1 STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-100, SUB 84 BEFORE THE NORTH CAROLINA UTILITIES COMMISSION In the Matter of Investigation of Integrated Resource Planning in North Carolina ) ORDER ADOPTING INTEGRATED RESOURCE ) PLANS ) BY THE COMMISSION: North Carolina General Statute (c) requires the North Carolina Utilities Commission (Commission) to "develop, publicize, and keep current an analysis of the long-range needs" for electricity in this State. This includes (1) the Commission's estimate of the probable future growth of the use of electricity; (2) the probable needed generating reserves; (3) the extent, size, mix and general location of the generating plants; (4) arrangements for pooling power to the extent not regulated by the Federal Power Commission (now the Federal Energy Regulatory Commission, or the FERC); and (5) other arrangements with other utilities and energy suppliers. The purpose of this requirement is "to achieve maximum efficiencies for the benefit of the people of North Carolina." The statute requires the Commission to develop a plan for the future requirements for electricity for North Carolina or the area served by a utility and to consider its analysis in acting upon any petition for construction. In addition, it requires the Commission to submit annually to the Governor and to the appropriate committees of the General Assembly the following: (1) a report of its analysis and plan; (2) the progress to date in carrying out such plan; and (3) the program of the Commission for the ensuing year in connection with such plan. Commission Rule R8-60 requires that each of the investor-owned utilities and the North Carolina Electric Membership Corporation, (collectively, "the utilities") furnish the Commission with an annual report that contains specific information that is set out in subsection (c) of the rule and provides that the Public Staff and any other intervenor may file its own report, evaluation, or comments regarding the utilities' reports. In addition, Rule R8-62(p) requires certain additional information be included in the reports about the construction of transmission lines. In its July 13, 1999 Order Adopting Least Cost Integrated Resource Plans And Clarifying Future Filing Requirements in Docket No. E-100, Sub 82, the Commission imposed additional requirements for the Annual Reports. Specifically, the utilities were directed to include a full response to each item of information required by the Rules; appropriate explanations for each item where the information requested is not available; and appropriate explanations referencing the location of information in the filings where such information does not follow the same general order of presentation as contained in the Commission Rules. The Commission further ordered the utilities to adhere to the requirement that each ten-year forecast and plan consist of the ten years next succeeding the annual September 1 filing date. Finally, the Commission required the utilities to file 1999 Annual Reports which included a detailed explanation of the basis for, and a justification for the adequacy and appropriateness of, the level of projected reserve margins and a discussion of the adequacy of the respective utility's transmission system. On or about September 2, 1999, the second Integrated Resource Plan (IRP) filings were made under the current rules by Carolina Power & Light Company (CP&L), Duke Power (Duke), North Carolina Power (NC Power), and North Carolina Electric Membership Corporation (NCEMC). On December 7, 1999, the Public Staff filed its comments on the IRPs filed by the utilities. On December 21, 1999, Duke and NC Power filed responses to the Public Staff comments. CP&L and NCEMC did not file reply comments. By Order issued October 29, 1999, public hearings were scheduled for the purpose of taking non-expert public witness testimony during the month of January. By Order issued February 10, 2000, the public hearings previously scheduled in Edenton and Raleigh were rescheduled for March 28, 2000, in Raleigh. Carolina Industrial Group for Fair Utility Rates I and II (CIGFUR) intervened in the proceeding but did not file comments.

2 UTILITY RESPONSES TO RULES R8-60(c) AND R8-62(p) The Public Staff comments contained a summary of the information filed by the utilities in response to requirements contained in Rules R8-60 and 62. All of the information filed by the utilities was satisfactory to the Public Staff, except for two instances: (1) NC Power responded to the requirement for listing wholesale purchase power commitments by stating that "there are no wholesale purchase power commitments included in the ten-year forecast" and that "for purposes of this filing, purchase contracts with non-utility generators are considered 'firm purchases' rather than 'wholesale purchase commitments.'" The Public Staff considered the response "unclear." (2) NCEMC did not respond to the requirement for the information on transmission lines contained on FERC Form 1. The Public Staff commented that NCEMC is not subject to FERC jurisdiction and thus does not generate the FERC Form 1 information. Nevertheless, as the Public Staff pointed out, the previous Order Adopting Least Cost Integrated Resource Plans And Clarifying Future Filing Requirements, issued July 13, 1999, in Docket No. E-100, Sub 82, required "that future filings by all utilities pursuant to NCUC Rules R8-60 and R8-61 shall include a full response to each item of information required by the Rules." RESERVE MARGINS The Commission Order Adopting Least Cost Integrated Resource Plans And Clarifying Future Filing Requirements, issued July 13, 1999, in Docket No. E-100, Sub 82, required "that the filings due September 1, 1999, shall include a detailed explanation of the basis for, and a justification for the adequacy and appropriateness of, the level of projected reserve margins and a discussion of the adequacy of the respective utility's transmission system." The Public Staff's comments contained the following discussion of the utilities' filings in response to the reserve margin portion of the requirement: (1) CP&L provided an assessment of the adequacy and appropriateness of its level of projected reserves. This assessment indicated that a reserve margin of 15% was adequate. CP&L found that the industry's widely used "one day in ten years" Loss-of-Load Exception (LOLE) criteria would be satisfied by a reserve level of 1,500 MWs, or a reserve margin of approximately 11.7%. CP&L used computer modeling, its own studies, and assessment of capacity assistance from neighboring electric systems to evaluate the reliability criteria. CP&L's survey of other utilities found a range of reserve margins, from 9.8% to 20.5%, with a majority of the utilities' reserves in the range of approximately 15% to 18%. CP&L also believes that the high reliability and small size of planned additions allow lower reserve levels. CP&L expects to attain a 15% reserve margin in all but the first two years of the current ten-year period. (2) Duke responded that its lowered reserve margin target of 17% was supported by the increased availability of existing generation, shorter lead times for new generation, and the emergence of new purchased power options. Duke's operating experience was also factored into the selection of a 17% reserve margin. Duke reported that between June 1997 and July 1999, there were 15 days when generating reserves dropped below 3%, without factoring in purchases and Demand Side Management (DSM). When purchases and DSM were factored in, the lowest reserve margin reached was 12%. Duke's reserve margin is slightly above the 17% target for the entire ten year planning period. (3) VEPCO reported that its target reserve margin is 12.5%. VEPCO's planning reserves in the past were established using a 12-hour loss of load criterion. VEPCO, this year, has initiated a review of this reserve planning criterion to evaluate its appropriateness. VEPCO's preliminary results determined that a reserve margin between 12% and 13% should be used as a target. An internal task force determined that a reserve margin of 12.5% would be adequate to cover various contingencies. This 12.5% reserve margin target is the lowest of the three major investor-owned utilities in North Carolina. Furthermore, while it is in the overall range that CP&L found for the utilities surveyed, it is well below the range of 15% to 18% maintained by the majority of the utilities in its survey. As noted earlier, VEPCO's reserves range from approximately 9.4% to 11.1 % for the 2000 to 2009 period, with the lowest levels occurring at the end of this period. VEPCO never reaches its target level of 12.5%, which is the level it plans to use to determine the amount of capacity to acquire in the wholesale market. For example, if VEPCO's reserve margin in the

