1 Cost of Compliance with the 2014 Massachusetts MS4 Permit Massachusetts Department of Environmental Protection Michael Giroux, Cameron Peterson, Eric Correia
2 The Massachusetts Department of Environmental Protection
3 Roadmap Background Information Goals and Objectives Cost Analysis Findings and Recommendations
4 Background The Six Minimum Control Measures The Central Massachusetts Regional Stormwater Coalition (Coalition) Subject Towns: Southbridge, Holden, Millbury
5 The Six Minimum Control Measures 1. Public Education and Outreach 2. Public Involvement and Participation 3. Illicit Discharge Detection and Elimination (IDDE) 4. Construction Site Stormwater Runoff Control 5. Post Construction Site Runoff Control 6. Pollution Prevention and Good Housekeeping 5
6 Central Mass Regional Stormwater Coalition 13 Original Towns in Fiscal Year More Joined in Fiscal Year
7 Subject Towns Holden Population 17,636 Town Budget $52,774,844 Area 36.2 mi 2 Percent Impervious 7.04% 7
8 Subject Towns Southbridge Population 16,799 Town Budget $56,739,257 Area 20.9 mi 2 Percent Impervious 8.69% 8
9 Subject Towns Millbury Population 13,305 Town Budget $9,018,827 Area 16.3 mi 2 Percent Impervious 13.09% 9
10 Project Goal and Objectives Project Goal Objectives
11 Project Goal Provide the towns of Southbridge, Holden, and Millbury a comprehensive cost analysis of implementing the 2014 MS4 draft permit 11
12 Objectives Objective 1: Become Educated 12
13 Objectives Objective 1: Become Educated Objective 2: Assess Compliance 13
14 Objectives Objective 1: Become Educated Objective 2: Assess Compliance Objective 3: Current Total Expenditures 14
15 Objectives Objective 1: Become Educated Objective 2: Assess Compliance Objective 3: Current Total Expenditures Objective 4: Identify Necessary Changes 15
16 Objectives Objective 1: Become Educated Objective 2: Assess Compliance Objective 3: Current Total Expenditures Objective 4: Identify Necessary Changes Objective 5: Create a Detailed Cost Analysis 16
17 Objectives Objective 1: Become Educated Objective 2: Assess Compliance Objective 3: Current Total Expenditures Objective 4: Identify Necessary Changes Objective 5: Create a Detailed Cost Analysis Objective 6: Create an Informational Video 17
18 Cost Analysis Current Cost of Compliance Example Cost Sheet: Holden Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit
19 Current Cost of Compliance Control Measure Public Education Public Participation Holden Millbury Southbridge $1,000 $566 $10,952 $0 $3,242 $0 IDDE $3,520 $4,678 $2,452 Construction $0 $350 $0 Post Construction Good Housekeeping $1,760 $0 $0 $180,246 $576,124 $255,200 Total $186,526 $584,960 $268,604 Impervious Area 7.04% 13.09% 8.69% 19
20 Example Future Cost Chart: Holden Control Measure Public Education Public Participation Annual Cost One-Time Cost Intermittent Cost $9,908 $0 $0 $0 $0 $0 IDDE $7,872 $314,494 $50,440 Construction $0 $770 $0 Post- Construction Good Housekeeping $5,280 $1,496 $7,436 $220,562 $6,292 $0 Miscellaneous $15,168 $2,376 $0 Total $258,790 $325,428 $57,876 20
21 Example Future Cost Chart: Holden Control Measure Public Education Public Participation Annual Cost One-Time Cost Intermittent Cost $9,908 $0 $0 $0 $0 $0 IDDE $7,872 $314,494 $50,440 Construction $0 $770 $0 Post- Construction Good Housekeeping $5,280 $1,496 $7,436 $220,562 $6,292 $0 Miscellaneous $15,168 $2,376 $0 Total $258,790 $325,428 $57,876 21
22 Example Future Cost Chart: Holden Control Measure Public Education Public Participation Annual Cost One-Time Cost Intermittent Cost $9,908 $0 $0 $0 $0 $0 IDDE $7,872 $314,494 $50,440 Construction $0 $770 $0 Post- Construction Good Housekeeping $5,280 $1,496 $7,436 $220,562 $6,292 $0 Miscellaneous $15,168 $2,376 $0 Total $258,790 $325,428 $57,876 22
23 Anticipated Future Costs for Complying with the 2014 MS4 Draft Permit Impervious Area Holden Southbridge Millbury 7.04% 8.69% 13.09% Number of Outfalls Current Cost $186,526 $268,604 $584,960 Predicted Annual Cost Percent Increase $258,790 $343,008 $735,629 39% 28% 26% 23
24 Findings and Recommendations Funding Techniques Centralized Management Innovative Funding Regionalization
25 Finding & Recommendation 1 Finding Funding Techniques CIC Grant Alternatives Millbury s Technique Recommendation Seek Alternative Funding 604(b), Source Water Protection, etc. 25
26 Finding & Recommendation 2 Finding Easier With Stormwater Coordinator Scattered Information Recommendation Designated Person DCR 26
27 Finding & Recommendation 3 Finding Innovative Management Millbury s Piping Art Contest Recommendation Be Creative 27
28 Finding & Recommendation 4 Finding Regionalization Is Beneficial More Efficient High Cost/Benefit Ratio Savings with Coalition Recommendation Form Coalitions Work With Neighbors 28
29 Citations ic/ma_imperv2010_holden.pdf ic/ma_imperv2010_millbury.pdf ic/ma_imperv2010_millbury.pdf ReportViewer.aspx?ReportName=At_A_Glance&Repo rttitle=at+a+glance
