Albania Water Supply and Sewerage Policy and Financing Strategy Model. Philip D. Giantris President Valu Add Management Services 3 November 2016
|
|
- Antonia Casey
- 5 years ago
- Views:
Transcription
1 Albania Water Supply and Sewerage Policy and Financing Strategy Model Philip D. Giantris President Valu Add Management Services 3 November 2016
2 What This Presentation Will Not Do!!! It will not present the Water Sector financing strategy for Albania, since to date, Albania has not made that decision. It will not propose what the Water Sector financing strategy for Albania should be, since that is the role of the Government of Albania. However, it will not deny that Albania is facing a major Water Sector financing crisis, which is solvable, but not without major revisions in service targets; significant increases in annual investment dedicated to the sector, increased efficiency of performance, and regularly increased tariffs.
3 What Causes a Water Sector Financing Crisis? Lack of a well quantified capital program, built on a master plan, that is directly tied to specific service and performance targets. Lack of an operational efficiency improvement program that is tied to specific, standard performance indicators. Political interference in the sound, commercial management of water supply and sewerage utilities, and in the tariff setting process at the local and national level.
4 Importance and Basis for Developing Water Sector Financial Gap Analysis Gap analysis aids in determining performance disparities or significant quantitative differences between how the sector is being managed and what should be the expected level of performance to be attained in the sector. Gap analysis naturally flows from benchmarking and other assessments tools. Once the general expectation of performance is understood, it is possible to compare expectation with current level of performance. Gap analysis identifies gaps between the optimized allocation and integration of the inputs (resources), and the current allocation-level. This helps to reveal areas that need to be improved.
5 Who Should Be Interested in Water Sector Financial Gap Analysis? An Individual Utility (Local Government) should care, since if done correctly, and for a period equal to a normal master plan, it virtually removes doubt from financial forecasting and decision-making. A Central Government should care, since world-wide, the treasury of Central Governments has always been, and will be, a major player in the financing of essential, public infrastructure. An Investment Institution (IFI) should care, so that it can better understand the financial risk (embarrassment) associated with long-term debt issuances.
6 Albania s Decision to Address a Water Sector Financial Gap Analysis Result of Many Fathers Ministry of Transport and Infrastructure developed the first quantified water sector strategy ( ). A National Water Supply and Sewerage Master Plan was prepared that addressed the capital investment needs to meet EU Water Directives, but without a financial feasibility analysis. Technical Secretariat of the National Water Council started to do the underlying studies needed for an Integrated Water Resources Management Plan and established the Water for People Working Group. The World Bank conducted a State of the Sector Report for the countries in the Danube River Catchment. The World Bank offered to fund the development of a Financial Gap Analysis Model for Albania.
7 Financing Sustainable Water Supply and Sewerage Services for All Expenditures O&M Sources of Funds Targets Service Improvement Service Expansion Asset Renewal Gap? Tariffs Taxes Transfers Subsidies Bridge Financing Financing Costs
8 Albania Water Sector Financing Strategy Project Phase I: What and How Much? : Define a set of feasible National Sector Program objectives and targets, and determine how much the corresponding services cost? Phase II: How to Pay for It? How to use tariffs, taxes and transfers to finance water supply and sewerage services in a manner that is efficient, sustainable, and allows for the achievement of National Sector Program?
9 Structuring of Financial Gap Analysis Model Excel-based model developed to ensure there is internal consistency between policy targets, expenditure needs, and any capital financing that is identified. Adheres to a common terminology and understanding of sources of funds The 3-T s (Transfers, Tariffs, Taxes). Works for all future individual water utilities as well as for the entire country. Driven by activating any number of pre-determined Policy Measures to be applied in a defined scenario. Can work in both English and Albanian languages. Indifferent to whether the management option is public or private sector driven.
10 Structure of Albania Water Sector Financial Model
11 Elements of the Financial Analysis Model Four Distinct Groups: Each with Modules and Segments Policy-Oriented Group: Policy-maker enters desired targets for the water sector. Targets may be entered at national and /or at local government level. Input Data Group: These are partly factual data on the water sector and partly projections for the future (population, income growth, price responsiveness of demand, etc). These data are entered at the local government level and for each water utility. Calculation Group: All calculations are done in this module. Summary Statistics and Outputs Group: Calculated results are presented at the various geographical levels (national, municipal, and rural versus urban).
12 Structure of Model Cockpit to Aid Decisions Cockpit Group contains three modules where the policymaker or model user specifies the following: Policy objectives or targets to be achieved in the water sector as a stated value. Proposed tariff/tariffs that policy-maker feels can be supported both through public perception and social means. Proposed financing assumptions for the investment needs generated, based on the sector objectives. Model foresees an iterative process whereby the policy maker/user suggests a set of tariffs, evaluates the outcome in terms of affordability and cost coverage for utilities, and revises the targets, capital funding levels, or tariffs, as appropriate.
