Country Operations Business Plan. Bangladesh October 2015

Size: px
Start display at page:

Download "Country Operations Business Plan. Bangladesh October 2015"

Transcription

1 Country Operations Business Plan October 2015 Bangladesh This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011.

2 CURRENCY EQUIVALENTS (as of 3 September 2015) Currency unit taka (Tk) Tk1.00 = $ $1.00 = Tk77.79 ABBREVIATIONS ADB Asian Development Bank ADF Asian Development Fund COBP country operations business plan CPS country partnership strategy GDP gross domestic product MFF multitranche financing facility OCR ordinary capital resources PDA project design advance SASEC South Asia Subregional Economic Cooperation TA technical assistance (i) (ii) NOTES The fiscal year (FY) of the Government of Bangladesh ends on 30 June. FY before a calendar year denotes the year in which the fiscal year ends, e.g., FY2015 ends on 30 June In this report, "$" refers to US dollars. Vice-President W. Zhang, Operations 1 Director General H. Kim, South Asia Department (SARD) Country Director K. Higuchi, Bangladesh Resident Mission (BRM), SARD Team leader M. P. Imdad, Principal Country Specialist, BRM, SARD Team members F. Ahad, Associate Programs Analyst, BRM, SARD Z. U. Ahmad, Senior Water Resources Officer, BRM M. S. Alam, Senior Safeguards Officer (Resettlement), BRM R. V. Dael, Senior Social Sector Specialist, BRM B. K. Dey, Economics Officer, BRM A. M. Faisal, Senior Project Officer (Environment), BRM A. K. M. Firoz, Senior Procurement Officer, BRM P. S. Hattle, Senior Climate Change Specialist (Clean Energy), SAEN S. M. Hossain, Senior Public Management Officer, BRM M. N. Islam, Senior Project Officer (Transport), BRM P. Marro, Principal Financial Sector Specialist, SARD E. Morsheda, Senior Project Officer (Urban Infrastructure), BRM M. G. Mortaza, Senior Economics Officer, BRM, SARD M. Roesner, Principal Transport Specialist, SARD

3 S. Rahman, Senior Economics Officer, BRM B. K. Saha, Senior Project Officer (Financial Sector), BRM N. Saito, Principal Urban Development Specialist, SARD N. Selim, Social Development Officer (Gender), BRM In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

4

5 CONTENTS Page I. CONSISTENCY OF BUSINESS PLAN WITH COUNTRY TNERSHIP STRATEGY 1 II. INDICATIVE RESOURCE AMETERS 1 III. SUMMARY OF CHANGES TO LENDING AND NONLENDING PROGRAMS 2 APPENDIXES 1. Updated Country Partnership Strategy Results Framework 3 2. Indicative Assistance Pipeline 6 3. Assistance Program for Current Year List of Indicative Knowledge Publications and Events 16

6

7 1 I. CONSISTENCY OF BUSINESS PLAN WITH COUNTRY TNERSHIP STRATEGY 1. To achieve its goal of achieving middle-income country status by 2021, Bangladesh is aiming for annual average real gross domestic product (GDP) growth of 7.4% under the government s seventh five-year plan for FY2016 FY To accelerate inclusive growth and reduce poverty and income inequality, the country will require a substantial increase in yearly investments from 29.0% of GDP in FY2015 to 34.4% of GDP by FY2020. More than $11 billion in external resources will be needed during the plan period for public sector investment. Consistent with the Asian Development Bank (ADB) strategic directions set by the ADB s Strategy 2020 midterm review, the country operations business plan (COBP) for aims to support the current and emerging development priorities of the government, including activities to sustain strong and inclusive economic growth and strong human development. 2 This COBP is the last under the ADB country partnership strategy (CPS), for Bangladesh. 2. The COBP will support continued government efforts in industrial development to diversify the economy and in rural development to manage urbanization. ADB will prioritize activities to develop infrastructure, skills, resilience to environmental and climate change, the private sector, and regional cooperation and integration. In terms of Strategy 2020 s drivers of change, activities in the ADB pipeline will seek to strengthen public private partnerships, improve governance in local governments, enhance skills, and mainstream gender equity and knowledge solutions. Environmental and climate change considerations have been integrated into project interventions. 3. Responding to the country needs and with ADB s enhanced resource base, the COBP substantially scales up ADB operations from the historical base by programming beyond the indicative assistance level. Projects covered by this additional programmed amount have been included under the standby category. Nonetheless, projects and programs will be processed according to their readiness, regardless of whether they are listed as firm or standby. Depending on readiness, project processing may also be advanced or rescheduled. The program includes the technical assistance (TA) loans and project design advances (PDAs) needed to support project readiness. TA resources will focus on project or program preparation, implementation support, and knowledge products and services. II. INDICATIVE RESOURCE AMETERS 4. Bangladesh is a Group B ADB developing member country and currently has access to both the Asian Development Fund (ADF) and ADB s ordinary capital resources (OCR). The indicative resources available during for sovereign operations amount to $2,778 million. This comprises $1,502 million in market-based OCR and $1,276 million in ADF and concessional OCR resources. 3 The final allocation will depend on the availability of ADF and concessional OCR resources, as well as the outcome of ADB s country performance assessments. The lending program includes the over-programming that is listed as standby (para. 3). This is done to build a strong pipeline for additional lending resources that may become available as a result of the merger of ADF lending resources with the OCR balance sheet. The pipeline will be revisited during the next country programming exercise in The ADB-funded TA program, for , averages about $3.7 million a year. An indicative lending and nonlending program and a list of indicative knowledge publications and events are 1 Government of Bangladesh The Seventh Five Year Plan FY2016-FY2020: Accelerating Growth and Empowering Every Citizen. Planning Commission, Ministry of Planning: Dhaka (draft) 2 ADB Midterm Review of Strategy 2020: Meeting the Challenges of a Transforming Asia and Pacific. Manila. 3 This reflects the approved combination of ADF lending operations with the OCR balance sheet that will become effective on 1 January 2017.

8 2 in Appendixes 2 and 4. In consultation with the government, ADB will actively explore opportunities for cofinancing to increase the project scope. Private sector operations will be catalyzed using ADB s nonsovereign lending products. III. SUMMARY OF CHANGES TO LENDING AND NONLENDING PROGRAMS 5. Energy. The COBP continues to focus on the generation, transmission, and distribution of electricity; improving energy efficiency; and developing regional cooperation in power trading. Tranche 3 of the Power System Expansion and Efficiency Improvement Investment Program multitranche financing facility (MFF) is confirmed for The Natural Gas Development and Distribution Project MFF, with tranche 1 in 2016 listed as standby, will support expanding delivery of domestic gas and imported liquefied natural gas. Project Preparatory Facility for Power Sector (TA loan) in 2016 will support early project preparation in the power sector. The Rural Hybrid Power Development Project in 2017 (standby) will support rural communities and renewable energy development. 6. Transport. ADB will focus on improving road maintenance, increasing the capacity of regional road corridor from Dhaka to Northwestern Bangladesh, and building the Dhaka Chittagong Cox s Bazar railway corridor. Additional Financing for Subregional Transport Project Preparatory Facility (TA loan) in 2015 will support preparation of 600 kilometers of roads improvement in eight subregional corridors, and the conversion of the Dhaka Chittagong Cox s Bazar rail corridor to dual-gauge from meter gauge. Tranche 1 of the SASEC Roads Project II is scheduled for The Railway Rolling Stock Project, scheduled for 2015, will enhance railway services by providing more and better rolling stock. The first tranche for the SASEC Chittagong Cox s Bazar Railway Project Phase 1 in 2016 (standby) will finance a new 100- kilometer railway line. 7. Education. The COBP strengthens ADB involvement in primary and secondary education; skills development; and science, technology and innovation. Tranche 3 of the Skills for Employment Investment Program in 2017 will support policy and institutional reforms and improved job placement. The Information Technology Parks for Employment in 2017 (standby) will support skills development in technology and innovation. 8. Finance. In the finance sector, ADB s focus will remain on the development of a capital market, small and medium-sized enterprises (SMEs), and infrastructure financing. The Small and Medium Enterprise II Project in 2015 (standby) will support access to finance for SMEs in nonmetropolitan areas. The Third Public Private Infrastructure Development Facility Project in 2016 (standby) will address infrastructure deficiencies by providing long-term debt financing for private sector-sponsored infrastructure projects. 9. Water and other urban infrastructure and services. ADB will provide support in the integrated planning process for climate change mitigation and adaptation, water supply and sanitation in large cities, urban primary health care, and governance. A PDA in 2016 will support preparation of the tranche 1 subproject of the City Region Development Investment Program. Additional financing for the Coastal Towns Environmental Infrastructure Project is included in the pipeline for Agriculture, natural resources, and rural development. ADB will support food security and rural livelihoods by helping to improve productivity, climate-resilient connectivity, and integrated water resources management. A PDA in 2016 will support preparation of the Crop Diversification and Value Chain Infrastructure Development Project. A PDA in 2015 will support the Rural Infrastructure Maintenance Program, with result-based lending, for 2016.

