HIGHWAY PROGRAMING, INFORMATION MANAGEMENT EVALUATION METHODS

Size: px
Start display at page:

Download "HIGHWAY PROGRAMING, INFORMATION MANAGEMENT EVALUATION METHODS"

Transcription

1 HIGHWAY PROGRAMING, INFORMATION MANAGEMENT EVALUATION METHODS Kumares C. Sinha, Purdue University Cf. Enhancing Highway Safety Through Engineering Management, Transportation Research Board, Final Report of a Conference, Nov 2-5, 1981, St. Louis, Missouri INTRODUCTION Highway safety continues to be a major issue in the transportation area. Although significant progress has been made in improving highway safety during the past decade, recent developments in the highway transportation sector pose a serious problem to highway safety. While the highway system in this country is aging and the composition of the traffic stream is changing with smaller cars and larger trucks, the need for highway maintenance and safety improvement becomes even more important. However, the financial resources available for the maintenance and improvement of highway facilities are declining. In an era of limited resources, it is imperative that much care be taken in allocating funds among various highway activities related to construction, maintenance, and operation to entire optimal cost effectiveness. Highway programming and administration must explicitly consider safety effectiveness along with other objectives such service, condition, and external factors, including energy and environment. A management approach is necessary to identify those engineering elements at would best enhance highway safety within the constraints of budget and at the same time satisfy service needs, preserve the physical condition of the facilities, and fulfill the national goals of energy and environment. HIGHWAY PROGRAMMING Highway programming involves a process of selecting and scheduling improvement projects on the basis of the relative urgency of the work. A key element of process is the matching of needed projects with available funds to accomplish the highway improvement objectives during a given period. System Objectives Highway improvement objectives can generally be grouped into four major categories: safety, service, condition, and energy and environment. Reduction of potential accidents is a primary concern in highway design and maintenance. As the function of a highway system is to provide service to the public, improvement of the level of service is also an important objective. At the same time, consideration must be given to protect the capital investment already made in highway facilities, and thus the preservation of the physical condition becomes another important objective. The next major objective of highway activities involves externalities, particularly associated with energy conservation and the reduction of environmental pollution. The possible improvement and maintenance activities are linked with these objectives through their impact on those physical elements that contribute to safety, service, condition, and energy and environ-mental aspects. For example, a reconstruction project would improve the condition of the highway system by improving the present serviceability index of the pavement and condition rating of the structures as well as other roadway i

2 appurtenances. Reconstruction projects would also affect the level of service if a lane is added or the lane width is increased or roadway geometry is improved. Similarly, the safety factor would also be improved if the project included roadway or shoulder widening or the installation of safety improvement appurtenances. It should be recognized that a project may affect all of the system objectives, although to a varying degree. Some projects are particularly meant for safety improvement, such as geometric modification and installation of traffic safety devices. Similarly, some projects are concerned mainly with condition, such as resurfacing, while some are meant to improve service, such as widening or geometric modification. However, most highway projects affect all of the objectives to a certain extent. Knowledge about the impact of various projects on different system objectives is not precise. However, some data are available in the literature. For example, the safety impacts of projects involving a change pavement width, shoulder width, and shoulder surface type are documented in NCHRP Report 197 (1). Also, the safety impacts of traffic operation and control devices are indicated in NCHRP Report 162 (2). Although efforts are made to follow a rational process in highway programming procedures by evaluating the projects in terms of program objectives there are many extraneous factors that may enter into the process. For example, some of these factors may arise out of political commitments, some motivated by self interest, and others by sincere differences of opinion on the relative importance of projects. Programming, therefore, includes the art of combining the appropriate variables into an orderly process of project selection and implementation. NCHRP, Report 48 summarizes the entire process in a 15-step procedure used to produce a workable program allowing for the complexities introduced by the many variables that are involved (3). The heart of this process, however, is the setting of priorities, which are-subsequently used in allocating funds among various competing projects. Priority Setting Since the amount of funds needed to accomplish necessary highway projects far exceeds the available funds, the allocation of resources among competing projects becomes the central issue in the programming process. Priority setting has thus been the essential element in highway program administration. For example, in California, a detailed procedure is undertaken to develop priority lists for an annual State Transportation Improvement Program (4). Although the major system objectives of safety, service, and condition form the primary criteria, there are many other technical and nontechnical, quantifiable and nonquantifiable criteria that enter into the process of priority setting (3). A review of these criteria was presented in Sinha and Jukins (5). There are several approaches to setting priorities for selecting highway improvement and maintenance projects. A procedure based on sufficiency or deficiency ratings has been in use for many decades in highway programming. However, this procedure is not capable of dealing explicitly with the problem of the optimal allocation of resources to maximize safety effectiveness. There are several other procedures developed over the past decades that have been in use in the process of project selection and budget allocation. Most of these techniques involve an estimation of project costs and associated benefits to arrive at a priority ranking and rating ii

3 scheme. Before these techniques are discussed, it is important to examine the type of information necessary for making a safety evaluation of alternative projects. INFORMATION MANAGEMENT For any effective management of highway improvement and maintenance programs, it is essential to have an efficient data-collection and reporting system. The periodic monitoring of accidents before and after a highway project is undertaken, along with information on project costs, is essential to form a vital data base that can be used to make intelligent decisions about future highway improvement and maintenance activities. Accident Data The basic data requirements include number of accidents by severity, time period of accident occurrence, accident locations, section lengths, traffic volumes, and highway class. Information on the time of day, weather, type of accident, or other conditions may be useful in some cases. The after data should also indicate the type of highway activity performed. Accident data for a period of at least two years before and after the project implementation are necessary to establish meaningful results. On the basis of the collected data, the accident rates for particular locations can be computed as shown below: For highway sections: 6 ( Number of Accidents) (10 ) Number of Accidents per MillionVehicle Miles = (1) ( Section ADT ) ( Number of Days) ( Section Length) For Intersections or spots: 6 ( Number of Accidents) (10 ) Number of Accidents per MillionVehicle = (2) ( Location ADT) ( Number of Days) The accident rates car be developed by severity (fatal, nonfatal injury, and property-damage-only), if sufficient data are available. Otherwise, accident data would include all accidents. Once the accident data are collected for a sufficient number of highway sections or locations of similar geometric and traffic characteristics, average accident rates can be established. An example of typical accident rates by highway type is given in the AASHTO Manual (6). iii

4 Project Cost Data Cost information of individual projects should be recorded in the following categories: initial cost, annual cost of maintenance and operation, expected terminal value, service life of a project, and the prevailing discount rate. In many cases, the project initial costs are available, while the rest of the information has to be estimated or assumed. Furthermore, in many cases, the projects are implemented in a combination of several project types, and it becomes difficult to separate the costs of one type from the others included in the project. Careful definition of project types would eliminate this problem. It should also be recognized that the project costs would vary significantly by the location of the highway and by the type of highway because of the difference in roadway geometric and traffic conditions. Locally collected and compiled cost data would be most appropriate. In the case where such information is not available, national average data can be used to make a system wide evaluation of highway programs. Accident Cost Data In economic analysis of improvement projects, it is necessary to assign cost values to accident reductions. Accident cost values are available by severity. However, in general, it is not necessary to consider fatal, injury, and property damage accidents separately when computing accident costs (7). In California, it is suggested that if the proportion of fatal to injury to property-damage accidents on a particular location is not significantly different from the statewide average, the accident costs for all accidents are to be used with the sum of fatal plus non-fatal injury and property-damage accidents. The statewide average accident cost figures for California are given in Table 1 (7). The most reliable data on accident costs would be those that have been collected locally. However, often such information is not readily available. Nationwide data are available from such organizations as the National Safety Council and the National Highway Traffic Safety Administration. Accident Reduction Rate Highway projects, particularly those projects that are primarily meant for safety improvement, must indicate a significant reduction in accidents in order to justify the project cost. Therefore, the heart of a highway safety management system lies in the ability to estimate the extent of reduction in the number of accidents. The most reliable procedure to estimate the appropriate reduction rates is to analyze the recorded accident experience before and after the installation of various projects. On the basis of the accident rates computed for a location, the reduction rate is estimated as shown below: Accident Rate Before Accident Rate After 100 Percent Re duction Rate = (3) Accident Rate Before iv

5 The average value of reduction rate of a project type, r, can be obtained by weighted mean method, as shown below: where r m Σ = i = 1 n n bi b r i m = number of locations where a particular: type of project has been implemented, n b = total number of accidents before implementation of the project type in all locations. (4) v

6 Table 1: Accident Costs by Road Type Used By California Division of Highways (As of March 1980) Area Accident Cost ($I,000) Fatal and Injury All Accidents Rural 2- and 3-lane conventional or more undivided or more divided lane expressway Divided expressway Full freeway Suburban 2- and 3-lane conventional or more undivided or more divided lane expressway Divided expressway Full freeway Urban 2- and 3-lane conventional or more undivided or more divided lane expressway Divided expressway Full freeway vi

