CAPITAL RESERVE STUDY

Size: px
Start display at page:

Download "CAPITAL RESERVE STUDY"

Transcription

1 CAPITAL RESERVE STUDY Prepared for: Hampton Club Condominium Association New Brunswick, N.J. Care of: Hampton Club 115 Edpas Road New Brunswick, NJ Daniel Rush CAI Certified Reserve Specialist Designation Number 6 July 2011 Project Number:

2 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 2 of 2 TABLE OF CONTENTS PAGE INTRODUCTION... 3 DESCRIPTION OF DEVELOPMENT... 4 DISCLOSURES... 5 TERMS AND DEFINITIONS... 6 STUDY METHODOLOGY CAPITAL ITEMS EXCLUDED ITEMS TABLES : REPLACEMENT RESERVE SCHEDULE YEARLY EXPENSE PROJECTION TABLE YEAR CASH FLOW CHART NOTES SUMMARY LIST OF ABBREVIATIONS BIBLIOGRAPHY... 31

3 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 3 of 3 INTRODUCTION A Capital Reserve Study is a report prepared to estimate the amount of money which must be put aside for future repairs and replacements to the Association s physical plant. The report is a tool for evaluating and establishing a stable level of reserve funding. The primary reason to set aside reserve funds is to ensure that adequate funds are available for anticipated long-term maintenance of common areas. Reserve funding is a means of fairly distributing the costs of future replacement to the common elements among all owners. The reserve fund is integral to the Association s administration of fiscal planning and budgeting. In addition, the reserve funding is an indicator of the financial strength of the Association which will affect the value of the units. This Reserve Study consists of two (2) parts: the physical analysis and the financial analysis. This Capital Reserve Study was prepared in accordance with the National Reserve Study Standards of the Community Associations Institute (C.A.I.). The level of service provided is a Category II, Capital Reserve Study Update. A Category II, Capital Reserve Study Update is a reserve study in which the following five (5) reserve study tasks are performed: 1. Component Inventory (verification only, not quantification) 2. Condition Assessment (based upon on-site visual observations) 3. Life and Valuation Estimates 4. Fund Status 5. Funding Plan This report will analyze the future replacement costs for common elements which are capital items with a reasonably predictable useful life. The capital items will be limited to those items which have a useful life exceeding two (2) years. If a certain item requires replacement more often than every two (2) years, it should be included in the operating budget. Furthermore, items will be excluded if they have an insignificant cost or if they are permanent in nature. Items with an insignificant cost would be those that could be funded in the operating budget without any adverse financial impact. Items of a permanent nature are those which exceed the thirty (30) year study period and those which are integral to reconstruction of the entire project, such as; concrete footings, foundation walls, crawlspace and roof wood framing, in-wall utility services and stormwater piping. Since the remaining useful life estimates, inflation and interest need on-going review, it is recommended that the study be updated every three (3) to five (5) years. An older Association with a significant amount of repair and replacement activity may need to update its study annually.

4 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 4 of 4 DESCRIPTION OF DEVELOPMENT Hampton Club is a residential community consisting of three hundred twelve (312) units contained within twelve (12) buildings. The project is located at Lot 1.03 and Block in the City of New Brunswick, Middlesex County, New Jersey. The buildings are wood construction with gable roofs framed by wooden trusses. The roofs are comprised of strip shingles. The exterior cladding of the buildings is constructed of vinyl siding. Entrance to the sixteen (16) acre community is located on Edpas Road. All interior streets and parking areas are maintained and owned by the Association. Recreational facilities within the community include a clubhouse currently under construction, a tennis court, a basketball court and a picnic area. The Association is responsible for common elements such as open space, roads, curbs, sidewalks, parking areas, fencing, irrigation systems, recreational facilities, utilities not located within easements or owned by the respective utility companies, exterior site lighting, roofing, foundations, common area building entrances, exterior or interior main walls between units and other miscellaneous items.

5 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 5 of 5 DISCLOSURES The Capital Reserve Study has been performed under the agreement that all relevant information has been provided to FWH Associates, P.A (FWH). Any material issues that have not been disclosed would cause a distortion of the Association s situation. Information provided by the official representative of the Association regarding financial, physical, quantity or historical issues will be deemed reliable by FWH. The reserve study will be a reflection of information provided to FWH and assembled for the Association s use, not for the purpose of performing an audit, quality/forensic analysis or background checks of historical records. The Capital Reserve Study update is performed considering the client has deemed previously developed component quantities as accurate and reliable. All current work is reliant on the validity of prior reserve studies. All information provided to FWH regarding reserve projects will be considered reliable. On-site inspections should not be considered project audits or quality inspections. At the time this reserve study was conducted FWH has had no involvements with the Association, which could result in actual or perceived conflicts of interest.

6 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 6 of 6 TERMS AND DEFINITIONS 1) Cash Flow Method A method of developing a Reserve Funding Plan where contributions to the Reserve fund are designed to offset the variable annual expenditures from the Reserve fund. Different Reserve Funding Plans are tested against the anticipated schedule of Reserve expenses until the desired Funding Goal is achieved. 2) Component The individual line items in the Reserve Study, developed or updated in the Physical Analysis. These elements form the building blocks for the Reserve Study. Components typically are: a) Association responsibility b) with limited Useful Life expectancies c) predictable Remaining Useful Life expectancies d) above a minimum threshold cost e) as required by local codes. 3) Component Inventory The task of selecting and quantifying Reserve Components. This task can be accomplished through on-site visual observations, review of association design and organizational documents, a review of established association precedents and discussion with appropriate Association representative(s). 4) Component Method A method of developing a Reserve Funding Plan where the total contributions are based on the sum of contributions for individual components. See Cash Flow method. 5) Condition Assessment The task of evaluating the current condition of the component based on observed or reported characteristics. 6) Current Replacement Cost See Replacement Cost.

7 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 7 of 7 7) Deficit An actual (or projected) Reserve Balance at the end of any fiscal year or at the end of the study which is less than the Fully Funded Balance. The opposite would be a Surplus. 8) Effective Age The difference between the Useful Life and the Remaining Useful Life. Not always equivalent to chronological age, since some components age irregularly. Used primarily in computations. 9) Financial Analysis The portion of a Reserve Study where current status of the Reserves (measured as cash or Percent Funded) and a recommended Reserve contribution rate (Reserve Funding Plan) are derived and the projected Reserve income and expense over time is presented. The Financial Analysis is one of the two parts of a Reserve Study. 10) Fully Funded One-hundred (100%) percent Funded. When the actual (or projected) Reserve Balance is equal to the Fully Funded Balance. 11) Fully Funded Balance (FFB) Total Accrued Depreciation. An indicator against which Actual (or projected) Reserve Balance can be compared. The Reserve Balance that is in direct proportion to the fraction of the life used up of the current Repair of Replacement cost. This number is calculated for each component, then summed together for an association total. Two (2) formulae can be utilized, depending on the provider s sensitivity to interest and inflation effects. Note: Both yield identical results when interest and inflation are equivalent. ( FFB ) = CurrentCost or EffectiveAge UsefulLife CurrentCost EffectiveAge ( FFB) = ( CurrentCost ) + UsefulLife (1 + InterestRate) EffectiveAge UsefulLife Re maininglife CurrentCost (1 + InflationRate) EffectiveAge UsefulLife Re maininglife

8 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 8 of 8 12) Fund Status The status of the Reserve Fund as compared to an established benchmark such as percent funding. 13) Funding Goals Independent of methodology utilized, the following represent the basic categories of Funding Plan goals: a) Baseline Funding: Establishing a Reserve funding goal of keeping the Reserve cash balance above zero. b) Full Funding: Setting a Reserve funding goal of attaining and maintaining Reserves at or near one-hundred (100%) percent funded. c) Statutory Funding: Establishing a Reserve funding goal of setting aside the specific minimum amount of Reserves required by local statutes. d) Threshold Funding: Establishing a Reserve funding goal of keeping the Reserve balance above a specified dollar or Percent Funded amount. Depending on the threshold, this may be more or less conservative than Fully Funding. 14) Funding Plan An Association s plan to provide income to a Reserve Fund to offset anticipated expenditures from that fund. 15) Funding Principles a) Sufficient Funds when Required b) Stable Contribution Rate over the Years c) Evenly Distributed Contributions over the Years d) Fiscally Responsible 16) Life and Valuation Estimates The task of estimating Useful Life, Remaining Useful Life and Repair or Replacement Costs for the Reserve components. 17) Percent Funded The ratio, at a particular point of time (typically the beginning of the Fiscal Year), of the actual (or projected) Reserve Balance to the Fully Funded Balance, expressed as a percentage.

