Municipal Programme for Solid Waste Management in Bosnia and Herzegovina Programme Document

Size: px
Start display at page:

Download "Municipal Programme for Solid Waste Management in Bosnia and Herzegovina Programme Document"

Transcription

1 1 of16 November 2009 Municipal Programme for Solid Waste Management in Bosnia and Herzegovina Programme Document 1. INTRODUCTION The Swedish International Development Cooperation Agency (Sida) will support a four and a half year programme in BiH, with the purpose to facilitate development of a well functioning solid waste management system. The programme design as presented in this document may be revised and amended if deemed necessary. The programme will aim at improving quality and availability of solid waste service, utilizing the economic potential of the sector and reducing environmental and health concerns. It will help Bosnia and Herzegovina in fulfilling future candidacy requirements for the EU membership. The programme will consist of a combination of capacity building and investment support. It will comprise the following three components: 1) State and entity level capacity building and nation-wide public awareness campaign. 2) Municipal capacity building and investment support 3) Inter-municipal and regional capacity building and investment support Implementation will mainly take place on the municipal level, and the municipalities shall be assisted in upgrading their human and technical capacity. Inter-municipal cooperation and regional landfills shall be supported through capacity building and limited investments. The state and entity level will also be targeted for important programme activities and take part in capacity building. Participation of and guidance from all stakeholders will be ensured through their formal participation in advisory boards. It is envisaged that the state Ministry of Foreign Trade and Economic Relations (MOFTER) will be responsible for coordinating the programme on behalf of Bosnia and Herzegovina. The implementation of the programme will be divided into two phases, with a mid-term evaluation after the first phase. The first phase will mainly focus on the state and entity level and the municipalities of the Zenica and Bijeljina landfill regions. Limited support can be provided also to other municipalities and regions, if it is considered to be crucial for establishment of additional regional landfills

2 2 of16 and the possibility to engage them in the second phase of the Sida-financed programme. The programme will utilise experiences from, and bring value-added to, other economic and social development projects, as well as link to Sida engagements on the municipal level in BiH (e.g. Governance Accountability Project/GAP 1 ; Local Environmental Action Plans/LEAP 2 ; North-East Regional Development Association/NERDA 3, civil society, justice, public administration reforms and economic development). Special cooperation is envisaged with the World Bank as the main actor in the solid waste sector 4. The programme planning and implementation will be managed by a procured team of experienced international and local consultants with relevant know-how and experience, hereinafter called the Consultant. The main role of the Consultant is to provide support to local stakeholders in implementing various activities resulting in better solid waste management. Implementation will hence be carried out by the local stakeholders, but with guidance and hands-on support from the Consultant. The Consultant s role will be to strengthen the sense of ownership and responsibility, to function as facilitator and adviser to the clients when analysing problems, defining targets and necessary changes. A keystone in the adopted National waste management strategy of BiH 5 is to construct approximately 16 regional sanitary landfills 6, mainly based on World Bank financing and local co-funding. The landfills will be used for disposal of solid waste being delivered to the sites by the municipalities, as substitutes for the numerous existing open waste dumps which negatively affect environment and health. According to state laws the use of open dumps should have been terminated by January 2008, but compliance with this deadline has not been enforced. The solution with regional landfills is based on regional utility companies, established as shareholding partnerships or other forms of agreement with municipalities. This represents a new form of regional cooperation between municipalities, which so far is limited to landfill ownership and operation. Municipalities are legally responsible for waste collection and other issues of waste management. The efficiency of municipal services will consequently affect the utilisation and operation of regional landfills. Many municipalities lack adequate technical resources for waste handling, and are often financially and institutionally weak. There is also great need for human resource development within the sector http://web.worldbank.org/external/projects/main?pagePK= &piPK=73230&theSitePK=362026&menuPK= &Projectid=P Bosnia and Herzegovina, National Strategy for Solid Waste Management, August The regions are not formal administrative units.

3 3 of16 Financial constraints relate to the generally weak economic situation, which affect household incomes and consequently state and municipal tax revenues. BiH is still a low-income transition country with high unemployment rates. The affordability of households to pay fees for waste collection and other utility costs will have to be considered when raising tariffs to improve cost-coverage rates. 2. OVERALL GOALS The programme shall meet the following goals: i. Enhanced know-how and commitment at the state and entity level as regards policy issues and incorporation of EC guidelines into strategic planning, legislation and concrete measures in solid waste management, for future compliance with EC regulations. ii. iii. iv. Improved legislative and institutional framework on solid waste management in compliance with the orientation and guidelines of the national solid waste strategy on the state, entity and municipal level. Strengthened local governance, accountability and political commitment as regards solid waste management in participating municipalities. Increased public awareness and civil sector participation in developing sustainable waste management solutions based on tariff-financed municipal services and household responsibilities for waste handling and disposal. v. Concrete measures taken towards developing customer-oriented and costefficient municipal waste management services, based on efficient organisation and management, efficient use of technical and financial resources, clear responsibilities and recognition of environmental, social, sanitary and economic principles. vi. vii. viii. ix. Mobilised domestic and international financial resources and co-financing that supports implementation of investments, in compliance with cost-bearing principles and eligibility criteria. Value-added to the World Bank financed programme through increased capacity of municipalities and regional utility companies. Improved coordination and cooperation between municipalities in participating regions, with the purpose to develop more economic solutions not only regarding construction and utilisation of sanitary landfills but also on issues such as waste collection, transportation, recycling, hazardous waste and procurement. Use of participating municipalities as role models for other municipalities by promoting replication of the programme, as well as promoting innovations that lead to cost-saving and improved efficiency.

4 4 of16 3. OBJECTIVES AND EXPECTED RESULTS All inputs and activities shall comply with the overall goals of the programme. They shall be result-oriented, produce concrete and tangible outputs and generate measurable results as defined in these terms of reference. The following list of operational objectives and targeted results can serve as guidance for definition of quantitative or qualitative performance indicators of programme achievements. A. State and entity level Commitment of decision makers to take concrete action to develop sustainable waste management systems in BiH, after taking part in capacity building. Policy and legislative changes which will enhance responsibility, improve compliance with the legislation and initiate concrete action on the municipal level. Concrete measures taken that will improve enforcement of laws and regulations on waste handling. Prepared priority list and timetable for compliance with various EC directives on solid waste management. Increased public awareness and acceptance of the need for improved waste collection and sanitary disposal, separation, recycling and willingness-to-pay customer tariffs, by implementing a national awareness campaign. Concrete measures taken to mobilise financial resources and develop plans for replication and development of municipal waste management in other landfill regions, based on knowledge sharing from the Sida-financed programme. Policy changes and plans in place to implement feasible solutions of various methods to utilise energy contents of solid waste, recycle specific materials and compost organic content currently disposed as mixed waste on dumps and landfills. B. Municipal level a. Waste management system Waste management services organised, with clear and transparent rules regarding responsibilities, principles for tariff setting, budget allocations, decision-making, investment prioritisation, relations to private sector, customer orientation and other key issues.

5 5 of16 Improved service level, quantified as well as experienced (based on customer reviews), of household waste collection, transportation and disposal at the regional sanitary landfill. Investments procured and implemented based on economic and financial justification, competitive bidding and co-financing, utilising procedures and tools as developed by the programme. Rules introduced and indicators defined for identification and quantification of direct and indirect costs related to waste management. Improved cost-efficiency and cost-coverage of waste management, in order to provide sustainable services. Improved transparency and accountability of waste management, in order to justify services and charges. Revised tariff structure and adopted time-plan for increasing tariffs towards stepwise achievement of cost-coverage. Mitigation measures introduced and social support plans developed with targeted support to the poorest as compensation for raising tariffs above their affordability limit. Increased payment collection rate. Concrete measures taken to enforce compliance with national and local laws and regulations on solid waste handling and disposal. Adopted policy and action plan for separation and utilisation of recyclable materials (e.g. metals, PET plastics and paper). b. Municipal waste collection Improved collection services in terms of frequency, numbers of household customers (households and number of people) and waste collection area. Increased waste collection rate, i.e. the portion of produced household waste being collected. Conditions affecting the rate should be identified (e.g. increased collection frequency, enforcement of illegal dumping, separation and recycling of materials at household level, etc). c. Waste production, separation and recycling Reduced waste amount produced, total and per household, in the collection area. The produced amount is usually estimated from samples and it is necessary to identify conditions that affect the amount per household (e.g. consumption patterns) or the total amount (e.g. the area for collection services). Increased separation and utilisation of materials from household waste to be recycled, composted or utilised in other forms.