9 Appendix 1 3 Country Development Goals UPDATED COUNTRY TNERSHIP STRATEGY RESULTS FRAMEWORK (Board endorsement of the CPS: 2011; COBP September 2015) 1. During FY2011 FY2015, attain average real gross domestic product growth of 7.3%, boost gross domestic investment to 32.5% of gross domestic product, and triple investment in infrastructure to 6% of gross domestic product. 2. Reduce poverty head count ratio by 10 percentage points by FY2015, from 31.5% in FY Raise the share of industrial employment from 17% in 2010 to 25% by Sectors Selected by ADB Government Sector Objectives Sector Outcomes that ADB Contributes to and Indicators 1. Energy (Core Areas 1: Infrastructure and 2: Environment) Reliable power supply Expanded access to power with expanded access to power Access to electricity increased Baseline: 47% (2009) Target: 65% (2015) Current value: 68% (2014) Per capita consumption of electricity increased Baseline: 170 kilowatt-hours (2010) Target: 390 kilowatt-hours (2015) Current value: 348 kilowatt-hours (2014) 2. Transport (Core Areas 1: Infrastructure and 3: Regional Integration) Safe, reliable, and fully integrated transport system that moves people and goods more efficiently Increased, more efficient, and safer movement of people and goods Rail passenger traffic increased (passengerkilometers) Baseline: 7 billion (2010) Target: 15 billion (2015) Current value: 8.14 billion (2014) Rail freight traffic increased (ton-kilometers) Baseline: 710 million (2010) Target: 1,238 million (2015) ADB Areas of Intervention Electricity generation, transmission, and distribution; energy efficiency; gas production and distribution Roads, rail transport, transport policy, and institutional development ADB Indicative Resource Allocation in the Next Pipeline and Thematic Priorities $641 million for (2016, 2017, and 2018 are outside current CPS period), including current year, 14.2% of total CPS envelope, and additional $424 million cofinancing, of which: ESG 78.8% GEM 18.7% PSD 50.7% RCI 18.7% $862 million up to 2014, 19.2% of total CPS envelope, of which: ESG 98.6% GEM 0.0% PSD 100.0% RCI 1.4% $1,140 million for (2016, 2017, and 2018 are outside current CPS period), including current year, 25.3% of total CPS envelope, and additional $629 million cofinancing, of which: ESG 0.9% GEM 44.7% PSD 30.7% RCI 97.3% $1,018 million up to 2014, 22.6% of total CPS envelope, of which: Changes from CPS or Last COBP Changes from CPS or Last COBP Sector allocation declined. Thematic focus on ESG, GEM, and PSD declined, but that on RCI rose. Sector allocation rose. Thematic focus on ESG, PSD, and RCI declined, but that on GEM rose.

10 4 Appendix 1 Sectors Selected by ADB Government Sector Sector Outcomes that ADB Contributes to and Objectives Indicators Current value: 677 million (2014) Annual average daily motorized traffic on Road and Highways Department roads Baseline: 3,085 vehicles (2010) Target: 4,532 vehicles (2015) Current value: 3,900 vehicles (2013) ADB Areas of Intervention 3. Water Supply and Other Urban Infrastructure and Services (Core Areas 1: Infrastructure and 2: Environment) Full access to clean water and sanitation; improved access to municipal services; strengthened urban policy, local governance, and management; and sustainable public and environmental health services fostered in city corporations 4. Education (Core Area 5: Education) Holistic development of the education sector to improve education quality and relevance; reversal of the low completion rate at all levels; reduction of the gap in access between rich and poor; and steady improvement of the skills base of the labor force More people enjoying improved water supply and sanitation services Urban population using improved drinking water sources increased Baseline: 85% (2008) Target: 100% (2015) Current value: 91% (2013) Urban population using improved sanitation facilities increased Baseline: 55% (2008) Target: 100% (2015) Current value: 90% (2013) Increased access to quality education and increased educational attainment for all Grade 5 completion rate increased Baselines: girls = 57% (2010), boys = 53% (2010) Target: 75% for girls and boys (2015) Current values: girls = 75% (2014), boys = 82% (2014) Net enrollment rate in secondary education increased Baselines: girls = 55% (2010), boys = 45% (2010) Target: 75% for girls and boys (2015) Current values: girls = 64.2% (2013), boys = 54.1% (2013) Urban water supply and sanitation services, solid waste management and slum improvement, urban policy, institutional and capacity development Primary and secondary education; TVET; education sector development ADB Indicative Resource Allocation in the Next Pipeline and Thematic Priorities ESG 30.2% GEM 64.2% PSD 59.5% RCI 45.0% $350 million for (2016, 2017, and 2018 are outside current CPS period), including current year, 7.7% of total CPS envelope, and additional $114 million cofinancing, of which: ESG 100.0% GEM 100.0% PSD 0.0% RCI 0.0% $712.5 million up to 2014, 15.8% of total CPS envelope, of which: ESG 82.5% GEM 100.0% PSD 47.1% RCI 0.0% $780 million for (2016, 2017, and 2018 are outside current CPS period), including current year, 17.3% of total CPS envelope, and additional $1,369 million cofinancing, of which: ESG 0.0% GEM 100.0% PSD 12.8% RCI 0.0% $580 million up to 2014, 12.9% of total CPS envelope, of which: ESG 0.0% GEM 100.0% PSD 17.2% RCI 0.0% Changes from CPS or Last COBP Sector allocation declined. Thematic focus on PSD declined. Sector allocation rose. Thematic focus on PSD declined.

