Section H. Capital Improvement Program. Table of Contents

Size: px
Start display at page:

Download "Section H. Capital Improvement Program. Table of Contents"

Transcription

1

2 Section H. Capital Improvement Program Table of Contents Introduction... H-1 Project Summary... H-13 Individual Project Sheets... H-21 Six-Year Fund Statements... H-129

3 Introduction Capital Improvement Program The two plans that make up the Capital Improvement Program (CIP) the Capital Reinvestment Plan (CRP) and Capital Facilities Plan (CFP) have been developed according to the guidelines set forth in the CIP budget policy (see Section C) and the City s Comprehensive Plan. Each biennium, Council provides direction through its regular meetings, semi-annual planning discussions, and various budget policies. Adoption of comprehensive planning documents, including the Transportation Improvement Plan (TIP) in June 2012, the Pedestrian and Bicycle Facilities Plan in June 2010, the Park and Recreation Plan in February 2007, the Open Space Vegetation Plan in 2004, the Luther Burbank Park Master Plan in April 2006, the Ballfield Use Analysis in October 2007, the Water System Plan in July 2008, the General Sewer Plan in February 2003, and the Comprehensive (Storm) Basin Review in December 2006 give more specific project direction. In the case of the TIP, the Council approves the street and other related projects, which are then simply inserted into the capital budget. Staff has been developing the CIP since March A preview of the proposed CIP was presented to Council in June Since then, staff has refined revenue and expenditure estimates and incorporated the direction provided by Council at the June CIP preview meeting. The capital budget is made up almost entirely of reinvestment projects (CRP) to maintain our existing infrastructure. The most significant reinvestments are for Residential Street Improvements ($1.2 million) and Luther Burbank Park Improvements ($0.9 million). The most significant capital facilities project is the construction of a new Fire Station 92 ($4.7 million excluding preliminary design) Proposed CIP Table 1 compares planned spending for specific categories of projects in the CIP with the actual costs of the biennium and the forecasted costs of the biennium. (Actual spending varies from budget due to factors such as permitting delays, bids which vary from project cost estimates and added projects.) Note that indirect overhead costs for CIP projects are not included in the following totals (for example, time spent by the City Attorney reviewing construction contracts). Table 1 Comparison of Proposed Budget by Project Category Project Category Actual Forecast Budget Parks, Recreation and Open Space $2,302,815 $2,402,036 $2,591,000 Streets, Pedestrian and Bicycle Facilities [1] $3,233,104 $4,876,552 $2,765,000 Buildings, Equipment and Technology [2] $3,951,421 $4,166,366 $8,475,000 Utilities [3] $25,039,586 $6,715,948 $5,869,000 $34,526,925 $18,160,902 $19,700,000 [1] Includes both ICW Resurfacing Phase 1 ($1.5M) and Town Center Signals ($1.0M) in [2] Includes replacement of Fire Station 92 ($4.7M) in [3] Includes Sewer Lake Line construction ($21.7M) in City of Mercer Island Budget H-1

4 Capital Improvement Financing Strategy Each biennial capital budget is part of a broader CIP financing plan that looks into the future to match capital reinvestment and capital facility needs with realistic financing strategies. (Please refer also to the CIP budget policy in Section C for additional detail.) Consistent with established budget policies and past Council financing strategies, CIP funding for the next two years relies heavily on existing, available fund balances and projected revenues from Real Estate Excise Taxes (REET), Fuel Taxes (State shared revenues), and Utility rates. The General Fund continues to be the sole source for capital investments in technology and equipment. Most revenues for capital projects come with restrictions. Utility rates may only be used for projects of the respective utility; fuel taxes may only be used for street and trail projects; and REET is reserved for capital projects to help develop a community s public infrastructure (e.g., parks, open space and streets). The City s capital financing strategy has been to use these restricted revenues on a pay as you go basis for needed improvements. This strategy remains unchanged, except for costly utility and public building projects for which debt financing is utilized to smooth utility rate spikes or to more equitably match the costs of the project to the benefit period. REET is the 0.5% tax paid by the seller in property transactions. State law restricts the use of REET for specific capital purposes. REET-1 (the 1 st quarter of 1% of the sales price) may be used for streets, parks, facilities, or utilities. REET-2 (the 2nd quarter of 1% of the sales price) may be used for streets, parks, or utilities, but may not be used for facilities. Neither REET-1 nor REET-2 may be used for equipment or technology. REET is the largest revenue source for the projects in the Street and Capital Improvement Funds. REET revenue can vary significantly from year to year as its base (property sales) is highly dependent on economic conditions and interest rates. As the Great Recession took root, REET revenues declined in 2008, then declined further in 2009 due to a significant drop in the number of home sales from 603 homes in 2004 to a low of 260 homes in 2008 and 267 homes in Average home prices also declined from a high of $1.24 million in 2008 to $854,000 a year later. REET has recovered slowly in , mostly due to lower home prices. It is anticipated that home sales will continue to recover, although at a moderate rate, in 2013 and Continuing the City s CIP financing strategy, REET-1 revenues are used to fund parks, open space, and public building maintenance projects and to pay the debt service on the Mercer View property and the Community Center. REET-2 revenues continue to be used for infrastructure needs, namely construction and maintenance of streets, pedestrian and bicycle facilities. Because they cannot rely upon REET revenues, expenditures for new vehicles, equipment, and technology come from general purpose revenue, reserve, or grant funding sources. An example is the purchase of Firefighting Equipment, including technical rescue tools, which is planned for this biennium. Consistent with their financial policies, utility capital improvements are funded from utility rates, primarily on a pay-as-you-go basis. Table 2 below shows an overview of the CIP financing strategy. H-2 City of Mercer Island Budget

5 Table 2 - Capital Improvement Program Financing Strategy REET 1 REET 2 General Purpose Revenues Utilities Parks Streets Equipment Sanitary Sewer Construction Construction Vehicle Replacement Construction Maintenance Maintenance Public Safety Items Maintenance Open Space Pedestrian / Bike Facilities Technology Storm Water Property Acquisition Construction Computers Construction Planning Maintenance Software Maintenance Improvements Communications Water Public Buildings Construction Repair Maintenance Maintenance Planning and Design Real Estate Excise Tax (REET) Forecast The REET forecast for was presented as part of the CIP Preview in June In September 2012, staff revised its 2012 REET forecast down to $1.78 million, which is $200,000 less than the March 2012 forecast. The revised forecast was based on a lower average sales price of $900,000 (down from the $925,000 forecast for the CIP Preview in June 2012). The number of forecast home sales (400) was unchanged for No change has been made to the REET forecast for The REET forecast will be reviewed again for the final CIP budget review (in November). Historical home sales ( ) equal to or less than $5.0 million and the forecasted number of home sales ( ) are shown in the chart below. # Sales 700 Number of Home Sales = $5.0 Million Fcst 2013 Fcst 2014 Fcst 2015 Fcst 2016 Fcst 2017 Fcst 2018 Fcst City of Mercer Island Budget H-3

6 Historical home sale prices ( ) as well as forecasted home sale prices ( ) are shown in the chart below. $ Millions Average Home Sale Price Fcst 2013 Fcst 2014 Fcst 2015 Fcst 2016 Fcst 2017 Fcst 2018 Fcst The historical trend for REET Revenue (shown in millions) as well as the forecast for REET used in developing the Preliminary Budget is presented in the chart below. Note that the spike in 2010 revenue reflects the sale of Shorewood Heights Apartments in September 2010, generating about $500,000 in REET. The spike in 2005 represents the sale of 4 commercial properties, which generated about $1.0 million in REET. $4.00 $3.50 $3.00 $2.50 $2.00 $1.50 $2.50 $1.51 $1.82 $3.71 $2.77 $2.93 $2.35 $2.21 $1.83 $1.98 $2.24 $2.78 $2.52 $2.91 $3.05 $3.19 $1.00 $1.17 $1.26 $0.50 $ Fcst 2013 Fcst 2014 Fcst 2015 Fcst 2016 Fcst 2017 Fcst 2018 Fcst H-4 City of Mercer Island Budget

7 Fund Balance Trends The six-year capital plan draws down fund balances, with the Street Fund going negative beginning in 2016, the Water Fund going negative beginning in 2015, and the Sewer Fund temporarily going negative beginning in For the most part, this is a calculated risk to take advantage of a continuing favorable bid environment. Projected fund balances (shown in thousands), excluding reserves dedicated for specific purposes (e.g. all-weather field sinking fund in the Capital Improvement Fund), are presented in the following table for all CIP-related funds Forecast Forecast Forecast Forecast Forecast Forecast Forecast Street Fund 1, , (856) (1,232) (1,876) Capital Improvement Fund 1,474 1,454 1, (338) Technology and Equipment Fund (77) Water Fund 2,183 1,836 1,356 (555) (980) (1,399) (1,498) Sewer Fund 456 (315) (37) (247) (2) (155) 45 Storm Water Fund 1,968 1,729 1, The available fund balance in the Street Fund is projected to be completely used in 2016, given the current REET revenue forecast and planned projects. To maintain the planned level of spending, new revenues, such as a Transportation Benefit District, will be needed. Planned capital reinvestment projects for will draw the available Capital Improvement Fund balance into a negative position in 2018, given current revenue forecasts. While the available Technology and Equipment Fund balance is projected to decline during the 6 year plan, it is not projected to go negative until This is due to the MICEC Sinking Fund, which needs $200,000 in additional, one-time funding by Rates are generally set for the Water, Sewer, and Storm Water Funds at levels to support daily operations, routine maintenance, and capital reinvestment planned for the 6 year period ( ). Available fund balances are used in conjunction with new revenues generated from rates and occasional debt proceeds to meet the funding needs of each utility. The Water Fund and Sewer Fund are projected to go negative in 2015 and 2013 respectively, because the Council directed staff to push two major capital projects out of the biennium to the biennium and to significantly reduce the Utility Board recommended water and sewer rate increases in The reason that the fund balance of the Water Fund and the Sewer Fund is negatively impacted is that the two projects were not eliminated from the six year CIP, which was the primary driver of the Utility Board recommended water and sewer rates for As a result, significant water and sewer rate increases will be needed beginning in 2015 or planned capital projects in will need to be pushed out beyond See Section F (Utility Funds Summary) and Section I (Recap by Fund) for more details on fund balances. Project Management Project Management staff costs are built into the budget of each capital project. Of note for , one position (Storm Water Project Manager) has been a contract position since 2007, and has been converted to a regular FTE. For several positions (Information and Geographic Services (0.45 FTE), Facilities Team Member (0.17 FTE), Parks Maintenance (0.20 FTE) and Parks Arborist (0.10 FTE)), this budget recognizes time actually spent on projects and reduces time budgeted in the General Fund by almost a full position (0.92 FTE). Much of the time spent on capital projects by these positions was charged to projects in , but the full position was still shown in the General Fund budget. City of Mercer Island Budget H-5

8 The time spent on project management was reduced slightly (0.05 FTE) for one position (Assistant City Engineer) to recognize time spent on transportation management and neighborhood traffic issues. Finally, two positions were increased by 0.25 FTE each (Parks Arborist and Natural Resources Specialist, which is a contracted position) to recognize additional CIP work. The increase was made by reducing a budgeted Parks Manager position in the General Fund which was vacant during , by 0.5 FTE. Historical ( ) and planned ( ) staffing levels are as follows: DEPARTMENT POSITION Regular FTE's Development Services City Engineer IGS Team Various Maintenance Assistant City Engineer Maintenance Street Engineer Maintenance Utilities Engineer Maintenance Storm Water Project Mgr Maintenance Facilities Team Member Parks & Recreation Parks Maintenance Parks & Recreation Parks Arborist Regular FTE Ongoing Contract FTE's Maintenance Storm Water Project Mgr Parks and Recreation Natural Resource Specialist Contract FTE TOTAL CIP FTE In addition to the listed staffing, a small percentage of Finance, City Attorney s Office, Communications Coordinator, Maintenance Director, Parks and Recreation Director, and City Manager s Office support is provided to capital projects. Accordingly, their time is charged through a CIP Overhead Charge to the Capital Project Funds (Streets, Water, Sewer, Storm Water, and CIP) and credited back to the General Fund. Summary of Changes to Proposed CIP On June 18, 2012, the Council was given a preview of the proposed CIP. At that meeting, the Council asked questions and voiced some concerns, but did not modify any projects. Changes made in response to Council comments were removal of the proposed Mercerdale Spray Park and addition of a mini-master planning process for Mercerdale Park and the Thrift Shop. Changes by staff included elimination of the Island Crest Park South Infield Synthetic Turf project (since grant funds were not awarded) and the EOC Incident Management project (to allow time for a regional plan to be developed). Two projects were postponed, City Hall bathroom remodel until and Maintenance Management System update until Two project budgets were increased based on possible grant funding (Luther Burbank Shoreline Phase II and Calkins Point Street End). A timing correction was made to the Preservation IMS Curve project (this was shown in 2015 during the preview, but should have been shown in 2014). The Fire Station 92 Replacement cost estimate was adjusted based on preliminary design. Finally, refined cost estimates were made to eight other project budgets. Table 3 summarizes the changes made since the June preview for the Preliminary Budget. H-6 City of Mercer Island Budget

9 Table 3 Summary of Changes to the Preview CIP in 000s June Prelim Project Preview Budget Change Notes Changes in Response to Council: Mercerdale Spray Park (375) Council not ready to move forward w/o a master plan Mercerdale Park & Thrift Shop Master Plan Council expressed need for a mini-master plan Council Changes (350) Staff Changes: Luther Burbank Shoreline Phase II Added design cost in 2013 funded with KCD Grant Island Crest Park S. Infield Synthetic Turf (338) Did not receive grant (funding for project) Small Parks, Street Ends Add Calkins Landing project funded by Grant Preservation - IMS Curve Shown in 2015 in Preview - should have been 2014 City Hall Building Repairs (100) Delay bathroom remodel to Fleet Replacements Refine cost estimates Mobile Asset Data Management (3) Remove Utility elements / refine cost estimates Document Management Refine cost estimates Financial System Upgrades Refine cost estimates Server Software Updates Refine cost estimates Permitting System Upgrades Refine cost estimates Maintenance Management System (165) Postpone until 2015 EOC Incident Management 60 - (60) Remove - wait for regional plan Police in-car Video System (6) Refine cost estimates Utility Billing System Upgrade Refine cost estimates Fire Station 92 Replacement 4,590 4, Refine cost estimate based on preliminary design Staff Changes 7,394 7,248 (146) Plus All Other Projects 16,139 16,139 - No change TOTAL 23,908 23,412 (496) City of Mercer Island Budget H-7

10 During the Council s review of the Preliminary Budget, additional modifications were made to the proposed CIP. Table 4 summarizes the changes directed by the Council and made by staff for the Final Budget. Table 4 Summary of Changes to the Preliminary CIP in 000s Prelim Final Project Budget Budget Change Notes Council Directed Changes: ICW Resurfacing Phase 2 1, (1,078) Pushed out because ICW water project was pushed out ICW & 85th Ave Water Sys Impvts 1,596 - (1,596) Pushed out to lower water rates EMW Sewer Replacement (500) Pushed out to lower sewer rates First Hill Drainage System Extension (425) Pushed out to lower storm water rates Thrift Shop/Mercerdale Site Planning Narrowed scope to focus on Thrift Shop & adjust funding Council Changes 3, (3,599) Staff Changes: South Fire Station Repairs (113) Not needed with passage of levy lid lift for S. Fire Station Staff Changes (113) Plus All Other Projects 19,575 19,575 - No change TOTAL 23,412 19,700 (3,712) Note that the following 2 projects have been pushed out of the biennium, leaving significant negative fund balances in in the Street and Water funds. The 6 year plans for these 2 funds will be revised during the first half of 2013 as part of the Transportation Planning process and Water System Plan development, potentially pushing out other projects from the later years of the six year period. Island Crest Way Resurfacing Phase 2 This project is to resurface Island Crest Way (Merrimount Drive to SE 40th Street.). The project design is still scheduled for ($100,000), but construction (just over $1.0 million) has been pushed out to ICW & 85 th Ave. Water System Improvements This project will replace 6-inch asbestos cement (AC) water mains with 8-inch ductile iron (DI) water mains. This project ($1.6 million) was planned for 2013, but has been pushed out to In order to make reduce Sewer rates in , the East Mercer Way (5600 block) Sewer Replacement project ($500,000) was postponed from 2014 to This change in turn resulted in the elimination of Sewer Lake Line Clean-Out work planned for 2015 ($500,000). The 6-year plan for Sewer reflects that the first Sewer Lake Line Clean-Out would be constructed in 2017 ($550,000). In order to make reduce Storm Water rates in , the First Hill Drainage System Extension project ($425,000) planned for 2013 was eliminated from the capital plan. H-8 City of Mercer Island Budget

11 Project Highlights Residential Streets The biennial allocation for residential overlays is $1.2 million, which includes both standard hot mix overlays and the use of cost effective chip seals. East Mercer Way Shoulders (Phase 8) This project would extend shoulder improvements on East Mercer Way south from the 6200 block to the 7400 block of East Mercer Way. Additional Phases of shoulder work (Phases 9 and 10) are anticipated in 2016 and 2018 also. Pedestrian and Bicycle Facilities A North-South bike route from Southeast 62nd Street south of Island Crest Park to Island Park Elementary will be installed in In addition, the Safe Routes to School program will continue at $100,000 of funding, and other small PBF Plan projects will be implemented ($45,000). Sewer Modernization of Pump Station 14 is planned for 2013 at an estimated cost of $375,000. The pump station is antiquated (parts are no longer available) and safety concerns exist about operating the station in compliance with current safety regulations. In addition, staff will continue to focus on telemetry improvements, pump station repairs and emergency generator replacements. An update to the 20-year capital plan in the General Sewer System Plan is scheduled for Storm Water In , the City will begin a program of installing two or three water quality treatment devices per year to reduce pollutants entering Lake Washington. The City will also undertake a systematic investigation to identify and remedy sources of dissolved copper and zinc in Basins 10 and 32b. The City plans to construct improvements for Sub-Basins 4, 6, and 27 at an estimated cost of $1.04 million. In addition, the City plans to undertake replacement of the aging/undersized portions of the East Seattle drainage system. Water The City will continue with its annual water main upsizing, pressure reducing valve, meter and hydrant replacement programs. Projects include system improvements and/or main replacements at Sandy Cove, Mercerwood Drive, and 88th Ave. and 86th Ave. An update to the Water System Plan is scheduled for Sustainability Investment Initial seed funding ($50,000) will be utilized to further the City s sustainability goals. Operation and maintenance savings from funded projects (i.e. reduced energy costs) will be tracked and re-invested in additional sustainability projects. Fire Station 92 A levy lid lift was approved by voters on November 6, 2012 to fund the replacement of Fire Station 92. Final design will be completed in 2013, and construction will be completed by early Thrift Shop Expansion Plan An analysis of Thrift Shop retail sales indicates that sales could be significantly increased if the Thrift Shop had additional physical space (remodel or expansion). The Thrift Shop experiences heavy use year round. In order to thoughtfully develop a proposed capital project that serves the needs of the Thrift Shop a plan is needed. Technology Technology projects for the biennium include completing computer equipment replacements and implementing necessary server software and financial system upgrades. City of Mercer Island Budget H-9

