Implementation Status & Results Vietnam Central North Region Health Support Project (P095275)

Size: px
Start display at page:

Download "Implementation Status & Results Vietnam Central North Region Health Support Project (P095275)"

Transcription

1 losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Vietnam Central North Region Health Support Project (P095275) Operation Name: Central North Region Health Support Project (P095275) Project Stage: Implementation Seq.No: 2 Status: ARCHIVED Archive : 28-Feb-2011 Country: Vietnam Approval FY: 2010 Product Line: IBRD/IDA Region: EAST ASIA AND PACIFIC Lending Instrument: Specific Investment Loan Implementing Agency(ies): Key s Board Approval 06-Apr-2010 Original Closing 31-Aug-2016 Planned Mid Term Review 01-Aug-2013 Last Archived ISR 28-Feb-2011 Effectiveness 23-Aug-2010 Revised Closing 31-Aug-2016 Actual Mid Term Review Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project development objective is to strengthen district-level curative and preventive health services and improving their accessibility for the economically vulnerable population in the Central North Provinces. Intermediate objectives are: Increasing health insurance coverage among the near-poor population; Upgrading capacities of district hospitals and District Preventive Health Centers; Improving supply and quality of health care personnel. Has the Project Development Objective been changed since Board Approval of the Project? Yes Component(s) No Component Name Component Cost Supporting health insurance for the near poor population 9.11 Strengthening district health services Improving supply and quality of human resources for health Project management, monitoring and evaluation 7.71 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Satisfactory Moderately Satisfactory Overall Risk Rating Moderate Page 1 of 8

2 Implementation Status Overview The Central North Health Support Project (CNHSP) is about 18 months away from its mid-term review. Similar to the other new projects, implementation progress was slow initially and has been increasing in pace. Effective since August 2010, the project has until August 2016 to be implemented. As of December 2011, about 22% of the Project implementation period has passed and about US$3.995 million of the US$65.00 million Credit (or about 6.1% of the Credit) has been disbursed. Main accomplishments to date include: 1. Supporting health insurance for the near poor: The Ministry of Health and Project Provinces have had a very successful effort thus far to enroll the near poor in the health insurance program. The identified number of near poor in the six project provinces is currently 1.5 million of which 1.08 million are identified as not having insurance. As of September 30, 2011, the Project has extended health insurance of the near poor to nearly 390,000 people or 36% of the target group which more than our proposed project target of covering the near poor by 20% at mid-term in 2013 and nearly the end of Project target of 40%. 2. Strengthening District Health Services: The construction of District Preventive Centers is well underway with 17 of the 30 planned centers already in the process of being constructed and the remaining 13 are all in the process of tendering. The centers are expected to be completed before the end 2012 and ready to receive equipment by end of 2012 or early Improving Supply and Quality of Health Human Resources: The long term training programs (conversion of assistant doctors to doctors and pharmacists, masters programs, Level I and Level II specialists) is well in progress. For example, 96% of the planned educational quota for the conversion of full doctors and pharmacists has started their education (489 out of 510 with a couple of provinces exceeding their plan). Additionally, 55% of the planned quota for obtaining the master s degree, Level I or Level II specialization of the district hospital, district health center and the Quang Tri Provincial Hospital) have started their education. Locations Country First Administrative Division Location Planned Actual Vietnam Tinh Nghe An Tinh Nghe An Vietnam Tinh Thua Thien-Hue Tinh Thua Thien-Hue Vietnam Tinh Thanh Hoa Tinh Thanh Hoa Vietnam Tinh Quang Tri Tinh Quang Tri Vietnam Tinh Quang Binh Tinh Quang Binh Vietnam Tinh Ha Tinh Tinh Ha Tinh Vietnam Tinh Nghe An Huyen Nam Dan Vietnam Tinh Nghe An Huyen Nghi Loc Vietnam Tinh Nghe An Huyen Dien Chau Vietnam Tinh Nghe An Huyen Yen Thanh Vietnam Tinh Nghe An Huyen Thanh Chuong Vietnam Tinh Nghe An Huyen Quynh Luu Page 2 of 8

3 Country First Administrative Division Location Planned Actual Vietnam Tinh Nghe An Huyen Nghia Dan Vietnam Tinh Nghe An Huyen Que Phong Vietnam Tinh Nghe An Huyen Tuong Duong Vietnam Tinh Nghe An Huyen Ky Son Vietnam Tinh Thanh Hoa Huyen Tinh Gia Vietnam Tinh Thanh Hoa Huyen Nhu Xuan Vietnam Tinh Thanh Hoa Huyen Hoang Hoa Vietnam Tinh Thanh Hoa Huyen Thuong Xuan Vietnam Tinh Thanh Hoa Huyen Ngoc Lac Vietnam Tinh Thanh Hoa Huyen Lang Chanh Vietnam Tinh Thanh Hoa Huyen Cam Thuy Vietnam Tinh Thanh Hoa Huyen Hau Loc Vietnam Tinh Thanh Hoa Huyen Ba Thuoc Vietnam Tinh Thanh Hoa Huyen Quan Son Vietnam Tinh Thanh Hoa Huyen Quan Hoa Vietnam Tinh Thanh Hoa Huyen Muong Lat Vietnam Tinh Quang Tri Huyen Hai Lang Vietnam Tinh Quang Tri Huyen Gio Linh Vietnam Tinh Quang Tri Huyen Vinh Linh Vietnam Tinh Quang Binh Huyen Le Thuy Vietnam Tinh Quang Binh Huyen Bo Trach Vietnam Tinh Quang Binh Huyen Quang Trach Vietnam Tinh Quang Binh Huyen Tuyen Hoa Vietnam Tinh Quang Binh Huyen Minh Hoa Vietnam Tinh Ha Tinh Huyen Cam Xuyen Page 3 of 8

