1 South Asia Subregional Economic Cooperation Chittagong-Cox s Bazar Railway Project, Phase 1 (RRP BAN ) A. Introduction ECONOMIC AND FINANCIAL ANALYSIS 1. The proposed project will construct 102 kilometers (km) of rail track, extending the Chittagong Dohazari section to Cox s Bazar, which is a major tourist attraction in Bangladesh and also the main salt-producing area in the country. The proposed railway line will add a muchneeded, comfortable travel option from Dhaka to Cox s Bazar, and support the long-term growth of tourism in the area. It will also benefit major economic development projects in the catchment area, such as a power plant, special economic zone, and a deep-sea port. The rail line will further provide connectivity to trade with Myanmar once the extension proposed for the next project phase is completed. The project will reduce road traffic by about 40% and reduce the travel time in half with a limited-stop service from Dhaka. The railway will also provide added travel comfort through special coaches for tourists and thus boost the number of tourists visiting Cox s Bazar, which in turn will add to the economic development of the area. 2. An economic analysis was undertaken to assess the economic viability of the project. It compares the benefits and costs of with-project and without-project situations to estimate the economic internal rate of return (EIRR) and the net present value (NPV) at a discount rate of 12%. The Bangladesh taka is used as the currency unit in the analysis. Customs duty and value-added tax (VAT) were included in the project cost estimate, but are excluded in the economic analysis. Physical contingencies are included because they are part of the value of resources that will be used for construction, but price contingencies are excluded since they do not reflect the real changes in the volume of resources consumed. The analysis period is taken as 25 years. The exchange rate used in the analysis is US$1 = Tk A financial analysis was undertaken to assess the financial viability of the project in a similar approach to that of the economic analysis. For the financial assessment, the hurdle rate of return is the weighted average cost of capital (WACC). Based on the funding mix, the interest rates, and inflation rates, the real WACC for this project is estimated to be 2.7%. The project s financial internal rate of return (FIRR) is calculated using the financial terms of Bangladesh Railway costs and revenues with some revisions. Customs duty and VAT are included in the costs. The analysis period and exchange rate used in the financial analysis are same as those used in the economic analysis. B. Project Details: Extension of Railway Line to Cox s Bazar 4. At present, the railway extends up to Dohazari, which is about 47 km from Chittagong in the direction of Cox s Bazar, and consists of a single line. The proposed project will extend this line by 102 km to connect Cox s Bazar. The rail connection to the planned deep-sea port takes off at about 48km south of Dohazari and thus the proposed line can be shared by passenger and freight. The proposed project also includes eight stations and one terminal station with commercial facilities at Cox s Bazar. A key objective of this project is to support the development of tourism, which depends on good access by land and air. Beyond tourism, this project would benefit the entire study area, from Dohazari to Teknaf, which is underdeveloped and largely isolated from the rest of the country. 5. Passenger traffic. Passenger traffic to Cox s Bazar consists of tourist flows and trips by the local population. Total passenger traffic along the road corridor is estimated at 16 million

2 2 trips a year (in both directions) based on daily traffic near Cox s Bazar. 1 About 58% of bus passengers travel the entire Chittagong Cox's Bazar road distance, which amounts to about 25,000 trips daily or 9 million trips a year in both directions. 2 In the absence of a rail line to Cox's Bazar, travel is mainly by bus at present. By the 2020s, luxury buses are assumed to predominate the tourist segment of the market. Air connection is also available from Dhaka to Cox s Bazar, but the local airport is not certified by the International Civil Aviation Organization. 6. A major driver of travel to Cox's Bazar will be tourism, mainly domestic but with a small percentage of international visitors. The estimated number of tourists to the area is million annually based on a survey of hotel accommodation in Cox s Bazar. The feasibility study estimates peak-season daily tourist arrivals at 7,300 and the off-peak equivalent at 3,100, for an annualized average daily tourist inflow of 5,200. Conservatively, this is assumed to grow at 5% per annum based on the sector growth rate. Tourists originate from all over the country, but most trips to Cox's Bazar will start or resume at Dhaka (or Chittagong), so travel costs, revenues, and benefits are tallied from Dhaka. Once the railway line extends to Cox s Bazar, Bangladesh Railway proposes to run trains that are fast luxury service, either nonstop or stopping just at Chittagong (and perhaps at Comilla). The carriages will be air-conditioned and have on-board features to attract passengers away from cars and luxury buses. The journey by train will be faster than the journey by road (by up to 50%). The rail journey becomes part of the holiday experience. By offering a comfortable and fast ride, and a competitive fare, rail s market share could exceed 50% (in theory, it should attract almost 100% of non-car users and a share of car users) but is conservatively assumed at 40% for the analysis. 7. In addition to the tourist trains and tourist traffic, the local population will use the railway for their travel. This amounts to over 5 million passenger trips going to Chittagong or beyond, and over 7 million trips along the corridor. The rail can attract a sizable share of longer-distance passenger traffic with reliable intercity and mail express trains, and also shorter-distance travel with local trains. For the analysis, one-third of the longer-distance passenger traffic and 10% of the shorter-distance passenger traffic are assumed to use the rail in this corridor. 8. Freight traffic. Cox s Bazar is the only place in the country where salt is harvested. Salt production is estimated at about 2.15 million tons per annum. Another major produce from the area is dry fish. Local consultation also indicated freight to be generated from timber arriving from Myanmar and from consumption of bulk commodities in the catchment area. The military cantonment and Bangladesh Border Guard base that is being established in Ramu will generate about three freight trains per month for supplies. Based on consultation, a conservative estimate of rail freight demand is 750,000 tons per year. The large development projects planned north of Cox s Bazar (power plant, economic zone, and deep-sea port) are likely to generate large-scale freight movement in this corridor, which will require a double-line rail service in the future, but this is not factored into the present analysis. 1 ADB Final Report, Phase I Feasibility Study for Upgrading of Chittagong Cox s Bazar Teknaf Road (N1) under SRTPPF (Roads Package 2). Consultant s Report. Manila. (ADB Loan BAN). 2 ADB Final Feasibility Study Report for RCIP Subproject 4 Construction of Single Line Dual Gauge Railway Track from Dohazari to Cox s Bazar via Ramu and Ramu to Gundum near Myanmar Border. Consultant s Report. Manila (ADB Loan No BAN (SF)).

