Multitranche Financing Facility Azerbaijan: Water Supply and Sanitation Investment Program Project 2

Size: px
Start display at page:

Download "Multitranche Financing Facility Azerbaijan: Water Supply and Sanitation Investment Program Project 2"

Transcription

1 Project Administration Manual Project Number: P Loan No AZE November 2017 Multitranche Financing Facility Azerbaijan: Water Supply and Sanitation Investment Program Project 2

2 2 CONTENTS ABBREVIATIONS 4 I. PROJECT DESCRIPTION 5 A. Overview 5 B. Project 2 5 II. IMPLEMENTATION PLANS 7 A. Project Readiness Activities 7 B. Overall Project Implementation Plan 8 III. PROJECT MANAGEMENT ARRANGEMENT 9 A. Project Implementation Organizations Roles and Responsibilities 9 B. Key Persons Involved in Implementation 10 C. Investment Program Organization Structure 11 D. Allocation and Withdrawal of Tranche 2 Loan Proceeds 12 IV. COSTS AND FINANCING 13 A. Detailed Cost Estimates by Expenditure Category 13 B. Detailed Cost Estimates by Financier 14 C. Detailed Cost Estimates by Outputs/Components 15 D. Project 2 Detailed Cost Estimates by Year 16 E. Contract and Disbursement S-curve 17 F. Fund Flow Diagram 18 V. FINANCIAL MANAGEMENT 19 A. Financial Management Assessment 19 B. Disbursement 19 C. Accounting 20 D. Auditing 20 VI. PROCUREMENT AND CONSULTING SERVICES 21 A. Advance Contracting and Retroactive Financing 21 B. Procurement of Goods, Works and Consulting Services 21 C. Procurement Plan for Project 2 22 BASIC DATA 22 VII. SAFEGUARDS 25 A. Social Safeguards 25 B. Environmental Safeguards 25 VIII. GENDER AND SOCIAL DIMENSIONS 29 IX. PERFORMANCE MONITORING, EVALUATION, REPORTING, AND COMMUNICATION 32 A. Monitoring 32 B. Evaluation 32 C. Reporting 32 X. ANTICORRUPTION POLICY 33 XI. ACCOUNTABILITY MECHANISM 34 XII. RECORD OF PAM CHANGES 35

3 3 Project Administration Manual Purpose and Process The project administration manual (PAM) describes the essential administrative and management requirements to implement the Water Supply and Sanitation Investment Program (Investment Program) on time, within budget, and in accordance with Government and Asian Development Bank (ADB) policies and procedures. The PAM should include references to all available templates and instructions either through linkages to relevant URLs or directly incorporated in the FAM. Azersu Joint Stock Company (AZERSU) and the State Amelioration and Water Management Committee (SAWMC), the investment program executing agencies, are wholly responsible for the implementation of ADB financed projects, as agreed jointly between the borrower and ADB, and in accordance with Government and ADB s policies and procedures. ADB staff is responsible to support implementation including compliance by AZERSU and SAWMC of their obligations and responsibilities for project implementation in accordance with ADB s policies and procedures. In the event of any discrepancy or contradiction between the PAM and the Loan and/or Project Agreement, the provisions of the Loan and/or Project Agreement shall prevail. After ADB President s approval of the loan, changes in implementation arrangements are subject to agreement and approval pursuant to relevant Government and ADB administrative procedures (including the Project Administration Instructions) and upon such approval they will be subsequently incorporated in the PAM.

4 4 Abbreviations ADB AZERSU EA EIRR EOCC FFA FIRR GDP IEE JSC LIBOR MFF NGO PFR PMF IPMO PPMS SAWMC TWUA WACC WSS Asian Development Bank Azersu Joint Stock Company executing agency economic internal rate of return economic opportunity cost of capital framework financing agreement financial internal rate of return gross domestic product initial environmental examination joint stock company London interbank offered rate multitranche financing facility nongovernment organization periodic financing request program management facility investment program management office project performance management system State Amelioration and Water Management Committee town water users association weighted average cost of capital water supply and sanitation

5 5 I. PROJECT DESCRIPTION A. Overview 1. The Investment Program will improve public health and environment in areas having about 500,000 residents total. The outcome of the Investment Program will be improved coverage, and continuity and quality of water supplies and wastewater disposal. Outputs include (i) physical expansion of the system; (ii) greater institutional efficiencies and management; and (iii) better planning, monitoring, evaluation, reporting, and treatment of priority themes. 1. Component A: Water Supply and Sanitation Infrastructure Development 2. Component A will finance WSS infrastructure in Agdash, Agdjabedi, Beylagan, Goychay, Nakhchivan. This component will increase water supply coverage and the number of metered connections to piped networks; reduce system leaks to ensure 24-hour supply of pressurized, safe drinking water; and improve the disposal and treatment of wastewater. 2. Component B: Institutional Effectiveness 3. Component B will be implemented in Agdash, Agdjabedi, Beylagan, Nakchivan. This component will finance nonphysical instruments targeting (i) institutional improvements for water supply and sanitation (WSS) service delivery; (ii) capacity development for better system planning, operation, and maintenance; (iii) enhanced cost recovery through metering, billing, and collection tariffs; (iv) increased efficiency for timely processing of effective WSS projects; and (v) a twinning arrangement with an external WSS utility to support capacity development. 3. Component C: Program Management Facility 4. Component C will finance implementation oversight at joint stock companies (JSCs)and sukanals, and consulting services for supervising works in the remaining investment program towns. B. Project 2 5. Project 2 of the Investment Program will improve WSS services in Agdash, Beylagan, Goychay, and Nakhchivan. The outcome of project 2 is improved access to WSS infrastructure in Agdash, Beylagan, Goychay, and Nakhchivan. The outputs will include (i) infrastructure investments to rehabilitate, improve, and expand WSS system and construct sewage treatment facilities in Agdash, Beylagan, Goychay, and Nakhchivan, and benefit approximately 201,000 persons by the end of the project period; (ii) implementation of a public outreach program targeting school children and teachers to disseminate project benefits, and better hygiene and sanitation practices to the community; and (iii) program management investments to supervise civil works in Nakhchivan.See Annex 1 for the Design and Monitoring Framework. 6. The Azersu Joint Stock Company (AZERSU) will be the Executing Agency for all project activities except those in Nakhchivan Autonomous Republic (NAR), where the State Amelioration and Water Management Committee(SAWMC) will be the Executing Agency. The investment program management offices (IPMOs) created at AZERSU and SAWMC will be responsible for supporting project implementation. Each IPMO will comprise international and national consultants (to be engaged through firms or directly as individuals) and counterpart staff.

6 6 7. The IPMOs will submit PFRs; undertake due diligence for subsequent projects; prepare detailed design for future investments; supervise procurement and construction; oversee safeguards and gender compliance; coordinate among rayon (town) agencies; monitor and evaluate project progress; prepare progress reports; and provide expertise in project management, planning, results measurement, and training. The IPMOs will also provide handson training to staff members during each stage of the investment program implementation. 8. Officials of the Cabinet of Ministers, the Ministry of Finance, the Ministry of Economic, Azersu provides general policy and strategic oversight, resolves interagency problems and oversees overall implementation. They comprehensively decide on future PFRs and evaluate implementation of the Investment Program based on the design and monitoring framework.

7 7 II. IMPLEMENTATION PLANS A. Project Readiness Activities Project 2 Indicative Activities 1 Advance contracting actions 1 2 Management Approval 4 Tranche 2 Loan signing 5 Government legal opinion provided 6 Government budget inclusion 7 Tranche 2 Loan effectiveness Jun Jul Aug Sept Oct Nov Dec Jan Party AZERSU, SAWMC, ADB ADB MOF, AZERSU SAWMC, ADB MOF, AZERSU SAWMC MOF MOF, MOJ ADB = Asian Development Bank, AZERSU = Azersu Joint Stock Company, MFF = multitranche financing facility, MOJ = Ministry of Justice, MOF = Ministry of Finance, SAWMC = State Amelioration and Water Management Committee. 1 ADB approved advance contracting and retroactive financing for civil works and consulting services on 17 November 2011.

8 8 B. Overall Project Implementation Plan Azerbaijan: Water Supply and Sanitation Investment Program - T2 Loan Implementation Progress Activity 1 Project Preparation 2 Detailed Engineering Design and Bidding Document 3 Invitation for Bids 4 Loan Approval 5 Trance 2 Loan Effectiveness Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Component A: WSS Infrastructure Development 6 Agdash Water Supply and Sewerage Network 7 Beylagan Water Supply and Sewerage Network 8 Goychay Water Supply and Sewerage Network 9 Nakhchivan Water Supply and Sewerage Network 10 Goychay Sewage Treatment Plant 11 Nakhchivan Sewage Treatment Plant Shikhmahmud Water Supply and Sewarage Network Component B: Institutional Effectiveness 12 Twinning Program 13 Public Outreach Program Component C: Program Management Facility 14 Design and Supervision 15 Resettlement Plan Implementation 16 Safeguards Compliance Monitoring 17 Gender Action Plan Monitoring

9 9 III. PROJECT MANAGEMENT ARRANGEMENT A. Project Implementation Organizations Roles and Responsibilities Implementation Organizations Executing Agency (AZERSU and SAWMC) Program Management Facility (PMF) Investment Program Management Consultant (AZERSU) Investment Program Management Consultant (SAWMC) Management Roles and Responsibilities responsible for investment program oversight and administration hold monthly meetings with JSCs and Sukanals to review progress submit progress reports to the PSC for decision making ensure compliance with investment program covenants submit Investment Program documents, including audit reports, to ADB on time responsible for executing the investment program including its development and management provide hands-on training to JSCs and SuKanals staff during each stage of the investment program implementation responsible for tendering, and construction supervision in Agdash, Aghabedi, Balakan, Beylagan, and Goychay responsible for completion safeguards compliance documents for all subprojects responsible for assisting AZERSU in preparing the periodic financing request responsible for tendering, and construction supervision in Nakhchivan responsible for completion safeguards compliance documents for all subprojects responsible for assisting SAWMC in preparing the periodic financing request ADB Ensure technical and financial support and oversight according to the framework financing, loan and project agreement

