Consortium agreements in ERA COFUND Actions Model Consortium Agreement by ERA LEARN M-ERA.NET 2 practical experiences

Size: px
Start display at page:

Download "Consortium agreements in ERA COFUND Actions Model Consortium Agreement by ERA LEARN M-ERA.NET 2 practical experiences"

Transcription

1 Consortium agreements in ERA COFUND Actions Model Consortium Agreement by ERA LEARN M-ERA.NET 2 practical experiences Roland Brandenburg, FFG NCP academy 25 Jan

2 Content Overview P2P ERA-NET Cofund Scheme Who can participate Eligible Costs and EC Contribution Use of EC-Contribution Model Consortium Agreement by ERA-LEARN Example M-ERA.NET 2 Consortium Agreement 2

3 P2P Landscape total call budget since 2004: almost 5.1 billion (excluding EU contributions) EU contribution to joint calls around 1.15 billion since

4 ERA-NET Cofund Currently: 27 ERA-NET Cofund networks several of the networks have been initiated by JPIs Main themes: Health, Environment, Energy 4

5 History of ERA-NET Cofund FP6: ERA-NET Funding of costs related to the coordination of national research programmes, 100% reimbursement rate for coordination and management costs FP7: ERA-NET and ERA-NET Plus ERA-NET: as under FP6 ERA-NET Plus: co-funding of a single joint call for trans-national proposals, 33% reimbursement rate for the costs of funding the projects Horizon 2020: ERA-NET Cofund Co-funding of a single joint call for trans-national proposals, in addition other joint activities including other joint calls without Union co-funding, 33% reimbursement rate 5

6 ERA-NET Cofund main features ERA-NET Cofund: implementation of a co-funded joint call for proposals (compulsory, one co-funded call per Grant Agreement) EU contribution: mainly a proportional contribution to total public funding of the joint call Additional EU contribution to coordination costs on the basis of a unit costs for additional activities including additional calls without top-up funding Stable reimbursement rate: ERA-NET Plus reimbursement rate from FP7 (33%) applies Co-funded calls: proposal evaluation and selection according to Horizon 2020 standards 6

7 Who can participate? Participants in ERA-NET Cofund actions must be research funders: legal entities owning or managing public research and innovation programmes. Programme Owners are typically national/regional ministries/authorities responsible for defining, financing or managing research programmes carried out at national or regional level. Programme Managers are typically research councils or funding agencies or other national or regional organisations that implement research programmes under the supervision of the programme owners. Their participation has to be mandated by the national/regional authorities in charge (normally the responsible Ministry). Only in addition to the minimum conditions, and if justified by the nature of the action, programmes funded by other entities (international programmes, foundations or other non-public programmes) may participate. 7

8 ERA-NET Cofund Types A. Implementation of a single joint call (MS contribution in cash) B. Implementation of a single joint call (MS contribution in cash) and additional activities C. Implementation of a single joint call (MS contribution in kind) In exceptional cases Call for proposals organised by national/regional funding agencies Activities: call preparation, implementation and follow-up Eligible costs: financial support paid to third parties Call and activities as in A. Additional joint activities including additional joint calls without Union topup funding. Eligible costs: financial support paid to third parties and coordination costs for additional activities (unit costs per beneficiary per year). Call for proposals organised by governmental research organisations Beneficiaries carry out the projects resulting from the call themselves Eligible costs: costs of trans-national projects on the basis of Horizon 2020 rules In-kind contributions: non-reimbursed expenditure 8

9 ERA-NET COFUND eligible costs and EC contribution(1) The EC contribution is calculated on the basis of the eligible costs. There are 3 types of eligible costs: a) direct costs related to transnational projects; b) direct coordination costs for of additional activities; c) indirect costs. a) = the total funding transferred to the transnational projects funded from the 1 cofunded call b) = a lump sum of per beneficiary per year (so-called Unit Costs) if a beneficiary is involved in additional activities c) = a flat rate of 25% on top of the Unit Costs b) 9

10 ERA-NET COFUND eligible costs and EC contribution(2) Option 1: 1 cofunded call only, no other activities during 5 years EC contribution = top-up funding nat/reg contribution Option 2: 1 cofunded call + other joint activities (e.g. other joint calls) Top-up funding EC contribution = top-up funding + unit costs compulsory 1 cofunded call voluntary additional joint calls nat/reg contribution lump sum (unit costs) year 1 year 2 year 3 year 4 year 5 10

11 ERA-NET-COFUND eligible costs and EC contribution (3) The EC contribution is max. 33% (or less!) of the total eligible costs. Example without additional activities: Beneficary Direct costs of providing financial support to third parties related to transnational projects Example with additional activities: Total eligible costs Reimburse ment rate EC contribution % % % % % Total Direct costs of providing financial support to third parties related to Units Indirect Total eligible Reimburse Beneficary transnational projects (ie. years) Total Unit Costs costs costs ment rate EC contribution % % % % % Total

12 NMP (M-ERA.NET 2): fixed max M EC contribution max. 20% (ie of M ) unit costs for other joint activities fixed: MEUR EC contribution min M EC top-up of 1 cofunded call (= 33% of total call budget) min. needed 20.7 M nat/reg contribution for 1 co-funded call (= 67% of total call budget) min M total budget of 1 cofunded call (= 100%) 12

13 The max. EC contribution is calculated on the basis of the preliminary nat./reg. commitments from EU member states & associated states & third countries eligible for EC contribution (see list of countries 1 ) at the time of submitting the proposal. The EC funding rate for ERA-NET COFUND is up to 33%. However, in case of relatively high nat./reg. commitments and a relatively small EC contribution (fixed in the H2020 work programme) the actual EC funding rate could be less than 33%. Template for ERA-NET COFUND proposals: ERA-NET-COFUND Calculation of EC contribution (1) 1 Eligible for funding: 13

14 ERA-NET-COFUND Calculation of EC contribution (2) Some third countries (high-income countries) can participate but their commitments are not considered for calculating the EC contribution 1. Structural funds (ESIF) are also not eligible for EC top-up funding. Example: national commitment AUSTRIA (EU member) regional commitment BELGIUM-WALLONIA (EU member) national commitment FRANCE (EU member) national commitment SOUTH AFRICA (third country eligible for EC funding) regional commitment (struct.funds) REGIONE CALABRIA (EU member but uses ESIF) national commitment SWITZERLAND (third country not eligible for EC funding) national commitment TURKEY (H2020 associated state) national commitment USA (third country not eligible for EC funding) total national/regional commitments but: total funding EU members + associated states + elig. 3 rd countr (=67%) max. EC contribution (based on EU MS + AS + elig. 3 rd c.) (=33%) Total contributions EU MS + AS + elig. 3 rd c. + EC top-up (=100%) Total call budget to receive an EC contribution of 3.3 M the national/regional committed funding from EU members + associated states + eligible third countries must be at least 6.7 M. 1 Eligible for funding: 14

