NERC Unaudited Summary of Results March 31, Finance and Audit Committee Meeting May 4, 2016

Size: px
Start display at page:

Download "NERC Unaudited Summary of Results March 31, Finance and Audit Committee Meeting May 4, 2016"

Transcription

1 NERC Unaudited Summary of Results March 31, 2016 Finance and Audit Committee Meeting May 4, 2016

2 First Quarter 2016 Significant Variances NERC was $186k (1.1%) under budget, including CRISP NERC was $407k (2.7%) under budget, excluding CRISP Personnel expenses over budget $478k (5.0%) o Stabilizing workforce, lower attrition Capital expenditures under budget $613k (64.4%) o Primarily due to timing of expected expenses vs budget Contracts expenses under budget $244k (14%) Meetings Expenses under budget $54k (6.1%) 2

3 2016 Year-End Projections NERC is projecting to be $428k (0.6%) over budget at year-end, including CRISP and projected use of reserves NERC projects to be $419k (0.7%) over budget at year-end, excluding CRISP Projected use of reserves for E-ISAC (reflected in contracts expense) o Portal Improvements o Machine to Machine Communications (STIX/TAXII) pilot o Analysis tools Expected over budget variance in personnel and building maintenance Offset by under budget variances in capital expenditures and office costs 3

4 2016 Working Capital and Operating Reserves Future Obligation Reserve - $2.6M Operating Contingency Reserve - $1.8M System Operator Reserve - $769k CRISP Reserve - $500k 4

5 5

6 Combined ERO Enterprise Unaudited Summary of Results March 31, 2016 Finance and Audit Committee Meeting May 4, 2015

7 First Quarter 2016 Significant Variances Combined ERO Enterprise was under budget 4.8% ($2.3M) NERC and all Regions except TRE are at or below budget NPCC (-14.9%) lower consulting and meeting expenses WECC (-13.6%) lower consulting and personnel expenses RF (-6.4%) lower personnel and travel expenses FRCC (-5.6%) lower consulting, personnel and meetings expenses SPP (-5.0%) lower travel and consulting expenses TRE (+2.6%) timing of personnel costs NERC, MRO, and SERC were at or slightly below budget Combined ERO Enterprise FTE budget was 4.2% under 2

8 2016 Year-End Projections Combined ERO Enterprise projects to be 0.2% under budget Most REs expect to be very close to budget FRCC projects to be 5.2% under budget due primarily to lower personnel, travel, and contractors costs SPP projects to be 4.0% under budget due primarily to reduced contractors and travel costs SERC projects to be 4.7% over budget due to personnel, office and contractors cost Combined ERO Enterprise projected year-end FTEs is 2.3% under budget 3

9 2016 Working Capital and Operating Reserves $30M Total reserves at beginning of 2016 Started $6.1M over combined budgets $56M Total reserves as of March 31, 2016 $25.8M added through operations in 2016 ($2.9M more than expected) $9.0M over combined budgets $29M Year-End Projection for 2016 Ending $6.2M more than combined budgets 4

10 5

11 NERC 2017 Business Plan and Budget First Draft Overview Finance and Audit Committee Meeting May 4, 2016

12 Agenda 2017 Business Plan and Budget Ongoing areas of focus in preliminary budget 2017 preliminary assessments Reserves Latest Regional Entity projections Remaining schedule 2

13 Ongoing Areas of Focus Goals and activities in Strategic Plan Increasing NERC s analytical capabilities E-ISAC operations Enterprise Risk Management Employee development and training Resource allocation and efficiency of operations 3

14 2017 Preliminary Budget NERC with CRISP* 2.8% total budget increase (operating and cap-x) 2017 forecast in 2016 Business Plan and Budget was 6.4% NERC without CRISP* 2.9% total budget increase (operating and cap-x) *Excludes additional E-ISAC funding for portal development. See slide 15. 4

15 2017 Preliminary Budget 2016 Budget w/out CRISP 2017 Budget w/out CRISP Variance $ Over(Under) Variance % Over(Under) Expenses Personnel Expenses $ 36,542,135 $ 38,055,728 $ 1,513, % Meeting Expenses 3,550,831 3,328,194 (222,637) -6.3% Operating Expenses 18,535,644 18,500,201 (35,443) -0.2% Other Non-Operating Expenses 110, ,100 12, % Total Expenses $ 58,088,250 $ 59,320,370 $ 1,232, % Inc(Dec) in Fixed Assets 1,125,952 1,635, , % TOTAL BUDGET $ 59,214,202 $ 60,956,221 $ 1,742, % FTEs % Personnel expenses include salaries, at-risk incentive compensation, benefits, temporary staffing, and training. In addition to those categories, overall personnel expense is increasing in part due to lower attrition and stabilizing workforce. Change in fixed assets, excluding depreciation and allocations, is a reduction of $439,000. 5

16 NERC Budget Details Personnel Costs and Assumptions (including CRISP) 205 headcount, which is lower than 2016 budgeted headcount FTEs (1.2 FTE increase driven by change in attrition assumption) Vacancy rate 5.5%, lower than 2016 budgeted rate of 8% o Experiencing more stable workforce, lower attrition 3% average salary increase (merit, promotion and market adjustments) Incentive compensation budgeted using evaluation of past performance Medical/dental premiums budgeted at high end of range provided by advisors 6

17 NERC Budget Details Retirement and Other Benefit Assumptions No changes in benefits or employee contributions No change in 401(k) match Retirement plan funding consistent with historical practice 7

18 NERC Budget Details Contracts and Consultants - $515k increase $250k for GridEx IV $100k for potential replacement for SAFNR $100k additional Regional audit support $100k for additional CRISP security support (funded by CRISP participants) $35k net decrease from various changes in other departments 8

19 Total NERC Capital Budget NERC CAPITAL BUDGET ERO Application Development $ 1,500,000 $ 800,000 Document Management 465, ,000 Hardware (Storage, servers, laptops) 955, ,000 Other Equipment 535, ,000 Disaster Recovery 200, ,000 NERC Software licenses 256, ,000 Total Capital Budget $ 3,911,000 $ 3,472,000 9