3 last years of its forecast were at the 12.5% level, its reserves would have to be approximately 500 MWs higher. If VEPCO maintained a 15% reserve margin instead, the reserves would have to be over 900 MWs higher than reported. VEPCO has firm purchases of over 3,000 MWs for each year of the planning period. (4) NCEMC did not provide an assessment of the adequacy of its reserve margin. The Public Staff believes that the Commission should continue to require the filing of this reserve adequacy report, including the criteria used to determine reserve margin targets, within the annual IRP reports. The information supplied is important and is not found elsewhere. CP&L and Duke appear to meet their projected reserve margin targets for the planning period. VEPCO misses its target in all years, and its projected reserve margin declines beginning in 2004 and lasting through the end of the planning period. The Public Staff recommends that CP&L and Duke maintain reserve margins of approximately 15% and 17%, respectively. VEPCO should address whether its 12.5% target is adequate, when it is so much lower than CP&L's, Duke's, and the majority of the surveyed utilities and why its reserve margins do not meet even this target. Duke's response to the Public Staff's comments was as follows: The VACAR Reserve Sharing Agreement currently provides that the members collectively maintain 1,694 MW of Contingency Reserves. Duke's share is currently 525 MW. Each VACAR member maintains its share of Contingency Reserves, enabling the members to respond to such factors as generation and transmission equipment unavailability. Duke believes that it is inappropriate to create additional reserve measures and requirements. Duke's 1999 Annual Plan filing stated that continued use of the 17% planning reserve margin target is appropriate at this time. Duke continually reviews the generating system capability, level of potential DSM activities, scheduled maintenance, purchased power availability and transmission capability to assess Duke's capability to reliability meet the customer load. Duke notes that significant changes are taking place in the electric industry. As a result, it may be advisable to deviate from the 17% planning reserve margin target. Future Annual Plan filings will address reserve margins and it is inappropriate to attempt to establish future reserve margins in this manner. NC Power's response to the Public Staff's comments was as follows: In the Comments, Public Staff expresses concerns about the adequacy of NC Power's reserve margin target of 12.5%. The reserve margins shown on the Company's response to Item (1) are based on the results of the expansion planning process completed as part of the development of the Company's resource plan. These reserve margins represent the results of the model evaluation, indicating what the system reserves must be to maintain our commitment to providing reliable service to our customers (i.e., twelve loss-of-load hours exclusive of incremental capacity purchases from outside of our system). The Company's model assumptions take into account the very low forced outage rate of its nuclear units, as well as the relatively low forced outage rates of its fossil units. The assumptions also account for the large number of small capacity units on the Company's system which serve to minimize the effect of forced outages and increase overall system reliability. As noted by the Public Staff in the Comments, an internal task force, determined that a target reserve margin of 12.5% would be adequate to cover various contingencies. Comments at 6. See Report at 46. That task force, comprised of various executive level personnel, studied the appropriate target reserve margin needed to balance the concerns related to lower reserve margins resulting from the model evaluation and the uncertainty relating to the level of native load to be served in the near future resulting from total retail choice beginning in 2002 in Virginia. The task force determined that a 12.5 % reserve margin target would be the adequate level to carry on the system at this time. Since the filing of the Company's resource plan, the Company has issued a Request for Proposals (RFP) with an all-source bid, with preference toward peaking capacity. Bids in response to the RFP are due by January 17, 2000 at which time the Company will evaluate the best option for obtaining the capacity

4 needed to meet the 12.5 % target reserve margin level. CP&L did not respond to the Public Staff comments. TRANSMISSION ADEQUACY The Public Staff's comments contained the following discussion of transmission adequacy: All of the utilities included a statement regarding their transmission line adequacy as required in the July 19, 1999, Order in Docket No. E-100, Sub 82. However, these statements describe the process for ensuring adequacy rather than providing technical details that would be sufficient for assessing the impact of various planning elements. The Public Staff recommends that the Commission require the utilities to file the following information: 1. A statement on direct utility interconnections/transfer points. For each transfer point provide the voltage level, the transfer capabilities in and out of the system for both the summer and winter seasons, any limitation on generation and purchase power planning, and plans to improve or limit these transfer capabilities over the planning period. Indicate the amount of power passing through these points for wheeling to other utilities and the amounts imported for native loads. 2. A descriptive and quantitative discussion on the impact of the open access policy and power wheeling (wholesale and retail) on the transmission line capabilities and planning. 3. The utilities' needs for building or upgrading transmission lines to meet native load growth during the planning period. 4. The utilities' plans to meet expected power wheeling demand during the planning period. 5. A list of all transmission lines (161 KV and above) that were operated above 80% of design limits. Report at least the following information: maximum line loading, maximum design capability, projected loading growth in MWs during the planning period, schedule for improvements, if any, and anticipated capability improvement resulting from scheduled improvement(s). 6. Impact of loss of one major interconnection or one major line on other lines. 7. The Public Staff recommends that the Commission require the utilities to file this information with the transmission adequacy statement in their next IRP annual reports. Duke responded as follows: The overall Public Staff concern is that utilities responded with statements describing the process for ensuring transmission system adequacy rather than providing technical details that would be sufficient for assessing the impact of various planning elements. The Public Staff is recommending the filing of enormous amounts of data and information. Much of this data is publicly available in the form of reports and models as a result of ongoing joint studies with our interconnected neighbors. Duke opposes this burdensome recommendation and further expresses concern that should the Commission adopt the Public Staff's recommendations to institute a new filing requirement of this magnitude circumvents the appropriate rulemaking process and procedure. However, Duke believes this issue requires more clarity and suggests that a meeting attended by the Public Staff, Duke, CP&L, VEPCO and NCEMC be held to better understand the Commission's needs and suggest an efficient and responsive reporting mechanism. NC Power responded that it would not object to filing the information recommended by the Public Staff if the Commission should request it. FILING REQUIREMENTS FOR ECONOMIC DEVELOPMENT AND SELF-GENERATION DEFERRAL RATES

5 The Public Staff comments contained the following discussion of filing requirements for economic development and self-generation deferral rates: By Order issued November 28, 1994 in Docket No. E-100, Sub 73, the Commission adopted Interim Guidelines and Filing Requirements for Economic Development Rates, which also included selfgeneration deferral rates. CP&L and Duke have approved tariffs for economic development rates, and VEPCO has filed for such approval. The filing requirements state: The utility shall review the combined effects of existing economic development rates annually within the approved LCIRP process and file the results in its short-term action plan... Similar language appears in the guidelines for self-generation deferral rates contained in the same Docket. None of the utilities subject to these interim guidelines have complied with these requirements. The Public Staff recommends that the utilities with economic development and/or self- generation deferral rates comply with the filing requirements in their future annual reports pursuant to Rule R8-60. Duke responded as follows: Duke has an economic development rider. There are several customers currently receiving electric service under tariffs subject to the rider. The effects of the addition of and continued service to such customers on Duke's resource planning is reflected within the load forecast data. In future annual report filings, Duke would agree to include the overall peak demand in MW for this class of customers and total annual energy amount. However, to require filing of additional data regarding such rates in connection with the Annual Plan would involve the inclusion of information not relevant to integrated resource planning and would circumvent the appropriate rulemaking process. NC Power responded that it would comply with the requirement in all future IRP filings. Utility Responses to Rules R8-60(c) and R8-62(p) CONCLUSIONS NC Power did not list the firm purchases from each individual source in its original filing, but its response to the Public Staff comments included a list of individual sources for each firm purchase. The Commission considers the latter NC Power response to be satisfactory. NCEMC did not respond to the requirement for the information on transmission lines contained on FERC Form 1. The Commission notes that FERC Form 1, pages 422 and 423, requires statistics on existing transmission lines, which are to be filed once every five years. NCEMC has few or no existing transmission lines. FERC Form 1, pages 424 and 425, requires statistics on transmission lines added during the year. NCEMC did not add any transmission lines during the year and reported that it has none under construction. The Commission considers NCEMC's failure to state specifically that it had no information to report under Rule R8-62(p)(1) to be a minor omission, and that NCEMC's overall response to Rules R8-60 through R8-62 is reasonable. Reserve Margins The Commission recognizes that the electric power industry is in the midst of a time of economic and regulatory transition and that the resulting changes have led to the rethinking of certain long-accepted industry standards. As a result of these changes and the amount of information contained in the present record, the Commission does not believe that it is appropriate to mandate the use of any particular reserve margin for any jurisdictional electric utility at this time. For this reason, the Commission concludes that it would be more prudent to monitor the situation closely, to allow all parties the opportunity to address this issue in future filings with the Commission, and to consider this matter further in subsequent integrated resource planning proceedings. At this point, the Commission has no reason to believe that existing generation resources are inadequate in light of current conditions. The Commission does, however, want the record to clearly indicate its belief that providing adequate service is a fundamental obligation imposed upon all jurisdictional electric utilities, that it will be actively monitoring the adequacy of existing electric utility reserve

