1 Facility Administration Manual Project Number: Loan Number: LXXXX September 2018 Proposed Multitranche Financing Facility India: Tamil Nadu Urban Flagship Investment Program

2 ABBREVIATIONS ADB Asian Development Bank CMSC contract management and supervision consultant CMWSSB Chennai Metropolitan Water Supply and Sewerage Board CAG Comptroller and Auditor General CAPP community awareness and participation plan CPS country partnership strategy CWPS clear water pumping station DMA district metering area DMF design and monitoring framework DPR detailed project report E&M electrical and mechanical EARF environmental assessment and review framework EMP environmental management plan EOI expression of interest FAM facility administration manual FFA framework financing agreement FMA financial management assessment FY fiscal year GePNIC Government e-procurement System of the National Informatics Centre GIS geographic information system GOTN Government of Tamil Nadu GRM grievance redressal mechanism ICB International Competitive Bidding IEE initial environmental examination LARRA Land Acquisition, Rehabilitation and Resettlement Act lpcd liter per capita per day MAWS Municipal Administration and Water Supply Department MFF multitranche financing facility NCB National Competitive Bidding NGO nongovernment organization NRW nonrevenue water O&M operation and maintenance OCR ordinary capital resources PAI project administration instructions PFR periodic financing request PIU program implementation unit PMU program management unit PPMS project performance management system QCBS quality- and cost-based selection RRP report and recommendations of the President SCADA supervisory control and data acquisition SLB service level benchmark SOE statement of expenditure SPS Safeguard Policy Statement STP sewage treatment plant TNUIFSL Tamil Nadu Urban Infrastructure and Financial Services Limited TNUFIP Tamil Nadu Urban Flagship Investment Program

3 TWAD Tamil Nadu Water Supply and Drainage Board UGR underground service reservoir URL user resource location WTP water treatment plant

4 CONTENTS I. PROJECT DESCRIPTION 1 A. Rationale 1 B. Road Map 2 C. Multitranche Financing Facility 2 D. Impact and Outcome 3 E. Outputs 3 II. IMPLEMENTATION PLANS 6 A. Project Readiness Activities 6 B. Overall Project Implementation Plan 7 III. PROGRAM MANAGEMENT ARRANGEMENTS 10 A. Key Persons Involved in Implementation 14 B. Project Organization Structure 16 IV. COSTS AND FINANCING 17 A. Cost Estimates Preparation and Revisions 18 B. Key Assumptions 18 C. Detailed Cost Estimates by Expenditure Category 19 D. Allocation and Withdrawal of Loan/Grant Proceeds 20 E. Detailed Cost Estimates by Financier 21 F. Detailed Cost Estimates by Outputs and/or Components 22 G. Detailed Cost Estimates by Year 23 H. Contract and Disbursement S-Curve 24 V. FINANCIAL MANAGEMENT 25 A. Financial Management Assessment 25 B. Disbursement 35 C. Accounting 36 D. Auditing and Public Disclosure 37 VI. PROCUREMENT AND CONSULTING SERVICES 38 A. Advance Contracting and Retroactive Financing 38 B. Procurement of Goods, Works, and Consulting Services 38 C. Procurement Plan 40 D. Consultant's Terms of Reference 43 VII. SAFEGUARDS 43 A. Environmental Safeguards 44 B. Social Safeguards 46 VIII. GENDER AND SOCIAL DIMENSIONS 50 IX. PERFORMANCE MONITORING, EVALUATION, REPORTING, AND COMMUNICATION 51 A. Project Design and Monitoring Framework 51 B. Monitoring 51 C. Evaluation 52 D. Reporting 52 E. Stakeholder Communication Strategy 52 X. ANTICORRUPTION POLICY 53 XI. ACCOUNTABILITY MECHANISM 54 XII. RECORD OF CHANGES TO THE PROJECT ADMINISTRATION MANUAL 54

5 List of Appendixes 1. Design and Monitoring Framework for the Investment Program 2. Design and Monitoring Framework for Tranche 1 3. Criteria for Subproject Selection for Future Tranches 4. Performance-based Governance Improvement Component 5. Procurement Plan 6. Outline Terms of Reference for the Contract Management and Supervision Consultant 7. Draft Outline Terms of Reference for Governance Improvement and Awareness Consultants 8. Draft Outline Terms of Reference for Project Development Consultant 9. Gender Action Plan 10. Gender Action Plan Monitoring Format 11. Community Awareness and Participation Plan

6 Facility Administration Manual Purpose and Process The Facility Administration Manual (FAM) describes the essential administrative and management requirements to implement the project on time, within budget, and in accordance with the policies and procedures of the government and Asian Development Bank (ADB). The Municipal Administration and Water Supply (MAWS) Department, Government of Tamil Nadu (GOTN), acting through Tamil Nadu Urban Infrastructure Financial Services Limited (TNUIFSL), are wholly responsible for the implementation of ADB-financed projects, as agreed jointly between the borrower and ADB, and in accordance with the policies and procedures of the government and ADB. ADB staff is responsible for supporting implementation including compliance by TNUIFSL of their obligations and responsibilities for project implementation in accordance with ADB s policies and procedures. At loan negotiations, the borrower and ADB agreed to the FAM and ensured consistency with the loan and project agreements. Such agreement is reflected in the minutes of the loan negotiations. In the event of any discrepancy or contradiction between the FAM and the loan agreement, the provisions of the loan agreement will prevail. After ADB Board approval of the project's report and recommendations of the President (RRP), changes in implementation arrangements are subject to agreement and approval pursuant to relevant government and ADB administrative procedures (including the Facility Administration Instructions) and upon such approval, they will be subsequently incorporated in the FAM.

7 I. PROJECT DESCRIPTION 1. The Tamil Nadu Urban Flagship Investment Program (the program) will develop priority water supply, sewerage, and drainage infrastructure in at least 10 cities located within strategic industrial corridors of Tamil Nadu. 1 It will support innovative pilot projects, including India's first solar-powered sewage treatment plant (STP) to offset greenhouse gas emissions and enhance operational efficiency; strengthen urban governance; and build capacity of state and local institutions to enhance urban services delivery, environmental sustainability, and climate resilience. 2 A. Rationale 2. Urban Challenges in Tamil Nadu. Tamil Nadu is the most urbanized of India s large states 48.5% of its population lives in urban areas, a share that is projected to increase to 67.0% in 2030 and makes the second-largest contribution to the country s gross domestic product. Although Tamil Nadu is a leader in many areas of manufacturing, managing its rapid urbanization is essential to sustain economic growth, alleviate poverty, and maintain urban livability. Key challenges include (i) acute infrastructure deficits as a result of rapid urbanization; (ii) growth of slum populations; (iii) pollution of waterways; (iv) weak institutional capacity to plan and implement projects; and (v) mixed performance in key areas of governance, including local revenue generation, financial management, and municipal administration. Water-related disasters such as recurring droughts (once in every 2.5 years) and catastrophic urban floods linked to climate change are aggravated by the high water losses associated with aging distribution networks, and inadequate drainage systems not adapted to heavier monsoon rains. Addressing these complex challenges requires significant investments and deeper institutional support. 3. Low service level indicators. In Tamil Nadu, urban service levels remain low. As of 2017: (i) 48% of households are served by piped water; (ii) 80% of cities receive less than 80 liters of water per capita per day versus the national standard of 135 liters per capita per day; (iii) nonrevenue water (NRW) is 30% 50%; (iv) 42% of households are covered by a sewerage network; (v) wastewater treatment capacity is 43% of sewage generation; and (vi) urban drainage coverage is 50%. 3 Low service levels are primarily the result of inadequate local finances to invest in capital expenditures and a shortage of trained staff. The program will directly support improvement in these areas. 4. National urban flagship programs. To help finance the large-scale investments in Tamil Nadu, the state will take advantage of funds from the three national flagship programs under the Ministry of Housing and Urban Affairs: (i) the Swachh Bharat (Clean India) Mission for Urban Areas, (ii) the Atal Mission for Rejuvenation and Urban Transformation, and (iii) the Smart Cities Mission. The programs are complementary, and each highlights the need to strengthen urban institutions and governance. Nevertheless, these funding sources are not sufficient for the large funding requirements of Tamil Nadu, and the state requested help from Asian Development Bank (ADB) to finance water supply, sewerage, and drainage infrastructure in at least 10 cities within 1 The project will include the following city corporations and municipalities (collectively referred to as cities): Ambur, Chennai, Coimbatore, Cuddalore, Rajapalayam, Thoothukudi, Tiruppur, Tiruchirappalli, Tirunelveli, and Vellore. The cities were selected based on population size, location in economic corridors, and eligibility for central government funds. Other cities eligible for support under the program are subject to compliance with selection criteria outlined in the Framework Financing Agreement (accessible from the list of linked documents in Appendix 2). 2 ADB Technical Assistance to India for State-Level Support for National Flagship Urban Programs. Manila. 3 Government of Tamil Nadu State Annual Action Plan, Chennai.

