BUDGETING A PROJECT Project Management and Leadership 2017D, PhD, PMP
|
|
- Reynold Hall
- 6 years ago
- Views:
Transcription
1 BUDGETING A PROJECT Project Management and Leadership 2017D, PhD, PMP
2 Predicting and analyzing the prospective financial performance of the project s product is often performed outside of the project. PROJECT COST MANAGEMENT is primarily concerned with the cost of the resources needed to complete project activities.
3 DECIDING TO INITIATE A PROJECT DECIDE TO: BUY MAKE at P= at P= at P= at P=0.3
4 DECISION TREE BUY 80K 0.1 MAKE K K 100K 90K 80K 40K
5 TIME VALUE OF MONEY OPPORTUNITY money invested (e.g. in a low-risk investment) will earn interest and the total amount available will be greater in the future. INFLATION the same amount of money in the future will not purchase as many goods and services as today. RISK something could go wrong, causing the future payment to be smaller or later than expected (or not happen at all). (mod. MARTLAND 2011, p.162)
6 ,00 110,00 121,00 133,10 146,41 161,05 177,16 194,87 214,36 235,79 259,37 38,55 42,41 46,65 51,32 56,45 62,09 68,30 75,13 82,64 90,91 100,00
7 DISCOUNT RATE The rate of return used in a discounted cash flow analysis to determine the present value of future cash flows
8 NET PRESENT VALUE The sum of the present values (PVs) of incoming and outgoing cash flows over a period of time. Adjusting, or discounting them to get their present value means working out how much money would have to be invested now in order to generate that specific amount at that time in the future. (BUGLEAR 2005, p.267)
9 INTERNAL RATE OF RETURN (IRR) The discount rate at which the total PV of the cash flows into a business arising from an investment precisely equals the initial outlay. IRR is the discount rate that would result in NPV of zero for the investment. In general, the higher the IRR, the more attractive the project. (BUGLEAR 2005, p )
10 HIGHLIGHTS: 1. DECISION TREES ARE USED TO CALCULATE EMV OF A PROJECT 2. MONEY HAS TIME VALUE 3. ESSENTIAL BUSINESS METRICS NPV and IRR ACCOUNT FOR IT
11 COST MANAGEMENT PROCESSES 1. PLAN COST MANAGEMENT 2. ESTIMATE COSTS 3. DETERMINE BUDGET 4. CONTROL COSTS
12 HOW TO PLAN Expert judgment Analytical techniques Meetings
13 COST MANAGEMENT PLAN A component of the PM plan; describes how the project costs will be planned, structured, and controlled It can establish: Units of measure Level of precision Level of accuracy Reporting formats
14 HOW TO ESTIMATE Expert judgment Analogous estimating Parametric estimating Bottom-up estimating Three-point estimating Vendor bid analysis Group decision-making techniques
15 OUTPUTS ACTIVITY COST ESTIMATES BASIS OF ESTIMATES (assumptions, constraints, ranges)
16 A GOOD COST ESTIMATE COMPLETE REASONABLE CREDIBLE ANALYTICALLY DEFENSIBLE (MISLICK & NUSSBAUM 2015, p.292)
17 HOW TO DETERMINE BUDGET Cost aggregation Reserve analysis Expert judgment Historical relationships Funding limit reconciliation
18 OUTPUTS COST BASELINE. The approved version of THE TIME-PHASED PROJECT BUDGET, excluding any management reserves, which can only be changed through formal change control procedures and is used as a basis for comparison to actual results; is developed as a summation of the approved budgets for the different schedule activities. PROJECT FUNDING REQUIREMENTS. Total funding requirements and periodic funding requirements (e.g., quarterly, annually) are derived from the cost baseline.
