Good afternoon, For further details regarding the Don River Replacement Project, please refer to the attached project description.

Size: px
Start display at page:

Download "Good afternoon, For further details regarding the Don River Replacement Project, please refer to the attached project description."

Transcription

1 Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 1, Page 1 of 9 From: To: Cc: Subject: Date: Attachments: Stephanie Allman "emma.sharkey@ontario.ca" "zora.crnojacki@oeb.ca" Enbridge Gas Distribution Inc. - Don River - Replacement Project - Duty to Consult Tuesday, October 10, :04:14 PM EGDI_NPS 30 XHP and NPS 20 HP Don River Replacement Project_ pdf Good afternoon, Enbridge Gas Distribution Inc. ( Enbridge ) is seeking guidance from the Ministry of Energy with regards to the need for duty to consult for the Don River Replacement Project. Enbridge has identified the need to eliminate two bridge crossings over the Don River in the City of Toronto. This is a Replacement project. This would not have required a Leave to construct application at the Ontario Energy Board except that new easements are required along the proposed pipeline route. Specifically a new easement is required for a feeder station, approximately 0.06 km x 0.04 km, and will most likely be acquired from Infrastructure Ontario. The project consists of two parts: A. Installation of approximately 300 meters of NPS 30 (Nominal Pipe size 30 inch diameter) Extra High Pressure (XHP) steel natural gas main ( Segment A ) underneath the Don River from Bayview Ave to Sunlight Park Road and the decommissioning of approximately 250 meters of the existing NPS 30. B. Installation of approximately 500 m of NPS 20 XHP main along Bayview Ave to Mill Street; installation of approximately 600 m of NPS 20 High Pressure (HP) from Mill Street to Cherry Street (together Segment B ); installation of a feeder station in the vicinity of Cherry and Mill Street; and the decommissioning of approximately 1.6 km of NPS 20 HP gas main from Station B to Cherry Street. Enbridge has identified two potential routes to replace Segment A and three potential routes to replace Segment B. These routes will be evaluated by an environmental consultant as part of the Environmental Assessment, to select one that is preferred from an environmental and socio-economic perspective; refinement of the routes based on stakeholder input is possible. Project construction is anticipated to begin in Q with commissioning in late Q or Q For further details regarding the Don River Replacement Project, please refer to the attached project description. Please contact me if you have any questions. Thank you Stephanie Allman Regulatory Analyst Regulatory Affairs

2 Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 1, Page 2 of 9 ENBRIDGE GAS DISTRIBUTION TEL: FAX: Consumers Road North York, Ontario M2J 1P8 enbridgegas.com Integrity. Safety. Respect.

3 Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 1, Page 3 of PROJECT SUMMARY Enbridge Gas Distribution Inc. ( Enbridge ) has identified the need to eliminate two bridge crossings over the Don River in the City of Toronto. This is a Replacement project. This would not have required a Leave to construct application at the Ontario Energy Board except that new easements are required along the proposed pipeline route. Specifically a new easement is required for a feeder station, approximately 0.06 km x 0.04 km, and will most likely be acquired from Infrastructure Ontario. Where possible the proposed pipeline will be located on previously disturbed municipal right-of-way in highly urbanized Toronto. Upon completion of the project the proposed pipeline will be located below ground eliminating the need for the two above ground bridge crossings. The project consists of two parts: A. Installation of approximately 300 meters of NPS 30 (Nominal Pipe size 30 inch diameter) Extra High Pressure (XHP) steel natural gas main ( Segment A ) underneath the Don River from Bayview Ave to Sunlight Park Road and the decommissioning of approximately 250 meters of the existing NPS 30. B. Installation of approximately 500 m of NPS 20 XHP main along Bayview Ave to Mill Street; installation of approximately 600 m of NPS 20 High Pressure (HP) from Mill Street to Cherry Street (together Segment B ); installation of a feeder station in the vicinity of Cherry and Mill Street; and the decommissioning of approximately 1.6 km of NPS 20 HP gas main from Station B to Cherry Street. Enbridge has identified two potential routes to replace Segment A and three potential routes to replace Segment B. These routes will be evaluated by an environmental consultant as part of the Environmental Assessment, to select one that is preferred from an environmental and socioeconomic perspective; refinement of the routes based on stakeholder input is possible. Project construction is anticipated to begin in Q with commissioning in late Q or Q System Overview Enbridge currently operates more than 37,000 kilometers of underground natural gas distribution pipelines serving more than 2 million customers. Figure 1 below shows the study area of the proposed location of Segment A and Segment B in relation to Enbridge s existing Extra High Pressure and High Pressure distribution network in the Greater Toronto Area. Please note this map is representative of only the Extra High Pressure and High Pressure distribution pipelines within the GTA.

4 Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 1, Page 4 of 9 FIGURE 1 Extra High Pressure and High Pressure Distribution in Greater Toronto Area 1.2 Segment A Replacement of NPS 30 XHP Steel Natural Gas Main, Don River Crossing Enbridge has identified two route alternatives for the NPS 30 XHP steel natural gas main replacement please reference Figure 2.

5 Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 1, Page 5 of 9 FIGURE 2 Segment A, Installation of NPS 30 XHP Steel Natural Gas Main Alternative Routes, Don River Crossing Alternative Route 1 Installation of NPS 30 XHP Steel Natural Gas Main The first route alternative begins on Bayview Ave approximately 50 m south of Eastern Ave and heads west around the existing hydro tower. It then heads east to cross under the Don River and Don Valley Parkway, connecting into the existing NPS 30 XHP steel natural gas main on Sunlight Park Rd. Alternative Route 2 Installation of NPS 30 XHP Steel Natural Gas Main The second route alternative begins at Bayview Ave approximately 100 m south of Eastern Ave and heads east to cross under the Don River and Don Valley Parkway to connect into the existing NPS 30 XHP steel natural gas main north of Sunlight Park Rd. Please note that only one of the proposed routes will be selected for the NPS 30 XHP steel natural gas main installation. 1.3 Segment B - Replacement of NPS 20 HP Steel Natural Gas Main Enbridge has identified three route alternatives for the NPS 20 HP steel natural gas main replacement. Please reference Figure 3.

6 Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 1, Page 6 of 9 FIGURE 3 Segment B, NPS 20 HP Steel Natural Gas Main Project Locations and Study Area Alternative Route 1- Installation of NPS 20 HP Steel Natural Gas Main The first route alternative begins on the west side of the Don River where it connects into the existing NPS 30 XHP steel natural gas main. It then follows Bayview Ave and Mill Street crossing under the railway corridor and Gardiner Expressway east of Cherry St where it connects into the existing NPS 20 HP steel natural gas main at Cherry St. Alternative Route 2 Installation of NPS 20 HP Steel Natural Gas Main The second route ties in at Station B (405 Eastern Avenue) and heads west on Sunlight Park Rd and crosses the Don Valley Parkway and Don River, paralleling the NPS 30 XHP river crossing. It then follows Bayview Ave and Mill Street crossing under the railway corridor and Gardiner Expressway east of Cherry St where it connects into the existing NPS 20 HP steel natural gas main at Cherry St. Alternative Route 3- Installation of NPS 20 HP steel Natural Gas Main The third route alternative follows the existing NPS 20 HP steel natural gas main and begins at

7 Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 1, Page 7 of 9 Station B (405 Eastern Avenue), heading east to Booth Ave, then south to Lake Shore Blvd. It then travels west on Lakeshore Blvd, crossing under the Don River, to Cherry St where it connects into the existing NPS 20 HP steel natural gas main. Please note that only one of the proposed routes will be selected for the NPS 20 HP natural gas main installation. 2.0 AUTHORIZATIONS REQUIRED An environmental study following the regulatory framework established by the Ontario Energy Board (OEB) is being initiated. Pending confirmation from the detailed study, potential permits from the following are expected. Federal approvals may include the following: Transport Canada Fisheries & Oceans Canada Provincial approvals may include the following: Ontario Energy Board Infrastructure Ontario Ministry of Natural Resources and Forestry Ministry of Environment and Climate Change Municipal approvals may include the following: Permit to secure easement for installation of pipeline in designated road rights-of-way and for crossing of other infrastructure (i.e., water mains, sewers). Noise By-Law exemptions if work is to be completed outside of permitted hours specified in the by-law. Permit to Injure and/or Remove Trees (woodlands/woodlots) for each municipality, as applicable. Toronto Parks Other notifications, permits and/or approvals that may be required prior to construction are: Toronto Region Conservation Authority Hydro One Networks Incorporated Canadian National Rail/Canadian Pacific Rail/Metrolinx Crossing of other pipelines

