Additional Cofinancing

Size: px
Start display at page:

Download "Additional Cofinancing"

Transcription

1 Additional Cofinancing Sri Lanka Sri Lanka Project Number: Loan Number: 3029/3030-SRI May 2014 Proposed Administration of Loan Democratic Socialist Republic of Sri Lanka: Greater Colombo Water and Wastewater Management Improvement Investment Program: Project 2 Distribution of this document is restricted until it has been approved by the Board of Directors. Following such approval, ADB will disclose the document to the public in accordance with ADB's Public Communications Policy 2011.

2 CURRENCY EQUIVALENTS (as of 1 May 2014) Currency Unit Sri Lanka rupee/s (SLRe/SLRs) SLRe1.00 = $ $1.00 = SLRs ABBREVIATIONS ADB Asian Development Bank AFD Agence Française de Développement MFF multitranche financing facility NRW nonrevenue water TEC towns east of Colombo NOTES (i) (ii) The fiscal year (FY) of the Government of Sri Lanka ends on December 31. FY before a calendar year denotes the year in which the fiscal year ends, e.g. FY2008 ends on 31 December In this report, "$" refers to US dollars.

3 Vice-President W. Zhang, Operations 1 Director General J. Miranda, South Asia Department (SARD) Director Y. Fei, Urban Development and Water Division, SARD Team leader Team members Peer reviewer M. Fan, Senior Urban Development Specialist, SARD P. Cawrse, Urban Development Specialist, SARD K. Dahanayake, Project Officer, SARD M. de Mesa David, Operations Assistant, SARD K. Emzita, Principal Counsel, Office of the General Counsel N. Gunasekera, Social Development and Gender Specialist, SARD N. Pokhrel, Urban Development Specialist, SARD I. Setyawati, Safeguards Specialist, SARD J. Zheng, Urban Development Specialist, SARD H. Jenny, Principal Urban Development Specialist, Southeast Asia Department In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

4 CONTENTS PROJECT AT A GLANCE Page I. THE ONGOING PROJECT 1 II. THE ADDITIONAL FINANCING 1 A. Rationale 1 B. Impact, Outcome, and Outputs 2 C. Cofinancing 2 III. THE PRESIDENT'S RECOMMENDATION 4 APPENDIX 1. Revised Design and Monitoring Framework 5 SUPPLEMENTARY APPENDIXES (available upon request) 1. Contribution to the ADB Results Framework 2. Financial Analysis 3. Economic Analysis

5 PROJECT AT A GLANCE Project Name Greater Colombo Water and Wastewater Management Tranche No. 2 Improvement Investment Program Project No Country Sri Lanka Department SARD Date of Receipt by ADB of PFR 3 June 2013 Division SAUW Project Data Sheet Tranche Sector Classification Sector: Water and Other Municipal Infrastructure and Services Subsectors: Water supply and sanitation Tranche Thematic Classification Theme: Social development, Environmental sustainability, Governance, Capacity development Subthemes: Human development, Urban environmental improvement, Public administration (national, decentralized, and regional), Institutional development Climate Change Impact Adaptation low Mitigation low Gender Mainstreaming Targeting Classification Gender equity theme Effective gender mainstreaming Some gender benefits No gender elements General Intervention Targeted Intervention (i) Geographic dimensions of inclusive growth (ii) Millennium Development Goals (iii) Income poverty at household level MDG7 Location Impact Rural Low National Medium Urban High Regional Tranche Risk Categorization Low Risk Complex (iii) Indigenous peoples C Not required Weblink: Financing Requested from ADB Modality Source Amount ($ million) MFF-Tranche OCR 70.0 MFF-Tranche ADF 18.0 Total: 88.0 Financier Category Amount ($million) Administration Type Agence Française de Official-Loan Partial Développement Counterpart Financing Government 30.0 Safeguard Categorization Category Required Document Disclosure Date (i) Environment B Initial Environmental Examinations 2 Jul 2013 Weblink: (ii) Involuntary resettlement B Resettlement Plans 3 Jul 2013 Weblink: Aid Effectiveness Parallel project implementation unit Program-based approach CPS/COBP

6 I. THE ONGOING PROJECT 1. The Board of Directors of the Asian Development Bank (ADB) approved the multitranche financing facility (MFF) for the Colombo Water and Wastewater Management Improvement Investment Program on 25 October The investment program will finance a portion of government initiatives to improve water and wastewater management services in Greater Colombo. 2 It will rehabilitate and expand water supply and wastewater management infrastructure. In order for investments in physical infrastructure to be effective and sustainable, the investment program will assist the government in introducing institutional reforms in the water and wastewater subsectors, particularly in Greater Colombo The Investment program is estimated to cost $400 million. Up to $300 million equivalent, or 75% of the total cost, will be provided through the MFF from ADB s Special Funds resources and ordinary capital resources. The MFF is sequenced as follows: (i) tranche 1: $84 million for project 1 in 2012; (ii) tranche 2: $88 million for project 2 in 2013; (iii) tranche 3: $90 million for project 3 in 2015; and (iv) tranche 4: $38 million for project 4 in Projects 1 and 2 will focus on reducing nonrevenue water (NRW) and improving water service efficiency in Colombo city. 4 Project 1 was approved by the President on 22 November 2012, and the loan for project 1 became effective on 25 September Project 2 was approved by the President on 26 September The implementation of project 1 is on track. The loan agreement for project 2 will be signed soon. II. THE ADDITIONAL FINANCING A. Rationale 3. The government has requested the scope of work under project 2 be expanded from rehabilitation of the water distribution system in Colombo city to include expanding the water supply to TEC and rehabilitating the pumping station in Ambathale. Agence Française de Développement (AFD) cofinancing will be used for this expansion. The MFF modality was selected to allow phased implementation and funding of individual projects when they are ready, subject to eligibility and readiness of subprojects included in the investment program. The MFF will offer the opportunity for cofinancing and private sector participation. The proposed additional cofinancing from AFD is mobilized in accordance with the approved MFF. The AFD cofinancing is proposed to finance two subprojects: (i) expansion of water supply coverage in towns east of Colombo (TEC), using water saved from NRW reductions under projects 1 and 2 in Colombo city; and (ii) reorganization of the current pumping and transmission arrangements of Colombo city to save energy in the 1 ADB Report and Recommendation of the President to the Board of Directors: Proposed Multitranche Financing Facility to the Democratic Socialist Republic of Sri Lanka for the Greater Colombo Water and Wastewater Management Improvement Investment Program. Manila. 2 Greater Colombo comprises 15 local authorities: five municipal councils (Colombo, Dehiwela Mount Lavinia, and Sri Jayawardenepura Kotte, Kaduwela, and Moratuwa), five urban councils, and five pradeshiya sabhas (smallest political units in peri-urban or rural areas). It has a population of more than 838,000 and a floating (transient) population of more than 500, ADB Technical Assistance to Sri Lanka for Colombo Water Supply Servie Improvement Project. Manila. Supplementary TA was provided in Nonrevenue water (NRW) is the gap between the amount of water put into the distribution system and the amount of water for which customers are actually billed.

