Alternate Bids Comparison For the January 26, 2007 Bid Opening
|
|
- Adrian Lucas
- 5 years ago
- Views:
Transcription
1 Alternate Bids Comparison For the January 26, 2007 Bid Opening Call Number 101 LCCA Factor $154, J1I0926 Asphalt Alternate 11" & 12" SP125B Harrison Concrete Alternate 7" & 8 1/2" NRPCCP Route 35 Length 0.6 Grading & Alt. Pvmts. New Welcome Center Chester Bross Const. Co./C.B. Equipment Inc. pc $5,089, $5,089, % Loch Sand and Construction Co. pc $5,603, $5,603, % Ideker Inc. pc $6,377, $6,377, % Call Number 103 LCCA Factor $161, J1P0760 Asphalt Alternate 10" & 7" BP Daviess Concrete Alternate 8" & 7" NRPCCP Route 6 Length Grading, Alt. Pvmts. & 3 Br. Chester Bross Const. Co. ac $6,660, $6,822, % McAninch Corporation ac $7,049, $7,211, % Columbia Curb& Gutter Co. ac $7,120,409. $7,282, % Ideker Inc. ac $7,133,5.98 $7,295, % Emery Sapp & Sons Inc. ac $7,572, $7,734, % Call Number 201 LCCA Factor $292, J2P0748 Asphalt Alternate 11.5" SP125C Macon Concrete Alternate 8.5" NRPCCP Route 63 Length Grading, Drainage & Alternate Pavements Emery Sapp & Sons, Inc. pc $5,133, $5,133, % Chester Bross Const. Co./C.B. Equipment Inc. ac $5,598, $5,890, % APAC - Missouri, Inc. ac $6,564, $6,857, % Call Number 902 LCCA Factor $654, J9P0364 Asphalt Alternate 13" SP125C Howell Concrete Alternate 9" NRPCCP Length 8.92 Grading, Drainage & Let in Combination with J9P0364L Alternate Pavements Chester Bross Const. Co./C.B. Equipment Inc. pc $14,539, $14,539, % Progressive Contractors Inc. pc $14,658, $14,658, % Emery Sapp & Sons, Inc. pc $14,854, $14,854, % Leo Journagan Construction Co. Inc. ac $15,052, $15,706, % Illinois Valley Paving Co. pc $16,029, $16,029, % Call Number 902 LCCA Factor $547, J9P0364L Asphalt Alternate 13" SP125C Howell Concrete Alternate 9" NRPCCP Length 5.03 Grading, Drainage & Let in Combination with J9P0364 Alternate Pavements Chester Bross Const. Co./C.B. Equipment Inc. pc $9,0, $9,0, % Progressive Contractors Inc. pc $9,514, $9,514, % Emery Sapp & Sons, Inc. pc $10,091,076. $10,091, % Leo Journagan Construction Co. Inc. ac $11,136, $11,683, % Illinois Valley Paving Co. pc $11,111, $11,111, %
2 Life-Cycle Cost Adjustment Worksheet last revised March 2006 J1I0926 $41, Harrison Route 35 Call 101 This Documentation should be filed with all other Final Total Area of Paving SY in the Alternate Pavements Notebook SY Estimated Unit Price for SP125B $64.53 /Ton *Straight Line Interpolation From Published Rates $1.42 /SY $3.07 /SY Total LCCA Adjustment Factor $154,533 For Job Special Provision $154,500 Mill Surface Lift Traveled Way ,370 SY $1.42 $37,4 $20,733 AC Resurfacing Traveled Way ,525 TON $64.53 $162,957 $90,225 Miscellaneous 9.5% 20 1 Price $19, $19,038 $10,541 Mobilization 3.0% 20 1 Price $6, $6,583 $3,6 Construction added costs 9.7% 20 1 Price $21, $21,924 $12,139 Mill Surface Lift - all ,370 SY $1.42 $37,4 $14,118 AC Resurfacing (100%) - all ,525 TON $64.53 $162,957 $61,439 Miscellaneous 9.5% 33 1 Price $19, $19,038 $7,178 Mobilization 3.0% 33 1 Price $6, $6,583 $2,482 Construction added costs 9.7% 33 1 Price $21, $21,924 $8,266 Years in analysis: Total Cost: $495,897 $230,766 Equivalent Uniform Annual Cost: $9,412 Traveled Way Slab Replacements 1.5% SY $ $49,444 $23,615 Diamond Grinding of Traveled Way 25 26,370 SY $3.07 $80,956 $38,665 Miscellaneous 9.5% 25 1 Price $12, $12,388 $5,917 Mobilization 1.9% 25 1 Price $2, $2,713 $1,296 Construction added costs 9.7% 25 1 Price $14, $14,114 $6,741 Years in analysis: Total Cost: $159,614 $76,233 Equivalent Uniform Annual Cost: $3,109
