BChgdro. lor\js. FOR GEt\JE B-1. September 30,2009

Size: px
Start display at page:

Download "BChgdro. lor\js. FOR GEt\JE B-1. September 30,2009"

Transcription

1 BChgdro FOR GEt\JE lor\js B-1 Joanna Sofield Chief Regulatory Officer Phone: (0) -0 Fax: (0) -0 September 0,009 Ms. Erica M. Hamilton Commission Secretary British Columbia Utilities Commission Sixth Floor Howe Street Vancouver, BC VZ N Dear Ms. Hamilton: RE: British Columbia Utilities Commission (BCUC) British Columbia Hydro and Power Authority (BC Hydro) Three-Year Report BCUC Order No. G BC Hydro is writing to the BCUC in compliance with BCUC Order No. G and accordingly attaches its Three-Year Summary Report (the Report) for the three years commencing April 1, 00, to March 1, 009 (fiscal years F00, F008 and F009). In the Report BC Hydro has provided its responses to the eight questions found in Appendix A of BCUC Order No. G regarding the Terms of Reference for the Transmission Service Evaluation Report that the BCUC is required to provide to Government by December 1, 009. It is BC Hydro's view that the Report, in combination with the three Transmission Service Rate Reports for each of F00, F008 and F009 (the latter filed concurrently with the Report) provides a common, factual basis for an informed understanding of the transmission customer events that have (or have not) occurred during the first three years of BC Hydro's Rate Schedule 18 - Transmission Services - Stepped Rate (RS 18). As discussed in detail in the Report, BC Hydro is of the view that RS 18 has facilitated energy conservation by BC Hydro's transmission customers, although there are challenges in quantifying the entire amount of demand side management (DSM) response from customers. BC Hydro remains of the view that there is no clear and objective way to discretely separate the impact of rate structure, Power Smart enabling activities and other customer decision-making factors for each DSM project. BC Hydro concludes in the Report that costs have been shifted from the transmission service class to other customer classes and to the shareholder as a result of the stepped rate. BC Hydro also concludes that it is important to take a longer-term view of cost-shifting impacts caused by changes (increases and decreases) in RS 18 energy sales and revenues. British Columbia Hydro and Power Authority, Dunsmuir Street, Vancouver BC VB R

2 September 0, 009 Ms. Erica M. Hamilton Commission Secretary British Columbia Utilities Commission Three-Year Report BCUC Order No. G BChydro Pageof With regard to retail access and RS 18 time-of-use rate options, BC Hydro reports that RS 18 has not achieved one of its objectives of facilitating retail access by transmission service customers and no customer has used RS 18. The Report provides a discussion of the possible reasons that have resulted in no customers exercising the option to use retail access or RS 18. Finally, BC Hydro provides its views on whether or not RS 18, as currently structured, contains barriers or obstacles to further conservation, load reduction or preservation and optimization of self-generation by BC Hydro's transmission customers and whether there are elements of RS 18 that could lead to less than optimal results. It is BC Hydro's view that the purpose of this proceeding is to provide information and submissions to the BCUC to assist it with preparing its Transmission Service Evaluation Report to Government. The purpose is not to redesign or otherwise change the transmission service rates. As directed by BCUC Order No. G BC Hydro has provided a copy of the Report to all intervenors in the TSR Re-pricing Application proceeding and to all of its transmission service customers. For further information, please contact Fred James at 0-1. Yours sincerely, Joanna Sofield Chief Regulatory Officer Enclosure c. BCUC Project No. 980 (BC Hydro Re-pricing Application) Registered Intervenor Distribution List. RS 18 Customers

3

4 Table of Contents 1 Introduction...1 Background... Responses to Terms of Reference Questions....1 Question 1: Has the transmission services stepped rate (RS 18) facilitated conservation by BC Hydro s transmission customers? Introduction Customer Reported DSM Unreported DSM Question : Has the transmission services stepped rate (RS 18) facilitated retail access by BC Hydro s transmission customers?...1. Question. If no retail access has occurred, why not? Are there features of the transmission services stepped rate that detract from the attractiveness of retail access? If no retail access has occurred, why not? Are there features of the transmission services stepped rate that detract from the attractiveness of retail access? Question : Has the transmission services stepped rate (RS 18) caused costs to shift to other BC Hydro customer classes or to the shareholder? Forecast Cost Shift..... After-the-fact Cost Shift.... Question : If there is cost shifting taking place, what are the reasons? Treatment of Forecast Variances Treatment of After-the-fact Variances Longer-Term View...1. Question : Why have no customers used the Time of Use (TOU) Rate (RS 18)? Background..... RS 18 Design..... Reasons Why No Customers Have Used RS Question : Does the transmission services stepped rate (RS 18), as currently structured, contain barriers or obstacles to further conservation, load reduction, or preservation and optimization of self-generation by BC Hydro s transmission customers? Obstacles to Further Energy Efficiency and Conservation..... Obstacles to Preservation and Optimization of Customer Self-generation... i

5 .8 Question 8: Are there elements of the RS 18 rate structure that could lead to less than optimal results in the future? If so, what are those elements and what are the less than optimal results? DSM Potential of the Rate Structure is Capped Tier 1 Rate CBL Preservation Market Conditions...1 List of Figures Figure 1 Illustration of Delivery of Retail Access Energy... 1 Figure Illustration of Energy Imbalance RS List of Tables Table 1 Total DSM Summary (F00 F009)... Table Customer Reported DSM Summary (F00 F009)... 9 Table Estimate of Unreported DSM (F00 to F009)... 1 Table Subjective Estimate of Unreported DSM... 1 Table RS 1890 Imbalance Rates for 009 (based on RS 18)... 1 Table Price Comparisons (current Canadian dollars per MWh)... 1 Table Forecast Revenue Variance Impact (F00 F009)... Table 8 Actual Versus Forecast RS 18 Gross Margin Variance... Table 9 RS 18 Energy Rates... Appendices Appendix A Appendix B Appendix C Government Information Bulletin - BCUC Report and Recommendations on Inquiry Into A Heritage Contract BC Hydro Power Smart Impact Evaluation of the E Analysis of Unreported Demand-Side-Management of BC Hydro s ii

6 1 Introduction This is BC Hydro s (TSR) Three-Year Summary Report (the Report) for the three year period commencing April 1, 00, and ending March 1, 009 (F00 to F009). The Report is being filed to comply with the TSR Application Negotiated Settlement Agreement (TSR NSA) 1 and the Terms of Reference for the Evaluation (TSR Evaluation) By Order No. G issued on February 19, 009, the British Columbia Utilities Commission (BCUC) approved Terms of Reference for the TSR Evaluation comprising the following eight questions: Has the transmission services stepped rate (RS 18) facilitated conservation by BC Hydro s transmission customers? 1 1. Has the transmission services stepped rate (RS 18) facilitated retail access by BC Hydro s transmission customers? 1 1. If no retail access has occurred, why not? Are there features of the transmission services stepped rate that detract from the attractiveness of retail access? Has the transmission services stepped rate (RS 18) caused costs to shift to other customer classes or to the shareholder (provincial Government)? 19. If there is cost-shifting taking place, what are the reasons? 0. Why have no customers used the Time of Use Rate (RS 18)? 1 Approved by BCUC Order No. G-9-0, August 9, 00. 1

7 . Does the transmission services stepped rate (RS 18), as currently structured, contain barriers or obstacles to further conservation, load reduction, or preservation and optimization of self-generation by BC Hydro s transmission customers? 8. Are there elements of the rate structure (RS 18) that could lead to less-than-optimal results in the future? If so, what are those elements, and what are the less-than-optimal results The Report provides BC Hydro s responses to each of the eight questions and has been prepared to assist the BCUC and stakeholder review. BC Hydro s responses incorporate a consolidated view of the conservation and financial results reported in each of the TSR Annual Reports for the three years under review; a preliminary estimate of the total conservation response to the stepped rate structure; and TSR customer perspectives obtained from executive interviews, individual customer meetings, stakeholder meetings and rate workshops It is BC Hydro s view that the Report, in combination with the TSR Annual Reports (F00, F008, F009) provides the basis for an informed understanding of transmission customer s response to the new transmission service rates during the first three years that they have been in place. It is also BC Hydro s view that the purpose of this proceeding is to provide information and submissions to the BCUC to assist it with preparing its TSR Evaluation Report to Government which is due on December 1, 009. The purpose is not, at this time, to redesign or otherwise change the TSR rate design nor the terms and conditions. 0 1 Background The BC Government s 00 Energy Plan, Energy for Our Future: a Plan for B.C. (00 Energy Plan), mandated that the BCUC conduct an inquiry to develop and make recommendations to Government regarding a stepped rate structure for BC Hydro s large commercial and industrial customers. In its Report and Recommendations dated October 1, 00 the BCUC provided nine recommendations to Government related to stepped rates. Customer executive interviews were conducted by an independent research firm (Innovologie LLC). The firm is finalizing its report and BC Hydro expects to file the report with the BCUC prior to October 1, 009 (the date for information requests from BCUC staff and intervenors).

8 The Government responded to the BCUC s Report and Recommendations in an information bulletin dated November 8, 00, a copy of which is attached as Appendix A. The Government also responded with Heritage Special Direction No. HC to the BCUC (HC) enacted pursuant to the BC Hydro Public Power Legacy and Heritage Contract Act. HC includes the following directions to the BCUC with respect to rates for TSR customers: Consideration in designing rates for transmission rate customers. (1) In designing rates for the authority's transmission rate customers, the BCUC must ensure that those rates are consistent with recommendations number 8 to number 1 inclusive in the BCUC's report and recommendations to the Lieutenant Governor in Council dated October 1, 00. () Without limiting subsection (1), the BCUC must ensure the following: (a) the rates for the authority's transmission rate customers are subject to (i) the terms and conditions found in Supplements and to the authority's tariff, and (ii) any other terms and conditions the BCUC considers appropriate for those rates; (b) customers who own multiple plants under common ownership may engage in load aggregation for energy, if each plant (i) is in operation, and (ii) meets the requirements to be a transmission rate customer that are set out in the authority's tariff, or is otherwise authorized by the BCUC to be treated as a transmission rate customer; (c) the authority publishes the Tier rate in the manner and with the frequency required by the BCUC. BC Hydro and intervenors subsequently entered into negotiations on the structure of the transmission service rate resulting in the TSR NSA which was approved by BCUC Order No. G-9-0 in August 00.

