BUDGETING A PROJECT Project Management and Leadership 2017D, PhD, PMP

Size: px
Start display at page:

Download "BUDGETING A PROJECT Project Management and Leadership 2017D, PhD, PMP"

Transcription

1 BUDGETING A PROJECT Project Management and Leadership 2017D, PhD, PMP

2 Predicting and analyzing the prospective financial performance of the project s product is often performed outside of the project. PROJECT COST MANAGEMENT is primarily concerned with the cost of the resources needed to complete project activities.

3 DECIDING TO INITIATE A PROJECT DECIDE TO: BUY MAKE at P= at P= at P= at P=0.3

4 DECISION TREE BUY 80K 0.1 MAKE K K 100K 90K 80K 40K

5 TIME VALUE OF MONEY OPPORTUNITY money invested (e.g. in a low-risk investment) will earn interest and the total amount available will be greater in the future. INFLATION the same amount of money in the future will not purchase as many goods and services as today. RISK something could go wrong, causing the future payment to be smaller or later than expected (or not happen at all). (mod. MARTLAND 2011, p.162)

6 ,00 110,00 121,00 133,10 146,41 161,05 177,16 194,87 214,36 235,79 259,37 38,55 42,41 46,65 51,32 56,45 62,09 68,30 75,13 82,64 90,91 100,00

7 DISCOUNT RATE The rate of return used in a discounted cash flow analysis to determine the present value of future cash flows

8 NET PRESENT VALUE The sum of the present values (PVs) of incoming and outgoing cash flows over a period of time. Adjusting, or discounting them to get their present value means working out how much money would have to be invested now in order to generate that specific amount at that time in the future. (BUGLEAR 2005, p.267)

9 INTERNAL RATE OF RETURN (IRR) The discount rate at which the total PV of the cash flows into a business arising from an investment precisely equals the initial outlay. IRR is the discount rate that would result in NPV of zero for the investment. In general, the higher the IRR, the more attractive the project. (BUGLEAR 2005, p )

10 HIGHLIGHTS: 1. DECISION TREES ARE USED TO CALCULATE EMV OF A PROJECT 2. MONEY HAS TIME VALUE 3. ESSENTIAL BUSINESS METRICS NPV and IRR ACCOUNT FOR IT

11 COST MANAGEMENT PROCESSES 1. PLAN COST MANAGEMENT 2. ESTIMATE COSTS 3. DETERMINE BUDGET 4. CONTROL COSTS

12 HOW TO PLAN Expert judgment Analytical techniques Meetings

13 COST MANAGEMENT PLAN A component of the PM plan; describes how the project costs will be planned, structured, and controlled It can establish: Units of measure Level of precision Level of accuracy Reporting formats

14 HOW TO ESTIMATE Expert judgment Analogous estimating Parametric estimating Bottom-up estimating Three-point estimating Vendor bid analysis Group decision-making techniques

15 OUTPUTS ACTIVITY COST ESTIMATES BASIS OF ESTIMATES (assumptions, constraints, ranges)

16 A GOOD COST ESTIMATE COMPLETE REASONABLE CREDIBLE ANALYTICALLY DEFENSIBLE (MISLICK & NUSSBAUM 2015, p.292)

17 HOW TO DETERMINE BUDGET Cost aggregation Reserve analysis Expert judgment Historical relationships Funding limit reconciliation

18 OUTPUTS COST BASELINE. The approved version of THE TIME-PHASED PROJECT BUDGET, excluding any management reserves, which can only be changed through formal change control procedures and is used as a basis for comparison to actual results; is developed as a summation of the approved budgets for the different schedule activities. PROJECT FUNDING REQUIREMENTS. Total funding requirements and periodic funding requirements (e.g., quarterly, annually) are derived from the cost baseline.

19 ACTIVITY COST ESTIMATES WORK PACKAGE COST ESTIMATES CONTROL ACCOUNTS COST BASELINE PROJECT BUDGET PROJECT BUDGET COMPONENTS CONTINGENCY RESERVE MANAGEMENT RESERVE ACTIVITY CONTINGENCY RESERVE

20 COST OVERRUNS (NICHOLAS 2012, p.283)

21 NOTABLE OVERRUNS The 2012 London Olympics: 2.4B (the bid in 2005) 9.3B (adj. in 2007) 8.9B (in 2010) (Ahiaga-Dagbui & Smith 2014) The City of Boston s Central Artery project (the Big Dig): $2.8B (by 1998) $14.6B (in 2007) (Wikipedia)

22 REASONS FOR COST ESCALATION Changes in requirements or design Economic and social factors Ego involvement of the estimator Inefficiency, poor communication, and lack of control Project contract Uncertainty and lack of accurate information (NICHOLAS 2012, p )

23 Cost estimating, budgeting, and control are sometimes thought to be the exclusive concerns of cost specialists, planners and accountants, but in projects they should be the concern of everyone. Project participants who are closest to the sources of costs engineers, scientists, systems specialists, architects, or others should be involved in the estimating and budgeting process. (NICHOLAS 2012, p )