7 2 water supply system. AFD cofinancing will further strengthen the impact and outcome of proved project 2 under the MFF. 4. The proposed AFD-cofinanced subprojects are part of the government s investment plan that envisions investments of $1,500 million for water and sanitation sector in Greater Colombo in AFD is a key development partner in the country and in the water sector in The AFD cofinancing is consistent with the priority assigned by ADB and the government to the water supply and other municipal infrastructure and services sector, as identified in the country partnership strategy. 5 B. Impact, Outcome, and Outputs 6. The impact of the investment program will be an improved urban environment and quality of life for the residents of Greater Colombo. The outcome of the investment program will be improved water supply and wastewater service and management in Greater Colombo. 7. The impact of project 2 will be improved water supply and wastewater service and management in Greater Colombo. 6 The expected outcome of project 2 will be improved system efficiency and financial sustainability of water supply and wastewater services in Greater Colombo. With AFD cofinancing, the impact and outcome of the project 2 remains the same with approved project 2, but two additional indicators will be used to measure the outcome of the intervention and monitor project outcome: (i) the number of households that receive a continuous water supply in TEC, and (ii) energy saving and cost reductions in water production through Ambathale pumping station refurbishments. 8. With AFD cofinancing, there are two additional outputs under physical aspects: (i) expansion of water supply coverage in TEC, and (ii) reorganization of the current pumping and transmission arrangements in Ambathale. Therefore, two indicators are added under output 1. The AFD cofinancing is to be implemented with an additional design and supervision consultant to strengthen the project implementation. The other output indicators remain the same. C. Cofinancing 9. AFD cofinancing in an amount equivalent to $101 million will be provided as a loan and will be partially administered by ADB (ADB will administer procurement and safeguards). Due to the complexity involved in currency swap management at AFD for loans dominated in US dollars, ADB will not administer AFD loan disbursement. All procurement, social, environmental, and gender safeguards will follow ADB requirements. 10. The loan agreement for the AFD loan will be between AFD and the government. The AFD loan in an amount equivalent to $101 million; it will have a 25-year term, including a grace period of 7 years, an annual interest rate equivalent to the London interbank offered rate to Euro interbank offered 6-month rate plus 1.26%, an engagement fee of 0.5% per annum to be paid on the engaged but undisbursed balance, a onetime appraisal fee of 5 ADB Country Partnership Strategy: Sri Lanka, Manila. 6 The project 2 design and monitoring framework is in Appendix 1.

8 3 0.25% on the full loan amount, and such other terms and conditions set forth in the loan agreement between AFD and the government. The coordination and cofinancing arrangements between ADB and AFD will be detailed in a cofinancing agreement. The revised investment and financing plans for project 2 are in Tables 1 and 2. Table 1: Revised Proposed Project 2 Investment Plan ($ million) Current Amount a, b Additional Financing Item Total A. Base Cost 1. Water supply and NRW rehabilitation Wastewater investments preparation Institutional reform and capacity building Project implementation support Subtotal (A) B. Taxes and Duties c C. Contingencies d D. Financing Charges During Implementation e Total (A+B+C+D) NRW = nonrevenue water a Exchange rate of $1.00 = SLRs is used. b c d e In March 2013 prices. Taxes and duties computed at 32% for imported goods and at 12% for domestic goods and services. Taxes and duties are the responsibility of the government. Physical contingencies computed at 10% for civil works and equipment; price contingency computed at 6% for domestic goods and 2% for imported goods, assuming US dollar Sri Lanka rupee purchasing power parity for foreign exchange forecasting. The Asian Development Bank (ADB) share includes interest and commitment charges. Interest during construction for ADB loan(s) is computed at 1.6% per year based on the London interbank-offered rate 5- year fixed swap rate plus ADB s contractual spread and a maturity premium for loans from ordinary capital resources, and 2.0% per year for loans from Special Funds resources. Commitment charges for ADB loans from ordinary capital resources are computed at 0.15% per year. Source: Asian Development Bank estimates. Table 2: Revised Financing Plan for Project 2 Current Additional Financing Total Amount Share of Amount Share of Amount Share of Source ($ million) Total (%) ($ million) Total (%) ($ million) Total (%) A. Asian Development Bank Ordinary Capital Resources (loan) Asia Development Fund (loan) B. Agence Française de Développement (loan) C. Government of Sri Lanka Total Source: Asian Development Bank estimates. 11. During the preparation of project 2, the project preparation technical assistance consultant prepared two feasibility studies for the TEC and Ambathale subprojects to be