9 The BCUC subsequently approved the TSR NSA by Order No. G-9-0. Section 10 of the TSR NSA established that BC Hydro will file a public Annual Report with the BCUC regarding the new TSR schedules: Rate Schedule 18 Transmission Service Stepped Rate (RS 18); Rate Schedule 18 Transmission Service Time-of-Use (TOU) Rate - (RS 18); and Rate Schedule 18 Transmission Service Rate for Exempt Customers - (RS 18). 8 9 The new TSR schedules came into effect on April 1, 00. Accordingly, BC Hydro has filed Annual TSR Reports for each of the three completed fiscal years (April 1 to March 1), being F00, F008 and F Each TSR Annual Report provides a detailed summary of the following: 11 Customer Baseline Load (CBL) adjustments; 1 Forecast RS 18 energy sales and revenue; 1 Actual RS 18 energy sales and revenue; 1 An estimate of customer conservation, efficiency and self-generation; 1 Public information regarding economic expansions of customer facilities; and 1 An estimate of financial and cost-shifting impacts Further to recommendation number 9 in the BCUC s 00 Report and Recommendations, section 10 of the TSR NSA also established that, after BC Hydro s third TSR Annual Report (F009), the BCUC will provide a comprehensive evaluation to Government regarding the new TSR schedules by December 1, The TSR NSA described the TSR Evaluation as follows:

10 8 9 This Evaluation will be filed by the end of 009 and will be an expansive review of whether the new rates are achieving the objectives of the Energy Plan and Heritage Inquiry Report and Recommendations, including the objective of avoiding cost-shifting between customer classes. The parties expect that BCUC staff will work with interested parties to formulate the terms of reference for the Evaluation to ensure that it will provide a comprehensive review of the operation and results of the new rates. The parties expect that the BCUC will make recommendations to the government regarding any necessary or desirable changes to Special Direction HC The BCUC established the Terms of Reference for the TSR Evaluation by Order No. G-10-09, which also established the following regulatory timetable: 1 TSR Three-Year Summary Report filed by BC Hydro September 0, 009; 1 BCUC and Stakeholder Information Requests October 1, 009; 1 BC Hydro IR Responses November, 009; 1 Stakeholder Final submissions November 18, 009; 1 BC Hydro Final submission November, 009; and 1 BCUC submits its TSR Evaluation Report to Government December 1, As described above, the TSR NSA includes an expectation that, as part of its TSR Evaluation report to Government, the BCUC will make recommendations regarding any necessary or desirable changes to section of HC. In light of the comments that follow in this report, BC Hydro s general observation is that some changes to section of HC may be desirable to allow the BCUC more flexibility to approve TSR design changes that enhance energy efficiency, conservation and self-generation opportunities (including retail access), or that address elements of the rate structure that may lead to less than optimal results in the future.

11 Responses to Terms of Reference Questions.1 Question 1: Has the transmission services stepped rate (RS 18) facilitated conservation by BC Hydro s transmission customers?.1.1 Introduction The stepped rate has facilitated conservation by TSR customers. 8 9 Prior to April 00, energy sales to transmission customers were based on a flat rate under Rate Schedule 181 Transmission Service (RS 181). For many transmission customers, RS 181 did not allow a sufficient return on investment for capital projects designed to reduce electrical energy use or increase self-generation output The 00 Energy Plan contained two policy actions which described the basis for new rate structures for transmission voltage customers: Policy Action #1 (new): Under new rate structures, large electricity consumers will be able to choose a supplier other than the local distributor. New stepped pricing (see Conservation and Efficiency) will provide an incentive for large industrial or transmission rate customers to purchase from IPPs, or to self-generate, when they can do so less expensively than the utility s cost of new supply Policy Action #1 (new): New rate structures will provide better price signals to large electricity consumers for conservation and energy efficiency. The BC Utilities Commission will conduct a hearing to develop new stepped and time-of-use pricing for BC Hydro s industrial and large commercial customers. As a principle, for stepped rates, the last block of energy consumed should reflect the cost of new supply. This will encourage these customers to meet part of their electricity needs through conservation and energy efficiency, or from other sources (self-generation or IPP purchases), where they can do so cost-effectively. To keep rates low overall, the stepped rate structure will be revenue neutral. Time-of-use rates will encourage customers who can manage the timing of their electricity use to shift consumption to low priced off-peak periods.

12 Therefore, RS 18 was designed to elicit a customer demand side management (DSM) response. The Tier Rate provides customers with a transparent indication of BC Hydro s long term marginal cost of new supply; and an efficient price signal to drive DSM investment The definition of DSM in Section.0 of the CBL Determination Guidelines is capital projects relating to energy efficiency, energy conservation and load displacement. BC Hydro is of the view that this definition is consistent with the definition of Demand-Side Measure in the amended Utilities Commission Act (UCA) which is a rate, measure, action or program undertaken: (a) to conserve energy or promote energy efficiency, (b) to reduce the energy demand a public utility must serve, or (c) to shift the use of energy to periods of lower demand There are two categories of RS 18 customer DSM, as shown in Table 1 below. The sum of these two categories is an estimate of the Total DSM response: 1 1. Customer Reported DSM (reported energy savings) 1. Unreported DSM (residual energy savings) 1 Table 1 Total DSM Summary (F00 F009) RS 18 Customer F00 F008 F009 DSM Category GWh GWh GWh Customer Reported DSM 8 8 Unreported DSM Total DSM The CBL Determination Guidelines are found in BC Hydro Electric Tariff Supplement No.. Customer Reported DSM is acquired energy savings that reflects the total estimated electrical energy reduction that was deemed (or physically measured) to have occurred at the BC Hydro meter each year. For each GWh of acquired energy savings from DSM, the customer is deemed to have purchased one less GWh of energy at the BC Hydro meter. Acquired energy savings are not cumulative between fiscal years. The estimate of acquired energy savings changes each year in line with changes in individual project persistence (life) and measurement and verification results. The CBL Determination Guidelines are found in BC Hydro Electric Tariff Supplement No..

13 Customer Reported DSM is an estimate of energy savings from energy conservation, efficiency and self-generation projects that were funded/installed by the customer. These projects were reported to BC Hydro as part of the annual CBL adjustment process and verified by BC Hydro to be operational. Customer Reported DSM occurs in response to the stepped rate and Power Smart enabling activities working in combination. These results have been provided in each of the TSR Annual Reports Unreported DSM is an estimate of residual energy savings from energy conservation and efficiency and self generation actions that were funded/installed by the customer. These actions were neither reported to, nor verified by, BC Hydro. Unreported DSM is assumed to occur in response to the stepped rate and Power Smart enabling activities working in combination. These results have not been provided in the TSR Annual Reports. A more detailed summary of each DSM category follows Customer Reported DSM These projects are 100 per cent funded by the customer. In all cases of Customer Reported DSM, BC Hydro has not provided a direct capital incentive towards the capital cost of the project. However, in some cases, BC Hydro has provided financial assistance to identify the DSM project and/or provided technical, key account manager and rate analysis support to verify the project energy savings and investment economics. These efforts are collectively regarded as Power Smart enabling activities. 0 1 BC Hydro s approach is to work with customers to identify, implement and verify DSM projects that are beneficial to customers under the stepped rate. BC Hydro has calculated the total acquired energy savings by fiscal year from Customer Reported DSM projects in each of the TSR Annual Reports. These projects reflect the total acquired energy savings from DSM projects that were verified to be operational at each individual RS 18 customer site. There are many complex variables that impact customer electricity use and DSM investment decision-making. There is no clear objective way to discretely separate the impact of rate 8

14 structure, Power Smart enabling activities and other customer decision-making factors for each reported DSM project. For convenience, BC Hydro has further separated Customer Reported DSM into three sub-categories, as shown in Table, and described in more detail below: a. Legacy Conservation and Efficiency (November, 00 to December 1, 00); b. New Conservation and Efficiency (January 1, 00 to March 1, 009); and c. Incremental self-generation (relative to an established generator baseline). 8 9 Table Customer Reported DSM Summary (F00 F009) F00 F008 F009 Sub-Category GWh GWh GWh Legacy conservation and efficiency New conservation and efficiency 18 9 Incremental self-generation TOTAL Legacy Conservation and Efficiency These DSM projects were installed between November, 00 and December 1, 00. The significance of the November, 00, start date is the introduction of the 00 Energy Plan, which set the stage for the implementation of new transmission service rates. Subsequently, through the TSR NSA, all parties implicitly agreed that customer investment in Legacy DSM projects was, at least in part, influenced by the 00 Energy Plan policy action for stepped rates Since the customers initial CBLs were to be established using actual metered calendar 00 energy consumption (00 metered energy), it was agreed that customers should not be penalized for any DSM investment after November, 00, that reduced 00 metered 9

15 energy. Accordingly, the annual energy savings from Legacy DSM projects were included as a credit adjustment to each customer s initial CBL, pursuant to section of the CBL Determination Guidelines New Conservation and Efficiency These DSM projects were installed after January 1, 00. The intent of these projects is to reduce Tier energy purchases, although some customers have invested in larger DSM projects that reduced their energy purchases to below 90 per cent of their CBL, to achieve a combination of Tier and Tier 1 energy reduction Whereas the energy savings from Legacy DSM projects resulted in a credit adjustment to the initial CBL, the energy savings from New DSM projects installed after January 1, 00 do not result in a CBL adjustment unless the customer s actual energy purchases fall outside the annual 90 per cent per cent dead-band used for CBL resets. If the adjusted energy purchases fall below, or above, the established dead-band, the CBL is reset to the adjusted amount. As such, the reset CBL includes the energy savings associated with New DSM projects Incremental Self-Generation These DSM projects reflect the increase in annual self-generation output between each fiscal year and the CBL establishment year (calendar 00 is the default CBL establishment year). BC Hydro has worked to establish a non-contracted generation baseline (non-contracted GBLs) for most customers with self generation based on the actual gross metered output of each generator in the CBL establishment year. The non-contracted description refers to generation output that is not under contract for off-site sales. 8 The non-contracted GBL represents the baseline generation output used by the customer in the CBL establishment year to serve an equivalent portion of the customer s historical plant load. A non-contracted GBL is required because the initial CBL is based on actual TSR energy purchases, which reflect the balance of the plant s total electricity requirements net of non-contracted self-generation. The non-contracted GBL calculation, using calendar 00 as the default CBL establishment year, follows the general formula: 10

