1 Strengthening Solid Waste Financing and Cost Recovery Framework in Syria Terms of Reference for a Financial Analyst BACKGROUND The present Terms of Reference cover the preparation of an analysis and recommendations for enhanced and effective cost recovery mechanism for municipal solid waste in Syria. Syria generated an estimated million tones of municipal solid waste in 2002, growing at an estimated percent per year. Municipal solid wastes have been inadequately managed for many years in the country. Waste collection systems have left large areas (up to 80 percent in some cases) of towns and cities that are not serviced or underserviced. The majority of collected waste dumped in facilities lacks any effective controls. Composting, although widespread, has generally not been effectively implemented; important recycling activities are undertaken in at least some cities (particularly Damascus). Hazardous wastes may be inappropriately managed with non-hazardous municipal wastes. Work has been undertaken in several of the major cities in Syria to develop waste management plans in support of either specific component of waste management systems or on MSW in general. Solid waste management plans have been developed for major cities such as Homs, Latakia, and Aleppo. In the absence of an overall policy identifying national objectives and priorities, this work has established project priorities without reference to a broader national agenda. Financing of waste management infrastructure is being undertaken through central government allocations, and international grant and loan initiatives. Waste management is not a government line item, and financing of capital and equipment is undertaken on an exception basis. Generally, a state planning commission reviews annual municipal infrastructure requests and allocates budget accordingly. In 2003, the Ministry of Local Administration and Environment initiated the elaboration of a national SW master plan. This master plan covered the whole chain of SWM except the collection and focus on transfer, processing and disposal facilities. It consisted of the collection of base data on municipal solid waste (input and output for each area), preparation of technical reports with needed technologies, equipment, required operation and maintenance (consumables, personnel, etc.), general layout plans, preliminary executions programs and projected costs for each facility. The technical reports are then to be used in tendering priority investment projects. The total investments for the next 10 years are estimated to USD 400 million. 1

2 The implementation of the above master plan will require great efforts for the mobilisation of financial resources for both investment and operating costs. It is reported that the cost of the planned municipal solid waste system will be around 420 SP/inhabitant/year or 10 times more the existing one. Therefore, strengthening the current solid waste cost recovery system is a must. The Ministry of Local Administration and Environment (MOLAE) recognized the urgent need for immediate action and established on June 22, 2004 a national working group to study cost recovery issues. The main tasks of this group include: (a) analysis of the current solid waste financing and cost recovery framework, (b) identification of alternatives and options for improvements, and (c) recommend the best option to ensure financial sustainability of the planned systems. Within this context the MoLE requested RMG assistance for the mobilisation of a short term consultant (financial analyst) in order to assist and guide the above national working group in carrying out its assigned tasks. OBJECTIVE OF THE MISSION The key objective of the present assignment is to assist the Government of Syria in strengthening the existing MSW financial and cost recover framework. More specifically, the consultants will assist the above national working group to develop and recommend appropriate cost recovery mechanisms including fees/tariff structures and cost recovery targets. The Consultant will rely principally upon readily available data. Original data collection will be furnished with the assistance of MOLAE and Damascus Municipality. Other involved parties (members of the working group) will also provide and arrange access to appropriate records and reports as necessary for the mission. KEY TASKS OF THE CONSULTANT The consultant will start its assignment by carrying out a short mission (7 days) in Damascus Syria to (a) discuss and validate the scope of the work with the MoLAE and the National Working Group; (b) collect and complement relevant data and information; and (c) discuss wit key stakeholders options and alternatives identified. More details on key tasks are as follow: Task 1: Cost analysis of MSW services The working group will collect available data on operating and investment costs of the existing SWM services including those provided through the private sector on the basis of a list prepared by the consultant 2

3 The consultant will analyse those data The consultant will conduct a comprehensive cost analysis of the current municipal solid waste collection, transport, treatment and disposal services; The consultant will prepare projections of operating and maintenance (O&M) costs for the next 10 years of operation of the whole MSW system including existing and proposed new services and facilities under the prepared Master Plan. The working group will conduct a market assessment on the achievements and potentialities of recycling and composting activities in Syria. On the basis of these data, the consultant will identify potential sources of revenues and evaluation of possible financial inputs of waste recovery and recycling activities as well as potential composting activities. Task 2: Assessment of current institutional responsibilities for financing MSW and current revenue levels for MSW With the support and the backing of the National working group, the consultant will: Assess the existing financial management responsibilities for the solid waste sector by the various institutions in Syria Analysis; Identify key national sources of finance for waste management investments including government budget transfers, international sources, municipal funds, etc.; Identify and evaluate national and/or municipal fiscal/legal instruments for MSW indirect sources of revenues (ex: Property taxes, etc.); Estimate the potential revenues based on the current fees/taxes recovery systems and relevant collection rate; and Estimate the current and future gaps between revenues and costs estimated under Task 1 and prepare a cash flow analysis including forecasts of revenues and expenditures associated to SWM services for 10 and 15 year Horizons; Task 3: Development of MSW new cost recovery options The working group, with the backing of the consultant, will: Based on the above and other factors deemed relevant by the consultants will develop possible alternatives for cost recovery in Syria; analyze the feasibility of the above alternatives, and determine the phasing-in schedule to move from partial to full cost recovery; describe the pros and cons for each alternative, estimate the cost to each household for each alternative cost recovery mechanisms. These 3