9 4 cofinanced by AFD. Technical, financial and economic aspects are sound. The consultant also conducted safeguard due diligence. The resettlement plans and initial environmental examinations for the TEC and Ambathale subprojects for AFD cofinancing were prepared in accordance with ADB Safeguard Policy Statement (2009) requirements; both the resettlement plans and initial environmental examinations submitted by the government were disclosed in accordance with ADB Safeguard Policy Statement requirements. 12. The proposed AFD cofinancing is classified as effective gender mainstreaming. The gender action plan for project 2 has included the activities for the proposed AFD cofinancing. The consultation and participation plan outlines specific outreach activities to raise awareness and ensure the meaningful participation of communities and stakeholders in the AFD cofinancing (TEC) area. A nongovernment organization will be recruited and will provide the guidance to (i) form water user groups; (ii) assist in implementing the gender action and consultation and participation plans; and (iii) implement a water, sanitation, and hygiene awareness campaign in the AFD cofinancing TEC area. ADB s Anticorruption Policy (1998, as amended to date) was explained to and discussed with the government and the implementing agencies. The specific policy requirements and supplementary measures are described in the revised project administration manual. 13. The implementation arrangements for the proposed AFD cofinancing will follow the implementation arrangements under projects 1 and 2, as set out in the MFF facility administration manual. Investments in water supply under the proposed project 2, including monitoring and evaluation, will be implemented by the National Water Supply and Drainage Board. The existing Project Management Unit and project director will be responsible to implement the AFD cofinancing. Two additional Project Implementation Units will be formed under the Project Management Unit, with two deputy project directors to implement the two AFD cofinancing subprojects. The services of an additional design and supervision consultant, selected under project 2, will be used for the proposed AFD cofinancing. The implementation period runs concurrently with project 2. III. THE PRESIDENT'S RECOMMENDATION 14. The President recommends that the Board approve ADB administering a loan not exceeding the equivalent of $101,000,000 to the Democratic Socialist Republic of Sri Lanka for the additional financing of the Greater Colombo Water and Wastewater Management Improvement Investment Program Project 2, to be provided by the Agence Française de Développement.

10 Appendix 1 5 REVISED DESIGN AND MONITORING FRAMEWORK Design Summary Impact Current project Improved water supply and wastewater service and management in Greater Colombo Performance Targets and Indicators with Baselines Daily water supply increased in low-pressure area a in Colombo (baseline: 5 hours in 2012; target: 24 hours by 2020) Citywide NRW in Colombo reduced (baseline: 49% citywide and 60% in critical area in 2012; target: 20% in Colombo and 18% in critical area by 2020) Data Sources and Reporting Mechanisms (Overall Project) NWSDB water balance audit Assumptions and Risks (Overall Project) Assumption Ongoing and planned water supply projects, financed by JICA and NWSDB successfully implemented Overall project Coverage of sewer network increased including all BPL households (FHH among them) (baseline: 80% in 2012; target: 100% in Colombo in 2020) CMC annual reports Outcome Current project Improved system efficiency and financial sustainability of water supply and wastewater services in Greater Colombo Overall project By the end of 2018: a. NRW in the southern part of Colombo city reduced to 20% (baseline: 49% in 2013) b. 44,500households (including all BPL households and FHH) benefitted with 24/7 water supply in the southern part of Colombo city (baseline 5 hours in 2013) By end 2018: a. NWSDB water balance audit Risk Tariff increase as agreed by the government is delayed b. c. 33,000 households benefitted with 24/7 water supply in TEC b (baseline water supply 5 6 hours in CBO areas in 2013) d. 25% energy saving and cost reductions in water production through Ambathale pumping station refurbishments b (baseline: annual energy costs $7.05 million in 2013)

11 6 Appendix 1 Design Summary Outputs Output 1 Current project Rehabilitated and expanded water supply system, and reduced NRW in Greater Colombo Performance Targets and Indicators with Baselines By the end of 2018: a. 242 km of water supply pipelines and 15,000 water meters replaced in the southern part of Colombo city b. Minimum of 15 DMAs established in the southern part Colombo city (baseline zero DMAs in 2013) c. Additional 150 water outlets provided in unserved settlements, metered and WUSGs formed (target: 50% of representatives in executive committees are women) Data Sources and Reporting Mechanisms (Overall Project) PPMS PPMS NWSDB and NGO annual reports Assumptions and Risks (Overall Project) For all outputs: Assumption Key project officials remain in office during the project period Risk Prices of pipes and construction materials increase beyond projections. Overall project By the end of 2018: a. b. c. d. 360 km of distribution network, 8 km of transmission mains and 18,000 m 3 capacity storage reservoir constructed for TEC water supply system improvement b AFD Project progress reports Output 2 Current project Completed designs and improved preparedness for wastewater investments e. Four new pumps installed, 24 existing pumps replaced and/or refurbished, facilities automated and improved at Ambathale b Detailed design and bid documents for investments in wastewater management under projects 3 and 4 approved AFD Project progress reports DSIDC and CMC reports Overall project Output 3 Current project Strengthened institutional structure and capacity of service providers Colombo city water supply operations decentralized to RSC- WC of NWSDB GIS-based asset management system for Colombo city established and operated by RSC- WC PPMS

12 Appendix 1 7 Design Summary Performance Targets and Indicators with Baselines Two NRW management offices established and functional, and 6 active-leakage-control (ALC) teams fully equipped and operational Data Sources and Reporting Mechanisms (Overall Project) Assumptions and Risks (Overall Project) Training and capability building provided to 1000 NWSDB and CMC staff (target: at least 25% of staff are female professionals) Awareness of water tariff among citizens increased by 20% before and after project 2 emphasizing shared responsibility of men and women in water management (target: 50% of participants in FGDs are women) Survey conducted by the project consultants WASH program implemented in 229 underserved settlements with 16,372 households(target: 50% of participants are women) NGO progress reports Volumetric sewerage tariff approved for CMC CMC annual reports Overall project Output 4 Current project Project 2 successfully managed and implemented Project 2 completed on time and within budget, and rated successful in ADB project success ratings; ADB PPR Overall project Activities with Milestones (Overall Project) 1. Rehabilitated and expanded water supply system, and reduced NRW, in Colombo city 1.1. Obtain all environmental, statutory, and utilities clearances by Q Issue tender documents for priority rehabilitation works by Q Provide advisory services on managing NRW reduction, construction management and supervision under the project by Q by MASC (changed) 1.4. Complete procurement of civil works contract by Q (changed) 1.5. Provide the NRW teams with vehicles, tools, equipment, and training, and mobilize the teams for active leakage control by Q Establish district metered areas by Q Replace or upgrade all service connections and meters by Rehabilitate plumbing systems in condominium housing schemes by Q Provide consultant service for design and supervision consultant by Q Inputs ADB $88.00 million (current) Co-financier AFD $ million (additional) Government $30.00 million (current) $36.00 million (additional) $66.00 million (overall)