24 HIGHLIGHTS: 4. PROJECT BUDGET CONSISTS OF ACTIVITY ESTIMATES AND 3 BUFFERS 5. COSTS ESCALATE THROUGH A PROJECT

LCS International, Inc. PMP Review. Chapter 5 Developing Project Budgets. Presented by David J. Lanners, MBA, PMP

LCS International, Inc. PMP Review. Chapter 5 Developing Project Budgets. Presented by David J. Lanners, MBA, PMP PMP Review Chapter 5 Developing Project Budgets Presented by David J. Lanners, MBA, PMP These slides are intended to be used only in settings where each viewer has an original copy of the Sybex PMP Study

More information

PROJECT COST MANAGEMENT

PROJECT COST MANAGEMENT PROJECT COST MANAGEMENT Planning DETERMINE BUDGET PROCESSES BY PROCESS GROUP Monitoring and Controlling 7.1 Plan Costs Management 7.4 Control Costs 7.2 Estimate Costs 7.3 Determine Budget DETERMINE BUDGET

More information

PROJECT COST MANAGEMENT

PROJECT COST MANAGEMENT PROJECT COST MANAGEMENT For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. 1 Contacts Name: Khaled El-Nakib, PMP, PMI-RMP

More information

PMP Exam Preparation Course. Madras Management Training W.L.L All Rights Reserved

PMP Exam Preparation Course. Madras Management Training W.L.L All Rights Reserved Project Cost Management 1 Project Cost Management Processes 1. Estimate Costs 2. Determine Budget 3. Control Costs In some projects, especially with smaller scope, cost estimation and cost budgeting are

More information

THE PMP EXAM PREP COURSE

THE PMP EXAM PREP COURSE THE PMP EXAM PREP COURSE Session 3 PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. www.falcontraining.co.nz Agenda 9:00 10:15 10:15 10:30 10:30 12:00 12:00 12:45 12:45

More information

Chapter 8 Cost Estimating and Budgeting

Chapter 8 Cost Estimating and Budgeting Chapter 8 Cost Estimating and Budgeting Project Management for Business, Engineering, and Technology Prepared by John Nicholas, Ph.D. Loyola University Chicago Cost overrun % Cost Overruns on Projects

More information

Department of Industrial Engineering

Department of Industrial Engineering Department of Industrial Engineering Engineering Project Management Presented By Dr. Abed Schokry Chapter 15: Cost Control Learning Outcomes After completing this chapter students should be able to: Define

More information

PMP. Preparation Training. Cost Management. Your key in Successful Project Management. Cost Management Processes. Chapter 7 6/7/2005

PMP. Preparation Training. Cost Management. Your key in Successful Project Management. Cost Management Processes. Chapter 7 6/7/2005 PMP Preparation Training Your key in Successful Project Management Akram Al-Najjar, PMP Cost Management Processes Chapter 7 Cost Management Slide 2 1 AGENDA What is Cost Management? Cost Management Processes

More information

Self-Assessment Questions for Module 07 Project Cost Management

Self-Assessment Questions for Module 07 Project Cost Management Self-Assessment Questions for Module 07 Project Cost Management Question 1: Which of the following regarding Analogous Estimating and Parametric Estimating is incorrect? A.) Parametric Estimating uses

More information

Five-Day Schedule and Course Content

Five-Day Schedule and Course Content Five-Day Schedule and Course Content The following sequence is suggested to balance out the material over five sessions. Note that Chapter 10 is placed with Chapters 12 and 13 on Day 5. DAY 1 DAY 1 Course

More information

Achieve PMP Exam Success Five-Day Course Syllabus

Achieve PMP Exam Success Five-Day Course Syllabus Course Delivery Format: Traditional class room 5-day format, 35 hrs. Achieve PMP Exam Success Five-Day Course Syllabus Course Description: Achieve PMP Exam Success is a 35-hour PMP exam preparation course

More information

PM tutor. Advanced Cost Theory. Presented by Dipo Tepede, PMP, SSBB, MBA. Empowering Excellence. Powered by POeT Solvers Limited

PM tutor. Advanced Cost Theory. Presented by Dipo Tepede, PMP, SSBB, MBA. Empowering Excellence. Powered by POeT Solvers Limited PM tutor Empowering Excellence Advanced Cost Theory Presented by Dipo Tepede, PMP, SSBB, MBA This presentation is copyright 2009 by POeT Solvers Limited. All rights reserved. This presentation is protected

More information

Cost Management Mock Exam. Lab for PMP Exam Prep Course Part 2 #347 Instructor: Neal L. Rowland, PMP

Cost Management Mock Exam. Lab for PMP Exam Prep Course Part 2 #347 Instructor: Neal L. Rowland, PMP Cost Management Mock Exam Lab for PMP Exam Prep Course Part 2 #347 Instructor: Neal L. Rowland, PMP 10 Practice Questions Move at Your Own Pace Question 1 You are project manager for a $2.3M project that

More information

Project Management Professional (PMP) Exam Prep Course 06 - Project Time Management

