINE EXTENSION POLICY FOR INDIVIDUAL RESIDENTIAL CUSTOMERS THE NARRAGANSETT ELECTRIC COMPANY POLICY 1 LINE EXTENSION POLICY FOR INDIVIDUAL RESIDENTIAL CUSTOMERS When an individual residential customer ( Customer ) requests that a distribution line be extended

More information

ROCKLAND ELECTRIC COMPANY B.P.U. NO. 3 - ELECTRICITY. 1st Revised Leaf No. 18 Superseding Original Leaf No. 18 GENERAL INFORMATION

ROCKLAND ELECTRIC COMPANY B.P.U. NO. 3 - ELECTRICITY. 1st Revised Leaf No. 18 Superseding Original Leaf No. 18 GENERAL INFORMATION 1st Revised Leaf No. 18 Superseding Original Leaf No. 18 No. 15 IDENTIFICATION OF EMPLOYEES Company employees or agents authorized to enter upon its customers premises are provided with photo identification

More information

December 2015 THE PERRYMAN GROUP. 510 N. Valley Mills Dr., Suite 300. Waco, TX ph , fax

December 2015 THE PERRYMAN GROUP. 510 N. Valley Mills Dr., Suite 300. Waco, TX ph , fax December 2015 The Potential Impact of the Proposed Rio Grande Liquefied Natural Gas (LNG) and Rio Bravo Pipeline Facilities on Business Activity in Cameron County, Texas, and the United States THE PERRYMAN

More information

Report on Gas Works and Waterworks

Report on Gas Works and Waterworks Workers Compensation Insurance Rating Bureau of California Workers Compensation Insurance Rating Bureau of California Report on Gas Works and Waterworks Excerpt from the WCIRB Classification and Rating

More information

Revised Cal. P.U.C. Sheet No E Cancelling Original Cal. P.U.C. Sheet No E. ELECTRIC RULE NO. 15 Sheet 1 DISTRIBUTION LINE EXTENSIONS

Revised Cal. P.U.C. Sheet No E Cancelling Original Cal. P.U.C. Sheet No E. ELECTRIC RULE NO. 15 Sheet 1 DISTRIBUTION LINE EXTENSIONS Revised Cal. P.U.C. Sheet No. 20093-E Cancelling Original Cal. P.U.C. Sheet No. 15575-E ELECTRIC RULE NO. 15 Sheet 1 APPLICABILITY: This rule is applicable to extension of electric Distribution Lines*

More information

Good afternoon, For further details regarding the Don River Replacement Project, please refer to the attached project description.

Good afternoon, For further details regarding the Don River Replacement Project, please refer to the attached project description. Filed: 2018-07-04, EB-2018-0108, Exhibit F, Tab 1, Schedule 1, Attachment 1, Page 1 of 9 From: To: Cc: Subject: Date: Attachments: Stephanie Allman "emma.sharkey@ontario.ca" "zora.crnojacki@oeb.ca" Enbridge

More information

Water and Wastewater System Schedules of Rates and Charges and Fees As of July 1, 2015

Water and Wastewater System Schedules of Rates and Charges and Fees As of July 1, 2015 Water and Wastewater System Schedules of Rates and Charges and Fees As of July 1, 2015 East Bay Municipal Utility District Oakland, California Photos on cover: EBMUD crew replacing 16-inch diameter pipeline

More information

NEVADA IRRIGATION DISTRICT. Appendix B

NEVADA IRRIGATION DISTRICT. Appendix B NEVADA IRRIGATION DISTRICT DEVELOPMENT STANDARDS DEVELOPER REQUIREMENTS FOR TREATED WATER SYSTEM EXTENSIONS Appendix B Conveyance Agreement Standard Form Preface The standard form of Conveyance Agreement

More information

Developing with Jobs per Household equal to 1.6

Developing with Jobs per Household equal to 1.6 Developing with Jobs per Household equal to 1.6 Report FAC/FCA-055 Frederick A. Costello April 25, 2011 Introduction: The purpose of this report is to present an alternative development plan for Reston

