Ramsey- Washington Metro Watershed District. September 2017 Board Packet
|
|
- Ami Jenkins
- 6 years ago
- Views:
Transcription
1 Ramsey- Washington Metro Watershed District September 2017 Board Packet
2 ************ Agenda ************
3 Regular Board Meeting Agenda Wednesday, September 6, :30 P.M. District Office Board Room 2665 Noel Drive, Little Canada, MN 1. Call to Order 6:30 PM 2. Approval of Agenda 3. Consent Agenda A. Approval of Minutes August 2, Treasurer s Report and Bill List 5. Visitor Presentations 6. Permit Program A. Applications i Willow Ridge Apartments II, Vadnais Heights ii Rose Place Townhomes, Roseville iii Artis Senior Living, Woodbury B. Enforcement Action Report 7. BMP Incentive Program A. Applications i CS Canabury Ponds, Additional Fund Request B. Budget Status Update Preliminary Budget and Levy Public Hearing 9. Action Items A. Approval of 2017 Preliminary Budget and Levy Certification to Ramsey and Washington Counties Resolution B. Change Order No. 3 Beltline and Battle Creek Tunnel Repair Project C. Grass Lake/Snail Lake Optimization Study Update and Recommended Actions *Items in bold signify that an action needs to be taken by the Board.
4 10. Administrator s Report A. Meetings Attended B. Upcoming Meetings and Dates C. Communications Coordinator Introduction Chris O Brien D. District Tour E. Cost Share Program Presentation F. Climate Change Resiliency Workshops 11. Project and Program Status Reports A. Ongoing Project and Program Updates i. Owasso Blvd and Park Project vii. Willow Pond CMAC Project ii. Atlas 14 Monitoring viii. Beltline/ Battle Creek Tunnel iii. Tanners Alum Facility Permit ix. CIP Maintenance/Repair 2017 iv. Targeted Retrofit Projects x. Routine CIP Maintenance/Repair v. Frost/Kennard Project xi. Natural Resources Program vi. BMP Design Assistance xii. Education Program 12. Informational Items 13. Report of Managers 14. Adjourn *Items in bold signify that an action needs to be taken by the Board.
5 ************ Consent Agenda ************
6 Ramsey-Washington Metro Watershed District Minutes of Regular Board Meeting August 2, 2017 The Regular Meeting of August 2, 2017, was held at the District Office Board Room, 2665 Noel Drive, Little Canada, Minnesota, at 6:30 p.m. PRESENT: Marj Ebensteiner, President Cliff Aichinger, Vice President Dr. Pam Skinner, Secretary Dianne Ward, Manager ALSO PRESENT: Tina Carstens, District Administrator Amanda Staple, Recording Secretary Brad Lindaman, Barr Engineering ABSENT: Jen Oknich, Manager Bill Bartodziej, Natural Resource Specialist Viet-Hanh Winchell, Attorney for District Dave Vlasin, Water Quality Technician 1. CALL TO ORDER The meeting was called to order by President Ebensteiner at 6:30 p.m. 2. APPROVAL OF AGENDA Tina Carstens requested to add an item to the agenda, Item 8C, Change Order #6 for CIP/Maintenance and Repair. Motion: Cliff Aichinger moved, Dianne Ward seconded, to approve the agenda as amended. Motion carried 4-0 (Oknich absent). 3. CONSENT AGENDA A. Approval of Minutes from July 12, 2017 Tina Carstens noted a change to the minutes on page three, under Permit #17-19, it should state, Nicole Soderholm stated that while the site is under an acre, its close proximity to a wetland warrants erosion control and therefore a permit application is being submitted to ensure the adjacent wetland is not impacted. Motion: Cliff Aichinger moved, Dianne Ward seconded, to approve the July 12, 2017, minutes as amended. Motion carried 4-0 (Oknich absent). B. Order Public Hearing for Review of the Preliminary 2018 Budget and Levy Motion: Cliff Aichinger moved, Dr. Pam Skinner seconded, to order a public hearing for review of the preliminary 2018 budget and levy. Motion carried 4-0 (Oknich absent). 4. TREASURER S REPORT AND BILL LIST Motion: Dianne Ward moved, Dr. Pam Skinner seconded, to approve the August 2, 2017, bill list as submitted. Motion carried 4-0 (Oknich absent).
7 5. VISITOR PRESENTATIONS There were none. 6. PERMIT PROGRAM A. Applications - None. B. Monthly Enforcement Report During July, 24 notices were sent to address: install/maintain inlet protection (7), install/maintain perimeter control (3), install/maintain construction entrance (4), sweep streets (2), stabilize exposed soils (2), contain liquid/solid wastes (3), remove discharged sediment (2), and install/maintain up-gradient BMPs (1). 7. BMP INCENTIVE PROGRAM A. Applications - None. President Ebensteiner asked if the District can solicit applications. Tina Carstens noted that staff has been sending targeting mailings. She confirmed that if the Board finds a feasible site, they can alert staff and staff can contact the property owner. B. Budget Status Update - No comments. 8. ACTION ITEMS A. District Office Solar Retrofit Tina Carstens noted that the presentation information was included in the Board packet from the last meeting and asked the Board for their input. President Ebensteiner asked if a comparison had been done regarding a solar farm compared to a single installation. Tina provided additional information on the comparison noting that typically the buy in would be from homeowners that do not have the opportunity to have solar installation on their property. She noted that staff could research that option further if the Board desires. Bill Bartodziej noted that he found a helpful article he could forward to the Board. He agreed that additional research would need to be done if the Board desired to consider that option. Manager Aichinger stated that if the office had solar panels it would be a visible example and would have educational impact in addition to the eventual cost savings. President Ebensteiner stated that there was just a presentation from one company and there is no rush. Brad Lindaman stated that staff met with other companies as well and believed that the company that made the presentation would be the best choice, should the Board decide to move forward. Manager Ward asked if a commitment would need to be made for the company to come in and do a full engineering review. Tina confirmed that would be the next step and the commitment would come after that engineering review. Manager Aichinger asked when the District would know whether the rebate would be received. Tina noted that the decision on the rebate would be known in September. Motion: Dr. Pam Skinner moved, Cliff Aichinger seconded, to direct staff to proceed with the engineer s review of the site for a solar retrofit project for the District office building, and bring that information back to the Board. Motion carried 4-0 (Oknich absent). B. North Heights Church Targeted Retrofit Advertise for Bid Page 2 August 2, 2017, RWMWD Minutes Regular Board Meeting
8 Brad Lindaman provided details on the project and a summary of the costs that would be involved for a total of $35,400. He noted that this is below the $100,000 threshold and therefore staff would request quotes from a few contractors rather than going through the formal bid process. He stated that the intent would be to have the construction completed in order to use the grant funding by the end of the year. Motion: Cliff Aichinger moved, Dr. Pam Skinner seconded, to approve draft plans and specifications, preliminary cost estimate, and proposed schedule; and direct staff to finalize the bidding documents and advertise the projects for bid. Motion carried 4-0 (Oknich absent). C. Change Order #6 for CIP/Maintenance and Repair 2017 Project Brad Lindaman provided an update on the project status and the communication with MnDOT. He stated that the timeframe should be extended to allow the contractor to complete the work. Motion: Cliff Aichinger moved, Dianne Ward seconded, to approve Change Order #6 for CIP Maintenance and Repair 2017 Project. Motion carried 4-0 (Oknich absent). 9. ADMINISTRATOR S REPORT A. Meetings Attended No comments. B. Upcoming Meeting Dates Tina Carstens provided an update on upcoming meeting dates and noted that she will be attempting to schedule a date for the fall tour. C. Retirement Notice Received Tina noted that while the retirement notice was a surprise, staff has begun to look to determine how those duties could be redistributed between existing staff rather than hiring a new employee at this time. D. Grass Lake Area Update No comments. E. Website Improvements Update No comments. F. Communications Coordinator Position Update Tina noted that interviews took place Monday and Tuesday of this week and provided an update on the candidates. She stated that staff is deciding between two candidates and will be checking references. Dianne Ward stated that the process was handled very well in order to dwindle down the many applicants to the seven applicants that were interviewed. She believed that it was a great process and all seven applicants interviewed were well qualified. Tina noted that she would provide more information at the next Board meeting, but stated that depending on which applicant is chosen, the person may be hired prior to the next meeting. G Budget Discussion Tina Carstens reviewed a handout which identifies the planned projects and their location in the District. Item 49, Communications and Marketing: Dianne Ward suggested an increase to the budget for marketing and communications to support mailings that may be necessary. Tina provided additional clarification on vehicle costs and IT equipment, specifically which costs would occur in 2017 and which would occur in (Items 33 and 37) Page 3 August 2, 2017, RWMWD Minutes Regular Board Meeting