Project Management Professional (PMP) Exam Prep Course 06 - Project Time Management Project Management Professional (PMP) Exam Prep Course 06 - Project Time Management Slide 1 Looking Glass Development, LLC (303) 663-5402 / (888) 338-7447 4610 S. Ulster St. #150 Denver, CO 80237 information@lookingglassdev.com

More information

Project Management: A Systems Approach to Planning, Scheduling, and Controlling Twelfth Edition

Project Management: A Systems Approach to Planning, Scheduling, and Controlling Twelfth Edition Project Management: A Systems Approach to Planning, Scheduling, and Controlling Twelfth Edition Chapter Thirteen Pricing and Estimating Pricing and Estimating Many managers regard this as an art! Information

More information

CONTROL COSTS Aastha Trehan, Ritika Grover, Prateek Puri Dronacharya College Of Engineering, Gurgaon

CONTROL COSTS Aastha Trehan, Ritika Grover, Prateek Puri Dronacharya College Of Engineering, Gurgaon CONTROL COSTS Aastha Trehan, Ritika Grover, Prateek Puri Dronacharya College Of Engineering, Gurgaon Abstract- Project Cost Management includes the processes involved in planning, estimating, budgeting,

More information

PMP Exam Preparation Workshop Chapter 7 Project Cost Management

PMP Exam Preparation Workshop Chapter 7 Project Cost Management PMP Exam Preparation Workshop Chapter 7 Project Cost Management 1 Learning Objectives By the end of this session, you should understand: Importance of cost management for the success of a project Cost

More information

PMI PMI-SP. PMI Scheduling Professional. Download Full Version :

PMI PMI-SP. PMI Scheduling Professional. Download Full Version : PMI PMI-SP PMI Scheduling Professional Download Full Version : http://killexams.com/pass4sure/exam-detail/pmi-sp QUESTION: 311 A company hires a scheduler for one of its projects. What skills should he

More information

Project Management. Session 5 Budgets and Estimation Andre Samuel

Project Management. Session 5 Budgets and Estimation Andre Samuel Project Management Session 5 Budgets and Estimation Andre Samuel This Session Budgets and Estimation Estimation Principles Estimation Techniques Cost Estimating Estimation Principles Prediction of project

More information

Professional Development Seminar Series

Professional Development Seminar Series Professional Development Seminar Series Feb, 2019 2019. All rights reserved. online@3foldtraining.com. www.pmexamstudy.com. www.3foldtraining.com. PMP Exam Review Agenda Introduction to Definition Context

More information

Managing Project Risk DHY

Managing Project Risk DHY Managing Project Risk DHY01 0407 Copyright ESI International April 2007 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or

More information

Project Appraisal, Scoping and Estimation. Week 3

Project Appraisal, Scoping and Estimation. Week 3 Project Appraisal, Scoping and Estimation Week 3 Last Week What is Project Management? Project Definition i i Stakeholder Management Organizing the Project This Week Defining the Project Project Appraisal

More information

PMI - Dallas Chapter. PMP Exam Sample Questions

PMI - Dallas Chapter. PMP Exam Sample Questions PMI - Dallas Chapter PMP Exam Sample Questions June 4, 1999 Disclaimer: These questions are intended for study purposes only. Success on these questions is not necessarily predictive of success on the

More information

Lesson 7 The Project Budget

Lesson 7 The Project Budget MBA, Msc, Bsc, PMP, CSM, PMI-ACP Indike Manthilake MBA, Msc, Bsc, CSM, PMI-ACP indikem@unitedmotors.lk.com Lesson 7 The Project Budget Agenda Estimate Costs and income Creating a Preliminary Budget Budget

More information

Chapter 11 Project Execution and Control

Chapter 11 Project Execution and Control Chapter 11 Project Execution and Control Project Management for Business, Engineering, and Technology Prepared by John Nicholas, Ph.D. Loyola University Chicago Phase C: Project Execution Most projects

More information

Project planning and creating a WBS

Project planning and creating a WBS 37E01500 Project Management and Consulting Practice Project planning and creating a WBS Matti Rossi Lecture 3, Tue 28.2.2017 Learning objectives Describe the project time management planning tasks, and

More information

Project Management Certification. Multiple Choice Questions

Project Management Certification. Multiple Choice Questions Project Management Certification (PMP) Project Management Certification (PMP) Multiple Choice Questions QUESTION 1 In Project Cost Management, which input is exclusive to the Determine Budget process?

More information

Project Integration Management

Project Integration Management Project Integration Management The Key to Overall Project Success: Good Project Integration Management Project managers must coordinate all of the other knowledge areas throughout a project s life cycle.