More information

APPLICATION FOR RIGHT-OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI

APPLICATION FOR RIGHT-OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI APPLICATION FOR RIGHT-OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: _100.00 Date: / / Receipt No: APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE,

More information

Line 3 Replacement. ALJ Report Review. April 30, 2018

Line 3 Replacement. ALJ Report Review. April 30, 2018 Line 3 Replacement ALJ Report Review April 30, 2018 Enbridge s Line 3 Replacement Project In the ALJ Report, the Judge reaffirmed that the Line 3 pipeline is important today, will continue to be long into

More information

4.12 POPULATION AND HOUSING

4.12 POPULATION AND HOUSING 4.12 POPULATION AND HOUSING 4.12.1 INTRODUCTION This section describes the existing socioeconomic conditions, including population, housing, and employment, within the Specific Plan Area and provides an

More information

STATE OF NEW HAMPSHIRE BEFORE THE PUBLIC UTILITIES COMMISSION. Docket No. DE

STATE OF NEW HAMPSHIRE BEFORE THE PUBLIC UTILITIES COMMISSION. Docket No. DE STATE OF NEW HAMPSHIRE BEFORE THE PUBLIC UTILITIES COMMISSION Liberty Utilities (Granite State Electric) Corp. d/b/a Liberty Utilities Distribution Service Rate Case DIRECT TESTIMONY OF CHRISTIAN P. BROUILLARD

More information

Town of Boones Mill Water and Sewer Ordinance Rules and Regulations

Town of Boones Mill Water and Sewer Ordinance Rules and Regulations Town of Boones Mill Water and Sewer Ordinance Rules and Regulations SUPERVISION The Town of Boones Mill (Town) Water and Sewer Department shall be under the supervision of the Town Manager, who shall exercise

More information

CHAPTER 2 REQUIREMENTS FOR STATEWIDE ONE-CALL NOTIFICATION CENTER

CHAPTER 2 REQUIREMENTS FOR STATEWIDE ONE-CALL NOTIFICATION CENTER CHAPTER 2 REQUIREMENTS FOR STATEWIDE ONE-CALL NOTIFICATION CENTER 001. These regulations shall apply to the operating procedures of the state-wide one-call center and the qualifications, appointment, retention,

More information

Chapter CONCURRENCY

Chapter CONCURRENCY Chapter 14.28 CONCURRENCY Sections: 14.28.010 Purpose. 14.28.020 Development exempt from project concurrency review. 14.28.030 Concurrency facilities and services. 14.28.040 Project concurrency review.

More information

QUONSET DEVELOPMENT CORPORATION (QDC) INVITATION TO BID

QUONSET DEVELOPMENT CORPORATION (QDC) INVITATION TO BID QUONSET DEVELOPMENT CORPORATION (QDC) A BID is solicited for the following work: INVITATION TO BID Name of Project: Background & Description of Work: Pavement Repairs: Utility Connections: On-Call Pavement

More information

GENERAL PROVISIONS I. WORK REQUIREMENTS

GENERAL PROVISIONS I. WORK REQUIREMENTS GENERAL PROVISIONS I. WORK REQUIREMENTS 1. Inspection The Permittee shall request initial inspection from the County at 408-573-2429 a minimum of twenty-four (24) hours prior to any work being performed.