10 10 B. Key Persons Involved in Implementation Executing Agency Azersu Joint Stock Company State Amelioration and Water Management Committee(SAWMC) Asian Development Bank Azerbaijan Resident Mission Central and West Asia Department Mission Leader Contact Information Officer's Name: Mr. Etibar Mammadov Position: Deputy Chairman Telephone: address: Officer's Name: Mr. Asgar Asgerov Position: Chairman Telephone: (+99436) address: Staff Name: Mr. Nariman Mannapbekov Position: Country Director Telephone: (ext 108) address: Staff Name: Ms. Sabina Jafarova Position: Project Officer Telephone: (ext 116) address:

11 11 C. Investment Program Organization Structure Cabinet of Ministries Azersu Joint Stock Company State Amelioration and Water Management Committee Investment Program Management Office Investment Program Management Office Investment Program Management Consultant Contractor Investment Program Management Consultant Contractor Water Supply and Sanitation Infrastructure Improvement

12 12 D. Allocation and Withdrawal of Tranche 2 Loan Proceeds Number Category Total Amount Allocated for ADB Financing ADB Financing ($) Percentage and Basis for Withdrawal from the Loan Account 1 Civil Works % of total expenditure claimed* 2 Consulting Services and Project Management % of total expenditure claimed* 3 Unallocated - Total * excluding taxes and duties. Source: AZERSU and SAWMC data.

13 13 IV. COSTS AND FINANCING A. Detailed Cost Estimates by Expenditure Category Project 2 Items $ million Total Cost % of Total Base Cost A. Investment Costs 1 Civil Works Environment and Social Mitigation Consultants Subtotal (A) B. Recurrent Costs 1 IPMO System Operation and Maintenance Subtotal (B) Total Base Cost C. Contingencies 1 Physical Price Subtotal (C) D. Financing Charges During Implementation 1 Interest During Construction Commitment Charges Subtotal (D) Total Project Cost (A+B+C+D) Source: AZERSU and SAWMC estimates as of November 2011.

14 14 B. Detailed Cost Estimates by Financier Project 2 A. Investment Costs Item $ million Total Cost Amount ADB % of Cost Category Government Amount % of Cost Category 1 Civil Works Environment and Social Mitigation Consultants Subtotal (A) B. Recurrent Costs 1 IPMO System Operation and Maintenance Subtotal (B) Total Base Cost C. Contingencies 1 Physical Price Subtotal (C) D. Financing Charges During Implementation 1 Interest During Implementation Commitment Charges Subtotal (D) Total Project Cost (A+B+C+D) Source: AZERSU and SAWMC estimates as of November 2011.

15 15 C. Detailed Cost Estimates by Outputs/Components Project 2 Item A. Investment Costs $ million Total Cost Water Amount % of Cost Category Sewerage Amount % of Cost Category 1 Civil Works Environment and Social Mitigation Consultants Subtotal (A) B. Recurrent Costs 1 IPMO System Operation and Maintenance Subtotal (B) Total Base Cost C. Contingencies 1 Physical Price Subtotal (C) D. Financing Charges During Implementation 1 Interest During Implementation Commitment Charges Subtotal (D) Total Project Cost (A+B+C+D) Source: AZERSU and SAWMC estimates as of November 2011.

16 16 D. Project 2 Detailed Cost Estimates by Year A Investment Costs $ million Cost Category Total Civil Works Environment and Social Mitigation Consultants B Subtotal A - Investment Costs Recurrent Costs 1 IPMO System O&M C Subtotal B - Recurrent Costs Total Base Cost Contingencies 1 Physical Price D Subtotal C - Contingencies Financing Charges 1 Interest During Construction Commitment Charges Subtotal D - Financing Charges Total Project Cost Source: AZERSU and SAWMC estimates as of November 2011.

17 мар.12 июн.12 сен.12 дек.12 мар.13 июн.13 сен.13 дек.13 мар.14 июн.14 сен.14 дек.14 мар.15 июн.15 сен.15 дек.15 мар.16 июн.16 сен.16 дек.16 мар.17 июн.17 сен E. Contract and Disbursement S-curve Project Contract and Disbursement S -curve 0 Contract Award Actual Disbursement Actual

18 18 F. Fund Flow Diagram Direct Payment Asian Development Bank Direct Payment Withdrawal Application/ Invoices Ministry of Finance Contractor Invoices Bills Contractor Investment Program Management Consultant UNICEF Invoices / Bills AZERSU Executing Agency SAWMC Executing Agency Invoices / Bills Investment Program Management Consultant

19 19 A. Financial Management Assessment V. FINANCIAL MANAGEMENT 9. The financial management assessment (FMA) for AZERSU and SAWMC indicated that the two executing agencies have gained sufficient experience with international lending institutions and currently meets ADB minimum financial management requirements. AZERSU and SAWMC have the financial management capability to satisfactorily record all transactions and balances, support the preparation of regular and reliable financial statements and financial monitoring reports, safeguard the assets, and subject these to auditing arrangements acceptable to ADB. B. Disbursement 10. The loan proceeds for financing Goods, Works, and consulting services shall be disbursed in accordance with ADB s Loan Disbursement Handbook (2007, as amended to date). 2 Pursuant to ADB's Safeguard Policy Statement (2009) (SPS), 3 ADB funds may not be applied to the activities described on the ADB Prohibited Investment Activities List set forth at Appendix 5 of the SPS. The direct payment method will be used under the loan. 11. The minimum value per withdrawal application is US$100,000, unless otherwise approved by ADB. Withdrawal applications and supporting documents will demonstrate, among other things that the goods, and/or services were produced in or from ADB members, and are eligible for ADB financing. Withdrawal applications and other loan disbursement information are available at ADB Controller s Department s website, The statement of expenditure (SOE) procedure may be used for reimbursement of eligible expenditures incurred under the Project, in accordance with the Loan Disbursement Handbook and detailed arrangements agreed upon between the Borrower and ADB. Any individual payment to be reimbursed or liquidated under the SOE procedure shall not exceed the equivalent of $ 100, First Withdrawal Application (WA). MOF should submit to ADB sufficient evidence of the authority of the (two) persons who will sign the withdrawal applications on behalf of the Government, together with the authenticated specimen signatures of each authorized person. 14. Retroactive Financing. If approved by ADB, withdrawals from the relevant Loan Account may be made for reimbursement of eligible expenditures incurred under the relevant Project before the Effective Date of the Loan Agreement (but not earlier than 12 months before the date of the Loan Agreement) in connection with items to be retroactively financed, subject to a maximum amount equivalent to 20% of the amount of the Loan. ADB will reimburse eligible expenditures incurred for retroactive financing to the Borrower, MoF, AZERSU, or SAWMC depending on the entity incurring eligible expenditures. The entity should provide sufficient evidence satisfactory to ADB of having incurred the eligible expenditure to be eligible to claim amounts to be retroactively financed. 2 Available at: 3 Available at:

20 Condition for Withdrawals from Loan Account. Notwithstanding any other provision detailed in the Loan Agreement for the current tranche, no withdrawals shall be made from the Loan Account until the Subsidiary Loan Agreement described between the Borrower, AZERSU and SAWMC in form and substance satisfactory to ADB, has been duly authorized or ratified, and executed and delivered on behalf of, the Borrower AZERSU and SAWMC, and is legally binding upon the parties thereto in accordance with its terms. C. Accounting 16. The Government shall ensure that the executing agencies (AZERSU and SAWMC) maintain separate accounts and records for the Loan Components and in accordance with sound accounting principles. These accounts shall be audited annually in accordance with standards acceptable to ADB, and the Government shall provide ADB with certified copies of the audited accounts promptly after their preparation (and no later than nine months after the close of the Financial Year for the relevant accounts). D. Auditing 17. The Borrower will cause the detailed consolidated project accounts to be audited in accordance with International Standards on Auditing and/or in accordance with the Government's audit regulations by an auditor acceptable to ADB. The Borrower will also cause to audit the accounts and annual financial statements of AZERSU and SAWMC. All audited accounts will be submitted using the English language to ADB within 9 months of the end of the fiscal year by AZERSU and SAWMC. The Borrower has been made aware of ADB s policy on delayed submission, and the requirements for satisfactory and acceptable quality of the audited accounts. ADB reserves the right to verify the project's financial accounts to confirm that the share of ADB s financing is used in accordance with ADB s policies and procedures.

21 21 VI. PROCUREMENT AND CONSULTING SERVICES A. Advance Contracting and Retroactive Financing 18. All advance contracting and retroactive financing will be undertaken in conformity with ADB s Procurement Guidelines (April 2010, as amended from time to time) and ADB s Guidelines on the Use of Consultants (April 2010, as amended from time to time). The issuance of invitations to bid under advance contracting and retroactive financing will be subject to ADB approval. The government and executing agencies have been advised that approval of advance contracting and retroactive financing does not commit ADB to finance the Investment Program. 19. Advance contracting. The government has requested ADB s approval of advance contracting for civil works construction and consulting services. Civil works construction will include development of WSS system in Agdash, Beylagan, Goychay and Nakhchivan. Consulting services will include appointment of a design and supervision consultant (DSC) for works in Nakhchivan. 20. Retroactive financing. For tranche 2, ADB will finance a maximum amount of eligible expenditures up to the equivalent of 20% of the loan for tranche 2 (approximately $60,000,000) incurred before tranche 2 loan effectiveness but not earlier than 12 months before the signing of the Loan Agreement for tranche2. Retroactive financing shall apply to civil works and consulting services under tranche 2 loan. B. Procurement of Goods, Works and Consulting Services 21. The investment program will follow ADB s Procurement Guidelines (2010, as amended time to time) and tranche 2 loan includes: (i) five international competitive bids (ICBs) for procurement of civil works for water supply and sewerage network in Agdash, Beylagan, Goychay and Nakchivan;(ii) two ICBs for procurement of civil works for sewage treatment plant in Goychay and Nakchivan; (iii) one consulting package using the quality-and cost- based selection method to recruit a DSC in Nakhchivan; (iv) one consulting services using a single source selection method to recruit UNICEF to implement the public outreach program. An 18-month procurement plan indicating threshold and review procedures, goods, works, and consulting service contract packages and national competitive bidding guidelines is listed in Section C. Procurement of civil works will use a single-stage single-envelope method. 22. Bidders eligibility will be determined in accordance with ADB's Procurement Guidelines (2010, as amended from time to time). Accordingly, no bidder or potential bidder shall be declared ineligible for ADB financed contracts for any reason other than those set out in ADB's Procurement Guidelines. For goods or services funded by loans from ADB's Special Fund resources, payments are limited to goods produced in, and services supplied by, developed member countries that have contributed to such resources and all developing member countries.

