Improve Operational and Financial Performance of the PUC s

Size: px
Start display at page:

Download "Improve Operational and Financial Performance of the PUC s"

Transcription

1 Improve Operational and Financial Performance of the PUC s European Agency for Reconstruction ( EAR )

2 Maršala Birjuzova 16/ Belgrade Serbia Telephone Fax Internet Arnhem CoC Document title Document short title Status Date Project name Project number Client Reference MIASP 9R5927 European Agency for Reconstruction (EAR) 9R5927/CvS/R2006_96/001 Drafted by Milorad Rosic Utility Operations Expert Checked by Peter Duindam Institutional Expert Date/initials check. Approved by Cok van Schooten Team Leader Date/initials approval. 1

3 ANNEXES 3 1 INTRODUCTION 4 2 INDIVIDUAL ASSESSMENT OF PUC S 5 3 PREPARATION OF ACTION PLANS TRAINING SESSIONS 7 5 RESULTS 8 2

4 ANNEXES HASKONING NEDERLAND B.V. WATER No Annexes 1 Assessment note on PUC Apatin 2 Assessment note on PUC Indjija 3 Assessment note on PUC Mionica 4 Assessment note on PUC Smederevo 5 Assessment note on PUC Varvarin 6 Assessment note on PUC Žitorađa 7 Final version of the Action Plan 2007 for Capacity Enhancement Program 8 Results of questionnaire for participants of CEP training 9 Summary report on Capacity Enhancement Services training 10 Example of presentation on 30 th October 2007 of results of Action Plan 2007 (example PUC Indjija). 3

5 1 INTRODUCTION HASKONING NEDERLAND B.V. WATER This report provides a summary of the conclusions of the individual assessments that have been carried out of the Public Utility Companies (PUC s) that have participated in the Capacity Enhancement Program (CEP) organized by the MIASP team in the period from December 2006 to December 2007, as stipulated in the individual EAR Grant Contracts (example: ref. No 03SER01/11- Upgrading of the water treatment plant and replacement of pipes, Apatin Municipality). Furthermore information is given on the results of the training that was provided to the participating PUC s. The results are presented including the assessment of the training sessions by the participants. Detailed information has been included in the annexes. They concern (parts of) reports and documents that have been produced during the realization of the CEP and they have been brought together in this report, which serves as a wrap-up report of the program. The CEP consisted of the following elements: Individual assessments of the participating PUC s; Preparation of action plans 2007; Training sessions. To each element a short section has been dedicated and reference has been made to its most important conclusions or results. 4

6 2 INDIVIDUAL ASSESSMENT OF PUC S HASKONING NEDERLAND B.V. WATER In line with the Terms of Reference for the CEP concerning the improvement of operational and financial performance of PUC s, an assessment has been made of the following topics: Financial performance of the PUC; Technical performance of the PUC; The organizational performance of the PUC; How customer relations are being executed by the PUC. Furthermore the assessments paid attention to: Data and indicators; Major problems encountered by PUC s in the execution of their daily tasks; The setting up of an Action Plan. During the period from December 2006 to March 2007, an analysis was made of seven Public Utility Companies (PUC s), receiving grant financing from the EAR via the Municipal Infrastructure Agency Support Program (MIASP). The objective of this analysis was to identify and prioritize short term measures to help the utilities to improve their financial and/or operational performance. This report now summarizes the identified measures and its relative ranking. In addition, it sets out an action plan to implement the selected measures. The action plan has been completed by November The following PUC s participated in the analysis: Apatin (water & sewerage and other communal activities); Indjija (water & sewerage); Mionica (water & sewerage and other communal activities); Smederevo (water & sewerage); Varvarin (water & sewerage and other communal activities); Zitoradja (water & sewerage and other communal activities). Vršac and Žitište received a grant as well as for road projects but the two involved PUC s were not taken into account for the assessment because they are not responsible for supply of services to the customers. The Municipality of Zemun (water supply project) was excluded since it is serviced by Belgrade waterworks. Indjija (water treatment plant project) joined in february Subotica (water supply project) have realized investments through an EBRD loan and they joined a EBRD financed CEP program (only the Service Contract part). MIASP has prepared an individual assessment report for each PUC that participated in the training and they are included in annexes 1 6 to this report. 5

7 3 PREPARATION OF ACTION PLANS 2007 HASKONING NEDERLAND B.V. WATER Two initial meetings were held in April 2006 to discuss the expected results and the contents of the training. Also a framework of the Action Plan 2007 was decided upon. A copy of this Action Plan, as agreed during the seminar of 26 April 2007 and is included in annex 2. At this seminar, representatives of the PUC s, the Municipalities, the Ministries of Finances and Trade and Services, the Standing Conference of Towns and Municipalities and Association of Consumers were present. After a realistic discussion with the representatives of the PUC s it was decided to prepare a training program on the topic of water meter replacement. The problem of outdated water meters exists in all PUC s and leads to uncertainties in the reading of the meters. Subsequently it is difficult for the PUC s billing department to invoice consumers on basis of their real water consumption (and wastewater production). Representatives declared the need for more specific information on this topic. 6

8 4 TRAINING SESSIONS HASKONING NEDERLAND B.V. WATER In order to elaborate with more detail on the most important issues a three-day training course has been given on 13, 20 and 27 June 2007 covering the following topics: Public Relations; Elements of Project Management; Practical introduction to water meter replacement; Cost calculations; Quality requirements for water meters. As part of sustainable consulting to public utility companies, a content of a leaflet has been developed, that serves as a direct communication between PUC s and end users. More details on the training are given in annex 7. In annex 8 the results of the questionnaire participants have filled in on their appreciation of the offered training sessions are included. According to the results it can be concluded as follows: The participants have participated with great interest during the entire training (three days of interactive teaching). They have acquired new knowledge on the addressed topics although not always they fully understood the relation between this acquired knowledge and their daily work. The degree of detailed information was sufficient to understand tasks of the Action Plan 2007: a guide to write a regular water meter replacement manual, cost recovery from revenues and PR information. Participants were very satisfied with the organization, presentation and the performance of the trainers. With a final average score of 4,293 out of 5, or 85,6 % the participants have shown their general contentment with the training. 7

9 5 RESULTS HASKONING NEDERLAND B.V. WATER During the period July October 2007, PUC s worked on their tasks as defined in the Action Plan The results of the Action Plan were presented at the final Seminar held on 30 October 2007 at the premises of PUC Indjija, who acted as host for this event. PUC s of the towns: Smederevo, Indjija, Mionica and Apatin successfully realized and presented their Action Plans. Unfortunately the PUC s of Varvarin and Zitoradja could not finalize their contribution due to limited available work force. In annex 9 a copy of the progress report prepared for PUC Smederevo has been included giving an overview of most of the activities and obtained results of the CEP. In annex 10 the PowerPoint presentation of PUC Indjija is given to illustrate the results as presented on this meeting. The conclusions that were reached at the closing session of this meeting are the following: 1. Water supply PUC's of the towns Smederevo, Indjija, Mionica and Apatin have achieved the expected results of the AP 2007 WMR (water meters replacement). They have defined a regular water meter replacement program for the O&M program of the existing house connections (including the individual water meters). The PUC's have implemented new standards of process, organization and management for WMR. In 2007 the PUC's have replaced water meters while the costs will be covered from the current revenues. They have prepared a proposal for the AP 2008 RWMRP (regular water meters replacement program) that will be sustainable and it has to be realized consistent to the previously defined standards. 2. With the aim to establish a continuous and sustainable source of financing for RWMRP, it is necessary to include in the monthly water bill a fixed part for the RWMRP (analogy power electricity meter) or to established WMRP as a new service to the consumer (PUC could also consider outsourcing the service). The municipalities have decided how the PUC will cover costs for AP 2008 RWMRP. At this moment, the municipalities are preparing the local ordinance of service. It will define rights and obligations in the fields of planning, operation and monitoring of service between the municipality, PUC and the customers. 3. In the Annual Plan 2008, the PUC's will define a proposal for the RWMRP in accordance with the local ordinance. 4. In 2008, it will be necessary to create a legal framework for the realization of the defined RWMRP s through adjustment of existing regulations and possibly by introducing new regulation. For example: adjustment of the regulated period of water meter calibration of five years. 8

10 This will create a certain autonomy for the PUC s in planning and financing their RWMR. PUC s have achieved changes by the implementation of WMR procedures on planning, operation and monitoring this activity. This type of change might have initiated a process of restructuring of the PUC s. Municipalities manage this process as foreseen in the Memorandum of Serbian Government (Official Gazette No 96/07). The Annual Plans will be forwarded to the following Republican Ministries: Economy and Regional Development, Finance Sector for Public Companies; Trade and Services (dept for Price Policy), and State Government and Local Self-government. 9

11 ANNEX 1: ASSESSMENT NOTE ON PUC APATIN CAPACITY ENHANCEMENT PROGRAM FOR THE PUC NAŠ DOM OF APATIN 08

12 TOPICS PROPOSAL FOR ACTION PLAN 2007 January 2007 Prepared by MIASP TEAM 1. INTRODUCTION The purpose of this note is to identify the Capacity Enhancement needs and the tentative program of the PUC NAS DOM Apatin in relation with the planned Water Supply Project in the Municipality of Apatin. The framework for the identification of topics is the ToR for the MIASP that defines under project results of Grant Contract for the Water Supply Project in Apatin; (i) improved financial and budget management practices and procedures in the participating municipalities, and (ii) improved operational and financial management practices in participating utility companies. This note is based on existing information available in the MIASP office and on PUC staff information that was given on meeting was held in PUC at December 27, The documentation that was explored for preparing this note is the MIASP Questionnaire, PIR, BPD, Grant Agreement and Project documentation for Water Supply System replacement water pipes and upgrading water treatment plant.. The approach applied in the analysis is as follows: a. Review existing data and information available within the MIA; b. Develop main indicators of PUC performance; c. Collect data and indicators of PUC performance and verify with the PUC that these data are correct; d. Analyses the indicators in light of national and international standards; e. Identify potential constraints and risks; f. Indicate possible fields of action for the Capacity Enhancement Program. The above approach is summarized in the Chapter 2 and in the Table 1 (Appendix 1). The Chapter 3 gives the overall conclusions.

13 2. PUC LEVEL HASKONING NEDERLAND B.V. WATER 2.1 Service level Findings In 2006 total coverage, in supplied settlements, with water supply services is 87,3%. Total coverage, in the town of Apatin, of sewerage services is 74,6%. The PUC has a reported number of 7,749 household water connections and 5,000 wastewater connections. 90 new connections were provided in Water tariffs are 14,17 dinar/m 3 for supplied drinking water and 7,08 dinar/m 3 of discharged wastewater into the sewerage. Calculated domestic consumption was 136 l pcpd. The total number of customer complaints is not known. In 2006 the total number of breaks in distribution network was 160. The metering level is reported by the PUC that there may be mistakes due to incorrect metering with 28,4% of customer s meters which are out of order. Analysis In some villages there is no existing wastewater system; In some cases in-house installations need to be installed; 28,4% of customer s meters are out of order. Possible Actions Advice PUC to assess the existing service levels and advise on measures for improvement; Advise on monitoring and management of customer complaints; Preparation and implementation of metering plan Financial performance Findings Accounting system of PUC activities could not express separately activity of sectors. This is the case for the non-existence of water financial performance indicators. Analysis Missing adequate accounting system to recognize separately sector activities Possible actions: Establish adequate accounting system; Establish adequate tariff level and design a tariff structure and scenarios for increase; Accounting system (cost accounting system) Operational efficiency Findings Non-revenue water of 25% in 2004, 25% in 2005 and 23% in 2006 are good outcomes for domestic conditions.

14 Total number of repairs at WS network was 130 in 2004, 192 in 2005 and 135 in Causes to these breakages as well as the response time are not known. Analysis Not clear whether sufficient funds for (preventive) maintenance of the systems are made available; Preparation and implementation cost accounting system. Possible actions: Determine appropriate level of O&M costs 2.4. Human Resource and Project Management Issues Findings The PUC has 67 employees of which 12 are involved in water supply and 10 in sewerage. 3 employees hold a university or college degree. The number of staff per 1000 house connections is for drinking water is 1,9 and the number of staff per 1000 house connections is sewerage is 2,4. Analysis PUC staff is not familiar with international implementation procedures; Project management capability of PUC and PUC staff is not known. Possible actions On-the-job training of existing PUC staff in project management; Advice the PUC on HRM policies and procedures and measures to increase staffing efficiency. 3. CONCLUSIONS This note is based on the existing information available in the MIASP office and PUC staff information that was given on meeting was held in PUC. The documentation that was explored for preparing this note is the MIASP Questionnaire, PIR, BPD, Grant Agreement and Project documentation for Water Supply System replacement water pipes and upgrading water treatment plant. The information available was sufficient to identify potential focus areas: Tariffs Models, Structure and Scenario Increases; Operation & Maintenance Tasks (Manual); Accounting System (Cost Accounting System); Metering (Costs and Procedures replacement of meters). After PUC coordinated and agreed with the proposal, the next step is to consult the PUC and the Municipal authorities and apply PUC CEP, if deemed feasible and realisti

15 Table 1-1 PUC LEVEL-PUC NAŠ DOM Apatin PUC Service Level Unit Actual vs total (potential) population served w / ww (sewerage Apatin only) % 87,3 / 74,6 Part of HH Income spent on water services (excluding in house installations) % Domestic Consumption l/cd Percentage of metered water sold % Nr of Customer complaints per annum Nr no evidence Nr of breaks in distribution network per total length of network Nr/Km 0,6 0,7 1,3 PUC Financial Performance Total revenues (TR) Euro* 10 6 Operational revenues Euro* 10 6 Gross operating profit Euro* 10 6 Net operating profit Euro* 10 6 Net profit after tax Euro* 10 6 Subsidy received from the Municipality Euro* 10 6 Subsidy provided by the Municipality as percentage of revenues received % Operating Costs, excl. Depreciation (OC) Euro* 10 6 of which maintenance costs Euro* 10 6 Depreciation (D) Euro* 10 6 Capital Costs (CC) Euro* 10 6 Cost Recovery Ratio multiple Ratio of Debt to Total Revenues multiple AR' AR' Plan 2006 HASKONING NEDERLAND B.V. WATER Analysis of possible risks and constraints In some villages do not exist w&ww systems In some cases inhouse installations need to be installed 28,4% of customer s meters are out of order. Analysis of possible risks and constraints Missing adequate accounting system. Proposed type of Actions Advice PUC to assess the existing service levels and advise on measures for improvement Advise on monitoring and management of customer complaints Preparation and implementation of metering plan. Proposed type of Actions Establish adequate accounting system Establish adequate tariff level and design a tariff structure and scenarios for increase Preparation and implementation cost accounting system.