More information

Financial Management & Accounting in Construction (CUE304) FINANCIAL MANAGEMENT. Dr. Ahmed Elyamany

Financial Management & Accounting in Construction (CUE304) FINANCIAL MANAGEMENT. Dr. Ahmed Elyamany 1 Financial Management & Accounting in Construction (CUE304) FINANCIAL MANAGEMENT Dr. Ahmed Elyamany 2 Course Content Project financial management: Cash flow prediction, Cash flow analysis, Cost of finance

More information

Vendor: PMI. Exam Code: CA Exam Name: Certified Associate in Project Management. Version: Demo

Vendor: PMI. Exam Code: CA Exam Name: Certified Associate in Project Management. Version: Demo Vendor: PMI Exam Code: CA0-001 Exam Name: Certified Associate in Project Management Version: Demo QUESTION: 1 On what is project baseline development established? A. Approved product requirements B. Estimated

More information

Software Economics. Introduction to Business Case Analysis. Session 2

Software Economics. Introduction to Business Case Analysis. Session 2 Software Economics Introduction to Business Case Analysis Session 2 Today Last Session we covered FV, PV and NPV We started with setting up the financials of a Business Case We talked about measurements

More information

PMI - Dallas Chapter. Sample Questions. March 22, 2002

PMI - Dallas Chapter. Sample Questions. March 22, 2002 PMI - Dallas Chapter PMP Exam Sample Questions March 22, 2002 Disclaimer: These questions are intended for study purposes only. Success on these questions is not necessarily predictive of success on the

More information

LCS International, Inc. PMP Review. Chapter 6 Risk Planning. Presented by David J. Lanners, MBA, PMP

LCS International, Inc. PMP Review. Chapter 6 Risk Planning. Presented by David J. Lanners, MBA, PMP PMP Review Chapter 6 Risk Planning Presented by David J. Lanners, MBA, PMP These slides are intended to be used only in settings where each viewer has an original copy of the Sybex PMP Study Guide book.

More information

Chapter 5: Estimating Project Times and Costs 4KF3

Chapter 5: Estimating Project Times and Costs 4KF3 Lecture Notes Importance of Estimates Support good decisions Schedule work o Make sure your team members can take on added work of project Determine length of project and costs o Projects can be cancelled

More information

Introduction to Project Management. Modeling after NYS ITS

Introduction to Project Management. Modeling after NYS ITS Introduction to Project Management Modeling after NYS ITS What is Project Management? Project management is the application of knowledge, skills, tools and techniques to project activities to meet project

More information

PMP Exam Prep Coaching Program

PMP Exam Prep Coaching Program PMP Exam Prep Coaching Program Project Part 1 Presented by Vinai Prakash, PMP 1 Project Plan Estimate s Determine Budget 2 Vinai Prakash, PMCHAMP.COM 1 Process of monitoring the status of the project to

More information

Every project is risky, meaning there is a chance things won t turn out exactly as planned.

Every project is risky, meaning there is a chance things won t turn out exactly as planned. PMBOK 5 Ed. DEI- Every project is risky, meaning there is a chance things won t turn out exactly as planned. percent of runaway projects Did no risk management at all 38 percent did some, and 7 percent

More information

Integrating Contract Risk with Schedule and Cost Estimates

Integrating Contract Risk with Schedule and Cost Estimates Integrating Contract Risk with Schedule and Cost Estimates Breakout Session # B01 Donald E. Shannon, Owner, The Contract Coach December 14, 2015 2:15pm 3:30pm 1 1 The Importance of Estimates Estimates

More information

3/15/2018 CHAPTER 5. PROJECT MANAGEMENT. Prepared by: Dr. Maria Elisa Linda T. Cruz

3/15/2018 CHAPTER 5. PROJECT MANAGEMENT. Prepared by: Dr. Maria Elisa Linda T. Cruz CHAPTER 5. BUDGETING CHAPTER AND 1 INTRODUCTION COST ESTIMATION TO PROJECT MANAGEMENT Prepared by: Dr. Maria Elisa Linda T. Cruz Prepared by: Dr. Maria Elisa Linda T. Cruz 1 Chapter 5. Topics 5.1 Estimating

More information

CPET 581 Smart Grid and Energy Management Nov. 20, 2013 Lecture

CPET 581 Smart Grid and Energy Management Nov. 20, 2013 Lecture CPET 581 Smart Grid and Energy Management Nov. 20, 2013 Lecture References [ 1] Mechanical and Electrical Systems in Building, 5 th Edition, by Richard R. Janis and William K.Y. Tao, Publisher Pearson

More information

For the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc.

For the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. 1 Contacts Name: Khaled El-Nakib, MSc, PMP, PMI-RMP URL: http://www.khaledelnakib.com

More information

Major Projects Advisory Project Leadership Series

Major Projects Advisory Project Leadership Series KPMG GLOBAL ENERGY INSTITUTE Major Projects Advisory Project Leadership Series February 7, 2013 Disclaimer The information contained herein is of a general nature and is not intended to address the circumstances

More information

BAE Systems Risk Opportunity & Uncertainty Modelling ACostE North West Region 4th September 2013

BAE Systems Risk Opportunity & Uncertainty Modelling ACostE North West Region 4th September 2013 BAE Systems Risk Opportunity & Uncertainty Modelling ACostE North West Region 4th September 2013 BAE SYSTEMS PLC 2011 All Rights Reserved The copyright in this document, which contains information of a

More information

1. What are the five major processes associated with every project? These are the same as the five Process Groups according to the PMBOK.