22 22 C. Procurement Plan for Project 2 Basic Data Project Name: Water Supply and Sanitation Investment Program Project 2 Country: Azerbaijan Executing Agency: AZERSU and SAWMC Loan Amount: $300 million Loan (Grant) Number: 2842-AZE Date of First Procurement Plan: 7 December 2011 Date of this Procurement Plan: 15 November Process Thresholds, Review and 18-Month Procurement Plan a. Project Procurement Thresholds 23. Except as the Asian Development Bank (ADB) may otherwise agree, the following process thresholds shall apply to procurement of goods and works. Method Procurement of Goods and Works Threshold International Competitive Bidding (ICB) for Works Above $10,000,000, b. ADB Prior or Post Review 24. Except as ADB may otherwise agree, the following prior or post review requirements apply to the various procurement and consultant recruitment methods used for the project. Procurement Method Prior or Post Comments Procurement of Goods and Works ICB Works Prior Recruitment of Consulting Firms Quality- and Cost-Based Selection (QCBS) Other selection methods: Least-Cost Selection (LCS) and Single Source (SSS) Recruitment of Individual Consultants Individual Consultants Prior Prior Prior

23 23 c. Goods and Works Contracts Estimated to Cost More Than $1 Million 25. The following table lists goods and works contracts for which procurement activity is either ongoing or expected to commence within the next 18 months. General Description Contract Value Procurement Method Prequalification of Bidders (y/n) Advertisement Date (quarter/year) Comments Procurement of civil works for water supply and sewerage network Procurement of civil works for water supply and sewerage network Procurement of civil works for water supply and sewerage network Procurement of civil works for water supply and sewerage network Procurement of civil works for sewage treatment plant Procurement of civil works for water supply and sewerage network (Shikhmahmud) Procurement of civil works for sewage treatment plant $34million ICB - Works N Q1/ package in Goychay $79million ICB - Works N Q1/ package in Agdash $66million ICB - Works N Q1/ package in Beylagan $92 million ICB - Works N Q4/ packages in Nakhchivan $21 million ICB - Works N Q1/ package for Goychay. $12,2 million ICB-WORKS N Q3/ package in Nakhchivan $45.25 million ICB - Works N Q1/ package in Nakhchivan Note: Amounts include value added tax. d. Consulting Services Contracts Estimated to Cost More Than $100, The following table lists consulting services contracts for which procurement activity is either ongoing or expected to commence within the next 18 months. General Description Contract Value Recruitment Method 1 Advertisement Date (quarter/year) International or National Assignment Comments Design and Supervision $3.7 million QCBS (90:10) Q4/2011 International For design of WSS network peri-urban Nakhchivan and

24 24 General Description Consultant - SAWMC Contract Value Recruitment Method 1 Advertisement Date (quarter/year) International or National Assignment Comments supervision of WSS network and sewage treatment plant million Consultants for auditing $0.3 million LCS - National To conduct project accounts auditing - 1 Auditor for Azersu and 1 for SAWMC Note: Amounts include value added tax. e. Goods and Works Contracts Estimated to Cost Less than $1 Million and Consulting Services Contracts Less than $100, The following table groups smaller-value goods, works and consulting services contracts for which procurement activity is either ongoing or expected to commence within the next 18 months. General Description Value of Contracts (cumulative) Number of Contracts Procurement / Recruitment Method 1 Comments Twinning program for SAWMC - $0.075 million 1 SSS WSS Utility to be determined by SAWMC 2. Indicative List of Packages Required Under the Project 28. The following table provides an indicative list of all procurement (goods, works and consulting services) over the life of the project. Contracts financed by the Borrower and others should also be indicated, with an appropriate notation in the comments section. General Description Estimated Value (cumulative) Estimated Number of Contracts Procurement Method Domestic Preference Applicable Comments NOT APPLICABLE

25 25 VII. SAFEGUARDS A. Social Safeguards 29. In order to ensure compliance with ADB Safeguard Policy Statement, 2009 (SPS), AZERSU and SAWMC as executing agencies will ensure social safeguards compliance under the Investment Program. AZERSU and SAWMC endorsed the Resettlement Framework (RF) that was prepared for the investment program and updated based on the SPS on 11 November 2011 by SAWMC and 15 November 2011 by AZERSU. The involuntary resettlement process as required under the RF will be followed during implementation and necessary resettlement plans will be prepared. 30. The RF will be reviewed regularly and, if necessary, updated during later tranches of the MFF, if indicated by unanticipated new types of impacts (review of applicability and relevance). The eligibility and entitlement provisions of the RF will not be lowered in subsequent revisions and updates. 31. During construction, there may be some temporary disturbance caused by subproject contractors for laying of water supply networks or for borrow pits, dump sites, storage areas and similar other activities. EAs will address such issues through appropriate conditions in the civil works contract. The civil works contracts will require the contractors to obtain approval of EAs, before they temporarily occupy any land for the purpose material storage or similar other activities. The contractors will be also required to negotiate and reach an agreement with the owners of such sites before those are used for temporary material storage/dumping purposes. Proofs of such agreements will also be submitted to Azersu for review to ensure that all appropriate provisions in the Land Acquisition and Resettlement Framework LARF (2011) are complied with. B. Environmental Safeguards 32. In order to ensure compliance with ADB Safeguard Policy Statement (2009), AZERSU and SAWMC as executing agencies will ensure the implementation of the following requirements and procedures for the investment program. AZERSU and SAWMC endorsed the Environmental Assessment and Review Framework (EARF) that was prepared for the investment program and updated based on the SPS on 11 November 2011 by SAWMC and 15 November 2011 by AZERSU. The EARF and the environmental assessment process as required under the EARF will be followed during implementation and necessary IEE and EMP will be prepared. Environmental Management Actions Implementation Activities Pre-construction commences Activity 1: Project becomes effective Conditions Required to Complete Actions Environmental recording system established in IPMO, UWSCG. Design and implement baseline monitoring for environmental conditions; unless this has been undertaken during the environmental assessment stage Activity 2: IMPO established with ESU. Environment staff appointed to ESU Activity 3: Prepare project baseline environmental matrix Budget, facilities and staff for ESU have been provided according to Loan Agreement

26 26 Environmental Management Actions Environment Specialist (ES) prepares design brief for design consultants that incorporates EMP Design requirements ES checks Design Brief meets EMP requirements ES extracts construction requirements from EMP and pass to design consultants for inclusion in bidding documents ES reviews bidding documents and confirm that environmental management provisions are sufficient ESU review environmental conditions of bid and rank contractors on this ability ES reviews SEMP and EMS ESU verifies compliance of Contractor with SEMP at site meeting ES informs IPMO that Contractor is now cleared to start work Pre-construction completed Construction commences ES, IPMO monitors contractor s SEMP compliance activities. ES audits construction activities ES evaluates monitoring program Implementation Activities Activity 4: Pre-construction: Design; Incorporation of EMP requirements Activity 5: Bidding documents prepared Activity 6: Bids evaluated and Contractor appointed Activity 7: Contractor prepares Site EMP (SEMP) and EMS if required Activity 8: Contractor inducted to site by ESU Activity 9: Contractor approved to start work Activity 1: Contractor begins work. Activity 2: Environmental monitoring undertaken and reports prepared. By Contractor: Monthly environmental report sent to IPMO Quarterly environmental report to ADB and country environmental agency Conditions Required to Complete Actions Appointment of Design and Supervision consultant with necessary technical capacity to address EMP requirements Standard environmental conditions have been prepared which are integrated into bidding documents ES to be a member of the Bid Evaluation Panel Contractor appoints Environmental Manager. After award of contact Contractor has 30 days to prepare SEMP/EMS. ADB CWRD Guidance notes on preparing SEMP available Contractor cannot take possession of construction site until (i) SEMP/EMS has been approved and (ii) induction is completed satisfactorily Contractor complies with SEMP requirements for implementing and monitoring work on-site ADB CWRD Guidance notes on preparing monitoring reports available Construction completed Activity 3: Construction completed and project commissioned Project works completed in accordance with the SEMP and all sites satisfactorily

27 27 Environmental Management Actions Implementation Activities Conditions Required to Complete Actions rehabilitated and restored. ES reviews and sign-off on completed work Final environmental monitoring report prepared Payments may be withheld if sites not cleared and closed to meet SEMP specifications. Sub Projects for subsequent tranches Sub-projects assessed against the selection criteria set out in the environmental assessment and review framework Environmental classification completed. Categorization forms sent to ADB regional Department and local Environment Authority for confirmation. ES prepares TOR for environmental assessment requirements Consultant appointed to prepare the necessary environmental assessment documents Environmental Assessment documents to accompany PFR Documents to be reviewed by ES CWRD. Design and implement baseline monitoring for environmental conditions; unless this has been undertaken during the environmental assessment stage ES prepare Design Brief for design consultants that incorporates EMP Design requirements ES check Design Brief meets EMP requirements ES extracts construction requirements from EMP and pass to design consultants for inclusion in bidding documents ES reviews bidding documents Activity 1: Potential sub-projects for new tranche identified Activity 2: Preliminary design undertaken for sub-projects Activity 3: Project Financing request submitted to ADB Activity 4: Sub-projects in new tranche approved Activity 5: Prepare project baseline environmental matrix Activity 6: Pre-construction: Design and incorporation of EMP requirements Activity 7: Bid documents prepared

28 28 Environmental Management Actions and confirm that environmental management provisions are sufficient ES review environmental conditions of Bid and rank contractors on this ability ES reviews SEMP and EMS Implementation Activities Activity 8: Bids evaluated and Contractor appointed Activity 9: Contractor prepares Site EMP (SEMP) and EMS if required Activity 10: Contractor inducted to site by ESU Conditions Required to Complete Actions 33. The EARF is reviewed regularly and, if necessary, updated during later tranches of the MFF, if indicated by unanticipated new types of impacts (review of applicability and relevance). The eligibility and entitlement provisions of the EARF will not be lowered in subsequent revisions and updates.