19 ACTIVITY COST ESTIMATES WORK PACKAGE COST ESTIMATES CONTROL ACCOUNTS COST BASELINE PROJECT BUDGET PROJECT BUDGET COMPONENTS CONTINGENCY RESERVE MANAGEMENT RESERVE ACTIVITY CONTINGENCY RESERVE
20 COST OVERRUNS (NICHOLAS 2012, p.283)
21 NOTABLE OVERRUNS The 2012 London Olympics: 2.4B (the bid in 2005) 9.3B (adj. in 2007) 8.9B (in 2010) (Ahiaga-Dagbui & Smith 2014) The City of Boston s Central Artery project (the Big Dig): $2.8B (by 1998) $14.6B (in 2007) (Wikipedia)
22 REASONS FOR COST ESCALATION Changes in requirements or design Economic and social factors Ego involvement of the estimator Inefficiency, poor communication, and lack of control Project contract Uncertainty and lack of accurate information (NICHOLAS 2012, p )
23 Cost estimating, budgeting, and control are sometimes thought to be the exclusive concerns of cost specialists, planners and accountants, but in projects they should be the concern of everyone. Project participants who are closest to the sources of costs engineers, scientists, systems specialists, architects, or others should be involved in the estimating and budgeting process. (NICHOLAS 2012, p )
24 HIGHLIGHTS: 4. PROJECT BUDGET CONSISTS OF ACTIVITY ESTIMATES AND 3 BUFFERS 5. COSTS ESCALATE THROUGH A PROJECT
LCS International, Inc. PMP Review. Chapter 5 Developing Project Budgets. Presented by David J. Lanners, MBA, PMP
PMP Review Chapter 5 Developing Project Budgets Presented by David J. Lanners, MBA, PMP These slides are intended to be used only in settings where each viewer has an original copy of the Sybex PMP Study
More informationPROJECT COST MANAGEMENT
PROJECT COST MANAGEMENT Planning DETERMINE BUDGET PROCESSES BY PROCESS GROUP Monitoring and Controlling 7.1 Plan Costs Management 7.4 Control Costs 7.2 Estimate Costs 7.3 Determine Budget DETERMINE BUDGET
More informationPROJECT COST MANAGEMENT
PROJECT COST MANAGEMENT For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. 1 Contacts Name: Khaled El-Nakib, PMP, PMI-RMP
More informationPMP Exam Preparation Course. Madras Management Training W.L.L All Rights Reserved
Project Cost Management 1 Project Cost Management Processes 1. Estimate Costs 2. Determine Budget 3. Control Costs In some projects, especially with smaller scope, cost estimation and cost budgeting are
More informationTHE PMP EXAM PREP COURSE
THE PMP EXAM PREP COURSE Session 3 PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. www.falcontraining.co.nz Agenda 9:00 10:15 10:15 10:30 10:30 12:00 12:00 12:45 12:45
More informationChapter 8 Cost Estimating and Budgeting
Chapter 8 Cost Estimating and Budgeting Project Management for Business, Engineering, and Technology Prepared by John Nicholas, Ph.D. Loyola University Chicago Cost overrun % Cost Overruns on Projects
More informationDepartment of Industrial Engineering
Department of Industrial Engineering Engineering Project Management Presented By Dr. Abed Schokry Chapter 15: Cost Control Learning Outcomes After completing this chapter students should be able to: Define
More informationPMP. Preparation Training. Cost Management. Your key in Successful Project Management. Cost Management Processes. Chapter 7 6/7/2005
PMP Preparation Training Your key in Successful Project Management Akram Al-Najjar, PMP Cost Management Processes Chapter 7 Cost Management Slide 2 1 AGENDA What is Cost Management? Cost Management Processes
More informationSelf-Assessment Questions for Module 07 Project Cost Management
Self-Assessment Questions for Module 07 Project Cost Management Question 1: Which of the following regarding Analogous Estimating and Parametric Estimating is incorrect? A.) Parametric Estimating uses
More informationFive-Day Schedule and Course Content
Five-Day Schedule and Course Content The following sequence is suggested to balance out the material over five sessions. Note that Chapter 10 is placed with Chapters 12 and 13 on Day 5. DAY 1 DAY 1 Course
More informationAchieve PMP Exam Success Five-Day Course Syllabus
Course Delivery Format: Traditional class room 5-day format, 35 hrs. Achieve PMP Exam Success Five-Day Course Syllabus Course Description: Achieve PMP Exam Success is a 35-hour PMP exam preparation course
More informationPM tutor. Advanced Cost Theory. Presented by Dipo Tepede, PMP, SSBB, MBA. Empowering Excellence. Powered by POeT Solvers Limited
