1 Update on EPA s Proposed GHG Rule for Existing Power Plants Clare Breidenich Western Power Trading Forum WSPP Operating Committee March 11, 2015
2 Overview of 111(d) Proposal Sets rate-based emission performance targets (lbs CO2/MWH) for individual states for 2030 and interim Applies to fossil generators with capacity of greater than 25 MW that existed or were under construction as of January 2014 Individual targets determined by EPA application of building blocks that comprise best system of emission reductions (BSER) Significant flexibility for states No mandated compliance approach Conversion to mass-based targets allowed Multi-state or regional approaches allowed
3 Western State Concerns Appropriateness of individual state targets Technical assumptions in building blocks, e.g base year not representative of hydro conditions 70% capacity factor NGCC not realistic Goals for RE and EE not achievable Treatment of exported emissions for fossil generation and renewables not equitable Timeline for interim targets too aggressive Timeline for submission of state plans not sufficient Modular options for regional cooperation
4 FERC s role Chairman Cheryl La Fleur: infrastructure, markets, and convening and facilitating discussions about how to balance the core values of reliability, cost, and the environment. Not going to tell EPA what to do role is advisory General agreement that CPP increases need for new investment in transmission & gas infrastructure No clear ideas on how FERC can encourage regional market-based approaches, but a lot of entities advocating for such Some convergence on Reliability Safety-valve Not MATS model, rather Ex-ante look at state implementation plans. FERC encourage regional reliability organizations, RTOs, BAs to work with states Ex-post if contingencies
5 Reliability Assessments NERC Initial Reliability Assessment Potential issues with resource adequacy, Gas-Electricity interface, integration of variable energy resources Difficult to assess in absence of state compliance plans Ongoing assessment as rule finalized, state compliance plans begin to emerge WECC Preliminary Analysis Reliability risks higher under uncoordinated approaches One state s compliance plan can affect wider grid Input from WIEB on potential regional compliance models NERC & WECC plan more analyses of emerging compliance plans
6 Expectations for final Rule Final Rule Modification of Technical assumptions to BSER Averaging across multiple base year Phase-in of building block 2 Others Changes to individual state targets RE credit will probably stay with consuming state More flexibility in state-defined glide paths Options for regional cooperation Additional reliability considerations Draft Federal Implementation Plan Same stringency as state targets No RE or EE measures EPA signaling options including cap and trade
7 Implications for California Unless target changes, will not drive stringency of California programs California over complies even w/out imported RE EPA likely to accommodate multi-sector nature of California s cap and trade Won t require changes to program design What other states do may necessitate changes to California s rules for electricity imports But CARB won t want to modify unless source state prices carbon CARB awaiting legislative action on post 2020 Will likely initiate some sort of process later this year if no action
8 Looking Forward Final rule and draft federal plan expected mid-summer State implementation plans due 1-3 years later? Legal Challenges Murray Energy State challenges EPA Authority Individual State Targets Outside-the-fence measures