8 Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 1, Page 8 of PROJECT ACTIVITIES PLANNING/APPROVALS Planning activities for the project commenced in late 2016 and will continue into 2017/2018 to prepare for construction in Pre-consultation is currently underway along with a review of potential routes. Once a preferred route is defined, Enbridge will commence the design and procurement phase. The design process involves the selection of a specific running line location, appropriate materials, valves/fittings, and location(s) for trenchless activities. Information on ground conditions and existing infrastructure will be gathered and factored into the pipeline design. Site activities typically involved in pipeline design include: Geotechnical analysis, including borehole sampling along the route to assess ground conditions and excavations in the proximity of the Gardiner Expressway; Subsurface utility engineering, to identify the location and depth of existing utilities; and, Soil sampling and testing, to identify suspect soil that might be encountered. Engineered drawings will be produced with the final design and issued to local municipalities and other regulators for approval. With all approvals obtained, the final engineered drawings will be issued for construction. CONSTRUCTION The pipelines and associated facilities may be installed via both open-trench and trenchless technologies. Normal depth of ground cover over the pipeline will be 1.2 m; however, it may be installed deeper to provide additional protection in areas where it crosses underneath existing or proposed infrastructure (roads, sewers, rail lines) and at a reduced cover in order to preserve the flood plain landform and other sensitive environmental and/or socio-economic features. The existing pipe to be decommissioned will be abandoned in accordance with Enbridge s Construction and Maintenance Manual OPERATION Operation of the project will include commissioning of the pipelines and station, and initiation of Enbridge s regular maintenance and monitoring program. The pipeline will be hydrostatically tested and qualified for operation. Enbridge will energize the pipeline with natural gas by connecting to existing, operating pipelines at each end. 4.0 POTENTIAL ENVIRONMENTAL EFFECTS AND MITIGATION MEASURES A detailed environmental and socio-economic effects assessment will be completed as part of the Environmental Assessment for the preferred and alternative routes. The objective of the assessment will be to: Choose a preferred route for construction based on environmental and socio-economic factors

9 Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 1, Page 9 of 9 Predict and analyze the nature and extent of project effects; Identify mitigation measures to protect significant features; and, Determine the significance of any effects remaining following mitigation (net effects), including the significance of combined effects (where applicable). It is anticipated that the majority of adverse environmental and/or socio-economic effects will be construction-related, temporary and transitory, and likely avoided by locating the proposed pipelines within existing, previously disturbed municipal rights-of-way and in other previously disturbed areas/corridors. The pipelines will also be underground once constructed further limiting the potential for any long-term effects. The facilities will be developed to minimize long term impacts. Mitigation measures will be recommended as part of the Environmental Report to minimize potential adverse effects to the environment. These recommendations, in combination with the Enbridge s Construction and Maintenance Manual (2017), should effectively serve to protect environmental features along the preferred route. The mitigation recommendations will be provided in an Environmental Report, along with the Enbridge construction policies, and are anticipated to be included in the contract specifications. Mitigation measures will be based on: Enbridge s Construction and Maintenance Manual (2017); Professional judgment and past experience of the project team; Industry best practices as well as the relevant permitting authority requirements; and, Feedback received as part of the consultation program. 5.0 PROJECT BENEFITS This project is needed to address the current risks and will ensure the continued safe and reliable delivery of natural gas to Enbridge s customers in the Greater Toronto Area. CONTACT INFORMATION Regulatory Kevin Culbert Kevin.culbert@enbridge.com Aboriginal Relations Sonia Fazari Sonia.fazari@enbridge.com Environmental Kelsey Mills Kelsey.mills@enbridge.com

10 Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 2, Page 1 of 2 From: Asha Patel Sent: Tuesday, November 14, :44 PM To: emma.sharkey@ontario.ca Cc: Stephanie Allman Subject: RE: Enbridge Gas Distribution Inc. - Don River - Replacement Project - Duty to Consult Hi Emma, Subsequent to the below being sent to you on October 10, Enbridge now needs to split the Don River Replacement Project into 2 separate projects rather than have it as one project with a segment A and B. Specifically the 2 projects will be: 1. NPS 30 Don River Replacement Project previously segment A 2. NPS 20 Don River Replacement Project previously segment B The details as included in the project summary do not change (attached for your reference). The only change is that Enbridge will be applying to the Board separately for each project. We would like your guidance on how to handle this change in terms of requirements for the duty to consult. The geographic area for both projects is the same and as such Enbridge would like to use the existing project summary which was sent to you on October 10 for both projects. Note however that Enbridge will be addressing the indigenous groups separately for each project. Please let us know if this is satisfactory for the MOE. Regards, Asha Patel Technical Manager Regulatory Applications Enbridge Gas Distribution Consumers Road I North York Ontario I M2J 1P8 enbridgegas.com Integrity. Safety. Respect. From: Stephanie Allman Sent: Tuesday, October 10, :04 PM To: emma.sharkey@ontario.ca Cc: zora.crnojacki@oeb.ca Subject: Enbridge Gas Distribution Inc. - Don River - Replacement Project - Duty to Consult

11 Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 2, Page 2 of 2 Good afternoon, Enbridge Gas Distribution Inc. ( Enbridge ) is seeking guidance from the Ministry of Energy with regards to the need for duty to consult for the Don River Replacement Project. Enbridge has identified the need to eliminate two bridge crossings over the Don River in the City of Toronto. This is a Replacement project. This would not have required a Leave to construct application at the Ontario Energy Board except that new easements are required along the proposed pipeline route. Specifically a new easement is required for a feeder station, approximately 0.06 km x 0.04 km, and will most likely be acquired from Infrastructure Ontario. The project consists of two parts: A. Installation of approximately 300 meters of NPS 30 (Nominal Pipe size 30 inch diameter) Extra High Pressure (XHP) steel natural gas main ( Segment A ) underneath the Don River from Bayview Ave to Sunlight Park Road and the decommissioning of approximately 250 meters of the existing NPS 30. B. Installation of approximately 500 m of NPS 20 XHP main along Bayview Ave to Mill Street; installation of approximately 600 m of NPS 20 High Pressure (HP) from Mill Street to Cherry Street (together Segment B ); installation of a feeder station in the vicinity of Cherry and Mill Street; and the decommissioning of approximately 1.6 km of NPS 20 HP gas main from Station B to Cherry Street. Enbridge has identified two potential routes to replace Segment A and three potential routes to replace Segment B. These routes will be evaluated by an environmental consultant as part of the Environmental Assessment, to select one that is preferred from an environmental and socio-economic perspective; refinement of the routes based on stakeholder input is possible. Project construction is anticipated to begin in Q with commissioning in late Q or Q For further details regarding the Don River Replacement Project, please refer to the attached project description. Please contact me if you have any questions. Thank you Stephanie Allman Regulatory Analyst Regulatory Affairs ENBRIDGE GAS DISTRIBUTION TEL: FAX: Consumers Road North York, Ontario M2J 1P8 enbridgegas.com Integrity. Safety. Respect.

12 Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 3, Page 1 of 4

13 Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 3, Page 2 of 4

14 Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 3, Page 3 of 4

15 Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 4, Page 1 of 8 Joel Denomy Technical Manager, Regulatory Applications Regulatory Affairs tel fax egdregulatoryproceedings@enbridge.com Enbridge Gas Distribution 500 Consumers Road North York, Ontario M2J 1P8 Canada March 26, 2018 VIA Ministry of Energy Shereen Smithanik Senior Policy Advisor, Indigenous Energy Policy Unit 77 Grenville St. 6 th Floor Toronto, ON M7A 1B3 Dear: Ms. Smithanik: Re: Don River Replacement Project-Update The revised Environmental Guidelines for the Location, Construction and Operation of Hydrocarbon Pipelines and Facilities in Ontario (the Guidelines ) issued by the Ontario Energy Board (the Board ) on August 11, 2016 indicate that a project applicant shall provide the Ministry of Energy (the Ministry ) with a description of a project, in the planning process, such that the Ministry can determine if there are any Duty to Consult requirements for the project. On October 10, 2017 Enbridge Gas Distribution Inc. ( Enbridge ) provided to the Ministry a project description for the Don River Replacement Project. Subsequently, on November 14, 2017 Enbridge informed the Ministry via that the Don River Replacement Project would be split into two separate projects: NPS 20 Don River Replacement Project (previously segment B) and NPS 30 Don River Replacement Project (previously segment A). On November 29, 2017 the Ministry issued a letter which delegated the procedural aspects of duty to consult for both projects to Enbridge. The purpose of this letter is to inform the Ministry that Enbridge has determined that the pipeline routing for the NPS 20 Don River Replacement Project has changed from that originally outlined in the October 10 th project description. The routing and timing for the NPS 30 Don River Replacement Project has not changed from that described in the October 10 th letter. Attachment 1 contains an updated description of the NPS 20 Don River Replacement Project s characteristics and its location for the Ministry s review and to assist it with its determination as to whether the determination made in the Ministry s November 28 th letter remains valid.

