MPERC TARIFF FILING FORMS UNIT -1 (TRUE UP PETITION) (For Financial Years: & )

Size: px
Start display at page:

Download "MPERC TARIFF FILING FORMS UNIT -1 (TRUE UP PETITION) (For Financial Years: & )"

Transcription

1 MPERC TARIFF FILING FORMS UNIT -1 (TRUE UP PETITION) (For Financial Years: & )

2 FORM-TPS-1 SUMMARY SHEET Place Anuppur, Madhya Pradesh S. No. Particulars Remarks (1) (2) (3) (7) (8) 1.1 Depreciation FORM-TPS Interest on Loan FORM-TPS-13A Return on Equity FORM-TPS-1(I) Interest on Working Capital FORM-TPS-13B O & M Expenses Cost of Secondary Fuel Oil Compensation Allowance (If applicable) Special allowance (If applicable) - - Total - Annual Capacity (Fixed) Charges Number of Days in Operation AFC for Number of Days in Operation Less: Other Income Net AFC (after adjusting Other Income) MP's Share of AFC 30% Landed Fuel Cost (Domestic Coal) Rs/MT 2,708 2,708 % of Fuel Quanitity % Landed Fuel Cost (Imported Coal) Rs/MT - - % of Fuel Quanitity % Secondary fuel oil cost Rs/Unit Energy Charge Rate ex-bus Rs/Unit

3 FORM 1(I) - Statement Showing Claimed Capital Cost S. No. Particulars Opening Capital Cost 4, , Add: Addition during the year/ period Less: Decapitalisation during the year/period Less: Reversal during the year/period Add: Discharges during the year/period Closing Capital Cost 4, , Average Capital Cost 4, , FORM 1(II) - Statement Showing Return on Equity S. No. Particulars Opening Equity 1, , Add: Increase due to addition during the year/period Closing equity 1, , Average equity 1, , Base rate of Return on Equity % % Tax Rate (MAT Rate) 0.000% 0.000% Rate of return on equity % % Return on equity

4 TPS FORM 2: PLANT CHARACTERISTICS MB POWER (MADHYA PRADESH) ANUPPUR THERMAL POWER PROJECT Unit(s)/ Block(s)/ Parameters Unit-I Unit-II Installed Capacity (MW) 600 MW 600 MW Schedule COD 20-May Nov-15 Actual COD/Date of Taken Over (as applicable) 20-May-15 7-Apr-16 Pit Head or Non Pit Head Name of the Boiler Manufacture Name of Turbine Generator Manufacture Main Steams Pressure at Turbine inlet (kg/cm 2 ) abs Main Steam Temperature at Turbine inlet ( C) Reheat Steam Pressure at Turbine inlet (kg/cm 2 ) Reheat Steam Temperature at Turbine inlet ( C) Main Steam flow at Turbine inlet under MCR condition (tons/hr) Main Steam flow at Turbine inlet under VWO condition (tons/hr) Unit Gross electrical output under MCR /Rated condition (MW) Unit Gross electrical output under VWO condition (MW) Guaranteed Design Gross Turbine Cycle Heat Rate (kcal/kwh) Conditions on which design turbine cycle heat rate guaranteed % MCR % Makeup Water Consumption Design Capacity of Make up Water System Design Capacity of Inlet Cooling System Design Cooling Water Temperature ( C) Back Pressure Steam flow at super heater outlet under BMCR condition (tons/ hr) Steam Pressure at super heater outlet under BMCR condition) (kg/cm2) Steam Temperature at super heater outlet under BMCR condition (oc) Steam Temperature at Reheater outlet at BMCR condition (oc) Design / Guaranteed Boiler Efficiency (%) Design Fuel with and without Blending of domestic/imported coal (Max/Min. Values) Non-Pit Head Station M/s. Harbin Boiler Company Ltd. M/s. Harbin Turbine Company Ltd % Ash (%) - 44/40, Moisture (%) - 16/12, Volatile Matter (%) - 26/20, Gross Clorific Value (Kcal/kWh) /3200 Type of Cooling Tower Type of cooling system Type of Boiler Feed Pump Fuel Details -Primary Fuel -Secondary Fuel -Alternate Fuels Special Features/Site Specific Features Special Technological Features Environmental Regulation related features Any other special features Induced Draft Closed Cycle Turbo Driven Coal LDO/ HFO

5 FORM-TPS-3 NORMATIVE PARAMETERS CONSIDERED FOR TARIFF COMPUTATION Particulars Unit (1) (2) (5) (6) Base Rate of Return on Equity % Effective Tax Rate % 0.000% 0.000%# Normative % Auxiliary Energy Consumption % Gross Station Heat Rate kcal/kwh 2, , Specific Fuel Oil Consumption ml/kwh FOR WORKING CAPITAL CORRESPONDING TO NORMATIVE ANNUAL PLANT AVAILABILITY FACTOR Cost of Coal for generation in Days Cost of coal towards Stock in Days Cost of Main Secondary Fuel Oil for WC in Months 2 2 O & M expenses in Months 1 1 Maintenance Spares for WC % of Annual O&M Expenses Receivables for WC in Months 2 2 Storage capacity of Primary Fuel in Days SBI Base Rate basis points as on % Blending ratio of domestic coal/imported coal % # Petitioner craves leave to claim tax as applicable as a part of the true-up Petition for FY

6 FORM-TPS-5 ABSTRACT OF ADMITTED CAPITAL COST Particulars Remarks Last date of order of Commission for the project 6-Sep-18 Reference of petition no. in which the above order was passed 11 of 2018 Following details (admitted/considered) as on as approved in above order by the Commission - Capital Cost 4, Amount of un-discharged liabilities included in above (& forming part of admitted capital cost) - - Amount of un-discharged liabilities corresponding to above admitted capital cost (but not forming part of admitted capital cost being allowed on cash basis) - - Gross Normative Debt 3, Cumulative Repayment Net Normative Debt 2, Normative Equity 1, Cumulative Depreciation Freehold Land 40.16

