FINANCIAL ANALYSIS. Table 1: Project Outputs Output Subcomponents Type of Analysis Enshi Wastewater Enshi Hongmiao WWTP Enshi Dashaba WWTP
|
|
- Marianna Shelton
- 5 years ago
- Views:
Transcription
1 Hubei Enshi Qing River Upstream Environment Rehabilitation Project (RRP PRC 47048) FINANCIAL ANALYSIS A. Introduction 1. The financial analysis of the project was carried out in accordance with the Asian Development Bank (ADB) guidelines for the financial analysis of projects. 1 The analysis included assessments of the current financial performance and the future viability of costrecovery objectives, and the fiscal impact of non-revenue-generating projects. Enshi and Lichuan city governments will service the ADB loan and are responsible for counterpart funding and ongoing recurrent operation and maintenance (O&M) costs. Project outputs are described in Table 1. Table 1: Project Outputs Output Subcomponents Type of Analysis Enshi Wastewater Enshi Hongmiao WWTP Enshi Dashaba WWTP Cost-recovery objectives, FIRR Enshi sewage network Lichuan Wastewater Lichuan WWTP Cost-recovery objectives, Enshi River Improvement Lichuan River Improvement Nonstructural measures Lichuan sewage network Enshi flood management Enshi river greening Lichuan flood management Lichuan river greening Agriculture NPS pollution reduction pilot scheme Other nonstructural measures, e.g., flood warning system to complement the structural components to improve their effectiveness and sustainability FIRR Non-revenue-generating, financial sustainability analysis Non-revenue-generating, financial sustainability analysis No financial analysis, these are capacity building, public engagement, and pilot projects FIRR = financial internal rate of return, NPS = nonpoint source, WWTP = wastewater treatment plant. B. Non-Revenue-Generating Outputs 2. Financial sustainability analyses were completed for the Enshi and Lichuan flood management and river rehabilitation outputs to assess the fiscal sustainability and debt repayment capacity of the Enshi city government (ECG) and Lichuan city government (LCG). The growth of total revenues and expenditures were analyzed. Assessment of the past financial performance of the cities was completed. The ECG and LCG will provide counterpart funding during implementation and pay debt service and O&M costs for non-revenue-generating outputs following project completion. The objectives of this assessment are (i) to review the historical revenue-generating capacity and the share of revenue from higher government sources during , and determine how much expenditure this supports; (ii) based on historical revenue-generating capacity, to assess the financial capacity of the cities to finance counterpart funding during project implementation; and 1 ADB Financial Management and Analysis of Projects. Manila; and ADB Financial Due Diligence: A Methodology Note. Manila.
2 2 (iii) based on projections of financial income, to assess the capacity of the cities to finance O&M and debt service costs, in addition to their other obligations, over the loan payback period. 3. A review of statements of revenue and expenditure for was completed for these jurisdictions to evaluate financial performance and their capacity to support current operations and finance the new costs. Revenues and expenditures were forecasted forward at a conservative rate of 5% per year to evaluate upcoming fiscal burdens. Counterpart funding and incremental O&M costs were compared to forecast expenditures and revenues. Average annual counterpart funding accounts for 0.55% of ECG projected revenues and 0.67% of the LCG projected revenues during implementation and all incremental costs are less than 0.1% of revenues after The financial sustainability assessment indicates that the ECG and LCG have sufficient funds to finance the counterpart contributions, as well as to finance debt service and O&M costs during operation. C. Financial Analysis of the Revenue-Generating Component 4. Cost-recovery objectives include the wastewater treatment plants (WWTPs). The financial analysis for these was conducted at an enterprise level based on pro forma financial statements. This analysis considered cost recovery, profitability, and liquidity of the enterprise based on existing tariffs. Financial internal rates of return (FIRRs) were estimated for the project investment based on financial cash flows. The analysis was completed with existing tariffs and full cost-recovery tariffs. 5. The following assumptions are used in the analysis: (i) Separate projections were made of with-project and without-project demands, revenues, and costs. (ii) Project construction costs were estimated by the project design institute. (iii) All costs are estimated at 2014 prices. These are forecasted forward based on growth in demand and inflation. (iv) FIRRs were evaluated at constant 2014 prices, while financial performance assessments were based on inflating values. (v) Physical contingencies were estimated as 8% of base costs. Price contingencies account for cost inflation and potential exchange rate movements over the construction period. (vi) An exchange rate of CNY6.13 = $1 was assumed. (vii) Capital costs include base cost and physical contingencies, but exclude price contingencies and financial charges during implementation. (viii) O&M costs include personnel salaries and welfare, and repair, maintenance, and other costs. Expenses also include depreciation of fixed assets. (ix) Revenues are derived from transfers from the city governments and from wastewater tariffs. (x) Outputs are financed using the ADB loan and counterpart funds from local governments. The ADB loan is a variable rate loan with straight line amortization. The loan period is 25 years including a 5-year grace period. Financing charges during implementation are not capitalized. 6. The financial cost benefit analysis compares the costs and benefits of the project from the viewpoint of the enterprise. The project costs use market prices including applicable taxes and duties.