15 ERA-NET COFUND Use of EC contribution (1) The calculation of the EC contribution is always based on the eligible costs but the actual use of the EC contribution is up to the consortium. The practical terms of using the EC contribution - often called black box are defined in the Consortium Agreement. The maximum EC contribution cannot exceed the absolute amount defined in the Grant Agreement but it can actually become less than 33% depending on the absolute national/regional contributions. The consortium can decide to use part of the EC contribution to cover the implementation cost of the ERA-NET COFUND; in this case the EC funding rate related to transnational projects will decrease correspondingly; the gap has to be filled with additional national/regional project funding. 15

16 Scenario 1: consortium of 41 partners; all 41 partners participate in other joint activities every year during 5 years total unit costs = 41 x 5 x = = 2.45 M fixed: M EC contribution 2.45 M unit costs for other joint activities = M EC top-up of the 1 co-funded call (= max. 33% ) 1) 2) min M total budget of 1 co-funded call (= 100%) 3) minimum M nat/reg contribution for 1 co-funded call (= min. 67%; if nat/reg funding is >20.91M the percentage increases since the EC contribution does not change) EC top up <33% 16

17 Scenario 3: the consortium needs more resources for coordination than the 20% limit borrow extra resources (e.g. 1 M ) for coordination from EC top-up and replace the same amount with nat/reg RTD funding fixed: M EC contribution (20% limit) really needed >2.45 M unit costs for other joint activities borrow 1 M from EC for coordination of other joint activities 1) = 9.30 M EC top-up of 1 co-funded call (= 29.9% ) M total budget of 1 co-funded call (= 100%) 2) = M nat/reg contribution for 1 co-funded call (= 70.1%) 3) add 1 M nat/reg RTD funding 17

18 unit costs for other joint activities =max 20% of 9.23 M = M instead of 2.45 M Scenario 4a: the actually spent nat/reg funding is less than expected (e.g. imbalance between partners, lack of proposals after stage 1) AND less than the minimum needed this will reduce the EC top-up and consequently the max 20% unit costs. example: real nat/reg funding is only 15 M (instead of committed M ) EC contribution cannot exceed 9.23 M actual EC contribution: = 9.23 M 2) actual EC top-up of 1 co-funded call (= max. 33% of call budget) is less than planned (e.g M instead of M ); the top-up is also min. 80% of the total EC contribution EC contribution =max M ) actual nat/reg contribution for 1 co-funded call (= 67%) is less than the requested minimum (e.g. 15 M instead of M ) mitigation measure: initial nat/reg commitments should be higher than the theoretical minimum 18 1)

19 unit costs for other joint activities cannot exceed 20% of the EC contribution and will also be less than originally planned Scenario 4b: the ranking list has a gap (e.g. nat interference with ranking list, lack of funding in some countries, oversubscription) the EC top-up will be calculated based only on nat/reg funding before the gap. If the gap occurs before the minimum nat/reg funding could be spent this will automatically reduce the EC top-up and consequently the max 20% unit costs (see scenario 4a) 2) actual EC top-up of 1 co-funded call (=max. 33% ) is re-calculated correspondingly and will be less than originally planned because of a gap in the ranking list the actual nat/reg contribution for 1 cofunded call (= min. 67%) is less than originally committed mitigation measures: 1) avoid gaps through wellelaborated evaluation procedure 2) fill gaps through EC top-up 1) 19

20 Background: ERA-NET Cofund distribution of EC top-up (I) EC rule: It is up to the consortium to decide how the EC top-up to the cofunded call is distributed. Option 1: 100% of the EC top-up is used as a VIRTUAL common pot all nat/reg budgets are topped-up by the same factor, e.g. 49% (1 M 1.49 M ; 0.5 M M, etc) + : fixed return - : small budgets will still be small budgets even with EC top up these are risks in the ranking list. 20

21 Background: ERA-NET Cofund distribution of EC top-up (I) EC rule: It is up to the consortium to decide how the EC top-up to the cofunded call is distributed. Option 2: 100% of the EC top-up is used as a REAL common pot the entire EC top-up is used to fill gaps in the ranking list, no matter which countries + : most effective gap filling mechanism - : the resulting individual nat/reg topup factors cannot be predicted and will range from 0% to any upper limit some partners will find this unfair. 21

22 Option 3: mixed mode the EC top-up is used both as a virtual and as a real common pot fixed return AND gap filling Examples: Background: ERA-NET Cofund distribution of EC top-up (II) 80% of EC contribution is used to top-up nat/reg budgets by a constant factor (virtual common pot) 20% of EC contribution is used to fill gaps (real common pot) 65% of EC contribution is used to top-up nat/reg budgets by a constant factor (virtual common pot) 35% of EC contribution is used to fill gaps (real common pot) 25% virtual common pot 75% of EC contribution is used to fill gaps (real common pot) the consortium decides which proportion is likely to deliver the most convenient result (=max. number of funded proposals AND fixed return) 22

23 Model Consortium Agreement (CA) The consortium agreements should be signed before the grant agreement. They cover issues that will or may arise during the project. The ERA-LEARN template for an ERA-NET Cofund Consortium Agreement is based on the DESCA Model but adapted according to the ERA-NET Cofund needs. Governance structure (structure, procedures, decision taking) Financial provisions (Payments, budgeting, insufficient financial contribution of the EC) Call implementation (selection process, use of EU-Top-Up funding for transnational projects, ranking list, conflicts of interests, contractual obligations towards EC on selection, contractual obligations for projects funded in the joint call) 23

24 General governance structure: CA - Governance structure (structure, procedures, decision taking) General Assembly, Executive Board, Call Secretariat, The Coordinator Voting rules DESCA: Each Member of a Consortium Body present or represented in the meeting shall have one vote ERA-NET Cofund Examples: One vote for each network member One vote per country One vote per national/regional funding programme Distinguish between call and other topics: E.g.: In the case of decisions regarding the Cofunded Call or the additional calls, voting rights are limited to those network member taking part in the respective call. 24

25 ERA-NET COFUND CA - Financial provisions (I) Budgeting: 4 Options costs are included in model Each Option include rules for: Implementation costs (How to share, how to Justify) Unit costs Support to trans-national projects National/ regional budget of the co-funded joint call Payment Schedule - a liquidity plan is recommended ( 25

26 ERA-NET COFUND CA - Financial provisions (II) It is up to the consortium to agree on how to cover the implementation costs ERA-LEARN identified in a study 4 main options which are in use by the existing ERA-NET COFUND networks These 4 options are included in the template for an ERA-NET COFUND Consortium Agreement

27 ERA-NET-COFUND CA Implementation Costs (and use of EC funding) Overview: 4 main options have been identified/applied by consortia: Option 1: Only a defined group of parties may claim implementation costs. The EC contribution for Unit costs and the related indirect costs will be paid to each of the parties according to their involvement in additional activities. Option 2: Costs of each party are calculated. These costs are subtracted from the EC contribution. Option 3: Each of the parties contributes with its Unit Costs and a specific additional agreed budget to the implementation costs Option 4: Implementation costs are covered with the EC contribution (Unit costs and EU-Top-up), travel/subsistence budget is foreseen for attending network meetings; reserve fund for additional activities