9 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 9 of 9 18) Physical Analysis The portion of the Reserve Study where the Component Inventory, Condition Assessment and Life and Valuation Estimate tasks are performed. This represents one of the two parts of the Reserve Study. 19) Remaining Useful Life Also referred to as Remaining Life. The estimated time, in years, that a reserve component can be expected to continue to serve its intended function. Projects anticipated to occur in the initial year have zero Remaining Useful Life. 20) Replacement Cost The cost of replacing, repairing or restoring a Reserve Component to its original functional condition. The Current Replacement Cost would be the cost to replace, repair or restore the component during that particular year. 21) Reserve Balance Actual or projected funds as of a particular point in time that the Association has identified for use to defray the future replacement of those major components which the Association is obligated to maintain. Also known as Reserves, Reserve Accounts, Cash Reserves. 22) Reserve Provider An individual that prepares Reserve Studies. 23) Reserve Study A budget planning tool which identifies the current status of the reserve fund and a stable and equitable Funding Plan to offset the anticipated future major common area expenditures. The Reserve Study consists of two (2) parts: the Physical Analysis and the Financial Analysis.

10 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 10 of 10 24) Responsible Charge A reserve specialist in responsible charge of a reserve study shall render regular and effective supervision to those individuals performing services which directly and materially affect the quality and competence rendered by the reserve specialist. A reserve specialist shall maintain such records as are reasonably necessary to establish that the reserve specialist exercised regular and effective supervision of a reserve study of which he was in responsible charge. A reserve specialist engaged in any of the following acts or practices shall be deemed not to have rendered the regular and effective supervision required herein: a) The regular and continuous absence from principal office premises from which professional services are rendered; except for performance of field work or presence in a field office maintained exclusively for a specific project; b) The failure to personally inspect or review the work of subordinates where necessary and appropriate; c) The rendering of a limited, cursory or perfunctory review of plans or projects in lieu of an appropriate detailed review; d) The failure to personally be available on a reasonable basis or with adequate advance notice for consultation and inspection where circumstances require personal availability. 25) Special Assessment An assessment levied on the members of an Association in addition to regular assessments in anticipation of unexpected common element replacement and funding deficit. Special assessments are often regulated by governing documents or local statutes. 26) Surplus An actual (or projected) Reserve Balance greater than the Fully Funded Balance. See Deficit. 27) Useful Life (UL) Total Useful Life or Depreciable Life. The estimated time, in years, that a reserve component can be expected to serve its intended function if properly constructed in its present application or installation.

11 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 11 of 11 STUDY METHODOLOGY The quantities used in the replacement cost estimations of the common elements were taken from the previous Capital Reserve Study prepared by Gartenberg Associates, LLC, dated The remaining life expectancies of the common elements were determined by FWH through visual site inspections performed on June 24, The common elements were identified by the previous Capital Reserve Study, through the experience of FWH and by information provided by the Association. The Hampton Club community was constructed in 1988, which is used as the base year of installation for the common elements. The current replacement costs were estimated utilizing published construction cost data, estimates provided by contractors and cost data from recent similar projects performed by this firm. The useful life and remaining useful life were estimated based on field inspections of the items and on the assumption that an adequate maintenance schedule exists and will be followed. Without proper maintenance the common elements can deteriorate quickly and require funds from the reserves for replacement earlier than planned. It should be noted that this data is an estimate based upon the experience of this firm. The work was performed pursuant to generally accepted standards of practice. Since accurate and detailed control over market conditions, usage, rate of deterioration, maintenance or weather conditions is not feasible, the actual costs and useful life expectancy will vary from the estimates presented. We cannot and do not represent or guarantee that the actual costs or useful life expectancy will not vary from those presented in this report. The future updates of the report will make adjustments so that these variations will have no significant impact. It is recommended that the study be updated every three (3) to five (5) years. The Capital Reserve Funding Plan developed within this report is based on the cash flow or pooling method. The cash flow method is a method of developing a Reserve Funding Plan where contributions to the Reserve Fund are designed to offset the variable annual expenditures from the Reserve Fund. Different Reserve Funding Plans are tested against the anticipated schedule of Reserve expenses until the desired Funding Goal is achieved. This report uses the threshold funding method, in which the reserve balance is kept above a specified dollar amount or percent funded amount. The existing reserve amount effective as of September 1, 2011, has been projected into the future based on the existing funding plan and information provided by the Association. It is the opinion of FWH Associates, P.A. that the Associations current reserve funding plan is adequate. It will, however, be necessary to increase the annual contribution in anticipation of future expenditures.

12 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 12 of 12 CAPITAL ITEMS 1) Asphalt Roads All of the paved surfaces at the Hampton Club community are constructed of bituminous concrete paving. Bituminous paving has a typical useful life of twenty (20) years after which it is expected to receive a new two (2 ) inch asphalt wearing surface. Half of the main entrance road and all the parking lots adjoining the condominium frontages were paved in 2005/2006; the front parking lot was resurfaced in Edge Failure at Inlet Severe Pavement Deterioration This asphalt and were observed to be in average condition, displaying separation and cracking along the installation seam. Evidence of crack sealing along these open seams did not remedy the longitudinal cracking. The back portion of the entrance road leading to the dumpster enclosure and the two (2) parking areas to the west are in poor condition, experiencing longitudinal and transverse cracking, alligatoring, failure at storm inlets, potholes, raveling and general surface deterioration. Patching at storm inlets was also evident. It is expected that the back roadway and parking lots will require an overlay in Regular maintenance of the asphalt surface including crack filling and pothole repair will extend the useful life of the pavement system. 2) Asphalt Sealcoating and Crack Repair It is recommended that all roadways and parking areas receive sealcoating every five (5) years to protect the asphalt surface from exposure to ultra-violet light, water, solvents and fuels such as gasoline, brake fluid, oil and engine coolant, all which have a destructive effect on asphalt. The cost to repaint parking stall delineations is included in the unit cost within the schedule.

13 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 13 of 13 3) Concrete and Granite Curb The roadways at the Hampton Club community are edged with standard 8 x 16 concrete curb and a granite block curb. Concrete and granite curb have a typical useful life of forty-five (45) years. The curb system was observed to be in average condition with the exception of the rear parking lot which displayed numerous areas of cracked and broken curbing. It is recommended that curb replacement is coordinated with the resurfacing of the asphalt to prevent damage to either item during replacement and resurfacing. 4) Concrete Surfaces a) Sidewalks / Servicewalks Scaled Sidewalk at Tennis Court The sidewalks and unit servicewalks at the Hampton Club community is constructed of Portland Cement concrete which has a typical useful life of thirty (30) years. The Association has replaced approximately ten (10%) percent of the sidewalks and servicewalks since The walks were observed to be in average condition displaying cracking, scaling, exposed aggregate and chipped corners, large gaps between expansion joints and heaved or depressed sections. Any existing sidewalk posing possible trip or safety hazards should be replaced or mudjacked immediately through the operating budget. Two (2%) percent of the walks are expected to require replacement beginning in 2013 which is reflected in the reserve schedule. b) Dumpster Pad The dumpster pad is constructed of six (6 ) inch thick Portland Cement concrete in order to support the weight of a dumpster. The replacement cost includes the removal and disposal of the old concrete pad. The slab was observed to be in average condition displaying minor cracking and is anticipated to require replacement in 2018.

14 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 14 of 14 c) Brick Paver Sunken Pavers at Curbline Brick pavers are interspersed throughout the community. The pavers were observed to be in average condition with settled pavers noted along a curbline, posing a possible trip hazard. The pavers are expected to perform for the remainder of their thirty (30) year useful life, with continued maintenance. Damaged and settled paver walkways should be repaired and reset on an as needed basis through the maintenance budget. Any existing pavers posing possible trip hazards should be repaired immediately through the operating budget. 5) Patios Each first floor unit at the Hampton Club community is supplied with a rear patio that is constructed of Portland Cement concrete. The patios were observed to be in average condition, displaying areas of spalling at the interface of the patio and the concrete foundation. It is expected that the patios will require replacement in ) Exterior Lighting Community walkways, parking areas and roadways are illuminated with globe, cobra head and/or floodlight fixtures which are mounted on aluminum, steel or wood posts. The lighting was observed to be in average to below average condition, displaying pole base corrosion as well as leaning posts. Exterior lighting has a useful life of twenty-five (25) years. It is expected that all lighting will be replaced with fixtures of the same type and intensity. The Association should consider replacing wood posts with fiberglass or aluminum posts which require less maintenance. Corroded Light Pole Base

15 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 15 of 15 7) Chainlink Fence Ten (10 ) foot high, vinyl coated chainlink fence is located at the tennis court and basketball court. Fence of this type has a twenty-five (25) year typical useful life and was observed to be in average condition with minor fastener corrosion and warped fence fabric, especially adjacent to the basketball hoops. It is important that the fencing receives regular maintenance in order to ensure it fully achieves its full expected useful life. Replacement of the fence is expected to occur in 2020 as provided on the schedule. 8) Board on Board Fencing Six (6 ) foot high board on board privacy fencing exists along a portion of the southeasterly property boundary and also at the dumpster pad. The fence was observed to be in average condition with leaning fence sections and broken slats observed. The replacement cost includes removal and disposal of the old fencing. It is recommended that exterior wood products are weatherproofed every three (3) to five (5) years to assure that premature replacement will not be required. Wood Board on Board & Aluminum Fence 9) Aluminum Fence There are two (2) types of aluminum fence within the Hampton Club community. A ten (10 ) foot high aluminum privacy fence follows the westerly and southerly site perimeter. This perimeter fence was noted to be in average condition with rusted and/or displaced fence components visible. A seven (7 ) foot high picket style Jerith fence exist between clubhouse parking lot and the gatehouse. Aluminum fences typically have a useful life of twenty-five (25) years. The Jerith fence was observed to be in average condition with no significant damage noted. With maintenance, this item is anticipated to fully achieve its typical useful life. 10) Aluminum Railing Each servicewalk and unit balcony at the Hampton Club community is provided with an aluminum railing. The railings are constructed of forty-two (42 ) inch high tubular aluminum which appeared in average condition. Fastener rust and general surface wear was observed on the railings. Aluminum rails can be sanded and painted to rejuvenate their appearance. Aluminum railing has a thirty (30) year typical useful life and it is anticipated that the railings will be removed during the balcony deck replacement work and re-installed.