29 29 VIII. GENDER AND SOCIAL DIMENSIONS 34. See Annex 2 for the Summary Poverty Reduction and Social Strategy. 35. Gender Development Strategy. Project 2 will improve access to WSS through construction of water supply and sewerage networks. Schools in project 2 towns will have improved access to WSS facilities and separate toilet for girls will also be constructed. Teachers (80% women) and mothers will be trained as hygiene change agents. The management capacity of sukanals and JSCs will be enhanced and human resources management will be gender mainstreamed to give women and men equal employment opportunities. 36. Knowledge of gender specific customer behavior will be gained through survey and analysis that will inform a sex-disaggregated customer database. The role of women will be expanded through their engagement in complaints redress mechanisms, which will provide feedback on service quality. Based on the analysis, an IEC on WSS, customer rights, and water efficiency will be conducted. As a pilot initiative, UNICEF Azerbaijan will develop a national hygiene educational policy, elaborate a training module and roll out the public information campaign in the selected towns. 37. The gender specialist, will closely work with the gender consultant of the EAs and will supervise and monitor the timely implementation of the GAP.

30 30 GENDER ACTION PLAN (GAP) Objective/impact on gender equality Actions and Description Output 1: Water Supply and Sanitation Infrastructure Development Equal access to Ensure construction of water supply potable water and and sewerage networks including improved sanitation house connections to all female for both male and headed households in all project 2 female-headed towns households provided Target/Indicator and Timeframe 100% female-headed households have access to 24-hour potable water supply (2017) 100% female-headed households have access to sanitation facilities (2017) Institutional Responsibility SAWMC, JSC and AZERSU Improved access to water supply and sanitation facilities in schools of Project 2 towns Ensure separate and adequate latrines and washing facilities for girls in 15 public schools in project 2 towns. Separate sanitation and hygiene facilities for boys and girls in 15 public school constructed (2017) SAWMC, JSC and AZERSU (Improved living standard ) Output 2: Institutional Effectiveness Enhanced Ensure equal employment management capacity opportunities for women in SuKanals of Sukanals and and JSCs JSCsand gender mainstreamed human resource management Train female staff working on management information system (MIS) and accounting system (Increased economic empowerment) Output 3: Program Management Facility Knowledge of gender Conduct survey and analyze specific customer knowledge gaps of households behavior enhanced (especially women as household managers) on water, hygiene, sanitation, customer rights and efficient water use Establish a sex-disaggregated customer database 30% of Sukanals and JSC staff are women 30% of customer care center staff are women Sex-disaggregated database in place for human resource management (2013) Sex-disaggregated customer database created to gain knowledge on gender specific customer behavior (2013) SAWMC, JSC and AZERSU SAWMC, JSC and AZERSU

31 Objective/impact on gender equality Improved hygiene and sanitation practices in the community Actions and Description Develop public outreach program (POP) on water, hygiene, sanitation based on survey results Train children and teachers to become effective advocates of change in their households and communities Ensure that national hygiene educational policy, standards, and training modules are developed and approved Target/Indicator and Timeframe POP material on water, hygiene and sanitation practices, customer rights is disseminated in 15 public schools in project 2 towns (2013-continuous) 5000 women in the community, 150 teachers (30 male and 120 female), and 2000 students (900 male and 1100 female) covered by the POP National hygiene educational policy approved by Institutional Responsibility SAWMC, JSC and AZERSU Improved WSS services through community feedback Develop and conduct awareness raising campaign on customer rights and water efficiency catering to women of all households in project towns IEC material customer rights, complaint mechanisms disseminated to all households in project towns SAWMC, JSC and AZERSU (Increased participation decision making) in Establish complaint redressal mechanism and database in customer care centers and identify specific customer service requirement (targeting women s needs) Establish a 24-hour customer care hotline and train staff of customer care centers as hygiene and sanitation advocates Annual report on quantity and redress of complaints published (2013 continuous) with gender analysis(women provide feedback on WSS services) Customer care hotline is established (2013) with 30% women staff and 100% of all staff are trained on water, hygiene, sanitation practices, customer rights and complaint mechanisms (issue resolutions)

32 32 IX. Performance Monitoring, Evaluation, Reporting, and Communication A. Monitoring 38. Project performance monitoring. Disaggregated baseline data for output and outcome indicators gathered during Investment Program processing will be updated and reported quarterly through investment program quarterly progress reports prepared by the AZERSU and SAWMC, and after each ADB review mission. These quarterly reports will provide information necessary to update ADB's project performance reporting system Compliance monitoring. Compliance on covenants will be monitored through regular ADB review missions and on a quarterly basis in discussion with the AZERSU and SAWMC. 40. Safeguards monitoring. Monitoring and reporting of the implementation on safeguards requirements and procedures will be prepared by AZERSU and SAWMC. The Investment Program Management Office (IPMO) will undertake internal monitoring of safeguard covenants compliance to be included in the quarterly project progress report. An ADB Staff Consultant will validate the internal monitoring reports and evaluate compliance of Investment Program activities with the ADB s Safeguard Policy Statement (2009). External monitoring will be carried out by the Resettlement Specialist in the Investment Program Management Consultant appointed by AZERSU and in two phases, once during the RP implementation and once a year later. 41. Gender and social dimensions monitoring. See DMF and the GAP for monitoring indicators. Currently, the IPMO reports on GAP indicators and an ADB Staff Consultant confirms the figures. B. Evaluation 42. Within 3 months of project completion, AZERSU and SAWMC will submit a project completion report to ADB. 5 C. Reporting 43. The executing agencies will provide ADB with (i) quarterly progress reports in a format consistent with ADB's project performance reporting system; (ii) consolidated annual reports including (a) progress achieved by output as measured through the indicator's performance targets, (b) key implementation issues and solutions, (c) updated procurement plan and (d) updated implementation plan for next 12 months; and (iii) a project completion report within 6 months of physical completion of each tranche of the Investment Program. To ensure that the investment program is efficiently managed, accounts of every tranche of the facility together with the associated auditor's report, should be adequately reviewed. 4 ADB's project performance reporting system is available at: 5 Project completion report format is available at: Sector-Landscape.rar

33 33 X. ANTICORRUPTION POLICY 44. ADB reserves the right to investigate, directly or through its agents, any violations of the Anticorruption Policy relating to the Project. 6 All contracts financed by ADB shall include provisions specifying the right of ADB to audit and examine the records and accounts of the executing agency and all Project contractors, suppliers, consultants and other service providers. Individuals/entities on ADB s anticorruption debarment list are ineligible to participate in ADBfinanced activity and may not be awarded any contracts under the Project To support these efforts, relevant provisions are included in the framework financing agreement, loan and project agreements, loan regulations, and the bidding documents for the investment program. The Government will disclose to the public, and update annually the current status of the investment program and how the proceeds of the facility are used. For each contract financed under the Investment Program, AZERSU and SAWMC will disclose on their respective websites information on, among others, the: (a) list of participating bidders; (b) name of the winning bidder; (c) basic details on bidding procedures and procurement methods adopted; (d)amount of contract awarded; (e)list of goods/services, including consulting services procured; and (f)intended and actual utilization of the facility proceeds. 6 Available at: 7 ADB's Integrity Office web site is available at:

34 34 XI. ACCOUNTABILITY MECHANISM 46. People who are, or may in the future be, adversely affected by the project may address complaints to ADB, or request the review of ADB's compliance under the Accountability Mechanism.The Accountability Mechanism provides an independent forum and process whereby people adversely affected by ADB-assisted projects can voice, and seek a resolution of their problems, as well as report alleged violations of ADB s operational policies and procedures. Before submitting a complaint to the Accountability Mechanism, affected people should make a good faith effort to solve their problems by working with the concerned ADB operations department. Only after doing that, and if they are still dissatisfied, should they approach the Accountability Mechanism. 8 8 For further information see:

35 35 XII. RECORD OF PAM CHANGES 47. PAM Updates Date of first draft PAM - November 2011 Revision 1 - November Update of procurement plan 2. Update of project implementation plan 3. Update in social safeguards implementation arrangements 4. Update in project management arrangement