11 Appendix 1 5 Sectors Selected by ADB Government Sector Sector Outcomes that ADB Contributes to and ADB Areas of Objectives Indicators Intervention 5. Agriculture, Natural Resources and Rural Development (Core Area: Other Areas) Higher agricultural Sustained high agriculture growth Rural infrastructure growth through support development; river for rural infrastructure Annual agriculture growth maintained at 4.5% basin and flood and integrated water Baseline: 5.2% (2010) management; resource management, Target: 4.5% on average (2015) climate change and through additional Current value: 4.4% (2014) capacity water-related disaster development; risk management knowledge management; climate-resilient connectivity, and crop insurance and pilot programs 6. Finance (Core Area 4: Finance Sector Development) Well-developed and More efficient capital market for private sector regulated capital enterprises market Private investment as a percentage of gross domestic product increased Baseline: 19.5% (2011) Target: 23% (2016) Current value: 22% (2014) Number of listed securities increased Baseline: 445 (2010) Target: 725 (2015) Current value: 536 (2014) Capital market development ADB Indicative Resource Allocation in the Next Pipeline and Thematic Priorities $779 million for (2016, 2017, and 2018 are outside current CPS period), including current year, 17.3% of total CPS envelope, and additional $57 million cofinancing, of which: ESG 30.2% GEM 100.0% PSD 45.0% RCI 0.0% $186 million up to 2014, 4.1% of total CPS envelope, of which: ESG 100.0% GEM 100.0% PSD 65.0% RCI 0.0% $250 million for (2016, 2017, and 2018 are outside current CPS period), including current year, 5.5% of total CPS envelope, of which: ESG 0.0% GEM 100.0% PSD 100.0% RCI 0.0% $371 million up to 2014, 8.2% of total CPS envelope, of which: ESG 13.5% GEM 0.0% PSD 100.0% RCI 5.7% Changes from CPS or Last COBP Sector allocation rose. Thematic focus on ESG and PSD declined. Sector allocation declined. ADB= Asian Development Bank, COBP = country operations business plan, CPS = country partnership strategy, ESG = environmentally sustainable growth, GEM = gender equity and mainstreaming, PSD = private sector development, RCI = regional cooperation and integration. Source: Asian Development Bank estimates.

12 6 Appendix 2 INDICATIVE ASSISTANCE PIPELINE Project/Program Name 2016 Firm Crop Diversification and Value Chain Infrastructure Development Project (PDA) c Sector Poverty Targeting Table A2.1: Lending Products, Strategic Agendas and Drivers of Change ANR GI IEG/GEM/ GCD/KNS/ PSD Division Year of PPTA/ PDA Total a Cofinance Marketbased OCR ADF Loans/ Conces sional OCR Cost ($ million) ADB b ADF Grants Total Gov t SAER tbd tbd 0.0 Rural Infrastructure Maintenance Program Skills for Employment Investment Program (tranche 2) ANR TI-G IEG/GCD/ GEM/KNS/ EDU GI IEG/GEM/G CD/PSD/ SAER 2015 tbd tbd 50.0 SAHS 2011 tbd tbd Project Preparatory Facility for Power Sector (TA loan) ENE TI-M IEG/ SAEN tbd tbd 4.0 Bangladesh Power System Enhancement and Efficiency Improvement Project Railway Sector Investment Program (tranche 4) City Region Development Investment Program (tranche 1) (PDA) d ENE GI IEG/ESG/ KNS/ TRA GI IEG/RCI/ GCD/ WUS GI IEG/ESG/ RCI/GEM/ GCD SAEN tbd tbd SATC tbd tbd SAUW tbd tbd 0.0

13 Appendix 2 7 Cost ($ million) ADB b Strategic Agendas Year of Marketbased ADF Loans/ Conces Project/Program Name sional ADF Co- Poverty and Drivers PPTA/ Sector Targeting of Change Division PDA Total a OCR OCR Grants Total Gov t finance Coastal Towns WUS GI IEG/ESG/ BRM tbd tbd 14.0 Environmental Infrastructure Project (additional financing) GCD/GEM/ KNS/ Total tbd tbd Standby Natural Gas Development and Distribution Project (tranche 1) Third Public Private Infrastructure Development Facility Project SASEC Chittagong Cox's Bazar Railway Project Phase 1 (tranche 1) ENE GI IEG/ESG/ GCD/ FIN GI IEG/ESG/ PSD TRA GI IEG/RCI/ GCD/GEM/ SAEN tbd tbd SAPF tbd tbd 0.0 SATC tbd tbd Dhaka Water Supply Network Improvement Project WUS TI-M IEG/ESG/ GCD/GEM SAUW 2015 tbd tbd 0.0 Total tbd tbd Firm Flood and Riverbank Erosion Risk Management Investment Program (tranche 2) ANR TI-G IEG/ESG/ GCD/GEM/ KNS/ SAER tbd tbd 0.0

14 8 Appendix 2 Project/Program Name Secondary Education Sector Investment Program (tranche 3) Skills for Employment Investment Program (tranche 3) Dhaka Metro Project (TA loan) SASEC Road Connectivity Project II (tranche 1) Strategic Agendas Sector Poverty Targeting and Drivers of Change EDU TI-M IEG/GCD/ GEM/ EDU TI-M IEG/GCD/ GEM/ TRA GI IEG/ESG/ RCI/GCD/ GEM TRA GI IEG/RCI/ GCD/PSD/ Cost ($ million) ADB b ADF Division Year of PPTA/ PDA Total a Marketbased OCR Loans/ Conces sional OCR ADF Grants Total Gov t Cofinance SAHS 2012 tbd tbd SAHS 2011 tbd tbd SATC tbd tbd 0.0 SATC tbd tbd Third Urban Governance and Infrastructure Improvement Project (additional financing) WUS GI IEG/ESG/ GCD/GEM/ KNS/ SAUW tbd tbd 50.0 Total tbd ,035.0 tbd Standby Information Technology Parks for Employment Second Power System Expansion and Efficiency Improvement Investment Program (tranche 1) Rural Hybrid Power Development Project EDU TI-G IEG/GCD/ GEM/PSD/ ENE GI IEG/PSD/ ESG/KNS/ ENE GI IEG/ESG/ SAHS 2016 tbd tbd SAEN 2016 tbd tbd SAEN 2016 tbd tbd 30.0 Housing Finance Facility FIN GI IEG/ESG/ GEM/PSD SAPF 2016 tbd tbd 0.0

15 Appendix 2 9 Project/Program Name Urban Health Sector Reform Program Phase 1 Strategic Agendas Sector Poverty Targeting and Drivers of Change HLT TI-H IEG/GCD/ GEM/PSD/ TRA GI IEG/RCI/ GCD/ Cost ($ million) ADB b ADF Division Year of PPTA/ PDA Total a Marketbased OCR Loans/ Conces sional OCR ADF Grants Total Gov t Cofinance SAHS 2016 tbd tbd 40.0 Rolling Stock Investment Program (tranche 1) SATC tbd tbd Total tbd 1, ,270.0 tbd Firm Flood and Riverbank Erosion Risk Management Investment Program (tranche 3) Crop Diversification and Value Chain Infrastructure Development Project Ganges-Kobadak Irrigation Project SASEC Chittagong Cox's Bazar Railway Project Phase 1 (tranche 2) SASEC Dhaka Chittagong Railway Project Phase 1 (tranche 1) ANR TI-G IEG/ESG/ GCD/GEM/ KNS/ ANR TI-H IEG/GCD/ GEM/KNS/ PSD ANR GI IEG/GCD/ GEM/KNS/ PSD TRA GI IEG/RCI/ GCD/GEM/ TRA GI IEG/RCI/ GCD/GEM/ SAER tbd tbd 0.0 SAER 2016 tbd tbd 0.0 SAER 2016 tbd tbd 0.0 SATC tbd tbd SATC tbd tbd City Region Development Investment Program (tranche 1) WUS GI IEG/ESG/ GCD/GEM/ SAUW 2016 tbd tbd 50.0 Total tbd ,090.0 tbd 350.0