8 2 strategic industrial corridors, as well as programs to develop institutional capacity, public awareness, and urban governance. B. Road Map 5. Road map, strategic context, policy framework, and investment program. As per its Policy Note ( ), 4 the state aims to lead India in addressing the challenges of rapid urbanization and transform its cities into modern, clean, and livable places. The state will achieve these goals through a range of programs focusing on institutional strengthening, green technologies, pro-poor and gender friendly services, and responsive urban governance. Key strategic documents, namely its Twelfth Five-Year Plan ( ), Tamil Nadu Vision 2023, 5 the State Annual Action Plan for urban development (SAAP, 2017) and the State Action Plan on Climate Change (2014) outline clear investment plans to achieve the state s policy goals, including (i) universal access to basic services, (ii) development of world-class cities, (iii) a thrust on industrial corridors, and (iv) climate resilient urban development. 6 Vision 2023 estimates $42.7 billion in urban investment, including $7.5 billion for water supply and sanitation prioritizing continuous and full coverage of services. The SAAP identifies a shelf of 136 projects in 27 cities covering water supply, sewerage, and drainage infrastructure and promotes principles of cost recovery, operational efficiency, and citizen participation, amongst others. The road map and policy framework are adequate to guide the program and ensure its sustainability. 6. The total cost of the state s urban infrastructure investment program under the Road Map is $42.7 billion equivalent, with short-term needs in water supply and sanitation placed at $4.46 billion equivalent (see financing framework agreement [FFA] for details). C. Multitranche Financing Facility 7. Choice of ADB lending modality. An multitranche financing facility (MFF) is a suitable financing modality considering the large-scale investment requirements covering multiple cities and subprojects planned within a clear policy framework. The MFF will facilitate long-term policy dialogue and capacity development, particularly in critical areas of sustainable services delivery and climate change. The Tamil Nadu Urban Infrastructure Financial Services Limited (TNUIFSL) and the implementing agencies have a good track record of implementing donor funded projects. Subprojects under Tranche 1 and the subsequent tranches will be of a similar nature. No Category A safeguards projects will be included in the MFF. The program is aligned with ADB s country partnership strategy, for India, particularly the three pillars of growth linked to India s urban transformation, 7 and is included in the country operations business plan, It supports development of the Chennai Kanyakumari Industrial Corridor implemented by the state in partnership with ADB to link the state s manufacturing sector with value chains in East and Southeast Asia. 9 4 Government of Tamil Nadu Municipal Administration and Water Supply Department Policy Note. Chennai. 5 Government of Tamil Nadu Vision Tamil Nadu Chennai. 6 Tamil Nadu Vision 2023 lists the following five corridors: Chennai-Hosur, Chennai-Tiruchirappalli, Coimbatore- Madurai, Coimbatore-Salem and Madurai-Thoothukudi corridors. Two of these corridors, the Chennai Tiruchirappalli and Madurai Thoothukudi corridors coincide with the East Coast Economic Corridor supported by ADB. 7 ADB Country Partnership Strategy. India, Manila. Pillars of growth (i) boosting competitiveness of cities in economic corridors, (ii) inclusive infrastructure and services, and (iii) increasing climate change resilience. 8 ADB Country Operations Business Plan. India, Manila. 9 ADB Technical Assistance for Supporting Preparation of a Comprehensive Master Plan for Chennai- Kanyakumari Industrial Corridor. Manila (TA-9446).

9 3 8. Lessons learned. Key lessons learned from past urban sector experience and incorporated into the program design include: (i) developing high project readiness for timely implementation and on-time delivery of outcomes to beneficiaries, (ii) tendering larger sized contract packages to attract good bidders and reduce administrative burden to urban local bodies (ULBs) of managing multiple smaller sized packages, (iii) incorporating water and sewerage connections into the civil works contracts to ensure household connectivity and sufficient flows, (iv) incorporating requirements for ULB financial sustainability and operation and maintenance (O&M), (v) supporting innovative approaches to improve energy efficiency and strengthen climate resilience in project designs, (vi) aligning with broader economic strategy of the state, and (vii) incentivizing ULB performance in key areas of urban governance and project implementation. 9. Framework financing agreement. The FFA records the agreements between India and ADB and establishes the principles by which ADB would provide financing, and India would avail itself of such financing. The FFA outlines the requirements for submitting periodic financing requests (PFR) to ADB. Currently, the MFF comprises three tranches to be implemented over a period of 8 years ( ), indicatively as follows: Tranche 1 ( ), Tranche 2 ( ), and Tranche 3 ( ). 10. Tranches and projects under the multitranche financing facility. Each tranche will constitute a project loan. Tranche 1 is representative of subprojects to be financed under the MFF. 10 ADB will approve financing for subsequent tranches under the MFF subject to good performance of ongoing tranches as assessed by Department of Economic Affairs (DEA) and ADB and complying with the requirements set out in the FFA, including compliance with subproject selection criteria and implementation arrangements. D. Impact and Outcome 11. The investment program is aligned with the following impacts: (i) universal access to basic water and sanitation services achieved; (ii) world-class cities and industrial corridors across the state developed; and (iii) water security, reduced vulnerability to climate change in urban areas, and enhanced share of renewable energy achieved. 11 The investment program will have the following outcome: livability and climate resilience in at least 10 cities in priority industrial corridors enhanced. E. Outputs 12. The MFF investment program will have three outputs. 13. Output 1: Climate-resilient sewage collection and treatment, and drainage systems developed in at least eight cities. This includes (i) 187 million liters per day (MLD) of new and 155 MLD of rehabilitated sewage treatment capacity developed, with solar power systems installed for STP operations on a pilot basis; (ii) treated wastewater reused for industrial purposes in selected areas; (iii) 2,810 kilometers (km) of sewage collection pipelines constructed, with 426,600 households connected; (iv) 173 sewage pump stations with a combined capacity of 6,390 kilowatts (kw) constructed; (v) 20 all-female community water and sanitation committees formed; 10 Tranche 1 corresponds to tranche 1 of the MFF and Tranche 2 corresponds to tranche 2 of the MFF, etc. 11 The design and monitoring framework for the Investment Program is in Appendix 1.

10 Output 1 4 and (vi) climate-resilient drainage and flood management systems (250 km of tertiary and 50 km of primary and secondary drains) established in selected cities Output 2: Water supply systems in at least five cities improved with smart features. This includes (i) smart water supply distribution systems (1,520 km pipelines) established within 110 new district metered areas (DMAs) to reduce NRW and provide regular water supply, with 100% of households (total of 171,000) connected; (ii) 120 km of transmission mains built; (iii) 30 pump stations (1,530 kw capacity) constructed; and (iv) 40 water storage reservoirs (combined capacity of 70 million liters), covering Chennai, Coimbatore, Cuddalore, Tiruppur, and Thoothukudi constructed. 15. Output 3: Institutional capacity, public awareness, and urban governance strengthened. This includes (i) establishing within Commissionerate of Municipal Administration (CMA) (a) a new state-level urban data and governance improvement cell, and (b) a new project design and management center; and (ii) implementing (a) state-wide performance-based urban governance improvement program for Tamil Nadu s 135 cities to improve revenue, financial management, administration, service delivery, gender mainstreaming, wastewater reuse, and fecal sludge management; and (b) public awareness campaigns on water conservation, sanitation, and hygiene in project cities. The program will intensify the capacity building of key urban institutions and provide incentives for urban governance improvement. Project design consultants will be recruited by the PMU to prepare new projects in subsequent tranches that meet ADB requirements. 16. The scope of Tranche 1 and indicative scopes for Tranches 2 and 3 are included in Table 1. Table 1: Scope of Tranches 1, 2 and 3 of the Multitranche Financing Facility Item Descriptions Unit Sewage treatment capacity rehabilitated Sewage treatment capacity newly added sewage collection pipelines constructed Number of house service connections Sewage pumping capacity added Renewable energy generated from dedicated solar power Treated sewage for industrial reuse provided Primary and secondary storm Tranche 1 Tranche 2 Tranche 3 Total under MFF MLD MLD km 1, ,810 nos kw GHG 3, ,400 MLD km The eight cities are Ambur, Chennai, Coimbatore, Rajapalayam, Tiruchirappalli, Tirunelveli, Tirupur, and Vellore. Drainage systems are proposed in Chennai, Cuddalore, and Thoothukudi.

11 Output 2 Output 3 5 Item Descriptions Unit water drains constructed Tertiary storm water drains constructed Community water and sanitation committees formed Water distribution pipelines constructed Water supply customer connections provided Pumps replaced /added Tranche 1 Tranche 2 Tranche 3 Total under MFF km nos km nos 30,800 63,558 76,206 1,70,564 kw DMAs established nos New reservoirs constructed ml Awareness campaign for 1000 School children, teachers and adminstrators for no water conservation and hygeine conducted Project Management and Design Center established in CMA nos and staff trained Design Manuals and standards Developed Set New data base with gender disaggregated data established in urban no data and governance improvement cell Training on gender and social inclusion in urban governance nos provided to CMA and ULB staff CMA = Commissionerate of Municipal Administration, DMA = district metering area, GAP = gender action plan, GHG = greenhouse gas, km = kilometer, kw = kilowatt, MFF = multitranche financing facility, ml = milliliter, MLD = million liters per day, nos = numbers, ULB = urban local body.