3 J1P0760 $28,6.59 DAVIESS Route 6 Call 103 This Documentation should be filed with all other Final Total Area of Paving SY in the Alternate Pavements Notebook SY 0 SY Estimated Unit Price for BP-1 $46.05 /Ton Estimated Unit Price for BP-1 - Shoulders $0.00 /Ton *Straight Line Interpolation From Published Rates $1.37 /SY $2.39 /SY Total LCCA Adjustment Factor $161,919 For Job Special Provision $161,900 Mill Surface Lift Traveled Way ,058 SY $1.37 $55,009 $30,7 AC Resurfacing Traveled Way ,836 TON $46.05 $176,656 $97,810 Miscellaneous 11.7% 20 1 Price $27, $27,105 $15,007 Mobilization 4.6% 20 1 Price $11, $11,903 $6,591 Construction added costs 10.1% 20 1 Price $27, $27,338 $15,136 Mill Surface Lift - all ,058 SY $1.37 $55,009 $20,740 AC Resurfacing (minus shoulders 6' wide or more) ,836 TON $46.05 $176,656 $66,604 Resurfacing Shoulders 6' wide or more TON $0.00 $0 $0 Miscellaneous 11.7% 33 1 Price $27, $27,105 $10,219 Mobilization 4.6% 33 1 Price $11, $11,903 $4,488 Construction added costs 10.1% 33 1 Price $27, $27,338 $10,307 Years in analysis: Total Cost: $596,022 $277,359 Equivalent Uniform Annual Cost: $11,312 Traveled Way Slab Replacements 1.5% SY $ $75,108 $35,872 Diamond Grinding of Traveled Way 25 40,058 SY $2.39 $95,814 $,761 Miscellaneous 23.0% 25 1 Price $39, $39,312 $18,776 Mobilization 4.9% 25 1 Price $10, $10,301 $4,920 Construction added costs 9.6% 25 1 Price $21, $21,171 $10,112 Years in analysis: Total Cost: $241,707 $115,441 Equivalent Uniform Annual Cost: $4,708
4 J2P0748 $34, Macon Route 63 Call 201 This Documentation should be filed with all other Final Total Area of Paving SY in the Alternate Pavements Notebook SY 0 SY Estimated Unit Price for SP125 $54.69 /Ton Estimated Unit Price for BP-1 - Shoulders $0.00 /Ton *Straight Line Interpolation From Published Rates $1.36 /SY $2.52 /SY Total LCCA Adjustment Factor $292,601 For Job Special Provision $292,600 Mill Surface Lift Traveled Way ,1 SY $1.36 $80,607 $44,630 AC Resurfacing Traveled Way ,693 TON $54.69 $311,339 $172,381 Miscellaneous 11.7% 20 1 Price $, $,858 $25,390 Mobilization 4.6% 20 1 Price $20, $20,139 $11,150 Construction added costs 10.1% 20 1 Price $46, $46,252 $25,609 Mill Surface Lift - all ,1 SY $1.36 $80,607 $30,391 AC Resurfacing (minus shoulders 6' wide or more) ,693 TON $54.69 $311,339 $117,383 Resurfacing Shoulders 6' wide or more TON $0.00 $0 $0 Miscellaneous 11.7% 33 1 Price $, $,858 $17,290 Mobilization 4.6% 33 1 Price $20, $20,139 $7,593 Construction added costs 10.1% 33 1 Price $46, $46,252 $17,438 Years in analysis: Total Cost: $1,008,390 $469,255 Equivalent Uniform Annual Cost: $19,139 Traveled Way Slab Replacements 1.5% SY $ $111,471 $53,239 Diamond Grinding of Traveled Way 25 59,1 SY $2.52 $150,084 $71,681 Miscellaneous 23.0% 25 1 Price $60, $60,158 $28,732 Mobilization 4.9% 25 1 Price $15, $15,764 $7,529 Construction added costs 9.6% 25 1 Price $32, $32,398 $15,473 Years in analysis: Total Cost: $369,874 $176,654 Equivalent Uniform Annual Cost: $7,205
5 J9P0364 $36, Howell Call 902 This Documentation should be filed with all other Final Total Area of Paving SY in the Alternate Pavements Notebook SY 0 SY Estimated Unit Price for SP125 $53.66 /Ton Estimated Unit Price for BP-1 - Shoulders $0.00 /Ton *Straight Line Interpolation From Published Rates $1.41 /SY $2.42 /SY Total LCCA Adjustment Factor $654,688 For Job Special Provision $654,700 Mill Surface Lift Traveled Way ,600 SY $1.41 $177,096 $98,054 AC Resurfacing Traveled Way ,028 TON $53.66 $6,419 $357,353 Miscellaneous 11.7% 20 1 Price $96, $96,234 $53,283 Mobilization 4.6% 20 1 Price $42, $42,262 $23,400 Construction added costs 10.1% 20 1 Price $97, $97,062 $53,741 Mill Surface Lift - all ,729 SY $1.41 $247,778 $93,419 AC Resurfacing (minus shoulders 6' wide or more) ,028 TON $53.66 $6,419 $243,340 Resurfacing Shoulders 6' wide or more TON $0.00 $0 $0 Miscellaneous 11.7% 33 1 Price $104, $104,504 $39,401 Mobilization 4.6% 33 1 Price $, $,894 $17,303 Construction added costs 10.1% 33 1 Price $105, $105,403 $39,740 Years in analysis: Total Cost: $2,207,073 $1,019,033 Equivalent Uniform Annual Cost: $41,561 Traveled Way Slab Replacements 1.5% 25 1,884 SY $ $235,500 $112,476 Diamond Grinding of Traveled Way ,600 SY $2.42 $303,952 $1,169 Miscellaneous 23.0% 25 1 Price $124, $124,074 $59,258 Mobilization 4.9% 25 1 Price $32, $32,513 $15,528 Construction added costs 9.6% 25 1 Price $66, $66,820 $31,913 Years in analysis: Total Cost: $762,858 $364,3 Equivalent Uniform Annual Cost: $14,860
