1 Approved Minutes - Wasatch Towers Special Owners Meeting Leak Investigation and Remediation November 8, 2017 Attending Board Members: Don Warmbier. Lisa Hansen, Jason Butler, John Veranth. Treo Representative: Steve Tesar HOA Counsel: Mike Miller CRSA Architects: Chris Huntsman, Steve Connell, Dave Scott Owners: Sally Assenberg, Dick Keller, Carl and Laura Warren, Clara Pugley, Gena Edvalson, Mary Carole Harrison, Yoshimi Minoshima, Mike Bailey, Tony Bailey by phone. Counsel for Baileys: Kerry Owens. Contractor for Baileys: Bruce Blaine Powerpoint Presentation The slides are submitted as a separate file. Tour of 802 Attendees were invited to walk through Apartment 802. There were multiple discussions of specific locations. The architects noted the rust in the area of the hallway leak indicating chronic wetness. Veranth answered questions about the patio drain pipes in the ceiling. Discussions Don Warmbier had individuals introduce themselves then turned the meeting over to John Veranth. Mike Miller made introductory remarks about his role and the ground rules for the meeting. Mike also discussed the plan to have a mediator allocate costs based on the provisions in the CC&Rs and a factual determination of who owns the specific building components being worked on. John summarized the remediation plan and how the project team is being organized. Questions from the floor were answered. Meeting Handouts (appended) Leak Investigation and Remediation Plan October 18, 2017 Answers to written questions submitted in advance Submitted John Veranth Acting Secretary.

2 Leak Investigation and Remediation Plan Wasatch Towers October 18, 2017 Overview The Board is committed to addressing water intrusion problems and other deferred maintenance issues in a manner that protects the property values for all owners. As a volunteer Board, we will retain qualified professionals to provide us with data, recommendations, architectural designs and specifications, and similar services. We will hire licensed and insured remediation and construction contractors to perform physical work in a timely and economical manner. This document describes the overall approach, and is based on information at the time of writing. It will be revised as further information becomes available. Quoting from the work plan by E2 on June 8: Please note that there is no way to guarantee we will find every leak origin. Also, winter conditions like ice dams can cause leaks even when there are no construction flaws in a building. Ultimately, in order to be most effective, there should be a process of elimination regarding repairs. Meaning; after repairs are made to the most likely origin of leaking, we may want to hold off on additional repairs to see how much of the leaking that origin repair solved. This will be most cost effective and confirm for us which leak origins were the worst, but will require time and patience from the homeowners and the Board. Leak Investigation At the recommendation of Treo, our property manager, the HOA hired Breck Dunham, E2 Solutions, to locate the sources of water intrusions. Their initial scope of work included: 1. The patio floor drains on levels 9 & The kick out between levels 9 & The stucco kick out above level 8's windows 4. Inspect the condition of the exterior walls and window fins 5. Interior drain leaks from levels 9 & 10, which may require removal of some sheetrock 6. Inspect the condition of the patios, roof, gutters and downspouts E2 also recommended having a commercial window contractor, a drain line inspection specialist, and a commercial roofing contractor to supplement their work. E2 presented their initial report at a working meeting on September 25. Leaks from the 9th floor patios and the patio drains were discussed. Copies of the reports have been distributed. A roofing contractor ACW Construction has inspected the roof. Planned Actions Continued investigation to include the north wall and other building areas has been authorized. Drain lines will be scoped. Immediate Damage Control Situations that are causing ongoing damage will be remediated as soon as possible after discovery. In many cases this will involve temporary repairs until the full scope of corrective action is determined. ACW Construction did temporary winter repairs to the roof using a liquid rubber coating.

3 The drain pipe leak above the 802 Hallway was repaired by K. Darby plumbing on 8/23. Planned Actions ACW Construction will do a test repair of the leak in the 9th floor SW patio. Redirecting the block underground patio drains to exterior discharge has been authorized. Further temporary and damage control repairs will be performed as situations are discovered. Professional Consultation Wasatch Towers will retain qualified professionals to provide data, recommendations, architectural designs and specifications, and similar services. Wasatch Towers will hire licensed and insured remediation and construction contractors to perform physical work in a timely and economical manner. The Board is in the process of interviewing architects with experience in repair of high rise residences. We are inviting contractors to provide recommendations on patio repair alternatives. Planned Actions See below. Remediation Design Permanent repairs to the roof, the outdoor patios, and the patio drains constitute major remodeling of the building, and the architectural control rules in the CC&Rs apply. A design for the permanent repairs will be prepared by an architect in consultation with other professionals such as a structural engineer or others as needed. The design will be reviewed and approved as described below before issuing any contracts. Not started. Allocation of Costs The allocation of costs between the HOA, the affected unit owners, and any insurance settlement will be conducted by an independent third-party to avoid conflict of interest. The allocation will be based on the obligations to maintain common areas, limited common areas, and private areas as defined in the Utah Condominium Ownership Act and the Wasatch Towers CC&Rs. Mediation is authorized by the dispute resolution provisions in the CC&Rs. The Board is in the process of determining who would be a suitable professional individual or team. This will likely be a combination of the HOA s legal counsel to interpret the HOA s CC&Rs and architectural rules, and other applicable statutes; and an architect or contractor to interpret drawings and specifications. Review and Signoff The Board and all owners of units with water intrusion damage or where physical work will take place will need to sign off on the architect s design package before conducting permanent repairs. This should take place after contractor bids have been obtained to establish firm costs.

4 Permanent Repairs Planned Actions Roof Replacement or recovering planned for Spring 2018 Patio surfaces Options for repair of the membrane below the tile are being evaluated. Storm water drains Replacement of the leaking drain pipes has been recommended. Drains improperly connected to the sanitary sewer will be rerouted to storm drain. The blocked drain below the pavement will be diverted to surface discharge. Curtain wall Repair plans are on hold pending detailed investigation of north wall, 9th floor protrusions, and other exterior shell. Spares are available to repair known missing tiles. Roof flashing repairs are needed in some locations. Other plumbing Further repair plans are on hold pending detailed investigation of area beyond the known leaks into 802. Windows Windows and window frame caulking are the responsibility of individual owners. It will be most economical to do any needed repairs as part of the curtain wall work since rigging for access will be needed for both tasks. Testing of Repairs Repaired areas will be tested for water tightness using the same approach as the initial E2 investigation. Corrective action will be taken if additional leaks are found. Interior Restoration Owners have the option of doing remodeling work at any time subject to the architectural control requirements in the CC&Rs and HOA rules. Commercial snap-in panels are available to close openings made for inspection and repair access and are recommended for both appearance and air flow control. Drywall and wood work repairs made prior to successful testing of the permanent repairs may be subject to further damage. Cost of interior restoration will be allocated by the independent third-party based on CC&Rs and applicable laws. The HOA has agreed to pay for costs associated with the leak investigation.