28 ERA-NET COFUND CA - Call implementation Evaluation of pre-proposals: assessments at national and/or transnational level Limited oversubscription: The selected pre-proposals should not exceed the proposed total individual national/regional budget of the Joint Call by a factor of more than xx Obligation to commit higher national/regional budget Use of EU-Top-up funding for transnational projects: virtual pot, common pot, balancing pot (mixed mode) Conflicts of interests Contractual obligations towards EC on selection Contractual obligations for projects funded in the Cofunded Call 28

29 Model Consortium Agreement (CA) The consortium agreements should be signed before the grant agreement. They cover issues that will or may arise during the project. The template for an ERA-NET Cofund Consortium Agreement on is based on the DESCA Model but adapted according to the ERA- NET Cofund needs. Governance structure (structure, procedures, decision taking) Financial provisions (Payments, budgeting, insufficient financial contribution of the EC) Call implementation (selection process, use of EU-Top-Up funding for transnational projects, ranking list, conflicts of interests, contractual obligations towards EC on selection, contractual obligations for projects funded in the joint call) 29

30 3/2016-2/2021 EC contribution mio Example: M-ERA-NET 2 ERA-NET COFUND for materials research and innovation 1 cofunded call with EU top-up + additional joint activities;

31 The M-ERA.NET 2 consortium (H2020 grant agreement): 41 public funding organisations from 28 different countries 12; 27% 4; 9% 29; 64% national regional 6; 15% already active in M-ERA.NET new in M-ERA.NET 2 international + additional observer participants joining selected activities 35; 85% 21 (52%) >5 years experience

32 full documentation: Call 2012: 30 funding orgs. 23 European countries + Taiwan Call 2013: 32 funding orgs. 22 European countries + Russia + Taiwan Call 2014: 36 funding orgs. 22 European countries + Russia + Taiwan Call 2015: 35 funding orgs. 22 European countries + Brazil (Sao Paulo) + Korea + Russia + Taiwan 124 pre-proposals 72 full proposals 23 funded projects 166 pre-proposals 90 full proposals 26 funded projects 172 pre-proposals 105 full proposals 22 funded projects 156 pre-proposals 94 full proposals 22 funded projects Österreichische Forschungsförderungsgesellschaft Sensengasse Wien 32

33 Average project: 3-5 partners from 2-3 countries project costs 1 Mio EUR; duration 2-3 years

34 full documentation: Call 2016: 35 funding orgs. 22 European countries + Brazil (Sao Paulo) + Russia + South Africa + Taiwan 233 pre-proposals 89 full proposals selection meeting 23 Jan 2017: proposals will be funded depending on increase of national budgets and distribution of top up (total funding ~32 mio )

35 Partner details Funding programmes Joint calls Funded projects Events

36 coordinator FFG 41 beneficiaries GA signed Nov 2015 project start 1 March 2016 CA: final version agreed 22 Dec signatures by April signatures by Oct 2016 Example: M-ERA-NET 2 ERA-NET COFUND for materials research and innovation 1 AT FFG 2 BE VLAIO 3 BE FNRS 4 BE DGo6 5 BR FAPESP 6 CY RPF 7 DE BMBF 8 DE JÜLICH 9 DE KIT 10 EE ETAG 11 ES MINECO 12 ES IDEA 13 ES IDEPA 14 ES EJ-GV 15 ES Innobasque 16 ES ADE 17 ES fmi+d 18 FR Nouvelle Aquitaine 19 HU NKFIH 20 IE SFI 21 IL MATIMOP-ISERD 22 IS RANNIS 23 IT MIUR 24 IT CaR 25 LT RCL 26 LU FNR 27 LV VIAA 28 NL M2i 29 NL NWO 30 NO RCN 31 PL NCBR 32 PL NCN 33 PT FCT 34 RO UEFISCDI 35 RU FASIE 36 SE VINNOVA 37 SI MIZS 38 SK SAS 39 TR TÜBITAK 40 TW MoST 41 ZA DST 36

37 Example: M-ERA-NET 2 M-ERA.NET 2 CA: Specific Rules: Decision taking Voting Rules and Quorums Implementation costs/ Unit Costs Call Implementation Joint Call [M-ERA.NET Call 2016] Use of EU-Top-Up Funding for Transnational Projects 37

38 Update of the Model Consortium Agreement Planned Updates Update Payment Schedule according to new EC Schedule Include DESCA-Updates Include ways to cover the audit costs (Certificates of the financial statements) Distinguish between co-funded and non-cofunded Joint Calls Good Practice Rules indicated in other existing Consortium Agreements Suggestions from Legal NCPs?

39 Links ERA-NET COFUND: Guidelines & Practical Documentation: ERA-NET COFUND: FAQ: Contact: Roland Brandenburg: 39

ERA-NET COFUND Financial Aspects General Principles. An overview and practical examples October 2016

ERA-NET COFUND Financial Aspects General Principles. An overview and practical examples October 2016 ERA-NET COFUND Financial Aspects General Principles An overview and practical examples October 2016 1 Content general financial aspects ERA-NET Cofund eligible costs and EC contribution calculation of

More information

For further information, please see online or contact

For further information, please see   online or contact For further information, please see http://ec.europa.eu/research/sme-techweb online or contact Lieve.VanWoensel@ec.europa.eu Seventh Progress Report on SMEs participation in the 7 th R&D Framework Programme

More information

ERA-NET Plus. Practical implementation. Jörg NIEHOFF DG Research & Innovation European Research Area Unit B4 - Joint Programming

ERA-NET Plus. Practical implementation. Jörg NIEHOFF DG Research & Innovation European Research Area Unit B4 - Joint Programming ERA-NET Plus Practical implementation Jörg NIEHOFF DG Research & Innovation European Research Area Unit B4 - Joint Programming Coordination of national programmes in FP7 ERA-NET Like in FP6: Coordination

More information

The Seal of Excellence

The Seal of Excellence The Seal of Excellence A concrete example of operational synergies between Horizon 2020 and the ESIF dr Grzegorz Ambroziewicz Unit RTD B5 Spreading Excellence and Widening Participation DG Research & Innovation

More information

Horizon Public-Public partnerships the road ahead. Jörg NIEHOFF DG Research & Innovation European Research Area Unit B4 - Joint Programming

Horizon Public-Public partnerships the road ahead. Jörg NIEHOFF DG Research & Innovation European Research Area Unit B4 - Joint Programming Horizon 2020 Public-Public partnerships the road ahead Jörg NIEHOFF DG Research & Innovation European Research Area Unit B4 - Joint Programming Coordination of national programmes in FP7 ERA-NET Like in

More information

Katerina Tzitzinou, FP7 Legal & Financial NCP A practical guide for understanding EC funding and rules of participation

