1 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, "Metro Plaza", Bittan Market, Bhopal Petition No. 05 of 2016 PRESENT: Dr. Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta, Member IN THE MATTER OF: Determination of generation tariff for 2x250MW (Phase-I) coal based power project at Bina, District Sagar (M.P.) for the control period of FY to FY based on the tariff petition filed by Jaiprakash Power Ventures Limited under Section 62 and 86(1) (a) of the Electricity Act, M/s Jaiprakash Power Ventures Ltd., Uttar Pradesh: PETITIONER 1. M.P. Power Management Company Ltd., Jabalpur 2. M. P. Poorv Kshetra Vidyut Vitaran Co. Ltd., Jabalpur 3. M. P. Madhya Kshetra Vidyut Vitaran Co. Ltd., Bhopal RESPONDENTS 4. M. P. Paschim Kshetra Vidyut Vitaran Co. Ltd., Indore M.P. Electricity Regulatory Commission Page 1

2 ORDER (Passed on this day of 08 th August 2016) 1. Madhya Pradesh Electricity Regulatory Commission (hereinafter referred to as the Commission or MPERC ) issued MPERC (Terms and Conditions for determination of Generation Tariff) Regulations, 2015 {RG-26(III) of 2015} (hereinafter referred to as the Regulations 2015) for the new control period i.e. FY to FY These were notified in the official gazette on 1 st January M/s Jaiprakash Power Ventures Ltd. (hereinafter referred to as the petitioner or JPVL ) filed the subject petition on 24 th February 2016 for determination of generation tariff of its 2X250 MW (Phase-1) coal based Thermal Power Plant at Bina, District Sagar (M.P) for the next Control Period of FY to FY The subject petition is filed under section 62 and 86 (1) (a) of the Electricity Act, 2003 and in terms of MPERC (Terms & Conditions for Determination of Generation Tariff) Regulations, The Commission has scrutinized the subject petition in accordance with the principles, methodology and the norms specified in the above mentioned MPERC (Terms & Conditions for determination of Generation Tariff) Regulations, The Bina Thermal Power Plant (Phase I) comprises of two generating units of 250 MW each. Date of Commercial Operation (CoD) of both units of the petitioner s power plant under Phase 1 are as given below: Table 1: Capacity and COD of Generating Units under Phase-1 Date of Commercial S. No Units Installed Capacity (in MW) Operation 1 Unit-I 250 MW 31 st August' Unit-II 250 MW 07 th April' Earlier, vide tariff order dated 26 th November 2014 (in petition no. 40 of 2012), the Commission determined the final generation tariff for 2X250 MW of Bina Thermal Power Project under Section 62 of the Electricity Act 2003 for FY and FY , based on the Annual Audited Accounts. In the aforesaid tariff order, the generation tariff for FY and FY was determined on provisional basis subject to true up on the basis of Audited Accounts for the respective year. 6. On 23 rd January 2015, the petitioner filed a review Petition No. 05 of 2015 M.P. Electricity Regulatory Commission Page 2

3 seeking review of the aforesaid Commission s order dated 26th November 2014 on some issues. 7. Vide order dated 8 th May 2015 in the aforesaid review petition, the Commission revised the Annual Capacity (fixed) charges on the basis of revision in only one issue i.e. interest and finance charges on loan. Regarding other issues, the petitioner has filed an appeal with the Hon ble Appellate Tribunal for Electricity, New Delhi. The issues in the aforesaid Appeal are sub judice before the Hon ble Tribunal for Electricity. 8. Further, vide order dated 3 rd June 2016, the Commission determined the true-up of generation tariff for FY based on Annual Audited Accounts for FY True-up petition for FY is to be filed by the petitioner after finalization of its Annual Audited Accounts for FY The element- wise Annual Capacity (fixed) charges claimed by the petitioner in the subject petition for next control period of FY to FY are as given below: Table 2: Element-Wise Annual Capacity (fixed) Charges filed: (` in Crores) Particular FY FY FY Return on Equity Interest on Term Loan Depreciation O&M Expenses O&M Expenses (Transmission Lines & Bay) Interest on Working Capital Lease Charges Total % of Capacity Charges The petitioner filed the following Energy (variable) charges for the control period of FY to FY :- Table 3: Energy Charges Filed in the Petition (`/Unit) Financial Years Energy Charges FY FY FY M.P. Electricity Regulatory Commission Page 3

4 11. The petitioner broadly prayed the following in its petition: a. Determine the Generation Tariff of the 2x250 MW (Coal Based Power Project at Bina, Dist. Sagar, Madhya Pradesh, for the period commencing from 1 st April, 2016 upto as required under the PPA dated ; b. The Petitioner may be allowed to raise bills from April, 2016 onwards as per tariff already determined for the year , pending the determination of MYT tariff for FY , FY and FY ; c. Allow the recovery of the filing fees as and when paid to the Commission and also the publication expenses from the beneficiaries; d. Petitioner respectfully seeks an opportunity to present their case prior to the finalization of the Tariff Order. The Petitioner believes that such an approach would provide a fair treatment to all the stakeholders and may eliminate the need of a review or clarification 12. While scrutinizing the subject petition, the Commission has considered the opening figures of capital cost and funding of the project as admitted by the Commission in its true-up order for FY issued on 3 rd June The Commission has also examined the subject petition in light of the comments/ suggestions offered by the Respondent No. 1 (MPPGCL) / other stakeholders and considering the response of petitioner on the same. Procedural History 14. Motion hearing in the subject matter was held on 26 th April 2016, when the petition was admitted and the petitioner was directed to serve copies of petition on all Respondents in the matter. The respondents were also asked to file their comments/ response on the petition if any, by 26 th May By affidavit dated 26 th May 2016, Respondent No. 1, M.P. Power Management Company Ltd. filed its comments on the petition. 16. Vide Commission s letter dated 31 st May 2016, the information gaps in the subject petition were communicated to the petitioner and it was asked to file a comprehensive reply along with relevant supporting documents by 20 th June Vide letter dated 20 th June 2016, the petitioner sought time extension of 30 days M.P. Electricity Regulatory Commission Page 4

5 for filing its response. Vide Commission s letter dated 29 th June 2016, the petitioner was allowed to file its response at the earliest but not later than 20 th July By affidavit dated 19 th July 2016, the petitioner filed its response on the issues raised by the Commission. The details of the issues raised in Commission s letter dated 31 st May 2016 along with the response filed by the petitioner by affidavit dated 19 th July 2016 are mentioned in Annexure-I enclosed with this order. 19. The public notice inviting comments/suggestions from all stakeholders was published on 2 nd July 2016 in the following news papers: a) Raj Express, Bhopal (Hindi) b) Raj Express, Gwalior (Hindi) c) Raj Express, Indore(Hindi) d) Raj Express, Jabalpur (Hindi) e) Times of India, Bhopal (English) 20. By affidavit dated 20 th July 2016, JPVL filed its reply on comments offered by (M.P. Power Management Company Ltd.) Respondent No.1 in the matter. The comments offered by MPPMCL and the response of JPVL are mentioned in Annexure-II enclosed with this order. 21. Public hearing in the subject petition was held on 26 th July The comments/objections filed by the objector and the response of the petitioner on the same are mentioned in Annexure II with this order. Capital Cost Petitioner s Submission: 22. The details of Gross Fixed Assets as on 1 st April 2015, proposed/provisional additional capitalization during FY and Gross Fixed Assets as on 1 st April 2016 as field by petitioner are given below: Table 4: Opening GFA as on Filed by the Petitioner (` in Crores) Particulars Amount Opening GFA as on Additional Capitalization during FY GFA as on Provisions in Regulation: 23. With regard to capital cost, Regulation 15 of MPERC (Terms and Conditions for M.P. Electricity Regulatory Commission Page 5

6 Determination of Generation Tariff) Regulations, 2015 provides that, 15.1 Capital cost as determined by the Commission after prudence check in accordance with this Regulation shall form the basis of determination of tariff for existing and new projects Capital cost for a Project shall include (a) (b) the expenditure incurred or projected to be incurred up to the date of commercial operation of the project; Interest during construction and financing charges, on the loans (i) being equal to 70% of the funds deployed, in the event of the actual equity in excess of 30% of the funds deployed, by treating the excess equity as normative loan, or (ii) being equal to the actual amount of loan in the event of the actual equity less than30% of the funds deployed; Any gain or loss on account of foreign exchange risk variation pertaining to the loan amount availed during the construction period shall form part of the capital cost. (c) Increase in cost in contract packages as approved by the Commission; (d) Interest during construction and incidental expenditure during construction as computed in accordance with Regulation 17 of these Regulations; (e) (f) (g) capitalised Initial spares subject to the ceiling rates specified in Regulation 19 of these Regulations; expenditure on account of additional capitalization and de-capitalisation determined in accordance with Regulation 20 of these Regulations; and adjustment of revenue due to sale of infirm power in excess of fuel cost prior to the COD as specified under Regulation 24 of these Regulations; 15.3 The Capital cost of an existing project shall include the following: (a) (b) the capital cost admitted by the Commission prior to duly trued up by excluding liability, if any, as on ; additional capitalization and de-capitalization for the respective year of tariff as determined in accordance with Regulation 20; and M.P. Electricity Regulatory Commission Page 6