3 3 7. Investment cost. The wastewater components are estimated to cost CNY million in Enshi and CNY million in Lichuan. Capital costs include civil works, equipment, land acquisition and resettlement, environmental and social monitoring costs, capacity building, taxes and duties, and physical contingencies. Price contingencies and financing charges during construction are not included. 8. Weighted average cost of capital. Estimated FIRR values are compared to the weighted average cost of capital (WACC). Financing sources consist of the equity contributions from the ECG and LCG and ADB foreign currency loan. The 10-year US Dollar fixed swap rate (2.46%) is assumed for debt servicing. 2 An ADB spread of 0.5% and a maturity premium of 0.1% are added to this rate. 3 The cost of equity was assumed to be 5.71% based on a risk-free rate of return of 3.64% and an assumed risk premium of 2.00%. 4 The corporate tax rate is 25%. The real after-tax costs of ADB funds were estimated to be 1.09% and of equity 2.63%. Domestic inflation is set at 3.0% and an international inflation at 1.58%. The computed values for WACC are shown in Table 2. Table 2: Weighted Average Cost of Capital Weighting Nominal Inflation Real Term Funding Source ECG LCG Rate Tax Rate ECG LCG ADB ECG LCG Real WACC ADB = Asian Development Bank, ECG = Enshi city government, LCG = Lichuan city government, WACC = weighted average cost of capital. 9. Wastewater tariffs. Revenues are estimated based on current tariff revenues and existing subsidies. Tariff revenues are based on assumed tariff levels and the customers billable water volumes. Both Enshi and Lichuan currently use a wastewater tariff that is a simple or uniform volumetric charge of CNY0.8 per cubic meter (m 3 ) that all customers with a water supply connection pay, even if they do not have a wastewater service connection. With this tariff level, cost recovery is estimated to be 90% in Enshi and 49% in Lichuan in Implementation of this tariff followed construction of the first WWTPs in Enshi in 2006 and in Lichuan in Under the policy, the intended purpose of this tariff is to cover the cost of wastewater treatment but not collection or sludge treatment. Billable water is the customer s average metered water supply. All water supply customers are billed for wastewater services based on metered water use. 10. A recent notice of the National Development and Reform Commission requires that the tariff is increased to CNY0.95/m 3 before Both the ECG and LCG have committed to a progressive increase of wastewater tariffs to achieve full cost recovery in accordance with national wastewater tariff policies and regulations. Adjustments to a full cost-recovery tariff level are gradual and are assumed to occur every 5 years. Measured at 2014 price levels, the full cost-recovery tariff profile for Enshi had tariffs increasing from CNY0.80/m 3 in 2015 to CNY1.79/m 3 by 2041 (average CNY1.25 per m 3 ) and from CNY0.80/m 3 to CNY 2.25/m 3 in 2 accessed on 19 November The average loan maturity is years. 4 A return of 3.64% was reported for 10-year government bonds in the PRC ( accessed 19 Nov 2014).
4 4 Lichuan (average CNY1.42 per m 3 ). With these increases, full cost recovery is achieved by 2026 in Enshi with a tariff of CNY1.27/m 3 and by 2021 in Lichuan with a tariff of CNY1.22/m 3. Both Enshi and Lichuan have committed to providing subsidies to fully cover funding shortfalls in wastewater operations caused by tariffs that fail to achieve full cost recovery. With ongoing increases, cost recovery continues to improve, so average recovery of capital and O&M costs over the life of the project is 132% in Enshi and 193% in Lichuan. 11. Tariff affordability analysis. Tariffs are considered affordable when they do not exceed 5% of average monthly incomes of CNY4,220 in Enshi and CNY3,960 in Lichuan based on monthly water consumption of 17.6 m 3. The tariff affordability analysis shows that the share of income spent on water and wastewater at full cost-recovery levels is well below the benchmark of 5.0%, less than 1.9% for average-income households, and less than 2.6% for low-income households. Nonetheless, the ECG and LCG have committed to (i) undertake periodic review of tariffs and fees following specified tariff setting mechanisms, (ii) assess the impact of wastewater collection fees and tariffs on the poor and provide necessary subsidies to ensure wastewater collection services to the poor, and (iii) hold public tariff consultation hearings to consult with the affected people when setting or adjusting tariffs for wastewater. 12. Financial internal rate of return. Results of the analysis of revenue-generating outputs are summarized in Table 3. The financial analysis for output 1 in Enshi and Lichuan confirms that it is financially feasible, with an FIRR above the weighted average cost of capital given commitments of the ECG and LCG to (i) a progressive increase of wastewater tariffs to achieve full cost recovery in accordance with national wastewater tariff policies and regulations, and (ii) provide subsidies to fully cover funding shortfalls in wastewater operations caused by tariffs that fail to achieve full cost recovery. Table 3: Revenue-Generating Output Analysis Tariff increase (every 5 Item WACC FIRR years) Enshi wastewater Lichuan wastewater FIRR = financial internal rate of return, WACC = weighted average cost of capital. 13. Sensitivity analysis. Sensitivity analysis was completed for the scenario that assumes a full cost-recovery tariff adjustment (Table 4). The large reduction in growth has little impact. None of the tests depress the FIRR to below the WACC. Table 4: Sensitivity Analysis Financial Internal Rate of Return Item Enshi Lichuan I. Base case II. Capital cost increased 10% III. Operating cost increased 10% IV. Revenue down 10% V. Combination of II, III, and IV VI. Demand growth reduced 50% a FIRR = financial internal rate of return a Adjusts high initial growth rates that reflect current growth patterns. Source: Asian Development Bank estimates