9 Questions?
EPA s Proposed Federal Plan and Model Trading Rules. Stakeholder Meeting Iowa DNR Air Quality Bureau November 16, 2015
EPA s Proposed Federal Plan and Model Trading Rules Stakeholder Meeting Iowa DNR Air Quality Bureau November 16, 2015 Proposed Federal Plan and Model Rules On August 3, 2015, EPA proposed a 111(d) federal
More informationThe Clean Power Plan: Key Choices in the Proposed Model Rules and Federal Plan(s)
The Clean Power Plan: Key Choices in the Proposed Model Rules and Federal Plan(s) Sarah Adair Senior Policy Associate Nicholas Institute for Environmental Policy Solutions Duke University 2 Agenda Brief
More informationContingency Reserve Cost Allocation. Draft Final Proposal
Contingency Reserve Cost Allocation Draft Final Proposal May 27, 2014 Contingency Reserve Cost Allocation Draft Final Proposal Table of Contents 1 Introduction... 3 2 Changes to Straw Proposal... 3 3 Plan
More informationCalifornia Independent System Operator Corporation
California Independent System Operator Corporation Request for Proposal Transferred Frequency Response Submittal Deadlines: Friday September 30, 2016 Time: 11:59pm Pacific Daylight Time Submit Proposals
More informationEPA's Clean Power Plan and Interstate Trading Options. PJM Perspective
EPA's Clean Power Plan and Interstate Trading Options PJM Perspective Council of State Governments October 27, 2015 M. Gary Helm Lead Market Strategist PJM 2015 Key Statistics Member companies 940+ Millions
More informationREBUTTAL TESTIMONY OF NEIL MILLAR ON BEHALF OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
Application No.: --00 Exhibit No.: Witness: Neil Millar In the Matter of the Application of SOUTHERN CALIFORNIA EDISON COMPANY (UE) for a Certificate of Public Convenience and Necessity for the West of
More informationPEAK RELIABILITY COORDINATOR FUNDING
PEAK RELIABILITY COORDINATOR FUNDING Straw Proposal May 8, 2015 Assessment of 2 Peak Reliability Coordinator Charges Straw Proposal Table of Contents 1 Introduction... 3 2 Background... 3 3 Plan for Stakeholder
More informationIan McKay Chair Transmission Expansion Planning and Policy Committee (204)
Date: December 23, 2015 Ian McKay Chair Transmission Expansion Planning and Policy Committee (204) 430-1950 i.mckay@shaw.ca To: Subject: Reliability Planning Stakeholders 2016 TEPPC Study Program Open
More informationPath Operator Implementation Task Force. Vic Howell, Vice Chair Report to OC March 22, 2016
Path Operator Implementation Task Force Vic Howell, Vice Chair Report to OC March 22, 2016 2 Agenda New Paradigm Review Industry Update Objective of today s presentation is to approve the following documents:
More informationBEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA COMMENTS OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Order Instituting Rulemaking to Develop an Electricity Integrated Resource Planning Framework and to Coordinate and Refine Long-Term Procurement
More informationMAKING A STATE 111(d) PLAN TRADING READY
MAKING A STATE 111(d) PLAN TRADING READY Franz Litz, Litz Energy Strategies LLC Stacey Davis, Senior Program Manager Minnesota Clean Power Plan Stakeholder Meeting, April 29, 2015 aq-rule2-21j AGENDA FOR
More informationPEAK RELIABILITY COORDINATOR FUNDING. Draft Final Proposal. May 28, 2015
PEAK RELIABILITY COORDINATOR FUNDING Draft Final Proposal May 28, 2015 2 Assessment of Peak Reliability Coordinator Charges Draft Final Proposal Table of Contents 1 Introduction... 3 2 Background... 3
More informationWyoming Office of Consumer Advocate (OCA)
Wyoming Office of Consumer Advocate (OCA) 2019-2020 Biennium Strategic Plan Results Statement Wyoming has a diverse economy that provides a livable income and ensures wage equality. Wyoming natural resources
More informationMinutes Board of Trustees
Minutes Board of Trustees Action Without a Meeting September 8, 2008 On September 8, 2008, a majority of the members of the Board of Trustees of the North American Electric Reliability Corporation consented
More informationMJB&A Clean Power Plan Compliance Tool. v 1.0. User Guide M A Y 1 2, (978) /
MJB&A Clean Power Plan Compliance Tool v 1.0 User Guide M A Y 1 2, 2 0 1 5 System Overview The Compliance Tool ( Tool) is designed to allow users to analyze state progress towards compliance with the Clean
More informationImplementation of BAL Dede Subakti