20 2017 Preliminary Assessments Before Considering Assessment Stabilization Reserve: 7.0% assessment requirements increase for total NERC 6.9% assessment requirements increase for NERC without CRISP Using Assessment Stabilization Reserve (w/o CRISP): Available Balance $2,271,000 Releasing $500, % increase in billed assessments Releasing $1,000, % Releasing $1,500, % *Above items exclude impact of E-ISAC portal project. For details, see slide

21 2017 Preliminary Assessments Historically, billed assessments were lower than otherwise required due to policy governing use of penalty funds Release of penalty funds in prior years to lower billed assessments contributed to larger increases in future periods Other factors, like debt service and replenishing reserves, also impact consistency of assessment requirements In 2016, Assessment Stabilization Reserve was established as a tool to mitigate impacts 11

22 2017 Preliminary Assessments Assessment Stabilization Reserve balance is almost $2.3M Using entire balance for the 2017 budget reduces billed assessments to around 3% Leaves no stabilization reserves for future periods, forces billed assessments up significantly the following year 12

23 2017 Preliminary Assessments Recommend multi-year strategy to better align budget increases, assessment requirements, and billed assessments Phased release of Assessment Stabilization Reserves to achieve target increases* 2017 assessment increase below 6% 2018 assessment increase below 5% 2019 assessment increase below 4% 2020 and beyond targeting low 3% *Assumed 3% budget increase for modeling purposes. 13

24 Projected Reserve Balances Future Obligation Reserve - $2.8M Operating Contingency Reserve - $2.0M System Operator Certification Reserve - $1.0M CRISP Reserve - $500k* Assessment Stabilization Reserve - to be determined Current balance is $2,271,000 *Subject to refinement based on negotiations with participants; funded by participants. 14

25 2017 Preliminary Budget with E-ISAC Portal Project Current estimates on E-ISAC portal project are $1M in 2017 Current budget includes $250k placeholder, additional $750k needed High priority recommendation by ESCC / MEC Improves physical and cyber threat analysis Enhances data sharing capabilities among registered users NERC budget increases from 2.8 to 4.0% NERC assessment increases 0.3% Impact on assessments is lower, assuming project is debt-funded Assumes no additional release of stabilization reserves 15

26 ERO Enterprise Budget Comparison Budget % Change Year Average Preliminary 2017 NERC 3.9% 18.2% 0.8% 7.6% 2.8% FRCC 4.6% 5.4% 1.4% 3.8% -0.8% MRO 4.3% 6.0% 9.9% 6.7% -1.1% NPCC 2.2% 4.6% 2.0% 2.9% -0.3% RF 3.7% 3.8% 3.3% 3.6% 2.8% SERC 6.1% -5.2% -0.8% 0.0% 8.5% SPP RE 2.6% -0.1% -14.5% -4.0% 7.6% TRE 7.6% 1.8% -1.7% 2.6% 3.3% WECC -49.8% 2.6% 4.1% -14.4% -2.1% Weighted Average Budget Increase 2.23% 16

27 ERO Enterprise Assessment Comparison Assessments % Change Year Average Preliminary 2017 NERC 8.0% 7.6% 3.2% 6.3% 5.5% FRCC -8.3% 10.5% 9.3% 3.8% -7.0% MRO -3.3% 7.8% 15.5% 6.7% -3.7% NPCC 9.7% 3.4% 2.0% 5.0% -0.3% RF 7.0% 23.4% 3.5% 11.3% 1.0% SERC -0.7% 0.0% 0.0% -0.2% 13.2% SPP RE 8.2% 5.0% -10.9% 0.8% 4.0% TRE 28.0% -0.1% -8.5% 6.5% 0.4% WECC -62.1% 60.1% 0.0% -0.7% 1.0% Weighted Average Assessment Increase 2.95% 17

28 Remaining Schedule May 19 Post NERC, Regional Entity BP&Bs, and Consolidated Budget and Assessment Projection for comment May 26 FAC Webinar to review 1st drafts June 30 Comments due on NERC 1st draft July 6 Closed FAC call to review proposed final budget and assessments July 15 Post and distribute final NERC and Regional Entity BP&Bs and assessments to FAC 18

29 Remaining Schedule July 21 FAC Webinar to review final drafts August 10 FAC meeting to recommend approval of final NERC and Regional Entity BP&Bs and assessments August 11 Board of Trustees meeting to approve final NERC and Regional Entity BP&Bs and assessments August 24 Submit NERC and Regional Entity BP&Bs and assessments to FERC for approval, with subsequent filings with Canadian authorities 19

30 20

Total ERO Enterprise 2019 Budgets and Assessments Analysis

Total ERO Enterprise 2019 Budgets and Assessments Analysis Total ERO Enterprise 2019 Budgets and Assessments Analysis The following includes an overview of the development of the proposed NERC, Regional Entity, and WIRAB 2019 Business Plan and Budgets (BP&Bs)

More information

Analysis of 2018 Total ERO Enterprise Budget

Analysis of 2018 Total ERO Enterprise Budget Agenda Item 3.b.iii Finance and Audit Committee Meeting August 9, 2017 Analysis of Total ERO Enterprise Total ERO Enterprise and Assessments The proposed budget for the Total ERO Enterprise 1, inclusive

More information

NERC 2013 Business Plan and Budget Overview. May 3, 2012

NERC 2013 Business Plan and Budget Overview. May 3, 2012 NERC 2013 Business Plan and Budget Overview May 3, 2012 NERC 2013 Business Plan and Budget Budget Planning Background Goals and Priorities Challenges Business Planning Framework Key Deliverables and Resource

More information

2017 Business Plan and Budget

2017 Business Plan and Budget 2017 Business Plan and Budget Draft 1 May 19, 2016 I Table of Contents About NERC... 1 Overview... 1 Membership and Governance... 1 Scope of Oversight... 2 Statutory and Regulatory Background... 3 Funding...