3 3 C. Economic Analysis 1. Project Costs and Benefits 9. The costs to be incurred for the project comprise construction costs and operation and maintenance costs. The purchase of rolling stock and passenger coaches is assumed in the case of tourist trains. In the first year of operation, eight train sets will be required to cover peakseason demand, and additional trains are to be procured to cater to growing tourist demand. It is assumed that during off-season, these trains will be used in other sections of the rail corridor. 10. Infrastructure capital costs were estimated based on the detailed engineering design (footnote 2). Rolling-stock prices were taken from the assessment carried out for purchases under the ongoing Railway Sector Investment Program of the Asian Development Bank. 3 Economic costs are expressed in fixed monetary values. The economic costs were derived from the financial cost by removing the transfer costs and applying a standard conversion factor of 0.94 and a shadow wage factor of 0.70 (as adopted in the feasibility study) for unskilled labor Capital costs include the cost of land acquisition. Financial land acquisition costs to build railways in rural areas are very high. The economic value is taken to be the value of crop land, which is the discounted cash flow of surpluses derived from farming the land. Using agricultural models, and adopting assumptions favoring high land values, the economic value of farm land is computed to be about $8,000 per hectare in the feasibility study, which the analysis adopts. To this is added the cost of buildings, trees, and other elements of the land, and allowances for social disruption arising from compulsory acquisition. 12. In the case of trains, catering to local passenger travel (local, mail, and intercity trains) and freight operations is assumed to be an extension of the railway operations, so system-wide capital and operating costs are adopted for the analysis. The economic cost used for passenger and freight trains is shown in Table 1. It is assumed that one passenger train has 22 coaches, and one container train has 32 bogies. Economic prices were derived from financial prices by using a conversion factor of 0.8, which is used for rail projects in Bangladesh. Table 1: Economic Cost of Passenger and Freight Trains (Tk per train-kilometer) Item Passenger Train Freight Train Capital, operation and maintenance cost Locomotive fuel expenditure Maintenance of permanent way Total 1,410 1,187 Source: Asian Development Bank estimates based on data from Bangladesh Railway Information Book Economic benefits include bus and truck traffic being replaced by the train, and road vehicle operating costs (VOCs), which were estimated by the HDM4 VOC model using input values obtained from the Roads and Highways Department (RHD) of Bangladesh and updated to 2015 prices. The estimates also reflect luxury bus prices. These figures cover vehicle capital as well as operation and maintenance. Road accident cost data published by RHD was used to derive the unit road accident cost per passenger-km (Tk0.180) and per ton-km (Tk0.597) and to estimate the benefit of fewer road accidents that comes with the shift from road to rail traffic. 3 ADB Report and Recommendation of the President to the Board of Directors: Proposed Multitranche Financing Facility and Technical Assistance Grant to the People s Republic of Bangladesh for the Railway Sector Investment Program. Manila. 4 Conversion factor estimated using trade data from the World Development Indicators available through the World Bank website.

4 4 14. The benefits considered are VOCs being replaced by the railway carrying tourists and local passengers as well as freight. In addition to the VOC savings, the passengers will save time thanks to faster travel. The journey time is calculated assuming an average speed of 40 km per hour (km/h) for luxury buses and 70 km/h for limited-stop tourist trains. In the case of local passenger traffic, the speeds are assumed at 30 km/h for buses and 50 km/h for trains. For passengers on air-conditioned buses, the value of travel time (updated to 2015 based on per capita income growth) is Tk104.8 per hour. 5 This value is adopted for car passengers as well. The value of time is assumed to increase in real terms based on an increase in per capita income in real terms; for the analysis, a 3% yearly increase is considered. 2. Results of Economic Analysis 15. An economic evaluation was carried out by comparing with-project and without-project options, and the results are shown in Table 2, which gives the EIRR and NPV for the proposed project option. A 4-year implementation period is considered for the construction of the proposed project starting in The analysis considers a 25-year operation period starting in A discount rate of 12% is used as an acceptable economic rate of return. The economic life of the project components ranges from 32 to 50 years, and the residual value at the end of the project period is considered by applying a straight-line depreciation. 6 The analysis yielded an EIRR of 14.8%, and the NPV of the project at a 12% discount rate is Tk18,598 million. Year Capital cost Railway line Tourist trains Table 2: Economic Analysis Results (Tk million) Operation /maintenan ce cost Tourist train operation Luxury bus/car operating cost savings Benefits Passenge r benefits Local passenger and freight train operation Local and Freight regional traffic net passeng benefits er net benefits Acci dent Savi ngs Net Benefits 2018 (8853) (8853) 2019 (22132) (22132) 2020 (25820) (25820) 2021 (16968) (16968) (6224) (494) (1037) (519) (1037) (545) (572) (1037) (600) (1037) (630) (1037) (662) (695) (1037) (730) (1037) (766) (1037) (805) (1037) (845) (1037) (887) (1037) (931) (1037) (978) (1037) (1027) (2075) (1078) (1037) (1132) Government of Bangladesh. Road and Highways Department Road User Cost Annual Report for The economic life of a railway line is 50 years; for rolling stock, it is 32 years.