Katerina Tzitzinou, FP7 Legal & Financial NCP A practical guide for understanding EC funding and rules of participation Katerina Tzitzinou, FP7 Legal & Financial NCP katerina@help-forward.gr A practical guide for understanding EC funding and rules of participation 1st training, Sochi, 20-21 January 2010 Presentation Content

More information

European Joint Programme and ERA-NET Co-fund Actions under Horizon 2020 a primer

European Joint Programme and ERA-NET Co-fund Actions under Horizon 2020 a primer European Joint Programme and ERA-NET Co-fund Actions under Horizon 2020 a primer Alexandros IATROU Deputy Head of Administration and Finance Unit, Directorate for Energy DG Research and Innovation JOPRAD

More information

RARE-Bestpractices Conference

RARE-Bestpractices Conference RARE-Bestpractices Conference 24 November 2016, Istituto Superiore di Sanità, Rome, Italy Funding relevant rare diseases research: experience from E-Rare Funding relevant rare diseases research: experience

More information

EU-Russia Science & Technology Cooperation under FP7

EU-Russia Science & Technology Cooperation under FP7 EU-Russia Science & Technology Cooperation under FP7 Vladimir MAYER Director Moscow Regional Office (Russia&NIS) French National Centre for Scientific research Presentation prepared using materials supplied

More information

May 2009 Euro area external trade surplus 1.9 bn euro 6.8 bn euro deficit for EU27

May 2009 Euro area external trade surplus 1.9 bn euro 6.8 bn euro deficit for EU27 STAT/09/106 17 July 2009 May 2009 Euro area external trade surplus 1.9 6.8 deficit for EU27 The first estimate for the euro area 1 (EA16) trade balance with the rest of the world in May 2009 gave a 1.9

More information

Horizon 2020 Partnerships and resulting opportunities

Horizon 2020 Partnerships and resulting opportunities Horizon 2020 Partnerships and resulting opportunities W. Wittke DG Research & Innovation Partnerships and platforms in the context of Horizon 2020 Public-public partnerships (P2P): ERA-NET/ERA-NET Plus/

More information

January 2009 Euro area external trade deficit 10.5 bn euro 26.3 bn euro deficit for EU27

January 2009 Euro area external trade deficit 10.5 bn euro 26.3 bn euro deficit for EU27 STAT/09/40 23 March 2009 January 2009 Euro area external trade deficit 10.5 26.3 deficit for EU27 The first estimate for the euro area 1 (EA16) trade balance with the rest of the world in January 2009

More information

EU Budget 2009: billion. implemented. 4. The European Union as a global player; ; 6.95% 5. Administration ; 6.

EU Budget 2009: billion. implemented. 4. The European Union as a global player; ; 6.95% 5. Administration ; 6. 20.09.2010 EU Budget 2009: 112.107 billion 4. The European Union as a global player; 7 788 ; 6.95% 3. Citizenship, freedom, security and justice; 1 930 ; 1.72% 2. Preservation and management of natural

More information

Marie Skłodowska-Curie Actions From Association to Participation

Marie Skłodowska-Curie Actions From Association to Participation Marie Skłodowska-Curie Actions From Association to Participation Research and Innovation Staff Exchange (RISE) Reykjavik, 5 September 2016 Bodo Richter, Deputy Head of Unit DG Education and Culture MSCA

More information

EU Market Situation for Eggs. Committee for the Common Organisation of the Agricultural Markets 30 August 2018

EU Market Situation for Eggs. Committee for the Common Organisation of the Agricultural Markets 30 August 2018 EU Market Situation for Eggs Committee for the Common Organisation of the Agricultural Markets 30 August 2018 F O R E C A S T EU production of eggs for consumption (expert forecast May 2018) Source : Experts

More information

P2P and support to Joint Programming under Horizon Dr Jörg Niehoff Head of Sector Joint Programming DG Research & Innovation

P2P and support to Joint Programming under Horizon Dr Jörg Niehoff Head of Sector Joint Programming DG Research & Innovation P2P and support to Joint Programming under Horizon 2020 Dr Jörg Niehoff Head of Sector Joint Programming DG Research & Innovation Public-public partnerships in Horizon 2020 (Art.26) 1. Horizon 2020 shall

More information

L 303/40 Official Journal of the European Union

L 303/40 Official Journal of the European Union L 303/40 Official Journal of the European Union 14.11.2013 COMMISSION IMPLEMENTING DECISION of 12 November 2013 as regards a Union financial aid towards a coordinated control plan for antimicrobial resistance

More information

Legal and Financial Issues in H2020

Legal and Financial Issues in H2020 Legal and Financial Issues in H2020 BESTPRAC Training School September 27, 2016 Katarina Rohsmann, FFG OVERVIEW ü Minimum requirements for participation ü Funding instruments and funding rates ü Grant

More information

EU Market Situation for Eggs. Committee for the Common Organisation of the Agricultural Markets 22 March 2018

EU Market Situation for Eggs. Committee for the Common Organisation of the Agricultural Markets 22 March 2018 EU Market Situation for Eggs Committee for the Common Organisation of the Agricultural Markets 22 March 218 F O R E C A S T EU production of eggs for consumption (expert forecast November 217) Source :

More information

EU Pigmeat Market Situation. Meat Market Observatory Economic Board meeting 02 October 2018

EU Pigmeat Market Situation. Meat Market Observatory Economic Board meeting 02 October 2018 EU Pigmeat Market Situation Meat Market Observatory Economic Board meeting 2 October 218 EXCHANGE RATE INDEX/EURO 14 Index of daily exchange rates of the main trading partners compared to the Euro 13 12

More information

EUROPEAN COMMISSION EUROSTAT

EUROPEAN COMMISSION EUROSTAT EUROPEAN COMMISSION EUROSTAT Directorate F: Social statistics Unit F-3: Labour market Doc.: Eurostat/F3/LAMAS/29/14 WORKING GROUP LABOUR MARKET STATISTICS Document for item 3.2.1 of the agenda LCS 2012

More information

Direct Payments: Financial mechanisms in the new system

Direct Payments: Financial mechanisms in the new system Direct Payments: Financial mechanisms in the new system The fiche presents the main financial provisions in the new direct payments' system introduced with the 203 CAP reform and their implementation by

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN COURT OF AUDITORS, THE COUNCIL AND THE EUROPEAN PARLIAMENT

REPORT FROM THE COMMISSION TO THE EUROPEAN COURT OF AUDITORS, THE COUNCIL AND THE EUROPEAN PARLIAMENT EUROPEAN COMMISSION Brussels, 27.2.2017 COM(2017) 120 final REPORT FROM THE COMMISSION TO THE EUROPEAN COURT OF AUDITORS, THE COUNCIL AND THE EUROPEAN PARLIAMENT Member States' Replies to the European

More information

CSDR: Getting to grips with the new rules

CSDR: Getting to grips with the new rules CSDR: Getting to grips with the new rules 21th ECS conference 25 June 2014, London Soraya Belghazi, Secretary General Agenda 1 2 3 What we know: Rules for CSDs Rules for market participants Impact on issuers