9 Item 44, Water Quality Monitoring: Cliff Aichinger noted that the cost for the permanent lake level monitoring stations seemed like a high cost. Brad Lindaman stated that the intent would be to move toward an automated system that would record the data. He stated that having that data available to understand the real-time impacts will be helpful. He stated that there are many factors that came into play, including Ramsey County discontinuing their monitoring. He noted that the estimated cost would be about $60,000 per site for the automated systems. Staff will research the item further to determine the appropriate technology needs and options. Discussion on the proposed addition of a watershed outlet monitoring station at Grass Lake was discussed. Brad Lindaman stated that each of the watershed outlets has a monitoring station that goes along with that and noted that staff believes that it would be helpful to have a station at the Grass Lake outlet also. Item 46, Research Projects: Tina Carstens reviewed the items included in the research project line item. Tina also provided highlights of the Capital Improvements Projects section of the budget and details on specific line items, including details on grant funding. She confirmed that she would communicate with Maplewood about the Wakefield Park project and let the city know that the District would be willing to move forward with, or without, the grant funds. The board consensus was to include the full project cost in the budget to ensure the completion of the project if the grant is not awarded. PRESENTATION: Adapting to Climate Change Brad Lindaman gave a presentation on adapting to climate change and how the District can use the existing system of pipes and outlets to better adapt to climate change. The presentation highlighted a feasibility study proposed to be completed in He explained that this study could go beyond identifying the impacts and begins to identify the things the District might do to lessen the severity of the impacts without huge infrastructure additions. He reviewed the scope of the potential study and explained that this would be a very time-consuming process. Dr. Pam Skinner asked if the modeling process would include the addition of a regional treatment storage area as a possibility. Brad explained that the modeling would not include the addition of new elements, but could tweak existing infrastructure of the District. Cliff Aichinger stated that the cities are going to look to the District for this information. He did not believe it was urgent in the next year and asked if the study could be done incrementally. Brad confirmed that if there is interested from the Board, staff would continue to scope the study and bring it back next month. President Ebensteiner agreed that the District should consider what comes after the modeling in order to determine what could be done to provide concrete solutions. Brad explained that this potential study would determine what could be done with the existing infrastructure rather than looking to add new costly infrastructure. He explained that the results of this study could provide more cost-effective solutions to consider. Dianne Ward noted that the West Vadnais Lake area is not in our District but contributes to the system and wondered whether that organization would contribute funds as well. Brad stated that the models would include that area in order to provide complete information. Tina Carstens stated that it would be unlikely that they would contribute financially but would continue to partner and advise the District. Pam stated that she does not mind modeling but would also like to pursue the traditional method that would add additional infrastructure. Tina confirmed that staff could do a hybrid of both methods to provide comparison information and the costs that would be associated with both methods. Page 4 August 2, 2017, RWMWD Minutes Regular Board Meeting
10 It was the consensus of the Board to direct staff to further scope the study and bring additional details back to the Board. 10. PROJECT AND PROGRAM STATUS REPORTS A. Ongoing Project and Program Updates i. Snail Lake/Grass Lake Area ii. Atlas 14 Monitoring iii. Markham Pond Restoration iv. Targeted Retrofit Projects v. Beltline/Battle Creek Tunnel vi. CIP Maintenance/Repair 2017 vii. New Technology Case Study viii. Natural Resources Program ix. Education Program 11. INFORMATIONAL ITEMS President Ebensteiner noted that Hillcrest Golf Course has closed and it was noted that staff should contact St. Paul to determine if there are possibilities to incorporate additional water treatment elements to whatever is developed. 12. REPORTS OF MANAGERS Dianne Ward thanked staff for setting up a fabulous tour with natural resources staff, Bill Bartodziej and Simba Blood to educate her on their work. She found the carp study to be a highlight. 13. ADJOURN Motion: Dr. Pam Skinner moved, Dianne Ward seconded, to adjourn the meeting at 8:10 p.m. Motion carried 4-0 (Oknich absent). Respectfully submitted, Dr. Pam Skinner, Secretary Page 5 August 2, 2017, RWMWD Minutes Regular Board Meeting
11 ************ Bill List ************
12 RWMWD BUDGET STATUS REPORT Administrative & Program Budget Fiscal Year /31/17 Current Current Account Original Budget Month Year-to-Date Budget Percent Budget Category Budget Item Number Budget Transfers Expenses Expenses Balance of Budget Manager Per diems 4355 $6, , $5, % Manager expenses , , , % Committees Committee/Bd Mtg. Exp , , % Employees Staff salary/taxes/benefits ,250, , , , % Employee expenses , , , , % District training & education , , , % Administration/ GIS system maint. & equip , , , % Office Data Base/GIS Maintenance , , , , % Equipment maintenance , , % Records Management , , % Telephone , , , % Office supplies , , , % IT/Internet/Web Site/Software Lic , , , , % Postage , , , % Printing/copying , , , , % Dues & publications , , , % Janitorial/Trash Service , , , % Utilities/Bldg.Contracts , , , % Bldg/Site Maintenance , , , % Miscellaneous , , , % Insurance , , , % Office equipment , , % Vehicle lease, maintenance , , , % Consultants/ Auditor/Accounting , , , , % Outside Services Engineering-administration , , , , % Engineering-permit I&E , , % Engineering-eng. review , , , , % Engineering-permit review , , , , % Project Feasibility Studies , , , , % Attorney-permits , , % Attorney-general , , , , % Outside Consulting Services , , , , % Programs Educational programming , (474.98) 25, , % Events , , , % Water QM-Engineering , , , , , % Project operations , , , , % SLMP/TMDL Studies , , , , % Water Management Plan/Updates , , , % Natural Resources/Keller Creek , , , , , % Outside Prog.Support/Weed Mgmt , , , % Research Projects , , , , % Health and Safety Program , , % NPDES Phase II , , , % Atlas 14 Watershed Modeling (223.59) 0.00% GENERAL FUND TOTAL $3,239, $58, $180, $1,549, $1,748, % CIP's CIP Project Repair & Maintenance , , , (101,147.18) % Targeted Retrofit Projects , , , , % District Office Building Solar Energy Retrofit , , , , % Flood Damage Reduction Fund 520 1,600, , , ,249, % Debt Services Beltline/MM/Battle Creek , , , % BMP Incentive Fund , , , , % Impervious Surface Volume Reduction Opportunity 531 1,500, ,500, % Beltline & Battle Creek Tunnel Repair , ,509, (1,509,881.25) --- Frost/Kennard Enhanced WQ BMP , , % Markham Pond Dredging & Aeration , , , , % Wakefield Park Project , , % District Office Bond Payment , , % CIP BUDGET TOTAL $7,530, $385, $3,558, $3,972, % TOTAL BUDGET $10,770, $58, $566, $5,107, $5,720, % Current Fund Balances: Beginning Fund Fund Year to date Current Month Year to Date Fund Balance Fund: 12/31/16 Transfers Revenue Expenses 08/31/ General Fund $3,420, ,725, , ,549, ,597, CIP Project Repair & Maintenance 464, , , , , Targeted Retrofit Projects 362, , , , , District Office Building Solar Energy Retrofit 146, , , , Flood Damage Reduction Fund 841, , , , , Debt Services Beltline/MM/Beltline-Battle Creek Tunnel Repair 114, , , , Casey Lake Watershed Infiltration Retrofit 210, (210,980.00) /529 - BMP Incentive Fund 709, , , , , Impervious Surface Volume Reduction Opportunity 1,484, ,484, Beltline & Battle Creek Tunnel Repair 4,521, , ,509, ,012, Frost/Kennard Enhanced WQ BMP 47, , , Markham Pond Dredging & Aeration 202, , , , , Wakefield Park Project - 183, , Contingency Fund 483, , , Certificates of Participation 134, , , , Total District Fund Balance $13,143, $ 3,651, $ 566, $5,107, $11,687,462.11
13 Ramsey Washington Metro Watershed Dist. Check Register For the Period From Aug 1, 2017 to Aug 31, 2017 Check # Date Payee ID Payee Descriptoin Amount EFT 08/15/17 hea002 HealthPartners Employee Benefits $7, V 08/24/17 cit009 City of St. Paul BMP Cost Share (10,508.44) 69250V 08/24/17 cen003 Centerline Charter Corp Educational Program (474.98) /16/17 ave001 Avenet, LLC IT/Website/Software /16/17 aws001 AWS Service Center Janitorial/Trash Service /16/17 bar004 Deborah Barnes Employee Reimbursement /16/17 cit009 City of St. Paul BMP Cost Share 10, /16/17 fle001 Flemings Auto Service Vehicle Expense /16/17 hen002 Henriksen Ace Hardware Atlas 14 Watershed Modeling /16/17 hom001 Home Depot Credit Services Water QM/Atlas/Resources /16/17 min017 MN Secretary of State-Notary Dues & Publications /16/17 ncp001 MN NCPERS Life Insurance Employee Benefits /16/17 ram002 Ramsey County Natural Resources /16/17 ros004 Roseville Midway Ford Vehicle Expense /16/17 sig001 Sign-A-Rama Vehicle Expense /29/17 ahl001 Paige Ahlborg Employee Reimbursement /29/17 all004 Allstream Project Operations /29/17 als001 ALS Group USA, Corp Water QM Staff 2, /29/17 ano002 Anoka County Dues & Publications /29/17 att002 AT & T Mobility - ROC IT/Website/Software /29/17 bar001 Barr Engineering July/August Engineering 110, /29/17 bar004 Deborah Barnes Employee Reimbursement /29/17 blo001 Simba Blood Employee Reimbursement /29/17 bur002 Tom Burns Consulting, LLC Data Base/GIS Maiantenance 1, /29/17 cad003 Cady Building Maintenance Janitorial/Trash Service /29/17 car007 Carp Solutions, LLC Natural Resources 14, /29/17 cit011 City of Roseville IT/Website/Software 2, /29/17 cit011 City of Roseville BMP Cost Share 100, /29/17 cre004 Crestview Forest HOA BMP Cost Share 12, /29/17 cro001 Crop Production Services, Inc. Natural Resources /29/17 don001 Matthew Doneux Employee Reimbursement /29/17 gal001 Galowitz Olson, PLLC July Legal Fees 2, /29/17 gra005 Grainger Natural Resources /29/17 gru001 Gruber's Power Equipment Natural Resources /29/17 haw001 Hawkins, Inc. Water QM Staff 4, /29/17 hew001 HP, Inc. Office Equipment /29/17 hom001 Home Depot Credit Services Construction/Natural Res /29/17 inn002 Innovative Office Solutions LLC Office Supplies/Events /29/17 kid002 KidZibits, Inc. Construction-Maint. & Rep. 1, /29/17 lea001 League of MN Cities Insurance Trust Insurance Expense /29/17 lea004 League of MN Cities Ins.Trust P & C Insurance Expense /29/17 mel001 Michelle L. Melser Employee Reimbursement /30/2017 at 2:08 PM Page: 1