4 proposals should take into consideration current legal and institutional framework and above developed finding resources alternatives. Based on the above development, the consultants will recommend the most appropriate cost recovery scheme to the Syrian context and draft a detailed schedule of associated rates. Task 4: Implementation Plan In close coordination with the National Working Group members, the consultants will identify the steps, decisions and actions needed to implement the various recommendations of the present assignment. EXPECTED OUTPUT REPORTS Deliverable #1 Draft Report: It shall be submitted to the MOLAE within the time schedule set out below. The core of the Draft Report will be the results of all tasks. The Draft Report should be prepared in English. The MOLAE will have 2 weeks to review and comment on the Draft Report. Deliverable #2 - Final Report. The Final Report shall be submitted to the the MOLAE within the time schedule set out below. The Final Report will provide complete details of all work performed, analyses made and justification of options and recommendations proposed. The Final Report should have an Executive Summary prepared in Arabic, and a Main Report prepared in English. ASSAIGNMENT SUPERVISION & TIME SCHEDULE The work of the Consultant would be supervised by the MoLAE in close coordination with RMG/ANPE. The Department of SWM among the MoLAE will be the focal point for coordination with all other ministries, agencies and any other member of the National Working Group. The MoLAE will assure free access to all existing data and to all relevant operations and facilities. The Client will also provide liaison and contacts with the local authorities and other key stakeholders. The following is the time schedule for the production of the reports described above. MILESTONE WEEKS TO COMPLETION 1. Contract signature 0 2. Submit Draft report 4 3. Comments issued by Client 6 5. Submit Final Report 8 4

5 LEVEL OF EFFORT & TIME FRAME: It is proposed that the Consultant will avail a total of 34 person-days for the completion of this assignment. It is anticipated that the Consultant would complete the work over a duration of maximum 2 months [February 2005] until [Marsh, 2005], including review time of reports. QUALIFICATION OF THE CONSULTANT The required qualification of the consultant should be as follow: Financial analyst or economist with over 10 years of related experience, Very well familiar and thorough knowledge of solid waste issues Fluency in Arabic and English required with excellent written and oral communications skills. BUDGET The budget of the proposed assignment is estimated to a total of 8500 euros (34@250 euros/day). The perdiem and travel cost related to country visit will be reimbursed 5

UNDAF Outcome(s)/Indicator(s): Sustainable development, disaster management and energy efficiency

UNDAF Outcome(s)/Indicator(s): Sustainable development, disaster management and energy efficiency INITIATION PLAN FOR A GEF PROJECT PREPARATION GRANT (PPG) UNDAF Outcome(s)/Indicator(s): Sustainable development, disaster management and energy efficiency Country Islamic Republic of Iran Expected Outcome(s)/Indicator

More information

Terms of Reference for an Individual National Consultant to conduct the testing of the TrackFin Methodology in Uganda.

Terms of Reference for an Individual National Consultant to conduct the testing of the TrackFin Methodology in Uganda. Terms of Reference for an Individual National Consultant to conduct the testing of the TrackFin Methodology in Uganda 21 July, 2017 Introduction: The Ministry of Water and Environment (MWE) is implementing

More information

TERMS OF REFERENCE FEASIBILITY STUDY FOR ENVIRONMENTAL TRUST FUND

TERMS OF REFERENCE FEASIBILITY STUDY FOR ENVIRONMENTAL TRUST FUND TERMS OF REFERENCE FEASIBILITY STUDY FOR ENVIRONMENTAL TRUST FUND Type of Position: Local consultant Sustainable finance expert Location: Ulaanbaatar, Mongolia Type of Contract: Individual contract Expected

More information

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) 2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) TECHNICAL SPECIFICATIONS 15 July 2016 1 1) Title of the contract The title of the contract is 2nd External

More information

Terms of Reference (ToR) Earthquake Hazard Assessment and Mapping Specialist

Terms of Reference (ToR) Earthquake Hazard Assessment and Mapping Specialist Terms of Reference (ToR) Earthquake Hazard Assessment and Mapping Specialist I. Introduction With the support of UNDP, the Single Project Implementation Unit (SPIU) of the Ministry of Disaster Management

More information

UNICEF Moldova. Terms of Reference

UNICEF Moldova. Terms of Reference UNICEF Moldova Terms of Reference Individual Consultancy on Public Finance for Development of the National Action Plan for Gradual Implementation of the Sanitary and Hygiene Norms for Preschools Duration

More information

Islamic Republic of Afghanistan Ministry of Finance. Terms of Reference. Ministry of Finance, Directorate General Budget

Islamic Republic of Afghanistan Ministry of Finance. Terms of Reference. Ministry of Finance, Directorate General Budget Islamic Republic of Afghanistan Ministry of Finance Terms of Reference Position Information: Post Title: Organization: Type of Appointment: Level: Duration: Duty Station: Closing Date: Senior GRB Specialist

More information

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN Terms of Reference for Consultants 1. BACKGROUND INFORMATION Government of Vanuatu has requested TA support in the formulation and preparation of a national infrastructure

More information

Municipal Programme for Solid Waste Management in Bosnia and Herzegovina Programme Document

Municipal Programme for Solid Waste Management in Bosnia and Herzegovina Programme Document 1 of16 November 2009 Municipal Programme for Solid Waste Management in Bosnia and Herzegovina Programme Document 1. INTRODUCTION The Swedish International Development Cooperation Agency (Sida) will support

More information

, OFFICIAL. The World Bank Office, INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION.

