CAPITAL BUDGET

Size: px
Start display at page:

Download "CAPITAL BUDGET"

Transcription

1 CAPITAL BUDGET

2 Table of Contents INTRODUCTION CAPITAL BUDGET FUNDING ALLOCATION Page 3 6 S Asset Management Projects Roadway Maintenance 7 Storm Drain Repairs 8 Building Interior Maintenance 9 Building Flooring 10 Building Eterior and Site Maintenance 11 Building Roofing 12 Building Mechanical Electrical and Plumbing (MEP) 13 Boundary Oak Clubhouse Renovation 14 Larkey Pool Renovation 15 Trails and Pathways Maintenance 16 Playground and Court Surfacing 17 Irrigation Repair and Upgrades 18 Borges Ranch ADA Upgrades 19 Curb, Gutter and Sidewalk Maintenance 20 Traffic Signal and Streetlight Maintenance 21 Parking Infrastructure Maintenance 22 Transportation Projects Pedestrian Path Improvements at Walnut Acres Elementary 23 Creekside Pedestrian and Safety Improvments 24 Bike Lanes 25 Bicycle Connection Study Iron Horse Tr. to BART 26 Newell Avenue Improvements 27 Crosswalk and Pedestrian Improvements 28 YVR / San Carlos Split Phasing Improvements 29 Walnut Boulevard One-Way Feasibility Study 30 Discretionary Projects LED Streetlight Conversion 31 Larkey Pool Splash Pad 32 Complete Wayfinding Implementation 33 2

3 Introduction The Capital Budget is based on the Capital Improvement Program (Ten-Year CIP) approved by the City Council on March 18, 2014 and the CIP Policy approved at the same meeting. The Ten-Year CIP is a planning document and does not allocate funds to projects. The Capital Budget defines the projects more specifically and allocates funding sources to these projects. The Capital Budget has been divided into three categories: Asset Management Projects, Transportation Projects, and Discretionary Projects. Asset Management projects preserve eisting City infrastructure. Transportation Projects focus on roadway capacity and safety improvements for all modes of transportation. Discretionary projects provide for new facilities or significant improvements to the City s eisting infrastructure. While helpful in establishing the budget, the three categories should not be viewed as absolute since some projects may fit in more than one category and all approvals are ultimately at the Councils discretion. Forecast of Available Funds The Capital Budget appropriates a total of $14,595,000 from eight primary funding sources with approimately $22,591,000 in available funds: General Fund: The General Fund contribution of $1,750,000 to Asset Management Projects is consistent with the funding from previous budget periods. The City Council, recognizing the magnitude of deferred maintenance and the importance of asset management, allocated an additional $1,899,000 in one-time funds for Asset Management Projects at the April 1, 2014 Council meeting. Lastly, a total of $729,000 of funds will be reprogrammed from previously approved Capital Budgets. When capital projects are completed under budget, remaining contingency funds are consolidated when the project is closed and reprogrammed into the net Capital Budget. Downtown Parking Fund: In November of 2013, Council approved a revision to the parking ordinance which allowed for better management of parking demand, creation of sufficient parking reserves, and increasing parking rates on-street and within the City s parking garages. A total of $894,000 in funds is projected to be available for capital projects related to parking infrastructure and downtown enhancement projects in the Capital Budget. Boundary Oak Golf Course: On March 4, 2014 City Council approved a plan for the Boundary Oak Golf Course enterprise fund to provide approimately $3,100,000 in addition to the approimately $535,000 of funds previously appropriated for necessary improvements to the golf course clubhouse. Gas Ta and Measure J: Roadway funding will continue to be augmented by the Highway Users (Gas) Ta and Measure J Local Street Maintenance. A total of approimately $4,495,000 from these two funds is forecast to be available for this budget cycle. Traffic Impact Fee: Commercial and residential developers pay Traffic Impact Fees for transportation improvements that reduce the traffic impacts caused by new development in the City. Approimately $3,083,000 in Traffic Impact Fees are available for this Capital Budget. In Lieu Parkland: for Parks and Open Space capital projects is provided by In-Lieu Parkland Dedication fees. The In Lieu Parkland Dedication Fee is paid by developers of 3

4 residential units as a way to provide amenities for new residents. Approimately $1,900,000 of In Lieu Parkland funds resulting from new residential developments are available for this Capital Budget. The defunding of the Ice Rink / Bocce and All-Weather Sports Fields projects when combined with the previously appropriated funds for the Larkey Pool Replastering project, provides and additional $1,223,000 of In-Lieu Parkland funds that are reprogramed in this Capital Budget. Prop WW: In 2008 voters approved an East Bay Regional Park District bond to preserve open space for recreation and wildlife habitat and provide funding directly to cities for high priority community park projects. The defunding of the Ice Rink / Bocce project and All-Weather Sports Fields project provides $2,240,000 in Prop WW funds available for reprograming in this Capital Budget. Asset Management Projects Asset Management Projects preserve the value of the City s eisting capital investments, providing long-term programmed maintenance of the City s infrastructure and facilities. These assets include 69 buildings of varying sizes and compleity, 22 parks, 2,704 acres of open space, 213 centerline miles of streets with 98 traffic signals, 1,290 City-owned street lights, and 90 miles of storm drain systems of varying sizes. These projects do not change the basic characteristics of a facility, allowing eisting City programs to continue to serve the community. The proposed Capital Budget funding is balance among the various asset categories. Engineering, building, and street maintenance staff work together with the facility users to select the most appropriate projects to include in the Capital Budget The Ten-Year CIP identified the Boundary Oak Clubhouse Renovation and the Larkey Pool Renovation as two key projects which are included in this Capital Budget: 1. The Boundary Oak Clubhouse Renovation includes Projects 1, 2, and 3 as presented in the March 4, 2014 report to Council. These projects are planned to take place in the net two years. Sufficient Golf Course Enterprise funds are projected to be available to finish Projects 1 and 2. Additional financing from eternal sources will be necessary to complete Project The Larkey Pool Renovation project will bring the swim center up to all current code requirements, separate the filtration systems for the pools, upgrade the circulation system, add new pumps, rebuild the deck, add additional inlets, and a new eterior restroom. Funds previously approved in the Capital Budget for the Larkey Pool Replastering will be reprogrammed and all remaining Prop WW funds will be directed to this renovation project. Transportation Projects The transportation projects in the Capital Budget build upon the complete streets concept and include all modes of transport: pedestrians, bicycles, autos, and buses. Several of the projects seek to leverage available City transportation funding with prospective grant funding where City funding would allow development of conceptual plans and local match funding. All of the transportation projects within the first two-year cycle of the recently approved Ten-Year CIP are included in the Capital Budget. The following project additions and changes to funding sources are included as part of the Capital Budget: 4

5 1. Project addition: Ygnacio Valley Road / San Carlos Split Phasing Improvements to reduce potential turning movement conflicts at this busy intersection. Proposed funding from Traffic Impact Fees. 2. Project addition: Walnut Boulevard One-Way Feasibility Study would fund a study to evaluate the traffic impacts on Walnut Boulevard and the adjoining streets of converting Walnut Boulevard to one-way traffic in the segment between Sierra Drive and Homestead Avenue. 3. change: Use Traffic Impact Fees for the conceptual design and local match component of the Creekside Pedestrian and Transit Improvements. Additional grant funding would be required to complete the project. 4. change: Use Traffic Impact Fees for the full project cost of Bike Lane additions on Olympic Boulevard, Lincoln Avenue, Buena Vista Avenue, and Cedro Lane. In addition, City Council has added the Ygnacio Valley Road / San Carlos Split Phasing Improvements, Creekside Pedestrian and Transit Improvements, and Bike Lane Additions projects to the list of Traffic Impact Fee eligible projects with the adoption of the Capital Budget. Discretionary Projects Two discretionary projects from the first two-year cycle of the Ten-Year CIP are in the Capital Budget: the Larkey Pool Splash Pad and completing the Wayfinding Implementation. A third discretionary project has been added to the Capital Budget to convert approimately 350 Cityowned streetlights from high pressure sodium to LED light fitures. The City has previously used PG&E rebate incentives to install LED streetlights along Ygnacio Valley Road and several other arterials. The City has ehausted its PG&E incentives and this project will pay for the streetlight conversions with a portion of the one-time funds allocated to the Capital Budget. The cost recovery period is anticipated to be five to eight years depending on the number and wattage of the replaced lights. The savings would result from reduced energy costs and lower maintenance effort due to the long life epectancy of the LED fitures. Remaining Funds Although the Capital Budget includes approimately $15 million of projects over the two year period, a substantial amount of remaining funds are epected. Approimately $1,500,000 of the one-time funds allocated to the Capital Budget by the City Council on April 1, 2014 will remain as an unappropriated funds balance. The Traffic Impact Fee will maintain a projected fund balance of approimately $2,700,000 and continued commercial development in the downtown and at the Shadelands Business Park will generate additional fees during the net two years. Similarly, the In- Lieu Parkland fund will maintain a projected fund balance of approimately $1,300,000 and continued residential development will generate additional fees during the net two years. The Ten-Year CIP process will be used to evaluate how to best invest these funds into the preservation of our eisting assets, improvements to the transportation system, and development of our parks and open space. 5