5 Replies to questions sent by K. Owens to M. Miller on Nov 7, 2017 LIST OF QUESTIONS FOR WASATCH TOWERS HOA BOARD Pursuant to the request of the Wasatch Towers HOA, the Baileys submit the questions set forth below in advance of the meeting at 4pm MDT, on Wednesday, November 8, The Baileys reserve any and all rights, damages, remedies and/or claims and nothing in this document is intended as a waiver of any such rights, damages, remedies and/or claims. Furthermore, by providing questions, the Baileys want to make it clear that nothing herein prevents them or their representatives from asking additional questions during or after the meeting. The questions set forth below in no way represent the entire body of questions that the Baileys have for Wasatch Towers HOA regarding the subject matter of the meeting. 1. Does the Board believe that it has now identified all the potential causes of leaks that could impact the 8th floor condominiums? A. Inspection for leaks is a phased process as stated by E2 in their proposal. The leaks from the 10th floor shower, the 9th floor bathroom, and the patios have been identified. As of Nov 7 we have not received a report on the second phase of leak investigation which includes areas such as the 9th floor bump-outs and the north wall. 2. Please list the specific causes of the leaks and tell us which condominiums are impacted by each cause. A. Apartment 802 has been impacted by the defective shower valve in 1001, the cracked drain line from 901, and from the patio membrane and drain pipe leaks. There is also evidence of window leaks into What other potential causes have you looked at and ruled out? A. Roof leaks have been temporarily patched and permanent roof repairs are planned for At this time we have no evidence of leaks from the water supply or from the heating and cooling water lines. Investigation is continuing.

6 4. Is there any additional investigation that the Board intends to do to determine potential causes of leaks? If so, be specific. A. We provided the list of nine Phase II items given to E2. 5. What specifically, in as much detail as is possible, step by step, is the Board s plan for repairing the causes of the leaks? A. We provided the 3-page Leak Investigation and Remediation Plan dated October 18, a. What is the timetable for repairing the potential leaks? We deserve to know the specific deadlines for each step. A. Work is ongoing. b. How is the Board going to make sure that the workers are licensed, have permits, have appropriate insurance and are safe? A. We will use our authority under Section 9 of the CC&Rs. The architect, CRSA, will provide construction administration and observation and will assist the board. c. What steps does the Board intend to take between now and when the causes of the leaks will be repaired to ensure that the condominiums on the 8th floor are not further impacted? For example, are you going to require tenting or winterizing of 9th and 10th floor balconies, etc.? A. This suggestion will be considered. 6. How does the Board intend to allocate the cost of repair of the causes of the leaks? A. As stated in the Leak Investigation and Remediation Plan costs will be allocated by a neutral mediator applying the provisions in the Utah Condo Act and the Wasatch Towers CC&Rs. Briefly, leaks from private areas are

7 the responsibility of the owner, leaks from common areas are the responsibility of the HOA. 7. Does the Board have an estimate of the costs of repairing the causes of the leaks? If so, what is it and who estimated the amount? A. No cost estimate at this time. The architect and general contractor will assist as each remediation phase is defined. 8. What is the Board s plan for paying for or repairing damage to Unit 802 that was caused by the testing and inspection done by E2 Solutions or any of its subcontractors? A. As indicated above, costs will be allocated by a mediator. The HOA previously agreed we would pay for the leak investigation including repairing areas opened to look for leaks. a. Does the Board have an estimate of the cost of those repairs? If so, what is it and who estimated the amount? A. No estimate has been repaired.

8 9. What claims has the HOA made against any insurance company regarding any water damage to Unit 802 and the building common areas and facilities? A. An insurance claim was made for the August 17, 2016 leak per the adjuster s report. Funds have been distributed to 1001, 901, and 802. No claim was made for the November nd leak from the 10th floor shower, but $15,000 was paid to the owners of 802 from HOA funds. 10. Do you intend to make additional claims against the insurance companies? A. Claims will be filed only if the future incident is covered by insurance and exceeds the revised deductible by a substantial amount. 11. Has the Board considered requiring the owner of Unit 901 to pursue legal action against the contractors who worked on or constructed the offending areas of Unit 901? A. This is not a board decision. Note that there has been extensive litigation regarding past remodeling of Apartment Has the Board considered requiring the owner of Unit 1001 to pursue legal action against the contractors who worked on or constructed the offending areas of Unit 1001? A. That is not a board decision. 13. Does the Board intend to fully replace the piping between the 9th and 8th floors? A. This will be determined by the architect. The recommendation from E2 was to replace the entire drain system serving the 9th and 10th floor patios. Other drain pipes are on the list of items to be scope inspected and their condition will be assessed. Domestic hot and cold water supply lines in the space between the 8th and 9th floors are the responsibility of the owners of 801 and 802 respectively.

9 14. If the piping between the 9th and 8th floors is merely repaired, how does the Board intend to prevent future leaks? A. The board will rely on our consultants and contractors to provide a professional opinion whether specific items need replacement.

10 Tony Bailey list Sent Nov 7 received Nov 8 1. When does the board expect to start work to repair the leaks? Work is ongoing. The 10th floor shower has been The pipe causing the hallway leak has been repaired. K. Darby has been hired to fix the blocked drain at grade level. We have hired CRSA as our architect to prepare a design and specifications for the permanent repairs. We are in the process of hiring a general contractor. 2. When does the board expect the work to be completed? Not known at this time. We are proceeding in an orderly manner. 3. Who will be making the repairs? Qualified, licensed, and insured contractors hired by the HOA and approved by the affected owners. 4. Has the repair work been engineered correctly? We have hired an architectural firm with experience in high rise buildings. They will hire specialty consultants such as structural engineers. 5. What are the priorities for repairs to ensure that unit 802 is useable as quickly as possible? The priority is to repair the patio leaks identified in the September 2017 report by E2. 6. How much will the dues be raised to pay for the repairs? Not determined at this time. 7. How does the Board intend to pay for repairs if/when unit owners fail to make their monthly assessments? A. We will follow the collection provisions in the CC&Rs. 8. Has the Board borrowed or does the Board intend to borrow from unit owner(s) to pay for ongoing expenses or repairs? If so, has the