More information

Charges schemes. New connections and developer services charges scheme 2019/2020 Page 1 of 64

Charges schemes. New connections and developer services charges scheme 2019/2020 Page 1 of 64 s schemes Page 1 of 64 United Utilities Water Limited has published four charges schemes for 2019/2020 charging year. They include the charges to be paid for services provided by us in the course of carrying

More information

THE NARRAGANSETT ELECTRIC COMPANY POLICY 3 LINE EXTENSION AND CONSTRUCTION ADVANCE POLICY

THE NARRAGANSETT ELECTRIC COMPANY POLICY 3 LINE EXTENSION AND CONSTRUCTION ADVANCE POLICY THE NARRAGANSETT ELECTRIC COMPANY POLICY 3 LINE EXTENSION AND CONSTRUCTION ADVANCE POLICY FOR COMMERCIAL, INDUSTRIAL AND EXISTING RESIDENTIAL CUSTOMERS The terms of this policy shall apply when a commercial,

More information

WISCONSIN PUBLIC SERVICE CORPORATION. C4. Standard Rules & Regulations Construction Policy RIIIM

WISCONSIN PUBLIC SERVICE CORPORATION. C4. Standard Rules & Regulations Construction Policy RIIIM Original Sheet No. C-48.01 EFFECTIVE IN All territory served. 1. DEFINITIONS a. Extension An extension is defined to include right-of-way, permits, easements, poles, conductors and appurtenances used in

More information

TERMS AND CONDITIONS RELATING TO CONNECTION OF INDUSTRIAL PROPERTIES AND COMMERCIAL PROPERTIES TO THE PHOENIX NATURAL GAS LIMITED NETWORK

TERMS AND CONDITIONS RELATING TO CONNECTION OF INDUSTRIAL PROPERTIES AND COMMERCIAL PROPERTIES TO THE PHOENIX NATURAL GAS LIMITED NETWORK TERMS AND CONDITIONS RELATING TO CONNECTION OF INDUSTRIAL PROPERTIES AND COMMERCIAL PROPERTIES TO THE PHOENIX NATURAL GAS LIMITED NETWORK BACKGROUND These Terms and Conditions apply to: (i) any application

More information

ATCO Gas and Pipelines Ltd. (South)

ATCO Gas and Pipelines Ltd. (South) Decision 22634-D01-2017 Southwest Calgary Connector Pipeline Project August 9, 2017 Alberta Utilities Commission Decision 22634-D01-2017 Southwest Calgary Connector Pipeline Project Proceeding 22634 Application

More information

Village of Fife Lake 616 Bates/Box 298 Fife Lake, MI Phone: (231) Fax: (231)

Village of Fife Lake 616 Bates/Box 298 Fife Lake, MI Phone: (231) Fax: (231) Village of Fife Lake 616 Bates/Box 298 Fife Lake, MI 49633 Phone: (231)879-4291 Fax: (231)879-5153 RIGHT OF WAY PERMIT APPLICATION APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE AND/OR MAINTAIN WITHIN

More information

6.0 MONITORING AND CONTINGENCY PLANS

6.0 MONITORING AND CONTINGENCY PLANS 6.0 MONITORING AND CONTINGENCY PLANS 6.1 MONITORING The primary objective of compliance and effects monitoring is to confirm whether mitigation and protective measures are effectively implemented and to

More information

Economic Impact of Kinder Morgan Utopia Pipeline Project"

Economic Impact of Kinder Morgan Utopia Pipeline Project Economic Impact of Kinder Morgan Utopia Pipeline Project Dr. Shawn M. Rohlin 1 Associate Professor of Economics Director of the Center for Entrepreneurship and Business Innovation Kent State University

More information

To: Honorable Public Utilities Board Submitted by: /s/ Douglas Draeger AGM - Engineering and Operations

To: Honorable Public Utilities Board Submitted by: /s/ Douglas Draeger AGM - Engineering and Operations AGENDA ITEM NO.: 5.A.1 MEETING DATE: 01/26/2015 ADMINISTRATIVE REPORT NO.: 2015-37 To: Honorable Public Utilities Board Submitted by: /s/ Douglas Draeger AGM - Engineering and Operations From: Douglas

More information

Under the proposed Fee Schedule, the permit fees would be adjusted as follows:

Under the proposed Fee Schedule, the permit fees would be adjusted as follows: 6.8 Pursuant to California law, if fees are charged by a local agency in connection with permit issuance, the fees may not exceed the estimated reasonable cost of providing the service for which the fee