13 Structure of a Cockpit Input Sheet C1: Policy initiatives Coverage WATER SUPPLY SEWERAGE Current Target Current Target Enter minimum level: Enter minimum level: Urban 50% 95% 99% 99% Urban 50% 95% 99% 99% Rural 10% 75% 85% 90% Rural 2% 25% 50% 75% And/or relative improvement: And/or relative improvement: Urban 0% Urban 0% Rural 0% Rural 0% Reduction of Non-Revenue Water (NRW) WATER SUPPLY Current Target Reduction in technical losses by rehabilitation of water network Enter acceptable level of technical loss 40% 30% 25% Increased metering of existing connections Enter share of metering 100% 100% 100% Calibration of meters in order to reduce NRW Enter share of correctly calbibrate 0% Reduction in illegal connections Enter reduction relative to now 0% Efficiency improvements WATER SUPPLY SEWERAGE Current Target Current Target operations efficiency operations efficiency Collection efficiency (billing) Collection efficiency (billing)
14 Financial Model Data Input Macroeconomic and Population Data Institute of Statistics (INSTAT) Ministry of Finance Density data by LGU from INSTAT Water Utilities and Sewerage Monitoring and Benchmarking Unit Data Water Regulatory Authority National Water Supply and Sewerage Master Plan Water Supply and Sewerage Support Program Data Assumptions Included but Not Limited to: Demand (Price and income elasticity)
15 Financial Model Results Overview of targets and performance Projected Utility Performance Unit Urban water coverage % 92% 97% 99% Rural water coverage % 40% 60% 80% Urban sewerage coverage % 65% 70% 80% Rural sewerage coverage % 15% 25% 50% Wastewater treatment - urban % 59% 70% 80% Wastewater treatment - rural % 15% 25% 50% Non Revenue Water % 59% 47% 38% Metering level % 81% 100% 100% Production metering % 100% 100% 100% Collection rate % 94% 96% 98% Staff efficiency (staff/1.000 conn.) staff/1,000 p Continuity (hours/day) hours/day O&M cost coverage % 166% 231% 252% TOC coverage % 90% 97% 98% Investments by policy measures, 1,000 LEK PM1: Cost of new urban water connections 13,444,194 37,857,945 47,623,445 PM2: Cost of new rural water connections 1,554,545 9,236,416 16,918,286 PM 3: Cost of new urban wastewater connections 11,377,270 60,600, ,047,524 PM4: Cost of new rural wastewater connections 23,605,401 50,080, ,269,704 PM5: Cost of rehabilitation of network 10,673,892 26,904,122 43,134,352 PM6: Cost of change to meter 285, , ,823 PM7: Cost of calibration of metres 2,189,384 3,284,076 4,159,829 PM8: Cost of removing illegal connections 795, , ,382 PM9: Increased metering of water production 29,407 33,549 36,863 PM10: Imposed efficiency improvements in operations PM11: Improved collection efficiency PM12: Energy efficiency 2,523,389 2,994,421 4,407,519 PM13: Water (Juri.) 3,091,507 3,111,802 5,546,775 PM14: Water (OS) 345, , ,634 PM15: WWTP (Juri.) 8,590,063 15,206,724 39,748,588 PM16: WWTP (OS) 1,480,941 1,480,941 2,626,932 Total investments 79,986, ,591, ,626,657 Investments financed from external sources 435,962,622
16 LEK/m³ Gap 1,000 ALL Surplus Funding Gap and Tariff Affordability Analysis 10,000,000 Funding surplus/gap 8,000,000 6,000,000 4,000,000 2,000, ,000,000-4,000,000-6,000, Investment funding surplus/gap OPEX funding surplus/gap Total costs Total funding surplus/gap Tariff Affordability Lowest decile affordability tariff LEK/m³ Third decile affordability tariff LEK/m³ Average income affordability tariff LEK/m³ Total tariff households Affordability given pro-poor scheme LEK/m³
17 Early Indications in Scenarios Considered Major realignment of public capital investment is needed if Albania wants to seriously negotiate its accession terms for compliance with the EU Water Directives. A major improvement in commercial operational efficiency is needed if water supply and sewerage utilities are not going to be an on-going financial burden to Central and Local Government treasuries. Public officials (elected and appointed) need to rethink affordability of services in the water sector, and not use it as a campaign issue at each election. Water is currently significantly under priced in Albania and cannot cover even operations and maintenance costs in a number of utilities.
18 So How Do We Address Water Supply and Sewerage Services for the Poorest of the Poor? FRIDAY 4 NOVEMBER - 14:20 PLENARY SESSION 4. WATER SUPPLY AND SEWERAGE ACCESS AND SERVICES: WHO PAYS FOR THE POOREST OF THE POOR?