36 36 ANNEX 1 - DESIGN AND MONITORING FRAMEWORK Design Summary Impact Improved water supply and sanitation services in the urban centers of Agdash, Beylagan, Goychay and Nakhchivan Performance Targets and/or Indicators By the end of Tranche 2 plus three years (2020): (i) Pressurized water supplied for 24 hours daily (ii) Nonrevenue water less than 20% (iii) Residual chlorine at tail ends of water supply system maintained at parts per million (iv) Sewage pumps operating daily and discharging sewage to the treatment plant (v) Effluent from the sewage treatment plant meets Azerbaijan effluent discharge standards Data Sources and/or Reporting Mechanisms Sex-disaggregated baseline survey conducted at Investment Program inception in tranche 1 (2012) and completion (2016) and annually thereafter. Surveys conducted as a part of PPMS and by the executing agencies (AZERSU and SAWMC) Assumptions and Risks Assumptions The Government provides an enabling investment climate Government provides adequate incentives to ensure Sukanals and JSCs provide efficient service delivery Risks Insufficient viability gap funding from the government to the executing agencies, to ensure financially sustainable service delivery Outcome Improved access to water supply and sanitation infrastructure in Agdash, Beylagan, Goychay and Nakhchivan By end of Tranche 2 (2017): (i) Residents (including 100% female headed households) access to sanitation facilities increased from 36% in 2011 to 95% by 2017 (ii) Residents (including 100% female headed households) access to 24-hour potable water supply increased from 57% in 2011 to 95% by 2017 Executing Agency (AZERSU and SAWMC) Annual Reports and audited statements Project component completion and commissioning certificates provided by investment program construction supervision consultant Risks Government s inability to protect the environment and natural resources from unregulated discharge of untreated sewage into water bodies Outputs By 2017: Water supply system efficiency improved through rehabilitation and replacement, and coverage expanded (i) 460 km of distribution networks constructed (ii) 7000cum of storage reservoirs constructed (iii) Pressurized water of 140 liters per capita supplied for 24-hour daily Semiannual progress reports prepared by AZERSU and SAWMC Disbursement and reimbursement records maintained by AZERSU and SAWMC PPMS reports prepared by AZERSU and SAWMC Assumption Ongoing internationally financed projects are efficiently implemented. Risk Lack of construction contractor and industry interest in bidding for projects in Azerbaijan

37 37 Design Summary Performance Targets and/or Indicators Data Sources and/or Reporting Mechanisms Assumptions and Risks Sewerage and sanitation system efficiency improved through rehabilitation and reconstruction, and coverage expanded (i) 424 km of sewer lines constructed (ii) Sewage treatment plants constructed to treat and safely discharge 83 MLD of sewage (iii) Separate and adequate latrines and washing facilities provided in 15 public schools in project towns AZERSU and SAWMC annual work plans As-built developed contractors drawings by Project component completion and commissioning certificates provided by investment program construction supervision consultant Substantial variance between the bid prices and engineer s estimate By 2017: Management information system developed (i) Sex-disaggregated human resource database maintained by AZERSU and SAWMC for human resource management Semiannual progress reports prepared by AZERSU and SAWMC AZERSU and SAWMC annual work plans Management capacity of Sukanals and JSCs enhanced Institutions improved for WSS delivery (i) Women in 30% of key management staff positions in Sukanals and JSCs (ii) Sukanals and JSCs staff trained in financial management and accounting (30% of them women) (iii) Women comprise 30% of customer care unit staff in project towns and inform, educate, and communicate on water, hygiene, and sanitation (i) Twinning program established with a WSS utility from a developed member country by 2013 (ii) JSCs and Sukanals achieve revenue surpluses annually from 2015

Republic of Azerbaijan: Water Supply and Sanitation Investment Program Tranche 4

Republic of Azerbaijan: Water Supply and Sanitation Investment Program Tranche 4 Periodic Financing Request Report Project Number: 42408-044 MFF Number: 0032 July 2016 Republic of Azerbaijan: Water Supply and Sanitation Investment Program Tranche 4 Distribution of this document is

More information

Multitranche Financing Facility Republic of Uzbekistan: Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program

Multitranche Financing Facility Republic of Uzbekistan: Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program Facility Administration Manual Project Number: 42107 MFF Number: 0042-UZB Loan Numbers: 2635-UZB (Project 1), 2746-UZB (Project 2), and 2868-UZB (Project 3) 21 August 2013 Multitranche Financing Facility

More information

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) the Borrower has applied to ADB for a loan

More information

Section 3.06 is deleted and the following is substituted therefor:

Section 3.06 is deleted and the following is substituted therefor: 2 (c) Section 3.03 is deleted and the following is substituted therefor: Commitment Charge; Credit; Maturity Premium. (a) The Borrower shall pay a commitment charge on the unwithdrawn amount of the Loan

More information

LOAN AGREEMENT (Special Operations) (Road Network Upgrading Project) between DEMOCRATIC REPUBLIC OF TIMOR-LESTE. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Special Operations) (Road Network Upgrading Project) between DEMOCRATIC REPUBLIC OF TIMOR-LESTE. and ASIAN DEVELOPMENT BANK LOAN NUMBER 2858-TIM (SF) LOAN AGREEMENT (Special Operations) (Road Network Upgrading Project) between DEMOCRATIC REPUBLIC OF TIMOR-LESTE and ASIAN DEVELOPMENT BANK DATED 2 MAY 2012 TIM 45094 LOAN AGREEMENT

More information

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).

LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) by a loan agreement of even date herewith

More information

(c) Section 3.07 is deleted and the following is substituted therefor:

(c) Section 3.07 is deleted and the following is substituted therefor: 2 outstanding Loan on which a higher Fixed Spread is applicable. The amount of the Rebate shall be determined by multiplying (i) the difference between the Fixed Spread applicable to the outstanding Loan

More information

Republic of Uzbekistan: Solid Waste Management Improvement Project

Republic of Uzbekistan: Solid Waste Management Improvement Project Project Administration Manual Project Number: 45366 Loan Number: {LXXXX-UZB} November 2013 Republic of Uzbekistan: Solid Waste Management Improvement Project CONTENTS ABBREVIATIONS I. PROJECT DESCRIPTION

More information

PROJECT PREPARATION TECHNICAL ASSISTANCE

PROJECT PREPARATION TECHNICAL ASSISTANCE 12 Appendix 4 A. Justification PROJECT PREPARATION TECHNICAL ASSISTANCE 1. A regional project preparatory technical assistance (R-PPTA) is required to prepare the Pacific Renewable Energy Investment Facility

More information

LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK LOAN NUMBER 2729-ARM LOAN AGREEMENT (Ordinary Operations) (North-South Road Corridor Investment Program Project 2) between REPUBLIC OF ARMENIA and ASIAN DEVELOPMENT BANK DATED 30 MAY 2011 ARM 42145 LOAN

More information

Section 3.07 is deleted and the following is substituted therefor:

Section 3.07 is deleted and the following is substituted therefor: 3 outstanding Loan on which a higher Fixed Spread is applicable. The amount of the Rebate shall be determined by multiplying (i) the difference between the Fixed Spread applicable to the outstanding Loan

More information

People s Republic of Bangladesh: Rural Infrastructure Maintenance Program

People s Republic of Bangladesh: Rural Infrastructure Maintenance Program Project Design Advance Project Administration Manual Project Number: 47243-003 June 2016 People s Republic of Bangladesh: Rural Infrastructure Maintenance Program CONTENTS I. PROPOSED PROJECT DESCRIPTION

More information

Uzbekistan: Small Business Finance Project

Uzbekistan: Small Business Finance Project Project Administration Manual Project Number: 42007-018 Loan Number: June 2016 Uzbekistan: Small Business Finance Project Important Note: This Project Administration Manual is an active document. It will

More information

PERIODIC FINANCING REQUEST. RE: Higher Education in the Pacific Investment Program: Periodic Financing Request #1

PERIODIC FINANCING REQUEST. RE: Higher Education in the Pacific Investment Program: Periodic Financing Request #1 PERIODIC FINANCING REQUEST Date: April 2012 To: Asian Development Bank 6 ADB Avenue Mandaluyong City, Metro Manila ATTENTION: Director General, Pacific Department Fax No. +632-632-6318 Sir: RE: Higher

More information

Section 3.07 is deleted and the following is substituted therefor:

Section 3.07 is deleted and the following is substituted therefor: 2 outstanding Loan and the Fixed Spread that will be applied to new Loans (expressed as a percentage per annum), by (ii) the principal amount of the outstanding Loan on which the Borrower shall pay interest

More information

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS

OUTLINE TERMS OF REFERENCE FOR CONSULTANTS Strengthening Public Financial Resource Management through Information and Communication Systems Technology Systems (TRTA MON 51084) OUTLINE TERMS OF REFERENCE FOR CONSULTANTS 1. The transaction technical

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 13 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is required to help the government of Mongolia design the Regional Road Development

More information

LOAN AGREEMENT (Special Operations) (Higher Education Reform Project) between MONGOLIA. and ASIAN DEVELOPMENT BANK DATED 9 SEPTEMBER 2011

LOAN AGREEMENT (Special Operations) (Higher Education Reform Project) between MONGOLIA. and ASIAN DEVELOPMENT BANK DATED 9 SEPTEMBER 2011 LOAN NUMBER 2766-MON(SF) LOAN AGREEMENT (Special Operations) (Higher Education Reform Project) between MONGOLIA and ASIAN DEVELOPMENT BANK DATED 9 SEPTEMBER 2011 LAS:MON 43007 LOAN AGREEMENT (Special Operations)

More information

Project Administration Manual. Project Number: November Republic of Palau: North Pacific Regional Connectivity Investment Project

Project Administration Manual. Project Number: November Republic of Palau: North Pacific Regional Connectivity Investment Project Project Administration Manual Project Number: 46382-001 November 2015 Republic of Palau: North Pacific Regional Connectivity Investment Project ABBREVIATIONS Contents I. PROJECT DESCRIPTION 1 A. Impact

More information

People s Republic of Bangladesh: Railway Rolling Stock Project

People s Republic of Bangladesh: Railway Rolling Stock Project Railway Rolling Stock Project (RRP BAN 49094) Project Administration Manual Project Number: 49094-001 Loan Number: {LXXXX} September 2015 People s Republic of Bangladesh: Railway Rolling Stock Project

More information

Completion Report. Project Number: Loan Number: 2119/2120 December Azerbaijan: Urban Water Supply and Sanitation Project

Completion Report. Project Number: Loan Number: 2119/2120 December Azerbaijan: Urban Water Supply and Sanitation Project Completion Report Project Number: 35087 Loan Number: 2119/2120 December 2011 Azerbaijan: Urban Water Supply and Sanitation Project CURRENCY EQUIVALENTS Currency Unit Azerbaijan manat (AZN) At Appraisal

More information

Project Administration Manual. Project Number: Grant Number: GXXXX November Vanuatu: Cyclone Pam School Reconstruction Project

Project Administration Manual. Project Number: Grant Number: GXXXX November Vanuatu: Cyclone Pam School Reconstruction Project Project Administration Manual Project Number: 49320-001 Grant Number: GXXXX November 2015 Vanuatu: Cyclone Pam School Reconstruction Project Contents ABBREVIATIONS 4 I. PROJECT DESCRIPTION 1 II. IMPLEMENTATION

More information

Project Administration Manual. Project Number: November Cook Islands: Renewable Energy Sector Project

Project Administration Manual. Project Number: November Cook Islands: Renewable Energy Sector Project Project Administration Manual Project Number: 46453 November 2014 Cook Islands: Renewable Energy Sector Project Contents ABBREVIATIONS I. PROJECT DESCRIPTION 5 A. Impact and Outcome 5 B. Outputs 5 II.