5 (1037) (1189) (2075) (1189) (1037) (1189) (2075) (1189) (1037) (1189) (1189) (1189) Net Present Value at 12% EIRR (%) 14.8 ( ) = negative, EIRR = economic internal rate of return. Source: Asian Development Bank estimates. 3. Sensitivity Analysis 16. A sensitivity analysis was carried out for the base case with respect to adverse changes in the costs and benefits. The result of the sensitivity analysis (Table 3) shows that all scenarios have an EIRR of more than 12%. Table 3: Results of Sensitivity Analysis for Economic Analysis Item Change NPV Switching EIRR (%) (Tk million) Value (%) Base case Overall investment (+)10% All benefits (-)10% year delay All benefits and all costs (-/+)10% /-13 EIRR = economic internal rate of return, NPV = net present value. Source: Asian Development Bank estimates. D. Financial Analysis 17. A financial analysis was carried out to assess the viability of the proposed investment based on the incremental earnings and operational costs that would accrue to Bangladesh Railway as a result of the implementation of the proposed project. Passenger fares are the most important revenue generator for the proposed section. Assuming that the tourist train fare will be equal to that for intercity trains, and that local and freight trains will use the fare that is currently charged on other sections, the project will generate sufficient revenue to meet the operation and maintenance expenditure and partially recover the investment made. The projected total revenue is Tk168,503 million, which is nearly six times the projected recurrent operation and maintenance costs of Tk29,190 million for the analysis period. A detailed cost benefit analysis was not performed for the project because neither the current nor the expected tariff is aimed at full cost recovery. The project lending decision is based more on the economic viability than the financial viability. 18. The historical trend of Bangladesh Railway s operating ratio (operating expenses divided by operating revenues) has not improved, mainly because of a static passenger and freight tariff for many years and the fact that Bangladesh Railway has been operating for years beyond the theoretical operating capacity, especially in the Dhaka Chittagong corridor. The operating ratio with subsidy is now at 170% in fiscal year (FY) 2015, after peaking at 216% in FY2012 compared with 161% in FY2008. The improvements in FY2014 and FY2015 were caused by an increase in the tariff approved by the government in October The adjustment of the passenger and freight tariff was the first since The ongoing tariff reform will ensure that the operating ratio will improve and remain at an acceptable level; annual adjustments of the tariff will compensate for increased cost, such as fuel prices and expenses for staff.

6 6 Table 4: Bangladesh Railway s Financial Performance Item Unit Fiscal Year Financial Performance Total operating revenue Tk million 8,043 8,002 9,345 Total operating expense Tk million (15,624) (16,017) (18,082) Net operating deficit Tk million (7,581) (8,015) (8,728) Ministry of Railways Budget Non-development budget Tk million 15,900 17,110 18,780 Ratio non-development budget to operating expenses % Development budget Tk million 33,100 38,780 44,850 Total ministry budget Tk million 49,000 55,890 63,630 ( ) = negative Source: Government of Bangladesh, Bangladesh Railway and Ministry of Finance. 19. Bangladesh Railway is supported by a budgetary support committed by the government; the yearly government support is adequate to sustain operations and reflects the systemic importance of Bangladesh Railway. The budgetary support provided to the Ministry of Railways covered 102% of the operating expenditure for Bangladesh Railway in FY2013, 107% in FY2014 and 104% in FY2015 (Table 4). The budgetary support to cover the full operating expenditures of Bangladesh Railway is provided as a separate budget item (non-development budget) and in addition to budgetary support for development projects (development budget) financed by the Government of Bangladesh and development partners.

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Railway Rolling Stock Project (RRP BAN 49094) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The project involves procurement of 214 meter gauge (MG) passenger carriages, 50 broad gauge (BG) passenger

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Bihar New Ganga Bridge Project (RRP IND 48373) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The proposed project is to build a new six-lane bridge across the Ganges River near Patna in the state

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Additional Financing of National Motorway M-4 Gojra Shorkot Khanewal Section Project (RRP PAK 48402) ECONOMIC AND FINANCIAL ANALYSIS A. General 1. Roads are the main mode of transport in Pakistan, accounting

More information

ECONOMIC ANALYSIS. Table 1: Vehicle Fleet Characteristics Four- Medium Car. Light Bus. Wheel Drive

ECONOMIC ANALYSIS. Table 1: Vehicle Fleet Characteristics Four- Medium Car. Light Bus. Wheel Drive Western Regional Road Corridor Investment Program (RRP MON 41193) A. Project Costs and Benefits ECONOMIC ANALYSIS 1. Project Costs. The project s capital costs include the costs of the road works, design,

More information

ECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million)

ECONOMIC ANALYSIS. Table 1: Total Cost Estimate (Economic Costs) (CNY million) Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) ECONOMIC ANALYSIS A. Project Costs 1. This chapter outlines the methodology and results of the economic analysis for the project, comprising

More information

ECONOMIC AND FINANCIAL ANALYSES FOR TRANCHE 2

ECONOMIC AND FINANCIAL ANALYSES FOR TRANCHE 2 Appendix 6 ECONOMIC AND FINANCIAL ANALYSES FOR TRANCHE 2 1. Background. The Second Rural Connectivity Investment Program will support the Government of India in improving rural connectivity through the

More information

ECONOMIC ANALYSIS. Table 1: Economic costs by project component

ECONOMIC ANALYSIS. Table 1: Economic costs by project component Jiangxi Fuzhou Urban Integrated Infrastructure Improvement Project (RRP PRC 44007) A. Project Costs and Benefits ECONOMIC ANALYSIS 1. The project s capital costs include the civil works, land acquisition

More information

People s Republic of Bangladesh: Updating the Road Master Plan

People s Republic of Bangladesh: Updating the Road Master Plan South Asia Subregional Economic Cooperation Dhaka Northwest Corridor Road Project, Phase 2 (RRP BAN 40540) Technical Assistance Report Project Number: 40540-016 Transaction Technical Assistance (TRTA)

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Khyber Pakhtunkhwa Provincial Roads Improvement Project (RRP PAK 47360) A. Background ECONOMIC AND FINANCIAL ANALYSIS 1. The province of Khyber Pakhtunkhwa in northwest Pakistan covers almost six degrees

More information

FINANCIAL ANALYSIS. A. Background

FINANCIAL ANALYSIS. A. Background SASEC Second Bangladesh India Electrical Grid Interconnection Project (RRP BAN 44192) A. Background FINANCIAL ANALYSIS 1. The South Asia Subregional Economic Cooperation (SASEC) Second Bangladesh India