, OFFICIAL. The World Bank Office, INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION. Public Disclosure Authorized The World Bank Office, INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION, OFFICIAL 28 March, 2014 Public Disclosure Authorized Public

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

37 days. 26 October (will depend on dates of HQ mission to Bxl) Deputy Director, UNICEF Brussels Office. 18 July 2018, 4pm Brussels time

37 days. 26 October (will depend on dates of HQ mission to Bxl) Deputy Director, UNICEF Brussels Office. 18 July 2018, 4pm Brussels time Assignment financing instruments Targeted mapping and analysis of EU innovative Location Home-based Duration 3 months Estimate number of working days 37 days Start date 23 July Tentative end date 26 October

More information

JORDAN. Terms of Reference

JORDAN. Terms of Reference JORDAN Terms of Reference Jordan: Strengthening municipal financial management systems to sustain service delivery in municipalities affected by the refugee crisis Assessment of Municipal Public Financial

More information

SPECIFIC TERMS OF REFERENCE Country Programme Interim Evaluation (CPiE)

SPECIFIC TERMS OF REFERENCE Country Programme Interim Evaluation (CPiE) SPECIFIC TERMS OF REFERENCE Country Programme Interim Evaluation (CPiE) FWC BENEFICIARIES 2009 - LOT 11: Macro Economy, Statistics, Public Finance Management EuropeAid/127054/C/SER/multi 1. BACKGROUND

More information

TERMS OF REFERENCE FOR CONSULTANCY SERVICES FOR THE ESTABLISHMENT OF AN ENDOWMENT FUND

TERMS OF REFERENCE FOR CONSULTANCY SERVICES FOR THE ESTABLISHMENT OF AN ENDOWMENT FUND TERMS OF REFERENCE FOR CONSULTANCY SERVICES FOR THE ESTABLISHMENT OF AN ENDOWMENT FUND 1.0 CONTEXT REQUEST FOR PROPOSALS The Caribbean Disaster Management Agency is a Regional Organization currently comprising

More information

Duration of Assignment: Apprx. 150 working days from January to September 2015

Duration of Assignment: Apprx. 150 working days from January to September 2015 Terms of reference GENERAL INFORMATION Title: Governance and Institutional Expert _CPEIR Bangka Belitung (Indonesian National) Project Name : Environment Unit/ Sustainable Development Financing (SDF) SIDA

More information

Duration of Assignment: Approx. 150 working days from January to September 2015

Duration of Assignment: Approx. 150 working days from January to September 2015 Terms of reference GENERAL INFORMATION Title: Gender Poverty Expert _CPEIR Bangka Belitung (Indonesian National) Project Name : Environment Unit/ Sustainable Development Financing (SDF) SIDA Funding Reports

More information

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan Technical Assistance Report Project Number: 46539 Regional Capacity Development Technical Assistance (R CDTA) August 2014 Improving the Financial Management Capacity of Executing Agencies in Afghanistan

More information

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT. International Public Financial Management Specialist

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT. International Public Financial Management Specialist TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT POST TITLE: AGENCY/PROJECT NAME: COUNTRY OF ASSIGNMENT: International Public Financial Management Specialist Governance of Climate Change Finance team, UNDP Bangkok

More information

Contribution of road transport to sustainability and economic development CALL FOR PROPOSALS

Contribution of road transport to sustainability and economic development CALL FOR PROPOSALS Contribution of road transport to sustainability and economic development CALL FOR PROPOSALS Deadline: February 28 th, 2018 1. PURPOSE AND STRATEGIC SIGNIFICANCE 1.1 Introduction The World Road Association

More information

TERMS OF REFERENCE FOR INTERNATIONAL CONSULTANT

TERMS OF REFERENCE FOR INTERNATIONAL CONSULTANT TERMS OF REFERENCE FOR INTERNATIONAL CONSULTANT Title: Countries: Duration: Analysis and Advocacy for Child-Centred Budgeting Botswana, Lesotho, Namibia, South Africa and Swaziland 40 working days, spread

More information

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACTORS

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACTORS TERMS OF REFERENCE FOR INDIVIDUAL CONTRACTORS ASSIGNMENT TITLE: International Planning/Budgeting Expert Discussion Paper - Integration of the SDGs into Myanmar s Planning and Budgeting Frameworks DURATION:

More information

Request For Proposals General Information Assignment Project Activity

Request For Proposals General Information Assignment Project Activity Request For Proposals General Information Assignment Short Term Consultancies* Project Caribbean Emergency Legislation Project (CELP) Activity Assessment of national legal and institutional frameworks

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE INDIVIDUAL CONSULTANT PROCUREMENT NOTICE Reference Code: Country: Description of the Assignment: Project: UNDP/SCR/SSS/IC/2017/08 Turkey Capacity development on operational efficiency and strategic planning

More information

DFTAD Health and Nutrition Project Manager - Appointment

DFTAD Health and Nutrition Project Manager - Appointment DFTAD Health and Nutrition Project Manager - Appointment Location: [Africa] [Central African Republic] Town/City: Bangui Category: Project Management Job Type: Open-ended, Full-time PURPOSE OF POSITION:

More information

TERMS OF REFERENCE TULINDE TUSOME PROJECT IN KILIFI AND KWALE, KENYA ENVIRONMENTAL IMPACT ASSESSMENT. Programme department, Plan International Kenya

TERMS OF REFERENCE TULINDE TUSOME PROJECT IN KILIFI AND KWALE, KENYA ENVIRONMENTAL IMPACT ASSESSMENT. Programme department, Plan International Kenya TERMS OF REFERENCE TULINDE TUSOME PROJECT IN KILIFI AND KWALE, KENYA ENVIRONMENTAL IMPACT ASSESSMENT Project Name Tulinde Tusome Start date of the Action 08/02/2016 End date of the Action 11/03/2016 Contracting

More information

IPP TRANSACTION ADVISOR TERMS OF REFERENCE

IPP TRANSACTION ADVISOR TERMS OF REFERENCE IPP TRANSACTION ADVISOR TERMS OF REFERENCE Terms of reference for transaction advisor services to the Government of [ ] for the [insert description of the project] (the Project ). Contents 1. Introduction

More information

Terms of Reference for Junior Non-Key Expert on e-invoicing, e-ordering and the respective framework

