1 MPERC TARIFF FORMS FY , FY , FY

2 FORM 1 SUMMARY SHEET Name of the Petitioner Name of the Generation Station Place (Region/District/State) MB POWER (MADHYA PRADESH) LIMITED ANUPPUR THERMAL POWER PROJECT Rs Cr S.No. Particulars Unit Depreciation Form Interest on Loan Form 13A Return on Equity Form 1(i) Interest on Working Capital Form 13B O & M Expenses Compensation Allowance (If applicable) Special allowance (If applicable) Total Rs Crore Share of MP 30% Landed Fuel Cost (Domestic Coal) Rs/MT % of Fuel Quanitity % 100% 100% 100% 2.2 Landed Fuel Cost (Imported Coal) Rs/MT % of Fuel Quanitity % Secondary fuel oil cost Rs/Unit Energy Charge (Fuel) ex-bus (Paise/kWh) Rs/Unit

3 Statement showing claimed capital cost: Petitioner: Generating Station: Anuppur Thermal Power Station ( 2 x 600 MW) FORM- 1(I) Sl.No. Particulars Unit Opening Capital Cost Rs. Cr 4, , , Add: Addition during the year/ period Rs. Cr Less: Decapitalisation during the year/period Rs. Cr Less: Reversal during the year/period Rs. Cr Add: Discharges during the year/period Rs. Cr Closing Capital Cost Rs. Cr 5, , , Average Capital Cost Rs. Cr 5, , , Statement showing Return on Equity FORM- 1(II) Sl.No. Particulars Unit Opening Equity Rs. Cr Opening Equity Normative Add: Increase due to addition during the year/period Less: Decrease due to de-capitalisation during the year/period Less: Decrease due to reversal during the year/period Add: Increase due to discharges during the year/period Rs. Cr Rs. Cr Rs. Cr Rs. Cr Rs. Cr Closing equity Rs. Cr Average equity Rs. Cr Base rate of Return on Equity % 15.50% 15.50% 15.50% Tax Rate (MAT Rate) % % % % Rate of return on equity % % 19.71% 19.71% Return on equity Rs. Cr

4 Plant Characteristics Part-I FORM 2 Name of the Petitioner: Name of the Generating Station: Anuppur Thermal Power Station ( 2 x 600 MW) Unit(s)/Block(s) Parameters Unit-1 Unit-II Installed Capacity (MW) 600 MW 600 MW Schedule COD 5/20/2015 Nov 2015 Actual COD/Date of Taken Over (as applicable) 5/20/2015 4/7/2016 Pit Head or Non Pit Head Name of the Boiler Manufacture Name of Turbine Generator Manufacture Main Steams Pressure at Turbine inlet (kg/cm2) absl. Main Steam Temperature at Turbine inlet ( C)1 Reheat Steam Pressure at Turbine inlet (kg/cm2) 1 Reheat Steam Temperature at Turbine inlet ( C)1 Main Steam flow at Turbine inlet under MCR condition (tons/hr)2 Main Steam flow at Turbine inlet under VWO condition (tons/hr)2 Unit Gross electrical output under MCR /Rated condition (MW)2 Unit Gross electrical output under VWO condition (MW)2 Guaranteed Design Gross Turbine Cycle Heat Rate (kcal/kwh)3 Conditions on which design turbine cycle heat rate guaranteed % MCR % Makeup Water Consumption Design Capacity of Make up Water System Design Capacity of Inlet Cooling System Design Cooling Water Temperature (0C) Back Pressure Steam flow at super heater outlet under BMCR condition (tons/ hr) Steam Pressure at super heater outlet under BMCR condition) (kg/cm2) Steam Temperature at super heater outlet under BMCR condition (0C) Steam Temperature at Reheater outlet at BMCR condition (0C) Design / Guaranteed Boiler Efficiency (%) 4 Design Fuel with and without Blending of domestic/imported coal (Max/Min. Values) Type of Cooling Tower Type of cooling system 5 Type of Boiler Feed Pump 6 Fuel Details 7 -Primary Fuel -Secondary Fuel -Alternate Fuels Special Features/Site Specific Features Special Technological Features Environmental Regulation related features8 Any other special features Non-Pit Head Station M/S Harbin Boiler company Ltd. Turbine - M/S Harbin Turbine company Ltd % Ash (%) - 44/40, Moisture (%) - 16/12, Volatile Matter (%) - 26/20, Induced Draft Closed cycle Turbo Driven Coal LDO/ HFO

5 Normative Parameters Considered For Tariff Computation FORM 3 Name of the Petitioner: Name of the Generating Station: Anuppur Thermal Power Station (2 x 600 MW) Particulars Unit Guaranteed Design heat rate kcal/kwh Base Rate of Return on Equity % Tax Rate % % % % Target Availability % Auxiliary Energy Consumption % Gross Station Heat Rate kcal/kwh Specific Fuel Oil Consumption ml/kwh Cost of Coal/Lignite for WC in Months Cost of Main Secondary Fuel Oil for WC in Months Fuel Cost for WC in Months Not Applicable. Not Applicable. Not Applicable. Liquid Fuel Stock for WC in Months Not Applicable. Not Applicable. Not Applicable. O & M expenses in Months Maintenance Spares for WC % of O&M Charges 20% 20% 20% Receivables for WC in Months Storage capacity of Primary Fuel Prime lending Rate of SBI as on Basis point Blending ratio of domestic coal/imported coal %

6 Details of Foreign loans (Details only in respect of loans applicable to the project under petition) FORM- 4 Name of the Company Name of the Power Station 2 x 600 MW Anuppur Thermal Power Project S. No. Financial Year (Starting from COD) Date Amount (Foreign Currency) Exchange Rate Amount (Rs.) Date Amount (Foreign Currency) Exchange Rate Amount (Rs.) Date Amount (Foreign Exchang Currency) e Rate Amount (Rs.) Date Amount (Foreign Exchang Currency) e Rate Amount (Rs.) Total Loan in 'USD million million million million A.1 At the date of Drawl 2 14/12/ ,769, ,506, /01/ ,500, ,617,303, /2/ ,210, ,683,649, /03/2016 9,200, ,189, Scheduled repayment date of principal 1/5/ Scheduled payment date of interest 14/12/ /01/2016 1/2/ /03/ At the end of Financial year B In case of hedging 3 1 At the date of hedging 1/1/ ,769, ,771, /2/ ,500, ,609,399, /2/ ,210, ,691,241, /6/2016 9,200, ,759, Rate of Interest 11.10% 11.09% 11.13% 11.10% 2 Period of hedging 10 Years 10 Years 10 Years 10 Years 3 Cost of hedging