14 Ramsey Washington Metro Watershed Dist. Check Register For the Period From Aug 1, 2017 to Aug 31, 2017 Check # Date Payee ID Payee Descriptoin Amount /29/17 met004 Metro Sales, Inc. Printing Expense /29/17 met008 MetLife-Group Benefits Employee Benefits /29/17 min008 Minnesota Native Landscapes, Inc. Construction-Maint. & Rep. 8, /29/17 min018 Minnesota Coaches, Inc. Events /29/17 ncp001 MN NCPERS Life Insurance Employee Benefits /29/17 nel004 Nelco Landscaping BMP Cost Share 1, /29/17 nsp001 Xcel Energy Utilities/Project Operations 1, /29/17 out001 Outdoor Lab Landscape Design, Inc. Construction-Maint. & Rep. 49, V 08/29/ VOID VOID /29/17 pac001 Pace Analytical Services, Inc. Water QM Staff 3, /29/17 pac001 Pace Analytical Services, Inc. Water QM Staff 3, /29/17 pac001 Pace Analytical Services, Inc. Water QM Staff 2, /29/17 pci001 PCi Roads, LLC Construction-Beltline/Battle 107, /29/17 pel001 Laurie Pellerite BMP Cost Share 1, /29/17 pin003 Zola R. Pineles Employee Reimbursement /29/17 qwe001 CenturyLink Project Operations /29/17 red002 Redpath & Company, Ltd June/July Accounting 4, /29/17 ros005 David Rosenbloom BMP Cost Share 5, /29/17 ruh001 Jennifer Ruhland BMP Cost Share /29/17 sod001 Nicole Soderholm Employee Reimbursement /29/17 stu001 Studio Lola BMP Cost Share /29/17 sun001 Sunram Construction, Inc BMP Cost Share 16, /29/17 tes001 The Tessman Company Construction-Maint. & Rep /29/17 tim002 Timesaver Off-Site Secretarial, Inc. CAC Expense /29/17 usb002 U.S. Bancorp Monthly Credit Card 1, /29/17 usb005 US Bank Equipment Finance Printing Expense /29/17 vla001 Dave Vlasin Employee Reimbursement /29/17 voy001 Voyager Fleet Systems, Inc. Vehicle Expense /29/17 was007 Washington Conservation District BMP Cost Share 2, /29/17 wil006 Patrick Willoughby BMP Cost Share 5, /29/17 win002 Windmill Design Incorporated Outside Consulting Services 2, Total $485, /30/2017 at 2:08 PM Page: 2
15 Ramsey Washington Metro Watershed Dist. Cash Disbursements Journal For the Period From August 1, August 31, 2017 Date Check # Vendor ID Name Account ID Account Description Amount Check Detail 08/15/17 EFT hea002 HealthPartners $7, Employee Benefits-General 6, Employee Health-General /24/ V cit009 City of St. Paul BMP Csot-Share Program (10,508.44) 08/24/ V cen003 Centerline Charter Corp Educational Program-General (474.98) 08/16/ ave001 Avenet, LLC IT/Website/Software /16/ aws001 AWS Service Center Janitorial/Trash Service /16/ bar004 Deborah Barnes Natural Resources Project-General Water QM Staff-General /16/ cit009 City of St. Paul BMP Csot-Share Program 10, /16/ fle001 Flemings Auto Service Vehicle Maintenance-General /16/ hen002 Henriksen Ace Hardware Atlas 14 Watershed Modeling Atlas 14 Watershed Modeling /16/ hom001 Home Depot Credit Service Water QM Staff-General Atlas 14 Watershed Modeling Natural Resources Project-General /16/ min017 MN Secretary of State-Notary Dues & Publications /16/ ncp001 MN NCPERS Life Insurance Employee Health-General /16/ ram002 Ramsey County Natural Resources Project-General /16/ ros004 Roseville Midway Ford Vehicle Maintenance-General /16/ sig001 Sign-A-Rama Vehicle-Miscellaneous-General /29/ ahl001 Paige Ahlborg Employee Expense-General Employee Benefits-General /29/ all004 Allstream Project Operations-General /29/ als001 ALS Group USA, Corp 2, Water QM Staff-General Water QM Staff-General Water QM Staff-General Water QM Staff-General Water QM Staff-General Water QM Staff-General Water QM Staff-General /29/ ano002 Anoka County Dues & Publications /29/ att002 AT & T Mobility - ROC IT/Website/Software /29/ bar001 Barr Engineering 110, Engineering Admin-General Fund 7, Engineering-Review 3, Project Feasability-General Project Feasability-General 10, Project Feasability-General
16 Ramsey Washington Metro Watershed Dist. Cash Disbursements Journal For the Period From August 1, August 31, 2017 Date Check # Vendor ID Name Account ID Account Description Amount Check Detail Project Feasability-General Project Feasability-General 1, Engineering-Flood Damage Engineering-Flood Damage 20, Engineering-Flood Damage 14, GIS System Maintenance & Equip WQM-Engineering Eng.Permit Review-General 3, SLMP/TMDL Studies 1, Watershed Management Plan Research Projects-General 2, Research Projects-General 1, Research Projects-General Project Operations-General 1, Engineering-School/Commer Retrofit 4, Engineering-School/Commer Retrofit 10, Research Projects-General 1, BMP Cost Share Program 2, Engineering-Markham Pond Dredging 3, Engineering-Beltline/Battle Creek 3, Engineering -Dist.Office Solar Energy Engineering-Projects Maint. & Repair 8, Engineering-Projects Maint. & Repair 4, /29/ bar004 Deborah Barnes Employee Benefits-General Employee Expense-General /29/ blo001 Simba Blood Employee Benefits-General Natural Resources Project-General /29/ bur002 Tom Burns Consulting, LLC Data Base/GIS Maintenance 1, /29/ cad003 Cady Building Maintenance Janitorial/Trash Service /29/ car007 Carp Solutions, LLC Natural Resources Project-General 14, cit001 City of Little Canada Utilities/Bldg. Contracts - 08/29/ cit011 City of Roseville 2, IT/Website/Software IT/Website/Software 2, IT/Website/Software /29/ cit011 City of Roseville BMP Cost Share Program 100, /29/ cre004 Crestview Forest HOA BMP Cost Share Program 12, /29/ cro001 Crop Production Services, Inc Natural Resources Project-General /29/ don001 Matthew Doneux Employee Expense-General
17 Ramsey Washington Metro Watershed Dist. Cash Disbursements Journal For the Period From August 1, August 31, 2017 Date Check # Vendor ID Name Account ID Account Description Amount Check Detail 08/29/ gal001 Galowitz Olson, PLLC 2, Attorney General-General 2, Attorney-Flood Damage /29/ gra005 Grainger Natural Resources Project-General /29/ gru001 Gruber's Power Equipment Natural Resources Project-General /29/ haw001 Hawkins, Inc Water QM Staff-General 4, /29/ hew001 HP, Inc Office Equipment-General /29/ hom001 Home Depot Credit Service Natural Resources Project-General Construction Imp.-Maint. & Repair /29/ inn002 Innovative Office Solutions, LLC Office Supplies-General Events Office Supplies-General Office Supplies-General /29/ kid002 KidZibits, Inc Construction Imp.-Maint. & Repair 1, /29/ lea001 League of MN Cities Ins. Trust Insurance-General /29/ lea004 League of MN Cities Ins. Trust Insurance-General /29/ mel001 Michelle Melser Employee Benefits-General Employee Expense-General /29/ met004 Metro Sales, Inc Printing-General /29/ met008 MetLife-Group Benefits Employee Benefits-General Employee Health-General /29/ min008 Minnesota Native Landscapes, Inc Construction Imp.-Maint. & Repair 8, /29/ min018 Minnesota Coaches, Inc Events /29/ ncp001 MN NCPERS Life Insurance Employee Health-General /29/ nel004 Nelco Landscaping 1, BMP Cost Share Program 1, BMP Cost Share Program /29/ nsp001 Xcel Energy 1, Utilities/Bldg. Contracts Project Operations-General /29/ out001 Outdoor Lab Landscape Designs, Inc Construction Imp.-Maint. & Repair 49, /29/ VOID --- VOID - 08/29/ pac001 Pace Analytical Services, Inc. 3, Water QM Staff-General Water QM Staff-General Water QM Staff-General Water QM Staff-General Water QM Staff-General Water QM Staff-General Water QM Staff-General Water QM Staff-General
18 Ramsey Washington Metro Watershed Dist. Cash Disbursements Journal For the Period From August 1, August 31, 2017 Date Check # Vendor ID Name Account ID Account Description Amount Check Detail 08/29/ pac001 Pace Analytical Services, Inc. 3, Water QM Staff-General Water QM Staff-General Water QM Staff-General Water QM Staff-General Water QM Staff-General Water QM Staff-General Water QM Staff-General Water QM Staff-General /29/ pac001 Pace Analytical Services, Inc. 2, Water QM Staff-General Water QM Staff-General Water QM Staff-General Water QM Staff-General Water QM Staff-General Water QM Staff-General /29/ pci001 Pci Roads, LLC Construction-Beltline/Battle 107, /29/ pel001 Laurie Pellerite BMP Cost Share Program 1, /29/ pin003 Zola R. Pineles Employee Expense-General /29/ qwe001 CenturyLink Project Operations-General /29/ red002 Redpath & Company, Ltd Auditor/Accounting 4, /29/ ros005 David Rosenbloom BMP Cost Share Program 5, /29/ ruh001 Jennifer Ruhland BMP Cost Share Program /29/ sod001 Nichole Soderholm Employee Benefits-General Employee Expense-General /29/ stu001 Studio Lola BMP Cost Share Program /29/ sun001 Sunram Construction, Inc BMP Cost Share Program 16, /29/ tes001 The Tessman Companyh Construction Imp.-Maint. & Repair /29/ tim002 Timesaver Off-Site Secretarial, Inc CAC Expenses-General CAC Expenses-General /29/ usb002 U.S. Bancorp 1, IT/Website/Software IT/Website/Software Training & Education-General Office Supplies-General Natural Resources Project-General Events IT/Website/Software Training & Education-General