30 Questions?
A Quick Guide to Defining and Funding Your Municipal Stormwater Program Merrimack Valley Stormwater Collaborative
A Quick Guide to Defining and Funding Your Municipal Stormwater Program Merrimack Valley Stormwater Collaborative June 3, 2015 Ellie Baker Horsley Witten Group, Inc. What will we cover today? Introduction
More informationPRESENTED BY: ANN WILSON
MS4 ANNUAL REPORT PRESENTED BY: ANN WILSON PERMIT REQUIREMENTS Found Part V, Section C, Pages 3-4 Submit reports to LDEQ by March 10 (postmarked) Reporting year, preceding calendar year Address where to
More informationNPDES Small MS4 General Permit (OHQ000002) Annual Reporting Form
NPDES Small MS4 General Permit (OHQ000002) Annual Reporting Form City of Middletown Updated Management Plan - 2011 City of Middletown Updated Management Plan Ohio EPA Facility Permit Number: 1GQ00055*AG
More informationDRAFT MS4 Annual Report Cover Page
3258632975 MS4 Annual Report Cover Page MCC form for period ending March 9, 2 1 8 This cover page must be completed by the report preparer. Joint reports require only one cover page. Choose one: 2 This
More informationWest Virginia Department of Environmental Protection MS4 Phase II Storm Water Program Storm Water Management Annual Report
West Virginia Department of Environmental Protection MS4 Phase II Srm Water Program Srm Water Management Annual Report City of Vienna, West Virginia May 23, 2009 1.0 INTRODUCTION The City of Vienna was
More informationActual TOTAL $ 2,793,103 $ 3,115,212 $ 3,206,457 $ 3,296,810
REVENUE AND EXPENDITURE SUMMARY ITEM Revenues, Other Sources, and Fund Balance Sales/Charges for Services $ 2,773,135 $ 3,077,010 $ 3,191,580 $ 3,288,810 Miscellaneous Income 9,538 8,000 8,416 8,000 Investment
More informationManagement Team Meeting Notes November 14, City of Clarkston Public Works Director. Asotin County Public Works Director
County of Asotin Regional Stormwater Program P.O. Box 160 135 2 nd Street Asotin, WA 99402 509-243-2074 Fax 509-243-2003 ATTENDANCE Management Team Meeting Notes November 14, 2011 Management Team Voting
More informationSTORMWATER ANNUAL REPORT MS4s (Municipal Separate Storm Sewer Systems) (Form revised 12/03)
(Municipal Separate Storm Sewer Systems) (Form revised 12/03) COLORADO DEPT. OF PUBLIC HEALTH & ENVIRONMENT Water Quality Control Division WQCD-P-B2 4300 Cherry Creek Drive South Denver, Colorado 80246-1530
More informationCity of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach
i City of Centerville s Table of Contents Minimum Control Measure 1. Public Education and Outreach Best Management Practice Page 1-1: Outreach Publications...1 1-2: 30-day Public Notice for Annual Storm
More informationSTORMWATER ADVISORY GROUP August 26, 2009 Clarkston School District Admin Office 1294 Chestnut Street, Clarkston 5:30-7:30 p.m.