4 Vietnam Tinh Ha Tinh Huyen Ky Anh Vietnam Tinh Ha Tinh Huyen Huong Khe Vietnam Tinh Ha Tinh Huyen Nghi Xuan Vietnam Tinh Ha Tinh Huyen Duc Tho Vietnam Tinh Ha Tinh Huyen Huong Son Vietnam Tinh Thua Thien-Hue Thanh Pho Hue Vietnam Tinh Thua Thien-Hue Huyen Phu Vang Vietnam Tinh Thua Thien-Hue Huyen Phong Dien Vietnam Tinh Thua Thien-Hue Huyen Huong Tra Vietnam Tinh Thua Thien-Hue Huyen Phu Loc Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target 10% increase in the utilization of inpatient and outpatient services by the poor 10% increase in the utilization of inpatient and outpatient services by the near-poor Text Value inpatient /100 outpatient /100 Text Sub Type Breakdown 30-Nov-2009 The baseline information was collected from 2009 prior to Year 0 (2010) of the Project. The CNHSP is mobilizing technical a surveyof administrative data to reconfirm baseline information. Value inpatient /100 outpatient /100 Not yet due. inpatient 2.58/100 (10% increase) outpatient /100 (10% increase) An update of the utilization is due by year 3 of the Project (2013). Not yet due. inpatient /100 (10% increase) outpatient /100 (10% increase) 30-Nov Feb-2011 Page 4 of 8

5 30% reduction in the referrals for deliveries, pneumonia and appendicitis from district hospitals to provincial hospitals 90% of children under age 1 fully vaccinated according with national EPI program Health facilities constructed, renovated, and/or equipped Intermediate Results Indicators The baseline information was collected from 2009 and from the 2008 VHLSS prior to Year 0 (2010) of the Project. The CNHSP is mobilizing technical a survey of administrative data to reconfirm baseline information. An update of the utilization is due by year 3 of the Project (2013). Percentage Value Nov-2008 This data was collected from No new information. Not yet a sample of hospitals in due. To be measured starting The baseline is to be in year 3 of the project. confirmed through an ongoing survey. Percentage Value Apr Jun-2016 No new information. Not available. Survey collecting available administrative data now in progress. Number Value Aug Mar-2012 This indicator is strictly referencing the 30 district health centers being constructed and equipped under the Project. An additional 32 health facilities are being equipped. As of end 2011, 17 District Preventive Health Centers were in the process of being constructed. The other 13 centers were in the process of bidding. Progress is sufficiently underway for their equipment by end 2012 and functionality by Page 5 of 8

6 Indicator Name Core Unit of Measure Baseline Current End Target People with access to a basic package of Number Value health, nutrition, or population services 30-Nov-2008 The actual indicator is 40% of the near poor are covered by the health insurance program. The baseline was estimated to be 10% or 150, Mar-2012 The share of near-poor households spending 25% of more of their non-food consumption on health is reduced to 12% or less The share of district hosptials in claims reimbursed by health insurance (VSS) is 50% or more It was estimated that 10% of the near poor were covered by health insurance. Once the Project identified the 1.5 million near poor, 28% or 420,000 were identified as beingcovered by health insurance through another progress group. 54%. 390,000 cards have been issued. Current actual figures exceed end of Project targets. Assuming the end of the Project target should 270,000 people greater since baseline miscalculated, the current results is close to the end of Project target. Percentage Value Nov-2008 No new information. Not yet due. By the results framework, this information is to be reported in year 3 (2013) of the Project. Note, however, this information has to come to VHLSS for which there is about a 2 year lag on the data availability. As of March 2012, the data for year 2010 is not yet available for this analysis. This indicator will become difficult to report on a timely basis. Percentage Value Nov-2008 No new information. Not yet due. Indicator is to be reported in Year 3 of the Project (2013). 40%. End target conservatively set assuming (i) baseline was 10% of the target population; and (ii) low take-up considering experience in the Mekong Region. Page 6 of 8