13 8 Appendix 1 Activities with Milestones (Overall Project) (added) Complete procurement of civil works contract for TEC by Q (added) Complete procurement of pump station contract for Ambathale by Q (added) Inputs 2. Completed designs and improved preparedness for wastewater investments 2.1. Issue tender documents for DSIDC by Q (changed) 2.2. Sign contract for DSIDC with consultant by Q (changed) 2.3. Conduct condition assessment survey and sewer cleaning of 125 km of the sewer network in Colombo City by Q () 3. Strengthened institutional structure and capacity of service providers 3.1. Provide training equipment by Q Renovate and modernize the training facilities by Q Institutionalize reforms in RSC-WC by Q Complete training of NWSDB staff in NRW reduction by Q Complete training of water user groups in meter reading and O&M by Establish and calibrate network model for Colombo sewerage by Q Establish separate wastewater cost center in CMC by Q Approve sustainable tariff system for CMC, together with formulation of implementation strategy/mechanism to include legal and institutional provisions, by Q Approve and start the awareness and media campaign, including TV and radio program, focus group discussion designs by Q Update GIS network maps for Colombo city by Q Project 2 successfully managed and implemented 4.1. Appoint PMU and core counterpart staff for project 2 by Q4, 2013 (25 women) 4.2. Mobilize core counterpart staff required for project 2 by Q ADB = Asian Development Bank, AFD = Agence Française de Développement, BPL= below poverty line, CEA = Central Environmental Authority, CMC = Colombo Municipal Council, DMA = district meter area, DSIDC = design, supervision and institutional development consultants, FGD = focus group discussion, GIS = geographic information system, HHW = households headed by women, km = kilometer, JICA= Japan International Cooperation Agency, m 3 = cubic meter, MASC = management advisory and supervision consultant, MOFP = Ministry of Finance and Planning, NGO = nongovernment organization, NRW = nonrevenue water, NWSDB = National Water Supply and Drainage Board, O&M = operation and maintenance, PMU = project management unit, PPMS = project performance management system, PPR = Project Performance Report, Q = quarter, RSC-WC = Western Central Regional Support Center, TEC = towns east of Colombo, WASH = water and sanitation and hygiene, WUSG = water use and sanitation group. a Low-pressure area is about 12 square kilometers and refers to Kotahena, Slave Island, Pamankada, Havelock Town, Mattakuliya, Borella, and Hulfsdorf. b In parallel with Periodic Financing Report PFR 2, the government is seeking contractual cofinancing from Agence Francaise de Developpement in the amount equivalent to $101 million to assist the government in achieving these outcomes. Source: Asian Development Bank.

FRAMEWORK FINANCING AGREEMENT (SRI: Colombo Water and Wastewater Management Improvement Investment Program)

FRAMEWORK FINANCING AGREEMENT (SRI: Colombo Water and Wastewater Management Improvement Investment Program) FRAMEWORK FINANCING AGREEMENT (SRI: Colombo Water and Wastewater Management Improvement Investment Program) Parties MFF Investment Program This Framework Financing Agreement (FFA) dated 12 September 2012

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Lanka Project Number: 46265 September 2013 Proposed Administration of Grant Socialist Republic of Viet Nam: Energy Efficiency for Ho

More information

Periodic Financing Request Report. India: Kolkata Environmental Improvement Investment Program (Tranche 2)

Periodic Financing Request Report. India: Kolkata Environmental Improvement Investment Program (Tranche 2) Periodic Financing Request Report Project Number: 42266-025 MFF Number: 0075 August 2016 India: Kolkata Environmental Improvement Investment Program (Tranche 2) Distribution of this document is restricted

More information

Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project

Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project Technical Assistance Report Project Number: 51107-001 Transaction Technical Assistance (TRTA) October 2017 Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project This

More information

Republic of Azerbaijan: Water Supply and Sanitation Investment Program Tranche 4

Republic of Azerbaijan: Water Supply and Sanitation Investment Program Tranche 4 Periodic Financing Request Report Project Number: 42408-044 MFF Number: 0032 July 2016 Republic of Azerbaijan: Water Supply and Sanitation Investment Program Tranche 4 Distribution of this document is

More information

MFF - Bihar Urban Development Investment Program (Facility Concept)

MFF - Bihar Urban Development Investment Program (Facility Concept) India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 42266 September 2013 Proposed Multitranche Financing Facility India: Kolkata Environmental Improvement Investment Program

More information

Republic of the Maldives: Preparing Business Strategy for Port Development

Republic of the Maldives: Preparing Business Strategy for Port Development Technical Assistance Report Project Number: 47283 Capacity Development Technical Assistance (CDTA) November 2013 Republic of the Maldives: Preparing Business Strategy for Port Development The views expressed

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Sri Lanka Project Number: 42378 November 2012 Proposed Multitranche Financing Facility and Administration of Grant People s Republic

More information

Periodic Financing Request Report. People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4

Periodic Financing Request Report. People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4 Periodic Financing Request Report Project Number: 43332 December 2013 People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4 CURRENCY EQUIVALENTS

More information

Secondary Towns and Rural Community Based Water Supply and Sanitation Project Loan No SRI (SF) LOAN COVENANTS COMPLIANCE AS AT 31 March 2011

Secondary Towns and Rural Community Based Water Supply and Sanitation Project Loan No SRI (SF) LOAN COVENANTS COMPLIANCE AS AT 31 March 2011 Secondary Towns and Rural Community Based Water Supply and Sanitation Project Loan No. 1993 SRI (SF) LOAN COVENANTS COMPLIANCE AS AT 31 March 2011 Reference in Loan Agreement paras 2 and 3 Covenant A.