6 J9P0364L $40, Howell Call 902 This Documentation should be filed with all other Final Total Area of Paving SY in the Alternate Pavements Notebook. 900 SY SY Estimated Unit Price for SP125 $54.87 /Ton Estimated Unit Price for BP-1 - Shoulders $50.80 /Ton *Straight Line Interpolation From Published Rates $1.41 /SY $2.42 /SY Total LCCA Adjustment Factor $547,252 For Job Special Provision $547,300 Mill Surface Lift Traveled Way ,500 SY $1.41 $133,2 $73,775 AC Resurfacing Traveled Way ,050 TON $54.87 $496,556 $274,931 Miscellaneous 11.7% 20 1 Price $73, $73,687 $40,799 Mobilization 4.6% 20 1 Price $32,360. $32,360 $17,917 Construction added costs 10.1% 20 1 Price $74, $74,321 $41,150 Mill Surface Lift - all ,704 SY $1.41 $185,703 $70,015 AC Resurfacing (minus shoulders 6' wide or more) ,050 TON $54.87 $496,556 $187,215 Resurfacing Shoulders 6' wide or more ,701 TON $50.80 $86,418 $32,582 Miscellaneous 11.7% 33 1 Price $89, $89,935 $33,908 Mobilization 4.6% 33 1 Price $39, $39,496 $14,891 Construction added costs 10.1% 33 1 Price $90, $90,709 $34,200 Years in analysis: Total Cost: $1,798,987 $821,381 Equivalent Uniform Annual Cost: $33,500 Traveled Way Slab Replacements 1.5% 25 1,418 SY $ $177,188 $84,626 Diamond Grinding of Traveled Way 25 94,500 SY $2.42 $228,690 $109,224 Miscellaneous 23.0% 25 1 Price $93, $93,352 $44,585 Mobilization 4.9% 25 1 Price $24, $24,462 $11,683 Construction added costs 9.6% 25 1 Price $50, $50,274 $24,011 Years in analysis: Total Cost: $573,966 $274,129 Equivalent Uniform Annual Cost: $11,180
State of the Industry
Florida Department of TRANSPORTATION State of the Industry Howie Moseley State Bituminous Materials Engineer State Highway System 43,920 lane miles of roadway 8,242 interstate lane miles 33,465 arterial
More informationITEM ESTIMATED UNIT NO. DESCRIPTION QUANTITIES UNIT PRICE AMOUNT 1a COLD MILLING CLASS 3 (Approx.2") 7,386 S.Y. $ $ 1b COLD MILLING CLASS 3 (Approx 3-
ITEM ESTIMATED UNIT NO. DESCRIPTION QUANTITIES UNIT PRICE AMOUNT 1a COLD MILLING CLASS 3 (Approx.2") 7,386 S.Y. $ $ 1b COLD MILLING CLASS 3 (Approx 3-4") 3,218 S.Y. $ $ 2 ASPHALTIC CONCRETE TYPE SPR 2,619
More informationLCCA Design and Maintenance
LCCA Design and Maintenance John Cunningham Iowa Concrete Paving Association ASCE Conference November 6, 2013 www.iowaconcretepaving.org Life Cycle Cost Analysis Life cycle cost analysis (LCCA) is an economic
More informationFALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST
FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) 1 Contractor Quality Control 1 LS $50,000.00 $50,000.00 2 Mobilization 1 LS $100,000.00 $100,000.00 3 Location of Underground Utilities 1 LS $25,000.00
More informationADDENDUM No. 1 January 29, Paving Program Village of Milford
ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for
More informationADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO
ADDENDUM NO. 1 10 th STREET WEST GAP CLOSURE This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans, and contract documents
More informationMaintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION
Maintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION Funding Allocations Routine State $ 166 Million Resurfacing Federal $ 260 Million
More information19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown
19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 40,000.00 $40,000.00 $ 61,320.82 $ 61,320.82 $ 45,000.00 $ 45,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 150,000.00 $150,000.00
More informationTABULATION OF BIDS 1 L.S. $ 5, $ 5, $ 27, $ 27,000.00
TABULATION OF BIDS Jesse Viertel Memorial Airport Boonville, Missouri Bids Received: 6/12/2018 Lochner Job No.: 000011332 RECONSTRUCT RUNWAY 1836, NORTH CONNECTING TAXIWAY AND TURNAROUND REPLACE EXISTING
More informationTown Road Improvement Project Plan
Opening Comments The information to be presented is based upon the Town Road Redevelopment workbook that was created in 2015 and posted on the town website Dec 3, 2015. The approach to be discussed is
More informationin Pavement Design In Search of Better Investment Decisions Northwest Pavement Management Association 2016 Conference Jim Powell, P.E.