County of Asotin Regional Stormwater Program P.O. Box 160 135 2 nd Street Asotin, WA 99402 509-243-2071 Fax 509-243-2003 STORMWATER ADVISORY GROUP August 26, 2009 Clarkston School District Admin Office
More informationDRAFT. Fill in SPDES ID in upper right hand corner. (Per Part II.E of GP ) Name of Single Entity
3258632975 2 0 1 7 3 7 1 Fill in in upper right hand corner. Name of MS4 T o w n o f O y s t e r B a y (Per Part II.E of GP-0-10-002) Name of Single Entity Provide of each permitted MS4 included in this
More informationSTORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES
DEPARTMENT OF ENVIRONMENTAL SERVICES Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,
More information2013 Financing Feasibility Study for Stormwater Management in Salisbury, Maryland
2013 Financing Feasibility Study for Stormwater Management in Salisbury, Maryland Prepared for the City of Salisbury, Maryland Prepared by the Environmental Finance Center (EFC) for the Maryland Department
More informationWater Resources Engineering Division Public Works City of Colorado Springs
Water Resources Engineering Division Public Works City of Colorado Springs Richard Mulledy, P.E. Division Manager City of Colorado Springs/Pueblo County IGA City of Colorado Springs/Pueblo County IGA $460
More informationStormwater Utility Report #2 April 5, 2016
Stormwater Utility Report #2 April 5, 2016 Introduction In 2015, the Village Council identified Consider Changes to the Stormwater Utility as a Top Priority Action Item. While the fundamental policy question
More informationMS4 Annual Report Cover Page. This report is being submitted on behalf of an individual MS4.
3258632975 MS4 Annual Report Cover Page MCC form for period ending March 9, 2 0 1 7 This cover page must be completed by the report preparer. Joint reports require only one cover page. Choose one: 2 9
More informationGREATER EAST WENATCHEE STORMWATER UTILITY MANAGEMENT TEAM MEETING AGENDA Thursday, February 15, 2018 Douglas County Conference Room
INVITEES: CONSENT ITEMS: GREATER EAST WENATCHEE STORMWATER UTILITY MANAGEMENT TEAM MEETING AGENDA Thursday, February 15, 2018 Douglas County Conference Room Kyle Steinburg, Jim Barker, Mitch Reister, Matthew
More informationAuthorization to Discharge Under the National Pollutant Discharge Elimination System (NPDES)
Authorization to Discharge Under the National Pollutant Discharge Elimination System (NPDES) General NPDES Permit Number NER310000 Authorizing Storm Water Discharges to waters of the State from Small Municipal
More informationStormwater Financing Feasibility Study for. Wrightsville Borough, Pennsylvania
2015 Stormwater Financing Feasibility Study for Wrightsville Borough, Pennsylvania Prepared for Wrightsville Borough, Pennsylvania Prepared by University of Maryland Environmental Finance Center for the
More informationBowie MEMORANDUM. lir. Update on Watershed Implementation Plan II Milestones
of 1; 7 15901 Excalibur Road eftmar4v Bowie, Maryland 20716 Bowie MEMORANDUM TO: City Council e, `_ ṛ Iv FROM: Alfred D. Lott, City M. -: er lir SUBJECT: Update on 2016-2017 Watershed Implementation Plan
More informationWORCESTER REGIONAL TRANSIT AUTHORITY ANNUAL REPORT. 287 Grove Street Worcester, MA
WORCESTER REGIONAL TRANSIT AUTHORITY ANNUAL REPORT 09 287 Grove Street Worcester, MA 01605 www.therta.com WRTA Administration Events and Milestones Prior to the global financial crisis taking hold in the
More informationTOWN OF CHARLTON. New York State Department of Environmental Conservation SPDES General Permit Coverage For Municipal Separate Storm Sewer Systems
TOWN OF CHARLTON New York State Department of Environmental Conservation SPDES General Permit Coverage For Municipal Separate Storm Sewer Systems Permit # NYR20A032 STORM WATER MANAGEMENT PROGRAM 2015
More informationSTORMWATER MANAGEMENT FUND Department of Environmental Services
Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,
More information*MS4 permittee name: Dakota County *County: Dakota (city, county, municipality, government agency or other entity)