12 6 II. IMPLEMENTATION PLANS A. Project Readiness Activities Table 2: Tranche 1 Readiness Activities Indicative Activities Responsible Agency Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ADB loan fact-finding mission Oct GOTN, ADB, DEA Advance contracting actions for consultant recruitment Establishment of project implementation arrangements Issuance of RFPs for CMSC recruitment Oct Nov TNUIFSL, ADB TNUIFSL Feb May TNUIFSL Consultant mobilization Aug TNUIFSL, PIU Approval of works bidding documents Nov Feb May GOTN, TNUIFSL, PIU, ADB IFB advertisement for all works packages Dec Feb May TNUIFSL, PIU ADB Management Review Meeting May ADB EOI advertisement of the Capacity Building Consultants Loan negotiations ADB Board approval Sep ADB June Jul TNUIFSL, CMA, ADB GOI, GOTN, TNUIFSL, PIU, ADB Loan signing Oct GOI, GOTN, ADB Loan effectiveness Jan GOI, GOTN ADB = Asian Development Bank, CMSC = construction management and supervision consultant, EOI = expression of interest, GOI = Government of India, GOTN = Government of Tamil Nadu, IFB = invitation for bidding, PIU = program implementation unit, PMU = program management unit, RFP = request for proposal, TNUIFSL= Tamil Nadu Urban Infrastructure Financial Services Limited. Source: Asian Development Bank estimates.

13 7 B. Overall Project Implementation Plan 13 Table 3: Tranche 1 Overall Project Implementation Plan Activities A. DMF 1. Climate-resilient sewage collection and treatment, and drainage systems developed in six cities 1.1 Approve DPR of the sewerage packages for Tirunelveli & Vellore 1.2 Award the sewerage packages for Tirunelveli & Vellore 1.3 Approve DPRs of all remaining sewerage packages 1.4 Award all remaining sewerage packages 1.5 Complete and commission all civil works 2. Water supply systems in one city improved with smart features 2.1 Approve DPRs of water supply packages X X X X X X 13 Gantt chart available in e-handbook on project implementation at

14 8 Activities Award water supply X packages 2.3 Complete and commission all civil X works related to water supply packages 3. Institutional capacity, public awareness, and urban governance strengthened 3.1 Initiate support to CMA in preparation and implementation of reforms and capacity development plan 3.2 Start and complete implementation of capacity building & reforms plan 3.3 Start and complete implementation of GAP and CAPP 3.4 Prepare action plan for implementation of project development facility 3.5 Develop bankable projects 3.6 Initiate & complete community awareness activities B. Program Management Activities X X X X X X

15 9 Activities Mobilize construction contract management & X supervision consultants Mobilise capacity X development consultants Establish program management unit with full X staff CAPP = community awareness and participation plan, CMA = Commissioner of Municipal Administration, DMF = design and monitoring framework, DPR = detailed project report, GAP = gender action plan. Source: Asian Development Bank.

16 10 III. PROGRAM MANAGEMENT ARRANGEMENTS 17. The Municipal and Water Supply Department (MAWS) acting through TNUIFSL will be the executing agency. A program steering committee, headed by Principal Secretary, MAWS Department, Government of Tamil Nadu (GOTN), will provide overall guidance and strategic directions to the program. A program management unit (PMU), headed by the Managing Director, TNUIFSL acting as Program Director will be established within TNUIFSL for overall management, planning, implementing, monitoring, reporting, and coordinating the program. The CMA will act as the Deputy Program Director in the PMU. The project ULBs, represented by respective Municipal Commissioners, will be the implementing agencies for works in cities/towns and will establish program implementing units (PIUs) headed by a municipal engineer as full-time Project Manager. PIUs will comprise of dedicated staff responsible for overseeing implementation of projects on a day-to-day basis. The PIUs will be supported by a contract management and supervision consultant (CMSC) recruited by TNUIFSL. ULBs under the program with less project implementation experience may utilize implementation support from the Tamil Nadu Water Supply and Drainage Board (TWAD) to strengthen implementation capacity. 14 In such cases, TWAD will establish a PIU and the ULB will appoint counterpart staff to coordinate implementation activities. For sewerage and water supply works in Chennai, The Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB), represented by its Managing Director, will be the implementing agency and establish a PIU headed by a superintending engineer as full-time Project Manager. For the institutional capacity, public awareness, and urban governance component, CMA acting through its Commissioner, will establish a PIU and appoint a governance improvement and awareness consultant (GIAC) responsible for supporting these activities. 18. The PMU staff will be mostly drawn from TNUIFSL, CMA, and municipal services, and, if required, will also be seconded from the other government departments such as TWAD, on deputation. The PIU staff will be drawn from the engineering units of the participating ULBs and augmented from the same government departments mentioned above as required. The CMSC will assist the PIUs implement, manage, and monitor works of the program. TNUIFSL will recruit a project design consultant (PDC) to prepare projects in consultation with ULBs for subsequent tranches. With the help of PMU, PIUs will design infrastructure, manage procurement processes, supervise construction, assure technical quality of designs and construction, and provide support on capacity building, governance improvement, and awareness building. The implementing agencies will procure contractors and manage construction and commissioning activities. 15 For social and environmental safeguards, the PMU and PIUs will appoint staff to oversee safeguards monitoring and compliance. 19. The roles and responsibilities are summarized in Table 4. Table 4: Management Roles and Responsibilities Program Implementation Arrangements Executing Agency: MAWS acting through TNUIFSL Management Roles and Responsibilities Negotiate, sign, and execute the program; Allocate and release government counterpart funds on time; Facilitate obtaining administrative sanction from the government for overall program and for all the subprojects with PIU staffing; Facilitate obtaining timely government-level approvals for smooth implementation of the program; 14 These include Rajapalayam (Tranche 1), Coimbatore (Tranche 1), Ambur (Tranche 2), and Cuddalore (Tranche 3). 15 In the case of TWAD supported projects, TWAD will do procurement while ULBs will make payments.

17 11 Program Implementation Arrangements Program Steering Committee a (headed by Principal Secretary, MAWS) Members: Managing Director, TNUIFSL (Convener) Commissioner of Municipal Administration Managing Director, CMWSSB Managing Director, TWAD Managing Director, TUFIDCO Program Management Unit Program Director: Managing Director, TNUIFSL Deputy Program Director: CMA PMU Staff (10): Technical Expert Accounts Officer Financial Officer/s Safeguards Officers Procurement Officer/s Administrative Officer Management Roles and Responsibilities Monitor program implementation progress and ensure timely actions for completion of the project; Responsible for annual independent audits of program accounts; and Plan, implement, and monitor public relations activities; gender mainstreaming initiatives and community participation activities, with the support of PIUs. Provide strategic guidance; Provide policy decisions to support smooth program implementation; Facilitate inter-departmental coordination and cooperation; Support TNUIFSL with government/ministerial level approvals; and Review and monitor the physical and financial progress of the subprojects. Program and Financial Management Overall responsibility of the investment program and financial management and administering program procedures and guidelines; Oversee MFF design of all projects in individual tranches; Prepare periodic financing requests for tranches; Review the DPRs submitted by ULBs / implementing agencies and obtain approval from ADB and government; Undertake project appraisals based on technical, financial, economic and safeguards compliance as agreed by GOTN/ TNUIFSL and ADB; Undertake financial structuring and obtain approval for the subprojects from the Sanctioning Committee; Sanction and disburse loan and grant funds to sub-projects based on progress and timely provision of counterpart funds from state finance department; Manage overall contract award and disbursement performance Manage overall fund flow; Provide overall technical and implementation guidance to the PIUs as required; Facilitate approval of various implementation related requests from the PIUs; Develop annual work plans, work schedules and budgets; Sign key documents including withdrawal applications and audit reports; Timely submit withdrawal applications; Establish financial accounting and control systems and ensuring accurate and timely report submissions and funds flow from ADB. Monitor safeguards compliance of PIUs; Act as focal point for communication with the ADB; Ensure compliance with loan covenants, ADB s guidelines, procedures and policies;

18 12 Program Implementation Arrangements Management Roles and Responsibilities Facilitate ADB program review missions; and Represent the program at Tripartite Review Meetings. Accounting and Reporting Report the program s progress to GOTN and ADB (quarterly); and Submit audited project accounts to GOTN and ADB (annually). Safeguards compliance Review and monitor safeguards compliance by PIUs and support corrective actions as necessary; Submit semi-annual safeguard monitoring reports to ADB; and Guide PIUs as and when necessary on safeguards compliance, and arrange capacity building for PIUs. Recruitment of Consultants Recruit consultants in accordance with ADB consultant recruitment guidelines and make payments to them; and Obtain ADB s concurrence for consultants recruitment. Project Implementing Units Project ULBs CMWSSB CMA TWAD Board A. PIU Staff (5): b Project Manager Technical Expert Accounts/Financial Officer Safeguards-gender Officer Contract Management Officer Procurement of Works/Goods Contracts Support ULB PIUs with preparation of bid documents as required, and with procurement process; Obtain ADB concurrence for bid documents, bid evaluation reports and contract awards; and Ensure compliance with ADB procurement policies and procedures. Project Management Responsible in managing subprojects; and Responsible for day-to-day implementation, monitoring and reporting. Procurement of works/goods contracts Prepare bidding documents for goods and works and submit through PMU to ADB for approval; Issue invitation for bids, evaluate bids and submit reports to ADB through PMU for approval and award contracts after approval from ADB; and Check all clearances including administrative, regulatory and statutory approvals. Supervision and Monitoring of the Construction Works Oversee, coordinate and monitor works (civil, electrical and mechanical) and supply of equipment and materials ensuring sound works supervision and high-quality control and any other technical matters and issue certificates for acceptance; Measure and record acceptable works, check contractor s/ suppliers invoices and recommend payments to the contractors; Manage contracts, prepare variation orders; and submit variation requests to approving authority with due intimation to PMU;