6 6 of16 d. Waste disposal Ensured fulfilment of obligations and commitments as defined in the service agreement with the regional landfill utility company. Improved transportation of waste to the regional landfill. Reduced illegal dumping, i.e. waste currently being disposed illegally (e.g. at open dumps), instead of being transported and disposed at the regional sanitary landfill. Prepared and adopted a realistic action plan, timetable, cost estimates and financing options for closure and rehabilitation of remaining open dumps. Adopted policy regarding incineration of infectious and other hazardous waste. e. Public participation and municipal cooperation Improved channels of public participation and verified ability to influence and communicate with the municipal waste management organisation. Concrete actions taken towards inter-municipal cooperation on waste management, including areas beyond partnership for regional landfills. 4. ORGANISATIONAL SET-UP The programme partners that shall assume roles and responsibilities in this programme are: Sida, the relevant institutions of Bosnia and Herzegovina at state, entity and municipal level, the utility companies at regional and municipal level, and the consultant Sida Sweden, represented by the Swedish International Development Cooperation Agency (Sida), will enter into a specific agreement with MOFTER on this programme. Sida will also contract the consultancy company selected through open tender, and enter into individual Agreements on Investment with each municipality/regional partner. The Embassy of Sweden in Sarajevo will act on behalf of Sida and be responsible for the programme follow-up, budgetary matters, responding to requests for no objection, approving work plans and reports and other issues State and Entity level The Ministry of Foreign Trade and Economic Relations (MOFTER) will represent Bosnia and Herzegovina and coordinate programme activities together with the Ministry of Environment and Tourism (FMET) in the Federation BiH and the Ministry of Physical Planning, Construction and Ecology (MPPCE) in Republika

7 7 of16 Srpska (RS). Other relevant ministries may also be engaged in the programme, e.g. the Ministry for Local Self-Governance and the Ministry of Finance in RS. It is envisaged that MOFTER, FMET and MPPCE will make the following undertakings: Facilitate access to and cooperation with relevant ministries and authorities at the state, entity, canton and municipal level. Assume responsibility for implementation of the awareness campaign and ensure adequate administration and internal control of the Swedish resources. Ensure that the Swedish contribution for implementation of the awareness campaign is used exclusively for agreed purposes. Ensure access to relevant documents and other information for the programme partners Consultant The Consultant (a core team of international and local consultants) will be contracted by Sida to provide services for a period of four and a half year, divided into two phases and the second phase subject to the results of a mid-term assessment of the programme results after the first phase. The Consultant is expected to implement a broad strategy of building capacities for efficient solid waste management, such as improved organisation, better planning and justification of investments, improved procurement and access to finance, introduction of software tools and information systems. Capacity building shall be implemented simultaneously with concrete material improvements on the ground, implemented by the local partners. The technical and material assistance of the programme shall result in an incremental reform process toward more effective solid waste management over the medium term. As part of the tender application the Consultant will submit a Programme Proposal and suggest participatory approach, methods, activities, inputs, target levels, relevant measurable performance indicators of the programme activities, and strategy for results sustainability. The local programme partners, experts and Sida staff will take part in the tender evaluation. During the Inception and Review Phase of six months the Consultant shall verify the ambitions set in the Programme Proposal and elaborate on the activities. During the implementation of the programme the Consultant shall apply proposed methods to the current situation, and in later stages quantify achievements of the programme activities. Achievements made should be specified for the state, entity and municipal level Programme Advisory Board (PAB) An advisory board will be set up for the programme. The main role of the PAB will be to suggest actions and make recommendations with regards to the Programme s budget and activities The PAB s suggested actions and recommendations is subject to Sida s no objection. Thus the board does not have the mandate to take decisions or in other ways act on behalf of Sida.

8 8 of16 PAB will serve as forum for coordination between the programme partners, where issues of joint interest such as priorities, time plan, budget, mix of capacity building and investments, problems and bottlenecks, compliance with the Programme s conditions and covenants, reports and achievements of expected results will be addressed. PAB will meet on a regular basis, at a minimum twice a year, and when so required for special reasons. Meetings can be initiated by Sida, the ministry representatives or the Consultant. The meetings will be organised by the Consultant, who will also prepare minutes of meetings for distribution to PAB members. Participation in the PAB will comprise representatives from the following partners: Ministry representative from MOFTER (suggested chairman) Ministry representatives from FBiH and RS Representative of the Embassy of Sweden in Sarajevo Sida s monitoring consultant World Bank representative Representative of the Consultant The associations of municipalities in FBiH and RS Other partners yet to be defined (e.g. national NGOs) 4.5. Regions In the first phase the municipalities from the Zenica and Bijeljina regional landfill regions will be considered, both of which are part of the World Bank s first stage sanitary landfill credit programme in BiH. Prerequisites in these regions are considered suitable for bringing value-added to the World Bank programme, by supporting municipalities in their responsibility for solid waste collection and disposal. The scope of the second programme phase will be defined after the mid-term evaluation. The programme is expected to engage in two or three additional regions in the second phase. The programme envisages limited financial support at the regional level. It can also be used in other regions besides Zenica and Bijeljina, if it is considered by the Programme Advisory Board to be crucial for the establishment of additional regional landfills and the possibility to engage more regions in the second phase of the Sida-financed programme Regional Boards (RB) A regional board will be established in each region. The purpose is to serve as a forum for municipal coordination and cooperation beyond the establishment and ownership of the regional sanitary landfill. This forum will also enable the Consultant to explain and discuss the goals and priorities of the programme and to access information. Participants in the board could be representatives of: Participating municipalities (Mayor s office and municipal administration) Municipal department or utility responsible for waste management

9 9 of16 Municipal department responsible for financial matters Regional utility landfill company Other partners 4.7. Municipal level Most programme activities will be carried out on the municipal level in the participating landfill regions. With the support of the Consultant, the municipalities will make plans for solid waste improvements that are justified as crucial for meeting the goal of improving economic, environmental, sanitary and social conditions. The plans, anticipated to include a package of capacity building and physical investments, for each municipality will be discussed at the PAB, and are subject to Sida no objection. Joint projects beneficial for a few municipalities are also possible (e.g. collection points or transfer stations). Sida will sign an agreement for each municipality participating in the Programme. Responsibilities of the municipalities with regard to the programme are expected to be: To ensure allocation of adequate human, technical and financial resources for implementation To authorise participation staff to prioritise project work in relation to daily duties To ensure participatory and transparent process To assume ownership of programme activities and utilise the Consultant as adviser and facilitator To set concrete objectives and implement concrete actions to meet expected results To bear full responsibility for implementation of Sida contribution to investments, To safeguard the sustainability of the created improvements In the Zenica region in FBiH all existing eight municipalities (Zenica, Zepce, Vitez, Novi Travnik, Travnik, Busovaca, Zavidovici and Visoko) have signed the inter-municipal agreement for construction and operation of the regional sanitary landfill Moscanica. However, three municipalities (Vitez, Novi Travnik and Zavidovici ) have not yet signed a service agreement contract with the landfill public utility company. In the Bijeljina region in RS all five municipalities (Bijeljina, Ugljevik, Lopare, Teocak and Celic) own and utilise the regional sanitary landfill Municipal Project Teams A project team will be set up in each municipality by the Consultant, the Mayor s office and the management of the municipal administration, consisting of representatives from the municipal utility, various municipal departments (i.e. not only technical handling of waste collection but also financial/treasury issues and other concerned areas) and representatives of local NGOs.