Implementation of BAL-002-2 Dede Subakti Agenda Background information Impact assessment Issue statement Implementation options Request for comments Page 2 Background Information NERC BAL-002-2 was approved
More informationMTEP16 Futures Development Workshop 1/15/15
MTEP16 Futures Development Workshop 1/15/15 Overview Objectives MTEP16 proposed futures Uncertainty variables definitions Next steps 2 Objective Ensure MTEP16 Futures are effective and are developed in
More information(pg - prepublication. version) I.A. (18) 64969
(pg - prepublication version) I.A. (18) 64969 pg - Federal Register version Question/Area of Comment Keyword/Theme EPA intends to finalize a single approach (rate- or mass-based) for every state in which
More informationDecember 23, By etariff Filing Hon. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426
December 23, 2014 By etariff Filing Hon. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Re: Nevada Power Company and Sierra Pacific Power Company,
More informationSPP s Operating Region
SPP s Operating Region Current 77,366 MW of generating capacity 46,136 MW of peak demand 48,930 miles transmission: 69 kv 12,569 miles 115 kv 10,239 miles 138 kv 9,691 miles 161 kv 5,049 miles 230 kv 3,889
More informationCarbon Markets and Mexico Key Issues for Market Design
Carbon Markets and Mexico Key Issues for Market Design Mark C. Trexler Director of Climate Strategies and Markets DNV Climate Change Service North America 24 August 2009 Key Points It s All About the Price
More informationEnergy Risk Management Policy
Energy Risk Management Policy May 10, 2017 Table of Contents 1 Overview... 3 2 Energy Risk Management Objective... 4 3 Governance Structure Roles and Responsibilities... 4 3.1 SVCE Board... 4 3.2 Risk
More informationVALLEY CLEAN ENERGY ALLIANCE. Staff Report Item 12. Mitch Sears, Interim General Manager Gary Lawson, Sacramento Municipal Utility District (SMUD)
VALLEY CLEAN ENERGY ALLIANCE Staff Report Item 12 TO: FROM: SUBJECT: Valley Clean Energy Alliance Board Mitch Sears, Interim General Manager Gary Lawson, Sacramento Municipal Utility District (SMUD) Procurement
More informationHow States Are Planning to Comply With the Clean Power Plan
How States Are Planning to Comply With the Clean Power Plan Environmental and Energy Study Institute Washington, DC September 29, 2015 S. William Becker, NACAA What I Will Cover Who We Are State Reactions
More informationCUSC Amendment Proposal Form CAP: 161
CUSC Amendment Proposal Form CAP: 161 Title of Amendment Proposal: Transmission Access System Operator Release of Short-term Entry Rights Description of the Proposed Amendment (mandatory by proposer):
More informationThe Clean Power Plan. Market Directions and Policy Impacts. 43 rd Annual PURC Conference Gainsville, Florida. Marc Chupka PRESENTED TO PRESENTED BY
The Clean Power Plan Market Directions and Policy Impacts PRESENTED TO 43 rd Annual PURC Conference Gainsville, Florida PRESENTED BY Marc Chupka March 17, 2016 Copyright 2015 The Brattle Group, Inc. Final
More information1. Title: Qualified Transfer Path Unscheduled Flow (USF) Relief
A. Introduction 1. Title: Qualified Transfer Path Unscheduled Flow (USF) Relief 2. Number: IRO-006-WECC-2 3. Purpose: Mitigation of transmission overloads due to unscheduled flow on Qualified Transfer
More informationMEMORANDUM. June 6, 2012
MEMORANDUM June 6, 2012 To: WSPP Participants From: Arnie Podgorsky Patrick Morand Re: California Cap and Trade: Potential WSPP Impacts This memorandum summarizes aspects of the cap and trade program (
More informationCOMMENTS ON THE PROPOSED FEDERAL PLAN AND MODEL RULES
COMMENTS ON THE PROPOSED FEDERAL PLAN AND MODEL RULES Stacey Davis, Senior Program Manager MN 111(d) Stakeholders Meeting, November 17, 2015 aq-rule2-21v BACKGROUND 1 STAKEHOLDER MEETINGS AND WEBINARS
More informationPJM Analysis. CCPPSTF July 17, PJM 2017
PJM Analysis CCPPSTF July 17, 2017 Contents 1. State Actions 2. Revenue Shortfall vs. Credits from State Actions: Example 3. State Actions Impact on Key RPM Components 4. Effect of Low Offer Prices on
More informationWECC Standard BAL-STD Operating Reserves
A. Introduction 1. Title: Operating Reserves 2. Number: BAL-STD-002-0 3. Purpose: Regional Reliability Standard to address the Operating Reserve requirements of the Western Interconnection. 4. Applicability
More information145 FERC 61,141 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Part 40. [Docket No. RM ; Order No.