7 FORMAT 5 B Name of the Petitioner : MB POWER (MADHYA PRADESH) LIMITED Name of the Generating Station: ANUPPUR THERMAL POWER PROJECT S No Break Down Estimated Capital Expenditure as Submitted in Petition 19/2014 Total Estimated Capital Expenditure as per FS Capital Expenditure for Unit 1 as on 31st March 2016 as per FS Actual Cash Expenditure on COD of Unit 1 (upto 20th May 2015) As on As on Undischarged Liability/Provisions (+) Advances (-) as on COD of Unit-I Actual Cash Expenditure on for Unit-I Undischarged Liability/Provisions (+) Advances (-) as on for Unit-I A B C E F 1 Cost of Land & Site Development 1.1 Free Hold Land incl. R&R Lease Hold Land Sub Total- Land & Site Development Plant & Equipment 2.1 Boiler, Turbine & Generator 2, , , , , Coal Handling System Ash Handling System (0.71) 2.4 Water System Fuel Handling & Other Mechanical Systems (0.69) 2.6 Switchyard & Other Electrical Systems Control & Instrumentation Systems (0.26) 2.8 Taxes & Duties (CD, ED & Other taxes) Raw Water Reservoir (5.28) (5.28) 2.10 Temp. Construction & Enabling works (other Assets) Barrage (Barrage + Pump House+Raw Water Pipeline) Railway Siding (0.02) 2.13 Taxes on Barrage & Railway Siding Mandatory Spares (0.20) Sub Total - Plant & Machinery 4, , , , , Building & Civil Works General Civil Works for Main Plant Building, Plant Roads and Drains & Other Misc. Civil Works etc Raw Water Reservoir Township (Boundary Wall, Roads & Parking, External Sewarage, Residential Quarters etc) Ash dyke Other Buildings (Admin Building, canteen watch Towers, Fire Stations, Time Office, Security House, Drivers Rest Room/Helipad) + BOUNDARY WALL Temp. Construction & Enabling works (other Assets) Transportation & Insurance for Non EPC Supplies Taxes on Non EPC items Sub Total - Civil Works 1, Pre-Operative Expenses/Pre-Commissioning Expenses IDC, FC, FERV, Hedging Cost & Contingency 1, , , , , PROJECT COST (wot CD/ED Provision) 7, , , , , Custom & Excise Duty on Offshore/Onshore Equipments Total Capital Expenditure 8, , , , , FERV Losses charged to P&L Unamortized Cost to Borrowings TOTAL 8, , , , ,

8 Details of variables, parameters, optional package etc. for New Project FORM 5D Name of the Petitioner Name of the Generating Station 2 x 600 MW Anuppur Thermal Power Project Unit Size Number of Units 600 MW 2 in No. Greenfield Greenfield/Extension S. No. Variables 1 Coal Quality Calorific Value 3400 Kcal/kg 2 Ash Content 43% 3 Moisture Content 15% 4 Boiler Efficiency Suspended Particulate Matter mg/nm3 <=50 6 Ash Utilization As per applicable MOEF guidelines 7 Boiler Configuration Pulverised corner fired vertical boiler 8 Turbine Heat Rate CW Temperature Water Source Son River 11 Distance of Water Source 5.4 Km 12 Clarifier 2 (nos.) x 2030M 3 /hr 13 Mode of Unloading Oil Unloading by Tanker (by road) 14 Coal Unholding Mechanism Wagon Tippler / Track Hopper 15 Type of Fly Ash Disposal and Distance Lean Slurry / 4.5 kms 16 Type of Bottom Ash Disposal and Distance Lean Slurry / 4.5 kms 17 Type of Soil Blackish Brown Colour silty clay 18 Foundation Type (Chimney) Bored Cast In-Situ Piles 19 Water Table Design Water Table-1m below G.L. 20 Seismic and Wind Zone Zone-III, Basic wind velocity 39m/s 21 Condensate Cooling Method IDCT 22 Desalination/RO Plant NIL 23 Evacuation Voltage Level 400KV 24 Type of Coal (Domestic/Imported) Domestic (However any shortfall in reqiurement is proposed to meet through domestic/ e-auction / imported coal) Parameter/Variables Values Completion Schedule Terms of Payment Performance Guarantee Liability Basis of Price (Firm/Escalation-Linked) Equipment Supplier (Country of Origin) Optional Packages Desalination Plant/RO Plant MGR Railway Siding Unloading Equipment at Jetty Rolling Stock/Locomotive FGD Plant Length of Transmission Line till Tie Point (in km) Unit-1: 20th May 2015 Unit-2: 07th April, 2016 NA Lanco Infratech Limited (LITL) Firm 1. Steam generator - M/S Harbin Boiler Company Ltd., China 2. Steam turbine - M/S Harbin Turbine Company Ltd., China 3. Generator: M/S Harbin Generator Company Ltd., China Yes/No No. No Yes No 2nos. Of Diesel Loco No Nil (as power is evacuated at Plant bus-bar)

9 Financial Package upto COD FORM- 6 Name of the Petitioner Name of the Generating Station 2 x 600 MW Anuppur Thermal Power Project (Rs.Cr) Financial Package Financial Package S. no. Lender as Approved as on Project COD As Admitted on COD Currency and Amount3 Currency and Amount3 Currency and Amount A DEBT A.1 State Bank of India INR 1, INR 1, A.2 AXIS Bank INR INR A.3 SBOP INR INR - A.4 PTC INR INR A.5 L&T INR INR A.6 PNB INR INR - A.7 LIC INR INR A.8 Federal Bank INR INR A.9 SBBJ INR INR - A.10 PFC INR 1, INR 1, A.11 REC INR INR A.12 Additional Debt appraised INR 1, INR - A.13 IIFCL UK* INR - INR A.14 Normative Debt at 70% for Rs Cr INR INR DEBT 6, , Less: Provision for WCM (199.53) (199.53) DEBT (net off provision for WCM) 6, , B EQUITY B.1 Foreign - B.2 Domestic INR 2, INR 2, B.3 Normative Equity at 30% of Rs Cr INR INR B.4 Additional Equity INR - INR TOTAL EQUITY 2, , Less: Provision for WCM (70.47) (70.47) EQUITY (net off provision for WCM) 2, , Debt : Equity Ratio TOTAL CAPITAL COST 8, , Total Debt 6, , Total Equity 2, , *$ 150 M SANCTIONED FROM IIFCL UK

10 Details of Project Specific Loans FORM 7 Name of the Company Name of the Power Station MB POWER (MADHYA PRADESH) LTD. ANUPPUR Thermal Power station (2x600 MW) Particulars Source of Loan 1 SBI Axis Bank SBOP PTC-PFS L&T Infra PNB LIC Federal SBBJ PFC REC IIFCL UK Currency 2 Amount of Loan sanctioned (after downselling of loans) 1, INR , Interest Type 6 Fixed Interest Rate, if applicable Floating NA Base Rate, if Floating Interest (based on Bankers certificate upto Margin, if Floating Interest % 13.91% 14.50% 14.36% 14.07% 15.44% 13.24% 14.54% 15.58% 14.06% 13.10% 12.69% Are there any Caps/Floor 9 If above is yes,specify caps/floor Moratorium Period 10 6 months Moratorium effective from Repayment Period 11 Repayment effective from 10 years After the 6 months from the date of commercial operation of the station 1/5/2016 Repayment Frequency 12 Repayment Instalment 13,14 Base Exchange Rate 16 Are foreign currency loan hedged? Quarterly 40 Installements Yes If above is yes,specify details 17 NA FORM 4 * Based on Banker's Certificates of Outstanding Loans and Interest paid