19 Ramsey Washington Metro Watershed Dist. Cash Disbursements Journal For the Period From August 1, August 31, 2017 Date Check # Vendor ID Name Account ID Account Description Amount Check Detail Office Supplies-General Miscellaneous Exp-General Water QM Staff-General Water QM Staff-General Training & Education-General Training & Education-General /29/ usb005 US Bank Equipment Finance Printing-General /29/ vla001 Dave Vlasin Employee Benefits-General Employee Expense-General Water QM Staff-General /29/ voy001 Voyager Fleet Systems, Inc Vehicle Fuel-General /29/ was007 Washington Conservation District BMP Cost Share Program 2, /29/ wil006 Patrick Willoughby BMP Cost Share Program 5, /29/ win002 Windmill Design Incorporated Outside Consulting Services 2, $485,777.03
20 Summary of Professional Engineering Services During the Period July 15, 2017 through August 18, 2017 Total Budget* (2017) Total Fees to Date (2017) Budget Balance (2017) Fees During Period District Accounting Code Plan Implementation Task Number Engineering Administration General Engineering Administration $72, $43, $28, $7, DW-13 RWMWD Health and Safety/ERTK Program $2, $1, $ DW-13 Educational Program/Educational Forum Assistance $20, $1, $18, DW-11 Engineering Review Engineering Review $50, $26, $23, $3, DW-13 Project Feasibility Studies Wakefield Park/Frost Avenue Stormwater Project- Project Planning with City Parks Department $30, $ $29, $ WL-1 Owasso Blvd and County Park Stormwater Retrofit $59, $47, $11, $10, DW-6 Aquifer Recharge Study Site Search and Feasibility Study $50, $1, $48, DW-10 Owasso Basin Improvements Feasibility Study $30, $ $29, $ GC-3 Shoreview Lake Subwatershed Feasibility Study $8, $0.00 $8, ShL-1 Roseville High School Campus Stormwater Retrofit (Bennett Lake Subwatershed) $30, $1, $28, DW-6 Create an Emergency Response Plan for Owasso Lake $15, $80.00 $14, LO-2 Battle Creek Targeted Subwatershed Study $10, $7, $2, $ BC-2 Strategic Monitoring of Atlas 14 Flood Prone Areas $11, $9, $1, $1, DW-9 Snail Lake/Grass Lake Area Temporary Flood Response Plng $100, $158, $58, $ DW-9 Snail Lake/Grass Lake Optimization $47, $20, $26, $20, DW-9 Grass Lake Berm Design $50, $14, $35, $14, DW-9 Contingency $20, $0.00 $20, GIS Maintenance GIS Maintenance $5, $ $4, $ DW-13 Monitoring Water Quality/Project Monitoring Lake Water Quality Monitoring (Misc QA/QC) $5, $3, $1, $ DW-2 Permit Processing, Inspection and Enforcement Permit Application Inspection and Enforcement $15, $0.00 $15, DW-7 Permit Application Review $50, $33, $16, $3, DW-7 Lake Studies/WRPPs/TMDL Reports 2017 Grant Applications $30, $1, $28, $1, Tanners Flood Response Tool Model Update $5, $1, $3, TaL-1 Macrophyte Harvesting Evaluation Study- Phase 2 $25, $25, $ KL-3 Kohlman TMDL Tracking (10 years into implementation plan) $15, $ $14, DW-2 Contingency for Lake Studies $25, $0.00 $25, Watershed Management Plan Update Watershed Management Plan Update $20, $13, $6, $ Research Projects New Technology Mini Case Studies (average 6 per year) $10, $5, $4, $2, DW-12 Modeling of 95% CI Limit Atlas 14 District-Wide (Climate Change Scenario) and Generation of Flood Maps for future outreach efforts $150, $20, $129, $1, DW-9 Kohlman Permeable Weir Test System Monitoring Plan $10, $1, $8, $ DW-12 Maplewood Mall Monitoring $10, $0.00 $10, DW-12 Summary of alternatives to alum treatment in shallow lakes. $5, $1, $3, DW-12 Project Operations 2017 Tanners Alum Facility Monitoring $20, $8, $11, $1, TaL-3 Capital Improvements Frost Kennard Spent Lime BMP $20, $ $19, WL-1 Commercial Sites Retrofit Projects 2017 $75, $0.00 $75, DW-6 School Sites Retrofit Projects 2017 $75, $36, $38, $4, DW-6 Church Sites Retrofit Projects 2017 $75, $32, $42, $10, DW-6 CMAC Project at Willow Pond (Bennett Lake Subwatershed) $30, $5, $24, $1, BeL-4 McKnight Basin Improvements (Battle Creek Subwatershed) Preliminary Design $30, $0.00 $30, BC-4 BMP Incentive Fund: General BMP Design Assistance and Review $30, $19, $10, $2, DW-6 BMP Incentive Fund: Faith-Based Organizations $20, $6, $13, DW-6 Markham Pond Dredging $152, $118, $33, $3, KC-1 CIP Project Repair & Maintenance 2017 Beltline Repairs Construction Services $360, $209, $150, $3, BELT-2 District Office Bldg Solar Energy Retrofit $20, $6, $13, $ DW-13 Kohlman Lake Macrophyte Mgmt $5, $ $4, KL-3 Routine CIP Inspection and Unplanned Maintenance Identification $60, $30, $29, $8, DW CIP Maintenance and Repairs $150, $95, $54, $4, DW-5 *For projects carried over from previous years, the total budget reflects the total project budget, and not just the 2017 portion. Subtotal $110, TOTAL PAYABLE FOR PERIOD 7/15/2017-8/18/2017 $110, Barr declares under the penalties of Law that this Account, Claim, or Demand is just and that no part has been paid. Bradley J. Lindaman, Vice President
21 2017 School Sites BMP Retrofits Progress Payment Number 2 1 Completed to Date: 2 Less Previously Billed: 3 Amount Completed This Period: 4 Amount Previously Retained: 5 Amount Retained This Period (See Note 1): 6 Total Amount Retained (See Note 2): 7 Retainage Released Through This Period: 8 Less Total Retainage Remaining: 9 less Amounts Previously Paid: 10 Amount Due This Estimate: $127, $0.00 $108, $3, $1, $4, $18, $0.00 $16, Note 1: At rate of 10% until Completed to Date equals 50% of current Contract Price and a rate of 0% thereafter. Note 2: Maximum amount is 5% of current Contract Price SUBMITIED BY: Name: Title: Contractor: Signature: Ryan Sunram Date: S"f;o~lnc~~ President 8/22/2017 RECOMMENDED BY: Name: Title: Engineer: Matt Kumka Project Manager Date: 8/22/2017 Signature: APPROVEO BY: Name: Title: Owner: Marj Ebensteiner Date: President Ramsey-Washington Metro Watershed District Signature:
22 Central Park Elementary Roseville Contract Amount Total Completed Through This Period Total Completed Through This Period Base Bid Items Invoice #1 Invoice #2 Estimated Actual Actual Item Description Unit Quantity Unit Price Quantity Extension Unit Price Quantity Extension Mobilization/Demobilization/Traffic A Control/Erosion Control L.S. 1 $3, $3, $3, $0.00 D Remove Concrete Curb and Gutter L.F. 16 $ $ $ $0.00 H Remove Sod S.Y. 268 $ $ $ $0.00 I Remove Tree (Greater than 6" DBH) Each 0 $0.00 L Excavate, Haul, and Dispose C.Y. 179 $ $3, $ $1, M Grading L.S. 1 $1, $1, $1, $0.00 N Soil Loosening S.Y. 223 $ $ $ $ Clean Sand C.Y. 21 $ $1, $ $ Planting Soil (12" depth- 75% Sand, 25% p Leaf compost- MnDOT Grade II) C.Y. 75 $ $4, $ $ Twice-Shredded Hardwood Mulch (3" Q depth) C.Y. 19 $ $ $ $45.00 T Concrete Curb & Gutter L.F. $ $0.00 Concrete Curb Cut & Small Splash Block U.l Assembly Each 2 $1, $3, $1, $0.00 Limestone Retaining Wall S.F. 194 $ $6, $ " Perforated (CPEP) Draintile w/o sock X (Underdrain) L.F. 62 $ $ $ $0.00 4" Solid (CPEP) Draintile w/o sock y (Underdrain) L.F. 10 $ $ $ FALSE z Draintile Clean Out Each 1 $ $0.00 $ $0.00 AA Connect Draintile to Catch Basin Each 1 $ $ $ $0.00 Inlet Protection Each 1 $ $ $ BB Edging L.F. 123 $ $0.00 $ $1, #1 Cont. Perennial or Shrub (Furnish & DD In stall) Each 377 $ $0.00 $ $0.00 EE #2 Cont. Shrub (Furnish & Install) Each 58 $ $0.00 $ $0.00 SUBTOTAL TOTAL $26, TOTAL $4,185.90
23 Woodbury Elementary Roseville Contract Amount Tot al Completed Through This Period Tot al Completed Through This Period Base Bid Items Invoice #1 Invoice #2 Estimated Actual Actual Item Description Unit Quantity Unit Price Quantity Ext ension Unit Price Quantity Extension Mobilization/Demobilization/Traffic A Control/Erosion Control L.S. 1 $5, $5, $5, $0.00 D Remove Concrete Curb and Gutter L.F. 16 $ $ $ $0.00 Remove Concrete Apron Each 1 $ $ $ Remove Dra intile L.S. 1 $ $ $ H Remove Sod S.Y $ $1, $ $0.00 I Remove Tree (Greater than 6" DB H) Each 2 $ $1, $ $0.00 L Excavate, Haul, and Dispose C.Y $ $18, $ $4, M Grading L.S. 1 $1, $1, $1, $0.00 N Soil Loosening S.Y. 763 $ $ $ $ Clean Sand C.Y. 77 $ $2, $ $0.00 Planting Soi l (12" depth- 75% Sand, 25% p Leaf compost- Mn DOT Grade II ) C.Y. 333 $ $21, $ $0.00 Twice-Shredded Hardwood M ul ch (3 " Q depth) C.Y. 116 $ $2, $ $ Rip Rap Ton 6 $ $ $95.00 T Concrete Cu rb & Gutter L.F. 8 $ $ $ $0.00 Concrete Curb Cut & Sma ll Splash Block U.1 Assembly Each 1 $1, $1, $1, $0.00 4" Perforated (CPEP) Drai ntile w/o sock X (U nderdrain) L.F. 232 $ $2, $ $0.00 4" Solid (CPEP) Draintil e w/o sock y (U nderdra in) L.F. 9 $ $ $ $0.00 z Draintile Clean Out Each 1 $ $0.00 $ $0.00 AA Connect Dra intile to Catch Basin Each 2 $ $1, $ $0.00 Inlet Protection Each 2 $ $ $ BB Edgi ng L.F. 661 $ $0.00 $ $4, #1 Cont. Perennial or Shrub (Furnish & DD Install) Each 625 $ $0.00 $ $0.00 EE #2 Cont. Shrub (Furnish & Insta ll ) Each 58 $ $0.00 $ $0.00 SUBTOTAL TOTAL $63, TOTAL $10,031.00