More information

DRAFT. Prepared for: CBRE CONSULTING CITY OF SAN FRANCISCO MAYOR S OFFICE OF ECONOMIC DEVELOPMENT JANUARY 2011

DRAFT. Prepared for: CBRE CONSULTING CITY OF SAN FRANCISCO MAYOR S OFFICE OF ECONOMIC DEVELOPMENT JANUARY 2011 DRAFT PARKMERCED FISCAL AND ECONOMIC IMPACT ANALYSIS OVERVIEW Prepared for: CITY OF SAN FRANCISCO MAYOR S OFFICE OF ECONOMIC DEVELOPMENT JANUARY 2011 CBRE CONSULTING 101 California Street, 44 th Floor

More information

a. RIGHTS-OF-WAY. PG&E will own, operate, and maintain Distribution Main Extension facilities only:

a. RIGHTS-OF-WAY. PG&E will own, operate, and maintain Distribution Main Extension facilities only: Revised Cal. P.U.C. Sheet No. 21543-G Cancelling Revised Cal. P.U.C. Sheet No. 18801-G GAS RULE NO. 15 Sheet 1 APPLICABILITY: This rule is applicable to the extension of gas Distribution Mains* necessary

More information

NORTHWEST NATURAL GAS COMPANY P.U.C. Or. 25 Second Revision of Sheet H-1 Cancels First Revision of Sheet H-1

NORTHWEST NATURAL GAS COMPANY P.U.C. Or. 25 Second Revision of Sheet H-1 Cancels First Revision of Sheet H-1 P.U.C. Or. 25 Second Revision of Sheet H-1 Cancels First Revision of Sheet H-1 PURPOSE: To provide Company-owned and maintained high pressure gas infrastructure sited on a Customer s Premise where the

More information

RULES OF TENNESSEE PUBLIC UTILITY COMMISSION CHAPTER WATER REGULATIONS TABLE OF CONTENTS

RULES OF TENNESSEE PUBLIC UTILITY COMMISSION CHAPTER WATER REGULATIONS TABLE OF CONTENTS RULES OF TENNESSEE PUBLIC UTILITY COMMISSION CHAPTER 1220-04-03 WATER REGULATIONS TABLE OF CONTENTS 1220-04-03-.01 Repealed 1220-04-03-.02 Repealed 1220-04-03-.03 Definitions 1220-04-03-.04 Retention of

More information

State of Vermont Hazard Mitigation Grant Program Project Application

State of Vermont Hazard Mitigation Grant Program Project Application State of Vermont Hazard Mitigation Grant Program Project Application FEMA- DR- VT Date Submitted: Part 1: Applicant Information Applicant (Eligible Applicant i.e. local government, state agency, non-profit)

More information

Palm Beach, Fla. January 12-13, Evercore ISI Utility CEO Conference

Palm Beach, Fla. January 12-13, Evercore ISI Utility CEO Conference Palm Beach, Fla. January 12-13, 2017 Evercore ISI Utility CEO Conference Forward-Looking Statements Statements contained in this presentation that include company expectations or predictions should be

More information

WASHTENAW COUNTY ROAD COMMISSION Permit Engineering Section 555 N. Zeeb Road Ann Arbor, MI 48103

WASHTENAW COUNTY ROAD COMMISSION Permit Engineering Section 555 N. Zeeb Road Ann Arbor, MI 48103 WASHTENAW COUNTY ROAD COMMISSION Permit Engineering Section The following is (1) a list of the activities which utility companies will be allowed to undertake in Washtenaw County road Right-of-Way under

More information

WASHTENAW COUNTY ROAD COMMISSION Permit Engineering Section 555 N. Zeeb Road Ann Arbor, MI 48103

WASHTENAW COUNTY ROAD COMMISSION Permit Engineering Section 555 N. Zeeb Road Ann Arbor, MI 48103 WASHTENAW COUNTY ROAD COMMISSION The following is (1) a list of the activities which utility companies will be allowed to undertake in Washtenaw County road Right-of-Way under a Blanket Permit ; and, (2)

