ACTION TRANSMITTAL No
|
|
- Claire Watkins
- 5 years ago
- Views:
Transcription
1 Transportation dvisory Board of the Metropolitan Council of the Twin Cities DTE: December 6, 2017 TO: CTION TRNSMITTL No TC Funding and Programming Committee PREPRED BY: Joe Barbeau, Senior Planner ( SUBJECT: REQUESTED CTION: POSSIBLE CTIONS: Scope Change Request for MnDOT s TH 41 TMS Installation and Signal Optimization Project MnDOT requests a scope change to its TH 41 TMS Installation and Signal Optimization Project (SP # to eliminate signal cabinets and fiber optic interconnect with a federal funding reduction from $597,840 to $381,600. The Committee can recommend approval or denial of the request. If it recommends approval, the committee can recommend the requested federal amount or an adjusted federal amount. BCKGROUND ND PURPOSE OF CTION: MnDOT was awarded $564,000 ($597,840, after inflation adjustment in Congestion Management and ir Quality (CMQ Program funds in the 2014 Regional Solicitation to install an advanced traffic management system (TMS and optimize signals along Trunk Highway 41 from Second Street to Trunk Highway 5 in Carver County. The project is programmed for fiscal year Three additional projects, the TH 41 intersection improvement project in Chaska and two future projects in Downtown Chaska and on Lyman Boulevard lead the project to need fewer elements. Specifically, the following elements were retained and removed from the project: Retained: 15 signal re-timings 16,520 feet of fiber Camera: Engler (County 10 Camera: Canyon / Park & Ride Camera: Hundertmark Camera: Pioneer Trail Camera: Hazeltine Cabinet: Crosstown/Victoria Cabinet: Engler (County 10 Cabinet: 212 South ramp Cabinet: 212 North ramp Cabinet: Hazeltine Removed: 7,155 feet of fiber Camera: Second Street Camera: Fourth Street Camera: Chaska Blvd (County 61 Cabinet: Walnut Cabinet: Chaska Blvd (County 61 Cabinet: Pioneer Trail Because the signal timing elements remain intact in the proposal, the project termini would not change. RELTIONSHIP TO REGIONL POLICY: Projects that receive funding through the Regional Solicitation process are subject to the regional scope change policy. The purpose of this policy is to ensure that the project is designed and constructed according to the plans and intent described in the 390 North Robert St., St. Paul, Minnesota ( Fax ( ; Page 1
2 original application. dditionally, federal rules require that any federally-funded project scope change must go through a formal review and TIP amendment process if the project description or total project cost changes substantially. The scope change policy and process allow project sponsors to adjust their projects as needed while still providing substantially the same benefits described in their original project applications. TIP amendment request is not included with this request, as the proposed change would not alter the project description and the proposed cost change would not warrant a TIP amendment. STFF NLYSIS: This project was funded through the Roadway System Management (RSM category in the 2014 Regional Solicitation. Because every RSM project was funded in that Solicitation, staff did not work with scorers to determine an overall scoring change, as a determination that an unfunded project would have scored above it is not feasible. The amount of federal funding to be removed from the project should be considered based on the proposed changes. The project was originally funded at a cost of $747,300, with an 80% federal contribution of $597,840. The applicant s revised cost estimate shows a total of $477,000 with an 80% federal contribution of $381,600. The original and revised estimates shown on the final page of the attached scope change request show the cost of each element and staff believes that the requested funding amount would be appropriate, should TB approve this request. This would lead to a return of $216,240 to the region for fiscal year ROUTING TO CTION REQUESTED COMPLETION DTE TC Funding & Programming Committee Review & Recommend - Technical dvisory Committee Review & Recommend - Transportation dvisory Board Review & pprove ; Page 2
3 ; Page 3
4 Scope Change Request TMS Installation and Signal Optimization SP (TH 41 Location Map map showing the location of the project within the area and region is attached as Exhibit. It also explains the project purpose and need statement. Revised Project Description Over the past 3 years several projects have surfaced which reduced the scope of SP These projects are detailed below and the corresponding work associated with them is shown. s each of these projects came through separate means of funding (Regional Solicitation, Cooperative greement Solicitation, and State Road Construction/Preservation it is important to remember the timelines for each as they were not known at the time of the original solicitation for CMQ funds. SP STIP Description: MN41, 0.1 MI S OF MN RIVER TO CRVER-CSH 61 IN CHSK - BITUMINOUS MILL ND OVERLY, MEDIN