1. What are the five major processes associated with every project? These are the same as the five Process Groups according to the PMBOK. CTC/ITC 310 Program Management California State University Dominguez Hills Instructor: Howard Rosenthal Final Exam May 15, 2018 All questions are 4 points unless indicated otherwise Answer Key 1. What

More information

Water Resource Economics C H A P T E R E E V A L U A T I O N O F W A T E R D E V E L O P M E N T P R O J E C T S

Water Resource Economics C H A P T E R E E V A L U A T I O N O F W A T E R D E V E L O P M E N T P R O J E C T S Water Resource Economics C H A P T E R E E V A L U A T I O N O F W A T E R D E V E L O P M E N T P R O J E C T S Text Reader, based on Griffin (2006), 6.1-6.10 Organization 1. The nature of water development

More information

Project Management. A Practitioner s Guide. Steven M. Bragg

Project Management. A Practitioner s Guide. Steven M. Bragg Project Management A Practitioner s Guide Steven M. Bragg Chapter 1 Overview of Project Management... 1 Learning Objectives... 1 Introduction... 1 Project Management Activities... 1 The Need for Project

More information

SCHOOL OF ACCOUNTING AND BUSINESS BSc. (APPLIED ACCOUNTING) GENERAL / SPECIAL DEGREE PROGRAMME END SEMESTER EXAMINATION JULY 2016

SCHOOL OF ACCOUNTING AND BUSINESS BSc. (APPLIED ACCOUNTING) GENERAL / SPECIAL DEGREE PROGRAMME END SEMESTER EXAMINATION JULY 2016 All Rights Reserved No. of Pages - 10 No of Questions - 06 SCHOOL OF ACCOUNTING AND BUSINESS BSc. (APPLIED ACCOUNTING) GENERAL / SPECIAL DEGREE PROGRAMME END SEMESTER EXAMINATION JULY 2016 MGT 30725 Project

More information

Management Reserve Defined

Management Reserve Defined Management Reserve Defined Management Reserve (MR) is defined in EIA 748 Earned Value Management Systems, the commercial standard for EVMS, as An amount of the total budget withheld for management control

More information

Project Management. Estimating Project Times and Costs. Clifford F. Gray Eric W. Larson Third Edition. Chapter 5

Project Management. Estimating Project Times and Costs. Clifford F. Gray Eric W. Larson Third Edition. Chapter 5 Project Management THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Third Edition Chapter 5 Estimating Project Times and Costs Copyright 2006 The McGraw-Hill Companies. All rights reserved. PowerPoint

More information

PROJECT MANAGEMENT BODY OF KNOWLEDGE

PROJECT MANAGEMENT BODY OF KNOWLEDGE A Guide to the PROJECT MANAGEMENT BODY OF KNOWLEDGE (PMBOK GUIDE ) Sixth edition Chapter 7 Project Cost Management PMBOK is a registered mark of the Project Management Institute, Inc Slide # 1 3FOLD Education

More information

Earned Value Management. Danielle Kellogg. Hodges University

Earned Value Management. Danielle Kellogg. Hodges University Earned Value Management 1 EARNED VALUE MANAGEMENT Earned Value Management Danielle Kellogg Hodges University Earned Value Management 2 Abstract Earned Value Management has been used with enterprise-level

More information

Project Management Certificate Program

Project Management Certificate Program Project Management Certificate Program Risk Management Terry Skaggs ( Denver class) skaggst@centurytel.net 719-783-0880 Lee Varra-Nelson (Fort Collins class) lvarranelson@q.com 970-407-9744 or 970-215-4949

More information

TH E pursuit of efficiency has become a central objective of policy

TH E pursuit of efficiency has become a central objective of policy 1 Efficiency in health care 1.1 Introduction TH E pursuit of efficiency has become a central objective of policy makers within most health systems. The reasons are manifest. In developed countries, expenditure

More information

Project Integration Management

Project Integration Management Project Integration Management Describe an overall framework for project integration management as it relates to the other PM knowledge areas and the project life cycle. Explain the strategic planning

More information

EVALUATE THE FEASIBILITY OF A PROJECT

EVALUATE THE FEASIBILITY OF A PROJECT EVALUATE THE FEASIBILITY OF A PROJECT Timeframe: Learning Outcome: Recommended reading: Multimedia: Section overview 12 hours Develop a feasible project strategy Plan a complex project Chapter : Tools

More information

Seminar on Financial Management for Engineers. Institute of Engineers Pakistan (IEP)

Seminar on Financial Management for Engineers. Institute of Engineers Pakistan (IEP) Seminar on Financial Management for Engineers Institute of Engineers Pakistan (IEP) Capital Budgeting: Techniques Presented by: H. Jamal Zubairi Data used in examples Project L Project L Project L Project

More information

2/9/2010. Investment Appraisal. Investment Appraisal. Investment Appraisal. Investment Appraisal. Investment Appraisal. Investment Appraisal

