1 Project Closure TODAY S LESSON
2 Lesson Learning Outcomes At the conclusion of this lesson, the student should be able to: Understand the need to carry out project closure. Describe the activities undertaken during project closure. Elaborate the outputs of a project closure.
3 Project Closure Phase Project Closure Phase is the last phase of the Project Life Cycle. The commencement of the Project Closure Phase is determined by the completion of all Project Objectives and acceptance of the end product by the customer.
4 Project closure Project closure involves releasing the final deliverables to the customer, handing over project documentation to the business, terminating supplier contracts, releasing project resources and communicating the closure of the project to all stakeholders. The last remaining step is to undertake a post implementation review to quantify the level of project success and identify any lessons learnt for future projects
5 Project closure activities Perform Project Closure Review Project Completion
6 Planning for project closure The following closure issues should be addressed as you initially define and structure your project: Acceptance Criteria Should define the form and function of specific project deliverables, establishing end-user expectations and requirements, and forming the basis by which project deliverables are accepted or rejected. Without acceptance criteria, true project closure cannot be obtained, as there may be no specific measurement for completion.
7 Planning for project closure Closure Kick-off (timing of closure activities) Typically, project closure activities should begin when project deliverables are near completion. Overall, the goal is to ensure that valuable time is not wasted. Once a project nears completion, transition should begin immediately in order to maintain momentum and to ensure that sufficient resources are available to move on to the next project.
8 Planning for project closure Transition (Turnover) Needs As you plan closure activities, you should consider specific transition/turnover requirements. Typically, transition/turnover activities relate to the status of project deliverables. When a deliverable is under development, the project team is in control. Once a deliverable is ready for production, ownership must be transitioned to end-users and operations staff so that the deliverable can be used and maintained. Turnover planning can involve end-user training, operations training and the preparation of procedural and technical documentation
9 Planning for project closure Resources, Roles and Responsibilities As project closure is planned, resource requirements, including roles and responsibilities must be considered. For ex: What types of resources will be required for project closure activities (considering activity requirements, tasks, skills and responsibilities)? Who will be involved in the closure process (including management and end-users)? As the project draws to a close, how will project team members be reassigned to other projects? Who will be involved in the post project review process (to analyze project results and performance)?
10 Problems faced by employees Emotional problem Staff Fear of no future work Loss of interest in remaining tasks Loss of project derived motivation Loss of team identity Selection of personnel to be reassigned Reassignment methodology Diversion of effort Client Change in attitude Loss of interest in project Change in personnel dealing with project Unavailability of key personnel
11 Problems faced by employees Intellectual Internal Identification of remaining deliverables Certification needs Identification of outstanding commitments Control of charges to project Screening of partially completed task Closure of work orders and work packages Identification of facilities assigned to project Accumulating and structuring of historical data Disposal of unused material External Agreement with client on remaining deliverable Obtaining required certification Agreement with suppliers on outstanding commitments. Communicating closure Closing down facilities Determination of requirements for audit` trail data.
12 Planning for project closure Communication Communication is essential to smooth project closure and transition. In order to ensure that all parties are informed and in synch with closure activities, you will need to take appropriate steps to keep information flowing as needed, and on a timely basis. For ex: Will you have closure planning meetings (how many and how often)? What types of documentation will be required to ensure effective project closure?
13 Perform project closure Project closure, or 'close out', essentially involves winding up the project. This includes: Determining whether all of the project completion criteria have been met; Identifying any outstanding project activities, risks or issues; Handing over all project deliverables and documentation to the customer; Canceling supplier contracts and releasing project resources to the business; Communicating the closure of the project to all stakeholders and interested parties.
14 Activities of project closure commissioning Start up and trial Main objectives of commissioning: Prove performance prediction To pass test and check To search for hazard Correction of design Personnel training Operation and maintenance of facility. Technical support required
15 Activities of project closure Issuing certificates Completion certificate has consequences, responsibility changed to client. Power of S.O ceased. L. A. D also ceased. Remedial works start CPC given.
16 Activities of project closure Preparing documentation Maintenance manual To tell the client on maintenance operation. Record drawing As built drawing, changes, variations, etc. Purchased equipment records Vendor should provide technical back up. Technical specification, test certificate, operation manual. Correspondence Proper storage of legal correspondence.