16 10 Appendix 2 Project/Program Name 2018 Standby Fourth Primary Education Development Program Natural Gas Development and Distribution Project (tranche 2) Grid-Connected Solar PV Plants 2x100 MWp Sector Poverty Targeting Strategic Agendas and Drivers of Change EDU TI-M IEG/GCD/ GEM/ ENE GI IEG/ESG/ GCD/ ENE GI IEG/ESG/ Division Year of PPTA/ PDA Total a Cofinance Marketbased OCR ADF Loans/ Conces sional OCR Cost ($ million) ADB b ADF Grants Total Gov t SAHS 2017 tbd tbd SAEN tbd tbd SAEN tbd tbd SASEC Roads Project III (tranche 1) Dhaka Metro Project Phase 1 (tranche 1) TRA GI IEG/RCI/ GCD/PSD/ TRA GI IEG/ESG/ GCD/GEM/ SATC tbd tbd 50.0 SATC tbd tbd Total tbd 1, ,300.0 tbd ADB = Asian Development Bank, ADF = Asian Development Fund, ANR = agriculture, natural resources, and rural development; BRM= Bangladesh Resident Mission, EDU = education, ENE = energy, ESG = environmentally sustainable growth, FIN = finance, GCD = governance and capacity development, GEM = gender equity and mainstreaming, GI = general intervention, Gov t = government, HLT = health, IEG = inclusive economic growth, KNS = knowledge solutions, MWp = megawatt-peak, OCR = ordinary capital resources, = partnerships, PDA = project design advance, PPTA = project preparatory technical assistance, PSD = private sector development, PV= photovoltaic, RCI = regional cooperation and integration, SAEN = South Asia Energy Division, SAER = South Asia Environment, Natural Resource, and Agriculture Division; SAHS = South Asia Human and Social Development Division, SAPF = South Asia Public Management, Financial Sector, and Trade Division; SASEC = South Asia Subregional Economic Cooperation, SATC = South Asia Transport and Communications Division, SAUW = South Asia Urban Development and Water Division, TA = technical assistance, tbd= to be determined, TI-G = targeted intervention geographic dimensions of inclusive growth, TI-H = targeted intervention income poverty at household level, TI-M = targeted intervention Millennium Development Goals, TRA = transport, WUS = water supply and other urban infrastructure and services. a The total cost and total financing do not tally because PDAs estimated at $7 million will be refinanced by the ensuing loans, scheduled for b This reflects the approved combination of ADF lending operations with the OCR balance sheet that will become effective on 1 January c The PDA will be refinanced by the ensuing $200 million OCR loan scheduled for 2018 for the Crop Diversification and Value Chain Infrastructure Development Project. d The PDA will be refinanced by the ensuing $30 million OCR and $110 million ADF loans scheduled for 2018 for the City Region Development Investment Program (tranche 1). Source: Asian Development Bank estimates.

17 Appendix 2 11 Table A2.2: Nonlending Products and Services, Sources of Funding ADB Others Assistance Name Sector Division Assistance Type Source Amount ($'000) Source Amount ($'000) Total ($'000) 2016 Preparing Ganges-Kobadak and Teesta Barrage Irrigation Project ANR SAER PPTA TASF Supporting Third Primary Education Development Program (additional financing) Supporting Skills for Employment Investment Program (tranche 2) Preparing Fourth Primary Education Development Program Preparing Information Technology Parks for Employment Preparing Second Power System Expansion and Efficiency Improvement Program Sustainable Management of Solar Pumps for Agricultural Irrigation Preparation of Rural Hybrid Power Systems in Bangladesh Preparing Urban Health Sector Reform Program Phase 1 EDU BRM CDTA TASF EDU SAHS CDTA TASF EDU SAHS PPTA 0.0 tbd EDU SAHS PPTA TASF ekorea ENE SAEN PPTA TASF ENE SAEN CDTA 0.0 CEFPF 1, ,000.0 ENE SAEN PPTA 0.0 CEFPF/Others 1, ,500.0 HLT SAHS PPTA 0.0 tbd Strengthening Public Sector Institutions PSM BRM CDTA TASF ekorea ,300.0 Capacity Building for Portfolio Management (additional financing) PSM BRM CDTA TASF Supporting SASEC Railway Connectivity TRA SATC CDTA TASF tbd ,000.0 Preparing City Region Investment Program WUS SAUW PPTA TASF Total 4, , ,450.0

18 12 Appendix 2 Sources of Funding ADB Others Assistance Name Sector Division Assistance Type Source Amount ($'000) Source Amount ($'000) Total ($'000) 2017 Automation of Meteorological Information and Climate Service ANR BRM CDTA 0.0 tbd 1, ,500.0 Preparing Solar PV Photovoltaic Power Development Project ENE SAEN PPTA 0.0 CEFPF 1, ,500.0 Supporting Housing Finance Project FIN SAPF CDTA TASF Capacity Building for Portfolio Management (additional financing) Updating Road Sector Strategy and Road Master Plan PSM BRM CDTA TASF TRA SATC CDTA TASF 1,500.0 tbd ,000.0 Strengthening Capacity of DWASA WUS SAUW CDTA TASF Capacity Building for Urban Governance and WUS BRM CDTA TASF Infrastructure Total 3, , , Supporting Energy Research Council ENE BRM CDTA TASF Supporting Bangladesh Railway Reform Program TRA SATC CDTA TASF 1, ,000.0 Metro Capacity Development and NAMA TRA SATC CDTA TASF 1, ,000.0 Strengthening Capacity of City Corporations WUS SAUW CDTA TASF 1, ,000.0 Total 3, ,500.0 ADB = Asian Development Bank, ANR = agriculture, natural resources, and rural development, BRM= Bangladesh Resident Mission, CDTA = capacity development technical assistance, CEFPF= Clean Energy Financing Partnership Facility, DWASA= Dhaka Water Supply and Sewerage Authority, EDU = education, ENE = energy, FIN = finance, HLT = health, NAMA = National Appropriate Mitigation Action, PPTA = project preparatory technical assistance, PSM = public sector management, SAEN = South Asia Energy Division, SAER = South Asia Environment, Natural Resource and Agriculture Division, SAHS = South Asia Human and Social Development Division, SAPF = South Asia Public Management, Financial Sector, and Trade Division; SASEC = South Asia Subregional Economic Cooperation, SATC = South Asia Transport and Communications Division, SAUW = South Asia Urban Development and Water Division, TASF = Technical Assistance Special Fund, tbd= to be determined, TRA = transport, WUS = water and other urban infrastructure and services. Source: Asian Development Bank estimates.

19 Appendix 3 13 ASSISTANCE PROGRAM FOR CURRENT YEAR Project/Program Name Firm Southwest Area Integrated Water Resources Planning and Management Project (additional financing) Sector Poverty Targeting Table A3.1: Lending Products, 2015 Strategic Agendas and Drivers of Change ANR TI-G IEG/ESG/ GEM/GCD/ Division Year of PPTA/ PDA Total a Cost ($ million) ADB ADF OCR ADF Grants Total Gov t Cofinance SAER 2012 tbd tbd 7.0 Rural Connectivity ANR TI-G IEG/GCD/ Program (PDA) b GEM/KNS/ SAER tbd tbd 0.0 Secondary Education Sector Investment Program (tranche 2) Third Primary Education Development Program (additional financing) Second SASEC Bangladesh India Electrical Grid Interconnection Project Power System Expansion and Efficiency Improvement Investment Program (tranche 3) Third Capital Market Development Program Railway Rolling Stock Project EDU GI IEG// GEM/GCD EDU GI IEG/GEM/ GCD/ /KNS ENE GI IEG/GEM/ GCD/PSD ENE GI IEG/ESG/ /PSD FIN TI-M IEG/GCD/ GEM/PSD TRA GI IEG/RCI/ GCD SAHS tbd tbd SAHS tbd tbd SAEN tbd c tbd 0.0 SAEN tbd tbd SAPF tbd tbd 0.0 SATC tbd tbd 0.0

