GMR Chhattisgarh Energy Limited
|
|
- Grant Thomas
- 6 years ago
- Views:
Transcription
1 Sr. GMR Chhattisgarh Energy Limited 1 RfS - Bid Informati on Sheet 2 RfS Ceiling tariff of Rs. 2.82/kWh 1.2.2: The Gross Station Heat Rate (SHR) quoted by Bidder has to be less than or equal to presently applicable CERC norm for equivalent unit size. Rationale for keeping the ceiling tariff at Rs. 2.82/kWh In the event of back down by GUVNL, the actual gross SHR and actual Aux consumption shall be adjusted based on the actual operating load of the unit. The same to be used for the coal consumption purpose Rationale is the no. 1 (ii) of General Principles of MoP Guidelines issued on and in case of GUVNL it is Rs / kwh. The SHR related provision is as per the provisions of the Guideline issued by the Ministry of Power in the matter of flexibility in utilization of domestic coal and other measures for reducing the cost of power generation reg. dated 20 th February, The RFP also has a provision wherein it is specified that GUVNL shall ensure that actual schedule does not fall below an average 80% of the contracted power on monthly basis and not technical minimum as specified by CERC for each time block. Further, there is also a provision for proving compensation by GUVNL at 10% of the Quoted Tariff per kwh for the quantum of shortfall below 80% on monthly basis. The above provisions have been specified to protect the bidder for any variation in actual loading during operations and accordingly, no Page 1
2 3 RfS (v) 4 RfS (v): For technically eligible.... to Traffic Transportation Directorate of Railway Board (Ministry of Railways) by GUVNL. Based on the operational considerations, Ministry of Railways would convey their consent or otherwise within 7 days of the receipt of the reference. The Power station of the Bidder where the transfer of coal is not feasible as conveyed by the Ministry of Railway, would not eligible to participate in Financial Bid : After E-Reverse Auction process, Bidders shall. 2 nd Selected Bidder at the tariff quoted by them and so on. In case of a tie at any stage, the successful bidder shall be selected through draw of lots amongst the tied bidders. 1. Kindly clarify whether the coal movement upto the plant is required by Railway mode only. 2. Kindly clarify whether coal transportation by road is allowed or not As we understand from the RFP, in the event of tie at any stage, the selection of bidder shall be done based on the highest capacity offered. Request you to kindly clarify the same. change is proposed in the existing clause. As per clause 1 (iv), of the methodology outline by MOP dated , the IPP where transfer of coal is not feasible by Railways would not be eligible to participate in RFP stage. Accordingly, primary mode of transport has to be railway upto railway siding nearest to the power plant. Seller can use other mode of transport from nearest railway siding to power plant. Bidder is required to mention nearest railway siding in the technical bid. The clause to be read as: After E-Reverse Auction process, Bidders shall. 2 nd Selected Bidder at the tariff quoted by them and so on. In the event, if two or more Bidders quote the same rate of Tariff during IPO and e-reverse Auction stage, the time of submission of bid will be the deciding factor for their ranking i.e the bidder who submits the tariff first will be selected first. 5 RfS We certify that in terms of the Kindly clarify what is meant by the The text in format 1 of the RFP document shall Page 2
3 Sr. Format 1 6 PPA - 3 (A) Bidding Document, our Technical Capacity is equivalent to MW of RFP: Gujarat Urja Vikas Nigam Ltd... assigned as per the re-organization scheme. In line with above mentioned Case-4 envisaged for allowing flexibility of utilization of coal, GUVNL has decided to procure 1000 MW electricity from operational coal based power generating stations with generating units having minimum installed capacity of 200 MW and for a period from 1st October, 2017 to 30th June, 2018 (the "Project"). Technical Capacity of a power station As per the RFP, requisitioned quantum is 1000 MW whereas in the PPA, it is 500 MW. Request to kindly specify the correct quantum in PPA. be modified as given below: 3. We certify that in terms of the Bidding Document, our available Operating Capacity is equivalent to MW (MW in words). The total requisitioned quantum is 1000 MW. The clause 3(A) of the PPA to be read as given below: WHEREAS: (A) GUVNL has resolved to procure electricity from operational coal based power generating stations for a cumulative contracted capacity of 1000 MW in accordance with the terms and conditions set forth in the Power Purchase Agreement (PPA) to be entered into between the parties. 3(A) of the PPA: GUVNL has resolved to procure electricity from operational coal based power generating stations for a cumulative contracted capacity of 500 MW in accordance with the terms and conditions set forth in the Power Page 3
4 7 PPA & Purchase Agreement (PPA) to be entered into between the parties : Making regular advance paymen t to the Coal Company (SECL). Further the difference between the advance amount paid and the bill raised by Coal India Ltd or its subsidiaries, except on account of revision in the notified price, shall be paid by the Seller to GSECL within 7 days from the date on which such claim is raised by GSECL. No 5.4.3: In addition to above, in case the amount paid by the such difference. Seller shall have to make the payment against the bill within 10 days from the receipt of bill or in the subsequent upfront payment to be made to GSECL, whichever is earlier. Kindly clarify whether payment of differential amount is required to be made within 7 days or 10 days Payment of differential amount is required to be made within 10 days as stated in The clause to be read as: Making regular advance upfront payment to the GSECL against the estimated quantum of coal to be transferred, as communicated by the GSECL to the Seller. The payment shall be made considering the grade-wise rate of coal specified in clause (Table 1). GSECL shall then make payment to the Coal Company (SECL). Further the difference between the advance amount paid and the bill raised by Coal India Ltd or its subsidiaries, except on account of revision in the notified price, shall be paid by the Seller to GSECL within 10 days from the date on which such claim is raised by GSECL. 8 PPA : Making regular Any increase/ decrease in railway freight The present agreement is a short term Page 4