17 Activities of project closure Finalising financial matters Final certificate is issued. Independent contractors are being paid. Project team report List the difficulties. Lesson learned for future Disposal of staff (Redeployment) Handling personnel Ensure staffs are motivated Keep staff fully informed.
18 Perform project closure A project closure report is documented and submitted to the customer and/or project sponsor for approval. The project manager is responsible for undertaking each of the activities identified in the project closure report, and the project is closed only when all the activities listed in the project closure report have been completed.
19 Review project completion Following the closure of any project, you should always review its overall success by undertaking a Post Implementation Review. This review helps you to determine whether the project delivered the business benefits, met the customer's requirements and remained within scope and budget.
20 Review project completion To determine how well it performed, the following types of questions are answered: Did the delivered product / solution meet the project requirements and objectives? Was the customer satisfied? Was Project Schedule Met? Was the Project completed within Budgeted Cost? Were the risks identified and mitigated? What could be done to improve the process?
21 Project Closure Benefits The outputs from Project Closure Phase provides as a stepping stone to execute the next projects with much more efficiency and control.
Key Aspects for Managing a Project
Key Aspects for Managing a Project What is a Project? Definition: A project is a temporary endeavor undertaken to create a unique product, service or result. The temporary nature of projects indicates
More informationHow to Prepare the Winding-Up Declaration
How to Prepare the Winding-Up Declaration This presentation is a summarisation of a presentation prepared by Marianna Miklós- Molnár, Director of Strategy and Methodology, Directorate General for Audit
More informationCAPITAL BUDGET NUCLEAR
Updated: 00-0- EB-00-00 Tab Page of 0 0 CAPITAL BUDGET NUCLEAR.0 PURPOSE The purpose of this evidence is to present an overview description of the nuclear capital project budget for the historical year,
More informationRisk Management Plan for the <Project Name> Prepared by: Title: Address: Phone: Last revised:
for the Prepared by: Title: Address: Phone: E-mail: Last revised: Document Information Project Name: Prepared By: Title: Reviewed By: Document Version No: Document Version Date: Review Date:
More informationPRINCE2. Number: PRINCE2 Passing Score: 800 Time Limit: 120 min File Version:
PRINCE2 Number: PRINCE2 Passing Score: 800 Time Limit: 120 min File Version: 1.0 Exam M QUESTION 1 Identify the missing word(s) from the following sentence. A project is a temporary organization that is
More informationRISK MANAGEMENT LECTURE 5. Ahmed Elyamany
RISK MANAGEMENT LECTURE 5 Ahmed Elyamany 1 RISK SECTION OBJECTIVES Introduce the students to the concepts of risk management and the different tools to analyze risk and estimate time and cost contingencies.
More informationPROJECT AND PORTFOLIO MANAGEMENT - NUCLEAR
Filed: 0-0- EB-0-0 Page of 0 PROJECT AND PORTFOLIO MANAGEMENT - NUCLEAR.0 PURPOSE This evidence provides an overview of the nuclear operations project portfolio and other related project work. The project
More informationRISK M A N A G E M E N T P L A N
CONTENTS LEARNING OUTCOMES... 2 INTRODUCTION... 3 RISK DEFINITION OVERVIEW... 3 RISK MANAGEMENT ROLES AND RESPONSIBILITIES... 3 RISK MANAGEMENT APPROACH... 4 RISK IDENTIFICATION... 4 RISK QUALIFICATION
More informationIT Certification Exams Provider! Weofferfreeupdateserviceforoneyear! h ps://
IT Certification Exams Provider! Weofferfreeupdateserviceforoneyear! h ps://www.certqueen.com Exam: PMI-002 Title : Certified Associate in Project Management (CAPM) Certification Version : DEMO 1 / 7 1.A
More informationMAIN BOARD LISTING RULES. Chapter 13
MAIN BOARD LISTING RULES Chapter 13 EQUITY SECURITIES CONTINUING OBLIGATIONS Environmental and Social Matters 13.91 (1) The Environmental, Social and Governance ( ESG ) Reporting Guide in Appendix 27 comprises
More informationRisk Management User Guide. Prepared By: Neville Turbit Version Feb /01/2009 Risk Management User Guide Page 1 of 36
Risk Management User Guide Prepared By: Neville Turbit Version 1.0 1 Feb 09 22/01/2009 Risk Management User Guide Page 1 of 36 Table of Contents Document Origin...2 Change History...2 Risk Guidelines...