More information

2017 Budget Presentation to MRO Board of Directors

2017 Budget Presentation to MRO Board of Directors MIDWEST RELIABILITY ORGANIZATION 2017 Presentation to MRO Board of Directors June 30, 2016 Silvia Parada Mitchell, Finance and Audit Committee Chair Dan Skaar, President and CEO Sue Clarke, VP-Finance

More information

SCHIFF HARDIN LLP A Limited Liability Partnership

SCHIFF HARDIN LLP A Limited Liability Partnership SCHIFF HARDIN LLP A Limited Liability Partnership Owen E. MacBride (312) 258-5680 Email: omacbride@schiffhardin.com 233 SOUTH WACKER DRIVE SUITE 6600 CHICAGO, ILLINOIS 60606 Tel.: 312.258.5500 Fax: 312.258.5700

More information

Agenda Finance and Audit Committee November 6, :00-9:45 a.m. Eastern

Agenda Finance and Audit Committee November 6, :00-9:45 a.m. Eastern Agenda Finance and Audit Committee November 6, 2018 9:00-9:45 a.m. Eastern Grand Hyatt Atlanta in Buckhead 3300 Peachtree Rd NE Atlanta, GA 30305 Conference Room: Grand Ballroom Lower Lobby Level Call

More information

2016 Business Plan and Budget

2016 Business Plan and Budget 2016 Business Plan and Budget Draft 1 May 19, 2015 I Table of Contents About NERC... iv Overview... iv Membership and Governance... iv Scope of Oversight... v Statutory and Regulatory Background... vi

More information

NERC Summary of Unaudited Results Third Quarter Andy Sharp, Controller Finance and Audit Committee Meeting November 6, 2018

NERC Summary of Unaudited Results Third Quarter Andy Sharp, Controller Finance and Audit Committee Meeting November 6, 2018 NERC Summary of Unaudited Results Third Quarter 2018 Andy Sharp, Controller Finance and Audit Committee Meeting November 6, 2018 2018 Third Quarter Results Total funding is on budget Interest income is

More information

Cyber Security Risk Information Sharing Program (CRISP) Overview, Budget Projection and Proposed Funding Allocation

Cyber Security Risk Information Sharing Program (CRISP) Overview, Budget Projection and Proposed Funding Allocation Cyber Security Risk Information Sharing Program (CRISP) Overview, Budget Projection and Proposed Funding Allocation Introduction and Executive Summary This document provides additional background on CRISP,

More information

Draft 1. Jen Kelly Director of Finance & HR

Draft 1. Jen Kelly Director of Finance & HR 2014 Business Plan and Budget Draft 1 Jen Kelly Director of Finance & HR 1 2014 Budget Overview 2 Increase in penalty sanctions ($915,500 vs. $51,000) Staffing Addition of.88 FTEs compared to 2013 budget

More information

Agenda Finance and Audit Committee May 9, :30-9:30 a.m. Eastern

Agenda Finance and Audit Committee May 9, :30-9:30 a.m. Eastern Agenda Finance and Audit Committee May 9, 2018 8:30-9:30 a.m. Eastern The Ritz-Carlton, Pentagon City 1250 S. Hayes Street Arlington, VA 22202 Conference Room: Ritz Carlton Grand Ballroom (2 nd Floor)

More information

westdrift Manhattan Beach, Autograph Collection 1400 Park View Avenue Manhattan Beach, California Conference Room: Loftlight Lobby

westdrift Manhattan Beach, Autograph Collection 1400 Park View Avenue Manhattan Beach, California Conference Room: Loftlight Lobby Agenda Finance and Audit Committee February 6, 2019 10:45-11:15 a.m. Pacific (Please note the Schedule may be adjusted real-time should meetings conclude early and/or extend past their scheduled end time.)

More information

September 8, 2017 VIA ELECTRONIC FILING

September 8, 2017 VIA ELECTRONIC FILING !! September 8, 2017 VIA ELECTRONIC FILING Kirsten Walli, Board Secretary Ontario Energy Board P.O Box 2319 2300 Yonge Street Toronto, Ontario, Canada M4P 1E4 Re: North American Electric Reliability Corporation

More information

BEFORE THE CROWN INVESTMENT CORPORATION OF THE PROVINCE OF SASKATCHEWAN

BEFORE THE CROWN INVESTMENT CORPORATION OF THE PROVINCE OF SASKATCHEWAN BEFORE THE CROWN INVESTMENT CORPORATION OF THE PROVINCE OF SASKATCHEWAN NORTH AMERICAN ELECTRIC ) RELIABILITY CORPORATION ) NOTICE OF FILING OF THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION OF ITS

More information

FRCC 2016 Business Plan & Budget (As Submitted to NERC and Posted for Comments on 5/1/2015) (Not Approved by the FRCC Board of Directors)

FRCC 2016 Business Plan & Budget (As Submitted to NERC and Posted for Comments on 5/1/2015) (Not Approved by the FRCC Board of Directors) FRCC 2016 Business Plan & (As Submitted to NERC and Posted for Comments on 5/1/2015) (Not Approved by the FRCC Board of Directors) Presentation to NERC FAC May 27, 2015 Reva R. Maskewitz - Controller 2016

More information

BEFORE THE ONTARIO ENERGY BOARD OF THE PROVINCE OF ONTARIO

BEFORE THE ONTARIO ENERGY BOARD OF THE PROVINCE OF ONTARIO BEFORE THE ONTARIO ENERGY BOARD OF THE PROVINCE OF ONTARIO NORTH AMERICAN ELECTRIC ) RELIABILITY CORPORATION ) NOTICE OF FILING OF THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION OF ITS 2012 BUSINESS

More information

Agenda Finance and Audit Committee February 7, :15-11:00 a.m. Eastern

Agenda Finance and Audit Committee February 7, :15-11:00 a.m. Eastern Agenda Finance and Audit Committee February 7, 2018 10:15-11:00 a.m. Eastern Hilton Fort Lauderdale Marina 1881 SE 17 th Street Fort Lauderdale, FL 33316 Conference Room: Grand Ballroom (1 st Floor) Call