Terms of Reference for Junior Non-Key Expert on e-invoicing, e-ordering and the respective framework Terms of Reference for Junior Non-Key Expert on e-invoicing, e-ordering and the respective framework 1 CONTRACT OBJECTIVES & EXPECTED RESULTS 2 1.1 Background to the Project 2 1.2 Background to the Assignment

More information

Terms of Reference for Senior Non-Key Short-Term Expert: e- Commerce Regulatory Issues

Terms of Reference for Senior Non-Key Short-Term Expert: e- Commerce Regulatory Issues Terms of Reference for Senior Non-Key Short-Term Expert: e- Commerce Regulatory Issues 1 CONTRACT OBJECTIVES & EXPECTED RESULTS 2 1.1 Background to the Project 2 1.2 Background to the Assignment 3 1.3

More information

Draft Terms of Reference. Mozambique Climate Change Technical Assistance Project

Draft Terms of Reference. Mozambique Climate Change Technical Assistance Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1. Background Context Draft Terms of Reference Mozambique Climate Change Technical Assistance

More information

Job Description and Requirements Programme Manager State-building and Governance Job no in the EU Delegation to the Republic of Yemen

Job Description and Requirements Programme Manager State-building and Governance Job no in the EU Delegation to the Republic of Yemen JOB PROFILE 17/08/2013 Job Description and Requirements Programme Manager State-building and Governance Job no. 127004 in the EU Delegation to the Republic of Yemen Job Type: Contract Agent Function Group

More information

REPUBLIC OF ZAMBIA. Ministry of National Development Planning

REPUBLIC OF ZAMBIA. Ministry of National Development Planning REPUBLIC OF ZAMBIA Ministry of National Development Planning Terms of References For Individual Local Consultant to Develop Guidelines and Procedures for a Comprehensive Framework for Public Investment

More information

Project approach - Decentralised management. DAC-code Government Administration

Project approach - Decentralised management. DAC-code Government Administration ANNEX Annex1 ACTION FICHE FOR SYRIAN ARAB REPUBLIC / ENPI / LOCAL DEVELOPMENT 1. IDENTIFICATION Title/Number Promoting Decentralisation and Local Development (DLD) Total Cost EC contribution 20,000,000

More information

JOB ADVERTISEMENT. I. Job Title : Urban Regional Planner and Geo-Spatial Analyst (National Only)

JOB ADVERTISEMENT. I. Job Title : Urban Regional Planner and Geo-Spatial Analyst (National Only) JOB ADVERTISEMENT I. Job Title : Urban Regional Planner and Geo-Spatial Analyst (National Only) II. Job Reference : RDTL-MPIE-MPS-2016-010 III. Terms of Reference : Attached IV. Application procedure Applications

More information

Page 1 of 5. APPROVED e-requisition

Page 1 of 5. APPROVED e-requisition United Nations Development Programme GENERAL INFORMATION Title: Senior Technical Officer for Secretariat in Directorate General Communicable Diseases Control (National Consultant) Project Name: Health

More information

Support to the implementation of the ICGLR's Regional Initiative on Natural Resources This project is co-financed by the European Union

Support to the implementation of the ICGLR's Regional Initiative on Natural Resources This project is co-financed by the European Union 1 Support to the implementation of the ICGLR's Regional Initiative on Natural Resources This project is co-financed by the European Union International Conference on the Great Lakes Region (ICGLR) Terms

More information

Committee on Development and Intellectual Property (CDIP)

Committee on Development and Intellectual Property (CDIP) E CDIP/14/7 ORIGINAL: ENGLISH DATE: SEPTEMBER 22, 2014 Committee on Development and Intellectual Property (CDIP) Fourteenth Session Geneva, November 10 to 14, 2014 PROJECT ON INTELLECTUAL PROPERTY (IP)

More information

EAF-Nansen Project (GCP/INT/003/NOR)

EAF-Nansen Project (GCP/INT/003/NOR) EAF-Nansen Project (GCP/INT/003/NOR) Title : Improving the Artisanal Fisheries Management of Liberia and Sierra Leone Funded: EAF-Nansen Total Contribution: USD 50,000 1 Countries: Duration: Liberia and

More information

Terms of Reference Development of the City of Tshwane Sustainability Financing Mechanism Strategy

Terms of Reference Development of the City of Tshwane Sustainability Financing Mechanism Strategy Terms of Reference Development of the City of Tshwane Sustainability Financing Mechanism Strategy 1. ABOUT THE SACN The South African Cities Network (SACN) as established in 2002, is a network of the nine

More information

PROJECT IMPLEMENTATION DOCUMENT NO.1 REPORTING PROCEDURES AND MONITORING INDICATORS

PROJECT IMPLEMENTATION DOCUMENT NO.1 REPORTING PROCEDURES AND MONITORING INDICATORS Establishing the European Geological Surveys Research Area to deliver a Geological Service for Europe PROJECT IMPLEMENTATION DOCUMENT NO.1 REPORTING PROCEDURES AND MONITORING INDICATORS Joint Call on applied

More information

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT Position: Short-term Planning Consultant -Support to Preparation of Ulaanbaatar City Development Vision Document reflecting social/economic and ' environmental

More information

Terms of Reference. International Consultant to MTR of the 5 year implementation of the National Nutrition Strategy,

Terms of Reference. International Consultant to MTR of the 5 year implementation of the National Nutrition Strategy, Terms of Reference International Consultant to MTR of the 5 year implementation of the National Nutrition Strategy, 2011-2020 1. Summary Title Terms of Reference for an international consultant in Nutrition

More information

TERMS OF REFERENCE FOR CONSULTANCY TO DEVELOP A PROCESS FOR DIGITIZING MODULAR TRAINING PROGRAM ON AGE INCLUSIVE HUMANITARIAN INTERVENTIONS