11 Name of the Petitioner Name of the Generating Station Financing of Additional Capitalisation Anuppur Thermal Power Station (2 x 600 MW) Actual / Anticipated Admitted PART-I FORM TPS- 10 (Rs. Cr) Financial Year (Starting from COD) Year 1 FY Year 3 Year 4 Year 5 Year 1 Year 2 Year 3 Year 4 Year Amount Captalized in Work/Equipment Financing Details Loan Loan 2 Loan 3 & so on Total Loan 2 Equity* Internal Resources Others Total

12 Calculation of Depreciation FORM 11 Name of the Petitioner Name of the Generating Station Anuppur Thermal Power Station ( 2 x 600 MW) Sl. no. Name of the Assets1 Gross Block as on Gross Block as on Average Gross Block Depreciation Rates as per MPERC's Depreciation Rate Schedule Depreciation Amount for FY Land % - 2 Lease Hold Land % Civil & structure works , , % Plant & equipments 3, , , % TOTAL 4, , , Weighted Average Rate of Depreciation (%) 4.78%

13 Statement of Depreciation FORM 12 Name of the Petitioner Name of the Generating Station Anuppur Thermal Power Station ( 2 x 600 MW) Rs Cr Financial Year (Annualized) Opening Capital Cost Closing Capital Cost Average Capital Cost Freehold land Rate of depreciation 4.78% 4.78% 4.78% Depreciable value Balance useful life at the beginning of the period Remaining depreciable value Depreciation (for the period) Depreciation (annualized) Cumulative depreciation at the end of the period Net Cumulative depreciation at the end of the period

14 Calculation of Weighted average rate of Interest on Actual Loan Outstanding PART-I FORM- 13 Name of The Generating Company :- Name of The Power Station :- 2 x 600 MW Anuppur Thermal Power Project (Amount in Crs.) PTC India Financial Services Limited Opening Balance Addition of Loan Downselling of Loan Net Addition of Loan Closing Balance Average Loan Actual Interest Paid Rate of Interest 15.99% 13.68% 13.53% 14.59% 14.36% Power Finance Corporation Limited Opening Balance , Addition of Loan Downselling of Loan Net Addition of Loan Closing Balance , , Average Loan , Actual Interest Paid Rate of Interest 0.00% 0.00% 1.21% 11.29% 14.06% Rural Electrification Corporation Limited Opening Balance Addition of Loan Downselling of Loan Net Addition of Loan Closing Balance Average Loan Actual Interest Paid Rate of Interest 0.00% 0.00% 0.00% 14.50% 13.10% State Bank of Patiala Opening Balance Addition of Loan Downselling of Loan Net Addition of Loan Closing Balance Average Loan Actual Interest Paid Rate of Interest 17.97% 14.24% 14.80% 15.11% 14.50% SBBJ Opening Balance Addition of Loan Downselling of Loan Net Addition of Loan Closing Balance Average Loan Actual Interest Paid Rate of Interest 7.07% 15.41% 15.30% 15.07% 15.58% SBI Opening Balance , , Addition of Loan Downselling of Loan Net Addition of Loan Repayment of Loan Closing Balance , , , Average Loan , , Actual Interest Paid Rate of Interest 13.27% 13.16% 15.00% 14.02% 14.61%

15 Calculation of Weighted average rate of Interest on Actual Loan Outstanding PART-I FORM- 13 Name of The Generating Company :- Name of The Power Station :- PTC India Financial Services Limited 2 x 600 MW Anuppur Thermal Power Project (Amount in Crs.) Federal Bank Opening Balance Addition of Loan Downselling of Loan Net Addition of Loan Closing Balance Average Loan Actual Interest Paid Rate of Interest 7.41% 13.75% 14.50% 14.56% 14.54% L&T Opening Balance Addition of Loan Downselling of Loan Net Addition of Loan Closing Balance Average Loan Actual Interest Paid Rate of Interest 17.56% 13.83% 13.74% 14.30% 14.07% PNB Opening Balance Addition of Loan Downselling of Loan Net Addition of Loan Closing Balance Average Loan Actual Interest Paid Rate of Interest 13.96% 13.77% 13.49% 15.53% 15.44% AXIS Opening Balance Addition of Loan Downselling of Loan Net Addition of Loan Closing Balance Average Loan Actual Interest Paid Rate of Interest 14.83% 14.07% 15.89% 14.87% 13.91% LIC Opening Balance Addition of Loan Downselling of Loan Net Addition of Loan Closing Balance Average Loan Actual Interest Paid Rate of Interest 9.77% 14.47% 14.32% 13.72% 13.24% HPPPL Opening Balance Addition of Loan Downselling of Loan Net Addition of Loan Repayment of Loan Closing Balance Average Loan Actual Interest Paid Rate of Interest 0.00% 0.00% 0.00% 14.00% 14.00%

16 Calculation of Weighted average rate of Interest on Actual Loan Outstanding PART-I FORM- 13 Name of The Generating Company :- Name of The Power Station :- PTC India Financial Services Limited 2 x 600 MW Anuppur Thermal Power Project (Amount in Crs.) IIFCL-UK Opening Balance Addition of Loan Downselling of Loan Net Addition of Loan Closing Balance Average Loan Actual Interest Paid Rate of Interest 0.00% 0.00% 0.00% 0.00% 12.69% Total Opening Balance - 1, , , , Addition of Loan 1, , , , , Downselling of Loan Net Addition of Loan 1, , , , Repayment of Loan Closing Balance 1, , , , , Average Loan , , , , Actual Interest Paid Rate of Interest 13.89% 13.72% 12.43% 13.89% 13.27%

17 Calculation of Interest on Normative Loan FORM 13 A Name of the Company: Name of the Power Station: Anuppur Thermal Power Station ( 2 x 600 MW) Rs Cr Particulars Net Normative loan Opening 3, , , , Add: Increase due to addition during the year/period Less: Decrease due to de-capitalization during the year/ period - Add: Increase due to discharges during the year/period Less: Decrease due to reversal during the year/period Net Normative loan Closing 3, , , , Average Normative Loan 3, , , Weighted average Rate of Interest of actual Loans 13.27% 13.27% 13.27% Interest on Normative loan

18 FORM 13 B Calculation of Interest on Working Capital Name of the Company: Name of the Power Station: Anuppur Thermal Power Station ( 2 x 600 MW) Rs Cr Sl. No. Particulars Cost of Coal/Lignite Cost of Secondary Fuel Oil Fuel Cost Liquid Fuel Stock O & M Expenses Maintenance Spares Receivables Total Working Capital Working capital Margin as on Total Working Capital allowed Rate of Interest 12.80% 12.80% 12.80% 12 Interest on allowed Working Capital WCM funded by Debt as per FS % WCM funded by Equity as per FS % Interest on WCM funded by Long term loans 13.27% Return on WCM 19.71% Total Interest on Working Capital

19 Other Income FORM 13 C Name of the Company: Name of the Power Station: MB POWER (MADHYA PRADESH) LTD. ANUPPUR Thermal Power station (2x600 MW) Rs Cr Particulars FY FY Interest on Loans and advance - Interest received on deposits Income from Investment 1.87 Income from sale of scrap 0.04 Rebate for timely payment - Surcharge on late payment from beneficiaries - Rent from residential building - Misc. receipts (Please Specify Details) 0.02 Less: Transferred to direct expenditure incurred during construction period Gross Income Net Income 10.21