19 THANK YOU PROJECT CONSULTANTS TO THE WORLD BANK A JOINT VENTURE COWI GROUP - DENMARK VALU ADD MANAGEMENT SERVICES - ALBANIA
PERFORMANCE IMPROVEMENT PLANNING MODEL PERFORMANCE ASSESSMENT SYSTEM PROJECT
PERFORMANCE NING MODEL PERFORMANCE ASSESSMENT SYSTEM PROJECT Contents 2 1. Approach to Performance improvement planning model 2. Data Entry and Forecasts 3. Module I: Performance Assessment 4. Module II:
More informationAlbania. Restructuring Public Expenditure to Sustain Growth. Public Expenditure and Institutional Review. Sector related presentations-water
Albania Public Expenditure and Institutional Review Restructuring Public Expenditure to Sustain Growth Sector related presentations-water Tirana March 15, 2007 Main messages 1. Despite improvements, water
More informationFINANCIAL ANALYSIS. Table 1: Project Outputs Output Subcomponents Type of Analysis Enshi Wastewater Enshi Hongmiao WWTP Enshi Dashaba WWTP
Hubei Enshi Qing River Upstream Environment Rehabilitation Project (RRP PRC 47048) FINANCIAL ANALYSIS A. Introduction 1. The financial analysis of the project was carried out in accordance with the Asian
More informationWATER AND WASTEWATER SERVICES IN THE DANUBE REGION SUMMER SCHOOL TSLR TORINO, SEPTEMBER, 2015
WATER AND WASTEWATER SERVICES IN THE DANUBE REGION SUMMER SCHOOL TSLR TORINO, SEPTEMBER, 2015 STRUCTURE A Framework for Sustainable Services The State of the Sector in the Danube region Context Access
More informationMUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES
MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES TO: FROM: Mayor and Members of Council Gerry Wolting, B. Math, CPA, CA General Manager, Corporate Services DATE: January 13, 2014 SUBJECT: 2013 Asset Management
More informationEAP Task Force. EAP Task
EAP Task Force EAP Task Force EAPP Task JOINT MEETING OF THE EAP TASK FORCE S GROUP OF SENIOR OFFICIALS ON THE REFORMS OF THE WATER SUPPLY AND SANITATION SECTOR IN EASTERN EUROPE, CAUCASUS AND CENTRAL
More informationURBACT III Programme Manual
URBACT III Programme Manual Fact Sheet 4B National URBACT Points Section 1. National URBACT Points in the URBACT III Operational programme: context and objective Section 2. Role of National URBACT Points
More informationMITIGATING THE IMPACT OF THE FINANCIAL CRISIS ON THE URBAN POOR USING RESULTS-BASED FINANCING SUCH AS OUTPUT-BASED AID FOR SLUM UPGRADING
INFRA GUIDANCE NOTES THE WORLD BANK, WASHINGTON, DC May 2009 IN-1 MITIGATING THE IMPACT OF THE FINANCIAL CRISIS ON THE URBAN POOR USING RESULTS-BASED FINANCING SUCH AS OUTPUT-BASED AID FOR SLUM UPGRADING
More informationTariffs and Tariff Design Promoting Access to the Poor
Regulation for Practitioners Building Capacity through Participation Tariffs and Tariff Design Promoting Access to the Poor Gloria Magombo Energy Advisor gmagombo@satradehub.org July 27-31, Eskom Convention
More informationMethodology for CBA preparation SOP Environment
Methodology for CBA preparation SOP Environment Programming Meeting for water and wastewater projects in the period 2008-2009 Mamaia, 10-13 th July 2008 Massimo Marra JASPERS Regional Office for Romania
More informationWater in the Green Economy in Practice Session 3: Sustainable Financing. Maria Angelica Sotomayor Senior Economist World Bank
Water in the Green Economy in Practice Session 3: Sustainable Financing Maria Angelica Sotomayor Senior Economist World Bank The Human Perspective A green economy aims to improve the environment for the
More informationWORKSHOP 1: LONG-RANGE FINANCIAL PLANNING
WORKSHOP 1: LONG-RANGE FINANCIAL PLANNING Tuesday, September 19, 2017 Overview of Today s Session Timeframe Topic/Discussion 20 min What is long-range financial planning and why is it important? 10 min
More informationFinancial Analysis INTRODUCTION FINDINGS AND TRENDS PAST FINANCIAL PERFORMANCE. Comparative Financial Statement
9 INTRODUCTION This chapter has been prepared by FCS Group to provide a financial program that enables the City of Sultan (City) to remain financially viable through the next 6-year planning period and
More informationApplied Workshop on Preparing Infrastructure Projects 21 th - 25 th March Bangkok DAY 2
Applied Workshop on Preparing Infrastructure Projects 21 th - 25 th March Bangkok DAY 2 1 2 Recap of Day 1 Applying central concepts to structuring PPP projects S1: Project screening S2: Defining project
More informationSUBJECT/REPORT NO: Ontario Ministry of Infrastructure Asset Management Plan Requirements (FCS13077/PW13077) (City Wide)
TO: Mayor and Members General Issues Committee WARD(S) AFFECTED: CITY WIDE COMMITTEE DATE: October 16, 2013 SUBJECT/REPORT NO: Ontario Ministry of Infrastructure Asset Management Plan Requirements (FCS13077/PW13077)
