Clear Hills Condominiums AND MAINTENANCE RESERVE STUDY SCHEDULE UPDATE. Clear Hills Condominiums HOA 7595 SW Clear Hills Dr. Portland, OR 97225

Size: px
Start display at page:

Download "Clear Hills Condominiums AND MAINTENANCE RESERVE STUDY SCHEDULE UPDATE. Clear Hills Condominiums HOA 7595 SW Clear Hills Dr. Portland, OR 97225"

Transcription

1 Clear Hills Condominiums RESERVE STUDY AND MAINTENANCE SCHEDULE UPDATE PREPARED FOR: Clear Hills Condominiums HOA 7595 SW Clear Hills Dr. Portland, OR PROJECT NUMBER: REPORT DATE: December 9, 2015 REVISION DATE: December 21, 2015 PREPARED BY: (P) (F) , FORENSIC BUILDING CONSULTANTS. ALL RIGHTS RESERVED.

2 This Page Left Intentionally Blank

3 TABLE OF CONTENTS Table of Contents 2 Executive Summary 3 Reserve Study Scope 3 Funding Model Calculations summaries 4 Scope of Reserve Study 6 Reserve Study Parameters 7 Property Site 9 Reserve Study Exclusions 10 Component Inventory 11 Component Inventory: Representative Photographs 13 Reserve Study Findings: Annual Expenditure Details 24 Annual Expenditure Detail (YEARS ) 25 Annual Expenditure Detail (YEARS ) 26 Annual Expenditure Detail (YEARS ) 27 CURRENT Funding Model Projection 28 Threshold Funding Model Projection 29 Appendix A: Maintenance Schedule 30 MAINTENANCE SCHEDULE 31 Appendix B: Important Information 38 Purpose of Report 39 Standard Terms and Definitions 40 Overview of Capital Planning Tools 43 Reserve Study Methodology 48 Disclosures and Limitations 50 PAGE 2

4 EXECUTIVE SUMMARY Client Name: Clear Hills Condominium Homeowners Association (HOA) Property Name: Clear Hills Condominiums (Property) Property Address: 7595 SW Clear Hills Dr. Portland, OR Report Type: Reserve Study Update (RS) Report Date: December 9, 2015 Dear Clear Hills HOA: As requested, Forensic Building Consultants (Forensic) has prepared an updated 30-year Reserve Study and Maintenance Schedule for the Clear Hills Condominiums community (Property). The following report consists of the following: 1) a physical analysis of the current condition of a limited representative sample of the Property s commonly-owned building components, and 2) a financial analysis of the Association s current reserve fund balance, contribution, and anticipated replacement schedule, and 3) a recommended maintenance schedule for the commonly-owned building components. The intent of this Reserve Study is to evaluate the results of the physical and financial analyses in order to help the Association assess their current reserve funding and to arrive at an appropriate annual reserve fund contribution for the Property, based on the anticipated replacements and renewals of major commonly-owned building components over the next thirty (30) years. RESERVE STUDY SCOPE Forensic s Reserve Study (RS) was limited to the observation, evaluation, and quantification of the common as-built construction assemblies and components, as they existed at the time of our presence on site at the Property. Note that Forensic s RS was limited to the following: Update to Reserve Study and Maintenance Plan Provider will review the Full Reserve Study (Type I) and update the computations, funding plan, and fund status for Year 3. PAGE 3

5 RESERVE STUDY AND MAINTENANCE SCHEDULE FUNDING MODEL CALCULATIONS SUMMARIES GENERAL ASSESSMENT OF CURRENT RESERVE FUND STATUS Based on the component inventory data and the schedule for renewal and replacement of the common element components over the next 30 years, the figure below illustrates the Threshold Assessment Funding Model. Reserve%Fund%vs.%Time% Threshold%Model% Current%Model% $300,000 $250,000 Reserve%Fund%($)% $200,000 $150,000 $100,000 $50,000 $0 2015% 2016% 2017% 2018% 2019% 2020% 2021% 2022% 2023% 2024% 2025% 2026% 2027% 2028% 2029% RECOMMENDED RESERVE FUND CONTRIBUTION RATE Year% 2030% 2031% 2032% 2033% 2034% 2035% 2036% 2037% 2038% 2039% 2040% 2041% 2042% 2043% 2044% In order for the Association to maintain its desired minimum threshold of $12,000 between the closing balance of one year and the scheduled expenditures for the subsequent year, we recommend the principal reserve fund contribution for 2016 to be $23,168. Per unit contribution is $ annually or $77.23 monthly (assuming contributions are split equally between the 25 property owners). Per the Association s instructions, this annual contribution has been modeled assuming a 0% increase each year while inflation is currently estimated at 1.0%. 1 EXPLANATORY NOTES 1 Inflation Data 2012, Capital Professional Services, LLC < PAGE 4

6 RESERVE STUDY AND MAINTENANCE SCHEDULE The increase in recommended reserve contribution versus current reserve contribution is largely due to the the projected asphalt overlay project scheduled for This result is based on the component inventory data, the adjusted remaining useful life (RUL) of those components, and the input data provided by the Association. The annual projected ending balance for the reserve fund using each model is tabulated in the Reserve Study Findings section of this report. CURRENT FUNDING MODEL SUMMARY OF CALCULATIONS Current Reserve Contribution: $23,124 THRESHOLD FUNDING MODEL SUMMARY OF CALCULATIONS Recommended (Threshold Model) 2016 Reserve Contribution: $23,168 PAGE 5

7 Scope of Reserve Study PAGE 6

8 RESERVE STUDY PARAMETERS EXPLANATORY NOTES The following data (provided by the Association) forms the basis for the funding model inputs. Level of Service: Year 3 Reserve Study Update Description: Reserve Study includes Component Inventory (verification), Condition Assessment (based upon on-site visual observations), Life and Valuation Estimates, Fund Status, and a Funding Plan Fiscal Year Start: January 1, 2016 Fiscal Year End: December 31, 2016 Model Interest Rate: Reserve Fund 2015 Starting Balance: 0.10 % Inflation Rate: 1.0 % $68,646 Contingency: 0.0 % Current Annual Contribution: $23,124 Annual Contribution Increase: 0 % Threshold Minimum Balance: $12,000 Number of Units: 25 Property Occupancy Type: Residential single-family and multifamily dwellings Date of Original Construction: 1968 General Description of Property: The Property consists of: Seven (7) one-story, wood-framed, multifamily buildings Eleven (11) one-story, wood-framed, single family buildings One (1) single-story, wood-framed, panel clad pool house The Property underwent a major underground utility upgrade in 2013 The structures are built atop concrete foundations In general, the Property appears to be in good physical condition PAGE 7

9 Description of Pool House Exterior Wall Assemblies: n Panel siding (believed to be T1-11 siding) n Cedar trim members, exterior sealant joints Description of Pool House Roof Assemblies: n Cedar roofing shake n Wood trim members, exterior sealant joints, and sheet metal flashing n Felt-based roof underlayment n Roof sheathing and wood framing members Description of Fenestration Assemblies: n Aluminum flange-mounted window units Description of Pool Deck: n Concrete topping slab wearing surface n Pedestrian Traffic Coating Some calculations are based on data and assumptions received from Client. Per Client s instructions, the rates below are fixed and inflation is calculated at 0% for the following components: Asphalt Overlay - $63,225 every thirty (30) years Landscape Bark Dust - $1,500 every two (2) years Sprinkler System - $10,000 every fifteen (15) years Pool Fence Repair/Replace - $1,000 every ten (10) years Pool Fence Paint/Stain - $200 every five (5) years Landscape Pruning - $2,000 every two (2) years Signage - $850 every ten (10) years Metal Handrail Painting - $200 every five (5) years Retaining Walls-Stamped - $800 every two (2) years Water Heater - $300 every ten (10) years Pool-Heater - $2,700 every ten (10) years Pool-Repaint/Replaster - $6,500 every five (5) years Pool-Furniture - $3,500 every five (5) years Water Pressure Pump Maintenance - $1,500 every two (2) years PAGE 8

10 PROPERTY SITE The aerial image below, obtained from Google Maps, illustrates the overall site conditions at the Property. Note that this image is oriented so that North corresponds with the top of the page. PAGE 9

11 RESERVE STUDY EXCLUSIONS EXPLANATORY NOTES The following components and systems have been excluded from this Reserve Study. Any pricing and component information for these systems contained within this report was provided by the Association, was included only for budgeting purposes, and has not been independently assessed or verified by Forensic: Site Utilities Foundation and Concealed Structural Components Mechanical and HVAC Systems Low-Voltage Electrical Systems Emergency Power Systems Plumbing Systems Fire Detection and Alarm Systems Fire Suppression Systems These systems (where they exist) will likely require periodic renewal and replacement during the next 30 years. However, the condition assessment and verification of replacement costs of these systems are beyond the scope of this Reserve Study. It is recommended that the Association have these systems evaluated by qualified professionals prior to inclusion in future Reserve Studies for the Property. PAGE 10

12 CLEAR HILLS CONDOMINIUMS COMPONENT INVENTORY EXPLANATORY NOTES In order to compile the 30-year funding forecast, this reserve study estimates the expected useful life (EUL) and remaining useful life (RUL) of the various building components and systems (components) included within the scope of the study, and provides estimated replacement or renewal costs for those components. Each common element component is identified as being primarily in one of four categories, and an appropriate modification to the components remaining useful life (RUL) was made for each, based on the actual condition and nature of the component Interior Component (Aesthetic): Maximum 100% extension of expected useful life (EUL) Exterior Component (Aesthetic): Maximum 50% extension of expected useful life (EUL) Interior Component (Performance): Maximum 50% extension of expected useful life (EUL) Exterior Component (Performance): Maximum 25% extension of expected useful life (EUL) Note that the component inventory tables on the following pages incorporate the abbreviations and terminology listed below: Qty. Quantity of a given component Current Replace. Cost Current cost of replacement for a given component EUL Expected useful life of given component RUL Remaining useful life of given component 1 st Repl. Date First anticipated replacement date for a given component, based upon RUL EUL Adj. Adjustment to EUL based on visual observation of component condition PAGE 11