6 Capital Budget Allocation Project Cost Estimate General Fund Downtown Parking Fund 2 Boundary Oak Golf Course 1 Roadway Developer Fees Gas Ta 2 Measure J 2 Traffic Impact Fee 3 In-Lieu Parkland Dedication 3 Grants East Bay RPD Prop WW 4 Other Grants Other Revenue 5 Estimated Funds Available for $15,965,000 $1,750,000 $894,000 $3,123,000 $2,333,000 $2,292,000 $3,083,000 $1,907,000 $0 $0 Reprogrammed Funds from Capital Budget $4,727,000 $729,000 $535,000 $1,223,000 $2,240,000 One-Time Funds $1,899,000 $1,899,000 s $22,591,000 $4,378,000 $894,000 $3,658,000 $2,333,000 $2,292,000 $3,083,000 $3,130,000 $2,240,000 $0 Asset Management Projects Roadway Maintenance $4,495,000 $0 $2,333,000 $2,162,000 Storm Drain Repairs $450,000 $450,000 Building/Facility Maintenance Building Interior Maintenance $346,000 $346,000 Building Flooring $90,000 $90,000 Building Eterior and Site Mantenance $650,000 $650,000 Building Roofing $43,000 $43,000 Building MEP $285,000 $285,000 Building/Facility Renovation and Replacement Boundary Oak Clubhouse Renovation $1,787,000 $1,787,000 Larkey Pool Renovation $3,500,000 $1,260,000 $2,240,000 Trail and Pathways Maintenance $315,000 $315,000 Parks and Open Space Playground and Court Surfacing $110,000 $110,000 Irrigation Repair and Upgrades $140,000 $100,000 $40,000 Borges Ranch ADA Upgrades $100,000 $100,000 Curb, Gutter, and Sidewalk $180,000 $180,000 Signal and Streetlight Maintenance $120,000 $120,000 Parking Infrastructure Maintenance $419,000 $0 $419,000 Asset Management Subtotals $13,030,000 $2,579,000 $419,000 $1,787,000 $2,333,000 $2,162,000 $0 $1,510,000 $2,240,000 $0 Transportation Projects Ped Improvements at Walnut Acres Elementary $150,000 $30,000 $0 Creekside Ped and Transit Improvements $800,000 $160,000 $0 Bike Lanes: Olympic Boulevard (Interim) Lincoln Ave, Buena Vista, Cedro $150,000 $150,000 Bicycle Connection Study - Iron Horse Tr to BART $100,000 $20,000 $0 Newell Avenue Improvements 5 $750,000 $ 750,000 Crosswalk and Pedestrian Improvements $400,000 $80,000 $0 YVR / San Carlos: Split Phasing Improvements $100,000 $100,000 Walnut Blvd: One Way Feasibility Study $50,000 $50,000 Transportation Projects Subtotal $2,500,000 $50,000 $0 $0 $0 $130,000 $410,000 $0 $0 $0 $ 750,000 Discretionary Capital Projects Sustainibility LED Streetlight Conversion $250,000 $250,000 Recreation Projects Larkey Pool Splash Pad $350,000 $350,000 Downtown Projects Complete Wayfinding Implementation $375,000 $375,000 Discretionary Capital Subtotals $975,000 $250,000 $375,000 $0 $0 $0 $0 $350,000 $0 $0 REPROGRAMMED FUNDS $6,626,000 $2,628,000 $0 $535,000 $0 $0 $0 $1,223,000 $2,240,000 $0 NEW APPROPRIATIONS $9,468,000 $1,750,000 $794,000 $1,252,000 $2,333,000 $2,292,000 $410,000 $637,000 $0 $0 TOTAL APPROPRIATIONS $14,595,000 $2,879,000 $794,000 $1,787,000 $2,333,000 $2,292,000 $410,000 $1,860,000 $2,240,000 $0 N/A REMAINING FUNDS $7,461,000 $1,499,000 $100,000 $1,336,000 $0 $0 $2,673,000 $1,270,000 $0 $0 N/A Footnotes: 1) Golf Course Enterprise Fund appropirations for the Clubhouse Renovation project reviewed and approved by City Council on March 4, ) Recurring funding sources for downtown parking, gas ta, and measure J include current un-appropraited fund balance and projected revenues through June 30, Additional revenue accrued beyond July 1, 2015 will be available for Capital Budget or as needed for specific projects as approved by Council. 3) Developer fees included traffic impact fee and in-lieu parkland dedication budgeted on a cash on-hand basis and projected revenues through June 30, Additional revenue accrued beyond July 1, 2014 will be available for Capital Budget or as needed for specific projects as approved by Council. 4) Proposition WW funds must be spent by All remaining avaialble Prop WW funds to be realocated to and fully ehasuted with the Larkey Pool Renovation project. 5) The Newell Avenue Improvements project will be constructed by Macerich as part of the Development Agreement for the Broadway Plaza Master Plan project. The project cost estimate is an in-kind estimate for constructed improvements

7 PROJECT TITLE: Roadway Maintenance PROJECT CATEGORY: Asset Management REQUESTING PARTY: Public Services FUNDING SOURCE: General Fund, Gas Ta, and Measure J The City s Pavement Management Program includes street slurry seal projects, residential asphalt overlay projects, and roadway reconstruction projects. The Pavement Management Program Update (P-TAP 12) dated April 2012 determined that $3.8 million are required annually to maintain City's current average Pavement Condition Inde (PCI) of 72. This equates to $7.6 million per two-year CIP budget. The Pavement Management Program Update (P-TAP 15) will be completed in 2014 and will provide an updated evaluation of the average PCI and maintenance needs. Streets planned for the pavement overlays are sections of Buena Vista Avenue, North Main Street, Oak Grove Road, and a portion of Ygnacio Valley Road. Measure J roadway funds will also be used to replace additional sections of the failing wood soundwall on S. Broadway and a failed retaining wall on Rudgear Drive. Resolves Health or Safety Problem Preserves Eisting Asset PROJECT STATUS: Continuous. The City has an annual paving and maintenance program. General Fund Gas Ta Measure J Engineering Plans and Specs $225 $225 $450 Contract Admin. and $225 $225 $450 Inspection Construction $0 $1,883 $1,712 $3,595 TOTAL $0 $2,333 $2,162 $4,495 Timely implementation of programmed street maintenance will prevent more costly repairs in the future. 7

8 PROJECT TITLE: Storm Drain Repairs PROJECT CATEGORY: Asset Management REQUESTING PARTY: Public Services FUNDING SOURCE: General Fund The City maintains 90 miles of storm drain system. This funding provides for small- to moderate-size repairs to the City s storm drain system as identified by City Maintenance and Engineering divisions. Many of the City s corrugated metal pipes (CMP) are approimately 50 years old. The emphasis during the net 10 years will be to proactively replace this aging infrastructure, beginning with a video survey of the system during the first two-year cycle. Resolves Health or Safety Problem Preserves Eisting Asset PROJECT STATUS: for an initial video survey of the storm drain was approved in the Capital Budget. Individual repair projects will be identified as that work progresses. General Fund Engineering Plans and Specs $40 $40 Contract Admin. and Inspection $40 $40 Construction $370 $370 TOTAL $450 $450 Timely implementation of storm drain maintenance will prevent more costly repairs in the future. 8

9 PROJECT TITLE: Building Interior Maintenance PROJECT CATEGORY: Asset Management REQUESTING PARTY: Public Services FUNDING SOURCE: General Fund The City maintains 69 buildings of various sizes and containing varying types of equipment. The City s Municipal Maintenance Master Plan (MMP) provides a schedule for the long-term maintenance/replacement of major building elements. The proposed Building Interior Maintenance projects for this budget include: Upgrade to LED lighting at Civic Arts Shadelands, Interior painting at the Civic Park Community Center Restroom ADA upgrades and remodel at Civic Park Community Center Repair of a sky light, lighting upgrades, replacement of sound insulation, and updated paint scheme in the Heather Farm Park Community Center Lakeside Room Partial restroom remodel in the Heather Farm Park Community Center. Resolves Health or Safety Problem Preserves Eisting Asset PROJECT STATUS: Not started. General Fund Engineering Plans and Specs $25 $25 Contract Admin. and Inspection $15 $15 Materials and/or Construction $306 $306 TOTAL $346 $346 Timely implementation of building and equipment maintenance will prevent more costly repairs in the future. Slight reduction in lighting energy costs and maintenance needs. 9

10 PROJECT TITLE: Building Flooring PROJECT CATEGORY: Asset Management REQUESTING PARTY: Public Services FUNDING SOURCE: General Fund The City maintains 69 buildings of various sizes and containing varying types of equipment. The City s Municipal Maintenance Master Plan (MMP) provides a schedule for the long-term maintenance/replacement of major building elements. The proposed Building Flooring projects for this budget include: Replace carpet in various locations on the 1 st and 3 rd floors of City Hall Install sealant on the floor of the Equipment Maintenance Shop.. Resolves Health or Safety Problem Preserves Eisting Asset PROJECT STATUS: Not started. General Fund Engineering Plans and Specs $9 $9 Contract Admin. and Inspection $6 $6 Materials and/or Construction $75 $75 TOTAL $90 $90 Timely implementation of building and equipment maintenance will prevent more costly repairs in the future. 10

11 PROJECT TITLE: Building Eterior and Site Maintenance PROJECT CATEGORY: Asset Management REQUESTING PARTY: Public Services FUNDING SOURCE: General Fund The City maintains 69 buildings of various sizes and containing varying types of equipment. The City s Municipal Maintenance Master Plan (MMP) provides a schedule for the long-term maintenance/replacement of major building elements. The proposed Building Eterior Maintenance projects for this budget include: Repair and replace eterior surface, paint and stain at Borges Ranch Visitor Center Replace Veteran s Memorial lighting with LED at City Hall Replace storefront doors at Civic Park Community Center Improve / Add parking lot and pathway light at Civic Park Community Center Remove high dive platform at Clark Swim Center Mitigate tripping hazards in pool deck around snack bar at Clark Swim Center Repair / replace coping at the baby pool at Clark Swim Center Replace railing around eterior deck at the Heather Farm Park Community Center Paint eterior metals, trim, and cap at the Lesher Center Paint eterior of the Lindsey Museum Paint eterior of the Police Range Resolves Health or Safety Problem Preserves Eisting Asset PROJECT STATUS: Not started. General Fund Engineering Plans and Specs $60 $60 Contract Admin. and Inspection $60 $60 Construction $530 $530 TOTAL $650 $650 Timely implementation of building and equipment maintenance will prevent more costly repairs in the future. Upgrading safety features reduces the City s liability. Slight reduction in lighting energy costs. 11