More information

PROJECT AGREEMENT. (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK. and

PROJECT AGREEMENT. (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK. and LOAN NUMBER 2835-PRC PROJECT AGREEMENT (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK and HEBEI PROVINCIAL GOVERNMENT DATED 6 MARCH 2012 PRC 44012 PROJECT

More information

People's Republic of Bangladesh: Padma Multipurpose Bridge Project

People's Republic of Bangladesh: Padma Multipurpose Bridge Project 1 Project Administration Manual Project Number: 35049 Loan and/or Grant Number(s): {LXXXX (OCR); LXXXX (ADF) to be determined} 26 October 2010 People's Republic of Bangladesh: Padma Multipurpose Bridge

More information

IND: Accelerating Infrastructure Investment Facility in India

IND: Accelerating Infrastructure Investment Facility in India Accelerating Infrastructure Investment Facility in India (RRP IND 47083) Facility Administration Manual Project Number: 47083 August 2013 IND: Accelerating Infrastructure Investment Facility in India The

More information

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time);

(i) Loan Disbursement Handbook means ADB s Loan Disbursement Handbook (2012, as amended from time to time); 2 (f) Goods means equipment and materials to be financed out of the proceeds of the Loan, including related services such as transportation, insurance, installation, commissioning, training, and initial

More information

Periodic Financing Request Report. Armenia: Sustainable Urban Development Investment Program Tranche 2

Periodic Financing Request Report. Armenia: Sustainable Urban Development Investment Program Tranche 2 Periodic Financing Request Report Project Number: 42417-033 MFF Number: 0056 September 2015 Armenia: Sustainable Urban Development Investment Program Tranche 2 This document is being disclosed to the public

More information

Additional Cofinancing

Additional Cofinancing Additional Cofinancing Sri Lanka Sri Lanka Project Number: 45148 Loan Number: 3029/3030-SRI May 2014 Proposed Administration of Loan Democratic Socialist Republic of Sri Lanka: Greater Colombo Water and

More information

Islamic Republic of Pakistan: Sindh Provincial Road Improvement Project

Islamic Republic of Pakistan: Sindh Provincial Road Improvement Project Sindh Provincial Road Improvement Project (RRP PAK 46377) Project Administration Manual Project Number: 46377 Loan Number: September 2015 Islamic Republic of Pakistan: Sindh Provincial Road Improvement

More information

Bangladesh: Greater Dhaka Sustainable Urban Transport Project

Bangladesh: Greater Dhaka Sustainable Urban Transport Project Project Administration Manual Project Number: 42169 Loan and/or Grant Number(s): LXXXX; LXXXX March 2012 Bangladesh: Greater Dhaka Sustainable Urban Transport Project Contents ABBREVIATIONS I. PROJECT

More information

GAMAS means Mongolia Customs Automated Data Processing

GAMAS means Mongolia Customs Automated Data Processing 2 System; (c) GAMAS means Mongolia Customs Automated Data Processing (d) Grant Account means the account opened by ADB on its books in the name of Mongolia for the purposes of the Project and to which

More information

PROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH

PROJECT AGREEMENT. (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and PROVINCE OF SINDH LOAN NUMBER 2499-PAK (SF) PROJECT AGREEMENT (Sindh Cities Improvement Investment Program Project 1) between ASIAN DEVELOPMENT BANK and PROVINCE OF SINDH NORTH SINDH URBAN SERVICES CORPORATION LIMITED DATED

More information

People's Republic of Bangladesh: Dhaka Chittagong Expressway PPP Design

People's Republic of Bangladesh: Dhaka Chittagong Expressway PPP Design Dhaka Chittagong Expressway PPP Design (RRP BAN 45174) Project Administration Manual Project Number: 45174 Loan Number: October 2011 People's Republic of Bangladesh: Dhaka Chittagong Expressway PPP Design

More information

LOAN AGREEMENT (Ordinary Operations) (Energy Efficiency Investment Program Tranche 1, Investment Project) between ISLAMIC REPUBLIC OF PAKISTAN.

LOAN AGREEMENT (Ordinary Operations) (Energy Efficiency Investment Program Tranche 1, Investment Project) between ISLAMIC REPUBLIC OF PAKISTAN. LOAN NUMBER 2552-PAK LOAN AGREEMENT (Ordinary Operations) (Energy Efficiency Investment Program Tranche 1, Investment Project) between ISLAMIC REPUBLIC OF PAKISTAN and ASIAN DEVELOPMENT BANK DATED 29 APRIL

More information

LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA.

LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA. LOAN NUMBER 3007-CAM (SF) LOAN AGREEMENT (Special Operations) (Climate Resilient Rice Commercialization Sector Development Project) between KINGDOM OF CAMBODIA and ASIAN DEVELOPMENT BANK DATED 26 AUGUST

More information

Periodic Financing Request Report. India: Kolkata Environmental Improvement Investment Program (Tranche 2)

Periodic Financing Request Report. India: Kolkata Environmental Improvement Investment Program (Tranche 2) Periodic Financing Request Report Project Number: 42266-025 MFF Number: 0075 August 2016 India: Kolkata Environmental Improvement Investment Program (Tranche 2) Distribution of this document is restricted

More information

Nepal: Kathmandu Sustainable Urban Transport Project

Nepal: Kathmandu Sustainable Urban Transport Project Project Administration Manual Project Number: 44058 Loan and/or Grant Number(s): LXXXX; GXXXX June 2010 Nepal: Kathmandu Sustainable Urban Transport Project CONTENTS I. PROJECT DESCRIPTION 1 II. IMPLEMENTATION

More information

Cook Islands: Renewable Energy Sector Project

Cook Islands: Renewable Energy Sector Project Project Administration Manual Project Number: 46453 October 2017 Cook Islands: Renewable Energy Sector Project (including Additional Financing I and II) ABBREVIATIONS CONTENTS I. PROJECT DESCRIPTION 1

More information

Myanmar: Power Distribution Improvement Project

Myanmar: Power Distribution Improvement Project Power Distribution Improvement Project (RRP MYA 46390) Project Administration Manual Project Number: 46390 November 2013 Myanmar: Power Distribution Improvement Project Contents ABBREVIATIONS I. PROJECT

More information

Project Administration Manual

Project Administration Manual Project Administration Manual Project Number: 31501 June 2011 Proposed Loan for Additional Financing Democratic Socialist Republic of Sri Lanka: Secondary Towns and Rural Community-Based Water Supply and

More information

Proposed Grants and Administration of Grants Independent State of Samoa: Renewable Energy Development and Power Sector Rehabilitation Project

Proposed Grants and Administration of Grants Independent State of Samoa: Renewable Energy Development and Power Sector Rehabilitation Project Project Administration Manual Project Number: 46044 October 2013 Proposed Grants and Administration of Grants Independent State of Samoa: Renewable Energy Development and Power Sector Rehabilitation Project

More information

PROJECT AGREEMENT. (Low-Carbon District Heating Project in Hohhot in Inner Mongolia Autonomous Region) between ASIAN DEVELOPMENT BANK.

PROJECT AGREEMENT. (Low-Carbon District Heating Project in Hohhot in Inner Mongolia Autonomous Region) between ASIAN DEVELOPMENT BANK. LOAN NUMBER 3218-PRC PROJECT AGREEMENT (Low-Carbon District Heating Project in Hohhot in Inner Mongolia Autonomous Region) between ASIAN DEVELOPMENT BANK and GOVERNMENT OF INNER MONGOLIA AUTONOMOUS REGION

More information

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project

Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project Project Design Advance Project Number: 47279-003 September 2016 Islamic Republic of Pakistan: Karachi Bus Rapid Transit Project This document is being disclosed to the public in accordance with ADB's Public

More information

Project Administration Manual

Project Administration Manual Project Administration Manual Project Number:50102 Loan and/or Grant Number(s): {LXXXX; GXXXX} July 2018 Kingdom of Cambodia: Second Urban Environmental Management in the Tonle Sap Basin Project ABBREVIATIONS

More information

Validation Report. India: North Karnataka Urban Sector Investment Program, Tranche 1. Independent Evaluation Department

Validation Report. India: North Karnataka Urban Sector Investment Program, Tranche 1. Independent Evaluation Department Validation Report Reference Number: PVR-451 Project Number: 38254-033 Loan Number: 2312 August 2016 India: North Karnataka Urban Sector Investment Program, Tranche 1 Independent Evaluation Department ABBREVIATIONS

More information

LOAN AGREEMENT (Ordinary Operations) (Clean Energy Finance Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and