13 COMPONENT NAME QTY. UNIT TYPE UNIT COST CURRENT REPL. COST YEAR IN SERVICE AGE EUL EUL ADJ. (+/-) RUL 1st REPL. DATE 1. Site Work 2. Poolhouse 3. M is 1.1 Asphalt Overlay 1 Lsum $63, $63, /1/ Asphalt Sealcoat SF $0.16 $7, /1/ Landscape Bark Dust 1 Lsum $1, $1, /1/ Concrete Curb Repair 1 Lsum $2, $2, /1/ Concrete Step Replacement 1 Lsum $2, $2, /1/ Sprinkler System 1 Lsum $10, $10, /1/ Pool Fence-Repair/Replace 1 Lsum $10, $10, /1/ Pool Fence-Paint/Stain 1 Lsum $ $ /1/ Landscape Tree Replacement 1 Lsum $5, $5, /1/ Entry Monument 25 Each $ $8, /1/ Signage 1 Lsum $ $ /1/ Lighting-Entry and Pool Fence 10 Each $ $1, /1/ Metal Handrail Replacement Allowance 1 Lsum $1, $1, /1/ Metal Handrail Painting 1 Lsum $ $ /1/ Retaining Walls-Stamped 1 Lsum $ $ /1/ Retaining Walls-Masonry 1 Lsum $1, $1, /1/ Retaining Walls-Masonry (2021 additional) 1 Lsum $1, $1, /1/ Mailboxes 26 Each $ $7, /1/ Utilities-Inspection/Scoping 1 Lsum $6, $6, /1/ Utilities-Inspection/Scoping (2016 additional) 1 Lsum $1, $1, /1/ Utilities-Repair Allowance 1 Lsum $5, $5, /1/ Siding-Panel 953 SF $4.70 $4, /1/ Doors-Exterior 4 Each $ $2, /1/ Painting-Exterior 1037 SF $1.60 $1, /1/ Windows 2 Each $ $1, /1/ Roofing Replacement 588 SF $6.02 $3, /1/ Gutters & Downspouts 105 LF $4.70 $ /1/ Bathroom Sinks 2 Each $ $ /1/ Bathroom-Mirrors/Fixtures 1 Lsum $ $ /1/ Bathroom-Toilets 2 Each $ $ /1/ Lighting-Interior 4 Each $ $ /1/ Water Heater 1 Each $ $ /1/ Pool-Pumps 2 Each $ $1, /1/ Pool-Sweep & Pump 1 Each $ $ /1/ Pool-Sweep & Pump (2016 Sweep) 1 Each $1, $1, /1/ Pool-Filter & Parts 1 Each $ $ /1/ Pool-Heater 1 Each $2, $2, /1/ Pool-Cover 1 Each $3, $3, /1/ Pool-Repaint/Replaster 1 Each $6, $6, /1/ Pool-Furniture 1 Each $3, $3, /1/ Water Pressure Pump Maint 1 Lsum $1, $1, /1/ Note: The item Pool Area Cleaning/Maintenance has been included for budgetary purposes only, this item pertains to the repair and/or replacement of common components including but necessarly limited to: Wood Handrails, Signage, Monument Signage PAGE 12

14 COMPONENT INVENTORY: REPRESENTATIVE PHOTOGRAPHS 1 SITE COMPONENTS 1.1 Asphalt Pavement 1.2 Asphalt Overlay Roadways Explanatory Notes: Expected overlay of asphalt payment expected in the year 2021, after potential settling of patchwork due to utility upgrades. 1.3 Landscaping Bark Dust Common Areas 1.4 Concrete Curbs Perimeter of roadways Explanatory Notes: Curbs are generally in good condition, cracking at joint locations. PAGE 13

15 COMPONENT INVENTORY: REPRESENTATIVE PHOTOGRAPHS 1.6 Sprinkler System All buildings Explanatory Notes: Primarily located in common areas 1.9 Pool Fence Repair/Replace 1.10 Pool Fence Paint/Stain Perimeter of pool area Explanatory Notes: 5 high wood fence, two gates 1.11 Landscaping Pruning 1.12 Landscaping Tree Replacement Common areas PAGE 14

16 COMPONENT INVENTORY: REPRESENTATIVE PHOTOGRAPHS 1.15 Entry Monument Intersection of SW Montclair St and SW Cedar Hills St. Explanatory Notes: Additional photograph illustrating Property entry signage attached to masonry Postlamp Repair/Replacement Allowance Atop columns at masonry entry wall Note: Additional type of signage on column face 1.17 Signage Roadway intersections Explanatory Notes: Street name identification signage PAGE 15

17 COMPONENT INVENTORY: REPRESENTATIVE PHOTOGRAPHS 1.18 Lighting Entry and Pool Fence Entry pathways at front of units Atop wood fencing posts at pool perimeter Pool house Explanatory Notes: Flood light PAGE 16

18 COMPONENT INVENTORY: REPRESENTATIVE PHOTOGRAPHS Exterior of pool house Explanatory Notes: Additional type of exterior light 1.19 Metal Handrail Replacement Allowance 1.20 Metal Handrail Painting Ramp to pool off of SW Clear Hills Dr. Explanatory Notes: Metal guardrails should be inspected for stability as well as corrosion annually; remediate as necessary. Note: Cracking of concrete pathway at ADA accessible pool entry Southwest of pool house Explanatory Notes: Metal guardrails should be inspected for stability as well as corrosion, remediate as necessary. PAGE 17

19 COMPONENT INVENTORY: REPRESENTATIVE PHOTOGRAPHS 1.21 Retaining Walls Stamped Concrete Throughout the property Explanatory Notes: Concrete retaining wall 1.22 Retaining Walls Masonry Intersection of SW Montclair Dr. and SW Clear Hills Dr. Explanatory Notes: Retaining wall is generally in good condition, minor algae growth. Brick units should be inspected periodically for failed mortar applications Utilities Inspection/Scoping 1.25 Utilities Repair Allowance Common Areas, primarily underground Explanatory Notes: Site utility improvements PAGE 18

20 2 POOL HOUSE COMPONENTS 2.1 Siding Pool house cladding Explanatory Notes: Panel siding 2.3 Exterior Paint Siding, projecting roof overhang, wood trim members, swing doors Explanatory Notes: Metal clad window 2.2 Swing Door Front and side elevations of pool house 2.4 Window Front elevation of pool house Explanatory Notes: Metal clad window PAGE 19

21 2.5 Roofing Pool house Explanatory Notes: Cedar shake roofing. Substantial organic growth on the north side of the roof. Forensic noted omitted ventilation provisions within the attic cavity/roof assembly; recommended installation of adequate ventilation provisions 2.6 Gutters and Downspouts Front and rear elevations of the pool house Explanatory Notes: Rear Gutter replaced in Bathroom Sinks 2.10 Bathroom Mirrors/Fixtures Pool house Explanatory Notes: Mirror, Soap Dispenser, Paper Towel Dispenser, Partition Wall PAGE 20

22 Shower Fixture Exterior of pool house Explanatory Notes: Wall mounted shower fixture 2.11 Bathroom-Toilets Pool house Explanatory Notes: Replace components as necessary, same paint schedule as building exteriors 2.14 Water Heater Pool house closet Explanatory Notes: Water heater supply for showers and sinks within pool house PAGE 21

23 2.15 Pool Pumps Pool house closet Explanatory Notes: Pool cleaner pump, pool filter pump 2.17 Pool - Filter & Parts Pool house closet Explanatory Notes: Repair allowance included for replacement parts and labor Manufacturer: Ray Pac 2.18 Pool Heater Pool house closet Explanatory Notes: Due to limited part availability, recommended replacement upon failure PAGE 22

24 2.19 Pool Cover Pool area 2.21 Furniture Pool Furniture Explanatory Notes: Furniture is stored away in the pool house during the off-season. PAGE 23

25 Reserve Study Findings: Annual Expenditure Details PAGE 24

26 ANNUAL EXPENDITURE DETAIL (YEARS ) 1. Sitework 2. Pool Description Asphalt Overlay $63, Asphalt Sealcoat $7, Landscape Bark Dust $1,500 $1,500 $1,500 $1,500 $1, Concrete Curb Repair $2, Concrete Step Replacement 1.6 Sprinkler System $10, Pool Fence-Repair/Replace 1.10 Pool Fence-Paint/Stain $200 $ Landscape Pruning $2,000 $2,000 $2,000 $2,000 $2, Landscape Tree Replacement 1.15 Entry Monument 1.16 Postlamp repair/replacement allowance $1,000 $1, Signage $ Lighting-Entry and Pool Fence $1, Metal Handrail Replacement Allowance $1, Metal Handrail Painting $200 $ Retaining Walls-Stamped $800 $800 $800 $800 $ Retaining Walls-Masonry $1, Mailboxes $8, Utilities-Inspection/Scoping $6, Utilities-Inspection/Scoping (2016 additional) $1, Utilities-Repair Allowance $5, Siding-Panel $4, Doors-Exterior $2, Painting-Exterior $1, Windows $1, Roofing Replacement $3, Gutters & Downspouts $ Bathroom Sinks 2.10 Bathroom-Mirrors/Fixtures $ Bathroom-Toilets $ Lighting-Interior $ Water Heater $ Pool-Pumps $1, Pool-Sweep & Pump $ Pool-Sweep & Pump (2016 Sweep) $1, Pool-Filter & Parts $ Pool-Heater $2, Pool-Cover $3, Pool-Repaint/Replaster $6,500 $6, Pool-Furniture $3,500 $3, Water Pressure Pump Maint $1,500 $1,500 $1,500 $1,500 $1,500 TOTAL $31,173 $5,151 $83,590 $0 $14,711 $21,836 $7,414 $0 $5,800 $17,731 PAGE 25