7 FORM-TPS-9A S. No. STATEMENT OF ADDITIONAL CAPITALISATION for FY Head of Work / Equipment ACE Claimed (FY ) Regulations Accrual Basis Cash Basis (3-4) under which claimed Un-discharged Liability (included in col. 3) IDC (included in col. 3) Justification Cost admitted by the Commission, if any (1) (2) (3) (4) (5) (6) (7) (8) (9) Discharges of un-discharged liabilities (138.59) Regulation 20.1 (i) of MPERC Regulations (138.59)

8 FORM-TPS-9A S. No. STATEMENT OF ADDITIONAL CAPITALISATION FOR FY Head of Work / Equipment ACE Claimed (Projected) Regulations Accrual Basis * Cash Basis (3-4) under which claimed Un-discharged Liability (included in col. 3) IDC (included in col. 3) Justification Cost admitted by the Commission, if any (1) (2) (3) (4) (5) (6) (7) (8) (9) Discharges of un-discharged liabilities (46.09) Regulation 20.1 (i) of MPERC Regulations 2015 * FY yet to be concluded - (46.09)

9 FORM-TPS-9C STATEMENT SHOWING RECONCILIATION OF ACE CLAIMED WITH THE CAPITAL ADDITIONS AS PER BOOKS S. Particulars * No. (1) (2) (5) (6) 1 Auditor Certified Cash Capital Cost - Closing 8, Less: Auditor Certified Cash Capital Cost - Opening 7, Total Additions as per books (On cash basis) Less: Additions pertaining to Unit Net Additions pertaining to Unit Less: Exclusions (items not allowable/ not claimed) 7 Net Additional Capital Expenditure Claimed * FY yet to be concluded

10 FORM-TPS-11 S. No. Name of the Assets Depreciation Rates as per MPERC's Depreciation Rate Schedule Gross Block as on Additions during FY Gross Block as on Average Gross Block for the period FY Depreciation Amount for the period FY Depreciation Amount for the period (1) (2) (3) (4) (5) (6) (7) (8) 1 Freehold Land 0% Lease Hold Land 3.34% Plant & Machinery 5.28% 6, , , Buildings (Permanent and other civil/structural works) 3.34% 1, , , Buildings (Temporary Structures and works) % Other Assets 6 Furniture & Fixtures 6.33% Office Equipments 6.33% Computer 15.00% Vehicles 6.33% Software 15.00% TOTAL Weighted Average Rate of Depreciation (%) Calculation of Weighted Average Rate of Depreciation 7, , , % 4.88% Form-11

11 FORM-TPS-12 Particulars Opening Capital Cost 4, , Closing Capital Cost 4, , Average Capital Cost 4, , Rate of depreciation 4.88% 4.88% Depreciable value 3, , Remaining depreciable value 3, , Depreciation (for the period) Depreciation (annualized) Net Cumulative depreciation at the end of the period STATEMENT OF DEPRECIATION

12 FORM-TPS-13 CALCULATION OF WEIGHTED AVERAGE RATE OF INTEREST ON ACTUAL LOANS MB POWER (MADHYA PRADESH) LIMITED ANUPPUR THERMAL POWER PROJECT (2 x 600 MW) S. Particulars (1) (2) (6) 1 Loan-1 - PTC India Financial Services Limited Net loan - Opening Add: Drawal(s) during the Year 0 Less: Repayment (s) of Loans during the year 5.96 Net loan - Closing Average Net Loan Rate of Interest on Loan on annual basis 13.88% Interest on loan Loan-2 - Power Finance Corporation Limited Net loan - Opening 1, Add: Drawal(s) during the Year Less: Repayment (s) of Loans during the year Net loan - Closing 1, Average Net Loan 1, Rate of Interest on Loan on annual basis 13.47% Interest on loan Loan-3 - Rural Electrification Corporation Limited Net loan - Opening Add: Drawal(s) during the Year Less: Repayment (s) of Loans during the year Net loan - Closing Average Net Loan Rate of Interest on Loan on annual basis 13.10% Interest on loan Loan-4- State Bank of Patiala Net loan - Opening Add: Drawal(s) during the Year Less: Repayment (s) of Loans during the year Net loan - Closing Loan Closed Average Net Loan Rate of Interest on Loan on annual basis Interest on loan 5 Loan-5 - SBBJ Net loan - Opening Add: Drawal(s) during the Year Less: Repayment (s) of Loans during the year Net loan - Closing Loan Closed Average Net Loan Rate of Interest on Loan on annual basis Interest on loan 6 Loan-6- SBI Net loan - Opening 1, Add: Drawal(s) during the Year Less: Repayment (s) of Loans during the year Net loan - Closing 1, Average Net Loan 1, Rate of Interest on Loan on annual basis 13.92% Interest on loan Loan-7 - Federal Bank Net loan - Opening Add: Drawal(s) during the Year 0.18 Less: Repayment (s) of Loans during the year 1.43 Net loan - Closing Average Net Loan Rate of Interest on Loan on annual basis 13.89% Interest on loan 6.48

13 S. Particulars (1) (2) (6) 8 Loan-8 - L&T Net loan - Opening Add: Drawal(s) during the Year 0 Less: Repayment (s) of Loans during the year Net loan - Closing Average Net Loan Rate of Interest on Loan on annual basis 13.90% Interest on loan Loan-9 - PNB Net loan - Opening Add: Drawal(s) during the Year Less: Repayment (s) of Loans during the year Net loan - Closing Average Net Loan Rate of Interest on Loan on annual basis Interest on loan 10 Loan-10 - AXIS Net loan - Opening Loan Closed Add: Drawal(s) during the Year 0 Less: Repayment (s) of Loans during the year Net loan - Closing Average Net Loan Rate of Interest on Loan on annual basis 13.95% Interest on loan Loan-11 - LIC Net loan - Opening Add: Drawal(s) during the Year 0 Less: Repayment (s) of Loans during the year Net loan - Closing Average Net Loan Rate of Interest on Loan on annual basis 14.31% Interest on loan Loan-12 - HPPPL Net loan - Opening Add: Drawal(s) during the Year Less: Repayment (s) of Loans during the year Net loan - Closing Average Net Loan Rate of Interest on Loan on annual basis Interest on loan 13 Loan-13 - IIFCL-UK Net loan - Opening Loan Closed Add: Drawal(s) during the Year Less: Repayment (s) of Loans during the year 8.65 Net loan - Closing Average Net Loan Rate of Interest on Loan on annual basis 11.42% Interest on loan Total Loan Net loan - Opening 5, Add: Drawal(s) during the Year 0.18 Less: Repayment (s) of Loans during the year Net loan - Closing 5, Average Net Loan 5, Rate of Interest on Loan on annual basis 13.34% Interest on loan