20 FORM 15 Details/Information to be Submitted in respect of Fuel for Computation of Energy Charges 1 Name of the Petitioner Name of the Generating Station MB POWER (MADHYA PRADESH) LTD. ANUPPUR Thermal Power station (2x600 MW) For preceding S No. Month Unit 3rd Month (from COD or from as the case may be ) Jan nd Month (from COD or from as the case may be ) Feb st Month (from COD or from as the case may be ) Mar FSA Non-FSA FSA Non-FSA FSA Non-FSA 1 Quantity of Coal/ Lignite supplied by Coal/Lignite Company (MMT) , ,871 94, ,891 87,701 2 Adjustment (+/-) in quantity supplied made by Coal/Lignite Company (MMT) 3 Coal supplied by Coal/Lignite Company (1+2) (MMT) 4 Normative Transit & Handling Losses (For coal/lignite based Projects) (MMT) 5 Net coal / LigniteSupplied (3-4) (MMT) 6 Amount charged by the Coal/Lignite Company (Rs.) 7 Adjustment (+/-) in amount charged made by Coal/ LigniteCompany (Rs.) 8 Total amount Charged (6+7) (Rs.) 9 Transportation charges by rail/ship/road transport ( Rs.) 10 Adjustment (+/-) in amount charged made by Railways/Transport Company ( Rs.) 11 Demurrage Charges, if any ( Rs.) 12 Cost of diesel in transporting coal through MGR system, if applicable ( Rs.) 13 Total Transportation Charges (9+/ ) ( Rs.) 14 Total amount Charged for coal/ supplied including Transportation (8+13) ( Rs.) 15 Landed cost of coal Rs/MT 2, , , , , , Blending Ratio (Domestic/Imported) 17 Weighted average cost of coal for preceding three months Rs./MT 18 GCV of Domestic Coal as per bill of Coal Company 19 GCV of Imported Coal as per bill Coal Company 20 Weighted average GCV of coal/ Lignite as Billed (kcal/kg) 21 GCV if Domestic Coal as received at Station (kcal/kg) 22 GCV if Imported Coal as received at Station (kcal/kg) 23 Weighted average GCV of coal as Received (kcal/kg) 3, ,615 3,524 3,621 3,515

21 Computation of Energy Charges (Additional form) Part-I Additional Form Name of the Company Name of the Power Station ANUPPUR Thermal Power station (2x600 MW) Description Unit Capacity MW NAPAF % 83% 83% 83% Gross Station Heat Rate Kcal/kWh Auxiliary Energy Consumption % 6.50% 6.50% 6.50% Energy Generation - Gross MU Auxiliary Energy Consumption MU Ex-bus Energy Sent Out MU Specific Oil Consumption ml/kwh Wt. Avg. GCV of Oil KCal/Lt Price of Oil Rs./KL Wt. Avg. GCV of Coal kcal/kg Price of Coal Rs./MT Heat Contribution from SFO Kcal/kWh Oil Consumption KL Heat Contribution from Coal Kcal/kWh Specific Coal Consumption kg/kwh Normative Transit Loss % 0.80% 0.80% 0.80% Coal Consumption MMT Total Cost of Oil Rs Cr Total Cost of Coal Rs Cr Total Fuel Cost Rs Cr Rate of Energy Charge from Secondary Fuel Oil ex-bus Rs/kWh Rate of Energy Charge from Coal ex-bus Rs/kWh Rate of Energy Charge ex-bus per kwh Paise/kWh

MPERC TARIFF FILING FORMS UNIT -1 (TRUE UP PETITION) (For Financial Years: & )

MPERC TARIFF FILING FORMS UNIT -1 (TRUE UP PETITION) (For Financial Years: & ) MPERC TARIFF FILING FORMS UNIT -1 (TRUE UP PETITION) (For Financial Years: 2017-18 & 2018-19) FORM-TPS-1 SUMMARY SHEET Place Anuppur, Madhya Pradesh S. No. Particulars Remarks 2017-18 2018-19 (1) (2) (3)

More information

MPERC TARIFF FORMS ANNEXURE

MPERC TARIFF FORMS ANNEXURE MPERC TARIFF FORMS ANNEXURE SUMMARY SHEET Name of the Petitioner: MB Power (Madhya Pradesh) L FORM 1 Name of the Generation Station: Anuppur Thermal Power Station ( 2x 600 MW) (in Rs Crores) S.No. Particulars

More information

Summary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar

Summary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar Summary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar In terms of sections 61, 62, 64 and 86 of the Electricity Act, 2003, the tariff for the generation and sale

More information

REGULATORY FORMATS FOR ARR & TARIFF FILING BY GENERATION LICENSEE

REGULATORY FORMATS FOR ARR & TARIFF FILING BY GENERATION LICENSEE REGULATORY FORMATS FOR ARR & TARIFF FILING BY GENERATION LICENSEE Name of Plant/ Station INDEX OF FORMATS Formats 1 Form F1 Annual Revenue Requirement Summary 2 Form F2a Plant Charateristics-Thermal 3

More information

Tenughat Vidyut Nigam Limited (TVNL) Annual Revenue Requirement FY

Tenughat Vidyut Nigam Limited (TVNL) Annual Revenue Requirement FY POWERING JHARKHAND Tenughat Vidyut Nigam Limited (TVNL) (A Government of Jharkhand Undertaking) Hinoo, Doranda,Ranchi-834 002 Annual Revenue Requirement FY 2007-08 Submitted to Jharkhand State Electricity

More information

Summary Sheet. From to

Summary Sheet. From to Summary Sheet FORM-TPS-1 Name of the Generating Company Jaiprakash Power Ventures Limited Name of the Power Station : Jaypee Nigrie Super Thermal Power Plant S. No. Particulars Unit From 03-09-2014 to

More information

Gujarat State Electricity Corporation Ltd. MYT Petition, True-up Petition Formats - Generation Dhuvaran CCPP 2 Sr. Title Reference No.

Gujarat State Electricity Corporation Ltd. MYT Petition, True-up Petition Formats - Generation Dhuvaran CCPP 2 Sr. Title Reference No. Title Reference 1 Aggregate Revenue Requirement - Summary Sheet Form 1 2 Summary of Tariff Proposal Form 1.1 3 Operational Parameters - Thermal Generation Form 2.1 4 Energy Charges - Thermal Generation

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on True-Up for FY 2014-15 & FY 2015-16, Business Plan, Aggregate Revenue Requirement and Tariff for Multi Year Tariff Period from FY 2016-17 to FY 2020-21 for Adhunik Power and Natural Resources

More information

Tariff Regulation in India

Tariff Regulation in India Department of Industrial and Management Engineering Indian Institute of Technology Kanpur 4 th Capacity Building Programme for Officers of Electricity Regulatory Commissions 18 23 July, 2011 Forum of Regulators

More information

Regulatory formats for Multi Year Annual Revenue Requirement for the Control Period from FY to FY and determination of retail tariff

Regulatory formats for Multi Year Annual Revenue Requirement for the Control Period from FY to FY and determination of retail tariff Regulatory formats for Multi Year Annual Revenue Requirement for the Control Period from FY 2016-17 to FY 2020-21 and determination of retail tariff for FY 2018-19 along with trueup of the FY 2012-13,