27 ANNUAL EXPENDITURE DETAIL (YEARS ) 1. Sitework 2. Pool Description 1.1 Asphalt Overlay 1.2 Asphalt Sealcoat 1.3 Landscape Bark Dust 1.4 Concrete Curb Repair 1.5 Concrete Step Replacement 1.6 Sprinkler System 1.9 Pool Fence-Repair/Replace 1.10 Pool Fence-Paint/Stain 1.12 Landscape Tree Replacement 1.15 Entry Monument 1.17 Signage 1.18 Lighting-Entry and Pool Fence 1.19 Metal Handrail Replacement Allowance 1.20 Metal Handrail Painting 1.21 Retaining Walls-Stamped 1.22 Retaining Walls-Masonry 1.22 Retaining Walls-Masonry (2021 additional) 1.23 Mailboxes 1.24 Utilities-Inspection/Scoping 1.24 Utilities-Inspection/Scoping (2016 additional) 1.25 Utilities-Repair Allowance 2.1 Siding-Panel 2.2 Doors-Exterior 2.3 Painting-Exterior 2.4 Windows 2.5 Roofing Replacement 2.6 Gutters & Downspouts 2.9 Bathroom Sinks 2.10 Bathroom-Mirrors/Fixtures 2.11 Bathroom-Toilets 2.13 Lighting-Interior 2.14 Water Heater 2.15 Pool-Pumps 2.16 Pool-Sweep & Pump 2.16 Pool-Sweep & Pump (2016 Sweep) 2.17 Pool-Filter & Parts 2.18 Pool-Heater 2.19 Pool-Cover 2.20 Pool-Repaint/Replaster 2.21 Pool-Furniture 3.1 Water Pressure Pump Maint TOTAL ,354 8,781 9, ,817 2,231 2, ,198 1,500 1,500 1,500 1,500 1,500 6,514 1,851 3, , , , ,000 3,500 1,105 1,161 2,700 6,500 6,500 1, , ,000 6,856 7,205 5, ,500 1,500 1,500 1,500 1,500 $32,428 $11,272 $10,751 $1,500 $21,199 $22,147 $4,645 1,705 $13,580 $4,118 $30,523 PAGE 26

28 ANNUAL EXPENDITURE DETAIL (YEARS ) 1. Sitework 2. Pool Description 1.1 Asphalt Overlay 1.2 Asphalt Sealcoat 1.3 Landscape Bark Dust 1.4 Concrete Curb Repair 1.5 Concrete Step Replacement 1.6 Sprinkler System 1.9 Pool Fence-Repair/Replace 1.10 Pool Fence-Paint/Stain 1.12 Landscape Tree Replacement 1.15 Entry Monument 1.17 Signage 1.18 Lighting-Entry and Pool Fence 1.19 Metal Handrail Replacement Allowance 1.20 Metal Handrail Painting 1.21 Retaining Walls-Stamped 1.22 Retaining Walls-Masonry 1.22 Retaining Walls-Masonry (2021 additional) 1.23 Mailboxes 1.24 Utilities-Inspection/Scoping 1.24 Utilities-Inspection/Scoping (2016 additional) 1.25 Utilities-Repair Allowance 2.1 Siding-Panel 2.2 Doors-Exterior 2.3 Painting-Exterior 2.4 Windows 2.5 Roofing Replacement 2.6 Gutters & Downspouts 2.9 Bathroom Sinks 2.10 Bathroom-Mirrors/Fixtures 2.11 Bathroom-Toilets 2.13 Lighting-Interior 2.14 Water Heater 2.15 Pool-Pumps 2.16 Pool-Sweep & Pump 2.16 Pool-Sweep & Pump (2016 Sweep) 2.17 Pool-Filter & Parts 2.18 Pool-Heater 2.19 Pool-Cover 2.20 Pool-Repaint/Replaster 2.21 Pool-Furniture 3.1 Water Pressure Pump Maint TOTAL ,229 9, ,112 2,465 2,591 1,500 1,500 1,500 1,500 1,500 1, , ,270 2,025 2, ,000 4, ,500 3,500 2,700 1,232 6,500 6,500 1,220 1, , ,573 7,959 6, ,500 1,500 1,500 1,500 1,500 10,000 $27,568 $10,249 $15,933 $1,500 $11,954 $20,440 $4,891 $3,134 $2,300 $47,223 PAGE 27

29 CURRENT FUNDING MODEL PROJECTION Year Current Funding Model Assessment Current Funding Model Interest Current Funding Model Expenditures Current Funding Model Ending Reserve Balance 2016 $23,124 $42 $32,273 $59, $23,124 $54 $5,151 $77, $23,124 $12 $83,590 $17, $23,124 $28 $0 $40, $23,124 $34 $14,710 $48, $23,124 $36 $20,736 $51, $23,124 $47 $7,414 $66, $23,124 $63 $0 $90, $23,124 $75 $5,800 $107, $23,124 $79 $17,731 $112, $23,124 $67 $40,932 $95, $23,124 $69 $19,772 $98, $23,124 $75 $14,251 $107, $23,124 $91 $0 $130, $23,124 $98 $14,299 $139, $23,124 $91 $32,208 $130, $23,124 $102 $8,145 $145, $23,124 $113 $7,177 $161, $23,124 $124 $7,618 $177, $23,124 $127 $18,623 $182, $23,124 $118 $36,188 $169, $23,124 $121 $18,750 $173, $23,124 $127 $15,932 $180, $23,124 $143 $0 $204, $23,124 $149 $15,054 $212, $23,124 $148 $24,123 $211, $23,124 $158 $8,391 $226, $23,124 $174 $1,634 $248, $23,124 $186 $5,800 $265, $23,124 $187 $21,823 $267,179 PAGE 28

30 THRESHOLD FUNDING MODEL PROJECTION Year Threshold Funding Model Assessment Threshold Funding Model Interest Threshold Funding Model Expenditures Threshold Funding Model Ending Reserve Balance 2015 $23,168 $59 $7,633 $84, $23,168 $67 $11,161 $96, $16,591 $20 $84,314 $28, $16,591 $31 $1,500 $43, $16,591 $34 $11,610 $48, $16,591 $33 $18,441 $46, $16,591 $42 $3,914 $59, $16,591 $52 $1,500 $74, $16,591 $60 $5,800 $85, $16,591 $51 $29,631 $72, $16,591 $40 $32,428 $56, $16,591 $44 $11,272 $62, $16,591 $48 $10,751 $68, $16,591 $58 $1,500 $83, $16,591 $55 $21,199 $78, $16,591 $51 $22,147 $73, $16,591 $60 $4,645 $85, $16,591 $62 $13,580 $88, $16,591 $71 $4,118 $100, $16,591 $61 $30,523 $86, $16,591 $53 $27,567 $76, $16,591 $58 $10,250 $82, $16,591 $58 $15,932 $83, $16,591 $69 $1,500 $98, $16,591 $72 $11,954 $103, $16,591 $69 $20,441 $99, $16,591 $78 $4,891 $111, $16,591 $87 $3,134 $124, $16,591 $97 $2,300 $138, $16,591 $76 $47,223 $108,383 PAGE 29

31 Appendix A: Maintenance Schedule PAGE 30

32 MAINTENANCE SCHEDULE EXPLANATORY NOTES The following recommendations are based on industry standard best practices, and are intended to provide easy-to-follow guidelines for the Association to follow regarding the maintenance and preservation of the Association's common elements. Each component is unique, and is subject to unique conditions, which may require an accelerated maintenance, renewal, or replacement schedule. The Association should inspect and replace these components as needed. The Association assumes 100% responsibility for the inspection and maintenance activities described herein, and should contact their community manager and/or maintenance manager if they discover or believe there to be water intrusion or premature degradation of a component or assembly. 1. COMPONENT MAINTENANCE ACTION(S) REQUIRED FREQUENCY BUILDING APPURTENANCES Decks and Railings COMMON AREAS Deck Furnishings HVAC Units Inspect for debris build-up and organic growth. Clean deck and railing surfaces as necessary. Inspect for loose, missing, or cracked components, rot, and trip hazards. Inspect metal components for rust or paint failure. Clean rust and loose material from metal using wire brush, dust cloth, and vacuum. Prep and repaint with two coats of compatible rust-inhibiting primer. Following application of primer and finish, apply compatible clear coat waterproof sealer to areas of work to help prevent additional corrosion. Inspect for loose, missing, or cracked components, rot, sharp edges, and other damage. Inspect metal components for rust or paint failure. Clean rust and loose material from metal using wire brush, dust cloth, and vacuum. Prep and repaint with two coats of compatible rust-inhibiting primer. Following application of primer and finish, apply compatible clear coat waterproof sealer to areas of work to help prevent additional corrosion. Inspect exhaust vent fans for operability, electrical shorts, and debris-build up. Clean or replace HVAC system filters. Semi-annually (spring and fall) Annually (spring) Annually (spring) Annually (spring) Annually (spring) Semi-annually (summer and winter) PAGE 31

33 1. COMPONENT MAINTENANCE ACTION(S) REQUIRED FREQUENCY Interior Walls and Ceilings Interior Furnishings Interior Lighting Fixtures Water Heaters Inspect for microbial growth, moisture-staining, holes, cracking, graffiti, or other damage. Regularly monitor locations that exhibit wetness/dampness, color differences, swelling/warping, blistering/cracking, abnormal odors, or failure of previous repairs. Inspect for loose, missing, or cracked components, sharp edges, and other damage. Inspect for operability and electrical shorts. Replace lamps as necessary. Drain and refill hot water tank. Inspect water heater, pointof-service, pressure-reducer valve, and shut-off valves for leaks. Annually (summer) Annually (summer) Semi-annually (summer and winter) Annually (summer) EXTERIOR SEALANTS AND FINISHES Exterior Finish Paint Exterior Sealant Joints Inspect for cracking, peeling, blistering, or other evidence of paint failure. Prep and clean loose material from wall surface using a dust cloth and vacuum. Apply compatible touch-up paint to entire wall surface in between architectural breaks (corner to corner or joint to joint). Spray and back-roll paint using a low-pressure sprayer (30-50 psi) with a 50 fanshaped tip. Brush trims, edges, and protruding surfaces. Always test an inconspicuous surface first to confirm color matching of new finishes to existing finishes. Protect adjacent building components and landscaping that may be damaged by paint overspray. Inspect for sealant failure (open voids) or degradation ( chalking or cracking). Re-seal pinhole sealant failure areas with compatible sealant materials. At more extensive areas of sealant failure or degradation, remove existing sealant and clean debris and loose material from joint using a wire brush, dust cloth, and vacuum. Install new sealant that is compatible with adjacent materials (Sonolastic 750 VLM by Sonneborn is recommended). Sealant joints should be dimensioned, installed, and tooled per ASTM C1193 specifications. Dynamic sealant joints featuring a closed-cell backer rod should be installed between dissimilar materials per ASTM E2112 specifications. Regularly monitor sealant repair areas for recurrence of failure, degradation, or staining. Remove and replace temporary sealant joint applications (installed during winter) as necessary. Annually (fall) Semi-annually (spring and fall) Annually (spring) PAGE 32