INSTLLTION, TURN LNES, SIGNL MODIFICTIONS, D, REHB BRIDGE #10012, DRINGE This project would provide modifications to the signal systems on TH 41 2 nd Street, 4 th Street, and a replacement of the signal system 6 th Street (Chaska BLVD. It reduces the need to provide a signal cabinet at the intersection of Old US 212 & Walnut because that signal was turned back to Carver County as part of agreement # It also reduces the need to provide a signal cabinet on TH 41 6 th Street (Chaska BLVD. The corresponding fiber optic interconnect (approximately 1,665 feet, cameras, and splice vault/pigtails for the intersections will be eliminated. The total reduction in cost of these physical elements would be approximately $137,500 - see Exhibit B for a more detailed reduction is cost spreadsheet. SP STIP Description: MN41, FROM US212 TO 0.3 MI N CSH 14 IN CHSK- RODWY RECONSTRUCTION ND EXPNSION, INTERSECTION IMPROVEMENTS, SIGNLS ND D (TIED TO ND E This project will replace the signals on TH 41 Hudertmark Road and TH 41 Pioneer Trail. It reduces the need to provide a signal cabinet on TH 41 Pioneer Trail. The total reduction in cost of this would be approximately $39,000 - see Exhibit B for a more detailed reduction is cost spreadsheet. SP (FY 2019 COOPERTIVE GREEMENT PROJECT Description: TH 41 T CSH 18 (LYMN BLVD INTERSECTION RECONSTRUCTION This project will replace the existing span wire signal system with a roundabout. It reduces the need to provide fiber optic interconnect and splice vault/pigtail from TH 41 Hazeltine BLVD to TH 41 Lyman BLVD. The total reduction in cost of this would be approximately $51,500 - see Exhibit B for a more detailed reduction is cost spreadsheet ; Page 4
5 Project Layout layout showing the original elements of the project (Cabinets, Cameras, and Fiber is attached as Exhibit C. layout showing the revised elements of the project (cabinets, cameras, and fiber is attached as Exhibit D. Work to be completed The signal plan for this project is currently being designed. The project is currently programmed for a March 23, 2018 letting. Revised cost estimate ttached in Exhibit E is the original cost estimate for the project of $705,000 ($747,000 after inflation and the revised cost estimate for the project of $477, ; Page 5
6 Exhibit Location Map FISCL YER: STTE PROJECT: METRO SCOPING ID: LOCTION: CMQ - Install TMS system and signal optimization - (includes Fiber, cameras, cabinet upgrades, signal retiming DESCRIPTION: 5 13 PROJECT MNGER: 5 18 CITY: Gerbensky, Michael On TH 41 from 2nd Street to TH 5 Carver 17 RP FUNCTIONL RE: Chanhassen, Chaska 43 COUNTY: Traffic Engineering, Ca r v e r Co u n t y The purpose is to improve traffic flow and reduce delays to the traveling public through an dvanced Traffic Management System (TMS along the signalized arterial. The traffic signals will be retimed to optimize traffic flow, reducing delays and improving the air quality. Fiber optic interconnection, upgraded traffic signal controllers will enable the traffic signals to be optimized, and the traffic surveillance cameras will be used to continuously... (more info* PURPOSE STTEMENT: Eden Prairie Lak et ow n The need is to install an dvanced Traffic Management System (TMS along the signalized arterial to optimize traffic flow, reduce delays, improve the air quality, and provide traffic surveillance of the arterial. This includes upgrading the traffic signal controllers, retiming the traffic signals, the installation of Ethernet fiber optic communications between the intersections with communications back to the RTMC (Regional Traffic Management Center, and traffic surveillance cameras. NEED STTEMENT: , * See project documentation for more information. Legend Project rea! ( / Signal Systems (Known Bridges MnDOT Right of Way* 61 C hask a 69 Reference Posts Interstate US MN D ahl gre n 140 Railroad Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCN, Esri Japan, METI, Esri China (Hong Kong, Esri (Thailand, Ramp Sc o t t Co u n t y Jac ks on County Routes Street Names Counties Civil Townships Loui sv i ll e Cities 79 RP , Created Date: 10/10/2015 Page 6 Metro ; Scoping Project ID:
7 EXHIBIT B REDUCTION IN COST FOR TH 41 METRO CMQ PROJECT Mobilzation & Fiber Interconnect Splice Vault & Pigtails Cameras Testing Sub Total Cover Total s Of 11/15/2017 Controller and Signal Timing Cost Miles Feet Total $7.00/ft Total $5K VMS Number Cost ref # Ref Pnt Cabinet Timing $ 3, $ 7.00 Number $5,000 $ 10, $ 11, %+1000 TH 41 in Chaska 1 TH 41 & 2nd St $ $ - 1 $5,000 1 $10,000 2 TH 41 & 4th St $ $ 5, $5,000 1 $10,000 3 TH (Old US 212 & Walnut (Carver Co Sig $30, $ 1, $5,000 0 $0 4 TH 41 & Chaska Blvd (61 (Old US $30, $ 5, $5,000 1 $10, TH 41 & Hundertmark $ TH 41 & Pioneer Tr $30, TH 41 & Lyman $ 38, $5,000 Totals $90, $ $ 50, $ 25, $ - 3 $ 30, $ 11, $ 206, $ 21, $ 228, $228,000 Fed (80% $ 72, $ - $ 40, $ 20, $ - $ 24, $ 9, $ 165, $ 17, $ 182, $182,400 SC (20% $ 18, $ - $ 10, $ 5, $ - $ 6, $ 2, $ 41, $ 4, $ 45, $45,600 SP SP SP ; Page 7