More information

RInfra-G Multi Year Tariff Petition for FY to FY Executive Summary 1

RInfra-G Multi Year Tariff Petition for FY to FY Executive Summary 1 TABLE OF CONTENTS 1. BACKGROUND... 4 1.1. Introduction... 4 1.2. Objective of the present MYT Petition... 4 2. TRUING UP OF FY 2014-15... 4 2.1. Operational Performance for FY 2014-15... 5 2.2. Fuel Cost

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI No. Dated 6 th December, 2013 DRAFT NOTIFICATION In exercise of powers conferred under section 178 of the Electricity Act, 2003 (36 of 2003) read with

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.16 of 2014 PRESENT: Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta, Member

More information

MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED (MSPGCL/MAHAGENCO)

MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED (MSPGCL/MAHAGENCO) MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED (MSPGCL/MAHAGENCO) PETITION FOR CAPITAL COST AND TARIFF DETERMINATION FOR FY 2012-13 TO FY 2015-16 INCLUDING TRUE UP FOR FY 2012-13 &FY 2013-14 OF BHUSAWAL

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.28 of 2012 PRESENT: Rakesh Sahni, Chairman IN THE MATTER OF: C.S. Sharma, Member

More information

I N V O I C E S U M M A R Y

I N V O I C E S U M M A R Y I N V O I C E S U M M A R Y Send To: SE(RDPPC) Copy To: 220 KV substation Heerapura Ajmer Road Jaipur 302005 (On behalf of Aravali Power Company Pvt. Ltd.) Beneficiary: Bill Date 9-Mar-2017 Sl. No. Bill

More information

I N V O I C E S U M M A R Y

I N V O I C E S U M M A R Y I N V O I C E S U M M A R Y Send To: SE(RDPPC) Copy To: 220 KV substation Heerapura Ajmer Road Jaipur 302005 (On behalf of Aravali Power Company Pvt. Ltd.) Beneficiary: Bill Date 9-Mar-2017 Sl. No. Bill

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No. 1, 13th floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/ 65/ 69; Fax 022 22163976 E-mail: mercindia@merc.gov.in

More information

Uttar Pradesh Electricity Regulatory Commission

Uttar Pradesh Electricity Regulatory Commission Uttar Pradesh Electricity Regulatory Commission Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696 Dated: 22.3.2010 In exercise of powers conferred under section 181 read with section 9, 61, 86

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on approval of Business plan and determination of ARR for the control period to (including True up for 2015-16 ) for Tata Power Company Limited (TPCL) Ranchi 19 February 2018 to (including True up

More information

COMPONENTS OF REVENUE REQUIREMENT

COMPONENTS OF REVENUE REQUIREMENT COMPONENTS OF REVENUE REQUIREMENT A typical Tariff Application of Discom has to include Demand Forecast Annual Revenue Requireme nt to meet the Cost of Supply to cater to the demand Power Procurement (Self+Purchase)

More information

Tariff Filing. Sri Damodaram Sanjeevaiah Thermal Power Station (2 x 800 MW)

Tariff Filing. Sri Damodaram Sanjeevaiah Thermal Power Station (2 x 800 MW) Tariff Filing Sri Damodaram Sanjeevaiah Thermal Power Station (2 x 800 MW) For the control period 2014-2019 INDEX Annex Description Page Application with supporting affidavit 1-16 A-1 Capital Cost 17-19

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No. 70 of 2015 PRESENT: Dr. Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta, Member

More information

Petition No 1234 of 2017

Petition No 1234 of 2017 No 1234 of 2017 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PRESENT: Hon ble Sri. S. K. Agarwal, Chairman Hon ble Sri. K. K. Sharma, Member IN THE MATTER OF: AND IN THE MATTER OF:

More information

The Bihar Gazette E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY BIHAR ELECTRICITY REGULATORY COMMISSION, PATNA

The Bihar Gazette E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY BIHAR ELECTRICITY REGULATORY COMMISSION, PATNA REGISTERED NO. PT-40 The Bihar Gazette E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY 7 VAISHAKHA 1929 (S) (NO. PATNA 426) PATNA, FRIDAY 27TH APRIL 2007 BIHAR ELECTRICITY REGULATORY COMMISSION, PATNA

More information

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA BIHAR ELECTRICITY REGULATORY COMMISSION PATNA NOTIFICATION 2 nd August, 2010 No. BERC-Regl/Solar-2/2010-03 In exercise of powers conferred under Section 61 read with Section 181(2)(zd) of the Electricity

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal (M.P.) - 462 016 Petition No. 62 of 2016 PRESENT: Dr. Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok

More information

Tariff Determination : Generation and Transmission (Case Study)

Tariff Determination : Generation and Transmission (Case Study) Department of Industrial and Management Engineering Indian Institute of Technology Kanpur 3 rd Capacity Building Programme for Officers of Electricity Regulatory Commissions 23 28 August, 2010 Tariff Determination

More information

Executive Summary of Tata Power Generation True up Petition for FY as well as MYT Petition for FY to FY

Executive Summary of Tata Power Generation True up Petition for FY as well as MYT Petition for FY to FY Executive Summary of Tata Power Generation True up Petition for FY 2011-12 as well as MYT Petition for FY 2012-13 to FY 2015-16 Tata Power G Page 1 TABLE OF CONTENTS TABLE OF CONTENTS... 2 LIST OF TABLES...

More information

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED MYT Petition, True-up Petition Formats - Transmission

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED MYT Petition, True-up Petition Formats - Transmission Title Reference 1 Aggregate Revenue Requirement - Summary Sheet Form 1 2 Normative Operation and Maintenance Expenses Form 2 3 Operations and Maintenance Expenses Form 2.1 4 Transmission Network Details

More information

SECTOR UPDATE KEY HIGHLIGHTS: FY 2011 FINANCIAL RESULTS SITE PHOTOGRAPHS

SECTOR UPDATE KEY HIGHLIGHTS: FY 2011 FINANCIAL RESULTS SITE PHOTOGRAPHS FY 2011 SECTOR UPDATE KEY HIGHLIGHTS: FY 2011 FINANCIAL RESULTS PROJECT UPDATE STRATEGIC PRIORITIES SITE PHOTOGRAPHS 2 Capacity Build up (GW) Peak Demand/Supply (GW) FY 2011 India: World s 6 th largest

More information

By order of the Commission Sd/- (G. K. Dhall) Secretary

By order of the Commission Sd/- (G. K. Dhall) Secretary ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN UNIT-VIII, BHUBANESWAR 751 012 Tel. No.[0674] 2396117/2393097 Fax: 2395781/2393306, E-mail: orierc@rediffmail.com, Website: www.orierc.org

More information

Petition No. 05 of 2016

Petition No. 05 of 2016 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No. 05 of 2016 PRESENT: Dr. Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta, Member

More information

EXTRA ORDINARY 13 SHRAVANA (S) BIHAR ELECTRICITY REGULATORY COMMISSION

EXTRA ORDINARY 13 SHRAVANA (S) BIHAR ELECTRICITY REGULATORY COMMISSION REGISTERED NO. PT.-40 The B Bihar Gazett te EXTRA ORDINARY PUBLISHED BY AUTHORITY 13 SHRAVANA (S) (NO.PATNA 541) PATNA, WEDNESDAY, 4TH AUGUST 2010 BIHAR ELECTRICITY REGULATORY COMMISSION NOTIFICATION The