7 (c) expenditure on account of renovation and modernization as admitted by the Commission in accordance with Regulations 21. Commission s Analysis: 24. Based on Annual Audited Accounts for FY , the Commission issued last True-Up order for FY on 3 rd June 2016 in this matter and the petition for true-up of generation tariff for FY is to be filed by petitioner on availability of Annual Audited Accounts for FY To work out the capital cost as on 1 st April 2016 in this order, the Commission has considered the closing Gross Fixed Assets of ` crores as on 31 st March 2015 (as admitted in its true up order dated 3 rd June 2016 for FY ) as a base figure for 1 st April Additional Capitalization during FY The petitioner filed the provisional additional capitalization during FY and its corresponding funding as given below: Table 5: Additional Capitalization and Funding during FY (` in Crores) Particulars Amount Additional Capitalization during FY Loan Equity Vide Commission s letter dated 31 st May 2016, the petitioner was asked to file a comprehensive reply to the following issues on additional capitalization with all relevant supporting documents: (i) (ii) (iii) (iv) Whether the addition of assets is on account of the reasons (a) to (e) in clause 20.1 of the MPERC (Terms and Conditions for determination of Generation tariff) Regulations, Whether the assets capitalized during the year are under original scope of work. Supporting documents were also sought in this regard. Whether the additional capitalization is within the cut-off date of the project. Statement showing the detailed break-up of the project cost originally approved by the competent authority, cost incurred up to 31 st March, 2015, addition capitalization proposed during FY , along with the reasons of increase in each item of additional capitalization proposed during FY was also sought. M.P. Electricity Regulatory Commission Page 7

8 (v) (vi) (vii) Details of the works completed as on 31 st March 2016 along with supporting documents were sought. Reasons for delay in completion of works under additional capitalization and the anticipated date of completion of these additional works were also sought. Details of any penalty/ld if any, imposed on the contractor for delay in completion of these works under additional capitalization were sought. 28. The petitioner was also asked to file the following: (i) The copy of its Board of Director s approval for additional capitalization of ` Crore filed by it during FY (ii) Board s Resolutions for equity investments and shareholder certificate for the equity infusion for the additional capital investment of ` in FY In response to above, by affidavit dated 19 th July 2016, the petitioner submitted the following: (i) Reply to issue (i), (ii) and (iii) The additional proposed capitalization of Rs Crs falls within the norms specified under Regulation 20.1 of MPERC (Terms and Conditions for determination of Generation Tariff) Regulations, The said Regulation reads as under:- The Capital Expenditure incurred or projected to be incurred, on the following counts within the original scope of work, after the Date of Commercial Operation and up to cut-off date may be admitted by the Commission, subject to prudent check: (a) Undisclosed liabilities (b) Work deferred for execution (c) Liabilities to meet award of arbitration or for compliance of order or decree of a court, (d) Change in Law, (e) Procurement of initial spares within the original scope of work, subject to the provisions of Regulation 17.1(b) Provided that the details of works included in the original scope of along with estimates of expenditure, un-discharged liabilities and works deferred for execution shall be submitted along with the application for Tariff. The Petitioner would humbly like to draw the kind attention of Hon ble Commission in the light of the above Regulation that the said additional capitalization is within the original scope of the work authorized by the Resolution of Board of Directors dated May 17 th, 2014 and is also within the prescribed cut-off date. M.P. Electricity Regulatory Commission Page 8

9 (ii) Reply to issue (iv) Break up of Originally Approved Project Cost, Revised Project Cost Proposed capitalization during and Final Project Cost are given as under:- Particulars Original Project Cost Revised Project Cost Final Project Cost (Rs in Crores) Cost Incurred upto Proposed Capitalization during Land BTG BOP Civil Cost Overhead & Pre-Operative IDC/IEDC * Margin Money Total * This includes Rs Crs approved by Hon ble Commission towards interest from COD of Unit I to COD II on Debt Component of unallocated capital cost as on COD of Unit I vide Para 4.30 and 4.31 Order dated Nov 26th, Reasons of increase/decrease between proposed capitalization during and actual capitalization shall be provided after approval of shareholders in Annual General Meeting of Balance Sheet as on March 31st, 2016 of Jaypee Bina Thermal Power Plant. (iii) (iv) (v) Reply to issue (v) Details of work completed up to March 31st, 2016 will be furnished only after approval of shareholders in Annual General Meeting of Balance Sheet as on March 31st, 2016 of Jaypee Bina Thermal Power Plant. Reply to issue (vi) In response to the query a detailed chart is enclosed herewith as Annexure-2. Reply to issue (vii) As regards Liquidated Damages & Legal Remedies, the same shall be looked into after the completion of balance of works as our current priority is to ensure that progress of work in not hampered. M.P. Electricity Regulatory Commission Page 9

10 30. With regard to Board s approval for additional capitalization, the petitioner submitted that since, this addition is part of original scope of work with a project completion cost of `3575 Crores, hence it does not require fresh approval of its Board of Director. The petitioner enclosed the Board s approval for Rs 3,575 Crs with its reply. 31. On perusal of the reply and documents filed by the petitioner, the Commission observed that the reply filed by the petitioner regarding the proposed additional capitalization during FY is not to the satisfaction and it will require detailed examination on several counts specified in the MPERC (Terms and Conditions for Determination of Generation Tariff) Regulations, Based on the information made available by JPVL, this exercise may be carried out while undertaking true up exercise for FY based on Annual Audited Accounts and other necessary details in this regard. The true-up exercise upto FY has been undertaken by the Commission and the petition for true-up of FY is to be filed by the petitioner. Therefore, the Commission shall consider the asset addition during FY at the time of dealing with the true up petition for FY based on the Annual Audited Accounts and also on detailed examination of assets addition in terms of applicable Regulations. 32. Accordingly, the status of opening Gross Fixed Assets (GFA) as on 1 st April 2016 will remain same in this order as considered by the Commission as on 31 st March 2015, in its true up order dated 3 rd June 2016 for FY The petitioner has not claimed any additional capitalization during the control period of FY to FY Therefore, the same Gross Fixed Assets as on 1 st April 2016 is considered till 31 st March Funding Status Petitioner s Submission: Equity 34. To work out the equity balance as on 1 st April 2016, the petitioner considered the closing balance of equity as on 31 st March 2015, as filed in the true up petition for FY as opening equity base figure as on 1 st April 2015 and further, equity addition of 30% of proposed/provisional additional capitalization filed during FY is considered. The petitioner has not filed any additional capitalization during the control period of FY to FY The details of the opening balance of equity as on 1 st April 2015, addition during M.P. Electricity Regulatory Commission Page 10

11 FY and opening balance of equity as on 1 st April 2016, as filed by petitioner are as given below: Table 6: Opening Equity as on (` in Crores) Particulars Amount Opening equity as on Additions during FY Opening equity as on Loan 36. To work out the loan balance as on 1 st April 2016, the petitioner considered the closing balances of loan as on 31 st March 2015, as filed in the true up petition for FY as opening loan as on 1 st April Further, loan addition of 70% of proposed/provisional additional capitalization filed during FY is considered and repayment equivalent to estimated depreciation during FY has also been considered by the petitioner to arrive at the loan balance as on 1 st April The petitioner has not filed any additional capitalization during the control period of FY to FY The details of the opening balance of loan as on 1 st April 2016, repayment during the control period for FY to FY and closing loan balances filed by the petitioner are as given below: Table 7: Opening and Closing Balance of Loan Filed (` in Crores) Financial Years Opening Balance Repayments Closing Balance FY FY FY Provisions in Regulation: 38. With regard to funding of the project, Regulation 25 of MPERC (Terms and Conditions for Determination of Generation Tariff) Regulations, 2015 provides that, Debt-Equity Ratio: 25.1 For a project declared under commercial operation on or after , the debt-equity ratio would be considered as 70:30 as on COD. If the equity actually deployed is more than 30% of the capital cost, equity in excess of 30% shall be treated as normative loan: M.P. Electricity Regulatory Commission Page 11