10 10 of16 The members of the municipal project teams should be given a clear mandate from their highest superiors to ensure sufficient availability and participation and avoid conflict with other duties and short-term priorities of their line management Monitoring consultant Sida will engage an independent consultant who will monitor programme progress and its compliance with goals, milestones and covenants. The monitoring consultant will work throughout the implementation period and participate in selected PAB and other meetings, access reports and other channels of information. 5. SCOPE OF WORK a) Inception and Review Phase (6 months) The Inception and Review Phase will focus on mobilisation of resources, formation of organisation, confirmation of commitments and compliance with covenants, capacity building for decision makers, review of the suggested awareness campaign, implementation of a baseline study and needs assessment of the current waste management situation, verification of performance indicators and deliverables, identification of necessary changes (gaps) and preparation of a Work plan for capacity building and investment support. All relevant programme partners shall be involved and contribute to implementation of the following preparatory activities, initiated and facilitated by the Consultant: Establishment of the Programme Advisory Board (PAB), the Regional Boards (RBs) in Zenica and Bijeljina, and project teams in participating municipalities. Establishment of routines for administration and reporting to Sida and the PAB. Verification of ownership and responsibilities of each programme partner (state, entities and municipalities) and their compliance with programme goals, objectives and covenants. Confirmation on allocation of human, financial and technical resources and authorisation from the programme partners. Confirmation of common perception of the result-oriented approach and the concept of capacity building, where the role of the Consultant is to advise and support the local partners as owners in performing identified activities. Review of the current legislation and identification of changes that will have to be made to ensure future compliance with EC directives and/or to reach other objectives. Review of systems, resources and necessary changes for enforcement of laws on waste management, including inspections, reporting, penalties, etc.

11 11 of16 Preparation of a baseline study of current status and the needs assessment of waste management issues on the state, entity and municipal level from environmental, economic, financial, social, sanitary, technical, legislative, managerial and human resource points of view. Capacity building and/or study trip for decision makers and management on issues such as policy and local governance, legislative and tariff issues, private/public relations, service outsourcing, energy recovery from waste, separation at source and recycling of different materials, and regulation and handling of infectious and other hazardous waste. A possible study trip can also be arranged during the Implementation Phase and target an appropriate EU member country. Review of the scope, content, budget, target groups and expected results of the suggested awareness campaign to be organised and implemented on the state and entity level Liaison with the World Bank to discuss and define activities which can provide value-added to municipalities engaged in the Bank s credit programmes and other donor supported activities. Such activities can, for example, comprise Environmental Impact Assessments (EIAs) of regional landfill projects in other regions. Establish contact with the Agency for Statistics of Bosnia and Herzegovina and explore potential correlations with this programme. Inter-municipal coordination and cooperation and support with ideas and bench-marking on how to develop concrete areas of common interest beyond landfill services in the participating regions. Definition of operational objectives, activities and expected results based on gap analysis, LFA technique or similar methods. Performance indicators relating to these targets should be defined. Adoption of targets and objectives by the stakeholders. Design of the eligibility criteria for investments. Identification and justification of investments from environmental, economic, financial, social, and sanitary points of view and with consideration of budget resources. Application of EIA criteria. b) Implementation Phase 1 (18 months) The implementation phase will adopt a result-oriented approach for all activities, based on the Consultant s recommendations, stakeholder priorities and decisions, PAB s review and Sida s no objection. The activities shall be in line with general goals, objectives and targeted results as outlined in this document. The following list merely underlines some basic issues:

12 12 of16 The work will address the reform process in the entire chain of waste management services and address prioritised needs and changes in order to meet defined objectives and generate expected results. This includes waste collection, separation, reduction of waste volumes per household, reduction of organic content, efficient transportation to transfer stations and sanitary landfill, recycling of materials, energy recovery, cost-coverage through tariffs, efficient payment collection, awareness creation, and measures for collection and handling of infectious and other hazardous waste. One part of the work will be linked to identification, analysis, justification, and preparation of investment proposals. The Consultant will support the clients with capacity building and development of procedures and utilisation of software tools for investment analysis. Co-financing of investment projects will be subject to proper analysis and justification in accordance with criteria for eligibility. Capacity building is linked to preparations and implementation of investments, including tendering and procurement procedures. The investment projects will serve as examples for other municipalities. Activities, investments and development plans of the municipalities shall correspond to the needs and affordability of its customers. Gender, minority issues, social, political, ethnic, religious or cultural aspects will be measured among other important performance indicators. Sida s investment support shall in principle be complemented with local contribution. The Consultant will support the municipalities in analysing and justifying investment alternatives. Sida s grants can, for example, help to soften loan/credit conditions. Other sources of finance could be local budgets, World Bank, EIB, EBRD, EU funding, etc. Municipalities as project owners will prepare tender documents. The Consultant will review them, ensure compliance with national procurement laws, supervise and support the tendering process, evaluations and contract signing, recommend Sida to make transfers (to the stakeholder s designated account), monitor payments and delivery of equipment and implementation, and sub-contract an annual external audit of transactions related to procurements. Investments and procurement of equipment should only be made in investment packages for each municipality, in order to reduce the number of tender documents and disbursements. The programme shall also promote inter-municipal procurement cooperation. Together with the local stakeholder the consultant shall plan and prepare for selection of new regions for the second phase. The programme is envisaged as an integrated and comprehensive long-term approach, and the transition from phase one to phase two shall be as smooth as possible. At the beginning of the

13 13 of16 second phase and after a positive mid-term review, Sida will formally confirm the selected regions and planned approach. Phase 2 (30 months) The scope and orientation of the second phase will be subject to the experiences of the first phase. It is expected that municipalities in two to three new regions will be supported. It remains to be seen if the work also will continue with the partners from the first phase. 6. COVENANTS The following covenants are applied for Sida s financial support to the programme partners: 1) Commitment on ownership: A prerequisite for efficient capacity building and improvement of municipal solid waste management system is that the project partners (stakeholders) commit to the programme scope and the ambition to generate concrete outputs and results. The programme should not be consultant- or donor-driven. 2) Commitment on allocation of resources: Implementation of capacity building implies that the consultant will support and guide the local client, who will take a leading role in implementing agreed actions. Commitment on state, entity and municipal level to allocate human and financial resources for the project teamwork with the consultant, to an extent to be defined during the Inception and Review Phase, is therefore a key covenant. 3) Confirmation of local co-financing: Conditions (apart from other criteria for eligibility and justification) for utilising financial support from Sida for investment items are: a) Co-financing with local means (from the budget or credits); b) The Sida-financed support shall represent additional funding and not a substitute for state or local allocations that otherwise would have taken place. Compliance with these conditions shall be confirmed by participating municipalities and other partners. Co-financing shall be specified, whether it is based on cash or in-kind contribution. 4) Awareness and participation: Commitment and concrete action on the state, entity and municipality level to promote awareness, public participation and dialogue with civil society organisations (NGOs). 5) Municipal cooperation: Commitment by participating municipalities to engage in municipal coordination and cooperation by establishing regional boards which will meet and discuss joint waste management issues on a regular basis.