More informationOutput-Based Aid for Water and Sanitation in Africa (learning points from three GPOBA pilots)
Output-Based Aid for Water and Sanitation in Africa (learning points from three GPOBA pilots) World Bank Water Week 27 February 2007 1 Agenda 1. The GPOBA pilot in Uganda - Water supply in Small Towns
More informationDOCUMENT OF THE EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT STRATEGY FOR ALBANIA
DOCUMENT OF THE EUROPEAN BANK FOR RECONSTRUCTION AND DEVELOPMENT STRATEGY FOR ALBANIA REPORT ON THE INVITATION TO THE PUBLIC TO COMMENT 1. Overview of the public consultation process The objective of this
More informationUniversity of Vermont Debt Policy
University of Vermont As Adopted by the Board of Trustees September 2004, revised November 2005, Revised, November 2006, Revised, December 2007, Reaffirmed, December 2008, Revised, October 2009 Revised,
More informationThe Priority Environmental Investment Programme for South Eastern Europe - PEIP
The Priority Environmental Investment Programme for South Eastern Europe - PEIP National Workshop: Developing Environmental Infrastructure Projects in the WATER Sector in Montenegro 13 th May 2008, Hotel
More informationBetween Public - Private Partnerships and public finance in the public infrastructure. The water and sanitation sector in Albania
Between Public - Private Partnerships and public finance in the public infrastructure sector: The water and sanitation sector in Albania Abstract PhD (C.) Fjona Zeneli University of Porto, Portugal It
More informationShort Justification for the Municipal Water Services Financing Strategy, Kazakhstan
Ministry of Environment, Denmark Short Justification for the Municipal Water Services Financing Strategy, Kazakhstan Submitted to the Ministry of Environment and Natural Resources, Kazakhstan DEPA/DANCEE
More informationACHIEVEMENT OF TECHNICAL ASSISTANCE OUTCOMES
Timor-Leste: CPS 2011 2015 Final Review Validation, Linked Document 7 ACHIEVEMENT OF TECHNICAL ASSISTANCE OUTCOMES Road Transport TA 7698 - Supporting Road Network Development Outcome: The Ministry of
More informationOXFORD ECONOMICS. Stress testing and risk management services
OXFORD ECONOMICS Stress testing and risk management services September 2014 The rising need for rigorous stress testing Stress testing has become a critical component of the risk identification and risk
More informationNordax Group AB (publ) Combined financial statements 1 January 31 December 2012, 2013, 2014
Nordax Group AB (publ) Combined financial statements 1 January 31 December 2012, 2013, 2014 Contents Income statement...2 Statement of financial position...3 Cash flow statement...4 Statement of changes
More informationGOOD PRACTICE IN PROJECT PREPARATION PUBLIC WATER UTILITIES
GOOD PRACTICE IN PROJECT PREPARATION PUBLIC WATER UTILITIES April 2005 Introduction This document has been published by the Project Preparation Committee (PPC) within the framework of the DABLAS Task Force
More informationINCENTIVES & TARGETS KEY FEATURES OF SUCCESSFUL OPERATING CONTRACTS
INCENTIVES & TARGETS KEY FEATURES OF SUCCESSFUL OPERATING CONTRACTS PLANNING TRANSITION TO COST RECOVERY Rs. per m3 45 40 35 30 25 20 15 10 5 0 2006 2007 2008 2009 2010 2011 Year 2012 2013 2014 2015 Total
More informationHouse Bill 20 Implementation. House Select Committee on Transportation Planning Tuesday, August 30, 2016, 1:00 P.M. Capitol Extension E2.
House Bill 20 Implementation Tuesday,, 1:00 P.M. Capitol Extension E2.020 INTRODUCTION In response to House Bill 20 (HB 20), 84 th Legislature, Regular Session, 2015, and as part of the implementation
More informationWhat is Water Worth to You?
2012 ANNUAL CONFERENCE AND EXHIBITION What is Water Worth to You? 6-7-8 NOVEMBER 2012 - Hotel Tirana International MAIN PARTNERS WELCOME The Water Supply and Sewerage Association of Albania will conduct
More informationReview of the Federal Transit Administration s Transit Economic Requirements Model. Contents
Review of the Federal Transit Administration s Transit Economic Requirements Model Contents Summary Introduction 1 TERM History: Legislative Requirement; Conditions and Performance Reports Committee Activities
More informationAN OVERVIEW ON ALBANIAN ECONOMIC DEVELOPMENT INDICATORS
AN OVERVIEW ON ALBANIAN ECONOMIC DEVELOPMENT INDICATORS Secretariat of Albania Investment Council, December 2017 Note: This Material is a summary of some of the main indicators and does not represent the
More informationTHE ROAD TO ECONOMIC GROWTH