16 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 16 of 16 11) Wrought Iron Fence An eight (8 ) foot tall wrought iron fence runs between the masonry walls along Van Dyke Avenue. The fence was experiencing corrosion and requires sanding and painting. With maintenance, wrought iron fence has a typical useful life of thirty (30) years. It is expected that this fence will require replacement in Corroded Fence Surface 12) Tennis Court/Basketball Court One (1) tennis court and one (1) basketball court are located within the community and are constructed of bituminous concrete. Funding for the replacement of the courts followed by resurfacing has been included in the schedule. Both courts were observed to be in average to above average condition with minor surface cracks visible in the basketball court. It is anticipated that the both courts will require resurfacing occurring in It is recommended that the courts are resurfaced every seven (7) years to seal minor cracks and deficiencies in the surface and also to rejuvenate surface. Tennis courts have a typical useful life of twenty (20) years, after which time they will require and overlay of new asphalt or full reconstruction depending on their condition. The unit costs for tennis court resurfacing includes reconstruction of all significant cracks, crack sealing, application of a new color coat, etc. The replacement cost includes a complete removal and replacement of the asphalt courts. 13) Strip Shingle Roofing The roofing that weatherproofs the condominium buildings at the Hampton Club community is a three (3)-tab strip type shingle. Shingles of this type have a twenty-five (25) year typical useful life. Information provided by the Association states that nine (9) out of the twelve (12) buildings were reroofed in 2005/2006. The current roofing was installed as a complete replacement and was observed to be in average condition with some lifted shingles noted. Although the building code allows for two (2) layers of shingles to be installed before a total removal of the roof material is necessary, roofing overlays are generally not advisable. Roofing components such as flashing, underlayment, edge metal and roof deck deterioration cannot be verified adequately during a roof overlay. Based on this, FWH recommends the next roofing effort should be a complete roof replacement. This is anticipated to occur in 2028 as reflected on the reserve schedule. It is expected that the remaining three (3) roofs will be completed in 2012 as provided on the schedule.

17 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 17 of 17 14) Siding Patched Siding The exterior walls of the Hampton Club residential buildings are weatherproofed with a horizontal vinyl siding. The siding system was observed to be in average to below average condition showing signs of damaged, displaced and patched sections, particularly at common building entrances. A distortion of the siding at the box beam at the top of the first floor is visible on many buildings. It is recommended that invasive inspections are performed in these areas to ensure no damage to the underlying substrate is causing this distortion. Aluminum cladding on the support posts of the porches and balconies are dented most probably from lawn mowing efforts. Inadequate or no caulking was observed at most building penetrations. This must be remedied to protect the underlying building components from water infiltration. No Caulk at Building Penetration Severe Wood Deterioration A minimum of six (6 ) inches of clearance must be maintained between the bottom of the vinyl siding and the outside ground elevation to avoid the wicking of soil moisture up into the wood sheathing. Inspection of the condominium buildings revealed that this required clearance has not been maintained throughout the site. Areas of siding below grade were observed in numerous locations resulting in severely deteriorated building components. It is strongly recommended that the Association consider invasive inspections in these areas to determine the extent of damage and the methodology required to remediate these integral building components.

18 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 18 of 18 Vinyl siding, related aluminum window and door cladding, porch soffit and fascia have a typical useful life of forty-five (45) years. The siding replacement interval is often based on appearance and not its functionality. It is recommended that cracked, punctured or unfastened sections are replaced immediately to avoid damage to the substrate material. Vinyl siding is virtually maintenance free and should be power washed periodically to free it of dust and staining fungi. Siding replacement on the residential building is expected to occur in The replacement cost includes removal of the old siding. Detached and Broken Siding 15) Aluminum Gutter and Downspout Aluminum gutters and downspouts on the individual dwelling units and on the community buildings are in average condition possessing the typical signs of weathering, incidental denting, and missing accessories. Information provided by the Association indicates that nine (9) out of the twelve (12) buildings received new gutters and downspouts in 2005/2006. It is expected that the remaining buildings will undergo rood drainage system replacement in conjunction with the roof replacement scheduled to occur in The leaders and the above ground portion of the ADS pipe are suffering from damage most probably caused by lawn mowing efforts. Gutters and downspouts have a typical useful life of twenty (20) years. Replacement of this system is anticipated to occur coinciding with the next roofing effort. 16) Wood Decks Individual units at the Hampton Club community contain an elevated pressure treated wood deck and aluminum railing. With maintenance, wood decks have a typical useful life of fifteen (15) years. The deck is constructed of 2 x 10 floor joists and 5/4 x 6 decking boards supported by 4 x 4 aluminum clad posts. The deck components were observed to contain many cracked, cupped deck boards and a general weathering. It is anticipated that the deck boards will require replacement over a five (5) year span beginning in It is recommended that exterior wood building components are weatherproofed every three (3) to five (5) years to assure that premature replacement of the deck is not required. 17) Interior Lighting Illumination in the residential building s common areas / community buildings is achieved through various types of fixtures. Interior lighting possesses a twenty five (25) year typical useful life. Replacement is anticipated to begin in 2021 as reflected in the schedule.

19 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 19 of 19 18) Wood Steps Deteriorated Rear Entry A pressure treated step and deck system constructed of dimensional lumber, are utilized as a secondary egress point for the first (1 st ) floor units. The step systems were observed to be in average to below average condition displaying cupped, twisted and detached wood components. It is recommended that the deck and stair system are replaced through the first five (5) years of the study on an as needed basis. It is recommended that the wood is weatherproofed every three (3) to five (5) years to assure that premature replacement of these systems is not necessary. During the replacement of the step systems, it is recommended that wood decking screws are utilized. 19) Interior Finishes The Association is responsible the replacement of the interior finishes of the common areas of the residential buildings, recreational and community buildings. The replacement of interior finishes is based largely on the element s appearance and not its functionality. a) Carpet Low nap carpet exists in the common hallways and stairwells. Depending on the quality of the loop and the degree of traffic carpet has a useful life of eight (8) to eleven (11) years. The carpet is expected to begin replacement in Heavily Stained Carpet

20 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 20 of 20 20) Entry Doors Steel full light doors provide access to the common building entrances. Exterior, prehung entry doors have a typical useful life of twenty (20) years. The doors were observed to be in below average condition displaying corrosion, denting, water infiltration and general wear. The doors are beyond their typical useful life and are scheduled for replacement over a three (3) year span beginning in Peeling Paint Deteriorated Door Frame 21) Common Windows All of the aluminum clad windows at the Hampton Club community are from the original construction of the building. Windows have a typical useful life of thirty (30) years and require significant maintenance and weatherproofing. The windows were observed to be in below average condition displaying corrosion and water infiltration. The windows are expected to require replacement over a ten (10) year span beginning in 2012 as reflected on the schedule. Corroded Common Window Frame 22) HVAC Systems Heating of the condominium building s common areas at Hampton Club are provided by wall mounted electric heaters. The heaters were observed to be in various conditions and are scheduled to be replaced in No mechanical, electrical or pneumatic testing was performed as part of our analysis. The systems appear to have been functioning correctly. During the study preparation, FWH was not made aware of any functional or operational difficulties with the system.

21 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 21 of 21 23) Fire Alarm System There are four (4) fire alarm control panels within each of the twelve (12) buildings within the Hampton Club community. These systems must be periodically maintained and inspected by qualified personnel. 24) Intercom/Security System Each of the common entrances of the buildings within the Hampton Club are provided with a intercom/remote door unlocking intercom entry system. The unit cost presented in the schedule accounts for the replacement of the control panel only. The replacement cost does not include the replacement or repair of any electrical work that may need to be done. Components of the security systems possess a typical useful life of twenty (20) years. 25) Security Gates There are two (2) sets of mechanical gates used to provide security at the entrance of the Hampton Club. These mechanical components possess a fifteen (15) year typical useful life. It is anticipated that the hydraulic controller for the entry gates will require replacement at the end of its useful life. 26) Sump Pumps Each building within the Hampton Club condominium is provided with four (4) basement sump pumps. The sump pumps have achieved their typical useful life. The pumps are scheduled to be replaced over a two (2) year span beginning in ) Pump Station Corroded Skid The Hampton Club community is responsible for the replacement of the sanitary sewer pump station and its components located within the community boundary. The pump station is housed in a steel shed situated on a concrete pad. The pumps and their associated valves appeared well maintained although portions of the iron skid are corroded. The Hampton Club replaces the pump station components on an as needed basis thought the reserve fund. No mechanical, electrical or pneumatic testing was performed as part of our analysis. The systems appear to have been functioning correctly. During the study preparation, FWH was not made aware of any functional or operational difficulties with the system.