16 Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 4, Page 2 of 8 While work on the NPS 20 Don River Replacement Project is still in its early stages, Enbridge would be pleased to discuss the project with you should you have any questions. Regards, Joel Denomy, M.A. CFA Technical Manager, Regulatory Applications Enbridge Gas Distribution Inc Cc: Emma Sharkey, Ministry of Energy Morgan Owen, Ministry of Energy

17 Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 4, Page 3 of 8 Attachment 1: NPS 20 Don Valley Replacement Project Description 1.0 PROJECT SUMMARY Enbridge Gas Distribution Inc. ( Enbridge ) is proposing to replace a segment of existing Nominal Pipe Size ( NPS ) 20 inch High Pressure ( HP ) gas main and eliminate an existing bridge crossing in the City of Toronto. Enbridge will be filing a Leave to Construct application with the Ontario Energy Board for the replacement pipeline (the Project ). Enbridge has identified three potential routes and one alternative north tie-in location for the Project. These routes will be evaluated by an environmental consultant as part of the Environmental Assessment ( EA )for the Project. The EA will select the route that is preferred from an environmental and socio-economic perspective. The project consists of: Installation of approximately 1220 m to 1460 m of NPS 20 Extra High Pressure ( XHP ) natural gas pipeline from the existing NPS 30 XHP main on Bayview Avenue; the installation of approximately 540 m to 980 m of NPS 20 HP natural gas pipeline; the installation of a feeder station; and the decommissioning of approximately 1.6 km of NPS 20 HP natural gas pipeline from Station B to Cherry Street. See Figure 1 for details of the proposed route alternatives. Alternative Route 1- Installation of NPS 20 Natural Gas Main The first route alternative begins with the installation of NPS 20 XHP natural gas pipeline at the existing NPS 30 XHP natural gas steel pipeline on Bayview Avenue at Old Brewery Lane. It heads south on Lower River Street and continues in the southerly direction tying into the proposed feeder station at Trinity Street. From the proposed feeder station NPS 20 HP natural gas pipeline will be installed traveling south on Trinity to Mill Street; west on Mill Street to Parliament Street; and south on Parliament Street to tie in at Lakeshore Blvd East. Alternative Route 2 Installation of NPS 20 Natural Gas Main The second route alternative follows the same route as Alternative 1 for the NPS 20 XHP proposed pipeline but differs in the proposed route for the NPS 20 HP pipeline. From the proposed feeder station at Trinity Street the proposed NPS 20 HP pipeline heads south on Trinity Street to Mill Street; East on Mill Street to Tannery Road; South on Tannery extension to tie in at Lakeshore Blvd East. Alternative Route 3- Installation of NPS 20 Natural Gas Main The third route alternative begins with the installation of NPS 20 XHP natural gas main at the existing NPS 30 XHP natural gas steel pipeline on Bayview Avenue at Old Brewery Lane. It heads south on Lower River Street and continues in the southerly direction until the alternative location for the proposed station at Tannery Road. From the proposed feeder station NPS 20

18 Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 4, Page 4 of 8 HP natural gas main will be installed south on the Service Road to tie in at Lakeshore Blvd East. Alternative Tie in- Installation of NPS 20 Natural Gas Main An alternative north tie-in location for all three of the above proposed alternatives has been proposed, should the land between Queen Street and King Street not be feasible. For this alternate north tie-in point the proposed NPS 20 XHP natural gas main would tie in to the existing NPS 30 XHP natural gas pipeline on Bayview Avenue, then head west along Labatt Avenue to River Street and south on River Street where it would tie-in to the existing above route alternatives on River Street. Where possible the proposed pipelines will be located within existing road allowances. Other corridors may be used if needed. Temporary working space and laydown areas may also be required adjacent to these areas to facilitate the movement and storage of equipment necessary for construction. Enbridge will work with regulators and landowners to identify and secure appropriate working space as required. Project construction is anticipated to begin in Q4 of 2019 with commissioning in late PROJECT INFORMATION Enbridge currently operates more than 37,000 kilometers of underground natural gas distribution pipelines serving more than 2 million customers. Upon completion of the project the proposed pipeline will be located below ground eliminating the need for the bridge crossing. 3.0 AUTHORIZATIONS REQUIRED An ER for the Project will be prepared using the Ontario Energy Board s (the Board ) 2016 Environmental Guidelines for the Location, Construction and Operation of Hydrocarbon Pipelines and Facilities in Ontario (the Guidelines ). The ER will identify the potential authorizations required. Enbridge s preliminary work on the Project has identified the following potential authorizations: Federal approvals may include the following: Fisheries & Oceans Canada Provincial approvals may include the following: Ontario Energy Board (OEB) Infrastructure Ontario (IO) Ministry of Natural Resources and Forestry (MNRF) Ministry of Environment and Climate Change (MOECC) Ministry of Tourism, Culture and Sport (MTCS) Toronto Portlands Company Municipal approvals may include the following: Toronto and Region Conservation Authority (TRCA) City of Toronto all applicable approvals

19 Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 4, Page 5 of 8 Other notifications, permits and/or approvals that may be required prior to construction are: Hydro One Networks Incorporated Canadian National Rail/Canadian Pacific Rail/Metrolinx Other authorization, notification, permits and/or approvals may be required in addition to those identified above. 4.0 PROJECT ACTIVITIES PLANNING/APPROVALS Planning activities for the project have been designed to prepare for and commence construction in Q Pursuant to the Guidelines an ER will be prepared and geotechnical and archaeological studies will be completed. Upon receiving leave to construct from the Board, Enbridge will commence the design and procurement phase. The design process involves the selection of a specific running line location, appropriate materials, and the selection of valves and fittings. Information obtained from geotechnical analysis, subsurface utility engineering and soil sampling is typically used to inform pipeline design. Engineered drawings will be produced with the final design and issued to local municipalities and other regulators for approval. Once all approvals obtained, the final engineered drawings will be prepared for construction. The pipelines and associated facilities may be installed via both open-trench and trenchless technologies. Normal depth of ground cover over the pipeline will be 1.2 m; however, it may be installed deeper to provide additional protection in areas where it crosses underneath existing or proposed infrastructure and other sensitive environmental and/or socio-economic features. The existing pipe to be decommissioned will be abandoned in accordance with Enbridge s Construction and Maintenance Manual POTENTIAL ENVIRONMENTAL EFFECTS AND MITIGATION MEASURES A detailed environmental and socio-economic effects assessment will be completed as part of the Environmental Assessment for the preferred and alternative routes. The objective of the assessment will be to: Choose a preferred route for construction based on environmental and socioeconomic factors Predict and analyze the nature and extent of project effects; Identify mitigation measures to protect significant features; and, Determine the significance of any effects remaining following mitigation (net effects), including the significance of combined effects (where applicable).