12 Partially or Unfunded Capital Needs Reflected in the 6 Year Plan ( ) Seven of the projects included in the proposed CIP are only partially funded or unfunded. For three of the projects, full funding depends on receipt of a grant. Two of the projects are funded from sinking funds which are not fully funded to meet the planned expenditures for The funding status for these projects is summarized in the table below. Funded Unfunded Cost Funding Source Project Estimate for Unfunded Portion Island Crest Park Ballfield Lights Replacement 338,000 45, ,000 PSE or Energy Grant Luther Burbank Playground Replacement 303,000 25, ,000 Private Contributions Luther Burbank Shoreline Phase II 161, , ,000 Grant Funding Small Parks, Street Ends (Calkins Landing) 1,238, ,000 1,545,000 KC Flood Control Grant MICEC Technology & Equipment 341, , ,000 Sinking Fund not fully funded Fire Apparatus Replacements 415,000 1,083,000 1,498,000 Sinking Fund not fully funded s 2,796,000 1,849,000 4,645,000 Of particular note are the following projects: Luther Burbank Shoreline Phase II Calkins Point in Luther Burbank Park has suffered from significant erosion due to its close proximity to high boat traffic and wakes. A defined beach access and protected shoreline will address this erosion and preserve the park. King Conservation District funding will be applied to design work. Following design, staff will apply for grant funding for a portion of the construction costs. The Washington Recreation and Conservation Office (RCO) or Salmon Restoration Funding are possible grant sources. Small Parks, Street Ends (Calkins Landing) Improvements to the street end at Calkins Landing ($307K) are planned for This project includes repairs associated with the storm drain outfall at this location. Staff hopes to pay for construction with KC Flood Control District funding. MICEC Technology and Equipment A sinking fund was established in using MICEC rental revenues. However, this will not fully fund the purchases planned for the 6 year period. An additional transfer of $200,000 will be needed by 2016 to fully fund planned equipment replacements in Fire Apparatus Replacements The sinking fund balance is projected to go negative in 2016 even though the Fire Station and Fire Rescue Truck levy passed on November 6, As a result, there is not adequate funding for the planned replacement of one mini pumper in 2015 and one maxi pumper in To keep the sinking fund positive for the next 20 years (through 2032), $50,000 in annual funding is needed beginning in Not reflected in the 6 Year Plan ( ) In addition to the projects planned above, there are significant capital improvements that are not included in the plan and for which a funding source has not yet been determined. The following projects continue to be unfunded or partially funded: Luther Burbank Master Plan Implementation Design and construction costs to implement master plan improvements identified in the planning process were estimated at $8.0 H-10 City of Mercer Island Budget

13 million. Two master plan elements were addressed in (Shoreline Restoration Phase I and Off-Leash Area Improvements) at a cost of $1.25 million. In November 2008, a $12.0 million parks bond levy to fund park capital improvements, including master plan elements for Luther Burbank Park, was put to a vote and failed. A new funding source for these improvements has not been identified. Open Space Acquisition (5-6 acres) This consists of one-time purchases of open space property as opportunities arise at a cost of approximately $2.0 million per acre. The preferred funding source identified is voted debt (20 years). REET-1 and other fund balances could also be used. Utility Projects there is a long list of Utility reinvestment projects (undersized water mains, sewer lake line clean-outs, aging sewer pipe, storm water basins, and conveyance pipe), which could be tackled at a faster pace with higher rate increases. Reader s Guide to the CIP The CIP section of the budget attempts to satisfy various interests, ranging from a high level overview to detailed specifics of each project planned for the upcoming biennium. The CIP Project Summary provides the most succinct presentation of project costs, timing, and funding sources. In this summary, projects are organized by plan (CRP vs. CFP) first and then by project category: A. Parks, Recreation and Open Space B. Streets, Pedestrian and Bicycle Facilities C. General Government (Equipment, Public Buildings, and Technology) D. Sewer Utility E. Storm Water Utility F. Water Utility Readers who are interested in project details will want to focus on the Individual Project Sheets. The project sheets include a detailed project description, identifying the business need and existing conditions. Detailed expenditure information and revenue sources are described as well. Finally, an overview of each project s schedule is presented. On both the CIP Project Summary and Individual Project Sheets, revenues and expenditures are expressed in thousands of dollars, rounded to the nearest $1,000. For the long-range view, Six-Year Fund Statements show projects planned for future years ( ) and the long-term funding plan. Understandably, predictions about projects in the last four years of the period are not as precise as for the projects the Council formally approves for implementation in Six-year funding plans are presented for the following City Funds: 1. Street Fund 2. Capital Improvement Fund 3. Technology and Equipment Fund 4. Water Fund 5. Sewer Fund 6. Storm Water Fund City of Mercer Island Budget H-11

14 H-12 City of Mercer Island Budget

15 CAPITAL IMPROVEMENT PROGRAM Project Summary This section includes a listing of projects by Plan (Reinvestment or New Facilities) and a listing of projects by Functional Category.

16 H-14 City of Mercer Island Budget

17 CIP Project Summary Capital Reinvestment Plan Parks, Recreation and Open Space Project Costs Source of Funds Project REET Street Utilities General Beautif Fees Contrib's Grants Levy Debt Other Funded - No Changes 23 Open Space - Vegetation Management Open Space ,958 2, Recurring Park Projects Parks Repairs and Maintenance Luther Burbank Minor Park Improvements Parks Improvements Funded - Modified 26 I-90 Lid Park Improvements Parks Repairs and Maintenance South Mercer Playfields Park Improvements Parks Repairs and Maintenance Mercer Island Community and Event Center Grounds Parks Repairs and Maintenance Funded - New Project 29 Island Crest Park North Outfield Improvements Parks Improvements Unfunded or Partially FundedModified 30 Small Parks, Street Ends and Other Improvements Parks Improvements ,545 1, Island Crest Park Ballfield Lights Replacement Parks Repairs and Maintenance Unfunded or Partially FundedNew Projec 32 Luther Burbank Playground Replacement Parks Improvements Luther Burbank Shoreline Phase II Parks Improvements Parks, Recreation and Open Space costs 608 1,150 1,301 1,539 1,395 1,254 1,553 8,192 Streets, Pedestrian and Bicycle Facilities Project Costs Source of Funds Project REET Street Utilities General Beautif Fees Contrib's Grants Levy Debt Other Funded - No Changes 34 Arterial Preservation Program Annual Street Maintenance Program Pavement Marking Replacement Annual Street Maintenance Program Island Crest Way Resurfacing Phase 2 Arterial Street Improvements , , , Funded - Modified 37 Residential Street Overlays Annual Street Maintenance Program , , Town Center Streets - South Town Center Street Reconstruction Arterial Street Improvements ( ) Arterial Street Improvements ,484 3, , Town Center Streets - North Town Center Street Reconstruction Mercerwood Drive Arterial Street Improvements Funded - New Project 42 Town Center - Crosswalk Needs Analysis Pedestrian and Bicycle Facilities Mercer Ways Fog Line Pedestrian and Bicycle Facilities Preservation - West Mercer Way (SE 24th to SE 28th) Arterial Street Improvements Preservation - IMS Curve (SE 72nd and 84th Ave) Arterial Street Improvements Streets, Pedestrian and Bicycle Facilities costs 576 1, ,168 2,351 1,550 2,190 10,417 City of Mercer Island Budget H - 15

18 CIP Project Summary General Government Project Costs Source of Funds Project REET Street Utilities General Beautif Fees Contrib's Grants Levy Debt Other Funded - No Changes 46 Computer Equipment Replacements Technology , , High Accuracy Orthophotos Technology Firefighting Equipment Small Technology/Equipment Mobile Asset Data Collection Technology Fuel Clean Up Other Equipment Document Management Technology Funded - Modified 52 City Hall Building Repairs Public Buildings Maintenance Building Repairs Public Buildings Thrift Shop Repairs Public Buildings North Fire Station Repairs Public Buildings South Fire Station Repairs Public Buildings Luther Burbank Admin Building Repairs Public Buildings Community Center Building Repairs Public Buildings Website Redesign Technology Financial System Upgrades Technology Server Software Updates Technology Permitting System Upgrades Technology Maintenance Management System Technology City Information via Web Based GIS Technology Fleet Replacements Other Equipment , , , Funded - New Project 66 Self Contained Breathing Apparatus Replacement Other Equipment Police In-Car Video System Replacement Technology City Hall Camera System Update Small Technology/Equipment Utility Billing System Upgrade Technology Unfunded or Partially FundedNo Change 70 Fire Apparatus Replacements Other Equipment , ,498 0 Unfunded or Partially FundedModified 71 MICEC Technology & Equipment Replacement Small Technology/Equipment General Government costs 1,883 2,077 1,570 2,031 2,174 2,516 1,903 12,271 Sewer Utility Project Costs Source of Funds Project REET Street Utilities General Beautif Fees Contrib's Grants Levy Debt Other Funded - No Changes 72 Sewer System Emergency Repairs Sewer System Rehabilitation Sewer System Pump Station Repairs Sewer System Rehabilitation East Mercer Way Sewer Replacement Sewer System Improvements H - 16 City of Mercer Island Budget

19 CIP Project Summary Sewer Utility Project Costs Source of Funds Project REET Street Utilities General Beautif Fees Contrib's Grants Levy Debt Other Funded - Modified 75 General Sewer System Improvements Sewer System Improvements , , Sanitary Sewer System Telemetry Sewer System Improvements Sewer System Generator Replacement Sewer System Rehabilitation Funded - New Project 78 Street Related Sewer CIP Projects Sewer System Improvements Backyard Sewer System Improvements Sewer System Improvements General Sewer Plan - 20 year Capital Plan Update Sewer System Improvements Pump Station 14 Modernization Other Sewer System Projects Sewer Utility costs , ,543 Storm Drainage Utility Project Costs Source of Funds Project REET Street Utilities General Beautif Fees Contrib's Grants Levy Debt Other Funded - No Changes 82 Neighborhood Spot Drainage Improvements Neighborhood Drainage Improvements Watercourse Condition Assessments Watercourse Projects Sub-Basin 4 Watercourse Stabilization Project Watercourse Projects Sub-Basin 29.2 Watercourse Stabilization Project Watercourse Projects Funded - Modified 86 Watercourse Stabilization Projects ( ) Watercourse Projects Drainage System Replacements ( ) Other Storm Drainage System Projects Minor Watercourse Improvements Watercourse Projects Sub-Basin 27 Watercourse Stabilization Project Watercourse Projects Sub-Basin 42 Watercourse Stabilization Project Watercourse Projects East Seattle Drainage System Replacement Other Storm Drainage System Projects Funded - New Project 92 Watercourse Minor Repairs/Maintenance Watercourse Projects Sub-Basin 6 Ph. 2 Watercourse Stabilization Project Watercourse Projects Drainage System Video Inspection Program Other Storm Drainage System Projects Drainage System Emergency Repairs Other Storm Drainage System Projects Storm Drainage Utility costs , ,022 Water Utility Project Costs Source of Funds Project REET Street Utilities General Beautif Fees Contrib's Grants Levy Debt Other Funded - No Changes 96 Water Model Updates/ Fire Flow Analysis Other Water System Projects Water System Plan Update Other Water System Projects Meter Replacement Program Other Water System Projects th Ave. & 86th Ave. Water System Improvements Undersized Main Replacement Program City of Mercer Island Budget H - 17

20 CIP Project Summary Water Utility Project Costs Source of Funds Project REET Street Utilities General Beautif Fees Contrib's Grants Levy Debt Other 100 Mercerwood Neighborhood Water System Improvemts Water System Improvements , , , Street Related Water CIP Projects Water System Improvements Funded - Modified 102 Hydrant Replacements Water System Improvements Sandy Cove Water System Improvement Undersized Main Replacement Program ICW & 85th Ave. Water System Improvements Water System Improvements , , , EMW 5400 to 6000 Block Watermain & PRV Stations Water System Improvements ,102 1, , Mercerwood Drive Water Main Replacement Undersized Main Replacement Program Water Main Replacement - 93rd, 89th, & 90th Ave SE Undersized Main Replacement Program , , Water System Components Replacement Water System Improvements Funded - New Project 109 Madrona Crest West Addition Water Sys Improvements Undersized Main Replacement Program , , , WMW Water System Improvements Undersized Main Replacement Program rd Ave off SE 40th St Water System Improvements Undersized Main Replacement Program Water Utility costs 317 1,142 1,375 3,132 1,980 2,236 1,859 11,724 Capital Reinvestment Plan 4,236 7,373 6,372 10,461 9,260 8,802 8,901 51,169 H - 18 City of Mercer Island Budget

21 CIP Project Summary Capital Facilities Plan Parks, Recreation and Open Space Project Costs Source of Funds Project REET Street Utilities General Beautif Fees Contrib's Grants Levy Debt Other Funded - No Changes 112 Regional Trail Connections (KC Prop 2 Levy) Parks Improvements Parks, Recreation and Open Space costs Streets, Pedestrian and Bicycle Facilities Project Costs Source of Funds Project REET Street Utilities General Beautif Fees Contrib's Grants Levy Debt Other Funded - No Changes 113 Pedestrian and Bicycle Facilities Plan Implementation Pedestrian and Bicycle Facilities Safe Routes to School Pedestrian and Bicycle Facilities Funded - Modified 115 East Mercer Way Roadside Shoulders, Phases 8-10 Pedestrian and Bicycle Facilities , , Funded - New Project 116 North-South Bike Route near Island Crest Park Pedestrian and Bicycle Facilities SE 53rd Place - New PBF Pedestrian and Bicycle Facilities Streets, Pedestrian and Bicycle Facilities costs ,925 General Government Project Costs Source of Funds Project REET Street Utilities General Beautif Fees Contrib's Grants Levy Debt Other Funded - No Changes 118 Small Technology/Equipment Items Small Technology/Equipment Funded - New Project 119 Thrift Shop Expansion Plan Planning and Design Sustainability Project Investment Public Buildings Unfunded or Partially FundedNew Projec 121 Fire Station 92 Replacement Public Buildings 0 2,603 2, , ,703 General Government costs 50 2,703 2, ,928 Sewer Utility Project Costs Source of Funds Project REET Street Utilities General Beautif Fees Contrib's Grants Levy Debt Other Funded - New Project 122 Sewer Lake Line Clean-Outs Other Sewer System Projects , Sewer Utility costs Storm Drainage Utility Project Costs Source of Funds Project REET Street Utilities General Beautif Fees Contrib's Grants Levy Debt Other Funded - New Project 123 Basins 10 & 32b Dissolved Metals Source Identification Other Storm Drainage System Projects Water Quality Treatment Improvements Other Storm Drainage System Projects City of Mercer Island Budget H - 19

22 CIP Project Summary Storm Drainage Utility Project Costs Source of Funds Project REET Street Utilities General Beautif Fees Contrib's Grants Levy Debt Other 125 Basin 32b Stormwater Treatment Improvements Other Storm Drainage System Projects Street Related Drainage Improvements Other Storm Drainage System Projects Drainage System Extensions ( ) Other Storm Drainage System Projects Storm Drainage Utility costs ,340 Water Utility Project Costs Source of Funds Project REET Street Utilities General Beautif Fees Contrib's Grants Levy Debt Other Funded - New Project 128 New Pressure Reducing Valve (PRV) Station Installatio Other Water System Projects Water Utility costs Capital Facilities Plan 168 3,535 2, ,007 1, ,133 Grand 4,404 10,908 8,792 10,806 10,267 10,003 9,526 60,302 H - 20 City of Mercer Island Budget

23 CAPITAL IMPROVEMENT PROGRAM Individual Project Sheets

24 H-22 City of Mercer Island Budget

25 Open Space - Vegetation Management Project Manager: P. West Approved ID: WP122R Exp (thousands): $ 2,958 Project : Provide vegetation management and minor trail improvements in existing open space areas consistent with the 2004 Open Space Vegetation Plan and Pioneer Park Forest Management Plan (updated in 2009). Revenues and expeditures reflect the 2008 Parks Levy which contributes $142,000 each year for these programs. Meet Plan's goals for removal of invasive species and restoration of parks and open spaces; improve recreation; address tree liabilities. Forty-three percent (43%) of open space is heavily invaded by non-native plants that will cause loss of the forest. Tree canopy is declining in certain areas because of competition from invasive plants, root disease and normal attrition. Prior Council Review: AB 3818, AB 3922, AB 4053, AB 4173, AB 4399, AB Parks Repairs ,561 Project Management , Levy REET ,106 Staff Responsible: Paul West Start Date: 01/03/2013 End Date: 12/31/2014 Labor Hours: 2,400 Public Involvement: As Needed City of Mercer Island Budget H - 23

26 Recurring Park Projects Project Manager: J. Kintner Approved ID: WP720R Exp (thousands): $ 720 Project : Construct kiosks, replace signage, perform emergency repairs, purchase park furnishings, trail improvements, building and other repairs to City parks. Park infrastructure must be maintained to ensure safety and functionality. On a recurring basis equipment, facilities and amenities must be repaired or replaced as they reach the end of their useful lifecycle. Prior Council Review: Budget; Budget Parks Repairs Project Management REET Staff Responsible: Parks Maintenance Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 270 Public Involvement: Not Applicable H - 24 City of Mercer Island Budget

27 Luther Burbank Minor Park Improvements Project Manager: J. Kintner Approved ID: XP710R Exp (thousands): $ 660 Project : Repairs and minor improvements to Luther Burbank Park infrastructure, equipment and amenities consistent with the 2008 Parks Levy, and the 2006 Luther Burbank Park Master Plan. Plan for improvements to Amphitheatre. On a recurring basis, equipment, facilities and amenities must be repaired or replaced as they reach the end of their useful lifecycle. Roads, sports courts, turf areas, restrooms, off-leash area, facilities, parking lots, trails and shoreline have suffered from extended deferred maintenance. These areas need ongoing minor repair. Prior Council Review: AB 3796 (9/2/03); Budget; Budget Parks Repairs Project Management Levy Staff Responsible: Jason Kintner Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 200 Public Involvement: Not Applicable City of Mercer Island Budget H - 25