16 00 metered energy + 00 gross generator output = total 00 plant load Where: 00 metered energy (net of RS 1880 energy) = unadjusted 00 CBL Where: 00 gross generator output = non-contracted GBL Each fiscal year, the participating customer provides BC Hydro with a Declaration of Generation for each of its generator units. This information is compared to the non-contracted GBL to determine the incremental generation output as follows: Gross generator output - non-contracted GBL = incremental generation (DSM) Increased self-generation displaces metered RS 18 energy purchases, and is considered DSM (load displacement) for CBL purposes. In the absence of a Declaration of Generation, BC Hydro would not be able to determine the cause of significant changes in metered RS 18 energy purchases that may otherwise trigger a CBL reset in accordance with the annual dead-band provisions of the CBL Determination Guidelines Some customers with self-generation sell a portion of their incremental generation output to off-site customers (mainly to BC Hydro and Powerex). In such cases, BC Hydro establishes a contracted GBL for the customer that represents the amount of generation output that must first be used to meet historical plant load requirements. Generation output that is incremental to the contracted GBL is then sold under contract as "off-site sales", usually via an Electricity Purchase Agreement (EPA) Any incremental self-generated energy that is surplus to the contracted GBL and EPA requirements, and that is used to serve an equivalent portion of the customer s plant load (thereby displacing actual RS 18 energy purchases), is considered incremental DSM for CBL purposes as follows: Gross generator output - contractual requirements = Incremental generation (DSM).1. Unreported DSM BC Hydro has provided a preliminary estimate of Unreported DSM in an attempt to provide an estimate of the total conservation response to the TSR rate structure. 11

17 .1..1 Unreported DSM Definition Unreported DSM is an estimate of residual energy savings from energy conservation and efficiency and self generation actions that were funded/installed by the customer. These actions were neither reported to, nor verified by, BC Hydro. This definition of Unreported DSM includes energy savings from both unreported DSM projects and customer DSM actions such as behavioural and/or operational changes. This includes capital and non-capital DSM activity For example, unreported customer DSM projects may include actual capital projects such as motor replacements or control system upgrades. Unreported customer DSM actions may include non-capital behavioural/operational change actions such as turning off idle equipment, product grade changes, or compressor leak repairs Unreported DSM Preliminary Estimate BC Hydro has not provided an estimate of Unreported DSM in prior TSR Annual Reports. This is a challenging analysis for the following reasons: 1 1 Data: BC Hydro has incomplete information on how customers have responded to the rate and/or what they would have done in absence of the rate change; 1 18 Control group: There is no control group of industrial customers that are not on the stepped rate Multiple variables: There are multiple data inputs that must be standardized and treated with specific assumptions, for statistical and econometric analysis to be performed. 1 Model Specification: An estimation model must be able to separate and measure the impact of different factors, including the stepped rate, on total conservation so that the amount of unreported conservation can be estimated. Nevertheless, BC Hydro considers it important to attempt to provide an estimate of the unreported conservation impact of the stepped rate and proposes two alternative methods by rate evaluation experts: 1

18 Method 1: TSR Impact Evaluation (BC Hydro Evaluation) (Appendix B); and Method : Statistical Analysis (Energy and Environmental Economics (E)) (Appendix C) Method 1 and Method utilize econometric and statistical analysis models, respectively. Table presents the results of each method, providing an estimate of the range of Unreported DSM. Table Estimate of Unreported DSM (F00 to F009) Unreported DSM F00 F008 F009 GWh GWh GWh Method Method PRELIMINARY RANGE Note that the estimates of Unreported DSM are not directly comparable, since each method utilizes different data sets and employs different modelling and analysis logic. Furthermore, although the estimate of Unreported DSM may be generally viewed as the residual price response to the change in rate structure, BC Hydro has no knowledge of the specific drivers of customer projects and actions that are reflected in the Unreported DSM estimate. Thus, it is reasonable to assume that some of the Unreported DSM may include other factors such as Power Smart enabling activity Subjective Test of Reasonableness BC Hydro has used subjective judgement to test the reasonableness of the Unreported DSM estimated by each method This subjective test is premised on the assumption that Customer Reported DSM is a conservative estimate of the Total DSM response. That is, Customer Reported DSM reflects a percentage (some number less than 100 per cent) of Total DSM. These are estimates only, and are not used by BC Hydro for DSM planning purposes. 1

19 As described above, Unreported DSM reflects the sum total of residual energy savings from DSM projects and actions at TSR customer sites that have not been reported to BC Hydro and are therefore not known or verified by BC Hydro. 8 BC Hydro estimates that there is a 10 to 0 per cent Unreported DSM response to RS 18 in addition to the Reported DSM. This estimate is based on the experience of BC Hydro Key Account Managers working with RS 18 customers on a regular basis, as well as the CBL annual review process. Table below provides the estimated range of Unreported DSM for each fiscal year based on the 10 to 0 per cent estimates. 9 Table Subjective Estimate of Unreported DSM 10 The two estimates of Unreported DSM shown in Table provide a range of numbers which 11 are not inconsistent with the estimates under the subjective estimates using a 1 10 to 0 per cent range, as shown in Table. 1

20 . Question : Has the transmission services stepped rate (RS 18) facilitated retail access by BC Hydro s transmission customers? The stepped rate has not facilitated retail access by TSR customers. Retail access arose from the 00 Energy Plan s Policy Action #1: under new rate structures, large electricity consumers will be able to choose a supplier other than the local distributor The stepped rate would provide the incentive for BC Hydro s TSR customers to purchase from alternative suppliers, such as IPPs, or to self-generate, when they can do so less expensively than BC Hydro s long term cost of new supply. The policy change introduced retail competition for TSR customers No customers have entered into Retail Access Program Agreements in any of the past three years. Accordingly, no customer has used RS 1890 (energy imbalance for retail access customers). 1 1 A detailed overview of the retail access design is provided in the response to question, in the next section. 1

21 . Question. If no retail access has occurred, why not? Are there features of the transmission services stepped rate that detract from the attractiveness of retail access?..1 If no retail access has occurred, why not? In order to understand why retail access has not occurred, it is helpful to first review retail access design Retail access gives transmission customers the option to purchase a portion of their monthly energy requirements from a supplier other than BC Hydro. Customers can displace their Tier energy purchases from BC Hydro by purchasing the energy from an alternate (third-party) supplier The retail access customer is required to enter into a Retail Access Program Agreement, also known as Tariff Supplement No. 1 (TS No. 1), with BC Hydro. TS No. 1 requires monthly firm energy to be scheduled and delivered by the third-party supplier over a month initial term. This is the retail access energy The retail access customer also enters into an agreement with a third-party supplier or suppliers pursuant to which the supplier(s) provide the retail access energy to the BC Hydro system from the supplier s own generation or from the market. The retail access energy is supplied to the BC Hydro system at the Point of Receipt (POR) defined in the contract BC Hydro applies a postage-stamp energy loss charge of.8 per cent in relation to the delivery of the retail access energy from the POR to the retail access customer s site called the Point of Delivery (POD). This charge is based on the average real power transmission losses in the British Columbia Transmission Corporation s (BCTC) Open Access Transmission Tariff (OATT). The arrangement is shown in Figure 1 below. 1

22 Figure 1 Illustration of Delivery of Retail Access Energy The third-party supplier provides retail access energy to the BC Hydro system in accordance with the Output Schedule that forms part of TS No Each month, actual gross energy delivered to the POR is compared to Gross Scheduled Output, the.8 per cent energy loss charge is deducted, and Net Actual Output is deemed to have been delivered to the retail access customer. Each month, for billing purposes, BC Hydro then deducts the Net Actual Output from actual metered RS 18 energy purchases at the customer site If Net Actual Output is higher than Net Scheduled Output, there is an energy surplus and a credit applies to the incremental energy. If Net Actual Output is lower, there is an energy shortfall and a charge applies to the decremental energy. Energy imbalance credits and charges are set out in RS 1890 and described (using F009 rates) in Table below. 1 1 Table RS 1890 Imbalance Rates for 009 (based on RS 18) 1

23 The imbalance credit for the first 10 per cent energy surplus is the seasonally/hourly adjusted RS 18 Tier Rate. The imbalance credit for the balance of the energy surplus is the RS 18 Tier 1 Rate. The imbalance charge for all energy shortfalls is the seasonally/hourly adjusted RS 18 Tier Rate. Figure, below, shows the retail access design including imbalance charges. Figure Illustration of Energy Imbalance RS

24 .. Are there features of the transmission services stepped rate that detract from the attractiveness of retail access?...1 Introduction What has become clear to BC Hydro is that the underlying premise upon which retail access was originally based (that some customers would wish to acquire some or all of their electricity supply from a third party other than BC Hydro) has not been borne out Interviews and workshops with customers revealed that most customers were not aware of the retail access alternative. For those customers that were aware, the terms, conditions, risks and complexities of purchasing power from a third-party supplier combined to made retail access less attractive than purchases from BC Hydro under RS The specific features of the transmission services stepped rate that deter customers from pursuing retail access are the amount of energy priced at Tier and the Tier Rate. In addition, the risks to customers of retail access outweigh the benefits With respect to energy priced at Tier, many RS 18 customers have already made significant DSM investments such that there is not sufficient Tier energy being purchased to be displaced by retail access With respect to the Tier Rate, despite being reset in F009, the prevailing Tier Rate is lower than the prevailing marginal price of IPP energy, such that the margin is not sufficient to warrant retail access. 0 1 With respect to risks, the customer perspective, as understood from customer interviews and workshops, is generally that TS No. 1 and RS 1890 seem complex and restrictive. For most customers the risks of taking retail access energy outweigh the potential benefits. These features are described in more detail below. 19