More information

November 4, 2013 VIA ELECTRONIC FILING

November 4, 2013 VIA ELECTRONIC FILING November 4, 2013 VIA ELECTRONIC FILING Doreen Friis Regulatory Affairs Officer/Clerk Nova Scotia Utility and Review Board 3 rd Floor 1601 Lower Water Street P.O. Box 1692, Unit âmâ Halifax, Nova Scotia

More information

NERC FAC M eeting July 20, 2017

NERC FAC M eeting July 20, 2017 M ID W EST RELIABILITY ORGAN IZ ATION NERC FAC M eeting July 20, 2017 2018 Business Plan and Budget Approved by the M RO Board of Directors June 2 2, 2017 Sue Clarke, VP of Finance and Administration Improving

More information

First Draft 2015 Business Plan and Budget May 16, 2014

First Draft 2015 Business Plan and Budget May 16, 2014 First Draft 2015 Business Plan and Budget May 16, 2014 1 Table of Contents Table of Contents Table of Contents... 2 About NERC... 4 Overview... 4 Membership and Governance... 5 Scope of Oversight... 5

More information

ieso Re: NERC 2016 Business Plan and Budget, Draft #1 June 30, 2015

ieso Re: NERC 2016 Business Plan and Budget, Draft #1 June 30, 2015 June 30, 2015 Mr. Michael Walker Senior Vice President and Chief Financial and Administrative Officer North American Electric Reliability Corporation 3353 Peachtree Road NE Suite 600, North Tower Atlanta,

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability ) Corporation ) Docket No.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability ) Corporation ) Docket No. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION North American Electric Reliability ) Corporation ) Docket No. FA11-21-000 COMPLIANCE FILING OF THE NORTH AMERICAN ELECTRIC RELIABILITY

More information

Agenda Conference Call Finance and Audit Committee

Agenda Conference Call Finance and Audit Committee Agenda Conference Call Finance and Audit Committee July 19, 2010 2:00-3:00 p.m. EDT Dial-In: 800-672-4749 (No Code Needed) Introductions and Chairman s Remarks NERC Antitrust Compliance Guidelines *1.

More information

SCHIFF HARDIN LLP A Limited Liability Partnership

SCHIFF HARDIN LLP A Limited Liability Partnership SCHIFF HARDIN LLP A Limited Liability Partnership Owen E. MacBride (312) 258-5680 Email: omacbride@schiffhardin.com 233 SOUTH WACKER DRIVE SUITE 6600 CHICAGO, ILLINOIS 60606 Tel.: 312.258.5500 Fax: 312.258.5700

More information

September 15, 2016 VIA ELECTRONIC FILING

September 15, 2016 VIA ELECTRONIC FILING !! September 15, 2016 VIA ELECTRONIC FILING Rachelle Verret Morphy Saskatchewan Electric Reliability Authority 2025 Victoria Avenue Regina, Saskatchewan, Canada S4P 0S1 Re: North American Electric Reliability

More information

Key Compliance Trends Item 2.A

Key Compliance Trends Item 2.A Key Compliance Trends Item 2.A Key Compliance Trends The number of violations received each month exceeds the total monthly violations approved by the BOTCC or dismissed, but the BOTCC approved violations

More information

Via . April 28, 2015

Via  . April 28, 2015 Via Email April 28, 2015 North American Electric Reliability Corporation 3343 Peachtree Road, NE Fourth Floor East Tower Suite 400 Atlanta, Georgia 30326 Attention: Mr. Michael Walker Subject: NPCC True

More information

SCHIFF HARDIN LLP. May 30, 2014 VIA ELECTRONIC FILING

SCHIFF HARDIN LLP. May 30, 2014 VIA ELECTRONIC FILING SCHIFF HARDIN LLP A Limited Liability Partnership Owen E. MacBride (312) 258-5680 Email: omacbride@schiffhardin.com 233 SOUTH WACKER DRIVE SUITE 6600 CHICAGO, ILLINOIS 60606 Tel.: 312.258.5500 Fax: 312.258.5700

More information

Violation Process States and Underlying Process Sub states Snapshot comparison between December 1, 2009 and December 31, 2009

Violation Process States and Underlying Process Sub states Snapshot comparison between December 1, 2009 and December 31, 2009 Violation Process States and Underlying Process Sub states Snapshot comparison between December 1, 29 and December 31, 29 15 New Preliminary Alleged Violation Information Submitted 15 15 Substate A Submitted

More information

Key Compliance Trends

Key Compliance Trends Key Compliance Trends Key Compliance Trends Trend # 1: The number of violations received each month exceeds the total monthly violations processed Monthly BOTCC approvals are increasing The use of the

More information

Agenda Finance and Audit Committee Open Conference Call and Webinar May 20, :00-3:30 p.m. Eastern

Agenda Finance and Audit Committee Open Conference Call and Webinar May 20, :00-3:30 p.m. Eastern Agenda Finance and Audit Committee Open Conference Call and Webinar May 20, 2013 2:00-3:30 p.m. Eastern DIAL-IN: 800-272-6255 Webex Registration Link: https://cc.readytalk.com/r/45l4p1np7adz Broadcast

More information

Analysis of NERC Compliance Registry & Registration Appeals

Analysis of NERC Compliance Registry & Registration Appeals Electric Reliability Organization (ERO) Compliance Analysis Report NERC Compliance Registry and Registration Appeals May 2011 Table of Contents ERO Compliance Analysis Report... 2 Background Information...

More information

Violation Process States and Underlying Process Sub states Snapshot comparison between February 1, 2009 and February 28, 2009

Violation Process States and Underlying Process Sub states Snapshot comparison between February 1, 2009 and February 28, 2009 Violation Process States and Underlying Process Sub states Snapshot comparison between February 1, 29 and February 28, 29 48 New Preliminary Alleged Violation Information Submitted 48 59 Substate A Submitted

More information

NERC TPL Standard Overview

NERC TPL Standard Overview NERC TPL-001-4 Standard Overview Attachment K Quarter 3 Stakeholder s Meeting September 29, 2016 1 Background New NERC TPL Standard 2016 TPL Plan and Status Update 2015 Planning Assessment Results Compliance

More information

Approved Business Plan and Budget. Florida Reliability Coordinating Council, Inc.