28 I-90 Lid Park Improvements Project Manager: J. Kintner Approved ID: WP701R Exp (thousands): $ 443 Project : Bike/Pedestrian trail repair and overlay at high use areas along the Lid Park corridor. Design Sculpture Park improvements in conjunction with Sound Transit construction. High use areas along the Lid corridor need to be repaired and overlayed to meet increasing demands. Areas of the Lid corridor are in need of repair and overlay to support the different user groups. Prior Council Review: None Construction Design Services Project Management REET Staff Responsible: Jason Kintner Start Date: 02/01/2017 End Date: 12/31/2018 Labor Hours: 150 Public Involvement: As Needed H - 26 City of Mercer Island Budget

29 South Mercer Playfields Park Improvements Project Manager: J. Kintner Approved ID: Exp (thousands): $ 641 Project : IMS (Islander Middle School) synthetic turf replacement. Playground equipment replacement. IMS turf will be at the end of it's warranty in Playground Equipment is at the end of its useful life cycle. IMS synthetic turf will be at the end of it's warranty in Non compliant playground equipment needs replacing. Prior Council Review: Budget Construction Project Management Other - Reserves REET Staff Responsible: Jason Kintner Start Date: 01/01/2016 End Date: 12/31/2016 Labor Hours: 150 Public Involvement: As Needed City of Mercer Island Budget H - 27

30 Mercer Island Community and Event Center Grounds Project Manager: J. Kintner Approved ID: Exp (thousands): $67 Project : Develop a Master Plan for the MICEC site and construct a fence along the west property boundary. Develop a guiding document for future MICEC site improvements. Address security and inconsistent fencing border to the west. The property lacks a cohesive community vision for future site developments and inconsistent border along the west property boundary. Prior Council Review: None Other Parks Repairs Beautification REET Staff Responsible: J. Kintner Start Date: 03/01/2015 End Date: 12/14/2015 Labor Hours: 100 Public Involvement: Combination H - 28 City of Mercer Island Budget

31 Island Crest Park North Outfield Improvements Project Manager: J. Kintner Approved ID: WP301R Exp (thousands): $97 Project : Extensive natural turf rehabilitation on the North outfield at Island Crest Park. Extensive turf rehabilitation is needed to support underground drainage and improve playability. "Organic layer" prevents field drainage from performing properly. Prior Council Review: None Construction Project Management REET Staff Responsible: J. Kintner Start Date: 01/01/2013 End Date: 06/30/2013 Labor Hours: 100 Public Involvement: As Needed City of Mercer Island Budget H - 29

32 Small Parks, Street Ends and Other Improvements Project Manager: J. Kintner Approved ID: WP310C Exp (thousands): $ 1,545 Project : Develop and publish the Parks & Recreation 6-Year Plan. Design and construct street end improvements. Plan for improvements to Groveland Beach. Replace playground equipment at the end of its useful life cycle and install Healthy Living Wellness equipment within the parks system. An updated Parks & Recreation Plan is REQUIRED in 2013 to be eligible to apply for GRANTS. Plan for improvements to deteriorating facilities and address hardened bulkheads to improve recreation and habitat. The current Parks & Recreation plan expires in Worn and outdated equipment which requires repair and improvements. Hardened bulkheads at street ends to be improved for recreation and habitat. Healthy Living Wellness Equipment currently does not exist. Prior Council Review: None Construction ,224 Design Services Project Management , Beautification Grant REET ,188 Staff Responsible: Jason Kintner Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 570 Public Involvement: As Needed H - 30 City of Mercer Island Budget

33 Island Crest Park Ballfield Lights Replacement Project Manager: J. Kintner Approved ID: Exp (thousands): $ 383 Project : Replace the field lights at Island Crest Park, possible grant funding from Puget Sound Energy for lighting components. Island Crest Park supports baseball, football and soccer under lights. Upgrading the existing 27 year old system will provide for reduced energy consumption and less impact to park neighbors from light 'spillage'. A 2005 consultants report recommended "Replacement of the sports lighting, controls and underground distribution with a new system that features steel poles, more user-friendly controls and neighbor-friendly luminaires...within five years." Prior Council Review: Budget Construction Design Services Project Management Grant REET Staff Responsible: Jason Kintner Start Date: 01/15/2015 End Date: 12/31/2015 Labor Hours: 600 Public Involvement: As Needed City of Mercer Island Budget H - 31

34 Luther Burbank Playground Replacement Project Manager: J. Kintner Approved ID: WP302R Exp (thousands): $ 328 Project : Replace playground equipment that is at the end of its useful life cycle and make improvements to meet existing demand at the park. Playground equipment is at the end of its useful life cyle. Playground equipment no longer in compliance with American Society for Testing Standards (ASTM) and Consumer Product Safety Commission (CPSC) guidelines. Prior Council Review: None Construction Design Services Project Management Beautification Private Contributions Staff Responsible: J. Kintner Start Date: 01/31/2013 End Date: 04/01/2014 Labor Hours: 300 Public Involvement: Various H - 32 City of Mercer Island Budget

35 Luther Burbank Shoreline Phase II Project Manager: J. Kintner Approved ID: WP303R Exp (thousands): $ 350 Project : Phase II of the LBP shoreline restoration will include a defined beach access at Calkins Point while taking protective measures to preserve the shoreline and park property. Calkins Point in Luther Burbank Park has suffered from significant erosion due to its close proximity to high boat traffic and wakes. A defined beach access and protected shoreline will address this erosion and preserve the park. Due to its location and proximity to boat traffic, Calkins Point has suffered from significant erosion. Prior Council Review: AB 3796 (9/2/03) Construction Design Services Project Management Grant REET Staff Responsible: J. Kintner Start Date: 04/01/2013 End Date: 12/31/2014 Labor Hours: 450 Public Involvement: Various City of Mercer Island Budget H - 33

36 Arterial Preservation Program Project Manager: C. Morris Approved ID: WR110R Exp (thousands): $ 440 Project : This program repairs distressed and failing pavement segments of arterial streets to extend their service lives. Repairs include square cut patching and crack sealing. Arterial streets develop localized pavement failures that need permanent repair. Some of the Island's arterial streets have developed segments of pavement fatigue and failure that need to be repaired. Prior Council Review: Transportation Improvement Plan Construction Project Management Street Fund Staff Responsible: C. Morris Start Date: 02/01/2013 End Date: 10/31/2014 Labor Hours: 600 Public Involvement: As Needed H - 34 City of Mercer Island Budget

37 Pavement Marking Replacement Project Manager: B. Sansbury Approved ID: WR111R Exp (thousands): $ 300 Project : Replacing worn or missing street markings such as crosswalks, stop bars, arrows, RPM's (buttons) and other forms of delineators. To provide guidance and information to the road user while meeting the standards set forth in the Manual on Uniform Traffic Control Devices (MUTCD). Overall conditions are satisfactory. On-going maintenance is needed to maintain visibility of street markings. Prior Council Review: Transportation Improvement Program, Budget Construction Street Fund Staff Responsible: B. Sansbury Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 25 Public Involvement: Not Applicable City of Mercer Island Budget H - 35

38 Island Crest Way Resurfacing Phase 2 Project Manager: C. Morris Approved ID: WR120S Exp (thousands): $ 1,178 Project : This project will complete design for repair and resurface the existing asphalt roadway from Merrimount Drive to SE 40th Street. Existing pedestrian facilities will be repaired and upgraded as needed. Island Crest Way is the City's main arterial, serving the entire Island. This portion of roadway is nearing the end of its pavement life and will need resurfacing. This four-lane portion of Island Crest Way was last resurfaced in It is currently showing pavement fatigue. Phase 1 resurfacing work from SE 53rd Street to Merrimount Drive was performed in Prior Council Review: Transportation Improvement Plan Construction , ,078 Design Services Project Management , , Street Fund , ,178 Staff Responsible: C. Morris Start Date: 08/01/2013 End Date: 10/01/2014 Labor Hours: 900 Public Involvement: As Needed H - 36 City of Mercer Island Budget

39 Residential Street Overlays Project Manager: C. Morris Approved ID: WR101R Exp (thousands): $ 3,857 Project : This annual program repairs and resurfaces public residential streets on the Island through hot mix asphalt overlays. Chip sealing has been added to this program after a pilot project in The program also includes upgrades to substandard residential streets, at the rate of about one per year. Many of the Island's residential street pavements are 25 to 35 years old. Numerous streets are in need of repair and resurfacing. A pavement condition index (PCI) is used to track the condition of streets and helps determine which segments of the 52 miles are most in need of repair. Current planning allows for a 35 year life cycle for residential hot mix asphalt pavements. Prior Council Review: Transportation Improvement Plan Construction ,115 Design Services Project Management , Street Fund ,857 Staff Responsible: C. Morris Start Date: 01/01/2013 End Date: 10/31/2014 Labor Hours: 3,000 Public Involvement: As Needed City of Mercer Island Budget H - 37

40 Town Center Streets - South Project Manager: C. Morris Approved ID: Exp (thousands): $ 387 Project : Repair and resurfacing of several streets in the southern part of the Town Center, including 80th Avenue (SE 28th to SE 32nd St) and portions of SE 29th and SE 32nd Streets. Work will include a slurry seal of the pavement, minor curb repairs, and sidewalk repairs. Project construction is proposed to be split in 2015 and These arterial streets are nearing the end of their pavement life and will need resurfacing. Arterial streets are currently resurfaced on a 20 to 25 year life cycle. These streets are reaching the end of their useful life and are in need of resurfacing and rehabilitation. These roadways were last resurfaced in the mid 1980's. Prior Council Review: Transportation Improvement Plan Construction Design Services Project Management Street Fund Staff Responsible: C. Morris Start Date: 02/01/2015 End Date: 10/01/2015 Labor Hours: 250 Public Involvement: Combination H - 38 City of Mercer Island Budget

41 Arterial Street Improvements ( ) Project Manager: C. Morris Approved ID: Exp (thousands): $ 3,202 Project : Repair and resurfacing of existing arterial streets that have reached the end of their pavement life. Roadways planned for these future years include portions of SE 40th Street (2015), SE 53rd Place (2016), East Mercer Way (2017 and 2018), and the northernmost portion of Island Crest Way (2018). Some arterial streets are approaching the end of their pavement life and will need resurfacing. Arterial streets are the primary segments of the City's transportation network. As sections of arterials wear and age, they need resurfacing. The Island's arterial pavements are planned to last 20 to 25 years. Prior Council Review: Transportation Improvement Plan Construction ,224 2,598 Design Services Project Management ,484 3, Street Fund ,484 3,202 Staff Responsible: C. Morris Start Date: 01/01/2015 End Date: 10/01/2016 Labor Hours: 2,500 Public Involvement: As Needed City of Mercer Island Budget H - 39

42 Town Center Streets - North Project Manager: C. Morris Approved ID: WR321R Exp (thousands): $ 528 Project : Repair and resurfacing of several streets in the northern part of the Town Center impacted by development projects and pavement fatigue, including SE 27th Street and portions of 76th, 78th, and 80th Avenues. Work will consist of grinding and hot mix asphalt overlay of existing roadways. construction is split in 2013 and The Town Center has experienced a surge of redevelopment in recent years. There is an expectation for streets in the Town Center to be well constructed and of good quality. The streets in the north end of the Town Center are showing signs of age and wear. Additionally, these street segments have numerous utility cuts resulting from multiple redevelopment projects. Prior Council Review: Transportation Improvement Plan Construction Design Services Project Management Street Fund Staff Responsible: C. Morris Start Date: 01/01/2013 End Date: 10/01/2013 Labor Hours: 250 Public Involvement: As Needed H - 40 City of Mercer Island Budget

43 Mercerwood Drive Project Manager: C. Morris Approved ID: WR323R Exp (thousands): $ 255 Project : This project will resurface Mercerwood Drive from Gallagher Hill Road to East Mercer Way with a chip seal over the full width of the roadway. Mercerwood Drive's pavement is over 25 years old and will need resurfacing in the near future. Chip sealing is a cost effective method to extend this road's life for another 8 to 10 years. Mercerwood Drive was last repaved in the mid 1980's. It has significant pavement cracking and has been crack sealed twice in recent years. This asphalt pavement is reaching the end of its life. Prior Council Review: Transportation Improvement Plan Construction Design Services Project Management Street Fund Staff Responsible: C. Morris Start Date: 02/01/2013 End Date: 09/01/2013 Labor Hours: 250 Public Involvement: As Needed City of Mercer Island Budget H - 41

44 Town Center - Crosswalk Needs Analysis Project Manager: A. Tonella-Howe Approved ID: WR322R Exp (thousands): $20 Project : Develop a pedestrian circulation plan for the Town Center, identifying walking routes and crossing locations including wayfinding signing and treatment options for mid-block crossings. The Town Center has experienced a surge of redevelopment in recent years. Goal 3 of the PBF Plan supports enhanced and improved pedestrian circulation within the Town Center Redevelopment in the Town Center has created a need for a pedestrian circulation plan that includes wayfinding signage and identified mid-block crossing locations. Prior Council Review: TIP Other Project Management Street Fund Staff Responsible: A. Tonella-Howe Start Date: 01/02/2014 End Date: 12/31/2014 Labor Hours: 35 Public Involvement: As Needed H - 42 City of Mercer Island Budget

45 Mercer Ways Fog Line Project Manager: B. Sansbury Approved ID: WR140G Exp (thousands): $50 Project : Remove fogline buttons delineating the shoulder area on the Mercer Way's and replace with 4-inch stripe Removal of the fogline buttons supports the PBF Plan and enhances the shoulder use for bicyclists Fogline buttons delineate the shoulder area on the Mercer Way's Prior Council Review: TIP Construction Street Fund Staff Responsible: B. Sansbury Start Date: 01/01/2013 End Date: 12/31/2013 Labor Hours: 2 Public Involvement: Not Applicable City of Mercer Island Budget H - 43

46 Preservation - West Mercer Way (SE 24th to SE 28th) Project Manager: C. Morris Approved ID: WR110V Exp (thousands): $ 100 Project : This project will resurface West Mercer Way from SE 24th to SE 28th Streets at its current width. Work will consist of grinding and a hot mix asphalt overlay. This arterial's pavement has reached the end of its useful life and needs to be resurfaced. This roadway recieved a thin HMA overlay in 1994 by WSDOT. This pavement is beginning to fail and has been patched several times. Prior Council Review: Transportation Imporvement Plan Construction Design Services Project Management Street Fund Staff Responsible: C. Morris Start Date: 06/01/2012 End Date: 09/01/2013 Labor Hours: 100 Public Involvement: As Needed H - 44 City of Mercer Island Budget

47 Preservation - IMS Curve (SE 72nd and 84th Ave) Project Manager: C. Morris Approved ID: WR110X Exp (thousands): $ 100 Project : This project will resurface the SE 72nd Street/84th Avenue curve near Islander Middle School from 82nd Avenue to SE 71st Street. Work will consist of grinding and hot mix asphalt overlay of the existing roadway. This roadway segment provides bus access to and from Islander Middle School and Lakeridge Elementary School. This asphalt pavement is nearing the end of its life and will need resurfacing. This roadway was last resurfaced in 1998 and has developed extensive pavement cracking. This area was crack sealed in Prior Council Review: Transportation Improvement Plan Construction Design Services Project Management Street Fund Staff Responsible: C. Morris Start Date: 06/01/2015 End Date: 09/01/2015 Labor Hours: 150 Public Involvement: As Needed City of Mercer Island Budget H - 45

48 Computer Equipment Replacements Project Manager: M. Kaser Approved ID: WG110T Exp (thousands): $ 1,132 Project : Scheduled replacement of desktop computers, printers and associated equipment. Routine replacement of outdated desktop computers and associated equipment. Departments schedule replacement of desktop computers (generally every 4 years) and contribute a predetermined amount to the Computer Equipment Replacement Fund. Prior Council Review: Budget Technology & Equipment Acquisition , , Dept Fees ,132 Staff Responsible: IGS Team Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 1,064 Public Involvement: Not Applicable H - 46 City of Mercer Island Budget

49 High Accuracy Orthophotos Project Manager: M. Kaser Approved ID: WG920T Exp (thousands): $51 Project : High resolution aerial photography that supports the maintenance of GIS layers for above ground features and infrastructure such as roadways, property and building information, and utilities. High accuracy digital orthophotography is the primary low cost tool to obtain an "on the ground" picture of island-wide property and infrastructure changes from which accurate measurements and analysis can occur. New photography is required periodically to capture changes over time. Prior Council Review: Budget Technology & Equipment Acquisition General Fund Staff Responsible: Mike Kaser Start Date: 01/01/2015 End Date: 12/01/2015 Labor Hours: 120 Public Involvement: Not Applicable City of Mercer Island Budget H - 47

50 Firefighting Equipment Project Manager: S. Heitman Approved ID: WG131E Exp (thousands): $ 185 Project : Replacement of firefighting equipment and continued work on our pre-fire drawing program (shown in map pictured below). Provide the fire department with safe and dependable equipment, and increase the safety of firefighters when they respond to calls from Mercer Island businesses. 4" supply hose has reached the end of its useful life. Development of pre-fire information for emergency responses has lagged behing other Fire Districts. Prior Council Review: Budget Technology & Equipment Acquisition General Fund Staff Responsible: Steve Heitman Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 155 Public Involvement: Not Applicable H - 48 City of Mercer Island Budget

51 Mobile Asset Data Collection Project Manager: M. Kaser Approved ID: WG922T Exp (thousands): $ 120 Project : A camera system mounted on a van is used to collect video images of infrastructure elements visible from a public right of way. Geographic elements will be imported into the City's GIS database and maintenance management system for planning of infrastructure maintenance. Users will be able to view and measure items through the City's online mapping system. Collecting information about assets such as pavement condition is a normal component of City operations and asset and infrastructure maintenance. As part of ongoing maintenance of critical infrastructure such as streets and utilities the City needs to collect information in the field to conduct further planning of maintenance activity. Prior Council Review: Budget Project Management Technology & Equipment Acquisition Street Fund Staff Responsible: M. Kaser Start Date: 01/01/2013 End Date: 12/31/2013 Labor Hours: 40 Public Involvement: Not Applicable City of Mercer Island Budget H - 49