PM tutor Empowering Excellence Advanced Cost Theory Presented by Dipo Tepede, PMP, SSBB, MBA This presentation is copyright 2009 by POeT Solvers Limited. All rights reserved. This presentation is protected
More informationCost Management Mock Exam. Lab for PMP Exam Prep Course Part 2 #347 Instructor: Neal L. Rowland, PMP
Cost Management Mock Exam Lab for PMP Exam Prep Course Part 2 #347 Instructor: Neal L. Rowland, PMP 10 Practice Questions Move at Your Own Pace Question 1 You are project manager for a $2.3M project that
More informationProject Management Professional (PMP) Exam Prep Course 06 - Project Time Management
Project Management Professional (PMP) Exam Prep Course 06 - Project Time Management Slide 1 Looking Glass Development, LLC (303) 663-5402 / (888) 338-7447 4610 S. Ulster St. #150 Denver, CO 80237 information@lookingglassdev.com
More informationProject Management: A Systems Approach to Planning, Scheduling, and Controlling Twelfth Edition
Project Management: A Systems Approach to Planning, Scheduling, and Controlling Twelfth Edition Chapter Thirteen Pricing and Estimating Pricing and Estimating Many managers regard this as an art! Information
More informationCONTROL COSTS Aastha Trehan, Ritika Grover, Prateek Puri Dronacharya College Of Engineering, Gurgaon
CONTROL COSTS Aastha Trehan, Ritika Grover, Prateek Puri Dronacharya College Of Engineering, Gurgaon Abstract- Project Cost Management includes the processes involved in planning, estimating, budgeting,
More informationPMP Exam Preparation Workshop Chapter 7 Project Cost Management
PMP Exam Preparation Workshop Chapter 7 Project Cost Management 1 Learning Objectives By the end of this session, you should understand: Importance of cost management for the success of a project Cost
More informationPMI PMI-SP. PMI Scheduling Professional. Download Full Version :
PMI PMI-SP PMI Scheduling Professional Download Full Version : http://killexams.com/pass4sure/exam-detail/pmi-sp QUESTION: 311 A company hires a scheduler for one of its projects. What skills should he
More informationProject Management. Session 5 Budgets and Estimation Andre Samuel
Project Management Session 5 Budgets and Estimation Andre Samuel This Session Budgets and Estimation Estimation Principles Estimation Techniques Cost Estimating Estimation Principles Prediction of project
More informationProfessional Development Seminar Series
Professional Development Seminar Series Feb, 2019 2019. All rights reserved. online@3foldtraining.com. www.pmexamstudy.com. www.3foldtraining.com. PMP Exam Review Agenda Introduction to Definition Context
More informationManaging Project Risk DHY
Managing Project Risk DHY01 0407 Copyright ESI International April 2007 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or
More informationProject Appraisal, Scoping and Estimation. Week 3
Project Appraisal, Scoping and Estimation Week 3 Last Week What is Project Management? Project Definition i i Stakeholder Management Organizing the Project This Week Defining the Project Project Appraisal
More informationPMI - Dallas Chapter. PMP Exam Sample Questions
PMI - Dallas Chapter PMP Exam Sample Questions June 4, 1999 Disclaimer: These questions are intended for study purposes only. Success on these questions is not necessarily predictive of success on the
More informationLesson 7 The Project Budget
MBA, Msc, Bsc, PMP, CSM, PMI-ACP Indike Manthilake MBA, Msc, Bsc, CSM, PMI-ACP indikem@unitedmotors.lk.com Lesson 7 The Project Budget Agenda Estimate Costs and income Creating a Preliminary Budget Budget
More informationChapter 11 Project Execution and Control
Chapter 11 Project Execution and Control Project Management for Business, Engineering, and Technology Prepared by John Nicholas, Ph.D. Loyola University Chicago Phase C: Project Execution Most projects
More informationProject planning and creating a WBS
37E01500 Project Management and Consulting Practice Project planning and creating a WBS Matti Rossi Lecture 3, Tue 28.2.2017 Learning objectives Describe the project time management planning tasks, and
More informationProject Management Certification. Multiple Choice Questions
Project Management Certification (PMP) Project Management Certification (PMP) Multiple Choice Questions QUESTION 1 In Project Cost Management, which input is exclusive to the Determine Budget process?