22 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 22 of 22 MISCELLANEOUS PHOTOS Debris Filled Inlet Mower Damage on Deck Support Posts Unanchored Retaining Wall Fresh Air Intake Covered at Utility Room Door

23 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 23 of 23 1) Entrance Wall EXCLUDED ITEMS An entrance wall constructed of masonry block with a stucco finish and brick capping is located along Van Dyke Avenue. The wall was noted to be in average condition. Stucco has a long useful life. Repair of the stucco should be funded out of the maintenance budget on an as needed basis. 2) Stormwater Management System The stormwater management system located at the Hampton Club community has been omitted from this study; complete replacement of the piping and structures is not anticipated. Storm inlets and basin structures are expected to perform beyond the scope of the study. Storm drainage structures must receive inspection and maintenance on a regular basis through the operating budget to prevent costly replacement of the structures. 3) Powerwashing Powerwashing will improve the appearance of the building exterior and is considered a maintenance item. 4) Air Conditioning Condensers Replacement of A/C condenser units is the responsibility of the individual unit owner. 5) Interior Doors All interior unit doors are the responsibility of the individual unit owner

24 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 24 of 24 SITEWORK Item PAVED SURFACES Replacement Reserve Schedule 2" Cap Asphalt Resurface SY $14.50 $124,410 2" Cap Asphalt Resurface SY $14.50 $218,008 2" Asphalt Resurface - Front Parking Lot SY $14.50 $48,068 Crack Repair & Asphalt Sealcoating SY $1.85 $15,873 Asphalt Sealcoating SY $1.65 $24,808 Asphalt Sealcoating (Front Parking Lot) SY $1.65 $5,470 Concrete Curbing LF Belgian Block Curbing LF $25.00 $37,500 Concrete Sidewalk (new) SF $8.50 $21,981 Concrete Sidewalk (Remaining over 10 years) SF $8.50 $87,924 Brick Pavers SF $13.05 $28,710 Dumpster Pad SF $10.00 $18,300 Fencing Subtotal: $631,051 6' Wood Board on Board LF $31.50 $77,805 10' Aluminum Privacy (Boundry) LF $70.00 $146,930 6' Wood Board on Board LF $31.50 $77,805 6' Wrought Iron Fence (Van Dyke Avenue) LF $56.00 $13,440 10' Chainlink (Tennis Court) LF $32.00 $15,360 10' Chainlink (Basketball Court) LF $32.00 $6,400 7' Aluminum Jerith Fence LF $60 $68,400 7' Aluminum Jerith Fence LF $60 $43,680 Recreation Subtotal: $449,820 Tennis Court (Resurface) LS $8,800 $8,800 Tennis Court (Reconstruction) LS $45,000 $45,000 Basketball Court Resurface LS $8,800 $8,800 Basketball Court Reconstruction SY $27.00 $12,015 Picnic Furniture LS $6,000 $6,000 Illumination Subtotal: $80,615 Street / Parking Lights (over 10 yrs) EA $1,815 $58,080 Mechanicals Hampton Club Replacement Reserve Schedule Effective as of : September 1st, 2011 Existing Reserve Amount $1,244,195 Year Installed Useful Life Est. Remaining Useful Life Estimated Quantity Subtotal: $58,080 Sanitary Pump Station LS $84,000 $84,000 Hydraulic Gate Controller LS $2,150 $2,150 Unit Unit Cost Current Rep. Value Subtotal: $86,150

25 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 25 of 25 Item Year Installed Useful Life Est. Remaining Useful Life Estimated Quantity Unit Unit Cost Current Rep. Value STRUCTURES RESIDENTIAL BUILDINGS Exterior Elements Asphalt Roofing Shingles (replace over 2 yrs) SQ $310 $334,800 Asphalt Roofing Shingles (replace) SQ $310 $111,600 Vinyl Siding (over 4 yrs) SQ $500 $1,140,000 Aluminum Gutters LF $7.16 $12,458 Aluminum Gutters (@ 4 yrs) LF $7.16 $37,375 Aluminum Leaders (@ 4 yrs) LF $5.27 $54,070 Aluminum Leaders LF $5.27 $18,023 Chimney Caps EA $545 $39,240 Balconies (wood over 3 yrs) SF $30.00 $259,200 Concrete Patios (@ 4 yrs) SF $8.50 $73,440 Aluminum Handrails (over 4 yrs) LF $46.00 $110,400 Rear Entry Decks (repl w/ 5 yrs) SF $46.00 $77,280 Full Light Entry Doors (over 3 years) EA $1,250 $120,000 Utility Doors - Steel w/ Louver (over 10 yrs) EA $446 $139,152 Windows (over 10 yrs) EA $750 $261,000 Building Lights (over 10 yrs) EA $65 $26,520 Subtotal: $2,814,559 STRUCTURES RESIDENTIAL BUILDINGS Interior Elements Interior Fire Doors (over 3 yrs) EA $1,200 $115,200 Hallway Carpet (over 5 yrs) SY $46.00 $88,780 Hallway Lights EA $75 $12,600 Emergency Lights EA $350 $25,200 Fire Lights EA $280 $16,800 Intercom/Security System (over 3 yrs) EA $2,725 $130,800 Fire Alarm System EA $4,000 $192,000 Wall Corridor Heaters EA $225 $21,600 Sump Pumps (over 2 yrs) EA $300 $14,400 Subtotal: $617,380 K:\FWH Documents\3177\0001\Reports\Reserves\[ hcca-crsu_schedules_draft1.xlsm]Cash Flow GRAND TOTAL: $4,737,655

26 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 26 of 26 Hampton Club YEARLY CAPITAL REPLACEMENT SCHEDULE ITEM i 4% SITEWORK PAVED SURFACES 2" Cap Asphalt Resurface $207,152 2" Cap Asphalt Resurface $218,008 $477,681 2" Asphalt Resurface - Front Parking Lot $101,271 Crack Repair & Asphalt Sealcoating $17,168 $20,888 $32,156 $39,122 $47,598 Asphalt Sealcoating $30,182 $36,722 $44,677 $66,133 Asphalt Sealcoating (Front Parking Lot) $6,655 $8,097 $9,851 $14,021 Concrete Curbing Belgian Block Curbing $43,870 Concrete Sidewalk (new) $54,177 Concrete Sidewalk (Remaining over 10 years) $10,697 $11,125 $11,570 $12,033 $12,514 $13,015 $13,535 $14,077 $14,640 $15,226 Brick Pavers $33,587 Dumpster Pad $22,265 Fencing 6' Wood Board on Board $124,568 $224,340 10' Aluminum Privacy (Boundry) $376,626 6' Wood Board on Board $102,386 $184,392 6' Wrought Iron Fence (Van Dyke Avenue) $27,227 10' Chainlink (Tennis Court) $31,117 10' Chainlink (Basketball Court) $12,965 7' Aluminum Jerith Fence $168,587 7' Aluminum Jerith Fence $136,223 Recreation Tennis Court (Resurface) $9,899 $13,026 $19,282 $25,374 Tennis Court (Reconstruction) $74,928 Basketball Court Resurface $9,899 $13,026 $26,326 $34,644 Basketball Court Reconstruction $20,006 Picnic Furniture $8,881 Illumination Street / Parking Lights (over 10 yrs) $6,040 $6,282 $6,533 $6,795 $7,066 $7,349 $7,643 $7,949 $8,267 $8,597 $161,025 Mechanicals Sanitary Pump Station $129,314 Hydraulic Gate Controller $2,829 $5,095 Yearly Expense Projection Table