52 Fuel Clean Up Project Manager: G. Boettcher Approved ID: WG550R Exp (thousands): $ 156 Project : Soil remediation and monitoring following clean-up of a fuel release from underground tanks at the Maintenance Shop that spread to what was known as the Honeywell Property. Clean-up of the Honeywell site began in Continue remedial action and monitoring of the site until the City receives formal notification from DOE that no further action is necessary. Results of remedial action to date are generally encouraging. It is likely that another two years of groundwater treatment, followed by two years of additional monitoring will be needed. Prior Council Review: AB 4270 (Feb 2008) Other Other Staff Responsible: Glenn Boettcher Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 20 Public Involvement: Not Applicable H - 50 City of Mercer Island Budget

53 Document Management Project Manager: M. Kaser Approved ID: WG702T Exp (thousands): $ 474 Project : Document Management refers to the management of all public and private records as described in RCW and RCW and other applicable local, state, and federal laws. The City generates public and private records as a function of City business. A system to manage these records in accordance with business need, state, and federal law is required. The City has implemented an electronic document management system and has deployed it to several departments. Additional work is needed to continue further deployment. Prior Council Review: Budget, Budget Project Management General Fund Staff Responsible: M. Kaser Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 250 Public Involvement: Not Applicable City of Mercer Island Budget H - 51

54 City Hall Building Repairs Project Manager: M. Olson Approved ID: WG101R Exp (thousands): $ 803 Project : Projects include: HVAC unit replacements, updated signage, restroom refurbish, and kitchen improvements. To maintain the functions of the building for customers and employees. The reinvestments are intended to enhance the life of the building and its systems. Replace final 4 HVAC units to conclude temperature conditioning upgrades. The signs are old and in need of replacement. Prior Council Review: Budget Building Repairs Project Management REET Staff Responsible: Marcy Olson Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 480 Public Involvement: Not Applicable H - 52 City of Mercer Island Budget

55 Maintenance Building Repairs Project Manager: M. Olson Approved ID: WG102R Exp (thousands): $ 495 Project : Projects include resealing of a skylight, door, window assembly in the hallway, interior paint and hazard and preventative maintenance to the trees on the property. To maintain and enhance the safety and functionality of the facility. Skylight and door assembly in the hallway downstairs is leaking. Interior paint is needed throughout. There are several hazardous trees and preventative maintenance needed on many other trees. Prior Council Review: Budget Building Repairs Project Management REET Utilities Staff Responsible: Marcy Olson Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 220 Public Involvement: Not Applicable City of Mercer Island Budget H - 53

56 Thrift Shop Repairs Project Manager: M. Olson Approved ID: WG104R Exp (thousands): $ 283 Project : Projects include retail space modification, HVAC unit, flat roof replacement, signage upgrade, and fixture replacements. Comfort and safety for customers and volunteers, and to prolong the life of the building. More retail space is needed. The HVAC unit for the top floor is at the end of its life expectancy. The flat portion of the roof needs to be replaced. Some electrical work is needed on the show room floors and addtional carts and fixtures are needed. Prior Council Review: Budget Building Repairs Project Management Private Contributions Staff Responsible: Marcy Olson Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 120 Public Involvement: Not Applicable H - 54 City of Mercer Island Budget

57 North Fire Station Repairs Project Manager: M. Olson Approved ID: WG106R Exp (thousands): $ 353 Project : Projects include HVAC replacement, installation of a handicap opener for the front door, electrical upgrades in the apparatus bay, and replacement of some furnishings. To keep the building functional for customers, firefighters, and to maintain the public asset. Front door for patrons lacks a handicap door opener. Additional electrical upgrades are needed to accommodate new fire equipment requirements. 2 HVAC units need to be replaced. Mattresses and meeting room furniture are in need of replacement. Prior Council Review: Budget Building Repairs Project Management REET Staff Responsible: Marcy Olson Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 405 Public Involvement: Not Applicable City of Mercer Island Budget H - 55

58 South Fire Station Repairs Project Manager: M. Olson Approved ID: WG103R Exp (thousands): $ 106 Project : This project is a placeholder for building repairs required following completion of construction of a new South Fire Station. To protect and prolong the life of the newly built South Fire Station. Citizens approved a levy lid lift to replace Fire Station 92 in November Final design will be completed in Construction would be completed by early Prior Council Review: Budget Building Repairs Project Management REET Staff Responsible: Marcy Olson Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 90 Public Involvement: Not Applicable H - 56 City of Mercer Island Budget

59 Luther Burbank Admin Building Repairs Project Manager: M. Olson Approved ID: WG107R Exp (thousands): $ 507 Project : Projects include HVAC installation to condition main and basement floors, repair of interior stairs, and replacement of old galvanized pipes and upgrading of restroom fixtures. To provide a safer environment for building users, make further progress towards energy conservation and prolong the life of the building. Heating is by steam boiler, old piping and registers. Cooling is by window air conditioning units. Domestic water pipes are galvanized and deteriorating, causing rusty water and leaks. There is a risk of pipes bursting within walls. Interior paint is needed. Prior Council Review: Budget Building Repairs Project Management REET Staff Responsible: Marcy Olson Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 270 Public Involvement: Not Applicable City of Mercer Island Budget H - 57

60 Community Center Building Repairs Project Manager: M. Olson Approved ID: WG105R Exp (thousands): $ 803 Project : Interior paint, HVAC repairs/replacement in the Annex, gym and dance floor refinishing, roof maintenance, parking lot seal coating and restriping, and landscaping enhancements. To make the facility safe and comfortable for class and program users and to prolong the life of the building. Heat registers in Annex building have high energy use. Parking lot needs to be seal coated. HVAC repairs are needed for increased efficiency. Gym and dance room floors need recoating. Landscaping and exterior repairs are needed. Prior Council Review: Budget Building Repairs Project Management REET Staff Responsible: Marcy Olson Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 580 Public Involvement: Not Applicable H - 58 City of Mercer Island Budget

61 Website Redesign Project Manager: M. Kaser Approved ID: WG711T Exp (thousands): $30 Project : Update and enhance the City's website to stay current with web technologies. The City's website is a primary form of communication with the public and provides access to many City services. Web technology and services change rapidly and the website needs to be updated periodically to stay current. Prior Council Review: Budget Technology & Equipment Acquisition General Fund Staff Responsible: A. Spietz Start Date: 01/01/2015 End Date: 12/31/2015 Labor Hours: 100 Public Involvement: As Needed City of Mercer Island Budget H - 59

62 Financial System Upgrades Project Manager: M. Kaser Approved ID: WG113T Exp (thousands): $ 177 Project : Implement additional software enhancements to the Financial system. Facilitate production of budget and ongoing improvements to financial accounting and reporting capabilities. The software vendor has released the next major version of the software. A new reporting system has also been developed by the vendor which must be migrated to. Prior Council Review: Budget Project Management Technology & Equipment Acquisition General Fund Utilities Staff Responsible: M. Kaser Start Date: 01/01/2013 End Date: 12/31/2013 Labor Hours: 240 Public Involvement: Not Applicable H - 60 City of Mercer Island Budget

63 Server Software Updates Project Manager: M. Kaser Approved ID: WG921T Exp (thousands): $ 304 Project : Update server operating system software and server database software to current versions. Servers run all of the business systems and major applications supporting City business. Maintaining a current version of operating system and database level is necessary for a stable and secure environment and is necessary to work with our software vendors. Software is out of date and requires updates to the latest version. This will include SQL Server 2012, Office 2010, and Windows Server and Desktop 8 Migrations. Prior Council Review: Budget Project Management Technology & Equipment Acquisition General Fund Utilities Staff Responsible: M. Kaser Start Date: 01/01/2013 End Date: 12/31/2013 Labor Hours: 1,600 Public Involvement: Not Applicable City of Mercer Island Budget H - 61

64 Permitting System Upgrades Project Manager: M. Kaser Approved ID: WG314T Exp (thousands): $30 Project : To implement the permitting system chosen by ecitygov Alliance. To continue to streamline permitting, DSG business practices, and integrate with regional ecitygov Alliance initiatives for Mercer Island and regional constituents. Online permitting and electronic plan review enhancements are being implemented to better serve Mercer Island permitting customers. Prior Council Review: Budget Project Management Technology & Equipment Acquisition General Fund Staff Responsible: M. Kaser Start Date: 01/01/2013 End Date: 12/31/2013 Labor Hours: 160 Public Involvement: Not Applicable H - 62 City of Mercer Island Budget

65 Maintenance Management System Project Manager: M. Kaser Approved ID: XG118T Exp (thousands): $ 180 Project : Replace existing Maintenance Management System. Maintenance of City assets and infrastructure in compliance with public needs and City policy requires a system to track current operations and conduct future planning. Ex: work orders track labor, equipment and materials used for customer response. The current system is significantly out of step with current industry standards and software. The vendor does not show the ability to support the existing system and update its software to current market and industry standards. Prior Council Review: Budget Technology & Equipment Acquisition General Fund Utilities Staff Responsible: M. Kaser Start Date: 01/01/2014 End Date: 12/31/2014 Labor Hours: 2,000 Public Involvement: Not Applicable City of Mercer Island Budget H - 63

66 City Information via Web Based GIS Project Manager: M. Kaser Approved ID: WG926T Exp (thousands): $30 Project : Enhance the City's Geographic Information System with additional layers for public use such as trails. To provide City data to the public and City staff to support decision making and information sharing in a user friendly manner. This software system requires investment to take advantage of new features and funtionality. Prior Council Review: Budget Technology & Equipment Acquisition General Fund Staff Responsible: M. Kaser Start Date: 01/01/2016 End Date: 12/31/2016 Labor Hours: 240 Public Involvement: Not Applicable H - 64 City of Mercer Island Budget

67 Fleet Replacements Project Manager: G. Boettcher Approved ID: WG130E Exp (thousands): $ 3,582 Project : Procurement of equiment and vehicles scheduled for replacement through Fleet Services, including police patrol vehicles, marine patrol boats and engines, heavy equipment and administrative staff vehicles. Equipment and vehicles that have reached the end of their useful lives need to be replaced in a timely and cost-effective manner to minimize fuel use, reduce emissions, and provide the desired services. The Equiment Rental Fund is used to manage replacement and M & O funds to ensure that the City's fleet meets the needs and demands of public service. Funds are collected over the life of the vehicle and spent as the useful life is reached. Prior Council Review: Budget Vehicle Replacements , , , , Dept Fees , ,582 Staff Responsible: Glenn Boettcher Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 300 Public Involvement: Not Applicable City of Mercer Island Budget H - 65

68 Self Contained Breathing Apparatus Replacement Project Manager: S. Heitman Approved ID: Exp (thousands): $ 306 Project : Replacement of Self Contained Breathing Apparatus (SCBA) including aire tanks, packs, and masks. In order to maintain safety and the ability to perform duties in a Immediately Dangerous to Life and Health (IDLH) environment, SCBA Equipment is needed. Current SCBA equipment will reach the end of it's useful life in Prior Council Review: AB 4189 (June 2007), Budget Technology & Equipment Acquisition General Fund Staff Responsible: S. Heitman Start Date: 01/01/2018 End Date: 12/31/2018 Labor Hours: 50 Public Involvement: Not Applicable H - 66 City of Mercer Island Budget

69 Police In-Car Video System Replacement Project Manager: M. Kaser Approved ID: WG317T Exp (thousands): $77 Project : Equipment used to record police officer activity near and in police vehicles has reached the end of its useful life and needs to be replaced. In-car video systems provide for Officer and public safety as well as prosecution requirements. The existing equipment has reached the end of its useful life and needs to be replaced. Prior Council Review: None Project Management Technology & Equipment Acquisition General Fund Staff Responsible: M. Kaser Start Date: 01/01/2013 End Date: 12/31/2013 Labor Hours: 80 Public Involvement: Not Applicable City of Mercer Island Budget H - 67

70 City Hall Camera System Update Project Manager: M. Kaser Approved ID: WG316T Exp (thousands): $9 Project : Replace several security cameras at City Hall for Police, Court, and City Hall security. Police, Court, and City Hall security requires video camera security systems. Several cameras have reached their useful end of life and need to be replaced. Prior Council Review: None Technology & Equipment Acquisition General Fund Staff Responsible: M. Kaser Start Date: 01/01/2013 End Date: 12/31/2013 Labor Hours: 30 Public Involvement: As Needed H - 68 City of Mercer Island Budget

71 Utility Billing System Upgrade Project Manager: M. Kaser Approved ID: WG315T Exp (thousands): $39 Project : Upgrade the utility billing system to the most current version. The City bills for the use and maintenance of three utilities and requires a sophisticated software system to manage this process. The existing system vendor has released a major new software version. The City maintains major software systems at the current software release to ensure support and take advantage of new features. Prior Council Review: None Project Management Technology & Equipment Acquisition Utilities Staff Responsible: M. Kaser Start Date: 01/01/2013 End Date: 12/31/2013 Labor Hours: 40 Public Involvement: Not Applicable City of Mercer Island Budget H - 69

72 Fire Apparatus Replacements Project Manager: S. Heitman Approved ID: XG710E Exp (thousands): $ 1,498 Project : Replacement of one rescue truck (2013), one mini pumper (2015) and one maxi pumper (2017). Fire apparatus (fire trucks, the rescue truck, and equipment) are a fundemental part of responding to fires and emergencies. Started a staggered replacement schedule for fire apparatus in 2007, with a maxi-pumper to be replaced every 5 years, and a mini-pumper replaced every 8 years. Prior Council Review: Budget, Budget Property Acquisition , , Debt ,498 Staff Responsible: S. Heitman Start Date: 01/01/2013 End Date: 12/31/2013 Labor Hours: 200 Public Involvement: As Needed H - 70 City of Mercer Island Budget

73 MICEC Technology & Equipment Replacement Project Manager: J. Raasch Approved ID: WG141E Exp (thousands): $ 541 Project : Begin normal replacement cycle of MICEC equipment that has reached the end of useful life. Examples include fitness room equipment, janitorial machines, electronics, and furniture. To ensure desired quality and safety standards are met at MICEC when offering services to the public. Replacement cycles range from 5 to 20 years (based on average useful life of equipment). In most MICEC equipment will be eight and nine years old. Prior Council Review: Budget Technology & Equipment Acquisition General Fund Staff Responsible: Jana Raasch Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 20 Public Involvement: Not Applicable City of Mercer Island Budget H - 71

74 Sewer System Emergency Repairs Project Manager: T. Smith Approved ID: WS901E Exp (thousands): $ 300 Project : Repair or replace sewer system infrastructure on an emergency basis. This project is necessary for continuing reliable and cost-effective sewer system operation. With an aging sewer system infrastructure, emergency response is inevitable to administer repairs to failing sewer system components. Prior Council Review: Budget, Budget, Budget Construction Utilities - Sewer Staff Responsible: T. Smith Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 50 Public Involvement: As Needed H - 72 City of Mercer Island Budget

75 Sewer System Pump Station Repairs Project Manager: T. Smith Approved ID: WS901D Exp (thousands): $ 380 Project : Ongoing capital repairs to sewer pump stations. Sewer Pump Stations are necessary for continuing reliable and cost-effective sewer system operation. Four aging pump stations are in need of capital repair that can no longer be deferred. Prior Council Review: Budget, Budget, Budget Construction Project Management Utilities - Sewer Staff Responsible: T. Smith Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 50 Public Involvement: As Needed City of Mercer Island Budget H - 73

76 East Mercer Way Sewer Replacement Project Manager: A. Tonella-Howe Approved ID: WS310R Exp (thousands): $ 500 Project : Replace 680 linear feet of sewer main in the 5600 block of East Mercer Way between manhole to Ongoing sewer system improvements will ensure continued reliable and cost-effective sewer system operation. This section of sewer main is settling and has developed a low spot or 'belly' requiring frequent flushing and maintenance to prevent backups. Prior Council Review: Budget Construction Design Services Project Management Utilities - Sewer Staff Responsible: A. Tonella-Howe Start Date: 01/01/2014 End Date: 12/31/2014 Labor Hours: 400 Public Involvement: As Needed H - 74 City of Mercer Island Budget

77 General Sewer System Improvements Project Manager: T. Smith Approved ID: WS710R Exp (thousands): $ 1,550 Project : Collection system improvements. Add manholes or cleanouts to existing inaccessible sewer mains to provide for cleaning and inspection. Repair or replace existing lines and manholes as needed. Continued reliable and cost-effective sewer system operation. Many components of the sewer system are aging and failures occur periodically. Prior Council Review: Budget, Budget, Budget Construction ,450 Design Services Project Management , Utilities - Sewer ,550 Staff Responsible: T. Smith Start Date: 01/01/2015 End Date: 12/30/2018 Labor Hours: 315 Public Involvement: As Needed City of Mercer Island Budget H - 75

78 Sanitary Sewer System Telemetry Project Manager: T. Smith Approved ID: WS330T Exp (thousands): $ 263 Project : Replace and upgrade equipment and software that provides monitoring and control of the sanitary sewer pump stations. This work in 2013 will complete the remaining 5 sewer stations; PS 14, 18, 19, 21, and 24. An effective telemetry system is necessary for efficient sewer pumping without impacting public health or water quality. The telemetry system for sewage pump stations has been updated at 12 stations. Five are outdated, deteriorating, and do not meet minimum reliability requirements. Prior Council Review: Budget, Budget, Budget Construction Design Services Utilities - Sewer Staff Responsible: T. Smith Start Date: 05/01/2013 End Date: 12/31/2013 Labor Hours: 50 Public Involvement: As Needed H - 76 City of Mercer Island Budget

79 Sewer System Generator Replacement Project Manager: T. Smith Approved ID: WS901G Exp (thousands): $ 425 Project : Continue the systematic replacement of sewer pump station generators that provide emergency power. An effective sewer system is necessary for continuing reliable and cost-effective sewer system operations. Several of the sewer pump station generators are outdated and past the end of their useful life. They do not meet minimum reliability requirements. Prior Council Review: Budget, Budget, Budget Construction Utilities - Sewer Staff Responsible: T. Smith Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 50 Public Involvement: Not Applicable City of Mercer Island Budget H - 77

80 Street Related Sewer CIP Projects Project Manager: T. Smith Approved ID: WS160R Exp (thousands): $ 300 Project : Replace sewer system components including sewer manhole lids and castings, within the Street resurfacing project boundary's ahead of the street resurfacing. Completing sewer system improvement prior to street projects is a cost effective way to coordinate street overlay and sewer system improvements. The condition of the sewer system varies through out the Island and will be assessed prior to overlay of streets. Prior Council Review: None Construction Utilities - Sewer Staff Responsible: T. Smith Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 50 Public Involvement: As Needed H - 78 City of Mercer Island Budget