More informationConstruction Project Manager TERMS OF REFERENCE
Construction Project Manager TERMS OF REFERENCE PURPOSE SSAA Mackay Branch Inc. Requires offers from suitably qualified Consultants to undertake the role of Project Manager for the development of George
More informationPCC Business continuity plan
PCC Business continuity plan Last reviewed September 2014 Background The business continuity policy was ratified in January 2013. As part of this policy, PCC is committed to producing for each work area
More informationProject Management for the Professional Professional Part 3 - Risk Analysis. Michael Bevis, JD CPPO, CPSM, PMP
Project Management for the Professional Professional Part 3 - Risk Analysis Michael Bevis, JD CPPO, CPSM, PMP What is a Risk? A risk is an uncertain event or condition that, if it occurs, has a positive
More informationCompleting the Accounting Cycle
4 Completing the Accounting Cycle 4-1 Closing the Books At the end of the accounting period, the company gets the accounts ready for the next period. Very similar to what happens at AHS at the end of a
More informationVersion 2.0- Project. Q: What is the current status of your project? A: Completed
Baker College, MI Project: Develop an institutional quality assurance framework to measure institutional effectiveness and drive continuous quality improvement efforts Version 2.0- Project What is the
More informationSection II PROJECT MANAGEMENT METHODOLOGY GUIDELINES
Section II B PROJECT MANAGEMENT METHODOLOGY GUIDELINES Chapter 8 INTRODUCTION TO A METHODOLOGY Vision The vision of the Project Management Center of Excellence (PMCoE) organization is to achieve a world-class
More information1890 Project Management
1890 Project Management Presenters: 101 Lois Burg, Office of Sponsored Programs (OSP) Craig Warner, College of Agriculture and Human Sciences (CAHS) 02 TOPICS OF DISCUSSION Techniques for 1. Program Management
More informationEnable Networks UFB Services Agreement Service Level Terms for Fibre Interconnection Services
Enable Networks UFB Services Agreement Service Level Terms for Services 1. INTERPRETATION 1.1 References to clauses or sections are references to clauses or sections in these Service Level Terms unless
More informationRisk Management Plan Project Name: Version 1.0 Date: dd/mm/yyyy
Risk Management Plan Project Name: Version 1.0 Date: dd/mm/yyyy Contents DOCUMENT OVERVIEW... 3 RISK METHODOLOGY... 3 RISK IDENTIFICATION... 3 Risk Categories... 3 RISK ANALYSIS... 4 RISK RESPONSE PLANNING...
More informationINFOSYS SOLUTION FOR CLAIMS LEAKAGE REDUCTION
INFOSYS SOLUTION FOR CLAIMS LEAKAGE REDUCTION Claims management is the foundation on which the edifice of the insurance business is built. Although a large contributor of cost to an organization, it is
More informationPMI - Dallas Chapter. Sample Questions. March 22, 2002
PMI - Dallas Chapter PMP Exam Sample Questions March 22, 2002 Disclaimer: These questions are intended for study purposes only. Success on these questions is not necessarily predictive of success on the
More informationFact Sheet 14 - Partnership Agreement
- Partnership Agreement Valid from Valid to Main changes Version 2 27.04.15 A previous version was available on the programme website but all projects must use this version. Core message: It is a regulatory
More informationLIFE CYCLE ASSET MANAGEMENT. Project Management Overview. Good Practice Guide GPG-FM-001. March 1996
LIFE YLE Good Practice Guide ASSET MANAGEMENT Project Management Overview March 1996 Department of Energy Office of Field Management Office of Project and Fixed Asset Management ontents 1. INTRODUTION...1
More informationProfit & Loss Lemonade Stand Income and Expense Information Income: total cups of lemonade sold 20 selling price per cup $.50
Lemonade Stand Income and Expense Information Income: total cups of lemonade sold 20 selling price per cup $.50 Expenses: Ready made ½ gallon cartons of lemonade (10 cups per carton) $1.50 each $1.50 each
More informationPROJECT MANAGEMENT DIPLOMA COURSE
PROJECT MANAGEMENT DIPLOMA COURSE UNIT FOUR PROJECT IMPLEMENTATION TUTOR TALK: The Learning Outcomes for this assignment are: Evaluate how a project is prepared for implementation. Analyse the following
