FINANCIAL ANALYSIS. Second Greater Mekong Subregion Tourism Infrastructure for Inclusive Growth Project (RRP REG 49387)
|
|
- Alberta O’Brien’
- 5 years ago
- Views:
Transcription
1 Second Greater Mekong Subregion Tourism Infrastructure for Inclusive Growth Project (RRP REG 49387) FINANCIAL ANALYSIS 1. The financial analysis follows Asian Development Bank (ADB) guidelines. 1 Subprojects were evaluated in real terms using constant 2018 prices. Cost estimates in nominal terms were converted to real terms by adjusting for the projected effects of foreign and domestic inflation as well as currency fluctuation. Road improvements in Cambodia, and roads and small port improvements in the Lao People s Democratic Republic (Lao PDR), were classified as nonrevenue-generating. Solid waste management improvement subprojects and Cambodia s Preah Sihanouk City Koh Rong ferry pier subproject were classified as revenue-generating. The analysis assessed nonrevenue-generating subprojects financial sustainability and revenuegenerating subprojects financial viability. The borrower and recipient have assured that they will adequately fund any shortfall in the operation and maintenance (O&M) cost of project facilities through the national budget. Covenants are included in the loan and grant agreements for this purpose. A. Financial Sustainability of Nonrevenue-Generating Subprojects. 2. Provincial departments of public works and transport (DPWTs) will own the infrastructure improved by the project and are responsible for its maintenance. Funds to maintain the assets will be sourced from annual DPWT budgets, allocated by central governments. DPWT financial statements covering the period were analyzed to determine historic budget allocations, with overall financial positions projected for 12 fiscal years (FY2018 FY2029). Based on past allocations, budget revenue and expenditure are assumed to increase by 5% per year, while subproject maintenance costs are assumed to increase by 3% per year. Periodic maintenance is scheduled every 7 years for all subprojects. The analysis assumes that DPWTs will take ownership of the improved infrastructure assets in Preah Sihanouk Province, Cambodia. Preah Sihanouk DPWT will maintain upgraded urban roads, drainage, lighting, and other facilities constructed at Occheuteal and Otres beaches as part of the Preah Sihanouk seaside access and environmental improvements subproject. Annual subproject routine O&M costs are KR39 million KR76million, equal to about 1.3% 1.9% of the DPWT s total budget. Periodic maintenance costs are KR28 million. 4. Champasak Province, Lao PDR. Champasak DPWT, through Khong District Office of Public Works and Transport (OPWT), will maintain the Nakasang access road, attached small port, and Det-Khone islands road network. Khong OPWT will require an additional annual routine maintenance budget appropriation of KN66 million KN82 million beginning in 2022, equal to about 1% of the DPWT s projected total annual expenditure. Periodic maintenance costs are KN831 million. 5. Vientiane Province, Lao PDR. Vientiane Province DPWT, through the Vang Vieng OPWT, will maintain the 26-kilometer western loop road, Kaeng Yui access road, improved urban roads and drains, and the new Nam Xong river bridge. The OPWT will require an additional routine maintenance budget appropriation of KN396 million KN433 million per year, equal to about 6% 7% of the DPWT s projected total annual expenditure. Periodic maintenance is estimated to cost KN2,867 million. Vientiane Province DPWT, through Keo Oudom District OPWT, will also maintain the improved concrete and bitumen roads at Nam Ngum reservoir. To do so, the OPWT will require an additional annual routine maintenance budget appropriation of KN18 million 1 ADB Financial Management and Analysis of Projects. Manila; ADB Financial Due Diligence: A Methodology Note. Manila.
2 KN21 million, equal to about 6% of its projected annual budget expenditures. Periodic maintenance costs of the Keo Oudom subproject are KN44 million. B. Financial Viability of Revenue-Generating Subprojects 6. Preah Sihanouk City Koh Rong passenger pier improvements. The subproject owner is the Government of Preah Sihanouk Province, which will form a public entity to manage the piers. Preah Sihanouk DPWT will be responsible for structural maintenance and navigation aids. Annual routine O&M costs are equal to about 0.4% of the DPWT s total budget. 