More information

Benchmarking options for the effective achievement of the renewable energy target of the EU energy strategy by 2030

Benchmarking options for the effective achievement of the renewable energy target of the EU energy strategy by 2030 Benchmarking options for the effective achievement of the renewable energy target of the EU energy strategy by 2030 IAEE 2017 Authors: Lukas Liebmann, Christoph Zehetner, Gustav Resch Energy Economics

More information

The Eurostars Programme

The Eurostars Programme The Eurostars Programme The EU-EUREKA joint funding programme for R&D-performing SMEs What is EUREKA? > 2 > EUREKA is a public network supporting R&D-performing businesses > Established in 1985 by French

More information

Final Draft. Revised Membership Fee Concept

Final Draft. Revised Membership Fee Concept Final Draft Revised Membership Fee Concept for the European Green Belt Association Status: 18 August 2016, based on the approved version of 18 September 2014 Introduction: On 24 September 2014 the founding

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL EUROPEAN COMMISSION Brussels, 17.9.2018 COM(2018) 629 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL 11th FINANCIAL REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND

More information

Belarus, 28 February 2008

Belarus, 28 February 2008 National Documentation Center (EKT/NHRF) FP7 Rules of Participation Funding schemes Financial issues Evaluation Criteria Implementation Submission Maria Samara, Administrative project officer Maria Koutrokoi,,

More information

Euratom Fission Energy Research

Euratom Fission Energy Research Euratom Fission Energy Research Towards Horizon 2020 Roger GARBIL Acting Head of Unit DG Research and Innovation Euratom Fission European Commission Roger.Garbil@ec.europa.eu Nuclear data week, ANDES and

More information

The new LIFE Programme

The new LIFE Programme The new LIFE Programme 2014-2020 Opportunities for IL stakeholders LIFE Information Session Tel Aviv, 29 July 2014 Esther Pozo Vera Sector Coordinator Neighbourhood, Central Asia and Gulf States European

More information

EU Market Situation for Poultry. Committee for the Common Organisation of the Agricultural Markets 22 March 2018

EU Market Situation for Poultry. Committee for the Common Organisation of the Agricultural Markets 22 March 2018 EU Market Situation for Poultry Committee for the Common Organisation of the Agricultural Markets 22 March 218 -.2% -.8% -1.1% -2.4% -2.9% -3.3% -4.2% -4.5% 5.1% 4.6% 4.5% 3.8% 3.3% 2.7% 2.4% 1.5% 1.1%

More information

August 2008 Euro area external trade deficit 9.3 bn euro 27.2 bn euro deficit for EU27

August 2008 Euro area external trade deficit 9.3 bn euro 27.2 bn euro deficit for EU27 STAT/08/143 17 October 2008 August 2008 Euro area external trade deficit 9.3 27.2 deficit for EU27 The first estimate for the euro area 1 (EA15) trade balance with the rest of the world in August 2008

More information

The Reform of the Common Agricultural Policy Implementation. Catherine Combette DG Agriculture and Rural Development European Commission

The Reform of the Common Agricultural Policy Implementation. Catherine Combette DG Agriculture and Rural Development European Commission The Reform of the Common Agricultural Policy 2014-2020 Implementation Catherine Combette DG Agriculture and Rural Development European Commission catherine.combette@ec.europa.eu Agriculture and Rural Development

More information

THE COMMON AGRICULTURAL POLICY POST Designing a Generational renewal Strategy in the CAP plan

THE COMMON AGRICULTURAL POLICY POST Designing a Generational renewal Strategy in the CAP plan DISCLAIMER: This presentation is only intended to facilitate the work of the ENRD workshop. It has no interpretative value as regards the draft Regulations for the CAP post-2020. THE COMMON AGRICULTURAL

More information

H Marie Skłodowska-Curie Actions (MSCA)

H Marie Skłodowska-Curie Actions (MSCA) H2020 Key facts and figures (2014-2020) Number of BE researchers funded by MSCA: EU budget awarded to BE organisations (EUR million): Number of BE organisations in MSCA: 274 161,04 227 In detail, the number

More information

European Innovation Policy. an Economic perspective

European Innovation Policy. an Economic perspective European Policy an Economic perspective Pierre VIGIER Economic Analysis Directorate DG Research & Europe is facing major challenges Knowledge and innovation are crucial Today: Major economic and financial

More information

H Marie Sklodowska-Curie Actions (MSCA)

H Marie Sklodowska-Curie Actions (MSCA) H2020 Key facts and figures (2014-2020) Number of FR researchers funded by MSCA: EU budget awarded to FR organisations (EUR million): Number of FR organisations in MSCA: 565 198.92 370 In detail, the number

More information

QUALITY REPORT: ANNUAL FINANCIAL ACCOUNTS

QUALITY REPORT: ANNUAL FINANCIAL ACCOUNTS QUALITY REPORT: ANNUAL FINANCIAL ACCOUNTS PROGRESS REPORT AND INVENTORY 19 th November 2013 Eurostat C-1 Page 1 TABLE OF CONTENTS 1. ABOUT THIS REPORT... 3 2. DATA TRANSMISSIONS DURING 2013... 3 3. COMPLETENESS

More information

January 2010 Euro area unemployment rate at 9.9% EU27 at 9.5%

January 2010 Euro area unemployment rate at 9.9% EU27 at 9.5% STAT//29 1 March 20 January 20 Euro area unemployment rate at 9.9% EU27 at 9.5% The euro area 1 (EA16) seasonally-adjusted 2 unemployment rate 3 was 9.9% in January 20, the same as in December 2009 4.

More information

H Marie Skłodowska-Curie Actions (MSCA)

H Marie Skłodowska-Curie Actions (MSCA) H2020 Key facts and figures (2014-2020) Number of FR researchers funded by MSCA: EU budget awarded to FR organisations (EUR million): Number of FR organisations in MSCA: 1 072 311.72 479 In detail, the

More information

Growth, competitiveness and jobs: priorities for the European Semester 2013 Presentation of J.M. Barroso,

Growth, competitiveness and jobs: priorities for the European Semester 2013 Presentation of J.M. Barroso, Growth, competitiveness and jobs: priorities for the European Semester 213 Presentation of J.M. Barroso, President of the European Commission, to the European Council of 14-1 March 213 Economic recovery

More information

H Marie Skłodowska-Curie Actions (MSCA)

H Marie Skłodowska-Curie Actions (MSCA) H2020 Key facts and figures (2014-2020) Number of PT researchers funded by MSCA: EU budget awarded to PT organisations (EUR million): Number of PT organisations in MSCA: 716 66,67 165 In detail, the number

More information

The EFTA Statistical Office: EEA - the figures and their use

The EFTA Statistical Office: EEA - the figures and their use The EFTA Statistical Office: EEA - the figures and their use EEA Seminar Brussels, 13 September 2012 1 Statistics Comparable, impartial and reliable statistical data are a prerequisite for a democratic