LOAN AGREEMENT (Ordinary Operations) (Clean Energy Finance Investment Program Project 1) between ASIAN DEVELOPMENT BANK. and LOAN NUMBER 3186-IND LOAN AGREEMENT (Ordinary Operations) (Clean Energy Finance Investment Program Project 1) between ASIAN DEVELOPMENT BANK and INDIAN RENEWABLE ENERGY DEVELOPMENT AGENCY LIMITED DATED

More information

MFF - Bihar Urban Development Investment Program (Facility Concept)

MFF - Bihar Urban Development Investment Program (Facility Concept) India: MFF - Bihar Urban Development Investment Program (Facility Concept) Project Name Project Number 41603-013 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount

More information

Republic of Uzbekistan: Takhiatash Power Plant Efficiency Improvement Project

Republic of Uzbekistan: Takhiatash Power Plant Efficiency Improvement Project Project Administration Manual Project Number: 45306-001 Loan Number: 3141 January 2015 Republic of Uzbekistan: Takhiatash Power Plant Efficiency Improvement Project TABLE CONTENTS ABBREVIATIONS 1 I. PROJECT

More information

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project

Environmental Safeguard Monitoring Report. FIJ: Transport Infrastructure Investment Sector Project Environmental Safeguard Monitoring Report Semi Annual Report July 2016 ADB Project Number: 48141-001 ADB Loan Number: 3210 FIJ: Transport Infrastructure Investment Sector Project Prepared by Fiji Roads

More information

OPERATIONS MANUAL BANK POLICIES (BP)

OPERATIONS MANUAL BANK POLICIES (BP) BANK POLICIES (BP) OM Section F1/BP Page 1 of 2 These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. SAFEGUARD POLICY STATEMENT 1. The Asian Development

More information

Periodic Financing Request Report. India: Karnataka Integrated Urban Water Management Investment Program (Tranche 2)

Periodic Financing Request Report. India: Karnataka Integrated Urban Water Management Investment Program (Tranche 2) Periodic Financing Request Report Project Number: 43253-027 MFF Number: 0080-IND October 2018 India: Karnataka Integrated Urban Water Management Investment Program (Tranche 2) Distribution of this document

More information

Completion Report. Project Number: Loan Number: 1472 August Philippines: Small Towns Water Supply Sector Project

Completion Report. Project Number: Loan Number: 1472 August Philippines: Small Towns Water Supply Sector Project Completion Report Project Number: 27250 Loan Number: 1472 August 2006 Philippines: Small Towns Water Supply Sector Project CURRENCY EQUIVALENTS Currency Unit Philippine peso (P) At Appraisal At Project

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program)

PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program) PROJECT PREPARATORY TECHNICAL ASSISTANCE (Preparing the Gujarat Solar and Smart Grid Development Investment Program) 1. A project preparatory technical assistance (PPTA) for $700,000 in grant funds is

More information

(l) "Qualified Subproject" means the installation of a solar home system under the SHS Program;

(l) Qualified Subproject means the installation of a solar home system under the SHS Program; 2 Section 1.02. Wherever used in this Loan Agreement, the several terms defined in the Loan Regulations have the respective meanings therein set forth unless modified herein or the context otherwise requires.

More information

Periodic Financing Request Report. People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4

Periodic Financing Request Report. People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4 Periodic Financing Request Report Project Number: 43332 December 2013 People s Republic of China: Railway Energy Efficiency and Safety Enhancement Investment Program (MFF): Tranche 4 CURRENCY EQUIVALENTS

More information

Project Completion Report

Project Completion Report Project Completion Report Project Number: 38074-013 Loan Number: 2208-UZB December 2011 Uzbekistan: Kashkadarya and Navoi Rural Water Supply and Sanitation Sector Project CURRENCY EQUIVALENTS Currency

More information

Kyrgyz Republic: Emergency Assistance for Recovery and Reconstruction

Kyrgyz Republic: Emergency Assistance for Recovery and Reconstruction Completion Report Project Number: 44236-013 Loan Number: 2668 Grant Number: 0217 July 2017 Kyrgyz Republic: Emergency Assistance for Recovery and Reconstruction This document is being disclosed to the

More information

Pakistan: MFF0009-PAK: Punjab Irrigated Agriculture Investment Program - Tranche 4

Pakistan: MFF0009-PAK: Punjab Irrigated Agriculture Investment Program - Tranche 4 Project Administration Manual Project Number: 37231-044 Loan Number: xxx November 2015 Pakistan: MFF0009-PAK: Punjab Irrigated Agriculture Investment Program - Tranche 4 ABBREVIATIONS Contents I. PROJECT

More information

Project Administration Manual

Project Administration Manual Ha Noi and Ho Chi Minh City Power Grid Development Sector Project (RRP VIE 46391) Project Administration Manual Project Number: 46391 Loan Numbers: {LXXXX; LXXXX} August 2014 Socialist Republic of Viet

More information

Project Administration Manual. India: Green Energy Corridor and Grid Strengthening Project. Project Numbers: October 2015

Project Administration Manual. India: Green Energy Corridor and Grid Strengthening Project. Project Numbers: October 2015 Green Energy Corridor and Grid Strengthening Project (RRP IND 44426) Project Administration Manual Project Numbers: 44426-016 October 2015 India: Green Energy Corridor and Grid Strengthening Project Contents

More information

Project Agreement. (Shanghai Urban Environment Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and SHANGHAI MUNICIPALITY

Project Agreement. (Shanghai Urban Environment Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT. and SHANGHAI MUNICIPALITY Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 4705-CHA Public Disclosure Authorized Public Disclosure Authorized Project Agreement (Shanghai Urban Environment Project) between INTERNATIONAL BANK

More information

Islamic Republic of Pakistan: Enhancing Public- Private Partnerships in Punjab Project

Islamic Republic of Pakistan: Enhancing Public- Private Partnerships in Punjab Project Enhancing Public Private Partnerships in Punjab Project (RRP PAK 49128) Project Administration Manual Project Number: 49128-002 Loan, Grant, and TA Numbers: LXXXX; GXXXX; TAXXXX November 2017 Islamic Republic

More information

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project Technical Assistance Report Project Number: 51039-001 Transaction Technical Assistance (TRTA) September 2017 Islamic Republic of Afghanistan: Preparing the Horticulture Value Chain Development Sector Project

More information

PROJECT AGREEMENT. (Tianjin Integrated Gasification Combined Cycle Power Plant Project) between ASIAN DEVELOPMENT BANK. and

PROJECT AGREEMENT. (Tianjin Integrated Gasification Combined Cycle Power Plant Project) between ASIAN DEVELOPMENT BANK. and LOAN NUMBER 2616-PRC PROJECT AGREEMENT (Tianjin Integrated Gasification Combined Cycle Power Plant Project) between ASIAN DEVELOPMENT BANK and THE EXPORT-IMPORT BANK OF CHINA CHINA HUANENG GROUP GREENGEN

More information

LOAN AGREEMENT (Ordinary Operations) (National Motorway M-4 Gojra-Shorkot Section Project) between ISLAMIC REPUBLIC OF PAKISTAN.

LOAN AGREEMENT (Ordinary Operations) (National Motorway M-4 Gojra-Shorkot Section Project) between ISLAMIC REPUBLIC OF PAKISTAN. LOAN NUMBER 3300-PAK LOAN AGREEMENT (Ordinary Operations) (National Motorway M-4 Gojra-Shorkot Section Project) between ISLAMIC REPUBLIC OF PAKISTAN and ASIAN DEVELOPMENT BANK DATED 22 OCTOBER 2015 PAK

More information

Kyrgyz Republic: Central Asia Regional Economic Cooperation Corridor 3 (Bishkek Osh Road) Improvement Project, Phase 4

Kyrgyz Republic: Central Asia Regional Economic Cooperation Corridor 3 (Bishkek Osh Road) Improvement Project, Phase 4 Central Asia Regional Economic Cooperation Corridor 3 (Bishkek Osh Road) Improvement Project, Phase 4 (RRP KGZ 45169) Project Administration Manual Project Number: 45169 Loan and Grant Numbers: L3056;

More information

India: Karnataka Urban Development and Coastal Environmental Management Project

India: Karnataka Urban Development and Coastal Environmental Management Project Validation Report Reference Number: PVR-334 Project Number: 30303 Loan Number: 1704 November 2014 India: Karnataka Urban Development and Coastal Environmental Management Project Independent Evaluation

More information

BHU: Second Green Power Development Project

BHU: Second Green Power Development Project Second Green Power Development Project (RRP BHU 44444) Project Administration Manual Project Number: 44444 Loan and/or Grant Number(s): {LXXXX&XXXX; GXXXX; TAXXXX} November 2014 BHU: Second Green Power

More information

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT

TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT Himachal Pradesh Clean Energy Transmission Investment Program (RRP IND 43464) TECHNICAL ASSISTANCE: HIMACHAL PRADESH POWER SECTOR CAPACITY DEVELOPMENT AND IMPLEMENTATION SUPPORT A. INTRODUCTION 1. The

More information

Development Credit Agreement

Development Credit Agreement Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 3909 YF Public Disclosure Authorized Development Credit Agreement (Transport Rehabilitation Project) Public Disclosure Authorized between SERBIA

More information

Indonesia: Metropolitan Sanitation Management and Health Project

Indonesia: Metropolitan Sanitation Management and Health Project Metropolitan Sanitation Management and Health Project (RRP INO 39071-01) Project Administration Manual Project Number: 39071 Loan xxxx June 2010 Indonesia: Metropolitan Sanitation Management and Health

More information

Report and Recommendation of the President to the Board of Directors

Report and Recommendation of the President to the Board of Directors Report and Recommendation of the President to the Board of Directors Project Number: 42266 September 2013 Proposed Multitranche Financing Facility India: Kolkata Environmental Improvement Investment Program

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The PPTA will review and assess the performance of the secondary education subsector in Viet Nam and identify the challenges, which

More information

Nauru: Sustainable and Climate-Resilient Connectivity Project

Nauru: Sustainable and Climate-Resilient Connectivity Project Sustainable and Climate-Resilient Connectivity Project (RRP NAU 48480-003) Project Administration Manual Project Number: 48480-003 Grant Numbers: GXXXX; GXXXX; GXXXX December 2017 Nauru: Sustainable and

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 4 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing loan project and prepared outline technical studies

More information

Section (a) ADB and Uzbekenergo shall cooperate fully to ensure that the purposes of the Loan will be accomplished.