7. Preah Sihanouk City and Koh Touch village piers will generate revenue from passenger departure fees (KR5,063 per passenger), ferry berthing fees (KR4,050 per one-way trip), parking fees (KR2,025 per vehicle), and commercial space rental at KR81,000 per square meter per month. Projected revenue and O&M costs are in Table 1. Table 1: Preah Sihanouk City Koh Rong Passenger Pier Improvements Revenues Preah Sihanouk City Koh Rong ferry service Ferry trips 10,868 11,387 11,931 15,065 20,493 22,243 Average passengers per vessel Passenger trips ( 000) International ( 000) Domestic ( 000) Preah Sihanouk ferry pier operation Total receipts 1,206 1,260 1,317 1,645 2,212 2,395 Passenger departure fee 1,111 1,164 1,219 1,539 2,094 2,273 Berthing fees Parking fees Stall and kiosk rental Koh Rong-Koh Touch ferry pier operation Total receipts 1,195 1,249 1,305 1,632 2,198 2,380 Passenger departure fee 1,111 1,164 1,219 1,539 2,094 2,273 Berthing fees Stall and kiosk rental Total revenue 2,401 2,509 2,623 3,277 4,410 4,775 Operation and maintenance costs Routine Periodic 1 Subtotal Operating surplus 2,388 2,496 2,609 3,260 4,389 4, Kep solid waste management improvements. The subproject owner is Kep Municipality, which through Kep DPWT will be responsible for maintaining the landfill and landfill access road, to be funded by the annual budget of the Government of Kep Province. Household tariffs will be sufficient to cover waste collection and transport to the landfill by a private contractor, managed by DPWT. Annual landfill and access road routine O&M costs range from KR168 million to KR501 million, equal to about 10% 23% of the DPWT s total budget. Periodic maintenance costs are KR295 million. 2
3 9. Kep s urban and peri-urban population is increasing by about 2.0% per year, and tourist arrivals are expected to reach 1.8 million in However, only about 45% of 1,825 households (population 9,000) and 150 businesses and government offices have access to waste collection services. With project assistance, garbage collection will be expanded from 821 to about 1,500 households (80% coverage). Garbage collection fees are assumed to be KR4,500 per household, per month. Garbage-collection fees for businesses will be higher, based on volume. To help finance landfill O&M, an environmental fee will be collected from international (KR4,050) and domestic tourists (KR2,025) through an accommodation surcharge. Surveys and focus group results indicate that residents and tourists are willing to pay these modest solid waste collection fees and environmental fee. Projected revenue and O&M costs are in Table 2. Table 2: Kep Solid Waste Management Improvements Population (Kep urban/peri-urban) 9,555 9,778 10,006 10, ,464 17,796 Number of households 1,911 1,956 2,001 2,048 2,245 2,893 3,559 Coverage area 80% 80% 80% 80% 80% 80% 80% Households in coverage area 1,529 1,564 1,601 1,638 1,796 2,314 2,847 Operating revenues Garbage fees Household collection revenue Business collection revenue Subtotal Environmental fees Number of visitors International visitors ('000) Domestic visitors ('000) 1,440 1,508 1,578 1,651 1,982 2,817 3,055 Total visitors 1,514 1,585 1,659 1,736 2,083 2,961 3,211 Revenue International visitors Domestic visitors 2,917 3,053 3,195 3,344 4,013 5,705 6,187 Subtotal 3,215 3,365 3,522 3,686 4,423 6,288 6,819 Total revenue 3,381 3,534 3,695 3,863 4,614 6,538 7,127 Operation and maintenance cost Routine Periodic 295 Subtotal Operating surplus 3,213 3,361 3,517 3,680 4,116 6,253 6, Vang Vieng solid waste management improvements. The subproject owner is Vang Vieng Urban Development Administration Authority (UDAA), responsible for district-wide solid waste collection and landfill O&M. The subproject is classified revenue-generating since the UDAA mandates its operating units to collect fees and charges to fund entity operations. Landfill O&M funding, including all onsite infrastructure and equipment maintenance, will be provided by the provincial government through the UDAA. 11. Vang Vieng s urban and peri-urban population is increasing by 4.5% per year and could reach 31,000 in 2020, while tourist arrivals are expected to reach 230,000 the same year. Currently only about 28% of Vang Vieng s 4,800 urban and peri-urban households have access to reliable waste collection services, along with 392 shops and guest houses, 32 offices, 2 markets, 6 schools, 5 cement plants, and 2 hospitals. 3
4 12. The UDAA will generate incremental revenue from expanding solid waste collection to 80% of Vang Vieng s urban and peri-urban households and collecting environmental fees from each international (KN8,300) and domestic tourist (KN5,063) through a tourist site entry surcharge. Garbage collection fees were recently increased from KN10,000 to KN15,000 per household per month. The higher collection fees will be retained and reassessed periodically. Survey and focus group results indicate that residents and tourists are willing to pay higher solid waste collection fees and higher tourist site entry fees to improve environmental management. Projected revenue and O&M costs are in Table 3. Table 3: Vang Vieng Solid Waste Management Improvements Covered households 1,551 1,621 3,765 3,935 4,112 4,297 5,124 8,316 12,358 Revenues Garbage collection fees ,356 1,417 1,480 1,547 1,845 2,994 4,449 Total visitors International visitors ('000) Domestic visitors ('000) Total visitors Environmental fee International visitors Domestic visitors 937 1,002 1,071 1,118 1,168 1,220 1,451 2,022 2,202 Total 1,336 1,415 1,499 1,565 1,634 1,705 2,024 2,808 3,050 Operation and maintenance costs Routine Periodic 3 Total operation and maintenance Operating surplus 2,438 2,553 2,672 2,797 3,354 5,093 6, Financial analysis. Financial internal rates of return (FIRRs) were calculated based on incremental costs and benefits in the with- and without-investment scenarios and compared with the weighted average cost of capital (WACC) based on project financing assumptions for