11 Board paid the unit owner(s) back? A. No money has been borrowed to pay for leak repairs. This option remains open. 9. Has the Board looked into going after the contractors that renovated Unit 901 or Unit 1001 to recoup repair costs? A. See answer above. 10. We would like the Board to allow the Baileys contractor the right to inspect the work outside of Unit 802. Will the Board approve? A. This is a reasonable request, but approval would need to come from the affected owners. The board is encouraging all owners to be cooperative during the leak investigation and remediation efforts. The board reserves the rights they have under the CC&Rs to make decisions about building maintenance and repair. 11. Will the Board require that a licensed and bonded contractor, electrician, and plumber be on site when that kind of work is underway? A. Licensed contractors are required by state law and SLC building permits. 12. Will the Board require proof of insurance from all contractors A. Yes. 13. Will the Board require a security deposit to ensure contractors repair damage to walls, floor, elevator or other common areas? A. We will follow the provisions in Section 9 of the CC&Rs and the remodeling rules passed by the board. 14. Will the Board ensure the rules for oversight of renovation, repair and other work apply to everyone? A. That is our intent.

Forest Rim Condominium Owners Association Board of Directors Meeting Report

Forest Rim Condominium Owners Association Board of Directors Meeting Report Forest Rim Condominium Owners Association Board of Directors Meeting Report Date/Time: 5 September 2017/1:00 PM Place: Forest Rim Condominium, Unit L2 Attendance: Present: Frank Turner Rob Lowd Mike Conlan

More information

Hurricanes and Beyond. Minimizing Your Disasters. by Kathy Danforth

Hurricanes and Beyond. Minimizing Your Disasters. by Kathy Danforth Images courtesy of www.nnvl.noaa.gov Hurricanes and Beyond Minimizing Your Disasters by Kathy Danforth In large part, wind and water are beyond the control of individuals, associations, and the government.

More information

Council in Attendance: Dennis Diamond - President Mike Reid - Vice President Rita Lum - Treasurer Daniel Fiss - Secretary Rod Hayley Ernie Ng

Council in Attendance: Dennis Diamond - President Mike Reid - Vice President Rita Lum - Treasurer Daniel Fiss - Secretary Rod Hayley Ernie Ng MINUTES OF THE COUNCIL MEETING FOR STRATA PLAN LMS 1872 PARIS PLACE, HELD ON MONDAY, MARCH 10, 2014 AT 6:30 PM IN THE 3 RD FLOOR MEETING ROOM, 183 KEEFER PLACE, VANCOUVER, BC Council in Attendance: Dennis

More information

All about. water damage. insurance and 12/2017

All about. water damage. insurance and 12/2017 12/2017 All about insurance and water damage Water damage: Tops the list of home insurance claims Water damage now accounts for nearly half of the amounts paid for home insurance claims in Quebec, well

More information

EXHIBIT B. Filed 8/10/2015 6:09:57 PM Esther Degollado District Clerk Webb District <<Name>> 2015CV D5

EXHIBIT B. Filed 8/10/2015 6:09:57 PM Esther Degollado District Clerk Webb District <<Name>> 2015CV D5 EXHIBIT B Filed 8/10/2015 6:09:57 PM Esther Degollado District Clerk Webb District 2015CV2002272D5 MASTER DISCOVERY TO PLAINTIFF(S) IN COMMERCIAL CASES Definitions 1. You or Your means the Plaintiff

More information

ARRRGGGGHH! There s a leak in my unit. Now what?

ARRRGGGGHH! There s a leak in my unit. Now what? ARRRGGGGHH! There s a leak in my unit. Now what? Presented by: Veronica P. Franco Clark Wilson LLP Tony Esposito BFL Canada Insurance Services Inc. Gaelan Porter FirstService Residential Moderator: Jamie

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE 0807 3502 SOUTH FIRST STREET CHAMPAIGN, ILLINOIS SYSTEM CONDITION INDEX.771 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 347,400 LABORATORY BUILDING GROSS SQUARE FEET 16,986

More information

Emerald Green Newsletter

Emerald Green Newsletter Emerald Green Newsletter e m e r a l d g r e e n i n f o. o r g J u n e / J u l y 2 0 1 7 Recreation Board News MEETING Please join us at the next Rec Board meeting to be held on Tuesday, August 15, 2017

More information

455 Vallejo Street Homeowners Association Board of Directors Meeting August 25, 2010

455 Vallejo Street Homeowners Association Board of Directors Meeting August 25, 2010 455 Vallejo Street Homeowners Association Board of Directors Meeting August 25, 2010 Board Members Present Nate Baca, Darrin Swan, and Bert Welti Community Association Manager Lisa Crikos also present.

More information

Home Buyer Pre Lending Package

Home Buyer Pre Lending Package Home Buyer Pre Lending Package Congratulations on the decision to buy a new home! The most important step in the home buying process is first obtaining a Mortgage Pre-Approval, and to understand the home

More information

REPLACEMENT RESERVE GUIDE

REPLACEMENT RESERVE GUIDE CANADA MORTGAGE AND HOUSING CORPORATION REPLACEMENT RESERVE GUIDE What is the Replacement Reserve? The replacement reserve is a fund kept by each housing sponsor under the terms of its operating agreement

More information

What did they tell me?

What did they tell me? LBS Insurance Commission Oct 25, 2018 What did they tell me? Handouts from the October 25, 2018 Insurance Town Hall C R. Reynolds 1 High Level Recap of Changes for 2018-19 Deductible $5,000 -> $25,000

More information

Meeting Minutes Present: Mardy Stevens, Shay Jarvis, Mike Pehrson, Kerry Ann O Halloran, Gerry Barra

Meeting Minutes Present: Mardy Stevens, Shay Jarvis, Mike Pehrson, Kerry Ann O Halloran, Gerry Barra Oneonta Townhomes Homeowner s Association Board of Directors Meeting Wednesday January 20, 2016 10:00 11:00 AM @ KMO Office 15 NE 3 rd Street Gresham Meeting Minutes Present: Mardy Stevens, Shay Jarvis,

More information

The Courtyards of West Hollywood Redecorating & Remodeling Agreement

The Courtyards of West Hollywood Redecorating & Remodeling Agreement The Courtyards of West Hollywood Redecorating & Remodeling Agreement The undersigned, as owner of Unit # ( Unit ), wishes to remodel/redecorate and/or make improvements or alterations to his or her Unit

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample HOA 2663 S Oakland St Los Angeles, CA Level I Study with Site Inspection Fiscal Year End: 11/30/2016 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

Insurance Claims Process

Insurance Claims Process Insurance Claims Process 1) File a claim with your insurance company. You can file a claim with your insurance company by calling your carrier s claim department. Often you can file your claim online by

More information

CONTRACTORS QUESTIONNAIRE

CONTRACTORS QUESTIONNAIRE www.hullandco.com CONTRACTORS QUESTIONNAIRE ALL QUESTIONS MUST BE ANSWERED (Attach additional paper if necessary) 1. Applicant: A. Years in business under current name: B. Describe your operations: C.