Approved Business Plan and Budget. Florida Reliability Coordinating Council, Inc. Approved 2015 Business Plan and Budget Florida Reliability Coordinating Council, Inc. Approved: 6/25/2014 Table of Contents Introduction... 3 Organizational Overview... 3 Membership and Governance... 4

More information

2018 ERO Enterprise Metrics

2018 ERO Enterprise Metrics 2018 ERO Enterprise Metrics Metrics In support of the ERO Enterprise s goals, there are six reliability metrics to measure achievement of a highly reliable and secure bulk power system (BPS). There is

More information

Compliance Trending May 2010

Compliance Trending May 2010 Compliance Trending May 21 Overall Trends New Violations in May were received at a rate lower than the rolling 6 month average 6 Month Violation Receipt Average (Nov 29 through May 21) = 136 violations/month

More information

Compliance Trending. Page 1 of 14

Compliance Trending. Page 1 of 14 Compliance Trending Page 1 of 14 Overall Trends The number of new CIP violations received each month continues to rise dramatically over the number of new non-cip violations In September 21, 182 CIP were

More information

2016 Business Plan and Budget. Southwest Power Pool Regional Entity. Preliminary Budget

2016 Business Plan and Budget. Southwest Power Pool Regional Entity. Preliminary Budget 2016 Business Plan and Budget Southwest Power Pool Regional Entity Preliminary Budget April 27, 2015 Table of Contents Introduction... 3 Section A 2015 Business Plan... 10 Reliability Standards Program...11

More information

2017 Metrics with Historical Data

2017 Metrics with Historical Data 2017 Metrics with Historical Data Metrics In support of the ERO Enterprise s goals, there are six reliability metrics to measure progress on reliability improvement. There is also one metric to measure

More information

Agenda Finance and Audit Committee Conference Call

Agenda Finance and Audit Committee Conference Call Agenda Finance and Audit Committee Conference Call November 2, 2009 10 a.m. EST Dial-In: 800-940-0570 Introductions and Chairman s Remarks Antitrust Compliance Guidelines *1. Minutes Review and Approve

More information

165 FERC 61,023 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability Corporation

165 FERC 61,023 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability Corporation 165 FERC 61,023 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Cheryl A. LaFleur, Neil Chatterjee, and Richard Glick. North American Electric Reliability Corporation

More information

Via . May 1, 2017

Via  . May 1, 2017 Via Email May 1, 2017 North American Electric Reliability Corporation 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 Attention: Mr. Scott Jones Subject: NPCC True Up Actual vs. Variance

More information

2019 Business Plan and Budget. Texas Reliability Entity, Inc. Approved by Texas RE Board of Directors

2019 Business Plan and Budget. Texas Reliability Entity, Inc. Approved by Texas RE Board of Directors 2019 Business Plan and Budget Texas Reliability Entity, Inc. Approved by Texas RE Board of Directors Date: May 23, 2018 1 Table of Contents Table of Contents... 2 Introduction... 3 Section A Statutory

More information

SERC Reliability Corporation Business Plan and Budget

SERC Reliability Corporation Business Plan and Budget SERC Reliability Corporation 3701 Arco Corporate Drive, Suite 300 Charlotte, NC 28273 704.357.7372 Fax 704.357.7914 www.serc1.org SERC Reliability Corporation 2018 Business Plan and Budget DRAFT April

More information

Approved Business Plan and Budget. Florida Reliability Coordinating Council, Inc.

Approved Business Plan and Budget. Florida Reliability Coordinating Council, Inc. Approved 2016 Business Plan and Budget Florida Reliability Coordinating Council, Inc. Approved: 6/25/2015 Table of Contents Introduction... 3 Organizational Overview... 3 Membership and Governance... 4

More information

SERC Reliability Corporation Business Plan and Budget

SERC Reliability Corporation Business Plan and Budget SERC Reliability Corporation 3701 Arco Corporate Drive, Suite 300 Charlotte, NC 28273 704.357.7372 Fax 704.357.7914 www.serc1.org SERC Reliability Corporation 2018 Business Plan and Budget FINAL June 28,

More information

Compliance Monitoring and Enforcement Program Report

Compliance Monitoring and Enforcement Program Report Compliance Monitoring and Enforcement Program Report Q3 2016 November 1, 2016 NERC Report Title Report Date I Table of Contents Preface... iii Introduction...1 Highlights from Q3 2016...1 Enforcement...1

More information

2014 Business Plan and Budget. Texas Reliability Entity, Inc. Approved by Texas RE Board of Directors

2014 Business Plan and Budget. Texas Reliability Entity, Inc. Approved by Texas RE Board of Directors 2014 Business Plan and Budget Texas Reliability Entity, Inc. Approved by Texas RE Board of Directors Date: June 14, 2013 Table of Contents Introduction... 3 Section A 2014 Business Plan...12 Reliability

More information

2018 Business Plan and Budget Southwest Power Pool Regional Entity. Approved by SPP Regional Entity Trustees

2018 Business Plan and Budget Southwest Power Pool Regional Entity. Approved by SPP Regional Entity Trustees 2018 Business Plan and Budget Southwest Power Pool Regional Entity Approved by SPP Regional Entity Trustees June 30, 2017 Table of Contents Introduction...3 Section A 2018 Business Plan... 10 Reliability

More information

APPENDIX 4D TO THE RULES OF PROCEDURE

APPENDIX 4D TO THE RULES OF PROCEDURE APPENDIX 4D TO THE RULES OF PROCEDURE PROCEDURE FOR REQUESTING AND RECEIVING TECHNICAL FEASIBILITY EXCEPTIONS TO NERC CRITICAL INFRASTRUCTURE PROTECTION STANDARDS Effective: July 1, 2016 TABLE OF CONTENTS