14 FORM-TPS-13A CALCULATION OF INTEREST ON NORMATIVE LOAN Particulars Gross loan - Opening 3, , Cumulative repayment of Normative Loan upto previous year Net Normative loan - Opening 2, , Add: Increase due to addition during the year/period Less: Repayment during the year/period Net Normative loan - Closing 2, , Average Normative Loan 2, , Weighted Average rate of Interest 13.34% 13.34% Interest on Loan

15 FORM-TPS-17 Party Asset/ Work Year of actual capitalisation LIABILITY FLOW STATEMENT Liability as on Liability as on Discharges Reversal Discharges Reversal Discharges Reversal GoMP Freehold Land EPC Contractor Plant & Machinery EPC/Non EPC Contractor Building & Civil Works Related IEDC Related IDC Total Liability as on Liability as on

16 Unit-1_Tariff Forms_True-up Tariff for FY _ _ECR Energy Charge Rate Particulars Capacity (MW) Target Availability (%) 85% 85% Hours in a Day Days in the Year Annual Hours of Operation (Hrs) 8,760 8,760 Energy Generated (MU) Aux. Power Consumption 5.75% 5.75% Aux. Power Consumption (MU) Energy Sent Out (MU) Gross Station Heat Rate (kcal/kwh) Specific Fuel Oil Consumption (ml/kwh) Oil Stock Weighted Avg. GCV of Oil (kcal/lit.) Heat Contribution by Oil (kcal/kwh) Annual Requirement of Oil (ltrs) Oil Stock(2 months) (KL) Weighted Avg. Price of Oil (Rs./KL) Oil Stock- 2 months- (Rs. in Crore) Coal Stock Weighted Avg. GCV of Coal (kcal/kg) Heat Contribution by Coal (kcal/kwh) Specific Coal Consumption (kg/kwh) including transit loss Annual Requirement of Coal (MT) Coal Stock (30 days) (MT) Weighted Avg. Price of Coal (Rs./MT) Coal Stock (30 days) - (Rs. in Crore) Variable Charges (Ex Bus) Coal (Rs/kwh) Oil (Rs/kwh) Rs./kwh Variable Charges per year- (Rs. in Crore) Receivables- (Rs. in Crore) Variable Charges -2 months Fixed Charges - 2 months Total Pg - 16 of 17

17 Other Income Details: S.No. Particulars Amount () 1 Interest Income Bank Deposits 6.02 Others Scrap Sales Others Gain on sale of investments 0.04 Total 8.63

MPERC TARIFF FORMS FY , FY , FY

MPERC TARIFF FORMS FY , FY , FY MPERC TARIFF FORMS FY 2016-17, FY 2017-18, FY 2018-19 FORM 1 SUMMARY SHEET Name of the Petitioner Name of the Generation Station Place (Region/District/State) MB POWER (MADHYA PRADESH) LIMITED ANUPPUR

More information

MPERC TARIFF FORMS ANNEXURE

MPERC TARIFF FORMS ANNEXURE MPERC TARIFF FORMS ANNEXURE SUMMARY SHEET Name of the Petitioner: MB Power (Madhya Pradesh) L FORM 1 Name of the Generation Station: Anuppur Thermal Power Station ( 2x 600 MW) (in Rs Crores) S.No. Particulars

More information

Summary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar

Summary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar Summary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar In terms of sections 61, 62, 64 and 86 of the Electricity Act, 2003, the tariff for the generation and sale

More information

Gujarat State Electricity Corporation Ltd. MYT Petition, True-up Petition Formats - Generation Dhuvaran CCPP 2 Sr. Title Reference No.

Gujarat State Electricity Corporation Ltd. MYT Petition, True-up Petition Formats - Generation Dhuvaran CCPP 2 Sr. Title Reference No. Title Reference 1 Aggregate Revenue Requirement - Summary Sheet Form 1 2 Summary of Tariff Proposal Form 1.1 3 Operational Parameters - Thermal Generation Form 2.1 4 Energy Charges - Thermal Generation

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on True-Up for FY 2014-15 & FY 2015-16, Business Plan, Aggregate Revenue Requirement and Tariff for Multi Year Tariff Period from FY 2016-17 to FY 2020-21 for Adhunik Power and Natural Resources

More information

Tenughat Vidyut Nigam Limited (TVNL) Annual Revenue Requirement FY

Tenughat Vidyut Nigam Limited (TVNL) Annual Revenue Requirement FY POWERING JHARKHAND Tenughat Vidyut Nigam Limited (TVNL) (A Government of Jharkhand Undertaking) Hinoo, Doranda,Ranchi-834 002 Annual Revenue Requirement FY 2007-08 Submitted to Jharkhand State Electricity

More information

Summary Sheet. From to

Summary Sheet. From to Summary Sheet FORM-TPS-1 Name of the Generating Company Jaiprakash Power Ventures Limited Name of the Power Station : Jaypee Nigrie Super Thermal Power Plant S. No. Particulars Unit From 03-09-2014 to

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.16 of 2014 PRESENT: Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta, Member

More information

REGULATORY FORMATS FOR ARR & TARIFF FILING BY GENERATION LICENSEE

REGULATORY FORMATS FOR ARR & TARIFF FILING BY GENERATION LICENSEE REGULATORY FORMATS FOR ARR & TARIFF FILING BY GENERATION LICENSEE Name of Plant/ Station INDEX OF FORMATS Formats 1 Form F1 Annual Revenue Requirement Summary 2 Form F2a Plant Charateristics-Thermal 3