25 ... The Tier Rate and the Amount of Energy Priced at Tier In order to secure project financing, IPPs secure contractual commitments for energy sales in advance of project construction. In B.C. this usually takes the form of a long-term EPA with BC Hydro. Almost all of the firm generation output from existing IPPs in the province is already committed to BC Hydro or another purchaser pursuant to a long-term EPA. Any surplus energy that an IPP may have available to sell on a short-term, non-firm basis would not be a suitable energy product for retail access Thus, there is little (if any) firm IPP power in B.C. that is currently available to retail access customers, and it is unlikely that an IPP would build a new generation facility to serve retail access customer loads under shorter term contracts. In addition, RS 18 s Tier 1 and Tier pricing split at 90 per cent of CBL effectively limits the amount of Tier energy that a customer may be interested in obtaining through retail access to 10 per cent of the customer s CBL (or aggregated CBL). Many RS 18 customers have already reduced their Tier purchases by investing in DSM which further reduces the retail access market The Tier Rate was $/MWh in F00 and F008 (based on BC Hydro s 00 Green Power Generation Call) and reset to $.0/MWh in F009 (based on BC Hydro s 00 Call for Tenders). The prevailing Tier Rate has, to date, been a lagging indicator of BC Hydro s long term marginal cost of new supply For example, the Tier Rate of $.0/MWh in F009 is less than the average levelized plant gate price of $101/MWh of the four contracts awarded in the 008 Bioenergy Call Phase 1 Request for Proposals (008 Bioenergy RFP). 8 The Tier Rate can also be compared to market electricity prices, using the Mid-Columbia (Mid-C) hub as the market reference. The Mid-C price, plus wheeling charges from Mid-C to the border, is broadly representative of the short term wholesale market price available to retail access customers in B.C. Table below shows that the price for Mid-C energy, excluding delivery to the BC Hydro system, was comparable to or higher than the Tier Rate in F00 and F008. The Mid-C price excluding delivery was lower than the Tier Rate in F009. 0

26 Table Price Comparisons (current Canadian dollars per MWh) Tier 1 Rate Tier rate Mid-C Difference between Mid-C and Tier 1 Rate Mid-C and Tier Rate F (.8) F F (1.) 8 Retail access also allows TSR customers to arrange for transmission service directly from BCTC. TSR customers can expose their load on a full or partial basis to retail access, provided that BC Hydro has access to the information necessary to properly bill such a customer for imbalance service. However, no customers have elected to make these arrangements with BCTC mainly because of the low cost of RS 18 relative to the cost of retail access supply alternatives The Retail Access Program Agreement (TS No. 1) TS No. 1 requires the transmission customer and the third-party retail supplier to commit to a -month delivery schedule of firm monthly output (scheduled output). The scheduled output can only be provided within a fixed monthly range The highest entry within any month cannot exceed 10 per cent of the lowest entry for any other month over the entire -month term. Further, scheduled output must be specified for heavy load hours (HLH) and light load hours (LLH) for the winter months of November to February In effect, the energy product contracted for delivery under retail access during the months of March to October is firm monthly energy. The energy product contracted for delivery during the months of November to February is firm hourly energy. 0 1 Interviews, meetings and workshops with TSR customers and potential third-party suppliers revealed that these terms and conditions are considered to be, for the most part, unattractive. 1

27 ... Risks Versus Benefits The benefit of retail access is the opportunity to displace Tier energy purchases by obtaining lower cost supply from an alternate supplier. However, the retail access customer takes the risk that it may end up paying more for the energy than the Tier Rate. The customer s energy price risk is based on the following considerations: 8 The customer must estimate its annual Tier energy purchases from BC Hydro for the next three years that it will seek to replace with lower priced retail access energy purchases that meet the requirements of TS No. 1; The customer s actual energy purchases from BC Hydro would be impacted by load reduction events such as DSM, force majeure, unplanned outages, and adverse economic conditions. All of these events would serve to reduce the customer s actual Tier energy purchases from BC Hydro; To the extent the customer is not able to foresee such energy reduction events and commits to purchasing a defined monthly volume of energy from a third-party supplier, the customer could be required to pay the third-party supplier for energy at the contract price at times when the customer would otherwise pay BC Hydro the Tier 1 Rate. The energy price risk may not be symmetrical for unplanned increased purchases from BC Hydro. The risk is equal to the contracted energy sales price minus the prevailing Tier 1 Rate; and 0 1 Per the example below, the potential benefit of retail access could be a $/MWh discount on Tier energy purchases, offset by a potential price risk of $.8/MWh. Unless the customer is able to transfer this energy price risk to the third-party supplier through their contract, which is unlikely, the risk would be borne by the retail access customer.

28 Retail Access Example: For a transmission customer with a CBL of 10 GWh/yr, the potential Tier energy available for replacement with retail access energy is 10 per cent x CBL = 1 GWh/yr = 1,000 MWh/month. Assumptions: Energy CBL = 10,000 MWh; Actual F009 Tier 1 Rate = $./MWh; 8 Actual F009 Tier Rate = $.0/MWh; 9 Assume $/MWh Tier discount for retail access energy = $8.0/MWh; and 10 Energy price risk = Discounted Tier energy Tier 1 Rate = $.8/MWh For illustrative purposes, it is assumed the discounted F009 energy sales price for retail access energy is $/MWh less than the F009 Tier Rate of $.0/MWh = $8.0/MWh. This is the price that the transmission customer would pay to the third-party supplier for monthly delivered energy The third-party supplier needs to supply 1,0 MWh of gross energy for every 1,000 MWh of net energy delivered to satisfy BC Hydro s.8 per cent energy loss charge. This reduces the effective realized energy price to the third-party supplier by.8 per cent = $8.0/MWh - $.0/MWh = $.0/MWh A retail access customer probably would not be able to do any better than a $/MWh discount since a realized price lower than $.0/MWh (for a firm monthly energy product) may not be economic for the third-party supplier, which illustrates the thin margins on the Tier Rate spread.

29 Benefit: Assuming a $/MWh discount, the transmission customer could save $0,000/year: ($/MWh discount x 1,000 MWh/month = $,000/month x 1 = $0,000/year. Risk: Assuming a price risk of $.8/MWh, the transmission customer could pay an additional $,000/year (notwithstanding the ability to recover incremental imbalance charges for energy shortfalls and/or non-delivery): ($.8/MWh price risk x 1,000 MWh/month = $,000/month x 1 = $,000/year).

30 . Question : Has the transmission services stepped rate (RS 18) caused costs to shift to other BC Hydro customer classes or to the shareholder? Costs have been shifted from the TSR class to other customer classes and to the shareholder as a result of the stepped rate. There are two points in time at which a cost shift from RS 18 customers can be identified: on a forecast rate-setting basis; and on an actual, after-the-fact basis Forecast Cost Shift On a forecast basis, a revenue variance arises from the pricing difference between the former RS 181 flat rate structure and the RS 18 stepped rate structure (in combination with CBLs) applied to the same forecast of energy sales. This analysis establishes the upper bound of a potential cost shift in that it assumes that forecast energy sales volumes and costs under RS 18 would be the same under RS 181, regardless of the difference in rate structure The analysis is imperfect because the revenue variance does not take into account the DSM response to the RS 18 rate structure which would result in differences between energy revenues and costs between the rate structures. A comparable estimate of DSM savings and costs was not created for a scenario where RS 18 was not implemented and all TSR customers remained on RS 181, which was terminated in April The revenue variance that arises is, nevertheless, an estimate of the cost or benefit shift to all customer classes via an across-the-board class average rate change pursuant to a BC Hydro Revenue Requirements Application (RRA). If the forecast revenue variance is positive, it will reduce the requested across-the-board rate increase. If the revenue variance is negative, it will increase the requested across-the-board rate increase. Estimated RRA cost-shift impacts for each fiscal year are shown in Table below.

31 Table Forecast Revenue Variance Impact (F00 F009) F00 RRA F008 RRA F009 RRA Transmission Rates $/MWh $/MWh $/MWh RS 18 Tier 1 Rate... RS 18 Tier Rate RS 18 Rate Forecast Energy Sales GWh GWh GWh Forecast CBL 1,0 1,0 1,18 RS 18 Tier 1 energy sales 1,01 1,88 1,098 RS 18 Tier energy sales 1,9 1,9 8 Total Forecast RS 18 energy sales 1,9 1, 1,8 Forecast Energy Revenue $ million $ million $ million Forecast RS 18 sales revenue Reference RS 18 sales revenue Revenue Variance*.0 (.) (.9) * As noted above, this analysis does not take into account the reduced costs to BC Hydro due to the forecast DSM response to the RS 18 stepped rate. Nor can it, given there is no way of estimating the DSM response to a continued flat rate under RS After-the-fact Cost Shift On an actual, after-the-fact basis, a gross revenue variance arises from the difference between forecast RS 18 energy sales and actual RS 18 energy sales. When forecast energy sales to customers are lower than forecast energy sales in a fiscal year, BC Hydro receives less revenue than forecast, but it also supplies less energy than forecast. This load variance therefore results in an offsetting reduction in the cost of energy. These revenue and cost variances arise irrespective of rate structure BC Hydro has used a short-run marginal cost estimate to value the avoided cost of energy for the purposes of this analysis. The difference between the Tier Rate and the short-run marginal cost determines the extent to which RS 18 is margin neutral, all other things being equal.