7 The average reduction rates can be developed separately for various locations, rural, urban, and suburban, if sufficient data are available. A set of accident reduction factors for various safety projects by location as used in California is given in Table 2 (7). Another set of rates developed for Indiana is reported in Kaji (8). NCHRP Report 162 provides a series of accident reduction rates for various highway projects (2) It is difficult to arrive at standard accident-reduction rates of such projects as highway maintenance, preservation and restoration, upgrading and rehabilitation, and reconstruction, and new construction. The reason for this difficulty is that each of these projects can have a number of physical elements that affect safety at a varying degree, and the safety impact of a project will depend on the particular physical elements included in the project at a given location. However, there are several methods that can be used to estimate the expected accident reduction from various improvement projects as indicated below. Percentage Reduction of Accident Data - Appropriate rates can be developed for various construction and other projects on the basis of past data. The rates reported to be used by California in NCHRP Report 162 (2) are the following: realignment/report 50 percent; superelevation 50 percent; reconstruction 25 percent; and combinations and miscellaneous 25 percent. Reduction to a Statewide Average Accident Rate - In this procedure, the accident reduction is the difference between the present accident rate at a particular location and the statewide average for the type of highway under consideration. California has been reported to use this method for spot improvements more than 0.50 mile in length (2). If the improvement project follows a significantly higher design standard than the existing standard, the new rate is calculated as 0.8 of the statewide average for the type of highway under consideration. The statewide accident base rates for different highway classes as used in California appear in a California Department of Transportation Manual (2). Statistical Relationships to Predict Accident Rate A compilation of research information on the relationship of highway traffic control and roadway elements to safety was included.in a Highway Users Federation Report (9). In addition, a set of statistical relationships between three highway design elements (pavement width, shoulder width, and shoulder surface type) was presented in NCHRP Report 197 (1).This type of information can be used to estimate the accident rate of proposed projects on the basis of the specific traffic control and roadway design elements included in the particular projects. vii

8 Significance Test of Accident Reduction Rate Accidents are statically rare and random events. The number of accidents in a year is subject to normal statistical variations. While dealing with small numbers, these variations can be large in terms of percentages. For example, if a section of highway has experienced 10 accidents per year on the average, then it can be expected that 85 percent of the time, the highway section would experience 5 to 15 accidents per year even though no physical change is made in the highway section (7). Consequently, it is necessary to determine the statistical significance of the expected accident reductions before further analysis is made. There are several statistical tests to assess the significance of accident reduction effect of highway improvement projects. One approach is to use the graphs shown in Figure 1 (2,8). The use of these graphs can be illustrated with the following example. Let us assume a highway location has experienced 56 accidents per year on the average in the past several years, and a safety improvement project proposed for this location has a reduction rate of 45 percent. On the basis of the graph indicating an intermediate test, the significant reduction rate for this location should be at least 30 percent for 95 percent level of confidence. As the expected reduction rate is 45 percent, it can be concluded that it is significant at 95 percent level of confidence. However, if the expected reduction rate were 25 percent, the same conclusion could not be made. viii

9 Table 2: Accident Reduction Factors for Highway Safety Projects Used In California Average Accident Minimum Accident Type of Improvement Reduction Experience* New signals (w or w/o channelization and/or lighting) A. 4-leg intersections Rural 13% 5 or more last year Urban 13% Suburban 13% B. Y and T intersections Rural 13% 5 or more last year Urban 13% Suburban 13% Modified signals: Calculate the appropriate reduction factor. Not to exceed 17% for all intersection types. New left-turn channelization A. At signalized intersections 1. With no left-turn phase 15% of all accidents 5 or more last year 2. With left-turn phase 36% of all accidents B. At nonsignalized intersections 29% of all accidents C. Two-way left turn lane 19% of all accidents 3 or more last year New Safety Lighting 50% of all accidents 3 or more night accidents last year Curve Corrections 50% of all accidents 3 or more last year Shoulder widening on narrow 2-lane roads (24-ft wide or less): Width (ft) AADT 28 < % of all accidents 3 or more last year 32 < % of all accidents 40 > % of all accidents Passing lanes for 2-lane roads: Width (ft) 36 11% of all accidents 3 or more last year 40 25% of all accidents 42 to 44 27% of all accidents * These number may be reduced by the number of fatal accidents at the location. ix

10 Figure 1: Test of Significance At 95% Level of Confidence EVALUATION METHODOLOGY The management techniques available to evaluate highway projects in terms of project costs and safety impacts can be grouped into two broad categories. The basic difference between the two categories is the method of measurement of safety impact. In the first approach, the safety impact is represented by the dollar amount of accident cost savings, while the second approach is to consider the expected number of accidents reduced as the measure of safety effectiveness. Both techniques are applicable to different functional classes of highways, provided appropriate accident information is available. x

11 Cost/Benefit Analysis In the priority-setting methods involving project costs and benefits, all candidate projects in the highway system for a given period are arrayed according to project costs and benefits. The allocation of funds or the selection of projects is then accomplished by considering relative values of the costs and benefits. The approach is to determine the safety benefits in terms of accident cost savings over the period of service life of the project and compare the benefits with project costs, including capital, maintenance, and operation costs. The comparison is accomplished by examining either the benefit/cost ratios or the net present values of the projects. The ratio can be computed either in terms of uniform annual benefits and costs, or in terms of present worth of benefits and costs. The computational relationships are shown below: EUAB PWOB B / C = = (5) EUAC PWOC NPV = PWOB PWOC (6) Where B/C = benefit/cost ratio of a project, NPV = net present value of a project, EUAB = equivalent uniform annual benefit of the project, EUAC = equivalent uniform annual cost of the project, PWOB = present worth of benefits, and PWOC = present worth of costs. Once the benefit/cost ratios or net present values are computed, the projects can then be ordered by magnitude of these parameters, largest to smallest. An example of a benefit/cost approach is the procedure used in California, where the computation of safety indices (SI) is required for all safety-improvement projects unless the project is a part of a special blanket program or warranted installations, such as a new median barrier (7,10). The approach can be easily adopted to other highway projects, provided the safety impact of the projects can be adequately estimated. The California SI procedure is a measure of the accident cost saved expressed as a percentage of the capital cost of the improvement. The SI values are determined as indicated below: SI = (Accident Cost Without Improvement-Accident Cost with Improvement)/ (Capital Cost of Improvement) 100 (7) xi

12 The steps involved in the computation of the SI values are discussed in the following paragraphs: 1. Appropriate accident reduction rates for various highway projects are applied to the base-period accident rate to estimate the number of accidents expected to be reduced due to the implementation of the projects. The service life of individual project types is also estimated on the basis of past records. 2. For general purpose use, statewide average accident base rates are developed for different highway classes and for different locations (rural, urban, and suburban) in terms of total accidents per million vehicle miles on the basis of I average daily traffic. Accident rates on projects less than 0.5 mile long are calculated on the basis of accidents per million vehicles. For specific projects, the reduction rates should be no lower than the statewide average for the particular type of highway. 3. Generally, it is not necessary to consider fatal, injury, and property-damage accidents separately. However, in some cases a project may not significantly reduce the total number of accidents, but may reduce accident severity considerably. In such cases, accidents should be examined by type. To distribute total accidents to different types of accidents, severity percentage figures developed on the basis of past records are used. The significance of the accident occurrences by severity type is checked through a statistical test. 4. Appropriate volume correction factors are developed to adjust estimated accident costs to reflect changes in traffic volume over the service life of the project. 5. On the basis of predetermined accident reduction rates associated with the proposed improvement project, the expected number of accident reductions after the improvement is computed. A separate consideration can be made for wet pavement while estimating reduction factors. Also, in the case of a project with a combination of improvements, a calculated average reduction factor should be used. For example, consider a project involving construction of two-way left-turn channelization (reduction rate 19 percent) and installation of safety lighting (reduction rate of 50 percent of night accidents). If there were 20 accidents, with 12 at night, the resulting reduction rate for the project would be 44 percent, as computed below: 12 night accidents x 50% = 6 accidents reduced by lighting (20-6) accidents x 19% = 2.7 accidents reduced by channelization Total = 8.7 accidents reduced Average Reduction Factor = 8.7/20 = 44% 6. The unit accident costs associated with types of accidents considered must be determined. In California, different accident costs are used for rural and urban areas and for conventional roads, expressways, and freeways to reflect differences in severity and accident reporting. On the average, fatal accidents cost from $ to $ , injury accidents about $5800, and property-damage-only accidents about $ "Before and after" accident costs are then computed over the service life of the project. The cost computation depends on the "significance" of accidents reduced, the location of the proposed project (rural, urban, or suburban area), and the type of highway involved. xii

13 8. By knowing the project capital cost, the appropriate SI can be computed. In the California procedure, construction costs include all local agency shares, but exclude planning. The costs also include design and construction engineering. Right-of-way cost is included, if relevant. In the following section, an example is provided to illustrate the procedure used in California. It should be mentioned that the procedure has a certain theoretical inconsistency. In the computation of the total accident cost savings, the discount factor of monetary amount is not considered. Consequently, while the.denominator is the present worth of the project cost, the numerator is not actually the present worth of safety benefits. In reality, the consideration of an appropriate discount factor to bring all future streams of safety 'benefits to the present year would produce a higher index value. Example of SI Approach - For the purpose of this example, consider a county highway department that has the accident information from the five most Il1azudous locations within the county highway system, as shown in Table 3. The agency plans to undertake improvement projects, and it has a budget of $ during the coming year. It is required to determine what project should be implemented during the next year. Information on proposed improvement projects is given in Table 4. The expected accident reduction rates have been computed on the basis of all accidents, as the accident occurrences by severity do not differ significantly from the average condition. The current unit cost per accident is estimated as $2850, $2310, and $2580 for rural, urban, and suburban locations, respectively. The accident cost saving for the entire service life of the project on Location A is computed as shown below: Accident Cost Savings = Unit Accident Cost Number of Accidents Accident Reduction Factor Volume Correction Factor Service Life of the Project = = $74,100 Similar values for other projects are computed and shown in Table 5. Once the accident cost savings are computed, the appropriate SIs are estimated as shown below: Safety Index = (Total Accident Cost Savings/Project Initial Cost) 100 (8) xiii

14 Table 3: Traffic and Accident Data For Five Locations Average Number of All ADT (1000) Traffic Growth Accidents per Year Location Type of Area Current ADT Future Average ADT Factor (Average from Last 3 Years) A Rural B Rural C Urban D Urban E Suburban Table 4: Data on Improvement Projects Additional Expected Maintenance Accident Location Project Type Service Life Initial Cost Cost per Year Terminal Value Reduction (in %) A B C D E Table 5: Safety Indices and Priority Ranks Location Project Type Accident Cost Savings ($) Initial Project Cost ($) SI Priority Rank A B C D E xiv