6 margins, and that it will take appropriate action in the event that any reliability problems develop. The Commission concludes that future filings by all utilities pursuant to Rules R8-60 and R8-61 should continue to include a detailed explanation of the basis for, and a justification for the adequacy and appropriateness of, the level of the respective utility's projected reserve margins. Transmission Adequacy The Commission notes that much of the transmission data recommended by the Public Staff is provided in some form or other by each utility for use in the joint engineering studies of system reliability conducted by VACAR and SERC on an ongoing basis. Nevertheless, it is not clear how difficult it would be to compile the data in the form needed for an IRP filing. SERC's report to NERC addresses the same concerns about transmission adequacy, but it does not contain a compilation of the detailed data recommended by the Public Staff. The Commission is of the opinion that the suggestion by Duke for the interested parties to meet and discuss an efficient and responsive reporting mechanism for transmission adequacy is a good one. The results of such a meeting would be a suitable item for discussion in the next round of IRP filings due September 1, The Commission further concludes that future filings by all utilities pursuant to Rules R8-60 and R8-61 should continue to include a discussion of the adequacy of the respective utility's transmission system (161 KV and above). Load Served Under Economic Development Rates and Self-Generation Deferral Rates The Commission agrees that a utility review of the impact of its respective economic development rates (and selfgeneration deferral rates) is required by the Order of November 28, 1994, and notes that such review is specified to be in the context of the IRP process. The Commission concludes that future filings by all utilities pursuant to Rules R8-60 and R8-61 should identify, as applicable, the separate block of MW load representing those customers served under economic development rates and/or self- generation deferral rates. Approval of IRPs As indicated in earlier IRP dockets, the Commission is of the opinion that the IRP review is intended to ensure that each utility is generally including all of the considerations in its planning as required by the Commission's Rules; that each utility is generally utilizing state-of-the-art techniques for its forecasting and planning activities; and that each utility has developed a reasonable analysis of its long-range needs for expansion of generation capacity. Also, the Commission is of the opinion that evaluations of individual DSM programs, certificates to construct new generating plants or transmission lines, and individual purchased power contracts should be handled in separate dockets from the IRP proceeding. Consistent with this view, it should be emphasized that inclusion of a DSM program, proposed new generating station, proposed new transmission line or purchased power contract in the IRP does not constitute approval of such individual elements even if the IRP itself is approved. The Commission concludes that the current IRPs should be approved. No party has argued that the IRP filed by any utility should be rejected. The Public Staff's objections as to completeness of the current IRP filings have been adequately addressed. IT IS, THEREFORE, ORDERED as follows: 1. That this Order shall be adopted as a part of the Commission's current analysis and plan for the expansion of facilities to meet the future requirements for electricity for North Carolina pursuant to G.S (c); 2. That the Integrated Resource Plans filed by CP&L, Duke, NC Power, and NCEMC in this proceeding are hereby approved as hereinabove discussed; 3. That future filings by all utilities pursuant to Rules R8-60 and R8-61 shall continue to include a detailed explanation of the basis for, and a justification for the adequacy and appropriateness of, the level of the respective utility's projected reserve margins.

7 4. That future filings by all utilities pursuant to Rules R8-60 and R8-61 shall continue to include a discussion of the adequacy of the respective utility's transmission system (161 KV and above); 5. That future filings by all utilities pursuant to Rules R8-60 and R8-61 shall identify, as applicable, the separate block of MW load representing those customers served under economic development rates and/or selfgeneration deferral rates; and 6. That the IRP filings due September 1, 2000, shall include a discussion of efforts by the interested parties to meet and develop an efficient and responsive reporting mechanism for transmission adequacy. ISSUED BY ORDER OF THE COMMISSION. This the 21st day of June, je NORTH CAROLINA UTILITIES COMMISSION Geneva S. Thigpen, Chief Clerk

8

STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-100, SUB 113

STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-100, SUB 113 STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-100, SUB 113 BEFORE THE NORTH CAROLINA UTILITIES COMMISSION In the Matter of Rulemaking Proceeding to Implement ) ORDER AMENDING Session

More information

STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-7, SUB 1146 ) ) ) ) )

STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-7, SUB 1146 ) ) ) ) ) STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-7, SUB 1146 BEFORE THE NORTH CAROLINA UTILITIES COMMISSION In the Matter of Application of Duke Energy Carolinas, LLC, for Adjustment of

More information

TRANSMISSION OWNER ZONAL PLACEMENT PROCESS

TRANSMISSION OWNER ZONAL PLACEMENT PROCESS TRANSMISSION OWNER ZONAL PLACEMENT PROCESS Published July 2017 CONTENTS Section 1: Introduction, Scope & Steps... 1 Subsection A: Introduction To Zonal Placement... 1 Subsection B: Scope... 1 Subsection

More information

STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-100, SUB 113

STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-100, SUB 113 STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-100, SUB 113 BEFORE THE NORTH CAROLINA UTILITIES COMMISSION In the Matter of Rulemaking Proceeding to Implement ) ORDER ADOPTING Session

More information

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON ORDER NO. 10-132 ENTERED 04/07/10 BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON UM 1401 In the Matter of PUBLIC UTILITY COMMISSION OF OREGON Investigation into Interconnection of PURPA Qualifying Facilities

More information

New Member Cost Allocation Review Process. Prepared by: COST ALLOCATION WORKING GROUP

New Member Cost Allocation Review Process. Prepared by: COST ALLOCATION WORKING GROUP New Member Cost Allocation Review Process Prepared by: COST ALLOCATION WORKING GROUP TABLE OF CONTENTS 1. HISTORY AND BACKGROUND... 1 2. PURPOSE / GOAL STATEMENT... 3 3. OVERVIEW OF PROCESS... 3 4. NEW

More information

State Legislation and Regulations Supporting Nuclear Plant Construction

State Legislation and Regulations Supporting Nuclear Plant Construction May 2008 State Legislation and Regulations Supporting Nuclear Plant Construction Florida 1 Georgia. 3 Iowa.. 4 Kansas.. 5 Louisiana. 6 Mississippi 7 North Carolina.. 8 Ohio.... 9 South Carolina.. 9 Texas.