12 PROJECT TITLE: Building Roofing PROJECT CATEGORY: Asset Management REQUESTING PARTY: Public Services FUNDING SOURCE: General Fund The City maintains 69 buildings of various sizes and containing varying types of equipment. The City s Municipal Maintenance Master Plan (MMP) provides a schedule for the long-term maintenance/replacement of major building elements. The proposed Building Roofing projects for this budget include: Replace the wood shingle roof at the Borges Ranch Visitor Center Replace sheet metal gutters at the Shadelands Ranch Museum Resolves Health or Safety Problem X Preserves Eisting Asset PROJECT STATUS: Not started. X General Fund Engineering Plans and Specs $4 $4 Contract Admin. and Inspection $3 $3 Construction $36 $36 TOTAL $43 $43 Timely implementation of building and equipment maintenance will prevent more costly repairs in the future. 12

13 PROJECT TITLE: Building Mechanical Electrical and Plumbing (MEP) PROJECT CATEGORY: Asset Management REQUESTING PARTY: Public Services FUNDING SOURCE: General Fund The City maintains 69 buildings of various sizes and containing varying types of equipment. The City s Municipal Maintenance Master Plan (MMP) provides a schedule for the long-term maintenance/replacement of major building elements. The proposed Building MEP projects for this budget include: Raise height of overhead electrical wiring at the Borges Ranch Visitor Center Upgrade HVAC at the IT server room in City Hall Replace the surveillance system at the Corporation Yard Replace the fire control system at the Lesher Center Citywide evaluation of all HVAC systems, replace most critical units Resolves Health or Safety Problem Preserves Eisting Asset PROJECT STATUS: Not started. General Fund Engineering Plans and Specs $40 $40 Contract Admin. and Inspection $25 $25 Construction $220 $220 TOTAL $285 $285 Timely implementation of building and equipment maintenance will prevent more costly repairs in the future. New, more efficient HVAC systems will result in energy savings. 13

14 PROJECT TITLE: Boundary Oak Clubhouse Renovation PROJECT CATEGORY: Building / Facility Renovation and Replacement REQUESTING PARTY: Arts, Recreation and Community Services FUNDING SOURCE: Golf Course Enterprise Fund, Eternal Loan, and Redemption of 1997 Lease Revenue Bonds See March 4, 2014 Council Agenda Report for more detail. The Boundary Oak Clubhouse is an aging facility in need of repair. City Staff presented a detailed report on the proposed improvements to Council on March 4, The improvements will occur over the course of three years with four separate projects including: 1) interior and eterior renovation work, 2) building envelope maintenance, 3) mechanical, plumbing, and electrical upgrades, and 4) kitchen remodel. These four project groupings are top priority items that will yield the greatest immediate impact from and infrastructure perspective while also addressing certain aesthetic issues. Projects 1, 2, and 3 are included in the Capital Budget. Resolves Health or Safety Problem Preserves Eisting Asset PROJECT STATUS: Schematic design work complete. Projects 1 and 3 would be completed during low season winter and early spring months (e.g. January April) on calendar years 2015, Project 2 would be completed during spring/summer 2015 to reduce the potential impact of rain. Golf Course Enterprise Fund Engineering Plans and Specs $232 $232 Contract Admin. and Inspection $304 $304 Construction $1,251 $1,251 TOTAL $1,787 $1,787 Annual operating costs of the renovated facility will be similar to eisting operations. The eisting facility is aging and will require increased maintenance without the replacement/renovation project. 14

15 PROJECT TITLE: Larkey Pool Renovation PROJECT CATEGORY: Building / Facility Renovation and Replacement REQUESTING PARTY: Arts, Recreation and Community Services FUNDING SOURCE: East Bay RPD Proposition WW and In-lieu Parkland Funds The Larkey Swim Center is approimately 40 years old and is in need of major renovations. The Capital Budget appropriated $750,000 to the Larkey Pool Replastering project. During project development, Contra Costa Heath Services required improvement significantly beyond the original replastering scope of work effectively renovating the entire facility. The renovation project will bring the swim center up to current code requirements and will include separation of the filtration systems for the pools, upgrading the circulation system, new pumps, revising the deck, additional inlets, ADA upgrades, energy efficiency improvements, and new eterior bathrooms. Resolves Health or Safety Problem Preserves Eisting Asset PROJECT STATUS: Preliminary design of the Replastering Project is complete. Plans will need to be developed for the epanded scope. In-Lieu Parkland Funds Proposition WW Engineering Plans and Specs $350 $0 $350 Contract Admin. and Inspection $350 $0 $75 Construction $560 $2,240 $2,800 TOTAL $1,260 $2,240 $3,500 Annual operating costs of the renovated facility will be similar to eisting operations. The eisting facility is aging and will require increased maintenance without the replacement / renovation project. 15

16 PROJECT TITLE: Trails and Pathways Maintenance PROJECT CATEGORY: Asset Management REQUESTING PARTY: Public Services FUNDING SOURCE: General Fund The City maintains a network of interconnecting trails and pathways throughout the City. Many of these trails are over twenty years old and in need of maintenance to preserve the pathways and mitigate trip and fall hazards. The proposed trail and pathway maintenance projects for this budget include: Canal Trail repair sections of trail throughout the City Arbolado Park repair sections of trail throughout the park Tice Valley Park repair sections of trail throughout the park Sugarloaf Open Space repair section of Bridle Lane trail Shell Ridge Open Space repair trails at the end of Wiget Whitecliff Way replace retaining wall and adjacent trail Resolves Health or Safety Problem Preserves Eisting Asset PROJECT STATUS: Not started. General Fund Engineering Plans and Specs $30 $30 Contract Admin. and Inspection $25 $25 Construction $260 $260 TOTAL $315 $315 Timely implementation of trail and pathway maintenance will prevent more costly repairs in the future. Maintaining pedestrian pathways reduces the City s liability. 16

17 PROJECT TITLE: Playground and Court Surfacing PROJECT CATEGORY: Asset Management REQUESTING PARTY: Public Services FUNDING SOURCE: In-Lieu Parkland Funds The City maintains 22 parks. The City s Municipal Maintenance Master Plan (MMP) provides a schedule for the long-term maintenance/replacement of playground and court surfacing and other improvements. The projects proposed for this budget include: Replace playground resilient surfacing at Civic Park Tennis Court resurfacing at Larkey and Rudgear Parks Resolves Health or Safety Problem Preserves Eisting Asset PROJECT STATUS: Not started. In-Lieu Parkland Funds Engineering Plans and Specs $10 $10 Contract Admin. and Inspection $10 $10 Construction $90 $90 TOTAL $110 $110 Timely implementation of maintenance projects will prevent more costly repairs in the future. Upgrading safety features reduces the City s liability. 17

18 PROJECT TITLE: Irrigation Repair and Upgrades PROJECT CATEGORY: Asset Management REQUESTING PARTY: Public Services FUNDING SOURCE: General Fund and In-Lieu Parkland Funds The City maintains 22 parks. The City s Municipal Maintenance Master Plan (MMP) provides a schedule for the long-term maintenance/replacement of irrigation and other improvements. The projects proposed for this budget include: Larkey Park replace mainline irrigation system, Phase II Heather Farm Park irrigation pond pump repairs Centralized irrigation smart clocks Resolves Health or Safety Problem Preserves Eisting Asset PROJECT STATUS: Not started. General Fund In-Lieu Parkland Funds Engineering Plans and Specs $10 $4 $14 Contract Admin. and Inspection $10 $4 $14 Construction $80 $32 $112 TOTAL $100 $40 $140 Timely implementation of maintenance projects will prevent more costly repairs in the future. Centralized irrigation smart clocks can reduce water usage. 18

19 PROJECT TITLE: Borges Ranch ADA Upgrades PROJECT CATEGORY: Asset Management REQUESTING PARTY: Public Services FUNDING SOURCE: In-Lieu Parkland Funds The Borges Ranch ADA upgrades project will provide for accessible parking near the museum and reconstruct much of the currently non-compliant upper picnic area creating a safer and accessible gathering area for the heavily used facility. Resolves Health or Safety Problem Preserves Eisting Asset PROJECT STATUS: Not started. In-Lieu Parkland Funds Engineering Plans and Specs $10 $10 Contract Admin. and Inspection $10 $10 Construction $80 $80 TOTAL $100 $100 ADA projects will reduce the likelihood of claims regarding non-compliance. 19

20 PROJECT TITLE: Curb, Gutter, and Sidewalk Maintenance PROJECT CATEGORY: Asset Management REQUESTING PARTY: Public Services FUNDING SOURCE: General Fund The City maintains 218 miles of streets within city limits. The City s Municipal Maintenance Master Plan (MMP) provides a schedule for the long-term maintenance/replacement of curbs, gutters, and sidewalks. The engineering division coordinates with the traffic maintenance division staff to periodically review and update the MMP and confirm the appropriate projects to be included in each two-year cycle of the CIP. The project will replace cracked, broken, and lifted curb, gutter, and sidewalk in various zones throughout the City. X Resolves Health or Safety Problem Preserves Eisting Asset PROJECT STATUS: Not started. X General Fund Engineering Plans and Specs $15 $15 Contract Admin. and Inspection $15 $15 Construction $150 $150 TOTAL $180 $180 Maintaining pedestrian pathways reduces the City s liability and will reduce maintenance service calls. 20