15 The SIs for the five projects are indicated in Table 5. Using the SIs as the priority ratings, the rank orders of the given projects are ascertained, and the array for these improvements is 3,4,2,1,5. However, projects with an SI value of less than 100 should be dropped from further consideration. Furthermore, because the budget is limited to $ , the first three improvement projects (on Locations C, D, and B) can be undertaken. The California procedure uses an average level of future traffic for the entire study period to calculate total safety benefits. However, the correct approach is to consider the safety benefits for each of the study years explicitly to compute the discounted present worth of benefits (6). Furthermore, the California procedure does not consider the lifecycle cost of a project. The additional annual cost, in some cases, may be positive, such as in the case of roadway widening, shoulder widening, or installation of traffic control devices, guardrails, etc. In some situations, however, the maintenance cost may decrease after improvement such as resurfacing or reconstruction. In case of unequal project lives, it is necessary to consider a common analysis period. For example, let us assume the analysis period in the problem considered here is 20 years. Then Projects 1 and 5 will have two cycles, Projects 2 and 3, four cycles, and Project 4, only one cycle in the analysis period. Assuming a terminal value at the end of the service life of a project, the present worth of cost for one cycle is computed as: Present Worth of Costs (PWOC) = Equivalent Uniform Annual Cost x Series Present Worth Factor (9) where Equivalent Uniform Annual Cost (EUAC) = Initial Project Cost Capital Recovery Factor + Additional Annual Cost of Maintenance and Operation - Terminal Value Sinking Fund Deposit Factor For given discount rates and service life information, the values for capital recovery, sinking fund, and series present worth factors can be obtained from standard tables (11). The present worth of safety benefit in terms of accident cost savings is computed as: Present Worth of Safety Benefits (PWOB) = First Year Benefits Series Present Worth Factor (10) where First Year Benefits (FYB) = Number of Accidents Before Improvement per Year Accident Reduction Rate Unit Cost of Accident The benefits in the future years will change according to the change in traffic volume. For computation of present worth of benefits, continuous compounding of first-year benefits to future years according to an annual rate of growth of traffic volume is considered, and the future year benefits are then discounted to the present (6). The formula for the series present worth factor is given below: xv

16 Continuously Compounded Exponential Series Present Worth Factor (CEPWF) = ( r i) n e 1 r i where r = annual rate of growth of traffic volume, i = discount rate in percent per year, and n = analysis period. The value of r can be obtained from Equation 12: r = Log e (Future Year ADT Base Year ADT) (12) Number of Years Between Base Year and Future Year The 1977 AASHTO Manual on User Benefit Analysis (6) provides a simple chart that can be used to obtain directly the present worth factors expressed in Equations 11 and 12. Assuming a 10 percent discount rate, the computations for the equivalent uniform annual cost for improvement project on Location A using Equation 9 are shown below: EUAC = = The present worth of costs for this project, with a service life of 10 years, can then be computed by considering two cycles of cash flows, assuming the analysis period is 20 years, as shown below: PWOC = Uniform Series Present Worth Factor for 10% and 20 Years = = The computations for the present worth of safety benefits using Equations 10, 11, and 12 for Project 1 on Location A are shown below: FYB = 25 x 0.10 x 2850 = 7125 r = Log e (28 27) = (Future ADT given in Table 3 is for the middle of the project service life). CEPWF = ( )20 e 1 = PWOB = = $ xvi

17 The benefit/cost ratio and net present value can then be computed by using Equations 5 and 6, respectively, as shown below: B/C Ratio = / = 0.55 Net Present Value = = -$ Similar computations for other locations were made, and the results are shown in Table 6. The projects with a benefit/cost ratio of less than 1.0, or with negative net present value, are dropped from further consideration. For the problem under consideration, the rank ordering under the benefit/cost approach and net present value approach is the same, and the projects to be recommended for implementation are on Locations B, C, and D, with a total initial cost of $ Although the results of this simple example problem did not indicate any difference, the evaluation procedure used can affect the rank orders of the specific projects. In real world use of the evaluation procedures where a large number of projects will be considered, the actual rank order of individual projects will make a significant difference in the selection of projects for implementation particularly in view of the fact that the available budget is always much less than the needed amount. It should be noted here that, although the benefit/cost ratio approach has been used widely in the past, there are several points that limit the appropriateness of using this approach. First, there is a concern over significance in relative values of benefit/cost ratios; the ratios do not indicate the magnitude of the total benefits with respect to the total costs. Consequently, the preferred procedure is to use the net present value approach where the profitability is expressed as a lump sum instead of a ratio. Cost Effectiveness Analysis The benefit/cost approach requires monetary definition of all costs and benefits. However, the problem of establishing accident costs is difficult, and any procedure based on dollar values of accident costs can often be misleading. In reality, the actual cost of an accident cannot be measured in monetary terms, because an accident cost figure cannot include the psychological effect of an accident on drivers, passengers, and their families. In this context, a cost effectiveness approach is more desirable, because this approach attempts to answer the question, How much does it cost to save one life, or one injury accident, or one accident without having to assign dollar values to them (10)? Another advantage of a cost effectiveness approach is that this procedure can accommodate all non commensurable consequences of highway construction and maintenance projects in one evaluation framework. The procedure offers more flexibility in the use of information about the project costs and benefits, including safety, than that given by a benefit/cost approach. xvii

18 Table 6: Benefit/Cost Ratios, Net Present Values, and Priority Ranks Number of Annual Project Cycles In Traffic Project Service Analysis Growth Net Present Project Location Type Life Period PWOC Factor PWOB B/C Ratio Value Rank A Not feasible B C D E Not feasible xviii

19 Safety Effectiveness Measures Safety effectiveness measures can be expressed as the reduction in the number of fatal accidents, or injury accidents, or all accidents (including property damage) per year as a result of the implementation of a highway improvement project. In case the accident information is given by severity type, an equivalent number of accidents in terms of anyone severity type can be estimated. For example, let us assume the accident experience on a section of a given highway class during a period includes 2 fatal, 15 non fatal injury, and 30 property damage only accidents. Let us also assume the ratio of numbers of property damage accidents to injury accidents to fatal accidents recorded on a statewide or area wide basis for this particular highway class is 20:10:1. Then, the equivalent number of nonfatal injury accidents on this section is 50 (2 x ). Once the average accident reduction rates associated with various highway projects for different highway classes are determined, the safety effectiveness of the proposed projects can then be estimated as the number of future accidents saved due to the implementation of these projects, as shown below: Accident Reduced in, the future year = where Nb r Nb ADT in the future year r ADT in the base year = average number of accidents reported per year before the implementation, and = percent reduction rate for a particular project in a given location (in decimal). (13) Cost-Safety Effectiveness of an Improvement Project The cost safety effectiveness of various projects can be evaluated by considering appropriate values for cost per fatal accident reduced, cost per injury accident reduced, or cost per accident (all accidents) reduced. These values can be obtained by dividing the equivalent uniform annual costs (or the present worth of costs) of a project by the expected number of annual accident reductions (or total number of accidents reduced during the analysis period) in fatal, injury, or all accidents, as shown below: Cost Safety Effectiveness Factor = EUAC (or PWOC) Average Number of Accidents Reduced per Year (or Total Accidents) Reduced During the AnalysisPeriod (14) The values for EUAC or PWOC can be computed. by using Equation 9. The computations for accident reductions should consider the changing traffic volume during the analysis period. Assuming a continuously changing traffic volume, the total number of expected accident reductions can be obtained from Equation 15: Total Number of Accidents Reduced = Number of Current Accidents per Year Accident Reduction Rate Continuous Compound Amount Factor (15) xix

20 The value for the Continuous Compound Amount Factor (CCAF) can be obtained from Equation 16: CCAF = e e ( n+ 1) r r 1 1 (16) where n = number of years in the analysis period, and r = annual rate of growth of traffic computed by Equation 12. Example of Cost-Safety Effectiveness Approach - To illustrate the use of the procedure, the example problem given in Table 3 is referred. Considering the analysis period of 20 years, the total number of accidents reduced during the analysis period can be computed by Equation 15. For example, the computations for the project on Location A are shown below: CCAF = e e = Number of Accidents Reduced = 25 x 0.10 x = 54 During the Analysis Period The cost-safety effectiveness factor for Project 1 on Location A is then equal to /54, or $2190. In Table 7 are shown the computations for this example. The rank ordering of the project in terms of cost per accident reduced shows Project 3 on Location C to be the most cost effective. Also, the sequence of the three best projects is Projects 3, 4, and 2, as obtained by the benefit/cost ratio and net present values approaches shown in Table 6. In a real-world application with a large number of projects the results may not be the same and the procedure used to compute the priority ranks must be carefully considered. Cost-System Effectiveness Matrix - The information on safety impact of alternative projects can be combined with other measures of effectiveness in a matrix in order to provide a broad evaluation framework for the highway management. For example, the matrix shown in Table 8 can be considered. This matrix can be used to present the actual values of the various measures of system effectiveness for each of the projects along with the individual rank orders. The decision makers can then use the information to make intelligent decisions regarding project selection, as they would be able to assess the impact of selecting one project over other alternatives by examining the values of individual system-effectiveness measures. When the number of projects is large, it may be useful to devise a scheme for preliminary.screening of the projects. This can be done by assigning appropriate relative weights to various system objectives and combining the individual rank order information into an overall project score. For example, let us assume the xx