5 Sr payments to the transporter (Railways / Shipping / Road) including demurrages, etc. for transportation of coal from Mine to Seller generating station. with applicable taxes and duties shall be suitably adjusted in the quoted tariff agreement and the bidder has to envisage and factor in any increase /decrease in railway freight with applicable taxes and duties during the contract tenure in his quoted tariff, as per clause no.8 (1) (x), of MoP Guidelines dated No change is required. 9 PPA Making payments towards all applicable charges / fees/ etc. including but not limited to the Inter-state / Intra-state open access charges, transmission charges and losses along with Point of Connection (POC) injection charges, RLDC Operating charges, POC drawal charges and losses, RLDC application fees up to Delivery Point Any increase in the POC charges/losses should be pass through. The present agreement is a short term agreement and the bidder has to envisage and factor in any increase /decrease in POC charges/ losses during the contract tenure in his quoted tariff, as per clause no.8 (1) (x), of MoP Guidelines dated No change is required. 10 PPA & : Arrangement for..is given in clause below. The actual quantum of coal being made available will depend on the following factors (i) Contracted Capacity (MW); (ii) Gross Station For the purpose of evaluating bid the SHR quoted by Bidder or as specified by CERC whichever is lower shall be considered. We request that for all other purposes like consumption of coal, Reconciliation, etc. actual SHR shall be considered. The SHR related provision is as per the provisions of the Guideline issued by the Ministry of Power in the matter of flexibility in utilization of domestic coal and other measures for reducing the cost of power generation reg. dated 20 th February, No change is required. Page 5
6 Heat Rate Quoted by bidder (kcal/kwh) or as specified by CERC for equivalent unit capacity, whichever is lower; (iii) GCV of Coal (kcal/kg) depending on the actual grade of coal. Normative Transit losses as specified in the prevailing CERC Regulations shall be considered for the purpose of computation of quantity of coal : Gross Station Heat Rate (kcal/kwh) shall be used for coal quantity calculation. The Seller shall indicate the unit size and the Gross Station Heat Rate from which they propose to supply power. The Gross Station Heat Rate to be considered for coal quantity calculations shall be the Gross Station Heat Rate specified by the Seller or as specified by CERC for equivalent unit capacity whichever is lower. Normative Transit losses as specified in the prevailing CERC Regulations shall be considered for the purpose of Page 6
7 11 PPA PPA computation of quantity of coal : Seller shall comply with the provisions of the applicable Law regarding Availability including, in particular, to the provisions of the ABT/Grid Code / any other applicable Codes and Regulations from time to time relating to declaration of Availability and the matters incidental thereto. Seller shall ensure that 100% contracted capacity is made available to GUVNL : Any shortfall in availability below 100% contracted capacity on account of reasons other than force majeure conditions or reasons specifically identified in the Agreement as those not under the reasonable control of the Seller shall be considered as a Sellers event of default and shall be dealt with in accordance with the provisions of clause of the Agreement. Request to kindly consider the availability as 85% of the contracted capacity. Any reduction in availability due to technical constraints shall not be treated as seller event of default. Request to kindly confirm the same. The clause to be read as: Seller shall comply with the provisions of the applicable Law regarding Availability including, in particular, to the provisions of the ABT/Grid Code / any other applicable Codes and Regulations from time to time relating to declaration of Availability and the matters incidental thereto. Seller shall ensure that at least 80% contracted capacity is made available to GUVNL on monthly basis. The clause to be read as: Any shortfall in availability below 80% contracted capacity on monthly basis on account of reasons other than force majeure conditions or reasons specifically identified in the Agreement as those not under the reasonable control of the Seller shall be considered as a Sellers event of default and shall be dealt with in accordance with the provisions of clause of the Agreement. 13 PPA 5.5.1: The coal company GCV (ARB) at unloading point should be As specified in the RFP, CIMFR will undertake Page 7