8 Exhibit C STTE PROJECT: METRO SCOPING ID: LOCTION: CMQ - Install TMS system and signal optimization - (includes Fiber, cameras, cabinet upgrades, signal retiming RP Í DESCRIPTION: 17 FISCL YER: Original Project Layout Í5 Vi c t o r i a RP 45 Chanhassen 18 On TH 41 from 2nd Street to TH 5 TRFFIC ENGINEERING: Key Contacts in Traffic Engineering by Subject Type are... *Note* Only the overhead sign structures with a need are labeled in this map. RP 5 Lake t ow n Camera Signal Systems Cabinet 101 Í Fiber RP RP Chas ka D ahlg re n 0 Ch ask a 1 Miles Jac ks on 69 RP 145 Carv er Created Date: 11/15/2017 Shak opee Metro Scoping Project ID: 169 Page 8 Metro ; Scoping Project ID:
9 Exhibit D STTE PROJECT: METRO SCOPING ID: LOCTION: CMQ - Install TMS system and signal optimization - (includes Fiber, cameras, cabinet upgrades, signal retiming RP Í DESCRIPTION: 17 Í5 Vi c t o r i a FISCL YER: Revised Project Layout RP 45 Chanhassen 18 On TH 41 from 2nd Street to TH 5 TRFFIC ENGINEERING: Key Contacts in Traffic Engineering by Subject Type are... *Note* Only the overhead sign structures with a need are labeled in this map. Lake t ow n RP 5 Camera Signal Systems Cabinet 101 Í Fiber RP RP Chas ka Shak opee 140 D ahlg re n 0 Ch ask a Jac ks on 1 Miles 69 RP 145 Created Date: 11/15/2017 Metro Scoping Project ID: Carv er 169 Page 9 Metro ; Scoping Project ID:
10 EXHIBIT E ORIGINL METRO CMQ PROJECT Mobilzation & Fiber Interconnect Splice Vault & Pigtails Cameras Testing Sub Total Cover Total s Of 10/31/2014 Controller and Signal Timing Cost Miles Feet Total $7.00/ft Total $5K VMS Number Cost ref # Ref Pnt Cabinet Timing $ 3, $ 7.00 Number $5,000 $ 10, $ 40, %+1000 TH 41 in Chaska 1 TH 41 & 2nd St $ $3, $ - 1 $5,000 1 $10,000 2 TH 41 & 4th St $ $3, $ 5, $5,000 1 $10,000 3 TH (Old US 212 & Walnut (Carver Co Sig $30, $3, $ 1, $5,000 0 $0 4 TH 41 & Chaska Blvd (61 (Old US $30, $3, $ 5, $5,000 1 $10,000 5 TH 41& Crosstown/Victoria $30, $3, $ 24, $5,000 1 $10,000 6 TH 41 & Engler ( $30, $3, $ 16, $5,000 1 $10,000 7 TH 41 & Canyon/ Park & Ride $ $3, $ 18, $5,000 0 $0 8 TH 41 & 212 SR $30, $3, $ 4, $5,000 0 $0 9 TH 41 & 212 NR Fiber Connection $30, $3, $ 3, $5,000 0 $0 10 TH 41 & Hundertmark $ $3, $ 8, $5,000 1 $10, TH 41 & Pioneer Tr $30, $3, $ 22, $5,000 1 $10, TH 41 & Hazeltine $30, $3, $ 16, $5,000 1 $10, TH 41 & Lyman $3, $ 38, $5, TH 41 & 82nd $3, TH 41 & TH $3,000 Totals $240, $ 45, $ 165, $ 65, $ - 8 $ 80, $ 40, $ 635, $ 64, $ 700, $705,000 Fed (80% $ 192, $ 36, $ 132, $ 52, $ - $ 64, $ 32, $ 508, $ 51, $ 560, $564,000 SC (20% $ 48, $ 9, $ 33, $ 13, $ - $ 16, $ 8, $ 127, $ 12, $ 140, $141,000 REVISED COST ESTIMTE METRO CMQ PROJECT Mobilzation & Fiber Interconnect Splice Vault & Pigtails Cameras Testing Sub Total Cover Total s Of 11/15/2017 Controller and Signal Timing Cost Miles Feet Total $7.00/ft Total $5K VMS Number Cost ref # Ref Pnt Cabinet Timing $ 3, $ 7.00 Number $5,000 $ 10, $ 31, %+1000 TH 41 in Chaska 1 TH 41 & 2nd St $ $3,000 $ - $0 $0 2 TH 41 & 4th St $ $3,000 $ - $0 $0 3 TH (Old US 212 & Walnut (Carver Co Sig $ $3,000 $ - $0 $0 4 TH 41 & Chaska Blvd (61 (Old US $ $3,000 $ - $0 $0 5 TH 41& Crosstown/Victoria $30, $3, $ 24, $5,000 1 $10,000 6 TH 41 & Engler ( $30, $3, $ 16, $5,000 1 $10,000 7 TH 41 & Canyon/ Park & Ride $ $3, $ 18, $5,000 $0 8 TH 41 & 212 SR $30, $3, $ 4, $5,000 $0 9 TH 41 & 212 NR Fiber Connection $30, $3, $ 3, $5,000 $0 10 TH 41 & Hundertmark $ $3, $ 8, $5,000 1 $10, TH 41 & Pioneer Tr $ $3, $ 22, $5,000 1 $10, TH 41 & Hazeltine $30, $3, $ 16, $5,000 1 $10, TH 41 & Lyman $3,000 $ - $0 14 TH 41 & 82nd $3, TH 41 & TH $3,000 Inflated $747, $597, $149, Totals $150, $ 45, $ 115, $ 40, $ - 5 $ 50, $ 31, $ 432, $ 44, $ 476, $477,000 Fed (80% $ 120, $ 36, $ 92, $ 32, $ - $ 40, $ 25, $ 345, $ 35, $ 381, $381,600 SC (20% $ 30, $ 9, $ 23, $ 8, $ - $ 10, $ 6, $ 86, $ 8, $ 95, $95, ; Page 10
ACTION TRANSMITTAL No
Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: December 21, 2017 TO: FROM ACTION TRANSMITTAL No. 2018-07 Technical Advisory Committee TAC Funding and Programming Committee
More information10-Year Capital Highway Investment Plan DRAFT
This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 10-Year Capital Highway
More informationACTION TRANSMITTAL No
Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL No. 209-04 DATE: January 7, 209 TO: FROM: PREPARED BY: SUBJECT: REQUESTED ACTION: RECOMMENDED MOTION: Transportation
More informationOakland Park Transportation Improvement Program (TIP) Projects. Mobility. Oakland Park Blvd. Total Funding Amounts ($):
Oakland Park 2016-2020 Transportation Improvement Program (TIP) Projects 4358081 4346971 4359251 4360971 4366851 4331651 4368751 4316721 4316721 4260161 4387321 Legend Projects Interstates Roadway Mobility
More informationCorridors of Commerce DRAFT Scoring and Prioritization Process. Patrick Weidemann Director of Capital Planning and Programming November 1, 2017