7 50% of patients satisfied with (a) overall quality of care at district hospitals, (b) reduction of waiting time, and (c) availability of services and diagnostic facilities Nghe An medical college fully meets the national standards for medical university Text Value (a) 35% (b) 35% (c) 32% 30-Nov-2008 (a) 50% (b) 50% (c) 50% Not yet due. Indicator is to be reported in Year 3 of the Project (2013). Text Value Nil Investments in Nghe An to Fully meets standards meet conditions of national standards in progress 28-Dec-2008 Health personnel receiving training Number Value Nov-2008 This includes training of 175 Doctors in Level 1 Specialty. and Training of 680 Assistant Doctors as full fledged doctors. 10-Feb-2011 In progress. Education/ training not completed. At present, 96% of the planned educational quota for the conversion of full doctors and pharmacists has started their education (489 out of 510 with a couple of provinces exceeding their plan). Additionally, 55% ofthe planned quota for obtaining the master s degree, Level I or Level II specialization of the district hospital, district health center and the Quang Tri Provincial Hospital) have started their education. Data on Financial Performance (as of 22-Feb-2012) Financial Agreement(s) Key s Project Loan No. Status Approval Signing Effectiveness Closing P IDA Effective 06-Apr May Aug Aug-2016 Disbursements (in Millions) Project Loan No. Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P IDA Effective XDR Page 7 of 8

8 Disbursement Graph Key Decisions Regarding Implementation 1. Due to the well performing uptake of the subsidized health insurance for the near poor, the entire original Credit allocation for the subsidy will be fully utilized by mid The Bank and Ministry of Health agreed to continue the implementation of the subsidy scheme and even at the prevailing subsidy levels. Sufficient resources within the Project would be able to be reallocated for this purpose for the period until the end of Even though the Government generally approved to increase its subsidy from 50 to 70% to the near poor health insurance nationally, significant additional resources would need to be mobilized or reallocated for this purpose. It is necessary to consider this by July 30, 2012 prior to the guidelines for the 2013 project budget are prepared. 2. Although there has been no detrimental impact seen, the Ministry of Health's Central Project Management Unit (MoH CPMU) has agreed to recruit and environmental health / medical waste management and a sociologist for implementing the mitigation measures for Health Care Waste Management and Ethnic Minority inclusion plan. 3. A proposal for a Results Based Financing "pre-pilot pilot" is being developed between the Bank, CPMU and Nghe An in order to increase the quantity and quality of services at the communal health station level, better delivery of preventive and district health management services for district health centers, and better quality of inpatient and outpatient care by hospitals. The skeleton will be circulated to the Project stakeholders, other key informants, for their comment and feedback. Restructuring History There has been no restructuring to date. Related Projects There are no related projects. Page 8 of 8

Implementation Status & Results Vietnam Second Northern Mountains Poverty Reduction Project (P113493)

Implementation Status & Results Vietnam Second Northern Mountains Poverty Reduction Project (P113493) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Vietnam Second Northern Mountains Poverty Reduction Project (P113493) Operation Name: Second Northern

More information

Implementation Status & Results Ghana Health Insurance Project (P101852)

Implementation Status & Results Ghana Health Insurance Project (P101852) Public Disclosure Authorized @ The World Bank Implementation Status & Results Ghana Health Insurance Project (P11852) o o Operation Name: Health Insurance Project (P11852) Project Stage: Implementation

More information

Implementation Status & Results Azerbaijan Corporate and Public Sector Accountivility Project (P099924)

Implementation Status & Results Azerbaijan Corporate and Public Sector Accountivility Project (P099924) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Azerbaijan Corporate and Public Sector Accountivility

More information

Implementation Status & Results India India: Bihar Integrated Social Protection Strengthening Project (P118826)

Implementation Status & Results India India: Bihar Integrated Social Protection Strengthening Project (P118826) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results India India: Bihar Integrated Social Protection Strengthening Project (P118826) Operation Name: India: Bihar Integrated

More information

Implementation Status & Results Ghana Health Insurance Project (P101852)

Implementation Status & Results Ghana Health Insurance Project (P101852) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Ghana Health Insurance Project (P101852) Operation Name: Health Insurance Project (P101852) Project

More information

Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469)

Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469) Operation Name: Second National

More information

Implementation Status & Results Croatia Revenue Administration Modernization Project (P102778)

Implementation Status & Results Croatia Revenue Administration Modernization Project (P102778) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Croatia Revenue Administration Modernization Project (P102778) Operation Name: Revenue Administration

More information

Implementation Status & Results Brazil Sao Paulo Feeder Roads Project (P106663)

Implementation Status & Results Brazil Sao Paulo Feeder Roads Project (P106663) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Brazil Sao Paulo Feeder Roads Project (P106663) Operation Name: Sao Paulo Feeder Roads Project (P106663) Project

More information

Implementation Status & Results Tajikistan Tax Administration (P127807)

Implementation Status & Results Tajikistan Tax Administration (P127807) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Tajikistan Tax Administration (P127807) Operation Name: Tax Administration (P127807) Project Stage:

More information

The World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy

The World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Lao People's Democratic Republic Lao PDR - Mainstreaming

More information

Results-Based Rural Water Supply and Sanitation Under the National Target Program (P127435)

Results-Based Rural Water Supply and Sanitation Under the National Target Program (P127435) Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Water Global Practice Requesting Unit: EACVF Responsible Unit: GWA02 IBRD/IDA Program-for-Results Financing FY 2013 Team Leader(s): Lilian Pena