5 5 D. Financial Management Assessment 14. The Enshi prefecture government (EPG), the project executing agency, has extensive experience in preparing and implementing projects funded by the World Bank and foreign governments. A new prefecture project management office has been established within the Enshi Prefecture Development and Reform Commission. It is responsible, on behalf of the EPG, for daily coordination and management of project preparation and implementation. The Enshi Prefecture Finance Bureau (EPFB) will be responsible, on behalf of the EPG, for the financial management of the project. The Enshi Urban Construction Investment Company (EUCIC) and Lichuan Liangli Urban Construction and Development Company (LLUCDC) are the implementing agencies of the project responsible for implementation of subcomponents in respective cities. They are stated-owned companies. 15. The financial management assessment looked into the financial management capacity of the EPFB, EUCIC, and LLUCDC. The assessment included review of fund-flow arrangements, staffing, accounting policies and procedures, internal and external auditing arrangements, reporting and monitoring, and financial information systems. 16. The EPFB has adequate financial staff, accounting policies and procedures, internal and external controls, audit arrangements, and reporting systems. It has experience with World Bank and foreign government projects, but no experience with ADB projects. The LLUCDC and EUCIC have sound financial management systems which can meet the minimum financial management requirements for their current activities. They have no experience with the financial management of foreign-funded projects. External financial management assistance is proposed to help the EUCIC implement improvements in its budget management system. 17. The executing and implementing agencies have agreed to strengthen their financial management capability to manage the project, including (i) undertaking training, particularly on ADB policy and procedural requirements including procurement, disbursement, and project management; and (ii) seeking external financial management assistance as needed. 18. The overall financial management risk rating of the project, after considering mitigating measures, is moderate. The identified financial management risks will be closely monitored during project implementation.
FINANCIAL ANALYSIS. 1. Introduction and Methodology
Third Urban Governance and Infrastructure Improvement (Sector) Project (RRP BAN 39295) 1. Introduction and Methodology FINANCIAL ANALYSIS 1. The project finances basic urban services improvements and aims
More informationFINANCIAL ANALYSIS. A. Introduction
FINANCIAL ANALYSIS Henan Sustainable Livestock Farming and Product Safety Demonstration Project (RRP PRC 46081) A. Introduction 1. A financial analysis was conducted following relevant Asian Development
More informationFINANCIAL ANALYSIS. A. Introduction
A. Introduction Air Quality Improvement in the Greater Beijing Tianjin Hebei Region China National Investment and Guaranty Corporation s Green Financing Platform Project (RRP PRC 50096) FINANCIAL ANALYSIS
More informationFINANCIAL ANALYSIS. A. Introduction
Urban Water Supply and Wastewater Management Investment Project (RRP FIJ 491-2) A. Introduction FINANCIAL ANALYSIS 1. The Asian Development Bank (ADB) Urban Water Supply and Wastewater Management Investment
More informationOUTLINE TERMS OF REFERENCE FOR CONSULTANTS
Strengthening Public Financial Resource Management through Information and Communication Systems Technology Systems (TRTA MON 51084) OUTLINE TERMS OF REFERENCE FOR CONSULTANTS 1. The transaction technical
More informationECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million)
Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) ECONOMIC ANALYSIS A. Project Costs 1. This chapter outlines the methodology and results of the economic analysis for the project, comprising
More informationFINANCIAL ANALYSIS: PROJECT 1
Green Power Development and Energy Efficiency Improvement Investment Program (RRP SRI 47037) A. Background and Rationale FINANCIAL ANALYSIS: PROJECT 1 1. Project 1 of the Green Power Development and Energy
More informationFINANCIAL ANALYSIS. A. Background
SASEC Second Bangladesh India Electrical Grid Interconnection Project (RRP BAN 44192) A. Background FINANCIAL ANALYSIS 1. The South Asia Subregional Economic Cooperation (SASEC) Second Bangladesh India
More informationFINANCIAL ANALYSIS. A. Methodology and Assumptions
Metropolitan Sanitation Management Investment Project (RRP INO 43251-025) FINANCIAL ANALYSIS 1. Financial analysis was prepared for the five subprojects in accordance with the Financial Management and
More informationFINANCIAL ANALYSIS OF TRANCHE 1
Town Electrification Investment Program (RRP PNG 41504) FINANCIAL ANALYSIS OF TRANCHE 1 A. Financial Analysis 1. Introduction 1. The financial analysis of the project covers the first three subprojects