Life Cycle Cost Analysis in Pavement Design In Search of Better Investment Decisions Northwest Pavement Management Association 2016 Conference Jim Powell, P.E. What is it? Economic procedure That uses
More informationREVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO
REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 OF THE CITY OF SAN JACINTO December 11, 2003 REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 CITY OF SAN JACINTO Prepared for CITY OF SAN
More informationBIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.
More informationEVALUATION OF EXPENDITURES ON RURAL INTERSTATE PAVEMENTS IN KANSAS
EXECUTIVE SUMMARY EVALUATION OF EXPENDITURES ON RURAL INTERSTATE PAVEMENTS IN KANSAS by Stephen A. Cross, P.E. Associate Professor University of Kansas Lawrence, Kansas and Robert L. Parsons, P.E. Assistant
More informationLETTING : CALL : 056 COUNTIES : MILLE LACS
S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE
More informationPreliminary Budget Cost Estimate-Raft Island RIIA Roads 26952 SY Construction Items Budget Preliminary Temporary Erosion Control/Miscellaneous Work $ 18,500.00 Traffic Control $ 10,000.00 Pulverizing $
More informationLegislative Report on Life-Cycle Cost Analyses
This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Legislative Report
More informationPART A ROADWAY - BASE BID
May 10, 2016 HEB-MC-61 PART A ROADWAY - BASE BID 202(A) - UNCLASSIFIED EXCAVATION - CY 34,946.00 $ 6.00 209,676.00 $ 7.98 $ 278,869.08 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $ 22,500.00 $ 22,500.00
More informationGladwin County Road Commission 2016 Hot Mix Asphalt (HMA) Paving. Page 1 of 5
Page 1 of 5 SEALED PROPOSALS (BIDS) WILL BE RECEIVED UNTIL 9:30 A.M., EST, WEDNESDAY, March 9, 2016 Board of County Road Commissioners of the County of Gladwin, 301 South State Street, Gladwin, Michigan
More informationNew Jersey Department of Transportation DATE : 06/22/10 PAGE : TABULATION OF BIDS
PAGE : 107-1 CONTRACT TIME : 01/24/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : FS-0022(105) ROUTE 37 FROM ROUTE 70 TO GARDEN STATE PARKWAY RESURFACING CONTRACT NO. 000103080 TOWNSHIP OF
More informationCITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS
1 2 3 4 5 6 MOBILIZATION per the General Requirements, Sections 01292 and 01721 ALLOWANCE for Differing Site Condition per the General Requirements, Sections 01212 and 01253 ALLOWANCE for Participating
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 70,000.00 $70,000.00 $ 15,735.00 $ 15,735.00 $ 60,000.00 $ 60,000.00 $ 25,000.00 $ 25,000.00 $ 20,000.00 $ 20,000.00 201(A) CLEARING & GRUBBING
More informationInfluence of Recycled Asphalt Shingles (RAS) on Fatigue Properties of Asphalt Pavements. Andrew Cascione & Dr. Christopher Williams
Influence of Recycled Asphalt Shingles (RAS) on Fatigue Properties of Asphalt Pavements Andrew Cascione & Dr. Christopher Williams Introduction 8-11 million tons of asphalt shingles are placed in landfills
More informationBID TABULATION. Engineer's Estmated Opinion of Costs
Street Resurfacing Project - 2018 Rank Vendor Name Total Bid % of Low Bid % of Estimate File 2018-004 Engineer's $ 5,032,397.47 102.11% 100.00% Bid 4529 1 Ajax Paving Industries, Inc $ 4,928,322.54 100.00%
More informationSTRAIGHT STRIPE PAINTING, INC. 22b Remove Pavement Markings with Sand Blasting Per Hour 1 $ $ $ $
PAVEMENT MARKING STRAIGHT STRIPE PAINTING, AMERICAN PAVEMENT MARKING, LLC ITEM UNIT TOTAL UNIT TOTAL NUMBER DESCRIPTION UNIT QUANTITY COST AMOUNT COST AMOUNT 1 Mobilization L.S. 3 $ 400.00 $ 1,200.00 $
More informationTOWN OF ORANGE BID SPECIFICATION PACKET PAVING WORK BID #PAV2019
TOWN OF ORANGE BID SPECIFICATION PACKET PAVING WORK BID #PAV2019 NOTICE TO BIDDERS As a matter of general information, each bidder is encouraged to direct specific attention to each of the points outlined
More informationAPPLICATION & PERMIT FOR CONSTRUCTION IN PUBLIC RIGHT OF WAY. Name of Owner: Name of Applicant: Address of Applicant: City: State: Zip:
Town of Chino Valley Public Works Department 1982 Voss Dr., #201 Chino Valley, AZ 86323 Phone: 928-636-7140 Fax: 928-636-7141 APPLICATION & PERMIT FOR CONSTRUCTION IN PUBLIC RIGHT OF WAY Date: Permit #:
More informationCONTRACT TIME DETERMINATION
CONTRACT TIME DETERMINATION MISSOURI DEPARTMENT OF TRANSPORTATION March 15, 2004 DEFINITIONS Calendar Day: Any day shown on the calendar beginning and ending at midnight. Working Day: A calendar day during
More informationReviax Constracting Corp. DeSantis Construction
Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp.