Corridors of Commerce DRAFT Scoring and Prioritization Process Patrick Weidemann Director of Capital Planning and Programming November 1, 2017 Project Purpose To develop and implement a scoring and project
More informationTransportation Improvement Program
Transportation Improvement Program Transportation Conformity Check List The Transportation Improvement Program (TIP) and all amendments must include a conformity report. The conformity report must address
More informationAnnual Listing of Obligated Projects Federal Fiscal Year 2013
Annual Listing of Obligated Projects Federal Fiscal Year 2013 Nashua Regional Planning Commission 9 Executive Park Drive Suite 201 Merrimack, NH 03054 (603) 424-2240 www.nashuarpc.org A N N U A L L I S
More information10-Year Capital Highway Investment Plan DRAFT
10-Year Capital Highway Investment Plan DRAFT 2018-2027 DRAFT AUGUST 2017 1 Table of Contents PURPOSE OF 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN... 1 This page intentionally left blank. SUMMARY OF INVESTMENT
More informationApproved STIP Formal Amendments for the Period of 11/01/2018-3/15/2019
3116-151 Hwy 169 from Taconite to Pengilly, Safety Improvements 5409-32 Concrete resurface, raise grade at levee's, install lighting, improve drainage and pedestrian accessibility on Hwy 75 in Halstad
More informationCity of Grand Forks Staff Report
City of Grand Forks Staff Report Committee of the Whole November 28, 2016 City Council December 5, 2016 Agenda Item: Federal Transportation Funding Request Urban Roads Program Submitted by: Engineering
More informationEnd-of-Session Update
End-of-Session Update Transportation Advisory Board Prepared by MnDOT, Office of Government Affairs June 21, 2017 The Sources of New Funding: Major provisions include: Dedicating Vehicle Rental Taxes,
More information10-Year Capital Highway Investment Plan
10-Year Capital Highway Investment Plan 2017-2026 OCTOBER 2016 1 Table of Contents PURPOSE OF 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN...1 This page intentionally left blank. SUMMARY OF INVESTMENT PLANS...6
More informationBRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION
BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION Amendment # 2 FY 2017-2020 Transportation Improvement Program Amendment Summary: The Transportation Improvement Program (TIP)
More informationDevelopment of the Cost Feasible Plan
March 15, 2012 TPO Board and Advisory Committee Meetings Development of the Cost Feasible Plan Transportation Outlook 2035 LRTP Update Atkins Development of the Cost Feasible Plan P a g e 1 Development
More informationTransportation Planning
Metropolitan Council Presentation Transportation Planning House Transportation and Regional Governance Committee January 25, 2017 Council has two primary roles in Transportation Planning Serves as the
More informationMnDOT Highway Construction Outlook
MnDOT Highway Construction Outlook Mark Gieseke MnDOT Office of Capital Programs & Performance Measures Minnesota Transportation Alliance November 1, 2012 MnDOT Highway Construction Outlook Forecast Accuracy
More informationHIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP)
HSIP GUIDEBOOK & APPLICATION FORM HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) Greater Minnesota Solicitation for District Projects State Fiscal Years 2019, 2020, 2021 and 2022 September 2017 2017 HSIP Solicitation
More informationNASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY
NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY 2008-2011 Amendment Conformity Report for August 20, 2008 Amendments (Amendment # 2008-028 thru 2008-030) On August 20, 2008 the Executive Board
More informationTransportation Advisory Board of the Metropolitan Council of the Twin Cities INFORMATION ITEM. DATE: July 12, 2018
Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: July 12, 2018 TO: PREPARED BY: SUBJECT: BACKGROUND: INFORMATION ITEM TAC Planning Committee Steve Peterson, Highway Planning
More informationNASHVILLE AREA MPO. ADJUSTMENT to The Fiscal Years Transportation Improvement Program. Adjustment Number: TIP Number:
NASHVILLE AREA MPO ADJUSTMENT to The Fiscal Years 20082011 Transportation Improvement Program Adjustment Number: 2009019 TIP Number: 200852034 FROM: TIP# 200852034 Jurisdiction: Hendersonville Project:
More informationOkaloosa-Walton 2035 Long Range Transportation Plan Amendment
Okaloosa-Walton 2035 Long Range Transportation Plan Amendment Adopted August 22, 2013 This report was financed in part by the U.S. Department of Transportation, Federal Highway Administration, the Florida
More informationSOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement
SOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement Quarterly Report No. 6 (September 1 November 30, 2017) Prepared by: Minnesota Department of Transportation
More information2016 PAVEMENT CONDITION ANNUAL REPORT
2016 PAVEMENT CONDITION ANNUAL REPORT January 2017 Office of Materials and Road Research Pavement Management Unit Table of Contents INTRODUCTION... 1 BACKGROUND... 1 DATA COLLECTION... 1 INDICES AND MEASURES...