145 FERC 61,141 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 18 CFR Part 40 [Docket No. RM13-13-000; Order No. 789] Regional Reliability Standard BAL-002-WECC-2 Contingency Reserve (Issued
More informationTrading- Ready Op/ons and the Final Clean Power Plan
Trading- Ready Op/ons and the Final Clean Power Plan Jonas Monast & Sarah Adair Nicholas Ins/tute for Environmental Policy Solu/ons Duke University AAPCA 2015 Annual Mee/ng CPP Compliance Timeline 2015
More informationRENEWABLE FINANCING CONSIDERATIONS. Bond Buyer 2011 CA Public Finance Renewable Panel
RENEWABLE FINANCING CONSIDERATIONS Panel Federal and State Proposals and Regulations Issue Background and Status Effects Clean Water Act (CWA) Section 316(b) requires that the location, design, construction
More information2018 Business Plan and Budget Supplemental Information May 1, 2017
2018 Business Plan and Budget Supplemental Information May 1, 2017 Today we posted our 2018 Business Plan and Budget (BP&B) for stakeholder comment. WECC staff had productive dialogue with the members
More informationNew Jersey Reference Case and Policy Scenario Results
New Jersey Reference Case and Policy Scenario Results January 3, 219 Prepared by ICF for Rutgers University at the Request of the New Jersey Board of Public Utilities NJ Reference Case and Policy Scenario
More informationPG&E Corporation: Peter Darbee, Chairman & CEO Merrill Lynch Investor Conference New York, NY September 26-27, 2006
PG&E Corporation: Positioned to Lead in a Carbon-Constrained World Peter Darbee, Chairman & CEO Merrill Lynch Investor Conference New York, NY September 26-27, 2006 This presentation is not complete without
More informationWelcome! Our goal: Liquidity, Liquidity, Liquidity
Welcome! Welcome! Our goal: Liquidity, Liquidity, Liquidity Welcome! Our goal: Liquidity, Liquidity, Liquidity For that, we need clarity and agreement on the definition of what products we re trading.
More information3. Purpose: To specify the quantity and types of Contingency Reserve required to ensure reliability under normal and abnormal conditions.
WECC Standard BAL-002-WECC-2a A. Introduction 1. Title: 2. Number: BAL-002-WECC-2a 3. Purpose: To specify the quantity and types of required to ensure reliability under normal and abnormal conditions.
More informationEPA s Clean Power Plan Summary of IPM Modeling Results
EPA s Clean Power Plan Summary of IPM Modeling Results J A N U A R Y 1 3, 2 0 1 6 Last updated: January 14, 2016 7:10 AM Acknowledgments The following analysis of EPA s final Clean Power Plan (CPP) is
More informationSummary of FERC White Paper on Bulk Power Market Design and Related Aspects of Senate Energy Bill No. S. 14
Summary of FERC White Paper on Bulk Power Market Design and Related Aspects of Senate Energy Bill No. S. 14 Introduction On April 28, 2003, the Federal Energy Regulatory Commission (FERC or Commission)
More informationPJM Analysis. CCPPSTF August 2, PJM 2017
PJM Analysis CCPPSTF August 2, 2017 Contents 1. State Actions 2. Revenue Shortfall vs. Credits from State Actions: Example 3. State Actions Impact on Key RPM Components 4. Effect of Low Offer Prices on
More informationNERC Unaudited Summary of Results March 31, Finance and Audit Committee Meeting May 4, 2016
NERC Unaudited Summary of Results March 31, 2016 Finance and Audit Committee Meeting May 4, 2016 First Quarter 2016 Significant Variances NERC was $186k (1.1%) under budget, including CRISP NERC was $407k
More informationTransmission Planning Standards Industry Webinar: Footnote b. January 8, 2012 John Odom, FRCC, Standard Drafting Team Chair
Transmission Planning Standards Industry Webinar: Footnote b January 8, 2012 John Odom, FRCC, Standard Drafting Team Chair Topics Brief history Overview of as posted draft standard Changes since last posting
More informationNORTHEASTERN ISO/RTO PLANNING COORDINATION PROTOCOL DESIGNATION OF FILING PARTY
NORTHEASTERN ISO/RTO PLANNING COORDINATION PROTOCOL DESIGNATION OF FILING PARTY The Northeastern ISO/RTO Planning Coordination Protocol among PJM Interconnection, L.L.C. ( PJM ), the New York Independent
More informationRMR and CPM Enhancements Stakeholder Conference Call December 20, 2018
RMR and CPM Enhancements Stakeholder Conference Call December 20, 2018 Keith Johnson Infrastructure & Regulatory Policy Manager Agenda Time Item Presenter 10:00-10:15 1. Stakeholder process and general
More informationUNITED STATES OF AMERICA Before the FEDERAL ENERGY REGULATORY COMMISSION. NORTH AMERICAN ELECTRIC ) RELIABILITY CORPORATION ) Docket No.