More information

ECONOMIC ANALYSIS. A. Introduction

ECONOMIC ANALYSIS. A. Introduction Bridge Replacement for Improved Rural Access Sector Project (RRP PNG 43200) ECONOMIC ANALYSIS A. Introduction 1. The economic analysis of the proposed project has been carried out in accordance with ADB

More information

SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR. 1. Sector Performance, Problems, and Opportunities Chhattisgarh State Road Sector Project (RRP IND 44427) Sector Road Map SECTOR ASSESSMENT (SUMMARY): CHHATTISGARH ROAD SECTOR 1. Sector Performance, Problems, and Opportunities 1. The state of Chhattisgarh

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Additional Financing to the Third Primary Education Development Project (RRP BAN 42122) ECONOMIC AND FINANCIAL ANALYSIS 1. This document provides an analysis of the economic rationale for additional financing

More information

FINANCIAL ANALYSIS. 1. Introduction and Methodology

FINANCIAL ANALYSIS. 1. Introduction and Methodology Third Urban Governance and Infrastructure Improvement (Sector) Project (RRP BAN 39295) 1. Introduction and Methodology FINANCIAL ANALYSIS 1. The project finances basic urban services improvements and aims

More information

ECONOMIC ANALYSIS. A. Introduction and Macroeconomic Context

ECONOMIC ANALYSIS. A. Introduction and Macroeconomic Context Dhaka Water Supply Network Improvement Project (RRP BAN 47254-003) ECONOMIC ANALYSIS A. Introduction and Macroeconomic Context 1. Economic growth in Bangladesh averaged an very healthy 6.1% during FY2006

More information

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2518 Operation Name

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 46452-002 September 2016 Proposed Multitranche Financing Facility and Technical Assistance Grant People s Republic of

More information

ECONOMIC ANALYSIS. A. Introduction

ECONOMIC ANALYSIS. A. Introduction North Pacific Regional Connectivity Investment Project (RRP PAL 46382) ECONOMIC ANALYSIS A. Introduction 1. Project summary. The Asian Development Bank (ADB) will support Palau to develop a fiber optic

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN])

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN]) CAREC Corridors 1 and 6 Connector Road (Aktobe Makat) Reconstruction Project (RRP KAZ 48424) SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN]) 1. Sector Performance, Problems, and Opportunities

More information

Bangladesh: Road Maintenance and Improvement Project

Bangladesh: Road Maintenance and Improvement Project Performance Evaluation Report Bangladesh: Road Maintenance and Improvement Project Independent Evaluation Performance Evaluation Report December 2014 Bangladesh: Road Maintenance and Improvement Project

More information

CBA of transport infrastructure projects in Germany

CBA of transport infrastructure projects in Germany CBA of transport infrastructure projects in Germany Dr. Catharina Horn Federal Transport Infrastructure Planning, Investment Policy Paris, 27th of February 2014 www.bmvi.de 1. The Federal Transport Infrastructure

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 46168-001 September 2014 Proposed Loans and Technical Assistance Grant People s Republic of Bangladesh: South Asia Subregional

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Coral Reef Rehabilitation and Management Program Coral Triangle Initiative Project (RRP INO 46421) A. Approach and Methodology ECONOMIC AND FINANCIAL ANALYSIS 1. The economic and financial analysis of

More information

FINANCIAL ANALYSIS. 2. Taking into account the financial costs, the total amount needed to finance the Padma Bridge Project is presented in Table 1.

FINANCIAL ANALYSIS. 2. Taking into account the financial costs, the total amount needed to finance the Padma Bridge Project is presented in Table 1. Padma Multipurpose Bridge Project (RRP BAN 35049) FINANCIAL ANALYSIS A. Introduction 1. A financial analysis assessed the viability of the proposed project investment based on the capacity of Bangladesh

More information

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN)

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN) Second Jharkhand State Road Project (RRP IND 49125) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN) A. Sector Performance, Problems, and Opportunities 1. State context. The state of Jharkhand was

More information

FINANCIAL ANALYSIS. Second Greater Mekong Subregion Tourism Infrastructure for Inclusive Growth Project (RRP REG 49387)

FINANCIAL ANALYSIS. Second Greater Mekong Subregion Tourism Infrastructure for Inclusive Growth Project (RRP REG 49387) Second Greater Mekong Subregion Tourism Infrastructure for Inclusive Growth Project (RRP REG 49387) FINANCIAL ANALYSIS 1. The financial analysis follows Asian Development Bank (ADB) guidelines. 1 Subprojects

More information

FINANCIAL ANALYSIS OF TRANCHE 1

FINANCIAL ANALYSIS OF TRANCHE 1 Town Electrification Investment Program (RRP PNG 41504) FINANCIAL ANALYSIS OF TRANCHE 1 A. Financial Analysis 1. Introduction 1. The financial analysis of the project covers the first three subprojects

More information

Bangladesh: Road Network Improvement and Maintenance Project II

Bangladesh: Road Network Improvement and Maintenance Project II Validation Report Reference Number: PVR-435 Project Number: 34415 Loan Number: 2021 November 2015 Bangladesh: Road Network Improvement and Maintenance Project II Independent Evaluation Department ABBREVIATIONS

More information

India: National Highway Sector II Project

India: National Highway Sector II Project Validation Report October 2017 India: National Highway Sector II Project Reference Number: PVR-517 Project Number: 35335-013 Loan Number: 2154 ABBREVIATIONS ADB Asian Development Bank CSC construction

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK TAR:PHI 29226 ASIAN DEVELOPMENT BANK Li TECHNICAL ASSISTANCE TO THE REPUBLIC OF ThE PHILIPPINES FOR PREPARATION OF A NATIONAL TRANSPORT STRATEGY November 1995 CURRENCY EQUIVALENTS (as of 15 October 1995)

More information

South Asia Subregional Economic Cooperation Power System Expansion Project (RRP NEP 44219) FINANCIAL ANALYSIS

South Asia Subregional Economic Cooperation Power System Expansion Project (RRP NEP 44219) FINANCIAL ANALYSIS South Asia Subregional Economic Cooperation Power System Expansion Project (RRP NEP 44219) A. Approach FINANCIAL ANALYSIS 1. Financial analysis of the project was carried out in accordance with the Financial