More informationTanahu Hydropower Project (RRP NEP 43281) FINANCIAL ANALYSIS. A. Introduction
Tanahu Hydropower Project (RRP NEP 43281) FINANCIAL ANALYSIS A. Introduction 1. The financial analysis of the Tanahu Hydropower Project was carried out in accordance with Financial Management and Analysis
More informationFINANCIAL ANALYSIS. A. Introduction
Solar Power Development Project (RRP SOL 48346) A. Introduction FINANCIAL ANALYSIS 1. The scope of the financial analysis for the Solomon Islands Solar Power Development project includes (i) an estimate
More informationECONOMIC AND FINANCIAL ANALYSIS
Bihar New Ganga Bridge Project (RRP IND 48373) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The proposed project is to build a new six-lane bridge across the Ganges River near Patna in the state
More informationFINANCIAL ANALYSIS. 3. Assumptions. The following assumptions were used in carrying out the financial analysis:
Java Bali 500-Kilovolt Power Transmission Crossing Project (RRP INO 42362) FINANCIAL ANALYSIS 1. General Methodology. Financial analysis of the project has been undertaken in accordance with Asian Development
More informationFINANCIAL ANALYSIS A. Introduction
Green Energy Corridor and Grid Strengthening Project (RRP IND 44426) FINANCIAL ANALYSIS A. Introduction 1. The proposed Green Energy Corridor and Grid Strengthening Project funds (i) a portion of India
More informationKarnataka Integrated Urban Water Management Investment Program (RRP IND 43253) ECONOMIC ANALYSIS
Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) A. Introduction ECONOMIC ANALYSIS 1. Karnataka. Karnataka is one of the top ten states in India by gross domestic product
More informationFINANCIAL ANALYSIS. A. Financial Capacity Assessment of MWSS
Angat Water Transmission Improvement Project (RRP PHI 46362-002) FINANCIAL ANALYSIS 1. The project is estimated to be $134.0 million of which $98.4 million is for the design and build contract, $6.0 million
More informationECONOMIC AND FINANCIAL ANALYSIS
Additional Financing to the Third Primary Education Development Project (RRP BAN 42122) ECONOMIC AND FINANCIAL ANALYSIS 1. This document provides an analysis of the economic rationale for additional financing
More informationECONOMIC ANALYSIS. A. Introduction and Macroeconomic Context
Dhaka Water Supply Network Improvement Project (RRP BAN 47254-003) ECONOMIC ANALYSIS A. Introduction and Macroeconomic Context 1. Economic growth in Bangladesh averaged an very healthy 6.1% during FY2006
More informationTECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT
Himachal Pradesh Clean Energy Transmission Investment Program (RRP IND 43464) TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT A. INTRODUCTION 1. The
More informationFINANCIAL ANALYSIS. A. Kathmandu Upatyaka Khanepani Limited
Kathmandu Valley Wastewater Management Project (RRP NEP 43524) FINANCIAL ANALYSIS A. Kathmandu Upatyaka Khanepani Limited 1. Kathmandu Upatyaka Khanepani Limited (KUKL) is a public company registered under
More informationFINANCIAL ANALYSIS. A. Methodology and Major Assumptions
Second Green Power Development Project (RRP BHU 44444) FINANCIAL ANALYSIS 1. The project s financial analysis was carried out in accordance with the Financial Management and Analysis of Project Guidelines
More informationFINANCIAL ANALYSIS. A. Introduction
Additional Financing of Agriculture and Rural Development Project (RRP MON 39229) FINANCIAL ANALYSIS A. Introduction 1. The financial analysis of the additional financing of the Agriculture and Rural Development
More informationPROJECT PREPARATORY TECHNICAL ASSISTANCE
Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies
More informationPeople s Republic of China: Preparing Yangtze River Economic Belt Projects
Technical Assistance Report Project Number: 50343-001 Transaction Technical Assistance Facility (F-TRTA) April 2017 People s Republic of China: Preparing Yangtze River Economic Belt Projects Cofinanced
More information(c) Section 3.07 is deleted and the following is substituted therefor:
2 outstanding Loan on which a higher Fixed Spread is applicable. The amount of the Rebate shall be determined by multiplying (i) the difference between the Fixed Spread applicable to the outstanding Loan
More informationECONOMIC ANALYSIS. Table 1: Economic costs by project component
Jiangxi Fuzhou Urban Integrated Infrastructure Improvement Project (RRP PRC 44007) A. Project Costs and Benefits ECONOMIC ANALYSIS 1. The project s capital costs include the civil works, land acquisition
More informationIslamic Republic of Pakistan: Karachi Bus Rapid Transit Project
Project Design Advance Project Number: 47279-003 September 2016 Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project This document is being disclosed to the public in accordance with ADB's Public
More informationPROJECT PREPARATORY TECHNICAL ASSISTANCE
8 Appendix 3 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of the Republic of the Union of Myanmar has requested the Asian Development Bank (ADB) to provide a project preparatory
More informationPROJECT PREPARATORY TECHNICAL ASSISTANCE
Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development
More informationECONOMIC AND FINANCIAL ANALYSIS
Railway Rolling Stock Project (RRP BAN 49094) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The project involves procurement of 214 meter gauge (MG) passenger carriages, 50 broad gauge (BG) passenger
More informationPROJECT PREPARATION TECHNICAL ASSISTANCE