UNITED STATES OF AMERICA Before the FEDERAL ENERGY REGULATORY COMMISSION NORTH AMERICAN ELECTRIC ) RELIABILITY CORPORATION ) Docket No. RR07-16- ) REQUEST OF THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION
More informationAPPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST
Seventh Northwest Conservation and Electric Power Plan APPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST Contents Introduction... 3 Key Findings... 3 Background... 5 Methodology... 7 Inputs and Assumptions...
More informationGovernance - Concepts
EIM FERC Jurisdiction and Governance - Concepts A WSPP Perspective Arnold Podgorsky WSPP General Counsel April 10, 2012 www.wrightlaw.com Today s Presentation Nature of FERC jurisdiction over EIM and Market
More informationEIPC Roll-Up Report & Scenarios
EIPC Roll-Up Report & Scenarios Zach Smith Director, Transmission Planning New York Independent System Operator IPTF/EGCWG/ESPWG Meeting January 6, 2014 2013 New York Independent System Operator, Inc.
More informationWECC Compliance Presentation to the WIRAB
WECC Compliance Presentation to the WIRAB Presented By Ken Driggs, Assistant Director, Training WECC Steve Rueckert, Director, Standards and Compliance - WECC May 23, 2006 2 Overview of Items to be Covered
More information2011 IRP Public Input Meeting. October 5, Pacific Power Rocky Mountain Power PacifiCorp Energy
2011 IRP Public Input Meeting October 5, 2010 Pacific Power Rocky Mountain Power PacifiCorp Energy Agenda Morning Session IRP Schedule Update Energy Gateway Transmission Construction Update and Evaluation
More informationADB Support to Thailand on the Development of Emissions Trading; Project synopsis
ADB Support to Thailand on the Development of Emissions Trading; Project synopsis Asia Pacific Carbon Forum, Bangkok 14 th December 2017 Mark Johnson Scope of work Policy objectives NDC alignment International
More information2019 Budget and Grid Management Charge Initial Stakeholder Meeting
2019 Budget and Grid Management Charge Initial Stakeholder Meeting July 24, 2018 Agenda Topic: Welcome and Introductions Presenter: Kristina Osborne 2019 Budget Process & GMC Rate Outlook April Gordon
More informationISO filed a tariff amendment to implement the rates, terms, and conditions of the ISO s Reliability Coordinator Service
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Roger Collanton, Vice President, General Counsel, Chief Compliance Officer, and Corporate Secretary Date:
More informationPRC Remedial Action Schemes
PRC-012-2 Remedial Action Schemes A. Introduction 1. Title: Remedial Action Schemes 2. Number: PRC-012-2 3. Purpose: To ensure that Remedial Action Schemes (RAS) do not introduce unintentional or unacceptable
More informationProcedure for ERO Support of Frequency Response and Frequency Bias Setting Standard
Procedure for ERO Support of Frequency Response and Frequency Bias Setting Standard NERC Report Title Report Date I Table of Contents Preface... iii Introduction...iiv Chapter 1: Event Selection Process...