20 Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 4, Page 6 of 8 It is anticipated that the majority of adverse environmental and/or socio-economic effects will be construction-related, temporary and transitory, and likely avoided by locating the proposed pipelines within existing, previously disturbed municipal rights-of-way and in other previously disturbed areas/corridors. The pipelines will also be underground once constructed further limiting the potential for any long-term effects. The facilities will be developed to minimize long term impacts. Mitigation measures will be recommended as part of the Environmental Report to minimize potential adverse effects to the environment. These recommendations, in combination with the Enbridge s Construction and Maintenance Manual (2017), should effectively serve to protect environmental features along the preferred route. The mitigation recommendations will be provided in an Environmental Report, along with the Enbridge construction policies, and are anticipated to be included in the contract specifications. Mitigation measures will be based on: Enbridge s Construction and Maintenance Manual (2017); Professional judgment and past experience of the project team; Industry best practices as well as the relevant permitting authority requirements; and, Feedback received as part of the consultation program. 6.0 PROJECT BENEFITS This project is needed to address the current risks and will ensure the continued safe and reliable delivery of natural gas to Enbridge s customers in the Greater Toronto Area. CONTACT INFORMATION Regulatory Joel Denomy Joel.denomy@enbridge.com Aboriginal Relations Sonia Fazari Sonia.fazari@enbridge.com Environmental Kelsey Mills Kelsey.mills@enbridge.com

21 Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 4, Page 7 of 8

22 Figure 1: Proposed Route Alternatives for the NPS 20 Don Valley Replacement Pipeline Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 4, Page 8 of 8

23 Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 5, Page 1 of 2

24 Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 5, Page 2 of 2

25 Filed: , EB , Exhibit F, Tab 1, Schedule 1, Attachment 6, Page 1 of 1 Indigenous Peoples Policy VERSION October 16, 2017 Enbridge recognizes the diversity of Indigenous peoples who live where we work and operate. We understand that the history of Indigenous peoples in both Canada and the United States has included social and economic exclusion, and Enbridge recognizes the importance of reconciliation between Indigenous communities and broader society. Positive relationships with Indigenous peoples, based on mutual respect and focused on achieving common goals, will create constructive outcomes for Indigenous communities and for Enbridge. Enbridge commits to pursue sustainable relationships with Indigenous communities in proximity to where Enbridge conducts business. To achieve this, Enbridge will govern itself by the following principles: We recognize the legal and constitutional rights possessed by Indigenous peoples, and the importance of the relationship between Indigenous peoples and their traditional lands and resources. We commit to working with Indigenous communities in a manner that recognizes and respects those legal and constitutional rights and the traditional lands and resources to which they apply, and we commit to ensuring that our projects and operations are carried out in an environmentally responsible manner. We recognize the importance of the United Nations Declaration on the Rights of Indigenous Peoples in the context of existing Canadian law and the legal and constitutional obligations governments in both Canada and the US have to protect those rights. We engage in forthright and sincere consultation with Indigenous peoples about Enbridge's projects and operations through processes that seek to achieve early and meaningful engagement so their input can help define our projects that may occur on lands traditionally occupied by Indigenous peoples. We commit to working with Indigenous peoples to achieve benefits for them resulting from Enbridge's projects and operations, including opportunities in training and education, employment, procurement, business development, and community development. We foster understanding of the history and culture of Indigenous peoples among Enbridge's employees and contractors, in order to create better relationships between Enbridge and Indigenous communities. This commitment is a shared responsibility involving Enbridge and its affiliates, employees and contractors, and we will conduct business in a manner that reflects the above principles. Enbridge will provide ongoing leadership and resources to ensure the effective implementation of the above principles, including the development of implementation strategies and specific action plans. Enbridge commits to periodically review this policy to ensure it remains relevant and meets changing expectations.

Filed: , EB , Exhibit C, Tab 1, Schedule 3, Attachment 2, Appendix 1, Page 1 of 2

Filed: , EB , Exhibit C, Tab 1, Schedule 3, Attachment 2, Appendix 1, Page 1 of 2 Filed: 2018-07-04, EB-2018-0108, Exhibit C, Tab 1, Schedule 3, Attachment 2, Appendix 1, Page 1 of 2 From: To: Subject: Date: Kelsey Mills Kelsey Mills EB-2018-0108 - Don River 30" Replacement Project

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND ORDER EB UNION GAS LIMITED

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND ORDER EB UNION GAS LIMITED Commission de l énergie de l Ontario DECISION AND ORDER UNION GAS LIMITED Application for approval to construct a natural gas pipeline in the City of Greater Sudbury BEFORE: Lynne Anderson Presiding Member

More information

ENVIRONMENTAL ASSESSMENT ACT SECTION 9 NOTICE OF APPROVAL TO PROCEED WITH THE UNDERTAKING

ENVIRONMENTAL ASSESSMENT ACT SECTION 9 NOTICE OF APPROVAL TO PROCEED WITH THE UNDERTAKING ENVIRONMENTAL ASSESSMENT ACT SECTION 9 NOTICE OF APPROVAL TO PROCEED WITH THE UNDERTAKING RE: An Environmental Assessment for the Easterly Extension of the 407 Transportation Corridor Proponent: EA File

More information

CERTIFICATE OC-063. IN THE MATTER OF the National Energy Board Act (NEB Act) and the regulations made thereunder; and

CERTIFICATE OC-063. IN THE MATTER OF the National Energy Board Act (NEB Act) and the regulations made thereunder; and BEFORE the Board on 19 April 2016. CERTIFICATE IN THE MATTER OF the National Energy Board Act (NEB Act) and the regulations made thereunder; and IN THE MATTER OF an application dated 5 November 2014 under

More information

Mr. Rob Phil Archaeological Services Inc. 528 Bathurst Street Toronto, Ontario M5S 2P9

Mr. Rob Phil Archaeological Services Inc. 528 Bathurst Street Toronto, Ontario M5S 2P9 Ministry of Tourism and Culture Culture Programs Unit Programs & Services Br. 900 Highbury Avenue Tel: 519-675-6898 Fax: 519-675-7777 July 14, 2011 Ministre du Tourisme et de la Culture Unité des programmes

More information

Impacts from the July 8, 2013 Storm Event on the City of Toronto

Impacts from the July 8, 2013 Storm Event on the City of Toronto STAFF REPORT ACTION REQUIRED Impacts from the July 8, 2013 Storm Event on the City of Toronto Date: September 10, 2013 To: From: Wards: Executive Committee City Manager All Reference Number: SUMMARY The

More information

National Energy Board Decision on Enbridge Line 9B Application Follow Up Actions

National Energy Board Decision on Enbridge Line 9B Application Follow Up Actions STAFF REPORT ACTION REQUIRED National Energy Board Decision on Enbridge Line 9B Application Follow Up Actions Date: August 12, 2014 To: From: Wards: City Council City Manager and City Solicitor All Reference

More information

Delegation of Authority for the Remainder of the Council Term

Delegation of Authority for the Remainder of the Council Term EX36.4 REPORT FOR ACTION Delegation of Authority for the Remainder of the 2014-2018 Council Term Date: July 11, 2018 To: Executive Committee From: Interim City Manager and Interim Chief Financial Officer

More information

Date: December 5, 2017 To: Budget Committee From: Deputy City Manager Cluster B and Acting Chief Financial Officer Wards: Ward 30

Date: December 5, 2017 To: Budget Committee From: Deputy City Manager Cluster B and Acting Chief Financial Officer Wards: Ward 30 EX31.2w REPORT FOR ACTION Port Lands Flood Protection Date: December 5, 2017 To: Budget Committee From: Deputy City Manager Cluster B and Acting Chief Financial Officer Wards: Ward 30 SUMMARY This report

More information

ATCO Gas and Pipelines Ltd. (South)

ATCO Gas and Pipelines Ltd. (South) Decision 22634-D01-2017 Southwest Calgary Connector Pipeline Project August 9, 2017 Alberta Utilities Commission Decision 22634-D01-2017 Southwest Calgary Connector Pipeline Project Proceeding 22634 Application

More information

NOTICE OF REVISED APPLICATION

NOTICE OF REVISED APPLICATION Ontario Energy Board Commission de l énergie de l Ontario EB-2012-0451 NOTICE OF REVISED APPLICATION Enbridge Gas Distribution Inc. has requested to revise its application for approval to build two segments

More information

Region of Waterloo Transportation and Environmental Services Rapid Transit

Region of Waterloo Transportation and Environmental Services Rapid Transit Region of Waterloo Transportation and Environmental Services Rapid Transit To: Chair Tom Galloway and Members of the Planning and Works Committee Date: November 17, 2015 File Code: D09-00(A) Subject: Stage

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998,S.O.1998, c. 15 (Schedule B) pursuant to section 90(1);