More information

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION Full Reserve Study With On-site Visual Inspection October 3, 2018 Reserve Study for Fiscal Year: 01/01/2019 through 12/31/2019 2059 Camden Ave. Suite 151

More information

REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES FOR DOUGLAS CITY HALL RENOVATIONS DOUGLAS, WYOMING

REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES FOR DOUGLAS CITY HALL RENOVATIONS DOUGLAS, WYOMING REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES FOR DOUGLAS CITY HALL RENOVATIONS DOUGLAS, WYOMING Request for Qualifications (RFQ) due: 3:00pm local time, August 17, 2018 Page 1 of 8 Section One Introduction

More information

THE CLARIDGE OF POMPANO CONDOMINIUM, INC. ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION PART A - COMPLETED BY OWNER

THE CLARIDGE OF POMPANO CONDOMINIUM, INC. ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION PART A - COMPLETED BY OWNER THE CLARIDGE OF POMPANO CONDOMINIUM, INC. ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION PART A - COMPLETED BY OWNER I, of UNIT # request approval by the Architectural Review Committee for the

More information

COLORADO CONTRACTORS QUESTIONNAIRE

COLORADO CONTRACTORS QUESTIONNAIRE COLORADO CONTRACTORS QUESTIONNAIRE ALL QUESTIONS MUST BE ANSWERED (Attach additional paper if necessary) 1. Applicant: A. Years in business under current name: B. Describe your operations: C. Do you currently

More information

Cottonwoods at Vine. Reserve Study. October 2012

Cottonwoods at Vine. Reserve Study. October 2012 Reserve Study October 2012 Tab Table of Contents Reserve Study Analysis Executive Summary... Remaining Useful Life Analysis... Reserve Study Schedule... Annual Expenditures... Funding Plan Summary... Percentage

More information

RESERVE STUDY SPECIALISTS

RESERVE STUDY SPECIALISTS RESERVE STUDY SPECIALISTS P.O. BOX 9178, CALABASAS, CA 91372 TEL: 818-992-1312 FAX: 818-992-1338 VILLAGE GREEN EAST HOMEOWNERS ASSOCIATION FULL RESERVE STUDY September 06, 2017 for Fiscal Year 2018 RESERVE

More information

Maintenance, Repair and Replacement Responsibility Policy Suggested Contractors List June 2014

Maintenance, Repair and Replacement Responsibility Policy Suggested Contractors List June 2014 Maintenance, Repair and Replacement Responsibility Policy Suggested Contractors List June 2014 The following list is provided for homeowners use when a contractor is needed for homeowner projects. These

More information

Protect your house, so it always feels like home.

Protect your house, so it always feels like home. Protect your house, so it always feels like home. Masterpiece Homeowners Insurance Protecting the details that make your house your home 97% of Chubb clients who had a claim paid were highly satisfied

More information

Renovating and Rebuilding America - One Home at a Time. FHA 203(K) Renovation Lending Product Information

Renovating and Rebuilding America - One Home at a Time. FHA 203(K) Renovation Lending Product Information FHA 203(K) Product Information 1 Program Summary The FHA 203(k) The FHA 203(k) loan allows a borrower to purchase or refinance and repair or renovate a property all in one loan. The borrower closes with

More information

Limited FHA 203K. Village Mortgage NMLS Intended for Mortgage Professionals Only 1

Limited FHA 203K. Village Mortgage NMLS Intended for Mortgage Professionals Only 1 Limited FHA 203K Before After Village Mortgage NMLS 6331 Intended for Mortgage Professionals Only 1 Program Highlights Up to $35,000 in repairs with no minimum No consultant required Up to 3 Contractors

More information

ROOFING CONTRACTOR QUESTIONNAIRE Ed. 9-09

ROOFING CONTRACTOR QUESTIONNAIRE Ed. 9-09 ROOFING CONTRACTOR QUESTIONNAIRE Ed. 9-09 Applicant Name: Mailing Address: Location: Web Address: Agent s Name: Address: Proposed Effective Date: From: To: 12:01 A.M. Standard Time at the address of the

More information

Invitation To Bid. for

Invitation To Bid. for Charter Township of Canton Community Development Block Grant (HUD) Invitation To Bid for CDBG HOUSING REHABILITATIONS WINTER 2018 (EACH HOUSE TO BE BID SEPARATELY) Contact: Mike Sheppard Phone: 734 394-5225

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Parkway Towers 1155 Ash St Denver, CO 80220 Level I Study with Site Inspection Fiscal Year End Date: 12/31/2014 8597 Via Mallorca Suite E La Jolla, CA 92037 Phone: 858-764-1895

More information

MINUTES OF COUNCIL MEETING CLASSICO STRATA PLAN BCS 460

MINUTES OF COUNCIL MEETING CLASSICO STRATA PLAN BCS 460 MINUTES OF COUNCIL MEETING CLASSICO STRATA PLAN BCS 460 TUESDAY, APRIL 25, 2017 AT 5:30 PM 1777 West 75 th Avenue Vancouver, BC V6P 6P2 Tel: (604) 685-3828 / Fax: (604) 685-3845 PACIFIC QUORUM 24-HOUR

More information

WHAT DO WE DO? SERVICES PROVIDED Exterior Painting. Interior Painting. Roofing. carpentry & siding. Concrete Repairs.