24 Roseville Middle School Roseville Contract Amount Total Completed Through This Period Total Completed Through This Period Base Bid Items Invoice #1 Invoice #2 Estimated Actual Actual Item Description Unit Quantity Un it Price Quantity Extension Unit Price Quantity Extension Mobil ization/demobilizat ion/ Traffic A Control/Erosion Cont rol L.S. 1 $2, $2, $2, $0.00 D Remove Concrete Curb and Gutter L.F. 8 $ $ $ $0.00 H Remove Sod S.Y. 405 $ $ $ $0.00 I Remove Tree (G reat er than 6" DB H) Each 2 $ $ $ $0.00 L Excavate, Hau l, and Dispose C.Y. 175 $ $3, $ $2, M Grad ing L.S. 1 $1, $1, $1, $0.00 N Soi l Loosening S.Y. 52 $ $23.40 $ $ Clean Sa nd C.Y. 17 $ $1, $ $ Planting Soi l (12" depth- 75% Sand, 25% p Leaf com post- MnDOT Grade II ) C.Y. 15 $ $4, $ $ Tw ice-shredded Hardwood Mulch (3" Q depth) C.Y. 34 $ $ $ $ $0.00 Concret e Curb Cut & Sma ll Splash Block U. l Assembly Each 1 $1, $1, $1, $0.00 Limestone Reta ining Wa ll S. F. 4" Perforated (CPEP) Draintile w/o sock X (Underdrain) L.F. 72 $ $ $ $0.00 4" Solid (CPEP) Draintile w/o sock y (Underdrain) L.F. 14 $ $ $ $0.00 z Dra intile Clean Out Each 1 $ $0.00 $ $0.00 AA Connect Dra intile to Catch Basin Each 1 $ $ $ $0.00 6" Sediment Log L.F. 60 $ $ $4.00 Inlet Protection Each 2 $ $ $ BB Edging L.F. 56 $ $0.00 $ $ #1 Cont. Perennial or Sh rub (Furn ish & DD Install ) Each 509 $ $0.00 $ $0.00 EE #2 Cont. Sh rub (Furni sh & Insta ll ) Each 29 $ $0.00 $ $0.00 SUBTOTAL TOTAL $18, TOTAL $4,246.00
25 2017 Faith Based Sites BMP Retrofits Progress Payment Number 2 1 Completed to Date: $81, Less Previously Billed: 3 Amount Completed This Period: 4 Amount Previously Retained: 5 Amount Retained This Period (See Note 1): 6 Total Amount Retained (See Note 2): 7 Retainage Released Through This Period: 8 Less Total Retainage Remaining: 9 Less Amounts Previously Paid: $ Amount Due This Estimate: $30, $3, $1, $4, $50, $0.00 $49, Note 1: At rate of 10% until Completed to Date equals 50% of current Contract Price and a rate of 0% thereafter. Note 2: Maximum amount is 5% of current Contract Price SUBMITTED BY: Name: Chuck Hanna Date: 8/23/2017 Title: President Contractor: Outdoor Lab Signature: RECOMMENDED BY: Name: Title: Engineer: Matt Kumka Date: Project Manager Barr Engineering Company 8/23/2017 Signature: APPROVED BY: Name: Title: Owner: Marj Ebensteiner Date: President Ramsey-Washington Metro Watershed District Signature:
26 Trinity Lutheran Church Pay App Progress Total Completed Through this Period Total Completed Through this Period Base Bid Items Invoice #1 Invoice #2 Actual Actual Item Description Unit Quantity Unit Pri ce Quantity Extension Unit Price Quantity Extension Mob i Ii zatio n/dem obi Ii zation/t raffi c A Cont rol/erosion Control L.S. 1 $2, $0.00 $2, $1, B 6" Sed iment Control Log L.F. 246 $ $0.00 $ $ D Remove Concrete Curb and Gutter L.F. 43 $ $0.00 $ $ F Remove Flared End Section Each 1 $ $0.00 $ $75.00 H Sod Remova l S.Y. 768 $ $0.00 $ $3, Remove Tree (greater than 6" DB H) Each 1 $ $0.00 $ $ I Disposa l of Excavat ed Materials Off-Site C.Y. 195 $ $0.00 $ $6, J Grading Each 2 $ $0.00 $ $ K Soil Loosening S.Y. 110 $ $0.00 $ $ L Co ncrete Paver Splash Block Assembly Each 2 $1, $0.00 $1, $4, M Clean Sand (Sand Trench) C.Y. 28 $ $0.00 $ $1, " Perforated (CPEP) Dra int ile w/o sock 0 (Underdrain) L.F. 58 $ $0.00 $ $ " Solid (CPEP) Dra intile w/o sock p (Underdrain) L.F. 153 $ $0.00 $ $ R 4" Dra int ile Catch Basin Con nection Each 1 $ $0.00 $ $ Planting Soil (12" depth- 75% Sand, 25% s Leaf compost- MnDOT Gra de II ) C.Y. 77 $ $0.00 $ $6, Twice-Shred ded Hardwood Mulch (3" T depth) C.Y. 26 $ $0.00 $ $4, " Black Powder Coated Landscape u Edging L.F. 210 $ $0.00 $ $3, Nyloplast Dra inbasin Each 1 $3, $0.00 $3, $3, V Sod S.Y. 469 $ $0.00 $ $ X #1 Co nt. Pere nnial or Shrub Each 631 $ $0.00 $ $7, EE #2 Cont. Shru b (Fu rnish & Inst all) Each 118 $ $0.00 $ $3, Dra in Tile Clean-Out Each 2 $ $0.00 $ $ y Inlet Prot ection Each 2 $ $0.00 $ $ SUBTOTAL TOTAL $0.00 TOTAL $50,939.58
27 North Church Roseville Contract Amount Total Completed Th rough This Period Total Completed Through This Period Base Bid Items Invoice #1 Invoice #2 Estimated Actual Actual Item Description Unit Quantity Unit Price Quantity Extension Unit Price Quantity Extension Mobilization/Demobil ization/traffic A Control/Erosion Control L.S. 1 $1, $1, $2, $0.00 D Remove Concrete Curb and Gutter L.F. 43 $ $ $ $0.00 H Remove Sod S.Y. 323 $ $1, $1, $0.00 I Remove Tree (Greater than 6" DBH) Eac h 1 $ $1, $ $0.00 L Excavate, Haul, and Dispose C.Y. 99 $ $4, $ $0.00 M Gradi ng L.S. 1 $ $ $1, $0.00 N Soi l Loosening S.Y. 122 $ $ $ $ Clean Sand C.Y. 22 $ $1, $2, $0.00 Planting Soi l (12" depth- 75% Sa nd, 25% p Leaf compost- MnDOT Grade II ) C.Y. 69 $ $3, $ $0.00 Tw ice-shredded Hardwood Mulch (3" Q depth) C.Y. 27 $ $1, $ $0.00 T Concrete Curb & Gutter L. F. 29 $ $1, $ $0.00 Concrete Curb Cut & Sma ll Splash Block U.1 Assembly Each 1 $1, $1, $ $0.00 4" Perforated (CPE P) Draintile w/o sock X (U nderdrain) L. F. 65 $ $ $ $0.00 4" So lid (CPEP) Draint ile w/o sock y (Underdrain) L.F. 37 $ $ $ $0.00 z Draintile Clean Out Eac h 1 $ $ $ $0.00 AA Connect Dra intile to Catch Basin Each 1 $ $ $ $0.00 BB Edging L.F. 115 $ $1, $ $0.00 #1 Cont. Perennia l or Shrub (Furnish & DD Insta ll) Each 272 $ $4, $ $0.00 EE #2 Cont. Shrub (Furnish & Install) Eac h 58 $ $2, $ $ " B&B Deciduous Tree (Furnish & FF Install) Eac h 2 $ $1, $ $0.00 GG Gate Va lve w/ assemble Each 1 $ $ II Stump Grinding Each 1 $ $ SUBTOTAL TOTAL $30, TOTAL $0.00
28 Application for Payment No..1. Beltline and Ba ttle Creek Repairs Ramsey-Washington Metro Watershed District Owner: Ramsey-Washington Metro Watershed District Contractor: PCi Roads, LLC Engineer: Barr Engineering, Co. For work accomplished through the date of August 18, Completed to Date: Less Previously Billed: Amount Completed This Period: Amount Previously Retained: Amount Retained This Period (See Note 1): Total Amount Retained:. Retainage Released Through This Period: Less Total Retainage Remaining: Less Amounts Previously Paid: Amount Due This Estimate: $1,403, $ 1,283, $119, $128, $11, $140, $0.00 $140, $ 1, 155, $107, Note 1: The specifications require 10% to be retained up to 50% of the project costs. CONTRACTOR's Certification The undersigned CONTRACTOR certifies that: (l) all previous progress payments received from OWNER on account of Work done under the Contract referred to above have been applied to discharge in full all obligations of CONTRACTOR.incurred in connection with Work covered by prior Applications for Payment numbered 1 through _6_ inclusive; (2) title to all Work, materials and equipment incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass to OWNER at time of payment free and clear of all liens, claims, security interest and encumbrances (except such as are covered by Bond acceptable to OWNER indemnifying OWNER against any such lien, claim, security interest or encumbrance); and (3) all Work covered by this Application for Payment is in accordance with the Contract Documents and not defective as that term is defined in the Contract Documents. SUBMITTED BY: Name: Title: Contractor: Leo Flynn Project Coordinator PCi Roads, LLC f/z f //J' Date: ,--,+-''--'' Signature: RECOMMENDED BY: / / Name: Samuel 0. Redinger Title: Project Engineer Engineer: Barr Engineering Co. Date: 8/21/ Signature: APPROVED BY: Name: Title: Owner: Maij Ebensteiner Date : President Ramsey-Washington Metro Watershed District Signature: C:\ Users\Leo\AppData\Loca l\ Microsoft\Win dows\temporary Internet Fil es\content.outlook\ SSTY20VU\ Draft PCI Payment Applica tion 7.xlsx
29 Beltline and Battle Creek Repairs Ramsey-Washington Metro Watershed District Summary of Work Completed Through August 18, 2017 for Progress Payment No. 7 Item ITEM DESCRIPTION A Mobilization B Water Management C Erosion Control D Traffic Control E Cold Joint Orientation Core Hole F Crack Repair - Hydrophobic F Crack Repair - Hydrophilic G Chemical Grout - Hydrophobic G Chemical Grout - Hydrophilic H Concrete Surface Repair* I Cementitious Mortar Patch J Manhole Steps K Root Removal L Encrustation Demolition and Disposal M Precast Joint Repairs N Rubble Removal (Station 14+94) N Rubble Removal (Station 15+87) N Rubble Removal (Station ) N Rubble Removal (Station ) N Rubble Removal (Station ) 0 Point Repair 0 Point Repair (Station 50+61) 0 Point Repair (Station 79+65) 0 Point Repair (Station ) 0 Point Repair (Station ) 0 Point Repair (Station 44+97) p Invert Repair (Station 63+92) p Invert Repair (Station ) Q Uncover Manhole R s Adjust Manhole Height CCTV Inspection PCi Roads, LLC (1) Total Completed This Period UNIT ESTIMATED QUANTITY UNIT COST EXTENSION Quantity LS 1 $ 280, $ 280, $0.00 LS 1 $ 5, $ 5, $0.00 LS 1 $ 35, $ 35, $0.00 LS 1 $ 25, $ 25, $0.00 EA 90 $ $ 39, $0.00 LF $ $ 812, $0.00 LF 5000 $ $ 325, $0.00 GAL 3000 $ $ 150, $0.00 GAL 1200 $ $ 60, $0.00 SF $ $ 819, $0.00 EA 20 $ 1, $ 20, $0.00 EA 391 $ $ 32, $0.00 LS 1 $ 5, $ 5, $0.00 LS 1 $ 35, $ 35, $0.00 LF 200 $ $ 11, $0.00 LS 1 $ 5, $ 5, $0.00 LS 1 $ 2, $ 2, $0.00 LS 1 $ 2, $ 2, $0.00 LS 1 $ 2, $ 2, $0.00 LS 1 $ 2, $ 2, $0.00 EA 27 $ $ 24, $0.00 EA 1 $ 1, $ 1, $0.00 EA 1 $ 1, $ 1, $0.00 EA 1 $ 1, $ 1, $0.00 EA 1 $ 1, $ 1, $0.00 EA 1 $ 1, $ 1, $0.00 SF 15 $ 1, $ 15, $0.00 SF 64 $ $ 32, $0.00 EA 4 $ 1, $ 7, $0.00 EA 4 $ 1, $ 7, $0.00 LS 1 $ 35, $ 35, $0.00 BASE BID TOTAL $ 2,796, $0.00 (2) Total Completed (3) Total Completed To Previous Periods Date Quantity Quantity $190, $190, $2, $2, $17, $17, $12, $12, $160, $160, $220, $220, $32, $32, $31, $31, $127, $127, $1, $1, $10, $10, $35, $35, $2, $2, $2, $2, $5, $5, $1, $1, $1, $1, $39, $39, $892, $892, of 2