2/9/2010. Investment Appraisal. Investment Appraisal. Investment Appraisal. Investment Appraisal. Investment Appraisal. Investment Appraisal A means of assessing whether an investment project is worthwhile or not Investment project could be the purchase of a new PC for a small firm, a new piece of equipment in a manufacturing plant, a whole

More information

Investment Decision Criteria. Principles Applied in This Chapter. Learning Objectives

Investment Decision Criteria. Principles Applied in This Chapter. Learning Objectives Investment Decision Criteria Chapter 11 1 Principles Applied in This Chapter Principle 1: Money Has a Time Value. Principle 2: There is a Risk-Return Tradeoff. Principle 3: Cash Flows Are the Source of

More information

Decommissioning Basis of Estimate Template

Decommissioning Basis of Estimate Template Decommissioning Basis of Estimate Template Cost certainty and cost reduction June 2017, Rev 1.0 2 Contents Introduction... 4 Cost Basis of Estimate... 5 What is a Basis of Estimate?... 5 When to prepare

More information

Some Notes on Value Creation and Market Efficiency

Some Notes on Value Creation and Market Efficiency Some Notes on Value Creation and Market Efficiency Wealth Creation by a Corporation Goal is to maximize shareholders wealth In a single period, wealth can be created if cash inflows exceed cash outflows

More information

Project Risk Management

Project Risk Management Project Risk Management Introduction Unit 1 Unit 2 Unit 3 PMP Exam Preparation Project Integration Management Project Scope Management Project Time Management Unit 4 Unit 5 Unit 6 Unit 7 Project Cost Management

More information

Pass PMP in 21 Days - ITTO Toolbox PROCESS MAP

Pass PMP in 21 Days - ITTO Toolbox PROCESS MAP PROCESS MAP 1 IntEgratIon Pass PMP in 21 Days - ITTO Toolbox InItIatIng PlannIng ExEcutIng MonItorIng & controlling closing Develop Project Charter Develop Project Management Plan Direct & Manage Project

More information

MODULE 5 PROJECT RISK MANAGEMENT, PROCUREMENT AND CONTRACTS

MODULE 5 PROJECT RISK MANAGEMENT, PROCUREMENT AND CONTRACTS Advanced Project Management MODULE 5 PROJECT RISK MANAGEMENT, PROCUREMENT AND CONTRACTS 06 07 November 2018 Facilitator: Mr Mondli Mbambo Module Purpose Project Risk & Procurement Managment Knowledge Risk

More information

Earned Value Management - EVM

Earned Value Management - EVM Earned Value Management (EVM) technique used to track the Progress and Status of a Project & Forecast the likely future performance of the Project. Earned Value Management (EVM) technique integrates the

More information

TA GROUP LIMITED Adding Value Through Technology

TA GROUP LIMITED Adding Value Through Technology TA GROUP LIMITED Adding Value Through Technology 'Newnhams', West Street, Farnham, Surrey, GU9 7EQ Tel: (01252) 711414; Fax: (01252) 735155 Presentation to 14th International Symposium on Military Operational

More information

SCAF Workshop Integrated Cost and Schedule Risk Analysis. Tuesday 15th November 2016 The BAWA Centre, Filton, Bristol

SCAF Workshop Integrated Cost and Schedule Risk Analysis. Tuesday 15th November 2016 The BAWA Centre, Filton, Bristol The following presentation was given at: SCAF Workshop Integrated Cost and Schedule Risk Analysis Tuesday 15th November 2016 The BAWA Centre, Filton, Bristol Released for distribution by the Author www.scaf.org.uk/library

More information

Mohammed Rafiuddin CEO and General Manager, BIOSI Biohazards Solutions Innovators

Mohammed Rafiuddin CEO and General Manager, BIOSI Biohazards Solutions Innovators Mohammed Rafiuddin CEO and General Manager, BIOSI Biohazards Solutions Innovators Profile of Mohammed Rafiuddin Mohammed is an active member of AACE International since 2006 with 30 years of experience

More information

Estimating Project Times and Costs

Estimating Project Times and Costs CHAPTER FIVE Estimating Project Times and Costs Copyright 2014 McGraw-Hill Education. All Rights Reserved. PowerPoint Presentation by Charlie Cook Where We Are Now 5 2 Estimating Estimating Projects The

More information

Financial Controls in Project Management Activities

Financial Controls in Project Management Activities Financial Controls in Management Activities Objective Complete hands-on exercises to apply cost control techniques Budgeting Budgeting Process Overview Budgeting Budgeting - aggregating the estimated costs

More information

Software Economics. Introduction to Business Case Analysis. Session 2

Software Economics. Introduction to Business Case Analysis. Session 2 Software Economics Introduction to Business Case Analysis Session 2 Today Last Session we covered FV, PV and NPV We started with setting up the financials of a Business Case We talked about measurements

More information

PMP102 Fundamentals of Project Management

PMP102 Fundamentals of Project Management PMP102 Fundamentals of Project Management H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: This course is designed for managers and staff,