WHAT DO WE DO? SERVICES PROVIDED Exterior Painting. Interior Painting. Roofing. carpentry & siding. Concrete Repairs. WHAT DO WE DO? We specialize in providing the highest quality renovation services for Residential, Multi-Family, Commercial, & Industrial properties throughout the metro-atlanta area. We believe communication

More information

Urban Heights Condominium

Urban Heights Condominium Condominium Capital 2011 2010, AssociationAnalysis, LLC Condominium Prepared For: Table of Contents Condominium Association, Inc. 1642 Maxwell Road Atlanta, GA 30012 October 19, 2010 INTRODUCTION INTRODUCTION

More information

Update With Site Visit

Update With Site Visit Update With Site Visit Le Chateau Bellevue, WA 10/28/2011 Report #1002 Phone: 253-241-8151 Fax: 360-872-8073 E-mail: jeremy@reservesolutions.net www.reservesolutions.net Le Chateau Client Info: REPORT

More information

ATTIC FAN - DECEMBER 1995

ATTIC FAN - DECEMBER 1995 400 Ashley Court Glen Mills, PA 19342 Phone: 610-459-0510 Fax: 610-459-5317 ATTIC FAN - DECEMBER 1995 WHEREAS, the Declaration of Condominium for Darlington Woods Condominium restricts alterations of any

More information

FARMLANE CONDOMINIUM ASSOCIATION 2014 ANNUAL OWNERS MEETING

FARMLANE CONDOMINIUM ASSOCIATION 2014 ANNUAL OWNERS MEETING FARMLANE CONDOMINIUM ASSOCIATION 2014 ANNUAL OWNERS MEETING January 20, 2014 7:00 PM at Worthington Community Center Present: Ken Barker (Barker Holdings LTD), Don Hayward, Anne Hayward, Carolyn Morris,

More information

THIS IS AN APPLICATION FOR A BUILDING PERMIT

THIS IS AN APPLICATION FOR A BUILDING PERMIT THIS IS AN APPLICATION FOR A BUILDING PERMIT 1. Read these instructions and carefully complete the application. 2. No building or structure shall be erected, added to or structurally altered or the use

More information

Warranty Information

Warranty Information Warranty Information Home warranty extension Page 2 SMART Home Protection Plan Page 2 90 Day Warranty Page 3 SewerGard Warranty Page 5 MoldSafe Warranty Page 7 Radon Warranty Page 9 5 Year Platinum Roof

More information

DISASTER RELIEF : INSURANCE RECOVERY

DISASTER RELIEF : INSURANCE RECOVERY DISASTER RELIEF : INSURANCE RECOVERY In the wake of the 2017 wildfires in the Northbay of Northern California, Asquared Studios has pulled together some research on wildfire rebuilding information. We

More information

The Pillar Blueprint A FRAMEWORK FOR CONSTRUCTION FINANCING. Solution Based Lender

The Pillar Blueprint A FRAMEWORK FOR CONSTRUCTION FINANCING. Solution Based Lender A FRAMEWORK FOR CONSTRUCTION FINANCING Solution Based Lender What is the Pillar Blueprint? The primary goal of the Pillar Blueprint is to provide competitive, flexible mortgages for those planning on building

More information

CAPITAL PROJECT PROCESS

CAPITAL PROJECT PROCESS CAPITAL PROJECT PROCESS May 2009 GETTING STARTED What is a project? A project is defined as all work (maintenance & repair or renovation) that requires 5,000 or more in time and materials and/or is sufficiently

More information

The Grande Phoenician at the Grande Preserve Condominium Association, Inc.

The Grande Phoenician at the Grande Preserve Condominium Association, Inc. The Grande Phoenician at the Grande Preserve Condominium Association, Inc. REMODELING YOUR UNIT A Guide for Unit Owners and their Contractors *Application Procedures *Application Form *Terms and Conditions

More information

Reserve Fund Study My Condominium Plan

Reserve Fund Study My Condominium Plan Reserve Fund Study My Condominium Plan 12 3456 Number of Units 36 Number of Buildings 1 Building Construction 21 Contact Ima Happy Position(s) President Contact Phone 43.555.4321 Report Date August 8,

More information

Home Buyer Pre Lending Package

Home Buyer Pre Lending Package Click to view homes! Carrie Woodruff Keller Williams 734.255.3188 carielw@sbcglobal.net Home Buyer Pre Lending Package Congratulations on the decision to buy a new home! The most important step in the

More information

Schedule your repairs today...

Schedule your repairs today... Dear HomeGuard Customer, Thank You for choosing HomeGuard Incorporated to inspect your home. Enclosed is your inspection report, which includes our findings, recommendations, and repair prices. Please

More information

MINUTES OF STRATA COUNCIL MEETING Eldon Place VIS 1052 January 16th, 2014

MINUTES OF STRATA COUNCIL MEETING Eldon Place VIS 1052 January 16th, 2014 Eldon Place VIS 1052 January 16th, 2014 Amenity Room; 3225 Eldon Place, Victoria, BC PRESENT: Wendy Wall President Ernie Lyle Vice President George Bowden Treasurer Sandy Wagner Secretary Doreen Kitchen

More information

Americano Beach Lodge Resort Condominium Association, Inc.

Americano Beach Lodge Resort Condominium Association, Inc. Americano Beach Lodge Resort Condominium Association, Inc. PO Box 511 Daytona Beach, FL 32115 (386) 255-7431 www.americanobeach.com SPECIAL UPDATE LETTER: Please understand that this information letter

More information

Fountains at Summerfield Condominiums

Fountains at Summerfield Condominiums Fountains at Summerfield Condominiums Email address: fountainshoa@yahoo.com Mailing address: 15685 SW 116th Avenue PMB 105 Tigard, Oregon 97224 Welcome Homeowners! This section contains basic information

More information

Letter of Instructions

Letter of Instructions Letter of Instructions Trade Contractor Prequalification Statement Please complete the following and return at your earliest convenience by email to prequal@chanen.com. 1. Trade Contractor Prequalification

More information

SPECIFICATIONS FOR BUILDING MAINTENANCE

SPECIFICATIONS FOR BUILDING MAINTENANCE SPECIFICATIONS FOR BUILDING MAINTENANCE Table of Contents Advertisement...3 1.0 General Terms and Conditions...4 1.1 Format of Response...4 1.2 Late Submissions...4 1.3 Amendment of Specifications...4

More information

Where Builders Risk Meets Personal Lines

Where Builders Risk Meets Personal Lines Where Builders Risk Meets Personal Lines Presenter Introduction Mary Stiglic, CIC, Marketing Manager More than 18 years experience with builders risk Licensed property and casualty agent Holds CIC designation

More information

2. Increasing costs of repair/replacement 3. Increasing claims 4. Above items threaten the insurability of our building

2. Increasing costs of repair/replacement 3. Increasing claims 4. Above items threaten the insurability of our building Canyon Road Towers HOA Committee 123 2nd Avenue Salt Lake City, Utah 84103 April 20, 2015 Dear Canyon Road Towers Owner, On March 18, 2015 the CRT Homeowners' Association Committee approved to increase