More information

BIENNIAL REPORT OF THE NORTH CAROLINA UTILITIES COMMISSION

BIENNIAL REPORT OF THE NORTH CAROLINA UTILITIES COMMISSION BIENNIAL REPORT OF THE NORTH CAROLINA UTILITIES COMMISSION TO THE GOVERNOR OF NORTH CAROLINA, THE ENVIRONMENTAL REVIEW COMMISSION, AND THE JOINT LEGISLATIVE COMMISSION ON GOVERNMENTAL OPERATIONS REGARDING

More information

FERC Issued Order No. 773-A on Rehearing and Clarification of NERC Bulk Electric System Definition and Exceptions Process under Rules of Procedure

FERC Issued Order No. 773-A on Rehearing and Clarification of NERC Bulk Electric System Definition and Exceptions Process under Rules of Procedure To: From: Winston & Strawn Clients Raymond B. Wuslich Roxane E. Maywalt Date: Subject: FERC Issued Order No. 773-A on Rehearing and Clarification of NERC Bulk Electric System Definition and Exceptions

More information

CHAPTER 15. REGULATORY FEE FOR PUBLIC UTILITIES.

CHAPTER 15. REGULATORY FEE FOR PUBLIC UTILITIES. CHAPTER 15. REGULATORY FEE FOR PUBLIC UTILITIES. Rule R15-1. Regulatory Fee. Rule R15-1. REGULATORY FEE. Rule R15-1. Regulatory fee. (a) Fee Imposed. G.S. 62-302 requires each public utility regulated

More information

Stochastic Loss of Load Study for the 2011 Integrated Resource Plan

Stochastic Loss of Load Study for the 2011 Integrated Resource Plan November 18, 2010 Stochastic Loss of Load Study for the 2011 Integrated Resource Plan INTRODUCTION PacifiCorp evaluates the desired level of capacity planning reserves for each integrated resource plan.

More information

STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. ER-100, SUB 0

STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. ER-100, SUB 0 STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. ER-100, SUB 0 BEFORE THE NORTH CAROLINA UTILITIES COMMISSION In the Matter of Rulemaking Proceeding to Implement ) ORDER ADOPTING Session

More information

PacifiCorp Utah All Source Request for Proposal 2016 Resource. Issued January 6, 2012 Responses May 9, 2012

PacifiCorp Utah All Source Request for Proposal 2016 Resource. Issued January 6, 2012 Responses May 9, 2012 PacifiCorp Utah All Source Request for Proposal 2016 Resource Issued January 6, 2012 Responses May 9, 2012 TABLE OF CONTENTS Page SECTION 1. INTRODUCTION... 7 SECTION 2. RESOURCE ALTERNATIVES AND PROPOSAL

More information

145 FERC 61,141 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Part 40. [Docket No. RM ; Order No.

145 FERC 61,141 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Part 40. [Docket No. RM ; Order No. 145 FERC 61,141 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 18 CFR Part 40 [Docket No. RM13-13-000; Order No. 789] Regional Reliability Standard BAL-002-WECC-2 Contingency Reserve (Issued

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION SOUTHWESTERN PUBLIC SERVICE COMPANY S UNOPPOSED RESPONSE TO STAFF S COMMENTS

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION SOUTHWESTERN PUBLIC SERVICE COMPANY S UNOPPOSED RESPONSE TO STAFF S COMMENTS BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN ) PUBLIC SERVICE COMPANY S 2018 ) INTEGRATED RESOURCE PLAN FOR ) NEW MEXICO. ) CASE NO. 18-00215-UT ) SOUTHWESTERN PUBLIC

More information

Filed with the Iowa Utilities Board on May 31, 2017, E STATE OF IOWA DEPARTMENT OF COMMERCE UTILITIES BOARD

Filed with the Iowa Utilities Board on May 31, 2017, E STATE OF IOWA DEPARTMENT OF COMMERCE UTILITIES BOARD STATE OF IOWA DEPARTMENT OF COMMERCE UTILITIES BOARD IN RE: MIDAMERICAN ENERGY IN RE: DOCKET NOS. E-22269, E-22270, AND E-22271 DOCKET NO. E-22279 (consolidated) ITC MIDWEST LLC BRIEF BY THE MIDCONTINENT

More information

La Régie de l énergie Demande de Hydro-Québec Dossier R Hydro-Québec tariff application. Evidence of Darrell Bishop

La Régie de l énergie Demande de Hydro-Québec Dossier R Hydro-Québec tariff application. Evidence of Darrell Bishop 1 1 1 1 1 1 1 1 0 1 0 1 0 1 La Régie de l énergie Demande de Hydro-Québec Dossier R-01- Hydro-Québec tariff application Evidence of Darrell Bishop Q1. What is your name and position? My name is Darrell

More information

Senate Bill No. 146 Senator Spearman

Senate Bill No. 146 Senator Spearman Senate Bill No. 146 Senator Spearman CHAPTER... AN ACT relating to energy; requiring certain electric utilities in this State to file with the Public Utilities Commission of Nevada a distributed resources

More information

September 25, General Rate Application of Newfoundland and Labrador Hydro, Requests for Information, Round #1

September 25, General Rate Application of Newfoundland and Labrador Hydro, Requests for Information, Round #1 September, 0 Senwung Luk sluk@oktlaw.com.. SENT VIA E-MAIL Cheryl Blundon Board Secretary Board of Commissioners of Public Utilities P.O. Box 00, St. John's, NL AA B Dear Ms Blundon: Re: 0 General Rate

More information

SPP Reserve Sharing Group Operating Process

SPP Reserve Sharing Group Operating Process SPP Reserve Sharing Group Operating Process Effective: 1/1/2018 1.1 Reserve Sharing Group Purpose In the continuous operation of the electric power network, Operating Capacity is required to meet forecasted

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION U.S. Department of Energy, Portsmouth/Paducah Project Office Docket No. RC08-5- REQUEST FOR REHEARING AND CLARIFICATION OF THE NORTH

More information

February 20, National Grid Renewable Energy Standard Procurement Plan Docket No. 3765

February 20, National Grid Renewable Energy Standard Procurement Plan Docket No. 3765 February 20, 2007 Luly Massaro Clerk Public Utilities Commission 89 Jefferson Boulevard Warwick, Rhode Island 02888 Re: National Grid Renewable Energy Standard Procurement Plan Docket No. 3765 Dear Luly:

More information

Black Eagle Dam First Quarter Earnings Webcast April 25, 2018

Black Eagle Dam First Quarter Earnings Webcast April 25, 2018 Black Eagle Dam 2018 First Quarter Earnings Webcast April 25, 2018 Presenting Today Bob Rowe, President & CEO Brian Bird, Vice President & CFO Forward Looking Statements During the course of this presentation,

More information

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 9(2018)

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 9(2018) NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. (0) 0 0 IN THE MATTER OF the Electrical Power Control Act,, SNL, Chapter E-. (the EPCA ) and the Public

More information

BAL Disturbance Control Performance - Contingency Reserve for Recovery from a Balancing Contingency Event Standard Background Document

BAL Disturbance Control Performance - Contingency Reserve for Recovery from a Balancing Contingency Event Standard Background Document BAL-002-2 Disturbance Control Performance - Contingency Reserve for Recovery from a Balancing Contingency Event Standard Background Document 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326