THE ROAD TO ECONOMIC GROWTH Introduction 1. As in many countries, the road sector accounts for the major share of domestic freight and inter-urban passenger land travel in Indonesia, playing a crucial
More informationNew Jersey Counties by Region
New Jersey Counties by Region 2 Summary Almost 25% of all revenue received by local governments in New Jersey comes from state funding assistance. Much of this assistance serves to lower household property
More informationSTRATEGY FOR DEVELOPMENT AND MANAGEMENT OF THE WATER SUPPLY AND SANITATION SECTOR IN THE REPUBLIC OF BULGARIA
REPUBLIC OF BULGARIA MINISTRY OF REGIONAL DEVELOPMENT STRATEGY FOR DEVELOPMENT AND MANAGEMENT OF THE WATER SUPPLY AND SANITATION SECTOR IN THE REPUBLIC OF BULGARIA 2014-2023 (Approved by Council of Minister
More informationMENA-OECD WORKING GROUP ON CORPORATE GOVERNANCE
MENA-OECD WORKING GROUP ON CORPORATE GOVERNANCE Rabat, Morocco, 12-13 December 2017 SESSION 1: The business case for corporate governance and the evolution of the concept in the MENA (Middle East and North
More informationPLANNING BUREAU SUMMARY. December 2009
PLANNING BUREAU EUROPEAN UNION REPUBLIC OF CYPRUS EVALUATION OF THE INDICATORS OF THE OPERATIONAL PROGRAMMES SUSTAINABLE DEVELOPMENT AND COMPETITIVENESS AND EMPLOYMENT, HUMAN CAPITAL AND SOCIAL COHESION
More informationFrequently Asked Questions on Accident and Injury Data
March 2013 Frequently Asked Questions on Accident and Injury Data background document to the Joint Call for a pan-european accident and injury data system What is the burden of accidents and injuries in
More informationEBRD s Experience in the Water Sector in Romania Challenges for the future period
1 EBRD s Experience in the Water Sector in Romania Challenges for the future period 2 EBRD - Three Key Principles Promotes transition to market economies, private ownership and good governance with respect
More informationDEVELOPMENT CHARGES BACKGROUND STUDY
DEVELOPMENT CHARGES BACKGROUND STUDY Town of New Tecumseth C o n s u l t i n g L t d. May 29, 2013 Amended June 18, 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 I INTRODUCTION... 10 II THE METHODOLOGY
More informationDraft price control determination notice: company-specific appendix South West Water
April 2014 Setting price controls for 2015-20 Draft price control determination notice: company-specific appendix South West Water Contents A1 Overview 2 A2 Wholesale water 6 A3 Wholesale wastewater 21
More informationCREATION OF A PUBLIC BENEFITS FRAMEWORK
CITY COUNCIL NEW BUSINESS SUBJECT: INITIATED BY: JULY 20, 2015 CREATION OF A PUBLIC BENEFITS FRAMEWORK DEPARTMENT OF COMMUNITY D~ELOPMENT (Stephanie DeWolfe, AICP, Directo (John Keho, AICP, Assistant Director
More informationPresented By: L. Carson Bise II, AICP President
Impact Fee Basics: Methodology and Fee Design Presented By: L. Carson Bise II, AICP President Basic Options for One-Time Infrastructure Charges Funding from broad-based revenues (general taxes) Growth
More information2 nd Danube Financing Dialogue - Challenges and opportunities of financing SME investment projects in the Danube Region
2 nd Danube Financing Dialogue - Challenges and opportunities of financing SME investment projects in the Danube Region Klaus Michal, Senior Account Manager Kommunalkredit Austria AG 24.01.2012 INFRA BANKING
More informationAMP2016. County of Grey. The 2016 Asset Management Plan for the. w w w. p u b l i c s e c t o r d i g e s t. c o m
AMP2016 w w w. p u b l i c s e c t o r d i g e s t. c o m The 2016 Asset Management Plan for the County of Grey SUBMITTED BY THE PUBLIC SECTOR DIGEST INC. (PSD) WWW.PUBLICSECTORDIGEST.COM JULY 2017 Contents
More informationBudget and Financial Controls Policy
Approved via Resolution 2015-139 Budget and Financial Controls Policy Scope 1. This policy applies to all Town departments, boards, committees, and other organizations falling within the reporting requirements
More informationorce DRAFT DISCUSSION PAPER FOR WATER AND WASTEWATER DEVELOPMENT STRATEGY FOR MOLDOVA
Task F Task F JOINT MEETING OF THE EAP TASK FORCE S GROUP OF SENIOR OFFICIALS ON THE REFORMS OF THE WATER SUPPLY AND SANITATION SECTOR IN EASTERN EUROPE, CAUCASUS AND CENTRAL ASIA THE EU WATER INITIATIVE
More informationIncentive regulation in water case study
Incentive regulation in water case study Alan Booker, Office of Water Services, Birmingham, United Kingdom. Background Incentive regulation embraces a wider agenda than setting price caps. It should include
More informationPromoting Financial Sustainability and Financial Benchmarking. By: Jim Bruzzese, President of BMA Management Consulting Inc.