16 Ratio of Debt Service to Total Revenues multiple Free cash flow (FCF) Euro* 10 6 Debt Service Coverage Ratio multiple Operating Costs per Unit produced per year /m 3 Collection Rate invoiced bills % Average Debtor Days (ADD) Days Debt to Equity Ratio multiple Current Ratio multiple PUC Operational Efficiency Non-revenue drinking water % Of which technical % Of which administrative % Drinking water produced m3/year Drinking water billed m3/year Manpower costs as % of operating costs % Depreciation costs as % of operating costs % Other costs as % of operating costs % Number of repairs No/yr PUC Project Management / HRD aspects Nr. of employees Nr of which management/staff/overhead Nr of which drinking water Nr of which waste water Nr of which other departments Nr Nr of (HH) Connections Water Nr No of connections WW Nr Analysis of possible risks and constraints Not clear whether sufficient funds for (preventive) maintenance of the systems are made available. Analysis of possible risks and constraints PUC staff not familiar with international implementation procedures Project management capability of PUC Proposed type of Actions Determine appropriate level of O&M costs. Proposed type of Actions On-the-job training of existing PUC staff in project management Advice the PUC on HRM policies and

17 Nr of staff per 000 per connections Water N0/ 000 1,8 1,8 1,9 Nr of staff per 000 connections waste water N0/ 000 2,20 2,20 2,44 Employees with higher education % 4,5 4,5 4,5 HASKONING NEDERLAND B.V. WATER and PUC staff is not known. procedures and measures to increase staffing efficiency.

18 ANNEX 2: ASSESSMENT NOTE ON PUC INĐIJA CAPACITY ENHANCEMENT PROGRAM FOR THE PUC FOR WATER SUPPLY AND SEWERAGE OF INDJIJA

19 TOPICS PROPOSAL FOR ACTION PLAN 2007 January 2007 Note prepared by MIASP TEAM 1. INTRODUCTION The purpose of this note is to identify the Capacity Enhancement needs and the tentative program of the PUC Vodovod i kanalizacija Indjija in relation with the planned Water Supply Project in Indjija. The framework for the identification of topics is the ToR for the MIASP that defines under project results of Grant Contract for the Water Supply Project in Indjija; (i) improved financial and budget management practices and procedures in the participating municipalities, and (ii) improved operational and financial management practices in participating utility companies. This note is based on existing information available in the MIASP office and on PUC staff information that was given on meeting was held in PUC at December 19, The documentation that was explored for preparing this note is the MIASP Questionnaire, Project documentation for Water Treatment Plan and balance sheet and income statements for The approach applied in the analysis is as follows: a. Review existing data and information available within the MIA; b. Develop main indicators of PUC performance; c. Collect data and indicators of PUC performance and verify with the PUC that these data are correct; d. Analyses the indicators in light of national and international standards; e. Identify potential constraints and risks; f. Indicate possible fields of action for the Capacity Enhancement Program (CEP). The above approach is summarized in Chapter 2 and in Table 1 (Appendix 1). Chapter 3 gives the overall conclusions.

20 2. PUC LEVEL HASKONING NEDERLAND B.V. WATER 2.1. Service Level Findings Total coverage, in supplied settlements, with water supply services is 93%. Total coverage, in the town Indjija, of sewerage services is 21%. Future coverage of sewerage is approximately 90% but commissioning of sewer network is not done yet. The PUC has a reported number of 14,055 household water connections and 1,111 wastewater connections. 264 new connections were provided in With the project all customers will be provided by good quality water. Water tariffs are expected to increase to approximately 30 dinar/m 3 to cover cost. But Government approved increase of 7,5%. Expenditures appear to be affordable to households that will spend less than 2% of household income on water fees. Calculated domestic consumption was 120 l/cd with a reported stabilized trend in long period. The total number of customer complaints was 6,070. The procedures for addressing complaints are not known. There are no data on water supply interruptions related to breakages. The metering level is reported by the PUC that there may be mistakes due to incorrect metering with 32% of customer s meters which are out of order. Analysis In some villages no w&ww systems exist; In some household in-house installations need to be installed; 32% of customer s meters are out of order. Possible Actions Advice PUC to assess the existing service levels and advise on measures for improvement; Preparation and implementation of metering plan; Advise on monitoring and management of customer complaints Financial performance Findings When compared to 2004 (resulted in loss) the PUC did not improve its performance which again resulted in losses in The collection rate in 2005 increased to 97%. The total volume of outstanding payments from customers at year end is not high. Current tariffs do not cover the existing operating costs. The method of calculating the current tariff is connected to the government s decision and only a maximum increase of 7,5% is allowed. The waste water tariff is 50% of the WS tariff. The breakdown of revenues between water and waste water is unclear. Cost coverage ratios are as follows: operating cost (excl. depreciation) is 88,4% of the total revenues (78,5% in 2004).

21 The accounting system as prescribed by the law is in line with the international accounting standard as of In 2005 subsidy from the Municipality to the PUC was 13% of the total revenues. Analysis It is unclear if sufficient resources are available for adequate maintenance of the system; Tariff increase is needed to cover all expenditures. Possible actions: Establish adequate tariff level and design a tariff structure and scenarios for increase; Preparation and implementation cost accounting system Operational efficiency Findings Metering process implemented in Non-revenue water is unknown. Total number of repairs at WS network was 198. Causes to these breakages as well as the response time are not known. Analysis Not clear whether sufficient funds for (preventive) maintenance of the systems are made available. Possible actions: Determine appropriate level of O&M costs Human Resource and Project Management Issues Findings The PUC employs 82 employees. 7 employees hold a university or college degree. In 2006, 10 new employees were admitted. The number of staff per 1000 house connections for drinking water is 6,3. The percentage of personnel costs in total operational costs is rather high, namely 41% in 2005 and it increased by 2% when compared to Analysis PUC staff is not familiar with international project implementation procedures; Project management capability of PUC and PUC staff no exist; Assuming constant number of staff, a considerable increase in staff efficiency is envisaged. Possible actions On-the-job training of existing PUC staff in project management; Advice the PUC on HRM policies and procedures and measures to increase staffing efficiency.

22 3. CONCLUSIONS HASKONING NEDERLAND B.V. WATER This note is based on existing information available in the MIASP office and PUC staff information that was given on meeting was held in PUC. The documentation that was explored for preparing this note is the MIASP Questionnaire, Project documentation for Water Treatment Plan and balance sheet and income statements for The information available was sufficient to identify potential focus areas: Tariffs Models, Structure and Scenario Increases; Operation & Maintenance Tasks (Manual); Accounting System (Cost Accounting System); Metering (Costs and Procedures replacement of meters). After PUC coordinated and agreed with the proposal, the next step is to consult the PUC and the Municipal authorities and apply PUC CEP, if deemed feasible and realistic.

23 Table 2-1 PUC Vovovod I kanalizacija Inđija PUC Service Level Unit Actual vs total (potential) population served w / ww (ww Indjija only) % 90,0 / 15 91,0 / 17 92,9 / 21 Part of HH Income spent on water services (excluding in house installations) % Domestic Consumption l/cd Percentage of metered water sold % Nr of Customer complaints per annum Nr Nr of breaks in distribution network per total length of network Nr/Km 0,34 0,38 0,42 PUC Financial Performance Unit AR' AR' Plan 2006 Total revenues (TR) Euro* ,93 1,12 - Operational revenues Euro* ,91 1,10 - Gross operating profit Euro* 10 6 (0,13) (0,19) - Net operating profit Euro* 10 6 (0,13) (0,17) - Net profit after tax Euro* 10 6 (0,13) (0,17) - Subsidy received from the Municipality Euro* ,15 Subsidy provided by the Municipality as percentage of revenues received % 0% 13% Operating Costs, excl. Depreciation (OC) Euro* ,73 0,99 - of which maintenance costs Euro* 10 6 Depreciation (D) Euro* ,31 0,30 - Capital Costs (CC) Euro* Cost Recovery Ratio multiple 1,12 1,15 Ratio of Debt to Total Revenues multiple 0,01 0,00 HASKONING NEDERLAND B.V. WATER Analysis of possible risks and constraints In some villages do not exist w&ww systems In some household inhouse installations need to be installed 32% of customer s meters are out of order. Analysis of possible risks and constraints It is unclear if sufficient resources are available for adequate maintenance of the system Tariff increase is needed to cover all expenditures. Proposed type of Actions Advice PUC to assess the existing service levels and advise on measures for improvement Preparation and implementation of metering plan Advise on monitoring and management of customer complaints. Proposed type of Actions Establish adequate tariff level and design a tariff structure and scenarios for increase Preparation and implementation cost accounting system.

24 Ratio of Debt Service to Total Revenues multiple - - Free cash flow (FCF) Euro* 10 6 (0,02) (0,14) - Debt Service Coverage Ratio multiple Operating Costs per Unit produced per year /m 3 unknown unknown unknown Collection Rate invoiced bills % Average Debtor Days (ADD) Days Debt to Equity Ratio multiple 0,00 0,00 Current Ratio multiple 3,49 2,93 PUC Operational Efficiency Unit Non-revenue drinking water % unknown unknown unknown of which technical % of which administrative % Drinking water produced m3/year unknown unknown unknown Drinking water billed m3/year Manpower costs as % of operating costs % Depreciation costs as % of operating costs % Other costs as % of operating costs % Number of repairs No/yr HASKONING NEDERLAND B.V. WATER Analysis of possible risks and constraints Not clear whether sufficient funds for (preventive) maintenance of the systems are made available. Proposed type of Actions Determine appropriate level of O&M costs.

25 PUC Project Management / HRD aspects Unit Nr. of employees Nr of which management/staff/overhead Nr of which drinking water Nr of which waste water Nr of which other departments Nr Nr of (HH) Connections Water Nr No of connections WW Nr Nr of staff per 000 per connections Water N0/ 000 6,1 5,6 6,3 Nr of staff per 000 connections waste water N0/ 000 0,0 0,0 0,0 Employees with higher education % 6,5 9,7 8,5 Analysis of possible risks and constraints PUC staff not familiar with international implementation procedures Project management capability of PUC and PUC staff no exist Assuming constant number of staff, a considerable increase in staff efficiency is envisaged. Proposed type of Actions On-the-job training of existing PUC staff in project management Advice the PUC on HRM policies and procedures and measures to increase staffing efficiency.

26 ANNEX 3: ASSESSMENT NOTE ON PUC MIONICA CAPACITY ENHANCEMENT PROGRAM FOR THE PUC MIONICA OF MIONICA

27 TOPICS PROPOSAL FOR ACTION PLAN 2007 January 2007 Note prepared by MIASP TEAM 1. INTRODUCTION The purpose of this note is to identify the Capacity Enhancement needs and the tentative program of the PUC MIONICA in relation with the planned Water Supply Project in Mionica. The framework for the identification of topics is the ToR for the MIASP that defines under project results of Grant Contract for the Water Supply Project in Mionica; (i) improved financial and budget management practices and procedures in the participating municipalities, and (ii) improved operational and financial management practices in participating utility companies. This note is based on existing information available in the MIASP office and PUC staff information that was given on meeting was held in PUC at December 22, The documentation that was explored for preparing this note is the MIASP Questionnaire, Project Identification Report, BPD, the Grant Contract and EAR Appraisal form that were prepared for this project. The approach applied in the analysis is as follows: a. Review existing data and information available within the MIA; b. Develop main indicators of PUC performance; c. Collect data and indicators of PUC performance and verify with the PUC that these data are correct; d. Analyze the indicators in light of national and international standards; e. Identify potential constraints and risks; f. Indicate possible fields of action for the Capacity Enhancement Program. The above approach is summarized in the Chapter 2 and in the Table 1 (Appendix 1). The Chapter 3 gives the overall conclusions.

28 2. PUC LEVEL HASKONING NEDERLAND B.V. WATER 2.1 Service level Findings Total coverage, in supplied settlements, with water supply services is 82%. Total coverage, in the town Mionica, with sewerage services is 87%. The PUC has a reported number of 5,532 household water connections and 782 wastewater connections. 42 new connections were provided in Water tariffs are 21,80 dinar/m 3 for drinking water supply and 4,68 dinar/m 3 of water for wastewater discharge. Calculated domestic consumption was 90 l/cd as reported in previous years too. PUC do not record customer complaints. The total number of breaks in distribution network was 1,187. The metering level is reported by the PUC that there may be mistakes due to incorrect metering with 66,1% of customer s meters which are out of order. Analysis In some villages do not exist w&ww systems; In some cases in-house installations need to be installed; Consumption level (90 l/cd) is under average; 66,1% of customer s meters are out of order. Possible Actions Advice PUC to assess the existing service levels and advise on measures for improvement; Advise on monitoring and management of customer complaints; Preparation and implementation of metering plan Financial performance Findings Accounting system of PUC activities could not express separately activity of sectors. This is reason do not exist water financial performance. Analysis Missing adequate accounting system to recognize separately sector activities; Considerable amount of outstanding consumer debt. Possible actions: Establish adequate accounting system; Establish adequate tariff level and design a tariff structure and scenarios for increase.