More information

FILED 11/02/ :33 AM ARCHIVES DIVISION SECRETARY OF STATE & LEGISLATIVE COUNSEL

FILED 11/02/ :33 AM ARCHIVES DIVISION SECRETARY OF STATE & LEGISLATIVE COUNSEL OFFICE OF THE SECRETARY OF STATE DENNIS RICHARDSON SECRETARY OF STATE LESLIE CUMMINGS DEPUTY SECRETARY OF STATE PERMANENT ADMINISTRATIVE ORDER PUC 8-2018 CHAPTER 860 PUBLIC UTILITY COMMISSION ARCHIVES

More information

DUKE ENERGY OHIO REQUEST FOR PROPOSALS FOR PEAKING/INTERMEDIATE POWER SUPPLY IN RESPONSE TO OHIO SENATE BILL 221

DUKE ENERGY OHIO REQUEST FOR PROPOSALS FOR PEAKING/INTERMEDIATE POWER SUPPLY IN RESPONSE TO OHIO SENATE BILL 221 DUKE ENERGY OHIO REQUEST FOR PROPOSALS FOR PEAKING/INTERMEDIATE POWER SUPPLY IN RESPONSE TO OHIO SENATE BILL 221 DUKE ENERGY OHIO Table of Contents Section Description Page 1.0 Purpose of Request for Proposals

More information

SUMMARY OF APPLICATION

SUMMARY OF APPLICATION Filed: September, 00 EB-00-00 Schedule Page of SUMMARY OF APPLICATION Hydro One Networks ( Hydro One or Hydro One Transmission ) is applying for an Order approving the revenue requirement, cost allocation

More information

PJM INTERCONNECTION, L.L.C. FOR THE QUARTER ENDED SEPTEMBER 30, 2017

PJM INTERCONNECTION, L.L.C. FOR THE QUARTER ENDED SEPTEMBER 30, 2017 PJM INTERCONNECTION, L.L.C. FOR THE QUARTER ENDED SEPTEMBER 30, 2017 INDEX PART I FINANCIAL INFORMATION PAGE Item 1. Financial Statements Consolidated Statement of Financial Position 2 Consolidated Statement

More information

At a session of the PUBLIC SERVICE COMMISSION OF WEST VIRGINIA in the City of Charleston on the 1 lth day of June, 2004.

At a session of the PUBLIC SERVICE COMMISSION OF WEST VIRGINIA in the City of Charleston on the 1 lth day of June, 2004. 03 1 174coma06 1 104.wpd At a session of the PUBLIC SERVICE COMMISSION OF WEST VIRGINIA in the City of Charleston on the 1 lth day of June, 2004. CASE NO. 03-1 174-G-30C WEST VIRGINIA POWER GAS SERVICE,

More information

STATE OF MINNESOTA BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION. LeRoy Koppendrayer

STATE OF MINNESOTA BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION. LeRoy Koppendrayer STATE OF MINNESOTA BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION LeRoy Koppendrayer Ellen Gavin Marshall Johnson Phyllis Reha Gregory Scott Chair Commissioner Commissioner Commissioner Commissioner

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ) ISO New England Inc. ) Docket No. ER )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ) ISO New England Inc. ) Docket No. ER ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ISO New England Inc. ) Docket No. ER19-291-000 ) LIMITED PROTEST OF THE NEW ENGLAND STATES COMMITTEE ON ELECTRICITY Pursuant to

More information

First Revised Sheet No. 448 Canceling Original WN U-60 Sheet No. 448 PUGET SOUND ENERGY Electric Tariff G SCHEDULE 448 POWER SUPPLIER CHOICE

First Revised Sheet No. 448 Canceling Original WN U-60 Sheet No. 448 PUGET SOUND ENERGY Electric Tariff G SCHEDULE 448 POWER SUPPLIER CHOICE First Revised Sheet No. 448 Canceling Original WN U-60 Sheet No. 448 1. ELIGIBILITY FOR SERVICE POWER SUPPLIER CHOICE All Special Contract Customers, and all Schedule 48 Customers as of March 9, 2001,

More information

MISO Planning Process. May 31, 2013

MISO Planning Process. May 31, 2013 MISO Planning Process May 31, 2013 MISO Planning Objectives Fundamental Goal The development of a comprehensive expansion plan that meets reliability needs, policy needs, and economic needs MISO Board

More information

AC TRANSMISSION PUBLIC POLICY TRANSMISSION NEEDS PROJECT SOLICITATION Response due April 29, 2016

AC TRANSMISSION PUBLIC POLICY TRANSMISSION NEEDS PROJECT SOLICITATION Response due April 29, 2016 10 Krey Boulevard Rensselaer, NY 12144 AC TRANSMISSION PUBLIC POLICY TRANSMISSION NEEDS PROJECT SOLICITATION Response due April 29, 2016 Dear NYISO Stakeholder or Interested Party: February 29, 2016 With

More information

BChgdro. lor\js. FOR GEt\JE B-1. September 30,2009

BChgdro. lor\js. FOR GEt\JE B-1. September 30,2009 BChgdro FOR GEt\JE lor\js B-1 Joanna Sofield Chief Regulatory Officer Phone: (0) -0 Fax: (0) -0 bchydroregulatorygroup@bchydro.com September 0,009 Ms. Erica M. Hamilton Commission Secretary British Columbia

More information

2003 Management s Discussion and Analysis

2003 Management s Discussion and Analysis OGE Energy Corp. 2003 Management s Discussion and Analysis Appendix A to the Proxy statement Management s Discussion and Analysis of Financial Condition and Results of Operations. Introduction OGE Energy

More information

BEFORE THE MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS 600 North Robert Street St. Paul, MN 55101

BEFORE THE MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS 600 North Robert Street St. Paul, MN 55101 BEFORE THE MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS 00 North Robert Street St. Paul, MN 1 FOR THE MINNESOTA PUBLIC UTILITIES COMMISSION Seventh Place East, Suite 0 St Paul, MN 1-1 IN THE MATTER OF THE

More information

Chapter 14A Sharing and/or Resale of Telephone Service by Colleges and Universities Pursuant to G.S (e).

Chapter 14A Sharing and/or Resale of Telephone Service by Colleges and Universities Pursuant to G.S (e). Chapter 14A Sharing and/or Resale of Telephone Service by Colleges and Universities Pursuant to G.S. 62-110(e). Rule R14A-1. Application. Rule R14A-2. Definitions (for purposes of this Chapter only). Rule

More information

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION IN RE: THE NARRAGANSETT ELECTRIC COMPANY : d/b/a NATIONAL GRID S 2017 STANDARD OFFER : SERVICE PROCUREMENT PLAN AND 2017 : DOCKET

More information

COMMONWEALTH OF KENTUCKY BEFORE THE PUBLIC SERVICE COMMISSION. The Commission, on its own motion pursuant to KRS , hereby initiates

COMMONWEALTH OF KENTUCKY BEFORE THE PUBLIC SERVICE COMMISSION. The Commission, on its own motion pursuant to KRS , hereby initiates COMMONWEALTH OF KENTUCKY BEFORE THE PUBLIC SERVICE COMMISSION In the Matter of: AN INVESTIGATION OF EAST KENTUCKY ) CASENO. POWER COOPERATIVE, INC. S NEED FOR ) 2010-00238 THE SMITH 1 GENERATING FACILITY

More information

BEFORE THE PUBLIC SERVICE COMMISSION OF UTAH

BEFORE THE PUBLIC SERVICE COMMISSION OF UTAH R. Jeff Richards (7294) Yvonne R. Hogle (7550) 1407 West North Temple, Suite 320 Salt Lake City, Utah 84116 Telephone: (801) 220-4050 Facsimile: (801) 220-3299 Email: robert.richards@pacificorp.com yvonne.hogle@pacificorp.com

More information

DEFAULT SERVICE IN PENNSYLVANIA. David B. MacGregor, Esquire Anthony D. Kanagy, Esquire Post & Schell, P.C.