More informationStrengthening Solid Waste Financing and Cost Recovery Framework in Syria. Terms of Reference for a Financial Analyst
Strengthening Solid Waste Financing and Cost Recovery Framework in Syria Terms of Reference for a Financial Analyst BACKGROUND The present Terms of Reference cover the preparation of an analysis and recommendations
More informationA Project Management Guide for Researchers
A Project Management Guide for Researchers Prepared by: Research Grant and Contract Services January 2018 Copyright 2018 Memorial University of Newfoundland Table of Contents 1.0 Introduction... 4 2.0
More informationFM Harmonization Frequently Asked Questions August 2013
FM Harmonization Frequently Asked Questions August 2013 The harmonization of Financial Management (FM) arrangements by Development Partners (DPs) can assist in reducing the burden of multiple FM systems
More informationRisk and Risk Management. Risk and Risk Management. Martin Schedlbauer, Ph.D., CBAP, OCUP Version 1.1
Risk and Risk Management Risk and Risk Management Martin Schedlbauer, Ph.D., CBAP, OCUP m.schedlbauer@neu.edu Version 1.1 Risk and Risk Management Copyright 2012 by Martin Schedlbauer ALL RIGHTS RESERVED.
More informationHaving regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof,
L 244/12 COMMISSION IMPLEMTING REGULATION (EU) No 897/2014 of 18 August 2014 laying down specific provisions for the implementation of cross-border cooperation programmes financed under Regulation (EU)
More informationUCISA TOOLKIT. Major Project Governance Assessment. version 1.0
UCISA TOOLKIT Major Project Governance Assessment version 1.0 Contents Introduction 1 Roles and responsibilities 2 Definition of a Major Project 3 Guidance for using the Toolkit 4 Governance elements 4
More informationFINANCE CONSULTANT FOR ASEAN COOPERATIVE PROJECT ON FINANCING MECHANISMS DESIGN FOR ENERGY EFFICIENCY AND CONSERVATION (EE&C) PROJECT IMPLEMENTATION
Call for Expert ASEAN Centre for FINANCE CONSULTANT FOR ASEAN COOPERATIVE PROJECT ON FINANCING MECHANISMS DESIGN EFFICIENCY AND CONSERVATION (EE&C) PROJECT IMPLEMENTATION About ACE Established on 1 January
More information2. 5 of the 75 questions are under trial and will not contribute to your overall score. There is no indication of which questions are under trial.
The Foundation Examination Sample Paper 3 Question Booklet Multiple Choice Exam Duration: 60 minutes Instructions 1. You should attempt all 75 questions. 2. 5 of the 75 questions are under trial and will
More informationTHIRD PARTY INSPECTION AND MONITORING
Toolkit for THIRD PARTY INSPECTION AND MONITORING 2 Third Party Inspection and Monitoring : Objectives Goal: To evolve a state level mechanism for Third Party Inspection and Monitoring of Projects sanctioned
More informationPrince2 Foundation.exam.160q
Prince2 Foundation.exam.160q Number: Prince2 Foundation Passing Score: 800 Time Limit: 120 min PRINCE2 Foundation PRINCE2 Foundation written Exam Sections 1. Volume A 2. Volume B Exam A QUESTION 1 Which
More informationHow to Avoid the Common Problems When Using Risk Management
How to Avoid the Common Problems Joseph A. Lukas PMP, CSM, PE, CCP Joseph A. Lukas, PMP, PE, CCE, CSM 634 Alpha Drive Pittsburgh, PA 15238 (888) 762-3683 Fax (412) 963-8618 Presenter Joe Lukas PMP, PE,
More informationProject Management for Graduate Students. The Office Move Case Study. January 2018
Project Management for Graduate Students The Office Move Case Study January 2018 1 Table of Contents Case Study Exercise 1 Initial Meeting with the Executive Sponsor... 3 Case Study Exercise 2 - Identifying
More informationPRINCE2-PRINCE2-Foundation.150q
PRINCE2-PRINCE2-Foundation.150q Number: PRINCE2-Foundation Passing Score: 800 Time Limit: 120 min File Version: 6.0 Exam PRINCE2-Foundation Version: 6.0 Exam A QUESTION 1 What process ensures focus on
More informationAppendix 20. Environmental, Social and Governance Reporting Guide
Appendix 20 Environmental, Social and Governance Reporting Guide The Guide 1. This Guide comprises two levels of disclosure obligations: comply or explain provisions; and recommended disclosures. 2. An
More informationInstitutional Presentation July - August 2017