12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility
More informationTrung Son Hydropower Project. Financial Analysis
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Trung Son Hydropower Project Financial Analysis Final Report February
More informationASIAN DEVELOPMENT BANK PPA: PRC 25013
ASIAN DEVELOPMENT BANK PPA: PRC 25013 PROJECT PERFORMANCE AUDIT REPORT ON THE DALIAN WATER SUPPLY PROJECT (Loan 1313-PRC) IN THE PEOPLE S REPUBLIC OF CHINA November 2003 At Appraisal (May 1994) CURRENCY
More informationNWC Tariff Submission for the Period January 2019 to December Submission to the Office of Utilities Regulation (OUR)
NWC Tariff Submission for the Period January 2019 to December 2021 Submission to the Office of Utilities Regulation (OUR) October 2018 Table of Contents 1 Executive Summary 1 1.1 Build-Up of the Revenue
More informationFINANCIAL ANALYSIS OF THE WATER SUPPLY AND SEWERAGE AUTHORITY OF ULAANBAATAR CITY
Ulaanbaatar Urban Services and Ger Areas Development Investment Program (RRP MON 45007) FINANCIAL ANALYSIS OF THE WATER SUPPLY AND SEWERAGE AUTHORITY OF ULAANBAATAR CITY A. BACKGROUND 1. The Water Supply
More informationFINANCIAL ANALYSIS. Second Greater Mekong Subregion Tourism Infrastructure for Inclusive Growth Project (RRP REG 49387)
Second Greater Mekong Subregion Tourism Infrastructure for Inclusive Growth Project (RRP REG 49387) FINANCIAL ANALYSIS 1. The financial analysis follows Asian Development Bank (ADB) guidelines. 1 Subprojects
More informationOPERATIONS MANUAL BANK POLICIES AND PROCEDURES NONSOVEREIGN OPERATIONS
Page 1 of 7 These policies and procedures were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. This Operations Manual is issued by the Strategy and Policy Department
More informationASIAN DEVELOPMENT BANK
. ASIAN DEVELOPMENT BANK TAR: BAN 35242 TECHNICAL ASSISTANCE TO THE PEOPLE S REPUBLIC OF BANGLADESH FOR PREPARING THE GAS SECTOR DEVELOPMENT PROJECT April 2004 CURRENCY EQUIVALENTS (as of 21 April 2004)
More informationVANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants
VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN Terms of Reference for Consultants 1. BACKGROUND INFORMATION Government of Vanuatu has requested TA support in the formulation and preparation of a national infrastructure
More informationINDIA: Preparing the Rajasthan Secondary Towns Development Investment Program
Appendix 3 9 Technical Assistance Report Project Number: 42267-027 Transaction Technical Assistance (TRTA) June 2017 INDIA: Preparing the Rajasthan Secondary Towns Development Investment Program This document
More informationFINANCIAL ANALYSIS. 2. Taking into account the financial costs, the total amount needed to finance the Padma Bridge Project is presented in Table 1.
Padma Multipurpose Bridge Project (RRP BAN 35049) FINANCIAL ANALYSIS A. Introduction 1. A financial analysis assessed the viability of the proposed project investment based on the capacity of Bangladesh
More informationECONOMIC AND FINANCIAL ANALYSIS
Coral Reef Rehabilitation and Management Program Coral Triangle Initiative Project (RRP INO 46421) A. Approach and Methodology ECONOMIC AND FINANCIAL ANALYSIS 1. The economic and financial analysis of
More informationPlanning & Economic Analysis I
Planning & Economic Analysis I Session on Planning & Policy Rita Nangia Asian Development Bank Session Description The session covers the following topics: Linkages between network planning and identification
More informationSection 3.07 is deleted and the following is substituted therefor:
2 outstanding Loan and the Fixed Spread that will be applied to new Loans (expressed as a percentage per annum), by (ii) the principal amount of the outstanding Loan on which the Borrower shall pay interest
More informationSession 3.2 Estimation of Project Costs. Introductory Course on Economic Analysis of Investment Projects 1 July 2009
Session 3.2 Estimation of Project Costs Introductory Course on Economic Analysis of Investment Projects 1 July 2009 Financial versus economic analysis Different definitions of benefits and costs so FIRR
More informationPhilippines: Philippine Energy Efficiency Project
Validation Report Reference Number: PVR-436 Project Number: 42001-013 Loan/Grant Numbers: 2507 and 0142 December 2015 Philippines: Philippine Energy Efficiency Project Independent Evaluation Department
More informationMethodology for CBA preparation SOP Environment
Methodology for CBA preparation SOP Environment Programming Meeting for water and wastewater projects in the period 2008-2009 Mamaia, 10-13 th July 2008 Massimo Marra JASPERS Regional Office for Romania
More informationECONOMIC AND FINANCIAL ANALYSIS
Integrated Livelihoods Improvement and Sustainable Tourism in Khuvsgul Lake National Park Project (RRP MON 48216) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. This document summarizes the results
More informationNew Development Bank. Policy on Financial Management and Financial Analysis, and Economic Analysis of Projects
New Development Bank Policy on Financial Management and Financial Analysis, and Economic Analysis of Projects Owner: Operations Division Approved Date: January 21, 2016 Policy on Financial Management and
More informationPROGRAM EXPENDITURE AND FINANCING ASSESSMENT
Access to Clean Energy Investment Program (RRP PAK 49056) PROGRAM EXPENDITURE AND FINANCING ASSESSMENT A. Expenditure Framework 1. Macroeconomic context. The budget preparation and approval process is
More informationRATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d.