DEFAULT SERVICE IN PENNSYLVANIA. David B. MacGregor, Esquire Anthony D. Kanagy, Esquire Post & Schell, P.C. DEFAULT SERVICE IN PENNSYLVANIA David B. MacGregor, Esquire Anthony D. Kanagy, Esquire Post & Schell, P.C. Synopsis: This presentation provides an overview of default electric service in Pennsylvania beginning

More information

DECISION AND ORDER ON PHASE 1

DECISION AND ORDER ON PHASE 1 Commission de l énergie de l Ontario DECISION AND ORDER ON PHASE 1 HYDRO ONE NETWORKS INC. Leave to construct a new transmission line and facilities in the Windsor-Essex Region, Ontario. Before: Ken Quesnelle

More information

Overview of Concentric Energy Advisors Energy

Overview of Concentric Energy Advisors Energy Ratemaking Mechanisms to Facilitate Major Additions to Rate Base Presented to the Sixth Annual National Conference on Today s Utility Rate Cases: Current Issues and Strategies February 11 & 12, 2010 John

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) NOTICE TO SPS CUSTOMERS

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) NOTICE TO SPS CUSTOMERS BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN PUBLIC SERVICE COMPANY S ENERGY EFFICIENCY COMPLIANCE APPLICATION THAT REQUESTS AUTHORIZATION TO: (1 PER APPROVED VARIANCE,

More information

107 FERC 61, 042 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

107 FERC 61, 042 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 107 FERC 61, 042 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Pat Wood, III, Chairman; Nora Mead Brownell, and Joseph T. Kelliher. California Independent System Operator

More information

Piedmont Natural Gas Company, Inc. Tennessee Index of Tariff & Service Regulations

Piedmont Natural Gas Company, Inc. Tennessee Index of Tariff & Service Regulations Tennessee Index of Tariff & Service Regulations Rate Schedule 301 Rate Schedule 302 Rate Schedule 303 Rate Schedule 304 Rate Schedule 306 Rate Schedule 309 Rate Schedule 310 Rate Schedule 311 Rate Schedule

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION California Independent System ) Docket No. ER18-1169-000 Operator Corporation ) MOTION TO INTERVENE AND PROTEST OF THE DEPARTMENT

More information

STATE OF NEW JERSEY OFFICE OF ADMINISTRATIVE LAW BEFORE HONORABLE IRENE JONES, ALJ ) ) ) ) ) ) ) ) )

STATE OF NEW JERSEY OFFICE OF ADMINISTRATIVE LAW BEFORE HONORABLE IRENE JONES, ALJ ) ) ) ) ) ) ) ) ) STATE OF NEW JERSEY OFFICE OF ADMINISTRATIVE LAW BEFORE HONORABLE IRENE JONES, ALJ I/M/O the Verified Petition of Rockland Electric Company For Approval of Changes in Electric Rates, Its Tariff For Electric

More information

Long-Term Reliability Assessment

Long-Term Reliability Assessment Long-Term Reliability Assessment Key Findings and Long-Term Issues John Moura, Director of Reliability Assessment Topics Covered Today Background on NERC s Long-Term Reliability Assessment Emerging and

More information

NPCC MARITIMES AREA INTERIM REVIEW OF RESOURCE ADEQUACY

NPCC MARITIMES AREA INTERIM REVIEW OF RESOURCE ADEQUACY NPCC MARITIMES AREA INTERIM REVIEW OF RESOURCE ADEQUACY December Executive Summary This is the Maritimes Area Interim Review of its Triennial Review of Resource Adequacy. This review covers the years 2006

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY RUTH M. SAKYA. on behalf of.

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY RUTH M. SAKYA. on behalf of. BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN PUBLIC SERVICE COMPANY S INTERIM REPORT ON ITS PARTICIPATION IN THE SOUTHWEST POWER POOL REGIONAL TRANSMISSION ORGANIZATION,

More information

Manitoba Hydro 2017/18 & 2018/19 Electric General Rate Application Reply. February 14, 2018

Manitoba Hydro 2017/18 & 2018/19 Electric General Rate Application Reply. February 14, 2018 Manitoba Hydro 2017/18 & 2018/19 Electric General Rate Application Reply February 14, 2018 Introduction Manitoba Hydro adopted the evidence of its witnesses at the outset of the process Manitoba Hydro

More information

ROCKLAND ELECTRIC COMPANY PROPOSAL FOR BASIC GENERATION SERVICE REQUIREMENTS TO BE PROCURED EFFECTIVE JUNE 1, 2016

ROCKLAND ELECTRIC COMPANY PROPOSAL FOR BASIC GENERATION SERVICE REQUIREMENTS TO BE PROCURED EFFECTIVE JUNE 1, 2016 STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES IN THE MATTER OF THE PROVISION OF BASIC GENERATION SERVICE FOR THE PERIOD BEGINNING JUNE 1, 2016 Docket No. ER15040482 ROCKLAND ELECTRIC COMPANY PROPOSAL FOR

More information

NORTH CAROLINA EASTERN MUNICIPAL POWER AGENCY

NORTH CAROLINA EASTERN MUNICIPAL POWER AGENCY NORTH CAROLINA EASTERN MUNICIPAL POWER AGENCY Annual Financial Report (With Report of Independent Auditor Thereon) December 31, 2015 This page intentionally left blank. Page(s) Report of Independent Auditor...

More information

H 7991 SUBSTITUTE A ======== LC005162/SUB A/4 ======== S T A T E O F R H O D E I S L A N D

H 7991 SUBSTITUTE A ======== LC005162/SUB A/4 ======== S T A T E O F R H O D E I S L A N D 01 -- H 1 SUBSTITUTE A LC001/SUB A/ S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO PUBLIC UTILITIES AND CARRIERS Introduced By: Representatives Kennedy,

More information

PJM & MISO Assumptions and Criteria for Testing of New Resources

PJM & MISO Assumptions and Criteria for Testing of New Resources & Assumptions and Criteria for Testing of New Resources 1 Introduction These slides provide a description and comparison of the assumptions and criteria used by and during the study of customer proposed

More information

January 17, National Grid Renewable Energy Standard Procurement Plan Docket No. 3765

January 17, National Grid Renewable Energy Standard Procurement Plan Docket No. 3765 January 17, 2007 Luly Massaro Clerk Public Utilities Commission 89 Jefferson Boulevard Warwick, Rhode Island 02888 Re: National Grid Renewable Energy Standard Procurement Plan Docket No. 3765 Dear Luly:

More information

DRAFT REQUEST FOR PROPOSALS BY THE ARIZONA POWER AUTHORITY FOR SCHEDULING SERVICES AND/OR USE OF HOOVER DAM DYNAMIC SIGNAL.