More information

Responding to economic and social challenges: Active inclusion of the people furthest from the labour market

Responding to economic and social challenges: Active inclusion of the people furthest from the labour market Responding to economic and social challenges: Active inclusion of the people furthest from the labour market István VÁNYOLÓS DG Employment, Social Affairs and Inclusion, European Commission Brussels, July

More information

H Marie Skłodowska-Curie Actions (MSCA)

H Marie Skłodowska-Curie Actions (MSCA) H2020 Key facts and figures (2014-2020) Number of AT researchers funded by MSCA: EU budget awarded to AT organisations (EUR million): Number of AT organisations in MSCA: 215 78.57 140 In detail, the number

More information

DATA SET ON INVESTMENT FUNDS (IVF) Naming Conventions

DATA SET ON INVESTMENT FUNDS (IVF) Naming Conventions DIRECTORATE GENERAL STATISTICS LAST UPDATE: 10 APRIL 2013 DIVISION MONETARY & FINANCIAL STATISTICS ECB-UNRESTRICTED DATA SET ON INVESTMENT FUNDS (IVF) Naming Conventions The series keys related to Investment

More information

Security Research. FP7-ICT-SEC Joint Call (ENTR + INFSO) on Critical Infrastructure Protection. Seventh Framework Programme

Security Research. FP7-ICT-SEC Joint Call (ENTR + INFSO) on Critical Infrastructure Protection. Seventh Framework Programme FP7 Security research FP7--007- Joint Call Security Research FP7--007- Joint Call (ENTR + INFSO) on Critical Infrastructure Protection Seventh Framework Programme 007-0 FP7 Security Theme / Joint Call

More information

State of play of CAP measure Setting up of Young Farmers in the European Union

State of play of CAP measure Setting up of Young Farmers in the European Union State of play of CAP measure Setting up of Young Farmers in the European Union Michael Gregory EN RD Contact Point Seminar CEJA 20 th September 2010 Measure 112 rationale: Measure 112 - Setting up of young

More information

FOCUS AREA 6C: Access to and quality of ICT

FOCUS AREA 6C: Access to and quality of ICT Rural Development Programmes 2014-2020: Key facts & figures FOCUS AREA 6C: Access to and quality of ICT 1. Introduction Focus Area (FA) 6C is designed to enhance the accessibility, use and quality of information

More information

Reform strategies: the experience of emerging European economies and their effects on sustainability and equity

Reform strategies: the experience of emerging European economies and their effects on sustainability and equity Cross-country experiences Session 3 Reform strategies: the experience of emerging European economies and their effects on sustainability and equity Per Eckefeldt European Commission Directorate General

More information

Two years to go to the 2014 European elections European Parliament Eurobarometer (EB/EP 77.4)

Two years to go to the 2014 European elections European Parliament Eurobarometer (EB/EP 77.4) Directorate-General for Communication PUBLIC OPINION MONITORING UNIT Brussels, 23 October 2012. Two years to go to the 2014 European elections European Parliament Eurobarometer (EB/EP 77.4) FOCUS ON THE

More information

Progress Report. Rules cleaning-up. Document Type: Report. Document ID: ERA-PRG-006-REP

Progress Report. Rules cleaning-up. Document Type: Report. Document ID: ERA-PRG-006-REP Rules EUROPEAN UNION AGENCY FOR RAILWAYS Progress Report - cleaning-up Progress Report Rules cleaning-up Document Type: Report Document ID: Origin: ERA Activity Based Item: SPD 2016 Reducing technical

More information

H Marie Skłodowska-Curie Actions (MSCA)

H Marie Skłodowska-Curie Actions (MSCA) H2020 Key facts and figures (2014-2020) Number of IE researchers funded by MSCA: EU budget awarded to IE organisations (EUR million): Number of IE organisations in MSCA: 253 116,04 116 In detail, the number

More information

MODEL ANNEX 2 FOR H2020 GENERAL MGA MULTI ESTIMATED BUDGET FOR THE ACTION. Total costs subcontracting. [F.2 Costs of ] 5

MODEL ANNEX 2 FOR H2020 GENERAL MGA MULTI ESTIMATED BUDGET FOR THE ACTION. Total costs subcontracting. [F.2 Costs of ] 5 i print format A4 landscape MODEL ANNEX 2 FOR H2020 GENERAL MGA MULTI ESTIMATED BUDGET FOR THE ACTION Estimated eligible 1 costs (per budget category) EU contribution Additional information B. Direct costs

More information

H Marie Skłodowska-Curie Actions (MSCA)

H Marie Skłodowska-Curie Actions (MSCA) H2020 Key facts and figures (2014-2020) Number of NL researchers funded by MSCA: EU budget awarded to NL organisations (EUR million): Number of NL organisations in MSCA: 427 268.91 351 In detail, the number

More information

Increasing the fiscal sustainability of health care systems in the European Union to ensure access to high quality health services for all

Increasing the fiscal sustainability of health care systems in the European Union to ensure access to high quality health services for all Increasing the fiscal sustainability of health care systems in the European Union to ensure access to high quality health services for all EPC Santander, 6 September 2013 Christoph Schwierz Sustainability

More information

The EAFRD: Activities of the European Network for Rural Development on the delivery system

The EAFRD: Activities of the European Network for Rural Development on the delivery system The EAFRD: Activities of the European Network for Rural Development on the delivery system Jean-Michel Courades European Commission DG AGRI G3 Farnet Meeting of Managing Authorities, 28-29 September 2010,

More information

The Marie Curie Actions FP7 Financial Guidelines

The Marie Curie Actions FP7 Financial Guidelines The Marie Curie Actions FP7 Financial Guidelines SPECIFIC PROVISIONS RELATED TO MARIE CURIE ACTIONS FINANCED UNDER THE FP7 "PEOPLE" PROGRAMME Part 3: Projects funded in the PEOPLE Work Programmes calls

More information

Prerequisites for a Social Security Agreement (SSA) Stephan Cueni Head of International Agreements

Prerequisites for a Social Security Agreement (SSA) Stephan Cueni Head of International Agreements Federal Department of Home Affairs Federal Social Insurance Office Intrenational Affairs, Agreements Prerequisites for a Social Security Agreement (SSA) Stephan Cueni Head of International Agreements Zagreb,

More information

SME Instrument. Gregor Novak Project Advisor / Dep. A / Unit A.2 09/11/2016

SME Instrument. Gregor Novak Project Advisor / Dep. A / Unit A.2 09/11/2016 SME Instrument Gregor Novak Project Advisor / Dep. A / Unit A.2 gregor.novak@ec.europa.eu 09/11/2016 SME Instrument in brief Budget in M Total of all topics 2014 2015 2016 2017 253.02 259.87 353.4 437.5

More information

2nd INCOBRA Scoping Workshop Martijntje Bakker, ZonMw. March 26, 2018 FAPESP Rua Pio XI, 1500 Alto da Lapa - São Paulo