More informationAddendum 1 13 TH Street Streetscape. September 1, 2017
Addendum 1 13 TH Street Streetscape September 1, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDUMS ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE
More informationFailure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.
Addendum #1 409 22nd Ave So PO Box 298 Brookings, SD 57006 Toll Free 1-855-323-6342 www.bannerassociates.com Project: Viborg Utility Improvements - 2017 Bid Date: 11:00 A.M., Local Time, March 15, 2017
More informationINVITATION TO BID. CONTRACT PERIOD: The contract shall cover the County s needs for the period of July 21, 2015 through July 20, 2015.
INVITATION TO BID The Etowah County Commission will, on June 22, 2015 in the Commission Chambers, 1st floor, 800 Forrest Avenue, Gadsden, AL, receive competitive bids on SUPERPAVE BITUMINOUS CONCRETE ASPHALT
More information2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)
2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion
More information...;..;...;.;;..;.. Additional preservation and safety needs have been identified and recommend to be programmed with funding available in FY2019.
DOT-1208 (6/09) (PROGRAM FISCAL YEAR IS OCTOBER 1 - SEPTEMBER 30) REVISION NUMBER: 19-001...;..;...;.;;..;.. J USTI FICA TION: Additional preservation and safety needs have been identified and recommend
More informationCITY OF DEERFIELD BEACH Request for City Commission Agenda
Item: CITY OF DEERFIELD BEACH Request for City Commission Agenda Agenda Date Requested: 7/10/2012 Contact Person: Charles DaBrusco, P.E., Director of Environmental Services Description: Award of contract
More informationPatchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.
Patchogue Road Culvert Crossing IFB 2015-03 ADDENDUM #1 07/13/2015 Addendum #1 addresses the questions submitted by contractors. Q1: Bid Item shows 22 LF of 60 RCP but plans show 27 LF, please clarify.
More informationPerformance Measures for Making Pavement Preservation Decisions. David Luhr Pavement Management Engineer Washington State DOT
Performance Measures for Making Pavement Preservation Decisions David Luhr Pavement Management Engineer Washington State DOT 1 Performance Measures as Tools Project Decision Support - Where, When, and
More informationCONTENTS. Sparger Springs Townhomes Durham, NC
CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE
More informationBID TABULATION PAGE 1 OF 6
BID TABULATION PAGE 1 OF 6 BID PRE-BID ESTIMATE R.G. Huston Company, Inc. Kopplin & Kinas Co., Inc. Cottage Grove, WI Green Lake, WI NO. DESCRIPTION OF WORK QUANT. UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT
More informationNE WEST KINGSTON ROAD CULVERT REPLACEMENT
NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS
More informationSECTION BID. Valley Court Force Main Replacement Contract No. BE17-029
SECTION 00300 - BID BID TO: THE CITY AND BOROUGH OF JUNEAU 1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with the OWNER in the form included in the
More informationBEST PRACTICES FOR DEVELOPING THE ENGINEER S ESTIMATE FINAL REPORT VOLUME II
BEST PRACTICES FOR DEVELOPING THE ENGINEER S ESTIMATE FINAL REPORT VOLUME II SCDOT Research Project 661 FHWA-SC-07-04 (Volume II) Greaton Sellers And Lansford C. Bell Department of Civil Engineering Clemson
More informationDORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates
DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial
More informationIncluding Maintenance & Rehabilitation Schedules
Final Report Methodology for the Development of Equivalent Structural Design Matrix for Municipal Roadways- Including Maintenance & Rehabilitation Schedules and Life Cycle Analysis Prepared for: Cement
More informationJANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,
ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT
More informationIncluding Maintenance & Rehabilitation Schedules
Final Report Methodology for the Development of Equivalent Structural Design Matrix for Municipal Roadways- Montréal and Québec City Including Maintenance & Rehabilitation Schedules and Life Cycle Analysis
More information2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationResidential Street Improvement Plan