Cambodia and the Lao PDR. Incremental benefits are revenues generated from expanding solid waste collection services and from imposing environmental fees, passenger departure fees, retail space rental, and berthing and parking fees, assessed in nominal terms. Other assumptions are that (i) the analysis covers 2018 to 2049, including construction; (ii) total subproject costs include physical contingency and taxes, and exclude price contingency and financial charges; (iii) all costs are in 2018 prices and converted at an exchange rate of $1 = KR4,050 or $1 = KN8,300; (iv) O&M costs include regular and periodic maintenance, administration, labor, materials, and equipment as estimated in the technical study; (v) annual increases are assumed to follow real increases, excluding the impact of inflation; and (vi) the WACC is 10.6% or 2.5% (Table 4). Table 4: Weighted Average Cost of Capital Computation Cambodia Lao PDR Item Grant Equity WACC Grant Equity Amount weighting Nominal cost a Tax rate Tax-adjustable nominal cost Inflation rate b WACC 4
5 Real cost Weighted component of WACC % % Lao PDR = Lao People s Democratic Republic, WACC = weighted average cost of capital. a Nominal cost for grant and equity averages 14.5% based on the long-term interest rate issued by the National Bank of Cambodia (January 2018) and a 5.1% long-term interest rate issued by Lao commercial banks. b Cost escalation factors for Cambodia and the Lao PDR. 14. The financial analysis confirms that the proposed subprojects are viable, with base-case FIRRs ranging from 3.5% for the Lao PDR to 12.6% for Cambodia, higher than the computed WACC for the respective country. All sensitivity test scenarios are also above the WACC (Table 5). Table 5: Financial Analysis Summary Results Cambodia: Subproject and Scenario Financial Cost FIRR NPV Switching Value Sensitivity Indicator Preah Sihanouk City-Koh Rong passenger piers improvements 24,402 Base case ,536 10% investment cost increase % O&M cost increase , % tourist and revenue decrease (10.7) (9.35) 1-year implementation delay ,085 Kep solid waste management improvements 31,335 Base case ,202 10% investment cost increase , % O&M cost increase , % tourist and revenue decrease ,825 (15.1) (6.62) 1-year implementation delay ,407 Lao PDR: Subproject and Scenario Financial Cost FIRR NPV Switching Value Sensitivity Indicator Vang Vieng solid waste management improvements 55, ,825 Base case , % investment cost increase , % O&M cost increase ,882 (38) (2.66) 10% tourist and revenue decrease ,252 1-year implementation delay ,825 () = negative value, FIRR = financial internal rate of return, KN = kip, KR = riel, Lao PDR = Lao People s Democratic Republic, NPV = net present value, O&M = operation and maintenance. 5
FINANCIAL ANALYSIS. 1. Introduction and Methodology
Third Urban Governance and Infrastructure Improvement (Sector) Project (RRP BAN 39295) 1. Introduction and Methodology FINANCIAL ANALYSIS 1. The project finances basic urban services improvements and aims
More informationECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million)
Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) ECONOMIC ANALYSIS A. Project Costs 1. This chapter outlines the methodology and results of the economic analysis for the project, comprising
More informationECONOMIC AND FINANCIAL ANALYSIS
South Asia Subregional Economic Cooperation Chittagong-Cox s Bazar Railway Project, Phase 1 (RRP BAN 46452-002) A. Introduction ECONOMIC AND FINANCIAL ANALYSIS 1. The proposed project will construct 102
More informationFINANCIAL ANALYSIS OF TRANCHE 1
Town Electrification Investment Program (RRP PNG 41504) FINANCIAL ANALYSIS OF TRANCHE 1 A. Financial Analysis 1. Introduction 1. The financial analysis of the project covers the first three subprojects
More informationFINANCIAL ANALYSIS. A. Introduction
Solar Power Development Project (RRP SOL 48346) A. Introduction FINANCIAL ANALYSIS 1. The scope of the financial analysis for the Solomon Islands Solar Power Development project includes (i) an estimate
More informationFINANCIAL ANALYSIS. A. Introduction
FINANCIAL ANALYSIS Henan Sustainable Livestock Farming and Product Safety Demonstration Project (RRP PRC 46081) A. Introduction 1. A financial analysis was conducted following relevant Asian Development
More informationECONOMIC AND FINANCIAL ANALYSIS
Railway Rolling Stock Project (RRP BAN 49094) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The project involves procurement of 214 meter gauge (MG) passenger carriages, 50 broad gauge (BG) passenger
More informationFINANCIAL ANALYSIS. A. Introduction
Urban Water Supply and Wastewater Management Investment Project (RRP FIJ 491-2) A. Introduction FINANCIAL ANALYSIS 1. The Asian Development Bank (ADB) Urban Water Supply and Wastewater Management Investment
More informationCOUNTRY ECONOMIC INDICATORS (CAMBODIA)
OrbiMed Asia Partners III, LP Fund (RRP REG 51072) COUNTRY ECONOMIC INDICATORS (CAMBODIA) Item 2012 2013 2014 2015 2016 Est. 1. GDP per capita ($, current) 973 1,042 1,131 1,218 1,331 2. GDP growth (%,
More informationECONOMIC AND FINANCIAL ANALYSIS
Bihar New Ganga Bridge Project (RRP IND 48373) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The proposed project is to build a new six-lane bridge across the Ganges River near Patna in the state