IN THE MATTER OF the Ontario Energy Board Act, 1998,S.O.1998, c. 15 (Schedule B) pursuant to section 90(1); Ontario Energy Board Commission de l Énergie de l Ontario EB-2010-0302 IN THE MATTER OF the Act, 1998,S.O.1998, c. 15 (Schedule B) pursuant to section 90(1); AND IN THE MATTER OF an application by Enbridge

More information

SHIFT RAPID TRANSIT MASTER PLAN AND BUSINESS CASE RECOMMENDATION

SHIFT RAPID TRANSIT MASTER PLAN AND BUSINESS CASE RECOMMENDATION TO: FROM: SUBJECT: CHAIR AND MEMBERS STRATEGIC PRIORITIES AND POLICIES COMMITTEE MEETING ON JULY 24, 2017 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR ENVIRONMENTAL & ENGINEERING SERVICES AND CITY

More information

The Bison Pipeline Project. Public Disclosure Document

The Bison Pipeline Project. Public Disclosure Document The Bison Pipeline Project Public Disclosure Document Who is involved with the Bison project? Bison Pipeline Ltd. (Bison Pipeline), a wholly owned subsidiary of BC Gas Inc., has released a public disclosure

More information

Waterfront Revitalization Initiative

Waterfront Revitalization Initiative CAPITAL BUDGET NOTES Waterfront Revitalization Initiative 2018 2027 CAPITAL BUDGET AND PLAN OVERVIEW The revitalization of Toronto's Waterfront is a 25 to 30 year project, in coordination with the three

More information

ACR Aboriginal Programs Project Program Template

ACR Aboriginal Programs Project Program Template ACR Aboriginal Programs Project Program Template Program Area: 5.0 Resource Stewardship Sub Program: 5.2 Implementing Consultation Processes for Resource Access and Management Template: 5.2.1 Aboriginal

More information

Toronto & Region Conservation Authority (TRCA)

Toronto & Region Conservation Authority (TRCA) OPERATING ANALYST NOTES OPERATING PROGRAM SUMMARY Contents Toronto & Region Conservation Authority (TRCA) 2014 OPERATING BUDGET OVERVIEW What We Do TRCA protects, restores and celebrates the natural environment

More information

Pipeline Application

Pipeline Application Pipeline Application Crude Oil Pipeline From 12-30-001-25 W1M to 13-17-009-28 W1M And NGL Pipeline From 12-30-001-25 W1M to 13-17-010-28 W1M Southwestern Manitoba Manitoba Innovation, Energy and Mines

More information

Metrolinx-City of Toronto-Toronto Transit Commission Master Agreement for Light Rail Transit Projects

Metrolinx-City of Toronto-Toronto Transit Commission Master Agreement for Light Rail Transit Projects STAFF REPORT ACTION REQUIRED Metrolinx-City of Toronto-Toronto Transit Commission Master Agreement for Light Rail Transit Projects Date: October 23, 2012 To: From: Wards: City Council City Manager All

More information

Electricity Power System Planning

Electricity Power System Planning Chapter 3 Section 3.02 Ministry of Energy Electricity Power System Planning Standing Committee on Public Accounts Follow-Up on Section 3.05, 2015 Annual Report The Committee held a public hearing in November

More information

Wastewater Treatment Project

Wastewater Treatment Project Wastewater Treatment Project Quarterly Report (Reporting Period: April, 2017 to June, 2017) September 05, 2017 Quarterly Report - Summary The Project is progressing as planned. Construction of the McLoughlin

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND ORDER EB UNION GAS LIMITED. BEFORE: Susan Frank Presiding Member

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND ORDER EB UNION GAS LIMITED. BEFORE: Susan Frank Presiding Member Commission de l énergie de l Ontario DECISION AND ORDER UNION GAS LIMITED Application for leave to construct a natural gas transmission pipeline and associated facilities in the Town of Lakeshore and the

More information

A loyal three made stronger in one. Loyalist Township Strategic Plan ( )

A loyal three made stronger in one. Loyalist Township Strategic Plan ( ) A loyal three made stronger in one Loyalist Township Strategic Plan (2012-2015) Adopted by Council on August 13, 2012 Loyalist Township Strategic Plan I. Community Profile As prescribed by the Ministry

More information

Receive and file capital works report CW providing an update on the Burloak grade separation.

Receive and file capital works report CW providing an update on the Burloak grade separation. Page 1 of Report CW-13-17 SUBJECT: Burloak Grade Separation Project Update TO: FROM: Committee of the Whole Capital Works Report Number: CW-13-17 Wards Affected: 5 File Numbers: 570.02-818 Date to Committee:

More information

6.0 MONITORING AND CONTINGENCY PLANS

6.0 MONITORING AND CONTINGENCY PLANS 6.0 MONITORING AND CONTINGENCY PLANS 6.1 MONITORING The primary objective of compliance and effects monitoring is to confirm whether mitigation and protective measures are effectively implemented and to

More information

Filed: , EB /EB , Exhibit JT1.21, Attachment 1, Page 1 of November 2017

Filed: , EB /EB , Exhibit JT1.21, Attachment 1, Page 1 of November 2017 Filed: 2018-04-04, EB-2017-0306/EB-2017-0307, Exhibit JT1.21, Attachment 1, Page 1 of 9 22 November 2017 The New Enbridge SLIDE 2 Filed: 2018-04-04, EB-2017-0306/EB-2017-0307, Exhibit JT1.21, Attachment

More information

Enbridge Battle Sands 594S Substation Connection Needs Identification Document

Enbridge Battle Sands 594S Substation Connection Needs Identification Document APPENDIX C AESO PIP Enbridge Battle Sands 594S Substation Connection Needs Identification Document 1.0 Participant Involvement Program (PIP) From June to October 2015, the AESO conducted a Participant

More information

RE: An Environmental Assessment for the Lakeview Waterfront Connection. Proponents: Credit Valley Co~se rvat ion and the Region of Peel

RE: An Environmental Assessment for the Lakeview Waterfront Connection. Proponents: Credit Valley Co~se rvat ion and the Region of Peel Page 1 of 6 Having considered the purpose of the Environmental Assessment Act, the approved Terms of Reference, the environmental assessment, the Ministry Review of the environmental assessment and submissions

More information

The Corporation of the Municipality of Chatham-Kent

The Corporation of the Municipality of Chatham-Kent Consolidated financial statements of The Corporation of the Municipality of Table of contents Independent Auditor s Report... 1-2 Consolidated statement of financial position... 3 Consolidated statement

More information

GLNG PROJECT - ENVIRONMENTAL IMPACT STATEMENT

GLNG PROJECT - ENVIRONMENTAL IMPACT STATEMENT 7 Values and Management of Impacts J:\Jobs\42626220\07 Deliverables\EIS\FINAL for Public Release\7. Values and Management of Impacts\7-12 Visual Amenity\07 12 Visual Amenity (Section 7.12) FINAL PUBLIC.doc

More information

Strategic Asset Management Policy

Strategic Asset Management Policy Strategic Asset Management Policy Submission Date: 2018-04-24 Approved by: Council Approval Date: 2018-04-24 Effective Date: 2018-04-24 Resolution Number: Enter policy number. Next Revision Due: Enter

More information

Page 1 ARR

Page 1 ARR Page 1 Page 2 Page 3 Page 4 TRANS MOUNTAIN EXPANSION RECEIVES STRONG BINDING COMMERCIAL SUPPORT Customers Submit Binding Bids for 660,000 Barrels per Day Next Steps - Extensive Engagement and Regulatory

More information

STUDY SCHEDULE STUDY PURPOSE

STUDY SCHEDULE STUDY PURPOSE STUDY SCHEDULE This Open House is the last of three public meetings for the Route Centennial Bridge Study. The material presented previously at the second Open House in July 2015 focused upon Corridor

More information

DECISION AND ORDER ON PHASE 1

DECISION AND ORDER ON PHASE 1 Commission de l énergie de l Ontario DECISION AND ORDER ON PHASE 1 HYDRO ONE NETWORKS INC. Leave to construct a new transmission line and facilities in the Windsor-Essex Region, Ontario. Before: Ken Quesnelle

More information

Allen Road Individual Environmental Assessment (EA)

Allen Road Individual Environmental Assessment (EA) STAFF REPORT ACTION REQUIRED PW14.8 Allen Road Individual Environmental Assessment (EA) Date: June 3, 2016 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager,

More information

PLANNING, HOUSING AND COMMUNITY SERVICES Transportation Planning

PLANNING, HOUSING AND COMMUNITY SERVICES Transportation Planning REGION OF WATERLOO PLANNING, HOUSING AND COMMUNITY SERVICES Transportation Planning TO: Chair Jim Wideman and Members of the Planning and Works Committee DATE: February 1, 2005 FILE CODE: D10-20/CTC SUBJECT:

More information

2016/17 Annual Corporate Plan

2016/17 Annual Corporate Plan 2016/17 Annual Corporate Plan Pg. 1 Introduction In accordance with the Toronto Waterfront Revitalization Corporation Act, 2002 (TWRC Act), the Corporation is required to adopt an annual business plan.