21 relative weights and the rank orders of the alternative projects with respect to each of the system-effectiveness object1ves are as shown in Table 8. The safety objective is considered to be of highest priority, and therefore the weight is 4. Condition is assumed to be of second highest priority, and service is given the third highest priority. The objective related to energy and environment is considered to have the least priority. The overall scare of an alternative Project J can be represented as: SCORE = Σ w P j i i ij where SCORE = overall scare of alternative project j, j w i = relative weight of system effectiveness objective i, and P = rank order of alternative project j with respect to objective i. ij The computation of the overall scare of alternative Project 1 by using Equation 17 is shown below: SCORE 1 = w 1 P 11 + W 2 P 12 + w 3 P 13 + w 4 P 14 = = 14 The overall project scare values of other alternative projects can be similarly computed and they are shown in Table 9. It should be noted that in the example problem, the higher the score value, the higher is the rank order. Therefore, the' best alternative is Project 3 on Location C, with an overall score of 42; while the least attractive project is Project 1 on Location A, with an overall score of 14. With a given budget level, the top projects can thus be sorted out in an ascending order of the project score values. Once the group of desirable projects is selected, the actual sequence for the implementation of these projects can be determined through a more detailed analysis of the system effectiveness information. In this analysis, the absolute values of the system effectiveness objectives can be considered to evaluate the merit of one.project relative to other projects. It should be noted that the weighting and ranking procedure often tends to over simplify the process of evaluation. xxi

22 Table 7: Example Of Cost-Safety Effectiveness Approach Number of Reduction Annual Total Accidents Cost Accidents Rate of Traffic Reduced Effective- Project Present Worth Per Year Project Growth During ness Rank Location Type of Cost at Location Type Factor Analysis Period Factor ($) Order A B C D E 5 107, Table 8: Cost-System Effectiveness Matrix For The Evaluall0n of Highway Projects Safety Service System Condition Externalities Impact on Energy Cost-Safety Impact on Impact on Consumption and Project Effectiveness Rank Volume-Capacity Rank Serviceability Rank Environmental Rank Location Type Factor Order ratio Order Rating Order Deterioration Order A B C D E xxii

23 Use of Optimization Approach in Project Selection So far, discussion has involved the priority ranking of projects by using engineering economic and cost effective approaches to develop priority arrays. However, there are several mathematical programming techniques that can be effectively used in project selection and priority setting (12). The use of these techniques requires access to computer facilities and may not be practical for some agencies. For an efficient utilization of the resources, it may be necessary to evaluate alternative projects for all possible locations simultaneously; and the management decision would be to select those projects that, on the whole, optimize the safety effectiveness within the constraint of the available budget. In other words, the allocation of funds should be made in such a way that the following question can be answered, what improvement projects should be undertaken in what locations so that the safety effectiveness is maximized? This problem can be solved by applying a simple integer programming technique (12). For example, if we consider that safety effectiveness can be represented by the reduction of total accidents, the objective function of the problem can be given as: Maximize Z = (18) i j A N r g X i i j i ij where N i = total number of accidents at location i; r j = accident reduction rate of project j; g i = growth rate factor of traffic volume for location i; X ij = 1, if improvement project j is implemented at location, 0, otherwise; and j A i = improvement project j, which is one of a set of alternatives for location i, (A i ). Equation 18 indicates that the total number of accidents can be minimized as a result of the system wide implementation of highway projects. If sufficient information is available about the severity of accidents and the reduction effect of alternative projects in terms of severity of accidents, the objective function can be appropriately defined to minimize specific types of accidents. As there are constraints imposed by the budget available, the following condition must be considered: (19) i j A c X B i ij ij (20) j A X for each i i ij 1 xxiii

24 where c ij = initial cost of' the project j in location i, and B = total budget available Equation 19 indicates that the total cost of all highway projects must be less than or equal to the budget available. Equation 20 indicates that no more than one project can be selected among alternative projects for each location in a given period. However, it is not necessary that a project be implemented at each location. Budget constraints can be written separately to represent different sources of funding. For example, for a state highway department, there are certain projects that can have federal funds matched by state money, and there are other projects that must be funded entirely by the state. Appropriate constraint equations can be developed to reflect various funding levels. Table 9: Example of a Project Priority Ordering Scheme System Effectiveness Overall Overall Safety Service Condition Energy and Project Project Rank Environment Score Order Location Project Type (w 1 =4) (w 2 =2) (w 3 =3) (w 4 =1) A B C D E Example of Safety-Optimization Approach Let us assume there are five most hazardous locations on a state highway system. The accident data along with the alternative improvement projects for each of these locations are given in Table 10. Accident reduction rates and the project costs of these projects are shown in Table 11. To simplify the example, the reduction rates and project costs are assumed to remain the same for allocations. Assuming a traffic growth factor of 1.00, the optimal selection of projects for a total budget of $ are given in Table 11. The results in Table 12 indicate what projects should be undertaken at what locations for a given level of budget available. This mix of projects, however, would change if the available budget level is changed. For example, the optimal selection of projects under budget scenarios of $ and $ is shown in Tables 13 and 14. It can be seen that the projects selected under these later scenarios are different from what resulted from a $ budget levels. This type of approach can then be undertaken to determine the optimal level of budget in order to maximize the safety improvement in terms of number of accidents reduced or the costeffectiveness ratio. xxiv

25 Table 10: Alternative Improvement Projects for Five Locations on a State Highway System Number of Accidents Alternative Improvement Projects Location per Year A 23 * * * B 15 * * * C 16 * * D 8 * * * E 10 * * Table 11: Reduction Rate and Cost of Each Alternative Project in the Example Problem Expected Accident Cost. Project Reduction Rate (%) ($1,000) Table 12: Optimal Solution of Case 1 (B = $40 000) Alternative Improvement Projects Location A * (*) * B * * (*) C * * D * (*) * E (*) * Total Number of Accidents Expected to be Reduced = 16.0 Cost of All Safety Improvements = $ System Cost-Effectiveness Ratio = $2500/accident * Available Alternatives (*)Alternative Selected xxv

26 Table 13: Optimal Solution of Case 3 (B - $60 000) Alternative Improvement Projects Location A * * (*) B * * (*) C * (*) D * * * E * (*) Total Number of Accidents Expected to be Reduced = 25.2 Cost of All Safety Improvements = $ System Cost-Effectiveness Ratio = $2340/accident * Available Alternatives (*)Alternative Selected Table 14: Optimal Solution of Case 5 (B = $80 000) Alternative Improvement Projects Location A * * (*) B * * (*) C * (*) D * * (*) E * (*) Total Number of Accidents Expected to be Reduced = 29.2 Cost of All Safety Improvements = $ System Cost Effectiveness Ratio = $2706/accident * Available Alternatives (*) Alternative Selected xxvi

27 Figure 2: Cost-Effectiveness Ratio and Total Funds Available In Figure 2 are shown the cost-effectiveness ratios of the improvement projects computed collectively under a given budget level. For the example problem, the optimal level of budget appears to be $60 000, so that the cost effectiveness of all of the projects combined is minimum. The implication of these results is that although the number of accidents can be reduced with a larger outlay of expenditure, beyond the budget of $60 000, the marginal improvement in safety is achieved only through a proportionately higher additional expenditure. This type of information is important to make management decisions in the process of budgeting and scheduling of improvement projects. The optimization approach can also be extended to consider multiyear programming of highway improvement activities (12). xxvii

28 Multiobjective Optimization of Highway Activities The available highway funds are not adequate to undertake all the projects in keeping with accepted standards. In the face of limited resources, the issue is how to make the best use of limited funds. The solution obviously lies in compromising improvement and maintenance efforts either in quality or quantity or both (13). The highway management decision is to determine the optimal strategy that would yield the maximum benefit within the constraint of budget availability. In this effort, there are several objectives that an effective highway system management must consider. Highway improvement and maintenance activities are undertaken to improve roadway condition, provide a higher level of service, enhance safety, and reduce energy conservation and environmental pollution. The highway management decisions involve how to determine what apportionment scheme of the available limited funds will enable the achievement of as many system objectives as possible, to as great an extent as possible, for as long as possible. The optimization technique discussed so far involved a single objective, safety without considering the role of other objectives. However, in the real world, the problem is of a multiobjective decision situation. A procedure has been developed on the basis of a multiobjective optimization approach to allocate optimally the limited highway resources (14). In this approach, targets or goals are assigned for each of the identified objectives, and the goalprogramming algorithm determines a solution that comes as close as possible to all the given goals or targets. In the following section, a brief discussion of the application of this procedure is presented. Detailed information on this technique can be obtained in Sinha and others (14). The procedure was applied to the Indiana highway system as reported in the 1976 National Highway Inventory and Performance Summary (15). The highway system was divided into six classes, and all possible highway activities were grouped into seven categories. The physical and traffic inventory of the highway system is considered along with given design and maintenance standards to determine the deficient miles and the feasible alternative projects. The impact of each type of project on each of the four major system objectives was derived through an opinion survey of a group of highway engineering design and maintenance personnel. The format of a matrix that indicates the relative role each of the activities play in achieving each of the system objectives is given in Table 15. This matrix can be developed through a field survey supplemented by the empirical evidence reported in the literature. The coefficients of the matrix should reflect the difference in useful life of each of the projects. A separate matrix can be developed for each of the six highway categories considered. With a given level of budget including state funds and federal grants, with associated matching requirements, and with a given set of targets for each of the stated objectives assigned by the highway system management, the procedure is to allocate available funds in order to determine miles of highway in each class to undergo a particular highway activity during a certain analysis period. Each of the system objectives is assigned a priority rating that affects the choice of type and r location of projects. For example, the management may decide that highway, safety is most critical compared with other objectives, and the priorities can then be set accordingly. The difference in programming strategies dictated by the difference in priorities assigned to system objectives can be studied by the results of the goal programming optimization algorithm. For example, a particular case study indicated that by assigning safety higher priority, the highway management strategy lies in reducing the resurfacing activity to a small extent on urban other arterials and considerably on rural other arterials. The released money is diverted to do all the needed minor widening in these classes of highways. Also, the needed traffic engineering xxviii

DMP (Decision Making Process)

DMP (Decision Making Process) DMP (Decision Making Process) Office of Systems Analysis Planning Road School March 7, 2007 Driving Indiana s Economic Growth *** Please note: This is derived from the United States Military Decision Making

More information

The Cost of Pavement Ownership (Not Your Father s LCCA!)