More information

ASSEMBLY, No STATE OF NEW JERSEY. 211th LEGISLATURE INTRODUCED JUNE 14, 2004

ASSEMBLY, No STATE OF NEW JERSEY. 211th LEGISLATURE INTRODUCED JUNE 14, 2004 ASSEMBLY, No. 00 STATE OF NEW JERSEY th LEGISLATURE INTRODUCED JUNE, 00 Sponsored by: Assemblyman WILFREDO CARABALLO District (Essex and Union) SYNOPSIS Changes liability of underground facility operators

More information

Fiscal Impact Analysis

Fiscal Impact Analysis Fiscal Impact Analysis Waterfront West Newburyport, MA March 22, 2017 Prepared By Fougere Planning & Development, Inc. Prepared For Newburyport Manager, LLC FOUGERE PLANNING & DEVELOPMENT, Inc. Mark J.

More information

Pipeline Application

Pipeline Application Pipeline Application Crude Oil Pipeline From 12-30-001-25 W1M to 13-17-009-28 W1M And NGL Pipeline From 12-30-001-25 W1M to 13-17-010-28 W1M Southwestern Manitoba Manitoba Innovation, Energy and Mines

More information

CONTRACT FOR THE CONSTRUCTION OF TW-3/17 WEST TRANSMISSION MAIN CONTRACT 1-17 INVITATION FOR BIDDER S PROPOSALS

CONTRACT FOR THE CONSTRUCTION OF TW-3/17 WEST TRANSMISSION MAIN CONTRACT 1-17 INVITATION FOR BIDDER S PROPOSALS DUPAGE WATER COMMISSION CONTRACT FOR THE CONSTRUCTION OF TW-3/17 WEST TRANSMISSION MAIN CONTRACT 1-17 INVITATION FOR BIDDER S PROPOSALS OWNER: ENGINEER: DuPage Water Commission AECOM Technical Services,

More information

PACP Based Asset Management

PACP Based Asset Management PACP Based Asset Management Objectives of Asset Management Maintain function or level of service as cost effectively as possible Maintain individual components (assets) at lowest life cycle cost possible

More information

4.3 Economic and Fiscal Impacts

4.3 Economic and Fiscal Impacts 4.3 This section evaluates the potential economic, and fiscal impacts that could arise from the construction and long-term operation of the proposed East San Fernando Valley Transit Corridor Project. 4.3.1

More information

TERMS AND CONDITIONS RELATING TO CONNECTION OF DOMESTIC PROPERTIES TO THE PHOENIX NATURAL GAS LIMITED NETWORK

TERMS AND CONDITIONS RELATING TO CONNECTION OF DOMESTIC PROPERTIES TO THE PHOENIX NATURAL GAS LIMITED NETWORK TERMS AND CONDITIONS RELATING TO CONNECTION OF DOMESTIC PROPERTIES TO THE PHOENIX NATURAL GAS LIMITED NETWORK BACKGROUND These Terms and Conditions apply to: (i) any application for a Domestic Property

More information

PROPERTY,INCLUDING, WITHOUT LIMITATION

PROPERTY,INCLUDING, WITHOUT LIMITATION Title 9 Safety- Industrial and Commercial Article 1.5 Excavation Requirements 9-1.5-101. Legislative declaration The purpose of this article is to prevent injury to persons and damage to property from

More information

Laois County Council Licence for Opening Roads, Footpaths and Verges. Application Form

Laois County Council Licence for Opening Roads, Footpaths and Verges. Application Form Licence for Opening Roads, Footpaths and Verges. Application Form Please Note: In order for Laois County Council to permit any contractor to carry out works on public property, the Council must be satisfied

More information

TIGER IV. Benefit Cost Analysis. Minot International Airport Access Road. Minot, ND

TIGER IV. Benefit Cost Analysis. Minot International Airport Access Road. Minot, ND Appendix A TIGER IV Benefit Cost Analysis Minot International Airport Access Road Minot, ND Table of Contents Summary and Findings... 3 Net Economic Impacts to North Dakota... 4 Project Matrix... Error!