More information

2018 Business Plan and Budget Supplemental Information May 1, 2017

2018 Business Plan and Budget Supplemental Information May 1, 2017 2018 Business Plan and Budget Supplemental Information May 1, 2017 Today we posted our 2018 Business Plan and Budget (BP&B) for stakeholder comment. WECC staff had productive dialogue with the members

More information

M RO NERC FAC 2016 Budget Review

M RO NERC FAC 2016 Budget Review M ID W EST RELIABILITY ORGAN IZ ATION M RO NERC FAC 2016 Review July 22, 2015 Sue Clarke, VP-Finance and Administration Improving RELIABILITY and mitigating RISKS to the Bulk Power System 2016 Overview

More information

129 FERC 61,040 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

129 FERC 61,040 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 129 FERC 61,040 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, and Philip D. Moeller. North American Electric Reliability Corporation

More information

SCENARIO Proposed Business Plan and Budget 2020 Transitional Reliability Coordinator. Peak Reliability

SCENARIO Proposed Business Plan and Budget 2020 Transitional Reliability Coordinator. Peak Reliability SCENARIO 1 2019 Proposed Business Plan and Budget 2020 Transitional Reliability Coordinator Peak Reliability Draft: Date: Version 1 June 1, 2018 Table of Contents Introduction... 3 Scenario 1 Status Quo

More information

APPENDIX 4D TO THE RULES OF PROCEDURE

APPENDIX 4D TO THE RULES OF PROCEDURE APPENDIX 4D TO THE RULES OF PROCEDURE PROCEDURE FOR REQUESTING AND RECEIVING TECHNICAL FEASIBILITY EXCEPTIONS TO NERC CRITICAL INFRASTRUCTURE PROTECTION STANDARDS Effective: April 1, 2016 TABLE OF CONTENTS

More information

Shared Business Plan and Budget Assumptions NERC and the Regional Entities Planning Period

Shared Business Plan and Budget Assumptions NERC and the Regional Entities Planning Period NERC and the Regional Entities 2013-2015 Planning Period Commencing in December 2011, NERC and the eight Regional Entities have been collaborating in the development of a common set of business planning

More information

123 FERC 61,282 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability Corporation

123 FERC 61,282 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability Corporation 123 FERC 61,282 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Joseph T. Kelliher, Chairman; Suedeen G. Kelly, Marc Spitzer, Philip D. Moeller, and Jon Wellinghoff.

More information

Final Business Plan and Budget. Florida Reliability Coordinating Council, Inc. Approved:

Final Business Plan and Budget. Florida Reliability Coordinating Council, Inc. Approved: Final 2018 Business Plan and Budget Florida Reliability Coordinating Council, Inc. Approved: 062917 Table of Contents Introduction... 3 Organizational Overview... 3 Membership and Governance... 4 Statutory

More information

March 16, 2009 TO: INDUSTRY STAKEHOLDERS. Ladies and Gentlemen:

March 16, 2009 TO: INDUSTRY STAKEHOLDERS. Ladies and Gentlemen: March 16, 2009 TO: INDUSTRY STAKEHOLDERS Ladies and Gentlemen: REQUEST FOR COMMENTS ON PROPOSED PROCEDURE FOR REQUESTING AND RECEIVING TECHNICAL FEASIBILITY EXCEPTIONS TO NERC CRITICAL INFRASTRUCTURE PROTECTION

More information

2017 Business Plan and Budget. Texas Reliability Entity, Inc. Approved by Texas RE Board of Directors. Date:, 2016

2017 Business Plan and Budget. Texas Reliability Entity, Inc. Approved by Texas RE Board of Directors. Date:, 2016 2017 Business Plan and Texas Reliability Entity, Inc. Approved by Texas RE Board of Directors Date:, 2016 Approved by the Texas RE Board of Directors, 2016 1 Table of Contents Table of Contents... 2 Introduction...

More information

SERC Reliability Corporation Business Plan and Budget

SERC Reliability Corporation Business Plan and Budget SERC Reliability Corporation 3701 Arco Corporate Drive, Suite 300 Charlotte, NC 28273 704.357.7372 Fax 704.357.7914 www.serc1.org SERC Reliability Corporation 2016 Business Plan and Budget DRAFT 1.0 April,

More information

161 FERC 61,131 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

161 FERC 61,131 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 161 FERC 61,131 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Neil Chatterjee, Chairman; Cheryl A. LaFleur, and Robert F. Powelson. North American Electric Reliability

More information

2019 Business Plan and Budget. Western Electricity Coordinating Council. Approved by: WECC Board of Directors Date: June XX, 2018

2019 Business Plan and Budget. Western Electricity Coordinating Council. Approved by: WECC Board of Directors Date: June XX, 2018 2019 Business Plan and Budget Western Electricity Coordinating Council Approved by: WECC Board of Directors Date: June XX, 2018 155 North 400 West, Suite 200 Salt Lake City, Utah 84103-1114 Table of Contents

More information

FINAL Business Plan and Budget. Florida Reliability Coordinating Council, Inc. Approved by: FRCC Board of Directors

FINAL Business Plan and Budget. Florida Reliability Coordinating Council, Inc. Approved by: FRCC Board of Directors FINAL 2013 Business Plan and Budget Florida Reliability Coordinating Council, Inc. Approved by: FRCC Board of Directors DATE: June 28, 2012 Table of Contents Introduction... 3 Organizational Overview...