Promoting Financial Sustainability and Financial Benchmarking By: Jim Bruzzese, President of BMA Management Consulting Inc. Presentation Outline Introduction to Long Range Financial Planning Presentation
More informationKarnataka Integrated Urban Water Management Investment Program (RRP IND 43253) ECONOMIC ANALYSIS
Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) A. Introduction ECONOMIC ANALYSIS 1. Karnataka. Karnataka is one of the top ten states in India by gross domestic product
More informationREGIONAL COUNCIL OF LAPLAND
REGIONAL COUNCIL OF LAPLAND OPINION 20 January 2011 North Finland EU Office Allan Perttunen RE: Opinion of the Regional Council of Lapland about issues related to the 5th Cohesion Report Reference: 31
More informationImplementation of an Asset Management Plan
Municipal Finance Officers Association of Ontario 2006 Annual Conference Implementation of an Asset Management Plan Chad McCleave, CA PricewaterhouseCoopers September 21, 2006 pwc Municipal Infrastructure
More informationDEBT STRATEGY REPORT. City of Boise FY 2012/2013 Biennial Budget OVERVIEW
OVERVIEW The Mayor and City Council adopt a debt strategy to guide the planning for recognized capital projects and other activities, which may require long-term funding. The debt strategy is a significant
More informationFichtner Management Consulting. Review of the Tariff Methodology in Water Supply. Extract. Tbilisi, February 18, 2016 I Dr Maria Belova, Nina Negic
Fichtner Management Consulting Review of the Tariff Methodology in Water Supply Extract Tbilisi, February 18, 2016 I Dr Maria Belova, Nina Negic Fichtner is one of the largest and best-known German independent
More informationECONOMIC ANALYSIS. A. Introduction
North Pacific Regional Connectivity Investment Project (RRP PAL 46382) ECONOMIC ANALYSIS A. Introduction 1. Project summary. The Asian Development Bank (ADB) will support Palau to develop a fiber optic
More informationCOUNTY OF SANTA CRUZ DEBT MANAGEMENT POLICY
COUNTY OF SANTA CRUZ DEBT MANAGEMENT POLICY Title I Finance and Accounting 800 DEBT MANAGEMENT POLICY A. Introduction/Purpose The purpose of the County of Santa Cruz Debt Management Policy (Policy) is
More informationNWC Tariff Submission for the Period January 2019 to December Submission to the Office of Utilities Regulation (OUR)
NWC Tariff Submission for the Period January 2019 to December 2021 Submission to the Office of Utilities Regulation (OUR) October 2018 Table of Contents 1 Executive Summary 1 1.1 Build-Up of the Revenue
More informationTestimony Concerning Regulation of Systemic Risk in the Financial Services Industry
Testimony Concerning Regulation of Systemic Risk in the Financial Services Industry Submitted for the Record By James Rech, Vice President, Risk Management and Financial Reporting Council of the American
More informationThe City of Owen Sound Asset Management Plan
The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to
More informationModel Concession Agreement for Highways: An Overview
Model Concession Agreement for Highways: An Overview - Gajendra Haldea The highways sector in India is witnessing significant interest from both domestic as well as foreign investors following the policy
More information2015 Draft Budgetary Plan
2015 Draft Budgetary Plan Corrected for technical errors, 7 November 2014 26c/2014 Economic outlook and economic policy 2015 Draft Budgetary Plan Ministry of Finance publications 26c/2014 Economic outlook
More informationOffice of Utilities Regulation REGULATORY FRAMEWORK FOR THE NATIONAL WATER COMMISSION ( )
REGULATORY FRAMEWORK FOR THE NATIONAL WATER COMMISSION (2008-2013) REGULATORY FRAMEWORK FOR NATIONAL WATER COMMISSION (2008-2013) Introduction - Legal Authority Pursuant to Section 4(1) (a) of the OUR
More informationASSET MANAGEMENT PLAN. HEMSON C o n s u l t i n g L t d. 30 Saint Patrick Street, Suite 1000 Toronto, ON, M5T 3A3
ASSET MANAGEMENT PLAN C o n s u l t i n g L t d. 30 Saint Patrick Street, Suite 1000 Toronto, ON, M5T 3A3 March 2017 TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 A. STATE OF THE LOCAL INFRASTRUCTURE... 1 B.