More information

Control of Cranes, Hoists and Elevated Work Platforms on Public Roads in Waterford

Control of Cranes, Hoists and Elevated Work Platforms on Public Roads in Waterford Direction in the Control of Cranes, Hoists and Mobile Elevated Work Platforms on Public Roads in Waterford Legal Background In accordance with Section 101D Road Traffic Act, 1961 (Subsection 2) as inserted

More information

Phoenix January 11-12, Evercore ISI Utility CEO Conference

Phoenix January 11-12, Evercore ISI Utility CEO Conference Phoenix January 11-12, 2018 Evercore ISI Utility CEO Conference Forward-Looking Statements Statements contained in this presentation that include company expectations or predictions should be considered

More information

ATCO Gas and Pipelines Ltd. (South)

ATCO Gas and Pipelines Ltd. (South) Decision 3421-D01-2015 Northeast Calgary Connector Pipeline January 16, 2015 The Alberta Utilities Commission Decision 3421-D01-2015: Northeast Calgary Connector Pipeline Application 1610854 Proceeding

More information

ALL Counties. ALL Districts

ALL Counties. ALL Districts TEXAS TRANSPORTATION COMMISSION ALL Counties rhnute ORDER Page of ALL Districts The Texas Transportation Commission (commission) finds it necessary to propose amendments to. and., relating to Transportation

More information

Boston & New York City February 26-28, Investor Meetings

Boston & New York City February 26-28, Investor Meetings Boston & New York City February 26-28, 2018 Investor Meetings Forward-Looking Statements Statements contained in this presentation that include company expectations or predictions should be considered

More information

PROVIDENCE WATER SUPPLY BOARD

PROVIDENCE WATER SUPPLY BOARD ENTITLEMENT SECTION MAIN EXTENSION APPLICATION PROCEDURES (January 1993 Rev. November 1994) 1. The Applicant shall personally apply for a water main extension at the offices of the Providence Water Supply

More information

TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number:

TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number: TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number: APPLICATION DATE: ADDRESS OF WORK OR ENCROACHMENT: CROSS STREET: STARTING DATE: APN: - - No. Street City/Township ESTIMATED COST: $ COMPLETION

More information

Second Regular Session. Sixty-second General Assembly STATE OF COLORADO A BILL FOR AN ACT 101. Bill Summary

Second Regular Session. Sixty-second General Assembly STATE OF COLORADO A BILL FOR AN ACT 101. Bill Summary Second Regular Session Sixty-second General Assembly LLS NO. 00-01.01 Thomas Morris SENATE BILL 00-0 BY SENATOR Evans STATE OF COLORADO A BILL FOR AN ACT 1 CONCERNING DAMAGE TO UNDERGROUND UTILITY FACILITIES.

More information

Railroad DOT Mitigation Strategies (R16) Master Project Agreement

Railroad DOT Mitigation Strategies (R16) Master Project Agreement Railroad DOT Mitigation Strategies (R16) Master Project Agreement The master project agreement includes standard legal provisions that are common to nearly all projects and incorporates them into one overall

More information

SFPP, L.P. CONNECTION POLICY

SFPP, L.P. CONNECTION POLICY CONNECTION POLICY Any Shipper seeking to obtain a connection to the pipelines and other facilities of SFPP, L.P. (the SFPP System or System ) under SFPP s currently effective rules and regulations tariff

More information

New York City March 3, Morgan Stanley MLP/Diversified Natural Gas, Utilities & Clean Tech Conference

New York City March 3, Morgan Stanley MLP/Diversified Natural Gas, Utilities & Clean Tech Conference New York City March 3, 2016 Morgan Stanley MLP/Diversified Natural Gas, Utilities & Clean Tech Conference Forward-Looking Statements Statements contained in this presentation that include company expectations