MS4 SWPPP Application for Reauthorization for the NPDES/SDS General Small Municipal Separate Storm Sewer System (MS4) Permit MNR040000 reissued with an effective date of August 1, 2013 Stormwater Pollution
More informationLake County Stormwater Utility Fee
County of Lake Stormwater Management Department 550 Blackbrook Road Painesville, OH 44077 Phone: (440) 350-2770 Fax: (440) 352-8133 www.lakecountyohio.org/smd Lake County Stormwater Utility Fee Credit
More informationStormwater Utilities 101: Getting Started on Financing your Stormwater Management Plan
Stormwater Utilities 101: Getting Started on Financing your Stormwater Management Plan Joanne Throwe Environmental Finance Center University of Maryland Martinsburg, WV July 17, 2013 The Environmental
More information*** DRAFT - NOT YET FILED ***
3745-39-03 Ohio EPA NPDES requirements for small MS4s. [Comment: For dates of non-regulatory government publications, publications of recognized organizations and associations, federal rules and federal
More informationSTORMWATER DISTRICT UTILITY FEASIBILITY STUDY York County, South Carolina
STORMWATER DISTRICT UTILITY FEASIBILITY STUDY, South Carolina February 18, 2018 Table of Contents 1 Introduction... 2 2 Program Overview... 3 2.1 Current Program... 5 2.1.1 Regulatory Compliance... 5 2.1.2
More informationFUTURE STORMWATER CONTROLS PROGRAM RULES (ARTICLE 5)
FUTURE STORMWATER CONTROLS PROGRAM RULES (ARTICLE 5) Catskill Watershed Corporation PO Box 569 Margaretville, NY 12455 (845) 586-1400 Approved by the Board of Directors June 23, 1998 Revised April 5, 2016
More informationCutting Costs through Regional
Cutting Costs through Regional Stormwater Management Presented by: Jim Tomaine, P.E. Executive Director, Wyoming Valley Sanitary Authority Adrienne Vicari, P.E. Financial Services Practice Area Leader
More informationStormwater Infrastructure Capital Finance
Stormwater Infrastructure Capital Finance Jeff Hughes Environmental Finance Center UNC School of Government (919) 843-4956 jhughes@iogmail.iog.unc.edu www.efc.unc.edu Objectives Increased understanding
More informationAUDIT OF Department of Public Utilities STORMWATER DIVISION
Report Issue Date: June 9, 2015 Report Number: 2015-10 AUDIT OF Department of Public Utilities STORMWATER DIVISION Richmond City Council Office of the City Auditor Richmond City Hall 900 E. Broad Street,
More informationCOMMUNITY DEVELOPMENT DEPARTMENT. Glynn County Board of Commissioners. Finance Committee. Pamela Thompson, Director Community Development Dept.
COMMUNITY DEVELOPMENT DEPARTMENT 1725 Reynolds Street, Second Floor, Brunswick, GA 31520 Phone: 912:554-7492/Fax: 1-888-261-4757 TO: VIA: FROM: RE: Glynn County Board of Commissioners Finance Committee
More information1. Work with the Stormwater Program to ensure robust participation in the process by an inclusive range of stakeholders.
Vermont Department of Environmental Conservation Watershed Management Division 1 National Life Drive [phone] 802-490-6169 Main 2 Montpelier, VT 05620-3522 www.watershedmanagement.vt.gov Agency of Natural
More informationCITY COUNCIL AGENDA THURSDAY, APRIL 4, :00 P.M. City Council Chambers- The Hurley Building 205 Saltonstall St., Canandaigua, NY 14424
CITY COUNCIL AGENDA THURSDAY, APRIL 4, 2019 7:00 P.M. City Council Chambers- The Hurley Building 205 Saltonstall St., Canandaigua, NY 14424 City Council: Ellen Polimeni, Mayor Nick Cutri, Councilmember
More informationCity of Kinston. Stormwater Utility Credit Manual
City of Kinston Stormwater Utility Credit Manual Effective Date: July 1, 2008 Table of Contents 1.0 INTRODUCTION...3 2.0 DEFINITIONS...4 3.0 GENERAL CREDIT POLICIES...4 4.0 STORMWATER BMP CREDIT POLICY.......................
More informationGROUP LONG-TERM CARE INSURANCE POLICY
JOHN HANCOCK LIFE INSURANCE COMPANY (John Hancock) John Hancock agrees with the Policyholder to pay the benefits and provide the other rights set forth in the Policy. Such agreement is subject to all conditions
More informationSECTION A-2, PROGRAM MANAGEMENT PROGRAM MANAGEMENT