8 5.5.1 will issue Credit / Debit notes whenever there is a variation in the price of coal on account of grade variation between the grade of the coal for which advance payment has been made by GSECL on behalf of the Seller and the actual grade of coal received by the Seller at loading end. The actual grade of the coal at loading end will be based on the third party inspection carried out by CSIR-Central Institute of Mining and Fuel Research (CIMFR). 14 PPA PPA For this evaluation, the GCV of coal to be used will be corresponding to the grade of coal specified by Coal Company and vetted by Third Party sampling for the mine/linkage source. Based on the grade & quantity of coal estimated by GSECL and rate specified in 3.3.4, Seller shall work out upfront payment to be made to GSECL. Upfront payment will be required certified by CIMFR and the same ARB shall be used for coal consumption purpose. We request you to kindly consider ARB GCV at the unloading point for the purpose of Coal consumption, The Seller should be allowed to make payment for coal through Letter of Credit third party inspection at the loading end. As specified in the RFP, CIMFR will undertake third party inspection at the loading end. Mode of transfer of payment has to be through RTGS Only. Page 8
9 16 PPA PPA to be made at least 15 days prior to the date on which the uploading of the coal from mine is required by the Seller. The Power will normally be scheduled at the agreed Tariff for the purpose of its consideration in the merit-order dispatch. However, the Seller shall have the flexibility to offer tariff less than the quoted tariff on dayahead basis in order to ensure increase scheduling of power Obtaining Open Access as per the relevant regulations of the Appropriate Commission for the quantum and duration of power supply. However, the situation such as Non-. TRN Energy Private Limited 18 RfS Quantum of Power required 1000 MW Procurer to confirm that the minimum offtake clause of 80% applies on a monthly basis. Buyer to confirm that application may be for STOA/MTOA/Day Ahead basis The Procurement quantum is stated to b e 1000 MW, whereas in the attached PPA, the same is stated to be 500 MW. It is clearly mentioned in of the PPA. Seller has to apply for the Open Access as per the relevant regulations of the Appropriate Commission for the quantum and duration of power supply. Requisitioned quantum is for 1000 MW. The clause 3(A) of the PPA to be read as given below: WHEREAS: (A) GUVNL has resolved to procure electricity from operational coal based power generating stations for a cumulative contracted capacity of MW in accordance with the terms and Page 9
10 Sr. 19 RfS RfS Further, in case of extension of the contract period on account of availability of excess coal at the end of the original contract period, the Seller shall be required to extend the validity of the Bank Guarantee for a period beyond 2 months after the expiry of the extended Contract Period as mentioned in the clause of PPA. The Bank Guarantee shall be extended at least 7 days prior to expiry of the claim period of the original B.G. submitted by the Seller. In case of failure to extend the validity of the B.G. within the stipulated time period, GUVNL reserves the right to invoke the Performance Security issued in the form of Bank Guarantee by the Seller. If the Buyer s balance power requirement after Bucket filling is less than the available quantum offered by next Bidder, then the At the end of the original contract period, in case of excess coal availability, the contract period is stated to be extended for a period beyond 2 months. However, in case of shortfall of coal, the Seller shall be free to market coal to supply contract capacity. The least quoted tariff bidder shall be free to accept / reject the request of Buyer to supply balance power which is offered to the next Bidder above it. conditions set forth in the Power Purchase Agreement (PPA) to be entered into between the parties. Extension of the contract in case of availability of excess coal shall be in line with the provisions of the of PPA. In case of shortfall, as per of PPA, GUVNL has the option either to reduce the quantum of supply or to allow the seller to use fuel from other sources which may be available at the time with the consent of GUVNL of PPA is self-explanatory. change is required. No Page 10
11 Sr. 21 PPA PPA Bidder may accept or reject that quantum of balance power being offered. In case the Bidder rejects, successful Bidders in order of least quoted tariff shall be requested to provide balance power. This agreement shall be valid for a period commencing from, the effective date up to 30 th June 2018(Contract Period), unless terminated earlier. After coal reconciliation as detailed out in clause 7.2, if extra coal remains after the Contract Period, Seller will supply equivalent energy to the GUVNL at the same terms and conditions by 6 th September, Accordingly, the Contract period shall be deemed to be extended till 6 th September 2018 or till utilization of extra coal whichever is earlier. Any increase in freight charges on account of transfer of coal or in transmission charges shall be borne by the Seller during the contract period. If extra coal remains after the contract period, Seller will supply equivalent energy to the GUVNL, at the same terms and conditions by 6 th September, 2018 or till utilization of extra coal whichever is earlier...whereas as per RFP, the contract period is getting extended by 2 months, the PPA is enumerating date of 6 th Sept, 2018 or till utilization of extra coal It is requested that the contract period should not be kept open. The contract period shall include additional 30 days for payment of last month s bill. Any increase in transmission charges during the contract period shall be borne by GUVNL. Likewise any increase in Railway Freight notified by Railways shall also be payable by GUVNL to the Contract period is not open ended. The maximum period for which it can be extended is upto 6 th September, 2018 which is clearly stated. Contract period need not include the payment period allowed. As per clause 8.1 (x), outlined in the methodology by MoP dated , any increase in the freight charges on account of transfer of coal or in transmission charges shall be borne by seller during the contract period. Page 11