81 Backyard Sewer System Improvements Project Manager: A. Tonella-Howe Approved ID: Exp (thousands): $ 400 Project : Repair or replace existing sewer mains located in the 'backyards' of homes. Add manholes and cleanouts to existing inaccessible mains to provide for cleaning and inspection activities in the future. Proactive reinvestment in sewer mains located along the back property line of some homes will ensure continued reliable and cost effective sewer system operation. These 'backyard' mains are aging and failures occur periodically. Many mains are inaccessible but still require maintenance, cleaning or replacement and repairs. Prior Council Review: None Construction Project Management Utilities - Sewer Staff Responsible: A. Tonella-Howe Start Date: 01/01/2015 End Date: 12/30/2018 Labor Hours: 250 Public Involvement: Combination City of Mercer Island Budget H - 79

82 General Sewer Plan - 20 year Capital Plan Update Project Manager: A. Tonella-Howe Approved ID: WS103P Exp (thousands): $50 Project : Update chapters of the General Sewer Plan to include a current 20-year Capital Improvement Plan, criteria for prioritizing improvements, assessment of pump station conditions and discussion on sustainability. The City is required by state law to maintain a current and accurate Sewer System Comprehensive Plan. The last update of the Sewer System Comprehensive Plan was completed in Prior Council Review: General Sewer Plan Adoption Other Project Management Utilities - Sewer Staff Responsible: A. Tonella-Howe Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 200 Public Involvement: As Needed H - 80 City of Mercer Island Budget

83 Pump Station 14 Modernization Project Manager: G. Boettcher Approved ID: WS320R Exp (thousands): $ 375 Project : Replace the pumping system and controls which are obsolete and unreliable at Sewer Pump Station 14. Sewer Pump Stations are necessary for continuing reliable and cost-effective sewer system operation. The pumping system in Pump Station 14 is the only one of its kind among the Sewer Utility's 19 pump stations. Parts for the pumping system no longer are available. There are safety concerns about operating the system, which does not meet current L & I standards. Prior Council Review: None Construction Project Management Utilities - Sewer Staff Responsible: A. Tonella-Howe Start Date: 01/01/2013 End Date: 12/31/2013 Labor Hours: 200 Public Involvement: As Needed City of Mercer Island Budget H - 81

84 Neighborhood Spot Drainage Improvements Project Manager: C. Morris Approved ID: WD101C Exp (thousands): $ 510 Project : This annual program makes improvements to the public stormwater system by correcting neighborhood drainage problems. An effective stormwater system is essential to prevent property and infrastructure damage and protect water quality in Lake Washington. Deficiencies develop in the public stormwater system due to a variety of factors, including lack of drainage systems, increased demand on the system, and failure of older components of the system. Prior Council Review: Comp. Basin Review; Budget Construction Project Management Utilities - Storm Drainage Staff Responsible: Clint Morris Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 200 Public Involvement: As Needed H - 82 City of Mercer Island Budget

85 Watercourse Condition Assessments Project Manager: P. Yamashita Approved ID: WD104D Exp (thousands): $ 115 Project : This biennial assessment evaluates the physical condition and rate of erosion in key watercourses. The assessments are used to prioritize watercourse restoration projects in the 6 year stormwater CIP and biennial budget. Protecting Lake Washington from siltation and water quality problems while safely conveying stormwater to the Lake is a primary responsibility of the City's Storm and Surface Water Utility. Many of the Island's ravines/basins have watercourses with downcutting/erosion in various locations. These must be monitored in order to property plan and prioritize watercourse improvement projects. Prior Council Review: Comprehensive Basin Review, Budget Design Services Project Management Utilities - Storm Drainage Staff Responsible: P. Yamashita Start Date: 09/01/2013 End Date: 05/01/2014 Labor Hours: 50 Public Involvement: As Needed City of Mercer Island Budget H - 83

86 Sub-Basin 4 Watercourse Stabilization Project Project Manager: F. Gu Approved ID: WD310C Exp (thousands): $ 327 Project : Channel and bank stabilization in the Sub-Basin 4 ravine within the Gallagher Hill Open Space. Project limits include Sub-Basins 4.2, 4.3c and 4.4. Construction will utilize sustainable practices through minimizing trucking of materials to/from the site, minimize use of mechanically manufactured quarry rock, and use large woody debris and other natural practices where possible. Disturbed areas will be replanted with native vegetation. Protecting Lake Washington from siltation and water quality problems while safely conveying stormwater to the Lake is a primary responsibility of the City's Storm and Surface Water Utility. Many of the Island's ravines/basins have watercourses causing downcutting/erosion in various locations. Prior Council Review: Comp. Basin Review; Budget Construction Design Services Project Management Utilities - Storm Drainage Staff Responsible: F. Gu Start Date: 01/11/2013 End Date: 12/31/2013 Labor Hours: 700 Public Involvement: As Needed H - 84 City of Mercer Island Budget

87 Sub-Basin 29.2 Watercourse Stabilization Project Project Manager: F. Gu Approved ID: WD314C Exp (thousands): $ 113 Project : Given the steepness of the existing channel, the project scope involves installation of a short butt-fused HDPE pipeline from WMW down the steep bank to the ravine bottom approximately 140 feet. Protecting Lake Washington from siltation and water quality problems while safely conveying stormwater to the Lake is a primary responsibility of the City's Storm and Surface Water Utility. A steep channel in Sub-basin 29.2 has eroded a 15 foot head cut incised into the east bank of the main channel. This damage is in need of repair. Prior Council Review: Comp Basin Review, Budget Construction Design Services Project Management Utilities - Storm Drainage Staff Responsible: F. Gu Start Date: 01/01/2014 End Date: 12/31/2015 Labor Hours: 200 Public Involvement: As Needed City of Mercer Island Budget H - 85

88 Watercourse Stabilization Projects ( ) Project Manager: P. Yamashita Approved ID: Exp (thousands): $ 802 Project : Projects associated with stabilization and protection of eroded ravine watercourses in include Sub-Basins 23.2, 45b.1, 46a.3, and 49b.4. Protecting Lake Washington from siltation and water quality issues while safely conveying storm water to the Lake is a primary responsibility of the City's Storm and Surface Water Utility. Many of the Island's ravines/basins have high flowing watercourses causing downcutting/erosion in various locations. Prior Council Review: Comp. Basin Review; Budget Construction Utilities - Storm Drainage Staff Responsible: F. Gu Start Date: 01/01/2015 End Date: 12/31/2018 Labor Hours: 750 Public Involvement: As Needed H - 86 City of Mercer Island Budget

89 Drainage System Replacements ( ) Project Manager: P. Yamashita Approved ID: Exp (thousands): $ 375 Project : Replacement of aging and poorly functioning piped conveyance systems in in neighborhoods such as Mercerwood, Dawn Terrace, and Tarrywood; 30" flume replacement (74th to 75th Ave. SE, sub-basin 11); and 12" culvert replacement (east of EMW in sub-basin 39a). Maintaining proper operation of the drainage system and protecting Lake Washington from siltation and water quality issues while safely conveying stormwater to the Lake are primary responsibilities of the Storm and Surface Water Utility. Several of the Storm and Surface Water Utility's drainage systems are aging and in need of replacement. Prior Council Review: Comp. Basin Review; Budget Construction Utilities - Storm Drainage Staff Responsible: F. Gu Start Date: 01/01/2016 End Date: 12/31/2018 Labor Hours: 750 Public Involvement: As Needed City of Mercer Island Budget H - 87

90 Minor Watercourse Improvements Project Manager: F. Gu Approved ID: WD106R Exp (thousands): $ 196 Project : This project will restore and protect small sections of watercourses in Basins 46a.6 ($47,000) and 52.1 ($97,000) in 2013 and Basin 27a.6 ($52,000) in Protecting Lake Washington from siltation and water quality problems while safely conveying stormwater to the Lake is a primary responsibility of the City's Storm and Surface Water Utility. Many of the Island's ravines/basins have watercourses causing downcutting/erosion in various locations. The locations identified in this project are in need of minor repairs. Prior Council Review: Comp. Basin Review, Budget Construction Design Services Project Management Utilities - Storm Drainage Staff Responsible: F. Gu Start Date: 01/01/2013 End Date: 11/01/2014 Labor Hours: 500 Public Involvement: As Needed H - 88 City of Mercer Island Budget

91 Sub-Basin 27 Watercourse Stabilization Project Project Manager: F. Gu Approved ID: WD311C Exp (thousands): $ 193 Project : The watercourse will be stabilized and restored utilizing sustainable practices through minimizing trucking of materials to/from the site, minimize the use of mechanically manufactured quarry rock, and use large woody debris and other more natural practices where possible. Disturbed areas will be replanted with native vegetation. Protecting Lake Washington from siltation and water quality problems while safely conveying stormwater to the Lake is a primary responsibility of the City's Storm and Surface Water Utility. The watercourse channel is deeply incised and has near vertical banks in spots. Sub-Basin 27 has experienced erosion and is in need of stabilization and restoration of the watercourse channel. Prior Council Review: Comp. Basin Review, Budget Construction Design Services Permitting & Environment Project Management Utilities - Storm Drainage Staff Responsible: F. Gu Start Date: 01/01/2014 End Date: 12/31/2014 Labor Hours: 420 Public Involvement: As Needed City of Mercer Island Budget H - 89

92 Sub-Basin 42 Watercourse Stabilization Project Project Manager: F. Gu Approved ID: WD313C Exp (thousands): $ 318 Project : The watercourse will be stabilized and restored utilizing sustainable practices through minimizing trucking of materials to/from the site, minimize use of mechanically manufactured quarry rock, and use large woody debris, log weirs and other natural practices where possible. Disturbed areas will be replanted with native vegetation. Preliminary design is scheduled for 2014 and construction in Protecting Lake Washington from siltation and water quality problems while safely conveying stormwater to the Lake is a primary responsibility of the City's Storm and Surface Water Utility. The temporary watercourse protection measures (sandbags and geotextile fabric check dams) installed in the 1990s are in need of replacement with permanent, sustainable improvements. The watercourse flow is also eroding stream banks. Prior Council Review: Comp. Basin Review, Budget Construction Design Services Project Management Utilities - Storm Drainage Staff Responsible: F. Gu Start Date: 10/01/2014 End Date: 12/31/2014 Labor Hours: 80 Public Involvement: As Needed H - 90 City of Mercer Island Budget

93 East Seattle Drainage System Replacement Project Manager: P. Yamashita Approved ID: WD120V Exp (thousands): $ 260 Project : Replacement of aging/undersized portions of the East Seattle drainage system bounded by SE 24th St., SE 32nd St., WMW, and Lake Washington. Protecting Lake Washington from siltation and water quality problems while safely conveying stormwater to the Lake is a primary responsibility of the City's Storm and Surface Water Utility. Many of the island's stormwater drainage systems are comprised of pipes that are aging and in need of replacement. Portions of the East Seattle drainage system are in need of replacement due to condition, age, and/or capacity. Prior Council Review: Budget Construction Design Services Project Management Utilities - Storm Drainage Staff Responsible: F. Gu Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 500 Public Involvement: As Needed City of Mercer Island Budget H - 91

94 Watercourse Minor Repairs/Maintenance Project Manager: F. Gu Approved ID: WD105R Exp (thousands): $ 110 Project : Over the years, many watercourses have been restored on Mercer island. This project will provide a modest annual budget to make minor repairs to these watercourses, remove invasive vegetation, and/or enhance native vegetation in the watercourse corridor. Protecting Lake Washington from siltation and water quality problems while safely conveying stormwater to the Lake is a primary responsibility of the City's Storm and Surface Water Utility. Many of the Island's ravines/basins have watercourses causing downcutting/erosion in various locations. Some have been restored but require minor repair or removal of invasive vegetation. Prior Council Review: Comp. Basin Review Construction Project Management Utilities - Storm Drainage Staff Responsible: Fred Gu Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 120 Public Involvement: Combination H - 92 City of Mercer Island Budget

95 Sub-Basin 6 Ph. 2 Watercourse Stabilization Project Project Manager: F. Gu Approved ID: WD312C Exp (thousands): $ 523 Project : The watercourse will be stabilized and restored utilizing sustainable practices through minimizing trucking of materials to/from the site, minimize use of mechanically manufactured quarry rock, and use large woody debris, log weirs and other natural practices where possible. Disturbed areas will be replanted with native vegetation. Protecting Lake Washington from siltation and water quality problems while safely conveying stormwater to the Lake is a primary responsibility of the City's Storm and Surface Water Utility. Parts of this sub-basin were stabilized in the 1990s but are in need of additional stabilization due to ongoing erosion and failure of some of the 20 year old improvements. Additionally, the west branch of the watercourse has also eroded and is in need of stabilization. Prior Council Review: Comp. Basin Review Construction Design Services Project Management Utilities - Storm Drainage Staff Responsible: F. Gu Start Date: 09/01/2013 End Date: 12/31/2014 Labor Hours: 1,140 Public Involvement: As Needed City of Mercer Island Budget H - 93

96 Drainage System Video Inspection Program Project Manager: B. Sansbury Approved ID: WD321R Exp (thousands): $90 Project : A focused effort on video inspections of public drainage system pipes is necessary to determine the condition of key segments of the system to prioritize future system replacements. Protecting Lake Washington from siltation and water quality issues while safely conveying stormwater to the Lake is a primary responsibility of the City's Storm and Surface Water Utility. Many of the Island's stormwater drainage systems are comprised of pipes that are aging and in need of replacement. Staff doesn't have a comprehensive record of the condition of the entire system. Such records will aid in planning and prioritizing the replacement of the system. Prior Council Review: Comp Basin Review Project Management Utilities - Storm Drainage Staff Responsible: F. Gu Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 180 Public Involvement: Not Applicable H - 94 City of Mercer Island Budget

97 Drainage System Emergency Repairs Project Manager: B. Sansbury Approved ID: WD320R Exp (thousands): $90 Project : Repair or replacement of drainage system infrastructure on an emergency basis. Protecting Lake Washington from siltation and water quality problems while safely conveying stormwater to the Lake is a primary responsibility of the City's Storm and Surface Water Utility. Occasionally as a result of heavy rains and severe weather conditions, there are localized failures in pipes, ditches, and watercourses that require emergency repairs to restore operation of the system quickly to minimize potential flooding and property damage. Prior Council Review: Budget Construction Utilities - Storm Drainage Staff Responsible: P. Yamashita Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 50 Public Involvement: As Needed City of Mercer Island Budget H - 95

98 Water Model Updates/ Fire Flow Analysis Project Manager: R. Lin Approved ID: WW102P Exp (thousands): $70 Project : Update the hydraulic model of the water system every two years to incorporate improvements and changes to the water system through the completion of capital improvement projects, private development and maintenance activities. Maintaining current information in the water model is essential for planning water system improvements and fire flow analysis. Public water system improvements and private development both rely on up to date model data to provide design criteria for construction. The water model becomes out of date if as improvements and changes are made to the water system. Prior Council Review: Budget Design Services Project Management Utilities - Water Staff Responsible: Rona Lin Start Date: 01/01/2014 End Date: 12/31/2014 Labor Hours: 150 Public Involvement: Not Applicable H - 96 City of Mercer Island Budget

99 Water System Plan Update Project Manager: R. Lin Approved ID: WW101P Exp (thousands): $ 130 Project : Update of the Water System Plan in Tasks include re-examining policies, criteria, and water use data since the last plan update in Provide plans and strategies to prepare the water system to handle the Islands' future water demands. Update the Water System Plan in accordance with WAC The current plan will expire in July An updated plan must be submitted to the Washington State Department of Health by July 2014 for review and approval. Prior Council Review: 2008 Water System Plan Adoption (AB 4329) Design Services Project Management Utilities - Water Staff Responsible: Rona Lin Start Date: 01/01/2013 End Date: 07/31/2014 Labor Hours: 200 Public Involvement: As Needed City of Mercer Island Budget H - 97

100 Meter Replacement Program Project Manager: T. Smith Approved ID: WW120C Exp (thousands): $ 280 Project : Outdated and malfunctioning compound water meters and larger residential water meters will be replaced systematically under this annual program. A systematic annual replacement program is necessary to ensure accuracy and accountability of water usage throughout the Island and prevent revenue loss. A large number of the existing meters are outdated and malfunctioning, contributing to high, unaccountable water loss and lost revenue. Prior Council Review: Budget Construction Utilities - Water Staff Responsible: T. Smith Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 0 Public Involvement: As Needed H - 98 City of Mercer Island Budget

101 88th Ave. & 86th Ave. Water System Improvements Project Manager: R. Lin Approved ID: WW311R Exp (thousands): $ 750 Project : Replace the 2-inch PVC water main and the 4-inch Cast Iron (CI) with 8-inch ductile iron (DI) water mains. Fire hydrants, valves, and water services will be replaced as well. Improving the water system is necessary to ensure cost-effective distribution of drinking water and adequate fire protection for the neighborhood. This existing 2-inch and 4-inch water mains are aging and undersized. Work Orders indicate breakage in recent years. Prior Council Review: Budget Construction Design Services Project Management Utilities - Water Staff Responsible: Rona Lin Start Date: 06/03/2013 End Date: 09/30/2014 Labor Hours: 850 Public Involvement: As Needed City of Mercer Island Budget H - 99

102 Mercerwood Neighborhood Water System Improvemts Project Manager: R. Lin Approved ID: Exp (thousands): $ 1,707 Project : Replace the 4-inch and 6-in water mains. Fire hydrants, valves, and water services will be replaced as well. Investment in these improvements will provide a safe and cost effective water distribution system. The 4-inch and 6-inch Asbestos Cement (AC) water mains are aging and have experienced breaks in the past. Prior Council Review: Budget Construction , ,236 Design Services Project Management , , Utilities - Water , ,707 Staff Responsible: Rona Lin Start Date: 06/01/2015 End Date: 08/31/2016 Labor Hours: 750 Public Involvement: As Needed H City of Mercer Island Budget

103 Street Related Water CIP Projects Project Manager: R. Lin Approved ID: WW117R Exp (thousands): $ 850 Project : Replace water main, fire hydrants, and water services within the Street projects' boundary ahead of the street construction. Completing the water system improvements prior to street projects is a cost effective way to coordinate street overlay and water system improvement priorities. The condition of the water system varies through out the Island and will be assessed prior to overlay of streets. Prior Council Review: Budget Construction Design Services Project Management Utilities - Water Staff Responsible: Rona Lin Start Date: 01/01/2014 End Date: 12/31/2014 Labor Hours: 80 Public Involvement: As Needed City of Mercer Island Budget H - 101

104 Hydrant Replacements Project Manager: R. Lin Approved ID: WW130R Exp (thousands): $ 225 Project : This biennial program is to replace the aging and undersized fire hydrants in various locations throughout the Island. A systematic, biennial improvement program is necessary to ensure all components of the water system are functioning properly and effectively. Undersized and/or aging hydrants are in need of replacement. Prior Council Review: Budget Construction Project Management Utilities - Water Staff Responsible: R. Lin Start Date: 01/01/2013 End Date: 12/31/2013 Labor Hours: 40 Public Involvement: As Needed H City of Mercer Island Budget