14 14 of16 6) Tariff increases and cost-coverage: Improvement of waste management services to comply with EC regulations (which is a national target) will depend on cost-coverage based on tariffs (at a point in time to be defined). Total costs include operating, maintenance and capital costs. This issue will depend on political leadership and require clear commitment to be confirmed by the mayors of participating municipalities, including policy regarding lowincome groups with limited affordability. 7) Advisory Board: Formation of a Programme Advisory Board (PAB) consisting of representatives from the state level, two entities, the World Bank, Sida and Sida s monitoring consultant, the Consultant, NGOs and the two associations of municipalities. 8) Compliance with procurement regulation: All procurement of equipment and services shall comply with the Law on Public Procurement of Bosnia and Herzegovina. 7 9) Recognition of basic principles: Programme partners (state, entities and municipalities) shall recognise the rights and entitlements, obligations and responsibilities of all consumers in order to provide adequate and equal access of services to all customers. Activities, investments and development plans of the municipalities shall correspond to the needs and affordability of its customers. Social, political, ethnic, religious or cultural aspects must not affect provision of waste management services or implementation of the programme. 7. BUDGET AND TIME SCHEDULE The total Sida budget for the four and a half year programme is SEK 100 million, whereof approximately 45 million is available for the first two years. The budget for capacity building and implementation costs is SEK 25 million, for municipal investments SEK 64 million, for regional investments SEK 2 million, for co-financing of a national awareness campaign SEK 3 million, and for contingencies and monitoring SEK 6 million. The presented budget items outline Sida s support for the four and a half year period. The total budget will obviously also include local co-funding from budget allocations and in-kind contributions, credits from international banks and possible grants from, for example, EU facilities (IPA) and bilateral donors. The relation between capacity building and investment support can differ between the two phases. Disbursements from the programme budget will be subject to Sida s approval and no objection to: 7

15 15 of16 The Consultant s work plans and progress reports, The Consultant s invoices, Local partners proposal and the Consultant s recommendations on coinvestment, Local partners requests for disbursements. Disbursements for the awareness campaign and investment support will be made directly to the local stakeholder-designated bank account. The disbursements will be based on the Consultant s justification and recommendations to Sida and on reviews by the PAB. The annual breakdown of the budgetary means from Sida is given a preliminary estimate as follows (changes can be made): 2010 (12 months): 21 MSEK 2011 (12 months): 28 MSEK 2012 (12 months): 26 MSEK 2013 (12 months): 25 MSEK Consultancy services include all activities in connection with capacity building on the state, entity, regional and municipal level. They also include preparatory studies and analyses, e.g. the baseline study and needs assessment, review of the suggested awareness campaign, preparation of a Work Plan and all other tasks identified in this document. The investment support will mainly be allocated to municipal projects. Intermunicipal (intra-regional) investments may be included in this category, if properly justified and approved in accordance with goals, objectives and targeted results. The expected costs are mainly construction or purchase of solid waste units, transport and other equipment, software, etc. The regional investment support may, to a limited extent, be used to support for example, Environmental Impact Assessments (EIA) or Social Impact Assessments (SIA) in connection with additional landfill projects or other projects of a regional nature. The mentioned contingency will be used, subject to Sida approval, for budget adjustments in the inception phase but it is not foreseen to be used for adjustment of TA. Phase 1 will be implemented over a period of two years, including an Inception and Review Phase of six months. The implementation and results of Phase 1 will be subject to a mid-term evaluation by Sida and followed by Phase 2, provided the evaluation is positive. The starting point is planned to be November 2009.

16 16 of16 8. REPORTING AND AUDIT Specific reporting requirements will be stipulated in legally binding documents that Sweden/Sida intends to sign with all programme partners8. All narrative and financial reports shall be submitted to the Consultant. The Consultant will be responsible to distribute the reports, initiate discussion about these reports at meetings of the relevant boards, collect board s meeting minutes and recommendations, and forward to Sida together with the report. Sida is responsible for approving the reports. The narrative reports shall be analytical in their nature and highlight any deviations from the agreed programme frame. The financial reports shall be based on the statement of accounts and cover revenue and expenditure as compared to budget for the entire operation including all sources of financing. The Consultant will, on behalf of Sida, be responsible that the entire programme, including investments and awareness campaign, is audited annually. The audit shall be carried out by an external, independent and qualified auditor. The terms of reference for the audit and the selection of auditor shall be approved by Sida. The Consultant is responsible that the audit report 9 and management response letters are submitted to Sida in time and with agreed content. All programme partners will assume responsibilities for the audit of the funds that they are responsible for : Ensure that the financial reports are delivered in time and accordance with the agreed quality standard. Ensure in the financial report that all funds are subject to annual audit. - Co-operate with and assist Sida and the Auditor in the performance of audits - Document their position to received audit reports in a form of management response letter. - Act on the information that is received in the audit reports. - Cooperate and assist in performing any additional audits, follow-ups and financial studies that Sida may request. The auditor shall review whether the programme partners have fulfilled the requirements stipulated in the programme documentation and agreements/contracts. It shall also state which measures have been taken as a result of previous audits and whether measures taken have been adequate to deal with reported shortcomings. 8 Sweden intends to sign Specific agreement with MOFTER for coordination of the programme and for implementation of the awareness campaign. Sida will also enter into a separate contract with the Consultant who will provide services according to the ToR and this programme document. Agreements on investments will be signed between Sida and responsible authorities on the municipal /regional level. 9 It comprises of audit report and management report/audit memorandum.

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

Guideline for strengthened bilateral relations. EEA and Norway Grants

Guideline for strengthened bilateral relations. EEA and Norway Grants Guideline for strengthened bilateral relations EEA and Norway Grants 2009 2014 Adopted by the Financial Mechanism Committee 29.03.2012, amended on 28 January 2016 Contents 1 Purpose of the guideline...

More information

IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV

IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV IPA National Programme 2009 Part II - Bosnia and Herzegovina Fiche 3 Preparation for IPA components III and IV 1. Basic information 1.1 CRIS Number: 2009 / 021-650 1.2 Title: Preparation for IPA components

More information

BOSNIA AND HERZEGOVINA

BOSNIA AND HERZEGOVINA INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 BOSNIA AND HERZEGOVINA European Integration Facility Action Summary The Action is designed to provide support to institutions in Bosnia and Herzegovina

More information

Office of the Auditor General of Norway. Handbook for the Office of the Auditor General s Development Cooperation

Office of the Auditor General of Norway. Handbook for the Office of the Auditor General s Development Cooperation Office of the Auditor General of Norway Handbook for the Office of the Auditor General s Development Cooperation i Photo: The Office of the Auditor General of Norway Illustration: Lobo Media AS March 2009

More information

ACTION PLAN OF BOSNIA AND HERZEGOVINA FOR ADDRESSING ROMA ISSUES IN THE FIELDS OF EMPLOYMENT, HOUSING AND HEALTH CARE

ACTION PLAN OF BOSNIA AND HERZEGOVINA FOR ADDRESSING ROMA ISSUES IN THE FIELDS OF EMPLOYMENT, HOUSING AND HEALTH CARE ACTION PLAN OF BOSNIA AND HERZEGOVINA FOR ADDRESSING ROMA ISSUES IN THE FIELDS OF EMPLOYMENT, HOUSING AND HEALTH CARE 2017-2020 I. INTRODUCTION The Strategy of Bosnia and Herzegovina for addressing the

More information

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting.

ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA. at the latest by 31 December years from the final date for contracting. EN EN EN ANNEX: IPA 2010 NATIONAL PROGRAMME PART II - BOSNIA AND HERZEGOVINA 1. IDENTIFICATION Beneficiary Bosnia and Herzegovina CRIS number 2010 / 022-674 Year 2010 Cost EUR 6 000 000 Implementing Authority

More information

JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT

JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT JESSICA JOINT EUROPEAN SUPPORT FOR SUSTAINABLE INVESTMENT IN CITY AREAS JESSICA INSTRUMENTS FOR ENERGY EFFICIENCY IN LITHUANIA FINAL REPORT 17 April 2009 This document has been produced with the financial

More information

MANAGERIAL ACCOUNTABILITY AND RISK MANAGEMENT

MANAGERIAL ACCOUNTABILITY AND RISK MANAGEMENT MANAGERIAL ACCOUNTABILITY AND RISK MANAGEMENT concept and practical implementation Discussion paper I Introduction The objective of this discussion paper is to explain the concept of managerial accountability