Section (a) ADB and Uzbekenergo shall cooperate fully to ensure that the purposes of the Loan will be accomplished. 2 Section 2.03. (a) In the carrying out of the Project, Uzbekenergo shall employ competent and qualified consultants and contractors, acceptable to ADB, to an extent and upon terms and conditions satisfactory

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE 8 Appendix 3 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of the Republic of the Union of Myanmar has requested the Asian Development Bank (ADB) to provide a project preparatory

More information

Periodic Financing Request Report. India: Assam Power Sector Investment Program (Tranche 2)

Periodic Financing Request Report. India: Assam Power Sector Investment Program (Tranche 2) Periodic Financing Request Report Project Number: 47101-003 MFF Number: 0083 November 2015 India: Assam Power Sector Investment Program (Tranche 2) This document is being disclosed to the public in accordance

More information

INDIA: Preparing the Rajasthan Secondary Towns Development Investment Program

INDIA: Preparing the Rajasthan Secondary Towns Development Investment Program Appendix 3 9 Technical Assistance Report Project Number: 42267-027 Transaction Technical Assistance (TRTA) June 2017 INDIA: Preparing the Rajasthan Secondary Towns Development Investment Program This document

More information

Bangladesh: Power System Expansion and Efficiency Improvement Investment Program

Bangladesh: Power System Expansion and Efficiency Improvement Investment Program Facility Administration Manual Power System Expansion and Efficiency Improvement Investment Program (RRP BAN 42378) Project Number: 42378-014 Loan Number: LXXXX October 2012 Bangladesh: Power System Expansion

More information

Socialist Republic of Viet Nam: Water Sector Investment Program Multitranche Financing Facility (MFF) Periodic Financing Request 3

Socialist Republic of Viet Nam: Water Sector Investment Program Multitranche Financing Facility (MFF) Periodic Financing Request 3 Appendix 3: Water Sector Investment Program (MFF0054-VIE) PFR3 Report VIE 41456-043 Project Administration Manual Project Number: 41456-043 Loan Number: XXXX March 2015 Socialist Republic of Viet Nam:

More information

Loan Agreement. (Eastern Indonesia Region Transport Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Loan Agreement. (Eastern Indonesia Region Transport Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT CONFORMED COPY LOAN NUMBER 4643 IND Loan Agreement (Eastern Indonesia Region Transport Project) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated January 22,

More information

Papua New Guinea: Town Electrification Investment Program, Tranche 2

Papua New Guinea: Town Electrification Investment Program, Tranche 2 Periodic Financing Request Report Project Number: 41504-025 MFF Number: 0051 June 2017 Papua New Guinea: Town Electrification Investment Program, Tranche 2 Distribution of this document is restricted until

More information

Periodic Financing Request Report. India: Railway Sector Investment Program (Tranche 3)

Periodic Financing Request Report. India: Railway Sector Investment Program (Tranche 3) Periodic Financing Request Report Project Number: 36330-043 MFF Number: 0060 November 2017 India: Railway Sector Investment Program (Tranche 3) Distribution of this document is restricted until it has

More information

LOAN AGREEMENT (Ordinary Operations) (Himachal Pradesh Clean Energy Development Investment Program Project 4) between INDIA. and

LOAN AGREEMENT (Ordinary Operations) (Himachal Pradesh Clean Energy Development Investment Program Project 4) between INDIA. and LOAN NUMBER 2914-IND LOAN AGREEMENT (Ordinary Operations) (Himachal Pradesh Clean Energy Development Investment Program Project 4) between INDIA and ASIAN DEVELOPMENT BANK DATED 19 NOVEMBER 2012 IND 41627

More information

Papua New Guinea: Port Moresby Power Grid Development Project

Papua New Guinea: Port Moresby Power Grid Development Project Port Moresby Power Grid Development Project (RRP PNG 43197) Project Administration Manual Project Number: 43197 April 2013 Papua New Guinea: Port Moresby Power Grid Development Project Contents ABBREVIATIONS

More information

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance

Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved Project Performance Technical Assistance Report Project Number: 47287-001 Capacity Development Technical Assistance (CDTA) December 2013 Republic of Indonesia: Aligning Asian Development Bank and Country Systems for Improved

More information

LOAN AGREEMENT (Ordinary Operations) (Ho Chi Minh City Urban Mass Rapid Transit Line 2 Investment Program Loan 2) between

LOAN AGREEMENT (Ordinary Operations) (Ho Chi Minh City Urban Mass Rapid Transit Line 2 Investment Program Loan 2) between LOAN NUMBER 2956-VIE LOAN AGREEMENT (Ordinary Operations) (Ho Chi Minh City Urban Mass Rapid Transit Line 2 Investment Program Loan 2) between SOCIALIST REPUBLIC OF VIET NAM and ASIAN DEVELOPMENT BANK

More information

FINANCIAL MANAGEMENT ASSESSMENT

FINANCIAL MANAGEMENT ASSESSMENT Greater Malé Environmental Improvement and Waste Management Project (RRP MLD 51077) EXECUTIVE SUMMARY FINANCIAL MANAGEMENT ASSESSMENT 1. The financial management assessment (FMA) was conducted for the

More information

INDIA: Rajasthan State Highway Investment Program

INDIA: Rajasthan State Highway Investment Program Rajasthan State Highway Investment Program (RRP IND 49228) Facility Administration Manual Project Number: 49228-001 Loan Number: XXXX April 2017 INDIA: Rajasthan State Highway Investment Program ADB APFS

More information

LOAN AGREEMENT (Ordinary Operations) (O Mon IV Combined Cycle Power Plant Project) between SOCIALIST REPUBLIC OF VIET NAM. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Ordinary Operations) (O Mon IV Combined Cycle Power Plant Project) between SOCIALIST REPUBLIC OF VIET NAM. and ASIAN DEVELOPMENT BANK LOAN NUMBER -VIE LOAN AGREEMENT (Ordinary Operations) (O Mon IV Combined Cycle Power Plant Project) between SOCIALIST REPUBLIC OF VIET NAM and ASIAN DEVELOPMENT BANK DATED VIE 43400 LOAN AGREEMENT (Ordinary

More information

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan

Improving the Financial Management Capacity of Executing Agencies in Afghanistan and Pakistan Technical Assistance Report Project Number: 46539 Regional Capacity Development Technical Assistance (R CDTA) August 2014 Improving the Financial Management Capacity of Executing Agencies in Afghanistan

More information

LOAN AGREEMENT (Special Operations) (Third Primary Education Development Project Additional Financing) between. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Special Operations) (Third Primary Education Development Project Additional Financing) between. and ASIAN DEVELOPMENT BANK LOAN NUMBER 3256-BAN (SF) LOAN AGREEMENT (Special Operations) (Third Primary Education Development Project Additional Financing) between PEOPLE S REPUBLIC OF BANGLADESH and ASIAN DEVELOPMENT BANK DATED

More information

Project Agreement CONFORMED COPY LOAN NUMBER CHA. (Hubei Shiman Highway Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT

Project Agreement CONFORMED COPY LOAN NUMBER CHA. (Hubei Shiman Highway Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 4745 - CHA Public Disclosure Authorized Project Agreement Public Disclosure Authorized (Hubei Shiman Highway Project) between INTERNATIONAL BANK

More information

Secondary Towns and Rural Community Based Water Supply and Sanitation Project Loan No SRI (SF) LOAN COVENANTS COMPLIANCE AS AT 31 March 2011

Secondary Towns and Rural Community Based Water Supply and Sanitation Project Loan No SRI (SF) LOAN COVENANTS COMPLIANCE AS AT 31 March 2011 Secondary Towns and Rural Community Based Water Supply and Sanitation Project Loan No. 1993 SRI (SF) LOAN COVENANTS COMPLIANCE AS AT 31 March 2011 Reference in Loan Agreement paras 2 and 3 Covenant A.

More information

Proposed Multitranche Financing Facility India: Tamil Nadu Urban Flagship Investment Program

Proposed Multitranche Financing Facility India: Tamil Nadu Urban Flagship Investment Program Facility Administration Manual Project Number: 49107-003 Loan Number: LXXXX September 2018 Proposed Multitranche Financing Facility India: Tamil Nadu Urban Flagship Investment Program ABBREVIATIONS ADB

More information

Afghanistan: Multitranche Financing Facility for Energy Sector Development Investment Program

Afghanistan: Multitranche Financing Facility for Energy Sector Development Investment Program Multitranche Financing Facility Administration Memorandum MFF Number: 0026 Project Numbers: Grant 0134, JFPR 9128 (Tranche 1), Grant 0184 (Tranche 2) June 2010 Afghanistan: Multitranche Financing Facility

More information

Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) ECONOMIC ANALYSIS

Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) ECONOMIC ANALYSIS Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) A. Introduction ECONOMIC ANALYSIS 1. Karnataka. Karnataka is one of the top ten states in India by gross domestic product

More information

LOAN AGREEMENT (Special Operations) (Municipal Services Development Project - Phase II) between GEORGIA. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Special Operations) (Municipal Services Development Project - Phase II) between GEORGIA. and ASIAN DEVELOPMENT BANK LOAN NUMBER 2534-GEO(SF) LOAN AGREEMENT (Special Operations) (Municipal Services Development Project - Phase II) between GEORGIA and ASIAN DEVELOPMENT BANK DATED 20 AUGUST 2009 LAS:GEO 43171 LOAN AGREEMENT

More information