TERMS OF REFERENCE FOR CONSULTANCY TO DEVELOP A PROCESS FOR DIGITIZING MODULAR TRAINING PROGRAM ON AGE INCLUSIVE HUMANITARIAN INTERVENTIONS TERMS OF REFERENCE FOR CONSULTANCY TO DEVELOP A PROCESS FOR DIGITIZING MODULAR TRAINING PROGRAM ON AGE INCLUSIVE HUMANITARIAN INTERVENTIONS January 2018 1. Context Leaving no one behind: Minimising the

More information

Good Practice when Preparing a Project Proposal. 15 February 2005

Good Practice when Preparing a Project Proposal. 15 February 2005 Good Practice when Preparing a Project Proposal II 15 February 2005 Before applying Familiarise yourself with the programmes Web site, FAQs, past projects Review open Call for Proposals and associated

More information

SPECIAL CONDITIONS OF TENDER

SPECIAL CONDITIONS OF TENDER Page 1 SPECIAL CONDITIONS OF TENDER A. INTRODUCTION The following documents are available on http://emits.esa.int/ under "Reference Documentation" --> "Administrative Documents": ESA Procurement Regulations

More information

Project Closure TODAY S LESSON

Project Closure TODAY S LESSON Project Closure TODAY S LESSON Lesson Learning Outcomes At the conclusion of this lesson, the student should be able to: Understand the need to carry out project closure. Describe the activities undertaken

More information

AFRICAN DEVELOPMENT BANK GROUP

AFRICAN DEVELOPMENT BANK GROUP REQUEST FOR EXPRESSION OF INTEREST FOR AN INDIVIDUAL CONSULTANT AFRICAN DEVELOPMENT BANK GROUP 01, Avenue Joseph Anoma, Plateau, BP 1387, Abidjan, Côte d Ivoire Financial Management Department (FIFM) /

More information

Tender Specifications attached to the Invitation to tender

Tender Specifications attached to the Invitation to tender Ref. Ares(2015)3457155-20/08/2015 Tender Specifications attached to the Invitation to tender Brussels, 20/08/2015 Invitation to tender N SRB/NEG/1/2015 for the provision of legal advice for bridge financing

More information

Mongolia: Development of State Audit Capacity

Mongolia: Development of State Audit Capacity Technical Assistance Report Project Number: 47198-001 Capacity Development Technical Assistance (CDTA) November 2013 Mongolia: Development of State Audit Capacity The views expressed herein are those of

More information

Project number: TR Twinning number: TR03-SPP Location: Turkey Public Administration at Central and Regional level.

Project number: TR Twinning number: TR03-SPP Location: Turkey Public Administration at Central and Regional level. ` Standard Summary Project Fiche Project number: TR 0305.01 Twinning number: TR03-SPP-01 1. Basic Information 1.1 Title: SUPPORT TO THE STATE PLANNING ORGANIZATION GENERAL DIRECTORATE FOR REGIONAL DEVELOPMENT

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE INDIVIDUAL CONSULTANT PROCUREMENT NOTICE Date: 07 July 2017 Country: Bangkok, Thailand Description of the assignment: National Consultant Chief Technical Advisor for BIOFIN Duty Station: Home-based in

More information

TERMS OF REFERENCE. Technical Working Group on the extension of social security to the informal economy

TERMS OF REFERENCE. Technical Working Group on the extension of social security to the informal economy TERMS OF REFERENCE Technical Working Group on the extension of social security to the informal economy Financing social security coverage to informal construction workers in Zambia: design of a social

More information

MCGILL GUIDE TO UNIT-LEVEL CLIMATE AND SUSTAINABILITY ACTION PLANNING

MCGILL GUIDE TO UNIT-LEVEL CLIMATE AND SUSTAINABILITY ACTION PLANNING MCGILL GUIDE TO UNIT-LEVEL CLIMATE AND SUSTAINABILITY ACTION PLANNING Prepared by the McGill Office of Sustainability January 2018 Introduction Context McGill adopted a Climate and Sustainability Action

More information

STANDARD SUMMARY PROJECT FICHE

STANDARD SUMMARY PROJECT FICHE STANDARD SUMMARY PROJECT FCHE 1. Basic nformation 1.1 CRS Number: Twinning Light Envelope Comp. 1 2003004-979-08-04 LV2003BTL 1.2 Title: nstitution Building Facility 1.3 Sector: Various 1.4 Location: Latvia

More information

TERMS OF REFERENCE. 2. Adaptation and implementation of this new methodological framework at national level

TERMS OF REFERENCE. 2. Adaptation and implementation of this new methodological framework at national level TERMS OF REFERENCE POST TITLE: AGENCY/PROJECT NAME: COUNTRY OF ASSIGNMENT: National Consultant Chief Technical Advisor for BIOFIN UNDP/ The Biodiversity Finance Initiative (BIOFIN) Home-based in Thailand,

More information

11. The project funding can be utilized for the following purposes, amongst others:

11. The project funding can be utilized for the following purposes, amongst others: Pre-DTIS Projects Pre-DTIS project objectives, amount and duration 8. The pre-dtis phase, where needed, aims at setting up the conditions for the EIF Country to make the arrangements for the DTIS to be

More information

Ministry of Finance, Banking & Postal Services Republic of the Marshall Islands

Ministry of Finance, Banking & Postal Services Republic of the Marshall Islands Ministry of Finance, Banking & Postal Services Republic of the Marshall Islands Consultant Recruitment Announcement Project to Strengthen Budget Execution and Financial Reporting Systems (BEFR) Project

More information

THE WORLD BANK TERMS OF REFERENCE Impact of carbon pricing instruments on national economy and contribution to NDC