Residential Street Improvement Plan Introduction Aging infrastructure, including streets, is a nationwide problem and it is one of the biggest challenges facing many cities and counties throughout the
More informationCertified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University
Base Bid - Parking Lot Construction Number Grading and Surfacing Items Quantity Unit C-1 Mobilization 1 LS $ 60,000.00 $ 60,000.00 $ 82,000.00 $ 82,000.00 $ 18,255.59 $ 18,255.59 C-2 Traffic Control 1
More informationPAYMENT PROVISIONS CONTRACT ADMINISTRATION MANUAL
Fund Encumbrances When a Contract has been officially approved, the funds to cover the Contract amount have been encumbered. This encumbrance is a legal process governed by State laws to ensure money has
More informationMinnesota Department of Transportation Report to Legislature on Life-Cycle Cost Analyses. January 2013
This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Minnesota Department
More informationNCDOT Legislative Report on Outsourcing Pavement Preservation. December 1, 2016
NCDOT Legislative Report on Outsourcing Pavement Preservation December 1, 2016 This report is presented to the Joint Legislative Transportation Oversight Committee (JLTOC) and Fiscal Research Division
More informationCITY OF TAMPA ADDENDUM 2. April 18, 2018
CITY OF TAMPA Bob Buckhorn, Mayor CONTRACT ADMINISTRATION DEPARTMENT Michael W. Chucran, Director ADDENDUM 2 April 18, 2018 Contract 17-C-00021; Citywide Water Meter Bidders on the above referenced project
More informationPRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer
G-7 STAFF REPORT MEETING DATE: November 27, 2018 TO: FROM: City Council Petr Skala, Associate Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213 www.novato.org PRESENTER: Christopher
More informationIncluding Maintenance & Rehabilitation Schedules
Final Report Methodology for the Development of Equivalent Structural Design Matrix for Municipal Roadways- Ontario Including Maintenance & Rehabilitation Schedules and Life Cycle Analysis Prepared for:
More informationPavement Preservation
Road Foreman Meeting West Windsor, Vermont March 24, 2015 Dan Patenaude, P.E. Hometown: Chester, VT Pavement Preservation Your Key to Pavement Management Success Since 1957 Corporate Headquarters Braintree,
More informationMaster Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.
, Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 250,000.00 $250,000.00 $ 240,978.56 $ 240,978.56 260,000.00 $ 260,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 30,000.00 $30,000.00 $ 17,188.20
More informationThe deadline for submitting bids under this RFP is Monday, March 26, 2017 at 2:00pm.
The City of Clinton is soliciting bids for resurfacing city (Powell Bill) streets, cemetery streets, as well as parking and service roads at the Police Department and the Water and Wastewater Treatment
More informationAVERAGE OF BID ITEMS ENGINEERS ESTIMATE
ROADWAY 1 Mobilization 1 LS $ 990,048.50 $ 80,000.00 $ 880,000.00 $ 880,000.00 $ 950,000.00 $ 950,000.00 $ 967,510.00 $ 967,510.00 $ 1,162,684.00 $ 1,162,684.00 2 Maintenance of Traffic ( incl. Pedestrian
More informationREQUEST FOR BIDS MILLING AND RESURFACING CITY OF SANDERSVILLE
REQUEST FOR BIDS MILLING AND RESURFACING CITY OF SANDERSVILLE Scope The City of Sandersville (City) is seeking a Contractor to provide asphalt milling and resurfacing services. The City has identified
More informationCANTON COMMUNITY REQUEST FOR BOARD ACTION
CANTON COMMUNITY REQUEST FOR BOARD ACTION MEETING DATE: March 22, 2016 AGENDA ITEM #G-10 ITEM: Consider Approval of a Budget Amendment & Award of a Contract Asphalt Repairs to Hutch Paving, Inc. the Wayne
More informationMEANDER WAY RECONSTRUCTION
Contract No. E14-091 File No. 1784 ENGINEERING DEPARTMENT SECTION 00005 - TABLE OF CONTENTS DIVISION 0 - BIDDING AND CONTRACT REQUIREMENTS, CONTRACT FORMS, AND CONDITIONS OF THE CONTRACT BIDDING and CONTRACT
More informationAWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET
STAFF REPORT MEETING DATE: June 9, 2015 TO: City Council FROM: Petr Skala, Engineer II PRESENTER: Russ Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 (415) 899-8900 FAX (415) 899-8213
More informationMainelli Wagner & Associates, Inc.