More information

Bilateral Guideline. EEA and Norwegian Financial Mechanisms

Bilateral Guideline. EEA and Norwegian Financial Mechanisms Bilateral Guideline EEA and Norwegian Financial Mechanisms 2014 2021 Adopted by the Financial Mechanism Committee on 9 February 2017 09 February 2017 Contents 1 Introduction... 4 1.1 Definition of strengthened

More information

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof,

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 291 thereof, L 244/12 COMMISSION IMPLEMTING REGULATION (EU) No 897/2014 of 18 August 2014 laying down specific provisions for the implementation of cross-border cooperation programmes financed under Regulation (EU)

More information

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS Strengthening Public Financial Resource Management through Information and Communication Systems Technology Systems (TRTA MON 51084) OUTLINE TERMS OF REFERENCE FOR CONSULTANTS 1. The transaction technical

More information

Multi-country European Integration Facility

Multi-country European Integration Facility 1 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 Multi-country European Integration Facility Action Summary The objective of the EU Integration Facility is to assist the IPA II beneficiaries

More information

PUBLIC ADMINISTRATION REFORM MONITORING PUBLIC FINANCE

PUBLIC ADMINISTRATION REFORM MONITORING PUBLIC FINANCE PUBLIC ADMINISTRATION REFORM MONITORING PUBLIC FINANCE 2015 This document has been prepared under the Public Administration Reform Monitoring (PARM) project, implemented by TI BiH and CIN, with financial

More information

GOOD PRACTICE IN PROJECT PREPARATION PUBLIC WATER UTILITIES

GOOD PRACTICE IN PROJECT PREPARATION PUBLIC WATER UTILITIES GOOD PRACTICE IN PROJECT PREPARATION PUBLIC WATER UTILITIES April 2005 Introduction This document has been published by the Project Preparation Committee (PPC) within the framework of the DABLAS Task Force

More information

WSSCC, Global Sanitation Fund (GSF)

WSSCC, Global Sanitation Fund (GSF) Annex I WSSCC, Global Sanitation Fund (GSF) Terms of Reference Country Programme Monitor (CPM) BURKINA FASO 1 Background The Water Supply and Sanitation Collaborative Council (WSSCC) was established in

More information

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism the European Economic Area (EEA) Financial Mechanism 2014-2021 Adopted by the EEA Financial Mechanism Committee pursuant to Article 10.5 of Protocol 38c to the EEA Agreement on 8 September 2016 and confirmed

More information

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution.

ANNEX ICELAND NATIONAL PROGRAMME IDENTIFICATION. Iceland CRIS decision number 2012/ Year 2012 EU contribution. ANNEX ICELAND NATIONAL PROGRAMME 2012 1 IDENTIFICATION Beneficiary Iceland CRIS decision number 2012/023-648 Year 2012 EU contribution 11,997,400 EUR Implementing Authority European Commission Final date

More information

Roma Integration 2020

Roma Integration 2020 Roma Integration 2020 is co-funded by the European Union Roma Integration 2020 Reference number: 018-018 Terms of Reference: Title: Contracting Authority: RCC Department: Reporting to: Application Deadline:

More information

R E P O R T. Sarajevo Bosnia and Hercegovina December I N T R O D U C T I O N

R E P O R T. Sarajevo Bosnia and Hercegovina December I N T R O D U C T I O N R E P O R T Sarajevo Bosnia and Hercegovina 18. - 19. December 2014. I N T R O D U C T I O N The initial group of Civil Society Organisations (CSO), with the aim to establish BH SECO ETE mechanism in the

More information

Council of the European Union Brussels, 4 December 2015 (OR. en) Mr Jeppe TRANHOLM-MIKKELSEN, Secretary-General of the Council of the European Union

Council of the European Union Brussels, 4 December 2015 (OR. en) Mr Jeppe TRANHOLM-MIKKELSEN, Secretary-General of the Council of the European Union Council of the European Union Brussels, 4 December 2015 (OR. en) Interinstitutional File: 2015/0275 (COD) 14975/15 ADD 3 COVER NOTE From: date of receipt: 3 December 2015 To: No. Cion doc.: Subject: ENV

More information

Multi-country European Integration Facility

Multi-country European Integration Facility 1 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 Multi-country European Integration Facility Action Summary The objective of the EU Integration Facility is to assist the IPA II beneficiaries

More information

Strengthening Solid Waste Financing and Cost Recovery Framework in Syria. Terms of Reference for a Financial Analyst

Strengthening Solid Waste Financing and Cost Recovery Framework in Syria. Terms of Reference for a Financial Analyst Strengthening Solid Waste Financing and Cost Recovery Framework in Syria Terms of Reference for a Financial Analyst BACKGROUND The present Terms of Reference cover the preparation of an analysis and recommendations

More information

Introduction

Introduction 2009-06-29 Utrikesdepartementet Action Plan on Aid Effectiveness 2009-2011 Introduction The Paris Declaration on Aid Effectiveness (2005) and the Accra Agenda for Action (AAA, 2008) are in the process

More information

Detailed Recommendations 10: Develop Environmental Cost Analysis

Detailed Recommendations 10: Develop Environmental Cost Analysis Detailed Recommendations 10: Develop Environmental Cost Analysis 10 This is a background paper to the report: Establishing China s Green Financial System published by the Research Bureau of the People

More information

Project Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean

Project Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean Project Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean 2014 2020 CCI 2014TC16M4TN003 22/06/2015 Version 1.0 Balkan-Mediterranean is co-financed by European Union and

More information

EAP Task Force. EAP Task

EAP Task Force. EAP Task EAP Task Force EAP Task Force EAPP Task JOINT MEETING OF THE EAP TASK FORCE S GROUP OF SENIOR OFFICIALS ON THE REFORMS OF THE WATER SUPPLY AND SANITATION SECTOR IN EASTERN EUROPE, CAUCASUS AND CENTRAL

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA)

2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) 2 nd INDEPENDENT EXTERNAL EVALUATION of the EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS (FRA) TECHNICAL SPECIFICATIONS 15 July 2016 1 1) Title of the contract The title of the contract is 2nd External

More information

STRATEGIC PLANNING AND MONITORING OF PUBLIC EXPENDITURES

STRATEGIC PLANNING AND MONITORING OF PUBLIC EXPENDITURES BOSNIA AND HERZEGOVINA COUNCIL OF MINISTERS MINISTRY OF FINANCE AND TREASURY STRATEGIC PLANNING AND MONITORING OF PUBLIC EXPENDITURES Methodology, development and implementation of Public Investment Programme

More information

Project Fiche IPA Annual Action Programme 2007 for Bosnia and Herzegovina Support for Rural Development Programming (SRDP) in B&H

Project Fiche IPA Annual Action Programme 2007 for Bosnia and Herzegovina Support for Rural Development Programming (SRDP) in B&H Project Fiche IPA Annual Action Programme 2007 for Bosnia and Herzegovina Support for Rural Development Programming (SRDP) in B&H 1. Basic information 1.1. CRIS Number: 43040 Rural Development 1.2. Title:

More information

Eduardo Mondlane University (UEM) shall represent Mozambique in matters concerning, the implementation of this Specific Agreement.