More information

Periodic Financing Request Report. India: Railway Sector Investment Program (Tranche 3)

Periodic Financing Request Report. India: Railway Sector Investment Program (Tranche 3) Periodic Financing Request Report Project Number: 36330-043 MFF Number: 0060 November 2017 India: Railway Sector Investment Program (Tranche 3) Distribution of this document is restricted until it has

More information

Validation Report. India: North Karnataka Urban Sector Investment Program, Tranche 1. Independent Evaluation Department

Validation Report. India: North Karnataka Urban Sector Investment Program, Tranche 1. Independent Evaluation Department Validation Report Reference Number: PVR-451 Project Number: 38254-033 Loan Number: 2312 August 2016 India: North Karnataka Urban Sector Investment Program, Tranche 1 Independent Evaluation Department ABBREVIATIONS

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 50138-001 September 2017 Proposed Loan Walkers Colombo Shipyard (Private) Limited Shipyard Rehabilitation and Infrastructure

More information

Periodic Financing Request Report. India: Karnataka Integrated Urban Water Management Investment Program (Tranche 2)

Periodic Financing Request Report. India: Karnataka Integrated Urban Water Management Investment Program (Tranche 2) Periodic Financing Request Report Project Number: 43253-027 MFF Number: 0080-IND October 2018 India: Karnataka Integrated Urban Water Management Investment Program (Tranche 2) Distribution of this document

More information

Report and Recommendation of the President to the Board of Directors. Proposed Loan Republic of Uzbekistan: Solid Waste Management Improvement Project

Report and Recommendation of the President to the Board of Directors. Proposed Loan Republic of Uzbekistan: Solid Waste Management Improvement Project Report and Recommendation of the President to the Board of Directors Project Number: 45366 October 2013 Proposed Loan Republic of Uzbekistan: Solid Waste Management Improvement Project CURRENCY EQUIVALENTS

More information

Periodic Financing Request Report. India: Assam Power Sector Investment Program (Tranche 2)

Periodic Financing Request Report. India: Assam Power Sector Investment Program (Tranche 2) Periodic Financing Request Report Project Number: 47101-003 MFF Number: 0083 November 2015 India: Assam Power Sector Investment Program (Tranche 2) This document is being disclosed to the public in accordance

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Sri Lanka Project Number: 47083 September 2013 Proposed Multitranche Financing Facility India: Accelerating Infrastructure Investment

More information

Socialist Republic of Viet Nam: Preparing the Ho Chi Minh City Water Supply Project

Socialist Republic of Viet Nam: Preparing the Ho Chi Minh City Water Supply Project Technical Assistance Report Project Number: 41070 June 2008 Socialist Republic of Viet Nam: Preparing the Ho Chi Minh City Water Supply Project (Financed by the Government of France) The views expressed

More information

INDIA: Preparing the Rajasthan Secondary Towns Development Investment Program

INDIA: Preparing the Rajasthan Secondary Towns Development Investment Program Appendix 3 9 Technical Assistance Report Project Number: 42267-027 Transaction Technical Assistance (TRTA) June 2017 INDIA: Preparing the Rajasthan Secondary Towns Development Investment Program This document

More information

Periodic Financing Request Report. Armenia: Sustainable Urban Development Investment Program Tranche 2

Periodic Financing Request Report. Armenia: Sustainable Urban Development Investment Program Tranche 2 Periodic Financing Request Report Project Number: 42417-033 MFF Number: 0056 September 2015 Armenia: Sustainable Urban Development Investment Program Tranche 2 This document is being disclosed to the public

More information

Periodic Financing Request Report. People s Republic of Bangladesh: Secondary Education Sector Investment Program Tranche 2

Periodic Financing Request Report. People s Republic of Bangladesh: Secondary Education Sector Investment Program Tranche 2 Periodic Financing Request Report Project Number: 44213-017 November 2015 People s Republic of Bangladesh: Secondary Education Sector Investment Program Tranche 2 This document is being disclosed to the

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 49107-003 September 2018 Proposed Multitranche Financing Facility, Technical Assistance Grant, and Administration of

More information

India: Preparing for the Ara Canal Water Productivity Improvement Project

India: Preparing for the Ara Canal Water Productivity Improvement Project Technical Assistance Report Project Number: 52153-002 Transaction Technical Assistance (TRTA) June 2018 India: Preparing for the Ara Canal Water Productivity Improvement Project This document is being

More information

People s Republic of Bangladesh: Secondary Education Sector Investment Program (Tranche 3)

People s Republic of Bangladesh: Secondary Education Sector Investment Program (Tranche 3) Periodic Financing Request Report Project Number: 44213-018 MFF Number: 0074 March 2018 People s Republic of Bangladesh: Secondary Education Sector Investment Program (Tranche 3) Distribution of this document

More information

Periodic Financing Request Report

Periodic Financing Request Report Periodic Financing Request Report Project Number: 47037-005 MFF Number: 0084 November 2016 Democratic Socialist Republic of Sri Lanka: Green Power Development and Energy Efficiency Improvement Investment

More information

Socialist Republic of Viet Nam: Preparing the Hai Phong Water Supply Project

Socialist Republic of Viet Nam: Preparing the Hai Phong Water Supply Project Technical Assistance Report Project Number: 41425 October 2008 Socialist Republic of Viet Nam: Preparing the Hai Phong Water Supply Project (Financed by the Netherlands Trust Fund for the Water Financing

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

Project Administration Manual

Project Administration Manual Project Administration Manual Project Number: 31501 June 2011 Proposed Loan for Additional Financing Democratic Socialist Republic of Sri Lanka: Secondary Towns and Rural Community-Based Water Supply and