27 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 27 of 27 ITEM i 4% STRUCTURES RESIDENTIAL BUILDINGS Exterior Elements Asphalt Roofing Shingles (replace over 2 yrs) $313,537 $326,079 Asphalt Roofing Shingles (replace) $116,064 $309,408 Vinyl Siding (over 4 yrs) $513,269 $533,800 $555,152 $577,358 Aluminum Gutters $12,458 $27,298 Aluminum Gutters (@ 4 yrs) $15,558 $16,180 $16,828 $17,501 Aluminum Leaders (@ 4 yrs) $22,508 $23,408 $24,344 $25,318 Aluminum Leaders $18,023 $39,491 Chimney Caps $39,240 $104,607 Balconies (wood over 3 yrs) $89,856 $93,450 $97,188 $121,369 $126,224 $131,273 $136,524 Concrete Patios (@ 4 yrs) $30,571 $31,794 $33,065 $34,388 Aluminum Handrails (over 4 yrs) $55,913 $58,149 $60,475 $62,894 Rear Entry Decks (repl w/ 5 yrs) $15,456 $16,074 $16,717 $17,386 $18,081 $48,202 Full Light Entry Doors (over 3 years) $40,000 $41,600 $43,264 $106,633 $110,899 $115,335 Utility Doors - Steel w/ Louver (over 10 yrs) $13,915 $14,472 $15,051 $15,653 $16,279 $16,930 $17,607 $18,311 $19,044 $19,806 $37,096 $38,579 $40,123 $41,728 $43,397 Windows (over 10 yrs) $26,100 $27,144 $28,230 $29,359 $30,533 $31,755 $33,025 $34,346 $35,720 $37,148 Building Lights (over 10 yrs) $5,304 $5,516 $5,737 $5,966 $6,205 $14,140 $14,705 $15,293 $15,905 $16,541 STRUCTURES RESIDENTIAL BUILDINGS Interior Elements Interior Fire Doors (over 3 yrs) $56,841 $59,115 $61,480 Hallway Carpet (over 5 yrs) $18,466 $19,205 $19,973 $20,772 $21,603 $28,428 $29,565 $30,748 $31,978 $33,257 $43,763 $45,514 $47,335 $49,228 $51,197 Hallway Lights $17,934 $39,295 Emergency Lights $35,867 $78,590 Fire Lights $23,912 $52,393 Intercom/Security System (over 3 yrs) $62,056 $64,539 $67,120 $135,973 Fire Alarm System $404,515 Wall Corridor Heaters $30,744 $67,363 Sump Pumps (over 2 yrs) $7,488 $7,788 $25,934 $26, TOTALS $388,505 $342,721 $252,891 $211,856 $176,121 $147,153 $69,106 $197,974 $74,745 $248,248 $222,744 $269,085 $228,553 $384,357 $85,562 $697,451 $1,103,546 $1,040,519 $902,396 $700,459 $650,554 $62,894 $189,487 $305,649 $436,161 $375,944 $683,844 $506,306 $105,231 $617,977 K:\FWH Documents\3177\0001\Reports\Reserves\[ hcca-crsu_schedules_draft1.xlsm]Cash Flow

28 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 28 of Year Cash Flow Chart Fiscal Year Beginning Balance as of Jan. 1 Reserve Contribution (Jan 1 - Dec 31) Hampton Club 30 YEAR CASH FLOW Effective as of : September 1st, 2011 Existing Reserve Amount $1,244,195 Net 3% Expenses Ending Balance Unit Contribution 2011 $1,244,195 $229,704 $40,771 $388,505 $1,126,166 $ $1,126,166 $243,360 $37,435 $342,721 $1,064,241 $ $1,064,241 $243,360 $35,578 $252,891 $1,090,287 $ $1,090,287 $243,360 $36,359 $211,856 $1,158,150 $ $1,158,150 $243,360 $38,395 $176,121 $1,263,784 $ $1,263,784 $280,800 $42,126 $147,153 $1,439,556 $ $1,439,556 $280,800 $47,399 $69,106 $1,698,648 $ $1,698,648 $280,800 $55,171 $197,974 $1,836,646 $ $1,836,646 $280,800 $59,311 $74,745 $2,102,013 $ $2,102,013 $280,800 $67,272 $248,248 $2,201,837 $ $2,201,837 $280,800 $70,267 $222,744 $2,330,160 $ $2,330,160 $318,240 $74,678 $269,085 $2,453,994 $ $2,453,994 $318,240 $78,393 $228,553 $2,622,074 $ $2,622,074 $318,240 $83,436 $384,357 $2,639,393 $ $2,639,393 $355,680 $84,517 $85,562 $2,994,029 $ $2,994,029 $355,680 $95,156 $697,451 $2,747,414 $ $2,747,414 $374,400 $88,038 $1,103,546 $2,106,306 $ $2,106,306 $374,400 $68,805 $1,040,519 $1,508,992 $ $1,508,992 $374,400 $50,886 $902,396 $1,031,882 $ $1,031,882 $374,400 $36,572 $700,459 $742,396 $ $742,396 $374,400 $27,888 $650,554 $494,130 $ $494,130 $374,400 $20,440 $62,894 $826,076 $ $826,076 $374,400 $30,398 $189,487 $1,041,387 $ $1,041,387 $374,400 $36,858 $305,649 $1,146,995 $ $1,146,995 $374,400 $40,026 $436,161 $1,125,260 $ $1,125,260 $374,400 $39,374 $375,944 $1,163,090 $ $1,163,090 $374,400 $40,509 $683,844 $894,155 $ $894,155 $374,400 $32,441 $506,306 $794,690 $ $794,690 $374,400 $29,457 $105,231 $1,093,315 $ $1,093,315 $374,400 $38,415 $617,977 $888,154 $ TOTALS: $9,795,624 $1,526,372 $11,678,038 $888,154 K:\FWH Documents\3177\0001\Reports\Reserves\[ hcca-crsu_schedules_draft1.xlsm]Cash Flow

29 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 29 of 29 NOTES 1) The table of scheduled items lists all the capital expense items with useful life, remaining useful life, quantity and current replacement value. 2) The yearly capital replacement schedule provides a yearly synopsis of which items are to be replaced and when. It also shows which items will require replacement more than once through the course of the thirty (30) year study. 3) The expenses generated by the replacement of the capital items are projected into the future based upon an inflation rate of 4.0 %. 4) The interest rate applied to the reserve funds is 3.0 %. SUMMARY 1) The thirty (30) year cash flow table indicates an annual reserve contribution for the fiscal year of September 1, 2011 to August , to be $ 229,704 This results in a monthly contribution of $ The monthly reserve fund contribution per unit is $ ) The unit contribution is based upon the occupancy of 312 units. 3) The projected reserve balance at the end of this study is $ 888,154. 4) It is necessary to increase the unit reserve contributions in anticipation of large capital expenditures throughout the thirty (30) year study.

30 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 30 of 30 LIST OF ABBREVIATIONS ADJ. AVG. BLDG. CT. CTD. C.Y. EA. E.O.Y. EXC. EXT. FL. LAV. L.F. LG. MBTU MSF NO. P.T. REP. RES. RM. S.F. SM. SQ. S.Y. UTIL. YR. = Adjacent = Average = Building = Court = Coated = Cubic Yard = Each = End of Year = Excellent = Exterior = Floor = Lavatory = Linear Foot = Large = Thousand British Thermal Units = Thousand Square Feet = Number = Pressure Treated = Replacement = Residential = Room = Square Foot = Small = Square (100 square feet) = Square Yard = Utility = Year

31 HAMPTON CLUB CONDOMINIUM ASSOCIATION Page 31 of 31 BIBLIOGRAPHY 1) Reserve Study Guidelines for Community Associations, Planned Developments, Condominiums by Richard Wyndhamsmith 1989, Wyndamhouse, Inc. 2) Reserve to Preserve, by Community Associations Institute Research Observation, ) Gap #24. A Complete Guide to Reserve Funding and Reserve Investment Strategies, 3 rd Edition by The Community Associations Institute. 4) R.S. Means Building Construction Cost Data , by Construction Consultants and Publishers. 5) R.S. Means Site Work and Landscape Cost Data , by Construction Consultants and Publishers. 6) National Reserve Study Standards of The Community Association Institute, ) Capital Reserve Study, prepared by Gartenberg Associates, LLC, dated AS/as k:\fwh documents\3177\0001\reports\reserves\ hc_crsu_draft1.docm

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State CAPITAL RESERVE STUDY FOR THE Meadow Wood Commons City, State Management Company: Any Management Company Contact Name: Mr. Bob Smith Date: July 28, 2014 Table of Contents Section Name Section # Executive

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY CAPITAL RESERVE STUDY FOR THE HIALEAH CONDOMINIUM WILDWOOD CREST, NEW JERSEY Project Number: 12-1066 W:\2012\12-1066\CORR\12-1066v1.doc Date: March 29, 2013 Table of Contents Section Page Executive Summary...

More information

Cottonwoods at Vine. Reserve Study. October 2012

Cottonwoods at Vine. Reserve Study. October 2012 Reserve Study October 2012 Tab Table of Contents Reserve Study Analysis Executive Summary... Remaining Useful Life Analysis... Reserve Study Schedule... Annual Expenditures... Funding Plan Summary... Percentage

More information

VILLAGE AT LAKE CHELAN

VILLAGE AT LAKE CHELAN VILLAGE AT LAKE CHELAN Manson, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued October, 2018 Next Update: Level 3 by October,

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: October 09, 2016 To: Joleen Cline, Cline & Associates From: Browning Reserve Group (BRG) Re: Whitehawk Townhomes Association; Update w/ Site Visit Review Attached,

More information

MILL CREEK CONDOMINIUMS RESERVE STUDY

MILL CREEK CONDOMINIUMS RESERVE STUDY MILL CREEK CONDOMINIUMS RESERVE STUDY Fiscal Year 2016 Prepared by: Eric Harker, Assoc. AIA Alliance Project Engineers and Construction Consultants November 6, 2015 Project Number: OR14-017 MILL CREEK

More information

DRAFT CAPITAL RESERVE STUDY. The Piano Works Condominium Association. Deep River, Connecticut FOR THE. Project Number:

DRAFT CAPITAL RESERVE STUDY. The Piano Works Condominium Association. Deep River, Connecticut FOR THE. Project Number: CAPITAL RESERVE STUDY DRAFT FOR THE Management Company: Sound Real Estate Services, Contact Name: Josh Parsons Date: August 22, 2016 Table of Contents Section Name Section # Executive Summary... 1 Reserve

More information

Arizona Nevada Texas Utah New Mexico

Arizona Nevada Texas Utah New Mexico Arizona Nevada Texas Utah New Mexico 9/12/2016 Summit Park HOA Regarding: Fiscal Year beginning 1/1/2017 Level II Capital Replacement Reserve Study We are pleased to submit this Level II Reserve Study

More information

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association 21289 E. Lords Way Queen Creek, AZ 85142 support@azreservestudy.com Tel: (480) 840-7130 Fax: (888) 842-9319 October 27, 2012 Sample Association Regarding: 2013 - Level I Capital Replacement Reserve Study

More information

Update With Site Visit

Update With Site Visit Update With Site Visit Le Chateau Bellevue, WA 10/28/2011 Report #1002 Phone: 253-241-8151 Fax: 360-872-8073 E-mail: jeremy@reservesolutions.net www.reservesolutions.net Le Chateau Client Info: REPORT

More information

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by:

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by: REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION WOODWIND ASSOCIATION REPLACEMENT RESERVE REPORT FY 2010 Community Management by: N & H Enterprises PO Box 5539 Greenville, SC 29607 864-467-1600

More information

CONTENTS 1.0 INTRODUCTION... 1

CONTENTS 1.0 INTRODUCTION... 1 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2019 Prepared for: SANCTUARY AT FALSE CAPE Ms. Rebecca Beamon 3700 Sandpiper Road Virginia

More information

Brookwood Homeowners Association, Inc.

Brookwood Homeowners Association, Inc. RESERVE STUDY Full Study Brookwood Homeowners Association, Inc. Published - February 05, 2013 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com Browning

More information

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08 Central Pointe HOA Level I Reserve Study Report Period 1/01/08 12/31/08 Client Reference Number.... 10870 Property Type...... Mid-Rise Number of Units............ 83 Fiscal Year End....... December 31

More information

DRAFT WILLOUGHBY PARK GREENVILLE, NC. Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION & HOA MANAGEMENT COMPANY, LLC.

DRAFT WILLOUGHBY PARK GREENVILLE, NC. Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION & HOA MANAGEMENT COMPANY, LLC. DRAFT FULL RESERVE STUDY WILLOUGHBY PARK GREENVILLE, NC Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION GREENVILLE, NC & HOA MANAGEMENT COMPANY, LLC Prepared by: CRITERIUM GILES ENGINEERS, INC. 1150

More information

Level 3 Reserve Study without a Site a Site Visit Visit

Level 3 Reserve Study without a Site a Site Visit Visit Level 3 Reserve Study without a Site a Site Visit Visit We offer two types of reports for a Level 3 Reserve Study with a Site Visit, RS-3 - Standard Reserve Study without a site visit SMRS-3 - Statutory

More information

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year SOMERSET CREEK Bellevue, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued April, 2018 Next Update: Level 2 by April, 2019

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Seavue Condominiums 130-5 th Avenue South, Edmonds, WA 98020 For: Seavue Homeowners Association c/o Jay Grant Board President (202) 351-9399 Prepared By: Jeff Samdal, PE, RS,

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY Arizona Texas Nevada Utah New Mexico CAPITAL RESERVE STUDY Prepared for: Quail Creek HOA Date of Report: 6/7/2018 Capital Reserve Analysts Bringing the future into the present Capital Reserve Analysts,

More information

Clearbrook HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2010. Client Reference Number /23/2010 Prepared By

Clearbrook HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2010. Client Reference Number /23/2010 Prepared By Clearbrook HOA Level 1 Reserve Study Report Period 1/1/2010 12/31/2010 Client Reference Number 11775 Property Type Apartment Style Number of Units 21 Fiscal Year End 12/31 Date of Property Inspection 3/23/2010

More information

Reserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado

Reserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado Reserve Study Project No. 09069 Prepared for 1771 Norwood Lane Fort Collins, Colorado Prepared by Bornengineering 1130 West 124 th Avenue, Suite 100 Westminster, Colorado 80234 January 28, 2010 1130 WEST

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Cambridge Court 9512-1 st Avenue Northeast, Seattle, WA 98115 For: Cambridge Court Homeowners Association c/o Tim Kammer, Property Manager Condo Managements, Inc. 1661 Harbor

More information

FLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association

FLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association Replacement Reserve Study REPLACEMENT RESERVE STUDY Oakton, Virginia Property Management: Flint Hill Manor Townhouse Association Jamie Critchfield Vice President Email: tommie0200@aol.com Consultant: RICHARD

More information

CONTENTS. Sparger Springs Townhomes Durham, NC

CONTENTS. Sparger Springs Townhomes Durham, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

Regarding: Level I Capital Replacement Reserve Study. We are pleased to submit this Level I Reserve Study for Summit Park Condominiums.

Regarding: Level I Capital Replacement Reserve Study. We are pleased to submit this Level I Reserve Study for Summit Park Condominiums. 1825 W. Ray Road, #1135, Chandler, AZ 85244 support@azreservestudy.com Tel: (480) 620-4757 Fax: (888) 842-9319 April 4, 2013 Summit Park Condominiums HOA Regarding: 2012 - Level I Capital Replacement Reserve

More information

RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO

RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com AUGUST, 2009 1.0 INTRODUCTION... 1

More information

REPLACEMENT RESERVE REPORT FY 2016

REPLACEMENT RESERVE REPORT FY 2016 REPLACEMENT RESERVE REPORT FY 2016 EVANS MILL POND REPLACEMENT RESERVE REPORT FY 2016 EVANS MILL POND Community Management by: EVANS MILL POND, HOA Evans Mill Road McLean, Virginia 22101 Consultant: 929

More information

CAPITAL RESERVE STUDY. Ellicott Meadows Condominium Association I. Ellicott City, Maryland

CAPITAL RESERVE STUDY. Ellicott Meadows Condominium Association I. Ellicott City, Maryland CAPITAL RESERVE STUDY FOR THE Ellicott Meadows Condominium Association I Ellicott City, Maryland Contact Name: Victor Brzozowski Date: October 3, 2017 Table of Contents Section Name Section # Executive

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Bridgewood Estates 2500 Jahn Avenue Northwest, Gig Harbor, WA 98335 For: Bridgewood Estates Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community

More information

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 6 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

REPLACEMENT RESERVE REPORT FY 2016

REPLACEMENT RESERVE REPORT FY 2016 REPLACEMENT RESERVE REPORT FY 2016 VILLAS AT PARKWOOD ESTATES VILLAS AT PARKWOOD ESTATES REPLACEMENT RESERVE REPORT FY 2016 Community Management by: Community Management Professionals, LLC Beth Maurer

More information

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by:

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by: REPLACEMENT RESERVE REPORT 2008 NEWTON PARISH NEWTON PARISH REPLACEMENT RESERVE REPORT FY 2008 Community Management by: CAS, Inc Mr. Dan Quartermane 1930 N. Salem Street, Suite 101 Apex, NC 27523 919-367-7711

More information

HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO

HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO RESERVE FUND STUDY HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com AUGUST 2016 CONTENTS 1.0 INTRODUCTION...

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Jason Kozleski Board President 10790-221 st Lane NE Redmond,

More information

Urban Heights Condominium

Urban Heights Condominium Condominium Capital 2011 2010, AssociationAnalysis, LLC Condominium Prepared For: Table of Contents Condominium Association, Inc. 1642 Maxwell Road Atlanta, GA 30012 October 19, 2010 INTRODUCTION INTRODUCTION

More information

CONTENTS. Twisted Creek Townhomes Holly Springs, NC

CONTENTS. Twisted Creek Townhomes Holly Springs, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I QUALCHAN HILLS HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 6 AUGUST 2012 CONTENTS 1.0 INTRODUCTION...

More information

REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES ROCKTOWN REALTY. Community Management by: Bernard Hamann

REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES ROCKTOWN REALTY. Community Management by: Bernard Hamann REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES Community Management by: ROCKTOWN REALTY Bernard Hamann 218 Market Street Harrisonburg, VA 22801 40-70-7080

More information

DRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by:

DRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by: DRAFT FOR BOARD REVIEW FULL RESERVE STUDY SPARGER SPRINGS TOWNHOMES DURHAM, NC Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION DURHAM, NC & ALLENTON MANAGEMENT Prepared by: CRITERIUM GILES ENGINEERS

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112

More information

WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT?

WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT? WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT? Tom Larson, PE, RS, PRA Facility Engineering Associates, PC What is a Reserve Study? A budget planning tool which identifies the current status of the

More information

REPLACEMENT RESERVE REPORT FY 2018 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon

REPLACEMENT RESERVE REPORT FY 2018 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2018 SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2018 Prepared for: SANCTUARY AT FALSE CAPE Ms. Rebecca Beamon 3700 Sandpiper Road Virginia

More information

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for:

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for: RESERVESTUDYUPDATE Dallas, GA Prepared for: THE VILLAS AT BLACKBERRY RUN HOME OWNERS ASSOCIATION, INC. Carl Swanson-President Prepared by: CRITERIUM-CARUSO ENGINEERS 1065 POWERS PLACE, SUITE B ALPHARETTA,

More information

Update With Site-Visit Reserve Study

Update With Site-Visit Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

National Reserve Study Standards

National Reserve Study Standards RS National Reserve Study Standards General Information about Reserve Studies One of the primary responsibilities of the board of directors of a community association is to protect, maintain, and enhance

More information

RESERVE STUDY ANNUAL REPORT

RESERVE STUDY ANNUAL REPORT RESERVE STUDY ANNUAL REPORT PINELOCH SUN BEACH CLUB LEVEL III RESERVE STUDY UPDATE WITHOUT SITE VISIT Ronald, WA 98940 Report #50510500R FINANCIAL YEAR 01.2016 12.2016 701 Fifth Ave, Suite 4200, Seattle

More information

FULL RESERVE STUDY Woodridge Park Homeowners' Association, Ltd. Orchard Park, New York November 10, 2017

FULL RESERVE STUDY Woodridge Park Homeowners' Association, Ltd. Orchard Park, New York November 10, 2017 FULL RESERVE STUDY Woodridge Park Homeowners' Association, Ltd. Orchard Park, New York November 10, 2017 This Report contains intellectual property developed by Reserve Advisors, Inc. and cannot be reproduced

More information

Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA. Prepared by:

Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA. Prepared by: RESERVE FUND STUDY THE VILLAGE AT HIGHLANDS CROZET, VA 22932 Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA C/O ASSOCIA COMMUNITY GROUP 1828 PAVILION CIRCLE CHARLOTTESVILLE, VA 22911

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Heritage Park 3208-52 nd Place NE, Tacoma, WA 98422 For: Heritage Park Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community Solutions 5500 Olympic Drive,

More information

Ashleigh Commons Condominiums Association, Inc.

Ashleigh Commons Condominiums Association, Inc. RESERVE STUDY Full Study Ashleigh Commons Condominiums Association, Inc. Published - January 14, 2016 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112 th Ave NE

More information

Reserve Specialist (RS ) Designation

Reserve Specialist (RS ) Designation Reserve Specialist (RS ) Designation NATIONAL RESERVE STUDY STANDARDS General Information About Reserve Studies One of the primary responsibilities of the board of directors of a community association

More information

CONTENTS. Greens at Lochmere Cary, NC

CONTENTS. Greens at Lochmere Cary, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 6 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA VILLAGE GREEN HOA REPLACEMENT RESERVE REPORT FY 2011 Community Management by: Ravenel Associates, Inc. Chad Hammond, Property Manager 3690 Bohicket

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Cascara at Redmond Ridge NE 112 th Place & Eastridge Drive NE, Redmond, WA 98052 For: Cascara at Redmond Ridge Homeowners Association c/o Luiza Limona Morris Management 325-118

More information

SMA RESERVES. Miramar Plaza Homeowners' Association. Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015

SMA RESERVES. Miramar Plaza Homeowners' Association. Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015 SMA RESERVES Miramar Plaza Homeowners' Association Reserve Study Update w/o Visual Inspection July 15, 2014 Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015 SMA RESERVES 2059 Camden Ave. Suite

More information

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION Full Reserve Study With On-site Visual Inspection October 3, 2018 Reserve Study for Fiscal Year: 01/01/2019 through 12/31/2019 2059 Camden Ave. Suite 151

More information

- RS. D e sig n atio n

- RS. D e sig n atio n ALEXANDER LIU CAI - RS Reserve D e sig n atio n Specialist Sample Table Of HOA Contents Project Table of Contents Page Preface i Executive Summary 1 Membership Disclosure Summary 2 Disclosure Statement

More information

FULL RESERVE STUDY Ameri-Cana Resorts Co-op, Inc. Rockledge, Florida April 13, 2017

FULL RESERVE STUDY Ameri-Cana Resorts Co-op, Inc. Rockledge, Florida April 13, 2017 FULL RESERVE STUDY Ameri-Cana Resorts Co-op, Inc. Rockledge, Florida April 13, 2017 This Report contains intellectual property developed by Reserve Advisors, Inc. and cannot be reproduced or distributed

More information

Estates at River Ranch HOA

Estates at River Ranch HOA Full Reserve Study Estates at River Ranch HOA Tucson, Arizona Report #: 29634-0 For Period Beginning: January 1, 2017 Expires: December 31, 2017 Date Prepared: June 15, 2016 Hello, and welcome to your

More information

Reserve Fund Study My Condominium Plan

Reserve Fund Study My Condominium Plan Reserve Fund Study My Condominium Plan 12 3456 Number of Units 36 Number of Buildings 1 Building Construction 21 Contact Ima Happy Position(s) President Contact Phone 43.555.4321 Report Date August 8,

More information

2019 Reserve Study. Pebble Shores Condominium Association, Inc. Pebble Shores Drive Naples, FL A Service of:

2019 Reserve Study. Pebble Shores Condominium Association, Inc. Pebble Shores Drive Naples, FL A Service of: Pebble Shores Drive Naples, FL 34410 A Service of: 5036 Dr. Phillips Blvd, Suite 207, Orlando FL 32819 www.lcamresources.com October 31, 2018 Pebble Shores Condominium Pebble Shores Drive Naples, FL 34410

More information

Harbour Isle at Hutchinson Island West Condominium Association, Inc. Ft. Pierce, Florida File #

Harbour Isle at Hutchinson Island West Condominium Association, Inc. Ft. Pierce, Florida File # A FULL RESERVE STUDY FOR Harbour Isle at Hutchinson Island West Condominium Association, Inc. Ft. Pierce, Florida File # 22920-04030 FOR PERIOD: January 1, 2017 December 31, 2017 PREPARED BY GAB ROBINS,

More information

Hyde Park Place Owners' Association, Inc.

Hyde Park Place Owners' Association, Inc. RESERVE STUDY Full Study Hyde Park Place Owners' Association, Inc. Published - February 10, 2016 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com

More information

RESERVE STUDY SPECIALISTS

RESERVE STUDY SPECIALISTS RESERVE STUDY SPECIALISTS P.O. BOX 9178, CALABASAS, CA 91372 TEL: 818-992-1312 FAX: 818-992-1338 VILLAGE GREEN EAST HOMEOWNERS ASSOCIATION FULL RESERVE STUDY September 06, 2017 for Fiscal Year 2018 RESERVE

More information

Depreciation Report Level I

Depreciation Report Level I Depreciation Report Level I Prepared for Strata VIS 2720 s 2013 Fiscal Year Prepared by RBC STRATA CONSULTING LTD. Version 3.1 2014 RBC STRATA CONSULTING LTD. Have questions about this Depreciation Report.

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: August 15, 215 To: Lorrie Olson, Caughlin Creek HOA From: Browning Reserve Group (BRG) Re: Caughlin Creek HOA; Full Study Attached, please find the reserve study

More information

OAK CREEK CONDOMINIUMS

OAK CREEK CONDOMINIUMS 1515 Heritage Dr., Suite 204 McKinney, Texas75069 (972) 562-1011 TEL (972) 540-1031 FAX Firm Reg. No F-4577 www.criteriumdotson.com RESERVE FUND STUDY OAK CREEK CONDOMINIUMS 1700 BAIRD FARM CIRCLE ARLINGTON,

More information

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated

More information

CAPITAL RESERVE STUDY. Providence Corner. Upper Providence Twp.

CAPITAL RESERVE STUDY. Providence Corner. Upper Providence Twp. CAPITAL RESERVE STUDY FOR THE Providence Corner Upper Providence Twp. Management Company: The Galman Group Contact Name: Ms. Debra Lynch Date: September 28, 2016 Table of Contents Section Name Section

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: January 18, 2012 To: Michael Lee, Collins Management Co. From: Richard Avelar & Associates (RA&A) Re: Bridgewater Condominium Association Attached, please find the

More information

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY:

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY: 2015 Reserve Study Report LOCATED AT: 101 Oasis Drive Pompano Beach, FL 33069 FOR: Oasis at Palm Aire Association, Inc. 101 Oasis Dr., # Office Pompano Beach, FL 33069 AS OF: January 1st, 2015 - December

More information

RESERVE STUDY. Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION. Prepared by: 22 MONUMENT SQUARE PORTLAND, MAINE (800) , EXT 111

RESERVE STUDY. Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION. Prepared by: 22 MONUMENT SQUARE PORTLAND, MAINE (800) , EXT 111 RESERVE STUDY THE VILLAGE AT HIGHLANDS CHARLOTTESVILLE, VA Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION C/O ASSOCIA COMMUNITY GROUP 1413 SACHEM PLACE, SUITE 2 CHARLOTTESVILLE, VA 22901 Prepared

More information

Paradise Island Condominium Association Final Report of the Reserve Study Review Committee

Paradise Island Condominium Association Final Report of the Reserve Study Review Committee Paradise Island Condominium Association Final Report of the Reserve Study Review Committee March 11, 2014 Chairperson Mary Linak Members Jeff Duppler Chuck Lanius Bill Murphy Paul Pudlas Advisor Mike Ashworth,

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE 0807 3502 SOUTH FIRST STREET CHAMPAIGN, ILLINOIS SYSTEM CONDITION INDEX.771 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 347,400 LABORATORY BUILDING GROSS SQUARE FEET 16,986

More information

Indian Peaks Townhomes 95 th Street Lafayette, CO 80026

Indian Peaks Townhomes 95 th Street Lafayette, CO 80026 Indian Peaks Townhomes 95 th Street Lafayette, CO 80026 Level 2, Premium Reserve Analysis Report Period 01/01/16 12/31/16 Client Reference Number - 4080 Property Type Townhome Development Number of Units

More information

RESERVE STUDY LEVEL I - Full Reserve Study. ABC Condominium Association, Inc.