More informationCoos County Transmission Action Plan & Cost Allocation Methodologies
Coos County Transmission Action Plan & Cost Allocation Methodologies Presentation to the NCTC KEMA, Inc. June 17, 2010 Experience you can trust. Agenda Introduction to KEMA Project Objectives Status of
More informationTPL Transmission System Planned Performance for Geomagnetic Disturbance (GMD) Events. Jay Loock O&P Auditor November 16, 2017
TPL-007-2 Transmission System Planned Performance for Geomagnetic Disturbance (GMD) Events Jay Loock O&P Auditor November 16, 2017 Purpose of Standard: Establish requirements for transmission system planned
More informationJanuary 26, /14/2011http://docs.cpuc.ca.gov/WORD_PDF/FINAL_DECISION/ pdf.
Bruce A. Measure Chair Montana Rhonda Whiting Montana W. Bill Booth Idaho James A. Yost Idaho Dick Wallace Vice-Chair Washington Tom Karier Washington Bill Bradbury Oregon Joan M. Dukes Oregon January
More information133 FERC 61,062 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability Corporation
133 FERC 61,062 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. North
More informationNYISO Posting for FERC Order 890 Describing the NYISO Planning Process
NYISO Posting for FERC Order 890 Describing the NYISO Planning Process September 14, 2007 ` NYISO Posting for FERC Order 890 Filing DRAFT Table of Contents Section: Page No: I. Cover Memo - Draft OATT
More informationSeams Cost Allocation: A Flexible Framework to Support Interregional Transmission Planning (Summary of Final Report)
Seams Cost Allocation: A Flexible Framework to Support Interregional Transmission Planning (Summary of Final Report) Presented at: SPP RSC Quarterly Meeting Presented by: Johannes Pfeifenberger Delphine
More information3. Purpose: To specify the quantity and types of Contingency Reserve required to ensure reliability under normal and abnormal conditions.
WECC Standard BAL-002-WECC-2 A. Introduction 1. Title: 2. Number: BAL-002-WECC-2 3. Purpose: To specify the quantity and types of required to ensure reliability under normal and abnormal conditions. 4.
More information165 FERC 61,023 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability Corporation
165 FERC 61,023 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Cheryl A. LaFleur, Neil Chatterjee, and Richard Glick. North American Electric Reliability Corporation
More informationWSPP Operating Committee BAL 002 Update. Kenneth W. Otto, PE March 7, 2014
WSPP Operating Committee BAL 002 Update Kenneth W. Otto, PE March 7, 2014 Disclaimer This presentation is for informational purposes and should not be construed as, and does not constitute legal advice.
More informationBILLING CODE P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission. [Docket No. IC ]
This document is scheduled to be published in the Federal Register on 07/21/2014 and available online at http://federalregister.gov/a/2014-17044, and on FDsys.gov BILLING CODE 6717-01-P DEPARTMENT OF ENERGY
More informationGeneration Retirement Scenario Special Assessment Update
Generation Retirement Scenario Special Assessment Update John Moura, Director, Reliability Assessments and Technical Committees Member Representatives Committee Meeting November 6, 2018 Assessment Objectives
More informationCOLUMBIAGRID GEOMAGNETIC DISTURBANCE DRAFT STUDY REPORT
COLUMBIAGRID GEOMAGNETIC DISTURBANCE DRAFT STUDY REPORT (NERC Standard TPL-007-1) Revision 1 February 1, 2018 ColumbiaGrid 8338 NE Alderwood Road, Suite 140 Portland, OR 97220 www.columbiagrid.org (503)
More informationOVERVIEW PRELIMINARY DRAFT REGULATION FOR A CALIFORNIA CAP-AND-TRADE PROGRAM - FOR PUBLIC REVIEW AND COMMENT - November 24, 2009
OVERVIEW PRELIMINARY DRAFT REGULATION FOR A CALIFORNIA CAP-AND-TRADE PROGRAM - - November 24, 2009 CALIFORNIA CAP ON GREENHOUSE GAS EMISSIONS AND MARKET-BASED COMPLIANCE MECHANISMS IN ACCORDANCE WITH CALIFORNIA
More informationNorthern Tier Transmission Group Cost Allocation Principles Work Group. Straw Proposal. May 29, 2007