Eduardo Mondlane University (UEM) shall represent Mozambique in matters concerning, the implementation of this Specific Agreement. 1(14) Appendix 8 Sida Contribution No: 51140011 SPECIFIC AGREEMENT BETWEEN SWEDEN AND THE GOVERNMENT OF MOZAMBIQUE ON CONTINUED RESEARCH COOPERATION WITH EDUARDO MONDLANE UNIVERSITY DURING 1 MARCH 2011

More information

STRATEGIC PLANNING AT CANTONAL LEVEL STEP CLOSER TO EU: CANTON SARAJEVO EXAMPLE

STRATEGIC PLANNING AT CANTONAL LEVEL STEP CLOSER TO EU: CANTON SARAJEVO EXAMPLE DOI 10.5644/PI2013-153-17 STRATEGIC PLANNING AT CANTONAL LEVEL STEP CLOSER TO EU: CANTON SARAJEVO EXAMPLE Emir Kurtović * Senad Softić ** Maida Fetahagić *** Gordana Memišević **** Abstract This article

More information

TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS. Roles and responsibilities

TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS. Roles and responsibilities IDP REVIEW PROCESS PLAN DEPARTMENT OF THE OFFICE OF THE MUNICIPAL MANAGER JULY 2009-JUNE2010 TABLE OF CONTENTS SUBJECTS 1. INTRODUCTION 2. INSTITUTIONAL ARRANGEMENTS Roles and responsibilities 2.1 Council

More information

IOPS Technical Committee DRAFT GOOD PRACTICES FOR GOVERNANCE OF PENSION SUPERVISORY AUTHORITIES. Version for public consultation

IOPS Technical Committee DRAFT GOOD PRACTICES FOR GOVERNANCE OF PENSION SUPERVISORY AUTHORITIES. Version for public consultation IOPS Technical Committee DRAFT GOOD PRACTICES FOR GOVERNANCE OF PENSION SUPERVISORY AUTHORITIES Version for public consultation DRAFT GOOD PRACTICES FOR GOVERNANCE OF PENSION SUPERVISORY AUTHORITIES Introduction:

More information

SERBIA. Support to participation in EU Programmes. Action Summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)

SERBIA. Support to participation in EU Programmes. Action Summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 SERBIA Support to participation in EU Programmes Action Summary This Action represents continuation of Serbian participation in EU programmes

More information

General Guide to the Local Government Budget Process for District & LLG Councillors, NGOs, CBOs & Civil Society

General Guide to the Local Government Budget Process for District & LLG Councillors, NGOs, CBOs & Civil Society General Guide to the Local Government Budget Process for District & LLG Councillors, NGOs, CBOs & Civil Society Prepared by Local Government Budget Committee 1 CONTENTS Section 1: Introduction 6 Section

More information

Screening report Montenegro

Screening report Montenegro Screening report Montenegro Chapter 22 Regional policy and coordination of Structural Instruments Date of screening meetings: Explanatory meeting: 14-15 November 2012 Bilateral meeting: 18 December 2012

More information

Cross Border Co-operation between Bulgaria & Romania Multi-annual Programme Project Fiche for Programme Support

Cross Border Co-operation between Bulgaria & Romania Multi-annual Programme Project Fiche for Programme Support Cross Border Co-operation between Bulgaria & Romania Multi-annual Programme 2003 2006 2005 Project Fiche for Programme Support 1. Basic Information 1.1 CRIS Number: BG 2005/017-455.01;04 1.2 1.2 Title:

More information

United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF)

United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF) United Nations Fund for Recovery Reconstruction and Development in Darfur (UNDF) Terms of Reference 29 March 2013 1 Contents I. Introduction... 3 II. Purpose, Scope and Principles of the UNDF... 4 III.

More information

Terms of Reference for the Fund Operator The EEA and Norway Grants Global Fund for Regional Cooperation EEA and Norwegian Financial Mechanisms

Terms of Reference for the Fund Operator The EEA and Norway Grants Global Fund for Regional Cooperation EEA and Norwegian Financial Mechanisms Terms of Reference for the Fund Operator The EEA and Norway Grants Global Fund for Regional Cooperation EEA and Norwegian Financial Mechanisms 2014-2021 Table of Contents 1. Introduction... 3 1.1 Objectives

More information

MONTENEGRO. Support to the Tax Administration INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary

MONTENEGRO. Support to the Tax Administration INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) Action summary INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MONTENEGRO Support to the Tax Administration Action summary This Action aims to support Montenegro in the process of fulfilling the EU preaccession

More information

Status of development of ESCO market and policies in Bosnia and Herzegovina

Status of development of ESCO market and policies in Bosnia and Herzegovina UNECE EE21 Group of Experts on Energy Efficiency Investments for Climate Change Mitigation Status of development of ESCO market and policies in Bosnia and Herzegovina Biljana Trivanovic Geneva, 18th April

More information

Progress on the Strengthening of the European Integration Structures

Progress on the Strengthening of the European Integration Structures TENTH MEETING OF THE STABILISATION AND ASSOCIATION PROCESS TRACKING MECHANISM CONCLUSIONS PRISTINA, 14 JULY 2006 The tenth meeting of the Stabilisation and Association Process Tracking Mechanism was held

More information

I Introduction 1. II Core Guiding Principles 2-3. III The APR Processes 3-9. Responsibilities of the Participating Countries 9-14

I Introduction 1. II Core Guiding Principles 2-3. III The APR Processes 3-9. Responsibilities of the Participating Countries 9-14 AFRICAN UNION GUIDELINES FOR COUNTRIES TO PREPARE FOR AND TO PARTICIPATE IN THE AFRICAN PEER REVIEW MECHANISM (APRM) Table of Contents I Introduction 1 II Core Guiding Principles 2-3 III The APR Processes

More information

1.2 Title: Project Preparation and Support Facility (PPF)

1.2 Title: Project Preparation and Support Facility (PPF) FINAL VERSION 1. Basic information 1.1 CRIS Number: 2009/021-665 1.2 Title: Project Preparation and Support Facility (PPF) 1.3 ELARG Statistical code: 4.40 1.4 Location: Skopje Implementing arrangements:

More information

M. Sc. Enes Čovrk-ACE BiH. Rome (Italy), November 2014

M. Sc. Enes Čovrk-ACE BiH. Rome (Italy), November 2014 M. Sc. Enes Čovrk-ACE BiH Rome (Italy), 27-28 November 2014 1 Presentation highlights Canton Sarajevo-facts and developments Agreements with Italian partners Developments of the Project: Tramway Line Ilidza-Hrasnica

More information

Cross-border Cooperation Action Programme Montenegro - Albania for the years

Cross-border Cooperation Action Programme Montenegro - Albania for the years ANNEX 1 Cross-border Cooperation Action Programme Montenegro - Albania for the years 2015-2017 1 IDENTIFICATION Beneficiaries CRIS/ABAC Commitment references Union Contribution Budget line Montenegro,

More information

Job Description and Requirements Programme Manager State-building and Governance Job no in the EU Delegation to the Republic of Yemen

Job Description and Requirements Programme Manager State-building and Governance Job no in the EU Delegation to the Republic of Yemen JOB PROFILE 17/08/2013 Job Description and Requirements Programme Manager State-building and Governance Job no. 127004 in the EU Delegation to the Republic of Yemen Job Type: Contract Agent Function Group

More information

INTEGRATED SAFEGUARDS DATA SHEET

INTEGRATED SAFEGUARDS DATA SHEET Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE Date ISDS Prepared/Updated:

More information

Recommendation of the Council on Good Practices for Public Environmental Expenditure Management

Recommendation of the Council on Good Practices for Public Environmental Expenditure Management Recommendation of the Council on for Public Environmental Expenditure Management ENVIRONMENT 8 June 2006 - C(2006)84 THE COUNCIL, Having regard to Article 5 b) of the Convention on the Organisation for

More information

IPA National Programme 2009 part 1 Bosnia and Herzegovina Fiche 3 - "Energy" 1.2 Title: Construction of small hydro power plant Cijevna III

IPA National Programme 2009 part 1 Bosnia and Herzegovina Fiche 3 - Energy 1.2 Title: Construction of small hydro power plant Cijevna III IPA National Programme 2009 part 1 Bosnia and Herzegovina Fiche 3 - "Energy" 1. Basic information 1.1 CRIS Number: 2009/021-333 1.2 Title: Construction of small hydro power plant Cijevna III 1.3 ELARG

More information

ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures

ANNEX V. Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures EN ANNEX V Action Document for Conflict Prevention, Peacebuilding and Crisis Preparedness support measures 1. Title/basic act/ CRIS number 2. Zone benefiting from the action/location CRIS number: 2018/41357