19 13 Program Implementation Arrangements Management Roles and Responsibilities Coordinate preparation of final measurement and 'as built' drawings; and Monitor implementation. Safeguards Compliance Ensure compliance with safeguard frameworks and plans; Facilitate consultation with stakeholders and disclose program information in consultation with PMU; Address grievances through the GRM; Coordinate land acquisition actions, if required; Ensure implementation of GAP; and Submit quarterly safeguard monitoring reports to PMU. Accounting and Reporting Open and administer project account; Prepare monthly, quarterly, mid-term and final progress reports; and Payments, accounting and reporting to the PMU. Manage Disbursements Retain supporting documents for safekeeping and audit; and Complete all reporting requirements, including the annual audit report and financial statements. Advance Project Preparation Prepare DPRs and bidding documents for future tranches. Supervise Contract Management and Supervision Consultants Review and approve all site investigation subcontracts; Monitor, review, evaluate and approve all outputs of the consultants including the DPRs and the tender documents; Finalize project components and works packages; and Review and recommend all consultants invoices. Act as Deputy Program Director; Implement urban governance and reforms component of the program; Establish and manage Urban Data and Governance Improvement Cell; and Recruit the Urban Governance and Awareness Consultant. CMWSS Board Establish a dedicated PIU for water and sewerage works in Chennai; Provide technical support to the PIUs for speedy resolution implementation related issues such as variations, deviations, time and cost control etc.; Review the performance of CMSC and implementation progress of subprojects; and Provide technical support for review and finalization of DPRs, bid documents, bidding and award of contracts. TWAD Board Provide technical support to ULBs; Deploy qualified full-time design, construction supervision and safeguards monitoring staff to ensure timely completion of subprojects;

20 14 Program Implementation Management Roles and Responsibilities Arrangements Provide additional technical support from the local TWAD Head Office to the PIUs for speedy resolution of implementation related issues such as variations, deviations, time and cost control, among others; Provide backup technical support for review and finalization of DPRs, bid documents, bidding and award of contracts; and Review and monitor the subprojects implementation when requested by ULBs. Asian Development Bank Monitor overall program and subproject performance; Communicate with TNUIFSL on program implementation; Attend tripartite review meetings; Review and approve procurement activities as per agreed Procurement Plan; Process withdrawal applications for disbursement; Disclose program information to the public as per ADB policy; Approve and monitor safeguards documents and implementation compliance including GAP and CAPP implementation; Monitor annual audits of program accounts, by private auditing firm or Auditor General of India, as selected by TNUIFSL; Field review missions; Facilitate knowledge sharing; Provide training in program management to PIU staff; and Support TNUIFSL, CMA and CMWSSB through various capacity building activities. ADB = Asian Development Bank, CAPP = community awareness and participation plan, CMSC = contract management and supervision consultant, CMA = Commissioner of Municipal Administration, CMWSSB = Chennai Metropolitan Water Supply and Sewerage Board, DPR = detailed project report, EARF = environmental assessment and review framework, EOI = expression of interest, GAP = gender action plan, GOTN = Government of Tamil Nadu, GRM = grievance redress mechanism, ICB = international competitive bidding, IEE = initial environmental examination, NCB = national competitive bidding, MAWS = Municipal Administration and Water Supply, MFF = multitranche financing facility, PDF = project design facility, PIU = program implementation unit, PMU = program management unit, RFP = request for proposal, TNUIFSL = Tamil Nadu Urban Infrastructure Financing Services Limited, TUFIDCO = Tamil Nadu Urban Finance and Infrastructure Development Corporation Limited, TWAD = Tamil Nadu Water Supply and Drainage Board, ULB = urban local body. a Government of Tamil Nadu constituted a state level inter-departmental coordination committee to discuss and resolve inter-departmental issues. This committee constitutes heads or state level heads of various GOTN and Government of India departments. The program shall also be included under the ambit of this committee. b Where TWAD sets up PIUs the following arrangement applies for safeguards and gender activities: (i) TWAD will appoint an environmental safeguards officer, (ii) CMA will appoint social safeguards and gender monitoring experts, and (iii) ULB will provide a safeguards-gender officer to coordinate monitoring activities. Source: Asian Development Bank. A. Key Persons Involved in Implementation Executing Agency MAWS acting through TNUIFSL Mr. Harmander Singh, IAS Principal Secretary to Government Municipal Administration and Water Supply Department Phone : (O) mawssec(at)tn.gov.in Secretariat, Chennai Ms. Kakarla Usha, IAS

21 15 Managing Director, TNUIFSL and Program Director Phone: / 3104 / md tnuifsl.com 19, TP Scheme Rd, Raja Annamalai Puram, Chennai, Tamil Nadu Asian Development Bank Urban Development and Water Division South Asia Department Mission Leader Mr. Sekhar Bonu Director Tel: sbonu@adb.org 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Mr. Ron H. Slangen Senior Urban Development Specialist Tel: rslangen@adb.org No. 23, Independence Avenue, Colombo Sri Lanka

22 16 B. Project Organization Structure Figure 1: Organization Structure ASIAN DEVELOPMENT BANK GOVERNMENT OF TAMIL NADU E x e c u t i n g A g e n c y Municipal Administration and Water Supply Department through Tamil Nadu Urban Infrastructure and Financial Services Limited (TNUIFSL) Program Steering Committee Commissioner of Municipal Administration (Implementing Agency) PROGRAM MANAGEMENT UNIT I m p l e m e n t i n g A g e n c i e s ULBs and CMWSSB PIU in CMA PROGRAM IMPLEMENTATION UNITS in ULBs/TWAD Board/CMWSSB Governance Improvement and Awareness Consultant Contract Management and Supervision Consultants (as required) monitoring role CMA = Commissionerate of Municipal Administration, CMWSSB = Chennai Metropolitan Water Supply and Sewerage Board, PIU = program implementation unit, TWAD = Tamil Nadu Water Supply and Drainage Board, ULBs = urban local bodies.

23 17 IV. COSTS AND FINANCING 20. The program is estimated to cost $1,268.4 million. The Government of India requested an MFF of up to $500 million from ADB's ordinary capital resources (OCR) to help finance a part of the investment program. The Asian Clean Energy Fund (ACEF) 16 under the Clean Energy Financing Partnership Facility will provide grant cofinancing equivalent to $2 million to be administered by ADB. The program will support the medium-term investment requirements envisaged in the GOTN s Tamil Nadu Vision 2023 and State Annual Action Plan The Tamil Nadu State Government, CMWSSB, and project ULBs will contribute $766.4 million to the investment costs of the MFF to finance: (i) taxes and duties; (ii) road restoration; (iii) land acquisition and resettlement costs; (iv) incremental administration cost: (v) contingencies: (vi) financing charges during implementation; and (vii) part of the civil works and equipment; and will provide the loan proceeds and counterpart funds to the implementing agency as a mix of loan and/or grant. The program will comprise three tranches (each financed by a respective tranche of the MFF), and will be subject to the government s submission of related periodic financing requests, execution of the related legal agreements for each tranche, and fulfillment of terms and conditions set forth in the framework financing agreement. 17 Cofinancing on a collaborative basis will be explored. 18 The investment program is in Table 5. Table 5: Investment Program ($ million) Item Amount a Tranche 1 Tranche 2 Tranche 3 Total A. Base Cost b 1. Climate-resilient sewage collection and treatment, and drainage systems developed in at least eight cities 2. Water supply systems in at least five cities improved with smart features 3. Institutional capacity, public awareness, and urban governance strengthened Subtotal (A) ,084.7 B. Contingencies c C. Financing Charges d Total (A+B+C) ,268.4 a In early-2018 prices; exchange rate of $1 = 64.3 is used. b Includes taxes and duties of $102.4 million to be financed from government resources by cash contribution. c Physical contingencies are computed at 5.0% for civil works and equipment. Price contingencies are computed at 1.5%-1.6% on foreign exchange costs and 4.5%-4.6% on local currency costs; includes provision for potential exchange rate fluctuation under the assumption of a purchasing power parity exchange rate. d Includes interest and commitment charges. Interest during construction for the ADB loan has been computed at the 5-year United States dollar fixed-swap rate plus a spread of 0.5% and a maturity premium of 0.2%. Commitment charges for an ADB loan are 0.15% per year to be charged on the undisbursed loan amount. 21. Tranche 1 of $477.5 million will be financed by a loan of $169 million from ADB s OCR and a grant of $2 million from ADB administered ACEF. The loan will have a 25-year term, 16 Established by the Government of Japan. ADB secured approval for the Asian Clean Energy Fund grant amount outside the MFF but will disburse funding concurrently with Tranche Framework financing agreement (accessible from the list of linked documents in Appendix 2 to the Report and Recommendation of the President to the Board of Directors). 18 During MFF preparation, ADB initiated constructive discussions with the Japan International Cooperation Agency, German Development Cooperation through KfW, and the World Bank, which currently implement urban projects in similar areas in Tamil Nadu. ADB will continue to explore parallel collaborative cofinancing in future tranches of $194 million from the Japan International Cooperation Agency, $100 million from KfW, and $197 million from the World Bank.