30 Beltline and Battle Creek Repairs Ramsey-Washington Metro Watershed District Summary of Work Completed Through August 18, 2017 for Progress Payment No. 7 Item ITEM DESCRIPTION UNIT ESTIMATED QUANTITY (1) Total Completed This PCi Roads, LLC Period UNIT COST EXTENSION Quantity (2) Total Completed (3) Total Completed To Previous Periods Date Quantity Quantity BID ALTERNATE #1: REINFORCEMENT STEEL Item ITEM DESCRIPTION UNIT ESTIMATED QUANTITY UNIT COST EXTENSION T Reinforcement Seal - 6 in. EA 264 $ $ 3, $0.00 T Reinforcement Seal - 12 in. EA 2197 $ $ 52, $0.00 T Reinforcement Seal - 24 in. EA 882 $ $ 42, $0.00 T Reinforcement Seal - 36 in. EA 252 $ $ 17, $0.00 BID ALTERNATE #1 $ 115, $0.00 TOTAL BASE BID PLUS BID ALTERNATE #1 $ 2,912, $0.00 $0.00 $0.00 $892, $892, CHANGE ORDER - ADDITIONAL ITEMS 1-2 Deep Concrete Surface Repair* SF 3,000 $ $ 261, $0.00 Beaver Lake Branch Deep Concrete Surface Repair Exceed ing 3, SF 0 $ $ - SF 0 $ Repair a Void at Station LS 1 $ 14, $ 14, $ Beaver Lake Branch Crack Sealinq LS 1 $ 119, $ 119, $119, SUBTOTAL CHANGE ORDERS $ 395, $119, TOTAL BASE BID PLUS BID ALTERNATE #1, PLUS CHANGE ORDERS $ 3,307, $119, RETAINAGE (10% Retainage, up to 50% of Work Completion) $11, TOTAL AMOUNT DUE: $107, *Change Order 1-2 results in an estimated reduction of Item Hof 3,000 SF, for an estimated reduction of $189,000. Thi s results in an estimated net increase of $72, $261, $261, $115, $115, $14, $14, $ $119, $391, $510, $1,283, $1,403, $128, $140, $1,155, $1,263, of 2
Ramsey-Washington Metro Watershed District Minutes of Regular Board Meeting August 2, 2017
Ramsey-Washington Metro Watershed District Minutes of August 2, 2017 The Regular Meeting of August 2, 2017, was held at the District Office Board Room, 2665 Noel Drive, Little Canada, Minnesota, at 6:30
More informationApproved Minutes of the Regular Meeting of the Brown s Creek Watershed District Board of Managers, Wednesday October 10, 2018 at 6:30 PM
Approved Minutes of the Regular Meeting of the Brown s Creek Watershed District Board of Managers, Wednesday October, 0 at :0 PM Family Means, Northwestern Avenue south Stillwater, MN 0 ROLL CALL Managers
More informationSTORMWATER ADVISORY GROUP August 26, 2009 Clarkston School District Admin Office 1294 Chestnut Street, Clarkston 5:30-7:30 p.m.
County of Asotin Regional Stormwater Program P.O. Box 160 135 2 nd Street Asotin, WA 99402 509-243-2071 Fax 509-243-2003 STORMWATER ADVISORY GROUP August 26, 2009 Clarkston School District Admin Office
More informationApproved Minutes of the Regular Meeting of the Brown s Creek Watershed District Board of Managers, Wednesday December 12, 2018 at 6:30 PM
0 0 Approved Minutes of the Regular Meeting of the Brown s Creek Watershed District Board of Managers, Wednesday December, 0 at :0 PM Family Means, Northwestern Avenue south Stillwater, MN 0 ROLL CALL
More informationRegular Meeting Minutes. I. Call to Order at 6:03p.m. (Vice President Mary Texer)
Approved March 6, 2013 Meeting Minutes of the Capitol Region Watershed District (CRWD) Board of Managers, for Wednesday, February 20, 2013, 6:00 p.m.at the office of the CRWD, 1410 Energy Park Dr., Suite
More information69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11
69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to
More informationCITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER
CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS 12835 NEWCASTLE WAY, SUITE 200 DECEMBER 18, 2012 SPECIAL MEETING 12:00 P.M. 1. CALL TO ORDER 2. GENERAL BUSINESS a. AB 12 077 Resolution Authorizing
More informationMinutes of the Regular Meeting of the Brown s Creek Watershed District Board of Managers, Wednesday, July 12, 2017 at 6:30 PM
Minutes of the Regular Meeting of the Brown s Creek Watershed District Board of Managers, Wednesday, July, 0 at :0 PM Family Means, Northwestern Avenue south Stillwater, MN 0 ROLL CALL Managers Present:
More informationSTORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES
DEPARTMENT OF ENVIRONMENTAL SERVICES Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,
More informationHow To Score, Rank & Prioritize. Improving Regional Water Quality Utah Cultural Celebration Center November 21, 2014
How To Score, Rank & Prioritize Improving Regional Water Quality Utah Cultural Celebration Center November 21, 2014 Why score & prioritize? You can t implement ALL your ideas! (at least not all at once)
More informationTOTAL QUANTITY UNIT COST UNIT
BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50
More informationMINUTES OF THE REGULAR MEETING OF THE BOARD OF MANAGERS OF THE NINE MILE CREEK WATERSHED DISTRICT WEDNESDAY, JANUARY 16, 2019
MINUTES OF THE REGULAR MEETING OF THE BOARD OF MANAGERS OF THE NINE MILE CREEK WATERSHED DISTRICT WEDNESDAY, JANUARY 16, 2019 Call to Order Chair Kloiber called the meeting of the Board of Managers of
More information1. Call to Order Manager Lavold called the meeting to order at 7:02 p.m.
Regular Meeting South Washington Watershed District Wednesday December 19, 2007 7:00 p.m. Woodbury Public Works Building 2301 Tower Drive, Woodbury, MN 1. Call to Order Manager Lavold called the meeting
More informationMINUTES OF REGULAR MEETING OF THE COMFORT LAKE - FOREST LAKE WATERSHED DISTRICT THURSDAY, JULY 23, 2009
MINUTES OF REGULAR MEETING OF THE COMFORT LAKE - FOREST LAKE WATERSHED DISTRICT THURSDAY, JULY 23, 2009 1) Call to Order The President called the July 23, 2009 regular Board meeting to order at 6:30 p.m.
More information2018 Operating Budget Approved August 17, 2017 Bassett Creek Watershed Management Commission Actual Actual.
2018 Operating Approved August 17, Bassett Creek Watershed Management Commission Item 2014 2014 Actual 2015 2015 Actual 2016 2016 Actual 2018 ENGINEERING & MONITORING Technical Services 120,000 109,391
More informationRock Chalk Park - Infrastructure Report. July 2013
Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the
More informationGateway Services Community Development District
Gateway Services Community Development District Fiscal Year 2018 Operating and Debt Service Budgets (Version 3 - Adopted on August 17, 2017) Table of Contents Page # Operating Budgets General Fund 001.........
More informationApproved Minutes. District Engineer Chris Otterness, Houston Engineering; District Attorney Louis Smith, Smith Partners
1 REGULAR MEETING OF THE RCWD BOARD OF MANAGERS Wednesday, April 26, 2017 Shoreview City Hall Council Chambers 4600 North Victoria Street, Shoreview, Minnesota 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
More informationSTORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES
DEPARTMENT OF ENVIRONMENTAL SERVICES Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,
More informationStephanie Smith, Project EngineerW
MEMORANDUM v TO: Paul Oehme, Director of Public Works/ City Engineer o FROM: Stephanie Smith, Project EngineerW 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 9522271100 Fax
More informationSTORMWATER MANAGEMENT FUND Department of Environmental Services
Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,
More informationLower Mississippi River Watershed Management Organization
Lower Mississippi River Watershed Management Organization APPROVED MEETING MINUTES Board of Managers Regular Meeting June 11, 2014 ~ 3:00 P.M. Mendota Heights City Hall Managers in attendance: Bob Bullard
More informationSTORMWATER MANAGEMENT FUND Department of Environmental Services
Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,
More informationX. REPORTS FROM COMMISSIONERS A. Review/Discussion: Comprehensive Planning Taskforce Update.
MEETING AGENDA ENVIRONMENTAL ADVISORY COMMISSION October 16, 2017 5:00 PM North St. Paul City Hall Sandberg Room 2400 Margaret Street I. CALL TO ORDER II. III. IV. ROLL CALL Simba Blood Felicia Tolbert-Ireland
More informationP= Attend in Person AT= Attend via Technology N= Not in Attendance
Board Members in Attendance: P - Carla Guiher (President) P - Jim Susin (Vice President) P - Chad Langan (Treasurer) P - Bonnie Nungester (Secretary) P - Brad Wilson P - Kathryn Diaz P - Tom Thomas P=
More informationUtility Board. Agenda topics. For Meeting of June 12, :00 PM to 9:00 PM City Council Chambers, City Hall
Utility Board For Meeting of June 12, 2012 7:00 PM to 9:00 PM City Council Chambers, City Hall Board Members: Council Liaison: Staff: David Laub, Chairman, Benjamin Levie, Vice Chairman, Suresh Malhotra,
More informationSTRAND MASTER ASSOCIATION BOARD MEETING MINUTES October 10, :00 PM CLUB AT THE STRAND. Heather Keel, Cambridge
STRAND MASTER ASSOCIATION BOARD MEETING MINUTES October 10, 2018 3:00 PM CLUB AT THE STRAND Board Members Present: Management Representatives: Tom Guthrie, Treasurer Susan Mulgrew, President Bob Polizzotto,
More informationDRAFT 2040 COMPREHENSIVE PLAN UPDATE
DRAFT 2040 COMPREHENSIVE PLAN UPDATE PLANNING COMMISSION PUBLIC HEARING TUESDAY, MAY 22, 2018 05/22/2018 DRAFT 2040 COMPREHENSIVE PLAN UDPATE - PUBLIC HEARING 1 What is a Comprehensive Plan? Framework
More informationSTORMWATER MANAGEMENT FUND Department of Environmental Services
Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,
More information2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)
2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion
More informationAmended Operating Budget Fiscal Year 2010
Amended Operating As Revised August 4, 2010 WWW.DMSUS.COM Amended Operating Table of Contents Section 1: Introduction Section 2: Operating Fund Balance Projections Section 3: Operating Comparative Analysis
More informationDRAFT Minutes of the Regular Meeting of the Board of Directors October 18, :00 pm 6:00 pm Location: RCD Office
DRAFT Minutes of the Regular Meeting of the Board of Directors October 18, 2018 4:00 pm 6:00 pm Location: RCD Office Directors present: Neal Kramer, TJ Glauthier, Jim Reynolds RCD staff present: Kellyx
More informationAGENDA WALLED LAKE LAKE IMPROVEMENT BOARD MEETING. December 11, :00 PM. Novi Civic Center W. Ten Mile Road
AGENDA WALLED LAKE LAKE IMPROVEMENT BOARD MEETING December 11, 2013 4:00 PM Novi Civic Center 45175 W. Ten Mile Road I. Call Meeting to Order II. III. IV. Roll Call Public Comment Approval of Minutes of
More informationSUBDIVISION IMPROVEMENTS AGREEMENT
SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El
More information2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.
ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense
More informationThe City of Arden Hills Truth-In-Taxation Hearing:
The City of Arden Hills Truth-In-Taxation Hearing: December 12, 2016 Mayor David Grant Council Members Brenda Holden, Fran Holmes, Dave McClung, and Jonathan Wicklund City Vision Arden Hills is a strong
More informationAddendum 1 Downtown North CRA Sidewalks
Addendum 1 Downtown North CRA Sidewalks January 12, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDA ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE
More informationADDENDUM No. 1 January 29, Paving Program Village of Milford
ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for
More information33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.
CITY OF PLANT CITY WHEELER STREET RE-ALIGNMENT Opinion of Probable Construction Costs (Final Plans) Rev 7/22/2010 Rev 8/2/2010 Rev 8/27/20012 Bid Cost per Estimated Extended Item Item Unit Units Wheeler
More informationLEXINGTON OAKS. Community Development District. Annual Operating and Debt Service Budget. Fiscal Year 2012
Annual Operating and Debt Service Budget Version 7 - Adlpted Budget (Adopted at meeting 8/18/11) Prepared by: Table of Contents Page # OPERATING BUDGET General Fund Summary of Revenues, Expenditures and
More informationMinutes of the Regular Meeting of the Brown s Creek Watershed District Board of Managers, May 20, 2013, 2013
Page of 0 0 Minutes of the Regular Meeting of the Brown s Creek Watershed District Board of Managers, May 0, 0, 0 WCD Offices, 0 W. Frontage Road, Hwy. Stillwater, MN 0 ROLL CALL Managers Present: Craig
More informationEAGAN-INVER GROVE HEIGHTS WATERSHED MANAGEMENT ORGANIZATION
EAGAN-INVER GROVE HEIGHTS WATERSHED MANAGEMENT ORGANIZATION AGENDA BOARD OF MANAGERS MEETING EAGAN MUNICIPAL CENTER BUILDING March 17, 2015 5:30 P.M. I. Call to Order II. III. IV. Approval of Agenda Consent
More informationWest Virginia Department of Environmental Protection MS4 Phase II Storm Water Program Storm Water Management Annual Report
West Virginia Department of Environmental Protection MS4 Phase II Srm Water Program Srm Water Management Annual Report City of Vienna, West Virginia May 23, 2009 1.0 INTRODUCTION The City of Vienna was
More informationREQUEST FOR PROPOSAL. Concrete Work at Grand Ravines County Park
REQUEST FOR PROPOSAL Concrete Work at Grand Ravines County Park July 13, 2018 The Ottawa County Parks and Recreation Commission (OCPRC) is seeking proposals for construction of a concrete stairs and pavement
More informationDRAFT 2040 COMPREHENSIVE PLAN UPDATE
DRAFT 2040 COMPREHENSIVE PLAN UPDATE CITY COUNCIL PUBLIC HEARING MONDAY, JUNE 4, 2018 06/04/2018 DRAFT 2040 COMPREHENSIVE PLAN UDPATE - CITY COUNCIL PUBLIC HEARING 1 Requested City Council Action Authorize
More informationThe City of Arden Hills Truth-In-Taxation Hearing:
The City of Arden Hills Truth-In-Taxation Hearing: December 8, 2014 Mayor David Grant Council Members Brenda Holden, Fran Holmes, Ed Werner, and Dave McClung City Vision Arden Hills is a strong community
More informationCITY COUNCIL MEETING MINUTES June 5, :00 p.m.
As Amended June 19, 2017 Item 2b, page 2; Item 6b, page 4 CITY COUNCIL MEETING MINUTES June 5, 2017 7:00 p.m. 1) Call to Order Mayor Whalen called the meeting to order at 7:00 p.m. a) Pledge of Allegiance
More informationCity of Centerville BMP Pages Table of Contents. Minimum Control Measure 1. Public Education and Outreach
i City of Centerville s Table of Contents Minimum Control Measure 1. Public Education and Outreach Best Management Practice Page 1-1: Outreach Publications...1 1-2: 30-day Public Notice for Annual Storm
More informationRegular. NECESSARY RESOURCES/IMPACTS (OTHER) n/a. Fiscal Impact
CITY COUNCIL AGENDA Meeting Date: 09/16/2013 TITLE: Hatley Way Sidewalk Improvements 2013 Bid Award Responsible Staff: Ron Crumley Backup Material: Backup material attached Digital Presentation: Yes Other
More informationStormwater Utility Agency Overview
Stormwater Utility Agency Overview Agency Mission The mission of the Stormwater Utility is to provide stormwater management services to the City of Madison with an equitable rate structure. Agency Overview
More informationStormwater Utility Agency Overview
Agency Overview Agency Mission The mission of the Stormwater Utility is to provide stormwater management services to the City of Madison with an equitable rate structure. Agency Overview The Stormwater
More informationTown of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562
Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated
More informationPUBLIC WORKS COMMITTEE 4:00 p.m., Monday, March 8, 2010
PUBLIC WORKS COMMITTEE 4:00 p.m., Monday, The regular meeting of the Public Works Committee was held at 4 p.m., Wednesday, March 8, 2010 in the Public Works Building located at 1303 Palm Boulevard, Isle
More informationRENAISSANCE COMMUNITY DEVELOPMENT DISTRICT. Agenda Package. Regular Board Meeting. Monday August 13, :30 a.m.
RENAISSANCE COMMUNITY DEVELOPMENT DISTRICT Agenda Package Regular Board Meeting Monday August 13, 2018 11:30 a.m. The Club at Renaissance 12801 Renaissance Way Fort Myers, Florida Note: The Advanced Meeting
More informationWater Resources Engineering Division Public Works City of Colorado Springs
Water Resources Engineering Division Public Works City of Colorado Springs Richard Mulledy, P.E. Division Manager City of Colorado Springs/Pueblo County IGA City of Colorado Springs/Pueblo County IGA $460
More informationShell Rock River Watershed District Regular Meeting Minutes September 12, 2017
Shell Rock River Watershed District Regular Meeting Minutes September 12, 2017 Managers present: Dan DeBoer, Gary Pestorious, Brad Kramer, Al Bakken, Joe Pacovsky, and Mick Delger Managers absent: Mike
More informationJANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,
ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT
More informationRIVER HALL COMMUNITY DEVELOPMENT DISTRICT FISCAL YEAR 2019 ADOPTED BUDGET UPDATED SEPTEMBER 7, 2018
FISCAL YEAR 2019 ADOPTED BUDGET UPDATED SEPTEMBER 7, 2018 TABLE OF CONTENTS Description Page Number(s) General Fund 1-2 Definitions of General Fund Expenditures 3-5 Debt Service Fund - Series 2011 6 Bond
More informationThe City of Arden Hills Truth-In-Taxation Hearing:
The City of Arden Hills Truth-In-Taxation Hearing: December 9, 2013 Mayor David Grant Council Members Brenda Holden, Fran Holmes, Ed Werner, and Dave McClung City Vision Arden Hills is a strong community
More informationFour Lakes Condominium Association B Minutes of the Board of Director s Meeting August 20, 2018
Four Lakes Condominium Association B Minutes of the Board of Director s Meeting August 20, 2018 R. Topps called the Four Lakes Condominium Association B Regular Meeting to order on Monday, August 20, 2018
More informationPID Minutes, Feb 9, 2015
GEORGETOWN VILLAGE PUBLIC IMPROVEMENT DISTRICT #1 ADVISORY BOARD MEETING Monday, February 09, 2015 Meeting time 6:15 PM @ Georgetown Public Library, Classroom 211, 402 W. 8th St., Georgetown, TX. http://government.georgetown.org/georgetown-village-public-improvement-district-gvpid/
More informationStorm Water Mitigation Services ITB SEMINOLE TRIBE OF FLORIDA INVITATION TO BID
SEMINOLE TRIBE OF FLORIDA INVITATION TO BID Solicitation #: ITB 58-2018 Title: Description: Storm Water Mitigation Services The Seminole Tribe of Florida ( Tribe or STOF ) is requesting proposals from
More informationF U L L R E S E RV E S T U DY R E P O RT
Office: (888) 927-7865 Fax: (813) 200-8448 Contact@customreserves.com 5470 E Busch Blvd., Unit 171 Tampa, FL 33617 Hawks Point Community Development District F U L L R E S E RV E S T U DY R E P O RT For
More informationLexington Oaks Community Development District
May 26, 2016 Lexington Oaks Severn Trent Management Services 210 N. University Drive Suite 702 Coral Springs, Florida 33071 Telephone: (954) 753-5841 Fax: (954) 345-1292 Board of Supervisors Lexington
More informationVILLA SOL. Community Development District. Annual Operating and Debt Service Budget. Fiscal Year Version 2 - Approved Tentative Budget
VILLA SOL Annual Operating and Debt Service Budget Version 2 - Approved Tentative Budget (Approved at 6/04/2018 meeting) Prepared by: VILLASOL Table of Contents Page # OPERATING BUDGET Summary of Revenues,
More informationActual TOTAL $ 2,793,103 $ 3,115,212 $ 3,206,457 $ 3,296,810
REVENUE AND EXPENDITURE SUMMARY ITEM Revenues, Other Sources, and Fund Balance Sales/Charges for Services $ 2,773,135 $ 3,077,010 $ 3,191,580 $ 3,288,810 Miscellaneous Income 9,538 8,000 8,416 8,000 Investment
More informationTrends Affecting Payable 2019 Property Taxes in Ramsey County. Chris Samuel, Ramsey County Auditor/Treasurer August 7, 2018
Trends Affecting Payable 2019 Property Taxes in Ramsey County Chris Samuel, Ramsey County Auditor/Treasurer August 7, 2018 Contents Key Takeaways Presentation Contents Select Median Valued Homes and Commercial
More informationSeventeen (17) homeowners were in attendance and 19 homeowners proxies were received for a total of 36. There was no quorum.