More informationTransportation Committee
Business Item No. 2013-341 Consent Transportation Committee Meeting date: December 9, 2013 For the Metropolitan Council meeting of January 15, 2014 Subject: 2014-2017 TIP Amendment for North Urban Regional
More informationChapter 7. Future Network and Implementation
Chapter 7. Future Network and Implementation Background and Overall Approach The previous Range of Alternatives Chapter provides a summary of how the Universe of Projects list was developed, which encompasses
More informationSOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement. Quarterly Report No. 4 (March 1 May 31, 2017)
SOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement Quarterly Report No. 4 (March 1 May 31, 2017) Prepared by: Minnesota Department of Transportation 395
More informationTransportation Improvement Program
Transportation Improvement Program Transportation Conformity Check List The Transportation Improvement Program (TIP) and all amendments must include a conformity report. The conformity report must address
More informationLake Region Electric Cooperative, Inc Annual Report
Lake Region Electric Cooperative, Inc. 2016 Annual Report Message from the CEO and Board President To our Members, LREC wrapped up fiscal year 2016 (FY 2016) maintaining a healthy financial position despite
More informationALL Counties. ALL Districts
TEXAS TRANSPORTATION COMMISSION ALL Counties rhnute ORDER Page of ALL Districts The Texas Transportation Commission (commission) finds it necessary to propose amendments to. and., relating to Transportation
More information10-Year Capital Highway Investment Plan
10-Year Capital Highway Investment Plan 2016-2025 DECEMBER 2015 1 This page intentionally left blank. TABLE OF CONTENTS Purpose of 10-Year Capital Highway Investment Plan...1 Summary of 10 Year Plan Investments...5
More informationHIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) Greater Minnesota Solicitation for Local Projects for 2017, 2018, 2019, and 2020.
HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) Greater Minnesota Solicitation for Local Projects for 2017, 2018, 2019, and 2020 August 2015 GUIDEBOOK & APPLICATION FORM HSIP HSIP Funding Guide Page 1 HSIP Funding
More informationTransportation Finance Overview. Presentation Contents
Transportation Finance Overview Matt Burress House Research Department matt.burress@house.mn Andy Lee House Fiscal Analysis andrew.lee@house.mn January 5 th & 10 th, 2017 Presentation Contents 2 Part 1:
More informationUNIFIED TRANSPORTATION PROGRAM
2002 UNIFIED TRANSPORTATION PROGRAM Blank Page SUMMARY OF CATEGORIES CATEGORIES NUMBER, NAME AND YEAR ESTABLISHED PROGRAMMING AUTHORITY FUNDING BANK BALANCE (Yes/) RESPONSIBLE ENTITY RANKING INDEX OR ALLOCATION
More informationChapter 4: Regional Transportation Finance
4.1 Chapter 4: Regional Transportation Finance 2040 4.2 CONTENTS Chapter 4: Transportation Finance Overview 4.3 Two Funding Scenarios 4.4 Current Revenue Scenario Assumptions 4.5 State Highway Revenues
More informationPotential Changes to the 2015 to 2018 TIP Highway List. Proposed Administrative Adjustment #3
Potential Changes to the 2015 to 2018 TIP Highway List Proposed Administrative Adjustment # PROJECT #60644, WORCESTER CENTRAL BUSINESS DISTRICT STREETSCAPE IMPROVEMENTS Move the FY 2015 Statewide Transportation
More informationGLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.
Glossary GLOSSARY Advanced Construction (AC): Authorization of Advanced Construction (AC) is a procedure that allows the State to designate a project as eligible for future federal funds while proceeding
More informationWatertown City Council
City of Watertown Watertown City Council November 24 th, 2015 Agenda Item: Community Profile and EDA Loan Policies and Application Request for Action: Presentation of Community Profile and EDA Loan Materials
More informationBHJTS TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL, STATE & LOCAL PROJECTS 2016 THROUGH 2019 FOUR-YEAR SHORT RANGE PROGRAM
TOTAL PROJECT ESTIMATE ($) STATE ALLOCATION CODE (SAC) FUND TYPE ENCUMBERED FROM BEFORE FY 2011 PE/RW PRIOR TO FY 2016 LOCAL MATCH LOCAL LABOR STATE LABOR FED LABOR & TSKF LINE ITEM # ST. LINE ITEM
More informationSOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement
SOUTHWEST LIGHT RAIL TRANSIT PROJECT (METRO GREEN LINE EXTENSION) Section 106 Memorandum of Agreement Quarterly Report No. 9 (June 1, 2018 August 31, 2018) Prepared by: Minnesota Department of Transportation
More informationMankato / North Mankato Area Planning Organization Transportation Improvement Program FY
Mankato / North Mankato Area Planning Organization Transportation Improvement Program FY 2017-2020 Prepared by the Mankato / North Mankato Area Planning Organization September 2016 To view this plan online
More informationPioneer Valley Transportation Improvement Program (TIP) Proposed Amendments January 2017
2017-2021 Pioneer Valley Transportation Improvement Program (TIP) Proposed Amendments January 2017 HIGHWAY AMENDMENTS FEDERAL FISCAL YEAR 2017 Part 1A: Federal Aid Target Projects Increase cost of (604033)
More informationPrioritization and Programming Process. NCDOT Division of Planning and Programming November 16, 2016
Prioritization and Programming Process NCDOT Division of Planning and Programming November 16, 2016 Today s Roadmap 1. Planning and Programming Division Overview 2. Strategic Investments (STI) Law 3. Prioritization
More informationACTION TRANSMITTAL No
Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: November 6, 2017 TO: FROM: ACTION TRANSMITTAL No. 2017-30 Transportation Advisory Board Technical Advisory Committee PREPARED
More informationMPO Staff Report MPO EXECUTIVE BOARD: August 16, 2017
MPO Staff Report MPO EXECUTIVE BOARD: August 16, 2017 RECOMMENDED ACTION: August 30 th Open House Matter of Kick-off for 2045 Street/Highway Element Background: The UPWP identifies that the major undertaking
More informationMinnesota Transportation Funding Redistribution ( ) Who Contributes More, Who Receives More?