24 18 including a grace period of 5 years, 10% annuity repayment method, an annual interest rate determined in accordance with the ADB s LIBOR-based lending facility, a commitment charge of 0.15% every year, a maturity premium of 0.2% 19 and such other terms and conditions set forth in the draft loan and project agreements. 20 The financing plan is in Table 6. Table 6: Financing Plan ($ million) Tranche (estimated year of PFR submission) 1 (2018) 2 (2019) 3 (2022) Total Share of Total (%) Source Asian Development Bank Ordinary capital resources (regular loan) Asian Clean Energy Fund a Government of Tamil Nadu, CMWSSB, ULBs Total , PFR = periodic financing request, CMWSSB = Chennai Metropolitan Water Supply and Sewerage Board, ULB = urban local body. a Established by Government of Japan and administered by the Asian Development Bank (approval on 21 May 2018). Source: Asian Development Bank estimates. 22. The estimated qualifying cost of climate change mitigation is $ million of which ADB will finance 43.8%, and estimated qualifying cost of climate change adaptation measures is $71.82 million, of which ADB will finance 44.3%. Key climate change measures include the use of renewable solar energy for STP operations, greenhouse gas capture through new sewerage systems, water conservation through NRW management in water scarce areas, and raised elevation of critical infrastructure considering high flood levels. A. Cost Estimates Preparation and Revisions 23. The cost estimates were prepared based on the detailed project report, where available, and other relevant details of subprojects. The cost estimate model was prepared using Microsoft Excel and, is available from the project preparation team and the PMU. The cost estimates will be further revised during the implementation by the PMU. B. Key Assumptions 24. The following key assumptions underpin the cost estimates and financing plan: (i) Exchange rate: 64.3 = $1.00 (as of March 2018) (ii) Price contingencies based on expected cumulative inflation over the implementation period are as follows: Table 7: Escalation Rates for Price Contingency Calculation Item Average Foreign rate of price inflation 1.4% 2.9% 4.4% 5.9% 7.5% 9.1% 10.7% 12.3% 13.9% 15.5% 8.4% Domestic rate of price inflation 4.0% 8.6% 13.1% 17.6% 22.1% 26.6% 31.1% 35.6% 40.1% 44.6% 24.3% Source: Asian Development Bank estimates. (iii) In-kind contributions cannot be easily measured and have not been quantified. 19 The maturity-based premium of 0.2% is based on the loan term and the government s repayment period. 20 Based on these loan terms, the maturity premium payable to ADB is 0.2% per annum.

25 19 C. Detailed Cost Estimates by Expenditure Category Item Table 8: Cost Estimates by Expenditure Category under Tranche 1 ($ million) Foreign Local Total Exchange Currency Cost Total Net Cost Tax % of Total Base Cost A. Investment Costs 1. Civil works and equipment % a. Water supply and sewerage % b. Solar development % 2. Provisional Items, road restoration, etc % 3. Resettlement % 4. Performance based governance improvement incentive % 5. Consulting services % a. Contract management, supervision % d. Project design % c. Governance improvement and awareness % Subtotal (A) % B. Recurrent Costs 1. Incremental administrative costs (CMA) % 2. Incremental administrative costs (PMU) % Subtotal (B) % Total Base Cost (A+B) % C. Contingencies 1. Physical contingencies % 2. Price contingencies % Subtotal (C) % D. Financing Charges During Implementation 1. Interest during construction % 2. Commitment charges % Subtotal (D) % Total Project Cost (A+B+C+D) % CMA = Commissionerate of Municipal Administration, PMU = program management unit. Notes: 1. Numbers may not sum precisely because of rounding. 2. The costs of the actual audits of the program are minor and will be borne by the government. 3. Minor environmental monitoring and implementation of resettlement plan and gender action plan cost are absorbed in B1. ADB will not finance land acquisition cost. Source: Asian Development Bank estimates.

26 20 D. Allocation and Withdrawal of Loan and Grant Proceeds No. 1 2 Table 9: Allocation and Withdrawal of Loan Proceeds under Tranche 1 Item Works and equipment (water and sewerage) Performance based governance improvement incentive Amount Allocated for ADB Financing ($) Category 145,979,000 10,000,000 3 Consulting services 13,021,000 Total 169,000,000 Exclusive of taxes and duties imposed within the territory of the Borrower. Source: Asian Development Bank estimates. Basis for Withdrawal from the Loan Account 43.8% of total expenditure claimed 100.0% of total expenditure claimed* 84.7% of total expenditure claimed No. 1 Table 10: Allocation and Withdrawal of Grant Proceeds under Tranche 1 Item Works and equipment (solar development) Amount Allocated for ADB Financing ($) Category 2,000,000 Total 2,000,000 Source: Asian Development Bank estimates. Basis for Withdrawal from the Loan Account 89.3% of total expenditure claimed

27 21 E. Detailed Cost Estimates by Financier Item Table 11: Tranche 1 Cost Estimates by Financier ($ million) ADB ACEF GOTN, CMWSSB, ULBs Non- $ % $ % Tax Total % Tax A. Investment Costs 1. Civil works and equipment % % % a. Water supply and sewerage % - 0.0% % b. Solar development - 0.0% % % Provisional Items, road restoration, etc % - 0.0% % Resettlement - 0.0% - 0.0% % Performance based governance improvement incentive % - 0.0% % Consulting services % - 0.0% % 15.4 a. Contract management, supervision % - 0.0% % 7.3 d. Project design % - 0.0% % 3.9 c. Governance improvement and awareness % - 0.0% % 4.2 Subtotal (A) % % % B. Recurrent Costs 1. Incremental administrative costs (CMA) - 0.0% - 0.0% % Incremental administrative costs (PMU) - 0.0% - 0.0% % 1.1 Subtotal (B) - 0.0% - 0.0% % 3.3 Total Base Cost (A+B) % % % C. Contingencies 1. Physical contingencies - 0.0% - 0.0% % Price contingencies - 0.0% - 0.0% % 27.5 Subtotal (C) - 0.0% - 0.0% % 44.1 D. Financing Charges During Implementation 1. Interest during construction - 0.0% - 0.0% % Commitment charges - 0.0% - 0.0% % 0.7 Subtotal (D) - 0.0% - 0.0% % 14.2 Total Project Cost % % % ADB = Asian Development Bank, ACEF = Asian Clean Energy Fund, CMA = Commissionerate of Municipal Administration, CMWSSB = CMWSSB = Chennai Metropolitan Water Supply and Sewerage Board, GOTN = Government of Tamil Nadu, PMU = program management unit, ULBs = urban local bodies. Notes: 1. Numbers may not sum precisely because of rounding. 2. The costs of the actual audits of the program are minor and will be borne by the government. 3. Minor environmental monitoring and implementation of resettlement plan and gender action plan cost are absorbed in B1. ADB will not finance land acquisition cost. Source: Asian Development Bank estimates. Total Costs

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 49107-003 September 2018 Proposed Multitranche Financing Facility, Technical Assistance Grant, and Administration of

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

Periodic Financing Request Report. India: Kolkata Environmental Improvement Investment Program (Tranche 2)

Periodic Financing Request Report. India: Kolkata Environmental Improvement Investment Program (Tranche 2) Periodic Financing Request Report Project Number: 42266-025 MFF Number: 0075 August 2016 India: Kolkata Environmental Improvement Investment Program (Tranche 2) Distribution of this document is restricted

More information

Multitranche Financing Facility Republic of Uzbekistan: Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program

Multitranche Financing Facility Republic of Uzbekistan: Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program Facility Administration Manual Project Number: 42107 MFF Number: 0042-UZB Loan Numbers: 2635-UZB (Project 1), 2746-UZB (Project 2), and 2868-UZB (Project 3) 21 August 2013 Multitranche Financing Facility

More information

Additional Cofinancing

Additional Cofinancing Additional Cofinancing Sri Lanka Sri Lanka Project Number: 45148 Loan Number: 3029/3030-SRI May 2014 Proposed Administration of Loan Democratic Socialist Republic of Sri Lanka: Greater Colombo Water and

More information

MFF - Bihar Urban Development Investment Program (Facility Concept)

MFF - Bihar Urban Development Investment Program (Facility Concept) India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount

More information

INSTITUTIONAL ASSESSMENT I. OVERVIEW OF URBAN INSTITUTIONS IN TAMIL NADU

INSTITUTIONAL ASSESSMENT I. OVERVIEW OF URBAN INSTITUTIONS IN TAMIL NADU Tamil Nadu Urban Flagship Investment Program (RRP IND 49107-003) INSTITUTIONAL ASSESSMENT I. OVERVIEW OF URBAN INSTITUTIONS IN TAMIL NADU 1. Urban administration responsibilities in Tamil Nadu are shared

More information

Validation Report. India: North Karnataka Urban Sector Investment Program, Tranche 1. Independent Evaluation Department

Validation Report. India: North Karnataka Urban Sector Investment Program, Tranche 1. Independent Evaluation Department Validation Report Reference Number: PVR-451 Project Number: 38254-033 Loan Number: 2312 August 2016 India: North Karnataka Urban Sector Investment Program, Tranche 1 Independent Evaluation Department ABBREVIATIONS

More information

PERIODIC FINANCING REQUEST. RE: Higher Education in the Pacific Investment Program: Periodic Financing Request #1