More informationFINANCIAL ANALYSIS. A. Background
SASEC Second Bangladesh India Electrical Grid Interconnection Project (RRP BAN 44192) A. Background FINANCIAL ANALYSIS 1. The South Asia Subregional Economic Cooperation (SASEC) Second Bangladesh India
More informationFINANCIAL ANALYSIS. Table 1: Project Outputs Output Subcomponents Type of Analysis Enshi Wastewater Enshi Hongmiao WWTP Enshi Dashaba WWTP
Hubei Enshi Qing River Upstream Environment Rehabilitation Project (RRP PRC 47048) FINANCIAL ANALYSIS A. Introduction 1. The financial analysis of the project was carried out in accordance with the Asian
More informationViet Nam: Thanh Hoa City Comprehensive Socioeconomic Development Project
Validation Report December 2017 Viet Nam: Thanh Hoa City Comprehensive Socioeconomic Development Project Reference Number: PVR-545 Program Number: 41013-013 Loan/Grant Number: 2511, 0147 ADB CDIA DMF EIRR
More informationECONOMIC ANALYSIS. A. Introduction and Macroeconomic Context
Dhaka Water Supply Network Improvement Project (RRP BAN 47254-003) ECONOMIC ANALYSIS A. Introduction and Macroeconomic Context 1. Economic growth in Bangladesh averaged an very healthy 6.1% during FY2006
More informationTeam Leader: Srinivasan Palle Venkata, Evaluation Specialist ( Contact:
Asian Development Bank. 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org; www.adb.org/evaluation Evaluation Approach Paper Project
More informationFINANCIAL ANALYSIS. A. Methodology and Assumptions
Metropolitan Sanitation Management Investment Project (RRP INO 43251-025) FINANCIAL ANALYSIS 1. Financial analysis was prepared for the five subprojects in accordance with the Financial Management and
More informationECONOMIC AND FINANCIAL ANALYSIS
Integrated Livelihoods Improvement and Sustainable Tourism in Khuvsgul Lake National Park Project (RRP MON 48216) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. This document summarizes the results
More informationPROJECT PREPARATORY TECHNICAL ASSISTANCE
Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies
More informationFINANCIAL ANALYSIS A. Introduction
Green Energy Corridor and Grid Strengthening Project (RRP IND 44426) FINANCIAL ANALYSIS A. Introduction 1. The proposed Green Energy Corridor and Grid Strengthening Project funds (i) a portion of India
More informationFINANCIAL ANALYSIS. A. Introduction
A. Introduction Air Quality Improvement in the Greater Beijing Tianjin Hebei Region China National Investment and Guaranty Corporation s Green Financing Platform Project (RRP PRC 50096) FINANCIAL ANALYSIS
More informationFINANCIAL ANALYSIS. 2. Taking into account the financial costs, the total amount needed to finance the Padma Bridge Project is presented in Table 1.
Padma Multipurpose Bridge Project (RRP BAN 35049) FINANCIAL ANALYSIS A. Introduction 1. A financial analysis assessed the viability of the proposed project investment based on the capacity of Bangladesh
More informationFINANCIAL ANALYSIS. A. Financial Capacity Assessment of MWSS
Angat Water Transmission Improvement Project (RRP PHI 46362-002) FINANCIAL ANALYSIS 1. The project is estimated to be $134.0 million of which $98.4 million is for the design and build contract, $6.0 million
More informationFINANCIAL ANALYSIS. 3. Assumptions. The following assumptions were used in carrying out the financial analysis:
Java Bali 500-Kilovolt Power Transmission Crossing Project (RRP INO 42362) FINANCIAL ANALYSIS 1. General Methodology. Financial analysis of the project has been undertaken in accordance with Asian Development
More informationKarnataka Integrated Urban Water Management Investment Program (RRP IND 43253) ECONOMIC ANALYSIS
Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) A. Introduction ECONOMIC ANALYSIS 1. Karnataka. Karnataka is one of the top ten states in India by gross domestic product
More informationASIAN DEVELOPMENT BANK
TAR:LAO 29284 ASIAN DEVELOPMENT BANK TECHNICAL ASSISTANCE TO ThE LAO PEOPLE'S DEMOCRATIC REPUBLIC FOR ThE CORPORATE AND FINANCIAL DEVELOPMENT OF ELECTRICIT DU LAO LI LI May 1996 - -I CURRENCY EQUIVALENTS
More information(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time);
2 (f) Goods means equipment and materials to be financed out of the proceeds of the Loan, including related services such as transportation, insurance, installation, commissioning, training, and initial
More information(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time);
2 (f) GAP or Gender Action Plan means the gender action plan for the Project, including any update thereto, prepared and agreed between the Borrower and ADB and further set out in the PAM; (g) Goods means
More informationSouth Asia Subregional Economic Cooperation Power System Expansion Project (RRP NEP 44219) FINANCIAL ANALYSIS
South Asia Subregional Economic Cooperation Power System Expansion Project (RRP NEP 44219) A. Approach FINANCIAL ANALYSIS 1. Financial analysis of the project was carried out in accordance with the Financial
More informationFINANCIAL ANALYSIS. A. Introduction