12 Provided that: a. where equity actually deployed is less than 30% of the capital cost, actual equity shall be considered for determination of tariff: b. the equity invested in foreign currency shall be designated in Indian rupees on the date of each investment: c. any grant obtained for the execution of the project shall not be considered as a part of capital structure for the purpose of debt : equity ratio. Explanation.-The premium, if any, raised by the generating company while issuing share capital and investment of internal resources created out of its free reserve, for the funding of the project, shall be reckoned as paid up capital for the purpose of computing return on equity, only if such premium amount and internal resources are actually utilised for meeting the capital expenditure of the generating station The generating company shall submit the resolution of the Board of the company regarding infusion of fund from internal resources in support of the utilization made or proposed to be made to meet the capital expenditure of the generating station In case of the generating station declared under commercial operation prior to , debt- equity ratio allowed by the Commission for determination of tariff for the period ending shall be considered In case of the generating station declared under commercial operation prior to , but where debt: equity ratio has not been determined by the Commission for determination of tariff for the period ending , the Commission shall approve the debt: equity ratio based on actual information provided by the generating company Any expenditure incurred or projected to be incurred on or after as may be admitted by the Commission as additional capital expenditure for determination of tariff, and renovation and modernisation expenditure for life extension shall be serviced in the manner specified in clause 25.1 of this Regulation. Commission s Analysis: Equity as on 1 st April Regulation 25.3 of MPERC (Terms & Conditions for Determination of Generation Tariff) Regulations, 2015 provides that in case of the generating station declared under commercial operation prior to 1 st April 2016, the debt-equity ratio allowed M.P. Electricity Regulatory Commission Page 12

13 by the Commission for determination of tariff for the period ending 31 st March 2016, shall be considered. Thus, the Commission has considered the opening equity as on 1 st April 2015, based on the true-up order for FY issued on 3 rd June Further, the Commission has not considered the provisional additional capitalization during FY in this order. Therefore, the equity balance of ` crore as on 31 st March 2015, as approved by the Commission in true up order dated 3 rd June 2016 for FY would remain same as on 1 st April The petitioner has not filed any equity additional during the control period FY to FY Therefore, the equity amount of ` crore shall remain unchanged during the control period till 31 st March Loan balances as on 1 st April In light of the aforesaid Regulation 25.3 of MPERC (Terms & Conditions for Determination of Generation Tariff) Regulations, 2015, the Commission has considered the loan amount as on 1 st April 2015, based on the true-up order for FY issued on 3 rd June Further, as discussed in preceding paragraphs of this order, the Commission has not considered the proposed/provisional additional capitalization during FY at this stage. Therefore, the loan balance as on 1 st April 2016 is worked out by considering the estimated repayment equivalent to depreciation for FY Based on the above, the status of loan balances as on 1 st April 2015, repayment during FY and loan balances as on 1 st April 2016 are worked out as given below: Table 8: Loan as on 1 st April 2015, Repayment during the FY and loan as on 1 st April 2016 (` in Crores) Particulars Amount Opening Loan as on Repayment during FY Loan balance as on The petitioner has not filed any loan addition during the control period of FY to FY Therefore, no loan addition is considered during the control period in this order. M.P. Electricity Regulatory Commission Page 13

14 Cumulative depreciation as on 1 st April 2016: 46. For computation of cumulative depreciation as on 1 st April 2016, the Commission has considered the closing cumulative depreciation as on 31 st March 2015, as approved in true-up order dated 3 rd June 2016 for FY and depreciation during FY has been computed using the weighted average rate of depreciation as filed by the petitioner. 47. In view of the above, the status of cumulative depreciation as on 1 st April 2015, addition during FY and cumulative depreciation as on 1 st April 2016 is worked out as given below : Table 9: Cumulative Depreciation as on 1 st April 2015, depreciation during FY and Cumulative Depreciation as on 1 st April 2016 (` in Crores) Particulars Amount Opening Cumulative Depreciation as on Depreciation during FY Cumulative depreciation as on The details of opening GFA, Loan balance, equity balance and cumulative depreciation as on 1 st April 2016 considered in this order are as follows: Table 10: Status as on 1 st April 2016 (` in crores) Particulars Amount Gross Fixed Assets Loan Balance Equity Balance Cumulative Deprecation Annual Capacity (fixed) Charges 49. As per Regulation 27 of the MPERC (Terms and Conditions for Determination of Generation Tariff) Regulations, 2015, the Annual Capacity (Fixed) Charges shall consist of the following components: (a) Return on Equity; (b) Interest on Loan Capital; (c) Depreciation; (d) Interest on Working Capital; (e) Operation and Maintenance Expenses; M.P. Electricity Regulatory Commission Page 14

15 Return on Equity Petitioner s Submission 50. The petitioner filed the Return on Equity during control period of FY to FY in form 1(II) of the petition as given below:- Table 11: Return on Equity Filed (` in Crores) Particulars FY FY FY Opening Equity Equity Additions Closing Equity Average Equity Base Rate of ROE 15.50% 15.50% 15.50% Tax Rate considered under MAT 21.34% 21.34% 21.34% Pre-Tax Rate of Return on Equity 19.71% 19.71% 19.71% Return on Equity Provisions in the Regulation: 51. With regard to Return on Equity, Regulation 30 and 31 of MPERC (Terms and Conditions for Determination of Generation Tariff) Regulations, 2015 provides that, 30 Return on Equity: 30.1 Return on equity shall be computed in rupee terms, on the equity base capital determined in accordance with Regulation Return on equity shall be computed at the base rate of 15.5% for thermal generating stations and hydro generating stations. Provided that (a) in case of Projects commissioned on or after 1 st April, 2016, an additional return of 0.5% shall be allowed if such Projects are completed within the timeline specified in Appendix-I : (b) the additional return of 0.5% shall not be admissible if the Project is not completed within the timeline specified above for reasons whatsoever. (c) the rate of return of a new project shall be reduced by 1% for such period as may be decided by the Commission, if the Generating station is found to be declared under commercial operation without M.P. Electricity Regulatory Commission Page 15

16 commissioning of any of the Restricted Governor Mode Operation (RGMO)/ Free Governor Mode Operation (FGMO): (d) as and when any of the above requirements are found lacking in a generation station based on the report submitted by the respective SLDC/RLDC, ROE shall be reduced by 1% for the period for which the deficiency continues: 31 Tax on Return on Equity: 31.1 The base rate of return on equity as allowed by the Commission under Regulation 30 shall be the shall be grossed up with the effective tax rate for the Year respective financial years. For this purpose, the effective tax rate shall be considered on the basis of actual tax paid in the respective financial year in line with the provisions of the relevant Finance Acts by the concerned generating company. The actual income tax on other income stream including deferred tax i.e., income of non generation business shall not be considered for the calculation of effective tax rate Rate of return on equity shall be rounded off to three decimal places and shall be computed as per the formula given below: Rate of pre-tax return on equity = Base rate / (1-t) Where t is the applicable tax rate in accordance with Regulation 31.1 of this Regulation and shall be calculated at the beginning of every financial year based on the estimated profit and tax to be paid estimated in line with the provisions of the relevant Finance Act applicable for that financial year to the company on prorata basis by excluding the income of non-generation business and the corresponding tax thereon. In case of generating company paying Minimum Alternate Tax (MAT), t shall be considered as MAT rate including surcharge and cess. For example: - In case of the generating company paying (i) Minimum Alternate Tax 20.96% including surcharge and cess: Rate of return on equity = 15.50/( ) = % (ii) In case of generating company paying normal corporate tax including surcharge and cess: (a) Estimated Gross Income from generation business forfy is Rs 1000 crore. (b) Estimated Advance Tax for the year on above is Rs 240 crore. (c) Effective Tax Rate for the year = Rs 240 Crore/Rs 1000 Crore =24% (d) Rate of return on equity = 15.50/ (1-0.24) = % M.P. Electricity Regulatory Commission Page 16

17 31.3 The actual tax paid together with any additional tax demand including interest thereon, duly adjusted for any refund of tax including interest received from the income tax authorities pertaining to the tariff period to on actual gross income of any financial year shall be trued-up every year. However, penalty, if any, arising on account of delay in deposit or short deposit of tax amount shall not be claimed by the generating company. Any under-recovery or over-recovery of grossed up rate on return on equity after truing up, shall be allowed to be recovered or refunded to beneficiaries on year to year basis. Commission s Analysis 52. As discussed in preceding paragraphs of this order, the Commission has not considered the provisional additional capitalization proposed during FY Thus, the equity balance as on 1 st April 2016 shall remain same as admitted by the Commission in last true-up order for FY as on 31 st March Further, the petitioner has not filed the additional capitalization during FY to FY , therefore, the equity balance as on 1 st April 2016 shall remain unchanged during the control period. 53. On scrutiny of the petition, it was observed that the petitioner claimed Return on Equity by grossing up the base rate with MAT. Therefore, vide Commission s letter dated 31 st May 2016, the petitioner was asked to explain with supporting documents whether the Petitioner s Bina Power Project is eligible for MAT in accordance with the balance sheet of Bina Power Project. 54. In response, by affidavit dated 19 th July 2016, the petitioner submitted that the Generation Company (JPVL) has been paying MAT upto on the basis of which the petitioner has grossed up base rate with MAT. The petitioner further submitted that the Income Tax Return is yet to be prepared and filed. 55. Regulation 31.1 of the Regulations 2015, provides that the base rate of return on equity shall be grossed up with the effective tax rate of the respective financial year. For this purpose the effective tax rate shall be considered on the basis of actual tax paid in the respective financial year by the generating company. 56. In terms of the above Regulation, the Commission shall deal with the tax liability based on the Annual Audited Accounts during truing- up exercise for each financial year under the control period. Accordingly, while computing the return on equity in this order, the Commission has not considered the grossing up of the base rate of return i.e.15.5% with MAT at this stage and worked out the Return on Equity for the control period FY to FY at the base M.P. Electricity Regulatory Commission Page 17