More information

CONTRACTORS SUPPLEMENTAL APPLICATION

CONTRACTORS SUPPLEMENTAL APPLICATION Mt. Hawley Insurance Company Peoria, IL 61615 CONTRACTORS SUPPLEMENTAL APPLICATION Applicants Instructions: Answer all questions. If the answer to any question is NONE, please state NONE. Application must

More information

REQUEST FOR PROPOSAL SINGLE-FAMILY HOMEOWNER OCCUPIED REHABILITATION PROGRAM SERVICES JULY Tacoma Community Redevelopment Authority

REQUEST FOR PROPOSAL SINGLE-FAMILY HOMEOWNER OCCUPIED REHABILITATION PROGRAM SERVICES JULY Tacoma Community Redevelopment Authority REQUEST FOR PROPOSAL SINGLE-FAMILY HOMEOWNER OCCUPIED REHABILITATION PROGRAM SERVICES JULY 2013 Tacoma Community Redevelopment Authority City of Tacoma Community and Economic Development 747 Market Street

More information

1. CALL TO ORDER The meeting was called to order at 5:00 p.m. by the Council President, Rod Maides.

1. CALL TO ORDER The meeting was called to order at 5:00 p.m. by the Council President, Rod Maides. Meeting of the Strata Council Strata Plan VR 2771 The Observatory To be held on Wednesday, October 14, 2015, 2015 at 5:00 p.m. John Braithwaite Community Centre, 145 West 1 st Street, North Vancouver,

More information

FHA Renovation Loan Program, or 203K

FHA Renovation Loan Program, or 203K FHA Renovation Loan Program, or 203K The Federal Housing Administration (FHA), which is part of the Department of Housing and Urban Development (HUD), administers various single family mortgage insurance

More information

Exterior Service Line Plus Terms and Conditions

Exterior Service Line Plus Terms and Conditions Exterior Service Line Plus Terms and Conditions This Service Agreement covers the following: Exterior Water Service Line, Exterior Sewer/Septic Line, Interior Plumbing ( Systems ). YOUR ENCLOSED DECLARATION

More information

REPLACEMENT RESERVE REPORT FY 2016

REPLACEMENT RESERVE REPORT FY 2016 REPLACEMENT RESERVE REPORT FY 2016 VILLAS AT PARKWOOD ESTATES VILLAS AT PARKWOOD ESTATES REPLACEMENT RESERVE REPORT FY 2016 Community Management by: Community Management Professionals, LLC Beth Maurer

More information

RFQ McMinnville School District REQUEST FOR QUALIFICATIONS FOR GENERAL CONTRACTORS FOR SCHOOL DISTRICT CONSTRUCTION PROJECTS

RFQ McMinnville School District REQUEST FOR QUALIFICATIONS FOR GENERAL CONTRACTORS FOR SCHOOL DISTRICT CONSTRUCTION PROJECTS RFQ 2016-11 McMinnville School District REQUEST FOR QUALIFICATIONS FOR GENERAL CONTRACTORS FOR SCHOOL DISTRICT CONSTRUCTION PROJECTS 279C.430 Prequalification of general contractors Closing Date: November

More information

CLASSICO STRATA PLAN BCS 460

CLASSICO STRATA PLAN BCS 460 CLASSICO STRATA PLAN BCS 460 STRATA COUNCIL MEETING MINUTES TUESDAY, APRIL 24, 2018, 5:30 PM COUNCIL PRESENT: Roman Piechocki President/Treasurer Peter van Diepen Vice-President Irfaan Hafeez Ken Sopko

More information

Statement of Policy. Milwaukee Metropolitan Sewerage District s Private Property Inflow and Infiltration Reduction Program.

Statement of Policy. Milwaukee Metropolitan Sewerage District s Private Property Inflow and Infiltration Reduction Program. Milwaukee Metropolitan Sewerage District s 2011-2020 Private Property Inflow and Infiltration Reduction Program Introduction Infiltration is the quantity of water entering a sewer system through such sources

More information

Solicitation of Interest for Grant-Funded Private Property Flood Risk Reduction Construction/Engineering Projects

Solicitation of Interest for Grant-Funded Private Property Flood Risk Reduction Construction/Engineering Projects SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE DIVISION Solicitation of Interest for Grant-Funded Private Property Flood Risk Reduction Construction/Engineering Projects NOVEMBER 2017 (REVISED

More information

Hyde Park Place Owners' Association, Inc.

Hyde Park Place Owners' Association, Inc. RESERVE STUDY Full Study Hyde Park Place Owners' Association, Inc. Published - February 10, 2016 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com

More information

R-T Specialty Insurance Services, LLC (Lic. # 0G97516) CONTRACTING RISK SUPPLEMENTAL QUESTIONNAIRE

R-T Specialty Insurance Services, LLC (Lic. # 0G97516) CONTRACTING RISK SUPPLEMENTAL QUESTIONNAIRE R-T Specialty Insurance Services, LLC (Lic. # 0G97516) CONTRACTING RISK SUPPLEMENTAL QUESTIONNAIRE Note: Throughout this questionnaire the words you and your include all entities seeking coverage. 1. Applicant

More information

The Catalonian at Cherry Creek North HOA Board Meeting 280 S. Madison St. January 10, 2011

The Catalonian at Cherry Creek North HOA Board Meeting 280 S. Madison St. January 10, 2011 The Catalonian at Cherry Creek North HOA Board Meeting 280 S. Madison St. January 10, 2011 1) Call to Order Meeting was called to order at 6:35 PM a. Quorum was established Geysu, Myles, Nancy (Via Skype),

More information

BOARD MEETING October 19, 2006 MILL CREEK CONDOMINIUM ASSOCIATION MINUTES. Greg Nelson, Chairperson; Mark Ozbun, Treasurer; Terry Dean

BOARD MEETING October 19, 2006 MILL CREEK CONDOMINIUM ASSOCIATION MINUTES. Greg Nelson, Chairperson; Mark Ozbun, Treasurer; Terry Dean ATTENDANCE Board Members: NWCM: Condo Owners: Greg Nelson, Chairperson; Mark Ozbun, Treasurer; Terry Dean None Present OPENING: Greg Nelson at 7:17 PM APPROVAL OF MOTION: By Greg Nelson to approve the

More information

Anson County Early College High

Anson County Early College High NC School District/040 Anson County/High School Anson County Early College High Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

This saves borrowers thousands of dollars out of pocket.