More informationProject Integration Management
Project Integration Management The Key to Overall Project Success: Good Project Integration Management Project managers must coordinate all of the other knowledge areas throughout a project s life cycle.
More informationFinancial Management & Accounting in Construction (CUE304) FINANCIAL MANAGEMENT. Dr. Ahmed Elyamany
1 Financial Management & Accounting in Construction (CUE304) FINANCIAL MANAGEMENT Dr. Ahmed Elyamany 2 Course Content Project financial management: Cash flow prediction, Cash flow analysis, Cost of finance
More informationVendor: PMI. Exam Code: CA Exam Name: Certified Associate in Project Management. Version: Demo
Vendor: PMI Exam Code: CA0-001 Exam Name: Certified Associate in Project Management Version: Demo QUESTION: 1 On what is project baseline development established? A. Approved product requirements B. Estimated
More informationSoftware Economics. Introduction to Business Case Analysis. Session 2
Software Economics Introduction to Business Case Analysis Session 2 Today Last Session we covered FV, PV and NPV We started with setting up the financials of a Business Case We talked about measurements
More informationPMI - Dallas Chapter. Sample Questions. March 22, 2002
PMI - Dallas Chapter PMP Exam Sample Questions March 22, 2002 Disclaimer: These questions are intended for study purposes only. Success on these questions is not necessarily predictive of success on the
More informationLCS International, Inc. PMP Review. Chapter 6 Risk Planning. Presented by David J. Lanners, MBA, PMP
PMP Review Chapter 6 Risk Planning Presented by David J. Lanners, MBA, PMP These slides are intended to be used only in settings where each viewer has an original copy of the Sybex PMP Study Guide book.
More informationChapter 5: Estimating Project Times and Costs 4KF3
Lecture Notes Importance of Estimates Support good decisions Schedule work o Make sure your team members can take on added work of project Determine length of project and costs o Projects can be cancelled
More informationIntroduction to Project Management. Modeling after NYS ITS
Introduction to Project Management Modeling after NYS ITS What is Project Management? Project management is the application of knowledge, skills, tools and techniques to project activities to meet project
More informationPMP Exam Prep Coaching Program
PMP Exam Prep Coaching Program Project Part 1 Presented by Vinai Prakash, PMP 1 Project Plan Estimate s Determine Budget 2 Vinai Prakash, PMCHAMP.COM 1 Process of monitoring the status of the project to
More informationEvery project is risky, meaning there is a chance things won t turn out exactly as planned.
PMBOK 5 Ed. DEI- Every project is risky, meaning there is a chance things won t turn out exactly as planned. percent of runaway projects Did no risk management at all 38 percent did some, and 7 percent
More informationIntegrating Contract Risk with Schedule and Cost Estimates
Integrating Contract Risk with Schedule and Cost Estimates Breakout Session # B01 Donald E. Shannon, Owner, The Contract Coach December 14, 2015 2:15pm 3:30pm 1 1 The Importance of Estimates Estimates
More information3/15/2018 CHAPTER 5. PROJECT MANAGEMENT. Prepared by: Dr. Maria Elisa Linda T. Cruz
CHAPTER 5. BUDGETING CHAPTER AND 1 INTRODUCTION COST ESTIMATION TO PROJECT MANAGEMENT Prepared by: Dr. Maria Elisa Linda T. Cruz Prepared by: Dr. Maria Elisa Linda T. Cruz 1 Chapter 5. Topics 5.1 Estimating
More informationCPET 581 Smart Grid and Energy Management Nov. 20, 2013 Lecture
CPET 581 Smart Grid and Energy Management Nov. 20, 2013 Lecture References [ 1] Mechanical and Electrical Systems in Building, 5 th Edition, by Richard R. Janis and William K.Y. Tao, Publisher Pearson
More informationFor the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc.