Minnesota Transportation Funding Redistribution (2009-2014) Who Contributes More, Who Receives More? Jerry Zhao, zrzhao@umn.edu Adeel Lari, larix001@umn.edu Shengnan Lou, louxx104@umn.edu March 4 rd, 2017
More informationChapter 6: Financial Resources
Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation
More informationReview and Update of Year 2035 Regional Transportation Plan
Review and Update of Year 2035 Regional Transportation Plan #217752 1 Background Every four years, the Year 2035 Plan is reviewed Elements of review Validity of Plan Year 2035 forecasts Transportation
More informationFY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary
FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary The adopted FY 2016 FY 2020 CIP is $205.3 million (including prior year expenditures) and is $2.9 million lower than the previous CIP
More informationUnified Planning Work Program
Unified Planning Work Program New Orleans, Mandeville Covington, Slidell, and Tangipahoa Parish Urbanized Areas ADDENDA FY 2016 2 P a g e Unified Planning Work Program Fiscal Year 2016 Urbanized Areas
More informationReport on the MnDOT Cost Participation Policy Update. February 19, 2016
Report on the 2016 MnDOT Cost Participation Policy Update February 19, 2016 1 Prepared by The Minnesota Department of Transportation 395 John Ireland Boulevard Saint Paul, Minnesota 55155-1899 Phone: 651-296-3000
More informationCHAPTER 2 BACKGROUND. Update of Previous Planning Work. Plan Development Process. Public Involvement and Review Process
CHAPTER 2 BACKGROUND What Is the 2030 TSP? Update of Previous Planning Work Plan Development Process Public Involvement and Review Process Hennepin County Transportation Systems Plan (HC-TSP) Chapter 2
More informationMankato / North Mankato Area Planning Organization Transportation Improvement Program FY
Mankato / North Mankato Area Planning Organization Transportation Improvement Program FY 2018-2021 Prepared by the Mankato / North Mankato Area Planning Organization July 2017 To view this plan online
More informationChapter 3: Regional Transportation Finance
Chapter 3: Regional Transportation Finance This chapter examines the sources of funding for transportation investments in the coming years. It describes recent legislative actions that have changed the
More informationFY STIP. Houston District. November Quarterly Revisions TRANSIT STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM TRANSIT Houston District November Quarterly Revisions November 2011 HOUSTON-GALVESTON AREA COUNCIL PO Box 22777 3555 Timmons Ln. Houston,
More informationMN Asphalt Construction & Quality Workshop
MN Asphalt Construction & Quality Workshop 1. Construction Program Outlook 2. Delayed Budget Projects 3. Project Selection Audit 4. MnSHIP 5. New Funding Priorities 6. Corridors of Commerce 7. Balanced
More informationLake Region Electric Cooperative, Inc. Annual Report
2015 Lake Region Electric Cooperative, Inc. Annual Report Message from the CEO and President 1 Lake Region Electric Cooperative s mission, adopted by the board of directors, charges the cooperative to
More informationCost Feasible Plan Technical Report TRANSPORTATION OUTLOOK 2035 OKALOOSA-WALTON 2035 LONG RANGE TRANSPORTATION PLAN UPDATE.
Cost Feasible Plan Technical Report TRANSPORTATION OUTLOOK 2035 OKALOOSA-WALTON 2035 LONG RANGE TRANSPORTATION PLAN UPDATE Prepared for the Okaloosa-Walton Transportation Planning Organization and The
More informationTRANSPORTATION CAPITAL PROGRAM
TRANSPORTATION CAPITAL PROGRAM The transportation capital program for fiscal year 2016 through fiscal year 2020 consists of a variety of transportation construction and maintenance capital projects primarily
More informationAttachment B. Project Cost Estimates. Ridge Road Extension Alternatives Analysis
Attachment B Project Cost Estimates for: Ridge Road Extension Alternatives Analysis PREPARED FOR: Pasco County Engineering Services Department PREPARED BY: NV5, INC. 6989 E. FOWLER AVENUE TAMPA, FLORIDA
More informationTarget Formula Re-evaluation
Target Formula Re-evaluation Target Formula Background Target formula is used to distribute federal funding to the eight ATPs Current formula was developed in 1996 Reauthorization of federal transportation
More informationFY Unified Planning Work Program. FY 2017 Unified Planning Work Program
FY 2017 Unified Planning Work Program Kalamazoo Area Transportation Study 5220 Lovers Lane, Suite 110 Portage, MI 49002 (269) 343-0766 info@katsmpo.org www.katsmpo.org 1 [This page intentionally left blank.]