29 2.3. Operational efficiency Findings Non-revenue water of 50% in 2004, 50% in 2005 and 47% in 2006 is high. Total number of repairs at WS network was 1,093 in 2004, 1,430 in 2005 and 1,330 in Causes to these breakages as well as the response time are not known. Analysis High level of non-revenue water; Not clear whether sufficient funds for (preventive) maintenance of the systems are made available. Possible actions: Design a program to reduce this level from 50% to 20%, including: - reduce leakage; - reduce illegal connections; - reduce administrative losses; Determine appropriate level of O&M costs Human Resource and Project Management Issues Findings The PUC employs 49 employees of which 15 involved in water supply and 2 in sewerage. 2 employees hold a university or college degree. The number of staff per 1000 house connections for drinking water is 3,7 and the number of staff per 1000 house connections is sewerage is 3,5. Analysis PUC staff not familiar with international implementation procedures; Project management capability of PUC and PUC staff is not known. Possible actions On-the-job training of existing PUC staff in project management; Advice the PUC on HRM policies and procedures and measures to increase staffing efficiency. 3. CONCLUSION This note is based on existing information available in the MIASP office and PUC staff information that was given on meeting was held in PUC. The documentation that was explored for preparing this note are the MIASP Questionnaire, Project Identification Report, BPD, the Grant Contract and EAR Appraisal form that were prepared for this project. The information available was sufficient to identify potential focus areas: Water Tariffs Models, Structure and Scenario Increases; Water Operation & Maintenance Tasks (Manual);

30 Accounting System (Cost Accounting System); Metering (Costs and Procedures replacement of water meters). After PUC coordinate and agreed of the proposal, the next step is to consult the PUC and the Municipal authorities and apply PUC CEP, if deemed feasible and realistic

31 Table 3 1 PUC MIONICA Mionica PUC Service Level Unit Actual vs total (potential) population served w / ww (sewerage Mionica only) % 82 / 87 Part of HH Income spent on water services (excluding in house installations) % Domestic Consumption l/cd Percentage of metered water sold % Nr of Customer complaints per annum Nr no evidence Nr of breaks in distribution network per total length of network Nr/Km 79,8 104,4 103,7 PUC Financial Performance AR' AR' Plan 2006 Total revenues (TR) Euro* 10 6 Operational revenues Euro* 10 6 Gross operating profit Euro* 10 6 Net operating profit Euro* 10 6 Net profit after tax Euro* 10 6 Subsidy received from the Municipality Euro* 10 6 Subsidy provided by the Municipality as percentage of revenues received % Operating Costs, excl. Depreciation (OC) Euro* 10 6 of which maintenance costs Euro* 10 6 Depreciation (D) Euro* 10 6 Capital Costs (CC) Euro* 10 6 Cost Recovery Ratio multiple HASKONING NEDERLAND B.V. WATER Analysis of possible risks and constraints In some villages do not exist w&ww systems In some cases inhouse installations need to be installed. Consumption level (90 l/cd) is under average 66,1% of customer s meters are out of order Analysis of possible risks and constraints Missing adequate accounting system to recognize separately sector activities Considerable amount of outstanding consumer debt. Proposed type of Actions Advice PUC to assess the existing service levels and advise on measures for improvement Advise on monitoring and management of customer complaints Preparation and implementation of metering plan Proposed type of Actions Establish adequate accounting system Establish adequate tariff level and design a tariff structure and scenarios for increase

32 Ratio of Debt to Total Revenues multiple Ratio of Debt Service to Total Revenues multiple Free cash flow (FCF) Euro* 10 6 Debt Service Coverage Ratio multiple Operating Costs per Unit produced per year /m 3 Collection Rate invoiced bills % Average Debtor Days (ADD) Days Debt to Equity Ratio multiple Current Ratio multiple PUC Operational Efficiency Non-revenue drinking water % of which technical % of which administrative % Drinking water produced m3/year Drinking water billed m3/year Manpower costs as % of operating costs % Depreciation costs as % of operating costs % Other costs as % of operating costs % Number of repairs No/yr Analysis of possible risks and constraints High level of nonrevenue water Not clear whether sufficient funds for (preventive) maintenance of the systems are made available Proposed type of Actions Design a program to reduce this level from 50% to 20%, including: - reduce leakage - reduce illegal connections - reduce administrative losses Determine appropriate level of O&M costs

33 PUC Project Management / HRD aspects Nr. of employees Nr 49 of which management/staff/overhead Nr 13 of which drinking water Nr 15 of which waste water Nr 2 of which other departments Nr 19 Nr of (HH) Connections Water Nr No of connections WW Nr Nr of staff per 000 per connections Water N0/ 000 3,69 Nr of staff per 000 connections waste water N0/ 000 3,48 Employees with higher education % 4,1 Analysis of possible risks and constraints PUC staff not familiar with international implementation procedures Project management capability of PUC and PUC staff is not known Proposed type of Actions On-the-job training of existing PUC staff in project management Advice the PUC on HRM policies and procedures and measures to increase staffing efficiency

34 ANNEX 4: ASSESSMENT NOTE ON PUC SMEDEREVO CAPACITY ENHANCEMENT PROGRAM FOR THE PUC OF SMEDEREVO

35 TOPICS PROPOSAL FOR ACTION PLAN 2007 January 2007 Note prepared by MIASP TEAM 1. INTRODUCTION The purpose of this note is to identify the Capacity Enhancement needs and the tentative program of the PUC Vodovod of Smederevo in relation with the planned Reconstruction of the Roads, Waste Water and Water Supply Project in Smederevo. The framework for the identification of topics is the ToR for the MIASP that defines under project results of Grant Contract for the Rehabilitation and Extension of Water and Waste Water; (i) improved financial and budget management practices and procedures in the participating municipalities, and (ii) improved operational and financial management practices in participating utility companies. This note is based on existing information available in the MIASP office and PUC staff information that was given on meeting was held in PUC at December 25, The documentation that was explored for preparing this note are the MIASP Questionnaire, Project Identification Report, BPD, the Grant Contract, EAR Appraisal form that were prepared for this project and balance sheet and income statements for The approach applied in the analysis is as follows: a. Review existing data and information available within the MIA; b. Develop main indicators of Municipal and PUC performance; c. Collect data and indicators of PUC performance and verify with the PUC that these data are correct; d. Analyze the indicators in light of national and international standards; e. Identify potential constraints and risks; f. Indicate possible fields of action for the Capacity Enhancement Program. The above approach is summarized in Chapter 2 and Table 1 (Annex 1). The findings at the PUC level are presented with a focus on operational performance and project management capacity. Chapter 3 gives the overall conclusions.

36 2. PUC LEVEL-PUC VODOVOD SMEDEREVO 2.1. Service level HASKONING NEDERLAND B.V. WATER Findings In town Smederevo and villages Vodanj, Lipe, Ralja, Radinac, Vranovo and Vucak total coverage of water supply services is 92.7%. The PUC has a reported number of household connections. 342 new connections were provided in In the town of Smederevo coverage with sewerage services is 81.1%. Water tariffs did not change in Expenditures appear to be affordable to households that will spend less than 2% of household income on water fees. Calculated domestic consumption was 166 l/c/d. The total number of written customer complaints was 309. There are 152 on water supply interruptions related to breakages. Old iron pipelines are main reason of breakages and of leakage. The metering level is known but it is reported by the PUC that there may be mistakes due to incorrect metering with 59,1% of customer s meters which are out of order. Analysis In some villages do not exist w&ww systems; In some household in-house installations need to be installed; 59,1% of customer s meters are out of order; Consumption level (166 lcd) reasonable, reported decreasing trend (150 lcd). Possible Actions Advice PUC to assess the existing service levels and advise on measures for improvement; Preparation and implementation of metering plan; Advise on monitoring and management of customer complaints Financial performance Findings When compared to the 2003 (resulted in loss) the PUC improved its performance which resulted in a slight profit in 2004 and The reason may be in intensive collection action that consisted of letters of reminder, disconnections and lawsuits. The collection rate in 2005 significant increased. However the total volume of outstanding payments from customers at year end is still very high. Average debtor days 90 in 2004 and 86 in 2005 are very high. Although current tariffs approximately cover the existing operating costs, a tariff increase of % is foreseen in order to cover the investments expenditures. The method of calculating the current tariff is coordinated by request of Government. The waste water tariff is approximately 1/5 of the WS tariff. The breakdown of revenues between water and waste water is unknown. Cost coverage ratios are as follows: operating cost (excl. depreciation) is 65% in 2005 of the total revenues (60% in 2004 and 63,5% in 2003) and total costs are 75.7% of the total revenues (75,7% in 2004 and 120% in 2003).

37 The accounting system as prescribed by the law is in line with the international accounting standard as of this year. Analysis It is unclear if sufficient resources are available for adequate maintenance of the system; Tariff increase of 100% is needed to cover all expenditures; The company improved collection rate compared to year 2004; Considerable amount of outstanding consumer debt. Possible actions: Establish adequate tariff level and design a tariff structure and scenarios for increase; Advice the PUC to either incur debts or write off bad debts; Accounting system (cost accounting system) Operational efficiency Findings Non-revenue water of 34% in 2004, 26% in 2005 and 30% in 2006 is at the country average level yet still very high, with indicated possible reasons of 16% loss due to leakage at water meters and valves, and 14% due to administrative losses and illegal users. In 2005 out of the total operational expenses, only 34,7% is spent on O&M which may indicate insufficient funding for (preventive) maintenance. Total number of repairs at WS network was 656 in 2004, 404 in 2005 and 328 in Causes to these breakages as well as the response time are not known. Analysis High level of non-revenue water; Not clear whether sufficient funds for (preventive) maintenance of the systems are made available. Possible actions: Define the causes of high level of non revenue water and design a program to reduce this level from 30% to 20%, including: reduce leakage; reduce illegal connections; reduce administrative losses; Review and update O&M system in relation with project requirements; determine appropriate level of preventive maintenance and costs for the systems.

38 2.4. Human resource and project management issues HASKONING NEDERLAND B.V. WATER Findings The PUC employs 171 employees. 16 employees hold a university or college degree. The number of managerial staff is not known. The number of staff per 1000 house connections for drinking water is 9,5 and 1,3 per 1000 of Waste Water connections. At the project end, the number of staff per 1000 WW connections is assumed to stay the same while per 1000 Water connections it would decrease to 6,4. The percentage of personnel costs in total operational costs is rather high, namely 52,8% in 2004 and 51,9% in Analysis PUC staff not familiar with international implementation procedures; Project management capability of PUC and PUC staff no exist. Possible actions On-the-job training of existing PUC staff in project management; Advice the PUC on HRM policies and procedures and measures to increase staffing efficiency. 3. CONCLUSIONS This note is based on existing information available in the MIASP office and PUC staff information that was given on meeting was held in PUC. The documentation that was explored for preparing this note are the MIASP Questionnaire, Project Identification Report, BPD, the Grant Contract, EAR Appraisal form that were prepared for this project and balance sheet and income statements for The information available was sufficient to identify potential focus areas: Tariffs Models, Structure and Scenario Increases; Operation & Maintenance Tasks (Manual); Accounting System (Cost Accounting System); Metering (Costs and Procedures replacement of meters). After PUC coordinate and agreed of the proposal, the next step is to consult the PUC and the Municipal authorities and apply PUC CEP, if deemed feasible and realistic.

39 Table 4-1 PUC level PUC Vodovod Smederevo PUC Service Level Unit Actual vs total (potential) population served (sewerage Smederevo only) Part of HH Income spent on water services (excluding in house installations) (PUC data) (PUC data) 2006 (PUC data) % 91,0 / 81,1 91,4 / 81,1 92,7 / 81,1 % Domestic Consumption l/cd Percentage of metered water sold % (almost) (almost) Nr of Customer complaints per annum Nr of breaks in distribution network per total length of network 100 (almost) Nr Nr/Km 0,52 0,48 0,49 Analysis of possible risks and constraints In some villages do not exist w&ww systems In some household in-house installations need to be installed 59,1% of customer s meters are out of order Consumption level (166 lcd) reasonable, reported decreasing trend (150 lcd). HASKONING NEDERLAND B.V. WATER Proposed type of Actions Advice PUC to assess the existing service levels and advise on measures for improvement Preparation and implementation of metering plan Advise on monitoring and management of customer complaints.

40 Operational Efficiency PUC Unit (PUC data and AR 05) (PUC data and AR 05 ) (PUC data) Non-revenue water % of which technical % 14 Of which administrative 16 Drinking water produced Drinking water billed Manpower costs as % of O&M costs % 52,8 51,9 Depreciation costs as % of O&M costs 15,6 13,4 Other costs as % of O&M costs 31,7 34,7 - Number of repairs Nr/yr Analysis of possible risks and constraints High level of non-revenue water Not clear whether sufficient funds for (preventive) maintenance of the systems are made available Possible type of Actions Design a program to reduce this level from 30% to 20%, including: - reduce leakage - reduce illegal connections - reduce administrative losses Determine appropriate level of O&M costs for the new system.

41 Financial Performance PUC Unit PUC AR 05 PUC AR 05 Analysis of possible risks and constraints HASKONING NEDERLAND B.V. WATER Possible type of Actions Total revenues (TR) Euro* ,89 2,26 Operational revenues Euro* ,59 2,11 Gross operating profit Euro* ,16 0,40 Net operating profit Euro* ,00 0,03 Net profit after tax Euro* ,00 0,03 Subsidy received from the Municipality Euro* ,32 0,24 Subsidy provided by the Municipality as % percentage of revenues received 17% 11% Operating Costs, excl. Depreciation Euro* 10 6 (OC) 1,21 1,48 of which maintenance costs Euro* 10 6 Depreciation (D) Euro* ,22 0,23 Capital Costs (CC) Euro* Cost Recovery Ratio multiple 0,76 0,75 Ratio of Debt to Total Revenues multiple - - Ratio of Debt Service to Total Revenues multiple 0,48 0,01 Free cash flow (FCF) Euro* ,38 (0,09) Debt Service Coverage Ratio multiple 1,00 5,22 Operating Costs per Unit produced per /m3 0,17 0,20 year Collection Rate invoiced bills % Average Debtor Days (ADD) Days Debt to Equity Ratio multiple - - Current Ratio multiple 2,44 2,19 It is unclear if sufficient resources are available for adequate maintenance of the system Tariff increase of 100% is needed to cover all expenditures The company improved collection rate compared to year Considerable amount of outstanding consumer debt Establish adequate tariff level and design a tariff structure and scenarios for increase Advice the PUC to either incur debts or write off bad debts Accounting system (cost accounting system)

42 HRM and Project Management PUC Unit (PUC data) (PUC data) (PUC data) Nr. of employees Nr of which management/staff/overhead of which drinking water of which waste water of which other departments Nr of (HH) Connections Water Nr No of connections WW Nr Nr of staff per 000 per Nr connections W / 000 9,23 9,57 9,46 Nr of staff per 000 per Nr connections WW / 000 1,45 1,45 1,31 Employees with higher education % 9,2 9,4 9,4 Analysis of possible risks and constraints PUC staff not familiar with international implementation procedures Project management capability of PUC and PUC staff no exist Proposed type of Actions On-the-job training of existing PUC staff in project management Advice the PUC on HRM policies and procedures and measures to increase staffing efficiency

43 ANNEX 5: ASSESSMENT NOTE ON PUC VARVARIN CAPACITY ENHANCEMENT PROGRAM FOR THE PUC VARVARIN OF VARVARIN

44 TOPICS PROPOSAL FOR ACTION PLAN 2007 January 2007 Note prepared by MIASP TEAM 1. INTRODUCTION The purpose of this note is to identify the Capacity Enhancement needs and the tentative program of the PUC Varvarin in relation with the planned Water Supply Project in Varvarin. The framework for the identification of topics is the ToR for the MIASP that defines under project results of Grant Contract for the Water Supply Project in Varvarin; (i) improved financial and budget management practices and procedures in the participating municipalities, and (ii) improved operational and financial management practices in participating utility companies. This note is based on existing information available in the MIASP office and PUC staff information that was given on meeting was held in PUC at December 26, The documentation that was explored for preparing this note are the MIASP Questionnaire, Project Identification Report, BPD, the Grant Contract and EAR Appraisal form that were prepared for this project.. The approach applied in the analysis is as follows: a. Review existing data and information available within the MIA; b. Develop main indicators of PUC performance; c. Collect data and indicators of PUC performance and verify with the PUC that these data are correct; d. Analyze the indicators in light of national and international standards; e. Identify potential constraints and risks; f. Indicate possible fields of action for the Capacity Enhancement Program. The above approach is summarized the Chapter 2 and in the Table 1(Appendix 1). The Chapter 3 gives the overall conclusion.