12 23 PPA PPA GUVNL shall ensure that actual schedule shall not fall below an average 80% of the contracted power on monthly basis and not below technical minimum as specified by the CERC for each time block as per approved open access. GUVNL shall pay compensation at 10% of the Quoted Tariff per Kwh for the quantum of shortfall below 80% on monthly basis. The process of billing for the same shall be as outlined in clause Seller shall comply with the provisions of the applicable Law regarding availability including, in particular, to the provisions of the ABT/Grid Code /any other applicable Codes and Regulations from time to time relating to declaration of Availability and the matters incidental thereto. Seller shall ensure that 100% contracted capacity is made available to GUVNL. Seller. Any reduction in schedule of contracted capacity shall be made on Round the Clock basis only within the overall limit of average 80% of the contracted power on monthly basis. The technical minimum of the Unit or the contracted capacity, whichever is lower, shall be the agreed schedule for each time block as per approved open access. This is a short term contract, wherein open access is applied on fixed quantum of power which the seller has to supply at the delivery point. Thus, there would not be any declaration of availability. No change is required. The applicable Open Access Regulation shall be followed for scheduling of the contracted capacity. As outlined in of PPA, Seller has to comply with the provisions of the applicable laws/ regulations relating to availability and other related matters. 25 The transmission charges corresponding Transmission charges corresponding to the Page 12
13 26 PPA Jaiprakash Power Ventures Limited 27 RfS 1.1.2/ 8 28 RfS / 8 29 RfS / 8 Delivery point: Gujarat States transmission Utility Periphery (CTU-STU interconnection point in case of power station located outside Gujarat and Generator Busbar i.e STU interconnection point in case of power station located within Gujarat) Table 1, Ash Content (%) Varies from 25% to 45% Table 1, STC to the power which is not scheduled by GUVNL shall be payable by GUVNL to the seller. Similar to commitment of 80% offtake by GUVNL, Seller should also be allowed to have commitment of supplying 8o% energy of approved open access. We understand that bidders who are located outside Gujarat need not to bear STU cost of Gujarat Transmission Utility. Please clarify or confirm We understand that there is high degree of variation in ash content. If ash content is more than 34%, seller will get the washed coal and need not arrange the washery facility. Please clarify or confirm Please define STC, further please clarify why STC has different values for different grade power which is not scheduled below 80% on monthly basis shall be payable by GUVNL to the Seller. Necessary changes are made in no & of PPA (iv) clearly mentions that the Delivery point is Gujarat periphery and hence bidder is not required to bear cost of Gujarat Transmission Utility. Not agreed. If there is any requirement of washing the coal to comply with MOEF guidelines or any other reasons, the bidder has to make the requisite arrangements at his own cost. It is a Surface Transportation Charge and defined by SECL. This is the cost taken by CIL for transporting coal from the mine to the Railway siding from where they will be loading in Railway wagons. It does Page 13
14 Sr. 30 RfS / 8 31 RfS / 8 Table 1, GST Table 1, General We understand that GST should not be levied on royalty, cess and taxes, however in calculation it has been levied on Sub TTL We understand that any other taxes, levies, duties, cess etc. or any other statutory charges not mentioned in Table 1 would be a pass through. not vary with grades but varies with distance from mine to siding. Presently, SECL is charging GST on Invoice value i.e. including royalty, cess, taxes etc. and hence GST will be applicable on total invoice value. Only the taxes, levies, duties, cess etc. or any other statutory charges which are not in existence as on date of bid submission will be considered for purpose of pass through. It is the responsibility of the Bidder to do necessary due diligence in this regards. 32 RfS Table 2, Band wise Coal Receipt details of Korea Rewa Coal (April 17 & May 17) Since GUVNL must be using the coal from these mines, therefore request you to mention the fired GCV from the coal obtained from these sources. Period of supply is from October 2017 to June 2018, therefore it is requested that data from September 2016 to June 2017 may please be provided for better assessment. Article of PPA (Page no 59/84) indicates that The actual quantum of coal being made available will depend on the following factors (i) Contracted Capacity (MW); (ii) Gross Station Heat Rate Quoted by bidder Assessment of as fired GCV is subjective and is dependent on various factors including the vintage of the stock, climatic conditions etc. Hence may not be relevant in the present case. 33 RfS Gross Station Heat Rate (SHR) quoted by Bidder has to be less than or equal to presently applicable CERC norm for equivalent unit size. Auxiliary Consumption quoted by Bidder The RFP specifies that the Bidder cannot quote SHR and Auxiliary consumption more than CERC norm for equivalent Power Station Capacity. Accordingly, the actual SHR or auxiliary consumption has no bearing on the participation of the bidder in the bidding process. Page 14