Additional Financing of Agriculture and Rural Development Project (RRP MON 39229) FINANCIAL ANALYSIS A. Introduction 1. The financial analysis of the additional financing of the Agriculture and Rural Development
More informationRepublic of the Maldives: Preparing Business Strategy for Port Development
Technical Assistance Report Project Number: 47283 Capacity Development Technical Assistance (CDTA) November 2013 Republic of the Maldives: Preparing Business Strategy for Port Development The views expressed
More informationCOUNTRY ECONOMIC INDICATORS. Table 1: Country Economic Indicators for Cambodia,
Aureos South-East Asia Fund II (RRP REG 45911) 1 COUNTRY ECONOMIC INDICATORS Table 1: Country Economic Indicators for Cambodia, 2007-2011 Fiscal Year ITEM 2007 2008 2009 2010 2011 Proj 1. GDP per Capita
More informationPlanning & Economic Analysis I
Planning & Economic Analysis I Session on Planning & Policy Rita Nangia Asian Development Bank Session Description The session covers the following topics: Linkages between network planning and identification
More informationFINANCIAL ANALYSIS. A. Kathmandu Upatyaka Khanepani Limited
Kathmandu Valley Wastewater Management Project (RRP NEP 43524) FINANCIAL ANALYSIS A. Kathmandu Upatyaka Khanepani Limited 1. Kathmandu Upatyaka Khanepani Limited (KUKL) is a public company registered under
More informationAlternative ways of Financing Urban Development
External Support for Decentralization Reforms & Local Governance Systems in the Asia Pacific: Better Performance, Higher Impact? Cities Development Initiative for Asia Alternative ways of Financing Urban
More informationINSTITUTIONAL ANALYSIS AND ARRANGEMENTS FOR O&M OF PROJECT FACILITIES
GMS Tourism Infrastructure for Inclusive Growth Project (RRP VIE 46293-005) INSTITUTIONAL ANALYSIS AND ARRANGEMENTS FOR O&M OF PROJECT FACILITIES A. Institutional Analysis 1.1 Governance Overview 1. Viet
More informationECONOMIC ANALYSIS. Table 1: Vehicle Fleet Characteristics Four- Medium Car. Light Bus. Wheel Drive
Western Regional Road Corridor Investment Program (RRP MON 41193) A. Project Costs and Benefits ECONOMIC ANALYSIS 1. Project Costs. The project s capital costs include the costs of the road works, design,
More informationReport and Recommendation of the President to the Board of Directors
Report and Recommendation of the President to the Board of Directors Project Number: 32254-02 September 2008 Proposed Supplementary Loan India: Urban Water Supply and Environmental Improvement in Madhya
More informationDetailed Economic and Financial Analysis. Lao PDR: Climate-Friendly Agribusiness Value Chains Sector Project
Climate-Friendly Agribusiness Value Chains Sector Project (RRP LAO 48409-004) Detailed Economic and Financial Analysis June 2018 Lao PDR: Climate-Friendly Agribusiness Value Chains Sector Project 1 I.
More informationECONOMIC AND FINANCIAL ANALYSIS
Additional Financing of National Motorway M-4 Gojra Shorkot Khanewal Section Project (RRP PAK 48402) ECONOMIC AND FINANCIAL ANALYSIS A. General 1. Roads are the main mode of transport in Pakistan, accounting
More informationPhilippines: Mindanao Basic Urban Services Sector Project
Validation Report Reference Number: PCV: PHI 2011-25 Project Number: 30551 Loan Number: 1843 September 2011 Philippines: Mindanao Basic Urban Services Sector Project Independent Evaluation Department ABBREVIATIONS
More informationContracts Awarded in April 2009
Contracts Awarded in April 2009 : 0089-BHU Micro, Small, And Medium-Sized Enterprise : Development Project Executing Agency : Ministry of Finance : Small & Medium Scale Enterprises : Bhutan Contract Description
More informationECONOMIC AND FINANCIAL ANALYSIS
Coral Reef Rehabilitation and Management Program Coral Triangle Initiative Project (RRP INO 46421) A. Approach and Methodology ECONOMIC AND FINANCIAL ANALYSIS 1. The economic and financial analysis of
More informationSTATE-OWNED ENTERPRISE ANALYSIS (Republic of the Marshall Islands: Public Sector Program)
Public Sector Program (RRP RMI 43321-01) A. Introduction STATE-OWNED ENTERPRISE ANALYSIS (Republic of the : Public Sector Program) 1. The Republic of the (RMI) operates an extensive state-owned enterprises
More informationECONOMIC AND FINANCIAL ANALYSES FOR TRANCHE 2
Appendix 6 ECONOMIC AND FINANCIAL ANALYSES FOR TRANCHE 2 1. Background. The Second Rural Connectivity Investment Program will support the Government of India in improving rural connectivity through the
More informationFINANCIAL ANALYSIS: PROJECT 1
Green Power Development and Energy Efficiency Improvement Investment Program (RRP SRI 47037) A. Background and Rationale FINANCIAL ANALYSIS: PROJECT 1 1. Project 1 of the Green Power Development and Energy
More informationCompletion Report. Project Number: Loan Number: 1367 May Philippines: Regional Municipal Development Project
Completion Report Project Number: 22102 Loan Number: 1367 May 2006 Philippines: Regional Municipal Development Project CURRENCY EQUIVALENTS Currency Unit peso (P) At Appraisal At Project Completion (1
More informationCompletion Report. Project Number: Loan Number: 2085-LAO (SF) March Lao People s Democratic Republic: Roads for Rural Development Project
Completion Report Project Number: 30271 Loan Number: 2085-LAO (SF) March 2014 Lao People s Democratic Republic: Roads for Rural Development Project This document is being disclosed to the public in accordance