45 2. PUC LEVEL HASKONING NEDERLAND B.V. WATER 2.1. Service level Findings Total coverage, in supplied settlements, with water services is 75%. The PUC has a reported number of 955 household water connections and 780 wastewater connections. 25 new connections were provided in Water tariffs are 20,62 dinar/m3 for water supply and 8,25 dinar/m3 for discharge of wastewater. Calculated domestic consumption was 130 l/cd. The total number of customer complaints was 15. The total number of breaks in distribution network was 38. The metering level is reported by the PUC that there may be mistakes due to incorrect metering with 47,1% of customer s meters which are out of order. Analysis In some villages do not exist w&ww systems; In some cases in-house installations need to be installed; 47,1% of customer s meters are out of order. Possible Actions Advice PUC to assess the existing service levels and advise on measures for improvement; Advise on monitoring and management of customer complaints; Preparation and implementation of metering plan Financial performance Findings Accounting system of PUC activities could not express separately activity of sectors. This is reason do not exist water financial performance. Analysis Missing adequate accounting system to recognize separately sector activities. Possible actions: Establish adequate accounting system; Establish adequate tariff level and design a tariff structure and scenarios for increase Operational efficiency Findings Non-revenue water of 54% in 2004, 52% in 2005 and 49% in 2006 is high. Total number of repairs at WS network was 69 in 2004, 63 in 2005 and 63 in Causes to these breakages as well as the response time are not known.

46 Analysis High level of non-revenue water; Not clear whether sufficient funds for (preventive) maintenance of the systems are made available; Possible actions: Design a program to reduce this level from 50% to 20%, including: reduce leakage; reduce illegal connections; reduce administrative losses; Determine appropriate level of O&M costs Human resource and project management issues Findings The PUC has 31 employees of which 11 involved in water supply and 2 in sewerage. 3 employees hold a university or college degree. The number of staff per 1000 house connections for water is 15,5 and the number of staff per 1000 house connections for sewerage is 3,5. Analysis PUC staff not familiar with international implementation procedures; Project management capability of PUC and PUC staff is not known. Possible actions On-the-job training of existing PUC staff in project management; Advice the PUC on HRM policies and procedures and measures to increase staffing efficiency. 3. CONCLUSIONS This note is based on existing information available in the MIASP office and PUC staff information that was given on meeting was held in PUC. The documentation that was explored for preparing this note are the MIASP Questionnaire, Project Identification Report, BPD, the Grant Contract and EAR Appraisal form that were prepared for this project. The information available was sufficient to identify potential focus areas: Water Tariffs Models, Structure and Scenario Increases; Water Operation & Maintenance Tasks (Manual); Accounting System (Cost Accounting System); Metering (Costs and Procedures replacement of water meters). After PUC coordinate and agreed of the proposal, the next step is to consult the PUC and the Municipal authorities and apply PUC CEP, if deemed feasible and realistic.

47 Table 5-1 PUC level PUC VARVARIN Varvarin PUC Service Level Unit Actual vs total (potential) population served w / ww % Part of HH Income spent on water services (excluding in house installations) % 0, Domestic Consumption l/cd Percentage of metered water sold % Nr of Customer complaints per annum Nr Nr of breaks in distribution network per total length of network Nr/Km 2,0 1,6 1,5 PUC Financial Performance AR' AR' Plan 2006 Total revenues (TR) Euro* 10 6 Operational revenues Euro* 10 6 Gross operating profit Euro* 10 6 Net operating profit Euro* 10 6 Net profit after tax Euro* 10 6 Subsidy received from the Municipality Euro* 10 6 Subsidy provided by the Municipality as percentage of revenues received % Operating Costs, excl. Depreciation (OC) Euro* 10 6 of which maintenance costs Euro* 10 6 Depreciation (D) Euro* 10 6 Capital Costs (CC) Euro* 10 6 Cost Recovery Ratio multiple HASKONING NEDERLAND B.V. WATER Analysis of possible risks and constraints In some villages do not exist w&ww systems In some cases inhouse installations need to be installed 47,1% of customer s meters are out of order. Analysis of possible risks and constraints Missing adequate accounting system. Proposed type of Actions Advice PUC to assess the existing service levels and advise on measures for improvement Advise on monitoring and management of customer complaints Preparation and implementation of metering plan. Proposed type of Actions Establish adequate accounting system Establish adequate tariff level and design a tariff structure and scenarios for increase.

48 Ratio of Debt to Total Revenues multiple Ratio of Debt Service to Total Revenues multiple Free cash flow (FCF) Euro* 10 6 Debt Service Coverage Ratio multiple Operating Costs per Unit produced per year /m 3 Collection Rate invoiced bills % Average Debtor Days (ADD) Days Debt to Equity Ratio multiple Current Ratio multiple PUC Operational Efficiency Non-revenue drinking water % of which technical % of which administrative % Drinking water produced m3/year Drinking water billed m3/year Manpower costs as % of operating costs % Depreciation costs as % of operating costs % Other costs as % of operating costs % Number of repairs No/yr Analysis of possible risks and constraints High level of nonrevenue water Not clear whether sufficient funds for (preventive) maintenance of the systems are made available. Proposed type of Actions Design a program to reduce this level from 50% to 20%, including: - reduce leakage - reduce illegal connections - reduce administrative losses Determine appropriate level of O&M costs.

49 PUC Project Management / HRD aspects Nr. of employees Nr of which management/staff/overhead Nr of which drinking water Nr of which waste water Nr of which other departments Nr Nr of (HH) Connections Water Nr No of connections WW Nr Nr of staff per 000 per connections Water N0/ ,09 14,66 15,52 Nr of staff per 000 connections waste water N0/ 000 3,64 3,50 3,46 Employees with higher education % 7,4 10,0 9,7 HASKONING NEDERLAND B.V. WATER Analysis of possible risks and constraints PUC staff not familiar with international implementation procedures Project management capability of PUC and PUC staff is not known Proposed type of Actions On-the-job training of existing PUC staff in project management Advice the PUC on HRM policies and procedures and measures to increase staffing efficiency.

50 ANNEX 6: ASSESSMENT NOTE ON PUC ŽITORAĐA CAPACITY ENHANCEMENT PROGRAM FOR THE PUC ŽITORAĐA OF ŽITORAĐA

51 TOPICS PROPOSAL FOR ACTION PLAN 2007 January 2007 Prepared by MIASP TEAM 1. INTRODUCTION The purpose of this note is to identify the Capacity Enhancement needs and the tentative program of the PUC ZITORADJA in relation with the planned Water Supply Project in Zitoradja. The framework for the identification of topics is the ToR for the MIASP that defines under project results of Grant Contract for the Water Supply Project in Zitoradja; (i) improved financial and budget management practices and procedures in the participating municipalities, and (ii) improved operational and financial management practices in participating utility companies. This note is based on existing information available in the MIASP office and PUC staff information that was given on meeting was held in PUC at December 20, The documentation that was explored for preparing this note is the MIASP Questionnaire, BPD, Grant Contract and Project documentation for Water Supply System construction of water supply pipelines in 5 communities.. The approach applied in the analysis is as follows: a. Review existing data and information available within the MIA; b. Develop main indicators of PUC performance; c. Collect data and indicators of PUC performance and verify with the PUC that these data are correct; d. Analyze the indicators in light of national and international standards; e. Identify potential constraints and risks; f. Indicate possible fields of action for the Capacity Enhancement Program. The above approach is summarized in the Chapter 2 and in the Table 1 (Appendix 1). The Chapter 3 gives the overall conclusions.

52 2. PUC LEVEL HASKONING NEDERLAND B.V. WATER 2.1. Service level Findings Total coverage, in supplied settlements, with water supply services is 93,7%. Total coverage, in the town Zitoradja, with sewerage services is 85,7%. The PUC has a reported number of 1,260 household water connections and 1,100 wastewater connections. 10 new connections were provided in Water tariffs are 12,00 dinar/m3 water supply and 15,00 dinar/m3 water and sewerage. Calculated domestic consumption was 86 l/cd. The total number of customer complaints was 5. The total number of breaks in distribution network was 40. The metering level is reported by the PUC that there may be mistakes due to incorrect metering with 79,4% of customer s meters which are out of order. Analysis In some villages do not exist w&ww systems In some cases in-house installations need to be installed 79,4% of customer s meters are out of order. Possible Actions Advice PUC to assess the existing service levels and advise on measures for improvement; Advise on monitoring and management of customer complaints; Preparation and implementation of metering plan Financial performance Findings Accounting system of PUC activities could not express separately activity of sectors. This is reason do not exist water financial performance. PUC dose not have computer. Analysis Missing adequate accounting system to recognize separately sector activities Possible actions: Establish adequate accounting system; Establish adequate tariff level and design a tariff structure and scenarios for increase.

53 2.3. Operational efficiency HASKONING NEDERLAND B.V. WATER Findings Non-revenue water of 17% in 2006 is good result if it is realistic. Total number of repairs at WS network is not known. Analysis Not clear whether sufficient funds for (preventive) maintenance of the systems are made available. Possible actions: Determine appropriate level of O&M costs Human resource and project management issues Findings The PUC has 14 employees of which 4 involved in water supply and 1 in sewerage. 1 employee holds a university degree. The number of staff per 1000 house connections is Water is 7,4 and the number of staff per 1000 house connections is sewerage is 2,1. Analysis PUC staff not familiar with international implementation procedures; Project management capability of PUC and PUC staff is not known. Possible actions On-the-job training of existing PUC staff in project management; Advice the PUC on HRM policies and procedures and measures to increase staffing efficiency. 3. CONCLUSIONS This note is based on existing information available in the MIASP office and PUC staff information that was given on meeting was held in PUC. The documentation that was explored for preparing this note is the MIASP Questionnaire, BPD, Grant Contract and Project documentation for Water Supply System construction of water supply pipelines in 5 communities. The information available was sufficient to identify potential focus areas: Tariffs Models, Structure and Scenario Increases; Operation & Maintenance Tasks (Manual); Accounting System (Cost Accounting System); Metering (Costs and Procedures replacement of meters). After PUC coordinate and agreed of the proposal, the next step is to consult the PUC and the Municipal authorities and apply PUC CEP, if deemed feasible and realistic.

54 Table 6-1 PUC level PUC ŽITORAĐA Žitorađa PUC Service Level Unit Actual vs total (potential) population served w / ww (sewerage Zitoradja only) % 93,7 / 85,7 Part of HH Income spent on water services (excluding in house installations) % Domestic Consumption l/cd Percentage of metered water sold % Nr of Customer complaints per annum Nr 4 5 Nr of breaks in distribution network per total length of network Nr/Km 1,0 1,3 PUC Financial Performance Unit AR Plan 2006 Total revenues (TR) Euro* 10 6 Operational revenues Euro* 10 6 Gross operating profit Euro* 10 6 Net operating profit Euro* 10 6 Net profit after tax Euro* 10 6 Subsidy received from the Municipality Euro* 10 6 Subsidy provided by the Municipality as percentage of revenues received % Operating Costs, excl. Depreciation (OC) Euro* 10 6 of which maintenance costs Euro* 10 6 Depreciation (D) Euro* 10 6 Capital Costs (CC) Euro* 10 6 HASKONING NEDERLAND B.V. WATER Analysis of possible risks and constraints In some villages do not exist w&ww systems In some cases inhouse installations need to be installed Consumption level (90 l/cd) is under average 79,4% of customer s meters are out of order. Analysis of possible risks and constraints Missing adequate accounting system. Proposed type of Actions Advice PUC to assess the existing service levels and advise on measures for improvement Advise on monitoring and management of customer complaints Preparation and implementation of metering plan. Proposed type of Actions Establish adequate accounting system Establish adequate tariff level and design a tariff structure and scenarios for increase.

55 Cost Recovery Ratio multiple Ratio of Debt to Total Revenues multiple Ratio of Debt Service to Total Revenues multiple Free cash flow (FCF) Euro* 10 6 Debt Service Coverage Ratio multiple Operating Costs per Unit produced per year /m 3 Collection Rate invoiced bills % Average Debtor Days (ADD) Days Debt to Equity Ratio multiple Current Ratio multiple PUC Operational Efficiency Unit Non-revenue drinking water % Of which technical % of which administrative % Drinking water produced m3/year Drinking water billed m3/year Manpower costs as % of operating costs % Depreciation costs as % of operating costs % Other costs as % of operating costs % - - Number of repairs No/yr Analysis of possible risks and constraints Not clear whether sufficient funds for (preventive) maintenance of the systems are made available. Proposed type of Actions Determine appropriate level of O&M costs.

56 PUC Project Management / HRD aspects Unit Nr. of employees Nr of which management/staff/overhead Nr 8 8 of which drinking water Nr 4 4 of which waste water Nr 1 1 of which other departments Nr 1 1 Nr of (HH) Connections Water Nr No of connections WW Nr Nr of staff per 000 per connections Water N0/ 000 7,47 7,41 Nr of staff per 000 connections waste water N0/ 000 2,12 2,12 Employees with higher education % 7,1 7,1 Analysis of possible risks and constraints PUC staff not familiar with international implementation procedures Project management capability of PUC and PUC staff is not known. Proposed type of Actions Advice the PUC on HRM policies and procedures and measures to increase staffing efficiency.