For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. 1 Contacts Name: Khaled El-Nakib, MSc, PMP, PMI-RMP URL: http://www.khaledelnakib.com
More informationMajor Projects Advisory Project Leadership Series
KPMG GLOBAL ENERGY INSTITUTE Major Projects Advisory Project Leadership Series February 7, 2013 Disclaimer The information contained herein is of a general nature and is not intended to address the circumstances
More informationBAE Systems Risk Opportunity & Uncertainty Modelling ACostE North West Region 4th September 2013
BAE Systems Risk Opportunity & Uncertainty Modelling ACostE North West Region 4th September 2013 BAE SYSTEMS PLC 2011 All Rights Reserved The copyright in this document, which contains information of a
More information1. What are the five major processes associated with every project? These are the same as the five Process Groups according to the PMBOK.
CTC/ITC 310 Program Management California State University Dominguez Hills Instructor: Howard Rosenthal Final Exam May 15, 2018 All questions are 4 points unless indicated otherwise Answer Key 1. What
More informationWater Resource Economics C H A P T E R E E V A L U A T I O N O F W A T E R D E V E L O P M E N T P R O J E C T S
Water Resource Economics C H A P T E R E E V A L U A T I O N O F W A T E R D E V E L O P M E N T P R O J E C T S Text Reader, based on Griffin (2006), 6.1-6.10 Organization 1. The nature of water development
More informationProject Management. A Practitioner s Guide. Steven M. Bragg
Project Management A Practitioner s Guide Steven M. Bragg Chapter 1 Overview of Project Management... 1 Learning Objectives... 1 Introduction... 1 Project Management Activities... 1 The Need for Project
More informationSCHOOL OF ACCOUNTING AND BUSINESS BSc. (APPLIED ACCOUNTING) GENERAL / SPECIAL DEGREE PROGRAMME END SEMESTER EXAMINATION JULY 2016
All Rights Reserved No. of Pages - 10 No of Questions - 06 SCHOOL OF ACCOUNTING AND BUSINESS BSc. (APPLIED ACCOUNTING) GENERAL / SPECIAL DEGREE PROGRAMME END SEMESTER EXAMINATION JULY 2016 MGT 30725 Project
More informationManagement Reserve Defined
Management Reserve Defined Management Reserve (MR) is defined in EIA 748 Earned Value Management Systems, the commercial standard for EVMS, as An amount of the total budget withheld for management control
More informationProject Management. Estimating Project Times and Costs. Clifford F. Gray Eric W. Larson Third Edition. Chapter 5
Project Management THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Third Edition Chapter 5 Estimating Project Times and Costs Copyright 2006 The McGraw-Hill Companies. All rights reserved. PowerPoint
More informationPROJECT MANAGEMENT BODY OF KNOWLEDGE
A Guide to the PROJECT MANAGEMENT BODY OF KNOWLEDGE (PMBOK GUIDE ) Sixth edition Chapter 7 Project Cost Management PMBOK is a registered mark of the Project Management Institute, Inc Slide # 1 3FOLD Education
More informationEarned Value Management. Danielle Kellogg. Hodges University
Earned Value Management 1 EARNED VALUE MANAGEMENT Earned Value Management Danielle Kellogg Hodges University Earned Value Management 2 Abstract Earned Value Management has been used with enterprise-level
More informationProject Management Certificate Program
Project Management Certificate Program Risk Management Terry Skaggs ( Denver class) skaggst@centurytel.net 719-783-0880 Lee Varra-Nelson (Fort Collins class) lvarranelson@q.com 970-407-9744 or 970-215-4949
More informationTH E pursuit of efficiency has become a central objective of policy
1 Efficiency in health care 1.1 Introduction TH E pursuit of efficiency has become a central objective of policy makers within most health systems. The reasons are manifest. In developed countries, expenditure
More informationProject Integration Management
Project Integration Management Describe an overall framework for project integration management as it relates to the other PM knowledge areas and the project life cycle. Explain the strategic planning
More informationEVALUATE THE FEASIBILITY OF A PROJECT
EVALUATE THE FEASIBILITY OF A PROJECT Timeframe: Learning Outcome: Recommended reading: Multimedia: Section overview 12 hours Develop a feasible project strategy Plan a complex project Chapter : Tools