A-2.0 A-2.1 PROGRAM MANAGEMENT INTRODUCTION management activities conducted by the County to implement the LIP involve the following activities: Coordination as the Principal Permittee with other Permittees
More informationMANAGING FLOODS OF THE FUTURE: CONCEPTS, TOOLS & SUCCESS STORIES Iowa Post-Disaster Workshops November 12 & 13, 2008 Cedar Falls & Iowa City, Iowa
MANAGING FLOODS OF THE FUTURE: CONCEPTS, TOOLS & SUCCESS STORIES Iowa Post-Disaster Workshops November 12 & 13, 2008 Cedar Falls & Iowa City, Iowa Sam Riley Medlock, CFM, JD ASFPM Policy & Partnerships
More informationDenton Planning Commission. Minutes. Town of Denton. March 27, * Those Present ** Excused
Denton Planning Commission Minutes Town of Denton Planning Commission Members: Doris Walls, Chairperson* William Quick* Sue Cruickshank* Marina Dowdall* Matt Breedlove* Brian Tyler * Those Present ** Excused
More informationMaster Request for Qualifications. Bay Area Stormwater Management Agencies Association (BASMAA) August 2015
Master Request for Qualifications Bay Area Stormwater Management Agencies Association (BASMAA) August 2015 Release: August 24, 2015 Submittal: 5 PM PDT; September 18, 2015 Filing Period: Open BASMAA Master
More informationMS4 Annual Report Cover Page DRAFT N Y R 2 O A N Y R 2 O A N Y R 2 O A N Y R 2 0 A N Y R 2 0 A N Y R 2 O A N Y R 2 O A N Y R 2 O A N Y R 2 O A
I 3258632975 MS4 Annual Report Cover Page MCC form for period ending March 9, 2 O l 8 This cover page must be completed by the report preparer. Joint reports require only one cover page. Choose one: O
More informationStormwater Business Plan & 2019 Budget
Stormwater 2019 2022 Business Plan & 2019 Budget Foreword Our Vision for the Future Mississauga will inspire the world as a dynamic and beautiful global city for creativity and innovation, with vibrant,
More informationSurface Water Utility Rate Study -Update-
Surface Water Utility Rate Study -Update- City Council Study Session July 18, 2017 Steve Leniszewski, PE Public Works Director Cheryl Paston, PE Deputy Public Works Director John Ghilarducci, FCS Group
More informationOHIO TURNPIKE OUTFALL PERMIT APPLICATION - GENERAL CONDITIONS
OHIO TURNPIKE OUTFALL PERMIT APPLICATION - GENERAL CONDITIONS The following General Conditions are to be reviewed, appropriate information collected and the Permit Application form filled out by the applicant
More informationSeptember 28, Yahara WINS Member:
September 28, 2018 Yahara WINS Member: The Executive Committee is pleased to present the DRAFT 2019 Operating Budget for Yahara WINS. As we enter another full year of full implementation we are optimistic
More informationSubj: REQUIREMENTS FOR PAYMENT OF STORMWATER MANAGEMENT CHARGES
DEPARTMENT OF THE NAVY COMMANDER, NAVY INSTALLATIONS COMMAND 716 SICARD STREET, SE, SUITE 1000 WASHINGTON NAVY YARD, DC 20374-5140 CNIC INSTRUCTION 5090.5 From: Commander, Navy Installations Command CNICINST
More informationWilliam & Mary Law School Scholarship Repository
College of William & Mary Law School William & Mary Law School Scholarship Repository Virginia Coastal Policy Clinic Law School Clinics 2013 Sea Level Rise, Stormwater Management, and the National Flood
More information1/12/2017. The Road to RAPs. Annette Higby. . Attorney at Law Randolph, VT
The Road to RAPs Annette Higby. Attorney at Law Randolph, VT. 1 The Road to RAPs 1972 Federal Clean Water Act Point Sources Permits and technological controls Non point sources left to the states. The
More informationSTORMWATER ANNUAL REPORT FORM
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 8 1595 Wynkoop Street DENVER, CO 80202-1129 Phone 800-227-8917 http://www.epa.gov/region8/stormwater STORMWATER ANNUAL REPORT FORM This form is for
More informationTERMS OF REFERENCE FOR CONSULTING SERVICES FOR A STORMWATER FUNDING STUDY
TERMS OF REFERENCE FOR CONSULTING SERVICES FOR A STORMWATER FUNDING STUDY PROJECT OVERVIEW The City of Guelph (City) wishes to retain a consulting engineering firm to complete a Stormwater Funding Study.