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Sri Lanka Project Number: 47381-001 June 2015 Proposed Multitranche Financing Facility Democratic Socialist Republic of Sri Lanka: Mahaweli

More information

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project Project Design Advance Project Number: 47279-003 September 2016 Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project This document is being disclosed to the public in accordance with ADB's Public

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

Report and Recommendation of the President to the Board of Directors. Proposed Loan and Grant Kyrgyz Republic: Power Sector Rehabilitation Project

Report and Recommendation of the President to the Board of Directors. Proposed Loan and Grant Kyrgyz Republic: Power Sector Rehabilitation Project Report and Recommendation of the President to the Board of Directors Project Number: 44198 May 2012 Proposed Loan and Grant Kyrgyz Republic: Power Sector Rehabilitation Project CURRENCY EQUIVALENTS (as

More information

FRAMEWORK FINANCING AGREEMENT

FRAMEWORK FINANCING AGREEMENT FRAMEWORK FINANCING AGREEMENT FRAMEWORK FINANCING AGREEMENT (Second Power Transmission Enhancement Investment Program) Parties This Framework Financing Agreement ( FFA ) dated 15 July 2016 is between

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 47926 April 2014 Proposed Equity Investment ReNew Power Ventures Private Limited ReNew Power Investment Project (India)

More information

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS Strengthening Public Financial Resource Management through Information and Communication Systems Technology Systems (TRTA MON 51084) OUTLINE TERMS OF REFERENCE FOR CONSULTANTS 1. The transaction technical

More information

People s Republic of Bangladesh: Updating the Road Master Plan

People s Republic of Bangladesh: Updating the Road Master Plan South Asia Subregional Economic Cooperation Dhaka Northwest Corridor Road Project, Phase 2 (RRP BAN 40540) Technical Assistance Report Project Number: 40540-016 Transaction Technical Assistance (TRTA)

More information

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance Technical Assistance Report Project Number: 47287-001 Capacity Development Technical Assistance (CDTA) December 2013 Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved

More information

Tuvalu: Outer Island Maritime Infrastructure Project

Tuvalu: Outer Island Maritime Infrastructure Project Project Design Advance Project Number: 48484-003 November 2015 Tuvalu: Outer Island Maritime Infrastructure Project This document is being disclosed to the public in accordance with ADB s Public Communications

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 43309-015 Loan Number: 2839-CAM September 2016 Proposed Loan for Additional Financing Kingdom of Cambodia: Provincial

More information

Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project

Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project Validation Report Reference Number: PCV: PHI 2011-15 Project Number: 35379 Loan Number: 2012 July 2011 Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project Independent

More information

India: Karnataka Urban Development and Coastal Environmental Management Project

India: Karnataka Urban Development and Coastal Environmental Management Project Validation Report Reference Number: PVR-334 Project Number: 30303 Loan Number: 1704 November 2014 India: Karnataka Urban Development and Coastal Environmental Management Project Independent Evaluation

More information

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project Technical Assistance Report Project Number: 51039-001 Transaction Technical Assistance (TRTA) September 2017 Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

More information

Country Operations Business Plan. Armenia October 2015

Country Operations Business Plan. Armenia October 2015 Country Operations Business Plan October 2015 Armenia 2016 2018 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 31

More information

Proposed Multitranche Financing Facility India: Tamil Nadu Urban Flagship Investment Program

Proposed Multitranche Financing Facility India: Tamil Nadu Urban Flagship Investment Program Facility Administration Manual Project Number: 49107-003 Loan Number: LXXXX September 2018 Proposed Multitranche Financing Facility India: Tamil Nadu Urban Flagship Investment Program ABBREVIATIONS ADB

More information

Periodic Financing Request Report. Islamic Republic of Pakistan: Punjab Irrigated Agriculture Investment Program (Tranche 4)

Periodic Financing Request Report. Islamic Republic of Pakistan: Punjab Irrigated Agriculture Investment Program (Tranche 4) Periodic Financing Request Report Project Number: 37231-044 MFF Number: 0009-PAK November 2015 Islamic Republic of Pakistan: Punjab Irrigated Agriculture Investment Program (Tranche 4) This document will

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 42180-016 February 2017 Proposed Multitranche Financing Facility and Technical Assistance Grant People s Republic of

More information

Papua New Guinea: Town Electrification Investment Program, Tranche 2

Papua New Guinea: Town Electrification Investment Program, Tranche 2 Periodic Financing Request Report Project Number: 41504-025 MFF Number: 0051 June 2017 Papua New Guinea: Town Electrification Investment Program, Tranche 2 Distribution of this document is restricted until

More information

FINANCIAL ANALYSIS: PROJECT 1

FINANCIAL ANALYSIS: PROJECT 1 Green Power Development and Energy Efficiency Improvement Investment Program (RRP SRI 47037) A. Background and Rationale FINANCIAL ANALYSIS: PROJECT 1 1. Project 1 of the Green Power Development and Energy

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 40423 June 2012 Proposed Multitranche Financing Facility, Technical Assistance, and Administration of Technical Assistance

More information

Country Operations Business Plan. Fiji October 2016

Country Operations Business Plan. Fiji October 2016 1 Country Operations Business Plan October 2016 Fiji 2017 2019 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 29

More information

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project Validation Report Reference Number: PVR-462 Project Number: 42496-013 Loan Number: 2508 December 2016 People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project Independent

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Sri Lanka Project Number: 48141-001 November 2014 Proposed Loan and Technical Assistance Grant Republic of Fiji: Transport Infrastructure

More information

Section 3.07 is deleted and the following is substituted therefor:

Section 3.07 is deleted and the following is substituted therefor: 2 outstanding Loan and the Fixed Spread that will be applied to new Loans (expressed as a percentage per annum), by (ii) the principal amount of the outstanding Loan on which the Borrower shall pay interest

More information

Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) ECONOMIC ANALYSIS

Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) ECONOMIC ANALYSIS Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) A. Introduction ECONOMIC ANALYSIS 1. Karnataka. Karnataka is one of the top ten states in India by gross domestic product