More information

FINANCIAL ANALYSIS. A. Introduction

FINANCIAL ANALYSIS. A. Introduction Solar Power Development Project (RRP SOL 48346) A. Introduction FINANCIAL ANALYSIS 1. The scope of the financial analysis for the Solomon Islands Solar Power Development project includes (i) an estimate

More information

FINANCIAL ANALYSIS: PROJECT 1

FINANCIAL ANALYSIS: PROJECT 1 Green Power Development and Energy Efficiency Improvement Investment Program (RRP SRI 47037) A. Background and Rationale FINANCIAL ANALYSIS: PROJECT 1 1. Project 1 of the Green Power Development and Energy

More information

People's Republic of China: Ganzhou Longyan Railway Project

People's Republic of China: Ganzhou Longyan Railway Project Validation Report Reference Number: PCV: PRC 2009-22 Project Number: 33442 Loan Number: 1850 December 2009 People's Republic of China: Ganzhou Longyan Railway Project Independent Evaluation Department

More information

Pre-Budget Submission To Government. From. The Coach Tourism & Transport Council of Ireland

Pre-Budget Submission To Government. From. The Coach Tourism & Transport Council of Ireland Pre-Budget Submission 2019 To Government From The Coach Tourism & Transport Council of Ireland August 2018 Introduction The Coach Tourism & Transport Council (CTTC) make this submission to Government in

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Integrated Livelihoods Improvement and Sustainable Tourism in Khuvsgul Lake National Park Project (RRP MON 48216) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. This document summarizes the results

More information

In general, expenditure inequalities are lower than the income inequalities for all consumption categories as shown by the Lorenz curve for four

In general, expenditure inequalities are lower than the income inequalities for all consumption categories as shown by the Lorenz curve for four In general, expenditure inequalities are lower than the income inequalities for all consumption categories as shown by the Lorenz curve for four major categories of expenditure (Figures 9 and 10). According

More information

ECONOMIC ANALYSIS (SUMMARY) 1

ECONOMIC ANALYSIS (SUMMARY) 1 Country Partnership Strategy: SRI, 2012 2016 A. Economic Performance and Outlook ECONOMIC ANALYSIS (SUMMARY) 1 1. Sri Lanka maintained an average rate of growth of 6.4% over the 5 years from 2006 to 2010.

More information

Economic Analysis Concepts

Economic Analysis Concepts Economic Analysis Concepts Questions & Decisions (1) Is the project justified?- Are benefits greater than costs? Which is the best investment if we have a set of mutually exclusive alternatives? If funds

More information

COST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD

COST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD COST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD 1 Introduction The objective of the cost benefit economic analysis is to identify and quantify the benefits and costs associated with the project. This

More information

Tanahu Hydropower Project (RRP NEP 43281) FINANCIAL ANALYSIS. A. Introduction

Tanahu Hydropower Project (RRP NEP 43281) FINANCIAL ANALYSIS. A. Introduction Tanahu Hydropower Project (RRP NEP 43281) FINANCIAL ANALYSIS A. Introduction 1. The financial analysis of the Tanahu Hydropower Project was carried out in accordance with Financial Management and Analysis

More information

THE ROAD TO ECONOMIC GROWTH

THE ROAD TO ECONOMIC GROWTH THE ROAD TO ECONOMIC GROWTH Introduction 1. As in many countries, the road sector accounts for the major share of domestic freight and inter-urban passenger land travel in Indonesia, playing a crucial

More information

FINANCIAL ANALYSIS. A. Introduction

FINANCIAL ANALYSIS. A. Introduction Urban Water Supply and Wastewater Management Investment Project (RRP FIJ 491-2) A. Introduction FINANCIAL ANALYSIS 1. The Asian Development Bank (ADB) Urban Water Supply and Wastewater Management Investment

More information

Planning & Economic Analysis I

Planning & Economic Analysis I Planning & Economic Analysis I Session on Planning & Policy Rita Nangia Asian Development Bank Session Description The session covers the following topics: Linkages between network planning and identification

More information

Team Leader: Srinivasan Palle Venkata, Evaluation Specialist ( Contact:

Team Leader: Srinivasan Palle Venkata, Evaluation Specialist (  Contact: Asian Development Bank. 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org; www.adb.org/evaluation Evaluation Approach Paper Project

More information

FINANCIAL ANALYSIS. A. Introduction

FINANCIAL ANALYSIS. A. Introduction A. Introduction Air Quality Improvement in the Greater Beijing Tianjin Hebei Region China National Investment and Guaranty Corporation s Green Financing Platform Project (RRP PRC 50096) FINANCIAL ANALYSIS

More information

FINANCIAL ANALYSIS. 3. Assumptions. The following assumptions were used in carrying out the financial analysis:

FINANCIAL ANALYSIS. 3. Assumptions. The following assumptions were used in carrying out the financial analysis: Java Bali 500-Kilovolt Power Transmission Crossing Project (RRP INO 42362) FINANCIAL ANALYSIS 1. General Methodology. Financial analysis of the project has been undertaken in accordance with Asian Development

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Country Partnership Strategy: Viet Nam, 2012 2015 SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Investment in the transport sector in Viet

More information

ECONOMIC ANALYSIS. A. Economic Analysis

ECONOMIC ANALYSIS. A. Economic Analysis Climate Resilience Sector Project (RRP TON 46351) ECONOMIC ANALYSIS 1. Tonga is one of the most isolated countries in the Pacific Region. Its population of 103,036 inhabits 48 of its 176 islands. 1 Approximately

More information

Bangladesh: Chittagong Port Trade Facilitation Project

Bangladesh: Chittagong Port Trade Facilitation Project Completion Report Project Number: 36105 Loan Number: 2147 June 2014 Bangladesh: Chittagong Port Trade Facilitation Project This document is being disclosed to the public in accordance with ADB s Public

More information

ECONOMIC SURVEY OF LATIN AMERICA MONTSERRAT

ECONOMIC SURVEY OF LATIN AMERICA MONTSERRAT UN TED NATIIONS nt* ECONO I[C / Apiza) SOCIAL COUNCII_ Distr. LIMITED E/CEPAL/L.286/Add.24 June 1984 ORIGINAL: INGLES ECLA Economic Commission for Latin America BIBUCTECA EACTUNES MBAS MEM ECONOMIC SURVEY

More information

International Monetary Fund Washington, D.C.