More informationMarch 29, Re: General Permit No. GP SPDES Storm Water Discharges Municipal Separate Storm Sewer Systems (MS4) Permit Modification
Division of Water Bureau of Water Compliance, 4 th Floor 625 Broadway, Albany, New York 12233-3506 Phone: (518) 402-8177 FAX: (518) 402-8082 Joseph Abbamonte United States Merchant Marine Academy 300 Steam
More informationFloodplain Management Plan
Floodplain Management Plan CITY OF FORT WORTH TFMA 2016 Spring Conference March 10, 2016 Agenda 1. Fort Worth Higher Standards (NFIP & CRS) 2. Floodplain Management Plan Overview and Results 3. Project
More informationSTORMWATER MANAGEMENT FUND Department of Environmental Services
Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,
More informationStormwater Utility & Water Utility Charges & Rates. October 20, 2015
Stormwater Utility & Water Utility Charges & Rates October 20, 2015 1 Agenda Fiscal Policies/Goals System Development Charge Stormwater Utility Charges & Rates Water Utility Charges & Rates 2 Fiscal Policies/Goals
More informationPUBLIC WORKS DEPARTMENT (303)
PUBLIC WORKS DEPARTMENT (303) 235-2861 7500 WEST 29thAVENUE WHEAT RIDGE, CO 80033 February 27,2004 Kathryn Dolan Stormwater Program Coordinator Colorado Dept of Public Health 4300 Cherry Creek Dr. S. Denver,
More informationNO EXPOSURE CERTIFICATION For Exclusion from NPDES Stormwater Permitting. Complete No Exposure Certification
NO EXPOSURE CERTIFICATION The enclosed form may be used to request a No Exposure Exclusion from Industrial Stormwater permitting requirements as outlined in Part 1.8 of ARR000000. Only a copy of the attached
More informationTown of Vernon Appointed Clerk/Treasurer Responsibilities in conjunction with Wisconsin State Statutes and Town of Vernon Ordinances
Town of Vernon Appointed Clerk/Treasurer Responsibilities in conjunction with Wisconsin State Statutes and Town of Vernon Ordinances Town Clerk s Financial Responsibilities Maintain an accurate filing
More informationSeptember 28, Yahara WINS Member:
September 28, 2017 Yahara WINS Member: The Executive Committee is pleased to present the DRAFT 2018 Operating Budget for Yahara WINS. As we enter the second full year of full implementation following the
More informationDeerfield Regional Storm Water District. Meeting Milestones/Logistics
Deerfield Regional Storm Water District SWAC Meeting No. 3 Storm Water Financing and Level of Service Selection September 22, 2005 Meeting Milestones/Logistics July 27, 2005 1 st Meeting Project Introduction
More informationDecember Sunday Monday Tuesday Wednesday Thursday Friday Saturday 5 PLANNING COMMISSION 7:00 CAUCUS 6:45 20 BZA 7:00 CAUCUS 6:45 19 BZA 7:00
December 2018 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 1 2 3 4 COUNCIL AND CAUCUS 7:00 5 PLANNING COMMISSION 7:00 CAUCUS 6:45 6 7 8 9 10 CIVIL SERVICE COMM 4:00 (COMMUNITY ROOM #2) 11 12
More informationMiddleborough FY18 Operating Budget
Middleborough FY18 Operating Budget February 6, 2017 Robert G. Nunes Town Manager FY18 Highlights Strong financial policies and procedures Maintains AA stable bond rating Monthly review of revenues and
More informationTown of Little Elm, Texas
, Texas Storm Water Program Evaluation and Funding Report December 7, 2011 1701 N. Market St. #500 Dallas, Texas 75202 214.217.2200 LTE10296 TABLE OF CONTENTS 1. INTRODUCTION... 1-1 1.1. DESCRIPTION OF
More informationBoston Water and Sewer Commission 2012 Annual Report Preserving Your Environment
Boston Water and Sewer Commission 2012 Annual Report Preserving Your Environment Boston Water and Sewer Commission Board of Commissioners Paul G. Afonso Chairman Cathleen Douglas Stone Commissioner Muhammad
More informationPhase If ~Sn7afl) IVIS4 Annual Report Form
IVarne and Explanation: Name and Explanation: Name and Explanation: 2. Is the named permittee relying on another entity/ies to satisfy some of its permit obligations? x Yes No If "Yes," provide the names}
More informationMUNICIPAL SERVICE REVIEW FINAL
FIVE CANYONS COUNTY SERVICE AREA MUNICIPAL SERVICE REVIEW FINAL November 29, 2012 Prepared for the Local Agency Formation Commission of Alameda County by Baracco and Associates, Policy Consulting Associates,
More informationHandout 8: Rate Structure Adjustments
Handout 8: Rate Structure Adjustments Introduction The purpose of this handout is to describe briefly rate structures, legal notions of fairness in ratemaking applicable to this stormwater discussion,
More informationHIGHLANDS REGIONAL MASTER PLAN MONITORING PROGRAM IMPLEMENTATION TECHNICAL ADVISORY COMMITTEE MEETING