57 ANNEX 7: FINAL VERSION OF THE ACTION PLAN 2007 FOR CAPACITY ENHANCEMENT PROGRAM CAPACITY ENHANCEMENT PROGRAM FOR THE PUC S FOR WATER SUPPLY AND SEWERAGE COLLECTION AND TREATMENT OF THE TOWNS OF SMEDEREVO, INĐIJA, MIONICA, APATIN, VARVARIN AND ŽITORAĐA

58 ACTION PLAN 2007 Date: 20 April ANALYSIS OF PUC S During the period from December 2006 to March 2007, an analysis was made of the operational & financial performance of seven public utility companies (PUC), receiving grant financing from the EAR via the Municipal Infrastructure Agency Support Program (MIASP). The objective of the analysis was to identify and prioritize short term measures to help the utilities to improve their financial and/or operational performance. This paper now summarizes the identified measures and its relative ranking. In addition, it sets out an action plan to implement the selected measures. The action plan is aimed at completion by the December The following PUC s participated in the analysis: Smederevo (water & sewerage); Indjija (water & sewerage); Mionica (water & sewerage); Apatin (water & sewerage); Varvarin (water & sewerage); Zitoradja (water & sewerage). Based on the analysis, the Consultant identified four short term measures which were consequently discussed and ranked in order of priority by the participating PUC s The identified measures are: Tariff calculation model. This measure aims at providing the PUC s with a tool with which they can set (full) cost price based tariffs. It would help them to identify current gaps with existing tariffs, provide support to discuss tariff adjustments with the Municipality and could serve as a basis for a tariff structure adjustment and/or tariff increase scenario; Operation & Maintenance Tasks (Manual). Through the development of a job & task description, as well as a procedures manual, the PUC s would be able to strengthen their operational management Cost accounting system. With the help of a cost accounting system, the PUC would be able to: Identify cost drivers for their operations. This would form the basis for a cost price based tariff structure; Have a financial management tool to track expenditure per department and/or location. This would enable budgeting and meaningful tracking and would strengthen financial control & management of the PUC; Budgeting would enable decentralization of the operational management to mid level management of the PUC (department heads).

59 Water meter replacement. This measure would define and structure the annual meter replacement by defining the replacement procedure, data collection and planning. It would help the PUC s to: Drive revenue through identification and reduction of administrative losses and lowering customer complaints due to faulty meters; Lower water usage per capita and thus lower operating costs; Provide accurate management information of actual, measured consumption patterns. The table below summarizes the priorities set by the PUC s. Krusevac will be dealt with separately, since it operations are of a rather different nature compared to the other six water utilities. Table 7-1 TOPICS Priority ranking identified 4 short term measures Water Tariffs Models, Structure and Scenario Increases Water Operation & Maintenance Tasks (Manual) Accounting System (Cost Accounting System) Metering (Costs and Procedures replacement of water meters) Smederevo 2 1 Indjija Apatin Varvarin Zitoradja Mionica 2 1 As can be concluded form the above table, all PUC s, with the exception of Apatin, attached the highest priority to a Metering Replacement Program. After the meeting held at PUC Apatin, on April 4th 2007 it is agreed that above selected topic: Metering Replacement Program is priority for PUC Apatin, too. This paper will therefore further detail the Meter Replacement Action Plan, as selected by six above identified PUC s. First, it will discuss and define some terms and background on operations & maintenance, followed by the Action Plan itself and the envisaged deliverables, benefits and results by December OPERATION AND MAINTENANCE: DEFINITIONS & BACKGROUND The term Operation and Maintenance is used as a general concept covering a wide range of activities carried out by utilities, governments and communities in order to sustain their services and to maintain existing capital assets. 2.1.Definitions For some of the most commonly used expressions and concepts this section gives their general definition. Service is the result of Operation and Maintenance activities;

60 Operation is the procedures and activities necessary for actuating, switching, controlling open and closed-control loops, etc. involved in the actual delivery of services; Maintenance consists of activities necessary to repair or restore assets or systems of assets to a satisfactory condition or level of performance; Operations and maintenance concerning the assets of the drinking water supply system include: abstraction; treatment of raw water; distribution of drinking water to the points-of-delivery (including water mains, reservoirs and tanks); handling of process water and the treatment and reuse of such process water, and the safe transportation and disposal/reuse of residues. Operations and maintenance concerning the assets of the wastewater system include: service connection (control of quality of installation of the connection; control of the impact of industrial connections); collection and transport (inspection and assessment of conditions of sewers and drains, rehabilitation of sewers and drains, inspection of the on-site system at each emptying or residue removal operation, inspection and maintenance of haulage tankers, etc.); treatment, reuse (if possible) or discharge/ disposal of the treated wastewater and the separated wastewater residues. The Operator or a PUC (today) is (a person or) an organization, who performs the dayto-day activities necessary for the provision of the service. The operator should develop a plan for an operations and maintenance strategy covering both proactive and corrective/reactive maintenance activities in relation to the Tariff policy. Proactive maintenance includes maintenance performed at planned or scheduled intervals to prevent, minimize, or delay failures or shutdowns that result in unplanned maintenance activities or to ensure continued, efficient asset operation and to prolong asset life. Corrective or reactive maintenance includes maintenance performed following a failure or shutdown and involves the activities necessary to repair or restore assets or systems of assets to a satisfactory condition or level of performance Operation & Maintenance systems and procedures The O&M activities and responsibilities of the water operator should include the following aspects: planning; operations (actuating, switching, controlling open and closed-control loops); operational efficiency controls;

61 maintenance (servicing, inspection, rehabilitation, repair including particularly leak management); monitoring of source water, finished water and residue quality and quantity; commissioning (stopping, testing, re-commissioning and decommissioning); troubleshooting (during and outside normal hours of work); documentation and record keeping, and emergency response. Operational documents and records All tasks and activities should be properly documented and maintained as evidence of its compliance. Managers and supervisors should check these records at regular intervals. All supervision and checking activities should be documented. If not stated otherwise in national legal provisions, license permits and official directions or the nationally generally accepted requirements or practices, every document should be kept on record for a defined period. Examples of documents and records include: plans and documentation of the system; operating instructions, diaries and records, and work rules; occupational health and safety related records; financial records; test records, proof of maintenance; wastewater analysis, effluents and residuals quality; contractual and legal affairs, and measures respecting employees Operation & Maintenance stakeholders It is well known that in Serbia, O&M has been neglected in the past, or has been discussed and introduced only after a project was completed. This neglect or delay in applying proper operation and maintenance procedures has adversely affected the credibility of the investments made, the functioning of the services, the well-being of rural populations, and the development of further projects. However, the importance of O&M has gained considerable visibility over the past few years, and it appears that policy-makers and project designers are now more conscious of the direct links between improved O&M practices and the sustainability of water supply and sanitation services. There is also greater recognition of the need to approach these projects in a comprehensive way, emphasizing not only the design and construction but also post-construction activities. Operation and Maintenance activities, which encompass not only technical issues, but also managerial, social, financial and institutional issues, must be directed towards the elimination or reduction of the major constraints which prevent the achievement of sustainability.

62 Different actors have a different degree of involvement in the Operation & Maintenance activities of Public Utilities. In general, the Water Utility Company and possible external agencies have a major involvement in O&M, while consumers and National authorities are less involved in these activities. Table 7-2 Degree of involvement in O&M Major Actors Slight Medium Major National institutions x Provincial institutions x Local Authorities x PUC X Users X Private sector and NGOs X External support agencies X

63 3. ACTION PLAN 2007 HASKONING NEDERLAND B.V. WATER Table 7-3 Nr Target Date Item(s) 1 18 April Agreement on proposed Action Plan 2007 ACTION PLAN 2007 REPLACEMENT OF WATER METERS IN THE WATER SUPPLY AREA Exchange of information Finance Ministry, Trade, Tourism and Services Ministry National consumers organization Water working group of SCTM Stakeholders Proposed Beneficiary Initiative/ form of Assistance Responsible program LA s, PUC s MIASP LA s, PUC s Meeting 2 26 April Presentation proposal ACTION PLAN 2007 Presentation of yearly PUC work program questionnaire: importance and practical problems 3 15 May Detailed cost estimate of replacement program, availability of budget Draft for Water meter replacement Manual MIA Finance Ministry, Trade, Tourism and Services Ministry National consumers organization Water working group of SCTM MIA LA s, PUC s MIASP MIASP Seminar LA s, PUC s LA s, PUC s MIASP Meeting MIASP

64 4 30 May Final version of Water meter replacement Manual Training of PUC s staff 5 15 June Start implementation: Procurement water meters PR campaign Improvement of data processing and billing system Prepare Performance indicators related to water meter replacement program 6 30 September 7 15 October Evaluate progress of program Presentation and discussion of conclusions of evaluation Follow-up on presentation of first seminar on yearly PUC work program 8 15 October Preparation of draft Action Plan Presentation of Action Plan November 2008 Finance Ministry, Trade, Tourism and Services Ministry National consumers organization Water working group of SCTM MIA HASKONING NEDERLAND B.V. WATER PUC s MIASP LA s, PUC s PUC s MIASP MIASP PUC s LA s, PUC s MIASP seminar LA s, PUC s LA s, PUC s MIASP LA s, PUC s LA s, PUC s MIASP

65 10 30 November Presentation of first results Performance indicators Finance Ministry, Trade, Tourism and Services Ministry LA s, PUC s LA s, PUC s MIASP Meeting National consumers organization Water working group of SCTM November - 15 December Guarantee budget reservation for 2008 MIA LA s, PUC s LA s, PUC s

66 3.1. Expected results HASKONING NEDERLAND B.V. WATER The general objective of the AP 2007 is to make a contribution to improvement of the operational and financial performance of the PUC s. This is done by producing the following deliverables towards the end of 2007: More specifically, the following deliverables are expected: Written procedure/manual on water meter replacement; A developed training module and delivered training to operational staff on water meter replacement; Analysis and recommendation on financing mechanism to achieve a sustainable water meter replacement program; Water meter replacement action plan 2008 submitted; Created awareness about this activity at National level. These deliverables would lead to the following specific results: Strengthened operational management by adoption of new working procedures; (indicator: new working procedure adopted and implemented by PUC management by the end of 2007); Increased revenues, through fewer customer complaints about inaccurate meter reading (indicator: fewer customer complaints about faulty meters by the end of 2007); Rationalized water usage through increased awareness of customers on their actual water usage (indicator: increase of metered and invoices water by the end of 2007); Increased quality of data on actual water consumption; (indicator: report on water balance issued by the end of 2007, based on actual water meter reading); Sustainable water meter replacement program in place (indicator: budget earmarked in 2008 plan for water meter replacement); Increased awareness at National level about water meter replacement program (indicator: # of people from national stakeholders present at final seminar at the end of 2007) Conclusions This document and the training and process activities described in it are intended for managers and planners of Local Authorities and Public Utility Companies, who are concerned with the challenging problem of how to implement effective operation and maintenance of rural and urban water supply and sanitation services in Serbian municipalities. In addition to the traditional management aspects of operation and maintenance, this action plan highlights the importance of community (LA, PUC, customer s associations, NGO ) participation, in order to make more efficient use of local resources for sustainability.

67 ANNEX 8: RESULTS OF QUESTIONNAIRE FOR PARTICIPANTS OF CEP TRAINING, JUNE 2007.

68 Summary of answers given by participants of training on water meter replacement, June 2007 Question number / average mark Question Did you get new 1 knowledge/ideas from course to improve your work 2 Is information provided useful for daily work 3 Is information provided relevant for daily work 4 The degree of detailed information 5 Judgment of organization and presentation 6 Judgement of cost recovery from revenues 7 Judgment of PR information 8 Judgment of Water meter Manual 9 Judgment of trainers Answers Average score , , , , , , , , ,789 Total average score ,293

69 A copy of the questionnaire provided to the participants of the training is given below: Assessment of training by participating PUC s in capacity enhancement training Please answer the questions below by marking the appreciation (5 = highest appreciation, 1 lowest appreciation) that best reflects your Appropriateness of training 1 Did the information provided give you new ideas and knowledge for improving your work? 2 Is the information offered to you directly useful in the daily operation of your PUC? Was the information offered relevant to your daily 3 operations? 4 How do you judge the degree of detailed information? B 5 Quality of training and materials How do you judge in general the organization and presentation of the training? 6 How do you judge the provided information on cost recovery from revenues? How do you judge the provided information on Public 7 Relations? 8 How do you judge the provided information on the Manual for Water Meter Replacement? 9 How do you judge the contribution of the trainers?

70 ANNEX 9: SUMMARY REPORT ON CAPACITY ENHANCEMENT SERVICES TRAINING

71 MIASP TRAINING INTRODUCTION IN WATER METER REPLACEMENT PROGRAMME The Municipal Infrastructure Support Program (MIASP) includes Capacity Enhancement Services for the Municipalities and Public Utility Companies in order to strengthen their capacity to plan and implement infrastructure projects. The objectives and results of the project are presented in the following table: Objectives Expected Results To enhance the capability of municipal and PUC staff in the preparation and financing of municipal infrastructure projects To ensure the proper implementation and the sustainable operation of project investments Municipal and PUC staff trained on the identification and preparation of municipal infrastructure projects Municipal and PUC staff trained on the financial and budgetary aspects of project preparation and project management Municipal and PUC staff trained and acquainted with project implementation and monitoring procedures Capacity Enhancement Programs prepared and implemented in 10 PUC s to achieve sustainable financial and technical operations at the PUC level Capacity Enhancement Strategy Document for MIA aimed at improved preparation, financing and implementation of municipal infrastructure management, including a set of models to be used in the transformation of PUC s. The activities leading to the results of the above are the following: 1. Training of Municipal and PUC Staff in: a. Management of Project Implementation; b. Municipal Finance and Budgeting; c. Project Identification and Preparation. 2. Improve the operational and financial performance of PUC s; 3. Preparation of guidelines for transformation of PUC s; 4. Assistance to the PUC Subotica in finalizing the Service Level Agreement (SLA) with the Municipality of Subotica. This report is a deliverable output and a means of verification related to the activity 2 above. With reference to municipal infrastructure projects the following results are included in each Annex 1 of the Grant Contracts: 1. Selected staff of the municipality trained in project cycle management techniques and the preparation of bankable project documentation 2. Selected staff of the PUC trained in project implementation, maintenance and operating practices