International Monetary Fund Washington, D.C. 2004 International Monetary Fund May 2004 IMF Country Report No. 04/153 Barbados: Statistical Appendix This Statistical Appendix for Barbados was prepared by a staff team of the International Monetary

More information

FINANCIAL ANALYSIS. A. Introduction

FINANCIAL ANALYSIS. A. Introduction Additional Financing of Agriculture and Rural Development Project (RRP MON 39229) FINANCIAL ANALYSIS A. Introduction 1. The financial analysis of the additional financing of the Agriculture and Rural Development

More information

NATIONAL LAND TRANSPORT PROGRAMME / INformation sheet / october 2012

NATIONAL LAND TRANSPORT PROGRAMME / INformation sheet / october 2012 NATIONAL LAND TRANSPORT PROGRAMME 2012 15 / INformation sheet / october 2012 Creating transport solutions for a thriving New Zealand The NZ Transport Agency Board has adopted the 2012 15 National Land

More information

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1

SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1 Accelerating Infrastructure Delivery through Better Engineering Services Project (RRP INO 49141) Sector Road Map SECTOR ASSESSMENT (SUMMARY): MULTISECTOR 1 1. Sector Performance, Problems, and Opportunities

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 51360-002 Transaction Technical Assistance Facility (F-TRTA) April 2018 Turkmenistan: Preparing the Central Asia Regional Economic Cooperation Corridors 2, 3

More information

The Implementation of Engineering Economy in the Transport Development - A Case Study of Road Transport

The Implementation of Engineering Economy in the Transport Development - A Case Study of Road Transport Abstract The Implementation of Engineering Economy in the Transport Development - By Winner Yousman The engineering economy is a part of skill and knowledge of cost engineering could be applied in many

More information

TEX Rail Fort Worth, Texas Project Development (Rating Assigned November 2012)

TEX Rail Fort Worth, Texas Project Development (Rating Assigned November 2012) TEX Rail Fort Worth, Texas Project Development (Rating Assigned November 2012) Summary Description Proposed Project: Commuter Rail 37.6 Miles, 14 Stations (12 new, two existing) Total Capital Cost ($YOE):

More information

Pre-seen analysis. T Railways. Note: The enclosed document in no way indicates what is likely to be examined in the un-seen information on exam day.

Pre-seen analysis. T Railways. Note: The enclosed document in no way indicates what is likely to be examined in the un-seen information on exam day. Pre-seen analysis T Railways Note: The enclosed document in no way indicates what is likely to be examined in the un-seen information on exam day. Contents Pre-seen analysis of T Railways E3 Tips and Guidance

More information

Impact of Next Generation Infrastructure on Australian Cities

Impact of Next Generation Infrastructure on Australian Cities Impact of Next Generation Infrastructure on Australian Cities ISNGI 2017 Institution of Civil Engineers, London 13 September 2017 Dr. Fariba Ramezani Associate Research Fellow SMART Infrastructure Facility

More information

Draft Environmental Impact Statement. Appendix G Economic Analysis Report

Draft Environmental Impact Statement. Appendix G Economic Analysis Report Draft Environmental Impact Statement Appendix G Economic Analysis Report Appendix G Economic Analysis Report Economic Analyses in Support of Environmental Impact Statement Carolina Crossroads I-20/26/126

More information

Travel and Reimbursement Policy EPF Meetings / Events

Travel and Reimbursement Policy EPF Meetings / Events Travel and Reimbursement Policy EPF Meetings / Events All representatives of patient organisations who have been invited and whose registration has been confirmed for an EPF event will be reimbursed for

More information

FINANCIAL ANALYSIS. A. Introduction

FINANCIAL ANALYSIS. A. Introduction FINANCIAL ANALYSIS Henan Sustainable Livestock Farming and Product Safety Demonstration Project (RRP PRC 46081) A. Introduction 1. A financial analysis was conducted following relevant Asian Development

More information

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT A. Sector Road Map Road Improvement and Institutional Development Project (RRP PHI 41076) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT 1. Sector Performance, Problems and Opportunities 1. Roads provide

More information

Consideration of applications to increase cash, Leap and pre-paid fares from Bus Éireann for 2014

Consideration of applications to increase cash, Leap and pre-paid fares from Bus Éireann for 2014 Consideration of applications to increase cash, Leap and pre-paid fares from Bus Éireann for 2014 Determination No. 4 for period Nov/Dec 2013 to Nov/Dec 2014 October 2013 1 Table of contents Executive

More information

Recent Economic Trends Selected Data. Released: February 12, 2004

Recent Economic Trends Selected Data. Released: February 12, 2004 Recent Economic Trends Selected Data Released: February 12, 2004 Recent Economic Developments and Prospects Indications are that the Bahamian economy grew marginally in 2003. Tourism expenditure, which

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT

SECTOR ASSESSMENT (SUMMARY): TRANSPORT SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Myanmar is the largest country in the Greater Mekong Subregion (GMS) with a total land area

More information

HISTORY OF MASS TRANSIT FUNDING IN PENNSYLVANIA

HISTORY OF MASS TRANSIT FUNDING IN PENNSYLVANIA HISTORY OF MASS TRANSIT FUNDING IN PENNSYLVANIA There are over 70 transit systems in five classes determined by fleet size and type of service in Pennsylvania. Transit receives funds from six state sources:

More information

FINANCIAL ANALYSIS. Table 1: Project Outputs Output Subcomponents Type of Analysis Enshi Wastewater Enshi Hongmiao WWTP Enshi Dashaba WWTP