More information

SENATE, No STATE OF NEW JERSEY. 217th LEGISLATURE INTRODUCED JUNE 6, 2016

SENATE, No STATE OF NEW JERSEY. 217th LEGISLATURE INTRODUCED JUNE 6, 2016 SENATE, No. STATE OF NEW JERSEY th LEGISLATURE INTRODUCED JUNE, 0 Sponsored by: Senator BOB SMITH District (Middlesex and Somerset) Senator SAMUEL D. THOMPSON District (Burlington, Middlesex, Monmouth

More information

Title 37 PUBLIC UTILITIES AND PUBLIC TRANSPORTATION.

Title 37 PUBLIC UTILITIES AND PUBLIC TRANSPORTATION. Title 37 PUBLIC UTILITIES AND PUBLIC TRANSPORTATION. Section 37-15-1 Purpose and intent. The purpose of this chapter is to safeguard against injury and loss of life due to excavation or demolition and

More information

Prague Municipal Hospital Medical Service Area- Economic Impact of the Health Sector

Prague Municipal Hospital Medical Service Area- Economic Impact of the Health Sector Prague Municipal Hospital Medical Service Area- Economic Impact of the Health Sector Hospitals Nursing Home Doctors & Other Professionals Community Pharmacies Other Medical Services Oklahoma State Department

More information

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS ENTERPRISE FUNDS

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS ENTERPRISE FUNDS TABLE OF CONTENTS ENTERPRISE FUNDS Storm Drainage Fund... 121-124 Off Street Parking Fund... 125-126 Airport Fund... 127-131 Water Service Fund... 132-145 STORM DRAINAGE FUND CURRENT OPERATIONS This fund

More information

Economic Impact of the Health Sector on the Economy of Craig County, Oklahoma

Economic Impact of the Health Sector on the Economy of Craig County, Oklahoma Economic Impact of the Health Sector on the Economy of Craig County, Oklahoma Hospitals Nursing Home Doctors & Other Professionals Community Pharmacies Other Medical Services Oklahoma Office of Rural Health

More information

CHEROKEE NATION DEPARTMENT OF TRANSPORTATION UTILITY RELOCATION AGREEMENT

CHEROKEE NATION DEPARTMENT OF TRANSPORTATION UTILITY RELOCATION AGREEMENT CHEROKEE NATION DEPARTMENT OF TRANSPORTATION UTILITY RELOCATION AGREEMENT PROJECT NAME: PROJECT NO.: COUNTY: UTILITY COMPANY: THIS AGREEMENT, made and entered into by and between the Department of Transportation,

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998,S.O.1998, c. 15 (Schedule B) pursuant to section 90(1);

IN THE MATTER OF the Ontario Energy Board Act, 1998,S.O.1998, c. 15 (Schedule B) pursuant to section 90(1); Ontario Energy Board Commission de l Énergie de l Ontario EB-2010-0302 IN THE MATTER OF the Act, 1998,S.O.1998, c. 15 (Schedule B) pursuant to section 90(1); AND IN THE MATTER OF an application by Enbridge

More information

Water Services Rate Study

Water Services Rate Study Report on the Water Services Rate Study Town of Telluride, Colorado Project No. 72447 August 2013 Water Services Rate Study prepared for Town of Telluride, Colorado August 2013 Project No. 72447 prepared

More information

Preliminary Economic and Fiscal Impacts of the Proposed Northern Pass Transmission Project Prepared for Northern Pass Transmission LLC

Preliminary Economic and Fiscal Impacts of the Proposed Northern Pass Transmission Project Prepared for Northern Pass Transmission LLC Preliminary Economic and Fiscal Impacts of the Prepared for Northern Pass Transmission LLC Prepared by Dr. Lisa Shapiro Chief Economist and Heidi Kroll Policy Analyst Gallagher, Callahan & Gartrell, P.C.

More information