More information

ENBRIDGE PIPELINES (VIRDEN) INC. Proposed NGL Injection Station and Connecting Pipeline W1M to W1M Near Cromer, Manitoba

ENBRIDGE PIPELINES (VIRDEN) INC. Proposed NGL Injection Station and Connecting Pipeline W1M to W1M Near Cromer, Manitoba ENBRIDGE PIPELINES (VIRDEN) INC. Proposed NGL Injection Station and Connecting Pipeline 06-20-09-28 W1M to 03-20-09-28 W1M Near Cromer, Manitoba Manitoba Innovation, Energy and Mines Project Application

More information

REFURBISHMENT AND NEW GENERATION NUCLEAR

REFURBISHMENT AND NEW GENERATION NUCLEAR Filed: 00--0 EB-00-00 Exhibit D Tab Page of 0 0 0 REFURBISHMENT AND NEW GENERATION NUCLEAR.0 PURPOSE The purpose of this evidence is to present an overview description of the nuclear plant refurbishment

More information

Toronto and Region Conservation Authority - Additional Information for the Long Term Accommodation Project

Toronto and Region Conservation Authority - Additional Information for the Long Term Accommodation Project REPORT FOR ACTION Toronto and Region Conservation Authority - Additional Information for the Long Term Accommodation Project Date: February 14, 2017 To: City Council From: Deputy City Manager & Chief Financial

More information

AltaLink Management Ltd.

AltaLink Management Ltd. Decision 22025-D03-2017 Red Deer Area Transmission Development Amendment Application June 8, 2017 Decision 22025-D03-2017 Red Deer Area Transmission Development Amendment Application Proceeding 22025 Applications

More information

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Growth Management Division

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Growth Management Division CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Growth Management Division TO: Mayor and Members General Issues Committee COMMITTEE DATE: June 20, 2018 SUBJECT/REPORT NO: WARD(S) AFFECTED:

More information

Public Notice. Proposed anchor structures, dredging, and discharge at the Enbridge Line 5 pipeline in the Straits of Mackinac, Michigan

Public Notice. Proposed anchor structures, dredging, and discharge at the Enbridge Line 5 pipeline in the Straits of Mackinac, Michigan US Army Corps of Engineers Detroit District Public Notice Applicant: Enbridge Pipelines (Lakehead), LLC In Reply Refer To: Corps File No. LRE-2010-00463-56-N18 Date: January 29, 2019 Expires: February

More information

ENERGY PARTNERSHIPS PROGRAM APPENDIX 1 DEFINITIONS

ENERGY PARTNERSHIPS PROGRAM APPENDIX 1 DEFINITIONS ENERGY PARTNERSHIPS PROGRAM APPENDIX 1 DEFINITIONS Version 1.0 (June 13, 2016) IESO, 2016 APPENDIX 1 DEFINITIONS Term or Acronym Acceptance Period Access Rights ACEP Activities Affiliate Applicant Applicant

More information

LETTER DECISION Kinder Morgan Cochin ULC (KM Cochin) Application pursuant to section 58 and Part IV (Application) of the National Energy Board Act

LETTER DECISION Kinder Morgan Cochin ULC (KM Cochin) Application pursuant to section 58 and Part IV (Application) of the National Energy Board Act File OF-Fac-Oil-K077-2012-01 01 13 June 2013 LETTER DECISION Mr. Peter J. Forrester Assistant General Counsel Kinder Morgan Group of Companies Kinder Morgan Canada Inc. Suite 2700, 300-5 th Avenue S.W.

More information

Applying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA

Applying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA Applying for a Kinder Morgan Canada Proximity Permit Design and Construction Guidelines CANADA A Guide to Applying for a Kinder Morgan Canada Proximity Permit Kinder Morgan Canada operates the Trans Mountain

More information

Block 31 in the Railway Lands: Development Agreement, Update and Next Steps

Block 31 in the Railway Lands: Development Agreement, Update and Next Steps STAFF REPORT ACTION REQUIRED Block 31 in the Railway Lands: Development Agreement, Update and Next Steps Date: January 20, 2014 To: From: Wards: Executive Committee Brenda Patterson, Deputy City Manager,

More information

TOWNSHIP OF WEST LINCOLN

TOWNSHIP OF WEST LINCOLN TOWNSHIP OF WEST LINCOLN April 18, 2016 dfa DFA Infrastructure International Inc. dfa DFA Infrastructure International Inc. 664-B Vine Street St. Catharines Ontario Canada L2M 7L8 Telephone: (905) 938-0965

More information

LETTER DECISION. File OF-Fac-OtherComm-H October 2016

LETTER DECISION. File OF-Fac-OtherComm-H October 2016 LETTER DECISION File OF-Fac-OtherComm-H109-2016-01 01 31 October 2016 Mr. Shawn Gowrie Regulatory Technician Husky Oil Operations Limited Box 6525, Station D 707 8 th Avenue SW Calgary, AB T2P 3G7 Facsimile

More information

Purpose. 2 Third Crossing Business Plan

Purpose. 2 Third Crossing Business Plan Business Plan April 18, 2017 Purpose This is the third of three information sheets on critical pieces of work related to the preliminary design and business plan development for the Third Crossing. This

More information

OPERATING ENVIRONMENT

OPERATING ENVIRONMENT Toronto Hydro-Electric System Limited EB-2014-0116 Exhibit 1C Tab 1 Schedule 1 ORIGINAL Page 1 of 2 1 OPERATING ENVIRONMENT 2 3 4 5 6 7 8 Toronto Hydro-Electric System Limited ( Toronto Hydro ) is the

More information

NOTICE OF DECISION CONSENT (Section 53 of the Planning Act)

NOTICE OF DECISION CONSENT (Section 53 of the Planning Act) City Planning Division North York Civic Centre 5100 Yonge Street North York, Ontario Canada, M2N 5V7 Tel: (416) 397-5330 Fax: (416) 395-7200 Wednesday, April 19, 2017 NOTICE OF DECISION CONSENT (Section

More information

THE ESTIMATES, MINISTRY OF ENERGY SUMMARY $ $ $ $ OPERATING

THE ESTIMATES, MINISTRY OF ENERGY SUMMARY $ $ $ $ OPERATING THE ESTIMATES, 2004-05 1 SUMMARY The Ministry of Energy's mandate includes the creation of an energy conservation culture while ensuring a reliable, sustainable, and diverse supply of power at stable and

More information

SHELL CANADA OIL SANDS EXPANSION: Jackpine Mine Expansion & Pierre River Mine Public Disclosure

SHELL CANADA OIL SANDS EXPANSION: Jackpine Mine Expansion & Pierre River Mine Public Disclosure SHELL CANADA OIL SANDS EXPANSION: Jackpine Mine Expansion & Pierre River Mine Public Disclosure January 2007 SHELL CANADA OIL SANDS EXPANSION SHELL CANADA OIL SANDS EXPANSION: Jackpine Mine Expansion

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique Greystone Village Inc. 1737 Woodward Drive, Unit.