www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 February 25, 2019 To Whom It May Concern: The Platte County
More informationCity of Newnan, Georgia
City of Newnan, Georgia Invitation to Bid Mill & Resurfacing of Various Streets- 2017 Issue Date: May 25, 2017 Issued By: Inquiries: Proposals Due: Bid Opening: City of Newnan Public Works Department 25
More informationDRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by:
DRAFT FOR BOARD REVIEW FULL RESERVE STUDY SPARGER SPRINGS TOWNHOMES DURHAM, NC Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION DURHAM, NC & ALLENTON MANAGEMENT Prepared by: CRITERIUM GILES ENGINEERS
More informationTown of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562
Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated
More informationOPTION A: 2 BITUMINOUS PAVING WITH SHOULDERS OPTION B: SCRATCH COURSE BITUMINOUS PAVING WITHOUT SHOULDERS
SHIAWASSEE COUNTY ROAD COMMISSION PROPOSAL FOR 2018 BITUMINOUS PAVING PROGRAM JUDDVILLE ROAD FROM CLINTON COUNTY LINE (MERIDIAN ROAD) TO GENESSEE COUNTY LINE (M-13) IN SHIAWASSEE COUNTY + / - 22.34 MILES
More informationCITY OF PALM DESERT PUBLIC WORKS DEPARTMENT
BEFORE YOU CAN PERFORM ANY CONSTRUCTION OR MAINTENANCE WORK IN THE PUBLIC RIGHT-OF-WAY, YOU MUST HAVE A VALID ENCROACHMENT PERMIT ISSUED BY THIS DEPARTMENT This work includes but is not limited to driveway
More informationAppendix B Example Project Designs and Engineers Opinion of Costs
Appendix B Example Project Designs and Engineers Opinion of Costs 32 nd Street from E. 2 nd to Main Avenue CR 251 and CR 250 9 th Street Sidewalk Improvements 15 th Street Improvements Intermodal Facility
More informationBid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221
Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00
More informationWednesday, June 6, 2018
Wednesday, June 6, 2018 Excellence in Program Administration Award 2018 AASHTO Civil Rights Training Symposium Excellence in Program Administration Award Joanna McFadden EEO/DBE Section Head APRIL 2017-2018
More informationRegular. NECESSARY RESOURCES/IMPACTS (OTHER) n/a. Fiscal Impact
CITY COUNCIL AGENDA Meeting Date: 09/16/2013 TITLE: Hatley Way Sidewalk Improvements 2013 Bid Award Responsible Staff: Ron Crumley Backup Material: Backup material attached Digital Presentation: Yes Other
More informationNON-MOTORIZED FACILITIES
NON-MOTORIZED FACILITIES POLICY The Board of Road Commissioners of the County of Kalamazoo non-motorized policy provides a guideline for the development of non-motorized facilities in the public right-of-way.
More informationPENNSYLVANIA TURNPIKE COMMISSION HIGHSPIRE, PENNSYLVANIA FORMAL TELEPHONE MEETING JUNE 5, :00 A.M.
PENNSYLVANIA TURNPIKE COMMISSION HIGHSPIRE, PENNSYLVANIA FORMAL TELEPHONE MEETING JUNE 5, 2012 10:00 A.M. A G E N D A A. Roll Call Sunshine Announcement Public Participation B. Minutes-May 15, 2012 C.
More informationInvitation No. BCPWD 17/18-03 Bid Opening Date & Time February 15, 2018 AT 2:00 P.M
INVITATION TO BID BOONE COUNTY FISCAL COURT OFFICE OF THE ASSISTANT COUNTY ADMINISTRATOR 2950 WASHINGTON STREET P.O. BOX 900 BURLINGTON, KENTUCKY 41005 Invitation No. BCPWD 17/18-03 Bid Opening Date &
More informationTOWN OF CLOVER REQUEST FOR PROPOSALS HAMPTON STREET ROAD REPAIR
TOWN OF CLOVER REQUEST FOR PROPOSALS HAMPTON STREET ROAD REPAIR I. INTRODUCTION The, South Carolina, is requesting bids to furnish labor, material, supervision and equipment to perform a street/gutter
More informationFinal Estimates Level 2
Florida Department of TRANSPORTATION Final Estimates Level 2 11/1/2017 FDOT Final Estimates Level 2 Release 11, Module 4 1 4-1 Module Content Adjustments in SiteManager Line Item Adjustments Contract Adjustments
More informationBID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012
Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00
More informationTOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number:
TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number: APPLICATION DATE: ADDRESS OF WORK OR ENCROACHMENT: CROSS STREET: STARTING DATE: APN: - - No. Street City/Township ESTIMATED COST: $ COMPLETION
More informationGLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.