PERIODIC FINANCING REQUEST. RE: Higher Education in the Pacific Investment Program: Periodic Financing Request #1 PERIODIC FINANCING REQUEST Date: April 2012 To: Asian Development Bank 6 ADB Avenue Mandaluyong City, Metro Manila ATTENTION: Director General, Pacific Department Fax No. +632-632-6318 Sir: RE: Higher

More information

Multitranche Financing Facility Annual Report 2017

Multitranche Financing Facility Annual Report 2017 May 2018 Multitranche Financing Facility Annual Report 2017 This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. ABBREVIATIONS ADB Asian Development

More information

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project Project Design Advance Project Number: 47279-003 September 2016 Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project This document is being disclosed to the public in accordance with ADB's Public

More information

Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) ECONOMIC ANALYSIS

Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) ECONOMIC ANALYSIS Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) A. Introduction ECONOMIC ANALYSIS 1. Karnataka. Karnataka is one of the top ten states in India by gross domestic product

More information

India: Karnataka Urban Development and Coastal Environmental Management Project

India: Karnataka Urban Development and Coastal Environmental Management Project Validation Report Reference Number: PVR-334 Project Number: 30303 Loan Number: 1704 November 2014 India: Karnataka Urban Development and Coastal Environmental Management Project Independent Evaluation

More information

FRAMEWORK FINANCING AGREEMENT

FRAMEWORK FINANCING AGREEMENT FRAMEWORK FINANCING AGREEMENT FRAMEWORK FINANCING AGREEMENT (Second Power Transmission Enhancement Investment Program) Parties This Framework Financing Agreement ( FFA ) dated 15 July 2016 is between

More information

INDIA: Preparing the Rajasthan Secondary Towns Development Investment Program

INDIA: Preparing the Rajasthan Secondary Towns Development Investment Program Appendix 3 9 Technical Assistance Report Project Number: 42267-027 Transaction Technical Assistance (TRTA) June 2017 INDIA: Preparing the Rajasthan Secondary Towns Development Investment Program This document

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 42266 September 2013 Proposed Multitranche Financing Facility India: Kolkata Environmental Improvement Investment Program

More information

Republic of Azerbaijan: Water Supply and Sanitation Investment Program Tranche 4

Republic of Azerbaijan: Water Supply and Sanitation Investment Program Tranche 4 Periodic Financing Request Report Project Number: 42408-044 MFF Number: 0032 July 2016 Republic of Azerbaijan: Water Supply and Sanitation Investment Program Tranche 4 Distribution of this document is

More information

Republic of Uzbekistan: Solid Waste Management Improvement Project

Republic of Uzbekistan: Solid Waste Management Improvement Project Project Administration Manual Project Number: 45366 Loan Number: {LXXXX-UZB} November 2013 Republic of Uzbekistan: Solid Waste Management Improvement Project CONTENTS ABBREVIATIONS I. PROJECT DESCRIPTION

More information

Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project

Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project Validation Report Reference Number: PCV: PHI 2011-15 Project Number: 35379 Loan Number: 2012 July 2011 Philippines: Metropolitan Waterworks and Sewerage System New Water Source Development Project Independent

More information

People s Republic of Bangladesh: Rural Infrastructure Maintenance Program

People s Republic of Bangladesh: Rural Infrastructure Maintenance Program Project Design Advance Project Administration Manual Project Number: 47243-003 June 2016 People s Republic of Bangladesh: Rural Infrastructure Maintenance Program CONTENTS I. PROPOSED PROJECT DESCRIPTION

More information

Bangladesh: Greater Dhaka Sustainable Urban Transport Project

Bangladesh: Greater Dhaka Sustainable Urban Transport Project Project Administration Manual Project Number: 42169 Loan and/or Grant Number(s): LXXXX; LXXXX March 2012 Bangladesh: Greater Dhaka Sustainable Urban Transport Project Contents ABBREVIATIONS I. PROJECT

More information

Periodic Financing Request Report. India: Karnataka Integrated Urban Water Management Investment Program (Tranche 2)

Periodic Financing Request Report. India: Karnataka Integrated Urban Water Management Investment Program (Tranche 2) Periodic Financing Request Report Project Number: 43253-027 MFF Number: 0080-IND October 2018 India: Karnataka Integrated Urban Water Management Investment Program (Tranche 2) Distribution of this document

More information

Project Administration Manual. Project Number: Grant Number: GXXXX November Vanuatu: Cyclone Pam School Reconstruction Project

Project Administration Manual. Project Number: Grant Number: GXXXX November Vanuatu: Cyclone Pam School Reconstruction Project Project Administration Manual Project Number: 49320-001 Grant Number: GXXXX November 2015 Vanuatu: Cyclone Pam School Reconstruction Project Contents ABBREVIATIONS 4 I. PROJECT DESCRIPTION 1 II. IMPLEMENTATION

More information

Establishment of the High-Level Technology Fund

Establishment of the High-Level Technology Fund April 2017 Establishment of the High-Level Technology Fund Distribution of this document is restricted until it has been approved by Management. Following such approval, ADB will disclose the document

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

Periodic Financing Request Report. India: Assam Power Sector Investment Program (Tranche 2)

Periodic Financing Request Report. India: Assam Power Sector Investment Program (Tranche 2) Periodic Financing Request Report Project Number: 47101-003 MFF Number: 0083 November 2015 India: Assam Power Sector Investment Program (Tranche 2) This document is being disclosed to the public in accordance

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE 8 Appendix 3 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of the Republic of the Union of Myanmar has requested the Asian Development Bank (ADB) to provide a project preparatory

More information

(c) Section 3.07 is deleted and the following is substituted therefor:

(c) Section 3.07 is deleted and the following is substituted therefor: 2 outstanding Loan on which a higher Fixed Spread is applicable. The amount of the Rebate shall be determined by multiplying (i) the difference between the Fixed Spread applicable to the outstanding Loan

More information

Periodic Financing Request Report. India: Railway Sector Investment Program (Tranche 3)

Periodic Financing Request Report. India: Railway Sector Investment Program (Tranche 3) Periodic Financing Request Report Project Number: 36330-043 MFF Number: 0060 November 2017 India: Railway Sector Investment Program (Tranche 3) Distribution of this document is restricted until it has

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section H5/BP Page 1 of 4 BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction ADDITIONAL FINANCING 1. The

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

FINANCIAL ANALYSIS: PROJECT 1

FINANCIAL ANALYSIS: PROJECT 1 Green Power Development and Energy Efficiency Improvement Investment Program (RRP SRI 47037) A. Background and Rationale FINANCIAL ANALYSIS: PROJECT 1 1. Project 1 of the Green Power Development and Energy

More information

Section 3.06 is deleted and the following is substituted therefor:

Section 3.06 is deleted and the following is substituted therefor: 2 (c) Section 3.03 is deleted and the following is substituted therefor: Commitment Charge; Credit; Maturity Premium. (a) The Borrower shall pay a commitment charge on the unwithdrawn amount of the Loan

More information

Project Administration Manual

Project Administration Manual Project Administration Manual Project Number:50102 Loan and/or Grant Number(s): {LXXXX; GXXXX} July 2018 Kingdom of Cambodia: Second Urban Environmental Management in the Tonle Sap Basin Project ABBREVIATIONS

More information

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT Himachal Pradesh Clean Energy Transmission Investment Program (RRP IND 43464) TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT A. INTRODUCTION 1. The

More information

Multitranche Financing Facility Azerbaijan: Water Supply and Sanitation Investment Program Project 2

Multitranche Financing Facility Azerbaijan: Water Supply and Sanitation Investment Program Project 2 Project Administration Manual Project Number: P42408-033 Loan No. 2842-AZE November 2017 Multitranche Financing Facility Azerbaijan: Water Supply and Sanitation Investment Program Project 2 2 CONTENTS

More information

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) the Borrower has applied to ADB for a loan

More information

FINANCIAL MANAGEMENT ASSESSMENT

FINANCIAL MANAGEMENT ASSESSMENT Greater Malé Environmental Improvement and Waste Management Project (RRP MLD 51077) EXECUTIVE SUMMARY FINANCIAL MANAGEMENT ASSESSMENT 1. The financial management assessment (FMA) was conducted for the

More information

India: Preparing for the Ara Canal Water Productivity Improvement Project

India: Preparing for the Ara Canal Water Productivity Improvement Project Technical Assistance Report Project Number: 52153-002 Transaction Technical Assistance (TRTA) June 2018 India: Preparing for the Ara Canal Water Productivity Improvement Project This document is being

More information

Periodic Financing Request Report. People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4

Periodic Financing Request Report. People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4 Periodic Financing Request Report Project Number: 43332 December 2013 People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4 CURRENCY EQUIVALENTS

More information

Bangladesh: Urban Governance and Infrastructure Improvement (Sector) Project

Bangladesh: Urban Governance and Infrastructure Improvement (Sector) Project f Validation Report Reference Number: PVR-370 Project Number: 29041 Loan Number: 1947 December 2014 Bangladesh: Urban Governance and Infrastructure Improvement (Sector) Project Independent Evaluation Department

More information

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) by a loan agreement of even date herewith

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK . ASIAN DEVELOPMENT BANK TAR: BAN 35242 TECHNICAL ASSISTANCE TO THE PEOPLE S REPUBLIC OF BANGLADESH FOR PREPARING THE GAS SECTOR DEVELOPMENT PROJECT April 2004 CURRENCY EQUIVALENTS (as of 21 April 2004)