18 rate as given below: Table 12: Return on Equity Allowed (` in Crores) Particulars FY FY FY Opening Equity Equity Additions Closing Equity Average Equity Base Rate of ROE 15.50% 15.50% 15.50% Return on Equity The petitioner is directed to file the details of actual tax status of Bina Thermal Power Station in light of the Annual Audited Account with the true-up petitions of each year of the control period. Interest on Loan Capital Petitioner s submission: 58. The petitioner submitted the detailed break-up of opening loan balances, repayment during the year, closing balance of loan, weighted average rate of interest and interest on loan in form TPS 13 A of the petition as given below: Table 13: Loan and Interest Filed (` in Crores) Particulars FY FY FY Opening Loan Balance Repayments during the Year Closing Loan Balance Average Loan Balance Weighted Average rate of interest 12.27% 12.27% 12.27% Interest on Loan balance Provisions in Regulation 59. With regard to Interest on loan capital, Regulation 32 of MPERC (Terms and Conditions for Determination of Generation Tariff) Regulations, 2015 provides that, 32.1 The loans arrived at in the manner indicated in Regulation 25 shall be considered as gross normative loan for calculation of interest on loan The normative loan outstanding as on shall be worked out by deducting the cumulative repayment as admitted by the Commission up to M.P. Electricity Regulatory Commission Page 18

19 from the gross normative loan The repayment for the Year of the Tariff period shall be deemed to be equal to the depreciation allowed for the corresponding year/ period. In case of de- capitalization of assets, the repayment shall be adjusted by taking into account cumulative repayment on a pro rata basis and the adjustment should not exceed cumulative depreciation recovered upto the date of de-capitalisation of such asset Notwithstanding any moratorium period availed by the Generating Company, the repayment of loan shall be considered from the first Year of commercial operation of the Project and shall be equal to the annual depreciation allowed for the year or part of the year The rate of interest shall be the weighted average rate of interest calculated on the basis of the actual loan portfolio after proving appropriate accounting adjustment for interest capitalized. Provided that if there is no actual loan for a particular Year but normative loan is still outstanding, the last available weighted average rate of interest shall be considered: Provided further that if the generating station does not have actual loan, then the weighted average rate of interest of the Generating Company as a whole shall be considered The interest on loan shall be calculated on the normative average loan of the Year by applying the weighted average rate of interest The Generating Company shall make every effort to re-finance the loan as long as it results in net savings on interest and in that event the costs associated with such re-financing shall be borne by the Beneficiaries and the net savings shall be shared between the Beneficiaries and the Generating Company, in the ratio of 2: The changes to the terms and conditions of the loans shall be reflected from the date of such re-financing In case of dispute, any of the parties may make an application in accordance with the MPERC (Conduct of Business) Regulation, 2004, as amended from time to time: Provided that the beneficiaries shall not withhold any payment on account M.P. Electricity Regulatory Commission Page 19

20 of the interest claimed by the generating company during the pendency of any dispute arising out of re-financing of loan. Commission s Analysis: 60. Regulation 32.2 of MPERC (Terms and Conditions for Determination of Generation Tariff) Regulations, 2015 provides that the normative loan outstanding as on 1 st April 2016, shall be worked out by deducting the cumulative repayment as admitted by the Commission up to 31 st March 2016, from the gross normative loan. 61. The Commission has worked out the loan balances as on 1 st April 2016, considering the following approach: a) Loan balances (as on 31 st March 2015) admitted by the Commission in last true-up order for FY are considered as the base figures for loan balance as on 1 st April 2015,. b) The proposed additional capitalization during FY and its corresponding loan has not been considered in this order. c) Thereafter, depreciation for FY computed by applying depreciation rate as filed by the petitioner for FY is considered as repayment during the FY to arrive at the opening balances of loan as on 1 st April The petitioner has not filed any loan addition during the control period. Therefore, the loan balance for each financial year is worked out accordingly by considering the normative repayment equivalent to depreciation for the respective year. 63. It is observed that in TPS form 13 of the petition, the petitioner has taken loan/debt from 10 different lending agencies and the weighted average rate of loan has been worked out by considering the loan balances of all lending agencies. 64. Vide letter dated 31 st May 2016, the Commission asked the petitioner to file supporting documents in respect of weighted average rate of interest claimed in the petition. 65. By affidavit dated 19 th July 2016, the petitioner submitted that To substantiate the Rate of Interest, a summary of Actual amount of monthly interest paid, rate of interest, sample payment instructions to Bank along with the true copy of bank M.P. Electricity Regulatory Commission Page 20

21 statement showing payment thereof has been attached herewith as Annexure Based on the above details submitted by petitioner, the interest on loan is worked out during the control period as given below: Table 14: Interest on Loan considered (` in Crores) Particulars FY FY FY Opening Loan Balance Repayments Closing Loan Balance Average Loan Balance Weighted Average rate of Interest 12.27% 12.27% 12.27% Interest Amount The petitioner is directed to file actual weighted average rate of interest in respect of each lending agency along with supporting documents while filing the true-up petitions for each year of the control period. Depreciation Petitioner s Submission: 68. The petitioner submitted the opening Gross Fixed Assets, closing Gross Fixed Assets and depreciation in form TPS 12 of the Petition are as given below:- Table 15: Depreciation on the Assets Filed (` in Crores) Financial Year FY FY FY Opening Capital Cost Closing Capital Cost Average Capital Cost Rate of Depreciation 4.92% 4.92% 4.92% Depreciation on Capital Cost Cumulative Depreciation at the end of year Provisions of the Regulation: 69. Regulation 33 of MPERC (Terms and Conditions for Determination of Generation Tariff) Regulations, 2015 provides that, 33.1 Depreciation shall be computed from the date of commercial operation of a generating station or unit thereof. In case of the tariff of all the units of a generating station for which a single tariff needs to be determined, the depreciation shall be computed from the effective date of commercial operation of the generating station taking into consideration the depreciation of individual M.P. Electricity Regulatory Commission Page 21

22 units. Provided that effective date of commercial operation shall be worked out by considering the actual date of commercial operation and installed capacity of all the units of the generating station for which single tariff needs to be determined The value base for the purpose of depreciation shall be the capital cost of the asset admitted by the Commission. In case of multiple units of a generating station, weighted average life for the generating station shall be applied. Depreciation shall be chargeable from the first year at the commercial operation The salvage value of the asset shall be considered as 10% and depreciation shall be allowed up to maximum of 90% of the capital cost of the asset: Provided that in case of Hydro generating stations, the salvage value shall be as provided in the agreement signed by the developers with the State Government for creation of the site: Provided further that the capital cost of the assets of the hydro generating station for the purpose of computation of depreciable value shall correspond to the percentage of sale of electricity under Long-term power purchase agreement at regulated Tariff. Provided also that any depreciation disallowed on account of lower availability of generating station or generating unit shall not be allowed to be recovered at a later stage during the useful life and extended life. Provided also that salvage value for IT equipment and softwares shall be considered as NIL and 100 % value of the assets shall be considered depreciable Land other than land held under lease and the land for reservoir in case of hydro generating station shall not be a depreciable asset and its cost shall be excluded from the capital cost while computing depreciable value of the asset Depreciation shall be calculated annually based on Straight Line Method and at rates specified in Appendix-II to these Regulations for the assets of the generating station: Provided that, the remaining depreciable value as on 31 st March of the Year closing after a period of 12 Years from the Date of M.P. Electricity Regulatory Commission Page 22