DRAFT REQUEST FOR PROPOSALS BY THE ARIZONA POWER AUTHORITY FOR SCHEDULING SERVICES AND/OR USE OF HOOVER DAM DYNAMIC SIGNAL. DRAFT REQUEST FOR PROPOSALS BY THE ARIZONA POWER AUTHORITY FOR SCHEDULING SERVICES AND/OR USE OF HOOVER DAM DYNAMIC SIGNAL March 31, 2017 Summary The Arizona Power Authority ( Authority ) recently signed

More information

NERC TPL Standard Overview

NERC TPL Standard Overview NERC TPL-001-4 Standard Overview Attachment K Quarter 3 Stakeholder s Meeting September 29, 2016 1 Background New NERC TPL Standard 2016 TPL Plan and Status Update 2015 Planning Assessment Results Compliance

More information

RR16 - Page 1 of

RR16 - Page 1 of DOCKET NO. APPLICATION OF SOUTHWESTERN PUBLIC SERVICE COMPANY FOR AUTHORITY TO CHANGE RATES PUBLIC UTILITY COMMISSION OF TEXAS DIRECT TESTIMONY of ARTHUR P. FREITAS on behalf of SOUTHWESTERN PUBLIC SERVICE

More information

Transmission Loss Factor Methodology

Transmission Loss Factor Methodology Transmission Loss Factor Methodology Discussion Paper Operations & Reliability Draft February 9, 2005 Table of Contents 1. Introduction...3 1.1 Legislative Direction.....3 1.2 Goal and Objectives... 3

More information

BEFORE THE MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS 600 North Robert Street St. Paul, MN 55101

BEFORE THE MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS 600 North Robert Street St. Paul, MN 55101 BEFORE THE MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS 00 North Robert Street St. Paul, MN 1 FOR THE MINNESOTA PUBLIC UTILITIES COMMISSION th Place East, Suite 0 St Paul MN 1-1 IN THE MATTER OF THE APPLICATION

More information

BEFORE THE MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS 600 North Robert Street St. Paul, MN 55101

BEFORE THE MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS 600 North Robert Street St. Paul, MN 55101 BEFORE THE MINNESOTA OFFICE OF ADMINISTRATIVE HEARINGS 00 North Robert Street St. Paul, MN 1 FOR THE MINNESOTA PUBLIC UTILITIES COMMISSION th Place East, Suite 0 St Paul MN 1-1 IN THE MATTER OF THE APPLICATION

More information

AEP Changes in Accumulated Other Comprehensive Income (Loss) by Component For the Year Ended December 31, 2017

AEP Changes in Accumulated Other Comprehensive Income (Loss) by Component For the Year Ended December 31, 2017 3. COMPREHENSIVE INCOME The disclosures in this note apply to all Registrants except for AEPTCo. AEPTCo does not have any components of other comprehensive income for any period presented in the financial

More information

Chapter 8. Electric Light and Power. Article 1. General Provisions. Article 2. General Service Provisions. Article 3. Meters, Meter Tests and Records.

Chapter 8. Electric Light and Power. Article 1. General Provisions. Article 2. General Service Provisions. Article 3. Meters, Meter Tests and Records. Chapter 8. Electric Light and Power. Rule R8-1. Rule R8-2. Rule R8-3. Rule R8-4. Rule R8-5. Rule R8-6. Rule R8-7. Rule R8-8. Rule R8-9. Rule R8-10. Rule R8-11. Rule R8-12. Rule R8-13. Rule R8-14. Rule

More information

Southern Companies Attachment J (LGIP), Page 2 Standard Large Generator Interconnection Procedures (LGIP) (Applicable to Generating Facilities that ex

Southern Companies Attachment J (LGIP), Page 2 Standard Large Generator Interconnection Procedures (LGIP) (Applicable to Generating Facilities that ex Southern Companies Attachment J (LGIP), Page 1 ATTACHMENT J STANDARD LARGE GENERATOR INTERCONNECTION PROCEDURES (LGIP) including STANDARD LARGE GENERATOR INTERCONNECTION AGREEMENT (LGIA) Southern Companies

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: June 14, 2018 Re: Decision on congestion

More information

South Carolina Electric & Gas Company ("SCE&G" or the "Company") hereby

South Carolina Electric & Gas Company (SCE&G or the Company) hereby BEFORE THE PUBLIC SERVICE COMMISSION OF SOUTH CAROLINA DOCKET NO. 2017- -E In Re: Petition of South Carolina Electric ) & Gas Company for Prudency ) Determination Regarding Abandonment, ) Amendments to

More information

ROCKLAND ELECTRIC COMPANY PROPOSAL FOR BASIC GENERATION SERVICE REQUIREMENTS TO BE PROCURED EFFECTIVE JUNE 1, 2018

ROCKLAND ELECTRIC COMPANY PROPOSAL FOR BASIC GENERATION SERVICE REQUIREMENTS TO BE PROCURED EFFECTIVE JUNE 1, 2018 STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES IN THE MATTER OF THE PROVISION OF BASIC GENERATION SERVICE FOR THE PERIOD BEGINNING JUNE 1, 2018 Docket No. ER17040335 ROCKLAND ELECTRIC COMPANY PROPOSAL FOR

More information

The Low Voltage Access Charge shall be determined in accordance with the ISO Tariff.

The Low Voltage Access Charge shall be determined in accordance with the ISO Tariff. 5. Access Charges and Transmission Rates. 5.1 Low Voltage Access Charge. The Low Voltage Access Charge shall be determined in accordance with the ISO Tariff. The Low Voltage Access Charge customer shall

More information

Powering Beyond. EEI Finance Conference November 11 13, 2018

Powering Beyond. EEI Finance Conference November 11 13, 2018 Powering Beyond EEI Finance Conference November 11 13, 2018 Safe harbor This presentation contains statements that may be considered forward looking statements, such as management s expectations of financial

More information

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON LC 50 ORDER NO. 10-392 ENTERED 10/11/10 In the Matter of IDAHO POWER COMPANY ORDER 2009 Integrated Resource Plan. DISPOSITION: PLAN ACKNOWLEDGED WITH REQUIREMENTS

More information

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON

BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON ENTERED 12/22/10 BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON UM 1396 In the Matter of PUBLIC UTILITY COMMISSION OF OREGON ORDER Investigation into determination of resource sufficiency, pursuant to

More information

RATE SCHEDULES. Effective Date January 1, 2018

RATE SCHEDULES. Effective Date January 1, 2018 RATE SCHEDULES OF Effective Date January 1, 2018 SHALLOTTE, NORTH CAROLINA RATE SCHEDULES TABLE OF CONTENTS Schedule Name Schedule/Rider Page No. Residential Service R 1 Single-Phase General Service A

More information

DECISION IN THE MATTER OF

DECISION IN THE MATTER OF DECISION IN THE MATTER OF an Application by New Brunswick Power Corporation pursuant to subsection 113(3) of the Electricity Act, S.N.B. 2013, c. 7, for approval of its 2018/19 Transmission Revenue Requirements.