More informationSeminar on Financial Management for Engineers. Institute of Engineers Pakistan (IEP)
Seminar on Financial Management for Engineers Institute of Engineers Pakistan (IEP) Capital Budgeting: Techniques Presented by: H. Jamal Zubairi Data used in examples Project L Project L Project L Project
More information2/9/2010. Investment Appraisal. Investment Appraisal. Investment Appraisal. Investment Appraisal. Investment Appraisal. Investment Appraisal
A means of assessing whether an investment project is worthwhile or not Investment project could be the purchase of a new PC for a small firm, a new piece of equipment in a manufacturing plant, a whole
More informationInvestment Decision Criteria. Principles Applied in This Chapter. Learning Objectives
Investment Decision Criteria Chapter 11 1 Principles Applied in This Chapter Principle 1: Money Has a Time Value. Principle 2: There is a Risk-Return Tradeoff. Principle 3: Cash Flows Are the Source of
More informationDecommissioning Basis of Estimate Template
Decommissioning Basis of Estimate Template Cost certainty and cost reduction June 2017, Rev 1.0 2 Contents Introduction... 4 Cost Basis of Estimate... 5 What is a Basis of Estimate?... 5 When to prepare
More informationSome Notes on Value Creation and Market Efficiency
Some Notes on Value Creation and Market Efficiency Wealth Creation by a Corporation Goal is to maximize shareholders wealth In a single period, wealth can be created if cash inflows exceed cash outflows
More informationProject Risk Management
Project Risk Management Introduction Unit 1 Unit 2 Unit 3 PMP Exam Preparation Project Integration Management Project Scope Management Project Time Management Unit 4 Unit 5 Unit 6 Unit 7 Project Cost Management
More informationPass PMP in 21 Days - ITTO Toolbox PROCESS MAP
PROCESS MAP 1 IntEgratIon Pass PMP in 21 Days - ITTO Toolbox InItIatIng PlannIng ExEcutIng MonItorIng & controlling closing Develop Project Charter Develop Project Management Plan Direct & Manage Project
More informationMODULE 5 PROJECT RISK MANAGEMENT, PROCUREMENT AND CONTRACTS
Advanced Project Management MODULE 5 PROJECT RISK MANAGEMENT, PROCUREMENT AND CONTRACTS 06 07 November 2018 Facilitator: Mr Mondli Mbambo Module Purpose Project Risk & Procurement Managment Knowledge Risk
More informationEarned Value Management - EVM
Earned Value Management (EVM) technique used to track the Progress and Status of a Project & Forecast the likely future performance of the Project. Earned Value Management (EVM) technique integrates the
More informationTA GROUP LIMITED Adding Value Through Technology
TA GROUP LIMITED Adding Value Through Technology 'Newnhams', West Street, Farnham, Surrey, GU9 7EQ Tel: (01252) 711414; Fax: (01252) 735155 Presentation to 14th International Symposium on Military Operational
More informationSCAF Workshop Integrated Cost and Schedule Risk Analysis. Tuesday 15th November 2016 The BAWA Centre, Filton, Bristol
The following presentation was given at: SCAF Workshop Integrated Cost and Schedule Risk Analysis Tuesday 15th November 2016 The BAWA Centre, Filton, Bristol Released for distribution by the Author www.scaf.org.uk/library
More informationMohammed Rafiuddin CEO and General Manager, BIOSI Biohazards Solutions Innovators
Mohammed Rafiuddin CEO and General Manager, BIOSI Biohazards Solutions Innovators Profile of Mohammed Rafiuddin Mohammed is an active member of AACE International since 2006 with 30 years of experience
More informationEstimating Project Times and Costs
CHAPTER FIVE Estimating Project Times and Costs Copyright 2014 McGraw-Hill Education. All Rights Reserved. PowerPoint Presentation by Charlie Cook Where We Are Now 5 2 Estimating Estimating Projects The
More informationFinancial Controls in Project Management Activities
Financial Controls in Management Activities Objective Complete hands-on exercises to apply cost control techniques Budgeting Budgeting Process Overview Budgeting Budgeting - aggregating the estimated costs
More informationSoftware Economics. Introduction to Business Case Analysis. Session 2
Software Economics Introduction to Business Case Analysis Session 2 Today Last Session we covered FV, PV and NPV We started with setting up the financials of a Business Case We talked about measurements