34 1. COMPONENT MAINTENANCE ACTION(S) REQUIRED FREQUENCY Fluid-Applied Traffic Coatings Inspect for cracking, peeling, blistering, or other evidence of failure. Prep and re-coat areas of failure as necessary. Annually (fall) EXTERIOR WALLS Electrical Outlets Exterior Lighting Fixtures Exterior Walls (General) Inspect for damaged covers or electrical shorts. Test ground fault plugs. Inspect for operability and electrical shorts. Replace lamps as necessary. Inspect weather-resistance of seals and gaskets at wall penetration. Inspect exterior wall surfaces for organic growth or graffiti. Clean wall surfaces as necessary with a compatible granulated soap/mild detergent applied using a low-pressure sprayer (30-50 psi) with a 50 fan-shaped tip. Never use muratic acid or petroleum-based cleaners or solvents. Scrub problematic wall surfaces vigorously with a stiff bristle brush (do not use a wire brush) and rinse thoroughly using a garden hose or low-pressure sprayer ( psi) with a fan-shaped tip. Do not allow cleaning solution to dry on building components. Always test an inconspicuous surface first to confirm the effect that scrubbing and application of cleaning solution will have on various building components. Protect adjacent building components and landscaping that may be damaged by cleaning solution. Inspect exterior wall surfaces for damaged, loose, or missing components, rot, storm damage, or other weatherresistance deficiencies. Inspect accessible interior surfaces for microbial growth, moisture staining, or evidence of water leakage to the interior. Regularly monitor locations that exhibit wetness/dampness, color differences, swelling/warping, blistering/cracking, abnormal odors, or failure of previous repairs. Inspect exterior wall surfaces for presence of bird or insect nests. Semi-annually (spring and fall) Semi-annually (summer and winter) Semi-annually (spring and fall) Semi-annually (spring and fall) Semi-annually (spring and fall) Semi-annually (spring and fall) Semi-annually (spring and fall) PAGE 33

35 1. COMPONENT MAINTENANCE ACTION(S) REQUIRED FREQUENCY Foundations Hose Bibbs Inspect for cracking, spalling, settlement, or damage caused by salt/de-icing chemicals. Patch or repair as necessary, following American Concrete Institute (ACI) concrete repair protocol. Regularly monitor concrete repair areas for recurrence of cracking or spalling. Disconnect hoses and drain hose bibbs. Winterize hose bibbs as necessary in advance of freezing temperatures. Annually (spring) Annually (fall) FENESTRATION UNITS Windows and Doors (General) Inspect weather stripping for continuity and air leakage. Annually (fall) Inspect for missing, cracked, or broken glazing components, or other damage to window or door unit, including evidence of forced entry. Inspect window and door hardware for operability and closer adjustment. Lubricate operable window and door hinges. Inspect interior surfaces for microbial growth, moisture staining, or evidence of water leakage to the interior. Clean exterior surfaces with compatible cleaning solution. Repair holes in window screens and wash screens with compatible cleaning solution. Annually (spring) Annually (spring) Semi-annually (spring and fall) Semi-annually (spring and fall) Annually (spring) POOLS AND SPAS Filters Heaters Pumps Resurfacing Replastering ROOFS Inspect for operability. Clean filter as necessary. Replace failed components as necessary, Inspect for operability and electrical shorts. Check for Replace failed components as necessary, Inspect for operability and electrical shorts. Replace failed components as necessary, Inspect surface for failure in pedestrian traffic coat, remediate conditions as necessary per manufacturers instructions. Turn off all working pool equipment, drain and inspect problematic areas, remediate as necessary. As recommended by manufacturer As recommended by manufacturer As recommended by manufacturer Annually (spring) Annually (spring) PAGE 34

36 1. COMPONENT MAINTENANCE ACTION(S) REQUIRED FREQUENCY Exhaust Vents Gutters and Downspouts Roof Surfaces (General) SITEWORK Asphalt Paving Catch Basins and Trench Drains Concrete Flatwork Inspect for proper operation of dampers or louvers, blockage by debris, or evidence of birds/rodents. Clean exhaust vents and screens as necessary. Inspect for debris build-up and organic growth. Clean gutters and downspouts as necessary. Identify and regularly monitor locations affected by recurring debris-build up or standing water. Inspect for damaged, loose, or missing components, as well as leaking joints. Inspect roof surfaces for organic growth or debris build-up. Clean roof surfaces as necessary with a compatible granulated soap/mild detergent applied using a low-pressure sprayer (30-50 psi) with a 50 fan-shaped tip. Never use muratic acid or petroleum-based cleaners or solvents. Scrub problematic roof surfaces vigorously with a stiff bristle brush (do not use a wire brush) and rinse thoroughly using a garden hose or low-pressure sprayer ( psi) with a fan-shaped tip. Do not allow cleaning solution to dry on building components. Always test an inconspicuous surface first to confirm the effect that scrubbing and application of cleaning solution will have on various building components. Protect adjacent building components and landscaping that may be damaged by cleaning solution. Inspect roof surfaces for damaged, loose, or missing components, storm damage, or other weather-resistance deficiencies. Inspect roof surfaces for presence of bird or insect nests. Patch all cracks in asphalt greater than 1/4 in width with hot-applied crack sealer. Monitor oil leaks that will disintegrate asphalt. Clean as necessary. Inspect for debris build-up and organic growth. Clean catch basins or trench drains as necessary. Inspect for debris build-up and organic growth. Clean concrete flatwork surfaces as necessary. Inspect for cracking, spalling, settlement, trip hazards, or damage caused by salt/de-icing chemicals. Patch or repair as necessary. Monthly Semi-annually (spring and fall) Semi-annually (spring and fall) Semi-annually (spring and fall) Semi-annually (spring and fall) Semi-annually (spring and fall) Annually (spring) Annually (spring) Semi-annually (spring and fall) Semi-annually (spring and fall) Annually (spring) PAGE 35

37 1. COMPONENT MAINTENANCE ACTION(S) REQUIRED FREQUENCY Fencing and Railings Inspect metal components for rust or paint failure. Clean rust and loose material from metal using wire brush, dust cloth, and vacuum. Prep and repaint with two coats of compatible rust-inhibiting primer. Following application of primer and finish, apply compatible clear coat waterproof sealer to areas of work to help prevent additional corrosion. Inspect base of wood fence pickets for debris build-up and clearance to soil. Remove debris and modify soil as necessary to maintain adequate clearance. Annually (spring) Semi-annually (spring and fall) Gates Irrigation Systems Landscaping Light Poles Inspect metal components for rust or paint failure. Clean rust and loose material from metal using wire brush, dust cloth, and vacuum. Prep and repaint with two coats of compatible rust-inhibiting primer. Following application of primer and finish, apply compatible clear coat waterproof sealer to areas of work to help prevent additional corrosion. Blow out sprinkler lines and inspect backflow devices for operability. Inspect electronic timers for operability and electric shorts. Redirect sprinkler heads away from building surfaces. Inspect soil finish grade for proper drainage away from structure. Fill in low areas as necessary to allow for 5% minimum positive slope away from structure. Inspect soil finish grade for blockage of masonry veneer weep provisions at base of wall locations. Inspect for plants growing on or too close to structure. Trim or remove plants as necessary to maintain minimum 6 clearance to structure. Inspect light poles for operability. Replace lamps as necessary. Inspect metal components for rust or paint failure. Clean rust and loose material from metal using wire brush, dust cloth, and vacuum. Prep and repaint with two coats of compatible rust-inhibiting primer. Following application of primer and finish, apply compatible clear coat waterproof sealer to areas of work to help prevent additional corrosion. Annually (spring) Annually (fall) Annually (spring) Annually (spring) Semi-annually (spring and fall) Semi-annually (spring and fall) Semi-annually (spring and fall) Semi-annually (summer and winter) Annually (spring) PAGE 36

38 1. COMPONENT MAINTENANCE ACTION(S) REQUIRED FREQUENCY Mailboxes* *(Not responsibility of CHCHOA) Inspect for loose, missing or cracked components, rot, sharp edges, and other damage. Repair or replace as necessary. Inspect metal components for rust or paint failure. Clean rust and loose material from metal using wire brush, dust cloth, and vacuum. Prep and repaint with two coats of compatible rust-inhibiting primer. Following application of primer and finish, apply compatible clear coat waterproof sealer to areas of work to help prevent additional corrosion. Annually (spring) Annually (spring) Retaining Walls (Masonry) Inspect wall surfaces for loose or missing masonry units. Annually (spring) Inspect masonry joints for failed mortar. Clean loose mortar material from joints using a wire brush, dust cloth, and vacuum. Tuckpoint smaller mortar failure areas with compatible materials. Remove and replace mortar at larger failure areas. Inspect masonry surfaces for presence of efflorescent staining. Clean efflorescence from wall surfaces as necessary with solution consisting of 1 part white household vinegar to 5 parts water, applied using a low-pressure sprayer (30-50 psi) with a 50 fan-shaped tip. Never use muratic acid or petroleum-based cleaners or solvents. Scrub problematic wall surfaces vigorously with a stiff bristle brush (do not use a wire brush) and rinse thoroughly with clean water using a garden hose or low-pressure sprayer ( psi) with a fan-shaped tip. Do not allow cleaning solution to dry on building components. Always test an inconspicuous surface first to confirm the effect that scrubbing and application of cleaning solution will have on various building components. Protect adjacent building components and landscaping that may be damaged by cleaning solution. Avoid use of de-icing chemicals on surfaces immediately adjacent to masonry veneer. Annually (spring) Annually (spring) Throughout winter PAGE 37