More information

COPYRIGHTED MATERIAL. Index

COPYRIGHTED MATERIAL. Index Index Note to the reader: Throughout this index boldfaced page numbers indicate primary discussions of a topic. Italicized page numbers indicate illustrations. A A+ certification, 28 acceptance criteria

More information

Introduction by Philip Croessmann, V.P., Director of Risk Management Sources of Construction Claims Common Types of Construction Claims Risk

Introduction by Philip Croessmann, V.P., Director of Risk Management Sources of Construction Claims Common Types of Construction Claims Risk Introduction by Philip Croessmann, V.P., Director of Risk Management Sources of Construction Claims Common Types of Construction Claims Risk Management Preconstruction & Construction Managing Construction

More information

INSE 6230 Total Quality Project Management

INSE 6230 Total Quality Project Management Lecture 5 Project Cost Management Project cost management introduction Estimating costs Budget Earned Value Management (EVM) EVM projections 2 IT projects have a poor track record for meeting budget goals

More information

International Project Management. prof.dr MILOŠ D. MILOVANČEVIĆ

International Project Management. prof.dr MILOŠ D. MILOVANČEVIĆ International Project Management prof.dr MILOŠ D. MILOVANČEVIĆ Project time management Project cost management Time in project management process Time is a valuable resource. It is also the scarcest. Time

More information

Insurance and Financial Services

Insurance and Financial Services Insurance and Financial Services 2016 1 Risk Transfer gives you the tools to grow and the resources to mitigate your costs. 2016 2 Your Team of Industry Experts Risk Transfer Insurance Agency is a full

More information

Project and Communication Management

Project and Communication Management Project and Communication Management Chapter 5 Learning objectives: Estimating Projects Estimating The process of forecasting or approximating the time and cost of completing project deliverables. The

More information

next level PMP Exam Preparation Formula Guide for the PMP Exam

next level PMP Exam Preparation Formula Guide for the PMP Exam next Formula Guide for the PMP Exam January 2017 n e x t l e v e l Page 1 What s Included: 1. Earned Value Formulas 2. Formulas 3. Float Formulas 4. Project Selection Formulas 5. Additional Formulas to

More information

CUMULATIVE IMPACT ASSESSMENT OF THE BASEL REFORM PACKAGE DATA AS OF DECEMBER 2015

CUMULATIVE IMPACT ASSESSMENT OF THE BASEL REFORM PACKAGE DATA AS OF DECEMBER 2015 CUMULATIVE IMPACT ASSESSMENT OF THE BASEL REFORM PACKAGE DATA AS OF DECEMBER 2015 Contents Introduction 3 Overview of the results 4 Annex: Methodological considerations 7 2 Introduction In 2014, the Basel

More information

Basic Financial Modelling in Excel

Basic Financial Modelling in Excel Basic Financial Modelling in Excel A Two Day Programme This course is presented in London on: 14-15 May 2018 This course can also be presented in-house for your company or via live on-line webinar The

More information

KPMG Major Projects Advisory Project Leadership Series: Budgeting, Estimating, and Contingency Management for Construction Projects

KPMG Major Projects Advisory Project Leadership Series: Budgeting, Estimating, and Contingency Management for Construction Projects KPMG Global Energy Institute KPMG International KPMG Major Projects Advisory Project Leadership Series: Budgeting, Estimating, and Contingency Management for Construction Projects Construction projects

More information

Investment Decision Criteria. Principles Applied in This Chapter. Disney s Capital Budgeting Decision

Investment Decision Criteria. Principles Applied in This Chapter. Disney s Capital Budgeting Decision Investment Decision Criteria Chapter 11 1 Principles Applied in This Chapter Principle 1: Money Has a Time Value. Principle 2: There is a Risk-Return Tradeoff. Principle 3: Cash Flows Are the Source of

More information

Brief course information Strategic planning and project selection Project integration management Project scope management

Brief course information Strategic planning and project selection Project integration management Project scope management Brief course information Strategic planning and project selection Project integration management Project scope management Total Quality Project Management 2 This is an individual work. Each student prepares

More information

Introduction to Discounted Cash Flow

Introduction to Discounted Cash Flow Introduction to Discounted Cash Flow Professor Sid Balachandran Finance and Accounting for Non-Financial Executives Columbia Business School Agenda Introducing Discounted Cashflow Applying DCF to Evaluate

More information

Intro Public-Private Partnership (P3) Finance Course

Intro Public-Private Partnership (P3) Finance Course Intro Public-Private Partnership (P3) Finance Course Identifying P3 Projects and Knowing the Atmosphere Kylee Anastasi Director, Capital Projects and Infrastructure Advisory PricewaterhouseCoopers LLP

More information

Principles of Financial Feasibility ARCH 738: REAL ESTATE PROJECT MANAGEMENT. Morgan State University

Principles of Financial Feasibility ARCH 738: REAL ESTATE PROJECT MANAGEMENT. Morgan State University Principles of Financial Feasibility ARCH 738: REAL ESTATE PROJECT MANAGEMENT Morgan State University Jason E. Charalambides, PhD, MASCE, AIA, ENV_SP (This material has been prepared for educational purposes)