More information

Work Programme 2007 Report 1/2007

Work Programme 2007 Report 1/2007 Work Programme 2007 Report 1/2007 WORK PROGRAMME 2007 NORDIC ENERGY REGULATORS (NordREG) Nordic Energy Regulators 2007 Report 1/2007 NordREG c/o The Energy Markets Inspectorate P.O. Box 310 SE- 631 04

More information

Budget Guidelines

Budget Guidelines Budget Guidelines 2018-2022 Formats and guidelines required for your application can be downloaded at www.uniontounion.org Budgets for year 1-3, resp 4, 5 Total budgets are the sum of Union to Union allocation

More information

GOOD PRACTICES FOR GOVERNANCE OF PENSION SUPERVISORY AUTHORITIES

GOOD PRACTICES FOR GOVERNANCE OF PENSION SUPERVISORY AUTHORITIES . GOOD PRACTICES FOR GOVERNANCE OF PENSION SUPERVISORY AUTHORITIES November 2013 GOOD PRACTICES FOR GOVERNANCE OF PENSION SUPERVISORY AUTHORITIES Introduction 1. Promoting good governance has been at the

More information

Contacts: Anastasija Trajkovska, Head of Sector, telephone: (0)

Contacts: Anastasija Trajkovska, Head of Sector,   telephone: (0) Project fiche 2.1: Support to the Agency for Supervision of Fully Funded Pension Insurance (MAPAS) 1. Basic information 1.1 CRIS Number: 2008/20-311 1.2 Title: Support to the Agency for Supervision of

More information

MULTI-COUNTRY. Support to Western Balkans Infrastructure Investment Projects for 2014 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)

MULTI-COUNTRY. Support to Western Balkans Infrastructure Investment Projects for 2014 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 MULTI-COUNTRY Support to Western Balkans Infrastructure Investment Projects for 2014 Action Summary This Action will allow financing Technical

More information

GUIDELINES FOR STRATEGIES IN SWEDISH DEVELOPMENT COOPERATION AND HUMANITARIAN ASSISTANCE

GUIDELINES FOR STRATEGIES IN SWEDISH DEVELOPMENT COOPERATION AND HUMANITARIAN ASSISTANCE GUIDELINES FOR STRATEGIES IN SWEDISH DEVELOPMENT COOPERATION AND HUMANITARIAN ASSISTANCE Annex to Government Decision 21 December 2017 (UD2017/21053/IU) Guidelines for strategies in Swedish development

More information

Project References Bosnia and Herzegovina

Project References Bosnia and Herzegovina Project References Bosnia and Herzegovina Name applicant: Arbeiter-Samariter-Bund, Deutschland e.v Project title: Support of socioeconomic Sector: 73010 Reconstruction relief and rehabilitation inclusion

More information

Overview of the framework

Overview of the framework Overview of the framework To meet the infrastructure deficit, the Twelfth Five Year Plan envisages a renewed thrust on investment in infrastructure, particularly in the power sector. The additional thermal

More information

Guidelines For Rajasthan Infrastructure Project Development Fund (RIPDF)

Guidelines For Rajasthan Infrastructure Project Development Fund (RIPDF) Guidelines For Rajasthan Infrastructure Project Development Fund (RIPDF) PPP Cell Planning Department Government of Rajasthan Contents 1. The RIPDF and its Role 2 i. Background of the RIPDF ---------------------------

More information

ANNEX. 1. IDENTIFICATION Beneficiary CRIS/ABAC Commitment references Total cost EU Contribution Budget line. Turkey IPA/2017/40201

ANNEX. 1. IDENTIFICATION Beneficiary CRIS/ABAC Commitment references Total cost EU Contribution Budget line. Turkey IPA/2017/40201 ANNEX to Commission Implementing Decision adopting an Annual Action Programme for Turkey under the Instrument for Pre-accession Assistance (IPA II) for the year 2017 1. IDENTIFICATION Beneficiary CRIS/ABAC

More information

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS EUROPEAN COMMISSION Brussels, 13.10.2011 COM(2011) 638 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE

More information

Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support

Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support Massimo Marra JASPERS Networking and Competence Centre IPA Conference Impact Assessment What can we

More information

Guidance for Member States on Performance framework, review and reserve

Guidance for Member States on Performance framework, review and reserve EGESIF_18-0021-01 19/06/2018 Version 2.0 EUROPEAN COMMISSION European Structural and Investment Funds Guidance for Member States on Performance framework, review and reserve This version was updated further

More information

PROJECT CYCLE MANAGEMENT & LOGICAL FRAMEWORK MATRIX TRAINING CYPRIOT CIVIL SOCIETY IN ACTION V INNOVATION AND CHANGES IN EDUCATION VI

PROJECT CYCLE MANAGEMENT & LOGICAL FRAMEWORK MATRIX TRAINING CYPRIOT CIVIL SOCIETY IN ACTION V INNOVATION AND CHANGES IN EDUCATION VI PROJECT CYCLE MANAGEMENT & LOGICAL FRAMEWORK MATRIX TRAINING CYPRIOT CIVIL SOCIETY IN ACTION V INNOVATION AND CHANGES IN EDUCATION VI Objectives of the training Understand the definition of project and

More information

COMMISSION DECISION. C(2007)6376 on 18/12/2007

COMMISSION DECISION. C(2007)6376 on 18/12/2007 COMMISSION DECISION C(2007)6376 on 18/12/2007 adopting a horizontal programme on the Energy Efficiency Finance Facility for Albania, Bosnia and Herzegovina, Croatia, Montenegro, Serbia including Kosovo

More information

Action Fiche for Syrian Arab Republic. 1. IDENTIFICATION Support to the EU-Syria Association Agreement Programme (SAAP I)

Action Fiche for Syrian Arab Republic. 1. IDENTIFICATION Support to the EU-Syria Association Agreement Programme (SAAP I) Action Fiche for Syrian Arab Republic 1. IDTIFICATION Title/Number Support to the EU-Syria Association Agreement Programme (SAAP I) Total cost EU contribution: EUR 5 000 000 Beneficiary contribution: tbc

More information

TERMS OF REFERENCE FEASIBILITY STUDY FOR ENVIRONMENTAL TRUST FUND

TERMS OF REFERENCE FEASIBILITY STUDY FOR ENVIRONMENTAL TRUST FUND TERMS OF REFERENCE FEASIBILITY STUDY FOR ENVIRONMENTAL TRUST FUND Type of Position: Local consultant Sustainable finance expert Location: Ulaanbaatar, Mongolia Type of Contract: Individual contract Expected

More information

Good Practice when Preparing a Project Proposal. 15 February 2005

Good Practice when Preparing a Project Proposal. 15 February 2005 Good Practice when Preparing a Project Proposal II 15 February 2005 Before applying Familiarise yourself with the programmes Web site, FAQs, past projects Review open Call for Proposals and associated

More information

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE

CE TEXTE N'EST DISPONIBLE QU'EN VERSION ANGLAISE CE TEXTE N'EST DISPONIBLE QU' VERSION ANGLAISE ANNEX 1 1. IDTIFICATION Title/Number Support Services to the National Authorising Officer CRIS NO: FED/2009/021-496 Total cost Total: 315,800 (EC Contribution:

More information

DAC-code Sector Public Sector Policy and Administrative Management

DAC-code Sector Public Sector Policy and Administrative Management ANNEX 1 ANNUAL ACTION PROGRAMME 2012 FOR UKRAINE PART 1 1. IDENTIFICATION Title/Number Total cost Aid method / Method of implementatio n Framework Programme in support of EU-Ukraine Agreements CRIS: ENPI/2012/23714

More information

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN Terms of Reference for Consultants 1. BACKGROUND INFORMATION Government of Vanuatu has requested TA support in the formulation and preparation of a national infrastructure

More information

IPA National Programme 2011 Bosnia and Herzegovina. Strengthening Public Financial Management. 1. Public Administration Reform

IPA National Programme 2011 Bosnia and Herzegovina. Strengthening Public Financial Management. 1. Public Administration Reform IPA National Programme 2011 Bosnia and Herzegovina 1. Identification Project Title Strengthening Public Financial Management CRIS Decision number Project no. 2 MIPD Sector Code ELARG Statistical code DAC