2nd INCOBRA Scoping Workshop Martijntje Bakker, ZonMw. March 26, 2018 FAPESP Rua Pio XI, 1500 Alto da Lapa - São Paulo 2nd INCOBRA Scoping Workshop Martijntje Bakker, ZonMw March 26, 2018 FAPESP Rua Pio XI, 1500 Alto da Lapa - São Paulo JPI More Years, Better Lives Joint Programming Initiative More Years, Better Lives

More information

H Marie Skłodowska-Curie Actions (MSCA)

H Marie Skłodowska-Curie Actions (MSCA) H2020 Key facts and figures (2014-2020) Number of SE researchers funded by MSCA: EU budget awarded to SE organisations (EUR million): Number of SE organisations in MSCA: 138 114.71 150 In detail, the number

More information

H Marie Skłodowska-Curie Actions (MSCA)

H Marie Skłodowska-Curie Actions (MSCA) H2020 Key facts and figures (2014-2020) Number of FI researchers funded by MSCA: EU budget awarded to FI organisations (EUR million): Number of FI organisations in MSCA: 155 47.93 89 In detail, the number

More information

Part C. Impact on sample design

Part C. Impact on sample design Part C. Impact on sample design Ing. Marie Hörmannová, CSc. Business Cycle Surveys Department Introduction In December 2006, the European Council adopted the regulation establishing the revised EU statistical

More information

H Marie Skłodowska-Curie Actions (MSCA)

H Marie Skłodowska-Curie Actions (MSCA) H2020 Key facts and figures (2014-2020) Number of PT researchers funded by MSCA: EU budget awarded to PT organisations (EUR million): Number of PT organisations in MSCA: 592 54.79 135 In detail, the number

More information

H Marie Skłodowska-Curie Actions (MSCA)

H Marie Skłodowska-Curie Actions (MSCA) H2020 Key facts and figures (2014-2020) Number of LV researchers funded by MSCA: EU budget awarded to LV organisations (EUR million): Number of LV organisations in MSCA: 35 3.91 11 In detail, the number

More information

ANNUAL ECONOMIC SURVEY OF EMPLOYEE OWNERSHIP IN EUROPEAN COUNTRIES IN 2008

ANNUAL ECONOMIC SURVEY OF EMPLOYEE OWNERSHIP IN EUROPEAN COUNTRIES IN 2008 www.efesonline.org 25.2.29 ANNUAL ECONOMIC SURVEY OF EMPLOYEE OWNERSHIP IN EUROPEAN COUNTRIES IN 28 INTRODUCTION TO COUNTRY FILES Employee ownership is progressing faster and stronger across Europe than

More information

EU Market Situation for Poultry. Committee for the Common Organisation of the Agricultural Markets 24 August 2017

EU Market Situation for Poultry. Committee for the Common Organisation of the Agricultural Markets 24 August 2017 EU Market Situation for Poultry Committee for the Common Organisation of the Agricultural Markets 24 August 217 -7.2% -7.7% -1.6% -1.7% -1.7% -2.1% -2.5% 4.1% 3.6% 3.5% 2.8% 1.9% 1.2%.8%.8%.6%.4%.2%.%.%.%.%

More information

FOCUS AREA 5B: Energy efficiency

FOCUS AREA 5B: Energy efficiency Rural Development Programmes 204-2020: Key facts & figures FOCUS AREA 5B: Energy efficiency. Introduction Focus Area (FA) 5B is designed to increase efficiency in energy use in agriculture and food processing.

More information

Guide to Financial Issues relating to FP7 Indirect Actions

Guide to Financial Issues relating to FP7 Indirect Actions Guide to Financial Issues relating to FP7 Indirect Actions Version 18/03/2013 Disclaimer This guide is aimed at assisting beneficiaries. It is provided for information purposes only and its contents are

More information

The Seal of Excellence

The Seal of Excellence Regional The Seal of Excellence A concrete example of operational synergies between Horizon 2020 and the ESIF Magda De Carli Deputy Head of Unit Unit RTD B5 Spreading Excellence and Widening Participation

More information

4. The European pension fund sector 35

4. The European pension fund sector 35 4. The European pension fund sector 35 The current macroeconomic environment and ongoing low interest rates pose challenges to the European occupational pension fund sector. Low interest rates keep the

More information

in focus Statistics Trade in high-tech products Contents China on the rise The EU is the leading trader in high-tech products in 2005

in focus Statistics Trade in high-tech products Contents China on the rise The EU is the leading trader in high-tech products in 2005 Trade in high-tech products China on the rise Statistics in focus This issue of Statistics in Focus presents a detailed analysis of the trade in high-tech products, concentrating mainly on world market

More information

European Green Belt Association. Membership Fee Concept October 2018

European Green Belt Association. Membership Fee Concept October 2018 European Green Belt Association Membership Fee Concept 2019-2022 October 2018 1 Introduction and history On 24 September 2014 the founding General Assembly of the European Green Belt Association approved

More information

ANNUAL ECONOMIC SURVEY OF EMPLOYEE OWNERSHIP IN EUROPEAN COUNTRIES IN 2008

ANNUAL ECONOMIC SURVEY OF EMPLOYEE OWNERSHIP IN EUROPEAN COUNTRIES IN 2008 www.efesonline.org 25.2.29 ANNUAL ECONOMIC SURVEY OF EMPLOYEE OWNERSHIP IN EUROPEAN COUNTRIES IN 28 INTRODUCTION TO COUNTRY FILES Employee ownership is progressing faster and stronger across Europe than

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL EUROPEAN COMMISSION Brussels, 27.9.2017 COM(2017) 554 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL 10th FINANCIAL REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND

More information

Working Group Social Protection statistics

Working Group Social Protection statistics EUROPEAN COMMISSION EUROSTAT Directorate F: Social statistics Unit F-5: Education, health and social protection Luxembourg, 17 March 2016 DOC SP-2016-08-Annex https://circabc.europa.eu/w/browse/70400e55-173f-433f-93ad-c8315904a11e

More information

Public-Public partnerships in SC1, Aligning European programmes

Public-Public partnerships in SC1, Aligning European programmes Public-Public partnerships in SC1, Aligning European programmes Health Info-Day Rome, October 2015 Giorgio CLAROTTI DG Research & Innovation Health Strategy Unit (RTD-E1) 1. JP WHY? A COMPARTMENTA- LISED

More information

Library statistical spotlight

Library statistical spotlight /9/2 Library of the European Parliament 6 4 2 This document aims to provide a picture of the, in particular by looking at car production trends since 2, at the number of enterprises and the turnover they

More information

PROVISIONAL DRAFT. Information Note from the Commission. on progress in implementing the UN Convention on the Rights of Persons with Disabilities

PROVISIONAL DRAFT. Information Note from the Commission. on progress in implementing the UN Convention on the Rights of Persons with Disabilities PROVISIONAL DRAFT Information Note from the Commission on progress in implementing the UN Convention on the Rights of Persons with Disabilities Introduction This note, which is based on the third report