32 The short-run marginal cost value is based on the average cost of market energy prices in each fiscal year. The actual average market price was used to value avoided energy costs in F00 and F008 as BC Hydro did not include load variance in its cost of energy deferral accounts in F00 and F008. In BCUC Order No. G-1-09 and Reasons for Decision regarding BC Hydro s F009/F010 Revenue Requirements Application (F09/F10 RRA) the BCUC approved a change to the Non-Heritage Deferral Account to include cost of energy variances arising from load variance for two years, F009 and F010. Under the cost of energy deferral account rules, BC Hydro uses the forecast Plan average cost of market electricity purchases if forecast supply is greater than actual supply. This was the case in F009 and the forecast Plan average cost of market electricity purchases for F009 was $./MWh. The gross margin calculations are shown in Table 8 below: 1 1 Table 8 Actual Versus Forecast RS 18 Gross Margin Variance F00 F008 F009 Avoided Cost of Energy Reference $/MWh $/MWh $/MWh Forecast market price of energy Actual market price of energy Energy Sales GWh GWh GWh Actual RS 18 energy sales 1,8 1,99 1,18 Forecast RS 18 energy sales 1,9 1, 1,8 Energy Sales Variance () (1,8) (9) Energy Revenue $ million $ million $ million Actual RS 18 energy revenue Forecast RS 18 energy revenue Gross Revenue Variance (.) (0.0) (.) Avoided cost of energy adjustment Gross margin (9.).8 (.) In F00 and F008, BC Hydro s cost of energy deferral accounts did not account for variances in cost of energy arising from variances in customer load. As a result, the F00 and F008 impact on gross margin was effectively borne by BC Hydro, and ultimately its

33 shareholder (in the form of net income that was lower in F00, and higher in F008, than it otherwise would have been). 8 In F009, cost of energy variances arising from differences between forecast and actual RS 18 energy sales, net of cost of energy savings or losses, are captured in BC Hydro s Non-Heritage Deferral Account. As a result, the F009 impact on gross margin will effectively be borne by all customer classes through an adjustment to the deferral account rate rider. BC Hydro notes that this deferral account treatment is applied equally to all customer classes BC Hydro does not prepare separate income statements for any specific customer class. Accordingly, the gross margin analysis shown in Table 8 is a high-level estimate only that excludes the impact of demand charges, line losses, TSR administration costs, Power Smart program and enabling costs, and all other non-rs 18 industrial customer electricity sales. 8

RETAIL ACCESS PROGRAM AUGUST 25, 2011 PRESENTERS: David Keir, Transmission Rates Manager, (david.keir@bchydro.com) Fred James, Rates and Tariff Manager, (fred.james@bchydro.com) Justin Miedema, Regulatory

More information

1. Background. March 7, 2014

1. Background. March 7, 2014 Janet Fraser Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com March 7, 2014 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission

More information

For further information, please contact Fred James at or by at

For further information, please contact Fred James at or by  at Tom A. Loski Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com July 21, 2016 Ms. Laurel Ross Acting Commission Secretary British Columbia Utilities Commission

More information

For further information, please contact Fred James at or by at

For further information, please contact Fred James at or by  at Janet Fraser Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com February 28, 2014 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission

More information

Attached is BC Hydro s annual filing of the Report on Demand-Side Management Activities for the 12 months ending March 31, 2012.

Attached is BC Hydro s annual filing of the Report on Demand-Side Management Activities for the 12 months ending March 31, 2012. Janet Fraser Chief Regulatory Officer Phone: 60-6-06 Fax: 60-6-07 bchydroregulatorygroup@bchydro.com July 0, 01 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission Sixth Floor

More information

For further information, please contact Fred James at or by at

For further information, please contact Fred James at or by  at Janet Fraser Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com August 30, 2013 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission

More information

For further information, please contact Fred James at or by at

For further information, please contact Fred James at or by  at Janet Fraser Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com December 6, 2011 Ms. Alanna Gillis Acting Commission Secretary British Columbia Utilities

More information

Re: FortisBC Inc. Application for Approval of Demand Side Management Expenditures for the Period of 2015 and 2016

Re: FortisBC Inc. Application for Approval of Demand Side Management Expenditures for the Period of 2015 and 2016 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL August 22, 2014 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604)

More information

BC Hydro takes this opportunity to raise the following two matters.

BC Hydro takes this opportunity to raise the following two matters. Tom A. Loski Chief Regulatory Officer Phone: 0--0 Fax: 0--0 bchydroregulatorygroup@bchydro.com September, 0 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission Sixth Floor 00

More information

November 8, Dear Mr. Wruck:

November 8, Dear Mr. Wruck: B-23 Fred James Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com November 8, 2017 Mr. Patrick Wruck Commission Secretary and Manager Regulatory Support

More information

For further information please contact Fred James at

For further information please contact Fred James at BChydro Joanna Sofield Chief Regulatory Officer Phone: (604) 6-4046 Fax: (604) 6-4407 regulatory. group@bchydro.com July,008 Ms. Erica M. Hamilton Commission Secretary British Columbia Utilities Commission

More information

INFORMATION RELEASE BCUC Receives Comments from BC Hydro on Site C Inquiry Final Report November 24, 2017

INFORMATION RELEASE BCUC Receives Comments from BC Hydro on Site C Inquiry Final Report November 24, 2017 Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 bcuc.com P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 INFORMATION RELEASE BCUC Receives Comments from BC Hydro on Site C Inquiry Final Report

More information

BC HYDRO F2012 F2014 REVENUE REQUIREMENTS EXHIBIT A2 8

BC HYDRO F2012 F2014 REVENUE REQUIREMENTS EXHIBIT A2 8 ERICA M. HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL bchydroregulatorygroup@bchydro.com March 31, 2011 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER,

More information

INFORMATION RELEASE BCUC responds to BC Hydro s comments on the Site C Inquiry Final Report November 28, 2017

INFORMATION RELEASE BCUC responds to BC Hydro s comments on the Site C Inquiry Final Report November 28, 2017 INFORMATION RELEASE BCUC responds to BC Hydro s comments on the Site C Inquiry Final Report November 28, 2017 Vancouver The British Columbia Utilities Commission (BCUC) has responded to the letter from

More information

Cascade Pacific Power Corporation

Cascade Pacific Power Corporation February 7, 2008 C23-3 BC Hydro and Power Authority 17 th Floor, 333 Dunsmuir Street Vancouver, BC V6B 5R3 Attention: Ms. Joanna Sofield, Chief Regulatory Officer Dear MS. Sofield RE: Standing Offer Program

More information

For further information, please contact Guy Leroux at

For further information, please contact Guy Leroux at BChydro m R GENE IONS Joanna Sofield Chief Regulatory Officer Phone: (604 623-4046 Fax: (604 623-4407 bchyd roregulatorygroup@bchydro.com July 13 2009 Ms. Erica M. Hamilton Commission Secretary British

More information

2015 RATE DESIGN APPLICATION (RDA) TRANSMISSION SERVICE RATE (TSR) STRUCTURES WORKSHOP #1

2015 RATE DESIGN APPLICATION (RDA) TRANSMISSION SERVICE RATE (TSR) STRUCTURES WORKSHOP #1 2015 RATE DESIGN APPLICATION (RDA) TRANSMISSION SERVICE RATE (TSR) STRUCTURES WORKSHOP #1 22 October, 2014 INTRODUCTION AGENDA Approximate Time Item Presenter(s) 9 :00 9:10 Welcome Anne Wilson Background

More information

FortisBC Inc. Annual Review of 2018 Rates Project No British Columbia Utilities Commission Information Request No. 1

FortisBC Inc. Annual Review of 2018 Rates Project No British Columbia Utilities Commission Information Request No. 1 Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com bcuc.com Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 September 6, 2017 Sent

More information

BC Hydro Revenue Requirements Application Evidence #1

BC Hydro Revenue Requirements Application Evidence #1 BC Hydro Revenue Requirements Application Evidence #1 BCUC Project No.: 3698430 By: Ludo Bertsch, Horizon Technologies Inc. For: ESVI Energy Solutions for Vancouver Island Society Date: Oct 6, 2006 Background

More information

SCHEDULE C ELECTRICITY PURCHASE AGREEMENT - TERM SHEET SMALL PROJECTS

SCHEDULE C ELECTRICITY PURCHASE AGREEMENT - TERM SHEET SMALL PROJECTS SCHEDULE C ELECTRICITY PURCHASE AGREEMENT - TERM SHEET SMALL PROJECTS The following is a summary of the key terms and conditions of the proposed standard form electricity purchase agreement ( EPA ) for

More information

September 10, Via Original via Mail. British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, B.C.

September 10, Via  Original via Mail. British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, B.C. C- Email: electricity.regulatory.affairs@fortisbc.comemail: electricity.regulatory.affairs@fortisbc.com Dennis Swanson Director, Regulatory Affairs FortisBC Inc. Suite 00 Springfield Road Kelowna, BC VY

More information

British Columbia Hydro and Power Authority

British Columbia Hydro and Power Authority 2016/17 SECOND QUARTER REPORT MANAGEMENT S DISCUSSION AND ANALYSIS This Management s Discussion and Analysis (MD&A) reports on British Columbia Hydro and Power Authority s (BC Hydro or the Company) consolidated

More information

FortisBC Inc. Annual Review of 2018 Rates Project No Final Order with Reasons for Decision

FortisBC Inc. Annual Review of 2018 Rates Project No Final Order with Reasons for Decision Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com bcuc.com Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 February 13, 2018 Sent

More information

BC HYDRO S APPLICATION FOR 2004/05 AND 2005/06 REVENUE REQUIREMENTS BCOAPO et al. INFORMATION REQUESTS

BC HYDRO S APPLICATION FOR 2004/05 AND 2005/06 REVENUE REQUIREMENTS BCOAPO et al. INFORMATION REQUESTS BC HYDRO S APPLICATION FOR 2004/05 AND 2005/06 REVENUE REQUIREMENTS BCOAPO et al. INFORMATION REQUESTS QUESTION 1 Reference: Application, Volume 1, Chapter 1, page 1-7, Tables 1-1 and 1-2 a) Please clarify

More information

British Columbia Hydro and Power Authority

British Columbia Hydro and Power Authority 2017/18 THIRD QUARTER REPORT MANAGEMENT S DISCUSSION AND ANALYSIS This Management s Discussion and Analysis (MD&A) reports on British Columbia Hydro and Power Authority s (BC Hydro or the Company) consolidated