More information

133 FERC 61,062 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability Corporation

133 FERC 61,062 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability Corporation 133 FERC 61,062 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. North

More information

2017 Business Plan & Budget

2017 Business Plan & Budget 2017 Business Plan & 2017 Overview Approved on June 2, 2016 by ReliabilityFirst Board Total 2017 : $19,908,939 2.8% $541,729 Personnel Expense 3.7% $582,486 Operating and Fixed Asset -1.1% ($ 40,757) Total

More information

2016 Business Plan and Budget. Texas Reliability Entity, Inc. Approved by Texas RE Board of Directors. Date: May 21, 2015

2016 Business Plan and Budget. Texas Reliability Entity, Inc. Approved by Texas RE Board of Directors. Date: May 21, 2015 2016 Business Plan and Texas Reliability Entity, Inc. Approved by Texas RE Board of Directors Date: May 21, 2015 1 Table of Contents Table of Contents... 2 Introduction... 3 Section A 2016 Business Plan

More information

Northeast Power Coordinating Council, Inc. (NPCC) 2014 Business Plan and Budget

Northeast Power Coordinating Council, Inc. (NPCC) 2014 Business Plan and Budget Northeast Power Coordinating Council, Inc. (NPCC) 2014 Business Plan and Budget Approved by NPCC Board of Directors June 25, 2013 Table of Contents Introduction... 3 Personnel Analysis... 11 Section A

More information

2018 Business Plan and Budget

2018 Business Plan and Budget 2018 Business Plan and Western Electricity Coordinating Council Approved by: WECC Board of Directors Date: June XX, 2017 155 North 400 West, Suite 200 Salt Lake City, Utah 84103-1114 Table of Contents

More information

2012 BUDGET REVIEW Sue Clarke, VP of Finance and Administration

2012 BUDGET REVIEW Sue Clarke, VP of Finance and Administration 2012 BUDGET REVIEW Sue Clarke, VP of Finance and Administration June 2, 2011 Promoting RELIABILITY and Mitigating RISKS to the Bulk Power System Overview MRO staff imposed a budget target with a flat headcount

More information

NYISO 2018 BUDGET OVERVIEW

NYISO 2018 BUDGET OVERVIEW NYISO 2018 BUDGET OVERVIEW Alan Ackerman Customized Energy Solutions Chair, Budget & Priorities Working Group Management Committee October 25, 2017 Rensselaer, NY This presentation is unchanged from the

More information

2017 Business Plan and Budget

2017 Business Plan and Budget 2017 Business Plan and Western Electricity Coordinating Council Approved by: WECC Board of Directors Date: June XX, 2016 155 North 400 West, Suite 200 Salt Lake City, Utah 84103 1114 Table of Contents

More information

Agenda Corporate Governance and Human Resources Committee November 2, :00-3:00 p.m. Eastern Conference Call

Agenda Corporate Governance and Human Resources Committee November 2, :00-3:00 p.m. Eastern Conference Call Agenda Corporate Governance and Human Resources Committee November 2, 2017 2:00-3:00 p.m. Eastern Conference Call Dial-in: 1-800-289-0438 Conference ID: 5180226 Call to Order and Chair s Remarks NERC Antitrust

More information

NYISO 2017 BUDGET OVERVIEW (dollars in millions, unless otherwise noted)

NYISO 2017 BUDGET OVERVIEW (dollars in millions, unless otherwise noted) NYISO 2017 BUDGET OVERVIEW (dollars in millions, unless otherwise noted) Draft For Discussion Only Cheryl Hussey Vice President & Chief Financial Officer New York Independent System Operator Budget & Priorities

More information

Transmission Planning Standards Industry Webinar: Footnote b. January 8, 2012 John Odom, FRCC, Standard Drafting Team Chair

Transmission Planning Standards Industry Webinar: Footnote b. January 8, 2012 John Odom, FRCC, Standard Drafting Team Chair Transmission Planning Standards Industry Webinar: Footnote b January 8, 2012 John Odom, FRCC, Standard Drafting Team Chair Topics Brief history Overview of as posted draft standard Changes since last posting

More information

SCHIFF HARDIN LLP A Limited Liability Partnership

SCHIFF HARDIN LLP A Limited Liability Partnership SCHIFF HARDIN LLP A Limited Liability Partnership Owen E. MacBride (312) 2585680 Email: omacbride@schiffhardin.com 233 SOUTH WACKER DRIVE SUITE 6600 CHICAGO, ILLINOIS 60606 Tel.: 312.258.5500 Fax: 312.258.5700

More information

April 6, 2018 VIA OVERNIGHT MAIL. Sheri Young, Secretary of the Board National Energy Board th Avenue SW Calgary, Alberta T2R 0A8

April 6, 2018 VIA OVERNIGHT MAIL. Sheri Young, Secretary of the Board National Energy Board th Avenue SW Calgary, Alberta T2R 0A8 !! April 6, 2018 VIA OVERNIGHT MAIL Sheri Young, Secretary of the Board National Energy Board 517 10 th Avenue SW Calgary, Alberta T2R 0A8 Re: North American Electric Reliability Corporation Dear Ms. Young:

More information

BES Definition Implementation Guidance

BES Definition Implementation Guidance BES Definition Implementation Guidance August 25, 2014 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 NERC BES Definition Implementation Guidance June 23, 2014 404-446-2560 www.nerc.com

More information

DRAFT Business Plan and Budget. Approved by: MRO Board of Directors. Date May 4June 28, 2012

DRAFT Business Plan and Budget. Approved by: MRO Board of Directors. Date May 4June 28, 2012 MIDWEST RELIABILITY ORGANIZATION DRAFT 2013 Business Plan and Budget Approved by: MRO Board of Directors Date May 4June 28, 2012 380 St. Peter Street, Suite 800 Saint Paul, MN 55102 Phone (651) 8551760

More information

2015 Business Plan and Budget Draft 1.0. Approved by: MRO Board of Directors. Date: May 16, 2014

2015 Business Plan and Budget Draft 1.0. Approved by: MRO Board of Directors. Date: May 16, 2014 Midwest Reliability Organization 2015 Business Plan and Budget Draft 1.0 Approved by: MRO Board of Directors Date: May 16, 2014 380 St. Peter Street, Suite 800 Saint Paul, MN 55102 Phone (651) 8551760

More information

SCENARIO & 2020 Proposed Business Plan and Budget Wind Down. Peak Reliability

SCENARIO & 2020 Proposed Business Plan and Budget Wind Down. Peak Reliability SCENARIO 2 2019 & 2020 Proposed Business Plan and Budget Wind Down Peak Reliability Draft: Date: Version 1 June 1, 2018 Table of Contents Introduction... 3 Scenario 2 Wind Down... 4 2019 & 2020 Business

More information

BES Frequently Asked Questions

BES Frequently Asked Questions BES Frequently Asked Questions Version 1.6 February 25, 2015 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446 - 2560 www.nerc.com Table of Contents Preface... iii 1. Version History...