More informationFinancial Capacity Analysis
FINANCIAL CAPACITY ANALYSIS Introduction Federal transportation planning rules require that metropolitan area transportation plans include a financial capacity analysis to demonstrate that the plan is
More informationOutline. Process Purpose & Need System Scenarios Open House Comments Next Steps
Outline Process Purpose & Need System Scenarios Open House Comments Next Steps Study Process Study Began Fall 2014 Open Houses in Fall 2014 & Jan 2015 May 4 Council Meeting Extended study schedule Additional
More informationCity Engineers Association of Minnesota Annual Conference January 31, 2013
City Engineers Association of Minnesota Annual Conference January 31, 2013 Highway User Tax Distribution (HUTD) Fund Gas Tax Registration Tax Motor Vehicle Sales Tax (MVST) Trunk Highway Fund County State
More informationJACKSON METROPOLITAN PLANNING ORGANIZATION (MPO) TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
HINDS Project: 480001 Responsible Agency: CITY OF CLINTON Total Project Cost: $6,068,000 Route: PINEHAVEN/NORTHSIDE DR Fund Source: EARMARK Project Length: 1.25 Pinehaven Dr from Northside Dr to 400' N
More informationBOND ACCELERATED PROGRAM LEGISLATIVE REPORT ON TRUNK HIGHWAY BONDING JANUARY 13, 2006
BOND ACCELERATED PROGRAM LEGISLATIVE REPORT ON TRUNK HIGHWAY BONDING JANUARY 13, 2006 Minnesota Session Laws of 2003 1st Special Session Chapter 19 Article 3 TABLE OF CONTENTS INTRODUCTION... 1 I. Project
More informationColumbia River Crossing Project Vancouver, Washington Engineering (Rating Assigned November 2012)
Columbia River Crossing Project Vancouver, Washington Engineering (Rating Assigned November 2012) Summary Description Proposed Project: Light Rail Transit 2.9 Miles, 5 Stations Total Capital Cost ($YOE):
More informationMANKATO/NORTH MANKATO PLANNING ORGANIZATION Policy Board, Staff and Advisory Committee Listing
MANKATO/NORTH MANKATO PLANNING ORGANIZATION Policy Board, Staff and Advisory Committee Listing Policy Board Technical Advisory Committee Tim Auringer City of Eagle Lake Sheri Allen Mankato Area Public
More informationStephanie Smith, Project EngineerW
MEMORANDUM v TO: Paul Oehme, Director of Public Works/ City Engineer o FROM: Stephanie Smith, Project EngineerW 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 9522271100 Fax
More informationFinancial Snapshot October 2014
Financial Snapshot October 2014 Financial Snapshot About the Financial Snapshot The Financial Snapshot provides answers to frequently asked questions regarding MoDOT s finances. This document provides
More informationDecember 27, Mr. Patrick McKenna, Director Missouri Department of Transportation P.O. Box 270 Jefferson City, Missouri 65102
U.S. Department of Transportation Mr. Patrick McKenna, Director Missouri Department of Transportation P.O. Box 270 Jefferson City, Missouri 65102 Federal Transit Administration Federal Highway Administration
More informationEstimated Financial Summary for the Highway and Bridge Construction Schedule
Estimated Financial Summary for the 2017-2021 Highway and Bridge Construction Schedule Overview Section 5 of the Statewide Transportation Improvement Program explains the sources and projected levels of
More information...;..;...;.;;..;.. Additional preservation and safety needs have been identified and recommend to be programmed with funding available in FY2019.
DOT-1208 (6/09) (PROGRAM FISCAL YEAR IS OCTOBER 1 - SEPTEMBER 30) REVISION NUMBER: 19-001...;..;...;.;;..;.. J USTI FICA TION: Additional preservation and safety needs have been identified and recommend
More informationTEXAS CLEAR LANES AND CONGESTION RELIEF TASK FORCE COMMITTEE ACTIVITY
TEXAS CLEAR LANES AND CONGESTION RELIEF TASK FORCE COMMITTEE ACTIVITY Texas Transportation Commission September 26, 2018 Governor s Charge for Congestion Relief Initiative The State of Texas is spurring
More informationFY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary
FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary The adopted FY 2017 FY 2021 CIP is $235.8 million (including prior year expenditures) and is $28 million higher than the previous CIP
More information2008 UTILITIES STP 2,200,000 1,760, , CONST ES 11,200,000 11,200,000. FY Work Funding Total Fed State Local
NASHVILLE AREA MPO ADJUSTMENT to The Fiscal Years 20082011 Adjustment Number: 2009022 TIP Number: 2004068a FROM: TIP# 2004068a Agency/Jurisdiction: TDOT / Mt. Juliet Project: SR171 / Mt. Juliet Road Termini:
More informationChapter 5: Cost and Revenues Assumptions
Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions INTRODUCTION This chapter documents the assumptions that were used to develop unit costs and revenue estimates for the
More informationGuideway Status Report
Guideway Status Report November 2017 2017 Guideway Status Report 1 Prepared by: The Minnesota Department of Transportation 395 John Ireland Boulevard Saint Paul, Minnesota 55155-1899 Phone: 651-296-3000
More informationFlorida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District One
DISTRICT ONE PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make project investments in District One. In FY 2017 and FY 2018, current Turnpike projects total over $105 million within Okeechobee
More informationOHIO MPO AND LARGE CITY CAPITAL PROGRAM SFY 2015 SUMMARY