20 14 Appendix 2 Cost ($ million) Strategic Agendas Year of ADB ADF Project/Program Name Poverty and Drivers PPTA/ Co- Sector Targeting of Change Division PDA Total a OCR ADF Grants Total Gov t finance Additional Financing for TRA GI IEG SATC tbd tbd 0.0 Subregional Transport Project Preparatory Facility (TA loan) Total tbd , ,096.0 Standby Railway Sector Investment Program (tranche 4) TRA GI IEG/ESG/ GCD/ SATC tbd tbd Small and Medium FIN GI IEG/GEM/ SAPF tbd tbd 0.0 Enterprise II PSD Total tbd tbd ADB = Asian Development Bank, ADF = Asian Development Fund, ANR = agriculture, natural resources, and rural development; EDU = education, ENE = energy, ESG = environmentally sustainable growth, FIN = finance, GCD = governance and capacity development, GEM = gender equity and mainstreaming, GI = general intervention, Gov t = government, IEG = inclusive economic growth, KNS = knowledge solutions, OCR = ordinary capital resources, = partnerships, PDA = project design advance, PPTA = project preparatory technical assistance, PSD = private sector development, RCI = regional cooperation and integration, SAEN = South Asia Energy Division, SAER = South Asia Environment, Natural Resource, and Agriculture Division; SAHS = South Asia Human and Social Development Division, SAPF = South Asia Public Management, Financial Sector, and Trade Division, SASEC = South Asia Subregional Economic Cooperation, SATC = South Asia Transport and Communications Division, TA = technical assistance, tbd= to be determined, TI-G = targeted intervention geographic dimensions of inclusive growth, TI-M = targeted intervention Millennium Development Goals, TRA= transport. a The total cost and total financing do not tally because PDA estimated at $2 million will be refinanced by the ensuing loan scheduled for b The PDA will be refinanced by the ensuing $150 million OCR and $64 million ADF loans for the Rural Infrastructure Maintenance Program, scheduled for c ADF amount includes $35 million RCI pool. Source: Asian Development Bank estimates.

21 Appendix 3 15 Table A3.2: Nonlending Products and Services, 2015 Sources of Funding ADB Others Assistance Name Sector Division Assistance Type Source Amount ($'000) Source Amount ($'000) Total ($'000) Education and Skills Development II EDU SAHS CDTA 0.0 JFPR 1, ,500.0 Enabling Poor Women's Benefits from Enhanced Access to Energy in Hatiya Island ENE BRM CDTA 0.0 ekorea Supporting Third Capital Market Development FIN SAPF CDTA TASF ekorea SME Capacity Development Project FIN SAPF CDTA 0.0 tbd 2, ,000.0 Preparing Dhaka Metro Project TRA SATC PPTA TASF 1, ,300.0 Total 1, , ,000.0 ADB = Asian Development Bank, BRM = Bangladesh Resident Mission, CDTA = capacity development technical assistance, EDU = education, ENE = energy, FIN = finance, JFPR = Japan Fund for Poverty Reduction, PPTA = project preparatory technical assistance, SAHS = South Asia Human and Social Development Division, SAPF= South Asia Public Management, Financial Sector, and Trade Division, SATC = South Asia Transport and Communications Division, SME= small and medium-sized enterprise, TASF = Technical Assistance Special Fund, tbd= to be determined, TRA = transport. Source: Asian Development Bank estimates.

22 16 Appendix 4 LIST OF INDICATIVE KNOWLEDGE PUBLICATIONS AND EVENTS Table A4.1: Knowledge Products (Publications and Events), 2016 Title of Publication or Event Subject Type Department or Sector Group or Thematic Group Technical Assistance Asian Development Outlook 2016 chapter on Economics Knowledge publication ERCD Bangladesh Asian Development Outlook 2016 Update chapter on Economics Knowledge publication ERCD Bangladesh Asian Development Outlook Supplement (June and Economics Knowledge publication ERCD December) section on Bangladesh Bangladesh Quarterly Economic Update (4 issues) Economics Knowledge publication ERCD Bangladesh Economic Indicators Update (6 issues) Economics Knowledge publication ERCD Domestic Cost Escalation Factor (2 issues) Economics Knowledge publication SARD Development Effectiveness Review Economics Knowledge publication SPD Country Fact Sheet Economics Knowledge publication DER CPS sector assessment and road map agriculture, Agriculture Road map report SARD and natural resources CPS sector assessment and road map education Education Road map report SARD CPS sector assessment and road map energy Energy Road map report SARD CPS sector assessment and road map finance Finance Road map report SARD CPS sector assessment and road map transport Transport Road map report SARD CPS sector assessment and road map urban and Urban Road map report SARD water Total Number of Publications: 14 CPS = country partnership strategy, DER= Department of External Relations, ERCD = Economic Research and Regional Cooperation Department, SARD = South Asia Regional Department, SPD = Strategy and Policy Department. Source: Asian Development Bank estimates.

23 Appendix 4 17 Table A4.2: Additional Knowledge Publications and Events Delivered, 2015 Department or Sector Title of Publication or Event Subject Type Group or Thematic Group Technical Assistance Asian Development Outlook 2015 chapter on Economics Knowledge publication ERCD Bangladesh Asian Development Outlook 2015 Update chapter Economics Knowledge publication ERCD on Bangladesh Asian Development Outlook 2015 Supplement (June Economics Knowledge publication SARD and December) section on Bangladesh Bangladesh Quarterly Economic Update (2 issues) Economics Knowledge publication SARD Bangladesh Economic Indicators Update (3 issues) Economics Knowledge publication SARD Domestic Cost Escalation Factor Economics Knowledge publication SARD Development Effectiveness Review Economics Knowledge publication SPD Country Fact Sheet Economics Knowledge publication DER CPS assessment poverty Poverty Assessment report SARD CPS assessment private sector Private sector Assessment report SARD CPS assessment governance risk Governance Assessment report SARD CPS assessment gender Gender Assessment report SARD CPS assessment environment Environment Assessment report SARD CPS Country Economic Analysis Economics Assessment report SARD Total number of publications = 14 CPS = country partnership strategy, DER = Department of External Relations, ERCD = Economic Research and Regional Cooperation Department, SARD = South Asia Regional Department, SPD= Strategy and Policy Department. Source: Asian Development Bank estimates.

24 18 Appendix 4 Table A4.3: Innovation, Advanced Technology, and Pilot Initiatives to be Implemented in 2016 Item Nature Project Number Sector or Theme Division PDA for rural connectivity program (results-based lending) PLT ANR SAER Road safety auditing on selected highway corridors to ensure road safety by PLT 2949 TRA SATC reducing fatal crashes Total Number of Initiatives: 2 ANR = agriculture, natural resources, and rural development; PDA= Project Design Advance, PLT = pilot initiative; TRA= transport; SAER = South Asia Environment, Natural Resource and Agriculture Division; SATC = South Asia Transport and Communications Division. Source: Asian Development Bank estimates.