Institutional Presentation July - August 2017 GAMASI TODAY. Gamasi was founded by Tomás Sinclair in August 1951 in order to provide solutions to corporate clients insurance needs, being today one of the
More informationSTAFF VACANCIES 1427SNE9
STAFF VACANCIES 1427SNE9 28 May 2014 The European Insurance and Occupational Pensions Authority (EIOPA) is currently inviting applications for a position as Seconded National Expert on Solvency II Processes
More informationGeneral Risk Management Framework
North Gold Coast Seahawks Basketball Inc General Risk Management Framework Introduction This guide provides an outline for a North Gold Coast Seahawks Basketball Risk Management Framework. Note: This draft
More information0470_022817_03_chap01.fm Page 11 Wednesday, September 8, :29 PM. Part I The basics of project risk management
0470_022817_03_chap01.fm Page 11 Wednesday, September 8, 2004 3:29 PM Part I The basics of project risk management 0470_022817_03_chap01.fm Page 12 Wednesday, September 8, 2004 3:29 PM 0470_022817_03_chap01.fm
More informationAgency terms and conditions
Agency terms and conditions Acceptance of quotation will be taken as acceptance of the Contract. Please ensure you have read and fully understand what is written below. Please contact us if anything is
More informationPRINCE2 Sample Papers
PRINCE2 Sample Papers The Official PRINCE2 Accreditor Sample Examination Papers Terms of use Please note that by downloading and/or using this document, you agree to comply with the terms of use outlined
More informationProposal for a COUNCIL REGULATION
EUROPEAN COMMISSION Brussels, 30.1.2019 COM(2019) 64 final 2019/0031 (APP) Proposal for a COUNCIL REGULATION on measures concerning the implementation and financing of the general budget of the Union in
More informationAppendix B: Glossary of Project Management Terms
Appendix B: Glossary of Project Management Terms Assumption - There may be external circumstances or events that must occur for the project to be successful (or that should happen to increase your chances
More informationLesson 6 - Personal Lines: Due Diligence & Account Management
Lesson 6 - Personal Lines: Due Diligence & Account Management Introduction The role of the Customer Service Representative is extremely important in the day-today operations of an agency. An agency may
More informationProposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL
EUROPEAN COMMISSION Brussels, 30.1.2019 COM(2019) 65 final 2019/0030 (COD) Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL laying down provisions for the continuation of ongoing
More informationRisk Assessment Procedure
1. Introduction Risk Assessment Procedure 1.1 The Management of Health and Safety at Work Regulations 1999 set out general duties which apply to employers and are aimed at improving health and safety management.
More informationThis action is funded by the European Union
This action is funded by the European Union ANNEX 10 of the Commission implementing Decision on the Annual Action Programme 2015 of the DCI Pan-African Programme Action Document for "Support Measures Annual
More information4. Outline of EIA for Development Assistance
4. Outline of EIA for Development Assistance 4.1 EIA and Development EIA has an important role to play resolving these environmental problems through its ability to contribute to environmentally sound
More informationEnable Networks UFB Services Agreement Service Level Terms for Direct Fibre Access Services (layer 1)
Enable Networks UFB Services Agreement Service Level Terms for Direct Services (layer 1) 1. INTERPRETATION 1.1 References to clauses or sections are references to clauses or sections in these Service Level
More informationPRINCE2 Sample Papers
PRINCE2 Sample Papers The Official PRINCE2 Accreditor Sample Examination Papers Terms of use Please note that by downloading and/or using this document, you agree to comply with the terms of use outlined
More informationTAC 216 Companion Guide
IT Project Management Best Practices The Texas A&M University System Version 2018 Last Revised 09/01/2017 Page 1 of 31 Table of Contents Introduction... 4 The A&M System s Approach to Help Members Achieve
More informationAll organisational units