More information

Implementation Status & Results Samoa SAMOA HEALTH SECTOR MANAGEMENT PROGRAM SUPPORT PROJECT (P086313)

Implementation Status & Results Samoa SAMOA HEALTH SECTOR MANAGEMENT PROGRAM SUPPORT PROJECT (P086313) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Samoa SAMOA HEALTH SECTOR MANAGEMENT PROGRAM SUPPORT PROJECT (P086313) Operation Name: SAMOA HEALTH

More information

Implementation Status & Results India Assam State Roads Project (P096018)

Implementation Status & Results India Assam State Roads Project (P096018) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results India Assam State Roads Project (P096018) Operation Name: Assam State Roads Project (P096018) Project Stage: Implementation

More information

Implementation Status & Results Ukraine Public Finance Modernization Project (P090389)

Implementation Status & Results Ukraine Public Finance Modernization Project (P090389) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Ukraine Public Finance Modernization Project (P090389)

More information

Implementation Status & Results Burkina Faso Local Government Support Project (P120517)

Implementation Status & Results Burkina Faso Local Government Support Project (P120517) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Burkina Faso Local Government Support Project (P120517) Operation Name: Local Government Support

More information

Implementation Status & Results Mozambique Health Commodity Security Project (P121060)

Implementation Status & Results Mozambique Health Commodity Security Project (P121060) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mozambique Health Commodity Security Project (P121060) Operation Name: Health Commodity Security

More information

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Operation Name: Transport Rehabilitation

More information

Public Disclosure Copy

Public Disclosure Copy SOUTH ASIA India Finance & Markets Global Practice IBRD/IDA Financial Intermediary Loan FY 2013 Seq No: 8 ARCHIVED on 11-Nov-2016 ISR25496 Implementing Agencies: National Housing Bank, National Housing

More information

Implementation Status & Results Yemen, Republic Fisheries Resource Management and Conservation (P086886)

Implementation Status & Results Yemen, Republic Fisheries Resource Management and Conservation (P086886) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Yemen, Republic Fisheries Resource Management and

More information

Implementation Status & Results Indonesia Project for Indonesian Tax Administration Reform (PINTAR) (P100740)

Implementation Status & Results Indonesia Project for Indonesian Tax Administration Reform (PINTAR) (P100740) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Project for Indonesian Tax Administration Reform (PINTAR) (P100740) Operation Name: Project

More information

Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577)

Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577) Operation Name: Local Government

More information

Implementation Status & Results Tanzania Tax Modernization Project (P100314)

Implementation Status & Results Tanzania Tax Modernization Project (P100314) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Tanzania Tax Modernization Project (P100314) Operation Name: Tax Modernization Project (P100314)

More information

Implementation Status & Results Central African Republic Support to Vulnerable Groups Community Development Project (P111679)

Implementation Status & Results Central African Republic Support to Vulnerable Groups Community Development Project (P111679) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Central African Republic Support to Vulnerable Groups Community Development Project (P111679) Operation

More information

Implementation Status & Results Ghana Ghana - Micro,Small and Medium Enterprise Project (P085006)

Implementation Status & Results Ghana Ghana - Micro,Small and Medium Enterprise Project (P085006) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Ghana Ghana - Micro,Small and Medium Enterprise Project (P085006) Operation Name: Ghana - Micro,Small

More information

Implementation Status & Results Lebanon LB-EMERGENCY POWER SECTOR REFORM CAPACITY REINFORCEMENT (P104774)

Implementation Status & Results Lebanon LB-EMERGENCY POWER SECTOR REFORM CAPACITY REINFORCEMENT (P104774) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Lebanon LB-EMERGENCY POWER SECTOR REFORM CAPACITY REINFORCEMENT (P104774) Operation Name: LB-EMERGENCY

More information

Implementation Status & Results Sri Lanka Public Sector Capacity Building (P097329)

Implementation Status & Results Sri Lanka Public Sector Capacity Building (P097329) Public Disclosure Authorized Public Disclosure Authorized @ The World Bank Implementation Status & Results Sri Lanka Public Sector Capacity Building (P97329) Report No: ISR553 o o Operation Name: Public

More information

Implementation Status & Results Kosovo Public Sector Modernization Project (P101614)

Implementation Status & Results Kosovo Public Sector Modernization Project (P101614) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Kosovo Public Sector Modernization Project (P101614) Operation Name: Public Sector Modernization Project (P101614)

More information

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Operation Name: AR Cordoba Road Infrastructure

More information

Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991)

Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991) Operation Name: ID-Urban Water Supply and

More information

Implementation Status & Results Senegal SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT (P101415)

Implementation Status & Results Senegal SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT (P101415) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Senegal SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT (P101415) Operation Name: SENEGAL: TRANSPORT

More information

Public Disclosure Copy. Implementation Status & Results Report Uganda Reproductive, Maternal and Child Health Services Improvement Project (P155186)

Public Disclosure Copy. Implementation Status & Results Report Uganda Reproductive, Maternal and Child Health Services Improvement Project (P155186) Public Disclosure Authorized AFRICA Uganda Health, Nutrition & Population Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 3 ARCHIVED on 20-Dec-2017 ISR30454 Implementing Agencies:

More information

The World Bank Sri Lanka - Second Health Sector Development Project (P118806)

The World Bank Sri Lanka - Second Health Sector Development Project (P118806) Public Disclosure Authorized SOUTH ASIA Sri Lanka Health, Nutrition & Population Global Practice IBRD/IDA Sector Investment and Maintenance Loan FY 2013 Seq No: 6 ARCHIVED on 15-Dec-2015 ISR21541 Implementing

More information

The World Bank Sri Lanka - Second Health Sector Development Project (P118806)

The World Bank Sri Lanka - Second Health Sector Development Project (P118806) Public Disclosure Authorized SOUTH ASIA Sri Lanka Health, Nutrition and Population Global Practice IBRD/IDA Sector Investment and Maintenance Loan FY 2013 Seq No: 5 ARCHIVED on 22-Jun-2015 ISR19359 Implementing

More information

Press Release. Press Release SAVILLS VIETNAM REPORT ON INDUSTRIAL SECTOR NATIONWIDE 1. OVERVIEW 24/09/2015

Press Release. Press Release SAVILLS VIETNAM REPORT ON INDUSTRIAL SECTOR NATIONWIDE 1. OVERVIEW 24/09/2015 24/09/2015 SAVILLS VIETNAM REPORT ON INDUSTRIAL SECTOR NATIONWIDE 1. OVERVIEW Co.,Ltd 18 th Floor, Continental Tower 81-85 Ham Nghi Street District 1, HCMC T: +84 8 3823 9205 savills.com.vn Large-scale

More information

Implementation Status & Results Philippines Rural Power Project (P066397)

Implementation Status & Results Philippines Rural Power Project (P066397) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Philippines Rural Power Project (P066397) Operation Name: Rural Power Project (P066397) Project

More information

Public Disclosure Copy. Implementation Status & Results Report QUALISUS-REDE Brazil Health Network Formation and Quality Improvement Project (P088716)

Public Disclosure Copy. Implementation Status & Results Report QUALISUS-REDE Brazil Health Network Formation and Quality Improvement Project (P088716) LATIN AMERICA AND CARIBBEAN Brazil Health, Nutrition and Population Global Practice IBRD/IDA Adaptable Program Loan FY 2009 Seq No: 11 ARCHIVED on 21-Jan-2015 ISR17508 Implementing Agencies: Ministry of

More information

Implementation Status & Results Indonesia Government Financial Management and Revenue Administration Project (P085133)

Implementation Status & Results Indonesia Government Financial Management and Revenue Administration Project (P085133) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Government Financial Management and Revenue

More information

Implementation Status & Results Haiti Strengthening the Management of Agriculture Public Services (GFRP) (P113623)

Implementation Status & Results Haiti Strengthening the Management of Agriculture Public Services (GFRP) (P113623) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Haiti Strengthening the Management of Agriculture Public Services (GFRP) (P113623) Operation Name:

More information

Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405)

Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For 2012-2015 (P125405) Operation

More information

Implementation Status & Results Afghanistan Afghanistan Capacity Building for Results Facility (CBR) (P123845)

Implementation Status & Results Afghanistan Afghanistan Capacity Building for Results Facility (CBR) (P123845) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Afghanistan Afghanistan Capacity Building for Results Facility (CBR) (P123845) Operation Name: Afghanistan

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2012 Seq No: 12 ARCHIVED on 08-Dec-2017

More information

List of Winners for Cash-Back VND 1,000,000 Upon Purchase Vietjet Air Ticket with ANZ Credit Card Promotion

List of Winners for Cash-Back VND 1,000,000 Upon Purchase Vietjet Air Ticket with ANZ Credit Card Promotion List of Winners for Cash-Back VND 1,000,000 Upon Purchase Vietjet Air Ticket with ANZ Credit Card Promotion Khách hàng trúng thưởng chương trình Hoàn Tiền 1.000.000 đồng Khi Mua Vé Máy Bay Vietjet Air

More information

Implementation Status & Results China China Wuhan Second Urban Transport (P112838)

Implementation Status & Results China China Wuhan Second Urban Transport (P112838) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results China China Wuhan Second Urban Transport (P112838) Operation Name: China Wuhan Second Urban Transport (P112838)

More information

Implementation Status & Results Philippines National Program Support for Tax Administration Reform. (P101964)

Implementation Status & Results Philippines National Program Support for Tax Administration Reform. (P101964) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Philippines National Program Support for Tax Administration Reform. (P101964) Operation Name: National

More information

Implementation Status & Results Indonesia Aceh Infrastructure Reconstruction Financing Facility (IRFF) (P101785)

Implementation Status & Results Indonesia Aceh Infrastructure Reconstruction Financing Facility (IRFF) (P101785) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Aceh Infrastructure Reconstruction Financing Facility (IRFF) (P101785) Operation Name:

More information

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585) Operation Name: AR Cordoba Road Infrastructure

More information

Implementation Status & Results Senegal SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT (P101415)

Implementation Status & Results Senegal SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT (P101415) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Senegal SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT (P101415) Operation Name: SENEGAL: TRANSPORT