The Cost of Pavement Ownership (Not Your Father s LCCA!) The Cost of Pavement Ownership (Not Your Father s LCCA!) Mark B. Snyder, Ph.D., P.E. President and Manager Pavement Engineering and Research Consultants, LLC 57 th Annual Concrete Paving Workshop Arrowwood

More information

CURRICULUM MAPPING FORM

CURRICULUM MAPPING FORM Course Accounting 1 Teacher Mr. Garritano Aug. I. Starting a Proprietorship - 2 weeks A. The Accounting Equation B. How Business Activities Change the Accounting Equation C. Reporting Financial Information

More information

NCHRP Consequences of Delayed Maintenance

NCHRP Consequences of Delayed Maintenance NCHRP 14-20 Consequences of Delayed Maintenance Recommended Process for Bridges and Pavements prepared for NCHRP prepared by Cambridge Systematics, Inc. with Applied Research Associates, Inc. Spy Pond

More information

Transportation Economics and Decision Making. Lecture-11

Transportation Economics and Decision Making. Lecture-11 Transportation Economics and Decision Making Lecture- Multicriteria Decision Making Decision criteria can have multiple dimensions Dollars Number of crashes Acres of land, etc. All criteria are not of

More information

RISK BASED LIFE CYCLE COST ANALYSIS FOR PROJECT LEVEL PAVEMENT MANAGEMENT. Eric Perrone, Dick Clark, Quinn Ness, Xin Chen, Ph.D, Stuart Hudson, P.E.

RISK BASED LIFE CYCLE COST ANALYSIS FOR PROJECT LEVEL PAVEMENT MANAGEMENT. Eric Perrone, Dick Clark, Quinn Ness, Xin Chen, Ph.D, Stuart Hudson, P.E. RISK BASED LIFE CYCLE COST ANALYSIS FOR PROJECT LEVEL PAVEMENT MANAGEMENT Eric Perrone, Dick Clark, Quinn Ness, Xin Chen, Ph.D, Stuart Hudson, P.E. Texas Research and Development Inc. 2602 Dellana Lane,

More information

A New Cost-Benefit Methodology for Highway-Railway Grade Crossing Safety Programs

A New Cost-Benefit Methodology for Highway-Railway Grade Crossing Safety Programs August 6 th, 2014 Ali Rezvani, Ricardo Cruz, Andrew Thomas GLX-2014 A New Cost-Benefit Methodology for Highway-Railway Grade Crossing Safety Programs Motivation Competition for increasingly scarce resources

More information

Project 06-06, Phase 2 June 2011

Project 06-06, Phase 2 June 2011 ASSESSING AND INTERPRETING THE BENEFITS DERIVED FROM IMPLEMENTING AND USING ASSET MANAGEMENT SYSTEMS Project 06-06, Phase 2 June 2011 Midwest Regional University Transportation Center College of Engineering

More information

Highway Engineering-II

Highway Engineering-II Highway Engineering-II Chapter 7 Pavement Management System (PMS) Contents What is Pavement Management System (PMS)? Use of PMS Components of a PMS Economic Analysis of Pavement Project Alternative 2 Learning

More information

Transportation Economics and Decision Making. L e c t u r e - 3

Transportation Economics and Decision Making. L e c t u r e - 3 Transportation Economics and Decision Making L e c t u r e - 3 Arithmetic Gradient Series Amount increases by G each period A+2G A+(n-1)G A+3G A A+G This is equivalent to Arithmetic Gradient Series A A

More information

FY Statewide Capital Investment Strategy... asset management, performance-based strategic direction

FY Statewide Capital Investment Strategy... asset management, performance-based strategic direction FY 2009-2018 Statewide Capital Investment Strategy.. asset management, performance-based strategic direction March 31, 2008 Governor Jon S. Corzine Commissioner Kris Kolluri Table of Contents I. EXECUTIVE

More information

CTRE EVALUATION OF THE IOWA DOT S SAFETY IMPROVEMENT CANDIDATE LIST PROCESS. CTRE Project 00-74

CTRE EVALUATION OF THE IOWA DOT S SAFETY IMPROVEMENT CANDIDATE LIST PROCESS. CTRE Project 00-74 EVALUATION OF THE IOWA DOT S SAFETY IMPROVEMENT CANDIDATE LIST PROCESS CTRE Project 00-74 Sponsored by the Office of Traffic and Safety, Iowa Department of Transportation CTRE Center for Transportation

More information

Implementing the MTO s Priority Economic Analysis Tool

Implementing the MTO s Priority Economic Analysis Tool Implementing the MTO s Priority Economic Analysis Tool presented at 6th National Conference on Transportation Asset Management presented by Alison Bradbury Ontario Ministry of Transportation November 2,

More information

Hot Springs Bypass Extension TIGER 2017 Application. Benefit-Cost Analysis Methodology Summary

Hot Springs Bypass Extension TIGER 2017 Application. Benefit-Cost Analysis Methodology Summary TIGER 2017 Application Overview This project proposes to extend the Hot Springs Bypass (US 70/US 270) from US 70 to State Highway 7 in Garland County, Arkansas. The 5.5 mile facility will initially consist

More information

Developing Optimized Maintenance Work Programs for an Urban Roadway Network using Pavement Management System

Developing Optimized Maintenance Work Programs for an Urban Roadway Network using Pavement Management System Developing Optimized Maintenance Work Programs for an Urban Roadway Network using Pavement Management System M. Arif Beg, PhD Principal Consultant, AgileAssets Inc. Ambarish Banerjee, PhD Consultant, AgileAssets

More information

RESEARCH RESULTS DIGEST March 2001 Number 252

RESEARCH RESULTS DIGEST March 2001 Number 252 National Cooperative Highway Research Program RESEARCH RESULTS DIGEST March 2001 Number 252 Subject Area: IA Planning and Administration Responsible Senior Program Officer: Charles W. Niessner Development

More information

SafetyAnalyst: Software Tools for Safety Management of Specific Highway Sites White Paper for Module 4 Countermeasure Evaluation August 2010

SafetyAnalyst: Software Tools for Safety Management of Specific Highway Sites White Paper for Module 4 Countermeasure Evaluation August 2010 SafetyAnalyst: Software Tools for Safety Management of Specific Highway Sites White Paper for Module 4 Countermeasure Evaluation August 2010 1. INTRODUCTION This white paper documents the benefits and

More information

A PROCEDURAL DOCUMENT DESCRIBING THE PROCESS OF DEVELOPING THE 4-YEAR PLAN

A PROCEDURAL DOCUMENT DESCRIBING THE PROCESS OF DEVELOPING THE 4-YEAR PLAN 5-9035-01-P8 A PROCEDURAL DOCUMENT DESCRIBING THE PROCESS OF DEVELOPING THE 4-YEAR PLAN Authors: Zhanmin Zhang Michael R. Murphy TxDOT Project 5-9035-01: Pilot Implementation of a Web-based GIS System

More information

Chapter 8: Lifecycle Planning

Chapter 8: Lifecycle Planning Chapter 8: Lifecycle Planning Objectives of lifecycle planning Identify long-term investment for highway infrastructure assets and develop an appropriate maintenance strategy Predict future performance

More information

SOLUTIONS FOR SAVING LIVES ON TEXAS ROADS

SOLUTIONS FOR SAVING LIVES ON TEXAS ROADS SOLUTIONS FOR SAVING LIVES ON TEXAS ROADS Darren McDaniel Texas Department of Transportation December 2016 Texas Traffic Safety Task Force Texas Traffic Safety Task Force was created in August 2015 with

More information

MONETARY PERFORMANCE APPLIED TO PAVEMENT OPTIMIZATION DECISION MANAGEMENT

MONETARY PERFORMANCE APPLIED TO PAVEMENT OPTIMIZATION DECISION MANAGEMENT MONETARY PERFORMANCE APPLIED TO PAVEMENT OPTIMIZATION DECISION MANAGEMENT Gordon Molnar, M.A.Sc., P.Eng. UMA Engineering Ltd., 17007 107 Avenue, Edmonton, AB, T5S 1G3 gordon.molnar@uma.aecom.com Paper

More information

White Paper: Performance-Based Needs Assessment

White Paper: Performance-Based Needs Assessment White Paper: Performance-Based Needs Assessment Prepared for: Meeting Federal Surface Transportation Requirements in Statewide and Metropolitan Transportation Planning: A Conference Requested by: American

More information

Transportation Improvement Program Project Priority Process White Paper

Transportation Improvement Program Project Priority Process White Paper Transportation Improvement Program Project Priority Process White Paper Pierce County Public Works- Office of the County Engineer Division Introduction This paper will document the process used by the

More information

Prospectus Rules. Chapter 2. Drawing up the prospectus

Prospectus Rules. Chapter 2. Drawing up the prospectus Prospectus ules Chapter Drawing up the Section.1 : General contents of.1 General contents of.1.1 UK General contents of... Sections 87A(), (A), (3) and (4) of the Act provide for the general contents of