More informationPMP102 Fundamentals of Project Management
PMP102 Fundamentals of Project Management H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: This course is designed for managers and staff,
More informationCOPYRIGHTED MATERIAL. Index
Index Note to the reader: Throughout this index boldfaced page numbers indicate primary discussions of a topic. Italicized page numbers indicate illustrations. A A+ certification, 28 acceptance criteria
More informationIntroduction by Philip Croessmann, V.P., Director of Risk Management Sources of Construction Claims Common Types of Construction Claims Risk
Introduction by Philip Croessmann, V.P., Director of Risk Management Sources of Construction Claims Common Types of Construction Claims Risk Management Preconstruction & Construction Managing Construction
More informationINSE 6230 Total Quality Project Management
Lecture 5 Project Cost Management Project cost management introduction Estimating costs Budget Earned Value Management (EVM) EVM projections 2 IT projects have a poor track record for meeting budget goals
More informationInternational Project Management. prof.dr MILOŠ D. MILOVANČEVIĆ
International Project Management prof.dr MILOŠ D. MILOVANČEVIĆ Project time management Project cost management Time in project management process Time is a valuable resource. It is also the scarcest. Time
More informationInsurance and Financial Services
Insurance and Financial Services 2016 1 Risk Transfer gives you the tools to grow and the resources to mitigate your costs. 2016 2 Your Team of Industry Experts Risk Transfer Insurance Agency is a full
More informationProject and Communication Management
Project and Communication Management Chapter 5 Learning objectives: Estimating Projects Estimating The process of forecasting or approximating the time and cost of completing project deliverables. The
More informationnext level PMP Exam Preparation Formula Guide for the PMP Exam
next Formula Guide for the PMP Exam January 2017 n e x t l e v e l Page 1 What s Included: 1. Earned Value Formulas 2. Formulas 3. Float Formulas 4. Project Selection Formulas 5. Additional Formulas to
More informationCUMULATIVE IMPACT ASSESSMENT OF THE BASEL REFORM PACKAGE DATA AS OF DECEMBER 2015
CUMULATIVE IMPACT ASSESSMENT OF THE BASEL REFORM PACKAGE DATA AS OF DECEMBER 2015 Contents Introduction 3 Overview of the results 4 Annex: Methodological considerations 7 2 Introduction In 2014, the Basel
More informationBasic Financial Modelling in Excel
Basic Financial Modelling in Excel A Two Day Programme This course is presented in London on: 14-15 May 2018 This course can also be presented in-house for your company or via live on-line webinar The
More informationKPMG Major Projects Advisory Project Leadership Series: Budgeting, Estimating, and Contingency Management for Construction Projects
KPMG Global Energy Institute KPMG International KPMG Major Projects Advisory Project Leadership Series: Budgeting, Estimating, and Contingency Management for Construction Projects Construction projects
More informationInvestment Decision Criteria. Principles Applied in This Chapter. Disney s Capital Budgeting Decision
Investment Decision Criteria Chapter 11 1 Principles Applied in This Chapter Principle 1: Money Has a Time Value. Principle 2: There is a Risk-Return Tradeoff. Principle 3: Cash Flows Are the Source of
More informationBrief course information Strategic planning and project selection Project integration management Project scope management
Brief course information Strategic planning and project selection Project integration management Project scope management Total Quality Project Management 2 This is an individual work. Each student prepares
More informationIntroduction to Discounted Cash Flow
Introduction to Discounted Cash Flow Professor Sid Balachandran Finance and Accounting for Non-Financial Executives Columbia Business School Agenda Introducing Discounted Cashflow Applying DCF to Evaluate
More informationIntro Public-Private Partnership (P3) Finance Course
Intro Public-Private Partnership (P3) Finance Course Identifying P3 Projects and Knowing the Atmosphere Kylee Anastasi Director, Capital Projects and Infrastructure Advisory PricewaterhouseCoopers LLP