39 Appendix B: Important Information PAGE 38

40 PURPOSE OF REPORT A MULTI-PURPOSE TOOL This reserve study report is an important part of the Association s budgetary process. Following the recommendations contained within this report should ensure the Association s smooth budgetary transitions from one fiscal year to the next, and either decrease or eliminate the need for special assessments. In addition, this reserve study serves a variety of useful purposes: Following the recommendations of a reserve study performed by a professional consultant can protect the Board of Directors in a community from personal liability concerning reserve components and reserve funding A reserve study is required by your accountant during the preparation of the Association s annual audit. A reserve study is often requested by lending institutions during the process of loan applications, both for the community and, in many cases, the individual owners The reserve study report is also a detailed inventory of the Association s major assets and serves as a management tool for scheduling, coordinating and planning future repairs and replacements The reserve study report is a tool that can assist the Board in fulfilling its legal and fiduciary obligations for maintaining the community in a state of good repair. If a community is operating on a special assessment basis, it cannot guarantee that an assessment, when needed, will be passed. Therefore, it cannot guarantee its ability to perform the required repairs or replacements to those major components for which the association is obligated. Since the reserve study includes measurements and cost estimates of the Association s assets, the detail reports may be used to evaluate the accuracy and price of contractor bids when assets are due to be repaired or replaced. The reserve study is an annual disclosure to the membership concerning the financial condition of the Association, and may be used as a consumers guide by prospective purchasers The reserve study report provides a record of the time, cost, and quantities of past reserve replacements. At times, the Association s management company and Boards of Directors are transitory, which may result in the loss of these important records. PAGE 39

41 STANDARD TERMS AND DEFINITIONS Adjustment to Useful Life Once the Estimated Useful Life (EUL) is determined, it may be adjusted, up or down, by this separate figure for the current cycle of replacement. This will allow for a current period adjustment without affecting the estimated replacement cycles for future replacements. Annual Assessment Increase This represents the percentage rate at which the Association will increase its assessment to reserves at the end of each year. For example, in order to accumulate $10,000 in 10 years, you could set aside $1,000 per year. As an alternative, you could set aside $795 the first year and increase that amount by 5% each year until the year of replacement. In either case you arrive at the same amount. The idea is that you start setting aside a lower amount and increase that number each year in accordance with the planned percentage. Ideally this figure should be equal to the rate of inflation. It can, however, be used to aid those Associations that have not set aside appropriate reserves in the past, by making the initial year s allocation less formidable. Annual Fixed Reserves An optional figure, which if used, will override the normal process of allocating reserves to each asset. Budget Year Beginning/Ending The budgetary year for which the report is prepared. For Associations with fiscal years ending December 31st, the monthly contribution figures indicated are for the 12-month period beginning 1/1/20xx and ending 12/31/20xx. Component: The individual line items in the reserve study, developed or updated in the Physical Analysis. These elements form the building blocks for the reserve study. Components typically are: 1) Association responsibility, 2) with limited useful life expectancies, 3) predictable Remaining Useful Life expectancies, 4) above a minimum threshold cost, and 5) as required by local codes. Component Inventory The task of selecting and qualifying reserve components. This task can be accomplished through on-site visual, review of Property design and organizational documents, a review of established Property precedents, and discussion with appropriate Association representative(s). Condition Assessment: The task of evaluating the current condition of the component based on observed or reported characteristics. Current Replacement Cost The estimated Replacement Cost effective at the beginning of the fiscal year for which the report is being prepared. Estimated Useful Life (EUL) The estimated useful life of a component based upon industry standards, manufacturer specifications, visual inspection, location, usage, association standards and prior history. All of these factors are taken into consideration when tailoring the estimated useful life to the particular component. For example, the carpeting in a hallway or elevator (a heavy traffic area) will not have the same life as the identical carpeting in a seldom-used meeting room or office. Financial Analysis: The portion of a Reserve Study where current status of the Reserves (measured as cash or Percent Funded) and a recommended Reserve contribution rate (Reserve Funding Plan) are derived, and the projected Reserve income and expense over time is presented. The Financial Analysis is one of the two parts of a Reserve Study. Funding Plan: An Association s plan to provide income to a Reserve Fund to offset anticipated expenditures from that fund. PAGE 40

42 Funding Principles: Sufficient Funds When Required Stable Contribution Rate over the Years Evenly Distributed Contributions over the Years Fiscally Responsible Future Replacement Cost The estimated cost to repair or replace the component at the end of its estimated useful life based upon the current replacement cost and inflation. Inflation This figure is used to approximate the future cost to repair or replace each component in the report. The current cost for each component is compounded on an annual basis by the number of remaining years to replacement, and the total is used in calculating the monthly reserve contribution that will be necessary to accumulate the required funds in time for replacement. Interest Contribution (After Taxes) The interest that should be earned on the reserves, net of taxes, based upon their beginning reserve balance and monthly contributions for one year. This figure is averaged for budgeting purposes. Investment Yield Before Taxes The average interest rate anticipated by the Association based upon its current investment practices. Life and Valuation Estimates: The task of estimating Useful Life, Remaining Useful Life, and Repair or Replacement Costs for the Reserve components. Number of Units and/or Phases As applicable, the number of units and/or phases included in this version of the report. Physical Analysis: The portion of the Reserve Study where the Component Inventory, Condition Assessment, and Life and Valuation Estimate tasks are performed. This represents one of the two parts of the Reserve Study. Placed-In-Service Date The month and year that the component was placed-in-service. This may be the construction date, the first escrow closure date in a given phase, or the date of the last servicing or replacement. Projected Reserve Balance The anticipated reserve balance on the first day of the fiscal year for which this report has been prepared. This is based upon information provided and not audited. Remaining Useful Life (RUL) The estimated time, in years, that a reserve component can be expected to continue to serve its intended function. Projects anticipated to occur in the initial year have zero Remaining Useful Life. Replacement Cost: The cost of replacing, repairing, or restoring a Reserve Component to its original functional condition. The Current Replacement Cost would be the cost to replace, repair, or restore the component during that particular year. Replacement Year The year that the component is scheduled to be replaced. The appropriate funds will be available by the first day of the fiscal year for which replacement is anticipated. PAGE 41

43 Reserve Balance: Actual or projected funds as of a particular point in time that the Association has identified for use to defray the future repair or replacement of those major components which the Association is obligated to maintain. Also known as Reserves, Reserve Accounts, Cash Reserves. Based upon information provided and not audited. Reserve Provider: An individual who prepares Reserve Studies. Reserve Study: A budget planning tool which identifies the current status of the Reserve Fund and a stable and equitable Funding Plan to offset the anticipated future major common area expenditures. The Reserve Study consists of two parts: the Physical Analysis and the Financial Analysis. PAGE 42

44 OVERVIEW OF CAPITAL PLANNING TOOLS INTRODUCTION Preparing the annual budget and overseeing the Association s finances are perhaps the most important responsibilities of board members. The annual operating and reserve budgets reflect the planning and goals of the association and set the level and quality of service for all of the Association s activities. FUNDING OPTIONS When a major repair or replacement is required in a community, an Association has essentially four options available to address the expenditure: Option 1 The first, and only logical means that the Board of Directors has to ensure its ability to maintain the components for which it is obligated, is by assessing an adequate level of reserves as part of the regular membership assessment, thereby distributing the cost of the replacements uniformly over the entire membership. The community is not only comprised of present members, but also future members. Any decision by the Board of Directors to adopt a calculation method or funding plan which would disproportionately burden future members in order to make up for past reserve deficits, would be a breach of its fiduciary responsibility to those future members. Unlike individuals determining their own course of action, the board is responsible to the community as a whole. Whereas, if the association was setting aside reserves for this purpose, using the vehicle of the regularly assessed membership dues, it would have had the full term of the life of the roof, for example, to accumulate the necessary moneys. Additionally, those contributions would have been evenly distributed over the entire membership and would have earned interest as part of that contribution Option 2 The second option is for the association to acquire a loan from a lending institution in order to affect the required repairs. In many cases, banks will lend to an association using future homeowner assessments as collateral for the loan. With this method, the current board is pledging the future assets of an association. They are also incurring the additional expense of interest fees along with the original principal amount. In the case of a $150,000 roofing replacement, the association may be required to pay back the loan over a three to five year period, with interest. Option 3 The third option, too often used, is simply to defer the required repair or replacement. This option, which is not recommended, can create an environment of declining property values due to expanding lists of deferred maintenance items and the association s financial inability to keep pace with the normal aging process of the common area components. This, in turn, can have a seriously negative impact on sellers in the association by making it difficult, or even impossible, for potential buyers to obtain financing from lenders. Increasingly, lending institutions are requesting copies of the association s most recent reserve study before granting loans, either for the association itself, a prospective purchaser, or for an individual within such an association. Option 4 The fourth option is to pass a special assessment to the membership in an amount required to cover the expenditure. When a special assessment is passed, the association has the authority and responsibility to collect the assessments, even by means of foreclosure, if necessary. However, an association considering a special assessment cannot guarantee that an assessment, when needed, will be passed. Consequently, the association cannot guarantee its ability to perform the required repairs or replacements to those major components for which it is obligated when the PAGE 43

Update With Site Visit

Update With Site Visit Update With Site Visit Le Chateau Bellevue, WA 10/28/2011 Report #1002 Phone: 253-241-8151 Fax: 360-872-8073 E-mail: jeremy@reservesolutions.net www.reservesolutions.net Le Chateau Client Info: REPORT

More information

RESERVE STUDY LEVEL I - Full Reserve Study. ABC Condominium Association, Inc.