Project Management Policy Responsible Officer Approved by Chief Operating Officer Vice-Chancellor Approved and commenced March, 2014 Review by March, 2017 Relevant Legislation, Ordinance, Rule and/or Governance
More informationBraindumps.PRINCE2-Foundation.150.QA
Braindumps.PRINCE2-Foundation.150.QA Number: PRINCE2-Foundation Passing Score: 800 Time Limit: 120 min File Version: 29.1 http://www.gratisexam.com/ I was a little apprehensive at first about an online
More informationOverview of Legal Project Management
Overview of Legal Project Management Scope - Determining the goals and deliverables for the project Conduct of Legal Matter Carrying out the project within the established parameters, making adjustments
More informationNational IT Project Management Methodology. IT Project Steering Committee Support Guide
NATIONAL INFORMATION TECHNOLOGY AUTHORITY - UGANDA National IT Project Management Methodology IT Project Steering Committee Support Guide Version 0.5 Steering Committee Support Guide version 0.5 Page 1
More informationPRINCE2 Sample Papers
PRINCE2 Sample Papers The Official PRINCE2 Accreditor Sample Examination Papers Terms of use Please note that by downloading and/or using this document, you agree to comply with the terms of use outlined
More informationAppendix 2 CLAIMS MANAGEMENT POSITIONAL STATEMENT. Introduction
CLAIMS MANAGEMENT POSITIONAL STATEMENT Appendix 2 Introduction 1 This report provides the Board with a statement of current ongoing claims, both personal injury and clinical negligence brought against
More informationProject Handover. Dr. JA Healy. Publisher JAHCon Physical Asset Management Pty. Ltd.
If you would like additional information on the topic covered in this information sheet please contact JAHCon on the numbers shown on page 1 Project Handover Dr. JA Healy Publisher JAHCon Physical Asset
More informationSCHEDULE I PROJECT ACCEPTANCE AND OTHER REQUIREMENTS
SCHEDULE I PROJECT ACCEPTANCE AND OTHER REQUIREMENTS 1. INTRODUCTION 1.1 Purpose of this Schedule The project management tools, procedures, terms and conditions set out in Schedule I will apply to each
More informationCredit Reporting and Scoring for MSMEs. Vincenzo Resta Orlando Antonio Rossi CRIF Kuala Lumpur November, Session n. 12
Credit Reporting and Scoring for MSMEs Vincenzo Resta Orlando Antonio Rossi CRIF Kuala Lumpur - 5-9 November, 2012 -Session n. 12 Credit Reporting and Scoring for MSMEs Serious Game followed by presentation
More informationINVITATION TO TENDER PROVISION OF HOUSING RELATED SUPPORT SERVICES FOR VULNERABLE PEOPLE (REF: ASC0016)
Wards Affected: All Wards. ITEM 6 PROCUREMENT & COMMISSIONING 15 DECEMBER 2015 INVITATION TO TENDER PROVISION OF HOUSING RELATED SUPPORT SERVICES FOR VULNERABLE PEOPLE (REF: ASC0016) Responsible Cabinet
More informationACCOUNTING CYCLE FOR A MERCHANDISING BUSINESS ORGANIZED AS A CORPORATION
ACCOUNTING CYCLE FOR A MERCHANDISING BUSINESS ORGANIZED AS A CORPORATION page 97. Source documents are checked, and transactions are analyzed.. Transactions are recorded in journals. 5. Journal entries
More informationPAC Guidelines for Project Progress Report
PAC Guidelines for Project Progress Report Version 1.0 September 2017 A stream of cooperation Programme co-funded by the European Union Content List of abbreviations... 5 Introduction... 6 PART I TECHNICAL
More informationlinked to the Australian National University s Work health and safety policy and is one of the procedures within the WHS Management System.
Purpose This procedure describes how the Australian National University evaluates and monitors contractors work health and safety for all activities performed at the University. This procedure ensures
More informationSPECIAL CONDITIONS OF TENDER
Page 1 SPECIAL CONDITIONS OF TENDER A. INTRODUCTION The following documents are available on http://emits.esa.int/ under "Reference Documentation" --> "Administrative Documents": ESA Procurement Regulations
More informationAfrican, Caribbean and Pacific Group of States TRADE REGULATORY IMPACT ASSESSMENT - MAURITIUS ACP-EU TBT PROGRAMME (REG/FED/ )
African, Caribbean and Pacific Group of States TRADE REGULATORY IMPACT ASSESSMENT - MAURITIUS ACP-EU TBT PROGRAMME (REG/FED/022-667) Project code: 020/15 FINAL REPORT 4 October 2015 Table of Contents GLOSSARY...