More information

IPA- EU Support to the coordination and implementation of Bosnia and Herzegovina s National Youth Policy. EuropeAid/128396/C/SER/BA

IPA- EU Support to the coordination and implementation of Bosnia and Herzegovina s National Youth Policy. EuropeAid/128396/C/SER/BA IPA Programme Funded by the European Union IPA- EU Support to the coordination and implementation of Bosnia and Herzegovina s National Youth Policy EuropeAid/128396/C/SER/BA Service Contract No: 2011/277-008

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA IDA-36721) ON A CREDIT IN THE AMOUNT OF SDR 14.3 MILLION (US$ 18.0 MILLION EQUIVALENT) AND AN

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA IDA-36721) ON A CREDIT IN THE AMOUNT OF SDR 14.3 MILLION (US$ 18.0 MILLION EQUIVALENT) AND AN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No: ICR00001647 IMPLEMENTATION COMPLETION AND RESULTS

More information

1.5 Contracting Authority (EC) European Commission, EC Delegation, on behalf of the beneficiary

1.5 Contracting Authority (EC) European Commission, EC Delegation, on behalf of the beneficiary Project fiche 1.1: Strengthening the capacity of the institutions to manage and implement the Operational Programmes 1. Basic information 1.1 CRIS Number: 2008/20-311 1.2 Title: Strengthening the capacity

More information

Communication agenda of SECO mechanism

Communication agenda of SECO mechanism Communication agenda of SECO mechanism 1 Introduction 1.1 About the mechanism SEIO mechanism was created with the desire to contribute to improving the programming process and increasing the efficiency

More information

Oil for Development in South Sudan. Program Document for an Institutional Cooperation between

Oil for Development in South Sudan. Program Document for an Institutional Cooperation between Oil for Development in South Sudan Program Document for an Institutional Cooperation between The Ministry of Petroleum and Mining, Republic of South Sudan and The Ministry of Petroleum and Energy, Norway

More information

05.01 Strengthen environmental impact assessment

05.01 Strengthen environmental impact assessment 05.01 Strengthen environmental impact assessment 1. Basic Information 1.1.Desiree Number:PL0007.01 1.2 Title: Strengthen environmental impact assessment 1.3 Sector : Environment Twinning code: PL2000/IB/EN01

More information

WORKING DOCUMENT. EN United in diversity EN. European Parliament

WORKING DOCUMENT. EN United in diversity EN. European Parliament European Parliament 2014-2019 Committee on Budgetary Control 24.4.2017 WORKING DOCUMT on ECA Special Report 5/2017 (2016 Discharge): Youth unemployment - have EU policies made a difference? An assessment

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION. of 2008

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION. of 2008 EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION DECISION of 2008 adopting an Annual Programme II for Kosovo (under UNSCR 1244/99) 1 under the IPA Transition Assistance and Institution Building

More information

OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED

OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED OPERATIONAL PROGRAMME under THE FUND FOR EUROPEAN AID TO THE MOST DEPRIVED 2014-2020 1. IDENTIFICATION (max. 200 characters) The purpose of this section is to identify only the programme concerned. It

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

South Sudan Common Humanitarian Fund (South Sudan CHF) Terms of Reference (TOR)

South Sudan Common Humanitarian Fund (South Sudan CHF) Terms of Reference (TOR) South Sudan Common Humanitarian Fund (South Sudan CHF) Terms of Reference (TOR) 14 February 2012 List of Acronyms AA Administrative Agent AB Advisory Board CAP Consolidated Appeal Process CHF Common Humanitarian

More information

Guidance document on. management verifications to be carried out by Member States on operations co-financed by

Guidance document on. management verifications to be carried out by Member States on operations co-financed by Final version of 05/06/2008 COCOF 08/0020/04-EN Guidance document on management verifications to be carried out by Member States on operations co-financed by the Structural Funds and the Cohesion Fund

More information

ST/SGB/2018/3 1 June United Nations

ST/SGB/2018/3 1 June United Nations 1 June 2018 United Nations Regulations and Rules Governing Programme Planning, the Programme Aspects of the Budget, the Monitoring of Implementation and the Methods of Evaluation Secretary-General s bulletin

More information

PROGRAMME MANUAL. Guide for applicants and project partners responding to the calls for proposals of the South-East Finland Russia CBC

PROGRAMME MANUAL. Guide for applicants and project partners responding to the calls for proposals of the South-East Finland Russia CBC PROGRAMME MANUAL Guide for applicants and project partners responding to the calls for proposals of the South-East Finland Russia CBC 2014-2020 HOW TO USE THIS MANUAL This Programme Manual is designed

More information

VADEMECUM ON FINANCING IN THE FRAME OF THE EASTERN PARTNERSHIP

VADEMECUM ON FINANCING IN THE FRAME OF THE EASTERN PARTNERSHIP EUROPEAN COMMISSION EUROPEAN EXTERNAL ACTION SERVICE VADEMECUM ON FINANCING IN THE FRAME OF THE EASTERN PARTNERSHIP ***LAST UPDATE 24 SEPTEMBER 2010*** Table of Contents PART I An Overview of the Eastern

More information

«FICHE CONTRADICTOIRE»

«FICHE CONTRADICTOIRE» «FICHE CONTRADICTOIRE» Evaluation of the Commission s External Cooperation with Angola (Country level evaluation) (*For details on the recommendations please refer to the main report) Recommendations STRATEGIC

More information

Terms of Reference for an Individual National Consultant to conduct the testing of the TrackFin Methodology in Uganda.

Terms of Reference for an Individual National Consultant to conduct the testing of the TrackFin Methodology in Uganda. Terms of Reference for an Individual National Consultant to conduct the testing of the TrackFin Methodology in Uganda 21 July, 2017 Introduction: The Ministry of Water and Environment (MWE) is implementing

More information

Table of contents. Introduction Regulatory requirements... 3

Table of contents. Introduction Regulatory requirements... 3 COCOF 08/0020/02-EN DRAFT Guidance document on management verifications to be carried out by Member States on projects co-financed by the Structural Funds and the Cohesion Fund for the 2007 2013 programming

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

Official Journal of the European Union DECISIONS

Official Journal of the European Union DECISIONS 6.7.2018 L 171/11 DECISIONS DECISION (EU) 2018/947 OF THE EUROPEAN PARLIAMT AND OF THE COUNCIL of 4 July 2018 providing further macro-financial assistance to Ukraine THE EUROPEAN PARLIAMT AND THE COUNCIL

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of the The World Bank FOR OFFICIAL USE ONLY PROJECT PAPER INTERNATIONAL DEVELOPMENT

More information

Serbia European Integration Facility - Indirect management -

Serbia European Integration Facility - Indirect management - 1 INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 Serbia European Integration Facility - Indirect management - Action Summary The contents of the IPA 2014 Action on European Integration is being

More information

DG Employment, Social Affairs and Inclusion

DG Employment, Social Affairs and Inclusion DG Employment, Social Affairs and Inclusion Annual work programme for operational technical assistance to implement the activities of the support group for Cyprus at the initiative of the Commission in

More information

COMMISSION IMPLEMENTING DECISION. of

COMMISSION IMPLEMENTING DECISION. of EUROPEAN COMMISSION Brussels, 17.9.2012 C(2012) 6299 final COMMISSION IMPLEMENTING DECISION of 17.9.2012 on adopting the annual work programme for 2013 for the specific programme on the "Prevention, Preparedness

More information

Western Balkans and Europe 2020 Supporting Convergence and Growth

Western Balkans and Europe 2020 Supporting Convergence and Growth Western Balkans and Europe 2020 Supporting Convergence and Growth Regional Coordination Conference, Brussels, March 31, 2011 Panel 2: Infrastructure and Sustainable Growth Marta Szigeti Bonifert, executive

More information