RESERVE STUDY LEVEL I - Full Reserve Study. ABC Condominium Association, Inc. Insurance Appraisals Reserve Studies Wind Mitigation RESERVE STUDY LEVEL I - Full Reserve Study Prepared for: ABC Condominium Association, Inc. For the period of January 1, 214 - December 31, 214 71 Enterprise

More information

Sample Reserve Study Your City, Your State Account Sample Reserve Study -- Version 7.0 (2003) February 01, 2003

Sample Reserve Study Your City, Your State Account Sample Reserve Study -- Version 7.0 (2003) February 01, 2003 Your City, Your State Account Sample Reserve Study -- Version 7.0 (2003) February 01, 2003 Reserve Analyst P.O. Box 797 Vernon, AZ 85940 Phone: 800-561-0173 Fax: 928-537-3377 Prepared By Quality Check

More information

Belle Monet. Full Reserve Study Report by HOMECERTS.COM

Belle Monet. Full Reserve Study Report by HOMECERTS.COM Belle Monet Full Reserve Study Report by HOMECERTS.COM 800.683.5528 SUPPORT@HOMECERTS.COM Belle Monet Reserve Study Report as of June 5, 2015 538 South 2200 West Pleasant Grove, UT 84062 168 Units Completed

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE 0807 3502 SOUTH FIRST STREET CHAMPAIGN, ILLINOIS SYSTEM CONDITION INDEX.771 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 347,400 LABORATORY BUILDING GROSS SQUARE FEET 16,986

More information

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION Full Reserve Study With On-site Visual Inspection October 3, 2018 Reserve Study for Fiscal Year: 01/01/2019 through 12/31/2019 2059 Camden Ave. Suite 151

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample Condominium Association Laguna Hills, California Version 1 March 31, 2004 23201 Mill Creek Drive, Suite 100 Laguna Hills, California 92653 Phone (949) 474-9800 Facsimile

More information

Reserve Study. Willow Lake Homeowner's Association, Inc.

Reserve Study. Willow Lake Homeowner's Association, Inc. Reserve Study For Willow Lake Homeowner's Association, Inc. August 03, 2015 Reserve Study Prepared By The Whayland Group,LLC 30613 Sussex Highway Laurel, Delaware 19956 TABLE OF CONTENTS Willow Lake Homeowner's

More information

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I QUALCHAN HILLS HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 6 AUGUST 2012 CONTENTS 1.0 INTRODUCTION...

More information

Cottonwoods at Vine. Reserve Study. October 2012

Cottonwoods at Vine. Reserve Study. October 2012 Reserve Study October 2012 Tab Table of Contents Reserve Study Analysis Executive Summary... Remaining Useful Life Analysis... Reserve Study Schedule... Annual Expenditures... Funding Plan Summary... Percentage

More information

GARDEN HOMES AT CHARBONNEAU GREEN TOWNHOME ASSOCIATION MAINTENANCE PLAN LEVEL I: FULL RESERVE STUDY FUNDING ANALYSIS 2012

GARDEN HOMES AT CHARBONNEAU GREEN TOWNHOME ASSOCIATION MAINTENANCE PLAN LEVEL I: FULL RESERVE STUDY FUNDING ANALYSIS 2012 GARDEN HOMES AT CHARBONNEAU GREEN TOWNHOME ASSOCIATION MAINTENANCE PLAN LEVEL I: FULL RESERVE STUDY FUNDING ANALYSIS 2012 www.schwindtco.com (503)227-1165 Page 1 of 49 GARDEN HOMES AT CHARBONNEAU GREEN

More information

Treetop Condos West Linn, Oregon Account 2015 On Site Update -- Version 1 October 07, 2014

Treetop Condos West Linn, Oregon Account 2015 On Site Update -- Version 1 October 07, 2014 West Linn, Oregon Account 2015 On Site Update -- Version 1 October 07, 2014 The Management Trust - Northwest P.O. Box 23099 Tigard, OR 97281 Phone: 503-670-8111 Toll Free: 877-852-8100 Fax: 503-670-0775

More information

RESERVE STUDY & MAINTENANCE PLAN ReserveStudyUpdate.com, LLC P.O. Box Portland, Oregon Phone: Fax:

RESERVE STUDY & MAINTENANCE PLAN ReserveStudyUpdate.com, LLC P.O. Box Portland, Oregon Phone: Fax: Chelan Drive & Chaparrel Loop West Linn, Oregon 97068 Account 98 - Version L Fiscal Year: October 1, 017 to September 30, 018 RESERVE STUDY & MAINTENANCE PLAN ReserveStudyUpdate.com, LLC P.O. Box 66778

More information

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year SOMERSET CREEK Bellevue, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued April, 2018 Next Update: Level 2 by April, 2019

More information

Fieldstone RESERVE STUDY UPDATE. John D. Beatty & Company OWNERS ASSOCIATION. for. Date Prepared: 12/4/2018 for fiscal year 2019.

Fieldstone RESERVE STUDY UPDATE. John D. Beatty & Company OWNERS ASSOCIATION. for. Date Prepared: 12/4/2018 for fiscal year 2019. RESERVE STUDY UPDATE for Fieldstone OWNERS ASSOCIATION Date Prepared: 12/4/2018 for fiscal year 2019 Prepared By: John D. Beatty & Company 8425 Brentwood Blvd., Suite A7 Brentwood, CA 94513 (925) 831-1803

More information

Brookwood Homeowners Association, Inc.

Brookwood Homeowners Association, Inc. RESERVE STUDY Full Study Brookwood Homeowners Association, Inc. Published - February 05, 2013 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com Browning

More information

CONTENTS. Sparger Springs Townhomes Durham, NC

CONTENTS. Sparger Springs Townhomes Durham, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State CAPITAL RESERVE STUDY FOR THE Meadow Wood Commons City, State Management Company: Any Management Company Contact Name: Mr. Bob Smith Date: July 28, 2014 Table of Contents Section Name Section # Executive

More information

DRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by:

DRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by: DRAFT FOR BOARD REVIEW FULL RESERVE STUDY SPARGER SPRINGS TOWNHOMES DURHAM, NC Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION DURHAM, NC & ALLENTON MANAGEMENT Prepared by: CRITERIUM GILES ENGINEERS

More information

LEVEL 3 RESERVE STUDY UPDATE WOOLSEY CORNER CONDOMINIUM

LEVEL 3 RESERVE STUDY UPDATE WOOLSEY CORNER CONDOMINIUM LEVEL 3 RESERVE STUDY UPDATE FOR WOOLSEY CORNER CONDOMINIUM Portland, OR January 1, 2017 December 31, 2017 Prepared By: Carson M. Horton, RS Quality Check By: L. Law Broili Date: April 6, 2017 Copyright

More information

FY15 Level 1 Reserve Study Tahoma Terra Yelm, WA 98597

FY15 Level 1 Reserve Study Tahoma Terra Yelm, WA 98597 FY15 Level 1 Reserve Study Yelm, WA 98597 17404 Meridian E, Suite F - PMB 208 Puyallup, WA 98375 September, 7 2015 Yelm, WA Board of Directors, Thank you for choosing as your trusted source for homeowners

More information

CONTENTS 1.0 INTRODUCTION... 1

CONTENTS 1.0 INTRODUCTION... 1 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

MILL CREEK CONDOMINIUMS RESERVE STUDY

MILL CREEK CONDOMINIUMS RESERVE STUDY MILL CREEK CONDOMINIUMS RESERVE STUDY Fiscal Year 2016 Prepared by: Eric Harker, Assoc. AIA Alliance Project Engineers and Construction Consultants November 6, 2015 Project Number: OR14-017 MILL CREEK

More information

LEVEL 3 RESERVE STUDY UPDATE WOOLSEY CORNER CONDOMINIUM

LEVEL 3 RESERVE STUDY UPDATE WOOLSEY CORNER CONDOMINIUM LEVEL 3 RESERVE STUDY UPDATE FOR WOOLSEY CORNER CONDOMINIUM Portland, OR January 1, 2014 December 31, 2014 Prepared By: Carson M. Horton, RS Quality Check By: L. Law Broili Date: January 1, 2014 Copyright

More information

VILLAGE AT LAKE CHELAN

VILLAGE AT LAKE CHELAN VILLAGE AT LAKE CHELAN Manson, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued October, 2018 Next Update: Level 3 by October,

More information

DRAFT WILLOUGHBY PARK GREENVILLE, NC. Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION & HOA MANAGEMENT COMPANY, LLC.

DRAFT WILLOUGHBY PARK GREENVILLE, NC. Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION & HOA MANAGEMENT COMPANY, LLC. DRAFT FULL RESERVE STUDY WILLOUGHBY PARK GREENVILLE, NC Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION GREENVILLE, NC & HOA MANAGEMENT COMPANY, LLC Prepared by: CRITERIUM GILES ENGINEERS, INC. 1150

More information

BUDGET APPROVED. GENERAL EXPENSES (158 Units)

BUDGET APPROVED. GENERAL EXPENSES (158 Units) TANGLEWOOD HILLS CONDOMINIUM Association name: Tanglewood Hills Condom Association number: 1457 General - Total # of Units 158 Fiscal year end: 12/31 Budget year: 2017 Budget type: M BUDGET APPROVED ACCT.

More information

TANGLEWOOD HILLS CONDOMINIUM

TANGLEWOOD HILLS CONDOMINIUM TANGLEWOOD HILLS CONDOMINIUM Association name: Tanglewood Hills Condom Association number: 1547 General - Total # of Units 158 Fiscal year end: 12/31 Budget year: 2018 Budget type: M BUDGET APPROVED ACCT.

More information

Comprehensive Reserve Fund Study and Building Condition Assessment for Wellington Standard Condominium Corporation No. 149

Comprehensive Reserve Fund Study and Building Condition Assessment for Wellington Standard Condominium Corporation No. 149 Comprehensive Reserve Fund Study and Building Condition Assessment for Wellington Standard Condominium Corporation No. 149 820 Gartshore Street Fergus, Ontario Report Prepared for the Board of Directors

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Jason Kozleski Board President 10790-221 st Lane NE Redmond,

More information

LODGES ATCANNON BEACH A CONDOMINIUM PHASE I OPERATING BUDGET MAINTENANCE PLAN LEVEL I: FULL RESERVE STUDY FUNDING ANALYSIS 2009

LODGES ATCANNON BEACH A CONDOMINIUM PHASE I OPERATING BUDGET MAINTENANCE PLAN LEVEL I: FULL RESERVE STUDY FUNDING ANALYSIS 2009 LODGES ATCANNON BEACH A CONDOMINIUM PHASE I OPERATING BUDGET MAINTENANCE PLAN LEVEL I: FULL RESERVE STUDY FUNDING ANALYSIS 2009 September 24, 2008 Lodges at Cannon Beach, a Condominium c/o Patrick Nofield

More information

LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC.

LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC. LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC. Woodburn, OR January 1, 2015 December 31, 2015 Project No: OR 11101 0006 5 Prepared By: Carson M. Horton, RS Quality Check By:

More information

Reserve Study ABC Condominium Association. ABC City, Florida

Reserve Study ABC Condominium Association. ABC City, Florida Reserve Study 2016 ABC Condominium Association ABC City, Florida Staebler Appraisal and Consulting Services Patricia Staebler, SRA State-Certified General Appraiser RZ 2890 Table of Contents Introduction...

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY Arizona Texas Nevada Utah New Mexico CAPITAL RESERVE STUDY Prepared for: Quail Creek HOA Date of Report: 6/7/2018 Capital Reserve Analysts Bringing the future into the present Capital Reserve Analysts,

More information

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association 21289 E. Lords Way Queen Creek, AZ 85142 support@azreservestudy.com Tel: (480) 840-7130 Fax: (888) 842-9319 October 27, 2012 Sample Association Regarding: 2013 - Level I Capital Replacement Reserve Study

More information

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08 Central Pointe HOA Level I Reserve Study Report Period 1/01/08 12/31/08 Client Reference Number.... 10870 Property Type...... Mid-Rise Number of Units............ 83 Fiscal Year End....... December 31

More information

RESERVE STUDY SPECIALISTS

RESERVE STUDY SPECIALISTS RESERVE STUDY SPECIALISTS P.O. BOX 9178, CALABASAS, CA 91372 TEL: 818-992-1312 FAX: 818-992-1338 VILLAGE GREEN EAST HOMEOWNERS ASSOCIATION FULL RESERVE STUDY September 06, 2017 for Fiscal Year 2018 RESERVE

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY CAPITAL RESERVE STUDY FOR THE HIALEAH CONDOMINIUM WILDWOOD CREST, NEW JERSEY Project Number: 12-1066 W:\2012\12-1066\CORR\12-1066v1.doc Date: March 29, 2013 Table of Contents Section Page Executive Summary...

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112 th Ave NE

More information

RESERVE STUDY UPDATE SUMMARY

RESERVE STUDY UPDATE SUMMARY RESERVE STUDY UPDATE SUMMARY for Fieldstone OWNERS ASSOCIATION Date Prepared: 12/4/2018 for fiscal year 2019 Prepared By: John D. Beatty & Company 8425 Brentwood Blvd., Suite A7 Brentwood, CA 94513 (925)

More information

CONTENTS. Greens at Lochmere Cary, NC

CONTENTS. Greens at Lochmere Cary, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 6 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Parkway Towers 1155 Ash St Denver, CO 80220 Level I Study with Site Inspection Fiscal Year End Date: 12/31/2014 8597 Via Mallorca Suite E La Jolla, CA 92037 Phone: 858-764-1895

More information

Anson County Early College High

Anson County Early College High NC School District/040 Anson County/High School Anson County Early College High Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

Sea le, WA Account SAMPLE CONDO Version SAMPLE January 01, Bellevue Way NE, #483 Bellevue, WA

Sea le, WA Account SAMPLE CONDO Version SAMPLE January 01, Bellevue Way NE, #483 Bellevue, WA Sea le, WA Account SAMPLE CONDO Version SAMPLE January 01, 2017 227 Bellevue Way NE, #483 Bellevue, WA 98004 866 574 5115 www.rdanorthwest.com Prepared By Quality Check By Page 1 Disclosures Reserve Study

More information

Year 2015 Reserve Study & Maintenance Plan. Multnomah Cityside Condominium Portland Oregon

Year 2015 Reserve Study & Maintenance Plan. Multnomah Cityside Condominium Portland Oregon Year 205 Reserve Study & Maintenance Plan Multnomah Cityside Condominium Portland Oregon PREPARED BY Regenesis? 503.977.7974 www.regenesis.net of 27 INNOVATIVE HOMEOWNER ASSOCIATION MANAGEMENT STRATEGIES

More information

LODGES AT CANNON BEACH A CONDOMINIUM PHASE I MAINTENANCE PLAN RESERVE STUDY LEVEL III: UPDATE WITH NO VISUAL SITE INSPECTION 2011

LODGES AT CANNON BEACH A CONDOMINIUM PHASE I MAINTENANCE PLAN RESERVE STUDY LEVEL III: UPDATE WITH NO VISUAL SITE INSPECTION 2011 LODGES AT CANNON BEACH A CONDOMINIUM PHASE I MAINTENANCE PLAN RESERVE STUDY LEVEL III: UPDATE WITH NO VISUAL SITE INSPECTION 2011 www.schwindtco.com 503.227.1165 Page 1 of 47 LODGES AT CANNON BEACH A CONDOMINIUM

More information

- RS. D e sig n atio n

- RS. D e sig n atio n ALEXANDER LIU CAI - RS Reserve D e sig n atio n Specialist Sample Table Of HOA Contents Project Table of Contents Page Preface i Executive Summary 1 Membership Disclosure Summary 2 Disclosure Statement

More information

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 4 3.1 PURPOSE... 4 3.2 SCOPE... 4 3.3 SOURCES OF INFORMATION... 5 4.0 DESCRIPTION... 7 5.0 OBSERVATIONS... 7 6.0 RESERVE

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Soda Creek Condominiums Dillon, Colorado Version 2 Monday, August 19, 2013 6860 S. Yosemite Court, Suite 2000 Centennial, CO 80112 Phone (303) 953-2078 Facsimile (303) 953-2157

More information

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by:

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by: REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION WOODWIND ASSOCIATION REPLACEMENT RESERVE REPORT FY 2010 Community Management by: N & H Enterprises PO Box 5539 Greenville, SC 29607 864-467-1600

More information

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY:

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY: 2015 Reserve Study Report LOCATED AT: 101 Oasis Drive Pompano Beach, FL 33069 FOR: Oasis at Palm Aire Association, Inc. 101 Oasis Dr., # Office Pompano Beach, FL 33069 AS OF: January 1st, 2015 - December

More information

RESERVE DATA ANALYSIS, INTL.

RESERVE DATA ANALYSIS, INTL. RESERVE DATA ANALYSIS, INTL. September 30, 2014 mail@reservedataanalysis.com 15502 NE 86 th Street Vancouver, WA 98682 Fax (800) 579-5015 Office (800) 359-5015 Mr. Art Burke, Manager Cape George Colony

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Bridgewood Estates 2500 Jahn Avenue Northwest, Gig Harbor, WA 98335 For: Bridgewood Estates Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community Solutions

More information

SAMPLE. Prepared for: SAMPLE HOMEOWNERS ASSOCIATION. Prepared by:

SAMPLE. Prepared for: SAMPLE HOMEOWNERS ASSOCIATION. Prepared by: SAMPLE FULL RESERVE STUDY Prepared for: SAMPLE HOMEOWNERS ASSOCIATION Prepared by: CRITERIUM GILES ENGINEERS 7334 CHAPEL HILL ROAD, SUITE 200 RALEIGH, NC 27607 (919) 465-3801 NC LIC. NO. C-2871 CONTENTS

More information

.USI.COMMERCIAL. The Summerlyn Association of Owners Inc. Lewes, Delaware. Funding Reserve Analysis. for. September 3, 2014

.USI.COMMERCIAL. The Summerlyn Association of Owners Inc. Lewes, Delaware. Funding Reserve Analysis. for. September 3, 2014 .USI.COMMERCIAL (888)225-3755 www.usicommercial.com Funding Reserve Analysis for The Summerlyn Association of Owners Inc. Lewes, Delaware September 3, 2014 Page 1 of 25 Pages Funding Reserve Analysis for

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample HOA 2663 S Oakland St Los Angeles, CA Level I Study with Site Inspection Fiscal Year End: 11/30/2016 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Bridgewood Estates 2500 Jahn Avenue Northwest, Gig Harbor, WA 98335 For: Bridgewood Estates Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community

More information

Urban Heights Condominium

Urban Heights Condominium Condominium Capital 2011 2010, AssociationAnalysis, LLC Condominium Prepared For: Table of Contents Condominium Association, Inc. 1642 Maxwell Road Atlanta, GA 30012 October 19, 2010 INTRODUCTION INTRODUCTION

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Seavue Condominiums 130-5 th Avenue South, Edmonds, WA 98020 For: Seavue Homeowners Association c/o Jay Grant Board President (202) 351-9399 Prepared By: Jeff Samdal, PE, RS,

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: WANDERMERE ESTATES HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM-PFAFF ENGINEERS 12128 N. DIVISION ST. #200 SPOKANE, WA 99218 (509)

More information

Listing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School

Listing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School Building Events 2004 2005 2006 2007 2008 Total Code Repair Add ventilation to storage room $ 1,000.00 $ - $ - $ - $ - $ 1,000.00

More information

Calusa Point Association, Inc. Miami, Florida File #

Calusa Point Association, Inc. Miami, Florida File # A FULL RESERVE STUDY FOR Miami, Florida File # 22920-06289 FOR PERIOD: January 1, 2014 December 31, 2014 PREPARED BY GAB ROBINS, A DIVISION OF CUNNINGHAM LINDSEY 3300 W. LAKE MARY BLVD. SUITE 350 LAKE

More information

Sample Community Association

Sample Community Association Level 1 Reserve Study Report Period - 1/1/2018 to 12/31/2018 Client Reference Number 10014 Property Type Condominium Number of Units 150 Fiscal Year End 12/31 Type of Study Full Study Date of Site Visit