21 PROJECT TITLE: Traffic Signal and Streetlight Maintenance PROJECT CATEGORY: Asset Management REQUESTING PARTY: Public Services FUNDING SOURCE: General Fund The City maintains 96 traffic signals and 1,290 City-owned streetlights. Signal and streetlight maintenance projects are included in a master plan managed by the traffic maintenance division. This master plan identifies scheduled maintenance/replacement of signal elements such as cabinets, controllers, and signal heads at each of the City s traffic signals and City-owned streetlights. The projects proposed for this budget include: Rewiring the traffic signal at the Geary Rd. / N. Main St intersection Replacing traffic signal cabinets at N. Main / California Install battery backup units at critical intersections within the City. X Resolves Health or Safety Problem X Preserves Eisting Asset PROJECT STATUS: Not started. General Fund Engineering Plans and Specs $15 $15 Contract Admin. and Inspection $10 $10 Construction $90 $95 TOTAL $120 $120 Timely implementation of signal and streetlight equipment maintenance will reduce maintenance service calls. 21

22 PROJECT TITLE: Parking Infrastructure Maintenance PROJECT CATEGORY: Asset Management REQUESTING PARTY: Public Services FUNDING SOURCE: Downtown Parking Fund The City maintains 3 parking structures which provide public parking to the downtown area. The City s Municipal Maintenance Master Plan (MMP) provides a schedule for the long-term maintenance/replacement of major elements of the parking structures. The projects proposed for this budget include: Installing new slip resistant stair tread for both stairwells in the S. Locust garage Restriping of the parking stalls within the Broadway garage Upgrades to the Lark Creek trash room and ADA parking resurfacing at the S. Locust garage Paint interior walls of the S. Locust garage X Resolves Health or Safety Problem X Preserves Eisting Asset PROJECT STATUS: Not started. Downtown Parking Fund Engineering Plans and Specs $40 $40 Contract Admin. and Inspection $40 $40 Construction $339 $339 TOTAL $419 $419 Timely implementation of parking structure maintenance will prevent more costly repairs in the future. Maintaining safety features reduces the City s liability. 22

23 PROJECT TITLE: Pedestrian Path Improvements at Walnut Acres Elementary PROJECT CATEGORY: Transportation Improvements REQUESTING PARTY: Public Services Traffic Engineering FUNDING SOURCE: Measure J / Grants City staff recently completed a citywide condition survey of 160 crosswalks and uncontrolled intersections. Crosswalk improvements such as signing, striping, lighting, line of sight, advanced warning, layout, and alignment were identified and an internal process was developed to prioritize the upgrades. Pedestrian path improvements were identified on the public streets adjacent to Walnut Acres Elementary School, specifically the Wiget Ln / Blackstone Dr and the Cedro Ln / Casa Bueno Ct intersections. These intersections rated as a high priority projects due to the high pedestrian use, high average speeds, and its proimity to Walnut Acres Elementary School. The project will include a neck downs at each intersection and improved advanced warning at the crosswalk. Resolves Health or Safety Problem Preserves Eisting Asset PROJECT STATUS: Not Started. City staff will seek grant funding to complete the project. The project may not move forward without grant funding. Measure J Grants Engineering Plans and Specs $15 $15 Contract Admin. and Inspection $15 $15 Construction $0 $120 $120 TOTAL $30 $120 $150 Minor increase in costs for electricity and maintenance of any lighting improvements, otherwise no significant change. 23

24 PROJECT TITLE: Creekside Pedestrian and Safety Improvements PROJECT CATEGORY: Transportation Improvements REQUESTING PARTY: Public Services Traffic Engineering FUNDING SOURCE: Traffic Impact Fees / Grants The County Connection (CCCTA) has identified Creekside Drive as an opportunity location for increased transit ridership. The project would construct pedestrian and safety improvements including sidewalks, crosswalks, and bus turnouts as recommended by a consultant report prepared for CCCTA. Resolves Health or Safety Problem Preserves Eisting Asset PROJECT STATUS: Not Started. City staff will seek grant funding to complete the project. The project may not move forward without grant funding. Traffic Impact Fees Grants Engineering Plans and Specs $80 $80 Contract Admin. and Inspection $80 $80 Construction $0 $640 $640 TOTAL $160 $640 $800 Minor increase in maintenance costs for new infrastructure. 24

25 PROJECT TITLE: Bike Lanes PROJECT CATEGORY: Transportation Improvements REQUESTING PARTY: Public Services Traffic Engineering FUNDING SOURCE: Traffic Impact Fees The Bike Master Plan identifies Olympic Blvd (interim), Lincoln Ave, Buena Vista Ave, Cedro Lane as priority bicycle improvements. This project would include a Class II facility on Olympic Boulevard as feasible and Class III facilities on Lincoln Ave, Buena Vista Ave, and Cedro Lane Resolves Health or Safety Problem Preserves Eisting Asset PROJECT STATUS: Not Started. Traffic Impact Fees Engineering Plans and Specs $15 $15 Contract Admin. and Inspection $15 $15 Construction $120 $120 TOTAL $150 $150 Minor increase in maintenance costs for new infrastructure. 25

26 PROJECT TITLE: Bicycle Connection Study Iron Horse Tr. to BART PROJECT CATEGORY: Transportation Improvements REQUESTING PARTY: Public Services Traffic Engineering FUNDING SOURCE: Measure J / Grants The project would complement the on-going pedestrian master plan, the City s desire to increase its Priority Development Area (PDA) in the downtown. The study would look to identify what are the most desirable routes from the Iron Horse Trail to BART from both a southbound and northbound direction. Resolves Health or Safety Problem Preserves Eisting Asset PROJECT STATUS: Not Started. City staff will seek grant funding to complete the project. The project may not move forward without grant funding. Measure J Grants Engineering Plans and Specs $10 $10 Contract Admin. and Inspection $10 $10 Construction $0 $80 $80 TOTAL $20 $80 $100 Planning project to identify possible improvements no operation costs at this time 26

27 PROJECT TITLE: Newell Avenue Improvements PROJECT CATEGORY: Transportation Improvements REQUESTING PARTY: Public Services Traffic Engineering FUNDING SOURCE: Developer The Newell Avenue Improvements project provides an additional left turn lane from eastbound Newell Ave to Broadway allowing improved signal phasing and improving the operation of the intersection. The project will also provide 14-foot wide Class III bike lanes both directions on Newell and a separate Class I facility from the Iron Horse Trail to the southern entrance of Broadway Plaza. The Broadway Plaza Master Plan Project EIR did not identify any impacts for this intersection. However, staff worked with the developer to identify potential improvements to this section of Newell. Completion of these improvements by the developer were included in the Broadway Plaza Development Agreement. Resolves Health or Safety Problem Preserves Eisting Asset PROJECT STATUS: Project Development in progress Developer Engineering Plans and Specs n/a n/a Contract Admin. and Inspection n/a n/a Construction $750 $750 TOTAL $750 $750 Minor increase in maintenance costs for new infrastructure. 27

28 PROJECT TITLE: Crosswalk and Pedestrian Improvements PROJECT CATEGORY: Transportation Improvements REQUESTING PARTY: Public Services Traffic Engineering FUNDING SOURCE: Measure J / Grants City staff recently completed a citywide condition survey of 160 crosswalks and uncontrolled intersections. Crosswalk improvements such as signing, striping, lighting, line of sight, advanced warning, layout, and alignment were identified and an internal process was developed to prioritize the upgrades. Most minor signing and striping upgrades will be completed within the Public Service Departments operational budget. The proposed project will address the highest priority projects that have been identified requiring capital ependitures to upgrade the service level of the crosswalk. Highest priority locations include: Walnut Ave at the Contra Costa Trail, Walnut Boulevard at Walnut Creek Intermediate School, the EBRPD trail crossing of San Luis Road near Conejo Way, and the intersection of Bonanza and Shuey Ave. Additional crossings would be included as funding permits. Resolves Health or Safety Problem Preserves Eisting Asset PROJECT STATUS: Not Started. City staff will seek grant funding to complete the project. The project may not move forward without grant funding. Measure J Grants Engineering Plans and Specs $40 $40 Contract Admin. and Inspection $40 $40 Construction $0 $320 $320 TOTAL $80 $320 $400 Minor increase in costs for electricity and maintenance of any lighting improvements, otherwise no significant change. 28

29 PROJECT TITLE: YVR / San Carlos Split Phasing Improvements PROJECT CATEGORY: Transportation Improvements REQUESTING PARTY: Public Services Traffic Engineering FUNDING SOURCE: Traffic Impact Fee The YVR / San Carlos Split Phasing Improvement project will modify the traffic signal operation at this intersection to allow split phasing on the San Carlos approaches and eliminating left turn conflicts with through movements at this intersection. The project will require the construction of new traffic signal poles, traffic signal heads and a rewiring of the intersection. Resolves Health or Safety Problem Preserves Eisting Asset PROJECT STATUS: Not Started. This project will be complete in conjunction with the YVR / San Carlos Left Turn etension project approved with the Capital Budget Traffic Impact Fees Engineering Plans and Specs $10 $10 Contract Admin. and Inspection $10 $10 Construction $80 $80 TOTAL $100 $100 Minor increase in costs for electricity and maintenance of any lighting improvements, otherwise no significant change. 29

30 PROJECT TITLE: Walnut Boulevard One-Way Feasibility Study PROJECT CATEGORY: Transportation Improvements REQUESTING PARTY: Public Services Traffic Engineering FUNDING SOURCE: General Fund The narrow roadway and eisting roadside ditches along Walnut Boulevard provide little room for the safe passage of pedestrian and bicycles. This project would fund a traffic study to evaluate the traffic impacts on Walnut Boulevard and the adjoining streets of converting Walnut Boulevard to one-way traffic in the segment between Sierra Drive and Homestead Avenue. One-way traffic, in conjunction with signing and striping improvements could allow a significantly improved pedestrian and bicycle pathway on this segment of Walnut Boulevard. This project would only fund the traffic study, and depending on the study results, public outreach to the community. The project would not fund any signing, striping, or any other necessary improvements to convert the street to one-way traffic. Resolves Health or Safety Problem Preserves Eisting Asset PROJECT STATUS: Not Started General Fund Engineering Plans and Specs $50 $50 Contract Admin. and Inspection n/a n/a Construction n/a n/a TOTAL $50 $50 None. 30