SACHEM S HEAD HOMEOWNERS ASSOCIATION, INC. Minutes of the Annual Meeting of Members June 13, 2018 6:30 p.m. 8:30 p.m. Midlothian Branch of the Chesterfield County Public Libraries 521 Coalfield Road, Midlothian,
More informationA. All Responses to Request for Statements shall be sent to:
CITY OF FEDERAL WAY REQUEST FOR STATEMENT OF QUALIFICATIONS ARCHITECTURAL AND ENGINEERING SERVICES Surface Water Management ( SWM ) Comprehensive Plan Capital Improvements Program Update and Rate Study
More informationCITY COUNCIL AGENDA. Tuesday, May 27, :30 p.m. Council Chambers, 315 N. Broadway
CITY COUNCIL AGENDA May 22, 2014 Tuesday, May 27, 2014 4:30 p.m. Council Chambers, 315 N. Broadway 1. Call to Order 2. Additions / Deletions to Agenda 3. Approval of Minutes 5/13/14 4. Approval of Accounts
More informationEverette Estates Homeowners Association. Board of Directors Meeting Snow Branch Library, Conference Room #2 Spotsylvania, VA 22553
Everette Estates Homeowners Association Board of Directors Meeting Snow Branch Library, Conference Room #2 Spotsylvania, VA 22553 June 14, 2017; 7:00pm to 8:45pm Meeting Notes ATTENDANCE Board of Directors:
More informationWhat s new in 2018 We clarified when sellers are required to collect local sales taxes. See Local Sales and Use Taxes on page 4.
www.revenue.state.mn.us Landscaping Construction Contracts Sales Tax Fact Sheet 121B 121B Fact Sheet What s new in 2018 We clarified when sellers are required to collect local sales taxes. See Local Sales
More informationAve Maria Stewardship Community District
Ave Maria Stewardship Community District Amended Final Budget For Fiscal Year 2017/2018 October 1, 2017 - September 30, 2018 AVE MARIA STEWARDSHIP COMMUNITY DISTRICT FY 2017/2018 AMENDED FINAL BUDGET TABLE
More informationCFM Community Development District
CFM Community Development District www.cfmcdd.org Approved Proposed Budget for Fiscal Year 2018/2019 Presented by: Rizzetta & Company, Inc. 9530 Marketplace Road Suite 206 Fort Myers, Florida 33912 Phone:
More informationPHEASANT LAKE TOWNHOME ASSOCIATION December 9, 2013
BOARD MEETING MINUTES I. Call to Order 7:00:04 p.m. II. Roll Call President: Judy Glazewski Vice President: James Hansen Treasurer: Beth Murphy Secretary: Jerry Spehar Director: Debbie Gardner EPI Management:
More informationCITY OF DEERFIELD BEACH Request for City Commission Agenda
Item: CITY OF DEERFIELD BEACH Request for City Commission Agenda Agenda Date Requested: 7/10/2012 Contact Person: Charles DaBrusco, P.E., Director of Environmental Services Description: Award of contract
More informationBelmont Community Development District
Belmont Community Development District Budget Proposal Packet for Fiscal Year 2016/2017 Presented by: Rizzetta & Company, Inc. Tampa Office 3434 Colwell Ave.; Suite 200 Tampa, FL 33614 813.933.5571 rizzetta.com
More informationLEXINGTON OAKS. Community Development District. Annual Operating and Debt Service Budgets. Fiscal Year 2018
s Version 6 - Final Budget: (Adopted at 8/17/17 meeting) Prepared by: Table of Contents Page # OPERATING BUDGET General Fund Summary of Revenues, Expenditures and Changes in Fund Balances 1-3 Exhibit A
More informationAve Maria Stewardship Community District
Ave Maria Stewardship Community District Amended Final Budget For Fiscal Year 2016/2017 October 1, 2016 - September 30, 2017 CONTENTS I AMENDED FINAL OPERATING FUND BUDGET II AMENDED FINAL DEBT SERVICE
More information2017 Setauket Meadows Budget Presentation Presented by the Homeowners Association Board of Directors
2017 Setauket Meadows Budget Presentation Presented by the Homeowners Association Board of Directors Agenda 1. Setauket Meadows 2017 HOA Board of Directors Organization & Functional Responsibilities 2.
More informationFountain Hills Community Association Board of Directors Meeting June 1, 2017
Corrected as approved on July 6, 2017 The Board of Directors of held a Board of Directors at the Germantown Regional Services Center on Thursday, at 7:30 p.m. Board Members Present: Harry Matchett, President
More informationCITY COUNCIL MEETING CITY OF FRIDLEY SEPTEMBER 26, Councilmember Barnette Councilmember Saefke Councilmember Varichak Councilmember Bolkcom
CITY COUNCIL MEETING CITY OF FRIDLEY SEPTEMBER 26, 2016 The City Council meeting for the City of Fridley was called to order by Mayor Lund at 7:02 p.m. ROLL CALL: MEMBERS PRESENT: OTHERS PRESENT: Mayor
More informationMINUTES CITY OF LONSDALE SPECIAL CITY COUNCIL MEETING APRIL 25, 2017
MINUTES CITY OF LONSDALE SPECIAL CITY COUNCIL MEETING APRIL 25, 2017 1. CALL TO ORDER Mayor Rud called a meeting of the Lonsdale City Council to order at 7:00 p.m. in the City Council Chambers, 415 Central
More informationBID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.
PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00
More informationA Galveston County MUD No. 6 Page 1 Operating Fund August 6, 2018 CASH-CHECKING (End of last report) ($10,592.38) ADD: Maintenance tax $625.32 From M.M. $20,000.00 Voided Checks From Construction Interest
More informationFountain View Homeowners Association Annual Meeting. February 25, 2018 Kirkendall Public Library, Ankeny Iowa
Fountain View Homeowners Association Annual Meeting February 25, 2018 Kirkendall Public Library, Ankeny Iowa Official Business Minutes: The official annual meeting of the Fountain View Homeowner s Association
More informationMAINTENANCE DEPARTMENT
MAINTENANCE DEPARTMENT E-78 City of Mercer Island 2007-2008 Budget Department: Maintenance The Maintenance Department consists of the following functions: 1) administration, 2) capital projects engineering,
More informationAPPROVED MINUTES CITY COUNCIL REGULAR MEETING CITY OF WYOMING, MINNESOTA MAY 17, :00 PM
APPROVED MINUTES CITY COUNCIL REGULAR MEETING CITY OF WYOMING, MINNESOTA MAY 17, 2016 7:00 PM CALL TO ORDER: Acting Mayor Joe Zerwas called the Regular Meeting of the Wyoming City Council for May 17, 2016
More informationOFFICE OF THE KANE COUNTY AUDITOR TERRY HUNT, KANE COUNTY AUDITOR
OFFICE OF THE KANE COUNTY AUDITOR TERRY HUNT, KANE COUNTY AUDITOR ANDREA RICH CHIEF DEPUTY AUDITOR MARGARET TODD-CAVE STAFF AUDITOR 719 S.BATAVIA AVENUE GENEVA, ILLINOIS 60134 630-232-5915 630-208-3838
More informationEngineer s Report: School Section Lake Outlet 2017
WENCK File #0002-0230 June 2017 Revised August 2017 Engineer s Report: School Section Lake Outlet 2017 Prepared for: Clearwater River Watershed District 75 Elm St E PO Box 481 Annandale, MN 55389 Prepared
More informationLake County Stormwater Utility Fee
County of Lake Stormwater Management Department 550 Blackbrook Road Painesville, OH 44077 Phone: (440) 350-2770 Fax: (440) 352-8133 www.lakecountyohio.org/smd Lake County Stormwater Utility Fee Credit
More informationTOWN OF WELLINGTON PLANNING COMMISSION May 7, 2018 LEEPER CENTER 3800 WILSON AVE.
TOWN OF WELLINGTON PLANNING COMMISSION REGULAR MEETING 7:00pm LEEPER CENTER 3800 WILSON AVE. REGULAR MEETING 1. CALL TO ORDER 2. ROLL CALL 3. ADDITIONS TO OR DELETIONS FROM THE AGENDA 4. PUBLIC FORUM Public
More informationAnnual Operating and Debt Service Budget
Annual Operating and Debt Service Budget (Adopted 08/23/2017) Prepared By Table of Contents Page OPERATING Summary of Revenues, Expenditures and Changes in Fund Balances 1-4 Budget Narrative 5-10 Exhibit
More informationCORY LAKES COMMUNITY DEVELOPMENT DISTRICT ADOPTED BUDGET FISCAL YEAR 2019 UPDATED JULY 24, 2018
ADOPTED BUDGET UPDATED JULY 24, 2018 TABLE OF CONTENTS Description Page Number(s) General Fund 1-4 Definitions of general fund expenditures 5-9 Debt Service Fund - Series 2013 Bonds 10 Amortization Schedule
More informationCITY OF MONTEVIDEO CITY COUNCIL PROCEEDINGS October 19, 2009
CITY OF MONTEVIDEO CITY COUNCIL PROCEEDINGS The city council met in regular session Monday, in e council chambers at city hall. President Hodge called e meeting to order at 7:00 P.M. wi e Pledge of Allegiance.
More informationShingle Creek Watershed Management Commission Treasurer's Report
REVENUE Application Fees Shingle Creek Watershed Management Commission - 2016 Treasurer's Report %age 2016 Budget May June %age YTD 2016 YTD 25,000 37.20 9,300.00 337,970 100.00 337,970.00 Assessments
More informationBEACON LAKES. Community Development District. Annual Operating and Debt Service Budget. Fiscal Year 2019
Version 5 - Final Budget: (Adopted at 9/11/18 meeting) Prepared by: Table of Contents Page # OPERATING BUDGET General Fund Summary of Revenues, Expenditures and Changes in Fund Balances.. 1-2 Budget Narrative
More informationRight of Way Permits. Contact Information:
Right of Way Permits A Right-of-Way Use Permit is required for any work performed in the public right-of-way (including but not limited to sewer or water extensions, franchise utility work, storm drainage,
More informationBridgewood Estates Homeowners Association
~SIMPLEX,WHITE,58,2,7,000000,0,0027010325805193548498335794103,1,23~ Bridgewood Estates Homeowners Association P.O. Box 364 Gig Harbor, WA 98335 November 1, 2017 Dear Bridgewood Estates Homeowner, The
More informationNORTH MARIN WATER DISTRICT
NORTH MARIN WATER DISTRICT MINUTES OF REGULAR MEETING OF THE BOARD OF DIRECTORS April 19, 2016 CALL TO ORDER President Schoonover called the regular meeting of the Board of Directors of North Marin Water
More information