More information

Cost Estimating in PMBoK vs. CEBoK

Cost Estimating in PMBoK vs. CEBoK 2015 ICEAA Washington Area Chapter Luncheon Series Cost Estimating in PMBoK vs. CEBoK Remember That. Then, Forget It! Kevin Cincotta, CCEA, PMP 1 Course Description The Project Management Body of Knowledge

More information

$82, $71, $768, $668,609.67

$82, $71, $768, $668,609.67 Question # 1 of 15 ( Start time: 07:14:23 PM ) Total Marks: 1 If you deposit $12,000 per year for 16 years (each deposit is made at the beginning of each year) in an account that pays an annual interest

More information

Project Management for the Professional Professional Part 3 - Risk Analysis. Michael Bevis, JD CPPO, CPSM, PMP

Project Management for the Professional Professional Part 3 - Risk Analysis. Michael Bevis, JD CPPO, CPSM, PMP Project Management for the Professional Professional Part 3 - Risk Analysis Michael Bevis, JD CPPO, CPSM, PMP What is a Risk? A risk is an uncertain event or condition that, if it occurs, has a positive

More information

The 120VC Portfolio Management Model

The 120VC Portfolio Management Model The 120VC Portfolio Management Model There are several layers that contribute to achieving the Vision of Project Portfolio Management. The workflow in the figure below starts at the bottom left and flows

More information

ADVANCED QUANTITATIVE SCHEDULE RISK ANALYSIS

ADVANCED QUANTITATIVE SCHEDULE RISK ANALYSIS ADVANCED QUANTITATIVE SCHEDULE RISK ANALYSIS DAVID T. HULETT, PH.D. 1 HULETT & ASSOCIATES, LLC 1. INTRODUCTION Quantitative schedule risk analysis is becoming acknowledged by many project-oriented organizations

More information

PREVENTING PROGRAM MANAGEMENT PITFALLS USING PORTFOLIO ESTIMATING

PREVENTING PROGRAM MANAGEMENT PITFALLS USING PORTFOLIO ESTIMATING PREVENTING PROGRAM MANAGEMENT PITFALLS USING PORTFOLIO ESTIMATING Nicholas Morales, MCR LLC. Christopher Dewberry, Dept. of Navy ICEAA 2016 Professional Development & Training Workshop Atlanta, GA 7-10

More information

Financial Analysis and Cash Flow

Financial Analysis and Cash Flow Financial Analysis and Cash Flow Version 2.0 Integrated Financial Analysis SOAPP CT.25 uses the capital cost and operating cost estimates to develop a Capital Outlay Schedule and a Pro Forma Income and

More information

Describe the importance of capital investments and the capital budgeting process

Describe the importance of capital investments and the capital budgeting process Chapter 20 Making capital investment decisions Affects operations for many years Requires large sums of money Describe the importance of capital investments and the capital budgeting process 3 4 5 6 Operating

More information

Evaluating and Comparing Fiscal Regimes for EI

Evaluating and Comparing Fiscal Regimes for EI Evaluating and Comparing Fiscal Regimes for EI NATURAL RESOURCE TAXATION IN THE ASIA-PACIFIC REGION A forum on the design, implementation and evaluation of fiscal regimes for extractive industries Jakarta,

More information

Basic Financial Modelling in Excel

Basic Financial Modelling in Excel Basic Financial Modelling in Excel A Two Day Programme This course is presented in London on: DATES TBD This course can also be presented in-house for your company or via live on-line webinar The Banking

More information

Project Management Professional (PMP) Exam Prep Course 11 - Project Risk Management

Project Management Professional (PMP) Exam Prep Course 11 - Project Risk Management Project Management Professional (PMP) Exam Prep Course 11 - Project Slide 1 Project Looking Glass Development, LLC (303) 663-5402 / (888) 338-7447 4610 S. Ulster St. #150 Denver, CO 80237 information@lookingglassdev.com

More information

Loan Pricing Deals & Relationships Session 1. Agenda

Loan Pricing Deals & Relationships Session 1. Agenda Loan Pricing Deals & Relationships Session 1 Thomas Farin President Farin & Associates, Inc tfarin@farin.com 1 Agenda Session 1 Inputs What We Need to Know Role of Benchmarks Four Models to Look at Profitability

More information

Stephen T Shickel CPA PLC

Stephen T Shickel CPA PLC Performance Review For the period ended 12/31/2006 Provided By Stephen T Shickel CPA PLC Page 1 / 7 Financial Score ABC Company Narrative Report Industry: Revenue: $1M - $10M Periods: 236220 - Commercial

More information

Project Management CSC 310 Spring 2017 Howard Rosenthal

Project Management CSC 310 Spring 2017 Howard Rosenthal Project CSC 310 Spring 2017 Howard Rosenthal 1 No?ce This course is based on and includes material from the text: Effective Project - Traditional, Agile, Extreme 7TH Edition Authors: Robert K. Wysocki

More information