More information

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT Himachal Pradesh Clean Energy Transmission Investment Program (RRP IND 43464) TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT A. INTRODUCTION 1. The

More information

Technical Assistance Report

Technical Assistance Report Technical Assistance Report Project Number: 51360-002 Transaction Technical Assistance Facility (F-TRTA) April 2018 Turkmenistan: Preparing the Central Asia Regional Economic Cooperation Corridors 2, 3

More information

Policy Paper. June Mainstreaming the Multitranche Financing Facility

Policy Paper. June Mainstreaming the Multitranche Financing Facility Policy Paper June 2008 Mainstreaming the Multitranche Financing Facility ABBREVIATIONS ADB Asian Development Bank ADF Asian Development Fund CPS country partnership strategy DMC developing member country

More information

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan Technical Assistance Report Project Number: 46539 Regional Capacity Development Technical Assistance (R CDTA) August 2014 Improving the Financial Management Capacity of Executing Agencies in Afghanistan

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 46168-001 September 2014 Proposed Loans and Technical Assistance Grant People s Republic of Bangladesh: South Asia Subregional

More information

Indonesia: Metropolitan Medan Urban Development Project

Indonesia: Metropolitan Medan Urban Development Project Validation Report Reference Number: PCV:INO 2009-09 Project Number: 27358 Loan Number: 1587 May 2009 Indonesia: Metropolitan Medan Urban Development Project Independent Evaluation Department 2 ABBREVIATIONS

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program)

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program) PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program) 1. A project preparatory technical assistance (PPTA) for $700,000 in grant funds is

More information

Multitranche Financing Facility Georgia: Sustainable Urban Transport Investment Program Tranche 3

Multitranche Financing Facility Georgia: Sustainable Urban Transport Investment Program Tranche 3 J Periodic Financing Request Report Project Number: 42414-043 November 2013 Multitranche Financing Facility Georgia: Sustainable Urban Transport Investment Program Tranche 3 CURRENCY EQUIVALENTS (as of

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 38412 September 2010 Proposed Multitranche Financing Facility India: Assam Integrated Flood and Riverbank Erosion Risk

More information

Facility Administration Manual

Facility Administration Manual Green Power Development and Energy Efficiency Improvement Investment Program (RRP SRI 47037) Facility Administration Manual Project Number: 47037 Loan Numbers: {LXXXX; LXXXX} May 2014 Democratic Socialist

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Sri Lanka Project Number: 46382-001 November 2015 Proposed Loans Republic of Palau: North Pacific Regional Connectivity Investment Project

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 44212 June 2014 Proposed Loan and Administration of Loan and Grants People s Republic of Bangladesh: Coastal Towns Environmental

More information

FINANCIAL ANALYSIS. A. Introduction

FINANCIAL ANALYSIS. A. Introduction Urban Water Supply and Wastewater Management Investment Project (RRP FIJ 491-2) A. Introduction FINANCIAL ANALYSIS 1. The Asian Development Bank (ADB) Urban Water Supply and Wastewater Management Investment

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 49267-001 October 2016 Proposed Equity Investment VI (Vietnam Investments) Fund III, L.P. (Regional) This is an abbreviated

More information

Georgia: Preparing the Second Domestic Resource Mobilization Program

Georgia: Preparing the Second Domestic Resource Mobilization Program Technical Assistance Report Project Number: 52161-002 Transaction Technical Assistance (TRTA) September 2018 Georgia: Preparing the Second Domestic Resource Mobilization Program This document is being

More information

Statement of the Asian Development Bank s Operations in 2017

Statement of the Asian Development Bank s Operations in 2017 February 208 Statement of the Asian Development Bank s Operations in 207 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 20. I. OVERVIEW OF OPERATIONS.

More information

Completion Report. Project Number: Loan Number: 1472 August Philippines: Small Towns Water Supply Sector Project

Completion Report. Project Number: Loan Number: 1472 August Philippines: Small Towns Water Supply Sector Project Completion Report Project Number: 27250 Loan Number: 1472 August 2006 Philippines: Small Towns Water Supply Sector Project CURRENCY EQUIVALENTS Currency Unit Philippine peso (P) At Appraisal At Project

More information

Country Operations Business Plan. Fiji September 2017

Country Operations Business Plan. Fiji September 2017 Country Operations Business Plan September 2017 Fiji 2018 2020 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 13

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 40037 October 2011 Proposed Loans for Additional Financing: Papua New Guinea: Lae Port Development Project CURRENCY

More information

Report and Recommendation of the President to the Board of Directors. Proposed Loan Kingdom of Bhutan: Secondary Towns Urban Development Project

Report and Recommendation of the President to the Board of Directors. Proposed Loan Kingdom of Bhutan: Secondary Towns Urban Development Project Report and Recommendation of the President to the Board of Directors Project Number: 42229-016 May 2018 Proposed Loan Kingdom of Bhutan: Secondary Towns Urban Development Project Distribution of this document

More information

Socialist Republic of Viet Nam: Preparing the Hue Water Supply Project

Socialist Republic of Viet Nam: Preparing the Hue Water Supply Project Technical Assistance Report Project Number: 41071 May 2008 Socialist Republic of Viet Nam: Preparing the Hue Water Supply Project (Financed by the Netherlands Trust Fund for the Water Financing Partnership

More information

Report and Recommendation of the President to the Board of Directors. Proposed Loan Nepal: Urban Water Supply and Sanitation (Sector) Project

Report and Recommendation of the President to the Board of Directors. Proposed Loan Nepal: Urban Water Supply and Sanitation (Sector) Project Report and Recommendation of the President to the Board of Directors Project Number: 35173-015 September 2018 Proposed Loan Nepal: Urban Water Supply and Sanitation (Sector) Project Distribution of this

More information

OPERATIONS MANUAL BANK POLICIES (BP)