OHIO MPO AND LARGE CITY CAPITAL PROGRAM SFY 2015 SUMMARY TABLE OF CONTENTS MPO AND LARGE CITY PROGRAM OVERVIEW.. 3 MPO AND LARGE CITY SFY 2015 STP BUDGET SUMMARY......... 4 MPO AND LARGE CITY SFY 2015
More informationWASATCH FRONT REGIONAL TRANSPORTATION PLAN FINANCIAL PLAN. Technical Report 47 May 2007 DAVIS MORGAN SALT LAKE TOOELE WEBER
WASATCH FRONT REGIONAL TRANSPORTATION PLAN 2007-2030 FINANCIAL PLAN Technical Report 47 May 2007 DAVIS MORGAN SALT LAKE TOOELE WEBER 2030 RTP Financial Plan WASATCH FRONT REGIONAL TRANSPORTATION PLAN
More informationAppendix B Example Project Designs and Engineers Opinion of Costs
Appendix B Example Project Designs and Engineers Opinion of Costs 32 nd Street from E. 2 nd to Main Avenue CR 251 and CR 250 9 th Street Sidewalk Improvements 15 th Street Improvements Intermodal Facility
More informationSolano Local Agency Formation Commission 675 Texas St. Ste Fairfield, California (707) FAX: (707)
Solano Local Agency Formation Commission 675 Texas St. Ste. 6700 Fairfield, California 94533 (707) 439-3897 FAX: (707) 438-1788 Staff Report DATE: May 8, 2017 TO: FROM: SUBJECT: Local Agency Formation
More informationANNUAL PERFORMANCE AND EXPENDITURE REPORT
ANNUAL PERFORMANCE AND EXPENDITURE REPORT FY 2014 Task 1 ADMINISTRATION AND MANAGEMENT Task 1 encompasses the general administration of the Victoria MPO s transportation planning process. This is achieved
More informationTEXAS DEPARTMENT OF TRANSPORTATION
TEXAS DEPARTMENT OF TRANSPORTATION FY 2013-2016 2016 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HOUSTON DISTRICT AUGUST 2014 Quarterly Revision HIGHWAY August 2014 . HOUSTON-GALVESTON AREA COUNCIL
More informationARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of September 21, 2013
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of September 21, 2013 DATE: September 4, 2013 SUBJECT: Fiscal Year 2014 HB 2313 (House Bill 2313) Local Share Funding Allocations and Priorities
More informationINVESTING STRATEGICALLY
11 INVESTING STRATEGICALLY Federal transportation legislation (Fixing America s Surface Transportation Act FAST Act) requires that the 2040 RTP be based on a financial plan that demonstrates how the program
More informationOzarks Transportation Organization Transportation Improvement Program Amendment 4
FR125 Ozarks Transportation Organization 2014-2017 Transportation Improvement Program Amendment 4 SHUU FARMER EN1401 2014 JACKSON WILLARD FR84 FR129 SHO SH13 FR141 HUNT TIP Project Road FR94 County Line
More informationChapter VIII Financial Plan
Chapter VIII Financial Plan 2017-2020 Transportation Improvement Program ccording to the Metropolitan Planning regulations reaffirmed under the Fixing merica s Surface Transportation (FST) ct (23 CFR Part
More informationDraft. Amendment FY Unified Planning Work Program
FY 2018 FY Unified Planning Work Program Kalamazoo Area Transportation Study 5220 Lovers Lane, Suite 110 Portage, MI 49002 (269) 343-0766 www.katsmpo.org Page 1 of 75 [This page intentionally left blank.]
More informationTAX INCREMENTAL PROJECT PLAN
TAX INCREMENTAL PROJECT PLAN TAX INCREMENT DISTRICT #77 RUSHMORE GATEWAY CORRIDOR CITY OF RAPID CITY Prepared by the Rapid City Community Planning and Development Services Department April 2016 INTRODUCTION
More informationCHAPTER 5 INVESTMENT PLAN
CHAPTER 5 INVESTMENT PLAN This chapter of the 2014 RTP/SCS plan illustrates the transportation investments for the Stanislaus region. Funding for transportation improvements is limited and has generally
More informationChapter 6 Transportation Improvements & Financial Plan
Chapter 6 Transportation Improvements & Financial Plan Introduction Up to this point, this plan has provided a regional profile (the population, employment, and commuting patterns) of the RTPO and MPO
More informationFY Work Funding Total Fed State Local
NASHVILLE AREA MPO ADJUSTMENT to The Fiscal Years 20082011 Transportation Improvement Program Adjustment Number: 2010024 TIP Number: 2006201 FROM: TIP# 2006201 Jurisdiction: City of Murfreesboro Project:
More informationHow to Read the Project Modification Listings - Roadway Section
How to Read the Project Modification Listings - Roadway Section Sa m pl e The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation
More informationNorthern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer March 15, 2016
Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer March 15, 2016 Northern Virginia District Construction Performance Bill Cuttler, P.E. District Construction Engineer
More informationMemphis and Shelby County Division of Planning & Development
Memphis and Shelby County Division of Planning & Development 125 NORTH MAIN STREET, MEMPHIS, TENNESSEE 38103 Tel: (901) 576 7190 Fax: (901) 576 7272 Mark H. Luttrell, Jr. Mayor, Shelby County A C Wharton,
More informationA. Approve updated Measure R Early Action Project list (Attachment A) ; and
One Gateway Plaza Los Angeles, CA 90012-2952 213-922.2000 Te metro. net 21 PLANNING AND PROGRAMMING COMMITTEE OCTOBER 17, 2012 SUBJECT: ACTION: MEASURER 1-710 EARLY ACTION PROJECT LIST UPDATE APPROVE RECOMMENDATION
More informationMINNESOTA. Jurisdictional Realignment Project Phase 1 Report
MINNESOTA Jurisdictional Realignment Project Phase 1 Report January 2013 Table of Contents Executive Summary... 1 Objective... 1 Approach... 1 Prior studies... 2 Phase 1 Assigning the right roads to the
More information