THE WORLD BANK TERMS OF REFERENCE Impact of carbon pricing instruments on national economy and contribution to NDC THE WORLD BANK TERMS OF REFERENCE Impact of carbon pricing instruments on national economy and contribution to NDC A. Project Background and Objectives Partnership for Market Readiness The Partnership

More information

How to Develop High-Quality Full Application Writing a Winning Proposal

How to Develop High-Quality Full Application Writing a Winning Proposal How to Develop High-Quality Full Application Writing a Winning Proposal Information and Training Workshop Presentations held at the Country Workshops in Moldova, Ukraine and Georgia Day 1 Day!One!!!! Workshop

More information

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project Technical Assistance Report Project Number: 51039-001 Transaction Technical Assistance (TRTA) September 2017 Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

More information

Terms of Reference (ToR) Budget Tracking Officer, Line Ministry Budget Information System (LMBIS)

Terms of Reference (ToR) Budget Tracking Officer, Line Ministry Budget Information System (LMBIS) Annex I Terms of Reference (ToR) Budget Tracking Officer, Line Ministry Budget Information System (LMBIS) (Planning and Budget Management Division) 1. Position Description Post Title: Level: Project: Supervisor:

More information

FINANCE CONSULTANT FOR ASEAN COOPERATIVE PROJECT ON FINANCING MECHANISMS DESIGN FOR ENERGY EFFICIENCY AND CONSERVATION (EE&C) PROJECT IMPLEMENTATION

FINANCE CONSULTANT FOR ASEAN COOPERATIVE PROJECT ON FINANCING MECHANISMS DESIGN FOR ENERGY EFFICIENCY AND CONSERVATION (EE&C) PROJECT IMPLEMENTATION Call for Expert ASEAN Centre for FINANCE CONSULTANT FOR ASEAN COOPERATIVE PROJECT ON FINANCING MECHANISMS DESIGN EFFICIENCY AND CONSERVATION (EE&C) PROJECT IMPLEMENTATION About ACE Established on 1 January

More information

PROJECT CHARTER VERSION: V01 REVISION DATE: [ ]

PROJECT CHARTER VERSION: V01 REVISION DATE: [ ] PROJECT CHARTER VERSION: V01 REVISION DATE: [03.22.10] Approval of the Project Charter indicates an understanding of the purpose and content described in this document. By signing this document, each individual

More information

ENHANCED INTEGRATED FRAMEWORK (EIF) GUIDANCE NOTE ON EIF SUSTAINABILTIY SUPPORT PHASE PROCESS

ENHANCED INTEGRATED FRAMEWORK (EIF) GUIDANCE NOTE ON EIF SUSTAINABILTIY SUPPORT PHASE PROCESS ENHANCED INTEGRATED FRAMEWORK (EIF) GUIDANCE NOTE ON EIF SUSTAINABILTIY SUPPORT PHASE PROCESS August 2016 Background 1. Tier 1 'Support to National Implementation Arrangements (NIAs)' projects (hereinafter

More information

EAST AFRICA TRADE AND INVESTMENT HUB REQUEST FOR PROPOSALS (RFP) RFP-NAI-0054

EAST AFRICA TRADE AND INVESTMENT HUB REQUEST FOR PROPOSALS (RFP) RFP-NAI-0054 EAST AFRICA TRADE AND INVESTMENT HUB REQUEST FOR PROPOSALS (RFP) RFP-NAI-0054 TRAINING ON DEVELOPMENT OF NATIONAL RESIDUE CONTROL PLANS CONSULTANCY SERVICES Issue Date: March 31, 2017 WARNING: Prospective

More information

REQUIRED DOCUMENT FROM HIRING UNIT

REQUIRED DOCUMENT FROM HIRING UNIT Terms of reference GENERAL INFORMATION Title: Public Financial Management Expert (Indonesian National) Project Name : Environment Unit/ Sustainable Development Financing (SDF) & BIOFIN Reports to: UNDP

More information

Terms of Reference for consultancy to carry out Project Base line study in the Malawi, Mozambique, Tanzania, Zambia and SADC region

Terms of Reference for consultancy to carry out Project Base line study in the Malawi, Mozambique, Tanzania, Zambia and SADC region Terms of Reference for consultancy to carry out Project Base line study in the Malawi, Mozambique, Tanzania, Zambia and SADC region STRENGTHENING THE SOCIAL ACCOUNTABILITY AND OVERSIGHT CAPACITY OF PARLIAMENTARY

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE TOR - CONSULTANCY IC/2012/026. Date: 16 April 2012

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE TOR - CONSULTANCY IC/2012/026. Date: 16 April 2012 INDIVIDUAL CONSULTANT PROCUREMENT NOTICE IC/2012/026 TOR - CONSULTANCY Date: 16 April 2012 Position: Consultant - RESOURCE MOBILISATION STRATEGY 2012-2015 for UNCT ETHIOPIA Duty Station: Addis Ababa, Ethiopia

More information

Georgia: Strengthening Domestic Resource Mobilization

Georgia: Strengthening Domestic Resource Mobilization Technical Assistance Report Project Number: 48044-003 Policy and Advisory Technical Assistance (PATA) September 2014 Georgia: Strengthening Domestic Resource Mobilization This document is being disclosed

More information

FP6 Contract and Financial Reporting. The Basics for EC Consortia. Linda Polik Research Services

FP6 Contract and Financial Reporting. The Basics for EC Consortia. Linda Polik Research Services FP6 Contract and Financial Reporting The Basics for EC Consortia Linda Polik Research Services linda.polik@admin.ox.ac.uk Overview of Presentation 1) Contractual Issues 2) Financial Issues 3) Reporting

More information

Financial Planning and Budget Analyst. Position Number Community Division/Region Yellowknife Corporate Services/HQ