More information

PROPERTY TAXES. A summary of taxes other than income and capital taxes is presented below: Table 1 ($ Millions)

PROPERTY TAXES. A summary of taxes other than income and capital taxes is presented below: Table 1 ($ Millions) Updated: February, 00 EB-00-0 Exhibit C Tab Schedule Page of PROPERTY TAXES A summary of taxes other than income and capital taxes is presented below: Description Property Tax Indemnity Payment Rights

More information

ATCO Gas and Pipelines Ltd. (South)

ATCO Gas and Pipelines Ltd. (South) Decision 3421-D01-2015 Northeast Calgary Connector Pipeline January 16, 2015 The Alberta Utilities Commission Decision 3421-D01-2015: Northeast Calgary Connector Pipeline Application 1610854 Proceeding

More information

2018 Budget Public Budget Consultation Meeting November 16 th, 2017

2018 Budget Public Budget Consultation Meeting November 16 th, 2017 2018 Budget Public Budget Consultation Meeting November 16 th, 2017 2 1. 2018 Budget Process and Communications Plan 2. 2018 Proposed Capital Budget a. Funding Sources b. Expenditures c. Life Cycle Reserve

More information

Discussion Paper: DAMAGE PREVENTION FRAMEWORK FOR FEDERALLY REGULATED POWER LINES

Discussion Paper: DAMAGE PREVENTION FRAMEWORK FOR FEDERALLY REGULATED POWER LINES Discussion Paper: DAMAGE PREVENTION FRAMEWORK FOR FEDERALLY REGULATED POWER LINES Discussion Paper: Damage Prevention Framework for Federally Regulated Power Lines Introduction Bill C-69, which creates

More information

ATCO Gas and Pipelines Ltd. (South)

ATCO Gas and Pipelines Ltd. (South) Decision 2010-170 New Construction Replacement of ATCO Pipelines Existing Southern Extension Pipeline From North of Lacombe to East of Gwynne April 15, 2010 ALBERTA UTILITIES COMMISSION Decision 2010-170:

More information

Financial Statements. Toronto and Region Conservation Authority. December 31, 2014

Financial Statements. Toronto and Region Conservation Authority. December 31, 2014 Financial Statements Toronto and Region Conservation Authority December 31, 2014 Contents Page Independent Auditor s Report 1-2 Statement of Financial Position 3 Statement of Operations and Accumulated

More information

2019 CAPITAL BUDGET BRIEFING NOTE State of Good Repair (SOGR) Backlog

2019 CAPITAL BUDGET BRIEFING NOTE State of Good Repair (SOGR) Backlog BN#13 Feb 13 Josie La Vita Executive Director Heather Taylor Chief Financial Officer and Treasurer Financial Planning Division City Hall, 7 th Floor, East Tower 100 Queen Street West Toronto, Ontario,

More information

2. CONSULTATION PROCESS

2. CONSULTATION PROCESS Design and Construction Report #2 35 of 129 610706-00-6D-RR-CGP-R002 01 2. CONSULTATION PROCESS Consultation is an integral component of various pieces of provincial and federal environmental legislation.

More information

OTHER OPERATING COST ITEMS

OTHER OPERATING COST ITEMS Filed: 2007-11-30 EB-2007-0905 Exhibit F3 Tab 2 Schedule 1 Page 1 of 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 OTHER OPERATING COST ITEMS 1.0 PURPOSE The purpose

More information

Ministère du Tourisme, de la Culture et du Sport

Ministère du Tourisme, de la Culture et du Sport Page 1 of 3 Ministry of Tourism, Culture and Sport Archaeology Programs Unit Programs and Services Branch Culture Division 401 Bay Street, Suite 1700 Tel.: (519) 675-6898 Email: Shari.Prowse@ontario.ca

More information

National Disaster Mitigation Program NDMP Overview, Ontario Projects, and Final Call for Proposals

National Disaster Mitigation Program NDMP Overview, Ontario Projects, and Final Call for Proposals National Disaster Mitigation Program NDMP Overview, Ontario Projects, and Final Call for Proposals March 6, 2018 NDMP Overview The NDMP is a 5-year federal program that set out $183 million for flood mitigation

More information

SUBJECT: Burloak Drive grade separation and Drury Lane pedestrian bridge update

SUBJECT: Burloak Drive grade separation and Drury Lane pedestrian bridge update Page 1 of Report CW-13-18 SUBJECT: Burloak Drive grade separation and Drury Lane pedestrian bridge update TO: FROM: Committee of the Whole Capital Works Report Number: CW-13-18 Wards Affected: 2 and 5

More information

City of Kingston Information Report to Rural Advisory Committee Report Number RAC

City of Kingston Information Report to Rural Advisory Committee Report Number RAC To: From: Resource Staff: City of Kingston Information Report to Rural Advisory Committee Report Number RAC-14-006 Chair and Members of the Rural Advisory Committee Cynthia Beach, Commissioner, Corporate

More information

National Energy Board Report

National Energy Board Report National Energy Board Report Enbridge Pipelines Inc. OH-002-2015 Volume I: Our Decisions and Recommendations April 2016 Facilities National Energy Board National Energy Board Report In the Matter of Enbridge

More information

Overview of the Northern Gateway Pipelines Project March 2013

Overview of the Northern Gateway Pipelines Project March 2013 Overview of the Northern Gateway Pipelines Project March 2013 New Market Access Required to Earn Full Value Petroleum Landscape: Global Demand Growth Going Up but USA Demand Going Down USA Supply Going

More information

Leadership & Safety Culture

Leadership & Safety Culture Leadership & Safety Culture PIPELINE PERFORMANCE: RAISING THE BAR Patrick Smyth, VP Safety & Engineering 28 April 2016 Who is CEPA? The Canadian Energy Pipeline Association (CEPA) represents Canada s transmission

More information

PROPERTY TAXES 1.0 A SUMMARY OF TAXES OTHER THAN INCOME TAX. A summary of taxes other than income and capital taxes is presented below:

PROPERTY TAXES 1.0 A SUMMARY OF TAXES OTHER THAN INCOME TAX. A summary of taxes other than income and capital taxes is presented below: Filed: May, EB--000 Exhibit C Schedule Page of PROPERTY TAXES.0 A SUMMARY OF TAXES OTHER THAN INCOME TAX A summary of taxes other than income and capital taxes is presented below: Table ($ Millions) Description

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

National Energy Board Suite 210, 517 Tenth Avenue SW Calgary, Alberta T2R 0A8. Attention: Ms. Sheri Young, Secretary of the Board. Dear Ms.

National Energy Board Suite 210, 517 Tenth Avenue SW Calgary, Alberta T2R 0A8. Attention: Ms. Sheri Young, Secretary of the Board. Dear Ms. 450-1 Street SW Calgary, Alberta T2P 5H1 Tel: (403) 920-2940 Fax: (403) 920-2347 E-mail: nicole_prince@transcanada.com March 15, 2018 Filed Electronically National Energy Board Suite 210, 517 Tenth Avenue

More information

MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN

MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN MUNICIPALITY OF ARRAN-ELDERSLIE CHESLEY DRINKING WATER SYSTEM FINANCIAL PLAN 15-013 GSS Engineering Consultants Ltd. Unit 104D 1010 9 th Avenue West Owen Sound ON N4K 5R7 519.372.4828 TABLE OF CONTENTS

More information

EXECUTIVE SUMMARY OF APPLICATION

EXECUTIVE SUMMARY OF APPLICATION Updated: 0-0-0 EB-0-00 Page of EXECUTIVE SUMMARY OF APPLICATION. SCOPE OF APPLICATION Hydro One Networks Inc. ( Hydro One ) is applying for an Order approving the revenue requirement, cost allocation and

More information

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT COMBINED MONTHLY AND QUARTERLY PROGRESS REPORT FOR QUARTER ENDING JUNE 30, 2014 GEORGE MASSEY TUNNEL MONTHLY STATUS REPORT SEPTEMBER 2017 FOREWORD TO MONTHLY STATUS REPORT On September 6, 2017, the Minister

More information

The application. Preamble:

The application. Preamble: Page 1 of 23 RÉGIE DE L ÉNERGIE S (THE RÉGIE) REQUEST FOR INFORMATION NO. 9 RELATING TO THE APPLICATION CONCERNING THE ALLOCATION OF COSTS AND RATE STRUCTURE METHODOLOGY FOR EVALUATING PROFITABILITY OF

More information

WRITTEN EVIDENCE of the Copetown Landowners Group

WRITTEN EVIDENCE of the Copetown Landowners Group NATIONAL ENERGY BOARD IN THE MATTER OF the National Energy Board Act, R.S.C. 1985, c. N-7, as amended, and the Regulations made thereunder; AND IN THE MATTER OF an application by Enbridge Pipelines Inc.