31 PROJECT TITLE: LED Streetlight Conversion PROJECT CATEGORY: Discretionary - Sustainibility REQUESTING PARTY: Public Services FUNDING SOURCE: General Fund The LED Streetlight Conversion project would convert approimately 350 City-owned streetlights from high pressure sodium to LED light fitures. The City has previously used PG&E rebate incentives to install LED streetlights along Ygnacio Valley Road and several other arterials. The City has ehausted its PG&E incentives and this project would pay for the streetlight conversions with a portion of the one-time funds allocated to the Capital Budget Resolves Health or Safety Problem Preserves Eisting Asset PROJECT STATUS: Not Started. Previous projects have converted streetlights on Ygnacio Valley Road and other arterials through the City. General Fund Engineering Plans and Specs $15 $15 Contract Admin. and Inspection $15 $15 Construction $220 $220 TOTAL $250 $250 The cost recovery period is anticipated to be five to eight years depending on the number and wattage of the replaced lights. The savings would result from reduced energy costs and lower maintenance effort due to the long life epectancy of the LED fitures. 31

32 PROJECT TITLE: Larkey Pool Splash Pad PROJECT CATEGORY: Discretionary Recreation Projects REQUESTING PARTY: Arts, Recreation, and Community Services FUNDING SOURCE: In-Lieu Parkland Funds The Larkey Swim Center is approimately 40 years old and is in need of major renovations. The proposed Splash Pad project would complement the Larkey Pool Renovation project providing a new amenity to the Larkey Swim Center. An Aquatics Study completed for Walnut Creek indicated that additional operating revenue could be increased by incorporating more recreational-type activities. Resolves Health or Safety Problem Preserves Eisting Asset PROJECT STATUS: Conceptual Layouts are complete In-Lieu Parkland Funds Engineering Plans and Specs $35 $35 Contract Admin. and Inspection $35 $35 Construction $280 $280 TOTAL $350 $350 The aquatics study shows that the annual operating revenue could be increased by incorporating more recreational-type activities. 32

33 PROJECT TITLE: Complete Wayfinding Implementation PROJECT CATEGORY: Discretionary Downtown Projects REQUESTING PARTY: City Manager s Office FUNDING SOURCE: Downtown Parking Fund In 2013, the City Council approved a new multi-modal citywide wayfinding system. Staff completed the Gateway elements of the system in This project will complete the remaining vehicular, pedestrian and bicycle elements of the program. Resolves Health or Safety Problem Preserves Eisting Asset PROJECT STATUS: Conceptual Layouts are complete Downtown Parking Fund Engineering Plans and Specs $20 $20 Contract Admin. and Inspection $40 $40 Construction $315 $315 TOTAL $375 $375 Minor increase in maintenance costs for new infrastructure. 33

CAPITAL PROJECTS BUDGET TAB 5

CAPITAL PROJECTS BUDGET TAB 5 CAPITAL PROJECTS BUDGET TAB 5 This page intentionally left blank. 2016-2018 CAPITAL BUDGET 5-1 This page intentionally left blank. City of Walnut Creek 2016-2018 Capital Budget Table of Contents Introduction

More information

CIP. PUBLIC WORKS DEPARTMENT Timm Borden, Director

CIP. PUBLIC WORKS DEPARTMENT Timm Borden, Director PUBLIC WORKS DEPARTMENT Timm Borden, Director CITY HALL 10300 TORRE AVENUE ~ CUPERTINO, CA 95014-3266 (408) 777-3354 ~ FAX (408) 777-3333 CIP 2015-2016 Budget report of the Capital Improvement Program

More information

IMPLEMENTATION A. INTRODUCTION C H A P T E R

IMPLEMENTATION A. INTRODUCTION C H A P T E R C H A P T E R 11 IMPLEMENTATION A. INTRODUCTION This chapter addresses implementation of the General Plan. The Plan s seven elements include 206 individual actions. 1 Many are already underway or are on-going.

More information

Capital Improvement Program Fund

Capital Improvement Program Fund Capital Improvement Program Fund The Capital Improvement Program Fund provides funding for streets, public buildings (both governmental and school facilities), land, and other capital assets. Capital Improvement

More information

Capital Investment Program (CIP) About CIP

Capital Investment Program (CIP) About CIP Capital Investment Program (CIP) About CIP The Capital Investment Program (CIP) is a multi-year program aimed at upgrading and expanding City facilities, buildings, grounds, streets, parks and roads. The

More information

Infrastructure and Capital Projects Planning and Funding

Infrastructure and Capital Projects Planning and Funding Infrastructure and Capital Projects Planning and Funding September 6, 2018 Preview of FY 2020 2024 CIP process Why are we here? Overview Current Assets Overview and Highlights of Adopted FY 2019 2023 CIP

More information

This page intentionally left blank

This page intentionally left blank 197 This page intentionally left blank 198 Capital Improvement Program PROCEDURE Each year the Capital Improvement Program (CIP) is prepared from project requests submitted by the various departments.

More information

Capital Improvement Projects

Capital Improvement Projects Capital Improvement Projects This section highlights the Capital Improvement Program (CIP) projects proposed for FY 2017-2018. Capital projects are designed to enhance the City s infrastructure, extend

More information

DRAFT C APITAL I MPROVEMENT P LAN C ITY OF G EORGETOWN, TEXAS S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6

DRAFT C APITAL I MPROVEMENT P LAN C ITY OF G EORGETOWN, TEXAS S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6 C ITY OF G EORGETOWN, TEXAS C APITAL I MPROVEMENT P LAN S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6 Georgetown Transportation Advisory Board April 10, 2015 Table of Contents Introduction... 1 Transportation

More information

Public Works and Development Services

Public Works and Development Services City of Commerce Capital Improvement Program Prioritization Policy Public Works and Development Services SOP 101 Version No. 1.0 Effective 05/19/15 Purpose The City of Commerce s (City) Capital Improvement

More information

City of Pacifica General Fund Budget

City of Pacifica General Fund Budget City of Pacifica 2017-18 General Fund Budget General Government Lorenzo Hines Jr. City Manager s Office May 2, 2017 City of Pacifica 1 General Government 2017-18 DRAFT Budget Mission We strive to manage

More information

Christopher Blunk, Deputy Director Public Works/City Engineer. PRESENTER: Christopher Blunk, Deputy Director Public Works/City Engineer

Christopher Blunk, Deputy Director Public Works/City Engineer. PRESENTER: Christopher Blunk, Deputy Director Public Works/City Engineer STAFF REPORT MEETING DATE: April 10, 2018 TO: FROM: City Council Christopher Blunk, Deputy Director Public Works/City Engineer PRESENTER: Christopher Blunk, Deputy Director Public Works/City Engineer 922

More information

Police Department & Court Your Tax Dollars at Work

Police Department & Court Your Tax Dollars at Work 1 Police Department & Court Your Tax Dollars at Work A Safe and Secure Community New York State Accredited Police Agency with a staff of 40 full time and 5 part time professional and dedicated sworn police

More information

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary The adopted FY 2017 FY 2021 CIP is $235.8 million (including prior year expenditures) and is $28 million higher than the previous CIP

More information

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016 City of Des Moines Citizen Engagement Capital Improvement Program November 29, 2016 Goals of Citizen Engagement Goal Focus on service levels Department definitions of adequate service and opportunities

More information

CITY FUNDS & FUND ACCOUNTING TAB 19

CITY FUNDS & FUND ACCOUNTING TAB 19 CITY FUNDS & FUND ACCOUNTING TAB 19 This page intentionally left blank. Special Revenue Funds Special Revenue Funds are used to account for proceeds of specific revenue sources (other than major capital

More information

Capital Projects CAPITAL PROJECTS CAPITAL PROJECTS

Capital Projects CAPITAL PROJECTS CAPITAL PROJECTS Capital Projects CAPITAL PROJECTS CAPITAL PROJECTS 121 REVENUE FUNDS REVENUE FUND REFERENCE NUMBERS AND DESCRIPTIONS: 01 - General Fund This fund is the primary fund for the City. In addition to Capital

More information

Funding Source: Highway Safety Improvement Program (HSIP) Grant - $315,100; Measure I - $60,500

Funding Source: Highway Safety Improvement Program (HSIP) Grant - $315,100; Measure I - $60,500 FY 2017-18 Capital Improvement Program Detail STREETS Raised Median on Pipeline Avenue S14009 Program Year Initiated: FY 2013-14 Construction Year: FY 2016-17 Project Description: Install raised median

More information

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State CAPITAL RESERVE STUDY FOR THE Meadow Wood Commons City, State Management Company: Any Management Company Contact Name: Mr. Bob Smith Date: July 28, 2014 Table of Contents Section Name Section # Executive

More information

PUBLIC WORKS DEPARTMENT PUBLIC WORKS ADMINISTRATION & ENGINEERING STREETS MAINTENANCE PARKS MAINTENANCE GOVERNMENT BUILDINGS

PUBLIC WORKS DEPARTMENT PUBLIC WORKS ADMINISTRATION & ENGINEERING STREETS MAINTENANCE PARKS MAINTENANCE GOVERNMENT BUILDINGS PUBLIC WORKS DEPARTMENT PUBLIC WORKS ADMINISTRATION & ENGINEERING STREETS MAINTENANCE PARKS MAINTENANCE GOVERNMENT BUILDINGS 180 PUBLIC WORKS ADMINISTRATION & ENGINEERING General Fund Department 4301 DEPARTMENT

More information

FISCAL YEAR RECOMMENDED BUDGET

FISCAL YEAR RECOMMENDED BUDGET FISCAL YEAR 2017-2018 RECOMMENDED BUDGET JUNE 6, 2017 AGENDA City Manager s Budget Status FY 2017-18 General Fund Recommended Budget FY 2017-18 Recommended Non-General Fund Budget FY 2017-18 Recommended