Northern Tier Transmission Group Cost Allocation Principles Work Group Straw Proposal May 29, 2007 NTTG Cost Allocation Principles and Process page 1 INTRODUCTION This paper makes a strawman proposal responsive
More informationNEW YORK MEETINGS. January 28, 2015
NEW YORK MEETINGS January 28, 2015 2 Safe Harbor This presentation includes statements concerning NU s expectations, beliefs, plans, objectives, goals, strategies, assumptions of future events, future
More informationLong-Term Reliability Assessment
Long-Term Reliability Assessment Key Findings and Long-Term Issues John Moura, Director of Reliability Assessment Topics Covered Today Background on NERC s Long-Term Reliability Assessment Emerging and
More informationNew Member Cost Allocation Review Process. Prepared by: COST ALLOCATION WORKING GROUP
New Member Cost Allocation Review Process Prepared by: COST ALLOCATION WORKING GROUP TABLE OF CONTENTS 1. HISTORY AND BACKGROUND... 1 2. PURPOSE / GOAL STATEMENT... 3 3. OVERVIEW OF PROCESS... 3 4. NEW
More informationUNINTENDED CONSEQUENCES OF DELAYING FERC S STANDARD MARKET DESIGN
UNINTENDED CONSEQUENCES OF DELAYING FERC S STANDARD MARKET DESIGN By Elizabeth Anne Moler 1 Executive Vice President Government and Environmental Affairs & Public Policy Exelon Corporation As conferees
More informationFTR Credit Requirements Prevailing Flow Paths Affected by Transmission System Upgrades
FTR Credit Requirements Prevailing Flow Paths Affected by Transmission System Upgrades Hal Loomis Manager, Credit Markets & Reliability Committee December 7, 2017 Credit Risk Exposure Issue Description
More informationTRANSMISSION OWNER ZONAL PLACEMENT PROCESS
TRANSMISSION OWNER ZONAL PLACEMENT PROCESS Published July 2017 CONTENTS Section 1: Introduction, Scope & Steps... 1 Subsection A: Introduction To Zonal Placement... 1 Subsection B: Scope... 1 Subsection
More information12782/14 1 DPG LIMITE EN
Council of the European Union Brussels, 13 October 2014 (OR. en) 12782/14 LIMITE CO EUR-PREP 30 NOTE From: General Secretariat of the Council To: Permanent Representatives Committee/Council Subject: European
More informationInformation Document Available Transfer Capability and Transfer Path Management ID # R
Information Documents are not authoritative. Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between an Information Document
More informationPrepared Remarks of Edison International CEO and CFO First Quarter 2017 Financial Teleconference May 1, 2017, 1:30 p.m. (PDT)
Prepared Remarks of Edison International CEO and CFO First Quarter 2017 Financial Teleconference May 1, 2017, 1:30 p.m. (PDT) Pedro Pizarro, President and Chief Executive Officer, Edison International
More informationSCHEDULE C ELECTRICITY PURCHASE AGREEMENT - TERM SHEET SMALL PROJECTS
SCHEDULE C ELECTRICITY PURCHASE AGREEMENT - TERM SHEET SMALL PROJECTS The following is a summary of the key terms and conditions of the proposed standard form electricity purchase agreement ( EPA ) for
More informationProposed Carbon Dioxide Trading Program
Proposed Carbon Dioxide Trading Program Before the Committee on Electric Utility Regulation December 4, 2017 David K. Paylor, Director Virignia Dept. of Environmental Quality 1 Executive Directive 11 May
More informationSTATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-100, SUB 84
STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-100, SUB 84 BEFORE THE NORTH CAROLINA UTILITIES COMMISSION In the Matter of Investigation of Integrated Resource Planning in North Carolina
More informationFlexible Capacity Requirements for 2019 through 2021
Flexible Capacity Requirements for 2019 through 2021 Clyde Loutan - Principal, Renewable energy Integration Amber Motley - Manager, Short Term Forecasting Stakeholder Conference Call January 29 th, 2018
More informationMemorandum. This memorandum requires Board action. EXECUTIVE SUMMARY
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: June 14, 2018 Re: Decision on congestion
More informationITP Evaluation Process Plan