More information

IND: Accelerating Infrastructure Investment Facility in India

IND: Accelerating Infrastructure Investment Facility in India Accelerating Infrastructure Investment Facility in India (RRP IND 47083) Facility Administration Manual Project Number: 47083 August 2013 IND: Accelerating Infrastructure Investment Facility in India The

More information

Islamic Republic of Pakistan: Enhancing Public- Private Partnerships in Punjab Project

Islamic Republic of Pakistan: Enhancing Public- Private Partnerships in Punjab Project Enhancing Public Private Partnerships in Punjab Project (RRP PAK 49128) Project Administration Manual Project Number: 49128-002 Loan, Grant, and TA Numbers: LXXXX; GXXXX; TAXXXX November 2017 Islamic Republic

More information

Evaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015

Evaluation Approach Project Performance Evaluation Report for Loan 2167 and Grant 0006-SRI: Tsunami-Affected Areas Rebuilding Project September 2015 Asian Development Bank 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org www.adb.org/evaluation Evaluation Approach Project Performance

More information

PROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH

PROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH LOAN NUMBER 2499-PAK (SF) PROJECT AGREEMENT (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK and PROVINCE OF SINDH NORTH SINDH URBAN SERVICES CORPORATION LIMITED DATED

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program)

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program) PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program) 1. A project preparatory technical assistance (PPTA) for $700,000 in grant funds is

More information

Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project

Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project Technical Assistance Report Project Number: 51107-001 Transaction Technical Assistance (TRTA) October 2017 Democratic Socialist Republic of Sri Lanka: Preparing the Health System Enhancement Project This

More information

Cook Islands: Renewable Energy Sector Project

Cook Islands: Renewable Energy Sector Project Project Administration Manual Project Number: 46453 October 2017 Cook Islands: Renewable Energy Sector Project (including Additional Financing I and II) ABBREVIATIONS CONTENTS I. PROJECT DESCRIPTION 1

More information

Socialist Republic of Viet Nam: Water Sector Investment Program Multitranche Financing Facility (MFF) Periodic Financing Request 3

Socialist Republic of Viet Nam: Water Sector Investment Program Multitranche Financing Facility (MFF) Periodic Financing Request 3 Appendix 3: Water Sector Investment Program (MFF0054-VIE) PFR3 Report VIE 41456-043 Project Administration Manual Project Number: 41456-043 Loan Number: XXXX March 2015 Socialist Republic of Viet Nam:

More information

People s Republic of Bangladesh: Secondary Education Sector Investment Program (Tranche 3)

People s Republic of Bangladesh: Secondary Education Sector Investment Program (Tranche 3) Periodic Financing Request Report Project Number: 44213-018 MFF Number: 0074 March 2018 People s Republic of Bangladesh: Secondary Education Sector Investment Program (Tranche 3) Distribution of this document

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Lanka Project Number: 46265 September 2013 Proposed Administration of Grant Socialist Republic of Viet Nam: Energy Efficiency for Ho

More information

Project Administration Manual. Project Number: November Cook Islands: Renewable Energy Sector Project

Project Administration Manual. Project Number: November Cook Islands: Renewable Energy Sector Project Project Administration Manual Project Number: 46453 November 2014 Cook Islands: Renewable Energy Sector Project Contents ABBREVIATIONS I. PROJECT DESCRIPTION 5 A. Impact and Outcome 5 B. Outputs 5 II.

More information

People's Republic of Bangladesh: Dhaka Chittagong Expressway PPP Design

People's Republic of Bangladesh: Dhaka Chittagong Expressway PPP Design Dhaka Chittagong Expressway PPP Design (RRP BAN 45174) Project Administration Manual Project Number: 45174 Loan Number: October 2011 People's Republic of Bangladesh: Dhaka Chittagong Expressway PPP Design

More information

URBAN GOVERNANCE ASSESSMENT

URBAN GOVERNANCE ASSESSMENT Tamil Nadu Urban Flagship Investment Program (RRP IND 49107-003) URBAN GOVERNANCE ASSESSMENT I. INTRODUCTION 1. The Government of Tamil Nadu (GOTN) requested support for a Governance Improvement Component

More information

LOAN AGREEMENT (Special Operations) (Road Network Upgrading Project) between DEMOCRATIC REPUBLIC OF TIMOR-LESTE. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Special Operations) (Road Network Upgrading Project) between DEMOCRATIC REPUBLIC OF TIMOR-LESTE. and ASIAN DEVELOPMENT BANK LOAN NUMBER 2858-TIM (SF) LOAN AGREEMENT (Special Operations) (Road Network Upgrading Project) between DEMOCRATIC REPUBLIC OF TIMOR-LESTE and ASIAN DEVELOPMENT BANK DATED 2 MAY 2012 TIM 45094 LOAN AGREEMENT

More information

Facility Administration Manual

Facility Administration Manual Green Power Development and Energy Efficiency Improvement Investment Program (RRP SRI 47037) Facility Administration Manual Project Number: 47037 Loan Numbers: {LXXXX; LXXXX} May 2014 Democratic Socialist

More information

Project Administration Manual. India: Green Energy Corridor and Grid Strengthening Project. Project Numbers: October 2015

Project Administration Manual. India: Green Energy Corridor and Grid Strengthening Project. Project Numbers: October 2015 Green Energy Corridor and Grid Strengthening Project (RRP IND 44426) Project Administration Manual Project Numbers: 44426-016 October 2015 India: Green Energy Corridor and Grid Strengthening Project Contents

More information

India: Madhya Pradesh Irrigation Efficiency Improvement Project

India: Madhya Pradesh Irrigation Efficiency Improvement Project Madhya Pradesh Irrigation Efficiency Improvement Project (RRP IND 45371) Project Administration Manual Project Number: 45371-007 Loan Number: LXXXX April 2018 India: Madhya Pradesh Irrigation Efficiency

More information

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS Strengthening Public Financial Resource Management through Information and Communication Systems Technology Systems (TRTA MON 51084) OUTLINE TERMS OF REFERENCE FOR CONSULTANTS 1. The transaction technical

More information

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project

People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project Validation Report Reference Number: PVR-462 Project Number: 42496-013 Loan Number: 2508 December 2016 People s Republic of China: Emergency Assistance for Wenchuan Earthquake Reconstruction Project Independent

More information

Report and Recommendation of the President to the Board of Directors. Proposed Loan Kingdom of Bhutan: Secondary Towns Urban Development Project

Report and Recommendation of the President to the Board of Directors. Proposed Loan Kingdom of Bhutan: Secondary Towns Urban Development Project Report and Recommendation of the President to the Board of Directors Project Number: 42229-016 May 2018 Proposed Loan Kingdom of Bhutan: Secondary Towns Urban Development Project Distribution of this document

More information

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones

People s Republic of China: Study on Natural Resource Asset Appraisal and Management System for the National Key Ecological Function Zones Technical Assistance Report Project Number: 50004-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Study on Natural Resource Asset Appraisal and Management System

More information

FINANCIAL ANALYSIS. A. Introduction

FINANCIAL ANALYSIS. A. Introduction Urban Water Supply and Wastewater Management Investment Project (RRP FIJ 491-2) A. Introduction FINANCIAL ANALYSIS 1. The Asian Development Bank (ADB) Urban Water Supply and Wastewater Management Investment

More information

OPERATIONS MANUAL BANK POLICIES (BP)

OPERATIONS MANUAL BANK POLICIES (BP) BANK POLICIES (BP) OM Section F1/BP Page 1 of 2 These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. SAFEGUARD POLICY STATEMENT 1. The Asian Development

More information

Islamic Republic of Pakistan: Punjab Intermediate Cities Improvement Investment Project

Islamic Republic of Pakistan: Punjab Intermediate Cities Improvement Investment Project Punjab Intermediate Cities Improvement Investment Project (RRP PAK 46526) Project Administration Manual Draft as of 26 July 2017 Project Number: 46526-002 Loan Number: LXXXX July 2017 Islamic Republic

More information

Nepal: Regional Urban Development Project

Nepal: Regional Urban Development Project Regional Urban Development Project (RRP NEP 47252) Project Administration Manual Project Number: 47252-002 Loan and/or Grant Number(s): {LXXXX; GXXXX; TAXXXX} September 2017 Nepal: Regional Urban Development

More information

Indonesia: Metropolitan Medan Urban Development Project

Indonesia: Metropolitan Medan Urban Development Project Validation Report Reference Number: PCV:INO 2009-09 Project Number: 27358 Loan Number: 1587 May 2009 Indonesia: Metropolitan Medan Urban Development Project Independent Evaluation Department 2 ABBREVIATIONS

More information

Georgia: Emergency Assistance for Post-Conflict Recovery

Georgia: Emergency Assistance for Post-Conflict Recovery Validation Report Reference Number: PCV: GEO 2011-49 Project Number: 32023 Loan Number: 2469-GEO(SF) December 2011 Georgia: Emergency Assistance for Post-Conflict Recovery Independent Evaluation Department

More information

LOAN AGREEMENT (Ordinary Operations) (Himachal Pradesh Clean Energy Development Investment Program Project 4) between INDIA. and

LOAN AGREEMENT (Ordinary Operations) (Himachal Pradesh Clean Energy Development Investment Program Project 4) between INDIA. and LOAN NUMBER 2914-IND LOAN AGREEMENT (Ordinary Operations) (Himachal Pradesh Clean Energy Development Investment Program Project 4) between INDIA and ASIAN DEVELOPMENT BANK DATED 19 NOVEMBER 2012 IND 41627