CHRIS CHRISTIE Governor KIM GUADAGNO Lt. Governor State of New Jersey Highlands Water Protection and Planning Council 100 North Road (Route 513) Chester, New Jersey 07930-2322 (908) 879-6737 (908) 879-4205
More informationStormwater Management Fee Policy Options and Recommendations
Green Infrastructure Advisory Committee Report Stormwater Management Fee Policy Options and Recommendations Prepared for City of Lancaster, PA March 17, 2014 1717 Arch Street Suite 4400 Philadelphia, PA
More information8.2 Adoption of the Cook County Stormwater Management Plan
PLAN IMPLEMENTATION 8.1 Introduction The (CCSMP) presents the mission, goals and framework of the countywide stormwater management program for Cook County. The implementation of the CCSMP and its program
More informationWastewater Utilities. FY Budget Presentation
Utilities FY 2018-19 Budget Presentation 1 Volume Forecast Wastewater Customers by Class Fiscal Year Residential Commercial Wholesale Total Growth 2013 26,995 1.1% 3,091 0.8% 4 30,090 1.1% 2014 27,548
More informationTOWN OF MILLBURY, MASSACHUSETTS MANAGEMENT LETTER YEAR ENDED JUNE 30, 2014
TOWN OF MILLBURY, MASSACHUSETTS MANAGEMENT LETTER YEAR ENDED JUNE 30, 2014 Table of Contents Transmittal letter...1 Overview...3 Informational Items...4 Findings and Recommendations...6 Board of Selectmen
More informationKaren Leatherwood, Chair Brenda Dinne, Staff Liaison/Secretary
Karen Leatherwood, Chair eac@ccg.carr.org Brenda Dinne, Staff Liaison/Secretary Created under Chapter 31 of the Carroll County Code of Public Local Laws, the Environmental Advisory Council (EAC) is dedicated
More informationGallagher Environmental Practice. Environmental Risk & Insurance for the Oil Production Industry
Gallagher Environmental Practice Environmental Risk & Insurance for the Oil Production Industry JANUARY 2018 Introduction Standard liability and property insurance policies have excluded coverage for claims
More informationStormwater Management Utility Fee Reduction Credit Application
Stormwater Management Utility City of Dubuque, IA Winter 2003 Stormwater Management Utility Stormwater Management Utility Introduction The City of Dubuque established a Stormwater Management Utility on
More informationPotential Changes to the 2015 to 2018 TIP Highway List. Proposed Administrative Adjustment #3
Potential Changes to the 2015 to 2018 TIP Highway List Proposed Administrative Adjustment # PROJECT #60644, WORCESTER CENTRAL BUSINESS DISTRICT STREETSCAPE IMPROVEMENTS Move the FY 2015 Statewide Transportation
More informationTHE CORPORATION OF THE CITY OF MISSISSAUGA STORMWATER FEES AND CHARGES BY-LAW (amended by , , )
THE CORPORATION OF THE CITY OF MISSISSAUGA STORMWATER FEES AND CHARGES BY-LAW 135-15 (amended by 292-15, 296-16, 219-17) WHEREAS sections 8, 9 and 11 of the Municipal Act, 2001, S.O. 2001, c. 25, authorize
More informationFiscal Affairs Advisory Commission Report to the County Board. FY2019 Proposed Budget
Depa Fiscal Affairs Advisory Commission Report to the County Board FY2019 Proposed Budget Budget Area: Department of Environmental Services FAAC Reviewers: Peter Robertson, Gillian Burgess Date of FAAC
More informationThe costs incurred by the Permittees in implementing the Santa Ana Regional DAMP fall into two broad categories:
2. FISCAL ANALYSIS Securing and sustaining adequate funding resources is arguably one of the most difficult issues MS4 Permittees must face. Although the overall economic climate has continued to be difficult,
More informationBoard of Commissioners: Michael J. Woodall, Chair Muhammad Ali-Salaam, Commissioner Cathleen Douglas Stone, Commissioner
Board of Commissioners: Michael J. Woodall, Chair Muhammad Ali-Salaam, Commissioner Cathleen Douglas Stone, Commissioner Henry F. Vitale, Executive Director John P. Sullivan, Chief Engineer Nelson W. Piacenza,
More informationCommunity Development Committee
C Community Development Committee For the Metropolitan Council meeting of February 27, 2008 Committee Report Item: 2008-41 ADVISORY INFORMATION Date Prepared: February 20, 2008 Subject: City of Minnetonka
More informationThe Affordable Care Act and Childhood Asthma
The Affordable Care Act and Childhood Asthma An Opportunity to Help Millions of Children Breathe Easier Webinar sponsored by the Childhood Asthma Leadership Coalition September 13, 2012 The ACA and Childhood
More informationThis is a courtesy copy of this rule. All of the Department s rules are compiled in Title 7 of the New Jersey Administrative Code.