More information

MVMCC CAPITAL IMPROVEMENT PROGRAM (CIP) UPDATE AND ADOPTING A RESOLUTION APPROVING A MVMCC CAPITAL BUDGET ALLOCATION AMENDMENT

MVMCC CAPITAL IMPROVEMENT PROGRAM (CIP) UPDATE AND ADOPTING A RESOLUTION APPROVING A MVMCC CAPITAL BUDGET ALLOCATION AMENDMENT STAFF REPORT MEETING DATE: October 20, 2015 TO: FROM: City Council Cathy Capriola, Assistant City Manager Matt Greenberg, Park General Manager Tony Williams, Senior Civil Engineer 922 Machin Avenue Novato,

More information

IMPLEMENTATION PLAN INTRODUCTION PROJECT PACKAGES

IMPLEMENTATION PLAN INTRODUCTION PROJECT PACKAGES INTRODUCTION The Implementation Plan is intended to provide the City of Berkeley a framework to define the future steps for the West Berkeley Circulation Master Plan (WBCMP). Since the objective of the

More information

CITY OF ORINDA. Road and Drainage Repairs Plan. (As Updated in 2016) March 15, 2016

CITY OF ORINDA. Road and Drainage Repairs Plan. (As Updated in 2016) March 15, 2016 CITY OF ORINDA Road and Drainage Repairs Plan (As Updated in 2016) March 15, 2016 (ORIGINALLY ADOPTED BY THE CITY COUNCIL JULY 17, 2012 AND UPDATED APRIL 22, 2014) CITY OF ORINDA 22 Orinda Way Orinda,

More information

CITY OF ORINDA. Road and Drainage Repairs Plan. (As Updated in 2016) March 15, 2016

CITY OF ORINDA. Road and Drainage Repairs Plan. (As Updated in 2016) March 15, 2016 CITY OF ORINDA Road and Drainage Repairs Plan (As Updated in 2016) March 15, 2016 (ORIGINALLY ADOPTED BY THE CITY COUNCIL JULY 17, 2012 AND UPDATED APRIL 22, 2014) CITY OF ORINDA 22 Orinda Way Orinda,

More information

Capital Improvement Program Fund

Capital Improvement Program Fund Capital Improvement Program Fund Capital Improvement Program (CIP) Overview The Capital Improvement Program provides funding for streets, public buildings (both governmental and school facilities), land,

More information

Agenda. Background Budget / PW General Fund Budget Streets & Infrastructure Citizen Engagement

Agenda. Background Budget / PW General Fund Budget Streets & Infrastructure Citizen Engagement 1 Agenda Background 2013-2014 Budget / PW General Fund Budget Streets & Infrastructure Citizen Engagement Sustainable Transportation Funding Dedicated Revenues Potential Rate Impact Clarification Proposed

More information

NOTICE OF ELECTION 2021 $10,000, $10,000, $10,000, $10,000,000

NOTICE OF ELECTION 2021 $10,000, $10,000, $10,000, $10,000,000 NOTICE OF ELECTION TO THE QUALIFIED VOTERS OF DEKALB COUNTY, GEORGIA NOTICE IS HEREBY GIVEN that on the 7 th day of November, 2017, an election will be held at the regular polling places in all of the

More information

Chapter 6: Financial Resources

Chapter 6: Financial Resources Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation

More information

CITY OF GOLDEN, COLORADO 2018 CAPITAL IMPROVEMENT PLAN

CITY OF GOLDEN, COLORADO 2018 CAPITAL IMPROVEMENT PLAN CITY OF GOLDEN, COLORADO 2018 CAPITAL IMPROVEMENT PLAN CAPITAL PROGRAMS FUND CITY OF GOLDEN CAPITAL PROGRAMS FUND 11/2/2017 TEN YEAR CAPITAL IMPROVEMENT PLAN 20172026 DESCRIPTION ACTUAL 2014 ACTUAL 2015

More information

FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary

FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary The adopted FY 2016 FY 2020 CIP is $205.3 million (including prior year expenditures) and is $2.9 million lower than the previous CIP

More information

Infrastructure Asset Management. Southwest Chula Vista Civic Association April 26, 2007

Infrastructure Asset Management. Southwest Chula Vista Civic Association April 26, 2007 Infrastructure Asset Management Southwest Chula Vista Civic Association April 26, 2007 Chula Vista s Municipal Infrastructure Pavement* Traffic Signals Alleys Streetlights Parking Lots Street Signs Sidewalks*

More information

CAPITAL IMPROVEMENT PROGRAM BUDGET

CAPITAL IMPROVEMENT PROGRAM BUDGET CAPITAL IMPROVEMENT PROGRAM BUDGET During the Capital Improvement Program budget process, departments submit Project Request Forms for each project. The form captures the costs spent to date, five-year

More information

2. fl Concord REPORT TO MAYOR AND COUNCIL/AGENCY BOARD

2. fl Concord REPORT TO MAYOR AND COUNCIL/AGENCY BOARD AGENDA ITEM NO. 2. fl Concord REPORT TO MAYOR AND COUNCIL/AGENCY BOARD TO THE HONORABLE MAYOR AND COUNCIL: DATE: June 22, 2009 Subiect: ADOPTING RESOLUTION NO. 09-53, APPROVING THE CITY'S REVISED PROPOSITION

More information

Policy CIE The following are the minimum acceptable LOS standards to be utilized in planning for capital improvement needs:

Policy CIE The following are the minimum acceptable LOS standards to be utilized in planning for capital improvement needs: Vision Statement: Provide high quality public facilities that meet and exceed the minimum level of service standards. Goals, Objectives and Policies: Goal CIE-1. The City shall provide for facilities and

More information

Hayward Area Recreation and Park District 1099 E Street, Hayward, CA (510)

Hayward Area Recreation and Park District 1099 E Street, Hayward, CA (510) Hayward Area Recreation and Park District 1099 E Street, Hayward, CA 94541 (510) 881-6700 ADDENDUM DESCRIPTION OF ITEMS ON AGENDA BOARD OF DIRECTORS Monday July 28, 2014 Work Session - 5:30 p.m. Regular

More information

City of St. Petersburg, FL 2015 thru 2019 Capital Improvement Plan - Project Descriptions by Fund Bicycle/Pedestrian Safety Grants CIP Fund (3004)

City of St. Petersburg, FL 2015 thru 2019 Capital Improvement Plan - Project Descriptions by Fund Bicycle/Pedestrian Safety Grants CIP Fund (3004) City of St. Petersburg FY15 Adopted Fiscal Plan Fiscal Year 2015 R-1 CIP Other Funds City of St. Petersburg, FL 2015 thru 2019 Capital Improvement Plan - Project Descriptions by Fund Bicycle/Pedestrian

More information

Lakeside Park Financial Review MAY 1, 2018

Lakeside Park Financial Review MAY 1, 2018 Lakeside Park Financial Review MAY 1, 2018 Utility System Sustainability Issues: Aging infrastructure / costly emergency repairs / inefficient spending of resources / dramatic drop in sale volume Developed

More information

Manheim Borough 2017/2018 Budget Summary Report

Manheim Borough 2017/2018 Budget Summary Report Manheim Borough 2017/2018 Budget Summary Report James R. Fisher, PE, CBO Chief Administrative Officer, Borough Manager, Treasurer 2017 has been a year of building on the changes that occurred in 2015/2016.

More information

PROPOSED TEN-YEAR CAPITAL IMPROVEMENT PLAN

PROPOSED TEN-YEAR CAPITAL IMPROVEMENT PLAN 2017/2018 YEAR 1 ESTIMATED FUND BALANCE 7/1/17 $ 1,795,000 $ - $ 209,000 $ 117,861 $ (333,878) $ (240,844) $ 642,513 $ (113,143) EXPECTED REVENUE ACTIVITY $ 1,014,000 $ 33,473 $ 49,500 $ - $ - $ - $ -

More information

City of SANTA ANA. Proposed Budget Summary FY

City of SANTA ANA. Proposed Budget Summary FY City of SANTA ANA Proposed Budget Summary FY 2015-2016 June 2, 2015 City Manager s Budget Message will be made available on May 29 th, 2015. This Page Intentionally Left Blank Total Annual Budget FY 2015-2016

More information

Parking Services and Transportation Planning

Parking Services and Transportation Planning Prepared for the Board of Governors April 10, 2014 Table of Contents PARKING SERVICES AND TRANSPORTATION PLANNING... 1 Background:... 2 Transportation Demand Management (TDM)... 2 Safety Initiatives:...

More information

Budget Overview. Section 2 BUDGET SUMMARIES

Budget Overview. Section 2 BUDGET SUMMARIES Budget Overview Section 2 BUDGET SUMMARIES Revenue & Expenditure Three Year History by Category Total Annual Budget Summary Budget Development Process Overview Budget Parameters & Key Assumptions General

More information

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS SPECIAL REVENUE FUNDS

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS SPECIAL REVENUE FUNDS TABLE OF CONTENTS SPECIAL REVENUE FUNDS Public Works Fund History... 74-81 Grant Special Revenue Fund... 82-84 Hotel/Motel Tax Fund... 85-86 Street Lights and Sidewalk Fund... 87-89 Bike Trail Fund...