More informationINCREASING INVESTMENT IN SOCIAL HOUSING Analysis of public sector expenditure on housing in England and social housebuilding scenarios
INCREASING INVESTMENT IN SOCIAL HOUSING Analysis of public sector expenditure on housing in England and social housebuilding scenarios January 219 A report by Capital Economics for submission to Shelter
More informationOrganisation de Coopération et de Développement Economiques Organisation for Economic Co-operation and Development
Unclassified ENV/EPOC/EAP(2007)12 ENV/EPOC/EAP(2007)12 Unclassified Organisation de Coopération et de Développement Economiques Organisation for Economic Co-operation and Development English - Or. English
More information1 st call for proposals, 2 nd call for proposals, Priority 3 Better network of harbours version
1 st call for proposals, 2 nd call for proposals, Priority 3 Better network of harbours version 14.09.16 Annex 2 Revenue Guidelines Table of contents Table of contents 1 1. Abbreviations and definitions
More informationAnalysis of Affordability of Cost Recovery: Communal and Network Energy Services. September 30, By Clare T. Romanik The Urban Institute
Analysis of Affordability of Cost Recovery: Communal and Network Energy Services September 0, 1998 By Clare T. Romanik The Urban Institute under contract to The World Bank EXECUTIVE SUMMARY The following
More informationBuilding a Better Tomorrow
Building a Better Tomorrow Investing in Ontario s Infrastructure to Deliver Real, Positive Change A Discussion Paper on Infrastructure Financing and Procurement February 2004 2 BUILDING A BETTER TOMORROW
More informationFINANCING WATER RESOURCE MANAGEMENT IN INDIA
FINANCING WATER RESOURCE MANAGEMENT IN Governance INDIA Federal country - resources and responsibilities are shared between Central and State governments Union MoWR is responsible for development, conservation
More informationWorking Party of Senior Budget Officials
Unclassified Unclassified Organisation de Coopération et de Développement Économiques Organisation for Economic Co-operation and Development 12-Jun-2013 English text only PUBLIC GOVERNANCE AND TERRITORIAL
More informationLocal Government Bonds
Last Updated: February 26, 2008 Local Government Bonds 1. The basics behind rating local government bonds JCR evaluates local government bonds in Japan by assessing local governments in conjunction with
More informationSection 6: Economic Development and Fiscal Impact
Section 6: Economic Development and Fiscal Impact The Economic Development and Fiscal Impact section of the Comprehensive Plan provides background on Insight Research Corporation s Development Simulation
More informationImprove Operational and Financial Performance of the PUC s
Improve Operational and Financial Performance of the PUC s European Agency for Reconstruction ( EAR ) Maršala Birjuzova 16/4 11000 Belgrade Serbia +381-11-2185 999 Telephone +381-11-2185 946 Fax www.miasp.com
More informationFiduciary Insights. COMPREHENSIVE ASSET LIABILITY MANAGEMENT: A CALM Aproach to Investing Healthcare System Assets
COMPREHENSIVE ASSET LIABILITY MANAGEMENT: A CALM Aproach to Investing Healthcare System Assets IN A COMPLEX HEALTHCARE INSTITUTION WITH MULTIPLE INVESTMENT POOLS, BALANCING INVESTMENT AND OPERATIONAL RISKS
More informationImpact Investments in India
Introduction: Impact investments, which aim to generate financial returns while creating measurable social and environmental benefits to address some of the world s most pressing challenges, have attained
More informationAccess to public and non-public information for IFIs: goodwill versus procedures?
Access to public and non-public information for IFIs: goodwill versus procedures? November, 2014 John McHale National University of Ireland, Galway Irish Fiscal Advisory Council Presentation to the Second
More informationValue for Money Analysis: Choosing the Best Project Delivery Method. Ken L. Smith, PE, CVS -HDR Engineering, Inc.
Value for Money Analysis: Choosing the Best Project Delivery Method Ken L. Smith, PE, CVS -HDR Engineering, Inc. 1 Overview What is a VfM analysis Why is it used Key VfM components and principles Life
More informationK&H Bank Zrt. CONSOLIDATED SEMI-ANNUAL REPORT 1H 2010
K&H Bank Zrt. CONSOLIDATED SEMI-ANNUAL REPORT 1H 2010 Budapest, 30 August 2010 CONTENT Statement of the Issuer Consolidated Balance Sheet Consolidated Income Statement Consolidated Management Report 2
More informationThe media often uses words
Best Practices Building and Maintaining Solid Infrastructure in the Town of Gilbert By Shayne Kavanagh Preserving the investment the community has made in its capital assets is a concern for all local
More informationMongolia Public Expenditure and Financial Management Review (PEFMR) Education. Prateek Tandon
Mongolia Public Expenditure and Financial Management Review (PEFMR) Education Prateek Tandon 1 Outline Outcomes and Achievements in the Education Sector The Public Financing of Education The Public Financing
More informationDeveloping Financing Strategies in Water Supply and Sanitation
EUWI Finance Working Group Developing Financing Strategies in Water Supply and Sanitation Note July 2007 COWI A/S Parallelvej 2 DK-2800 Kongens Lyngby Denmark Tel +45 45 97 22 11 Fax +45 45 97 22 12 www.cowi.com
More information1. Introduction. 1 Government of Kosovo, Decision no. 01/61, accessed on: ,
2 1. Introduction In December 2015 the Government of Kosovo adopted the Draft Law on Strategic Investments 1. This law aims to facilitate the bureaucratic procedures for potential investors in Kosovo.
More information- ESF - EUR 14.5 million - Loan + training - SME - Lithuania. Entrepreneurship Promotion Fund (EPF) sustainable business.