More information

Docks and Watercraft Placement Fronting RM 622- managed Shorefront; Lac des Iles South Shoreline

Docks and Watercraft Placement Fronting RM 622- managed Shorefront; Lac des Iles South Shoreline Policy Type: Policy Title: 700 Recreation & Culture Docks and Watercraft Placement Fronting RM 622- managed Shorefront; Lac des Iles South Shoreline Authority: Resolution 229-07 Resolution 52-12 Resolution

More information

City Planning CAPITAL BUDGET AND PLAN OVERVIEW Capital Budget and Plan Highlights. CAPITAL PROGRAM SUMMARY Contents

City Planning CAPITAL BUDGET AND PLAN OVERVIEW Capital Budget and Plan Highlights. CAPITAL PROGRAM SUMMARY Contents CAPITAL PROGRAM SUMMARY Contents I: Overview 1 II: Council Approved Budget 4 III: 10-Year Capital 5 IV: 2014 Capital Budget 16 V: Issues for Discussion 20 City ning 2014 2023 CAPITAL BUDGET AND PLAN OVERVIEW

More information

Dunkirk Gas Corporation. Dunkirk Natural Gas Pipeline Project. Exhibit 6. Economic Effects of Proposed Facility

Dunkirk Gas Corporation. Dunkirk Natural Gas Pipeline Project. Exhibit 6. Economic Effects of Proposed Facility Dunkirk Gas Corporation Exhibit 6 Economic Effects of Proposed Facility EXHIBIT 6: ECONOMIC EFFECTS OF PROPOSED FACILITY This Exhibit addresses the requirements of 16 NYCRR 86.7 regarding the direct and

More information

Engineering & Construction Services

Engineering & Construction Services OPERATING PROGRAM SUMMARY Contents Overview I: 2016 2018 Service Overview and Plan 6 II: 2016 Budget by Service 13 III: Issues for Discussion 23 Appendices: 1. 2015 Performance 27 Engineering & Construction

More information

Transportation Services

Transportation Services CAPITAL BUDGET NOTES 2027 CAPITAL BUDGET AND PLAN OVERVIEW maintains infrastructure comprised of 5,600 km of roads, 7,950 km of sidewalks, 900 bridges/culverts and 2,400 traffic control signals. The -

More information

Applicant: TONY AND SHERRY DERBEDROSIAN. ANDREW DEANE Richard Wengle Architect Inc.

Applicant: TONY AND SHERRY DERBEDROSIAN. ANDREW DEANE Richard Wengle Architect Inc. File: A075/14 Item # 16 Ward #5 Applicant: TONY AND SHERRY DERBEDROSIAN Address: Agent: 29 THORNBANK ROAD ANDREW DEANE Richard Wengle Architect Inc. Comments/Conditions: Commenting Department Comment Condition

More information

UPDATE ON DALLAS FLOODWAY

UPDATE ON DALLAS FLOODWAY UPDATE ON DALLAS FLOODWAY ENVIRONMENTAL IMPACT STATEMENT [ EIS ] Transportation and Trinity River Project Committee Rob Newman Director, Trinity River Corridor Project, Fort Worth District 28 April 2014

More information

TORONTO AND REGION CONSERVATION AUTHORITY

TORONTO AND REGION CONSERVATION AUTHORITY Financial Statements of TORONTO AND REGION CONSERVATION AUTHORITY KPMG LLP Vaughan Metropolitan Centre 100 New Park Place, Suite 1400 Vaughan ON L4K 0J3 Canada Tel 905-265-5900 Fax 905-265-6390 INDEPENDENT

More information

Asset Management Plan 2016 Township of King

Asset Management Plan 2016 Township of King Asset Management Plan 206 Township of King GHD Allstate Parkway Suite 30 Markham Ontario L3R 9T8 T 905 752 4300 F 905 752 430 5432 Table of Contents. 2. 3. 4. 5. 6. Executive Summary. Introduction.2 State

More information

Transportation Services

Transportation Services CAPITAL PROGRAM SUMMARY Transportation Services CONTENTS Overview 1. 1-Year Capital 6 2. Issues for Discussion 24 Appendices 1. 217 Performance 34 2. 218 Capital Budget 36 3. 218 Capital Budget; 219-227

More information

TORONTO AND REGION CONSERVATION AUTHORITY

TORONTO AND REGION CONSERVATION AUTHORITY Financial Statements of TORONTO AND REGION CONSERVATION AUTHORITY KPMG LLP Vaughan Metropolitan Centre 100 New Park Place, Suite 1400 Vaughan ON L4K 0J3 Canada Tel 905-265-5900 Fax 905-265-6390 INDEPENDENT

More information

Planning and Growth Management Committee

Planning and Growth Management Committee Agenda Regular Planning and Growth Management Committee Meeting No. 20 Contact Merle MacDonald, Committee Administrator Meeting Date Thursday, November 13, 2008 Phone 416-392-7340 Start Time 9:30 AM E-mail

More information

Office of the Chief Operating Officer

Office of the Chief Operating Officer Office of the Chief Operating Officer Table of Contents Organizational Structure Departmental Overview Economic Development and Tourism Division Strategic Communications Division Strategic and Enterprise

More information

Federal Budget Bills 2012 Implications for Federal Environmental Law

Federal Budget Bills 2012 Implications for Federal Environmental Law Federal Budget Bills 2012 Implications for Federal Environmental Law Theresa McClenaghan Executive Director and Counsel, Canadian Environmental Law Association November 2013 Overview Budget Speech and

More information

RE: EB-2017-XXXX AN APPLICATION FOR AN ACCOUNTING ORDER ESTABLISHING A DEFERRAL ACCOUNT TO CAPTURE THE REVENUE REQUIREMENT IMPACT

RE: EB-2017-XXXX AN APPLICATION FOR AN ACCOUNTING ORDER ESTABLISHING A DEFERRAL ACCOUNT TO CAPTURE THE REVENUE REQUIREMENT IMPACT Brenda MacDonald Vice President Regulatory Affairs 700 University Avenue, Toronto, Ontario M5G 1X6 Tel: 416-592-3603 Fax: 416-592-8519 brenda.macdonald@opg.com December 29, 2017 VIA RESS AND COURIER Ms.

More information

Commitments Tracking Table Line 9B Reversal and Line 9 Capacity Expansion Project Reasons for Decision 0H

Commitments Tracking Table Line 9B Reversal and Line 9 Capacity Expansion Project Reasons for Decision 0H Commitments Tracking Table Line 9B Reversal and Line 9 Capacity Expansion Project Reasons for Decision 0H-002-2013 ENB-001 1) Enbridge shall comply with all of the conditions contained in this Order unless

More information

Briefing Memorandum: Second Nile Crossing at Jinja- Uganda. ICA Meeting: Financing Transport for Growth in Africa

Briefing Memorandum: Second Nile Crossing at Jinja- Uganda. ICA Meeting: Financing Transport for Growth in Africa Briefing Memorandum: Second Nile Crossing at Jinja- Uganda ICA Meeting: Financing Transport for Growth in Africa December 3-4, 2007 TABLE OF CONTENTS 1. Summary 2. Economic Rationale 3. The Project 4.

More information

OUR WORLD. OUR CITY. OUR RESPONSIBILITY.

OUR WORLD. OUR CITY. OUR RESPONSIBILITY. corporate responsibility report 2012 THE MEASURE OF OUR COMMITMENT OUR WORLD. OUR CITY. OUR RESPONSIBILITY. highlights brochure HIGHLIGHTS brochure I 2012 corporate responsibility report 1 2 HIGHLIGHTS

More information

NO: R245 COUNCIL DATE: December 18, TO: Mayor & Council DATE: December 14, FROM: General Manager, Engineering FILE: /11

NO: R245 COUNCIL DATE: December 18, TO: Mayor & Council DATE: December 14, FROM: General Manager, Engineering FILE: /11 CORPORATE REPORT NO: R245 COUNCIL DATE: December 18, 2017 REGULAR COUNCIL TO: Mayor & Council DATE: December 14, 2017 FROM: General Manager, Engineering FILE: 1717-071/11 SUBJECT: Award of Contract No.

More information

Toronto Local Advisory Committee Meeting #2. June 1, 2016

Toronto Local Advisory Committee Meeting #2. June 1, 2016 Toronto Local Advisory Committee Meeting #2 June 1, 2016 Presentation Outline Presentation by City of Toronto Review of Last Meeting Questions Submitted: Protocol for Responding Plan Implementation Update

More information