105 Sandy Cove Water System Improvement Project Manager: R. Lin Approved ID: WW113R Exp (thousands): $ 374 Project : Replace the 2-inch and 4-inch steel water mains with an 8-inch ductile iron (DI) water main. Fire hydrants, valves, and water services will be replaced as well. Investment in these improvements will provide a safe and cost effective water distribution system. These undersized water mains have experienced numerous breaks in recent years. Prior Council Review: Budget Construction Design Services Project Management Utilities - Water Staff Responsible: Rona Lin Start Date: 01/01/2012 End Date: 07/31/2013 Labor Hours: 450 Public Involvement: As Needed City of Mercer Island Budget H - 103

106 ICW & 85th Ave. Water System Improvements Project Manager: R. Lin Approved ID: WW312R Exp (thousands): $ 1,596 Project : Replace the 6-inch asbestos cement (AC) water mains with 8-inch ductile iron (DI) water mains, disconnect/abandon a segment of a 6-in AC water main, extend a 14-inch water main (with 8-in or 12-in water main), and complete the water main loop at SE 44th St/86th Ave SE. Fire hydrants, valves, and water services will be replaced as well. Investment in these improvements will provide a safe and cost effective water distribution system. Replace aging pipe in advance of the resurfacing of Island Crest Way and 85th Ave SE. Prior Council Review: Budget and 2012 TIP Updates Construction , ,290 Design Services Project Management , , Utilities - Water , ,596 Staff Responsible: Rona Lin Start Date: 06/01/2012 End Date: 08/30/2013 Labor Hours: 900 Public Involvement: As Needed H City of Mercer Island Budget

107 EMW 5400 to 6000 Block Watermain & PRV Stations Project Manager: R. Lin Approved ID: Exp (thousands): $ 1,290 Project : Replace the aging 4-inch Cast Iron (CI) watermain. Install pressure reducing valve (PRV) stations at the three individual locations on East Mercer Way to provide adequate water pressure. Pressure Reducing Valves will help prevent high water pressures and prevent damage to service lines and other water system components. Investment in these improvements will ensure a safe and cost effective water distribution system. The undersized watermain is aging and problematic. Currently there are no PRV's protecting these East Mercer Way neighborhoods from the potential impacts of high water pressure. Prior Council Review: Budget Construction Design Services Project Management ,102 1, Utilities - Water ,102 1,290 Staff Responsible: R. Lin Start Date: 01/01/2017 End Date: 12/31/2018 Labor Hours: 900 Public Involvement: As Needed City of Mercer Island Budget H - 105

108 Mercerwood Drive Water Main Replacement Project Manager: R. Lin Approved ID: WW313R Exp (thousands): $ 442 Project : Replace the aging 4-in water main and extend the water main from 4222 Mercerwood Drive to E Mercer Way to complete the watermain loop. Improving the water system is necessary to ensure cost-effective distribution of domestic water supply. This 4 inch asbestos Cement (AC) water main is aging and has experienced breaks in recent years. Prior Council Review: Budget Construction Project Management Utilities - Water Staff Responsible: Rona Lin Start Date: 01/01/2013 End Date: 07/31/2013 Labor Hours: 600 Public Involvement: As Needed H City of Mercer Island Budget

109 Water Main Replacement - 93rd, 89th, & 90th Ave SE Project Manager: R. Lin Approved ID: WW314R Exp (thousands): $ 1,137 Project : Replace the 4-inch Cast Iron (CI) water mains with 8-inch ductile iron (DI) water mains. Fire hydrants, valves, and water services will be replaced as well. Investment in these improvements will provide a safe and cost effective water distribution system. This 4 inch CI water mains are aging and have experienced breaks in the past. Prior Council Review: Budget & 2008 Water System Plan Construction Design Services Project Management , Utilities - Water ,137 Staff Responsible: Rona Lin Start Date: 06/02/2014 End Date: 08/31/2015 Labor Hours: 800 Public Involvement: As Needed City of Mercer Island Budget H - 107

110 Water System Components Replacement Project Manager: T. Smith Approved ID: WW131R Exp (thousands): $ 190 Project : This annual program is to replace components of the water system including air-vacuum release valves, blow-offs, in-line valves, and pressure reducing valves. A systematic, annual improvement program is necessary to ensure all components of the water system are functioning properly and effectively. Undersized and/or aging valves, blow-offs and other system components are in need of replacement. All components of the distribution system will eventually fail if not replaced. Prior Council Review: Budget Construction Utilities - Water Staff Responsible: T. Smith Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 20 Public Involvement: Not Applicable H City of Mercer Island Budget

111 Madrona Crest West Addition Water Sys Improvements Project Manager: R. Lin Approved ID: Exp (thousands): $ 1,956 Project : Replace the 4-in and 6-in Cast Iron (CI) water mains with 8-in Ductile Iron (DI) water mains. Fire hydrants, valves, and water services will be replaced as well. Improving the water system is necessary to ensure cost-effective distribution of drinking water and adequate fire protection for the neighborhood. The 4-in and 6-in Cast Iron water mains are extremely corroded and could restrict the flow for domestic water supply and fire flow. Prior Council Review: None Construction , ,432 Design Services Project Management , , Utilities - Water , ,956 Staff Responsible: Rona Lin Start Date: 06/01/2016 End Date: 08/31/2017 Labor Hours: 950 Public Involvement: As Needed City of Mercer Island Budget H - 109

112 3838 WMW Water System Improvements Project Manager: R. Lin Approved ID: Exp (thousands): $ 497 Project : Replace the 4-inch Cast Iron (CI) water main with an 8-inch Ducitile Iron (DI) water main. Fire hydrants, valves, and water services will be replaced as well. Improving the water system is necessary to ensure cost-effective distribution of drinking water and adequate fire protection for the neighborhood. The water main is aging, undersized, and has experienced breakage in the past. Prior Council Review: 2008 Water System Plan Adoption Construction Design Services Project Management Utilities - Water Staff Responsible: R. Lin Start Date: 01/01/2018 End Date: 12/31/2018 Labor Hours: 400 Public Involvement: As Needed H City of Mercer Island Budget

113 83rd Ave off SE 40th St Water System Improvements Project Manager: R. Lin Approved ID: WW315R Exp (thousands): $ 230 Project : Replace the 4-inch Cast Iron (CI) water main with an 8-inch Ducitile Iron (DI) water main. Fire hydrants, valves, and water services will be replaced as well. Improving the water system is necessary to ensure cost-effective distribution of drinking water and adequate fire protection for the neighborhood. The water main is aging, undersized, and has experienced breakage in the past. Prior Council Review: 2008 Water System Plan Adoption Construction Design Services Project Management Utilities - Water Staff Responsible: R. Lin Start Date: 01/01/2014 End Date: 12/31/2014 Labor Hours: 250 Public Involvement: As Needed City of Mercer Island Budget H - 111

114 Regional Trail Connections (KC Prop 2 Levy) Project Manager: P. West Approved ID: XP720R Exp (thousands): $ 140 Project : Construct trails that connect City trails or the Town Center to the regional trail system in King County. Acquire easements where needed. Funding from the KC Levy continues through Available funds allow continuation of program through Trails have been identified in several planning processes to improve transportation and recreation for Mercer Island residents. Trails are one of the City's sustainability goals because they provide a non-motorized alternative to getting around the island. Trails need to be designed and built to fill in gaps in the City's existing trail system. The 2007 King County Parks levy revenue will be used to pay for improvements. Prior Council Review: Mid-Biennial Budget Review AB 4236 (11/19/07), Budget Parks Repairs Project Management Other - Reserves Staff Responsible: Paul West Start Date: 08/03/2009 End Date: 12/31/2014 Labor Hours: 120 Public Involvement: As Needed H City of Mercer Island Budget

115 Pedestrian and Bicycle Facilities Plan Implementation Project Manager: A. Tonella-Howe Approved ID: WR140C Exp (thousands): $ 270 Project : Work includes planning, design and construction of projects identified in 2010 Pedestrian and Bicycle Facilities (PBF) Plan update. On going effort to build new or improve existing facillities for pedestrians and bicyclists as defined in the PBF Plan. In some ares, the City's existing transportation system does not provide adequate facilities for non-motorized uesrs. PBF facilities need to be designed and built to fill in gaps in the existing PBF system. Prior Council Review: Transportation Improvement Program Construction Design Services Project Management Street Fund Staff Responsible: A. Tonella-Howe Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 75 Public Involvement: As Needed City of Mercer Island Budget H - 113

116 Safe Routes to School Project Manager: C. Morris Approved ID: XR320R Exp (thousands): $ 300 Project : In partnership with the Mercer Island School District, identify and construct safe walk routes within the walking zone to the Island's elementary schools. The 2013 project focus is Island Park Elementary. West Mercer Elementary was the focus in 2011/2012 and Lakeridge Elementary was the focus in 2009/2010. There is a growing interest in providing school children and their parents with safe non-motorized routes to school. Parents often drive their children to school because there is a lack of safe walking routes to school. Fifty percent of students living in the walk zone of one elementary school traveled to school by automobile in Prior Council Review: Transportation Improvement Plan Construction Design Services Project Management Street Fund Staff Responsible: C. Morris Start Date: 01/01/2013 End Date: 10/31/2013 Labor Hours: 200 Public Involvement: As Needed H City of Mercer Island Budget

117 East Mercer Way Roadside Shoulders, Phases 8-10 Project Manager: C. Morris Approved ID: XR310R Exp (thousands): $ 1,010 Project : This program continues the construction of paved shoulder along the southbound side of East Mercer Way. Phases 8, 9, and 10 propose to construct shoulders from the 6200 Block to the 7400 block. Pedestrians and bicyclists regularly use East Mercer Way, but lack of shoulders can make the roadway hazardous for these users. Paved roadside shoulders exist along East Mercer Way from I-90 to the 6200 block. A roadside shoulder development program for the Mercer Ways was implemented in Prior Council Review: Transportation Improvement Plan Construction Design Services Project Management , Street Fund ,010 Staff Responsible: C. Morris Start Date: 01/01/2013 End Date: 11/01/2013 Labor Hours: 300 Public Involvement: As Needed City of Mercer Island Budget H - 115

118 North-South Bike Route near Island Crest Park Project Manager: A. Tonella-Howe Approved ID: XR140D Exp (thousands): $85 Project : Provide bicycle improvements adjacent to Island Crest Way between SE 63rd Street and Island Park Elementary. PBF Plan identifies completing connectivity of ped/bike facilites as a high priority, including identifying a route parallel with and adjacent to, Island Crest Way. The west side of ICW does not provide adequate facilities for non-motorized uesrs. The east side has adequate facilites that requires some vegetation management and signage. Prior Council Review: Transportation Improvement Plan Construction Street Fund Staff Responsible: A. Tonella-Howe Start Date: 05/01/2013 End Date: 08/30/2013 Labor Hours: 200 Public Involvement: As Needed H City of Mercer Island Budget

119 SE 53rd Place - New PBF Project Manager: C. Morris Approved ID: Exp (thousands): $ 260 Project : In conjunction with the street resurfacing project, construct new bicycle facilities on SE 53rd Place in accordance with the PBF Plan. On-going effort to build new or improve existing facillities for pedestrians and bicyclists as defined in the PBF Plan. Existing shoulder area exists on the south side (downhill) for pedestrian and bicycle use. No facility exists on the north side for uphill bicycle use. Prior Council Review: Transportation Improvement Plan Construction Project Management Street Fund Staff Responsible: C. Morris Start Date: 01/01/2016 End Date: 10/30/2016 Labor Hours: 150 Public Involvement: As Needed City of Mercer Island Budget H - 117

120 Small Technology/Equipment Items Project Manager: C. Corder Approved ID: XG150T Exp (thousands): $ 150 Project : Set aside funds for purchase of small items of office equipment and technology. Ability to respond to unanticipated needs for new technology components and small office equipment items. Planned replacement of technology items and office equipment is budgeted in the CRP and operating budgets. From time to time, new products become available to improve staff efficiency. Prior Council Review: Budget Technology & Equipment Acquisition General Fund Staff Responsible: C. Corder Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 0 Public Involvement: Not Applicable H City of Mercer Island Budget

121 Thrift Shop Expansion Plan Project Manager: N. Treat Approved ID: XG305P Exp (thousands): $25 Project : An analysis of Thrift Shop retail sales indicates that sales could be significantly increased if the Thrift Shop had additional physical space (remodel or expansion). In order to thoughtfully develop a proposed capital project that serves the needs of the Thrift Shop a plan is needed. Thrift shop sales need to increase in order to eliminate the General Fund subsidy of Youth and Family Services starting in The Thrift Shop experiences heavy use year round. The Thrift Shop has fully utilized its existing physical space and could increase sales with additional physical space (remodel, expansion, or a new facility). Prior Council Review: Design Services Other Staff Responsible: N. Treat Start Date: 01/31/2013 End Date: 12/31/2013 Labor Hours: 100 Public Involvement: As Needed City of Mercer Island Budget H - 119

122 Sustainability Project Investment Project Manager: N. Treat Approved ID: XG152C Exp (thousands): $50 Project : Provide seed funding for projects that further City sustainability policies. Operation and maintenance savings (i.e. reduced energy costs) from sustainability projects will be tracked and the savings will be dedicated to funding additional sustainability projects. The City can achieve ongoing operations and maintenance savings by capital investments in sustainability projects. For example, replacing street lights with energy efficient LED lights. Prior Council Review: The City has funded numerous projects over time that further sustainability goals but the City has not established a specific sustainability capital project. The City has not tracked savings resulting from sustainability projects nor ear-marked such savings for reinvestment in additional projects. None Construction General Fund Staff Responsible: NRT Start Date: 01/13/2013 End Date: 12/31/2013 Labor Hours: 40 Public Involvement: Focus Group H City of Mercer Island Budget

123 Fire Station 92 Replacement Project Manager: C. Tubbs Approved ID: XG300R Exp (thousands): $ 4,703 Project : Replacement of Fire Station 92 is at a preliminary cost estimate of $4.7 million. The pre-design study by Miller Hull Architects (June 2012) was presented to Council at the June 16th mini-planning session. A levy lid lift waw approved by the voters in November Final design will be completed in Construction would be completed by early The assessment of the facility is concerned with the construction of the facility, structural observation, systems, and the programmatic function of the station as a modern fire station. Fire Station 92 was built in 1962, with sleeping quarters added in It houses three firefighters, who staff an engine, midi pumper, and aid car. The building does not meet existing codes, regulations and program needs. Structural integrity during a seismic event is a concern. Prior Council Review: AB ; AB Construction 0 2,113 2, ,213 Design Services ,603 2, , Other 0 2,603 2, ,703 Staff Responsible: C. Tubbs Start Date: 01/01/2012 End Date: 12/31/2014 Labor Hours: 300 Public Involvement: As Needed City of Mercer Island Budget H - 121

124 Sewer Lake Line Clean-Outs Project Manager: G. Boettcher Approved ID: Exp (thousands): $ 550 Project : Provide access points for cleaning and other routine maintenance of older sections of the Sewer Lake Line. Pump station monitoring in 2010 found grease concentrations at high levels. There have been three documented plug-ups in the Lake Line due to grease over the past several years. A major plug-up causing sewage backups in waterfront homes could result in claims exceeding the cost of installing clean-outs to allow preventative maintenance. Older sections of the Sewer Lake Line were constructed without access points for cleaning and other routine maintenance. Prior Council Review: Budget Construction Utilities - Sewer ,050 Staff Responsible: G. Boettcher Start Date: 01/01/2015 End Date: 12/31/2015 Labor Hours: 200 Public Involvement: As Needed H City of Mercer Island Budget

125 Basins 10 & 32b Dissolved Metals Source Identification Project Manager: P. Yamashita Approved ID: XD310C Exp (thousands): $80 Project : Systematic investigation of the drainage systems in Sub-Basins 10 & 32b to identify any significant sources of dissolved copper and zinc entering the drainage system. A subsequent phase will involve source control and treatment of stormwater from the sources identified through this project. Protecting Lake Washington from siltation and water quality problems while safely conveying stormwater to the Lake is a primary responsibility of the City's Storm and Surface Water Utility. Mercer Island staff have monitored water and sediment quality within five to six selected basins over the past decade. The results reflect elevated levels of dissolved copper and zinc in sub-basins 10 and 32b. Prior Council Review: Budget Project Management Utilities - Storm Drainage Staff Responsible: P. Yamashita Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 50 Public Involvement: Not Applicable City of Mercer Island Budget H - 123

126 Water Quality Treatment Improvements Project Manager: B. Sansbury Approved ID: XD311C Exp (thousands): $ 300 Project : Installation of two to three water quality treatment devices per year to reduce pollutant loads in stormwater runoff before entering watercourses and/or Lake Washington Protecting Lake Washington from siltation and water quality problems while safely conveying stormwater to the Lake is a primary responsibility of the City's Storm and Surface Water Utility. Many of the island's basins have watercourses causing downcutting/erosion in various locations. Some drainage systems may be conveying illicit polluted discharges to Mercer Island's streams and the Lake. One source may be sediment laden runoff from streets. Prior Council Review: Budget Construction Project Management Utilities - Storm Drainage Staff Responsible: B. Sansbury Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 240 Public Involvement: Not Applicable H City of Mercer Island Budget

127 Basin 32b Stormwater Treatment Improvements Project Manager: P. Yamashita Approved ID: Exp (thousands): $ 290 Project : Implementation of stormwater treatment improvements in Sub-Basin 32b following the completion of the Sub-Basin 10 & 32b Dissolved Metals Source Identification Project. Protecting Lake Washington from siltation and water quality problems while safely conveying stormwater to the Lake is a primary responsibility of the City's Storm and Surface Water Utility. Staff has monitored water and sediment quality in five to six selected basins over the past decade. Elevated levels of dissolved copper and zinc have been found in sub-basins 10 and 32b. A source identification effort is planned for to identify sources of these metals. Prior Council Review: None Construction Utilities - Storm Drainage Staff Responsible: F. Gu Start Date: 01/01/2015 End Date: 12/31/2018 Labor Hours: 60 Public Involvement: As Needed City of Mercer Island Budget H - 125