Country Operations Business Plan. Armenia October 2015

Country Operations Business Plan. Armenia October 2015 Country Operations Business Plan October 2015 Armenia 2016 2018 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 31

More information

Country Operations Business Plan. Afghanistan November 2015

Country Operations Business Plan. Afghanistan November 2015 Country Operations Business Plan November 2015 Afghanistan 2016 2018 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as

More information

Country Operations Business Plan. Bhutan Asian Development Bank. September 2017

Country Operations Business Plan. Bhutan Asian Development Bank. September 2017 Country Operations Business Plan September 2017 Bhutan 2018 2020 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. Asian Development Bank CURRENCY

More information

Country Operations Business Plan. Nepal August 2018

Country Operations Business Plan. Nepal August 2018 Country Operations Business Plan August 2018 Nepal 2019 2021 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 3 August

More information

Country Operations Business Plan. Papua New Guinea August 2016

Country Operations Business Plan. Papua New Guinea August 2016 Country Operations Business Plan August 2016 Papua New Guinea 2017 2019 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as

More information

Country Operations Business Plan. Timor-Leste March 2017

Country Operations Business Plan. Timor-Leste March 2017 Country Operations Business Plan March 2017 Timor-Leste 2017 2019 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS The currency

More information

Country Operations Business Plan. Fiji October 2016

Country Operations Business Plan. Fiji October 2016 1 Country Operations Business Plan October 2016 Fiji 2017 2019 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 29

More information

Country Operations Business Plan. Fiji September 2017

Country Operations Business Plan. Fiji September 2017 Country Operations Business Plan September 2017 Fiji 2018 2020 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 13

More information

Country Operations Business Plan: Maldives,

Country Operations Business Plan: Maldives, IN.309-16 19 August 2016 Country Operations Business Plan: Maldives, 2017 2019 Attached for information is a paper on the above subject. For Inquiries: M. Nakane, South Asia Department (Ext. 5346) Country

More information

Nauru Country Operations Business Plan. August 2015

Nauru Country Operations Business Plan. August 2015 Country Operations Business Plan August 2015 Nauru 2016 2018 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 1 July

More information

Country Operations Business Plan. Afghanistan November 2017

Country Operations Business Plan. Afghanistan November 2017 Country Operations Business Plan November 2017 Afghanistan 2018 2020 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. 1 CURRENCY EQUIVALENTS (as

More information

Country Operations Business Plan. Myanmar September 2015

Country Operations Business Plan. Myanmar September 2015 Country Operations Business Plan September 2015 Myanmar 2016 2018 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of

More information

Uzbekistan Country Operations Business Plan. Project Number: October 2017

Uzbekistan Country Operations Business Plan. Project Number: October 2017 1 Country Operations Business Plan Number: 26194 October 2017 Uzbekistan 2018 2020 This document is being disclosed to the public in accordance with s Public Communications Policy 2011. CURRENCY EQUIVALENTS

More information

Country Operations Business Plan. Cambodia September 2016

Country Operations Business Plan. Cambodia September 2016 Country Operations Business Plan September 2016 Cambodia 2017 2019 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of

More information

Country Operations Business Plan. Fiji December 2015

Country Operations Business Plan. Fiji December 2015 1 Country Operations Business Plan December 2015 Fiji 20162018 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. ADB COBP CPS GDP MOL OCR PDA CURRENCY

More information

Country Operations Business Plan. Maldives June 2018

Country Operations Business Plan. Maldives June 2018 Country Operations Business Plan June 2018 Maldives 2019 2021 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 2 May

More information

Country Operations Business Plan. Georgia September 2018

Country Operations Business Plan. Georgia September 2018 Country Operations Business Plan September 2018 Georgia 2019 2021 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of

More information

Country Operations Business Plan. Sri Lanka August 2018

Country Operations Business Plan. Sri Lanka August 2018 Country Operations Business Plan August 2018 Sri Lanka 2019 2021 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 9

More information

Country Operations Business Plan. Nepal September 2016

Country Operations Business Plan. Nepal September 2016 Country Operations Business Plan September 2016 Nepal 2017 2019 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 30

More information

Country Operations Business Plan. Kazakhstan September 2017

Country Operations Business Plan. Kazakhstan September 2017 Country Operations Business Plan September 2017 Kazakhstan 2018 2020 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as

More information

Country Operations Business Plan. Kazakhstan September 2018

Country Operations Business Plan. Kazakhstan September 2018 Country Operations Business Plan September 2018 Kazakhstan 2019 2021 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as

More information

Country Operations Business Plan. Nauru October 2016

Country Operations Business Plan. Nauru October 2016 Country Operations Business Plan October 2016 Nauru 2017 2019 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 7 September

More information

Country Operations Business Plan. Papua New Guinea July 2017

Country Operations Business Plan. Papua New Guinea July 2017 Country Operations Business Plan July 2017 Papua New Guinea 2018 2020 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as

More information

Country Operations Business Plan. September Nepal

Country Operations Business Plan. September Nepal Country Operations Business Plan September 2011 Nepal 2012 2014 CURRENCY EQUIVALENTS (as of 31 August 2011) Currency Unit Nepalese rupee/s (NRe/NRs) NRe1.00 = $0.014 $1.00 = NRs73.35 ABBREVIATIONS ADB

More information

Country Operations Business Plan. August Bangladesh

Country Operations Business Plan. August Bangladesh Country Operations Business Plan August 2007 Bangladesh 2008 2010 CURRENCY EQUIVALENTS (as of 5 August 2007) Currency Unit taka (Tk) Tk1.00 = $0.015 $1.00 = Tk68.5 ABBREVIATIONS ADB Asian Development Bank

More information

Country Operations Business Plan. May 2013 Number: Malaysia

Country Operations Business Plan. May 2013 Number: Malaysia Country Operations Business Plan May 2013 Number: 26194 Malaysia 20132014 CURRENCY EQUIVALENTS (as of 15 May 2013) Currency unit ringgit (RM) RM1.00 = $0.3342 $1.00 = RM2.9925 ABBREVIATIONS ADB AIF COBP

More information

Country Operations Business Plan. Afghanistan September 2018

Country Operations Business Plan. Afghanistan September 2018 Country Operations Business Plan September 2018 Afghanistan 2019 2021 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as

More information

Country Operations Business Plan. Philippines October 2018

Country Operations Business Plan. Philippines October 2018 Country Operations Business Plan October 2018 Philippines 2019 2021 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of

More information

People s Republic of Bangladesh: Updating the Road Master Plan

People s Republic of Bangladesh: Updating the Road Master Plan South Asia Subregional Economic Cooperation Dhaka Northwest Corridor Road Project, Phase 2 (RRP BAN 40540) Technical Assistance Report Project Number: 40540-016 Transaction Technical Assistance (TRTA)

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 42180-016 February 2017 Proposed Multitranche Financing Facility and Technical Assistance Grant People s Republic of

More information

Statement of the Asian Development Bank s Operations in 2017

Statement of the Asian Development Bank s Operations in 2017 February 208 Statement of the Asian Development Bank s Operations in 207 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 20. I. OVERVIEW OF OPERATIONS.

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 51360-002 Transaction Technical Assistance Facility (F-TRTA) April 2018 Turkmenistan: Preparing the Central Asia Regional Economic Cooperation Corridors 2, 3

More information

2015 Annual Portfolio Performance Report

2015 Annual Portfolio Performance Report April 2016 2015 Annual Portfolio Performance Report This is a redacted version of the document that excludes information that is subject to exceptions to disclosure set forth in ADB's Public Communications

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

ADB INDIA PORTFOLIO,

ADB INDIA PORTFOLIO, CAPE India, Supplementary Linked Document 1 ADB INDIA PORTFOLIO, 2007 2015 Table 1: Sovereign Loans Loan No. Project Name Amount ($ million) PCR (PVR) Agriculture, Natural Resources, and Rural Development

More information

Policy Paper. March Establishing the Project Design Facility

Policy Paper. March Establishing the Project Design Facility Policy Paper March 2011 Establishing the Project Design Facility ABBREVIATIONS ADB Asian Development Bank ADF Asian Development Fund COBP country operations business plan DMC developing member country

More information

Country Partnership Strategy. Bhutan

Country Partnership Strategy. Bhutan Country Partnership Strategy June 2014 Bhutan 2014 2018 Distribution of this document is restricted until it has been endorsed by the Board of Directors. Following such endorsement, ADB will disclose the

More information

India: Preparing for the Ara Canal Water Productivity Improvement Project

India: Preparing for the Ara Canal Water Productivity Improvement Project Technical Assistance Report Project Number: 52153-002 Transaction Technical Assistance (TRTA) June 2018 India: Preparing for the Ara Canal Water Productivity Improvement Project This document is being