More information

FortisBC Inc. Application for an Exempt Residential Rate

FortisBC Inc. Application for an Exempt Residential Rate B-1 Corey Sinclair Manager, Regulatory Affairs FortisBC Inc. Suite 100-1975 Springfield Road Kelowna, BC V1Y 7V7 Ph: (250) 469-8038 Fax: 1-866-335-6295 electricity.regulatory.affairs@fortisbc.com www.fortisbc.com

More information

Long-Term Rate Forecast

Long-Term Rate Forecast Long-Term Rate Forecast OVERVIEW This brief provides background information on the Long-Term Rate Forecast (LTRF) used in the 2011 Integrated Resource Plan (IRP). It is similar to the report filed as Attachment

More information

CONSOLIDATED FINANCIAL STATEMENTS 2011

CONSOLIDATED FINANCIAL STATEMENTS 2011 FINANCIAL RESULTS CONSOLIDATED FINANCIAL STATEMENTS 2011 MANAGEMENT REPORT The consolidated financial statements of British Columbia Hydro and Power Authority (BC Hydro) are the responsibility of management

More information

hydro /Yl- Fax: (604) Y,-- ww.bchydro. com Yours sinc

hydro /Yl- Fax: (604) Y,-- ww.bchydro. com Yours sinc -".... /Yl- -.-'- BC hydro Tony Morris Acting Chief Regulatory Offcer Phone: (604) 623-4046 Fax: (604) 623-4407 June 27, 2005 Mr. Robert J. Pellatt Commission Secretary British Columbia Utilities Commission

More information

2015 Rate Design Application

2015 Rate Design Application 2015 Rate Design Application D-Wires Extension Policy Customer Workshops: July/August 2014 Discussion Guide Discussion Guide Distribution Extension Policy Review OVERVIEW Currently, BC Hydro is consulting

More information

For further information, please contact Sylvia von Minden at or by at

For further information, please contact Sylvia von Minden at or by  at B-1 Janet Fraser Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com October 24, 2011 Ms. Alanna Gillis Acting Commission Secretary British Columbia Utilities

More information

BC Hydro FIrST QUArTEr report FISCAL 2015

BC Hydro FIrST QUArTEr report FISCAL 2015 BC Hydro FIRST QUARTER REPORT FISCAL 2015 BC Hydro & Power Authority Management S Discussion and Analysis This Management s Discussion and Analysis (MD&A) reports on British Columbia Hydro and Power Authority

More information

British Columbia Hydro and Power Authority (BC Hydro) Application for Approval of New Power Purchase Agreement (PPA) with FortisBC Inc.

British Columbia Hydro and Power Authority (BC Hydro) Application for Approval of New Power Purchase Agreement (PPA) with FortisBC Inc. C1-24 Reply Attention of: Ludmila B. Herbst Direct Dial Number: (604) 661-1722 Email Address: lherbst@farris.com Our File No.: 05497-0224 January 20, 2014 BY EMAIL British Columbia Utilities Commission

More information

Comprehensive Review of BC Hydro: Phase 1 Final Report

Comprehensive Review of BC Hydro: Phase 1 Final Report Comprehensive Review of BC Hydro: Phase 1 Final Report ii Table of Contents 1. Executive Summary 1 1.1 Enhancing Regulatory Oversight of BC Hydro 1 1.2 New Rates Forecast 3 1.3 Next Steps 5 2. Strategic

More information

BC Hydro s Clean Power Call

BC Hydro s Clean Power Call BC Hydro s Clean Power Call November 27, 2007 Housekeeping Details Morning break at 9:45 for 15 minutes Lunch is at 12:30 for 30 minutes Break out groups at 1:30 for 1 hour Meeting ends at 4:00 Washrooms

More information

2.0 Reference: Application, Volume I, Chapter 2, Consolidated Revenue Requirements and Financial Schedules

2.0 Reference: Application, Volume I, Chapter 2, Consolidated Revenue Requirements and Financial Schedules 1 2.0 Reference: Application, Volume I, Chapter 2, Consolidated Revenue Requirements and Financial Schedules 2.2 2-3, Table 2-2: Please indicate for Columns C and D whether or not an average expected value

More information

BC HYDRO CONTRACTED GBL EXHIBIT A-6

BC HYDRO CONTRACTED GBL EXHIBIT A-6 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL FREE:

More information

FortisBC Inc. (FBC) Application for Approval of Demand Side Management (DSM) Expenditures for 2015 and 2016 FBC Final Submission

FortisBC Inc. (FBC) Application for Approval of Demand Side Management (DSM) Expenditures for 2015 and 2016 FBC Final Submission Dennis Swanson Director, Regulatory Affairs FortisBC Inc. Suite 100 1975 Springfield Road Kelowna, BC V1Y 7V7 Tel: (250) 717-0890 Fax: 1-866-335-6295 www.fortisbc.com Regulatory Affairs Correspondence

More information

Financial Statements Year Ended March 31, 2011

Financial Statements Year Ended March 31, 2011 1980 1981 Built in the early 1980s, Revelstoke Generating Station has been powering British Columbia with four generating units for nearly 30 years, with two unit bays remaining empty. As part of BC Hydro

More information

SCHEDULE C ELECTRICITY PURCHASE AGREEMENT TERM SHEET TRANSMISSION AND LARGE DISTRIBUTION CONNECTED PROJECTS

SCHEDULE C ELECTRICITY PURCHASE AGREEMENT TERM SHEET TRANSMISSION AND LARGE DISTRIBUTION CONNECTED PROJECTS SCHEDULE C ELECTRICITY PURCHASE AGREEMENT TERM SHEET TRANSMISSION AND LARGE DISTRIBUTION CONNECTED PROJECTS The following is a summary of the key terms and conditions of the proposed standard form electricity

More information

Revenue Requirement Application. 2004/05 and 2005/06. Volume 2. Appendix I. Power Smart 10-Year Plan

Revenue Requirement Application. 2004/05 and 2005/06. Volume 2. Appendix I. Power Smart 10-Year Plan Revenue Requirement Application 2004/05 and 2005/06 Volume 2 Appendix I. Power Smart 10-Year Plan 10-Year Plan: 2002/03 through 2011/12 December 2, 2003 Table of Contents 1 PLAN SUMMARY...1 2 PLAN COST-EFFECTIVENESS

More information

BC HYDRO F2017 F2019 REVENUE REQUIREMENTS EXHIBIT A-29

BC HYDRO F2017 F2019 REVENUE REQUIREMENTS EXHIBIT A-29 Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com Website: www.bcuc.com Sixth Floor, 900 Howe Street Vancouver, BC Canada V6Z 2N3 TEL: (604) 660-4700 BC Toll Free: 1-800-663-1385 FAX: (604)

More information

Revenue Requirement Application 2004/05 and 2005/06. Volume 1. Chapter 2. Consolidated Revenue Requirements and Financial Schedules

Revenue Requirement Application 2004/05 and 2005/06. Volume 1. Chapter 2. Consolidated Revenue Requirements and Financial Schedules Revenue Requirement Application 00/0 and 00/0 Volume 1 Chapter. Consolidated Revenue Requirements and Financial Schedules Table of Contents LIST OF FIGURES... -IV LIST OF TABLES... -IV LIST OF SCHEDULES...-V

More information

ORDER NUMBER G IN THE MATTER OF the Utilities Commission Act, RSBC 1996, Chapter 473. and

ORDER NUMBER G IN THE MATTER OF the Utilities Commission Act, RSBC 1996, Chapter 473. and Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 bcuc.com P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 ORDER NUMBER G-48-19 IN THE MATTER OF the Utilities Commission Act, RSBC 1996, Chapter

More information

FORTISBC INC PERFORMANCE BASED RATEMAKING REVENUE REQUIREMENTS EXHIBIT A-27

FORTISBC INC PERFORMANCE BASED RATEMAKING REVENUE REQUIREMENTS EXHIBIT A-27 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL rhobbs@shaw.ca January 16, 2014 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. CANADA V6Z

More information

FEVI DEFERRAL ACCOUNT PEC EXHIBIT A2-3

FEVI DEFERRAL ACCOUNT PEC EXHIBIT A2-3 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL gas.regulatory.affairs@fortisbc.com April 4, 2013 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER,

More information

Please find attached BC Hydro's supplemental responses to BCUC IR and BCUC IR

Please find attached BC Hydro's supplemental responses to BCUC IR and BCUC IR B16-12 Joanna Sofield Chief Regulatory Officer Phone: (604) 623-4046 Fax: (604) 623-4407 regulatory.group@bchydro.com September 29, 2006 Mr. Robert J. Pellatt Commission Secretary British Columbia Utilities

More information

FortisBC Inc. s Preliminary 2011 Revenue Requirements Application for Approval Pursuant to Sections 60 and 61 of the Utilities Commission Act

FortisBC Inc. s Preliminary 2011 Revenue Requirements Application for Approval Pursuant to Sections 60 and 61 of the Utilities Commission Act Dennis Swanson Director, Regulatory Affairs FortisBC Inc. Suite 00 - Springfield Road Kelowna, BC VY V Ph: (0) -00 Fax: --- regulatory@fortisbc.com www.fortisbc.com October, 00 B- Via Email Original via

More information

January 23, Via Original via Mail. British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3

January 23, Via  Original via Mail. British Columbia Utilities Commission 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3 3700 2 nd Avenue Burnaby, BC V5C 6S4 January 23, 2014 Via Email Original via Mail 6 th Floor, 900 Howe Street Vancouver, BC V6Z 2N3 Attention: Ms. Erica M. Hamilton, Commission Secretary Dear Ms. Hamilton:

More information

DECISION and Order E and Letter L-15-16

DECISION and Order E and Letter L-15-16 IN THE MATTER OF FortisBC Energy Inc. 2015 Price Risk Management DECISION and Order E-10-16 and Letter L-15-16 June 17, 2016 Before: D. A. Cote, Commissioner/Panel Chair B. A. Magnan, Commissioner R. D.