More information

UNIFIED TRANSPORTATION PROGRAM

UNIFIED TRANSPORTATION PROGRAM 2002 UNIFIED TRANSPORTATION PROGRAM Blank Page SUMMARY OF CATEGORIES CATEGORIES NUMBER, NAME AND YEAR ESTABLISHED PROGRAMMING AUTHORITY FUNDING BANK BALANCE (Yes/) RESPONSIBLE ENTITY RANKING INDEX OR ALLOCATION

More information

CAPITAL BUDGETING AND THE INVESTMENT DECISION

CAPITAL BUDGETING AND THE INVESTMENT DECISION C H A P T E R 1 2 CAPITAL BUDGETING AND THE INVESTMENT DECISION I N T R O D U C T I O N This chapter begins by discussing some of the problems associated with capital asset decisions, such as the long

More information

Draft Environmental Impact Statement. Appendix G Economic Analysis Report

Draft Environmental Impact Statement. Appendix G Economic Analysis Report Draft Environmental Impact Statement Appendix G Economic Analysis Report Appendix G Economic Analysis Report Economic Analyses in Support of Environmental Impact Statement Carolina Crossroads I-20/26/126

More information

A 2009 Social Accounting Matrix (SAM) for South Africa

A 2009 Social Accounting Matrix (SAM) for South Africa A 2009 Social Accounting Matrix (SAM) for South Africa Rob Davies a and James Thurlow b a Human Sciences Research Council (HSRC), Pretoria, South Africa b International Food Policy Research Institute,

More information

Public Works and Development Services

Public Works and Development Services City of Commerce Capital Improvement Program Prioritization Policy Public Works and Development Services SOP 101 Version No. 1.0 Effective 05/19/15 Purpose The City of Commerce s (City) Capital Improvement

More information

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade. Glossary GLOSSARY Advanced Construction (AC): Authorization of Advanced Construction (AC) is a procedure that allows the State to designate a project as eligible for future federal funds while proceeding

More information

CUSTOMERS. PEOPLE. PARTNERS.

CUSTOMERS. PEOPLE. PARTNERS. THIRD-QUARTER 2017 FINANCIAL REVIEW October 24, 2017 CUSTOMERS. PEOPLE. PARTNERS. FORWARD-LOOKING STATEMENTS Forward-looking Statements Certain statements in this financial review relate to future events

More information

(Non-legislative acts) REGULATIONS

(Non-legislative acts) REGULATIONS 29.11.2016 L 323/1 II (Non-legislative acts) REGULATIONS COMMISSION REGULATION (EU) 2016/2067 of 22 November 2016 amending Regulation (EC) No 1126/2008 adopting certain international accounting standards

More information

Australian Hotel Market Property Prospects

Australian Hotel Market Property Prospects Australian Hotel Market Property Prospects 2012 2021 Intro text to be supplied and go here. Intro text to be supplied and go here. Intro text to be supplied and go here. Intro text to be supplied and go

More information

Third Quarter 2018 Financial Review. October 23, 2018

Third Quarter 2018 Financial Review. October 23, 2018 Third Quarter 2018 Financial Review October 23, 2018 Forward-Looking Statements Certain statements in this financial review relate to future events and expectations and are forward-looking statements within

More information

Midterm 2 Review. ECON 30020: Intermediate Macroeconomics Professor Sims University of Notre Dame, Spring 2018

Midterm 2 Review. ECON 30020: Intermediate Macroeconomics Professor Sims University of Notre Dame, Spring 2018 Midterm 2 Review ECON 30020: Intermediate Macroeconomics Professor Sims University of Notre Dame, Spring 2018 The second midterm will take place on Thursday, March 29. In terms of the order of coverage,

More information

HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP)

HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) HSIP GUIDEBOOK & APPLICATION FORM HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) Greater Minnesota Solicitation for District Projects State Fiscal Years 2019, 2020, 2021 and 2022 September 2017 2017 HSIP Solicitation

More information

House Bill 20 Implementation. House Select Committee on Transportation Planning Tuesday, August 30, 2016, 1:00 P.M. Capitol Extension E2.

House Bill 20 Implementation. House Select Committee on Transportation Planning Tuesday, August 30, 2016, 1:00 P.M. Capitol Extension E2. House Bill 20 Implementation Tuesday,, 1:00 P.M. Capitol Extension E2.020 INTRODUCTION In response to House Bill 20 (HB 20), 84 th Legislature, Regular Session, 2015, and as part of the implementation

More information

I-44/US-75 Interchange and Related Improvements on I-44 in Tulsa County

I-44/US-75 Interchange and Related Improvements on I-44 in Tulsa County I-44/US-75 Interchange and Related Improvements on I-44 in Tulsa County Cost-Effectiveness Analysis Supplementary Documentation FASTLANE Discretionary Grant Program I-44/US-75 Interchange and Related Improvements

More information

HDM-4 Applications. Project Appraisal. Project Formulation. Maintenance Policy Optimization. Road Works Programming. Network Strategic Analysis

HDM-4 Applications. Project Appraisal. Project Formulation. Maintenance Policy Optimization. Road Works Programming. Network Strategic Analysis HDM-4 Applications HDM-4 Applications Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards & Policies 2 Project Appraisal Concerned

More information

Prospectus Rules. Chapter 2. Drawing up the prospectus

Prospectus Rules. Chapter 2. Drawing up the prospectus Prospectus Rules Chapter Drawing up the PR : Drawing up the included in a.3 Minimum information to be included in a.3.1 EU Minimum information... Articles 3 to 3 of the PD Regulation provide for the minimum

More information

The Road Safety Risk Manager: Maximising Road Trauma Reductions from Engineering Countermeasures

The Road Safety Risk Manager: Maximising Road Trauma Reductions from Engineering Countermeasures The Safety Risk Manager: Maximising Trauma Reductions from Engineering Countermeasures Name of Author MCINERNEY, Rob., BE (Civil) (Hons 1) Peng, ARRB Transport Research Ltd Abstract safety practitioners

More information

Traffic Impact Analysis Guidelines Methodology

Traffic Impact Analysis Guidelines Methodology York County Government Traffic Impact Analysis Guidelines Methodology Implementation Guide for Section 154.037 Traffic Impact Analysis of the York County Code of Ordinances 11/1/2017 TABLE OF CONTENTS

More information

In addition to embarking on a new dialogue on Ohio s transportation priorities,

In addition to embarking on a new dialogue on Ohio s transportation priorities, Strategic Initiatives for 2008-2009 ODOT Action to Answer the Challenges of Today In addition to embarking on a new dialogue on Ohio s transportation priorities, the Strategic Initiatives set forth by

More information

Appendices to NCHRP Research Report 903: Geotechnical Asset Management for Transportation Agencies, Volume 2: Implementation Manual

Appendices to NCHRP Research Report 903: Geotechnical Asset Management for Transportation Agencies, Volume 2: Implementation Manual Appendices to NCHRP Research Report 903: Geotechnical Asset Management for Transportation Agencies, Volume 2: Implementation Manual This document contains the following appendices to NCHRP Research Report

More information

INVESTMENT STRATEGIES

INVESTMENT STRATEGIES 3 INVESTMENT STRATEGIES 70 INVESTMENT STRATEGIES 71 A key role of Mobilizing Tomorrow is to outline a strategy for how the region will invest in transportation infrastructure over the next 35 years. This

More information

Malvern Borough Zoning Ordinance TABLE OF CONTENTS

Malvern Borough Zoning Ordinance TABLE OF CONTENTS TABLE OF CONTENTS Article I: Title, Purpose, Objectives, and Interpretation Page Section 100. Title...I-1 Section 101. Purposes...I-1 Section 102. Statement of Community Development Objectives...I-1 Section

More information

Long-Term Monitoring of Low-Volume Road Performance in Ontario

Long-Term Monitoring of Low-Volume Road Performance in Ontario Long-Term Monitoring of Low-Volume Road Performance in Ontario Li Ningyuan, P. Eng. Tom Kazmierowski, P.Eng. Becca Lane, P. Eng. Ministry of Transportation of Ontario 121 Wilson Avenue Downsview, Ontario

More information

Ordinance on Terminology, Forms, and Preparation Methods of Consolidated Financial Statements

Ordinance on Terminology, Forms, and Preparation Methods of Consolidated Financial Statements Ordinance on Terminology, Forms, and Preparation Methods of Consolidated Financial Statements (Ordinance of the Ministry of Finance No. 28 of October 30, 1976) Pursuant to the provisions of Article 193

More information

Overhead 2018 EA-2F Seminar outline Page # Revised July 25, 2018

Overhead 2018 EA-2F Seminar outline Page # Revised July 25, 2018 01 13 CM-01 CM- CM- CM-16 CM-17 CM-24 CM-25 CM-31 CM-32 CM-33 CM-34 CM-35 CM-36 CM-38 I. INTRODUCTION A. General information B. Summary of past exams C. Summary of Overhead sections II. COST METHODS A.