More information

Republic of the Maldives: Preparing Business Strategy for Port Development

Republic of the Maldives: Preparing Business Strategy for Port Development Technical Assistance Report Project Number: 47283 Capacity Development Technical Assistance (CDTA) November 2013 Republic of the Maldives: Preparing Business Strategy for Port Development The views expressed

More information

Proposed Policy-Based Loans, Grants, and Technical Assistance Grant Pacific Disaster Resilience Program

Proposed Policy-Based Loans, Grants, and Technical Assistance Grant Pacific Disaster Resilience Program Concept Paper Project Number: 50028-001 July 2017 Proposed Policy-Based Loans, Grants, and Technical Assistance Grant Pacific Disaster Resilience Program This document is being disclosed to the public

More information

MFF - Bihar Urban Development Investment Program (Facility Concept)

MFF - Bihar Urban Development Investment Program (Facility Concept) India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount

More information

Establishment of the High-Level Technology Fund

Establishment of the High-Level Technology Fund April 2017 Establishment of the High-Level Technology Fund Distribution of this document is restricted until it has been approved by Management. Following such approval, ADB will disclose the document

More information

Establishment of the Leading Asia s Private Sector Infrastructure Fund

Establishment of the Leading Asia s Private Sector Infrastructure Fund March 2016 Establishment of the Leading Asia s Private Sector Infrastructure Fund This document is being disclosed to the public prior to Board consideration in accordance with ADB s Public Communications

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS South Asia Subregional Economic Cooperation Chittagong-Cox s Bazar Railway Project, Phase 1 (RRP BAN 46452-002) A. Introduction ECONOMIC AND FINANCIAL ANALYSIS 1. The proposed project will construct 102

More information

2016 Annual Portfolio Performance Report

2016 Annual Portfolio Performance Report May 2017 2016 Annual Portfolio Performance Report This is a redacted version of the document that excludes information that is subject to exceptions to disclosure set forth in ADB's Public Communications

More information

People s Republic of Bangladesh: Secondary Education Sector Investment Program (Tranche 3)

People s Republic of Bangladesh: Secondary Education Sector Investment Program (Tranche 3) Periodic Financing Request Report Project Number: 44213-018 MFF Number: 0074 March 2018 People s Republic of Bangladesh: Secondary Education Sector Investment Program (Tranche 3) Distribution of this document

More information

Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project

Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project Technical Assistance Report Project Number: 51107-001 Transaction Technical Assistance (TRTA) October 2017 Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project This

More information

Country Partnership Strategy. October Nepal

Country Partnership Strategy. October Nepal Country Partnership Strategy October 2013 Nepal 2013 2017 CURRENCY EQUIVALENTS (as of 4 October 2013) Currency unit Nepalese rupee/s (NRe/NRs) NRe1.00 = $0.01001 $1.00 = NRs99.15 ABBREVIATIONS ADB Asian

More information

Management s Discussion and Analysis and Annual Financial Statements

Management s Discussion and Analysis and Annual Financial Statements Management s Discussion and Analysis and Annual Financial Statements 31 December 2015 Asian Development Bank CONTENTS Management s Discussion and Analysis I. Overview 1 II. Combination of OCR and ADF

More information

Partnership Brief. Cofinancing with Spain

Partnership Brief. Cofinancing with Spain Partnership Brief Cofinancing with Spain Contents 3 Defining the Partnership 5 Project Portfolio 6 Highlights Boxes and Tables 4 Organizational Structure 7 Trust Funds 2011 Asian Development Bank All rights

More information

Periodic Financing Request Report. India: Railway Sector Investment Program (Tranche 3)

Periodic Financing Request Report. India: Railway Sector Investment Program (Tranche 3) Periodic Financing Request Report Project Number: 36330-043 MFF Number: 0060 November 2017 India: Railway Sector Investment Program (Tranche 3) Distribution of this document is restricted until it has

More information

Periodic Financing Request Report. People s Republic of Bangladesh: Secondary Education Sector Investment Program Tranche 2

Periodic Financing Request Report. People s Republic of Bangladesh: Secondary Education Sector Investment Program Tranche 2 Periodic Financing Request Report Project Number: 44213-017 November 2015 People s Republic of Bangladesh: Secondary Education Sector Investment Program Tranche 2 This document is being disclosed to the

More information

2014 Annual Portfolio Performance Report

2014 Annual Portfolio Performance Report April 2015 2014 Annual Portfolio Performance Report This is a redacted version of the document that excludes information that is subject to exceptions to disclosure set forth in ADB's Public Communications

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 40540-016 September 2017 Proposed Multitranche Financing Facility and Technical Assistance Grant People s Republic of

More information

Additional Cofinancing

Additional Cofinancing Additional Cofinancing Sri Lanka Sri Lanka Project Number: 45148 Loan Number: 3029/3030-SRI May 2014 Proposed Administration of Loan Democratic Socialist Republic of Sri Lanka: Greater Colombo Water and

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 46168-001 September 2014 Proposed Loans and Technical Assistance Grant People s Republic of Bangladesh: South Asia Subregional

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK BUDGET OF THE ASIAN DEVELOPMENT BANK FOR 2017 NOVEMBER 2016 ASIAN DEVELOPMENT BANK November 2016 Budget of the Asian Development Bank for 2017 Distribution of this document is restricted until it has been

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 47243-004 October 2018 Proposed Loans and Technical Assistance Grant People s Republic of Bangladesh: Rural Connectivity

More information

Interim Country Partnership Strategy. Maldives October 2014

Interim Country Partnership Strategy. Maldives October 2014 Interim Country Partnership Strategy October 2014 Maldives 2014 2015 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as

More information

Proposed Programmatic Approach and Policy- Based Loan for Subprogram 1 Republic of Fiji: Sustained Private Sector-Led Growth Reform Program

Proposed Programmatic Approach and Policy- Based Loan for Subprogram 1 Republic of Fiji: Sustained Private Sector-Led Growth Reform Program Concept Paper Project Number: 48490-002 November 2017 Proposed Programmatic Approach and Policy- Based Loan for Subprogram 1 Republic of Fiji: Sustained Private Sector-Led Growth Reform Program This document

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 46452-002 September 2016 Proposed Multitranche Financing Facility and Technical Assistance Grant People s Republic of

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program)

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program) PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program) 1. A project preparatory technical assistance (PPTA) for $700,000 in grant funds is

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 49107-003 September 2018 Proposed Multitranche Financing Facility, Technical Assistance Grant, and Administration of

More information

Georgia: Preparing the Second Domestic Resource Mobilization Program

Georgia: Preparing the Second Domestic Resource Mobilization Program Technical Assistance Report Project Number: 52161-002 Transaction Technical Assistance (TRTA) September 2018 Georgia: Preparing the Second Domestic Resource Mobilization Program This document is being

More information

Islamic Republic of Pakistan: Update on Energy Sector Plan

Islamic Republic of Pakistan: Update on Energy Sector Plan Technical Assistance Report Project Number: 50081-001 Knowledge and Support Technical Assistance (KSTA) August 2017 Islamic Republic of Pakistan: Update on Energy Sector Plan This The views document expressed

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

RCI as Driver of Inclusive Growth

RCI as Driver of Inclusive Growth RCI as Driver of Inclusive Growth 19 July 2013 Alfredo Perdiguero Principal Economist Thailand Resident Mission Southeast Asia Department Asian Development Bank Disclaimer: In preparing any country program

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Country Partnership Strategy: Viet Nam, 2012 2015 SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Investment in the transport sector in Viet

More information

Lao People s Democratic Republic: Preparing the Northern Cross-Border Power Trade and Distribution Project