FINANCIAL ANALYSIS. Table 1: Project Outputs Output Subcomponents Type of Analysis Enshi Wastewater Enshi Hongmiao WWTP Enshi Dashaba WWTP Hubei Enshi Qing River Upstream Environment Rehabilitation Project (RRP PRC 47048) FINANCIAL ANALYSIS A. Introduction 1. The financial analysis of the project was carried out in accordance with the Asian

More information

RESPONSIBLE MINISTER FOR MINISTRY OF TRANSPORT: Minister of Transport

RESPONSIBLE MINISTER FOR MINISTRY OF TRANSPORT: Minister of Transport Vote Transport APPROPRIATION MINISTER(S): Minister of Transport (M72) APPROPRIATION ADMINISTRATOR: Ministry of Transport RESPONSIBLE MINISTER FOR MINISTRY OF TRANSPORT: Minister of Transport THE ESTIMATES

More information

Chapter 9 Financial Considerations. 9.1 Introduction

Chapter 9 Financial Considerations. 9.1 Introduction 9.1 Introduction Chapter 9 This chapter presents anticipated costs, revenues, and funding for the NEPA BART Extension Alternative. A summary of VTA s financial plan for the BART Extension Alternative is

More information

The value of ATO for the future operations of Suburban and Regional rail lines with dense traffic. Jacques Poré. Alstom Digital Mobility

The value of ATO for the future operations of Suburban and Regional rail lines with dense traffic. Jacques Poré. Alstom Digital Mobility The value of ATO for the future operations of Suburban and Regional rail lines with dense traffic Jacques Poré Alstom Digital Mobility Intelligent Rail Summit 2017 Agenda 1. Introduction - why ATO? 2.

More information

Study of High Speed Rail in Alberta

Study of High Speed Rail in Alberta Study of High Speed Rail in Alberta Presentation to Standing Committee on Alberta s Economic Future Marc-Andre Roy February 4, 2014 Via Videoconference Many options, varying capital costs: $3-$8 billion

More information

Departmental Spending. Department for Transport

Departmental Spending. Department for Transport Departmental Spending Day-to-day Spending (Resource DEL) DfT spends 1.2% of total Resource DEL Spending Review 2015 The SR planned overall decreases to the Resource DEL Transport Budget over the period

More information

PUBLIC PRIVATE PARTNERSHIP IN THAILAND HIGHWAYS A CASE STUDY ON AN EXTENSION OF DONMUANG TOLLWAY PROJECT

PUBLIC PRIVATE PARTNERSHIP IN THAILAND HIGHWAYS A CASE STUDY ON AN EXTENSION OF DONMUANG TOLLWAY PROJECT PUBLIC PRIVATE PARTNERSHIP IN THAILAND HIGHWAYS A CASE STUDY ON AN EXTENSION OF DONMUANG TOLLWAY PROJECT Pruethipong Singhatiraj 1, Chatchai Chuangching 1 and Boonkua Janbanjong 1 1 Department of Highways,

More information

Country Operations Business Plan. Bangladesh October 2015

Country Operations Business Plan. Bangladesh October 2015 Country Operations Business Plan October 2015 Bangladesh 2016 2018 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of

More information

GENERAL MANUAL POLICY MOUNT SINAI HOSPITAL Form MS 204A Original Date: July 2004 Revised: June 2011

GENERAL MANUAL POLICY MOUNT SINAI HOSPITAL Form MS 204A Original Date: July 2004 Revised: June 2011 Policy Number: VII a 10 15 Key Words: business expense, travel, cash advances, air transportation, rail/bus transportation, car rental, personal vehicles, taxi, hotel accommodation, alcohol, meals, consultant

More information

Freight Rail Improvements Oklahoma City to Shawnee TIGER Grant Application Benefit Cost Analysis Technical Memo October 2009

Freight Rail Improvements Oklahoma City to Shawnee TIGER Grant Application Benefit Cost Analysis Technical Memo October 2009 Freight Rail Improvements Oklahoma City to Shawnee TIGER Grant Application Benefit Cost Analysis Technical Memo October 2009 Introduction The formal benefit cost analysis has been conducted using best

More information

A Summary of Changes to the HS2 Economic Case

A Summary of Changes to the HS2 Economic Case A Summary of Changes to the HS2 Economic Case April 2011 Contents 1 Introduction 4 2 Cost Changes 6 3 Appraisal Changes 7 4 Summary of Changes 9 Annex 1: Capital Costs 10 Annex 2: Operating Costs 13 Annex

More information

NORTH LUZON, PHILIPPINES. Case Study (Transportation) Project Summary:

NORTH LUZON, PHILIPPINES. Case Study (Transportation) Project Summary: NORTH LUZON, PHILIPPINES Case Study (Transportation) Project Summary: The Republic of the Philippines is an archipelagic nation in Southeast Asia comprised of 7,107 islands. The Philippines is home to

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK . ASIAN DEVELOPMENT BANK TAR: BAN 35242 TECHNICAL ASSISTANCE TO THE PEOPLE S REPUBLIC OF BANGLADESH FOR PREPARING THE GAS SECTOR DEVELOPMENT PROJECT April 2004 CURRENCY EQUIVALENTS (as of 21 April 2004)

More information

UNIVERSITY OF WALES EXPENSES, TRAVEL AND SUBSISTENCE POLICY. 1. Introduction. Travel & Expenses - Version 4, July 2014, Academic Unit

UNIVERSITY OF WALES EXPENSES, TRAVEL AND SUBSISTENCE POLICY. 1. Introduction. Travel & Expenses - Version 4, July 2014, Academic Unit UNIVERSITY OF WALES EXPENSES, TRAVEL AND SUBSISTENCE POLICY 1. Introduction This document provides detailed guidance on the University s policy for the reimbursement of expenses necessarily incurred by

More information

Swords/ Airport to City Centre BRT Consultation Submission For Coach Tourism and Transport Council of Ireland (CTTC)

Swords/ Airport to City Centre BRT Consultation Submission For Coach Tourism and Transport Council of Ireland (CTTC) - Swords/ Airport to City Centre BRT Consultation Submission For Coach Tourism and Transport Council of Ireland (CTTC) Final Submission November 2014 Email:- info@transportinsights.com Telephone:- + 353

More information

Vocational Qualifications (QCF, NVQ, NQF) CPC (Certificate of Professional Competence)

Vocational Qualifications (QCF, NVQ, NQF) CPC (Certificate of Professional Competence) Vocational Qualifications (QCF, NVQ, NQF) CPC (Certificate of Professional Competence) Level 3 CPC (Certificate of Professional Competence) for Transport Managers (International Passenger Transport) -

More information

ARTA 22 months on. Have we made a difference to transport in Auckland?