15 34 RfS RfS (C & J) has to be less than or equal to presently applicable CERC norm for equivalent Power Station Capacity Validity of Bid Article C and J (kcal/kwh) or as specified by CERC for equivalent unit capacity, whichever is lower. Therefore it indicates that IPPs having plants whose SHR and APC is even higher than that specified by CERC may also be qualified but the quantum of coal being made available is as per Article of PPA. Please clarify or confirm If signing of PPA extended by GUVNL than Bidder should have option to exit without forfeiting the Bid Security. We understand both articles are same i.e. Non-submission of receipt of fees submitted to PFCCL along with RFP Document. Please clarify or confirm 36 RfS 7.9 Annexure 1 Name of Banks Please suggest the course of action if the associated banker of the seller is other than what mentioned in clause PPA Obtaining Open Access as per the relevant regulations of the Appropriate Commission for the quantum and duration of power supply. We understand that Obtaining Open Access as per the relevant regulations of the Appropriate Commission for the quantum and duration of power supply is the onus of seller, however request you For the purpose of this tender, the SHR and auxiliary consumption quoted by the Bidder, subject to the condition prescribed in the RFP, will only be considered. The validity of the bid security as per the RFP is 120 days and there is no provision for extension of the same. Accordingly, the bid validity is enforceable by GUVNL for maximum period of 120 days from the date of bid submission (j) is deleted.. No other Banks are allowed. Bid Security and Performance Security issued by banks other than mentioned in Annexure-1 will be considered as invalid and hence Bid will be considered to be Non-responsive. GUVNL shall endeavor to facilitate the Bidders in obtaining Open Access. However, it shall be sole responsibility of Seller To obtain Open Access and GUVNL shall not be held responsible for the same. Page 15
16 Sr. 38 PPA PPA PPA However, the situation such as non-supply of coal by Coal Company to the Seller shall be treated as "Force majeure" and there will be no liability on either parties. Any increase in freight charges on account of transfer of coal or in transmission charges shall be borne by the Seller during the Contract Period. Any impact (positive or adverse) of the credit / debit notes raised by the coal companies on account of grade variation based on the report of the third party sampling and analysis undertaken by CIMFR shall be borne by the Seller as outlined in clause 5.4. to clarify will GUVNL facilitate in obtaining open access. We understand that the situation such as non-supply of coal by Coal Company to the Seller shall be treated as "Force majeure" however there is no mention of rake availability or role of Indian Railways. Request you to add the following the situation such as nonsupply of coal by Coal Company or by Indian Railways to the Seller shall be treated as "Force majeure" and there will be no liability on either parties. Since sellers have no control over railway freight charges and transmission charges, therefore request GUVN to consider any increase in freight charges on account of transfer of coal or in transmission charges as a pass through and vice versa. Since one grade has a spread of 300 Kcal, therefore request you to link the mentioned clause with GCV. Hence the clause may be written as Any impact (positive or adverse) of the credit / debit notes raised by the coal companies on account of GCV variation based on the report of the third party sampling and analysis undertaken by No change is required. As per clause 8.1 (x), outlined in the methodology by MoP dated , any increase in the freight charges on account of transfer of coal or in transmission charges shall be borne by seller during the contract period. No change is required. It is not possible to link with GCV as coal is billed by CIL Grade wise and CIMFR is also submitting third party inspection results Grade wise. Page 16
17 Sr. 41 PPA PPA Any shortfall in availability below 100% contracted capacity on account of reasons other than force majeure conditions or reasons specifically identified in the Agreement as those not under the reasonable control of the Seller shall be considered as a Sellers event of default and shall be dealt with in accordance with the provisions of clause of the Agreement. In case of the normal scenario wherein the credit note is issued by the Coal Company only on account of variation in grade of coal for which the payment has been done by the GSECL to the Coal Company and the actual CIMFR shall be borne by the Seller as outlined in clause 5.4. Request you to consider the reliability of machines also. At times emergency breakdown/unplanned outages may occur even after adopting best O&M strategy. Therefore request you to give margin for such incidence. Further, the clause should be equal to both the Parties. Hence the clause may be amended as Any shortfall in availability below 80% contracted capacity on account of reasons other than force majeure conditions or reasons specifically identified in the Agreement as those not under the reasonable control of the Seller shall be considered as a Sellers event of default and shall be dealt with in accordance with the provisions of clause of the Agreement. Please provide the framework of inspection by third party comprising of points from where samples may be taken (both loading and delivery points) and frequency of tests ( after arrival every lots) The clause to be read as: Any shortfall in availability below 80% contracted capacity on monthly basis on account of reasons other than force majeure conditions or reasons specifically identified in the Agreement as those not under the reasonable control of the Seller shall be considered as a Sellers event of default and shall be dealt with in accordance with the provisions of clause of the Agreement. CIMFR is appointed by the committee constituted by the MoP/MoC to collect sample and do the analysis at the Loading end. CIMFR collects the sample from 6 nos. of wagons in a railway rake at the time of loading of coal in the Railway wagons. It normally takes days for the Analysis result to reach GSECL from CIMFR. Page 17