More information

Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail: mercindia@mercindia.org.in

More information

Compensatory Tariff Orders...A Fine Balancing Act by CERC

Compensatory Tariff Orders...A Fine Balancing Act by CERC Impact Analysis: Compensatory Tariff Orders...A Fine Balancing Act by CERC March 11, 2014 CERC has finally notified the long awaited Compensatory Tariff orders on imported coal based Tata and Adani Mundra

More information

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED MYT Petition, True-up Petition Formats - Transmission

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED MYT Petition, True-up Petition Formats - Transmission Title Reference 1 Aggregate Revenue Requirement - Summary Sheet Form 1 2 Normative Operation and Maintenance Expenses Form 2 3 Operations and Maintenance Expenses Form 2.1 4 Transmission Network Details

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.55 of 2012 PRESENT: Rakesh Sahni, Chairman IN THE MATTER OF: C.S. Sharma, Member

More information

ODISHA ELECTRICITY REGULATORY COMMISSION UNIT VIII, BHUBANESWAR

ODISHA ELECTRICITY REGULATORY COMMISSION UNIT VIII, BHUBANESWAR ODISHA ELECTRICITY REGULATORY COMMISSION UNIT VIII, BHUBANESWAR 751012 NOTIFICATION The 8 th September, 2014 No. OERC/RA/AMEND. REGU. 8/2013 (Vol-I)/1251 - In exercise of powers conferred by Section 61

More information

Order on. Petition No. 21/2014

Order on. Petition No. 21/2014 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 4 th and 5 th Floor, Metro Plaza, Bittan Market, Bhopal - 462 016 Order on ARR & Retail Power Supply Tariff for Electricity Distribution Business of Special

More information

Petition No. 975 of 2014 and 1017 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Date of Order:

Petition No. 975 of 2014 and 1017 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Date of Order: Petition No. 975 of 2014 and 1017 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order: 27.11.2015 IN THE MATTER OF: AND IN THE MATTER OF M/s Lalitpur Power Generation

More information

Summary Sheet. 3 Variable Charges recoverable ECR Calculation

Summary Sheet. 3 Variable Charges recoverable ECR Calculation Summary Sheet FORM-TPS-1 Name of the Generatg Company Name of the Power Station : Jaiprakash Power Ventures Limited Jaypee Ba Thermal Power Plant (Rs. Crs) S. No. Particulars Ref. Form 2017-18 1 2 3 4

More information

PUBLIC NOTICE. O. P. No. 9 of 2016

PUBLIC NOTICE. O. P. No. 9 of 2016 TELANGANA STATE ELECTRICITY REGULATORY COMMISSION 11-4-660, 5 th Floor, Singareni Bhavan, Red Hills, Hyderabad. Phone Nos. (040) 23397625/ 23311125 to 28 Fax No.(040)23397489 Website www.tserc.gov.in PUBLIC

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.40 of 2012 PRESENT: Rakesh Sahni, Chairman IN THE MATTER OF: In the matter of determination

More information

TARIFF ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION CASE NO: TP 31 / IN RE THE TARIFF PETITION OF THE WEST BENGAL

TARIFF ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION CASE NO: TP 31 / IN RE THE TARIFF PETITION OF THE WEST BENGAL TARIFF ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION IN CASE NO: TP 31 / 07 08 IN RE THE TARIFF PETITION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR THE YEAR 2007 2008 UNDER

More information

TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Tariff Order No 1 of 2010 dated

TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Tariff Order No 1 of 2010 dated TAMIL NADU ELECTRICITY REGULATORY COMMISSION Tariff Order No 1 of 2010 dated 27.05.2010 Sl.No Description Summary of Regulations 1 Title Tariff order for projects covered by Jawaharlal Nehru National Solar

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION Urja Bhawan, Shivaji Nagar, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION Urja Bhawan, Shivaji Nagar, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION Urja Bhawan, Shivaji Nagar, Bhopal-462 016 (Email: secmperc@sancharnet.in) (Website : www.mperc.org) ORDER Dated : 29 th November 2002 Petition No. 99/2002

More information

BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL

BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL IN THE MATTER OF Provisional approval of Generation tariff of M.P. s 57% share of power in Sardar Sarovar Project (6x200+5x50

More information

Before the Karnataka Electricity Regulatory Commission, Bangalore. In the matter of Determination of Tariff in respect of Renewable Sources of Energy

Before the Karnataka Electricity Regulatory Commission, Bangalore. In the matter of Determination of Tariff in respect of Renewable Sources of Energy Before the Karnataka Electricity Regulatory Commission, Bangalore Dated 18 th January 2005 Present: 1. K.P. Pandey, Chairman 2. Sri H.S.Subramanya, Member 3. Sri S.D.Ukkali, Member In the matter of Determination

More information

GMR Chhattisgarh Energy Limited

GMR Chhattisgarh Energy Limited Sr. GMR Chhattisgarh Energy Limited 1 RfS - Bid Informati on Sheet 2 RfS - 1.2.2 Ceiling tariff of Rs. 2.82/kWh 1.2.2: The Gross Station Heat Rate (SHR) quoted by Bidder has to be less than or equal to

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL under Coal Mines (Special Provisions) Second Ordinance, 2014 and Rules framed SMP No. 50 of 2015 DAILY ORDER (Date of Hearing: 24 th November, 2015)

More information

Energy Q1 FY 2012 Lighting up the Future 1

Energy Q1 FY 2012 Lighting up the Future 1 Energy Q1 FY 2012 Lighting up the Future 1 SECTOR UPDATE KEY HIGHLIGHTS FINANCIAL RESULTS PROJECT UPDATE STRATEGIC PRIORITIES SITE PHOTOGRAPHS 2 Capacity Build up (GW) Peak Demand/Supply (GW) Q1 FY 12

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION (DRAFT)

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION (DRAFT) CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI New Delhi, the 20 th of June 2013 NOTIFICATION (DRAFT) No.L-1/132/2013/CERC.- In exercise of the powers conferred under Section 178 of the Electricity

More information

(INTERNATIONAL COMPETITIVE BIDDING)

(INTERNATIONAL COMPETITIVE BIDDING) D B POWER (MADHYA PRADESH) LIMITED (DBP(MP)L) INVITAION FOR BIDS FOR COAL BASED 2 X 660 MW SUPER CRITICAL BOILER, TURBINE & GENERATOR PACKAGE WITH ASSOCIATED AUXILIAIRES (BTG) ALONGWITH SUPPLY OF MANDATORY

More information

Bhopal: Dated 5 th May 2006

Bhopal: Dated 5 th May 2006 Bhopal: Dated 5 th May 2006 No. 1192/MPERC/2006. In exercise of the powers conferred by section 181 (g) read with section 32(3) of the Electricity Act, 2003 enacted by the parliament, the Madhya Pradesh

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, E-5, Arera Colony, Bittan Market, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal - 462016 Petition No.02/2013 PRESENT: Rakesh Sahni, Chairman A. B. Bajpai, Member Alok

More information

CASE NO. 196 OF In the matter of

CASE NO. 196 OF In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No. 1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022-22163964/65/69 Fax No. 022-22163976 Email: mercindia@merc.gov.in