72 This report is a means of verification related to the activity 4 above. A 3 days training program was prepared for participants from the six PUC s which have been selected for this capacity enhancement training. During the first day and during the last day of the course also representatives from the Local Authority and from management of the PUC s were invited, while the rest of the course is mainly meant for middle management of the PUC s. By inviting LA and directors of the PUC s MIASP made the link between general recommendations for improved efficiency of management, and the particular contributions of a well prepared and well executed water meter replacement program. Participating municipalities are: Smederevo; Indjija; Mionica; Apatin; Varvarin; Zitoradjă. TIMETABLE Day 1: June 13, 2007 SCTM, Makedonska 22, XI floor, Training Center, Belgrade Trainer Topic Morning Registration of participants Cok van Schooten Background MIASP/training, O&M manuals, objective and program training, WMR is first step of O&M manual Milorad Rosić Mission, vision, strategy of PUC for water supply (and wastewater) Jaša Gabrijan Public relations Milorad Rosić Elements of Project Management Coffee break Bojana Importance of cost recovery from revenues Katusevski Milorad Rosić Introduction in water meter replacement (copy of article of Westerling and Hart) and AP 2007/ Lunch Afternoon Milorad Rosić Practical introduction to Water Meter Replacement program (WMR): Three phases of WMR program Guide for preparing Manual Milorad Rosić Indjija Sample on calculation of costs for WMR program (present list of necessary data from each PUC to be used with exercise day 2) Coffee break Jaša Gabrijan Public relations: explications on how, what and why

73 Day 2: June 20, 2007 SIV III Hall No 437, IV floor, Omladinskih brigada 1, Novi Beograd Trainer Topic Morning Milorad Rosić Examples of annexes to WMR manual Milorad Rosić Exercise on costs calculation of WMR for individual PUC s Coffee break Continuation of exercise and conclusion Jaša Gabrijan Results of PR exercises Lunch Afternoon Milorad Rosić, INSA Visit to INSA factory Day 3: June 26, 2007 SCTM, Makedonska 22, VIII floor, Conference Hall, Belgrade Trainer Topic Morning Peter Duindam Quality requirements for water meters (Topic 1) Peter Duindam Reliable Lifetime of water meters (ABC/XYZ method) (Topic 2) Coffee break Jaša Gabrijan Public relations Lunch Afternoon Milorad Rosić Presentation of results from day 1, 2 and Jaša Gabrijan Public relations Coffee break Milorad Rosić Possible actions for LA and management PUC

74 PARTICIPANTS LIST 1. Nikola Marčeta Apatin 2. Boris Tankosić Apatin 3. Mirko Pavlović Apatin 4. Tibor Sabo Apatin 5. Dejan Dmitrović Inđija 6. Dragan Došen Inđija 7. Jovica Turčinović Inđija 8. Ljiljana Radovanović Inđija 9. Ljiljana Nikolić Mionica 10. Radiša Stanković Mionica 11. Miroslav Grbović Mionica 12. Persida Kurtić Mionica 13. Zdravka Kovačević-Vasić Smederevo 14. Slobodan Miladinović Smederevo 15. Saša Botić Smederevo 16. Tomislav Miljković Smederevo 17. Zoran Milisavljević Smederevo 18. Živomir Avramović Smederevo 19. Zoran Milenković Varvarin 20. Radica Atanasković Varvarin 21. Srboljub Petrović Varvarin 22. Tomica Atanasković Žitorađa 23. Miodrag Stanojević Žitorađa 24. Radisav Petrović Žitorađa 25. Cok van Schooten MIASP 26. Milorad Rosić MIASP 27. Bojana Katuševski- Ivanović MIASP 28. Jaša Gabrijan MIASP 29. Peter Duindam Royal Haskoning

75 TRAINING OBJECTIVES Short introduction on MIASP EAR Serbia Short introduction on grant agreements EAR Municipalities in Serbia Investments Investments O&M (CEP) Short explanation on this element of MIASP: Capacity Enhancement of Municipalities and PUC s Capacity Enhancement of PUC s Action Plan 2007 Objectives of the training: detailed water meter replacement program: Water Meters Replacement Manual (water meter replacement is first element of a new setup of O&M Manual) in 2007 PR material; Program of Training: First day in morning (LA and PUC): Introduction PUC s Vision, Mission and Strategy PR (as a PUC s tool) Project Management (as a PUC s tool) Costs Recovery (as a PUC s tool) Water Meter Replacement as economy category (as a PUC s tool) First day in afternoon, second day and third day morning (PUC): Training Manual PR and water meter replacement Cost calculation of PMR Visit to Insa factory Topics related to improved WMR Third day in afternoon: Conclusions Presentation of results of Training First conclusions for Action Plan 2007/2008 Possible actions for LA and management PUC Public relations

76 RESULTS Municipal and PUC staff trained on the technical, financial and public relation aspects of project preparation and project management Water Meter Replacement Program. DELIVERABLES Guideline for the Replacement of Water Meters (Manual) PR Manual FOLLOW UP Post training actions are in accordance with PUC Action Plan 2007 Replacement of water meters in the respective water supply areas.

77 ANNEX 10: EXAMPLE OF PRESENTATION ON 30 TH OCTOBER OF RESULTS OF ACTION PLAN 2007 (EXAMPLE OF PUC INDJIJA)

78

GOOD PRACTICE IN PROJECT PREPARATION PUBLIC WATER UTILITIES

GOOD PRACTICE IN PROJECT PREPARATION PUBLIC WATER UTILITIES GOOD PRACTICE IN PROJECT PREPARATION PUBLIC WATER UTILITIES April 2005 Introduction This document has been published by the Project Preparation Committee (PPC) within the framework of the DABLAS Task Force

More information

STRATEGY OF PUBLIC INTERNAL FINANCIAL CONTROL DEVELOPMENT IN THE REPUBLIC OF SERBIA FOR THE PERIOD OF

STRATEGY OF PUBLIC INTERNAL FINANCIAL CONTROL DEVELOPMENT IN THE REPUBLIC OF SERBIA FOR THE PERIOD OF Ministry of Finance STRATEGY OF PUBLIC INTERNAL FINANCIAL CONTROL DEVELOPMENT IN THE REPUBLIC OF SERBIA FOR THE PERIOD OF 2017-2020 www.mfin.gov.rs REPUBLIC OF SERBIA MINISTRY OF FINANCE TABLE OF CONTENTS

More information

FINANCIAL ANALYSIS. A. Kathmandu Upatyaka Khanepani Limited

FINANCIAL ANALYSIS. A. Kathmandu Upatyaka Khanepani Limited Kathmandu Valley Wastewater Management Project (RRP NEP 43524) FINANCIAL ANALYSIS A. Kathmandu Upatyaka Khanepani Limited 1. Kathmandu Upatyaka Khanepani Limited (KUKL) is a public company registered under

More information

Introduction to the SNA 2008 Accounts, part 1: Basics 1

Introduction to the SNA 2008 Accounts, part 1: Basics 1 Introduction to the SNA 2008 Accounts, part 1: Basics 1 Introduction This paper continues the series dedicated to extending the contents of the Handbook Essential SNA: Building the Basics 2. The aim of

More information

Irish Water Customer Information Note

Irish Water Customer Information Note Irish Water Customer Information Note Reference: CER/17009 Date Published: 20/01/2017 The CER, Irish Water s Economic Regulator The CER The Commission for Energy Regulation (CER) is Ireland s independent

More information

Header Tile ATTACHMENT 2. City of Saskatoon

Header Tile ATTACHMENT 2. City of Saskatoon Header Tile ATTACHMENT 2 2 Building Better Infrastructure The Administration evaluates the condition of the City s assets in order to develop annual programs to maintain the assets at a minimum cost. Where

More information

QUALITY OF SERVICE STANDARDS FOR THE SUPPLY AND DISTRIBUTION OF WATER AND WASTEWATER SERVICES. December Final Decision - Summary

QUALITY OF SERVICE STANDARDS FOR THE SUPPLY AND DISTRIBUTION OF WATER AND WASTEWATER SERVICES. December Final Decision - Summary QUALITY OF SRVIC STANDARDS FOR TH SUPPLY AND DISTRIBUTION OF WATR AND WASTWATR SRVICS December 2017 Final Decision - Summary i Table of Contents 1. INTRODUCTION...1 Purpose of this Document... 1 Acknowledgement...

More information

UGI Utilities, Inc. Gas Division And UGI Penn Natural Gas, Inc. Universal Service Program. Final Evaluation Report

UGI Utilities, Inc. Gas Division And UGI Penn Natural Gas, Inc. Universal Service Program. Final Evaluation Report UGI Utilities, Inc. Gas Division And UGI Penn Natural Gas, Inc. Universal Service Program Final Evaluation Report July 2012 Table of Contents Table of Contents Executive Summary... i Evaluation Questions

More information

NWC Tariff Submission for the Period January 2019 to December Submission to the Office of Utilities Regulation (OUR)

NWC Tariff Submission for the Period January 2019 to December Submission to the Office of Utilities Regulation (OUR) NWC Tariff Submission for the Period January 2019 to December 2021 Submission to the Office of Utilities Regulation (OUR) October 2018 Table of Contents 1 Executive Summary 1 1.1 Build-Up of the Revenue

More information

orce DRAFT DISCUSSION PAPER FOR WATER AND WASTEWATER DEVELOPMENT STRATEGY FOR MOLDOVA

orce DRAFT DISCUSSION PAPER FOR WATER AND WASTEWATER DEVELOPMENT STRATEGY FOR MOLDOVA Task F Task F JOINT MEETING OF THE EAP TASK FORCE S GROUP OF SENIOR OFFICIALS ON THE REFORMS OF THE WATER SUPPLY AND SANITATION SECTOR IN EASTERN EUROPE, CAUCASUS AND CENTRAL ASIA THE EU WATER INITIATIVE

More information

Final Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY

Final Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY Final Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY Phase 2 Cost of Service and Rate Design BLACK & VEATCH PROJECT NO. 192366 Black & Veatch Holding Company 2017. All rights

More information

Financing Natura 2000

Financing Natura 2000 GuideGuidelines workshop evaluation 0 Financing Natura 2000 Workshop report NETHERLANDS Prepared by: Stichting Natuur en Milieu Arjan Berkhuysen 3 July 2006 Stichting Natuur en Milieu July 2006 Workshop

More information

Annex 1 Citizen s summary 1

Annex 1 Citizen s summary 1 Programming process Annex 1 Citizen s summary 1 The process of preparation of the Cooperation Programme was coordinated by the Managing Authority (Ministry of Regional Development and EU Funds of the Republic

More information

Office of Utilities Regulation REGULATORY FRAMEWORK FOR THE NATIONAL WATER COMMISSION ( )

Office of Utilities Regulation REGULATORY FRAMEWORK FOR THE NATIONAL WATER COMMISSION ( ) REGULATORY FRAMEWORK FOR THE NATIONAL WATER COMMISSION (2008-2013) REGULATORY FRAMEWORK FOR NATIONAL WATER COMMISSION (2008-2013) Introduction - Legal Authority Pursuant to Section 4(1) (a) of the OUR

More information

ACCOUNTING SEPARATION STATEMENT Analysis of Operating and Fixed Asset Costs by Business Unit

ACCOUNTING SEPARATION STATEMENT Analysis of Operating and Fixed Asset Costs by Business Unit ACCOUNTING SEPARATION STATEMENT 2014-15 Analysis of Operating and Fixed Asset Costs by Business Unit 1. PURPOSE OF METHODOLOGY The purpose of this methodology statement is to explain how the accounting

More information

Money Management Curriculum Overview

Money Management Curriculum Overview Teaching Notes: The money management curriculum will help students understand their financial standing and create a plan that will help them succeed in improving their financial future. There are eight

More information

United Utilities Wholesale Charges A consultation on United Utilities proposed NAV tariff

United Utilities Wholesale Charges A consultation on United Utilities proposed NAV tariff United Utilities Wholesale Charges A consultation on United Utilities proposed NAV tariff 1. Introduction The New Appointments and Variations (NAV) regime allows new entry into the wholesale water and

More information

Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) ECONOMIC ANALYSIS

Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) ECONOMIC ANALYSIS Karnataka Integrated Urban Water Management Investment Program (RRP IND 43253) A. Introduction ECONOMIC ANALYSIS 1. Karnataka. Karnataka is one of the top ten states in India by gross domestic product

More information

North Carolina Department of Environment and Natural Resources

North Carolina Department of Environment and Natural Resources North Carolina Department of Environment and Natural Resources Revised March 23, 2000 Public Water Supply Section Division of Environmental Health 1634 Mail Service Center Raleigh, NC 27699-1634 (919)

More information

PROCEDURE FOR PRICING CENTRALIZED WATER AND WASTEWATER SERVICES

PROCEDURE FOR PRICING CENTRALIZED WATER AND WASTEWATER SERVICES APPROVED by Order of the State Committee for Construction, Architecture, and Housing Policy of Ukraine # 138 dated June 27, 2001 Registered with the Ministry of Justice of Ukraine, # 748/5939, August 23,

More information

FINANCIAL ANALYSIS OF THE WATER SUPPLY AND SEWERAGE AUTHORITY OF ULAANBAATAR CITY

FINANCIAL ANALYSIS OF THE WATER SUPPLY AND SEWERAGE AUTHORITY OF ULAANBAATAR CITY Ulaanbaatar Urban Services and Ger Areas Development Investment Program (RRP MON 45007) FINANCIAL ANALYSIS OF THE WATER SUPPLY AND SEWERAGE AUTHORITY OF ULAANBAATAR CITY A. BACKGROUND 1. The Water Supply

More information

ADMINISTRATION TREASURY OFFICE COLLECTION OF WATER/SEWER ACCOUNTS 1. PURPOSE:

ADMINISTRATION TREASURY OFFICE COLLECTION OF WATER/SEWER ACCOUNTS 1. PURPOSE: CORPORATE POLICY Schedule A to By-law # 04-2018 DEPARTMENT: SECTION: APPROVAL: ADMINISTRATION TREASURY OFFICE COLLECTION OF WATER/SEWER ACCOUNTS COUNCIL POLICY NUMBER: 01-2018 DATE OF PRESENTATION: JANUARY

More information

ACCOUNTING SEPARATION STATEMENT Analysis of Operating and Fixed Asset Costs by Business Unit

ACCOUNTING SEPARATION STATEMENT Analysis of Operating and Fixed Asset Costs by Business Unit ACCOUNTING SEPARATION STATEMENT 2017-18 Analysis of Operating and Fixed Asset Costs by Business Unit 1. PURPOSE OF METHODOLOGY The purpose of this methodology statement is to explain how the totex and

More information

FUNDING & RESERVES POLICY

FUNDING & RESERVES POLICY FUNDING & RESERVES POLICY UNCHANGED 1 JULY 2016 STEVE TSHWETE LOCAL MUNICIPALITY MP 313 Approved May 2016 C36/05/2016 1. INTRODUCTION The funding and reserves policy is aimed to ensure that the municipality

More information

Municipal Economics & Planning A division ifruekert/mielke

Municipal Economics & Planning A division ifruekert/mielke A division ifruekert/mielke Economic, Fiscal & Planning Consultants for Local Governments (262) 542-5733 Proposal to Prepare a Sanitary Sewer and Water Utility Consolidation Study Scope of Services This

More information

Department of Public Works Water & Sewer Divisions. Water & Sewer Divisions Customer Service Policy & Procedure Manual

Department of Public Works Water & Sewer Divisions. Water & Sewer Divisions Customer Service Policy & Procedure Manual Department of Public Works Customer Service Page 1 I. Application for Service Anyone may apply for water and/or sewer service to a property provided they are the owner, owner s agent, or an occupant of

More information

Network of Associations of Local Authorities of South East Europe. Asset Management- Business Planning Decision Support Tool.