More informationIntroduction to Project Management. Modeling after NYS ITS
Introduction to Project Management Modeling after NYS ITS What is Project Management? Project management is the application of knowledge, skills, tools and techniques to project activities to meet project
More informationTiverton EUE Access Draft Benefits Realisation Plan and Monitoring and Evaluation Plan
Draft Benefits Realisation Plan and Monitoring and Evaluation Plan October 2014 Devon County Council County Hall Topsham Road Exeter Devon EX2 4QD Contents 1 Scheme Background and Context... 3 1.1 Description
More informationMEGAPROJECT Case Study
SECTION 1 - BASIC PROJECT INFORMATION MEGAPROJECT Case Study Case compiled by: Milen Baltov Contact details: mbaltov@bfu.bg Basic Project Information 1 Project Title Location Purpose Scope Total Project
More informationPRINCE Masterclass Foundation and Practitioner. Sampler
2018 Masterclass Foundation and Practitioner Sampler Copyright Copyright 2018 Projex Academy Cover and internal design The Projex Academy First Edition, July 2018 http://www.projex.com All rights reserved.
More informationProgramme Manual
1.1.1. 25 October 2010 Table of contents 0. Introduction... 1 1. General programme information... 2 1.1. Main objectives of the programme...2 1.2. Programme area...2 1.3. Programme funding...2 1.4. Programme
More informationGeneral Purchase Conditions. Non-Disclosure Agreement (NDA)
General Purchase Conditions Non-Disclosure Agreement (NDA) Definitions STG has SANOVO TECHNOLOGY GROUP. STG s headquarter is located in Denmark and entities in the Netherlands and Italy. Customer The buying
More informationM_o_R (2011) Foundation EN exam prep questions
M_o_R (2011) Foundation EN exam prep questions 1. It is a responsibility of Senior Team: a) Ensures that appropriate governance and internal controls are in place b) Monitors and acts on escalated risks
More information2016 Consortium Program of Work and Budget
Version: 30 October 2015 Revision 1 2016 Consortium Program of Work and Budget Background The paper presents the proposed 2016 Program of Work and Budget of the CGIAR Consortium 1 ( 2016 PoWB ), approved
More informationASPEC Engineering HSE Management System Work Instruction
1 Objective This work instruction outlines ASPEC s sub-contractor management process. The purpose of the process is to ensure that sub-contractors align with ASPEC/Clients Health, Safety and Environment
More informationCapital Project Approval Request
Capital Project Approval Request PMP T07 Project Number MAJ 0000 Project Title Project Description Existing Approvals EC Approval Court Approval Approved Gateway 0 To proceed to GW1 Prepare OBC / Feasibility
More informationProject Management. Joycelyn M. Ray HCC Insurance Holdings SCCE- Chicago 9/08
Project Management Joycelyn M. Ray HCC Insurance Holdings SCCE- Chicago 9/08 Society of Corporate Compliance and Ethics 6500 Barrie Road, Suite 250, Minneapolis, MN 55435, United States www.corporatecompliance.org
More informationChapter 02 - Analyzing and Recording Transactions. Chapter Outline
I. Analyzing and Recording Process A. The accounting process identifies business transactions and events, analyzes and records their effects, and summarizes and presents information in reports and financial
More informationThe impact of Solvency II on the Asset Management industry
The impact of Solvency II on the Asset Management industry A focus on asset data Dean Brown Ernst &Young EMEIA Asset Management Solvency II Leader Top data related concerns and focus areas Ernst & Young
More informationContract HSE Management/Part I
Contract HSE Management/Part I HEALTH, SAFETY AND ENVIRONMENT PROCEDURE Contract HSE Management/Part I DOCUMENT ID - PR-10-POGC-001 REVISION - 1.0 Pages 9 Revision 1.0 Contract HSE Management/Part II Document
More informationCross Border Co-operation between Bulgaria & Romania Multi-annual Programme Project Fiche for Programme Support