WATER AND WASTEWATER RATE STUDY Town of Midland C o n s u l t i n g L t d. December 2010 TABLE OF CONTENTS EXECUTIVE SUMMARY.........1 I BACKGROUND AND STUDY OBJECTIVES.........9 ll ASSOCIATED LEGISLATION.........13
More informationKEY QUESTIONS FOR CONSULTANTS ECONOMIC ANALYSIS OF PROJECTS. Project Economic Evaluation Division Economics and Development Resource Center
KEY QUESTIONS FOR CONSULTANTS ECONOMIC ANALYSIS OF PROJECTS Project Economic Evaluation Division Economics and Development Resource Center Copies of the Guidelines for the Economic Analysis of Projects
More informationFINANCIAL ANALYSIS. Table 1: Uzbekistan Health Financing Indicators
Primary Health Care Improvement Project (RRP UZB 50190-002) FINANCIAL ANALYSIS A. Introduction 1. This financial analysis was undertaken in accordance with the guidelines for financial management and analysis
More informationPROJECT AGREEMENT. (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK. and
LOAN NUMBER 2835-PRC PROJECT AGREEMENT (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK and HEBEI PROVINCIAL GOVERNMENT DATED 6 MARCH 2012 PRC 44012 PROJECT
More informationOPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.
OM Section H5/BP Page 1 of 4 BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction ADDITIONAL FINANCING 1. The
More informationPeople s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project
Validation Report Reference Number: PVR-462 Project Number: 42496-013 Loan Number: 2508 December 2016 People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project Independent
More informationIndonesia: Metropolitan Medan Urban Development Project
Validation Report Reference Number: PCV:INO 2009-09 Project Number: 27358 Loan Number: 1587 May 2009 Indonesia: Metropolitan Medan Urban Development Project Independent Evaluation Department 2 ABBREVIATIONS
More informationMARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT. September 2013
MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT September 2013 10540 TALBERT AVENUE, SUITE 200 EAST FOUNTAIN VALLEY, CALIFORNIA 92708 P. 714.593.5100 F. 714.593.5101 MARINA
More informationPROJECT AGREEMENT. (Tianjin Integrated Gasification Combined Cycle Power Plant Project) between ASIAN DEVELOPMENT BANK. and
LOAN NUMBER 2616-PRC PROJECT AGREEMENT (Tianjin Integrated Gasification Combined Cycle Power Plant Project) between ASIAN DEVELOPMENT BANK and THE EXPORT-IMPORT BANK OF CHINA CHINA HUANENG GROUP GREENGEN
More informationCITY OF WATERLOO Water & Sanitary Sewer Rate Design Study Final Report & Financial Plan No
CITY OF WATERLOO Water & Sanitary Sewer Rate Design Study Final Report & Financial Plan No. 112301 April 1st 2016 DFA Infrastructure International Inc. dfa DFA Infrastructure International Inc. 33 Raymond
More informationPROJECT PREPARATORY TECHNICAL ASSISTANCE
Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which
More informationFINANCIAL MANAGEMENT ASSESSMENT
Greater Malé Environmental Improvement and Waste Management Project (RRP MLD 51077) EXECUTIVE SUMMARY FINANCIAL MANAGEMENT ASSESSMENT 1. The financial management assessment (FMA) was conducted for the
More informationIndia: Karnataka Urban Development and Coastal Environmental Management Project
Validation Report Reference Number: PVR-334 Project Number: 30303 Loan Number: 1704 November 2014 India: Karnataka Urban Development and Coastal Environmental Management Project Independent Evaluation
More informationWater and Wastewater Budget development Summary of proposed 2015 Water and Wastewater rates About demand forecasting
Water and Wastewater Budget development Annual operating budget development for water and wastewater is based on net zero funding principles, as defined by the Municipal Act, 2001, where revenues and expenses,
More informationPeople s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones
Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System
More informationWastewater Rate Study. Villa Park, Illinois
Wastewater Rate Study Villa Park, Illinois June 2013 Executive Summary General The Village of Villa Park s Wastewater Utility is responsible for operation and maintenance of the Village s separate sanitary
More informationProject Agreement LOAN NUMBER CN. (Second Liuzhou Environment Management Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT
Public Disclosure Authorized OFFICIAL DOCUMENTS LOAN NUMBER 8005 -CN Public Disclosure Authorized Project Agreement (Second Liuzhou Environment Management Project) Public Disclosure Authorized between
More informationECONOMIC AND FINANCIAL ANALYSIS