More information

Implementation Status & Results Brazil State Pension Reform II TAL (P089793)

Implementation Status & Results Brazil State Pension Reform II TAL (P089793) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil State Pension Reform II TAL (P089793) Operation Name: State Pension Reform II TAL (P089793)

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Water Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 7 ARCHIVED on 19-Jun-2015 ISR19914 Implementing Agencies: Ministry of

More information

Implementation Status & Results Lao People's De Lao PDR Trade Development Facility Project (P106165)

Implementation Status & Results Lao People's De Lao PDR Trade Development Facility Project (P106165) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Lao People's De Lao PDR Trade Development Facility Project (P106165) Operation Name: Lao PDR Trade

More information

Implementation Status & Results India Strengthening India's Rural Credit Cooperatives (P102768)

Implementation Status & Results India Strengthening India's Rural Credit Cooperatives (P102768) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Strengthening India's Rural Credit Cooperatives (P102768) Operation Name: Strengthening India's

More information

Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase APL (P082429)

Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase APL (P082429) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase

More information

Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405)

Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For 2012-2015 (P125405) Operation

More information

The World Bank Kenya Cash Transfer for Orphans and Vulnerable Children (P111545)

The World Bank Kenya Cash Transfer for Orphans and Vulnerable Children (P111545) Public Disclosure Authorized AFRICA Kenya Social Protection & Labor Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 17 ARCHIVED on 21-Jun-2017 ISR28380 Implementing Agencies: Ministry

More information

The World Bank Municipal Services Improvement (P096481)

The World Bank Municipal Services Improvement (P096481) Public Disclosure Authorized EUROPE AND CENTRAL ASIA Macedonia, former Yugoslav Republic of Urban Development Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 15 ARCHIVED on 15-Jun-2015

More information

Saint Lucia Health System Strengthening Project (P166783)

Saint Lucia Health System Strengthening Project (P166783) LATIN AMERICA AND CARIBBEAN St. Lucia Health, Nutrition & Population Global Practice IBRD/IDA Investment Project Financing FY 2019 Seq No: 1 ARCHIVED on 26-Dec-2018 ISR35158 Implementing Agencies: Ministry

More information

Improving Maternal and Child Health through Integrated Social Services (P123706)

Improving Maternal and Child Health through Integrated Social Services (P123706) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Haiti Health, Nutrition & Population Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 31-Dec-2018 ISR35476 Implementing

More information

Implementation Status & Results Bosnia and Herzegovina Agriculture and Rural Development Project (P101213)

Implementation Status & Results Bosnia and Herzegovina Agriculture and Rural Development Project (P101213) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Bosnia and Herzegovina Agriculture and Rural Development Project (P101213) Operation Name: Agriculture and Rural

More information

Public Disclosure Copy

Public Disclosure Copy EAST ASIA AND PACIFIC Solomon Islands Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2009 Seq No: 14 ARCHIVED on 16-May-2018 ISR32246 Implementing Agencies: Ministry of Finance

More information

Zambia Kafue Town - Muzuma - Victoria Falls Regional Transmission Line Reinforcement Project

Zambia Kafue Town - Muzuma - Victoria Falls Regional Transmission Line Reinforcement Project Public Disclosure Authorized Zambia Kafue Town - Muzuma - Victoria Falls Regional Transmission Line Reinforcement Project (P124351) AFRICA Africa Energy and Mining Global Practice IBRD/IDA Specific Investment

More information

Implementation Status & Results Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD) (P117243)

Implementation Status & Results Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD) (P117243) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD)

More information

Public Disclosure Copy

Public Disclosure Copy EAST ASIA AND PACIFIC China Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 12 ARCHIVED on 27-Nov-2017 ISR28052 Implementing Agencies: Ministry of Fiance, Shandong

More information

The World Bank Bangladesh Ghorashal Unit 4 Repowering Project (P128012)

The World Bank Bangladesh Ghorashal Unit 4 Repowering Project (P128012) Public Disclosure Authorized SOUTH ASIA Bangladesh Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 3 ARCHIVED on 24-Apr-2017 ISR27761 Implementing Agencies: Public

More information

Vertical Accountability PAPI Chapter 3. Map 3.3: Provincial Performance in Vertical Accountability by Quartiles

Vertical Accountability PAPI Chapter 3. Map 3.3: Provincial Performance in Vertical Accountability by Quartiles Dimension 3: Vertical Accountability Map 3.3: Provincial Performance in Vertical Accountability by Quartiles Vertical Accountability Best Performers High Average Low Average Poor Performers 46 THE VIET

More information

PROJECT AGREEMENT. (Viet Nam Water Sector Investment Program Project 2) between ASIAN DEVELOPMENT BANK. and

PROJECT AGREEMENT. (Viet Nam Water Sector Investment Program Project 2) between ASIAN DEVELOPMENT BANK. and LOAN NUMBER 2961-VIE PROJECT AGREEMENT (Viet Nam Water Sector Investment Program Project 2) between ASIAN DEVELOPMENT BANK and BAC GIANG WATER SUPPLY AND SEWERAGE ONE MEMBER LIMITED COMPANY BINH DUONG