More information

RInfra-G Multi Year Tariff Petition for FY to FY Executive Summary 1

RInfra-G Multi Year Tariff Petition for FY to FY Executive Summary 1 TABLE OF CONTENTS 1. BACKGROUND... 4 1.1. Introduction... 4 1.2. Objective of the present MYT Petition... 4 2. TRUING UP OF FY 2014-15... 4 2.1. Operational Performance for FY 2014-15... 5 2.2. Fuel Cost

More information

Tariff Regulation in India

Tariff Regulation in India Department of Industrial and Management Engineering Indian Institute of Technology Kanpur 4 th Capacity Building Programme for Officers of Electricity Regulatory Commissions 18 23 July, 2011 Forum of Regulators

More information

Petition No 1234 of 2017

Petition No 1234 of 2017 No 1234 of 2017 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PRESENT: Hon ble Sri. S. K. Agarwal, Chairman Hon ble Sri. K. K. Sharma, Member IN THE MATTER OF: AND IN THE MATTER OF:

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.28 of 2012 PRESENT: Rakesh Sahni, Chairman IN THE MATTER OF: C.S. Sharma, Member

More information

I N V O I C E S U M M A R Y

I N V O I C E S U M M A R Y I N V O I C E S U M M A R Y Send To: SE(RDPPC) Copy To: 220 KV substation Heerapura Ajmer Road Jaipur 302005 (On behalf of Aravali Power Company Pvt. Ltd.) Beneficiary: Bill Date 9-Mar-2017 Sl. No. Bill

More information

I N V O I C E S U M M A R Y

I N V O I C E S U M M A R Y I N V O I C E S U M M A R Y Send To: SE(RDPPC) Copy To: 220 KV substation Heerapura Ajmer Road Jaipur 302005 (On behalf of Aravali Power Company Pvt. Ltd.) Beneficiary: Bill Date 9-Mar-2017 Sl. No. Bill

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No. 1, 13th floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/ 65/ 69; Fax 022 22163976 E-mail: mercindia@merc.gov.in

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on approval of Business plan and determination of ARR for the control period to (including True up for 2015-16 ) for Tata Power Company Limited (TPCL) Ranchi 19 February 2018 to (including True up

More information

MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED (MSPGCL/MAHAGENCO)

MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED (MSPGCL/MAHAGENCO) MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED (MSPGCL/MAHAGENCO) PETITION FOR CAPITAL COST AND TARIFF DETERMINATION FOR FY 2012-13 TO FY 2015-16 INCLUDING TRUE UP FOR FY 2012-13 &FY 2013-14 OF BHUSAWAL

More information

COMPONENTS OF REVENUE REQUIREMENT

COMPONENTS OF REVENUE REQUIREMENT COMPONENTS OF REVENUE REQUIREMENT A typical Tariff Application of Discom has to include Demand Forecast Annual Revenue Requireme nt to meet the Cost of Supply to cater to the demand Power Procurement (Self+Purchase)

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No. 70 of 2015 PRESENT: Dr. Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta, Member

More information

The Bihar Gazette E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY BIHAR ELECTRICITY REGULATORY COMMISSION, PATNA

The Bihar Gazette E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY BIHAR ELECTRICITY REGULATORY COMMISSION, PATNA REGISTERED NO. PT-40 The Bihar Gazette E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY 7 VAISHAKHA 1929 (S) (NO. PATNA 426) PATNA, FRIDAY 27TH APRIL 2007 BIHAR ELECTRICITY REGULATORY COMMISSION, PATNA

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI No. Dated 6 th December, 2013 DRAFT NOTIFICATION In exercise of powers conferred under section 178 of the Electricity Act, 2003 (36 of 2003) read with

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No. 11 of 2017 PRESENT: Dr. Dev Raj Birdi, Chairman A. B. Bajpai, Member Alok Gupta,

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal (M.P.) - 462 016 Petition No. 62 of 2016 PRESENT: Dr. Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok

More information

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED MYT Petition, True-up Petition Formats - Transmission

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED MYT Petition, True-up Petition Formats - Transmission Title Reference 1 Aggregate Revenue Requirement - Summary Sheet Form 1 2 Normative Operation and Maintenance Expenses Form 2 3 Operations and Maintenance Expenses Form 2.1 4 Transmission Network Details

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION Urja Bhawan, Shivaji Nagar, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION Urja Bhawan, Shivaji Nagar, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION Urja Bhawan, Shivaji Nagar, Bhopal-462 016 (Email: secmperc@sancharnet.in) (Website : www.mperc.org) ORDER Dated : 29 th November 2002 Petition No. 99/2002

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.55 of 2012 PRESENT: Rakesh Sahni, Chairman IN THE MATTER OF: C.S. Sharma, Member

More information

By order of the Commission Sd/- (G. K. Dhall) Secretary

By order of the Commission Sd/- (G. K. Dhall) Secretary ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN UNIT-VIII, BHUBANESWAR 751 012 Tel. No.[0674] 2396117/2393097 Fax: 2395781/2393306, E-mail: orierc@rediffmail.com, Website: www.orierc.org

More information

Tariff Determination : Generation and Transmission (Case Study)

Tariff Determination : Generation and Transmission (Case Study) Department of Industrial and Management Engineering Indian Institute of Technology Kanpur 3 rd Capacity Building Programme for Officers of Electricity Regulatory Commissions 23 28 August, 2010 Tariff Determination

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL under Coal Mines (Special Provisions) Second Ordinance, 2014 and Rules framed SMP No. 50 of 2015 DAILY ORDER (Date of Hearing: 24 th November, 2015)

More information

Petition No. 05 of 2016

Petition No. 05 of 2016 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No. 05 of 2016 PRESENT: Dr. Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta, Member

More information

Executive Summary of Tata Power Generation True up Petition for FY as well as MYT Petition for FY to FY

Executive Summary of Tata Power Generation True up Petition for FY as well as MYT Petition for FY to FY Executive Summary of Tata Power Generation True up Petition for FY 2011-12 as well as MYT Petition for FY 2012-13 to FY 2015-16 Tata Power G Page 1 TABLE OF CONTENTS TABLE OF CONTENTS... 2 LIST OF TABLES...