More informationCOUNTRY PROGRESS REPORT: CAMBODIA
COUNTRY PROGRESS REPORT: CAMBODIA PSC MEETING OF THE GEF/UNDP/PEMSEA PROJECT ON SCALING UP IMPLEMENTATION OF THE SDS-SEA JULY 24, 2017 1 CAMBODIA Summary of Major Achievements/Outputs in 2016-2017 National
More informationNew Development Bank. Policy on Financial Management and Financial Analysis, and Economic Analysis of Projects
New Development Bank Policy on Financial Management and Financial Analysis, and Economic Analysis of Projects Owner: Operations Division Approved Date: January 21, 2016 Policy on Financial Management and
More informationCambodia: Second Power Transmission and Distribution Project
Validation Report Reference Number: PVR-464 Project Number: 37041-013 Loan Number: 2261 December 2016 Cambodia: Second Power Transmission and Distribution Project Independent Evaluation Department ABBREVIATIONS
More informationProvince of Nova Scotia Service Nova Scotia and Municipal Relations
v214-215.1.1 Province of Nova Scotia Service Nova Scotia and Municipal Relations FINANCIAL INFORMATION RETURN ( as prescribed by the Minister of Service Nova Scotia and Municipal Relations) FOR Municipality
More informationADB RELENDING FACILITIES FOR THE LOCAL GOVERNMENT UNITS. Local Government Unit Support Credit Program (LGUSCP)
RELENDING FACILITIES FOR THE LOCAL GOVERNMENT UNITS Local Government Unit Support Credit Program (LGUSCP) Water District Development Project (WDDP) ADB Mindanao Basic Urban Services Sector (MBUSS) PROGRAM
More informationTanahu Hydropower Project (RRP NEP 43281) FINANCIAL ANALYSIS. A. Introduction
Tanahu Hydropower Project (RRP NEP 43281) FINANCIAL ANALYSIS A. Introduction 1. The financial analysis of the Tanahu Hydropower Project was carried out in accordance with Financial Management and Analysis
More informationProject Administration Manual
Project Administration Manual Project Number:50102 Loan and/or Grant Number(s): {LXXXX; GXXXX} July 2018 Kingdom of Cambodia: Second Urban Environmental Management in the Tonle Sap Basin Project ABBREVIATIONS
More informationIndonesia: Metropolitan Medan Urban Development Project
Validation Report Reference Number: PCV:INO 2009-09 Project Number: 27358 Loan Number: 1587 May 2009 Indonesia: Metropolitan Medan Urban Development Project Independent Evaluation Department 2 ABBREVIATIONS
More informationECONOMIC ANALYSIS. A. Introduction
North Pacific Regional Connectivity Investment Project (RRP PAL 46382) ECONOMIC ANALYSIS A. Introduction 1. Project summary. The Asian Development Bank (ADB) will support Palau to develop a fiber optic
More informationIndia: Karnataka Urban Development and Coastal Environmental Management Project
Validation Report Reference Number: PVR-334 Project Number: 30303 Loan Number: 1704 November 2014 India: Karnataka Urban Development and Coastal Environmental Management Project Independent Evaluation
More information2018 BUDGET PUBLIC MEETING
2018 BUDGET PUBLIC MEETING April 23, 2018 Council Chambers Presented By: Dawn Galusha, Deputy Treasurer BUDGET PROCESS Municipalities exist under the mandate of the Province. Municipal Act and a variety
More informationTrung Son Hydropower Project. Financial Analysis
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Trung Son Hydropower Project Financial Analysis Final Report February
More informationECONOMIC AND FINANCIAL ANALYSIS
Additional Financing to the Third Primary Education Development Project (RRP BAN 42122) ECONOMIC AND FINANCIAL ANALYSIS 1. This document provides an analysis of the economic rationale for additional financing
More informationEconomic Impact Assessment of Updated Delegate Projections for Proposed Redevelopment of the Halifax World Trade and Convention Centre
Economic Impact Assessment of Updated Delegate Projections for Proposed Redevelopment of the Halifax World Trade and Convention Centre FINAL REPORT Prepared for: Trade Centre Limited (TCL), Halifax, Nova
More informationSECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT
A. Sector Road Map Road Improvement and Institutional Development Project (RRP PHI 41076) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT 1. Sector Performance, Problems and Opportunities 1. Roads provide
More informationVILLAGE OF NEW MARYLAND 2015 GENERAL OPERATING FUND BUDGET. 1. Total Budget - Total Page 17 $4,466,360
1. Total Budget - Total Page 17 $4,466,360 2. Less: Non-Tax Revenue - Total Page 7 $311,392 3. Net Budget $4,154,968 4. Less: Community Funding and Equalization Grant $6,108 5. Warrant to be Raised by
More informationFINANCIAL PERFORMANCE AND PROJECTIONS OF LAO HOLDING STATE ENTERPRISE
Greater Mekong Subregion Nam Ngum 3 Hydropower Project (RRP LAO 41385) Supplementary Appendix 3 FINANCIAL PERFORMANCE AND PROJECTIONS OF LAO HOLDING STATE ENTERPRISE A. Introduction 1. An assessment of
More informationECONOMIC ANALYSIS. Table 1: Economic costs by project component
Jiangxi Fuzhou Urban Integrated Infrastructure Improvement Project (RRP PRC 44007) A. Project Costs and Benefits ECONOMIC ANALYSIS 1. The project s capital costs include the civil works, land acquisition
More informationBRITISH COLUMBIA FERRY SERVICES INC.