Cross Border Co-operation between Bulgaria & Romania Multi-annual Programme 2003 2006 2005 Project Fiche for Programme Support 1. Basic Information 1.1 CRIS Number: BG 2005/017-455.01;04 1.2 1.2 Title:
More informationTERMS AND CONDITIONS OF SALE
TERMS AND CONDITIONS OF SALE 1. General 1.1. These terms and conditions of sale ( Terms ) apply to the sale of goods and services by Sealite UK Ltd, ( us ) to the person or entity who enters into a contract
More informationInvesting in Infrastructure International Best Legal Practice in Project and Construction Agreements January 2016
Investing in Infrastructure International Best Legal Practice in Project and Construction Agreements January 2016 Damian McNair Partner, Legal M: +61 421 899 231 E: damian.mcnair@au.pwc.com Sponsor checklist
More informationANTI-FRAUD CODE CONTENTS INTRODUCTION GOAL CORPORATE REFERENCE FRAMEWORK CONCEPTUAL FRAMEWORK ACTION FRAMEWORK GOVERNANCE STRUCTURE
ANTI-FRAUD CODE CONTENTS INTRODUCTION GOAL CORPORATE REFERENCE FRAMEWORK CONCEPTUAL FRAMEWORK ACTION FRAMEWORK GOVERNANCE STRUCTURE PREVENTION, DETECTION, INVESTIGATION AND RESPONSE MECHANISMS APPLICATION
More informationProject Management. A Practitioner s Guide. Steven M. Bragg
Project Management A Practitioner s Guide Steven M. Bragg Chapter 1 Overview of Project Management... 1 Learning Objectives... 1 Introduction... 1 Project Management Activities... 1 The Need for Project
More informationRisk Management Plan PURPOSE: SCOPE:
Management Plan Authority Source: Vice-Chancellor Approval Date: 16/05/2018 Publication Date: 17/05/2018 Review Date: 17/05/2021 Effective Date: 16/05/2018 Custodian: General Counsel and University Secretary
More informationCounty of Sonoma Agenda Item Summary Report
County of Sonoma Agenda Item Summary Report Agenda Item Number: 46 (This Section for use by Clerk of the Board Only.) Clerk of the Board 575 Administration Drive Santa Rosa, CA 95403 To: Board of Supervisors
More informationRISK MANAGEMENT FRAMEWORK
RISK MANAGEMENT FRAMEWORK 1 RISK MANAGEMENT FRAMEWORK... 1 INTRODUCTION... 3 AN EFFECTIVE ENTERPRISE RISK MANAGEMENT SYSTEM... 4 Guiding Principles... 4 RISK GOVERNANCE... 5 Mandate and Commitment... 5
More informationOur Commitment to Taft-Hartley Plans
Our Commitment to Taft-Hartley Plans Solutions to maximize the value of your retirement program Integrity People Investments Technology Communications insure invest retire FOR PLAN SPONSOR USE ONLY NOT
More informationNHS Working Longer Group Initial findings and recommendations. What do they say about older women at work?
NHS Working Longer Group Initial findings and recommendations What do they say about older women at work? Background The Working Longer Group (WLG) was established to address the impact of a raised retirement
More informationASPEC Engineering HSE Management System Work Instruction
1 Objective This work instruction outlines ASPEC s sub-contractor management process and works in conjunction with ASPEC Quality Management System - Purchasing Process Work Instruction, AE-QMS-WI-0004.
More informationContract Administration Final Exam
Contract Administration Final Exam 1. You want to solicit bids for a one year contract for concrete to support your roadway construction work. At this time, prices are fluctuating due to high demand and
More informationSubject CP1 Actuarial Practice Core Practices Syllabus
Subject CP1 Actuarial Practice Core Practices Syllabus for the 2019 exams 1 June 2018 Actuarial Practice Aim The aim of the Actuarial Practice subject is to use the technical and business skills learnt
More informationWORK HEALTH AND SAFETY REFRESHER
WORK HEALTH AND SAFETY REFRESHER LEARNING OUTCOMES Advice regarding legislative duties, rights and obligations WHSMS implementation and maintenance Identifying hazards; assessing risks; and developing,
More informationUPDATED IAA EDUCATION SYLLABUS
II. UPDATED IAA EDUCATION SYLLABUS A. Supporting Learning Areas 1. STATISTICS Aim: To enable students to apply core statistical techniques to actuarial applications in insurance, pensions and emerging
More information