More information

Tariff Filing. Sri Damodaram Sanjeevaiah Thermal Power Station (2 x 800 MW)

Tariff Filing. Sri Damodaram Sanjeevaiah Thermal Power Station (2 x 800 MW) Tariff Filing Sri Damodaram Sanjeevaiah Thermal Power Station (2 x 800 MW) For the control period 2014-2019 INDEX Annex Description Page Application with supporting affidavit 1-16 A-1 Capital Cost 17-19

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.40 of 2012 PRESENT: Rakesh Sahni, Chairman IN THE MATTER OF: In the matter of determination

More information

Order on. Petition No. 21/2014

Order on. Petition No. 21/2014 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 4 th and 5 th Floor, Metro Plaza, Bittan Market, Bhopal - 462 016 Order on ARR & Retail Power Supply Tariff for Electricity Distribution Business of Special

More information

ODISHA ELECTRICITY REGULATORY COMMISSION UNIT VIII, BHUBANESWAR

ODISHA ELECTRICITY REGULATORY COMMISSION UNIT VIII, BHUBANESWAR ODISHA ELECTRICITY REGULATORY COMMISSION UNIT VIII, BHUBANESWAR 751012 NOTIFICATION The 8 th September, 2014 No. OERC/RA/AMEND. REGU. 8/2013 (Vol-I)/1251 - In exercise of powers conferred by Section 61

More information

Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail: mercindia@mercindia.org.in

More information

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED MYT Petition, True-up Petition Formats - Transmission

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED MYT Petition, True-up Petition Formats - Transmission Title Reference 1 Aggregate Revenue Requirement - Summary Sheet Form 1 2 Normative Operation and Maintenance Expenses Form 2 3 Operations and Maintenance Expenses Form 2.1 4 Transmission Network Details

More information

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA BIHAR ELECTRICITY REGULATORY COMMISSION PATNA NOTIFICATION 2 nd August, 2010 No. BERC-Regl/Solar-2/2010-03 In exercise of powers conferred under Section 61 read with Section 181(2)(zd) of the Electricity

More information

Uttar Pradesh Electricity Regulatory Commission

Uttar Pradesh Electricity Regulatory Commission Uttar Pradesh Electricity Regulatory Commission Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696 Dated: 22.3.2010 In exercise of powers conferred under section 181 read with section 9, 61, 86

More information

MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED Plot No. G-9, Prakashgad, Bandra (E), Mumbai Website:

MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED Plot No. G-9, Prakashgad, Bandra (E), Mumbai Website: MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED Plot G-9, Prakashgad, Bandra (E), Mumbai 400051 Website: www.mahagenco.in PUBLIC NOTICE Inviting Suggestions/Objections on Maharashtra State Power Generation

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, E-5, Arera Colony, Bittan Market, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal - 462016 Petition No.02/2013 PRESENT: Rakesh Sahni, Chairman A. B. Bajpai, Member Alok

More information

By S K Agrawal ED (Commercial) NHPC Ltd.1

By S K Agrawal ED (Commercial) NHPC Ltd.1 By S K Agrawal ED (Commercial) NHPC Ltd.1 Need for Renovation & Modernisation of HEPs Advantages of R&M of old Power Stations Govt. policies on R&M Regulatory Provisions & Commercial aspects Overview of

More information

M/s Jaiprakash Power Ventures Ltd 113 Rajpur Road, Dehradun

M/s Jaiprakash Power Ventures Ltd 113 Rajpur Road, Dehradun BEFORE IN THE MATTER OF: AND IN THE MATTER OF: THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Petition No.443/2007 Approval of tariff for supply of electricity from 400 MW Vishnu Prayag Hydroelectric

More information

C O N T E N T S. Chapter Title Page No. 1. Introduction True-up for FY Review for FY

C O N T E N T S. Chapter Title Page No. 1. Introduction True-up for FY Review for FY C O N T E N T S Chapter Title Page No. 1. Introduction 1-6 2. True-up for FY 2009-10 7-44 3. Review for FY 2010-11 45-81 4. Annual Revenue Requirement for FY 2011-12 83 125 5. Tariff Related Issues 127-130

More information

Before the Karnataka Electricity Regulatory Commission, Bangalore. In the matter of Determination of Tariff in respect of Renewable Sources of Energy

Before the Karnataka Electricity Regulatory Commission, Bangalore. In the matter of Determination of Tariff in respect of Renewable Sources of Energy Before the Karnataka Electricity Regulatory Commission, Bangalore Dated 18 th January 2005 Present: 1. K.P. Pandey, Chairman 2. Sri H.S.Subramanya, Member 3. Sri S.D.Ukkali, Member In the matter of Determination

More information

ASSAM ELECTRICITY REGULATORY COMMISSION

ASSAM ELECTRICITY REGULATORY COMMISSION ASSAM ELECTRICITY REGULATORY COMMISSION NOTIFICATION The 28th December, 2010 No. AERC.23/2010: In exercise of the powers conferred under Section 61(d), 62(4), 86(1)(b) sub-section (1) of section 181 and

More information

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. (Date of Order: )

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. (Date of Order: ) HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA IN THE MATTER OF:- (Date of Order: 25.07.2018) Petition No.: 26/2018(Suo-Moto) CORAM Sh. S.K.B.S. Negi Chairman Sh. Bhanu Pratap Singh Member

More information

Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009

Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009 Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009 No. 2734/MPERC/2009. In exercise of powers conferred under Section 181(2) (zd) read with Section 45 and 61 of the Electricity Act, 2003

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, "Metro Plaza", Bittan Market, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, Metro Plaza, Bittan Market, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No. 02 of 2018 PRESENT: Dr. Dev Raj Birdi, Chairman Mukul Dhariwal, Member Anil Kumar

More information

Regulatory formats for Multi Year Annual Revenue Requirement for the Control Period from FY to FY and determination of retail tariff