23 Commercial operation shall be spread over the balance Useful life of the assets In case of the existing Projects, the balance depreciable value as on shall be worked out by deducting the cumulative depreciation as admitted by the Commission upto from the gross depreciable value of the assets The rate of Depreciation shall be continued to be charged at the rate specified in Appendix-II till cumulative depreciation reaches 70%. Thereafter the remaining depreciable value shall be spread over the remaining life of the asset such that the maximum depreciation does not exceed 90% Depreciation shall be chargeable from the first Year of commercial operation. In case of commercial operation of the asset for part of the Year, depreciation shall be charged on pro rata basis The generating company shall submit the details of proposed capital expenditure during the fag end of the project (five years before the useful life) along with justification and proposed life extension. The Commission based on prudence check of such submissions shall approve the depreciation on capital expenditure during the fag end of the project In case of de-capitalization of assets in respect of generating station or unit thereof, the cumulative depreciation shall be adjusted by taking into account the depreciation recovered in tariff by the de-capitalized asset during its useful services. Commission s Analysis:- 70. The Commission has worked out the accumulated depreciation as on 1 st April 2016, considering the following: a) Accumulated depreciation as on 31 st March 2015 as admitted by the Commission in the last true-up order for FY is considered as the base figure as on 1 st April 2015, for Accumulated Depreciation. b) Thereafter, Depreciation is worked out during FY by applying the weighted average rate of depreciation as filed by the petitioner to arrive at the opening balance of Accumulated depreciation as on 1 st April Vide Commission s letter dated 31 st May 2016, the petitioner was asked to M.P. Electricity Regulatory Commission Page 23

24 furnish a statement showing year wise details of depreciation un-recovered if any, till , on account of plant availability lower than the NAPAF and ensuring adherence with third proviso under Regulation 33.3 of MPERC (Terms and Conditions for Determination of Generation Tariff) Regulations, 2015 along with asset cum depreciation register in support of depreciation worked out in this petition. 72. By affidavit dated 19 th July 2016, the petitioner submitted the statement of yearwise details of depreciation un-recovered. The petitioner submitted that there is no unrecovered depreciation in any year except FY However the unit no. 1 of the project was under operation only for part of the year and PAF was lower than the norms fixed in the Regulations. Further with regard to Asset-cum- Depreciation, the petitioner submitted that the Balance sheet as on is yet to be approved by shareholder in the Annual General Meeting, hence, as soon as the same is approved, the Asset-cum-Depreciation register shall be submitted to the Commission. 73. In view of the above, the petitioner is directed to file a detailed year-wise Assets- Cum-Depreciation register with the true-up petition for respective years. 74. The depreciation on the Gross Fixed Assets (considered as on 1 st April 2016) is worked out by the Commission on the following basis: i) For the purpose of computation of depreciation, the opening Gross Fixed Assets as on 1 st April 2016, is worked out as explained in preceding paragraphs. ii) The petitioner has not filed any additional capitalization during the control period of FY to FY iii) The depreciation during the control period has been computed on the aforesaid Gross Fixed Assets by applying the weighted rate of depreciation as filed by the petitioner during the control period. 75. Based on above, the depreciation is worked out in this order as given below:- Table 16: Depreciation allowed (` in Crores) Financial Year FY FY FY Opening Capital Cost Additions Closing Capital Cost Average Capital Cost M.P. Electricity Regulatory Commission Page 24

25 Rate of Depreciation 4.92% 4.92% 4.92% Depreciation for the year Cumulative Depreciation Operation & Maintenance Expenses Petitioner s Submission: 76. The petitioner filed the Operation & Maintenance expenses of thermal power station (in Form TPS 1) and Operation & Maintenance expenses of Transmission lines & Bay are as given below: Table 17: Operation & Maintenance Expenses Filed (` in Crores) Operation & Maintenance Expenses for Thermal Operation & Maintenance Expenses (Transmission lines & Financial Years Power Station Bay) FY FY FY Provisions in Regulation: 77. Regulation 35.7 of MPERC (Terms and Conditions for Determination of Generation Tariff) Regulations, 2015 provides that, The Operation and Maintenance expenses admissible to existing thermal power stations commissioned prior to comprise of employee cost, Repair & Maintenance (R&M) cost and Administrative and General (A&G) cost. These norms exclude Pension and Terminal Benefits, EL encashment, Incentive, arrears to be paid to employees, taxes payable to the Government, and fees payable to MPERC. The generating company shall claim the rate, rent & taxes payable to the Government, cost of chemicals and consumables, fees to be paid to MPERC, EL encashment and any arrears paid to employees separately as actuals. The claim of pension and Terminal Benefits shall be dealt as per Regulation 35.4 of these Regulations. Table 18: O&M Norms for Thermal Generating Units Commissioned on or after (` in lakh/mw) Units (MW) FY FY FY /210/ M.P. Electricity Regulatory Commission Page 25

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal (M.P.) - 462 016 Petition No. 62 of 2016 PRESENT: Dr. Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No. 70 of 2015 PRESENT: Dr. Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta, Member

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.55 of 2012 PRESENT: Rakesh Sahni, Chairman IN THE MATTER OF: C.S. Sharma, Member

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.16 of 2014 PRESENT: Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta, Member

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No. 11 of 2017 PRESENT: Dr. Dev Raj Birdi, Chairman A. B. Bajpai, Member Alok Gupta,

More information

Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009

Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009 Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009 No. 2734/MPERC/2009. In exercise of powers conferred under Section 181(2) (zd) read with Section 45 and 61 of the Electricity Act, 2003

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal - 462016 Petition No75/2012 PRESENT: Rakesh Sahni, Chairman A. B. Bajpai, Member Alok

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL under Coal Mines (Special Provisions) Second Ordinance, 2014 and Rules framed SMP No. 50 of 2015 DAILY ORDER (Date of Hearing: 24 th November, 2015)

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal - 462016 Petition 24/2014 PRESENT: IN THE MATTER OF: Dr. Dev Raj Birdi, Chairman A.

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal - 462016 Petition 06/2013 PRESENT: Rakesh Sahni, Chairman A. B. Bajpai, Member Alok

More information

Bhopal: Dated 5 th May 2006

Bhopal: Dated 5 th May 2006 Bhopal: Dated 5 th May 2006 No. 1192/MPERC/2006. In exercise of the powers conferred by section 181 (g) read with section 32(3) of the Electricity Act, 2003 enacted by the parliament, the Madhya Pradesh

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.40 of 2012 PRESENT: Rakesh Sahni, Chairman IN THE MATTER OF: In the matter of determination

More information

Order on. Petition No. 21/2014

Order on. Petition No. 21/2014 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 4 th and 5 th Floor, Metro Plaza, Bittan Market, Bhopal - 462 016 Order on ARR & Retail Power Supply Tariff for Electricity Distribution Business of Special

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, "Metro Plaza", Bittan Market, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, Metro Plaza, Bittan Market, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No. 02 of 2018 PRESENT: Dr. Dev Raj Birdi, Chairman Mukul Dhariwal, Member Anil Kumar

More information

BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL)

BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL) BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL) REVISED PETITION FOR APPROVAL OF TRUE UP OF FY 2015-16 & FY 2016 17 AND PROVISIONAL TRUE UP of FY 2017-18

More information

COMPONENTS OF REVENUE REQUIREMENT

COMPONENTS OF REVENUE REQUIREMENT COMPONENTS OF REVENUE REQUIREMENT A typical Tariff Application of Discom has to include Demand Forecast Annual Revenue Requireme nt to meet the Cost of Supply to cater to the demand Power Procurement (Self+Purchase)

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal - 462016 Petition No. 58/2017 PRESENT: Dr. Dev Raj Birdi, Chairman Mukul Dhariwal, Member

More information

Petition No 1234 of 2017

Petition No 1234 of 2017 No 1234 of 2017 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PRESENT: Hon ble Sri. S. K. Agarwal, Chairman Hon ble Sri. K. K. Sharma, Member IN THE MATTER OF: AND IN THE MATTER OF:

More information

SMP-10/2016 M.P. Electricity Regulatory Commission Bhopal

SMP-10/2016 M.P. Electricity Regulatory Commission Bhopal SMP-10/2016 M.P. Electricity Regulatory Commission Bhopal Tariff Order for procurement of power from Municipal Solid Waste based power generating plants in Madhya Pradesh June 2016 1. LEGISLATIVE PROVISIONS

More information

Before the MP Electricity Regulatory Commission 5 TH Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market : BHOPAL.

Before the MP Electricity Regulatory Commission 5 TH Floor, Metro Plaza, E-5, Arera Colony, Bittan Market : BHOPAL. In the Matter of - Before the MP Electricity Regulatory Commission 5 TH Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market : BHOPAL. Petition 53 of 2013 Filing of application for True-up of the Transmission

More information

RInfra-G Multi Year Tariff Petition for FY to FY Executive Summary 1

RInfra-G Multi Year Tariff Petition for FY to FY Executive Summary 1 TABLE OF CONTENTS 1. BACKGROUND... 4 1.1. Introduction... 4 1.2. Objective of the present MYT Petition... 4 2. TRUING UP OF FY 2014-15... 4 2.1. Operational Performance for FY 2014-15... 5 2.2. Fuel Cost

More information

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY Petition Nos.