128 Street Related Drainage Improvements Project Manager: C. Morris Approved ID: XD312C Exp (thousands): $ 470 Project : Annual program that provides drainage improvements ahead of residential roadway overlays. Protecting Lake Washington from siltation and other water quality problems and safely conveying stormwater to the Lake is a primary responsibility of the City's Storm and Surface Water Utility. Some of the Island's residential streets do not have formal or adequate drainage systems. Prior to repaving residential streets, drainage improvements are constructed to provide adequate drainage. Prior Council Review: Budget Construction Project Management Utilities - Storm Drainage Staff Responsible: C. Morris Start Date: 01/01/2013 End Date: 12/31/2014 Labor Hours: 230 Public Involvement: As Needed H City of Mercer Island Budget

129 Drainage System Extensions ( ) Project Manager: P. Yamashita Approved ID: Exp (thousands): $ 200 Project : Storm drainage system extensions in areas lacking drainage systems. For 2016, the neighborhood north of Clise Park bewteen 84th & 86th Ave. SE and SE 36th & SE 39th St. For 2018, the neighborhood south of Shorewood Apts. between 88th & 90th Ave. SE and SE 36th & SE 39th St. Protecting Lake Washington from siltation and water quality problems while safely conveying stormwater to the Lake is a primary responsibility of the City's Storm and Surface Water Utility. The Island's drainage system is largely complete. However, some localized areas are not served by a formal public drainage system. These areas are in need of improvments. Prior Council Review: Comp Basin Review, Budget Construction Utilities - Storm Drainage Staff Responsible: F. Gu Start Date: 01/01/2016 End Date: 12/31/2018 Labor Hours: 100 Public Involvement: As Needed City of Mercer Island Budget H - 127

130 New Pressure Reducing Valve (PRV) Station Installation Project Manager: R. Lin Approved ID: Exp (thousands): $ 250 Project : Install new PRV Station(s) to regulate the water pressure so that water supply pressure are within the acceptable range. Investment in these improvements will provide a safe and cost effective water distribution system. Many water mains, most of them on dead-ended streets, have pressure exceeding 80 pounds per square inch (PSI). PRV Stations can control the discharge pressure so it stays within the acceptable range. Prior Council Review: None Construction Project Management Utilities - Water Staff Responsible: R. Lin Start Date: 01/01/2018 End Date: 12/31/2018 Labor Hours: 250 Public Involvement: As Needed H City of Mercer Island Budget

131 CAPITAL IMPROVEMENT PROGRAM Six-Year Fund Statements This section includes six year capital spending plans for the following funds: Street Fund CIP Fund Technology and Equipment Fund Water Fund Sewer Fund Storm Water Fund

Section G. Capital Improvement Program. Table of Contents

Section G. Capital Improvement Program. Table of Contents Section G. Capital Improvement Program Table of Contents Introduction... G-1 Project Summary... G-13 Individual Project Sheets... G-21 Six-Year Fund Statements... G-135 INTRODUCTION Capital Improvement

More information

Utility Board. Agenda topics. For Meeting of June 12, :00 PM to 9:00 PM City Council Chambers, City Hall

Utility Board. Agenda topics. For Meeting of June 12, :00 PM to 9:00 PM City Council Chambers, City Hall Utility Board For Meeting of June 12, 2012 7:00 PM to 9:00 PM City Council Chambers, City Hall Board Members: Council Liaison: Staff: David Laub, Chairman, Benjamin Levie, Vice Chairman, Suresh Malhotra,

More information

Section E. Recap By Fund. Table of Contents

Section E. Recap By Fund. Table of Contents Section E. Recap By Fund Table of Contents Fund # Fund Name Page # General Purpose Funds 001 General Fund... E-3 037 Self-Insurance Claim Reserve... E-9 061 Youth Services Endowment Fund... E-11 Special

More information

Budget Summary. City Organization

Budget Summary. City Organization This section has been prepared as a general summary of the 2019-2020 biennial budget for the City of Mercer Island. It is designed to provide City residents and other interested readers with a quick overview

More information

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA September 3, 2013 Regular Business 2 ND QUARTER 2013 FINANCIAL STATUS REPORT & 2013-2014 BUDGET ADJUSTMENTS Proposed Council Action: Receive report

More information

City of Mercer Island CITY S FINANCIAL CHALLENGES: HOUSTON, WE HAVE A PROBLEM

City of Mercer Island CITY S FINANCIAL CHALLENGES: HOUSTON, WE HAVE A PROBLEM City of Mercer Island CITY S FINANCIAL CHALLENGES: HOUSTON, WE HAVE A PROBLEM Presented by: Julie Underwood, City Manager Chip Corder, Assistant City Manager/Finance Director Presented to: Community Advisory

More information

City of Mercer Island. Section C Budget Summary

City of Mercer Island. Section C Budget Summary City of Mercer Island Section C Budget Summary This section has been prepared as a general summary of the 2017-2018 biennial budget for the City of Mercer Island. It is designed to provide City residents

More information

MAINTENANCE DEPARTMENT

MAINTENANCE DEPARTMENT MAINTENANCE DEPARTMENT E-78 City of Mercer Island 2007-2008 Budget Department: Maintenance The Maintenance Department consists of the following functions: 1) administration, 2) capital projects engineering,

More information

The Reader s Guide (Section A) at the beginning of the budget document provides a brief overview of how the City s budget is organized.

The Reader s Guide (Section A) at the beginning of the budget document provides a brief overview of how the City s budget is organized. Under Washington Law, the City Manager presents a balanced annual or biennial budget for the City s upcoming fiscal period for consideration and adoption by the City Council. Mercer Island s biennial budget

More information

BUDGET POLICES Capital Improvement Program

BUDGET POLICES Capital Improvement Program BUDGET POLICES Capital Improvement Program D-38 City of Mercer Island 2007-2008 Budget Capital Improvement Program Background The City of Mercer Island separates the Capital Improvement Program (CIP) into

More information

City of Mountlake Terrace. Second Quarter 2016 Financial Report September 19, 2016

City of Mountlake Terrace. Second Quarter 2016 Financial Report September 19, 2016 City of Mountlake Terrace Second Quarter 2016 Financial Report September 19, 2016 1 Overview Reviewing the City s finances on a regular basis, and posting the review on the City s website, highlights the

More information

City of Mountlake Terrace. Fourth Quarter 2014 Financial Report April 2, 2015

City of Mountlake Terrace. Fourth Quarter 2014 Financial Report April 2, 2015 City of Mountlake Terrace Fourth Quarter 2014 Financial Report April 2, 2015 1 Overview Reviewing the City s finances on a regular basis, and posting the review on the City s website, highlights the City

More information

City of Mercer Island CITY S FINANCIAL CHALLENGES: OPERATING BUDGET (PART II)

City of Mercer Island CITY S FINANCIAL CHALLENGES: OPERATING BUDGET (PART II) City of Mercer Island CITY S FINANCIAL CHALLENGES: OPERATING BUDGET (PART II) Presented by: Chip Corder, Assistant City Manager/Finance Director Presented to: Community Advisory Group Date: February 5,

More information

City of Mercer Island CITY S FINANCIAL CHALLENGES: HOUSTON, WE HAVE A PROBLEM

City of Mercer Island CITY S FINANCIAL CHALLENGES: HOUSTON, WE HAVE A PROBLEM City of Mercer Island CITY S FINANCIAL CHALLENGES: HOUSTON, WE HAVE A PROBLEM Presented by: Julie Underwood, City Manager Chip Corder, Assistant City Manager/Finance Director Presented to: Mercer Island

More information

City of Mercer Island CITY S FINANCIAL CHALLENGES: HOUSTON, WE HAVE A PROBLEM

City of Mercer Island CITY S FINANCIAL CHALLENGES: HOUSTON, WE HAVE A PROBLEM City of Mercer Island CITY S FINANCIAL CHALLENGES: HOUSTON, WE HAVE A PROBLEM Presented by: Julie Underwood, City Manager Chip Corder, Assistant City Manager/Finance Director Presented to: Mercer Island

More information

Following the Budget Message is an Executive Summary of the Budget.

Following the Budget Message is an Executive Summary of the Budget. Budget Message Dear Mercer Island City Council and Island Residents: Houston, we have a problem. This oft-quoted line from Apollo 13 succinctly captures the City s projected financial status in the 2017-2018

More information

Utility Board Agenda. Agenda topics. For Meeting of September 20, :00 PM to 9:00 PM Mercer Room, Mercer Island Community & Event Center

Utility Board Agenda. Agenda topics. For Meeting of September 20, :00 PM to 9:00 PM Mercer Room, Mercer Island Community & Event Center Utility Board Agenda For Meeting of September 20, 2017 7:00 PM to 9:00 PM Mercer Room, Mercer Island Community & Event Center Board Members: Council Liaison: Staff: Kwan Wong, Chairman, Tim O Connell,

More information

Capital Investment Program (CIP) About CIP

Capital Investment Program (CIP) About CIP Capital Investment Program (CIP) About CIP The Capital Investment Program (CIP) is a multi-year program aimed at upgrading and expanding City facilities, buildings, grounds, streets, parks and roads. The

More information

City of Mercer Island. Section I Budget Policies

City of Mercer Island. Section I Budget Policies City of Mercer Island Section I Budget Policies Section I. Budget Policies Table of Contents General Government Beautification Fund... I-3 Communications... I-5 Debt Financing... I-7 Investment Earnings...

More information

City of Pacifica General Fund Budget

City of Pacifica General Fund Budget City of Pacifica 2017-18 General Fund Budget General Government Lorenzo Hines Jr. City Manager s Office May 2, 2017 City of Pacifica 1 General Government 2017-18 DRAFT Budget Mission We strive to manage

More information

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES DEPARTMENT OF ENVIRONMENTAL SERVICES Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

Recommended by City Manager A.C. Gonzalez

Recommended by City Manager A.C. Gonzalez Recommended by City Manager A.C. Gonzalez Proposed budget is fiscally responsible, strategically begins restoring services, and positions City to continue growth FY 2014-15 budget is balanced and totals

More information

The City of Owen Sound Asset Management Plan

The City of Owen Sound Asset Management Plan The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to

More information

City Services Appendix

City Services Appendix Technical vices 1.0 Introduction... 1 1.1 The Capital Facilities Plan... 1 1.2 Utilities Plan... 2 1.3 Key Principles Guiding Bremerton s Capital Investments... 3 1.4 Capital Facilities and Utilities Addressed

More information

UTILITY FUNDS SUMMARY

UTILITY FUNDS SUMMARY UTILITY FUNDS SUMMARY On the following pages is important information about the utilities as a whole. This section identifies the emerging issues for each of the utilities, followed by a brief discussion

More information

COUNTY ADMINISTRATOR PUBLIC WORKS

COUNTY ADMINISTRATOR PUBLIC WORKS COUNTY ADMINISTRATOR PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm

More information

Minority Recommendation of the Community Advisory Group

Minority Recommendation of the Community Advisory Group Financial Challenges - Community Advisory Group (CAG) REPORT Minority Recommendation of the Community Advisory Group Lisa Anderl, Heather Cartwright, Doris Cassan, Bob Harper, El Jahncke, Elaine Kavalok

More information

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS ENTERPRISE FUNDS

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS ENTERPRISE FUNDS TABLE OF CONTENTS ENTERPRISE FUNDS Storm Drainage Fund... 121-124 Off Street Parking Fund... 125-126 Airport Fund... 127-131 Water Service Fund... 132-145 STORM DRAINAGE FUND CURRENT OPERATIONS This fund

More information

Overview of the 2016 Proposed Budget

Overview of the 2016 Proposed Budget Overview of the 2016 Proposed Budget City of Burnsville November 24, 2015 2016 Budget Process Meeting Dates June 9 July 14 August 11 September 8 October 20 October 27 Discussion Topics Financial Management

More information

Capital Improvement Projects

Capital Improvement Projects Capital Improvement Projects This section highlights the Capital Improvement Program (CIP) projects proposed for FY 2017-2018. Capital projects are designed to enhance the City s infrastructure, extend

More information

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016 City of Des Moines Citizen Engagement Capital Improvement Program November 29, 2016 Goals of Citizen Engagement Goal Focus on service levels Department definitions of adequate service and opportunities

More information

Action Plan for City Council Goals

Action Plan for City Council Goals Action Plan for 2017 2018 City Council Goals Abbreviations: CA City Administrator ACA Assistant City Administrator PC Police Chief FC Fire Chief PWD Public Works Director CDD Community Development Director

More information

Agenda. Background Budget / PW General Fund Budget Streets & Infrastructure Citizen Engagement

Agenda. Background Budget / PW General Fund Budget Streets & Infrastructure Citizen Engagement 1 Agenda Background 2013-2014 Budget / PW General Fund Budget Streets & Infrastructure Citizen Engagement Sustainable Transportation Funding Dedicated Revenues Potential Rate Impact Clarification Proposed

More information

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA BUSINESS OF THE CITY COUNCIL, WA December 6, 2010 Public Hearing 2011-2012 PRELIMINARY BUDGET REVIEW: FINALIZE CHANGES TO PRELIMINARY BUDGET, RE-BALANCE GENERAL FUND, AND ADOPT 2011 EMS UTILITY RATES Proposed

More information

FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary

FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary The adopted FY 2016 FY 2020 CIP is $205.3 million (including prior year expenditures) and is $2.9 million lower than the previous CIP

More information

FINANCIAL POLICIES ADOPTED BIENNIAL BUDGET CITY OF MOUNTLAKE TERRACE

FINANCIAL POLICIES ADOPTED BIENNIAL BUDGET CITY OF MOUNTLAKE TERRACE Purpose: The primary purpose of financial management policies is to provide guidelines for the City Council and staff to use in making financial decisions that ensure core services are maintained and the

More information

City of SANTA ANA. Proposed Budget Summary FY

City of SANTA ANA. Proposed Budget Summary FY City of SANTA ANA Proposed Budget Summary FY 2015-2016 June 2, 2015 City Manager s Budget Message will be made available on May 29 th, 2015. This Page Intentionally Left Blank Total Annual Budget FY 2015-2016

More information

STORMWATER MANAGEMENT FUND Department of Environmental Services

STORMWATER MANAGEMENT FUND Department of Environmental Services Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

General Fund FY2016 Final Budget

General Fund FY2016 Final Budget General Fund FY RESERVES & CARRY FORWARD Reserves 27,000 Carry Forward 75,000 Carry Forward (T-Pier Park) 10,000 REVENUES 112,000 Ad Valorem Taxes (5.024 Mills) 942,500 Insurance Premium Tax (Excise) 41,000

More information

Balanced Financial Plan Projected Changes and Assumptions

Balanced Financial Plan Projected Changes and Assumptions Appendix I Resolution Adopting the Three Year Plan Town of Castle Rock Projected Changes and Assumptions Unless otherwise noted, following is a general list of Townwide growth rates used in future years:

More information

PRELIMINARY 2018 BUDGET

PRELIMINARY 2018 BUDGET PRELIMINARY 2018 BUDGET 2 ND BUDGET MEETING Monday, October 9, 2017 ENTERPRISE FUNDS CAPITAL PROJECT FUNDS CITIZENS OF FIRCREST (population 6,640) CITY COUNCIL Matthew Jolibois, Mayor Shannon Reynolds

More information

Projects Receiving New Funding by. Funding Source and Project Number

Projects Receiving New Funding by. Funding Source and Project Number 20172022 Approved Capital Improvement Program s Receiving New Funding by Funding Source and Number 1001 GENERAL FUND A04000100 A07000300 A07000400 CITY CLER AUTOMATION IT EQUIPMENT REPLACEMENT CITYWIDE

More information

SECOND QUARTER FINANCIAL REPORT June 30, 2018

SECOND QUARTER FINANCIAL REPORT June 30, 2018 SECOND QUARTER FINANCIAL REPORT June 30, 2018 UpTown Cruisin Car Show June, 2018 Introduction The second quarter 2018 financial report is presented here. As has been the custom in the past, the report

More information

Operating Budget Overview 2019

Operating Budget Overview 2019 OPERATING BUDGET Operating Overview 2019 Introduction In planning for a vibrant, healthy and sustainable community, the Town of Halton Hills is committed to providing community leadership on issues of

More information

Biennial Budget PUBLIC HEARING NOVEMBER 13, 2018

Biennial Budget PUBLIC HEARING NOVEMBER 13, 2018 2019-2020 Biennial Budget PUBLIC HEARING NOVEMBER 13, 2018 This Evening s Session: 2 2019-2020 Public Hearing on Proposed Biennial Budget Receive public testimony Review of Proposed 3% tax levy increase

More information

CHAPTER 9 CAPITAL FACILITIES ELEMENT

CHAPTER 9 CAPITAL FACILITIES ELEMENT Town of La Conner Comprehensive Plan Capital Facilities Element CHAPTER 9 CAPITAL FACILITIES ELEMENT Introduction The Capital Facilities Element sets policy direction for determining capital improvement

More information

CITY OF SACRAMENTO CALIFORNIA. April 27, 2012

CITY OF SACRAMENTO CALIFORNIA. April 27, 2012 OFFICE OF THE CITY MANAGER CALIFORNIA April 27, 2012 CITY HALL 5 th FLOOR 915 I STREET SACRAMENTO, CA 95814-2684 PH 916-808-5704 FAX 916-808-7618 Honorable Mayor and City Council Sacramento, California

More information

TOWN OF COLLINGWOOD ASSET MANAGEMENT PLAN

TOWN OF COLLINGWOOD ASSET MANAGEMENT PLAN TOWN OF COLLINGWOOD ASSET MANAGEMENT PLAN JUNE 24, 2014 EXECUTIVE SUMMARY CONTENTS Page (i) 1. INTRODUCTION 1.1 Overview 1-1 1.2 Plan Development 1-1 1.3 Maintaining the Asset Management Plan 1-2 1.4

More information

LEGEND Bridges Parks Fire Stations Project Locations Libraries Schools A

LEGEND Bridges Parks Fire Stations Project Locations Libraries Schools A LEGEND Bridges Parks Fire Stations Project Locations Libraries Schools A Aid to Construction Fund The Aid to Construction Fund (Water) are funds received from customers for requested water service and

More information

This page intentionally left blank

This page intentionally left blank 197 This page intentionally left blank 198 Capital Improvement Program PROCEDURE Each year the Capital Improvement Program (CIP) is prepared from project requests submitted by the various departments.

More information

Levy Lid Lift or Metropolitan Park District

Levy Lid Lift or Metropolitan Park District Levy Lid Lift or Metropolitan Park District Why We Are Discussing These Two Options April 2012 City Happenings The city has no funding to continue to rent its interim City Hall space beyond July of 2014.