More information

M/s Jaiprakash Power Ventures Ltd 113 Rajpur Road, Dehradun

M/s Jaiprakash Power Ventures Ltd 113 Rajpur Road, Dehradun BEFORE IN THE MATTER OF: AND IN THE MATTER OF: THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Petition No.443/2007 Approval of tariff for supply of electricity from 400 MW Vishnu Prayag Hydroelectric

More information

BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI 1 BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI PETITION NO:.OF 2014 Petition under section 62 and 79(1) (a) of the Electricity Act, 2003, read with Chapter V of the Central Electricity

More information

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. (Date of Order: )

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. (Date of Order: ) HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA IN THE MATTER OF:- (Date of Order: 25.07.2018) Petition No.: 26/2018(Suo-Moto) CORAM Sh. S.K.B.S. Negi Chairman Sh. Bhanu Pratap Singh Member

More information

ASSAM ELECTRICITY REGULATORY COMMISSION

ASSAM ELECTRICITY REGULATORY COMMISSION ASSAM ELECTRICITY REGULATORY COMMISSION NOTIFICATION The 28th December, 2010 No. AERC.23/2010: In exercise of the powers conferred under Section 61(d), 62(4), 86(1)(b) sub-section (1) of section 181 and

More information

Draft MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

Draft MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION Draft MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION No. / /2017/MPERC.- In exercise of the powers conferred under Section 181of the Electricity Act, 2003 (36 of 2003), and all other powers enabling

More information

Perspective on Financing Wind Energy Projects. June 16, 2016

Perspective on Financing Wind Energy Projects. June 16, 2016 Perspective on Financing Wind Energy Projects June 16, 2016 Agenda 2 1 Risk Matrix 3 Context Setting Way Forward KEY SEGMENTS IN THIS PRESENTATION 3 Indian Energy Sector Landscape Bank Lending Sector wise

More information

BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL)

BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL) BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL) REVISED PETITION FOR APPROVAL OF TRUE UP OF FY 2015-16 & FY 2016 17 AND PROVISIONAL TRUE UP of FY 2017-18

More information

Section 2. ARR and Tariff proposal submitted by the JSEB

Section 2. ARR and Tariff proposal submitted by the JSEB Page 1 of 10 Section 2 ARR and Tariff proposal submitted by the JSEB The petition filed by the Board for approval of its Annual Revenue Requirement (ARR) and tariff for FY 2003-04 has been summarized in

More information

No. F.25/TERC/09/204 Dated, 11 th August 2011 TRIPURA ELECTRICITY REGULATORY COMMISSION NOTIFICATION

No. F.25/TERC/09/204 Dated, 11 th August 2011 TRIPURA ELECTRICITY REGULATORY COMMISSION NOTIFICATION No. F.25/TERC/09/204 Dated, 11 th August 2011 TRIPURA ELECTRICITY REGULATORY COMMISSION NOTIFICATION In exercise of the powers conferred under Section 61(d),62(4), 86(1)(b) sub-section (1) of section 181

More information

CASE No. 38 of Coram. Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member. Adani Power Maharashtra Ltd.

CASE No. 38 of Coram. Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member. Adani Power Maharashtra Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

(On behalf of Aravali Power Company Pvt. Ltd.)

(On behalf of Aravali Power Company Pvt. Ltd.) (On behalf of Aravali Power Company Pvt. Ltd.) I N V O I C E S U M M A R Y Send To: Superintending Engineer(Billing) Copy To: Rajasthan Urja Vikas Nigam Limited 132 KV GSS Sub Station Building, Calgiri

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No. 11 of 2017 PRESENT: Dr. Dev Raj Birdi, Chairman A. B. Bajpai, Member Alok Gupta,

More information

C O N T E N T S. Chapter Title Page No. 1. Introduction True-up for FY Review for FY

C O N T E N T S. Chapter Title Page No. 1. Introduction True-up for FY Review for FY C O N T E N T S Chapter Title Page No. 1. Introduction 1-6 2. True-up for FY 2009-10 7-44 3. Review for FY 2010-11 45-81 4. Annual Revenue Requirement for FY 2011-12 83 125 5. Tariff Related Issues 127-130

More information

Fuel and Power Purchase Price Adjust Formula Regulations DRAFT

Fuel and Power Purchase Price Adjust Formula Regulations DRAFT Fuel and Power Purchase Price Adjust Formula Regulations DRAFT 2011 No. F.25/TERC/09/ Dated, 30 th March 2011 TRIPURA ELECTRICITY REGULATORY COMMISSION NOTIFICATION In exercise of the powers conferred

More information

2018 Results Conference Call. March 27, 2019

2018 Results Conference Call. March 27, 2019 2018 Results Conference Call March 27, 2019 Disclaimer This earnings presentation contains forward-looking statements that are based on our current expectations, assumptions, estimates and projections

More information

By S K Agrawal ED (Commercial) NHPC Ltd.1

By S K Agrawal ED (Commercial) NHPC Ltd.1 By S K Agrawal ED (Commercial) NHPC Ltd.1 Need for Renovation & Modernisation of HEPs Advantages of R&M of old Power Stations Govt. policies on R&M Regulatory Provisions & Commercial aspects Overview of

More information

For approval of R&M scheme of BTG of Parichha Unit-1.

For approval of R&M scheme of BTG of Parichha Unit-1. PRESENT: Petition No. 1153 of 2016 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order: 16.08.2017 1. Hon ble Sri Desh Deepak Verma, Chairman 2. Hon ble Sri S.K. Agarwal, Member

More information

SMP-10/2016 M.P. Electricity Regulatory Commission Bhopal

SMP-10/2016 M.P. Electricity Regulatory Commission Bhopal SMP-10/2016 M.P. Electricity Regulatory Commission Bhopal Tariff Order for procurement of power from Municipal Solid Waste based power generating plants in Madhya Pradesh June 2016 1. LEGISLATIVE PROVISIONS

More information

Vidarbha Industries Power Limited - Transmission

Vidarbha Industries Power Limited - Transmission Vidarbha Industries Power Limited - Transmission Revised Petition towards: Approval of Capital Cost and Determination of Aggregate Revenue Requirement ( ARR ) for the period FY 14-15 to FY 15-16 Filed

More information

MONNET POWER COMPANY LIMITED List of Creditors (Version 1: Pursuant to claims received and updated as on )

MONNET POWER COMPANY LIMITED List of Creditors (Version 1: Pursuant to claims received and updated as on ) MONNET POWER COMPANY LIMITED List of Creditors (Version 1: Pursuant to claims received and updated as on 11.04.2018) Sl. No. Category of Creditor Amount Claimed (in INR) Amounts of Claims admitted (in

More information

CHAPTER 9 CAPITAL COST ESTIMATES & FINANCIAL ANALYSIS

CHAPTER 9 CAPITAL COST ESTIMATES & FINANCIAL ANALYSIS CHAPTER 9 CAPITAL COST ESTIMATES & FINANCIAL ANALYSIS TATA Consulting Engineers Limited Capital Cost Estimation Sr. No. COST ESTIMATION FOR PLANTS / UTILITIES AND OTHERS UNIT / SYSTEM BASIS COST (INR Lakhs)

More information

Draft JSERC (Determination of Tariff for procurement of power from Small Hydro Power Projects) Regulations, 2016