More information

Level 3 Reserve Study without a Site a Site Visit Visit

Level 3 Reserve Study without a Site a Site Visit Visit Level 3 Reserve Study without a Site a Site Visit Visit We offer two types of reports for a Level 3 Reserve Study with a Site Visit, RS-3 - Standard Reserve Study without a site visit SMRS-3 - Statutory

More information

FLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association

FLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association Replacement Reserve Study REPLACEMENT RESERVE STUDY Oakton, Virginia Property Management: Flint Hill Manor Townhouse Association Jamie Critchfield Vice President Email: tommie0200@aol.com Consultant: RICHARD

More information

OAK CREEK CONDOMINIUMS

OAK CREEK CONDOMINIUMS 1515 Heritage Dr., Suite 204 McKinney, Texas75069 (972) 562-1011 TEL (972) 540-1031 FAX Firm Reg. No F-4577 www.criteriumdotson.com RESERVE FUND STUDY OAK CREEK CONDOMINIUMS 1700 BAIRD FARM CIRCLE ARLINGTON,

More information

CONTENTS. Twisted Creek Townhomes Holly Springs, NC

CONTENTS. Twisted Creek Townhomes Holly Springs, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

Reserve Study. Epworth United Methodist Church

Reserve Study. Epworth United Methodist Church Reserve Study For Epworth United Methodist Church July 21, 2015 Reserve Study Prepared By The Whayland Group,LLC 30613 Sussex Highway Laurel, Delaware 19956 TABLE OF CONTENTS Epworth United Methodist Church

More information

Reserve Analysis Sample HOA 1234 Colorado Blvd. Your City, CO 80010

Reserve Analysis Sample HOA 1234 Colorado Blvd. Your City, CO 80010 Reserve Analysis Sample HOA 1234 Colorado Blvd. Your City, CO 80010 Level 1 Reserve Analysis Report Period 01/01/13 12/31/13 Client Reference Number - 1001 Property Type Townhouse Style Number of Units

More information

Agenda Item # 5b Page 1 of 43

Agenda Item # 5b Page 1 of 43 Page 1 of 43 Page 2 of 43 Page 3 of 43 Page 4 of 43 Page 5 of 43 Page 6 of 43 Page 7 of 43 Page 8 of 43 Page 9 of 43 Page 10 of 43 Page 11 of 43 Page 12 of 43 Page 13 of 43 Page 14 of 43 Page 15 of 43

More information

RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO

RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com AUGUST, 2009 1.0 INTRODUCTION... 1

More information

RESERVE STUDY Component Analysis and Reserve Fund Plan Annual Review Study 2016/17 For Middlefield Meadows HOA Mountain View, CA Prepared By RESERVE ANALYSIS CONSULTING, LLC 1750 Bridgeway, Suite B106

More information

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for:

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for: RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: MEADOWWOOD GLEN HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 Site Inspection:

More information

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 6 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2 2014 Reserve Study The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee 37862 Report No: 2921 Version 2 For the Period From: January 1, 2014 To: December 31, 2014 TABLE

More information

Laurel Hill Elementary

Laurel Hill Elementary NC School District/830 Scotland County/Elementary School Laurel Hill Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

NC School District/520 Jones County/Elementary School Trenton Elementary Final Campus Assessment Report March 11, 2017

NC School District/520 Jones County/Elementary School Trenton Elementary Final Campus Assessment Report March 11, 2017 NC School District/520 Jones County/Elementary School Trenton Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 4 Campus

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112

More information

Anderson Creek Primary

Anderson Creek Primary NC School District/430 Harnett County/Elementary School Anderson Creek Primary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

FULL RESERVE STUDY Woodridge Park Homeowners' Association, Ltd. Orchard Park, New York November 10, 2017

FULL RESERVE STUDY Woodridge Park Homeowners' Association, Ltd. Orchard Park, New York November 10, 2017 FULL RESERVE STUDY Woodridge Park Homeowners' Association, Ltd. Orchard Park, New York November 10, 2017 This Report contains intellectual property developed by Reserve Advisors, Inc. and cannot be reproduced

More information

Pinebrook Elementary

Pinebrook Elementary NC School District/300 Davie County/Elementary School Pinebrook Elementary Final Campus Assessment Report March 10, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 6 Campus

More information

Hyde Park Place Owners' Association, Inc.

Hyde Park Place Owners' Association, Inc. RESERVE STUDY Full Study Hyde Park Place Owners' Association, Inc. Published - February 10, 2016 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com

More information

Pinewood, A Condominium Sample Policy Resolution # Reserve Study & Funding

Pinewood, A Condominium Sample Policy Resolution # Reserve Study & Funding Reserve Study & Funding Policy Planning for future repairs and replacements is one of the most critical things a homeowner association should do. A Reserve Study is a long range planning tool that identifies

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Heritage Park 3208-52 nd Place NE, Tacoma, WA 98422 For: Heritage Park Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community Solutions 5500 Olympic Drive,

More information

REPLACEMENT RESERVE REPORT FY 2016

REPLACEMENT RESERVE REPORT FY 2016 REPLACEMENT RESERVE REPORT FY 2016 VILLAS AT PARKWOOD ESTATES VILLAS AT PARKWOOD ESTATES REPLACEMENT RESERVE REPORT FY 2016 Community Management by: Community Management Professionals, LLC Beth Maurer

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: January 18, 2012 To: Michael Lee, Collins Management Co. From: Richard Avelar & Associates (RA&A) Re: Bridgewater Condominium Association Attached, please find the

More information

Arizona Nevada Texas Utah New Mexico

Arizona Nevada Texas Utah New Mexico Arizona Nevada Texas Utah New Mexico 9/12/2016 Summit Park HOA Regarding: Fiscal Year beginning 1/1/2017 Level II Capital Replacement Reserve Study We are pleased to submit this Level II Reserve Study

More information

SCT RESERVE CONSULTANTS, INC. P.O. BOX TEMECULA, CA

SCT RESERVE CONSULTANTS, INC. P.O. BOX TEMECULA, CA SCT RESERVE CONSULTANTS, INC. P.O. BOX 890129 TEMECULA, CA 92589-0129 PHONE (951) 296-3520 FAX (951) 296-5038 E-MAIL mike.g@sctreserve.com March 24, 2015 Job 2000-003-10 L3 St. Tropez Villas I, Incorporated

More information

Pleasantdale Elementary

Pleasantdale Elementary DeKalb County School District/Elementary Schools Pleasantdale Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 5 School

More information

Reference: The Bel-Harbour Condominium Association Reserve Study Update Kipcon Great Lakes Project No CRU

Reference: The Bel-Harbour Condominium Association Reserve Study Update Kipcon Great Lakes Project No CRU August 18, 2016 Mr. Nicholas Burbulis 420 W. Belmont Ave. Chicago, IL 60657 Reference: The Kipcon Great Lakes Dear Mr. Burbulis: Attached, please find Kipcon Great Lakes, which has been prepared for the.

More information

Year Per Manor Per Month Assessment Total Contribution United Laguna Woods Mutual 2019 RESERVES PLAN Reserve 30-Year Funding Plan Interest Earnings Th

Year Per Manor Per Month Assessment Total Contribution United Laguna Woods Mutual 2019 RESERVES PLAN Reserve 30-Year Funding Plan Interest Earnings Th Year Per Manor Per Month Assessment Total Contribution United Laguna Woods Mutual 2019 RESERVES PLAN Reserve 30-Year Funding Plan Interest Earnings Threshold (Min Balance): $ 10,400,000 Indexed for projected

More information

Educational & Performing Arts Center: Downriver Campus

Educational & Performing Arts Center: Downriver Campus Educational & Performing Arts Center: Total Estimated Project Construction Cost: $ 18.04 million Groundbreaking: September 2006 Percentage Completed: 100 percent Anticipated Completion Date: Completed

More information

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for:

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for: RESERVESTUDYUPDATE Dallas, GA Prepared for: THE VILLAS AT BLACKBERRY RUN HOME OWNERS ASSOCIATION, INC. Carl Swanson-President Prepared by: CRITERIUM-CARUSO ENGINEERS 1065 POWERS PLACE, SUITE B ALPHARETTA,

More information

Park Rise Homeowners Association, Inc. Financial Statements and Supplementary Information. For the Year Ended December 31, 2014

Park Rise Homeowners Association, Inc. Financial Statements and Supplementary Information. For the Year Ended December 31, 2014 Financial Statements and Supplementary Information For the Year Ended December 31, 2014 Table of Contents Independent Auditor s Report..... 1 Financial Statements Balance Sheet.. 3 Statement of Revenues,

More information

Full Reserve Study For Glenmoor Homeowners Association Conway, South Carolina

Full Reserve Study For Glenmoor Homeowners Association Conway, South Carolina Full Reserve Study For Glenmoor Homeowners Association Conway, South Carolina Prepared for FY 2016 Report Date: November 27, 2015 Southeast Region 10459 Hunters Creek Court Jacksonville, FL 32256 (904)

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Cambridge Court 9512-1 st Avenue Northeast, Seattle, WA 98115 For: Cambridge Court Homeowners Association c/o Tim Kammer, Property Manager Condo Managements, Inc. 1661 Harbor

More information

Update "With-Site-Visit" Reserve Study

Update With-Site-Visit Reserve Study Update "With-Site-Visit" Reserve Study Sample Townhouse HOA Ventura, CA Report #: For Period Beginning: Expires: Date Prepared: 99999999-0 January 1, 2019 December 31, 2019 June 27, 2018 T W Hello, and

More information

GLOBAL Solution Partners, LLC - Toll free phone and fax: (844)

GLOBAL Solution Partners, LLC - Toll free phone and fax: (844) GLOBAL Solution Partners, LLC info@globalreservestudies.com - Toll free phone and fax: (844) 477-7883 - www.globalsolutionpartners.com Funding Reserve Analysis for The Bluffs at Ashley River August 2,

More information

Reserve Fund Study My Condominium Plan

Reserve Fund Study My Condominium Plan Reserve Fund Study My Condominium Plan 12 3456 Number of Units 36 Number of Buildings 1 Building Construction 21 Contact Ima Happy Position(s) President Contact Phone 43.555.4321 Report Date August 8,

More information