Financial Planning and Budget Analyst. Position Number Community Division/Region Yellowknife Corporate Services/HQ IDENTIFICATION Department Position Title Infrastructure Financial Planning and Budget Analyst Position Number Community Division/Region 33-2524 Yellowknife Corporate Services/HQ PURPOSE OF THE POSITION

More information

ADMINISTRATIVE ANALYST (Class Code 1590) TASK LIST

ADMINISTRATIVE ANALYST (Class Code 1590) TASK LIST ADMINISTRATIVE ANALYST (Class Code 1590) TASK LIST A. General Administration 1. Writes narrative material such as letters, memos, and reports on various personnel, budgetary, contractual, grant, and policy

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

Definitions. Terms of Reference

Definitions. Terms of Reference Terms of Reference National or International consultants: International Description of the assignment (Title of consultancy): Mid-Term Review of the LEPAP project Project Title: Lebanon Environmental Pollution

More information

Action Fiche for Syrian Arab Republic. 1. IDENTIFICATION Support to the EU-Syria Association Agreement Programme (SAAP I)

Action Fiche for Syrian Arab Republic. 1. IDENTIFICATION Support to the EU-Syria Association Agreement Programme (SAAP I) Action Fiche for Syrian Arab Republic 1. IDTIFICATION Title/Number Support to the EU-Syria Association Agreement Programme (SAAP I) Total cost EU contribution: EUR 5 000 000 Beneficiary contribution: tbc

More information

It is currently the institution whose role consists of supporting the promotion of:

It is currently the institution whose role consists of supporting the promotion of: The supreme audit institution of Romania, the Court of Accounts, was initially set up in 1864 and operated until 1948. For the following 25 years financial control was initially the responsibility of the

More information

CITY OF PETALUMA REQUEST FOR PROPOSALS

CITY OF PETALUMA REQUEST FOR PROPOSALS CITY OF PETALUMA S 1) OVERHEAD COST ALLOCATION PLAN AND OMB CIRCULAR A-87 PLAN 2) USER FEE STUDY 3) CIP ADMINISTRATIVE RATE AND WORK ORDER RATE ANALYSIS 4) PREPARATION OF HOURLY OVERHEAD RATES 5) INTERNAL

More information

Annex C. Sample ToR for Independent Procurement Review

Annex C. Sample ToR for Independent Procurement Review 1. Introduction Annex C. Sample ToR for Independent Procurement Review TERMS OF REFERENCE INDEPENDENT PROCUREMENT REVIEW (IPR) 1.1. The procurement team of the World Bank requires an independent review

More information

People s Republic of China: Supporting the Reform of the Role of the People s Bank of China

People s Republic of China: Supporting the Reform of the Role of the People s Bank of China Technical Assistance Report Project Number: 49401-001 Policy and Advisory Technical Assistance (PATA) April 2016 People s Republic of China: Supporting the Reform of the Role of the People s Bank of China

More information

Definition. World Bank Seminar on Procurement November 15-18, 2010, Kyiv, Ukraine. Consultant Services

Definition. World Bank Seminar on Procurement November 15-18, 2010, Kyiv, Ukraine. Consultant Services World Bank Seminar on Procurement November 15-18, 2010, Kyiv, Ukraine Consultant Services 1 Definition 1.3 For the purpose of these Guidelines, the term consultants includes a wide variety of private and

More information

PROJECT CYCLE MANAGEMENT & LOGICAL FRAMEWORK MATRIX TRAINING CYPRIOT CIVIL SOCIETY IN ACTION V INNOVATION AND CHANGES IN EDUCATION VI

PROJECT CYCLE MANAGEMENT & LOGICAL FRAMEWORK MATRIX TRAINING CYPRIOT CIVIL SOCIETY IN ACTION V INNOVATION AND CHANGES IN EDUCATION VI PROJECT CYCLE MANAGEMENT & LOGICAL FRAMEWORK MATRIX TRAINING CYPRIOT CIVIL SOCIETY IN ACTION V INNOVATION AND CHANGES IN EDUCATION VI Objectives of the training Understand the definition of project and

More information

Developing Anti-Money Laundering and Combating the Financing of Terrorism Approaches, Methodologies, and Controls

Developing Anti-Money Laundering and Combating the Financing of Terrorism Approaches, Methodologies, and Controls Technical Assistance Report Project Number: 50258-001 Cluster Regional Capacity Development Technical Assistance (C-R-CDTA) December 2016 Developing Anti-Money Laundering and Combating the Financing of

More information

MINISTRY OF FINANCE DIRECTORATE GENERAL BUDGET MAKING BUDGET & AID WORK PROJECT. Vacancy Announcement

MINISTRY OF FINANCE DIRECTORATE GENERAL BUDGET MAKING BUDGET & AID WORK PROJECT. Vacancy Announcement MINISTRY OF FINANCE DIRECTORATE GENERAL BUDGET MAKING BUDGET & AID WORK PROJECT Vacancy Announcement Position Information: Vacancy Number Post Title: Project: Type of Contract: Number of Position(s): Duration:

More information

REQUEST FOR EXPRESSIONS OF INTEREST AFRICAN DEVELOPMENT BANK 01 B.P.