18 43 PPA PPA DB Power Limited 45 RfS grade of coal as provided by Coal Company based on third party inspection then the entire credit received by GSECL from the Coal Company will be passed on to the Seller. For this evaluation, the GCV of coal to be used will be corresponding to the grade of coal specified by Coal Company and vetted by Third Party sampling for the mine/linkage source. Normative Transit losses as specified in the prevailing CERC Regulations shall be considered for the purpose of computation of quantity of coal. Regarding Bid security of Rs per MW Please provide the framework of inspection by third party comprising of points from where samples may be taken (both loading and delivery points) and frequency of tests ( after arrival every lots) Since bidder /sellers have no control over transit losses, therefore it would not be judicious to penalize the seller for the same. Therefore, transit losses may be considered as per actual basis. Hence the clause may be modified as Actual Transit losses as specified in the prevailing CERC Regulations shall be considered for the purpose of computation of quantity of coal. We request to amend the of RFQ issued by GUVNL as per the Guidelines issued by Government of India dt Sampling will be done at the loading end only and frequency will be as decided by CIMFR. Normative transit losses as specified in CERC regulations shall be considered as per provisions of the methodology outlined by MoP dated No change is required. Bid Security amount Rs per MW is calculated as per of the Guidelines issued by MoP, Government of India dt only. Page 18
19 46 RfS PPA Regarding Performance Guarantee Rs lakh per MW Payment of transmission charges by buyer to seller in case of force majeure due to non availability of coal from coal company We request to amend the of RFQ issued by GUVNL as per the Guidelines issued by Coordination with such as non supply of coal by coal company to the seller shall be treated as force Majure and buyer Shall be liable to pay transmission charge for power surrender due to non-availability of coal 48 The third party sampling of coal should be carried out at the plant end. 49 As per tender document date of signing of PPA is Lifting of coal will take at least 15 days thereafter. Hence we request to shift the date of commencement of power supply by at least 2 Weeks. 50 RfS - Table 2 The GCV wise coal receipt details for Korea Rewa coal is provided for month of Apr'17 & May'17. It is requested to provide similar details for Korba coal as well. Performance Guarantee amount Rs lakh per MW is calculated as per 6 (iii) of the Guidelines issued by MoP, Government of India dt only. No change is required. As per clause 13.1 of guidelines issued by MOP dated , the GCV of coal to be used will be corresponding to the grade of coal specified by Coal Company and vetted by the Third Party sampling for the mine/linkage source. Accordingly, CIMFR is undertaking third party inspection at loading end only. Results of the E-Reverse Auction process will be known by 08 th September, 2017 and accordingly the short-listed bidders can start necessary preparation for meeting contractual/ operational obligations. 100% Sampling has not been started by CIMFR at korba field. Generally based on past experience G11/G10 band coal is available from Korba field. Page 19
20 51 How is it proposed to achieve the sharing ratio of 80:20 between Korba and Korea Rewa coal is not clear. Will it be ensured on month to month basis? 52 RfS Gross SHR should be less than or equal to CERC norms. CERC norm is 1.045*2267 kcal/kwh. Should the Gross SHR quoted be less than 2369 kcal/kwh (or) 2267 kcal/kwh? Bidder should be allowed to decrease the bid quantity as well. In case Bidder had bid for 500 MW initially, but is willing to reduce the bid price further for a less quantity, say 200 MW or 300 MW, then bidder should have option of reducing the bid quantity as well. Allowing bidder to reduce the bid quantity is favorable for Discom. 54 RfS (b) & (c) says non-submission of bid security & receipt of fees will be considered non-responsive. (j) says submission of bid security & receipt of fees will be considered non-responsive. Both these clauses are contradictory to RFP clause no shall be modified as under: Coal will be made available through coal linkages allocated to GSECL which is a subsidiary company of GUVNL. GSECL shall submit requisition to SECL for supply of coal to the Seller from Korea Rewa and Korba Coal fields in the indicative ratio of 35:65 respectively. Actual supply by SECL may differ. As per CERC norm, SHR is 2369 kcal/kwh in the given example. No change is required (j) is deleted Page 20
21 Sr. 55 PPA (v) each other. In case Ministry of Railways says transfer of coal is not feasible, then option should be left to the Seller either to withdraw the financial bid (or) to continue with the same bid through other modes of transport. As per clause 1 (iv), of the methodology outline by MOP dated , the IPP where transfer of coal is not feasible by Railways would not be eligible to participate in RFP stage. Accordingly, primary mode of transport has to be railway upto railway siding nearest to the power plant. Seller can use other mode of transport from nearest railway siding to power plant. Bidder is required to mention nearest railway siding in the technical bid. 56 Recital 3 (A) 57 PPA Recital (A) mentions the cumulative contracted quantum as 500 MW. It should be corrected as 1000 MW In some cases, even though coal may be allocated by coal company, actual coal lifting may not materialize due to nonallocation of required rakes by railway. Requisition quantum is for 1000 MW. The clause 3(A) of the PPA to read as given below: WHEREAS: (A) GUVNL has resolved to procure electricity from operational coal based power generating stations for a cumulative contracted capacity of 1000 MW in accordance with the terms and conditions set forth in the Power Purchase Agreement (PPA) to be entered into between the parties. No change is required. Page 21