More information

TABLE 1 BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and Expenditures

TABLE 1 BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and Expenditures Alameda CTC Programs Annual Compliance Report 00 Reporting Year TABLE BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and DATE : Revised /0/ Column A Column B Column C Column D Column E Column F Column

More information

Municipality of ANCHORAGE. MAYOR DAN SULLIVAN 2014 Municipal Bonds

Municipality of ANCHORAGE. MAYOR DAN SULLIVAN 2014 Municipal Bonds Municipality of ANCHORAGE MAYOR DAN SULLIVAN 2014 Municipal Bonds 2014 MOA BONDS Request: $32.7 Million Proposition 2 Area wide Safety and Public Transportation Capital Improvement Bonds Proposition 3

More information

Progress Update Identified Needs & Capital Plan

Progress Update Identified Needs & Capital Plan Progress Update Identified Needs & Capital Plan May 29, 2012 Buena Park School District Facilities Assessment & Implementation Plan 0 Facilities Planning, Public Finance, Program Administration Summary

More information

The following is a summary of General Fund revenue by major category as of April 30, 2017: Revenues: Budget* Actual Variance % of Budget

The following is a summary of General Fund revenue by major category as of April 30, 2017: Revenues: Budget* Actual Variance % of Budget General Fund Revenues The following is a summary of General Fund revenue by major category as of April 30, 2017: Revenues: Budget* Actual Variance % of Budget Property Taxes 1,174,200 1,264,609 90,409

More information

The following is a summary of General Fund revenue by major category as of May 31, 2017: Revenues: Budget* Actual Variance % of Budget

The following is a summary of General Fund revenue by major category as of May 31, 2017: Revenues: Budget* Actual Variance % of Budget General Fund Revenues The following is a summary of General Fund revenue by major category as of May 31, 2017: Revenues: Budget* Actual Variance % of Budget Property Taxes 1,174,200 1,266,578 92,378 107.9%

More information

SUBJECT: AMENDMENTS TO FISCAL YEAR 2019 CAPITAL IMPROVEMENT PROGRAM BUDGET, AUTHORIZE AMENDMENTS TO CONTRACTS

SUBJECT: AMENDMENTS TO FISCAL YEAR 2019 CAPITAL IMPROVEMENT PROGRAM BUDGET, AUTHORIZE AMENDMENTS TO CONTRACTS 0 » 0 y % t &? 0 so 0»>; - s'; 0 < E TO: Honorable Mayor and City Council THROUGH: Finance Committee FROM: Department of Public Works SUBJECT: AMENDMENTS TO FISCAL YEAR 2019 CAPITAL IMPROVEMENT PROGRAM

More information

TRANSPORTATION CAPITAL PROGRAM

TRANSPORTATION CAPITAL PROGRAM TRANSPORTATION CAPITAL PROGRAM The transportation capital program for fiscal year 2016 through fiscal year 2020 consists of a variety of transportation construction and maintenance capital projects primarily

More information

RECEIVE A REPORT AND APPROVE PROPOSED PUBLIC ENGAGEMENT POLICIES AND PRACTICES FOR THE PUBLIC

RECEIVE A REPORT AND APPROVE PROPOSED PUBLIC ENGAGEMENT POLICIES AND PRACTICES FOR THE PUBLIC J-17 STAFF REPORT MEETING DATE: October 24, 2017 TO: City Council FROM: Russ Thompson, Public Works Director PRESENTER: Russ Thompson, Public Works Director SUBJECT: RECEIVE A REPORT AND APPROVE PROPOSED

More information

Welcome to the Annual Meeting September 15, :00 p.m. North Lounge, Clubhouse 43 Heritage Drive Avon, CT 06001

Welcome to the Annual Meeting September 15, :00 p.m. North Lounge, Clubhouse 43 Heritage Drive Avon, CT 06001 Welcome to the Annual Meeting September 15, 2015 8:00 p.m. North Lounge, Clubhouse 43 Heritage Drive Avon, CT 06001 Note: The Financial information included within this report does not reflect any proposed

More information

PPC RESOLUTION NO RESOLUTION ALLOCATING $510,526 IN PROP K FUNDS, WITH CONDITIONS, TO

PPC RESOLUTION NO RESOLUTION ALLOCATING $510,526 IN PROP K FUNDS, WITH CONDITIONS, TO PPC041613 RESOLUTION NO. 13-47 RESOLUTION ALLOCATING $510,526 IN PROP K FUNDS, WITH CONDITIONS, TO THE SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY FOR FIVE REQUESTS AND $831,100 IN PROP K FUNDS, WITH

More information

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET CITY OF PLACERVILLE ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET 2014/2015 CAPITAL IMPROVEMENT PROGRAM POLICY Each year the City faces the challenge of meeting infrastructure and equipment needs with limited

More information

CITY COUNCIL FY 2018/2019 BUDGET WORKSHOP

CITY COUNCIL FY 2018/2019 BUDGET WORKSHOP CITY COUNCIL FY 2018/2019 BUDGET WORKSHOP Presented by: David Kelley, City Manager Susie Holmes, Finance Manager Stephen Cramer, Police Chief Mark Rincon, City Engineer Budget Presentation - Outline 1.

More information

GLOBAL Solution Partners, LLC - Toll free phone and fax: (844)

GLOBAL Solution Partners, LLC - Toll free phone and fax: (844) GLOBAL Solution Partners, LLC info@globalreservestudies.com - Toll free phone and fax: (844) 477-7883 - www.globalsolutionpartners.com Funding Reserve Analysis for Oak Crest Farms November 2, 2016 Page

More information

QUALITY TRANSPORTATION SUMMARY

QUALITY TRANSPORTATION SUMMARY SUMMARY Transportation systems influence virtually every aspect of community life. They are the means for moving people, goods, and services throughout the community, and they play a significant role in

More information

Update With Site Visit

Update With Site Visit Update With Site Visit Le Chateau Bellevue, WA 10/28/2011 Report #1002 Phone: 253-241-8151 Fax: 360-872-8073 E-mail: jeremy@reservesolutions.net www.reservesolutions.net Le Chateau Client Info: REPORT

More information

QUALITY TRANSPORTATION SUMMARY

QUALITY TRANSPORTATION SUMMARY QUALITY TRANSPORTATION SUMMARY Quality Transportation Overview... 126 Department of Transportation... 127 Traffic Field Operations... 129 Winston-Salem Transit Authority... 131 Quality Transportation Non-Departmental...

More information

Fiscal Responsibility to Further Invest in the Future. Executive Committee Department of Finance May 4, 2017

Fiscal Responsibility to Further Invest in the Future. Executive Committee Department of Finance May 4, 2017 Fiscal Responsibility to Further Invest in the Future Executive Committee Department of Finance May 4, 2017 1 Asset Inventory Denver s Assets Parks and Recreation $1.8B Transportation $4.7B Buildings $1.9B

More information

Manheim Borough 2017/2018 Budget Summary Report

Manheim Borough 2017/2018 Budget Summary Report Manheim Borough 2017/2018 Budget Summary Report 2017 has been a year of building on the changes that occurred in 2015/2016. Council and staff have placed an emphasis on maintaining and improving the efficient

More information

Physical Plant. Five-Year Capital Budget Plan. State College Area School District November Page 1 of 15

Physical Plant. Five-Year Capital Budget Plan. State College Area School District November Page 1 of 15 Physical Plant Five-Year Capital Budget Plan State College Area School District November 2011 Page 1 of 15 Table of Contents Background and 2013 Projects Pages 3-5 Funding Level Pages 6-7 Existing Buildings

More information

Capital Improvement Program. FY Adopted Biennial Budget

Capital Improvement Program. FY Adopted Biennial Budget Capital Improvement Program FY 2013-15 Adopted Biennial Budget Program Summary FY 2013-14 through FY 2017-18 Capital Improvement Program Last year the City of Santa Monica developed its first biennial

More information

CITY OF BRENTWOOD DEVELOPMENT IMPACT FEE PROGRAM 2015

CITY OF BRENTWOOD DEVELOPMENT IMPACT FEE PROGRAM 2015 CITY OF BRENTWOOD DEVELOPMENT IMPACT FEE PROGRAM 2015 TABLE OF CONTENTS Page Introduction. 1 Program Overview. 1 Fee Summary 2 Land Use Categories and Growth Projections. 3 Administration 5 Community Facilities

More information

~ FINANCIAL ACTION SUMMARY / Expenditure Required Amount Budgeted/Approved (Over)/Under Approved Amount

~ FINANCIAL ACTION SUMMARY / Expenditure Required Amount Budgeted/Approved (Over)/Under Approved Amount CITYOFWOODINVILLE, WA REPORT TO THE CITY COUNCIL 17301 133rct Avenue NE, Woodinville, WA 98072 WWW.Cl.WOODINVILLE.WA.US To: Honorable City Council Date: April 5, 2016 By Thomas E Hansen P E., Public Works

More information

CITY OF PARKLAND ANALYSIS OF REVENUES/SOURCES AND EXPENDITURES/USES GENERAL FUND

CITY OF PARKLAND ANALYSIS OF REVENUES/SOURCES AND EXPENDITURES/USES GENERAL FUND GENERAL FUND % Change From 2018 Locally Levied Taxes Property Taxes 16,246,790 17,496,916 17,702,458 21,004,985 3,508,069 20.0% Franchise Fee - Electricity - - 398,767 1,900,000 1,900,000 n/a Franchise

More information

OAK CREEK CONDOMINIUMS

OAK CREEK CONDOMINIUMS 1515 Heritage Dr., Suite 204 McKinney, Texas75069 (972) 562-1011 TEL (972) 540-1031 FAX Firm Reg. No F-4577 www.criteriumdotson.com RESERVE FUND STUDY OAK CREEK CONDOMINIUMS 1700 BAIRD FARM CIRCLE ARLINGTON,

More information

ALAMEDA COUNTY REGISTRAR OF VOTERS LIST OF LOCAL MEASURES November 6, 2012 GENERAL ELECTION MEASURE I

ALAMEDA COUNTY REGISTRAR OF VOTERS LIST OF LOCAL MEASURES November 6, 2012 GENERAL ELECTION MEASURE I MEASURE I Chabot-Las Positas Community College District Parcel Tax To provide Chabot and Las Positas Community Colleges funds that cannot be taken by the state, ensure affordable quality education, prepare

More information

FINANCIAL ACTION SUMMARY

FINANCIAL ACTION SUMMARY City of Woodinville, WA Report to the City Council 17301 133 rd Avenue NE, Woodinville, WA 98072 www.ci.woodinville.wa.us To: Honorable City Council Date: 02/06/2018 By: Blaine Fritts, Finance Director;