Draft JSERC (Determination of Tariff for procurement of power from Small Hydro Power Projects) Regulations, 2016 Draft JSERC (Determination of Tariff for procurement of power from Small Hydro Power Projects) Regulations, 2016 JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION In exercise of the powers conferred by

More information

TABLE OF CONTENTS. S. No. PARTICULARS Page No. I TRUE UP TARIFF PETITION FOR FY II PRAYER 09 III AFFIDAVIT IV AUTHORIZATION 12

TABLE OF CONTENTS. S. No. PARTICULARS Page No. I TRUE UP TARIFF PETITION FOR FY II PRAYER 09 III AFFIDAVIT IV AUTHORIZATION 12 TABLE OF CONTENTS S. No. PARTICULARS Page No. I TRUE UP TARIFF PETITION FOR FY 2013-14 3-8 II PRAYER 09 III AFFIDAVIT 10-11 IV AUTHORIZATION 12 V SUB INDEX OF TRUE UP TARIFF PROPOSAL 1 CAPACITY 13-16 2

More information

OERC KEEPS RETAIL ELECTRICITY TARIFF UNCHANGED FOR

OERC KEEPS RETAIL ELECTRICITY TARIFF UNCHANGED FOR OERC KEEPS RETAIL ELECTRICITY TARIFF UNCHANGED FOR 2007-08 The Orissa Electricity Regulatory Commission approved the Retail Supply Tariff orders for the four distribution companies of Orissa for 2007-08.

More information

Power Procurement Strategy

Power Procurement Strategy Power Procurement Strategy 01.03.16 IIT-Kanpur For Public Use POWER SECTOR OVERVIEW Source: Executive Summary of October 2015, CEA *including renewable generation Installed Capacity (All) Category Installed

More information

Compensatory Tariff Orders and Fine Balancing Act by CERC

Compensatory Tariff Orders and Fine Balancing Act by CERC CARE RESEARCH Compensatory Tariff Orders and Fine Balancing Act by CERC CERC has finally notified the long awaited Compensatory Tariff orders on imported coal based Tata and Adani Mundra projects. With

More information

BEFORE THE KARNATAKA ELECTRICITY REGULATORY COMMISSION, BENGALURU. Dated 16 th, May,2018

BEFORE THE KARNATAKA ELECTRICITY REGULATORY COMMISSION, BENGALURU. Dated 16 th, May,2018 No. S/01/18 BEFORE THE KARNATAKA ELECTRICITY REGULATORY COMMISSION, BENGALURU Present: Dated 16 th, May,2018 Sri. M.K. Shankaralinge Gowda - Chairman Sri. H.D. Arun Kumar - Member Sri. D.B. Manival Raju

More information

2 EXECUTIVE SUMMARY. 2.1 Distribution Business in Mumbai Area

2 EXECUTIVE SUMMARY. 2.1 Distribution Business in Mumbai Area 2 EXECUTIVE SUMMARY The Tata Power Company Limited ( Tata Power ) is a company established in 1919. On April 1, 2000, The Tata Hydro-Electric Power Supply Company Limited (established in 1910) and The

More information

COMPREHENSIVE PERFORMANCE AWARD SCHEME FOR THERMAL POWER STATIONS

COMPREHENSIVE PERFORMANCE AWARD SCHEME FOR THERMAL POWER STATIONS Revision-3/August 2012 COMPREHENSIVE PERFORMANCE AWARD SCHEME FOR THERMAL POWER STATIONS YEAR 2016-17 - 1 - THERMAL POWER STATIONS PERFORMANCE AWARD SCHEME 1.0 PREAMBLE The incentive award scheme in force

More information

OF ARR & TARIFF FILING FORMATS FOR DISTRIBUTION AND RETAIL SUPPLY LICENSEES

OF ARR & TARIFF FILING FORMATS FOR DISTRIBUTION AND RETAIL SUPPLY LICENSEES ANNEXURE - I Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited, Indore INDEX OF ARR & TARIFF FILING FORMATS FOR DISTRIBUTION AND RETAIL SUPPLY LICENSEES Financial Formats 1 Sheet S1 Profit

More information

Order Date of hearing

Order Date of hearing PRESENT Petition No. 1075 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order:07.03.2018 Hon ble Sri Suresh Kumar Agarwal, Chairman IN THE MATTER OF: Amendment of provisional

More information

59 th Annual Report

59 th Annual Report Significant Accounting Policies I. Basis of Accounting The financial statements are prepared on accrual basis of accounting under historical cost convention, in accordance with Generally Accepted Accounting

More information

1.2. The sponsors, to develop and implement the power project, established a Special Purpose Company called Fimcotex Industries Pvt) Ltd.

1.2. The sponsors, to develop and implement the power project, established a Special Purpose Company called Fimcotex Industries Pvt) Ltd. A Continuation Sheet No. 1 Tp Pi ICiYa K damr3d7sa (P t Ltd 1. INTRODUCTION 1.1. The Hyderabad Electric Supply Company Limited (HESCO) issued an LOI for setting up a new captive power plant in the premises

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal - 462016 Petition 06/2013 PRESENT: Rakesh Sahni, Chairman A. B. Bajpai, Member Alok

More information

PTC India Financial Services Limited. July 2011

PTC India Financial Services Limited. July 2011 PTC India Financial Services Limited July 2011 PFS Unique Business Model PTC s lineage Across Energy Value Chain Debt Financing Fee Based Services Equity Financing Structured Products 2 Operational Highlights

More information

Madhya Gujarat Vij Company Ltd.

Madhya Gujarat Vij Company Ltd. BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR Summary of Case No. 1761 /2018 In respect of Petition for True up of & Mid-Term Review of ARR for to & Tariff determination for Filed by:-

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No. 16 of 2016 PRESENT: Dr. Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta,

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal - 462016 Petition No75/2012 PRESENT: Rakesh Sahni, Chairman A. B. Bajpai, Member Alok

More information

M.P. Electricity Regulatory Commission Bhopal

M.P. Electricity Regulatory Commission Bhopal SMP-20/2010 M.P. Electricity Regulatory Commission Bhopal Tariff Order for procurement of power from Wind Electric Generators 1. LEGISLATIVE PROVISIONS 1.1 Section 86(1) (e) of the Electricity Act 2003

More information

CASE No. 102 of In the matter of

CASE No. 102 of In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Knowledge Sharing Platform

Knowledge Sharing Platform To Knowledge Sharing Platform Topics for Discussion Highlight of Performance Coal Marketing in CIL Income tax provisions for Salaried Employee Organisational Structure Coal India Limited 8 Subsidiaries

More information

Implementation of Solar Based Projects in MP Dated 20 July, 2012

Implementation of Solar Based Projects in MP Dated 20 July, 2012 86 Compendium of Policies, Regulations, Technical Standards & Financing Norms for Solar Power Projects GOVERNMENT OF MADHYA PRADESH Implementation of Solar Based Projects in MP Dated 20 July, 2012 1. Title

More information

Madhya Gujarat Vij Company Ltd.

Madhya Gujarat Vij Company Ltd. BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR Summary of Case 1624 /2016 In respect of Petition for True up of & Determination of Multi-Year ARR for to & Determination of final ARR for

More information