22 Sr. 58 PPA PPA PPA PPA Non-allocation of rakes by Railways should also be considered as force majeure For plants located at distance of about 100 kms, will transit loss be considered as 0.2% (or) 0.8%. Seller s obligation to supply should be same as that of buyer s obligation to purchase i.e. 80% of contracted capacity to take care of forced outages. Supply of 100% contracted capacity is not technically feasible. Further, the power surrender should be on RTC basis only. If the power is curtailed by SLDC due to merit order dispatch then GUVNL shall bear the transmission charges for such period of curtailment. It is not clear from the clause whether the ratio for sharing of credit/debit note would be calculated as per the price of coal based on originally billed GCV or actual GCV. Normative transit loss of 0.2% will be applicable for plants located at distance of upto 100 kms from the mine and for all others, normative transit loss of 0.8% will be applicable. The clause to be read as: Seller shall comply with the provisions of the applicable Law regarding Availability including, in particular, to the provisions of the ABT/Grid Code / any other applicable Codes and Regulations from time to time relating to declaration of Availability and the matters incidental thereto. Seller shall ensure that at least 80% contracted capacity is made available to GUVNL on monthly basis. Transmission charges corresponding to the power which is not scheduled below 80% on monthly basis shall be payable by GUVNL to the Seller. The revised of PPA is as under: The amount of Debit or credit arising out of variation in grade of coal shall be passed on to the Seller while the impact of price variation shall be borne by GUVNL. The required modification is made in the PPA document Page 22
23 Sr. accordingly. 62 PPA In case the proportion of coal between Korba & Korea is not in the ratio 80:20, then seller shall have option of not lifting the costlier coal and accordingly supply less power. 63 PPA (b) Any restriction from Coal Supply Company or Railways should be force majeure. 64 In case, third party sampling is not done by CIMFR (or) by other third party appointed by GSECL, the results of sampling done by Seller should be considered for purpose of determining the actual GCV of coal supplied. Not acceptable. Further, RFP clause no shall be modified as under: Coal will be made available through coal linkages allocated to GSECL which is a subsidiary company of GUVNL. GSECL shall submit requisition to SECL for supply of coal to the Seller from Korea Rewa and Korba Coal fields in the indicative ratio of 35:65 respectively. Actual supply by SECL may differ. As per of PPA, any restriction imposed by Coal Company on supply of Coal is treated as Force Majeure event. However, inclusion of restriction by Railways cannot be accepted as Force Majeure event. The Sampling is to be done at the loading end and not unloading end. CIMFR has been appointed as per the committee constituted by MoP/MoC. So it is compulsory for GSECL to carry out sampling of coal at loading end through CIMFR. For commercial purpose with CIL only Loading end Analysis done by CIMFR is considered. So if in any case CIMFR cannot carry out the sampling. Then in that case the declared Page 23
24 Adani Power Limited 65 RFP RFP RFP PPA Table 1: Reference rates of coal (grade-wise) existing on the date of submission of the proposal by the Seller. GUVNL does not provide any guarantee regarding grade of coal to be supplied by Coal Company. The shortlisted Bidder after elimination will be intimated individually by system generated s only. The Reverse auction should start within 120 minutes of opening of Initial Price Offers. All GST/Cess/Taxes (including GST) on coal as applicable on the date of bidding shall be paid by GSECL and reimbursed by Seller. Kindly provide current coal cost at loading siding including GST. Kindly modify the clause as below: GUVNL/GSECL does not shall provide guarantee regarding grade of coal to be supplied by Coal Company. Whether Seller has to mention IPO (in MW) and maximum quantum of power (in MW) with respect to bid security in Financial Bid. Kindly clarify. We understand that Seller shall be responsible for all taxes and duties applicable as on Bid Due Date. Any variation in taxes and duties after the Bid Due Date shall be borne by GUVNL/GSECL. Kindly confirm. Rationale Provided: It shall be GSECL/ GUVNL s responsibility to bear the variation of price in coal due grade of coal by Coal company shall be considered for purpose of determining the actual GCV of coal supplied. Seller will be billed based on the rate of coal (grade-wise) existing as on the date of submission of the proposal. Indicative reference rates of coal (grade-wise) have been provided in Table 1. GUVNL/GSECL has no control over the grade of coal supplied by the coal company and hence no change is required. Seller has to mention IPO in Rs./kWh and the capacity offered in MW. As per of RFP, the maximum quantum of power (in MW) which can be bid by the Bidder is dependent on the available operating capacity and Bid Security provided by the Bidder. Only the taxes, levies, duties, cess etc. or any other statutory charges which are not in existence as on date of bid submission will be considered for purpose of allowing pass through to GUVNL. It is the responsibility of the Bidder to do necessary due diligence in this regards. Page 24