ARTA 22 months on. Have we made a difference to transport in Auckland? ARTA 22 months on Have we made a difference to transport in Auckland? The starting point > Land Transport Management Act > Local Government (Auckland) Amendment Act > Regional Land Transport Strategy >

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE 8 Appendix 3 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of the Republic of the Union of Myanmar has requested the Asian Development Bank (ADB) to provide a project preparatory

More information

LIST OF EXTERNAL PAYMENT CODES LEPC 2.1

LIST OF EXTERNAL PAYMENT CODES LEPC 2.1 LIST OF EXTERNAL PAYMENT CODES LEPC 2.1 List of External Payment Codes LEPC 2.1 1 The List of External Payment Codes (hereinafter, the List of Codes) shall be used by residents of the Republic of Latvia

More information

Alleviating Traffic Congestion in Manila, Appraisal of the Pasig Expressway. Baher El-Hifnawi Cambridge Resources International Inc.

Alleviating Traffic Congestion in Manila, Appraisal of the Pasig Expressway. Baher El-Hifnawi Cambridge Resources International Inc. Alleviating Traffic Congestion in Manila, Appraisal of the Pasig Expressway Baher El-Hifnawi Cambridge Resources International Inc. Glenn P. Jenkins Queen s University, Kingston, Canada. Eastern Mediterranean

More information

Consolidated Financial Results for the Three Months Ended June 30, 2018 (Japanese GAAP)

Consolidated Financial Results for the Three Months Ended June 30, 2018 (Japanese GAAP) [REFERENCE TRANSLATION] Please note that this translation is to be used solely as reference and the financial statements in this material are unaudited. In case of any discrepancy between this translation

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 40540-016 September 2017 Proposed Multitranche Financing Facility and Technical Assistance Grant People s Republic of

More information

Periodic Financing Request Report. India: Railway Sector Investment Program (Tranche 3)

Periodic Financing Request Report. India: Railway Sector Investment Program (Tranche 3) Periodic Financing Request Report Project Number: 36330-043 MFF Number: 0060 November 2017 India: Railway Sector Investment Program (Tranche 3) Distribution of this document is restricted until it has

More information

CHALLENGES BEFORE THE INDIAN RAILWAYS

CHALLENGES BEFORE THE INDIAN RAILWAYS 1 INFRASTRUCTURE FINANCING CHALLENGES BEFORE THE INDIAN RAILWAYS 2 Structure Overview: Investment in Infrastructure: Needs & Stages Requirements: India Railways: Process Plans Requirements Finance: Sources

More information

India. Key Indicators for Asia and the Pacific Item

India. Key Indicators for Asia and the Pacific Item 1 POPULATION a Total population as of 1 October (million) 1,019 1,040 1,056 1,072 1,089 1,106 1,122 1,138 1,154 1,170 1,186 1,220 1,235 1,251 1,267 1,283 1,299 1,316 Population density (persons/km 2 )

More information

Financial Report Fiscal Year 2018

Financial Report Fiscal Year 2018 Financial Report Fiscal Year 2018 Year to Date July 31, 2018 Presented on September 17, 2018 1 Major Highlights Revenue FY2018 sales tax revenue budgeted at 2.5% growth over FY2017 Sales tax remittances

More information

APPENDIX B TECHNICAL MEMORANDUM #2 TRANSPORTATION FUNDING

APPENDIX B TECHNICAL MEMORANDUM #2 TRANSPORTATION FUNDING APPENDIX B TECHNICAL MEMORANDUM #2 TRANSPORTATION FUNDING CONTENTS Purpose... B1 Summary of Transportation Funding Sources... B1 Figure B-1: Average Annual Transportation Revenue Breakdown by Source (2011-2015)...B1

More information

Economic accounts office

Economic accounts office Economic accounts office 1 Compilation of : National Accounts Regional Accounts Quarterly Accounts Input-output Tables Satellite Account of: Health Accounts Cooperatives and Mutual Societies Accounts ICT

More information

Sada Reddy: Economic contribution of tourism the way forward

Sada Reddy: Economic contribution of tourism the way forward Sada Reddy: Economic contribution of tourism the way forward Speech by Mr Sada Reddy, Governor of the Reserve Bank of Fiji, at the Fiji Tourism Forum 2010, Suva, 20 August 2010. * * * The Attorney-General

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Project Name Region Sector Project ID Borrower Report No. PIC4620 Senegal-Urban Transport Reform and... Capacity Building Project Africa Urban Transport SNPA44383 Republic

More information

STATE-OWNED ENTERPRISE ANALYSIS (Republic of the Marshall Islands: Public Sector Program)

STATE-OWNED ENTERPRISE ANALYSIS (Republic of the Marshall Islands: Public Sector Program) Public Sector Program (RRP RMI 43321-01) A. Introduction STATE-OWNED ENTERPRISE ANALYSIS (Republic of the : Public Sector Program) 1. The Republic of the (RMI) operates an extensive state-owned enterprises

More information

Bangladesh: Chittagong Hill Tracts Rural Development Project

Bangladesh: Chittagong Hill Tracts Rural Development Project Validation Report Reference Number: PVR-222 Project Number: 32467 Loan Number: 1771(SF) December 2012 Bangladesh: Chittagong Hill Tracts Rural Development Project Independent Evaluation Department ABBREVIATIONS

More information