More information

Caterpillar Resource Industries. Denise Johnson, Group President

Caterpillar Resource Industries. Denise Johnson, Group President Caterpillar Resource Industries Denise Johnson, Group President Forward-Looking Statements Certain statements in this presentation relate to future events and expectations and are forward-looking statements

More information

DEVELOPMENT AND IMPLEMENTATION OF A NETWORK-LEVEL PAVEMENT OPTIMIZATION MODEL FOR OHIO DEPARTMENT OF TRANSPORTATION

DEVELOPMENT AND IMPLEMENTATION OF A NETWORK-LEVEL PAVEMENT OPTIMIZATION MODEL FOR OHIO DEPARTMENT OF TRANSPORTATION DEVELOPMENT AND IMPLEMENTATION OF A NETWOR-LEVEL PAVEMENT OPTIMIZATION MODEL FOR OHIO DEPARTMENT OF TRANSPORTATION Shuo Wang, Eddie. Chou, Andrew Williams () Department of Civil Engineering, University

More information

Multi-Objective Optimization Model using Constraint-Based Genetic Algorithms for Thailand Pavement Management

Multi-Objective Optimization Model using Constraint-Based Genetic Algorithms for Thailand Pavement Management Multi-Objective Optimization Model using Constraint-Based Genetic Algorithms for Thailand Pavement Management Pannapa HERABAT Assistant Professor School of Civil Engineering Asian Institute of Technology

More information

NEIGHBOURHOOD CONCEPT PLAN (NCP) AREAS REQUIRE AMENITY CONTRIBUTIONS

NEIGHBOURHOOD CONCEPT PLAN (NCP) AREAS REQUIRE AMENITY CONTRIBUTIONS 13450 104 Ave Surrey, BC, V3T 1V8 March, 2018 PLANNING & DEVELOPMENT DEPARTMENT NEIGHBOURHOOD CONCEPT PLAN (NCP) AREAS REQUIRE AMENITY CONTRIBUTIONS The Surrey Official Community Plan encourages orderly

More information

10-Year Capital Highway Investment Plan DRAFT

10-Year Capital Highway Investment Plan DRAFT This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 10-Year Capital Highway

More information

Linear Programming Model for Pavement Management

Linear Programming Model for Pavement Management TRANSPORTATION RESEARCH RECORD 12 71 Linear Programming Model for Pavement Management CHRISTIAN F. DAVIS AND c. PETER VAN DINE A computer model, CONNP A VE, has been developed for the Connecticut Department

More information

AMP2016. County of Grey. The 2016 Asset Management Plan for the. w w w. p u b l i c s e c t o r d i g e s t. c o m

AMP2016. County of Grey. The 2016 Asset Management Plan for the. w w w. p u b l i c s e c t o r d i g e s t. c o m AMP2016 w w w. p u b l i c s e c t o r d i g e s t. c o m The 2016 Asset Management Plan for the County of Grey SUBMITTED BY THE PUBLIC SECTOR DIGEST INC. (PSD) WWW.PUBLICSECTORDIGEST.COM JULY 2017 Contents

More information

SECURITIES AND EXCHANGE COMMISSION Washington, DC FORM 8-K. MOOG INC. (Exact name of registrant as specified in its charter)

SECURITIES AND EXCHANGE COMMISSION Washington, DC FORM 8-K. MOOG INC. (Exact name of registrant as specified in its charter) SECURITIES AND EXCHANGE COMMISSION Washington, DC 20549 FORM 8-K CURRENT REPORT Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934 Date of Report (Date of earliest event reported):

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 2006R1828 EN 01.12.2011 003.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B C1 COMMISSION REGULATION (EC) No 1828/2006 of

More information

City of Glendale, Arizona Pavement Management Program

City of Glendale, Arizona Pavement Management Program City of Glendale, Arizona Pavement Management Program Current Year Plan (FY 2014) and Five-Year Plan (FY 2015-2019) EXECUTIVE SUMMARY REPORT December 2013 TABLE OF CONTENTS TABLE OF CONTENTS I BACKGROUND

More information

ARTICLE 4. SECTION 1. Chapter 31-2 of the General Laws entitled Division of Motor Vehicles is

ARTICLE 4. SECTION 1. Chapter 31-2 of the General Laws entitled Division of Motor Vehicles is ======= art.00//00//00//00//00//00//00/1 ======= 1 ARTICLE 1 1 1 1 1 1 1 1 0 1 0 SECTION 1. Chapter 1- of the General Laws entitled Division of Motor Vehicles is hereby amended by adding thereto the following

More information

Empirical Bayes Analysis For Safety. Larry Hagen, P.E., PTOE

Empirical Bayes Analysis For Safety. Larry Hagen, P.E., PTOE Empirical Bayes Analysis For Safety Larry Hagen, P.E., PTOE Disclaimer: The following interviews and commentaries are for informational exchange only. The views and opinions expressed therein are those

More information

APPENDIX E: ATM MODEL TECH MEMORANDUM. Metropolitan Council Parsons Brinckerhoff

APPENDIX E: ATM MODEL TECH MEMORANDUM. Metropolitan Council Parsons Brinckerhoff APPENDIX E: ATM MODEL TECH MEMORANDUM Metropolitan Council Parsons Brinckerhoff Metropolitan Highway System Investment Study Evaluation of Active Traffic Management Strategies Prepared by: Parsons Brinckerhoff

More information

International Project Management. prof.dr MILOŠ D. MILOVANČEVIĆ

International Project Management. prof.dr MILOŠ D. MILOVANČEVIĆ International Project Management prof.dr MILOŠ D. MILOVANČEVIĆ Project Evaluation and Analysis Project Financial Analysis Project Evaluation and Analysis The important aspects of project analysis are:

More information

32 nd Street Corridor Improvements

32 nd Street Corridor Improvements Benefit-Cost Analysis Supplementary Documentation TIGER Discretionary Grant Program 32 nd Corridor Improvements USDOT TIGER BCA Results City of Joplin, MO April 29, 2016 32nd Corridor Improvements Contents...

More information

Using Asset Management Planning to Make Roadway Improvements

Using Asset Management Planning to Make Roadway Improvements Using Asset Management Planning to Make Roadway Improvements 1 Presentation Overview Status of Municipal Infrastructure Asset Management 101 15+ Year Pavement Life cycle Data, M,R&R, Prediction Models,

More information

Economic Implications of Selection of Long-Life versus Conventional Caltrans Rehabilitation Strategies for High-Volume Highways

Economic Implications of Selection of Long-Life versus Conventional Caltrans Rehabilitation Strategies for High-Volume Highways Economic Implications of Selection of Long-Life versus Conventional Caltrans Rehabilitation Strategies for High-Volume Highways Draft report prepared for the CALIFORNIA DEPARTMENT OF TRANSPORTATION Division

More information

Corridors of Commerce DRAFT Scoring and Prioritization Process. Patrick Weidemann Director of Capital Planning and Programming November 1, 2017

Corridors of Commerce DRAFT Scoring and Prioritization Process. Patrick Weidemann Director of Capital Planning and Programming November 1, 2017 Corridors of Commerce DRAFT Scoring and Prioritization Process Patrick Weidemann Director of Capital Planning and Programming November 1, 2017 Project Purpose To develop and implement a scoring and project

More information

ORDINANCE NO. STA-16-01

ORDINANCE NO. STA-16-01 NO. STA-16-01 AN ORDINANCE PROVIDING FOR A ONE-HALF OF ONE PERCENT RETAIL TRANSACTIONS AND USE TAX FOR LOCAL TRANSPORTATION PURPOSES IN SACRAMENTO COUNTY BE IT ENACTED BY THE GOVERNING BOARD OF THE SACRAMENTO

More information

FOR IMMEDIATE RELEASE FEBRUARY 28, 2018 SYKES ENTERPRISES, INCORPORATED REPORTS FOURTH QUARTER AND FULL YEAR 2017 FINANCIAL RESULTS

FOR IMMEDIATE RELEASE FEBRUARY 28, 2018 SYKES ENTERPRISES, INCORPORATED REPORTS FOURTH QUARTER AND FULL YEAR 2017 FINANCIAL RESULTS News Release news release FOR IMMEDIATE RELEASE FEBRUARY 28, 2018 SYKES ENTERPRISES, INCORPORATED REPORTS FOURTH QUARTER AND FULL YEAR 2017 FINANCIAL RESULTS --Higher overall demand drives strong underlying

More information

Wells Fargo Industrials Conference. May 8, 2018

Wells Fargo Industrials Conference. May 8, 2018 Wells Fargo Industrials Conference May 8, 2018 Forward-Looking Statements Certain statements in this financial review relate to future events and expectations and are forward-looking statements within

More information

Maintenance Management of Infrastructure Networks: Issues and Modeling Approach

Maintenance Management of Infrastructure Networks: Issues and Modeling Approach Maintenance Management of Infrastructure Networks: Issues and Modeling Approach Network Optimization for Pavements Pontis System for Bridge Networks Integrated Infrastructure System for Beijing Common

More information

Evaluating Different Bridge Management Strategies Using The Bridge Management Research System (bmrs)

Evaluating Different Bridge Management Strategies Using The Bridge Management Research System (bmrs) Purdue University Purdue e-pubs Open Access Theses Theses and Dissertations 2013 Evaluating Different Bridge Management Strategies Using The Bridge Management Research System (bmrs) Timothy Paul Stroshine

More information

Additionally, the UPWP serves as a source for the following information:

Additionally, the UPWP serves as a source for the following information: Executive Summary ES.1 WHAT IS THE UPWP? The Unified Planning Work Program (UPWP) produced by the Boston Region Metropolitan Planning Organization (MPO) explains how the Boston region s federal transportation

More information

1.0 CITY OF HOLLYWOOD, FL

1.0 CITY OF HOLLYWOOD, FL 1.0 CITY OF HOLLYWOOD, FL PAVEMENT MANAGEMENT SYSTEM REPORT 1.1 PROJECT INTRODUCTION The nation's highways represent an investment of billions of dollars by local, state and federal governments. For the

More information

ENGINEERING ECONOMIC ANALYSIS

ENGINEERING ECONOMIC ANALYSIS ENGINEERING ECONOMIC ANALYSIS r T ~' ELEVENTH EDITION Donald G. Newnan San Jose State University Ted G. Eschenbach University of Alaska Anchorage Jerome P. Lavelle North Carolina State t University New

More information

SafetyAnalyst TM : Software Tools for Safety Management of Specific Highway Sites

SafetyAnalyst TM : Software Tools for Safety Management of Specific Highway Sites SafetyAnalyst TM : Software Tools for Safety Management of Specific Highway Sites July 2010 NTIS Accession No. PB2010-111996 FHWA Publication No. FHWA-HRT-10-063 FOREWORD This report provides a detailed