This saves borrowers thousands of dollars out of pocket. A 203(k) loan is a loan that allows the borrower to purchase or refinance a home and include in the loan the costs to do repairs, upgrades and remodeling of the home. This saves borrowers thousands of

More information

Low down payment option; qualify with as little as 3.5% down

Low down payment option; qualify with as little as 3.5% down Not every home is move-in ready. The FHA 203(k) Renovation Loan allows you to broaden your home shopping horizons and create the home you want from the start. The FHA 203(k) Renovation Loan combines the

More information

BUILDING CONDITION ASSESSMENT. A Comprehensive Approach in Energy and Facility Management

BUILDING CONDITION ASSESSMENT. A Comprehensive Approach in Energy and Facility Management BUILDING CONDITION ASSESSMENT A Comprehensive Approach in Energy and Facility Management Presentation Outline Page Nadine International Company Profile.. 3 FCI -Industry Preferred Formula.... 4 FCI -Other

More information

Schedule your repairs today...

Schedule your repairs today... Dear HomeGuard Customer, Thank You for choosing HomeGuard Incorporated to inspect your home. Enclosed is your inspection report, which includes our findings, recommendations, and repair prices. Please

More information

Robert Shaw Theme Elementary

Robert Shaw Theme Elementary DeKalb County School District/Elementary Schools Robert Shaw Theme Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School

More information

DRAFT MINUTES OF MEETING

DRAFT MINUTES OF MEETING OTTAWA-CARLETON STANDARD CONDOMINIUM CORPORATION # 769 August 9, 2018 DRAFT MINUTES OF MEETING PRESENT: Rose-Marie Batley, President Irmela Murphy, Vice President, Secretary Scott McDermott, Treasurer

More information

Mt. Hawley Insurance Company CONTRACTORS SUPPLEMENTAL APPLICATION

Mt. Hawley Insurance Company CONTRACTORS SUPPLEMENTAL APPLICATION Mt. Hawley Insurance Company CONTRACTORS SUPPLEMENTAL APPLICATION Applicants Instructions: Answer all questions. If the answer to any question is NONE, please state NONE. Application must be signed and

More information

COUNCIL MEETING MINUTES Thursday, October 17, 2013 DISTRICT CROSSING BCS Elsa Nohlen. David Dickinson. Jane Dennison.

COUNCIL MEETING MINUTES Thursday, October 17, 2013 DISTRICT CROSSING BCS Elsa Nohlen. David Dickinson. Jane Dennison. 1 COUNCIL MEETING MINUTES Thursday, October 17, 2013 DISTRICT CROSSING BCS 4175 LOCATION: 6:30 p.m. 1679 Lloyd Ave. Amenity Room, 2nd Floor North Vancouver, BC STRATA COUNCIL 2012/2013 ATTENDANCE: Elsa

More information

The Reserve on the Eagle River Board Meeting Minutes Monday, February 20, 2017, at 6:30 PM The Reserve Clubhouse

The Reserve on the Eagle River Board Meeting Minutes Monday, February 20, 2017, at 6:30 PM The Reserve Clubhouse The Reserve on the Eagle River Board Meeting Minutes Monday, February 20, 2017, at 6:30 PM The Reserve Clubhouse BOARD MEMBERS PRESENT: Susan Ferrari, Deb Forsline, Linda Guerrette, Marilee Horan and Brian

More information

sunlightshores.weebly.com (Board Contacts, Approved Minutes, Treasurer s Reports and Announcements)

sunlightshores.weebly.com (Board Contacts, Approved Minutes, Treasurer s Reports and Announcements) Sunlight Shores Country Club APPROVED Board of Trustees Meeting Minutes September 20, 2017 6:30 p.m. SSCC Clubhouse 2705 Evening Glory Court Clinton, WA 98236 sunlightshores.weebly.com (Board Contacts,

More information

Hamlet at Fountain Greens Association, Inc. Annual Meeting Homeowners February 21, Goodwill Community Meeting Room. Location ½ Road

Hamlet at Fountain Greens Association, Inc. Annual Meeting Homeowners February 21, Goodwill Community Meeting Room. Location ½ Road Hamlet at Fountain Greens Association, Inc Annual Meeting Homeowners February 21, 2018 Goodwill Community Meeting Room Location 630 24 ½ Road -First Draft- President Tom Haas brought the meeting to order

More information

AGENDA. MANDATORY PRE-BID/ SITE VISIT MEETING July 24, 2018 (10:00 AM)

AGENDA. MANDATORY PRE-BID/ SITE VISIT MEETING July 24, 2018 (10:00 AM) AGENDA MANDATORY PRE-BID/ SITE VISIT MEETING July 24, 2018 (10:00 AM) Project Number: 219003 Project Name: Miami FMS #1 Renovation Project Location: Miami, Florida 1. SIGN-IN OF ALL ATTENDEES: 2. INTRODUCTIONS:

More information

FILED: NEW YORK COUNTY CLERK 06/29/ :00 PM INDEX NO /2017 NYSCEF DOC. NO. 2 RECEIVED NYSCEF: 06/29/2017

FILED: NEW YORK COUNTY CLERK 06/29/ :00 PM INDEX NO /2017 NYSCEF DOC. NO. 2 RECEIVED NYSCEF: 06/29/2017 Pleadings/Desai v. Ford (SNY) Complaint 06-29-2017.docx SUPREME COURT OF THE STATE OF NEW YORK COUNTY OF NEW YORK ------------------------------------------------------------------------- LAXMAN S. DESAI

More information

Social Housing Administration Directive No

Social Housing Administration Directive No Regional Municipality of Halton Social Housing Administration Directive No. 06-05 Date: August 30, 06 To: Federally-Funded Social Housing Providers subject to Operating Agreements under Section 95 of the

More information

AGENDA. PRE-BID / SITE VISIT MEETING November 29, :00 PM. Project Number: Project Name: DeLand NGA Roof and Waterproofing DeLand, Florida

AGENDA. PRE-BID / SITE VISIT MEETING November 29, :00 PM. Project Number: Project Name: DeLand NGA Roof and Waterproofing DeLand, Florida AGENDA PRE-BID / SITE VISIT MEETING November 29, 2017 2:00 PM Project Number: 217061 Project Name: DeLand NGA Roof and Waterproofing DeLand, Florida 1. SIGN-IN OF ALL ATTENDEES: 2. INTRODUCTIONS: 3. GENERAL

More information

Reference: The Bel-Harbour Condominium Association Reserve Study Update Kipcon Great Lakes Project No CRU

Reference: The Bel-Harbour Condominium Association Reserve Study Update Kipcon Great Lakes Project No CRU August 18, 2016 Mr. Nicholas Burbulis 420 W. Belmont Ave. Chicago, IL 60657 Reference: The Kipcon Great Lakes Dear Mr. Burbulis: Attached, please find Kipcon Great Lakes, which has been prepared for the.