Network of Associations of Local Authorities of South East Europe. Asset Management- Business Planning Decision Support Tool. Network of Associations of Local Authorities of South East Europe Asset Management- Business ning Decision Support Tool Implemented by: The tool enables Municipalities analyse and bring strategic decisions

More information

WATER AND WASTEWATER SERVICES IN THE DANUBE REGION SUMMER SCHOOL TSLR TORINO, SEPTEMBER, 2015

WATER AND WASTEWATER SERVICES IN THE DANUBE REGION SUMMER SCHOOL TSLR TORINO, SEPTEMBER, 2015 WATER AND WASTEWATER SERVICES IN THE DANUBE REGION SUMMER SCHOOL TSLR TORINO, SEPTEMBER, 2015 STRUCTURE A Framework for Sustainable Services The State of the Sector in the Danube region Context Access

More information

PERFORMANCE IMPROVEMENT PLANNING MODEL PERFORMANCE ASSESSMENT SYSTEM PROJECT

PERFORMANCE IMPROVEMENT PLANNING MODEL PERFORMANCE ASSESSMENT SYSTEM PROJECT PERFORMANCE NING MODEL PERFORMANCE ASSESSMENT SYSTEM PROJECT Contents 2 1. Approach to Performance improvement planning model 2. Data Entry and Forecasts 3. Module I: Performance Assessment 4. Module II:

More information

BEST PRACTICE 3: System Water Loss Control Overview Why a Best Practice? State Planning Requirements

BEST PRACTICE 3: System Water Loss Control Overview Why a Best Practice? State Planning Requirements BEST PRACTICE 3: System Loss Control Foundational best practice Utility operations - implemented by water utilities on their own system Customer participation not applicable Overview loss control is the

More information

What is PBC and how it can help deal with the challenges of reducing NRW?

What is PBC and how it can help deal with the challenges of reducing NRW? Joint DWP ARA Regional Workshop on Performance Based Contracting for Non-Revenue Water Reduction What is PBC and how it can help deal with the challenges of reducing NRW? Bambos Charalambous World Bank

More information

WATER AND SEWERAGE CORPORATION BENCHMARKING STUDY (USING WORLD BANK MODEL) DATA REFERENCE GUIDE. Mr. Armbrister Research Department Central Bank

WATER AND SEWERAGE CORPORATION BENCHMARKING STUDY (USING WORLD BANK MODEL) DATA REFERENCE GUIDE. Mr. Armbrister Research Department Central Bank WATER AND SEWERAGE CORPORATION BENCHMARKING STUDY (USING WORLD BANK MODEL) DATA REFERENCE GUIDE ITEM NO. No. 5 - GDP per capita No. 6 Exchange rate No. 7 Average Annual Inflation No. 8 Minimum Annual Salary

More information

National Water Commission

National Water Commission National Water Commission Review of Rates October 1, 2013 1 DOCUMENT TITLE AND APPROVAL PAGE 1. DOCUMENT NUMBER: 2013/WAS/004/DET.003 2. DOCUMENT TITLE: 3. PURPOSE OF DOCUMENT This Document outlines the

More information

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d.

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d. WATER AND WASTEWATER RATE STUDY Town of Midland C o n s u l t i n g L t d. December 2010 TABLE OF CONTENTS EXECUTIVE SUMMARY.........1 I BACKGROUND AND STUDY OBJECTIVES.........9 ll ASSOCIATED LEGISLATION.........13

More information

Update on Municipal Asset Management Planning

Update on Municipal Asset Management Planning Update on Municipal Asset Management Planning Municipal Finance Officers Association Conference Ontario Ministry of Infrastructure September 20, 2017 Overview Municipal asset management planning in Ontario

More information

Project Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean

Project Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean Project Selection Criteria Transnational Cooperation Programme Interreg Balkan Mediterranean 2014 2020 CCI 2014TC16M4TN003 22/06/2015 Version 1.0 Balkan-Mediterranean is co-financed by European Union and

More information

Engagement of Financial Advisory Services for the Soapberry Wastewater. Terms of Reference

Engagement of Financial Advisory Services for the Soapberry Wastewater. Terms of Reference JAMAICA: FOUNDATIONS FOR COMPETITIVENESS AND GROWTH PROJECT Loan No.:8408-JM Component: 2A Assignment Title: Treatment Plant Engagement of Financial Advisory Services for the Soapberry Wastewater Reference

More information

DRM : EnergyNorth Natural Gas, Inc. dlbla Liberty Utilities Comments on Proposed Changes to Puc 500 Rules for Gas Service

DRM : EnergyNorth Natural Gas, Inc. dlbla Liberty Utilities Comments on Proposed Changes to Puc 500 Rules for Gas Service Liberty U ilities Sarah B. Knowlton Assistant General Counsel Phone: 603/328-2794 E-Mail: sarah.knowlton@libertyutilities.com Debra A. Rowland Executive Director New Hampshire Public Utilities Commission

More information

IPP TRANSACTION ADVISOR TERMS OF REFERENCE

IPP TRANSACTION ADVISOR TERMS OF REFERENCE IPP TRANSACTION ADVISOR TERMS OF REFERENCE Terms of reference for transaction advisor services to the Government of [ ] for the [insert description of the project] (the Project ). Contents 1. Introduction

More information

SINGLE STAGE OPEN COMPETITIVE SELECTION REQUEST FOR PROPOSALS

SINGLE STAGE OPEN COMPETITIVE SELECTION REQUEST FOR PROPOSALS SELECTION OF CONSULTANTS SINGLE STAGE OPEN COMPETITIVE SELECTION REQUEST FOR PROPOSALS Reference No.: 842/60811 Selection of Consulting Services for: Tbilisi Solid Waste Project Tbilisi Municipal Solid

More information

EAP Task Force. EAP Task

EAP Task Force. EAP Task EAP Task Force EAP Task Force EAPP Task JOINT MEETING OF THE EAP TASK FORCE S GROUP OF SENIOR OFFICIALS ON THE REFORMS OF THE WATER SUPPLY AND SANITATION SECTOR IN EASTERN EUROPE, CAUCASUS AND CENTRAL

More information

Notice of a public hearing

Notice of a public hearing Notice of a public hearing Dear Benicia Resident and/or Business Owner, You are receiving a revised Notice of a Public Hearing to increase the water and sewer rates and add water meter replacement fees.

More information

Terms of Reference for Senior Non-Key Short-Term Expert: e- Commerce Regulatory Issues

Terms of Reference for Senior Non-Key Short-Term Expert: e- Commerce Regulatory Issues Terms of Reference for Senior Non-Key Short-Term Expert: e- Commerce Regulatory Issues 1 CONTRACT OBJECTIVES & EXPECTED RESULTS 2 1.1 Background to the Project 2 1.2 Background to the Assignment 3 1.3

More information

City of Madison 2019 Operating Budget 296

City of Madison 2019 Operating Budget 296 City of Madison 2019 Operating Budget 296 City of Madison 2019 Operating Budget 297 Agency: Sewer Proposed Budget Cost to Continue Proposed Change Revenue -$38,331,199 -$40,684,110 -$2,352,911 Expenditures

More information

Project Summary. The overall aims of USAID BEP work in these areas are to:

Project Summary. The overall aims of USAID BEP work in these areas are to: USAID Business Enabling Project in Serbia Contract No. 169-C-00-11-00001-00 Scope of Work for Technical Assistance to the Ministry of Finance in Streamlining Planning, Evaluation, Prioritization, and Monitoring

More information

Project Progress Report

Project Progress Report Competitiveness and Jobs Project IBRD RBM Landing Operation Project ID: P152104 Project Progress Report January Jun 2016 Public Policy Secretariat, Republic of Serbia for Inter-Ministerial Working Body

More information

Statement of Policy. Milwaukee Metropolitan Sewerage District s Private Property Inflow and Infiltration Reduction Program.

Statement of Policy. Milwaukee Metropolitan Sewerage District s Private Property Inflow and Infiltration Reduction Program. Milwaukee Metropolitan Sewerage District s 2011-2020 Private Property Inflow and Infiltration Reduction Program Introduction Infiltration is the quantity of water entering a sewer system through such sources

More information

Terms of Reference for Junior Non-Key Expert on e-invoicing, e-ordering and the respective framework

Terms of Reference for Junior Non-Key Expert on e-invoicing, e-ordering and the respective framework Terms of Reference for Junior Non-Key Expert on e-invoicing, e-ordering and the respective framework 1 CONTRACT OBJECTIVES & EXPECTED RESULTS 2 1.1 Background to the Project 2 1.2 Background to the Assignment

More information

Aquasol Pty Ltd. Water Services (Operating) Licence. Operational Audit and Asset Management System Effectiveness Review. Report 18 September 2018

Aquasol Pty Ltd. Water Services (Operating) Licence. Operational Audit and Asset Management System Effectiveness Review. Report 18 September 2018 Aquasol Pty Ltd (Operating) Licence Operational Audit and Asset Management System Effectiveness Review Report 18 September 2018 Perth Melbourne Sydney September 2018 Final Version Liability limited by

More information

BUDGET SYSTEM LAW. / Official Gazette of the Republic of Serbia No. 9, 26 February 2002/ I. GENERAL PROVISIONS. Article 1

BUDGET SYSTEM LAW. / Official Gazette of the Republic of Serbia No. 9, 26 February 2002/ I. GENERAL PROVISIONS. Article 1 BUDGET SYSTEM LAW / Official Gazette of the Republic of Serbia No. 9, 26 February 2002/ I. GENERAL PROVISIONS Content and Scope of the Law Article 1 This Law shall regulate the planning, preparation and

More information

September Preparing a Government Debt Management Reform Plan

September Preparing a Government Debt Management Reform Plan September 2012 Preparing a Government Debt Management Reform Plan Introduction Preparing a Government Debt Management Reform Plan The World Bank supports the strengthening of government debt management

More information

RS Official Gazette, No 55/2015, /correction 69/2015, 36/2007 and 29/2018

RS Official Gazette, No 55/2015, /correction 69/2015, 36/2007 and 29/2018 RS Official Gazette, No 55/2015, /correction 69/2015, 36/2007 and 29/2018 Pursuant to Article 32, paragraph 2, Article 42, paragraph 5, Article 62, paragraph 7 and Article 81, paragraph 6 of the Insurance

More information

COMMITTEE OF EUROPEAN SECURITIES REGULATORS GUIDANCE. Date: 4 th June 2010 Ref.: CESR/10-347

COMMITTEE OF EUROPEAN SECURITIES REGULATORS GUIDANCE. Date: 4 th June 2010 Ref.: CESR/10-347 COMMITTEE OF EUROPEAN SECURITIES REGULATORS Date: 4 th June 2010 Ref.: CESR/10-347 GUIDANCE CESR s Guidance on Registration Process, Functioning of Colleges, Mediation Protocol, Information set out in

More information

MANAGERIAL ACCOUNTABILITY AND RISK MANAGEMENT

MANAGERIAL ACCOUNTABILITY AND RISK MANAGEMENT MANAGERIAL ACCOUNTABILITY AND RISK MANAGEMENT concept and practical implementation Discussion paper I Introduction The objective of this discussion paper is to explain the concept of managerial accountability

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS Water & Sewer Utilities Optimization City of Wichita Public Works & Utilities May 14, 2015 PROJECT DEFINITION The City of Wichita is seeking proposals for assistance with the risk,

More information

Financial Management, Accounting & Controlling curricula development for capacity building of public administration Project Management and Risk Plan

Financial Management, Accounting & Controlling curricula development for capacity building of public administration Project Management and Risk Plan DOCUMENT TYPE PLACE External/internal document University of Belgrade Belgrade SERBIA Financial Management, Accounting & Controlling curricula development for capacity building of public administration

More information

Table of Contents. Page Witness Background and Experience General Matters Major Wastewater Rate Changes Wastewater Revenue...

Table of Contents. Page Witness Background and Experience General Matters Major Wastewater Rate Changes Wastewater Revenue... MSD Exhibit No. MSD H 0 Rate Change Proceeding WILLIAM STANNARD Direct Testimony Metropolitan St. Louis Sewer District February, 0 Table of Contents Page Witness Background and Experience... General Matters...