More information

Southern California Contractors Association, Inc E. Washington Blvd., Suite 200 Los Angeles, CA / Fax 323/

Southern California Contractors Association, Inc E. Washington Blvd., Suite 200 Los Angeles, CA / Fax 323/ Southern California Contractors Association, Inc. 6055 E. Washington Blvd., Suite 200 Los Angeles, CA 90040 323/726-3511 Fax 323/726-2366 LABOR BULLETIN 11/13 TO: SUBJECT: SCCA CONTRACTOR & ALLIED MEMBERS

More information

First Quarter 2018 Financial Review. April 24, 2018

First Quarter 2018 Financial Review. April 24, 2018 First Quarter 2018 Financial Review April 24, 2018 Forward-Looking Statements Certain statements in this financial review relate to future events and expectations and are forward-looking statements within

More information

SECURITIES AND EXCHANGE COMMISSION Consolidated quarterly report QSr 1 / 2005

SECURITIES AND EXCHANGE COMMISSION Consolidated quarterly report QSr 1 / 2005 SECURITIES AND EXCHANGE COMMISSION Consolidated quarterly report QSr 1 / 2005 Pursuant to 93 section 2 and 94 section 1 of the Regulation of the Council of Ministers of March 21, 2005 (Journal of Laws

More information

The Royal Bank of Scotland plc

The Royal Bank of Scotland plc PROSPECTUS The Royal Bank of Scotland plc (Incorporated in Scotland with limited liability under the Companies Acts 1948 to 1980, registered number SC090312) (the Issuer ) Call and Put Warrants Base Prospectus

More information

THE ECONOMICS OF PREVENTIVE MAINTENANCE

THE ECONOMICS OF PREVENTIVE MAINTENANCE THE ECONOMICS OF PREVENTIVE MAINTENANCE C lyde B urke Vice President Roy Jorgensen Associates, Inc. Gaithersburg, Maryland H O W M U C H P R E V E N T IV E M A IN T E N A N C E? How do we know when we

More information

Freight Rail Improvements Oklahoma City to Shawnee TIGER Grant Application Benefit Cost Analysis Technical Memo October 2009

Freight Rail Improvements Oklahoma City to Shawnee TIGER Grant Application Benefit Cost Analysis Technical Memo October 2009 Freight Rail Improvements Oklahoma City to Shawnee TIGER Grant Application Benefit Cost Analysis Technical Memo October 2009 Introduction The formal benefit cost analysis has been conducted using best

More information

Paris Legally Binding Agreement

Paris Legally Binding Agreement Submission by Nepal on behalf of the Least Developed Countries Group on the ADP Co-Chairs Non Paper of 7 July 2014 on Parties Views and Proposal on the Elements for a Draft Negotiating Text The Least Developed

More information

Optimization Model for Allocating Resources for Highway Safety Improvement at Urban Intersections

Optimization Model for Allocating Resources for Highway Safety Improvement at Urban Intersections Optimization Model for Allocating Resources for Highway Safety Improvement at Urban Intersections Sabyasachee Mishra 1, and Snehamay Khasnabis, MASCE 2 Abstract The authors present a procedure for allocating

More information

The Permanent University Fund and Available University Fund

The Permanent University Fund and Available University Fund The Permanent University Fund and Available University Fund This issue brief describes the Permanent University Fund (PUF) and the Available University Fund (AUF), particularly as used and administered

More information

HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) Greater Minnesota Solicitation for Local Projects for 2017, 2018, 2019, and 2020.

HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) Greater Minnesota Solicitation for Local Projects for 2017, 2018, 2019, and 2020. HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) Greater Minnesota Solicitation for Local Projects for 2017, 2018, 2019, and 2020 August 2015 GUIDEBOOK & APPLICATION FORM HSIP HSIP Funding Guide Page 1 HSIP Funding

More information

OPTIMIZATION MODELING FOR TRADEOFF ANALYSIS OF HIGHWAY INVESTMENT ALTERNATIVES

OPTIMIZATION MODELING FOR TRADEOFF ANALYSIS OF HIGHWAY INVESTMENT ALTERNATIVES IIT Networks and Optimization Seminar OPTIMIZATION MODEING FOR TRADEOFF ANAYSIS OF HIGHWAY INVESTMENT ATERNATIVES Dr. Zongzhi i, Assistant Professor Dept. of Civil, Architectural and Environmental Engineering

More information

Tools & Methods for Monitoring Performance Results

Tools & Methods for Monitoring Performance Results Tools & Methods for Monitoring Performance Results Craig B. Newell Bureau of Transportation Planning Manager Michigan Department of Transportation Overview of MDOT s Tools & Methods for Monitoring Performance

More information

Second Quarter 2018 Financial Review. July 30, 2018

Second Quarter 2018 Financial Review. July 30, 2018 Second Quarter 2018 Financial Review July 30, 2018 Forward-Looking Statements Certain statements in this financial review relate to future events and expectations and are forward-looking statements within

More information

(Non-legislative acts) REGULATIONS

(Non-legislative acts) REGULATIONS 9.6.2012 Official Journal of the European Union L 150/1 II (Non-legislative acts) REGULATIONS COMMISSION DELEGATED REGULATION (EU) No 486/2012 of 30 March 2012 amending Regulation (EC) No 809/2004 as regards

More information

AGREEMENT ON SOCIAL SECURITY BETWEEN THE GOVERNMENT OF CANADA AND THE GOVERNMENT OF SWEDEN

AGREEMENT ON SOCIAL SECURITY BETWEEN THE GOVERNMENT OF CANADA AND THE GOVERNMENT OF SWEDEN AGREEMENT ON SOCIAL SECURITY BETWEEN THE GOVERNMENT OF CANADA AND THE GOVERNMENT OF SWEDEN The Government of Canada and the Government of Sweden, Resolved to continue their co-operation in the field of

More information

Fourth Quarter and Full Year 2018 Financial Review. January 28, 2019

Fourth Quarter and Full Year 2018 Financial Review. January 28, 2019 Fourth Quarter and Full Year 2018 Financial Review January 28, 2019 Forward-Looking Statements Certain statements in this financial review relate to future events and expectations and are forward-looking

More information

Maricopa County DOT. Transportation Asset Management (TAM) Planning. March 1, 2018 DYE MANAGEMENT GROUP, INC.

Maricopa County DOT. Transportation Asset Management (TAM) Planning. March 1, 2018 DYE MANAGEMENT GROUP, INC. Maricopa County DOT Transportation Asset Management (TAM) Planning March 1, 2018 DYE MANAGEMENT GROUP, INC. Transportation Asset Management (TAM) A strategic and systematic process of operating, maintaining,

More information

Economic Appraisal Objectives

Economic Appraisal Objectives Network Screening HSM Vol. 1 (Part B) Chapters 7 & 8 MODULE 10. ECONOMIC APPRAISAL AND PRIORITIZATION Roadway Safety Management Process Diagnosis and Countermeasure Selection Economic Appraisal and Prioritization

More information

AVIVA GROUP GRATUITY ADVANTAGE [UIN : 122L090V01] Non Participating Linked Plan STANDARD TERMS & CONDITIONS

AVIVA GROUP GRATUITY ADVANTAGE [UIN : 122L090V01] Non Participating Linked Plan STANDARD TERMS & CONDITIONS AVIVA GROUP GRATUITY ADVANTAGE [UIN : 122L090V01] Non Participating Linked Plan STANDARD TERMS & CONDITIONS Note: In this Master Policy, the investment risk in the investment portfolio is borne by You

More information

LOCAL MAJOR BRIDGE PROGRAM

LOCAL MAJOR BRIDGE PROGRAM LOCAL MAJOR BRIDGE PROGRAM The Local Major Bridge Program provides federal funds to counties and municipal corporations for bridge replacement or bridge major rehabilitation projects. A Local Major Bridge

More information

Genesee-Finger Lakes Regional Bridge Network Needs Assessment and Investment Strategy

Genesee-Finger Lakes Regional Bridge Network Needs Assessment and Investment Strategy Genesee-Finger Lakes Regional Bridge Network Needs Assessment and Investment Strategy prepared for Genesee Transportation Council prepared by Cambridge Systematics, Inc. February 2015 GTC s Commitment

More information

PROCEDURE: APPROVAL FOR RISK ASSESSMENT (RA) STUDIES

PROCEDURE: APPROVAL FOR RISK ASSESSMENT (RA) STUDIES 1. PURPOSE: PROCEDURE: APPROVAL FOR RISK ASSESSMENT (RA) STUDIES The development of projects under the jurisdiction of Trakhees-EHS, that possess a significant risk of Environment, Health & Safety and

More information

[D7] PROBABILITY DISTRIBUTION OF OUTSTANDING LIABILITY FROM INDIVIDUAL PAYMENTS DATA Contributed by T S Wright

[D7] PROBABILITY DISTRIBUTION OF OUTSTANDING LIABILITY FROM INDIVIDUAL PAYMENTS DATA Contributed by T S Wright Faculty and Institute of Actuaries Claims Reserving Manual v.2 (09/1997) Section D7 [D7] PROBABILITY DISTRIBUTION OF OUTSTANDING LIABILITY FROM INDIVIDUAL PAYMENTS DATA Contributed by T S Wright 1. Introduction

More information

TESTIMONY. The Texas Transportation Challenge. Testimony Before the Study Commission on Transportation Financing

TESTIMONY. The Texas Transportation Challenge. Testimony Before the Study Commission on Transportation Financing TESTIMONY The Texas Transportation Challenge Testimony Before the Study Commission on Transportation Financing Ric Williamson Chairman Texas Transportation Commission April 19, 2006 Texas Department of

More information