More information

2018/19 SECOND QUARTER REPORT

2018/19 SECOND QUARTER REPORT 2018/19 SECOND QUARTER REPORT MANAGEMENT S DISCUSSION AND ANALYSIS This Management s Discussion and Analysis (MD&A) reports on British Columbia Hydro and Power Authority s (BC Hydro or the Company) consolidated

More information

Reference: Exhibit B-5-1, page 1-4, Section , Electricity Demand Growth

Reference: Exhibit B-5-1, page 1-4, Section , Electricity Demand Growth C18-2 REQUESTOR NAME: Independent Power Producers of B.C. INFORMATION REQUEST ROUND NO: 1 TO: BRITISH COLUMBIA HYDRO & POWER AUTHORITY DATE: July 5, 2006 PROJECT NO: 3698416 APPLICATION NAME: F2007/F2008

More information

British Columbia Hydro and Power Authority. F2017 to F2019 Revenue Requirements Application. Decision and Order G-47-18

British Columbia Hydro and Power Authority. F2017 to F2019 Revenue Requirements Application. Decision and Order G-47-18 Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 bcuc.com P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 British Columbia Hydro and Power Authority F2017 to F2019 Revenue Requirements Application

More information

BC Hydro writes in compliance with BCUC Order No. G to provide, as Exhibit B-3, its responses to BCUC Information Request No. 1.

BC Hydro writes in compliance with BCUC Order No. G to provide, as Exhibit B-3, its responses to BCUC Information Request No. 1. Janet Fraser Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 bchydroregulatorygroup@bchydro.com October 25, 2013 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission

More information

included in the survey is published in the Quarterly Reports and the Budget and Fiscal Plan.

included in the survey is published in the Quarterly Reports and the Budget and Fiscal Plan. Information Request No. 2.23.0(a) Dated: 5 April 2004 23.0 Reference: BC Hydro letter of March 29, 2004 indicating, among other things, that BC Hydro is prepared to call Mr. Robert Fairholm to testify

More information

Audited Financial Statements. March 31, 2007

Audited Financial Statements. March 31, 2007 Audited Financial Statements March 31, 2007 Vancouver, Canada May 23, 2007 Report of the Office of the Auditor General of British Columbia To the Members of the Board of British Columbia Transmission

More information

British Columbia Hydro and Power Authority

British Columbia Hydro and Power Authority 2017/18 SECOND QUARTER REPORT MANAGEMENT S DISCUSSION AND ANALYSIS This Management s Discussion and Analysis (MD&A) reports on British Columbia Hydro and Power Authority s (BC Hydro or the Company) consolidated

More information

PNG WEST 2013 REVENUE REQUIREMENTS EXHIBIT A-9

PNG WEST 2013 REVENUE REQUIREMENTS EXHIBIT A-9 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL FREE:

More information

BCUC INQUIRY RESPECTING SITE C A-4

BCUC INQUIRY RESPECTING SITE C A-4 Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com bcuc.com Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 P: 604.660.4700 TF: 1.800.663.1385 F: 604.660.1102 August 11, 2017 Sent

More information

building trust. driving confidence.

building trust. driving confidence. ~ building trust. driving confidence. January 29, British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, BC V6Z 2N3 Attention: Ms. Erica Hamilton, Commission Secretary and Director

More information

Ms. Laurel Ross, Acting Commission Secretary and Director

Ms. Laurel Ross, Acting Commission Secretary and Director Diane Roy Vice President, Regulatory Affairs Gas Regulatory Affairs Correspondence Email: gas.regulatory.affairs@fortisbc.com Electric Regulatory Affairs Correspondence Email: electricity.regulatory.affairs@fortisbc.com

More information

Parties are invited to make submissions on IR responses and the additional topics to be issued by the Panel. ACTION DATE (2014)

Parties are invited to make submissions on IR responses and the additional topics to be issued by the Panel. ACTION DATE (2014) ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL FREE:

More information

This is in response to your July 17, 2006 letter (attached) in which you state that

This is in response to your July 17, 2006 letter (attached) in which you state that 1 ROBERT J. PELLATT COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA E-MAIL nfnsn_hrly@yahoo.ca July 26, 2006 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. CANADA

More information

STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-100, SUB 84

STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-100, SUB 84 STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-100, SUB 84 BEFORE THE NORTH CAROLINA UTILITIES COMMISSION In the Matter of Investigation of Integrated Resource Planning in North Carolina

More information

Manitoba Hydro 2015 General Rate Application

Manitoba Hydro 2015 General Rate Application Manitoba Hydro 2015 General Rate Application OVERVIEW & REASONS FOR THE APPLICATION Darren Rainkie Vice-President, Finance & Regulatory Manitoba Hydro Why Rate Increases are Needed 2 Manitoba Hydro is

More information

April 13, Via

April 13, Via ENMAX Corporation 141 50 Avenue SE Calgary, AB T2G 4S7 Tel (403) 514-3000 enmax.com April 13, 2007 Via Email Ms. Brenda Ambrosi Vancouver, BC V7X 1V5 Dear Ms. Ambrosi: Re: Network Economy Business Practices

More information

Long Run Marginal Cost (LRMC)

Long Run Marginal Cost (LRMC) Long Run Marginal Cost (LRMC) Ryan Steele Power Supply Planning Specialist Agenda & Objectives Preliminary Discussion PART I Provide a historic overview of FBC s LRMC Highlights from BC Hydro s stated

More information

CLASS EXEMPTION FOR BC HYDRO CUSTOMERS UNDER CERTAIN LEASE ARRANGEMENTS EXHIBIT A2-1

CLASS EXEMPTION FOR BC HYDRO CUSTOMERS UNDER CERTAIN LEASE ARRANGEMENTS EXHIBIT A2-1 Laurel Ross Acting Commission Secretary Commission.Secretary@bcuc.com Website: www.bcuc.com Sixth Floor, 900 Howe Street Vancouver, BC Canada V6Z 2N3 TEL: (604) 660-4700 BC Toll Free: 1-800-663-1385 FAX:

More information

RFP APPENDIX #3 PROPOSAL LETTER

RFP APPENDIX #3 PROPOSAL LETTER RFP APPENDIX #3 PROPOSAL LETTER TO: BC Hydro 10 th Floor, 333 Dunsmuir Street Vancouver, BC V6B 5R3 Attention: RFP Administrator Full Legal Name of Proponent: Project Pursuant to the BC Hydro Bionergy

More information

FEU COMMON RATES, AMALGAMATION RATE DESIGN RECONSIDERATION PHASE 2 EXHIBIT A-4

FEU COMMON RATES, AMALGAMATION RATE DESIGN RECONSIDERATION PHASE 2 EXHIBIT A-4 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL gas.regulatory.affairs@fortisbc.com July 24, 2013 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER,

More information

BC HYDRO S RATE DESIGN APPLICATION FARM AND IRRIGATION CUSTOMER ISSUES. Presentation to the BC Cranberry Marketing Commission (BCCMC) June 15, 2015

BC HYDRO S RATE DESIGN APPLICATION FARM AND IRRIGATION CUSTOMER ISSUES. Presentation to the BC Cranberry Marketing Commission (BCCMC) June 15, 2015 BC HYDRO S RATE DESIGN APPLICATION FARM AND IRRIGATION CUSTOMER ISSUES Presentation to the BC Cranberry Marketing Commission (BCCMC) June 15, 2015 AGENDA Background on BC Hydro s 2015 Rate Design Application

More information

Revenue Requirement Application 2004/05 and 2005/06. Volume 2

Revenue Requirement Application 2004/05 and 2005/06. Volume 2 Revenue Requirement Application 2004/05 and 2005/06 Volume 2 Appendix K. BC Hydro Transfer Pricing Agreement Fiscal year 2004 TRANSFER PRICING AGREEMENT FOR ELECTRICITY AND GAS This Agreement is dated

More information

First Quarter Report FOR THE THREE MONTHS ENDED JUNE 30, 2004 A04-356

First Quarter Report FOR THE THREE MONTHS ENDED JUNE 30, 2004 A04-356 First Quarter Report FOR THE THREE MONTHS ENDED JUNE 30, 2004 A04-356 First Quarter Report CONTENTS 1. Overview................................. 3 2. Financial................................. 5 3. Performance

More information

CASE 17-M-0178 Draft Discussion Document, November 2017 Session, Publicly Released November 15, 2017 STATE OF NEW YORK PUBLIC SERVICE COMMISSION

CASE 17-M-0178 Draft Discussion Document, November 2017 Session, Publicly Released November 15, 2017 STATE OF NEW YORK PUBLIC SERVICE COMMISSION STATE OF NEW YORK PUBLIC SERVICE COMMISSION At a session of the Public Service Commission held in the City of COMMISSIONERS PRESENT: CASE 17-M-0178 - Petition of Orange and Rockland Utilities, Inc. for

More information

FEVI DEFERRAL ACCOUNT PEC EXHIBIT A2-1

FEVI DEFERRAL ACCOUNT PEC EXHIBIT A2-1 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL gas.regulatory.affairs@fortisbc.com April 4, 2013 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER,

More information

Long Run Marginal Cost (LRMC) Ryan Steele Power Supply Planning Specialist

Long Run Marginal Cost (LRMC) Ryan Steele Power Supply Planning Specialist Long Run Marginal Cost (LRMC) Ryan Steele Power Supply Planning Specialist Overview Provide a historic overview of FBC s LRMC Highlight BC Hydro s stated LRMC Discuss FBC s proposed LRMC approach Relationship

More information

VIA October 27, 2005

VIA  October 27, 2005 ROBERT J. PELLATT COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL

More information

MAR 2017 JAN 2017 DEC 2016 FEB 2017 HOEP*

MAR 2017 JAN 2017 DEC 2016 FEB 2017 HOEP* Ontario Energy Report Q3 Electricity July September Electricity Prices Commodity Commodity cost comprises of two components, the wholesale price (the Hourly Ontario Energy Price) and the Global Adjustment.