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY Petition Nos. MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 TH Floor Metro Plaza, Bittan Market", Bhopal - 462 016 AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY 2012-13 Petition Nos. 72/2011

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, E-5, Arera Colony, Bittan Market, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal - 462016 Petition No.02/2013 PRESENT: Rakesh Sahni, Chairman A. B. Bajpai, Member Alok

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No. 16 of 2016 PRESENT: Dr. Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta,

More information

MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED (MSPGCL/MAHAGENCO)

MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED (MSPGCL/MAHAGENCO) MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED (MSPGCL/MAHAGENCO) PETITION FOR CAPITAL COST AND TARIFF DETERMINATION FOR FY 2012-13 TO FY 2015-16 INCLUDING TRUE UP FOR FY 2012-13 &FY 2013-14 OF BHUSAWAL

More information

ORDER ON TRUE-UP OF ARR FOR FINANCIAL YEAR Period From April 2012 to March 2013

ORDER ON TRUE-UP OF ARR FOR FINANCIAL YEAR Period From April 2012 to March 2013 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 4 th and 5 th Floor, Metro Plaza, Bittan Market, Bhopal - 462 016 ORDER ON TRUE-UP OF ARR FOR FINANCIAL YEAR 2012-13 Period From April 2012 to March 2013

More information

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PETITION NO. 1058/2015

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PETITION NO. 1058/2015 UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PETITION NO. 1058/2015 DETERMINATION OF ANNUAL REVENUE REQUIREMENT (ARR) AND TARIFF FOR FY 2016-17 AND TRUE UP OF ARR AND REVENUE FOR FY 2013-14

More information

ORDER ON TRUE-UP OF ARR FOR THE PERIOD April 06 to March 07

ORDER ON TRUE-UP OF ARR FOR THE PERIOD April 06 to March 07 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 4 th and 5 th Floor, Metro Plaza, Bittan Market, Bhopal - 462 016 ORDER ON TRUE-UP OF ARR FOR THE PERIOD April 06 to March 07 Petition Nos. PRESENT: 22/08

More information

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. (Date of Order: )

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. (Date of Order: ) HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA IN THE MATTER OF:- (Date of Order: 25.07.2018) Petition No.: 26/2018(Suo-Moto) CORAM Sh. S.K.B.S. Negi Chairman Sh. Bhanu Pratap Singh Member

More information

BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL

BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL IN THE MATTER OF Provisional approval of Generation tariff of M.P. s 57% share of power in Sardar Sarovar Project (6x200+5x50

More information

Case No. 170 of Coram. Shri. Anand B. Kulkarni, Chairperson Shri. I.M. Bohari, Member Shri Mukesh Khullar, Member ORDER

Case No. 170 of Coram. Shri. Anand B. Kulkarni, Chairperson Shri. I.M. Bohari, Member Shri Mukesh Khullar, Member ORDER Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre No. 1, 13 th Floor, Cuffe Parade, Mumbai 400 005 Tel. No. 022 22163964/65/69 Fax 022 22163976 E mail: mercindia@merc.gov.in Website:

More information

M/s Jaiprakash Power Ventures Ltd 113 Rajpur Road, Dehradun

M/s Jaiprakash Power Ventures Ltd 113 Rajpur Road, Dehradun BEFORE IN THE MATTER OF: AND IN THE MATTER OF: THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Petition No.443/2007 Approval of tariff for supply of electricity from 400 MW Vishnu Prayag Hydroelectric

More information

BIHAR ELECTRICITY REGULATORY COMMISSION. Case No. 54 of for BIHAR STATE POWER TRANSMISSION COMPANY LIMITED (BSPTCL)

BIHAR ELECTRICITY REGULATORY COMMISSION. Case No. 54 of for BIHAR STATE POWER TRANSMISSION COMPANY LIMITED (BSPTCL) BIHAR ELECTRICITY REGULATORY COMMISSION Case 54 of 2015 Tariff Order Truing-up for FY 2014-15, Annual Performance Review (APR) for FY 2015-16, Annual Revenue Requirement (ARR) for FY 2016-17 to FY 2018-19

More information

Order Date of hearing

Order Date of hearing PRESENT Petition No. 1075 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order:07.03.2018 Hon ble Sri Suresh Kumar Agarwal, Chairman IN THE MATTER OF: Amendment of provisional

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.28 of 2012 PRESENT: Rakesh Sahni, Chairman IN THE MATTER OF: C.S. Sharma, Member

More information

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA BIHAR ELECTRICITY REGULATORY COMMISSION PATNA NOTIFICATION 2 nd August, 2010 No. BERC-Regl/Solar-2/2010-03 In exercise of powers conferred under Section 61 read with Section 181(2)(zd) of the Electricity

More information

Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited Block No. 7, Shakti Bhawan, Vidyut Nagar, Jabalpur

Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited Block No. 7, Shakti Bhawan, Vidyut Nagar, Jabalpur AGGREGATE REVENUE REQUIREMENT FOR MYT FY 2017 TO FY 2019 AND TARIFF PROPOSAL PETITION FOR FY 2017-18 Submitted By: Madhya Pradesh Power Management Company Limited Shakti Bhawan, Vidyut Nagar, Jabalpur

More information

TABLE OF CONTENTS. S. No. PARTICULARS Page No. I TRUE UP TARIFF PETITION FOR FY II PRAYER 09 III AFFIDAVIT IV AUTHORIZATION 12

TABLE OF CONTENTS. S. No. PARTICULARS Page No. I TRUE UP TARIFF PETITION FOR FY II PRAYER 09 III AFFIDAVIT IV AUTHORIZATION 12 TABLE OF CONTENTS S. No. PARTICULARS Page No. I TRUE UP TARIFF PETITION FOR FY 2013-14 3-8 II PRAYER 09 III AFFIDAVIT 10-11 IV AUTHORIZATION 12 V SUB INDEX OF TRUE UP TARIFF PROPOSAL 1 CAPACITY 13-16 2

More information

Petition No. 975 of 2014 and 1017 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Date of Order:

Petition No. 975 of 2014 and 1017 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Date of Order: Petition No. 975 of 2014 and 1017 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order: 27.11.2015 IN THE MATTER OF: AND IN THE MATTER OF M/s Lalitpur Power Generation

More information

Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited Block No. 7, Shakti Bhawan, Vidyut Nagar, Jabalpur

Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited Block No. 7, Shakti Bhawan, Vidyut Nagar, Jabalpur ANNUAL REVENUE REQUIREMENT AND TARIFF PROPOSAL PETITION FOR FY 2015-16 Submitted By: Madhya Pradesh Power Management Company Limited Shakti Bhawan, Vidyut Nagar, Jabalpur Madhya Pradesh Poorv Kshetra Vidyut

More information

Vidarbha Industries Power Limited - Transmission

Vidarbha Industries Power Limited - Transmission Vidarbha Industries Power Limited - Transmission Revised Petition towards: Approval of Capital Cost and Determination of Aggregate Revenue Requirement ( ARR ) for the period FY 14-15 to FY 15-16 Filed

More information

EXTRA ORDINARY 13 SHRAVANA (S) BIHAR ELECTRICITY REGULATORY COMMISSION

EXTRA ORDINARY 13 SHRAVANA (S) BIHAR ELECTRICITY REGULATORY COMMISSION REGISTERED NO. PT.-40 The B Bihar Gazett te EXTRA ORDINARY PUBLISHED BY AUTHORITY 13 SHRAVANA (S) (NO.PATNA 541) PATNA, WEDNESDAY, 4TH AUGUST 2010 BIHAR ELECTRICITY REGULATORY COMMISSION NOTIFICATION The

More information

Madhya Pradesh Poorv Ksthera Vidyut Vitaran Company Limited

Madhya Pradesh Poorv Ksthera Vidyut Vitaran Company Limited MYT ARR Filing for 10-11 to 12-13 AGGREGATE REVENUE REQUIREMENT AND TARIFF PROPOSAL PETITION FOR FY 2010-11 Madhya Pradesh Poorv Ksthera Vidyut Vitaran Company Limited Block No. 7, Shakti Bhawan, Vidyut

More information

ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE YEAR CASE NO: TP 59 / 13 14

ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE YEAR CASE NO: TP 59 / 13 14 ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION FOR THE YEAR 2015 2016 IN CASE NO: TP 59 / 13 14 IN RE THE TARIFF APPLICATION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR THE

More information

ORDER ON TRUE-UP OF ARR FOR FINANCIAL YEAR Period From April 2007 to March 2008

ORDER ON TRUE-UP OF ARR FOR FINANCIAL YEAR Period From April 2007 to March 2008 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 4 th and 5 th Floor, Metro Plaza, Bittan Market, Bhopal - 462 016 ORDER ON TRUE-UP OF ARR FOR FINANCIAL YEAR 2007-08 Period From April 2007 to March 2008

More information

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW. Petition Nos. 921, 917, 918, 919, 920, 885, 886, 887, 888, 889 / 2013

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW. Petition Nos. 921, 917, 918, 919, 920, 885, 886, 887, 888, 889 / 2013 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW Petition Nos. 921, 917, 918, 919, 920, 885, 886, 887, 888, 889 / 2013 and Petition Nos. 916, 894 / 2013 IN THE MATTER OF: Application

More information

Before the MP Electricity Regulatory Commission 5 TH Floor, "Metro Plaza", E-5, Arera Colony, BHOPAL.