Lao People s Democratic Republic: Preparing the Northern Cross-Border Power Trade and Distribution Project Appendix 3 11 Technical Assistance Report Project Number: 51329-002 Transaction Technical Assistance (TRTA) November 2017 Lao People s Democratic Republic: Preparing the Northern Cross-Border Power Trade

More information

Policy Paper. June Mainstreaming the Multitranche Financing Facility

Policy Paper. June Mainstreaming the Multitranche Financing Facility Policy Paper June 2008 Mainstreaming the Multitranche Financing Facility ABBREVIATIONS ADB Asian Development Bank ADF Asian Development Fund CPS country partnership strategy DMC developing member country

More information

Finance Sector Group. Lotte Schou-Zibell Sustainable Development and Climate Change Department ADB 27 March 2019

Finance Sector Group. Lotte Schou-Zibell Sustainable Development and Climate Change Department ADB 27 March 2019 Finance Sector Group Lotte Schou-Zibell Sustainable Development and Climate Change Department ADB 27 March 2019 Overview Finance sector support to Strategy 2030 and the Sustainable Development Goals Finance

More information

Georgia Country Partnership Strategy. December 2014

Georgia Country Partnership Strategy. December 2014 Country Partnership Strategy December 2014 Georgia 2014 2018 Distribution of this document is restricted until it has been endorsed by the Board of Directors. Following such endorsement, ADB will disclose

More information

Multitranche Financing Facility Annual Report 2017

Multitranche Financing Facility Annual Report 2017 May 2018 Multitranche Financing Facility Annual Report 2017 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. ABBREVIATIONS ADB Asian Development

More information

Periodic Financing Request Report. India: Assam Power Sector Investment Program (Tranche 2)

Periodic Financing Request Report. India: Assam Power Sector Investment Program (Tranche 2) Periodic Financing Request Report Project Number: 47101-003 MFF Number: 0083 November 2015 India: Assam Power Sector Investment Program (Tranche 2) This document is being disclosed to the public in accordance

More information

Periodic Financing Request Report. People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4

Periodic Financing Request Report. People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4 Periodic Financing Request Report Project Number: 43332 December 2013 People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4 CURRENCY EQUIVALENTS

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 45253-002 October 2015 Proposed Policy-Based Loans and Administration of Technical Assistance Grant People s Republic

More information

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project Technical Assistance Report Project Number: 51039-001 Transaction Technical Assistance (TRTA) September 2017 Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 49419 March 2016 Proposed Multitranche Financing Facility Punjab National Bank India: Solar Rooftop Investment Program

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 50138-001 September 2017 Proposed Loan Walkers Colombo Shipyard (Private) Limited Shipyard Rehabilitation and Infrastructure

More information

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project Project Design Advance Project Number: 47279-003 September 2016 Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project This document is being disclosed to the public in accordance with ADB's Public

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Sri Lanka Project Number: 42378 November 2012 Proposed Multitranche Financing Facility and Administration of Grant People s Republic

More information

People s Republic of China: Preparing Yangtze River Economic Belt Projects

People s Republic of China: Preparing Yangtze River Economic Belt Projects Technical Assistance Report Project Number: 50343-001 Transaction Technical Assistance Facility (F-TRTA) April 2017 People s Republic of China: Preparing Yangtze River Economic Belt Projects Cofinanced

More information

Cambodia: Water Resources Management Sector Development Program (Second Tranche)

Cambodia: Water Resources Management Sector Development Program (Second Tranche) Progress Report on Tranche Release Project Number: 38558-013 Loan Number: 2673 April 2017 Cambodia: Water Resources Management Sector Development Program (Second Tranche) This consultant s document report

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR:NEP 37266 TECHNICAL ASSISTANCE (Financed by the Japan Special Fund) TO THE KINGDOM OF NEPAL FOR PREPARING THE TRANSPORT CONNECTIVITY SECTOR PROJECT June 2004 CURRENCY EQUIVALENTS

More information

Country Operations Business Plan. October Cambodia

Country Operations Business Plan. October Cambodia Country Operations Business Plan October 2009 Cambodia 2009 2012 CURRENCY EQUIVALENTS (as of 14 August 2009) Currency Unit riel/s (KR) $1.00 = KR4,136 ABBREVIATIONS ADB Asian Development Bank ADF Asian

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section H5/BP Page 1 of 4 BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction ADDITIONAL FINANCING 1. The

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 47926 April 2014 Proposed Equity Investment ReNew Power Ventures Private Limited ReNew Power Investment Project (India)

More information

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN)

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN) Second Jharkhand State Road Project (RRP IND 49125) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT (NON-URBAN) A. Sector Performance, Problems, and Opportunities 1. State context. The state of Jharkhand was

More information

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT Sector Performance, Problems, and Opportunities Sector Road Map Country Partnership Strategy: Fiji, 2014 2018 SECTOR ASSESSMENT (SUMMARY): PUBLIC SECTOR MANAGEMENT 1 1. Sector Performance, Problems, and Opportunities 1. The government is responsible

More information

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project

Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project Technical Assistance Project Number: 50098 Project Preparatory Technical Assistance (PPTA) November 2016 Socialist Republic of Viet Nam: GMS Corridor Connectivity Enhancement Project This document is being

More information

Periodic Financing Request Report. India: Kolkata Environmental Improvement Investment Program (Tranche 2)

Periodic Financing Request Report. India: Kolkata Environmental Improvement Investment Program (Tranche 2) Periodic Financing Request Report Project Number: 42266-025 MFF Number: 0075 August 2016 India: Kolkata Environmental Improvement Investment Program (Tranche 2) Distribution of this document is restricted

More information

India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects

India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects Technical Assistance Report Project Number: 51308-002 Transaction Technical Assistance Facility (F-TRTA) December 2017 India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects Distribution

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Sri Lanka Project Number: 47083 September 2013 Proposed Multitranche Financing Facility India: Accelerating Infrastructure Investment

More information

India: Supporting the Second West Bengal Development Finance Program

India: Supporting the Second West Bengal Development Finance Program Second West Bengal Development Finance Program (RRP IND 49209) Technical Assistance Report Project Number: 49209-001 Transaction Technical Assistance (TRTA) August 2017 India: Supporting the Second West

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Lanka Project Number: 46265 September 2013 Proposed Administration of Grant Socialist Republic of Viet Nam: Energy Efficiency for Ho

More information

Financing Climate Change Resilient Urban Infrastructure

Financing Climate Change Resilient Urban Infrastructure From Planning to Investment Defining Bankable projects Financing Climate Change Resilient Urban Infrastructure Paul Schuttenbelt South Asia Coordinator, Cities Development Initiative for Asia (CDIA), January

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Railway Rolling Stock Project (RRP BAN 49094) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The project involves procurement of 214 meter gauge (MG) passenger carriages, 50 broad gauge (BG) passenger

More information

Unlocking Investment in Transport Infrastructure: The role of ADB

Unlocking Investment in Transport Infrastructure: The role of ADB Unlocking Investment in Transport Infrastructure: The role of ADB Asian Highway Investment Forum 8 October, 2013 Hideaki Iwasaki Principal Infrastructure Specialist Asian Development Bank Asian Development

More information

FINANCIAL ANALYSIS. A. Background

FINANCIAL ANALYSIS. A. Background SASEC Second Bangladesh India Electrical Grid Interconnection Project (RRP BAN 44192) A. Background FINANCIAL ANALYSIS 1. The South Asia Subregional Economic Cooperation (SASEC) Second Bangladesh India

More information

Tuvalu: Outer Island Maritime Infrastructure Project

Tuvalu: Outer Island Maritime Infrastructure Project Project Design Advance Project Number: 48484-003 November 2015 Tuvalu: Outer Island Maritime Infrastructure Project This document is being disclosed to the public in accordance with ADB s Public Communications

More information