More information

A loyal three made stronger in one. Loyalist Township Strategic Plan ( )

A loyal three made stronger in one. Loyalist Township Strategic Plan ( ) A loyal three made stronger in one Loyalist Township Strategic Plan (2012-2015) Adopted by Council on August 13, 2012 Loyalist Township Strategic Plan I. Community Profile As prescribed by the Ministry

More information

Charges scheme. Summary explanation

Charges scheme. Summary explanation Charges scheme 2011-2012 Summary explanation www.thameswater.co.uk Contents Introduction 1 Charges for unmetered water supplies 2 Charges for metered water supplies 4 Households opting to have a water

More information

Water Loss Control Tools. Software Tools for Supply Side Efficiency

Water Loss Control Tools. Software Tools for Supply Side Efficiency Water Loss Control Tools Software Tools for Supply Side Efficiency PNWS, April 2015 Today s Goals 1) What is Water Loss? (10 min) 2) Water Loss Baseline AWWA Audits (20 min) 3) Intervention Strategies

More information

Albania Water Supply and Sewerage Policy and Financing Strategy Model. Philip D. Giantris President Valu Add Management Services 3 November 2016

Albania Water Supply and Sewerage Policy and Financing Strategy Model. Philip D. Giantris President Valu Add Management Services 3 November 2016 Albania Water Supply and Sewerage Policy and Financing Strategy Model Philip D. Giantris President Valu Add Management Services 3 November 2016 What This Presentation Will Not Do!!! It will not present

More information

Terms of Reference (ToR) for a Short-Term assignment

Terms of Reference (ToR) for a Short-Term assignment Terms of Reference (ToR) for a Short-Term assignment Technical assistance requested: One (1) Senior Non-Key Expert in the area of EU integration Project Title: Policy and Legal Advice Centre (PLAC II),

More information

RURAL MUNICIPALITY OF ROCKWOOD STONY MOUNTAIN WATER AND WASTEWATER UTILITY APPROVAL OF REVISED RATES AS FINAL 2017, 2018 & 2019 VARYING BOARD ORDER NO

RURAL MUNICIPALITY OF ROCKWOOD STONY MOUNTAIN WATER AND WASTEWATER UTILITY APPROVAL OF REVISED RATES AS FINAL 2017, 2018 & 2019 VARYING BOARD ORDER NO RURAL MUNICIPALITY OF ROCKWOOD STONY MOUNTAIN WATER AND WASTEWATER UTILITY APPROVAL OF REVISED RATES AS FINAL 2017, 2018 & 2019 VARYING BOARD ORDER NO. 99/17 DEFICIT RECOVERY FOR 2013, 2014 & 2015 ACTUAL

More information

Production, treatment and distribution of water; storm and wastewater disposal and treatment. CONTENTS Page MANAGEMENT REPORT 3

Production, treatment and distribution of water; storm and wastewater disposal and treatment. CONTENTS Page MANAGEMENT REPORT 3 AS Tallinna Vesi Results of operations for the 4 th quarter of 2009 Currency Thousand euros Start of reporting period 1 January 2009 End of reporting period 31 December 2009 Address Tallinn, Ädala 10 Chairman

More information

A. These rules and regulations are promulgated pursuant to the authority conferred by R.I. Gen. Laws

A. These rules and regulations are promulgated pursuant to the authority conferred by R.I. Gen. Laws 216-RICR-50-05-7 TITLE 216 DEPARTMENT OF HEALTH CHAPTER 50 ENVIRONMENTAL HEALTH SUBCHAPTER 05 - WATER QUALITY PART 7 Clean Water Infrastructure Plans 7.1 AUTHORITY A. These rules and regulations are promulgated

More information

COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS

COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS Black & Veatch Holding Company 2011. All rights reserved. COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS San Antonio Water System PREPARED FOR San Antonio Water System 26 MAY 2015 B&V PROJECT NO.

More information

FINANCIAL ANALYSIS. Table 1: Project Outputs Output Subcomponents Type of Analysis Enshi Wastewater Enshi Hongmiao WWTP Enshi Dashaba WWTP

FINANCIAL ANALYSIS. Table 1: Project Outputs Output Subcomponents Type of Analysis Enshi Wastewater Enshi Hongmiao WWTP Enshi Dashaba WWTP Hubei Enshi Qing River Upstream Environment Rehabilitation Project (RRP PRC 47048) FINANCIAL ANALYSIS A. Introduction 1. The financial analysis of the project was carried out in accordance with the Asian

More information

Government of Peru Peru. PROVIAS Departamental Peru

Government of Peru Peru. PROVIAS Departamental Peru Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category Safeguard Classification PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB827 Regional Transport

More information

EBRD s Experience in the Water Sector in Romania Challenges for the future period

EBRD s Experience in the Water Sector in Romania Challenges for the future period 1 EBRD s Experience in the Water Sector in Romania Challenges for the future period 2 EBRD - Three Key Principles Promotes transition to market economies, private ownership and good governance with respect

More information

CERN/2841/Corr. CERN/FC/5338/Corr. Original: English 11 June 2009

CERN/2841/Corr. CERN/FC/5338/Corr. Original: English 11 June 2009 CERN/2841/Corr. Original: English 11 June 2009 ORGANISATION EUROPÉENNE POUR LA RECHERCHE NUCLÉAIRE CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Action to be taken TAKE NOTE FINANCE COMMITTEE 325 th

More information

CITY. September 4, Financial Planning Model. model by. rate plan. in July we tested. LESLIE WARD City Auditor (404)

CITY. September 4, Financial Planning Model. model by. rate plan. in July we tested. LESLIE WARD City Auditor (404) LESLIE WARD City Auditor lward1@atlantaga.gov AMANDA NOBLE Deputy City Auditor anoble@atlantaga.gov CITY OF ATLAA NTA CITY AUDITOR S OFFICE 68 MITCHELL STREET SW, SUITE 12100 ATLANTA, GEORGIA 30303-0312

More information

Mbombela Water Indaba : April 2012

Mbombela Water Indaba : April 2012 Background South Africa is a dry country, with a low average rainfall. Our rivers are small in comparison with other countries and shared with other countries. Presented by: Willem Wegelin Many of our

More information

BAPJ E User Rate Supported Operating Budgets. The City of. Introduction

BAPJ E User Rate Supported Operating Budgets. The City of. Introduction Introduction The User-rate supported budget includes water, wastewater and parking services. For all three services, recently completed or ongoing capital works have a significant influence on each service's

More information

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants

VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN. Terms of Reference for Consultants VANUATU NATIONAL INFRASTRUCTURE MASTERPLAN Terms of Reference for Consultants 1. BACKGROUND INFORMATION Government of Vanuatu has requested TA support in the formulation and preparation of a national infrastructure

More information

Fiscal Council s Opinion on the Second Budget Revision for 2016

Fiscal Council s Opinion on the Second Budget Revision for 2016 Fiscal Council s Opinion on the Second Budget Revision for 2016 On November 16th 2016, the Fiscal Council received from the Ministry of Public Finance by letter no. 55263/14.11.2016, the draft of the second

More information

THE METHODOLOGY OF PROJECT MANAGEMENT OF SOFTWARE DEVELOPMENT AT THE NATIONAL BANK OF SERBIA

THE METHODOLOGY OF PROJECT MANAGEMENT OF SOFTWARE DEVELOPMENT AT THE NATIONAL BANK OF SERBIA Impact of Internet on Business activities in Serbia and Worldwide Uticaj Interneta na poslovanje u Srbiji i svetu doi: 10.15308/SInteZa-2014-530-536 THE METHODOLOGY OF PROJECT MANAGEMENT OF SOFTWARE DEVELOPMENT

More information

Workshops (Full day / 2 Days)

Workshops (Full day / 2 Days) Strategic planning, budgeting and forecasting are critical for effective corporate performance management (CPM). Yet, many organisations struggle to come to grips with the challenge of effectively coordinating

More information

South Australian Water Corporation Fees and Charges Schedule Rates and Sales

South Australian Water Corporation Fees and Charges Schedule Rates and Sales The following fees and charges are fixed for the period 1 July 2016 to 30 June 2017. s and Sales Annual Charge / s Charge / s Residential Tier 1 Use $2.27 first 0.3288kL Tier 2 Use $3.24 from 0.3288kL

More information

Why There is No Health Insurance in the Republic of Kosovo?

Why There is No Health Insurance in the Republic of Kosovo? Why There is No Health Insurance in the Republic of Kosovo? Mybera Shala Mustafa Tirana University, Faculty of Medicine, Albania, myberashala@yahoo.com Filloreta Demiri PhD Student Joint Regional Doctoral

More information

OPINION ON FISCAL STRATEGY DRAFT FOR 2015 WITH PROJECTIONS FOR 2016 AND Summary

OPINION ON FISCAL STRATEGY DRAFT FOR 2015 WITH PROJECTIONS FOR 2016 AND Summary Republic of Serbia FISCAL COUNCIL OPINION ON FISCAL STRATEGY DRAFT FOR 2015 WITH PROJECTIONS FOR 2016 AND 2017 Summary The programme presented in the Fiscal Strategy could bring about a recovery of public

More information

Environmental protection expenditure of public sector

Environmental protection expenditure of public sector Ref. Ares(2013)137833-04/02/2013 1(14) Environmental protection expenditure of public sector Contents ENVIRONMENTAL PROTECTION EXPENDITURE OF PUBLIC SECTOR... 1 Contents... 1 Preface... 2 Executive summary...

More information

THE ANALYSIS OF THE CONSTRUCTION COSTS OF TRANSPORT INFRASTRUCTURE PROJECTS

THE ANALYSIS OF THE CONSTRUCTION COSTS OF TRANSPORT INFRASTRUCTURE PROJECTS The 8 th International Conference RELIABILITY and STATISTICS in TRANSPORTATION and COMMUNICATION - 2008 THE ANALYSIS OF THE CONSTRUCTION COSTS OF TRANSPORT INFRASTRUCTURE PROJECTS Algirdas Griskevicius

More information

1. Risk of regularizing illegal connections

1. Risk of regularizing illegal connections 1. Risk of regularizing illegal connections Background: This is an example of a contract provision for mitigating the risk of converting illegal connections to legal connections in a 300,000 population

More information

Town of Derry, NH Water Rates and Fees

Town of Derry, NH Water Rates and Fees 1. Meter Retail Service Rates (all customer classes) These rates are for metered retail service. CONSUMPTION RATE: 2.55 per 100 Cu. Ft. (748 gals.) (Revised 2/7/17, Eff. 9/1/17) MINIMUM BASE CHARGES (Revised

More information

Toledo Area Water Authority Memorandum of Understanding

Toledo Area Water Authority Memorandum of Understanding 1 st Quarter 2018 Toledo Area Water Authority Memorandum of Understanding Table of Contents 1) Background... 4 2) Definitions... 4 3) Toledo Area Water Authority Service Area... 6 4) Necessity and Purpose...

More information

RE: Consultation Paper for Water Services Code of Conduct (Customer Service Standards) 2013

RE: Consultation Paper for Water Services Code of Conduct (Customer Service Standards) 2013 busselton's water BUSSELTON WATER po box 57 busselton wa 6280. p 089781 0500. f 0897541075. abn 79 306 761 565 admin@busseltonwater.wa.gov.au. www.busseltonwater.wa.gov.au Our ref: OL6-04 Your ref: Enquiries:

More information

Severn Trent Water Accounting Separation Methodology Statement

Severn Trent Water Accounting Separation Methodology Statement Severn Trent Water Accounting Separation Methodology Statement 1. Business structure, systems and sources of information used to populate tables 2. Population of lines within the accounting separation

More information

The York Water Company

The York Water Company The York Water Company Your Rights and Responsibilities as a Water or Sewer Consumer Table of Contents The Pennsylvania Public Utility Commission (PUC) prepared this guide to summarize the regulations

More information

FINANCING SMEs IN SERBIA * Introduction

FINANCING SMEs IN SERBIA * Introduction FINANCING SMEs IN SERBIA * Ivan Stošić 1, Đuro Đurić 2, Bojana Radovanović 3 Abstract The sector of small and medium-sized enterprises (SME) has an extremely important role for the Serbian economic development.

More information

NWG Business Limited User-friendly Terms and Conditions for Our Transferred Customers

NWG Business Limited User-friendly Terms and Conditions for Our Transferred Customers NWG Business Limited User-friendly Terms and Conditions for Our The Scheme of Terms & Conditions for explains how we will provide you with water and/or wastewater services following your transfer from

More information

Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support

Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support Cost-benefit analysis in the context of EU Cohesion funding - tools, methodology and available support Massimo Marra JASPERS Networking and Competence Centre IPA Conference Impact Assessment What can we

More information

This page intentionally left blank

This page intentionally left blank This page intentionally left blank This page intentionally left blank. Table of Contents CreditSmart Module 2: Managing Your Money Welcome to Freddie Mac s CreditSmart Initiative... 6 Program Structure...

More information

RS Official Gazette, Nos 55/2015, 82/2015, 29/2018 and 15/2019

RS Official Gazette, Nos 55/2015, 82/2015, 29/2018 and 15/2019 RS Official Gazette, Nos 55/2015, 82/2015, 29/2018 and 15/2019 Pursuant to Article 80, paragraphs 3 and 10, Article 81, paragraph 5, Article 82, paragraph 5, Article 104, paragraph 5, Article 119, paragraph

More information

Sewer Rates. General Information Sheet. July 18, 2017

Sewer Rates. General Information Sheet. July 18, 2017 Sewer Rates General Information Sheet July 18, 2017 Welcome to the City of O'Fallon's sewer rates public hearing. This meeting presents the preliminary findings to revise the sewer rates. In this public

More information

1 st call for proposals, 2 nd call for proposals, Priority 3 Better network of harbours version

1 st call for proposals, 2 nd call for proposals, Priority 3 Better network of harbours version 1 st call for proposals, 2 nd call for proposals, Priority 3 Better network of harbours version 14.09.16 Annex 2 Revenue Guidelines Table of contents Table of contents 1 1. Abbreviations and definitions

More information

Municipal Programme for Solid Waste Management in Bosnia and Herzegovina Programme Document

Municipal Programme for Solid Waste Management in Bosnia and Herzegovina Programme Document 1 of16 November 2009 Municipal Programme for Solid Waste Management in Bosnia and Herzegovina Programme Document 1. INTRODUCTION The Swedish International Development Cooperation Agency (Sida) will support

More information

Risk-based Prioritization of Transmission & Distribution Projects in Westchester County

Risk-based Prioritization of Transmission & Distribution Projects in Westchester County Risk-based Prioritization of Transmission & Distribution Projects in Westchester County NYS AWWA Water Event April 26, 2017 Alberto Quiroz, PE Outline Background Methodology Results SUEZ in North America

More information

SSC - Appendix A35. South Staffordshire Water PR19. Monte Carlo modelling of ODI RoRE. Issue 3 Final 29/08/18. South Staffordshire Water

SSC - Appendix A35. South Staffordshire Water PR19. Monte Carlo modelling of ODI RoRE. Issue 3 Final 29/08/18. South Staffordshire Water Document Ti tle SSC - Appendix A35 South Staffordshire Water PR19 Monte Carlo modelling of ODI RoRE Issue 3 Final 29/08/18 South Staffordshire Water South Staffordshire Water PR19 Project No: B2342800

More information

DG Employment, Social Affairs and Inclusion

DG Employment, Social Affairs and Inclusion DG Employment, Social Affairs and Inclusion Annual work programme for operational technical assistance to implement the activities of the support group for Cyprus at the initiative of the Commission in

More information

DATA GAPS AND NON-CONFORMITIES

DATA GAPS AND NON-CONFORMITIES 17-09-2013 - COMPLIANCE FORUM - TASK FORCE MONITORING - FINAL VERSION WORKING PAPER ON DATA GAPS AND NON-CONFORMITIES Content 1. INTRODUCTION... 3 2. REQUIREMENTS BY THE MRR... 3 3. TYPICAL SITUATIONS...

More information