Before the MP Electricity Regulatory Commission 5 TH Floor, Metro Plaza, E-5, Arera Colony, BHOPAL. Before the MP Electricity Regulatory Commission 5 TH Floor, "Metro Plaza", E-5, Arera Colony, BHOPAL. Petition of 2018 In the Matter of - Applicant - Filing of application for True-up of the Transmission

More information

By S K Agrawal ED (Commercial) NHPC Ltd.1

By S K Agrawal ED (Commercial) NHPC Ltd.1 By S K Agrawal ED (Commercial) NHPC Ltd.1 Need for Renovation & Modernisation of HEPs Advantages of R&M of old Power Stations Govt. policies on R&M Regulatory Provisions & Commercial aspects Overview of

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM RP 6/2017 In the matter of : Review petition filed by M/s Kanan Devan Hill Plantations Company Private Limited (KDHPCL) seeking review

More information

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Sub: Suo-moto proceedings in the matter of Uttar Pradesh Electricity Regulatory Commission (Terms & Conditions of Generation Tariff) Regulations

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (LEVY AND COLLECTION OF FEES AND CHARGES BY STATE LOAD DESPATCH CENTRE) REGULATIONS,

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (LEVY AND COLLECTION OF FEES AND CHARGES BY STATE LOAD DESPATCH CENTRE) REGULATIONS, Approach Paper for MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (LEVY AND COLLECTION OF FEES AND CHARGES BY STATE LOAD DESPATCH CENTRE) REGULATIONS, 2014 Issued By: Maharashtra Electricity Regulatory

More information

AGGREGATE REVENUE REQUIREMENT AND TARIFF PETITION FOR FY *********

AGGREGATE REVENUE REQUIREMENT AND TARIFF PETITION FOR FY ********* AGGREGATE REVENUE REQUIREMENT AND TARIFF PETITION FOR FY 2016-17 ********* Submitted by: - Madhya Pradesh Power Management Company Limited, Shakti Bhawan, Vidyut Nagar, JABALPUR Madhya Pradesh Poorva Kshetra

More information

M.P. Electricity Regulatory Commission Bhopal

M.P. Electricity Regulatory Commission Bhopal SMP-20/2010 M.P. Electricity Regulatory Commission Bhopal Tariff Order for procurement of power from Wind Electric Generators 1. LEGISLATIVE PROVISIONS 1.1 Section 86(1) (e) of the Electricity Act 2003

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM PRESENT: Sri. T.M.Manoharan, Chairman Sri.P.Parameswaran, Member Sri.Mathew George, Member 15 th May, 2013 Petition OP No. 42/2012 In the

More information

Tariff Order. For. True up for FY and Determination of ARR and Generation Tariff for FY

Tariff Order. For. True up for FY and Determination of ARR and Generation Tariff for FY MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION Tariff Order For True up for FY 2014-15 and Determination of ARR and Generation Tariff for FY 2017-18 MEGHALAYA POWER GENERATION CORPORATION LIMITED CONTENTS

More information

M.P. Electricity Regulatory Commission Bhopal

M.P. Electricity Regulatory Commission Bhopal SMP-74/2015 M.P. Electricity Regulatory Commission Bhopal Tariff Order for procurement of power from Wind Electric Generators 1. LEGISLATIVE PROVISIONS Section 86(1) (e) of the Electricity Act 2003 mandates

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, E-5 Arera Colony, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, E-5 Arera Colony, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, E-5 Arera Colony, Bhopal - 462 016 Petition No. 28/2014 IN THE MATTER OF: PRESENT: Dr. Dev Raj Birdi Chairman A.

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on approval of Business plan and determination of ARR for the control period to (including True up for 2015-16 ) for Tata Power Company Limited (TPCL) Ranchi 19 February 2018 to (including True up

More information

JAMMU AND KASHMIR STATE ELECTRICITY REGULATORY COMMISSION

JAMMU AND KASHMIR STATE ELECTRICITY REGULATORY COMMISSION JAMMU AND KASHMIR STATE ELECTRICITY REGULATORY COMMISSION Notification No. 5/JKSERC/2005 Jammu dated 23 Sept. 2005 In exercise of powers conferred under section 36 read with section 8(1) (c) of the Jammu

More information

3.1 In FY , the transmission loss is 4.08% as compared to last year loss

3.1 In FY , the transmission loss is 4.08% as compared to last year loss ASSAM ELECTRICITY GRID CORPORATION LIMITED Truing Up for FY 2013-14, Annual Performance Review for FY 2014-15 & Revised ARR for FY 2015-16 and Transmission Tariff for FY 2015-16 1 Truing up for FY 2013-14

More information

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, Bhopal - 462 016 AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY 2014-15 Petition Nos. Petition

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM O.A No.15/2016

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM O.A No.15/2016 KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM O.A No.15/2016 In the matter of : Amendment to the Order on truing up of accounts for financial year 2009-10 of M/s KPUPL Applicant : M/s

More information

TARIFF ORDER. Petition No. 250/2017. For. Electricity Department, UT of Dadra and Nagar Haveli (Transmission Division)

TARIFF ORDER. Petition No. 250/2017. For. Electricity Department, UT of Dadra and Nagar Haveli (Transmission Division) TARIFF ORDER True-up of FY 2014-15, FY 2015-16 and FY 2016-17, Annual Performance Review of FY 2017-18 and Approval of Aggregate Revenue Requirement (ARR) and determination of tariff for FY 2018-19 Petition

More information

The Bihar Gazette E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY BIHAR ELECTRICITY REGULATORY COMMISSION, PATNA

The Bihar Gazette E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY BIHAR ELECTRICITY REGULATORY COMMISSION, PATNA REGISTERED NO. PT-40 The Bihar Gazette E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY 7 VAISHAKHA 1929 (S) (NO. PATNA 426) PATNA, FRIDAY 27TH APRIL 2007 BIHAR ELECTRICITY REGULATORY COMMISSION, PATNA

More information

BEFORE THE HONOURABLE KERALA STATE ELECTRICITY REGULATORY COMMISSION

BEFORE THE HONOURABLE KERALA STATE ELECTRICITY REGULATORY COMMISSION BEFORE THE HONOURABLE KERALA STATE ELECTRICITY REGULATORY COMMISSION In the Matter of: Petitioner : Review Petition against KSERC order dated 14 August 2014 on Petition OP No. 9 of 2014 on ARR & ERC of

More information

Executive Summary of Tata Power Generation True up Petition for FY as well as MYT Petition for FY to FY

Executive Summary of Tata Power Generation True up Petition for FY as well as MYT Petition for FY to FY Executive Summary of Tata Power Generation True up Petition for FY 2011-12 as well as MYT Petition for FY 2012-13 to FY 2015-16 Tata Power G Page 1 TABLE OF CONTENTS TABLE OF CONTENTS... 2 LIST OF TABLES...

More information

Summary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar

Summary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar Summary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar In terms of sections 61, 62, 64 and 86 of the Electricity Act, 2003, the tariff for the generation and sale

More information

ORDER. Case No. 112 of 2008

ORDER. Case No. 112 of 2008 Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022-22163964/6569 Fax 022-22163976 Email: mercindia@mercindia.org.in

More information

PRELIMINARY. (2) These Regulations shall come into force from the date of their publication in the Official Gazette.