OPERATIONS MANUAL BANK POLICIES (BP) BANK POLICIES (BP) OM Section F1/BP Page 1 of 2 These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. SAFEGUARD POLICY STATEMENT 1. The Asian Development

More information

Policy Paper. March Establishing the Project Design Facility

Policy Paper. March Establishing the Project Design Facility Policy Paper March 2011 Establishing the Project Design Facility ABBREVIATIONS ADB Asian Development Bank ADF Asian Development Fund COBP country operations business plan DMC developing member country

More information

Section 3.06 is deleted and the following is substituted therefor:

Section 3.06 is deleted and the following is substituted therefor: 2 (c) Section 3.03 is deleted and the following is substituted therefor: Commitment Charge; Credit; Maturity Premium. (a) The Borrower shall pay a commitment charge on the unwithdrawn amount of the Loan

More information

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project Environmental Safeguard Monitoring Report Semi Annual Report July 2016 ADB Project Number: 48141-001 ADB Loan Number: 3210 FIJ: Transport Infrastructure Investment Sector Project Prepared by Fiji Roads

More information

Bangladesh: Urban Governance and Infrastructure Improvement (Sector) Project

Bangladesh: Urban Governance and Infrastructure Improvement (Sector) Project f Validation Report Reference Number: PVR-370 Project Number: 29041 Loan Number: 1947 December 2014 Bangladesh: Urban Governance and Infrastructure Improvement (Sector) Project Independent Evaluation Department

More information

India: Supporting the Second West Bengal Development Finance Program

India: Supporting the Second West Bengal Development Finance Program Second West Bengal Development Finance Program (RRP IND 49209) Technical Assistance Report Project Number: 49209-001 Transaction Technical Assistance (TRTA) August 2017 India: Supporting the Second West

More information

LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK LOAN NUMBER 2729-ARM LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA and ASIAN DEVELOPMENT BANK DATED 30 MAY 2011 ARM 42145 LOAN

More information

The World Bank LK GPOBA - Access to Sanitation Project (P111161)

The World Bank LK GPOBA - Access to Sanitation Project (P111161) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF LK GPOBA - ACCESS TO SANITATION PROJECT APPROVED ON JUNE 8, 2011 TO DEMOCRATIC

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section H5/BP Page 1 of 4 BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction ADDITIONAL FINANCING 1. The

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK PCR: THA 27262 PROJECT COMPLETION REPORT ON THE CHONBURI WATER SUPPLY PROJECT (Loan 1326-THA) IN THAILAND March 2002 CURRENCY EQUIVALENTS Currency Unit Baht (B) At Appraisal (August

More information

Pakistan: Second Power Transmission Enhancement Investment Program (Tranche 2)

Pakistan: Second Power Transmission Enhancement Investment Program (Tranche 2) Periodic Financing Request Report Project Number: 48078-004 MFF Number: 0092 September 2017 Pakistan: Second Power Transmission Enhancement Investment Program (Tranche 2) Distribution of this document

More information

Philippines: Emergency Assistance for Relief And Recovery from Typhoon Yolanda

Philippines: Emergency Assistance for Relief And Recovery from Typhoon Yolanda Validation Report Reference Number: PVR-471 Project Number: 47337-001 Loan Number: 3080 December 2016 Philippines: Emergency Assistance for Relief And Recovery from Typhoon Yolanda Independent Evaluation

More information

PERIODIC FINANCING REQUEST. RE: Higher Education in the Pacific Investment Program: Periodic Financing Request #1

PERIODIC FINANCING REQUEST. RE: Higher Education in the Pacific Investment Program: Periodic Financing Request #1 PERIODIC FINANCING REQUEST Date: April 2012 To: Asian Development Bank 6 ADB Avenue Mandaluyong City, Metro Manila ATTENTION: Director General, Pacific Department Fax No. +632-632-6318 Sir: RE: Higher

More information

Nauru Country Operations Business Plan. August 2015

Nauru Country Operations Business Plan. August 2015 Country Operations Business Plan August 2015 Nauru 2016 2018 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 1 July

More information

Country Operations Business Plan. Georgia September 2018

Country Operations Business Plan. Georgia September 2018 Country Operations Business Plan September 2018 Georgia 2019 2021 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of

More information

Multitranche Financing Facility Republic of Uzbekistan: Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program

Multitranche Financing Facility Republic of Uzbekistan: Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program Facility Administration Manual Project Number: 42107 MFF Number: 0042-UZB Loan Numbers: 2635-UZB (Project 1), 2746-UZB (Project 2), and 2868-UZB (Project 3) 21 August 2013 Multitranche Financing Facility

More information

Establishment of the High-Level Technology Fund

Establishment of the High-Level Technology Fund April 2017 Establishment of the High-Level Technology Fund Distribution of this document is restricted until it has been approved by Management. Following such approval, ADB will disclose the document

More information

Nepal: Rural Finance Sector Development Cluster Program (Subprogram 2)

Nepal: Rural Finance Sector Development Cluster Program (Subprogram 2) Validation Report July 2017 Nepal: Rural Finance Sector Development Cluster Program (Subprogram 2) Reference Number: PVR-497 Project Number: 36169-023 Loan Number: 2641 Grant Number: 0208 ABBREVIATIONS

More information

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) the Borrower has applied to ADB for a loan

More information

(c) Section 3.07 is deleted and the following is substituted therefor:

(c) Section 3.07 is deleted and the following is substituted therefor: 2 outstanding Loan on which a higher Fixed Spread is applicable. The amount of the Rebate shall be determined by multiplying (i) the difference between the Fixed Spread applicable to the outstanding Loan

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 49419 March 2016 Proposed Multitranche Financing Facility Punjab National Bank India: Solar Rooftop Investment Program

More information

Establishment of the Leading Asia s Private Sector Infrastructure Fund

Establishment of the Leading Asia s Private Sector Infrastructure Fund March 2016 Establishment of the Leading Asia s Private Sector Infrastructure Fund This document is being disclosed to the public prior to Board consideration in accordance with ADB s Public Communications

More information