- ESF - EUR 14.5 million - Loan + training - SME - Lithuania Entrepreneurship Promotion Fund (EPF) supporting entrepreneurs to develop a sustainable business DISCLAIMER This document has been produced
More informationLONDON CORPORATE ASSET MANAGEMENT PLAN 2014
LONDON CORPORATE ASSET MANAGEMENT PLAN 2014 OVERVIEW THE PLAN THE CORPORATE ASSET MANAGEMENT PLAN: Documents the City s plans for the management of its $10.9 billion worth of infrastructure directly under
More informationTHE ASSET MANAGEMENT PLAN FOR THE CITY OF NIAGARA FALLS
THE ASSET MANAGEMENT PLAN FOR THE CITY OF NIAGARA FALLS 2013 THE CITY OF NIAGARA FALLS 4310 QUEEN STREET NIAGARA FALLS, ONTARIO, L2E 6X5 SUBMITTED DECEMBER 2013 BY PUBLIC SECTOR DIGEST 148 FULLARTON STREET,
More informationFebruary The Economy. Debt. Debt. Debt EFFECTS OF THE LAW ON DEBT FORGIVENESS
Debt gap February 2018 analysis The Economy Debt Debt EFFECTS OF THE LAW ON DEBT FORGIVENESS EFFECTS OF THE LAW ON DEBT FORGIVENESS Executive summary Law on debt forgiveness entered into force on September
More informationCapital and Debt. Capital Expenditures 2017 to 2021 Capital Plan. Capital Plan Introduction. PSAB Tangible Capital Asset Five year Capital Plan
Capital and Debt CAPITAL AND DEBT Capital Expenditures 2017 to 2021 Capital Plan Capital Plan Introduction Asset Management Plans Bringing it all Together The City of Regina is building an asset management
More informationDANMARKS NATIONALBANK
ANALYSIS DANMARKS NATIONALBANK 14 DECEMBER 218 NO. 24 New financing of social housing strengthens the market for Danish government securities In 218, the central government has purchased all government-guaranteed
More informationEU Strategy for the Danube Region
EU Strategy for the Danube Region Presidency programme for 2016 Ladislav Šimko Office of the Government of the Slovak Republic Meeting of the National Coordinators 10. 12. 2015 EUSDR 2016 Activities Political
More informationCity of Welland. Comprehensive Asset Management Plan. GMBP File: January 13, Prepared By:
Prepared By: City of Welland Comprehensive Asset Management Plan GMBP File: 614013 January 13, 2015 GUELPH OWEN SOUND LISTOWEL KITCHENER EXETER HAMILTON GTA 650 WOODLAWN RD. W., BLOCK C, UNIT 2, GUELPH
More informationWORKING DRAFT. Jan Hlavsa Yannis Arvanitis. Office of Chief Economist, the European Bank for Reconstruction and Development.
WORKING DRAFT Benchmarks performance in Early Transition Countries: Evidence from Micro, Small and Medium Enterprises Lending and Municipal and Environmental Infrastructure 1 Jan Hlavsa Yannis Arvanitis
More informationStrategic Planning Developing an IR Plan
Webinar Series Strategic Planning Developing an IR Plan 3. Measuring the Success of Your Program August 20, 2009 4-5 p.m. ET Keith Mabee Vice Chairman, Dix & Eaton 1 Agenda 1. August 6 Introduction The
More informationMANAGE RISK WORLDWIDE
MANAGE RISK WORLDWIDE Zurich International Programs Corporate customers At Zurich, we re proud of our ability to help protect businesses that operate internationally. For nearly 40 years, we have built
More informationWater & Sewer Rate Study. Water & Sewer Cost of Service Rate Study. City of Norco, CA. Draft Report for
Water & Sewer Cost of Service Rate Study for City of Norco, CA October 11, 2016 Table of Contents October 11, 2016 Chad Blais Director of Public Works City of Norco 2870 Clark Avenue Norco, CA 92860 Re:
More informationBudget Management and Public Financial Accountability: Training Workshop and Study Tour to South Africa
Date: 18 22 June, 2007 Venue: Pretoria, South Africa Budget Management and Public Financial Accountability: Training Workshop and Study Tour to South Africa CABRI and World Bank Institute Introduction
More informationECOTEC in association with CESAM, CLM, University of Gothenburg, UCD and IEEP (CR)
Abstraction permits represent a natural resource endowment, which may justify an accompanying payment to the entity which controls property rights. Still, abstraction taxes are relatively rare in the EU
More informationVisit Oman delegation. George Gelauff Deputy director. Oman delegation
Visit Oman delegation George Gelauff Deputy director Oman delegation History Founded in September 1945 by Jan Tinbergen First Nobel Laureate in economics (1969) Legally established on 21 April 1947 Publish
More informationThe Argentine Economy in the year 2006
The Argentine Economy in the year 2006 ECONOMIC REPORT Year 2006 1. The Current Recovery from a Historical Perspective The Argentine economy has completed another year of significant growth with an 8.5%
More informationAlternatives Development, Project Justification, and Financial Realities Financial Considerations
Alternatives Development, Project Justification, and Financial Realities Financial Considerations Joe Hebert Manager, Financial Analysis and PFC Branch, FAA Office of Airports joe.hebert@faa.gov 1 Overview
More informationEthiopia Protection of Basic Services Social Accountability Program Social Accountability Guide First edition
Ethiopia Protection of Basic Services Social Accountability Program Social Accountability Guide First edition Chapter 0 of 13 Ethiopia Social Accountability Program Phase 2 MANAGEMENT AGENCY Multi Donor
More informationVANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants
VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN Terms of Reference for Consultants 1. BACKGROUND INFORMATION Government of Vanuatu has requested TA support in the formulation and preparation of a national infrastructure
More informationUnited Utilities Wholesale Charges A consultation on United Utilities proposed NAV tariff
United Utilities Wholesale Charges A consultation on United Utilities proposed NAV tariff 1. Introduction The New Appointments and Variations (NAV) regime allows new entry into the wholesale water and
More information