More information

Time Series. Time Series

Time Series. Time Series 1992 Flood at Cua Dat (instaneous peak discharge: 422m3/s) 2, Time Series 2, Discharge historical [m3/s] 2, 2, 1,8 1, 1, 1, 8 2-9-1992 23-9-1992 26-9-1992 29-9-1992 Time 2-1-1992 5-1-1992 8-1-1992 M1 QH

More information

Public Disclosure Copy. Implementation Status & Results Report Improving Maternal and Child Health through Integrated Social Services (P123706)

Public Disclosure Copy. Implementation Status & Results Report Improving Maternal and Child Health through Integrated Social Services (P123706) Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Haiti Health, Nutrition & Population Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 10 ARCHIVED on 29-Jun-2018 ISR32902 Implementing

More information

Public Disclosure Copy. Implementation Status & Results Report Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770)

Public Disclosure Copy. Implementation Status & Results Report Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770) Public Disclosure Authorized SOUTH ASIA Bangladesh Governance Global Practice IBRD/IDA Program-for-Results FY 2014 Seq No: 7 ARCHIVED on 05-Jun-2017 ISR28344 Implementing Agencies: National Board of Revenue,

More information

Implementation Status & Results Bolivia BO: Investing in Children and Youth (P101084)

Implementation Status & Results Bolivia BO: Investing in Children and Youth (P101084) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bolivia BO: Investing in Children and Youth (P101084) Operation Name: BO: Investing in Children

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Myanmar Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 06-Jan-2016 ISR21425 Implementing Agencies:

More information

Implementation Status & Results China Rural Health Project (P084437)

Implementation Status & Results China Rural Health Project (P084437) Public Disclosure Authorized @ The World Bank Implementation Status & Results China Rural Health Project (P84437) o o Operation Name: Rural Health Project (P84437) Project Stage: Implementation Seq.No:

More information

Implementation Status & Results Peru PERU Participatory intervention model to improve child nutrition (P120888)

Implementation Status & Results Peru PERU Participatory intervention model to improve child nutrition (P120888) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru PERU Participatory intervention model to improve child nutrition (P120888) Operation Name:

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Burkina Faso Social Protection & Labor Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 10 ARCHIVED on 23-Dec-2017 ISR29874 Implementing Agencies:

More information

Implementation Status & Results Indonesia URBAN SECTOR DEVELOPMENT AND REFORM PROJECT (P071296)

Implementation Status & Results Indonesia URBAN SECTOR DEVELOPMENT AND REFORM PROJECT (P071296) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia URBAN SECTOR DEVELOPMENT AND REFORM PROJECT (P071296) Operation Name: URBAN SECTOR DEVELOPMENT

More information

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components

The World Bank. Ghana: Energy Development and Access Project (P074191) Key Dates. Project Development Objectives. Components Public Disclosure Authorized AFRICA Ghana Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2008 Seq No: 19 ARCHIVED on 29-Jun-2018 ISR32934 Implementing Agencies: Electricity

More information

The World Bank Ghana - PPP Project (P125595)

The World Bank Ghana - PPP Project (P125595) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized AFRICA Ghana Finance & Markets Global Practice IBRD/IDA Adaptable Program Loan FY 2012

More information

LOCAL FINANCE SURVEY REPORT

LOCAL FINANCE SURVEY REPORT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Background Report for the World Bank s Country Economic Memorandum Vietnam: Fiscal Decentralization

More information

Public Disclosure Copy. Name Previous Rating Current Rating

Public Disclosure Copy. Name Previous Rating Current Rating Public Disclosure Authorized AFRICA Kenya Social Protection Global Practice IBRD/IDA Program-for-Results FY 2014 Seq No: 3 ARCHIVED on 26-Dec-2014 ISR17662 Implementing Agencies: Program Development Objectives

More information

Implementation Status & Results Liberia LR-Public Financial Management - IFMIS (P109775)

Implementation Status & Results Liberia LR-Public Financial Management - IFMIS (P109775) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Liberia LR-Public Financial Management - IFMIS (P109775) Operation Name: LR-Public Financial Management

More information

Implementation Status & Results Indonesia URBAN SECTOR DEVELOPMENT AND REFORM PROJECT (P071296)

Implementation Status & Results Indonesia URBAN SECTOR DEVELOPMENT AND REFORM PROJECT (P071296) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia URBAN SECTOR DEVELOPMENT AND REFORM PROJECT (P071296) Operation Name: URBAN SECTOR DEVELOPMENT

More information

Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810)

Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810) Operation

More information

Public Disclosure Copy. Implementation Status & Results Report Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770)

Public Disclosure Copy. Implementation Status & Results Report Revenue Mobilization Program for Results: VAT Improvement Program (VIP) (P129770) Public Disclosure Authorized SOUTH ASIA Bangladesh Governance Global Practice IBRD/IDA Program-for-Results FY 2014 Seq No: 5 ARCHIVED on 30-Jun-2016 ISR24364 Implementing Agencies: National Board of Revenue

More information

REPORT ON CORPORATE GOVERNANCE OF DHG PHARMACEUTICAL JOINT STOCK COMPANY (in 2018) Kind Attn to:

REPORT ON CORPORATE GOVERNANCE OF DHG PHARMACEUTICAL JOINT STOCK COMPANY (in 2018) Kind Attn to: DHG PHARMACEUTICAL JSC SOCIALIST REPUBLIC OF VIETNAM Independence Freedom - Happiness No.: 051/DHG-FN Cantho, 28 th January 2019 REPORT ON CORPORATE GOVERNANCE OF DHG PHARMACEUTICAL JOINT STOCK COMPANY

More information

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Mozambique -Roads and Bridges Management and Maintenance Program - Phase II (P083325) AFRICA Mozambique Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2007 Seq No: 24 ARCHIVED on 29-Aug-2018 ISR33744 Implementing Agencies: ROAD FUND (Fundo de Estradas),

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Transport Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 12 ARCHIVED on 24-Feb-2015 ISR18063 Implementing Agencies: Hanoi Urban

More information

The World Bank Transport Connectivity and Asset Management Project (P132833)

The World Bank Transport Connectivity and Asset Management Project (P132833) Public Disclosure Authorized SOUTH ASIA Sri Lanka Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2016 Seq No: 2 ARCHIVED on 30-Jan-2017 ISR26613 Implementing Agencies: Public Disclosure

More information

Implementation Status & Results India India: Reproductive & Child Health Second Phase (P075060)

Implementation Status & Results India India: Reproductive & Child Health Second Phase (P075060) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India India: Reproductive & Child Health Second Phase

More information

The PCI-Foreign Invested Enterprises 2011 Survey American Chamber of Commerce June 6, 2012, New Saigon World Hotel, HCMC

The PCI-Foreign Invested Enterprises 2011 Survey American Chamber of Commerce June 6, 2012, New Saigon World Hotel, HCMC The PCI-Foreign Invested Enterprises 2011 Survey American Chamber of Commerce June 6, 2012, New Saigon World Hotel, HCMC Jim Winkler, Ph.D. USAID/VNCI Director Findings taken from the PCI 2011 report,

More information

Implementation Status & Results Nigeria Nigeria Edo State First Development Policy Operation (P123353)

Implementation Status & Results Nigeria Nigeria Edo State First Development Policy Operation (P123353) Public Disclosure Authorized Public Disclosure Authorized Project Name: Implementation Status & Results Nigeria Nigeria Edo State First Development Policy Operation (P123353) Nigeria Edo State First Development

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Congo, Republic of Social Protection & Labor Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 4 ARCHIVED on 07-Jan-2016 ISR22324 Implementing Agencies:

More information

MicroSmall&Medium Enterprise and Large Enterprise Supply Chain Finance (P157691)

MicroSmall&Medium Enterprise and Large Enterprise Supply Chain Finance (P157691) EUROPE AND CENTRAL ASIA Turkey Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 6 ARCHIVED on 26-Nov-2018 ISR34378 Implementing Agencies: Türkiye

More information

MISSION REPORT POST DISTRIBUTION MONITORING OF THE EMERGENCY CASH TRANSFER PROGRAMME IN THREE FLOOD-HIT PROVINCES

MISSION REPORT POST DISTRIBUTION MONITORING OF THE EMERGENCY CASH TRANSFER PROGRAMME IN THREE FLOOD-HIT PROVINCES International Federation of Red Cross and Red Crescent Societies MISSION REPORT on POST DISTRIBUTION MONITORING OF THE EMERGENCY CASH TRANSFER PROGRAMME IN THREE FLOOD-HIT PROVINCES Monitoring sites Reported

More information

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Transport & ICT Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 12 ARCHIVED on 20-Jun-2016 ISR23360 Implementing Agencies:

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 21-Feb-2013 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

More information

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916)

The World Bank Indonesia Infrastructure Guarantee Fund Project (P118916) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Finance & Markets Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 10 ARCHIVED on 24-Dec-2017 ISR31037 Implementing Agencies:

More information

TR Third Access to Finance for SMEs (SME III) (P130864)

TR Third Access to Finance for SMEs (SME III) (P130864) EUROPE AND CENTRAL ASIA Turkey Finance, Competitiveness and Innovation Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 9 ARCHIVED on 17-Oct-2018 ISR34297 Implementing Agencies: T.

More information

Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810)

Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810) Operation

More information

Implementation Status & Results Indonesia Initiatives for Local Governance Reform Project (P076174)

Implementation Status & Results Indonesia Initiatives for Local Governance Reform Project (P076174) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Initiatives for Local Governance Reform Project (P076174) Operation Name: Initiatives

More information

The World Bank CG Rep. Skills Development for Employability Project (P128628)

The World Bank CG Rep. Skills Development for Employability Project (P128628) Public Disclosure Authorized AFRICA Congo, Republic of Education Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 17-Jun-2017 ISR27973 Implementing Agencies: Ministry

More information

Implementation Status & Results India Bihar Rural Livelihoods Project - "JEEViKA" (P090764)

Implementation Status & Results India Bihar Rural Livelihoods Project - JEEViKA (P090764) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results India Bihar Rural Livelihoods Project - "JEEViKA" (P090764) Operation

More information