PRELIMINARY. (2) These Regulations shall come into force from the date of their publication in the Official Gazette. No. JERC-10/2009:- In exercise of powers conferred on it under Section 61 read with Section 181 of the Electricity Act, 2003 (36 of 2003) and all other powers enabling it in this behalf, the Joint State

More information

Multi Year Tariff Order For Himachal Pradesh State Load Dispatch Society (HPSLDS) For the period FY 15 to FY 19

Multi Year Tariff Order For Himachal Pradesh State Load Dispatch Society (HPSLDS) For the period FY 15 to FY 19 Multi Year Tariff Order For Himachal Pradesh State Load Dispatch Society (HPSLDS) For the period FY 15 to FY 19 Himachal Pradesh Electricity Regulatory Commission 10 th June, 2014 Himachal Pradesh Electricity

More information

MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION

MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION Tariff Order For True up for FY 2014-15 And Annual Revenue Requirement & Transmission Tariff For FY 2017-18 MEGHALAYA POWER TRANSMISSION CORPORATION LIMITED

More information

2 EXECUTIVE SUMMARY. 2.1 Distribution Business in Mumbai Area

2 EXECUTIVE SUMMARY. 2.1 Distribution Business in Mumbai Area 2 EXECUTIVE SUMMARY The Tata Power Company Limited ( Tata Power ) is a company established in 1919. On April 1, 2000, The Tata Hydro-Electric Power Supply Company Limited (established in 1910) and The

More information

BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AT GANDHINAGAR PETITION NO OF 2016

BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AT GANDHINAGAR PETITION NO OF 2016 1 BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AT GANDHINAGAR PETITION NO OF 2016 IN THE MATTER OF: Petition under Section 86 read with Section 181 of the Electricity Act, 2003 for amendment of

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on True up for FY 2015-16 and Annual Performance Review of FY 2016-17 and Determination of Annual Revenue requirement (ARR) and Tariff for FY 2017-18 for Jamshedpur Utilities & Services Company Limited

More information

BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI 1 BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI PETITION NO:.OF 2014 Petition under section 62 and 79(1) (a) of the Electricity Act, 2003, read with Chapter V of the Central Electricity

More information

Case No. 30 of In the matter of Petition filed by MSETCL for approval of SLDC Budget for FY and FY

Case No. 30 of In the matter of Petition filed by MSETCL for approval of SLDC Budget for FY and FY Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail mercindia@mercindia.org.in

More information

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO No , SECTOR 34 A, CHANDIGARH CONTENTS

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO No , SECTOR 34 A, CHANDIGARH CONTENTS PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO No. 220-221, SECTOR 34 A, CHANDIGARH CONTENTS CHAPTER TITLE PAGE NO. 1. Introduction 1-7 2. True up for FY 2012-13 & FY 2013-14 9-10 3. Review for FY

More information

Statement of Reasons. 1.3 Subsequently a public hearing was held on , wherein stakeholders presented their views before the Commission.

Statement of Reasons. 1.3 Subsequently a public hearing was held on , wherein stakeholders presented their views before the Commission. HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA In the matter of formulation of the Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 SMP No. 50 of 2015 PRESENT: Dr. Dev Raj Birdi, Chairman A. B. Bajpai, Member Alok Gupta, Member

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM. PRESENT: Sri.T.M. Manoharan, Chairman

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM. PRESENT: Sri.T.M. Manoharan, Chairman KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM PRESENT: Sri.T.M. Manoharan, Chairman Petition No. 1893/DD (T)/Jhabua/2016/KSERC in OP No. 13/2015 In the matter of Procurement of 865

More information

MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION (MSERC)

MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION (MSERC) MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION (MSERC) Tariff Order For Annual Revenue Requirement & Generation Tariff For FY 2015 16 List of Contents ORDER... 1 1. Introduction... 5 1.1 1.2 1.3 1.4

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No. 1, 13th floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/ 65/ 69; Fax 022 22163976 E-mail: mercindia@merc.gov.in

More information

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO No , SECTOR 34 A, CHANDIGARH CONTENTS

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO No , SECTOR 34 A, CHANDIGARH CONTENTS PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO No. 220-221, SECTOR 34 A, CHANDIGARH CONTENTS CHAPTER TITLE PAGE NO. 1. Introduction 1-9 2. True up for FY 2014-15 11-31 3. True up for FY 2015-16 33-53

More information

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION PETITION NO.: 735/2011 & 789/2012 FILED BY. Madhyanchal Vidyut Vitran Nigam Limited IN THE MATTER OF

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION PETITION NO.: 735/2011 & 789/2012 FILED BY. Madhyanchal Vidyut Vitran Nigam Limited IN THE MATTER OF UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION PETITION NO.: 735/2011 & 789/2012 FILED BY Madhyanchal Vidyut Vitran Nigam Limited IN THE MATTER OF DETERMINATION OF ANNUAL REVENUE REQUIREMENT (ARR) AND

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on Approval of Business Plan And ARR for MYT Control Period FY 2016-17 to FY 2020-21 And Transmission and SLDC Tariff for FY 2016-17 for Jharkhand Urja Sancharan Nigam Ltd (JUSNL) Ranchi February

More information

ODISHA ELECTRICITY REGULATORY COMMISSION UNIT VIII, BHUBANESWAR

ODISHA ELECTRICITY REGULATORY COMMISSION UNIT VIII, BHUBANESWAR ODISHA ELECTRICITY REGULATORY COMMISSION UNIT VIII, BHUBANESWAR 751012 NOTIFICATION The 8 th September, 2014 No. OERC/RA/AMEND. REGU. 8/2013 (Vol-I)/1251 - In exercise of powers conferred by Section 61

More information

BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION, NEW DELHI PETITION NO. OF 2016 AND INDEX. Volume -1/2

BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION, NEW DELHI PETITION NO. OF 2016 AND INDEX. Volume -1/2 BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION, NEW DELHI PETITION NO. OF 2016 IN THE MATTER OF GMR-Kamalanga Energy Limited... Petitioner AND GRIDCO Limited... Respondents INDEX Volume -1/2 Sr.

More information

THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION SHIMLA. NOTIFICATION Shimla, the 22 nd November, 2018

THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION SHIMLA. NOTIFICATION Shimla, the 22 nd November, 2018 THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION SHIMLA NOTIFICATION Shimla, the 22 nd November, 2018 No. HPERC-F(1)-1/2018- Whereas section 61 of the Electricity Act, 2003 (36 of 2003), provides

More information

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, Bhopal - 462 016 AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY 2016-17 Petition Nos. Petition

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI No. Dated 6 th December, 2013 DRAFT NOTIFICATION In exercise of powers conferred under section 178 of the Electricity Act, 2003 (36 of 2003) read with

More information

TARIFF ORDER

TARIFF ORDER MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION "Urja Bhawan", Shivaji Nagar, Bhopal - 462 016 TARIFF ORDER 2006-07 Petition No. 141/05 (East Discom) 142/05 (West Discom) 144/05 (Central Discom) PRESENT:

More information

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, Bhopal - 462 016 AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY 2015-16 Petition Nos. Petition

More information

Implementation of Solar Based Projects in MP Dated 20 July, 2012

Implementation of Solar Based Projects in MP Dated 20 July, 2012 86 Compendium of Policies, Regulations, Technical Standards & Financing Norms for Solar Power Projects GOVERNMENT OF MADHYA PRADESH Implementation of Solar Based Projects in MP Dated 20 July, 2012 1. Title

More information

Executive Summary. Annual Performance Review towards: Truing up of ARR of FY09, APR of FY10 and Determination of ARR and Tariff for FY11

Executive Summary. Annual Performance Review towards: Truing up of ARR of FY09, APR of FY10 and Determination of ARR and Tariff for FY11 RInfra-Distribution (RInfra-D) Wire and Retail Annual Performance Review towards: Truing up of ARR of FY09, APR of FY10 and Determination of ARR and Tariff for FY11 Executive Summary Filed with Maharashtra

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, E-5 Arera Colony, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, E-5 Arera Colony, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, E-5 Arera Colony, Bhopal - 462 016 Petition No. 88/2012 PRESENT: Rakesh Sahni, Chairman A. B. Bajpai, Member Alok

More information

ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION IN CASE NO.: APR 32 / 12 13

ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION IN CASE NO.: APR 32 / 12 13 ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION IN CASE NO.: APR 32 / 12 13 IN RE THE APPLICATION OF WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED FOR ANNUAL PERFORMANCE REVIEW

More information

ASSAM ELECTRICITY REGULATORY COMMISSION

ASSAM ELECTRICITY REGULATORY COMMISSION ASSAM ELECTRICITY REGULATORY COMMISSION FILE NO. AERC. 511/2015 Petition No.: 14/2015 ORDER SHEET 21.12.2015 Before the Assam Electricity Regulatory Commission ASEB Campus, Dwarandhar, G. S. Road, Sixth

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on True-Up for FY 2014-15 & FY 2015-16, Business Plan, Aggregate Revenue Requirement and Tariff for Multi Year Tariff Period from FY 2016-17 to FY 2020-21 for Adhunik Power and Natural Resources

More information

MPERC TARIFF FILING FORMS UNIT -1 (TRUE UP PETITION) (For Financial Years: & )

MPERC TARIFF FILING FORMS UNIT -1 (TRUE UP PETITION) (For Financial Years: & ) MPERC TARIFF FILING FORMS UNIT -1 (TRUE UP PETITION) (For Financial Years: 2017-18 & 2018-19) FORM-TPS-1 SUMMARY SHEET Place Anuppur, Madhya Pradesh S. No. Particulars Remarks 2017-18 2018-19 (1) (2) (3)

More information

AMENDMENT ORDER DATED

AMENDMENT ORDER DATED KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM Petition No. : OP 37/2013 In the matter of Petitioner : Amendment to ARR & ERC of M/s Kanan Devan Hills Plantations Company Limited for