More information

Third Quarter Report. For the nine months ended December 31, 2003 A04-24

Third Quarter Report. For the nine months ended December 31, 2003 A04-24 Third Quarter Report For the nine months ended December 31, 2003 A04-24 INDEX 1. Overview......................... 3 2. Financial......................... 6 3. Performance Measures............. 26 4. Lines

More information

BC Hydro Revenue Requirements 2004/ /06. Financial Overview. Dana Hardy BC Hydro Controller

BC Hydro Revenue Requirements 2004/ /06. Financial Overview. Dana Hardy BC Hydro Controller Financial Overview Dana Hardy BC Hydro Controller Objectives To review the calculation of BC Hydro s revenue requirement To illustrate the impact of key cost drivers on BC Hydro s Revenue Requirement To

More information

BC Hydro 2008 Long Term Acquisition Plan. Request by Mr. Ludo Bertsch to represent other organizations

BC Hydro 2008 Long Term Acquisition Plan. Request by Mr. Ludo Bertsch to represent other organizations BC Hydro 2008 Long Term Acquisition Plan C23-5 Request by Mr. Ludo Bertsch to represent other organizations By: Ludo Bertsch, Horizon Technologies Inc. (250) 592-1488; ludob@horizontec.com Date: December

More information

Terasen Gas (Vancouver Island) Inc. ( TGVI ) 2010 and 2011 Revenue Requirements and Rate Design Application (the Application )

Terasen Gas (Vancouver Island) Inc. ( TGVI ) 2010 and 2011 Revenue Requirements and Rate Design Application (the Application ) Tom A. Loski Chief Regulatory Officer 16705 Fraser Highway Surrey, B.C. V4N 0E8 Tel: (604) 592-7464 Cell: (604) 250-2722 Fax: (604) 576-7074 Email: tom.loski@terasengas.com www.terasengas.com Regulatory

More information

Alberta Coalition Presentation. BCUC Workshop - August 23, BCTC Network Economy and Open Access Transmission Tariff

Alberta Coalition Presentation. BCUC Workshop - August 23, BCTC Network Economy and Open Access Transmission Tariff C8-7 Alberta Coalition Presentation BCUC Workshop - August 23, 2006 BCTC Network Economy and Open Access Transmission Tariff August 23, 2006 Alberta Coalition 1 Overview of AC Evidence August 23, 2006

More information

Alberta Electric System Operator 2017 ISO Tariff Update

Alberta Electric System Operator 2017 ISO Tariff Update Alberta Electric System Operator 2017 ISO Tariff Update Date: October 20, 2016 Prepared by: Alberta Electric System Operator Prepared for: Alberta Utilities Commission Classification: Public Table of Contents

More information

2005 Integrated Electricity Plan. Provincial IEP Committee Meeting #2 Economic Analysis February 22/23, 2005

2005 Integrated Electricity Plan. Provincial IEP Committee Meeting #2 Economic Analysis February 22/23, 2005 2005 Integrated Electricity Plan Provincial IEP Committee Meeting #2 Economic Analysis February 22/23, 2005 Presentation Overview Economic Analysis Economic vs Financial Analysis Unit Costs vs Portfolio

More information

The Himachal Pradesh Electricity Regulatory Commission Demand Side Management Regulations, 2011

The Himachal Pradesh Electricity Regulatory Commission Demand Side Management Regulations, 2011 HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION SHIMLA F.No.HPERC/437 (VI) Dated: Shimla, the 30 th September, 2011 NOTIFICATION No. HPERC/.- Whereas section 23 of the Electricity Act, 2003 provides

More information

SUBMISSION BRITISH COLUMBIA HYDRO AND POWER AUTHORITY F2017 TO F2019 REVENUE REQUIREMENTS APPLICATION

SUBMISSION BRITISH COLUMBIA HYDRO AND POWER AUTHORITY F2017 TO F2019 REVENUE REQUIREMENTS APPLICATION British Columbia Old Age Pensioners Organization, Active Support Against Poverty, Council of Senior Citizens Organizations of BC, Disability Alliance BC, Tenant Resource and Advisory Centre and Together

More information

Creative Energy Vancouver Platforms Inc. Creative NEFC Neighbourhood Energy Agreement Amendments Submission of FortisBC Energy Inc.

Creative Energy Vancouver Platforms Inc. Creative NEFC Neighbourhood Energy Agreement Amendments Submission of FortisBC Energy Inc. C5-2 April 22, 2016 File No.: 240148.00782/14797 Matthew Ghikas Direct +1 604 631 3191 Facsimile +1 604 632 3191 mghikas@fasken.com VIA EMAIL British Columbia Utilities Commission 6 th floor, 900 Howe

More information

Electricity Plan Implementation (2015) Act

Electricity Plan Implementation (2015) Act Electricity Plan Implementation (2015) Act CHAPTER 31 OF THE ACTS OF 2015 2016 Her Majesty the Queen in right of the Province of Nova Scotia Published by Authority of the Speaker of the House of Assembly

More information

1 (1) In this regulation:

1 (1) In this regulation: Copyright (c) Queen's Printer, Victoria, British Columbia, Canada IMPORTANT INFORMATION B.C. Reg. 393/2008 905/2008 Deposited December 9, 2008 Greenhouse Gas Reduction Targets Act EMISSION OFFSETS REGULATION

More information

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB VERIDIAN CONNECTIONS INC.

Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER EB VERIDIAN CONNECTIONS INC. Ontario Energy Board Commission de l énergie de l Ontario DECISION AND RATE ORDER VERIDIAN CONNECTIONS INC. Application for rates and other charges to be effective May 1, 2018 By Delegation, Before: Jane

More information

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B);

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); Ontario Energy Board Commission de l énergie de l Ontario IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c. 15, (Schedule B); AND IN THE MATTER OF an application by Wellington North Power

More information

Rocky Mountain Power Exhibit RMP (JKL-5) Docket No Witness: Jeffrey K. Larsen BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH

Rocky Mountain Power Exhibit RMP (JKL-5) Docket No Witness: Jeffrey K. Larsen BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH Exhibit RMP (JKL-5) BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER Exhibit Accompanying Direct Testimony of Jeffrey K. Larsen Proposed Schedule June 2017 Exhibit RMP (JKL-5)

More information

17 GWh Domestic 51,213 57, LT Debt incl. current 16,876 18, Equity 4,170 4, Net Reg. & Def. Balance 5,433 5,908 5,685 5,894 6,006

17 GWh Domestic 51,213 57, LT Debt incl. current 16,876 18, Equity 4,170 4, Net Reg. & Def. Balance 5,433 5,908 5,685 5,894 6,006 C5-2 BC HYDRO REVENUE REQUIREMENTS APPLICATION F2017 to F2019 INFORMATION REQUEST No. 1 RICHARD McCANDLESS October 17, 2016. 1.0 FINANCIAL SUMMARY 1.1 The table below as developed from the 2015/16 Annual

More information

July 7, 2015 File No.: /14797 BY . British Columbia Utilities Commission 6 th floor, 900 Howe Street Vancouver, BC V6Z 2N3

July 7, 2015 File No.: /14797 BY  . British Columbia Utilities Commission 6 th floor, 900 Howe Street Vancouver, BC V6Z 2N3 C7-3 July 7, 2015 File No.: 240148.00782/14797 Matthew Ghikas Direct +1 604 631 3191 Facsimile +1 604 632 3191 mghikas@fasken.com BY E-MAIL British Columbia Utilities Commission 6 th floor, 900 Howe Street

More information

FORTISBC ENERGY PROPOSAL FOR DEPRECIATION & NET SALVAGE RATE CHANGES EXHIBIT A2-3

FORTISBC ENERGY PROPOSAL FOR DEPRECIATION & NET SALVAGE RATE CHANGES EXHIBIT A2-3 Laurel Ross Acting Commission Secretary Commission.Secretary@bcuc.com Website: www.bcuc.com Sixth Floor, 00 Howe Street Vancouver, BC Canada VZ N TEL: (0) 0-00 BC Toll Free: -00-- FAX: (0) 0- Log No. VIA

More information

AGREEMENT FOR NEW TRANSMISSION SERVICE CUSTOMERS WITH AN INDIRECT INTERCONNECTION TO THE BC HYDRO SYSTEM

AGREEMENT FOR NEW TRANSMISSION SERVICE CUSTOMERS WITH AN INDIRECT INTERCONNECTION TO THE BC HYDRO SYSTEM Original of Page 1 AGREEMENT FOR NEW TRANSMISSION SERVICE CUSTOMERS WITH AN INDIRECT INTERCONNECTION TO THE BC HYDRO SYSTEM THIS FACILITIES AGREEMENT made as of the day of, 20 for. BETWEEN: BRITISH COLUMBIA

More information

HYDRO-QUÉBEC DISTRIBUTION S RESPONSE TO

HYDRO-QUÉBEC DISTRIBUTION S RESPONSE TO HYDRO-QUÉBEC DISTRIBUTION S RESPONSE TO THE RÉGIE S INFORMATION REQUEST #1 pages 13 to 41 Translation commissioned by Association québécoise des consommateurs industriels d électricité (AQCIE) and Québec

More information

September 25, General Rate Application of Newfoundland and Labrador Hydro, Requests for Information, Round #1

September 25, General Rate Application of Newfoundland and Labrador Hydro, Requests for Information, Round #1 September, 0 Senwung Luk sluk@oktlaw.com.. SENT VIA E-MAIL Cheryl Blundon Board Secretary Board of Commissioners of Public Utilities P.O. Box 00, St. John's, NL AA B Dear Ms Blundon: Re: 0 General Rate

More information

PacifiCorp Utah All Source Request for Proposal 2016 Resource. Issued January 6, 2012 Responses May 9, 2012

PacifiCorp Utah All Source Request for Proposal 2016 Resource. Issued January 6, 2012 Responses May 9, 2012 PacifiCorp Utah All Source Request for Proposal 2016 Resource Issued January 6, 2012 Responses May 9, 2012 TABLE OF CONTENTS Page SECTION 1. INTRODUCTION... 7 SECTION 2. RESOURCE ALTERNATIVES AND PROPOSAL

More information