REQUEST FOR EXPRESSIONS OF INTEREST AFRICAN DEVELOPMENT BANK 01 B.P. REQUEST FOR EXPRESSIONS OF INTEREST AFRICAN DEVELOPMENT BANK Avenue Joseph Anoma, 01 B.P. 1387, Abidjan, CÔTE D'IVOIRE Programming and Budget Department (SNPB) E-mail: a.maquengo@afdb.org / b.mugova@afdb.org

More information

TERMS OF REFERENCE Final evaluation consultant AUP Project, Kayin State, Myanmar

TERMS OF REFERENCE Final evaluation consultant AUP Project, Kayin State, Myanmar TERMS OF REFERENCE Final evaluation consultant AUP Project, Kayin State, Myanmar 1. Background The European Union approved a project (February 2013 to April 2017) implemented by a consortium of HelpAge

More information

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project Technical Assistance Project Number: 50098 Project Preparatory Technical Assistance (PPTA) November 2016 Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project This document is being

More information

The Development Agreement. Long-Term Care Home Renewal Branch October 2016

The Development Agreement. Long-Term Care Home Renewal Branch October 2016 The Development Agreement Long-Term Care Home Renewal Branch October 2016 Learning Objectives By the end of this session, you will have a solid understanding of: The description and purpose of a Development

More information

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2

Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2 Technical Assistance Report Project Number: 40345 April 2008 Republic of the Philippines: Strengthening Provincial and Local Planning and Expenditure Management Phase 2 The views expressed herein are those

More information

Terms of Reference for the Mid-term Evaluation of the Implementation of UN-Habitat s Strategic Plan,

Terms of Reference for the Mid-term Evaluation of the Implementation of UN-Habitat s Strategic Plan, Terms of Reference for the Mid-term Evaluation of the Implementation of UN-Habitat s Strategic Plan, 2014-2019 I. Introduction and Mandate 1. The Governing Council (GC) of the United Nations Human Settlement

More information

b) Annex II: Proposal Submission Form, to be completed and returned with your proposal; and

b) Annex II: Proposal Submission Form, to be completed and returned with your proposal; and Dear Sir/Madam, Subject: Request for Proposals for [Provision of Cash Delivery Services] Project no. Multiple 1. The United Nations Office for Project Services (UNOPS) is seeking qualified offers for the

More information

KANPUR City Development Plan (CDP)

KANPUR City Development Plan (CDP) Annexure-IV JNNURM AND METHODOLOGY FOR DEVELOPING CITY DEVELOPMENT PLAN BACKGROUND Urban population of India has increased from 23.34 percent in 1981 to 27.8 percent in 2001 (Census of India 1991, 2001).

More information

High school diploma or G.E.D., and 3 years of experience is required.

High school diploma or G.E.D., and 3 years of experience is required. TML Salary Survey: Job Descriptions and Qualifications (2018) Job Title Job Description Job Qualifications Accounting/ Billing Specialist Performs specialized accounting support activities, which may include:

More information

TERMS OF REFERENCE FOR CONDUCTING MID-TERM EVALUATION FOR MALARIA PROJECT IN GEITA

TERMS OF REFERENCE FOR CONDUCTING MID-TERM EVALUATION FOR MALARIA PROJECT IN GEITA TERMS OF REFERENCE FOR CONDUCTING MID-TERM EVALUATION FOR MALARIA PROJECT IN GEITA Harnessing on the Private Health Sectors Potential in the Fight against Malaria 1.0. Introduction and Background Information

More information

Engagement of Financial Advisory Services for the Soapberry Wastewater. Terms of Reference

Engagement of Financial Advisory Services for the Soapberry Wastewater. Terms of Reference JAMAICA: FOUNDATIONS FOR COMPETITIVENESS AND GROWTH PROJECT Loan No.:8408-JM Component: 2A Assignment Title: Treatment Plant Engagement of Financial Advisory Services for the Soapberry Wastewater Reference

More information

Assignment Name: Workshop on EU Budget Support for civil servants of Macedonia Section 1. Introductory Information

Assignment Name: Workshop on EU Budget Support for civil servants of Macedonia Section 1. Introductory Information P R O C U R E M E N T N O T I C E Assignment Name: Workshop on EU Budget Support for civil servants of Macedonia Section 1. Introductory Information 1.1 Background information on the Regional School of

More information

I. PROPOSAL PREPARATION INSTRUCTIONS AND REQUIRED PROPOSAL INFORMATION

I. PROPOSAL PREPARATION INSTRUCTIONS AND REQUIRED PROPOSAL INFORMATION Request for Proposals for AUDITING SERVICES for the FALLON PAIUTE-SHOSHONE TRIBE (Issued: August 8, 2016) All questions and inquiries should be directed to Jon Pishion, Tribal Treasurer, by email at fbctreasurer@fpst.org

More information

III. modus operandi of Tier 2

III. modus operandi of Tier 2 III. modus operandi of Tier 2 Objective, country and project eligibility 70 Budget and timing 71 Project preparation: formulation of proposals 71 Project appraisal 72 Project approval 73 Agreements and

More information

REQUEST FOR PROPOSAL FOR. Full Cost Allocation Plan and Citywide User Fee and Rate Study. Finance Department CITY OF HUNTINGTON BEACH

REQUEST FOR PROPOSAL FOR. Full Cost Allocation Plan and Citywide User Fee and Rate Study. Finance Department CITY OF HUNTINGTON BEACH REQUEST FOR PROPOSAL FOR Full Cost Allocation Plan and Citywide User Fee and Rate Study Finance Department CITY OF HUNTINGTON BEACH Released on October 17, 2007 Full Cost Allocation Plan and Citywide User

More information

REQUIRED DOCUMENT FROM HIRING UNIT

REQUIRED DOCUMENT FROM HIRING UNIT Terms of reference GENERAL INFORMATION Title: Maternal Health Consultant for Impact Evaluation on MDG Acceleration Framework (MAF) in Central Java Project Name : Support to the Acceleration of MDG Achievement

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE. 2019/UNDP-MMR/PN/002 Date: 10 January 2019

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE. 2019/UNDP-MMR/PN/002 Date: 10 January 2019 United Nations Development Programme INDIVIDUAL CONSULTANT PROCUREMENT NOTICE 2019/UNDP-MMR/PN/002 Date: 10 January 2019 Country: Myanmar Description of the assignment: Duty Station: Period of assignment/services:

More information