South Asia Subregional Economic Cooperation Chittagong-Cox s Bazar Railway Project, Phase 1 (RRP BAN 46452-002) A. Introduction ECONOMIC AND FINANCIAL ANALYSIS 1. The proposed project will construct 102
More informationSession 1.2 Discounting and Project Alternatives. Introductory Course on Economic Analysis of Investment Projects
Session 1.2 Discounting and Project Alternatives Introductory Course on Economic Analysis of Investment Projects Project statements Comparison of benefits and costs Typically investment costs (equipment,
More informationGuidelines for the Financial Governance and Management of Investment Projects Financed by the Asian Development Bank
Guidelines for the Financial Governance and Management of Investment Projects Financed by the Asian Development Bank Effective January 2002 Foreword Financial analysis of ADB projects has been conducted
More informationOPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.
Page 1 of 1 OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction FINANCIAL INTERMEDIATION
More informationEngagement of Financial Advisory Services for the Soapberry Wastewater. Terms of Reference
JAMAICA: FOUNDATIONS FOR COMPETITIVENESS AND GROWTH PROJECT Loan No.:8408-JM Component: 2A Assignment Title: Treatment Plant Engagement of Financial Advisory Services for the Soapberry Wastewater Reference
More informationSocialist Republic of Viet Nam: Preparing the Hai Phong Water Supply Project
Technical Assistance Report Project Number: 41425 October 2008 Socialist Republic of Viet Nam: Preparing the Hai Phong Water Supply Project (Financed by the Netherlands Trust Fund for the Water Financing
More informationSecondary Towns and Rural Community Based Water Supply and Sanitation Project Loan No SRI (SF) LOAN COVENANTS COMPLIANCE AS AT 31 March 2011
Secondary Towns and Rural Community Based Water Supply and Sanitation Project Loan No. 1993 SRI (SF) LOAN COVENANTS COMPLIANCE AS AT 31 March 2011 Reference in Loan Agreement paras 2 and 3 Covenant A.
More informationAlbania Water Supply and Sewerage Policy and Financing Strategy Model. Philip D. Giantris President Valu Add Management Services 3 November 2016
Albania Water Supply and Sewerage Policy and Financing Strategy Model Philip D. Giantris President Valu Add Management Services 3 November 2016 What This Presentation Will Not Do!!! It will not present
More informationProject Appraisal and Selection
Project Appraisal and Selection Project Appraisal Objectives Dr. DNS Dhakal Duke University Leadership for Results Program for Mid-Level Officers in the Nepalese Civil Service Kathmandu, Nepal 2 September
More informationARTICLE II. The Loan
2 ARTICLE II The Loan Section 2.01. (a) ADB agrees to make to the Borrower the Loan in an amount of forty million Dollars ($40,000,000), with funds to be obtained entirely through the Participation in
More informationASIAN DEVELOPMENT BANK
ASIAN DEVELOPMENT BANK PCR: THA 27262 PROJECT COMPLETION REPORT ON THE CHONBURI WATER SUPPLY PROJECT (Loan 1326-THA) IN THAILAND March 2002 CURRENCY EQUIVALENTS Currency Unit Baht (B) At Appraisal (August
More informationCost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support
Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support Massimo Marra JASPERS Networking and Competence Centre IPA Conference Impact Assessment What can we
More informationIslamic Republic of Pakistan: Punjab Intermediate Cities Improvement Investment Project
Punjab Intermediate Cities Improvement Investment Project (RRP PAK 46526) Project Administration Manual Draft as of 26 July 2017 Project Number: 46526-002 Loan Number: LXXXX July 2017 Islamic Republic
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
Project Name Region Sector Project ID Implementing Agency Report No. PIC908 West Bank and Gaza-Emergency Rehabilitation Project (& Middle East and North Africa Non-Sectoral XOPA34112 Date prepared May
More informationPhilippines: Mindanao Basic Urban Services Sector Project
Validation Report Reference Number: PCV: PHI 2011-25 Project Number: 30551 Loan Number: 1843 September 2011 Philippines: Mindanao Basic Urban Services Sector Project Independent Evaluation Department ABBREVIATIONS
More informationPeople s Republic of China: Xinjiang Akesu Integrated Urban Development and Environment Improvement Project
Project Administration Manual Project Number: 46049-002 June 2015 People s Republic of China: Xinjiang Akesu Integrated Urban Development and Environment Improvement Project Contents ABBREVIATIONS... IV
More informationRepublic of the Maldives: Preparing Business Strategy for Port Development