More information

Compliance Monitoring and Enforcement Program Quarterly Report

Compliance Monitoring and Enforcement Program Quarterly Report Compliance Monitoring and Enforcement Program Quarterly Report Q2 2018 August 15, 2018 NERC Report Title Report Date I Table of Contents Preface... iii Executive Summary... iv Chapter 1 : CMEP Activities...

More information

I - PROJECT STATUS OVERVIEW

I - PROJECT STATUS OVERVIEW Project Sponsor: Status Report : Start : Project Manager: Project R&C Category: End : I - PROJECT STATUS OVERVIEW A. Overview of project progress during reporting period: B. SPI & CPI (for

More information

2013 Business Plan and Budget

2013 Business Plan and Budget MIDWEST RELIABILITY ORGANIZATION 2013 Business Plan and Budget Approved by: MRO Board of Directors Date June 28, 2012 380 St. Peter Street, Suite 800 Saint Paul, MN 55102 Phone (651) 8551760 Fax (651)

More information

The NCUA Budget in Brief

The NCUA Budget in Brief The NCUA in Brief Proposed 2019 and 2020 s The goals and objectives set forth in the National Credit Union Administration s (NCUA) Strategic Plan 2018-2022 form the basis for determining agency resource

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability ) Docket No. RC Corporation )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability ) Docket No. RC Corporation ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION North American Electric Reliability ) Docket No. RC11-6-000 Corporation ) NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION S ANNUAL

More information

Procedure for ERO Support of Frequency Response and Frequency Bias Setting Standard

Procedure for ERO Support of Frequency Response and Frequency Bias Setting Standard Procedure for ERO Support of Frequency Response and Frequency Bias Setting Standard NERC Report Title Report Date I Table of Contents Preface... iii Introduction...iiv Chapter 1: Event Selection Process...

More information

1. Title: Qualified Transfer Path Unscheduled Flow (USF) Relief

1. Title: Qualified Transfer Path Unscheduled Flow (USF) Relief A. Introduction 1. Title: Qualified Transfer Path Unscheduled Flow (USF) Relief 2. Number: IRO-006-WECC-2 3. Purpose: Mitigation of transmission overloads due to unscheduled flow on Qualified Transfer

More information

2019 & 2020 Proposed Business Plan and Budget Wind Down. Peak Reliability

2019 & 2020 Proposed Business Plan and Budget Wind Down. Peak Reliability 2019 & 2020 Proposed Business Plan and Budget Wind Down Peak Reliability Draft: Date: Board Approval Draft September 4, 2018 Table of Contents Introduction... 3 2019 & 2020 Business Plan and Budget Wind

More information

Long-Term Reliability Assessment

Long-Term Reliability Assessment Long-Term Reliability Assessment Key Findings and Long-Term Issues John Moura, Director of Reliability Assessment Topics Covered Today Background on NERC s Long-Term Reliability Assessment Emerging and

More information

Northeast Power Coordinating Council, Inc. (NPCC) 2017 Business Plan and Budget

Northeast Power Coordinating Council, Inc. (NPCC) 2017 Business Plan and Budget Northeast Power Coordinating Council, Inc. (NPCC) 2017 Business Plan and Budget Draft 1 Submitted to NERC April 28, 2016 Table of Contents Introduction... 3 Personnel Analysis... 12 Section A 2017 Regional

More information

Agenda - Alternate Service Delivery Committee - May 17, 2005 REPORTS

Agenda - Alternate Service Delivery Committee - May 17, 2005 REPORTS Agenda - Alternate Service Delivery Committee - May 17, 2005 REPORTS Item No. 1 Solid Waste Collection Services Business Plan May 2005 Files WT-1 and WT-1.3 ADMINISTRATIVE RECOMMENDATION: 1. That the attached

More information

NYISO 2019 BUDGET OVERVIEW

NYISO 2019 BUDGET OVERVIEW NYISO 2019 BUDGET OVERVIEW Alan Ackerman Customized Energy Solutions Chair, Budget & Priorities Working Group Management Committee October 31, 2018 Rensselaer, NY Except for items noted in RED, this presentation

More information

Agenda Conference Call Finance and Audit Committee

Agenda Conference Call Finance and Audit Committee Agenda Conference Call Finance and Audit Committee January 24, 2011 8:309:00 a.m. ET DialIn: 8007058289 (No Code Needed) Introductions and Chair s Remarks NERC Antitrust Compliance Guidelines 1. Texas

More information

Amended Agenda Finance and Audit Committee Conference Call

Amended Agenda Finance and Audit Committee Conference Call Amended Agenda Finance and Audit Committee Conference Call June 5, 2009 2 p.m. EDT Dial-In: 866-833-6395 Code: 12556849 Open Session Introductions and Chairman s Remarks Antitrust Compliance Guidelines

More information

FAC Facility Interconnection Studies

FAC Facility Interconnection Studies A. Introduction 1. Title: Facility Interconnection Studies 2. Number: FAC-002-2 3. Purpose: To study the impact of interconnecting new or materially modified Facilities on the Bulk Electric System. 4.

More information

3. Purpose: To specify the quantity and types of Contingency Reserve required to ensure reliability under normal and abnormal conditions.

3. Purpose: To specify the quantity and types of Contingency Reserve required to ensure reliability under normal and abnormal conditions. WECC Standard BAL-002-WECC-2a A. Introduction 1. Title: 2. Number: BAL-002-WECC-2a 3. Purpose: To specify the quantity and types of required to ensure reliability under normal and abnormal conditions.

More information