Interim Consolidated Financial Statements of BRITISH COLUMBIA FERRY SERVICES INC. (unaudited) Interim Consolidated Statements of Financial Position (unaudited) (Expressed in thousands of Canadian dollars)
More informationPeriodic Financing Request Report. India: Kolkata Environmental Improvement Investment Program (Tranche 2)
Periodic Financing Request Report Project Number: 42266-025 MFF Number: 0075 August 2016 India: Kolkata Environmental Improvement Investment Program (Tranche 2) Distribution of this document is restricted
More informationReport and Recommendation of the President to the Board of Directors
Report and Recommendation of the President to the Board of Directors Project Number: 48175-002 May 2018 Proposed Loan Republic of the Union of Myanmar: Third Greater Mekong Subregion Corridor Towns Development
More informationTECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT
Himachal Pradesh Clean Energy Transmission Investment Program (RRP IND 43464) TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT A. INTRODUCTION 1. The
More informationLao People s Democratic Republic: Preparing the Northern Cross-Border Power Trade and Distribution Project
Appendix 3 11 Technical Assistance Report Project Number: 51329-002 Transaction Technical Assistance (TRTA) November 2017 Lao People s Democratic Republic: Preparing the Northern Cross-Border Power Trade
More informationIssue. Background. Options and Recommendation
Date: March 3, 2016 To: Public Works Commission Members From: Heather Buchanan, Support Systems Sr. Manager Subject: FY2017 O&M Budget Issue Public Works is proposing its FY 2017 operations and maintenance
More informationSECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR. 1. Sector Performance, Problems, and Opportunities
Chhattisgarh State Road Sector Project (RRP IND 44427) Sector Road Map SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR 1. Sector Performance, Problems, and Opportunities 1. The state of Chhattisgarh
More informationPort Tariffs Port of Bodø - Port Tariffs
Port Tariffs 2018 Port of Bodø - Port Tariffs 2018 1 2 Port of Bodø - Port Tariffs 2018 Contents 1. USE OF PORT INFRASTRUCTURE 1.1 Quay dues 1.2 Goods charges 1.3 Charge for storage of goods 1.4 Passenger
More informationOFF CIAL 6 L. October 15, H. E. Phouphet Khamphounvong Minister of Finance Ministry of Finance Vientiane Lao People's Democratic Republic
Public Disclosure Authorized OFF CIAL 6 L The World Bank 30th F I Telephone: (66) 0 26868300 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT 989 R ntl 1 FATS Facsimile: (66) 0 26868301 INTERNATIONAL
More informationDraft PPP Policy Outline
Note 7 May 2012 Draft PPP Policy Outline This note is the seventh in a series of notes on developing a comprehensive policy, legal, and institution framework for public-private partnership (PPP) programs.
More informationDraft Design and Monitoring Framework
Draft Design and Monitoring Framework Project Number: 42394-022 August 2011 TON : Nuku'alofa Urban Development Sector Project A design and monitoring framework is an active document, progressively updated
More informationReport and Recommendation of the President to the Board of Directors
Report and Recommendation of the President to the Board of Directors Project Number: 43309-015 Loan Number: 2839-CAM September 2016 Proposed Loan for Additional Financing Kingdom of Cambodia: Provincial
More informationBRITISH COLUMBIA FERRY SERVICES INC.
Consolidated Financial Statements of BRITISH COLUMBIA FERRY SERVICES INC. INDEPENDENT AUDITORS REPORT To the Shareholders of British Columbia Ferry Services Inc. We have audited the accompanying consolidated
More informationSECTOR ASSESSMENT (SUMMARY): TRANSPORT 1
Country Partnership Strategy: Viet Nam, 2012 2015 SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Investment in the transport sector in Viet
More informationKEY QUESTIONS FOR CONSULTANTS ECONOMIC ANALYSIS OF PROJECTS. Project Economic Evaluation Division Economics and Development Resource Center
KEY QUESTIONS FOR CONSULTANTS ECONOMIC ANALYSIS OF PROJECTS Project Economic Evaluation Division Economics and Development Resource Center Copies of the Guidelines for the Economic Analysis of Projects
More informationCambodia: Greater Mekong Subregion: Cambodia Northwest Provincial Road Improvement Project
Validation Report December 2017 Cambodia: Greater Mekong Subregion: Cambodia Northwest Provincial Road Improvement Project Reference Number: PVR-520 Project Number: 42358-013 Loan Number: 2539 CURRENCY
More informationMillage Comparison. FY19 Rolled- Back Rates. FY19 Adopted Rates
Millage Comparison Adopted Rates Millage Rates Rolled- Back Rates Adopted Rates Adopted Taxes Ad Valorem Taxes Taxes Levied Adopted Taxes Countywide Operating 5.2904 5.2904 $937,994,229 $930,455,041 $1,002,331,958
More informationSECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN)
Second Jharkhand State Road Project (RRP IND 49125) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN) A. Sector Performance, Problems, and Opportunities 1. State context. The state of Jharkhand was
More informationAssessing Impact in the Greater Mekong Subregion. An Analysis of Regional Cooperation Projects
Assessing Impact in the Greater Mekong Subregion An Analysis of Regional Cooperation Projects Assessing Impact in the Greater Mekong Subregion An Analysis of Regional Cooperation Projects 2014 Asian Development
More informationCapital Region Water. Water and Wastewater Rate Study Report. November 22, Capital Region Water Water and Wastewater Rate Study
Capital Region Water Water and Wastewater Rate Study Report November 22, 2017 Capital Region Water Water and Wastewater Rate Study TABLE OF CONTENTS 1. INTRODUCTION...1 1.1 RATE STUDY SCOPE AND OBJECTIVES...1
More informationBRITISH COLUMBIA FERRY SERVICES INC.