Regulatory formats for Multi Year Annual Revenue Requirement for the Control Period from FY to FY and determination of retail tariff Regulatory formats for Multi Year Annual Revenue Requirement for the Control Period from FY 2016-17 to FY 2020-21 and determination of retail tariff for FY 2018-19 along with trueup of the FY 2012-13,

More information

CASE NO. 196 OF In the matter of

CASE NO. 196 OF In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No. 1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022-22163964/65/69 Fax No. 022-22163976 Email: mercindia@merc.gov.in

More information

Petition No. 975 of 2014 and 1017 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Date of Order:

Petition No. 975 of 2014 and 1017 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Date of Order: Petition No. 975 of 2014 and 1017 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order: 27.11.2015 IN THE MATTER OF: AND IN THE MATTER OF M/s Lalitpur Power Generation

More information

EXTRA ORDINARY 13 SHRAVANA (S) BIHAR ELECTRICITY REGULATORY COMMISSION

EXTRA ORDINARY 13 SHRAVANA (S) BIHAR ELECTRICITY REGULATORY COMMISSION REGISTERED NO. PT.-40 The B Bihar Gazett te EXTRA ORDINARY PUBLISHED BY AUTHORITY 13 SHRAVANA (S) (NO.PATNA 541) PATNA, WEDNESDAY, 4TH AUGUST 2010 BIHAR ELECTRICITY REGULATORY COMMISSION NOTIFICATION The

More information

BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL

BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL IN THE MATTER OF Provisional approval of Generation tariff of M.P. s 57% share of power in Sardar Sarovar Project (6x200+5x50

More information

AGGREGATE REVENUE REQUIREMENT AND TARIFF PETITION FOR FY *********

AGGREGATE REVENUE REQUIREMENT AND TARIFF PETITION FOR FY ********* AGGREGATE REVENUE REQUIREMENT AND TARIFF PETITION FOR FY 2016-17 ********* Submitted by: - Madhya Pradesh Power Management Company Limited, Shakti Bhawan, Vidyut Nagar, JABALPUR Madhya Pradesh Poorva Kshetra

More information

(On behalf of Aravali Power Company Pvt. Ltd.)

(On behalf of Aravali Power Company Pvt. Ltd.) (On behalf of Aravali Power Company Pvt. Ltd.) I N V O I C E S U M M A R Y Send To: Superintending Engineer(Billing) Copy To: Rajasthan Urja Vikas Nigam Limited 132 KV GSS Sub Station Building, Calgiri

More information

Concept Paper on Multi Year Tariff Process for MSPGCL (Maha GENCO) & MSEDCL (Maha DISCOM)

Concept Paper on Multi Year Tariff Process for MSPGCL (Maha GENCO) & MSEDCL (Maha DISCOM) Concept Paper on Multi Year Tariff Process for MSPGCL (Maha GENCO) & MSEDCL (Maha DISCOM) Submitted to MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Prepared by: ABPS Infrastructure Advisory Private Limited

More information

BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL)

BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL) BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL) REVISED PETITION FOR APPROVAL OF TRUE UP OF FY 2015-16 & FY 2016 17 AND PROVISIONAL TRUE UP of FY 2017-18

More information

COMPREHENSIVE PERFORMANCE AWARD SCHEME FOR THERMAL POWER STATIONS

COMPREHENSIVE PERFORMANCE AWARD SCHEME FOR THERMAL POWER STATIONS Revision-3/August 2012 COMPREHENSIVE PERFORMANCE AWARD SCHEME FOR THERMAL POWER STATIONS YEAR 2016-17 - 1 - THERMAL POWER STATIONS PERFORMANCE AWARD SCHEME 1.0 PREAMBLE The incentive award scheme in force

More information

Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited Block No. 7, Shakti Bhawan, Vidyut Nagar, Jabalpur

Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited Block No. 7, Shakti Bhawan, Vidyut Nagar, Jabalpur ANNUAL REVENUE REQUIREMENT AND TARIFF PROPOSAL PETITION FOR FY 2015-16 Submitted By: Madhya Pradesh Power Management Company Limited Shakti Bhawan, Vidyut Nagar, Jabalpur Madhya Pradesh Poorv Kshetra Vidyut

More information

No. F.25/TERC/09/204 Dated, 11 th August 2011 TRIPURA ELECTRICITY REGULATORY COMMISSION NOTIFICATION

No. F.25/TERC/09/204 Dated, 11 th August 2011 TRIPURA ELECTRICITY REGULATORY COMMISSION NOTIFICATION No. F.25/TERC/09/204 Dated, 11 th August 2011 TRIPURA ELECTRICITY REGULATORY COMMISSION NOTIFICATION In exercise of the powers conferred under Section 61(d),62(4), 86(1)(b) sub-section (1) of section 181

More information

Draft JSERC (Determination of Tariff for procurement of power from Small Hydro Power Projects) Regulations, 2016

Draft JSERC (Determination of Tariff for procurement of power from Small Hydro Power Projects) Regulations, 2016 Draft JSERC (Determination of Tariff for procurement of power from Small Hydro Power Projects) Regulations, 2016 JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION In exercise of the powers conferred by

More information

Madhya Pradesh Poorv Ksthera Vidyut Vitaran Company Limited

Madhya Pradesh Poorv Ksthera Vidyut Vitaran Company Limited MYT ARR Filing for 10-11 to 12-13 AGGREGATE REVENUE REQUIREMENT AND TARIFF PROPOSAL PETITION FOR FY 2010-11 Madhya Pradesh Poorv Ksthera Vidyut Vitaran Company Limited Block No. 7, Shakti Bhawan, Vidyut

More information

41 st Annual Report MANAGEMENT DISCUSSION AND ANALYSIS. Management Discussion and Analysis Annexure - I to Directors Report

41 st Annual Report MANAGEMENT DISCUSSION AND ANALYSIS. Management Discussion and Analysis Annexure - I to Directors Report ECONOMIC AND SECTOR OUTLOOK MANAGEMENT DISCUSSION AND ANALYSIS A Maharatna Company Annexure-I to Directors Report Existing Installed Capacity Total Capacity (MW) % share 32 24 44 Total* 326848.54 100 INDUSTRY