More information

Finnish pension (investment) system. 28th Ljubljana Stock Exchange Conference May 2011 Mika Vidlund

Finnish pension (investment) system. 28th Ljubljana Stock Exchange Conference May 2011 Mika Vidlund Finnish pension (investment) system 28th Ljubljana Stock Exchange Conference May 2011 Mika Vidlund 2 Contents Overall picture of the Finnish pension system EU-Commission s guidelines for how to make pension

More information

EEA EFTA States Internal Market Scoreboard. March 2011

EEA EFTA States Internal Market Scoreboard. March 2011 EEA EFTA States Internal Market Scoreboard March 2011 Event No: 374279 INTERNAL MARKET SCOREBOARD No. 27 EEA EFTA STATES of the EUROPEAN ECONOMIC AREA March 2011 EFTA SURVEILLANCE AUTHORITY Event No: 374279

More information

Economic, employment and social policies in the new EU 2020 strategy

Economic, employment and social policies in the new EU 2020 strategy EUROPEAN COMMISSION DG Employment, Social Affairs and Equal Opportunities Social protection and inclusion policies Walter WOLF Economic, employment and social policies in the new EU 2020 strategy Skopje,

More information

Adverse scenario for the European Insurance and Occupational Pensions Authority s EU-wide insurance stress test in 2018

Adverse scenario for the European Insurance and Occupational Pensions Authority s EU-wide insurance stress test in 2018 9 April 218 ECB-PUBLIC Adverse scenario for the European Insurance and Occupational Pensions Authority s EU-wide insurance stress test in 218 Introduction In accordance with its mandate, the European Insurance

More information

H Marie Skłodowska-Curie Actions (MSCA)

H Marie Skłodowska-Curie Actions (MSCA) H2020 Key facts and figures (2014-2020) Number of CZ researchers funded by MSCA: EU budget awarded to CZ organisations (EUR million): Number of CZ organisations in MSCA: 157 23.11 58 In detail, the number

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 13 June /1/13 REV 1 SOC 409 ECOFIN 444 EDUC 190

COUNCIL OF THE EUROPEAN UNION. Brussels, 13 June /1/13 REV 1 SOC 409 ECOFIN 444 EDUC 190 COUNCIL OF THE EUROPEAN UNION Brussels, 13 June 2013 10373/1/13 REV 1 SOC 409 ECOFIN 444 EDUC 190 COVER NOTE from: to: Subject: The Employment Committee Permanent Representatives Committee (Part I) / Council

More information

FREQUENTLY ASKED QUESTIONS (FAQ)

FREQUENTLY ASKED QUESTIONS (FAQ) FINANCIAL CONTRIBUTION TOWARDS TRAVEL AND SUBSISTENCE EXPENSES FOR ACI CANDIDATES INVITED TO ACCREDITATION TESTS FREQUENTLY ASKED QUESTIONS (FAQ) version 5.0 applicable for candidates invited as of 1 January

More information

A new approach to education PPPs in the Eurostat/OECD exercise

A new approach to education PPPs in the Eurostat/OECD exercise A new approach to education PPPs in the Eurostat/OECD exercise OECD Meeting on PPPs for Non-European Countries, 27 29 April 2009 Eurostat losure Authorized Public Disclosure Authorized Public Disclosure

More information

Evaluation of the Part-Time and Fixed-Term Work Directives. Conference on EU Labour Law, 21 October 2013, Brussels

Evaluation of the Part-Time and Fixed-Term Work Directives. Conference on EU Labour Law, 21 October 2013, Brussels Evaluation of the Part-Time and Fixed-Term Work Directives Conference on EU Labour Law, 21 October 2013, Brussels Agenda Aims of the Directives Level of change introduced by the Directives Measures to

More information

H2020-Galileo Call evaluation outcome

H2020-Galileo Call evaluation outcome H2020-Galileo Call evaluation outcome Overview evaluation process 2015 Evaluation of H2020 2 nd Call Closure Call 8 April 2015 Remote evaluations 22 May-07 June 2015 Central evaluations 08-11 June August:

More information

Member States Meeting jointly with. Vegetables" and. Group

Member States Meeting jointly with. Vegetables and. Group Member States Meeting jointly with the Advisory Group on "Fruit Fruit and Vegetables" and the School Fruit Scheme Experts Group Wednesday 28 March 2012 DG Agriculture and Rural Development European Commission

More information

COMMISSION STAFF WORKING DOCUMENT Accompanying the document

COMMISSION STAFF WORKING DOCUMENT Accompanying the document EUROPEAN COMMISSION Brussels, 9.10.2017 SWD(2017) 330 final PART 13/13 COMMISSION STAFF WORKING DOCUMENT Accompanying the document REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE

More information

Themes Income and wages in Europe Wages, productivity and the wage share Working poverty and minimum wage The gender pay gap

Themes Income and wages in Europe Wages, productivity and the wage share Working poverty and minimum wage The gender pay gap 5. W A G E D E V E L O P M E N T S At the ETUC Congress in Seville in 27, wage developments in Europe were among the most debated issues. One of the key problems highlighted in this respect was the need

More information

The Mystery of Low Productivity Growth: Some Insights from Belgium

The Mystery of Low Productivity Growth: Some Insights from Belgium The Mystery of Low Productivity Growth: Some Insights from Belgium Bank of Poland - 26 October 218 Luc Dresse (luc.dresse@nbb.be) Chief Advisor Economics and Research Dept. LU BE US NL DK DE FR SE EU15

More information

H Marie Skłodowska-Curie Actions (MSCA)

H Marie Skłodowska-Curie Actions (MSCA) H2020 Key facts and figures (2014-2020) Number of SI researchers funded by MSCA: EU budget awarded to SI organisations (EUR million): Number of SI organisations in MSCA: 121 12.53 35 In detail, the number

More information

FOCUS AREA 6B: Fostering local development

FOCUS AREA 6B: Fostering local development Rural Development Programmes 014-00: Key facts & figures FOCUS AREA 6B: Fostering local development 1. Introduction Focus Area (FA) 6B is designed to foster local development in rural areas. Two measures

More information

FIRST REPORT COSTS AND PAST PERFORMANCE

FIRST REPORT COSTS AND PAST PERFORMANCE FIRST REPORT COSTS AND PAST PERFORMANCE DECEMBER 2018 https://eiopa.europa.eu/ PDF ISBN 978-92-9473-131-9 ISSN 2599-8862 doi: 10.2854/480813 EI-AM-18-001-EN-N EIOPA, 2018 Reproduction is authorised provided

More information

CONCLUSIONS 1. INTRODUCTION

CONCLUSIONS 1. INTRODUCTION CONCLUSIONS 1. INTRODUCTION The Workshop for the Participation of Non-EU Black Sea and Eastern Partnership Countries in Thematic COFUND ERANETs & JPIs took place on 13-14 October 2016, in Baku, Azerbaijan.