ITP Evaluation Process Plan HVDC Conversion Project The goal of the coordinated Interregional Transmission Project (ITP) evaluation process is to achieve consistent planning assumptions and technical data
More information161 FERC 61,131 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
161 FERC 61,131 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Neil Chatterjee, Chairman; Cheryl A. LaFleur, and Robert F. Powelson. North American Electric Reliability
More informationGroup Arizona Public Service Company Janet Smith, Regulatory Affairs Supervisor Yes. Yes. Group Salt River Project Chris Chavez for Mike Gentry Yes
Name (1 Responses) Organization (1 Responses) Name (5 Responses) Lead Contact (5 Responses) Question 1 (6 Responses) Question 1 Comments (6 Responses) Question 2 (6 Responses) Question 2 Comments (6 Responses)
More informationEU Funding for Sustainable Energy
EU Funding for Sustainable Energy 2014-2020 Green Economy e sostenibilità energetica Bologna, 17 September 2013 Hugh GOLDSMITH European Commission Directorate-General for and Urban 1 From 2007-2013 Cohesion
More informationDraft Proposal for the Allocation of Congestion Revenue Rights to Merchant Transmission
Draft Proposal for the Allocation of Congestion Revenue Rights to Merchant Transmission 1 Introduction This paper provides a draft proposal as well as a list of underlying principles for allocating Congestion
More informationOutlook: U.S. Public Power and Electric Cooperative Sector
Outlook: U.S. Public Power and Electric Cooperative Sector American Public Power Association Business & Financial Conference Dennis Pidherny, Managing Director September 18, 2017 2017 Outlook: U.S. Public
More information45-day Comment and Initial Ballot day Final Ballot. April, BOT Adoption. May, 2015
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationProject Disturbance and Sabotage Reporting
Project 2009-01 Disturbance and Sabotage Reporting Consideration of Issues and Directives Issue or Directive Source Consideration of Issue or Directive CIP 001 1 NERC Audit Observation Team "What is meant
More informationViolation Risk Factor and Violation Severity Level Justifications Project Modifications to BAL
Violation Risk Factor and Violation Severity Level Justifications Project 2017-01 Modifications to BAL-003-1.1 This document provides the standard drafting team s (SDT s) justification for assignment of
More informationAppendix. Investor Conference April 4, 2007 New York, NY
Appendix Investor Conference April 4, 2007 New York, NY 1 Cautionary Statement Regarding Forward- Looking Information This presentation contains forward-looking statements regarding management s guidance
More informationUpdate on FERC, Legislation, and the Courts
Update on FERC, Legislation, and the Courts WSPP Joint Committee Meeting Arnold Podgorsky and Patrick Morand February 2012 www.wrightlaw.com Overview of the Legal Update FERC Updates Developments Initiatives
More informationWECC Criterion TPL-001-WECC-CRT-3.1
WECC Criterion TPL-001-WECC-CRT-3.1 A. Introduction 1. Title: Transmission System Planning Performance 2. Number: TPL-001-WECC-CRT-3.1 3. Purpose: To facilitate coordinated near-term and long-term transmission
More informationPOWER RESOURCES RISK MANAGEMENT POLICIES. Board of Public Utilities January 18, 2013
POWER RESOURCES RISK MANAGEMENT POLICIES Board of Public Utilities January 18, 2013 INTRODUCTION RPU'S supply portfolio is exposed to several risks Load variability Cost variability Counterparty risk Energy
More informationCA045 Arrangements for User Commitment
Stage 02: Proposed System Operator Transmission Owner Code (STC) CA045 Arrangements for User Commitment What stage is this document at? 01 02 03 Initial Proposed Amendment Report This proposal seeks to
More informationALBERTA MARKET RE-DESIGN CAPACITY MARKET DESIGN AND IMPLEMENTATION
ALBERTA MARKET RE-DESIGN CAPACITY MARKET DESIGN AND IMPLEMENTATION November 30, 2016 www.poweradvisoryllc.com To: Power Advisory Clients and Colleagues From: Kris Aksomitis, Jason Chee-Aloy, Brenda Marshall,
More information