More information

Fuel and Power Purchase Price Adjust Formula Regulations DRAFT

Fuel and Power Purchase Price Adjust Formula Regulations DRAFT Fuel and Power Purchase Price Adjust Formula Regulations DRAFT 2011 No. F.25/TERC/09/ Dated, 30 th March 2011 TRIPURA ELECTRICITY REGULATORY COMMISSION NOTIFICATION In exercise of the powers conferred

More information

(INTERNATIONAL COMPETITIVE BIDDING)

(INTERNATIONAL COMPETITIVE BIDDING) D B POWER (MADHYA PRADESH) LIMITED (DBP(MP)L) INVITAION FOR BIDS FOR COAL BASED 2 X 660 MW SUPER CRITICAL BOILER, TURBINE & GENERATOR PACKAGE WITH ASSOCIATED AUXILIAIRES (BTG) ALONGWITH SUPPLY OF MANDATORY

More information

CHAPTER X ESTIMATED POWER TARIFF MODEL

CHAPTER X ESTIMATED POWER TARIFF MODEL CHAPTER X ESTIMATED POWER TARIFF MODEL 10.0 INTRODUCTION It has been observed from the previous chapters that the SEBs are cash strapped. While the cost of supply of electricity has shown an increasing

More information

UTTAR GUJARAT VIJ COMPANY LIMITED MEHSANA MYT Petition, True-up Petition Formats - Distribution & Retail Supply

UTTAR GUJARAT VIJ COMPANY LIMITED MEHSANA MYT Petition, True-up Petition Formats - Distribution & Retail Supply Title Reference 1 Aggregate Revenue Requirement - Summary Sheet ARR-Summary 2 Customer Sales Forecast Form 1 3 Power Purchase Expenses Form 2 4 Summary of Operations and Maintenance Expenses Form 3 5 Normative

More information

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY Petition Nos.

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY Petition Nos. MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 TH Floor Metro Plaza, Bittan Market", Bhopal - 462 016 AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY 2012-13 Petition Nos. 72/2011

More information

Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited Block No. 7, Shakti Bhawan, Vidyut Nagar, Jabalpur

Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited Block No. 7, Shakti Bhawan, Vidyut Nagar, Jabalpur AGGREGATE REVENUE REQUIREMENT FOR MYT FY 2017 TO FY 2019 AND TARIFF PROPOSAL PETITION FOR FY 2017-18 Submitted By: Madhya Pradesh Power Management Company Limited Shakti Bhawan, Vidyut Nagar, Jabalpur

More information

International Journal of Scientific & Engineering Research, Volume 5, Issue 7, July ISSN

International Journal of Scientific & Engineering Research, Volume 5, Issue 7, July ISSN International Journal of Scientific & Engineering Research, Volume 5, Issue 7, July-2014 960 Review of Multi Year Generation Tariff structure in India Ashok Upadhayay Research Scholar, MANIT, Bhopal (M.P.)

More information

Case No.39 of 2012 IN THE MATTER OF. Shri V. P. Raja, Chairman Shri Vijay L. Sonavane, Member ORDER

Case No.39 of 2012 IN THE MATTER OF. Shri V. P. Raja, Chairman Shri Vijay L. Sonavane, Member ORDER Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail: mercindia@mercindia.org.in

More information

Maharashtra State Power Generation Company Limited

Maharashtra State Power Generation Company Limited MSPGCL s Petition for True up of FY 2014-15, Provisional True up for FY 2015-16 and MYT Tariff Petition for the Period from FY 2016-17 to 2019-20 Maharashtra State Power Generation Company Limited Executive

More information

ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE YEAR CASE NO: TP 59 / 13 14

ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE YEAR CASE NO: TP 59 / 13 14 ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE YEAR 2015 2016 IN CASE NO: TP 59 / 13 14 IN RE THE TARIFF APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR THE

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal - 462016 Petition No75/2012 PRESENT: Rakesh Sahni, Chairman A. B. Bajpai, Member Alok

More information

Compensatory Tariff Orders...A Fine Balancing Act by CERC

Compensatory Tariff Orders...A Fine Balancing Act by CERC Impact Analysis: Compensatory Tariff Orders...A Fine Balancing Act by CERC March 11, 2014 CERC has finally notified the long awaited Compensatory Tariff orders on imported coal based Tata and Adani Mundra

More information

TABLE OF CONTENTS. S. No. PARTICULARS Page No. I TRUE UP TARIFF PETITION FOR FY II PRAYER 09 III AFFIDAVIT IV AUTHORIZATION 12

TABLE OF CONTENTS. S. No. PARTICULARS Page No. I TRUE UP TARIFF PETITION FOR FY II PRAYER 09 III AFFIDAVIT IV AUTHORIZATION 12 TABLE OF CONTENTS S. No. PARTICULARS Page No. I TRUE UP TARIFF PETITION FOR FY 2013-14 3-8 II PRAYER 09 III AFFIDAVIT 10-11 IV AUTHORIZATION 12 V SUB INDEX OF TRUE UP TARIFF PROPOSAL 1 CAPACITY 13-16 2

More information

BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AHMEDABAD. Petition No.1210/2012

BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AHMEDABAD. Petition No.1210/2012 BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AHMEDABAD In the Matter of: Petition No.1210/2012 Application under Article 13 (Change in Law) of the Power Purchase Agreement dated 02.02.2007 entered

More information

Summary Sheet. 3 Variable Charges recoverable ECR Calculation

Summary Sheet. 3 Variable Charges recoverable ECR Calculation Summary Sheet FORM-TPS-1 Name of the Generatg Company Name of the Power Station : Jaiprakash Power Ventures Limited Jaypee Ba Thermal Power Plant (Rs. Crs) S. No. Particulars Ref. Form 2017-18 1 2 3 4

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM RP 6/2017 In the matter of : Review petition filed by M/s Kanan Devan Hill Plantations Company Private Limited (KDHPCL) seeking review

More information

Power Procurement Strategy

Power Procurement Strategy Power Procurement Strategy 01.03.16 IIT-Kanpur For Public Use POWER SECTOR OVERVIEW Source: Executive Summary of October 2015, CEA *including renewable generation Installed Capacity (All) Category Installed

More information

Madhya Gujarat Vij Company Ltd.