Glossary GLOSSARY Advanced Construction (AC): Authorization of Advanced Construction (AC) is a procedure that allows the State to designate a project as eligible for future federal funds while proceeding
More informationMONTE SERENO BETTER STREETS COMMISSION AGENDA 7:00 P.M. Thursday March 8, 2018 Regular Meeting
MONTE SERENO BETTER STREETS COMMISSION AGENDA 7:00 P.M. Thursday March 8, 2018 Regular Meeting Monte Sereno City Council Chambers 18041 Saratoga-Los Gatos Road, Monte Sereno, CA 95030 MEETING CALLED TO
More informationSOLANO COMMUNITY COLLEGE DISTRICT GOVERNING BOARD AGENDA ITEM
AGENDA ITEM MEETING DATE January 17, 2018 GOVERNING BOARD AGENDA ITEM TO: SUBJECT: Members of the Governing Board CONTRACT AWARD TO HM CONSTRUCTION, INC. FOR CONSTRUCTION SERVICES FOR THE PAVEMENT REHABILITATION
More informationGeneral Fund FY2016 Final Budget
General Fund FY RESERVES & CARRY FORWARD Reserves 27,000 Carry Forward 75,000 Carry Forward (T-Pier Park) 10,000 REVENUES 112,000 Ad Valorem Taxes (5.024 Mills) 942,500 Insurance Premium Tax (Excise) 41,000
More informationLADOTD COST ESTIMATING PROCESS. Charles Nickel, P.E. Value Engineering & Cost Estimate Director Office: (225)
LADOTD COST ESTIMATING PROCESS Charles Nickel, P.E. Value Engineering & Cost Estimate Director Office: (225) 379-1078 E-mail: Charles.Nickel@la.gov Project Management Body of Knowledge (PMBOK) Cost Management
More informationSolicitation/Proposal/Award (Construction) PROPOSAL
SOLICITATION: PL-K-REC-09-001-17-011, Amendment #03. Solicitation/Proposal/Award (Construction) PROPOSAL Offerors shall enter in the space below a Total Lump Sum Cost Proposal. A. Total Lump Sum Cost Proposal:
More informationAsset Management Plan
2016 Asset Management Plan United Counties of Prescott and Russell 6/1/2016 Preface This Asset Management Plan is intended to describe the infrastructure owned, operated, and maintained by the United Counties
More informationFees: An application fee of one hundred dollars ($100) shall be included with the application submission.
Town of Conway, NH Construction/Driveway Permit Adopted by the Board of Selectmen, November 26, 1996 Applicability: In accordance with NH RSA Chapter 236 and the legislative authority cited in 131-1, 131-67.C.8.(j),
More informationLETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY
LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY January 5, 205 2 Partially Completed Single Family Lots (65' x 5' typical) 46 Completed Townhome Pads (22' x 50' typical) Sale. This letter of intent outlines
More informationPROPOSAL AND SPECIFICATIONS FOR COUNTY PRIMARY HOT MIX ASPHALT PAVING #2
NAME OF CONTRACTOR: PROPOSAL AND SPECIFICATIONS FOR COUNTY PRIMARY HOT MIX ASPHALT PAVING #2 APRIL 18, 2018 1. PH 3546 WAYLAND TOWNSHIP On 10 th Street, M-179 (129 th Avenue) to the Wayland City Limits
More informationDepartment of Public Works Engineering
Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan
More informationReserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado
Reserve Study Project No. 09069 Prepared for 1771 Norwood Lane Fort Collins, Colorado Prepared by Bornengineering 1130 West 124 th Avenue, Suite 100 Westminster, Colorado 80234 January 28, 2010 1130 WEST
More informationEST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS
BID TAB PROJECT: City of Steamboat Springs / Emerald Park Access & Railroad Crossing Phase I (2017) JOB NO: 1340-067 DATE: 6/15/2017 Oldcastle SW Group, Inc. dba Engineer's Estimate United Companies Native
More informationNorthumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate
Date: Nov 12, 2012 Page: A - 1 CPR Bridge Rehabilitation - Construction Phase I Rehabilitation of C.P. Bridge L.S. $ 1,400,000.00 $ 1,400,000.00 SUBTOTAL $ 1,400,000.00 Engineering and Contingency (25%)
More informationBID TABULATION 32-04MAY06-Asphalt Overlay & Roadway Drainage Improvements
BID TABULATION 32-04MAY06-Asphalt Overlay & Roadway Drainage Improvements BETHEL CHURCH ROAD BID Description Unit Qty Unit Price Extended Total Unit Price Extended Total Mobilization LS 1 $ 2,500.00 $
More informationNew Jersey Department of Transportation DATE : 11/16/10 PAGE : TABULATION OF BIDS
PAGE : 131-1 CONTRACT TIME : 11/30/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : STP-5042(107) ROUTE 129 RESURFACING FROM ROUTE 1 TO LAMBERTON ROAD CONNECTOR CITY OF TRENTON, TOWNSHIP OF
More informationPROPOSAL BITUMINOUS ASPHALT CONCRETE NON-CAPITAL PROJECTS PAVING
Gary Hammond, P.E. Commissioner of Public Works Tioga County Department of Public Works 477 Route 96 Owego, New York 13827 (607) 687-0302 Fax (607) 687-4453 Richard Perkins, P.E. Deputy Commissioner of
More informationHUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO
RESERVE FUND STUDY HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com AUGUST 2016 CONTENTS 1.0 INTRODUCTION...
More information