More information

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY WILLIAM A. GRANT. on behalf of

BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION ) ) ) ) ) ) ) ) ) ) ) DIRECT TESTIMONY WILLIAM A. GRANT. on behalf of BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF SOUTHWESTERN PUBLIC SERVICE COMPANY S APPLICATION FOR REVISION OF ITS RETAIL RATES UNDER ADVICE NOTICE NO., SOUTHWESTERN PUBLIC SERVICE

More information

North Carolina Eastern Municipal Power Agency 2013 Financial Report

North Carolina Eastern Municipal Power Agency 2013 Financial Report North Carolina Eastern Municipal Power Agency 2013 Financial Report Benson Smart Grid pilot participant Haley Zapp monitors home energy use while at the PK Vyas Park in Benson. NORTH CAROLINA EASTERN

More information

NPCC 2017 MARITIMES AREA INTERIM REVIEW OF RESOURCE ADEQUACY

NPCC 2017 MARITIMES AREA INTERIM REVIEW OF RESOURCE ADEQUACY NPCC 2017 MARITIMES AREA INTERIM REVIEW OF RESOURCE ADEQUACY NEW BRUNSWICK POWER CORP. NOVA SCOTIA POWER INC. MARITIME ELECTRIC COMPANY, LIMITED NORTHERN MAINE ISA, INC. Approved by RCC December 5, 2017

More information

Resource Adequacy. WPUI April 19, 2018

Resource Adequacy. WPUI April 19, 2018 WPUI April 19, 2018 Resource Adequacy What is the interplay between states resource adequacy power per the Federal Power Act and the RTO s Reliability Coordinator role? Is a state Integrated Resource Plan

More information

SUBSTITUTE FOR SENATE BILL NO. 437

SUBSTITUTE FOR SENATE BILL NO. 437 SUBSTITUTE FOR SENATE BILL NO. A bill to amend PA, entitled "An act to provide for the regulation and control of public and certain private utilities and other services affected with a public interest

More information

Alberta Electric System Operator 2018 ISO Tariff Application

Alberta Electric System Operator 2018 ISO Tariff Application Alberta Electric System Operator 2018 ISO Tariff Application Date: September 14, 2017 Table of Contents 1 Application... 6 1.1 Background... 6 1.2 Organization of application... 6 1.3 Relief requested...

More information

Precedent Agreements for KM/TGP NED Project - in New Hampshire

Precedent Agreements for KM/TGP NED Project - in New Hampshire Precedent Agreements for KM/TGP NED Project - in New Hampshire In order to issue a Certificate of Public Convenience and Necessity FERC requires binding Precedent Agreements between the pipeline applicant

More information

GSS/GSM rebuttal on all issues of Manitoba Hydro s 2015 cost of service methodology review proceeding

GSS/GSM rebuttal on all issues of Manitoba Hydro s 2015 cost of service methodology review proceeding GSS/GSM rebuttal on all issues of Manitoba Hydro s 2015 cost of service methodology review proceeding prepared for Hill Sokalski Walsh Olson LLP August 8, 2016 Upon review of the intervenor evidence of

More information

Portland General Electric Reports 2017 Financial Results and Initiates 2018 Earnings Guidance

Portland General Electric Reports 2017 Financial Results and Initiates 2018 Earnings Guidance February 16, 2018 Portland General Electric Reports 2017 Financial Results and Initiates 2018 Earnings Guidance Full-year 2017 financial results on target excluding the effects of the Tax Cuts and Jobs

More information

Alberta Electric System Operator 2017 ISO Tariff Update

Alberta Electric System Operator 2017 ISO Tariff Update Alberta Electric System Operator 2017 ISO Tariff Update Date: October 20, 2016 Prepared by: Alberta Electric System Operator Prepared for: Alberta Utilities Commission Classification: Public Table of Contents

More information

STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH

STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-2, SUB 1131 DOCKET NO. E-2, SUB 1142 DOCKET NO. E-2, SUB 1102 DOCKET NO. E-2, SUB 1153 DOCKET NO. E-2, SUB 1131 ) ) In the Matter of )

More information

Decision D FortisAlberta Inc PBR Capital Tracker True-Up and PBR Capital Tracker Forecast

Decision D FortisAlberta Inc PBR Capital Tracker True-Up and PBR Capital Tracker Forecast Decision 20497-D01-2016 FortisAlberta Inc. 2014 PBR Capital Tracker True-Up and 2016-2017 PBR Capital Tracker Forecast February 20, 2016 Alberta Utilities Commission Decision 20497-D01-2016 FortisAlberta

More information

Year Assessment Preliminary Study Design

Year Assessment Preliminary Study Design 2015 10-Year Assessment Preliminary Study Design October 15, 2014 Stakeholder and Customer Webcast atcllc.com Purpose Solicit pre-study Comments 2015 Assessment Process 2015 Assessment Assumptions Public

More information

November 29, RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO2019)

November 29, RE: Southern California Edison Company s Formula Transmission Rate Annual Update Filing in Docket No. ER (TO2019) Jeffrey L. Nelson Director FERC Rates & Market Integration Ms. Kimberly D. Bose, Secretary 888 First Street, N.E. Washington, DC 20426 RE: Southern California Edison Company s Formula Transmission Rate

More information

STATE OF MINNESOTA BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION

STATE OF MINNESOTA BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION STATE OF MINNESOTA BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION LeRoy Koppendrayer Chair Gregory Scott Commissioner Ellen Gavin Commissioner Phyllis Reha Commissioner Marshall Johnson Commissioner

More information

Electricity Plan Implementation (2015) Act

Electricity Plan Implementation (2015) Act Electricity Plan Implementation (2015) Act CHAPTER 31 OF THE ACTS OF 2015 2016 Her Majesty the Queen in right of the Province of Nova Scotia Published by Authority of the Speaker of the House of Assembly

More information

PJM INTERCONNECTION, L.L.C. FOR THE QUARTER ENDED SEPTEMBER 30, 2018

PJM INTERCONNECTION, L.L.C. FOR THE QUARTER ENDED SEPTEMBER 30, 2018 PJM INTERCONNECTION, L.L.C. FOR THE QUARTER ENDED SEPTEMBER 30, 2018 INDEX PART I FINANCIAL INFORMATION PAGE Item 1. Financial Statements Consolidated Statement of Financial Position 2 Consolidated Statement

More information

Cost Allocation Principles for Seams Transmission Expansion Projects

Cost Allocation Principles for Seams Transmission Expansion Projects Cost Allocation Principles for Seams Transmission Expansion Projects SPP s seams agreements currently contain requirements for SPP to develop coordinated system plans with its neighbors. The extent and

More information

Transmission Planning Standards Industry Webinar: Footnote b. January 8, 2012 John Odom, FRCC, Standard Drafting Team Chair

Transmission Planning Standards Industry Webinar: Footnote b. January 8, 2012 John Odom, FRCC, Standard Drafting Team Chair Transmission Planning Standards Industry Webinar: Footnote b January 8, 2012 John Odom, FRCC, Standard Drafting Team Chair Topics Brief history Overview of as posted draft standard Changes since last posting

More information

Update. Second Quarter 2018

Update. Second Quarter 2018 Update Second Quarter 2018 August 2, 2018 1 Safe Harbor Statement/Regulation G Information Statements included in this Presentation which are not statements of historical fact are intended to be, and are

More information

Amendment to extend exceptional dispatch mitigated energy settlement rules and modify residual imbalance energy settlement rules

Amendment to extend exceptional dispatch mitigated energy settlement rules and modify residual imbalance energy settlement rules California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Nancy Saracino, Vice President, General Counsel & Chief Administrative Officer Date: September 7, 2012 Re:

More information

ENTERGY LOUISIANA, LLC

ENTERGY LOUISIANA, LLC Page 32.1 ENTERGY LOUISIANA, LLC ELECTRIC SERVICE Effective Date: October 1, 2015 Filed Date: August 31, 2015 Supersedes: IS Revision 3 effective 6/1/14 Revision 0 Schedule Consists of: Five Pages EXPERIMENTAL

More information

The tariff leaves have an effective date of December 1, Background

The tariff leaves have an effective date of December 1, Background Orange and Rockland Utilities, Inc. 4 Irving Place New York NY 10003-0987 www.oru.com August 1, 2016 Honorable Kathleen H. Burgess Secretary State of New York Public Service Commission Three Empire State

More information