Madhya Gujarat Vij Company Ltd. BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR Summary of Case No. 1761 /2018 In respect of Petition for True up of & Mid-Term Review of ARR for to & Tariff determination for Filed by:-

More information

Approval of Final Capital Cost, True up FY and Multi Year Tariff of BEPL for FY 15-19

Approval of Final Capital Cost, True up FY and Multi Year Tariff of BEPL for FY 15-19 THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Petition Nos. 973 of 2014, 1036,1037,1038,1039 &1040 of 2015 1079, 1080, 1081, 1082 &1083 of 2016 FILED BY Bajaj Energy Private Ltd (BEPL) IN

More information

Draft MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

Draft MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION Draft MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION No. / /2017/MPERC.- In exercise of the powers conferred under Section 181of the Electricity Act, 2003 (36 of 2003), and all other powers enabling

More information

OBRA B TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY TO

OBRA B TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY TO 2009 OBRA B TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009 10 TO 2013 14 UP RAJYA VIDYUT UTPADAN NIGAM LTD OBRA B _MYT Petition for Determination of Tariff FORM 1 (See Regulation 30) BEFORE THE

More information

Fiscal Year 2017 Columbia Generating Station Annual Operating Budget

Fiscal Year 2017 Columbia Generating Station Annual Operating Budget Fiscal Year 2017 Columbia Generating Station Annual Operating Budget Table of Contents Table Page Summary 3 Key Assumptions/Qualifications 4 Memorandum of Agreement (MOA) Table 1 5 Columbia Station Costs

More information

Investor s Meet August 17

Investor s Meet August 17 Investor s Meet August 17 GROWTH CHART CAPACITY & PRODUCTION JKLC Mn. MT. As on 31 st March 2011 2012 2013 2014 2015 2016 2017 Sep 18(E) Clinker Capacity * 3.96 4.13 4.29 4.62 6.27 6.27 6.60 6.77 Cement

More information

TARIFF ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION CASE NO: TP 31 / IN RE THE TARIFF PETITION OF THE WEST BENGAL

TARIFF ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION CASE NO: TP 31 / IN RE THE TARIFF PETITION OF THE WEST BENGAL TARIFF ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION IN CASE NO: TP 31 / 07 08 IN RE THE TARIFF PETITION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR THE YEAR 2007 2008 UNDER

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal - 462016 Petition 24/2014 PRESENT: IN THE MATTER OF: Dr. Dev Raj Birdi, Chairman A.

More information

Case No. 27 of In the matter of

Case No. 27 of In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Section 2. ARR and Tariff proposal submitted by the JSEB

Section 2. ARR and Tariff proposal submitted by the JSEB Page 1 of 10 Section 2 ARR and Tariff proposal submitted by the JSEB The petition filed by the Board for approval of its Annual Revenue Requirement (ARR) and tariff for FY 2003-04 has been summarized in

More information

ACCELERATED PROGRESS ON MULTIPLE PROJECTS UNDER CONSTRUCTION. NET PROFIT OF Rs 61 CRORE (US$ 14.2 MILLION) FOR THE QUARTER

ACCELERATED PROGRESS ON MULTIPLE PROJECTS UNDER CONSTRUCTION. NET PROFIT OF Rs 61 CRORE (US$ 14.2 MILLION) FOR THE QUARTER Reliance Power Limited H Block, 1st floor, Dhirubhai Ambani Knowledge City Navi Mumbai 400 710, India Tel : +91 22 3038 6010 Fax : +91 22 30376633 www.reliancepower.co.in MEDIA RELEASE ACCELERATED PROGRESS

More information

Appellate Tribunal for Electricity (Appellate Jurisdiction) Appeal No. 147 of 2012

Appellate Tribunal for Electricity (Appellate Jurisdiction) Appeal No. 147 of 2012 Appellate Tribunal for Electricity (Appellate Jurisdiction) Dated: 14 th November, 2013 Present: MR. JUSTICE KARPAGA VINAYAGAM, CHAIRPERSON MR. V J TALWAR, TECHNICAL MEMBER, IN THE MATTER OF: Appeal No.

More information

OF ARR & TARIFF FILING FORMATS FOR DISTRIBUTION AND RETAIL SUPPLY LICENSEES

OF ARR & TARIFF FILING FORMATS FOR DISTRIBUTION AND RETAIL SUPPLY LICENSEES ANNEXURE - I Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited, Indore INDEX OF ARR & TARIFF FILING FORMATS FOR DISTRIBUTION AND RETAIL SUPPLY LICENSEES Financial Formats 1 Sheet S1 Profit

More information

BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI 1 BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI PETITION NO:.OF 2014 Petition under section 62 and 79(1) (a) of the Electricity Act, 2003, read with Chapter V of the Central Electricity

More information

For approval of R&M scheme of BTG of Parichha Unit-1.

For approval of R&M scheme of BTG of Parichha Unit-1. PRESENT: Petition No. 1153 of 2016 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order: 16.08.2017 1. Hon ble Sri Desh Deepak Verma, Chairman 2. Hon ble Sri S.K. Agarwal, Member

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal - 462016 Petition 06/2013 PRESENT: Rakesh Sahni, Chairman A. B. Bajpai, Member Alok

More information

3.1 In FY , the transmission loss is 4.08% as compared to last year loss

3.1 In FY , the transmission loss is 4.08% as compared to last year loss ASSAM ELECTRICITY GRID CORPORATION LIMITED Truing Up for FY 2013-14, Annual Performance Review for FY 2014-15 & Revised ARR for FY 2015-16 and Transmission Tariff for FY 2015-16 1 Truing up for FY 2013-14

More information

Madhya Gujarat Vij Company Ltd.

Madhya Gujarat Vij Company Ltd. BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR Summary of Case 1624 /2016 In respect of Petition for True up of & Determination of Multi-Year ARR for to & Determination of final ARR for

More information