More information

OPERATIONS MANUAL BANK POLICIES (BP)

OPERATIONS MANUAL BANK POLICIES (BP) OM Section J6/BP Page 1 of 3 BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Definitions DISBURSEMENT Closing date The

More information

India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects

India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects Technical Assistance Report Project Number: 51308-002 Transaction Technical Assistance Facility (F-TRTA) December 2017 India: Enhancing Capacity of State Utilities in Preparing Energy Sector Projects Distribution

More information

Islamic Republic of Pakistan: Sindh Provincial Road Improvement Project

Islamic Republic of Pakistan: Sindh Provincial Road Improvement Project Sindh Provincial Road Improvement Project (RRP PAK 46377) Project Administration Manual Project Number: 46377 Loan Number: September 2015 Islamic Republic of Pakistan: Sindh Provincial Road Improvement

More information

Policy Paper. June Mainstreaming the Multitranche Financing Facility

Policy Paper. June Mainstreaming the Multitranche Financing Facility Policy Paper June 2008 Mainstreaming the Multitranche Financing Facility ABBREVIATIONS ADB Asian Development Bank ADF Asian Development Fund CPS country partnership strategy DMC developing member country

More information

Section 3.07 is deleted and the following is substituted therefor:

Section 3.07 is deleted and the following is substituted therefor: 2 outstanding Loan and the Fixed Spread that will be applied to new Loans (expressed as a percentage per annum), by (ii) the principal amount of the outstanding Loan on which the Borrower shall pay interest

More information

BHU: Second Green Power Development Project

BHU: Second Green Power Development Project Second Green Power Development Project (RRP BHU 44444) Project Administration Manual Project Number: 44444 Loan and/or Grant Number(s): {LXXXX&XXXX; GXXXX; TAXXXX} November 2014 BHU: Second Green Power

More information

Evaluation Approach Project Performance Evaluation Report for ADB Loans 1913/1914 Sri Lanka: Plantation Development Project July 2015 I.

Evaluation Approach Project Performance Evaluation Report for ADB Loans 1913/1914 Sri Lanka: Plantation Development Project July 2015 I. Asian Development Bank. 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org; www.adb.org/evaluation Evaluation Approach Project Performance

More information

LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK LOAN NUMBER 2729-ARM LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA and ASIAN DEVELOPMENT BANK DATED 30 MAY 2011 ARM 42145 LOAN

More information

INDIA: Rajasthan State Highway Investment Program

INDIA: Rajasthan State Highway Investment Program Rajasthan State Highway Investment Program (RRP IND 49228) Facility Administration Manual Project Number: 49228-001 Loan Number: XXXX April 2017 INDIA: Rajasthan State Highway Investment Program ADB APFS

More information

People s Republic of Bangladesh: Natural Gas Infrastructure and Efficiency Improvement Project

People s Republic of Bangladesh: Natural Gas Infrastructure and Efficiency Improvement Project Natural Gas Infrastructure and Efficiency Improvement Project (RRP BAN 45203) Project Administration Manual Project Number: 45203-006 October 2016 People s Republic of Bangladesh: Natural Gas Infrastructure

More information

Evaluation Approach Paper Project Performance Evaluation Report: Economic Recovery Program in the Maldives (Loans 2597/2598-MLD) August 2017

Evaluation Approach Paper Project Performance Evaluation Report: Economic Recovery Program in the Maldives (Loans 2597/2598-MLD) August 2017 Asian Development Bank. 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2163; evaluation@adb.org; www.adb.org/evaluation Evaluation Approach Paper Project

More information

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project Technical Assistance Report Project Number: 51039-001 Transaction Technical Assistance (TRTA) September 2017 Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

More information

LOAN AGREEMENT (Ordinary Operations) (Clean Energy Finance Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and

LOAN AGREEMENT (Ordinary Operations) (Clean Energy Finance Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and LOAN NUMBER 3186-IND LOAN AGREEMENT (Ordinary Operations) (Clean Energy Finance Investment Program Project 1) between ASIAN DEVELOPMENT BANK and INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY LIMITED DATED

More information

Periodic Financing Request Report. Armenia: Sustainable Urban Development Investment Program Tranche 2

Periodic Financing Request Report. Armenia: Sustainable Urban Development Investment Program Tranche 2 Periodic Financing Request Report Project Number: 42417-033 MFF Number: 0056 September 2015 Armenia: Sustainable Urban Development Investment Program Tranche 2 This document is being disclosed to the public

More information

Socialist Republic of Viet Nam: Preparing the Hai Phong Water Supply Project

Socialist Republic of Viet Nam: Preparing the Hai Phong Water Supply Project Technical Assistance Report Project Number: 41425 October 2008 Socialist Republic of Viet Nam: Preparing the Hai Phong Water Supply Project (Financed by the Netherlands Trust Fund for the Water Financing

More information

Nepal: Road Connectivity Sector I Project

Nepal: Road Connectivity Sector I Project Validation Report October 2017 Nepal: Road Connectivity Sector I Project Reference Number: PVR-523 Project Number: 37266-032 Grant Number: 0051 ABBREVIATIONS ADB Asian Development Bank DOR Department of

More information

Periodic Financing Request Report. People s Republic of Bangladesh: Secondary Education Sector Investment Program Tranche 2

Periodic Financing Request Report. People s Republic of Bangladesh: Secondary Education Sector Investment Program Tranche 2 Periodic Financing Request Report Project Number: 44213-017 November 2015 People s Republic of Bangladesh: Secondary Education Sector Investment Program Tranche 2 This document is being disclosed to the

More information

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance Technical Assistance Report Project Number: 47287-001 Capacity Development Technical Assistance (CDTA) December 2013 Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved

More information

Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1)

Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1) Validation Report Reference Number: PVR-326 Project Number: 37066 Loan Number: 2248 October 2014 Multitranche Financing Facility India: Rural Road Sector II Investment Program (Project 1) Independent Evaluation

More information

ATTACHED TECHNICAL ASSISTANCE

ATTACHED TECHNICAL ASSISTANCE Third Capital Market Development Program (RRP BAN 45253) ATTACHED TECHNICAL ASSISTANCE A. Introduction 1. The attached technical assistance (TA) of $700,000 will support implementation of the proposed

More information

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan Technical Assistance Report Project Number: 46539 Regional Capacity Development Technical Assistance (R CDTA) August 2014 Improving the Financial Management Capacity of Executing Agencies in Afghanistan

More information

Ex post evaluation India

Ex post evaluation India Ex post evaluation India Sector: 24030 - Formal sector financial intermediaries Programme/Project: Urban infrastructure development Tamil Nadu - 2006 66 107* (interest subsidy), 2006 66 081** (bond issue)

More information

Project Administration Manual

Project Administration Manual Ha Noi and Ho Chi Minh City Power Grid Development Sector Project (RRP VIE 46391) Project Administration Manual Project Number: 46391 Loan Numbers: {LXXXX; LXXXX} August 2014 Socialist Republic of Viet

More information

Nauru: Sustainable and Climate-Resilient Connectivity Project

Nauru: Sustainable and Climate-Resilient Connectivity Project Sustainable and Climate-Resilient Connectivity Project (RRP NAU 48480-003) Project Administration Manual Project Number: 48480-003 Grant Numbers: GXXXX; GXXXX; GXXXX December 2017 Nauru: Sustainable and

More information

Updated Facility Administration Manual. Socialist Republic of Viet Nam: Greater Mekong Subregion Ben Luc Long Thanh Expressway Project

Updated Facility Administration Manual. Socialist Republic of Viet Nam: Greater Mekong Subregion Ben Luc Long Thanh Expressway Project Updated Facility Administration Manual Project Number: 41414 Loan Number: MFF 0053-VIE 23 March 2016 Socialist Republic of Viet Nam: Greater Mekong Subregion Ben Luc Long Thanh Expressway Project 1 Contents

More information

Pakistan: Second Power Transmission Enhancement Investment Program (Tranche 2)

Pakistan: Second Power Transmission Enhancement Investment Program (Tranche 2) Periodic Financing Request Report Project Number: 48078-004 MFF Number: 0092 September 2017 Pakistan: Second Power Transmission Enhancement Investment Program (Tranche 2) Distribution of this document

More information

Secondary Towns and Rural Community Based Water Supply and Sanitation Project Loan No SRI (SF) LOAN COVENANTS COMPLIANCE AS AT 31 March 2011

Secondary Towns and Rural Community Based Water Supply and Sanitation Project Loan No SRI (SF) LOAN COVENANTS COMPLIANCE AS AT 31 March 2011 Secondary Towns and Rural Community Based Water Supply and Sanitation Project Loan No. 1993 SRI (SF) LOAN COVENANTS COMPLIANCE AS AT 31 March 2011 Reference in Loan Agreement paras 2 and 3 Covenant A.

More information

Ulaanbaatar Urban Services and Ger Areas Development Investment Program

Ulaanbaatar Urban Services and Ger Areas Development Investment Program EA Progress Report Project Number: 45007-003 Loan: 3099-MON Period covered October December 2016 Mid Term Review (February 2016) Ulaanbaatar Urban Services and Ger Areas Development Investment Program

More information