More informationPrinciples of Financial Feasibility ARCH 738: REAL ESTATE PROJECT MANAGEMENT. Morgan State University
Principles of Financial Feasibility ARCH 738: REAL ESTATE PROJECT MANAGEMENT Morgan State University Jason E. Charalambides, PhD, MASCE, AIA, ENV_SP (This material has been prepared for educational purposes)
More informationCost Estimating in PMBoK vs. CEBoK
2015 ICEAA Washington Area Chapter Luncheon Series Cost Estimating in PMBoK vs. CEBoK Remember That. Then, Forget It! Kevin Cincotta, CCEA, PMP 1 Course Description The Project Management Body of Knowledge
More information$82, $71, $768, $668,609.67
Question # 1 of 15 ( Start time: 07:14:23 PM ) Total Marks: 1 If you deposit $12,000 per year for 16 years (each deposit is made at the beginning of each year) in an account that pays an annual interest
More informationProject Management for the Professional Professional Part 3 - Risk Analysis. Michael Bevis, JD CPPO, CPSM, PMP
Project Management for the Professional Professional Part 3 - Risk Analysis Michael Bevis, JD CPPO, CPSM, PMP What is a Risk? A risk is an uncertain event or condition that, if it occurs, has a positive
More informationThe 120VC Portfolio Management Model
The 120VC Portfolio Management Model There are several layers that contribute to achieving the Vision of Project Portfolio Management. The workflow in the figure below starts at the bottom left and flows
More informationADVANCED QUANTITATIVE SCHEDULE RISK ANALYSIS
ADVANCED QUANTITATIVE SCHEDULE RISK ANALYSIS DAVID T. HULETT, PH.D. 1 HULETT & ASSOCIATES, LLC 1. INTRODUCTION Quantitative schedule risk analysis is becoming acknowledged by many project-oriented organizations
More informationPREVENTING PROGRAM MANAGEMENT PITFALLS USING PORTFOLIO ESTIMATING
PREVENTING PROGRAM MANAGEMENT PITFALLS USING PORTFOLIO ESTIMATING Nicholas Morales, MCR LLC. Christopher Dewberry, Dept. of Navy ICEAA 2016 Professional Development & Training Workshop Atlanta, GA 7-10
More informationFinancial Analysis and Cash Flow
Financial Analysis and Cash Flow Version 2.0 Integrated Financial Analysis SOAPP CT.25 uses the capital cost and operating cost estimates to develop a Capital Outlay Schedule and a Pro Forma Income and
More informationDescribe the importance of capital investments and the capital budgeting process
Chapter 20 Making capital investment decisions Affects operations for many years Requires large sums of money Describe the importance of capital investments and the capital budgeting process 3 4 5 6 Operating
More informationEvaluating and Comparing Fiscal Regimes for EI
Evaluating and Comparing Fiscal Regimes for EI NATURAL RESOURCE TAXATION IN THE ASIA-PACIFIC REGION A forum on the design, implementation and evaluation of fiscal regimes for extractive industries Jakarta,
More informationBasic Financial Modelling in Excel
Basic Financial Modelling in Excel A Two Day Programme This course is presented in London on: DATES TBD This course can also be presented in-house for your company or via live on-line webinar The Banking
More informationProject Management Professional (PMP) Exam Prep Course 11 - Project Risk Management
Project Management Professional (PMP) Exam Prep Course 11 - Project Slide 1 Project Looking Glass Development, LLC (303) 663-5402 / (888) 338-7447 4610 S. Ulster St. #150 Denver, CO 80237 information@lookingglassdev.com
More informationLoan Pricing Deals & Relationships Session 1. Agenda
Loan Pricing Deals & Relationships Session 1 Thomas Farin President Farin & Associates, Inc tfarin@farin.com 1 Agenda Session 1 Inputs What We Need to Know Role of Benchmarks Four Models to Look at Profitability
More informationStephen T Shickel CPA PLC
Performance Review For the period ended 12/31/2006 Provided By Stephen T Shickel CPA PLC Page 1 / 7 Financial Score ABC Company Narrative Report Industry: Revenue: $1M - $10M Periods: 236220 - Commercial
More informationProject Management CSC 310 Spring 2017 Howard Rosenthal
Project CSC 310 Spring 2017 Howard Rosenthal 1 No?ce This course is based on and includes material from the text: Effective Project - Traditional, Agile, Extreme 7TH Edition Authors: Robert K. Wysocki
More information