SUBCHAPTER 25. MUNICIPAL STORMWATER REGULATION PROGRAM 7:14A-25.1 Scope (a) This subchapter sets forth requirements applicable to the Municipal Stormwater Regulation Program, which regulates discharges
More informationThe contribution of law enforcement coordination and cooperation to the EU Drugs Strategy
The contribution of law enforcement coordination and cooperation to the EU Drugs Strategy 2013-2020 Jari Liukku Head of Serious and Organised Crime Department Operations Directorate Europol LIBE mini-hearing
More information***EXPEDITED REVIEW***
***EXPEDITED REVIEW*** Application for Erosion and Sediment Pollution Control Plan Adequacy Review General NPDES Plan Review This application must be completed and accompanied by the required fees, plans,
More informationMarkets, Policies & Tools for Green Infrastructure
Markets, Policies & Tools for Green Infrastructure Image credit: Danya Henninger, ImagicDigital Research Team & Project EPA-funded research grant to study GI implementation in Philadelphia Team: urban
More informationPUBLIC WORKS COMMITTEE 4:00 p.m., Monday, March 8, 2010
PUBLIC WORKS COMMITTEE 4:00 p.m., Monday, The regular meeting of the Public Works Committee was held at 4 p.m., Wednesday, March 8, 2010 in the Public Works Building located at 1303 Palm Boulevard, Isle
More informationINTERGOVERNMENTAL STORMWATER COMMITTEE AGREEMENT THIS INTERGOVERNMENTAL STORMWATER COMMITTEE AGREEMENT,
INTERGOVERNMENTAL STORMWATER COMMITTEE AGREEMENT THIS INTERGOVERNMENTAL STORMWATER COMMITTEE AGREEMENT, ALLEGHENY TOWNSHIP, ANTIS TOWNSHIP, BELLWOOD BOROUGH, BLAIR TOWNSHIP, CITY OF ALTOONA, DUNCANSVILLE
More informationPROJECT FEASIBILITY REPORT CHECKLIST
THE FEASIBILITY PROCESS PROJECT FEASIBILITY REPORT CHECKLIST The Project Feasibility Report is conducted to determine the parameters of time, cost and quality of a proposed capital building project that
More informationEast Hartford. Challenges
East Hartford The Town of East Hartford is a suburban community of approximately 52,212 located east of the City of Hartford and west of the Town of Manchester. The Town covers slightly more than 18 square
More informationUNC System Building Reserve Model Instructions
Instructions Introduction: These are instructions for filling out the two building reserve templates. One template is for new buildings - UNC System Building Reserve Model for New Buildings; and one template
More informationSix Year Stormwater Comprehensive Plan
City of Mountlake Terrace Six Year Stormwater Comprehensive Plan Prepared for: City of Mountlake Terrace 23204 58 th Avenue W Mountlake Terrace, WA 98043 Prepared by: Otak, Inc. Joe Simmler, PhD Maureen
More informationTHE PEOPLE OF THE STATE OF MICHIGAN ENACT:
DRAFT A bill to authorize local units of government to create storm water utilities; to permit the establishment and collection of storm water utility fees; to provide for the allocation of the costs of
More informationPUBLIC NOTICE AGENDA STUDY SESSION MEETING. 1. Report by NPD on Train Blocking City Streets. ( Councilman Varona)
PUBLIC NOTICE STUDY SESSION MAYOR AND CITY COUNCIL MEETING 4:30 PM, WEDNESDAY, FEBRUARY 7, 2018 CITY HALL COMPLEX COUNCIL CHAMBERS 777 N. GRAND AVENUE NOGALES, AZ 85621 AGENDA You re Among Friends STUDY
More informationAt the regular meeting of the Village Board of Trustees held April 13, Mayor Kastberg called the meeting to order at 7:12 p.m.
Mayor Kastberg called the meeting to order at 7:12 p.m. At the regular meeting of the Village Board of Trustees held PRESENT: Trustee Gifford, Mathes, Rizzo, Zeman and Mayor Kastberg Mayor Kastberg opened
More informationTHE CORPORATION OF THE CITY OF WATERLOO
PWS2012-070 Appendix A Page 1 of 16 THE CORPORATION OF THE CITY OF WATERLOO BY LAW NO. 2012- I J_ 5 BY-LAW TO IMPOSE A STORMWATER CHARGE AND IMPLEMENT A STORMWATER CREDIT PROGRAM WHEREAS municipalities
More informationStormwater System Asset Management Plan. June 2018
Stormwater System Asset Management Plan June 2018 City Council Citizens, stakeholders Strategic Priorities Level of Service Goals Performance Measures What actions are needed to meet Level of Service Goals
More informationDRAFT. Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY
DRAFT Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY JANUARY 2019 Table of Contents Introduction 3 Definitions 3
More informationCity Services Appendix
Technical vices 1.0 Introduction... 1 1.1 The Capital Facilities Plan... 1 1.2 Utilities Plan... 2 1.3 Key Principles Guiding Bremerton s Capital Investments... 3 1.4 Capital Facilities and Utilities Addressed
More informationSTORMWATER MANAGEMENT FUND Department of Environmental Services
Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,
More information