More information

Status: Structural steel installation complete at primary building. Observatory construction underway. Central Plant modifications are complete.

Status: Structural steel installation complete at primary building. Observatory construction underway. Central Plant modifications are complete. Page 1 of 11 FACILITIES PLAN STATUS REPORT June 22, 2015 SADDLEBACK COLLEGE 1. SCIENCES BUILDING Project Budget: $52,234,000 $8,308,000 $67,358,000 State Match: $36,564,000 ($36,564,000) - Basic Aid Allocation:

More information

Coronado Shores Condominium Association #8 El Encanto Meeting of the Board of Directors APPROVED MINUTES May 19, 2017

Coronado Shores Condominium Association #8 El Encanto Meeting of the Board of Directors APPROVED MINUTES May 19, 2017 Coronado Shores Condominium Association #8 El Encanto Meeting of the Board of Directors APPROVED MINUTES May 19, 2017 The Meeting of the Board was called to order at 9:30 am in the Manager s office. Directors

More information

Construction to Permanent Loan Forms

Construction to Permanent Loan Forms Construction to Permanent Loan Forms Table of Contents Form A - Builder Acceptance Checklist and Questionnaire Form completed by builder for Builder Acceptance by the Lender. Form B - Builder s Letter

More information

Hurricane Preparedness Plan The Cotton Mill Condominiums

Hurricane Preparedness Plan The Cotton Mill Condominiums Cotton Mill Hurricane Preparedness Plan..Page 1 Hurricane Preparedness Plan The Cotton Mill Condominiums Introduction The Board, the property management firm and the on-site management staff (hereinafter

More information

Rehab Financing The FHA Streamline 203(k) Program

Rehab Financing The FHA Streamline 203(k) Program The FHA Streamline 203(k) Program A Guide to Financing Your Home Improvement Project The Program: This is a new 1 st mortgage program sponsored by the FHA and designed to provide homeowners with low-cost

More information

National Flood Insurance Program. Flood Insurance Claims Handbook

National Flood Insurance Program. Flood Insurance Claims Handbook National Flood Insurance Program Flood Insurance Claims Handbook Revised and Effective as of November 13, 2006 Thank you for protecting yourself through the National Flood Insurance Program Table of Contents

More information

ALTERATION AGREEMENT 125 Bronx River Road August 2014

ALTERATION AGREEMENT 125 Bronx River Road August 2014 5683 Riverdale Avenue, Suite 203 Riverdale, NY 10471 Office: (718) 796-5022 Fax: (718) 796-5026 www.gmcrealty.com ALTERATION AGREEMENT 125 Bronx River Road August 2014 Dear Shareholder(s): Enclosed you

More information

Our Focus: Your Future

Our Focus: Your Future Town of Fort Erie Infrastructure Services Our Focus: Your Future Prepared for Council-in-Committee Report No. IS-53-07 Agenda Date November 19, 2007 File No. 220102 Subject 5 YEAR FACILITY CONDITION STATUS

More information

WASHINGTON STATE CHAPTER of Community Associations Institute

WASHINGTON STATE CHAPTER of Community Associations Institute Welcome to the WASHINGTON STATE CHAPTER of Community Associations Institute The leading professional organization providing education, resources, and advocacy for community association living. Unit Water

More information

Comprehensive Reserve Fund Study and Building Condition Assessment for Wellington Standard Condominium Corporation No. 149

Comprehensive Reserve Fund Study and Building Condition Assessment for Wellington Standard Condominium Corporation No. 149 Comprehensive Reserve Fund Study and Building Condition Assessment for Wellington Standard Condominium Corporation No. 149 820 Gartshore Street Fergus, Ontario Report Prepared for the Board of Directors

More information

APPENDIX E ALLOWABLE CAPITAL EXPENDITURE GUIDELINES

APPENDIX E ALLOWABLE CAPITAL EXPENDITURE GUIDELINES APPENDIX E ALLOWABLE CAPITAL EXPENDITURE GUIDELINES Introduction State capital appropriations are funded primarily through the issuance of State bonds. State bonds must be authorized by Ohio voters via

More information

Private Sewer Lateral Incentive Application

Private Sewer Lateral Incentive Application Purpose To assist and encourage homeowners to repair or replace their sewer lateral line. Homeowners are responsible for the entire sewer lateral from the building to the point of connection (including

More information

CONDO ISSUES AND RISK MANAGEMENT

CONDO ISSUES AND RISK MANAGEMENT A Deland, Gibson University White Paper Providing Peace of Mind Through Proactive Service. CONDO ISSUES AND RISK MANAGEMENT In the event of a claim a well written insurance policy should provide the means

More information

The Final Tangible Property Regulations West Virginia Tax Institute

The Final Tangible Property Regulations West Virginia Tax Institute The Final Tangible Property Regulations West Virginia Tax Institute October 20, 2014 Notice ANY TAX ADVICE IN THIS COMMUNICATION IS NOT INTENDED OR WRITTEN BY KPMG or Teresa Castanias, CPA TO BE USED,

More information

Reserve Study: Alpenrose Condominium Association

Reserve Study: Alpenrose Condominium Association Reserve Study: Alpenrose Condominium Association The Alpenrose Condominiums 74 Erste Strausse Snoqualmie Pass, Washington 98068 Originally Prepared October 5 th 2009 Updated with inspection November 15

More information

Council in Attendance: Dennis Diamond - President Mike Reid - Vice President Rita Lum - Treasurer Ernie Ng Michael Rawlinson

Council in Attendance: Dennis Diamond - President Mike Reid - Vice President Rita Lum - Treasurer Ernie Ng Michael Rawlinson MINUTES OF THE COUNCIL MEETING FOR STRATA PLAN LMS 1872 PARIS PLACE, HELD ON MONDAY, MAY 12, 2014 AT 6:30 PM IN THE 3 RD FLOOR MEETING ROOM, 183 KEEFER PLACE, VANCOUVER, BC Council in Attendance: Dennis

More information

BORDEN COMMONS CONDOMINIUM OWNER S ASSOCIATION Annual Meeting Notes

BORDEN COMMONS CONDOMINIUM OWNER S ASSOCIATION Annual Meeting Notes BORDEN COMMONS CONDOMINIUM OWNER S ASSOCIATION 2015 Annual Meeting Notes Members Present: Robert Benevento, Judy Chaudet, Lisa Hutzel, Bob Ludt, Gail MacLeod, and Mark Rush Roll Call Proxies were certified

More information