RESERVE STUDY LEVEL I - Full Reserve Study. ABC Condominium Association, Inc. Insurance Appraisals Reserve Studies Wind Mitigation RESERVE STUDY LEVEL I - Full Reserve Study Prepared for: ABC Condominium Association, Inc. For the period of January 1, 214 - December 31, 214 71 Enterprise

More information

F U L L R E S E RV E S T U DY R E P O RT

F U L L R E S E RV E S T U DY R E P O RT Office: (888) 927-7865 Fax: (813) 200-8448 Contact@customreserves.com 5470 E Busch Blvd., Unit 171 Tampa, FL 33617 Hawks Point Community Development District F U L L R E S E RV E S T U DY R E P O RT For

More information

Calusa Point Association, Inc. Miami, Florida File #

Calusa Point Association, Inc. Miami, Florida File # A FULL RESERVE STUDY FOR Miami, Florida File # 22920-06289 FOR PERIOD: January 1, 2014 December 31, 2014 PREPARED BY GAB ROBINS, A DIVISION OF CUNNINGHAM LINDSEY 3300 W. LAKE MARY BLVD. SUITE 350 LAKE

More information

Comprehensive Reserve Fund Study and Building Condition Assessment for Wellington Standard Condominium Corporation No. 149

Comprehensive Reserve Fund Study and Building Condition Assessment for Wellington Standard Condominium Corporation No. 149 Comprehensive Reserve Fund Study and Building Condition Assessment for Wellington Standard Condominium Corporation No. 149 820 Gartshore Street Fergus, Ontario Report Prepared for the Board of Directors

More information

FOR BOARD REVIEW CARRBORO, NC. Prepared for: FENWAY PARK HOMEOWNERS ASSOCIATION, INC. Prepared by:

FOR BOARD REVIEW CARRBORO, NC. Prepared for: FENWAY PARK HOMEOWNERS ASSOCIATION, INC. Prepared by: FOR BOARD REVIEW RESERVE FUND STUDY FENWAY PARK CARRBORO, NC Prepared for: FENWAY PARK HOMEOWNERS ASSOCIATION, INC. CARRBORO, NC Prepared by: CRITERIUM GILES ENGINEERS 1150 SE MAYNARD ROAD, SUITE 220 CARY,

More information

RESERVE FUND STUDY. Hill & Associates Ltd. Member APEGNB July 2014

RESERVE FUND STUDY. Hill & Associates Ltd. Member APEGNB July 2014 2014 RESERVE FUND STUDY Hill & Associates Ltd. Member APEGNB July 2014 Reserve Fund Study Prepared for Bobak Place Townhome Condominiums Prepared by Hill & Associates Ltd. Consulting Professional Engineers

More information

.USI.COMMERCIAL. The Summerlyn Association of Owners Inc. Lewes, Delaware. Funding Reserve Analysis. for. September 3, 2014

.USI.COMMERCIAL. The Summerlyn Association of Owners Inc. Lewes, Delaware. Funding Reserve Analysis. for. September 3, 2014 .USI.COMMERCIAL (888)225-3755 www.usicommercial.com Funding Reserve Analysis for The Summerlyn Association of Owners Inc. Lewes, Delaware September 3, 2014 Page 1 of 25 Pages Funding Reserve Analysis for

More information

Do-It-Yourself Reserve Study

Do-It-Yourself Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO

NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO RESERVE FUND STUDY NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com NOVEMBER 2013 1.0 INTRODUCTION...1

More information

RESERVE STUDY Component Analysis and Reserve Fund Plan Annual Review Study 2016/17 For Middlefield Meadows HOA Mountain View, CA Prepared By RESERVE ANALYSIS CONSULTING, LLC 1750 Bridgeway, Suite B106

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Licorice Fern II Homeowners Association 16880 SE Licorice Way, Renton, WA 98059 For: Licorice Fern II Homeowners Association c/o Ann Hart, Property Manager Pinnacle 2801 Alaskan

More information

TIMBERLAKE COMMUNITY ASSOCIATION

TIMBERLAKE COMMUNITY ASSOCIATION TIMBERLAKE COMMUNITY ASSOCIATION REPLACEMENT RESERVE REPORT FY 2014 TIMBERLAKE COMMUNITY ASSOCIATION REPLACEMENT RESERVE REPORT FY 2014 Community Management by: Mr. Phil Massa, AMS, PCAM 933 Windsor Oaks

More information

Harbour Isle at Hutchinson Island West, CA, Inc. Ft. Pierce, Florida

Harbour Isle at Hutchinson Island West, CA, Inc. Ft. Pierce, Florida A RESERVE STUDY UPDATE FOR Harbour Isle at Hutchinson Island West, CA, Inc. Ft. Pierce, Florida File # U22920-04030 FOR PERIOD: January 1, 2019 December 31, 2019 PREPARED BY GAB ROBINS, A SEDGWICK COMPANY

More information

Year Per Manor Per Month Assessment Total Contribution United Laguna Woods Mutual 2019 RESERVES PLAN Reserve 30-Year Funding Plan Interest Earnings Th

Year Per Manor Per Month Assessment Total Contribution United Laguna Woods Mutual 2019 RESERVES PLAN Reserve 30-Year Funding Plan Interest Earnings Th Year Per Manor Per Month Assessment Total Contribution United Laguna Woods Mutual 2019 RESERVES PLAN Reserve 30-Year Funding Plan Interest Earnings Threshold (Min Balance): $ 10,400,000 Indexed for projected

More information

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012 Parkwood HOA Level 1 Reserve Study Report Period 1/1/2012 12/31/2012 Client Reference Number Property Type Number of Units Fiscal Year End 12784 Townhouse 8 12/31 Date of Property Inspection Prepared By

More information

GARDEN ESTATES MAINTENANCE ASSOCIATION ("CORPORATION")

GARDEN ESTATES MAINTENANCE ASSOCIATION (CORPORATION) info@src-reservestudy.com 951-693-1721 GARDEN ESTATES MAINTENANCE ASSOCIATION ("CORPORATION") Level 3 Reserve Study Update (No Site-Visit) Prepared For Fiscal Year 2016 1/26 Contents 1 Title Page 2 Table

More information

Update "With-Site-Visit" Reserve Study

Update With-Site-Visit Reserve Study Update "With-Site-Visit" Reserve Study Sample Townhouse HOA Ventura, CA Report #: For Period Beginning: Expires: Date Prepared: 99999999-0 January 1, 2019 December 31, 2019 June 27, 2018 T W Hello, and

More information

RESERVE STUDY. The cost of replacement should be high enough to make it financially unsound to fund it from the operating budget.

RESERVE STUDY. The cost of replacement should be high enough to make it financially unsound to fund it from the operating budget. THE Page 2 Introduction RESERVE STUDY A Reserve Study is a report giving an estimate of the amount of money which must be put aside to replace the major items (or building components) that will wear out

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Sammamish Landing Condominiums 4214 West Lake Sammamish Parkway NE, Redmond, WA 98052 For: Sammamish Landing Homeowners Association c/o Scott McCue, Property Manager McCue &

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Raft Island Homeowners Association 200 Raft Island Drive Northwest, Gig Harbor, WA 98335 For: Raft Island Homeowners Association c/o Juanita Carbaugh, Property Manager P.O. Box

More information

Agenda Item # 5b Page 1 of 43

Agenda Item # 5b Page 1 of 43 Page 1 of 43 Page 2 of 43 Page 3 of 43 Page 4 of 43 Page 5 of 43 Page 6 of 43 Page 7 of 43 Page 8 of 43 Page 9 of 43 Page 10 of 43 Page 11 of 43 Page 12 of 43 Page 13 of 43 Page 14 of 43 Page 15 of 43

More information

The Ranches HOA. Level II Reserve Study. Report Period 1/01/08 12/31/08

The Ranches HOA. Level II Reserve Study. Report Period 1/01/08 12/31/08 The Ranches HOA Level II Reserve Study Report Period 1/01/08 12/31/08 Client Reference Number.... 10329 Property Type..... Single Family Homes Number of Units.......... 1,750 Fiscal Year End......... December

More information

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2 2014 Reserve Study The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee 37862 Report No: 2921 Version 2 For the Period From: January 1, 2014 To: December 31, 2014 TABLE

More information