More information

Capital Improvement Plan

Capital Improvement Plan Fiscal Year 2016-17 through Fiscal Year 2021-22 Adopted: Overview City of Jonesville 2016-17 through 2021-22 The (CIP) is a six year schedule of all proposed major capital improvement projects including

More information

PARKS, RECREATION AND WATERFRONT DEPARTMENT FACILITIES ASSESSMENT AND FUNDING OPTIONS

PARKS, RECREATION AND WATERFRONT DEPARTMENT FACILITIES ASSESSMENT AND FUNDING OPTIONS PARKS, RECREATION AND WATERFRONT DEPARTMENT FACILITIES ASSESSMENT AND FUNDING OPTIONS Worksession February 11, 2014 1 INTRODUCTION/ OVERVIEW Parks Tax Structural Deficit Capital Improvement Program Projected

More information

Where the Money Goes (Uses) FY 2011

Where the Money Goes (Uses) FY 2011 Capital Expenditure Analysis The total FY2011 capital budget for the Village of Orland Park is $23,650,283, a 33% decrease from the fiscal year 2010 adopted capital budget of $31,446,027. The decrease

More information

SAMPLE BALLOT NOT FOR OFFICIAL USE

SAMPLE BALLOT NOT FOR OFFICIAL USE 3 in 1! Bike Lanes for Safety and Convenience! $ 117,000 Increase striping and marking of bicycle lanes and routes along selected streets. LOCATIONS: Various locations throughout Vallejo determined by

More information

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I QUALCHAN HILLS HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 6 AUGUST 2012 CONTENTS 1.0 INTRODUCTION...

More information

County Barn Road RPUD. Deviation Justification

County Barn Road RPUD. Deviation Justification 1. Deviation 1 seeks relief from LDC Section 6.06.02.A.2 which requires dual sidewalks on local roads internal to the site, to allow a sidewalk on one side of the roadway where the property is permitted

More information

To the Residents of Cotati

To the Residents of Cotati City of Cotati To the Residents of Cotati The City is proud to present you with Cotati s first Annual Financial Report to the Community for the fiscal year (FY) ended June 30, 2018. This report provides

More information

CAPITAL IMPROVEMENT PROGRAM SUMMARY

CAPITAL IMPROVEMENT PROGRAM SUMMARY CAPITAL IMPROVEMENT PROGRAM SUMMARY The purpose of the CIP Budget is to serve as a planning tool, which coordinates the financing and scheduling of major projects undertaken by the City. The CIP Budget

More information

Operating and Capital Improvement Program Budget Proposals Fiscal Year 2018/2019. City of Placerville, California June 12, 2018

Operating and Capital Improvement Program Budget Proposals Fiscal Year 2018/2019. City of Placerville, California June 12, 2018 Operating and Capital Improvement Program Budget Proposals Fiscal Year 2018/2019 City of Placerville, California June 12, 2018 2 Overview Sales Tax Trends General Fund Budget Other City Fund Budgets Capital

More information

INVESTING STRATEGICALLY

INVESTING STRATEGICALLY 11 INVESTING STRATEGICALLY Federal transportation legislation (Fixing America s Surface Transportation Act FAST Act) requires that the 2040 RTP be based on a financial plan that demonstrates how the program

More information

Quarterly Status Report

Quarterly Status Report Capital Projects Quarterly Status Report 3rd Quarter FY2017: January 1 March 31, 2017 Prepared for the June 7, 2017 SamTrans Board Meeting San Mateo County Transit District San Mateo County Transit District

More information

Section E. Recap By Fund. Table of Contents

Section E. Recap By Fund. Table of Contents Section E. Recap By Fund Table of Contents Fund # Fund Name Page # General Purpose Funds 001 General Fund... E-3 037 Self-Insurance Claim Reserve... E-9 061 Youth Services Endowment Fund... E-11 Special

More information

Budget Narrative Page 4. Fiscal Year

Budget Narrative Page 4. Fiscal Year CITY OF CARSON FISCAL YEAR 2017-18 (FY17-18) BUDGET NARRATIVE The reader of this narrative will have a good understanding of the City s budget structure, current budget challenges, and the future budget

More information

LEGEND Bridges Parks Fire Stations Project Locations Libraries Schools A

LEGEND Bridges Parks Fire Stations Project Locations Libraries Schools A LEGEND Bridges Parks Fire Stations Project Locations Libraries Schools A Aid to Construction Fund The Aid to Construction Fund (Water) are funds received from customers for requested water service and

More information

Memorandum. Date: February 21, 2018 To: From: Subject:

Memorandum. Date: February 21, 2018 To: From: Subject: Agenda Item 6 Memorandum Date: February 21, 2018 To: From: Subject: Transportation Authority Board Anna LaForte Deputy Director for Policy and Programming 3/13/2018 Board Meeting: Allocation of $8,795,721

More information

- RS. D e sig n atio n

- RS. D e sig n atio n ALEXANDER LIU CAI - RS Reserve D e sig n atio n Specialist Sample Table Of HOA Contents Project Table of Contents Page Preface i Executive Summary 1 Membership Disclosure Summary 2 Disclosure Statement

More information

AGENDA ITEM I-1 City Manager's Office

AGENDA ITEM I-1 City Manager's Office AGENDA ITEM I-1 STAFF REPORT City Council Meeting Date: 8/6/2018 Staff Report Number: 18-153-CC Informational Item: Quarterly update on the 2018 City Council work plan Recommendation This is an informational

More information

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade. Glossary GLOSSARY Advanced Construction (AC): Authorization of Advanced Construction (AC) is a procedure that allows the State to designate a project as eligible for future federal funds while proceeding

More information

Chapter 4: Plan Implementation

Chapter 4: Plan Implementation This chapter discusses the financial and regulatory needs associated with the implementation of this Transportation System Plan. Projected Funding for Transportation Improvements Projecting the revenue

More information

Special Budget Workshop April 5 th, 2016 Penybyrn at Maryfield 109 Penny Rd. High Point, NC. 6:30 pm. Minutes & General Account

Special Budget Workshop April 5 th, 2016 Penybyrn at Maryfield 109 Penny Rd. High Point, NC. 6:30 pm. Minutes & General Account Special Budget Workshop April 5 th, 2016 Penybyrn at Maryfield 109 Penny Rd. High Point, NC 6:30 pm Minutes & General Account Council Members Present: Mayor Volz, Council Member Montgomery, Nixon-Roney,

More information

City of Santa Monica Annual Financial Report of its

City of Santa Monica Annual Financial Report of its Annual Financial Report of its Proposition A Local Return Fund Proposition C Local Return Fund Measure R Local Return Fund Transportation Development Act Article 3 Fund As of and for the Years Ended June

More information

Ada Township Capital Improvements Plan Adopted February 28, 2011

Ada Township Capital Improvements Plan Adopted February 28, 2011 Ada Township Capital Improvements Plan 2011-2017 Adopted February 28, 2011 i ADA TOWNSHIP CAPITAL IMPROVEMENTS PLAN, 2011-2017 February 28, 2011 TABLE OF CONTENTS Page Introduction... 1 Benefits and Uses

More information

Overview of the 2016 Proposed Budget

Overview of the 2016 Proposed Budget Overview of the 2016 Proposed Budget City of Burnsville November 24, 2015 2016 Budget Process Meeting Dates June 9 July 14 August 11 September 8 October 20 October 27 Discussion Topics Financial Management

More information

Baytree Community Development District

Baytree Community Development District Adopted Budget FY 2017 Presented by: Table of Contents 1-10 General Fund 11-12 Capital Projects Fund 13 Pavement Management Fund 14 Community Beautification Fund 15 O&M Assessment Calculation 16 IOB Roadway

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 20172018 AGENCY CONTACT INFORMATION Agency Name: City of Fremont Date: 12/21/2018 Primary Point of Contact Name: Tish Saini

More information

CITY OF SANTA ANA FISCAL YEAR PROPOSED BUDGET SUMMARY

CITY OF SANTA ANA FISCAL YEAR PROPOSED BUDGET SUMMARY CITY OF SANTA ANA FISCAL YEAR 2017-2018 PROPOSED BUDGET SUMMARY Work-Study Session May 16, 2017 FISCAL YEAR 2017-18 PROPOSED BUDGET SUMMARY GENERAL FUND APPROPRIATIONS FY 2017-2018 Community Safety Youth,

More information

SPECIAL EVENTS PROCEDURE

SPECIAL EVENTS PROCEDURE Procedure Date Policy Description Adoption Date Amendment Date Page/Section 2/6/2009 Special Events Procedure 10/21/2013 SPECIAL EVENTS PROCEDURE I. INTENT a. A Special Events Permit shall only be required

More information

Capital Improvement Plan. Fiscal Year through Fiscal Year

Capital Improvement Plan. Fiscal Year through Fiscal Year Fiscal Year 2015-16 through Fiscal Year 2020-21 Adopted: May 20, 2015 Overview City of Jonesville 2015-16 through 2020-21 The (CIP) is a six year schedule of all proposed major capital improvement projects

More information

OVERSIGHT OF MEASURE C SPENDING THE CITIZENS OVERSIGHT COMMITTEE

OVERSIGHT OF MEASURE C SPENDING THE CITIZENS OVERSIGHT COMMITTEE MEASURE C SCHOOL SAFETY AND MODERNIZATION On November 3, 2009 the voters residing in the Mill Valley School District (MVSD) approved the Measure C Safety and Modernization Bond of 2009 (Measure C). Measure

More information

PUBLIC FACILITIES ELEMENT

PUBLIC FACILITIES ELEMENT PUBLIC FACILITIES ELEMENT E l C e n t r o G e n e r a l P l a n This Implementation Program provides actions to implement the adopted policies and plans identified in the Public Facilities Element. The

More information