Consolidated Financial Statements of BRITISH COLUMBIA FERRY SERVICES INC. INDEPENDENT AUDITORS REPORT To the Shareholders of British Columbia Ferry Services Inc. We have audited the accompanying consolidated
More informationMillage Comparison. FY17 Rolled- Back Rates. FY17 Adopted Rates
Millage Comparison Adopted Rates Millage Rates Rolled- Back Rates Adopted Rates Adopted Taxes Ad Valorem Taxes Taxes Levied Adopted Taxes Countywide Operating 5.3444 5.2904 $805,284,750 $800,498,049 $862,115,399
More informationGRAEME JOHNSEN Project Manager
GRAEME JOHNSEN Project Manager Project Manager with MMK Consulting Inc. (2011-Present) Seven years management consulting experience specializing in business strategy, economics, and financial evaluations
More information19A NCAC 02D.0532 Toll Operations. Establishment of tolls for all ferry routes except those designated by NC statute as free.
FISCAL NOTE Rule Citation: Rule Topic: NCDOT Division: Staff Contact: 19A NCAC 02D.0531 Free Operations 19A NCAC 02D.0532 Toll Operations Establishment of tolls for all ferry routes except those designated
More informationSection 3.07 is deleted and the following is substituted therefor:
2 outstanding Loan and the Fixed Spread that will be applied to new Loans (expressed as a percentage per annum), by (ii) the principal amount of the outstanding Loan on which the Borrower shall pay interest
More informationFY15 APPROPRIATIONS. Specific highlights for the General Fund, Special Capital
FY15 APPROPRIATIONS The following sections will provide highlights on changes to budgeted appropriations from FY14 to FY15. OPERATING BUDGET HIGHLIGHTS The total Operating Budget for FY15 has increased
More informationLao People s Democratic Republic: Strengthening Capacity for Health Sector Governance Reforms
Technical Assistance Report Project Number: 47137-004 Capacity Development Technical Assistance (CDTA) September 2016 Lao People s Democratic Republic: Strengthening Capacity for Health Sector Governance
More informationTHE CORPORATION OF THE VILLAGE OF LUMBY
THE CORPORATION OF THE VILLAGE OF LUMBY CONSOLIDATED FINANCIAL STATEMENTS December 31, 2016 December 31, 2016 CONTENTS Page INDEPENDENT AUDITORS' REPORT 3 FINANCIAL STATEMENTS Consolidated Statement of
More informationSocialist Republic of Viet Nam: Preparing the Hai Phong Water Supply Project
Technical Assistance Report Project Number: 41425 October 2008 Socialist Republic of Viet Nam: Preparing the Hai Phong Water Supply Project (Financed by the Netherlands Trust Fund for the Water Financing
More informationTechnical Assistance to the People s Republic of China for Preparing the Railway Development Project
Technical Assistance TAR: PRC 39153 Technical Assistance to the People s Republic of China for Preparing the Railway Development Project September 2005 CURRENCY EQUIVALENTS (as of 14 August 2005) Currency
More informationASIAN DEVELOPMENT BANK PPA: PRC 25013
ASIAN DEVELOPMENT BANK PPA: PRC 25013 PROJECT PERFORMANCE AUDIT REPORT ON THE DALIAN WATER SUPPLY PROJECT (Loan 1313-PRC) IN THE PEOPLE S REPUBLIC OF CHINA November 2003 At Appraisal (May 1994) CURRENCY
More informationPeople s Republic of China: Qinghai Haidong Urban- Rural Eco Development Project
Project Administration Manual Project Number: 48102-002 January 2018 People s Republic of China: Qinghai Haidong Urban- Rural Eco Development Project i ABBREVIATIONS ADB Asian Development Bank AAOV average
More informationCountry Operations Business Plan. Myanmar September 2015
Country Operations Business Plan September 2015 Myanmar 2016 2018 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of
More informationValidation Report. India: North Karnataka Urban Sector Investment Program, Tranche 1. Independent Evaluation Department
Validation Report Reference Number: PVR-451 Project Number: 38254-033 Loan Number: 2312 August 2016 India: North Karnataka Urban Sector Investment Program, Tranche 1 Independent Evaluation Department ABBREVIATIONS
More informationImplementation of the Gas Tax Funding Agreement in Manitoba. Annual Implementation Report for the Period of April 1, 2012 to March 31, 2013
Implementation of the Gas Tax Funding Agreement in Manitoba Annual Implementation Report for the Period of April 1, 2012 to March 31, 2013 October 2013 Table of Contents Introduction.... 5 Oversight Committee..
More information