More information

Memo. To: Mayor Lee Gray Members of Council City Manager Bill Vance. From: Scott Tourville. Project: 2015 CIP Budget Update CC:

Memo. To: Mayor Lee Gray Members of Council City Manager Bill Vance. From: Scott Tourville. Project: 2015 CIP Budget Update CC: To: Mayor Lee Gray Members of Council City Manager Bill Vance Memo From: Scott Tourville Project: 2015 CIP Budget Update CC: C. Schornack S. Spencer File Date: November 21, 2014 RE: Updated 2015 CIP Plan

More information

THIRD QUARTER FINANCIAL REPORT September 30, 2018

THIRD QUARTER FINANCIAL REPORT September 30, 2018 THIRD QUARTER FINANCIAL REPORT September 30, 2018 2018 Cider Squeeze Introduction The 3rd Quarter 2018 Financial Report is presented here. As has been the custom in the past, the report has been prepared

More information

CITY OF PORT MOODY 2012 CAPITAL & OPERATING BUDGET SUMMARY

CITY OF PORT MOODY 2012 CAPITAL & OPERATING BUDGET SUMMARY 2012 & OPERATING BUDGET SUMMARY ACCOUNT 4710 4790 4727 4728 4724 4721 4771 4700 4712 4774 4772 4701 4736 TOTAL LIFE CYCLE MRN ASSET DEPARTMENT EXP. TAXATION SURPLUS RESERVE RESERVE RESERVE RESERVE RESERVE

More information

Capital Facilities Planning Put Your Money Where Your Mouth Is

Capital Facilities Planning Put Your Money Where Your Mouth Is Capital Facilities Planning Put Your Money Where Your Mouth Is Speakers Joyce Phillips, AICP, Senior Planner, WA State Dept. of Commerce, Growth Management Lynn Kohn, Regional Services Coordinator, WA

More information

TOWN OF DILLON 2018 Budget Combining Balance Sheet

TOWN OF DILLON 2018 Budget Combining Balance Sheet 2018 Budget Combining Balance Sheet Housing Cemetery General Capital Street Water Sewer Marina Parking Conservation Initiative Perpetual Fund Imp Fund Imp Fund Funds Funds Fund Fund Trust Fund 5A Fund

More information

Fiscal Year Proposed Budget

Fiscal Year Proposed Budget Fiscal Year 2017-2018 Proposed Budget GFOA Budget Presentation Award Recognizes budget documents of the very highest quality that reflect best practices for clearly communicating budget information. Recently

More information

IMPLEMENTATION A. INTRODUCTION C H A P T E R

IMPLEMENTATION A. INTRODUCTION C H A P T E R C H A P T E R 11 IMPLEMENTATION A. INTRODUCTION This chapter addresses implementation of the General Plan. The Plan s seven elements include 206 individual actions. 1 Many are already underway or are on-going.

More information

City of Glendale, Arizona Pavement Management Program

City of Glendale, Arizona Pavement Management Program City of Glendale, Arizona Pavement Management Program Current Year Plan (FY 2014) and Five-Year Plan (FY 2015-2019) EXECUTIVE SUMMARY REPORT December 2013 TABLE OF CONTENTS TABLE OF CONTENTS I BACKGROUND

More information

FUNDING SOURCES Restricted vs. Un-Restricted Funding Sources Fund Balances and Projected Funding Availability IBank Loan

FUNDING SOURCES Restricted vs. Un-Restricted Funding Sources Fund Balances and Projected Funding Availability IBank Loan FUNDING SOURCES The following section discusses the major funding sources available to fund projects. ing amounts included in the s column are those that are available for use as of preparation of this

More information

CITY OFANAHEIM. Community Services Department. FY 2017/18Proposed Budget. June 6, Operating Budget & Capital Improvement Program

CITY OFANAHEIM. Community Services Department. FY 2017/18Proposed Budget. June 6, Operating Budget & Capital Improvement Program CITY OFANAHEIM FY 2017/18Proposed Budget Community Services Department June 6, 2017 Operating Budget & Capital Improvement Program Overview Core Services Proposed Budget Summary Personnel Notable Changes

More information

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary The adopted FY 2017 FY 2021 CIP is $235.8 million (including prior year expenditures) and is $28 million higher than the previous CIP

More information

SPECIAL COUNCIL MEETING MARCH 6, Capital Improvements

SPECIAL COUNCIL MEETING MARCH 6, Capital Improvements SPECIAL COUNCIL MEETING MARCH 6, 2012 Capital Improvements 1 CAPITAL PROJECTS Review Requests from the Departments for FY 2012-13 Capital Improvements and Machinery & Equipment Discussion and Recommendations

More information

GENERAL FUND Revenues

GENERAL FUND Revenues GENERAL FUND Revenues The General Fund is used to account for general purpose revenues, which are used to fund general governmental services, excluding utilities. Following are descriptions of the City's

More information

City of Ocoee Quarterly Report First Quarter Fiscal Year

City of Ocoee Quarterly Report First Quarter Fiscal Year City of Ocoee Quarterly Report First Quarter Fiscal Year 2008-2009 Prepared by the Finance Department February 2009 TABLE OF CONTENTS Quarterly Overview...i-iii General Fund... 1 Revenue Comparison Graph...

More information

TOWN OF CARY CAPITAL IMPROVEMENTS BUDGET OVERVIEW FOR FISCAL YEAR 2015

TOWN OF CARY CAPITAL IMPROVEMENTS BUDGET OVERVIEW FOR FISCAL YEAR 2015 TOWN OF CARY CAPITAL IMPROVEMENTS BUDGET OVERVIEW FOR FISCAL YEAR 2015 The Capital Improvements Budget/Plan Process Each year, staff prepares a capital improvements budget and a long range capital improvements

More information

Proposed Biennial Budget

Proposed Biennial Budget 2017-2018 Proposed Biennial Budget T.C. Broadnax, City Manager City Council Budget Worksession October 4, 2016 3 Agenda Budget Overview Budget Development Process Financial Overview Proposed Budget Highlights

More information

Public Works and Development Services

Public Works and Development Services City of Commerce Capital Improvement Program Prioritization Policy Public Works and Development Services SOP 101 Version No. 1.0 Effective 05/19/15 Purpose The City of Commerce s (City) Capital Improvement

More information

CAPITAL IMPROVEMENT PROJECTS CAPITAL PROJECTS FUND FISCAL YEAR 2013/2014 PROJECTS SCHEDULED FOR CONSTRUCTION. Local Option Sales Tax Funds $ 500,000

CAPITAL IMPROVEMENT PROJECTS CAPITAL PROJECTS FUND FISCAL YEAR 2013/2014 PROJECTS SCHEDULED FOR CONSTRUCTION. Local Option Sales Tax Funds $ 500,000 CAPITAL IMPROVEMENT PROJECTS CAPITAL PROJECTS FUND FISCAL YEAR 2013/2014 PROJECTS SCHEDULED FOR CONSTRUCTION On-Going Pavement Management Program: In 2009/2010 the city completed the initial 3-year plan

More information

Stephanie Smith, Project EngineerW

Stephanie Smith, Project EngineerW MEMORANDUM v TO: Paul Oehme, Director of Public Works/ City Engineer o FROM: Stephanie Smith, Project EngineerW 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 9522271100 Fax

More information

BUDGET AT A GLANCE BUDGET OVERVIEW CITYWIDE BUDGET SUMMARY CITYWIDE FTE SUMMARY

BUDGET AT A GLANCE BUDGET OVERVIEW CITYWIDE BUDGET SUMMARY CITYWIDE FTE SUMMARY BUDGET AT A GLANCE BUDGET OVERVIEW CITYWIDE BUDGET SUMMARY CITYWIDE FTE SUMMARY BUDGET OVERVIEW 2017-2018 ADOPTED BUDGET CITY OF REDMOND The Budget Overview serves as a review of the recommended 2017-2018

More information

CAPITAL PROGRAM (CP) TOWN OF LAGUNA VISTA

CAPITAL PROGRAM (CP) TOWN OF LAGUNA VISTA CAPITAL PROGRAM (CP) 2011 2014 TOWN OF LAGUNA VISTA DEFINITION The CP is a three-year planning document to be adopted annually by the Town Council to plan for capital improvements related to the Town s

More information

PRESENTATION OF PROPOSED BUDGET

PRESENTATION OF PROPOSED BUDGET PRESENTATION OF PROPOSED BUDGET CITY COUNCIL MEETING AUGUST 7, 2018 AGENDA Budget Process Budget Drivers and Areas of Focus Budget By Funds Revenues Operating Expenditure Highlights and Variances Tax Rate

More information

Village of Bensenville Proposed Annual Budget and Community Investment Plan

Village of Bensenville Proposed Annual Budget and Community Investment Plan Village of Bensenville 2015 Proposed Annual Budget and Community Investment Plan 2015 Proposed Annual Budget and Community Investment Plan - Overview 2 The Mission of the Village of Bensenville The Mission

More information

Letter of Transmittal

Letter of Transmittal Letter of Transmittal October 25, 2019 To: New Hanover Township Board of Supervisors Introduction I am pleased to submit the proposed 2019 Budget for your consideration. The budget document consists of

More information

TRANSPORTATION CAPITAL PROGRAM

TRANSPORTATION CAPITAL PROGRAM TRANSPORTATION CAPITAL PROGRAM The transportation capital program for fiscal year 2016 through fiscal year 2020 consists of a variety of transportation construction and maintenance capital projects primarily

More information

Capital Improvement Program Fund

Capital Improvement Program Fund Capital Improvement Program Fund Capital Improvement Program (CIP) Overview The Capital Improvement Program provides funding for streets, public buildings (both governmental and school facilities), land,

More information

FY BUDGETED CURRENT REVENUE MONTHLY ESTIMATED CASH INFLOW COMPARED TO ACTUAL RECEIPTS (CUMULATIVE) TOTAL (Excludes Reclamation Reimbursements)

FY BUDGETED CURRENT REVENUE MONTHLY ESTIMATED CASH INFLOW COMPARED TO ACTUAL RECEIPTS (CUMULATIVE) TOTAL (Excludes Reclamation Reimbursements) FY 2008-09 BUDGETED CURRENT REVENUE MONTHLY ESTIMATED CASH INFLOW COMPARED TO ACTUAL RECEIPTS (CUMULATIVE) TOTAL (Excludes Reclamation Reimbursements) $13,000,000 $12,000,000 $11,000,000 $10,000,000 $9,000,000

More information

PUBLIC WORKS DIRECTOR

PUBLIC WORKS DIRECTOR WASHINGTON PUBLIC WORKS DIRECTOR $109,865 - $129,254 Plus Excellent Benefits Apply by October 22, 2017 (First Review, open until filled) 1 P a g e WHY APPLY? Nestled east of famous Puget Sound and north

More information

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES DEPARTMENT OF ENVIRONMENTAL SERVICES Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET CITY OF PLACERVILLE ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET 2012/2013 1 2 CAPITAL IMPROVEMENT PROGRAM POLICY Each year the City faces the challenge of meeting infrastructure and equipment needs with

More information

FINANCIAL ACTION SUMMARY

FINANCIAL ACTION SUMMARY City of Woodinville, WA Report to the City Council 17301 133 rd Avenue NE, Woodinville, WA 98072 www.ci.woodinville.wa.us To: Honorable City Council Date: 02/06/2018 By: Blaine Fritts, Finance Director;

More information

AB 5169 Exhibit 1 Page 2. City of Mercer Island Telephone Survey April 2016

AB 5169 Exhibit 1 Page 2. City of Mercer Island Telephone Survey April 2016 AB 5169 Exhibit 1 Page 2 City of Mercer Island Telephone Survey April 2016 Methodology Live telephone survey, including landlines and cellphones, of all registered voters in City of Mercer Island Survey

More information

Infrastructure Asset Management. Southwest Chula Vista Civic Association April 26, 2007

Infrastructure Asset Management. Southwest Chula Vista Civic Association April 26, 2007 Infrastructure Asset Management Southwest Chula Vista Civic Association April 26, 2007 Chula Vista s Municipal Infrastructure Pavement* Traffic Signals Alleys Streetlights Parking Lots Street Signs Sidewalks*

More information

Infrastructure and Capital Projects Planning and Funding

Infrastructure and Capital Projects Planning and Funding Infrastructure and Capital Projects Planning and Funding September 6, 2018 Preview of FY 2020 2024 CIP process Why are we here? Overview Current Assets Overview and Highlights of Adopted FY 2019 2023 CIP

More information

CAPITAL IMPROVEMENT PLAN

CAPITAL IMPROVEMENT PLAN 20192024 CAPITAL IMPROVEMENT PLAN City of Woodinville, Washington WOODINVILLE CITY COUNCIL Mayor James Evans Deputy Mayor Elaine Cook Councilmember Al Taylor Councilmember Susan BoundySanders Councilmember

More information

CAPITAL IMPROVEMENT ELEMENT Inventory Analysis

CAPITAL IMPROVEMENT ELEMENT Inventory Analysis CAPITAL IMPROVEMENT ELEMENT Inventory Analysis 2.191 INTRODUCTION The principal purpose of this element is to identify the capital improvements that are needed to implement the comprehensive plan and ensure

More information

Capital Projects CAPITAL PROJECTS CAPITAL PROJECTS

Capital Projects CAPITAL PROJECTS CAPITAL PROJECTS Capital Projects CAPITAL PROJECTS CAPITAL PROJECTS 121 REVENUE FUNDS REVENUE FUND REFERENCE NUMBERS AND DESCRIPTIONS: 01 - General Fund This fund is the primary fund for the City. In addition to Capital

More information

Village of Shorewood Long Range Financial Plan In Preparation for the 2015 Budget Process

Village of Shorewood Long Range Financial Plan In Preparation for the 2015 Budget Process Village of Shorewood Long Range Financial Plan 2015-2024 In Preparation for the 2015 Budget Process Long Range Financial Plan 2015-2024 Table of Contents Overview 1 Property Taxes 2-5 Operational Forecast

More information

Overview. Highland Creek Wastewater Treatment Plant. R.C. Harris Water Treatment Plant

Overview. Highland Creek Wastewater Treatment Plant. R.C. Harris Water Treatment Plant Presentation to Budget Committee October 19, 2009 2010 Operating Budget 2010-20192019 Capital Budget 1 Overview Serves 3.1 million residents and businesses in Toronto, and portions of York and Peel Over

More information

REQUEST FOR QUALIFICATIONS by the CITY OF MERCER ISLAND, WA for FIRE STATION 92 DESIGN ARCHITECTURAL AND ENGINEERING SERVICES

REQUEST FOR QUALIFICATIONS by the CITY OF MERCER ISLAND, WA for FIRE STATION 92 DESIGN ARCHITECTURAL AND ENGINEERING SERVICES REQUEST FOR QUALIFICATIONS by the CITY OF MERCER ISLAND, WA for FIRE STATION 92 DESIGN ARCHITECTURAL AND ENGINEERING SERVICES Overview and Purpose of Request The Mercer Island City Council has authorized

More information

REVENUE ASSUMPTIONS. Actual Actual Adopted Revised Adopted TOTAL SOURCES BEGINNING FUND BALANCE $

REVENUE ASSUMPTIONS. Actual Actual Adopted Revised Adopted TOTAL SOURCES BEGINNING FUND BALANCE $ General Government Funds Revenues REVENUE ASSUMPTIONS This section explains and illustrates the estimates for revenue sources included in the General Government funds of the 2009/ Biennial. Key funding

More information

CAPITAL IMPROVEMENT PROGRAM (CIP) POLICY AND STRUCTURE

CAPITAL IMPROVEMENT PROGRAM (CIP) POLICY AND STRUCTURE CAPITAL IMPROVEMENT PROGRAM (CIP) POLICY AND STRUCTURE Purpose: One of the primary responsibilities of local governments is the creation and preservation of the community s physical infrastructure including

More information

SALT LAKE CITY COUNCIL STAFF REPORT BUDGET AMENDMENT ANALYSIS FISCAL YEAR

SALT LAKE CITY COUNCIL STAFF REPORT BUDGET AMENDMENT ANALYSIS FISCAL YEAR SALT LAKE CITY COUNCIL STAFF REPORT BUDGET AMENDMENT ANALYSIS FISCAL YEAR 2002-03 DATE: May 7, 2002 BUDGET FOR: STAFF REPORT BY: cc: DEPARTMENT OF AIRPORTS Gary Mumford Rocky Fluhart, David Nimkin, Tim

More information

SIGNIFICANT BUDGET CHANGES

SIGNIFICANT BUDGET CHANGES Department of Environmental Services Our Mission: To build and maintain water delivery, sanitary sewer collection, and wastewater treatment systems that provide high-quality water and sewer services and

More information

FY CURRENT REVENUE BUDGET MONTHLY ESTIMATED CASH INFLOW COMPARED TO ACTUAL RECEIPTS (CUMULATIVE) TOTAL (Excludes Reclamation Reimbursements)

FY CURRENT REVENUE BUDGET MONTHLY ESTIMATED CASH INFLOW COMPARED TO ACTUAL RECEIPTS (CUMULATIVE) TOTAL (Excludes Reclamation Reimbursements) FY 2007-08 CURRENT REVENUE BUDGET MONTHLY ESTIMATED CASH INFLOW COMPARED TO ACTUAL RECEIPTS (CUMULATIVE) TOTAL (Excludes Reclamation Reimbursements) $13,000,000 $12,000,000 $11,000,000 $10,000,000 $9,000,000

More information

Budget. One. Time Cost. Total

Budget. One. Time Cost. Total Service Enhancements General Fund Town of Los Altos Hills 2018 20 Budget Attachment 2 - Budget Service Enhancements/New Requests CIP and Capital Funds Town wide 15,072,124 (1,364,236) 13,707,888 932,967

More information

FY 16 - FY 18 Capital Fund Revenues

FY 16 - FY 18 Capital Fund Revenues FY 16 - FY 18 Capital Fund Revenues Fiscal Year $ Change 2016 2017 2018 FY 17 to Revenue Source Budget Budget Budget FY 18 Local Transfer from General Fund $3,136,950 $2,977,556 $6,087,130 $3,109,574 Local

More information

Budget in Brief Proposed City Commission Budget FY 2017

Budget in Brief Proposed City Commission Budget FY 2017 City of Treasure Island Budget in Brief Proposed City Commission Budget FY 2017 Where charm meets contemporary All Funds Budget Summary Total Proposed Budget Budget % Fund FY 2016 FY 2017 Change General

More information

2018 BUDGET AND FINANCIAL PLAN

2018 BUDGET AND FINANCIAL PLAN Questionnaire 2018 BUDGET AND FINANCIAL PLAN January 1, 2018 - January 23, 2018 The Township of Langley is reviewing the Draft 2018 2022 Five-Year Financial Plan with emphasis on the 2018 Budget. Your

More information