Technical Assistance Report Project Number: 47283 Capacity Development Technical Assistance (CDTA) November 2013 Republic of the Maldives: Preparing Business Strategy for Port Development The views expressed
More informationASIAN DEVELOPMENT BANK
ASIAN DEVELOPMENT BANK TAR: SAM 35132 TECHNICAL ASSISTANCE (Financed by the Japan Special Fund) TO THE INDEPENDENT STATE OF SAMOA FOR PREPARING THE SAVAI I RENEWABLE ENERGY PROJECT November 2002 CURRENCY
More information11 Economic Evaluation
11 Economic Evaluation Contents 11.1 Project Decription... 1 11.2 Scope and Methodology of Study... 1 11.3 Basic Assumptions... 2 11.3.1 Construction Period & Commercial Operation Period... 2 11.3.2 Energy
More informationSection 3.06 is deleted and the following is substituted therefor:
2 (c) Section 3.03 is deleted and the following is substituted therefor: Commitment Charge; Credit; Maturity Premium. (a) The Borrower shall pay a commitment charge on the unwithdrawn amount of the Loan
More informationRepublic of Azerbaijan: Water Supply and Sanitation Investment Program Tranche 4
Periodic Financing Request Report Project Number: 42408-044 MFF Number: 0032 July 2016 Republic of Azerbaijan: Water Supply and Sanitation Investment Program Tranche 4 Distribution of this document is
More informationPeriodic Financing Request Report. India: Karnataka Integrated Urban Water Management Investment Program (Tranche 2)
Periodic Financing Request Report Project Number: 43253-027 MFF Number: 0080-IND October 2018 India: Karnataka Integrated Urban Water Management Investment Program (Tranche 2) Distribution of this document
More informationECONOMIC AND FINANCIAL ANALYSIS
Additional Financing of National Motorway M-4 Gojra Shorkot Khanewal Section Project (RRP PAK 48402) ECONOMIC AND FINANCIAL ANALYSIS A. General 1. Roads are the main mode of transport in Pakistan, accounting
More informationProject Agreement. (Shanghai Urban Environment Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and SHANGHAI MUNICIPALITY
Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 4705-CHA Public Disclosure Authorized Public Disclosure Authorized Project Agreement (Shanghai Urban Environment Project) between INTERNATIONAL BANK
More informationLOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK
LOAN NUMBER 2729-ARM LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA and ASIAN DEVELOPMENT BANK DATED 30 MAY 2011 ARM 42145 LOAN
More informationLOAN AGREEMENT (Ordinary Operations) (Ulaanbaatar Urban Services and Ger Areas Development Investment Program Project 1) between MONGOLIA.
LOAN NUMBER 3098-MON LOAN AGREEMENT (Ordinary Operations) (Ulaanbaatar Urban Services and Ger Areas Development Investment Program Project 1) between MONGOLIA and ASIAN DEVELOPMENT BANK DATED 30 JUNE 2014
More informationSouth Asia Subregional Economic Cooperation Power System Expansion Project (RRP NEP 44219) FINANCIAL ANALYSIS
South Asia Subregional Economic Cooperation Power System Expansion Project (RRP NEP 44219) A. Approach FINANCIAL ANALYSIS 1. Financial analysis of the project was carried out in accordance with the Financial
More informationFINANCIAL PERFORMANCE OBJECTIVES
ORANGE WATER AND SEWER AUTHORITY FINANCIAL MANAGEMENT POLICY JANUARY 26, 2012 SUMMARY The purpose of this document is to describe a comprehensive and systematic approach to strategic financial planning,
More informationTuvalu: Outer Island Maritime Infrastructure Project
Project Design Advance Project Number: 48484-003 November 2015 Tuvalu: Outer Island Maritime Infrastructure Project This document is being disclosed to the public in accordance with ADB s Public Communications
More informationCASE STUDIES: HISTORICAL BACKDROP TO NONSOVEREIGN INTERVENTIONS
State-Owned Enterprise Engagement and Reform, Linked Document 6 CASE STUDIES: HISTORICAL BACKDROP TO NONSOVEREIGN INTERVENTIONS A. Power Grid Corporation of India Limited (POWERGRID) 1. POWERGRID was established
More informationGreat Lakes Water Authority/ Detroit Water and Sewerage Department Five-year Financial Forecast Cash Basis. July 1, 2015 through June 30, 2020
Great Lakes Water Authority/ Detroit Water and Sewerage Department Cash Basis July 1, 2015 through June 30, 2020 Table of Contents Report Letter... 1 Project Summary... 2-3 Executive Summary... 4 Financial
More informationSECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1
Accelerating Infrastructure Delivery through Better Engineering Services Project (RRP INO 49141) Sector Road Map SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1 1. Sector Performance, Problems, and Opportunities
More information