25 Sr. 69 PPA PPA PPA & Any increase in freight charges on account of transfer of coal or in transmission charges shall be borne by the Seller during the Contract Period. GUVNL shall ensure that actual schedule shall not fall below an average 80% of the contracted power on monthly basis and not below technical minimum as specified by the CERC for each time block as per approved open access. GUVNL shall pay compensation at 10% of the Quoted Tariff per kwh for the quantum of shortfall below 80% on monthly basis Seller shall ensure that 100% contracted capacity is made available to GUVNL. to changes in taxes & duties after bid submission date. Any increase in freight charges on account of transfer of coal shall be borne by GUVNL/GSECL and transmission charges shall be borne by the Seller during the Contract Period. Rationale Provided: Any variation in freight charges is responsibility of the GUVNL/GSECL as it is beyond the control Seller. GUVNL shall ensure that actual schedule shall not fall below an average 80% of the contracted power on monthly basis and not below technical minimum as specified by the CERC for each time block as per approved open access. GUVNL shall pay compensation at 25% of the Quoted Tariff per kwh for the quantum of shortfall below 80% on monthly basis. Rationale Provided: In reference to model bid document on basis of DBFOO, it should be 25%. Seller shall ensure that 80% contracted capacity on cumulative basis is made available to GUVNL. The present agreement is a short term agreement and the bidder has to envisage and factor in any increase / decrease in freight charges on account of transfer of coal during the contract tenure in his quoted tariff. No change is required. Referred is as per the provisions of the Guideline issued by the Ministry of Power in the matter of flexibility in utilization of domestic coal and other measures for reducing the cost of power generation reg. dated 20 th February, No change is required. The clause & to be read as: Seller shall comply with the provisions of the applicable Law regarding Availability including, in particular, to the provisions of the Page 25
26 4.1.2 Any shortfall in availability below 100% contracted capacity on account of reasons other than force majeure conditions or reasons specifically identified in the Agreement as those not under the reasonable control of the Seller shall be considered as a Sellers event of default and shall be dealt with in accordance with the provisions of clause of the Agreement. Rationale Provided: Maintaining of 100% availability for every month is difficult since there is a possibility of forced shutdown, emergency shutdown, technical problem, or any such event, which is beyond control of Seller and not covered under Force Majeure event as in case of any shortfall, it is directed to the termination clause 9 and under this clause, the Seller shall pay termination amount equivalent to 10% of energy that would have been scheduled at the agreed tariff for period of 1 month or the balance period of contract. Due such to such high risk, it is requested to reduce the availability to 80% capacity on cumulative basis. ABT/Grid Code / any other applicable Codes and Regulations from time to time relating to declaration of Availability and the matters incidental thereto. Seller shall ensure that at least 80% contracted capacity is made available to GUVNL on monthly basis Any shortfall in availability below 80% contracted capacity on monthly basis on account of reasons other than force majeure conditions or reasons specifically identified in the Agreement as those not under the reasonable control of the Seller shall be considered as a Sellers event of default and shall be dealt with in accordance with the provisions of clause of the Agreement. Such 100% availability clause is not mentioned in model draft document of Case 4: Flexibility in utilization of coal in IPP Stations. Lower availability due to any event, which is beyond control of Seller and not covered under Force Majeure event and in case of any shortfall, it is directed to the termination. Page 26
27 72 PPA & PPA PPA Seller shall ensure that 100% contracted capacity is made available to GUVNL. The Power will normally be scheduled at the agreed Tariff for the purpose of its consideration in the merit-order dispatch. In case the amount paid by the Seller to GSECL as upfront payment for procurement of coal is higher than the bill raised by the Coal Company to GSECL based on the actual coal supplied, then GSECL shall adjust this additional amount in the subsequent upfront payment to be recovered from the Seller. It is requested to allow alternate supply of power by Seller in case of power from plant is not available due to any reason beyond control of Seller and not covered under Force Majeure Event. DELETED. It should be under must run status. Rationale Provided: Such merit order dispatch clause is not mentioned in model draft document of Case 4: Flexibility in utilization of coal in IPP Stations. In case the amount paid by the Seller to GSECL as upfront payment for procurement of coal is higher than the bill raised by the Coal Company to GSECL based on the actual coal supplied, then GSECL shall adjust this additional amount in the subsequent upfront payment to be recovered from the Seller. In case GSECL shall not adjust the additional amount in next month then GSECL shall pay late payment surcharge at the rate of 1.5% per month on the additional amount. 75 PPA 5.6 Disputed Amounts GUVNL shall pay 75% of the disputed amount within 7 days of receiving the Not allowed. This power will be scheduled based on meritorder despatch, subject to provisions of Short- Term Open Access if applicable. The PPA has clauses pertaining to compensating the Seller in case the actual schedule falls below an average 80% of the contracted power on monthly basis. No change is required. No change is required. Page 27
28 Sr. 76 PPA In the event that the amount covered by the Letter of Credit is at any time insufficient for recovery of payment due against the Monthly Invoice, GUVNL shall, within a period of 7 (seven) days from the date on which such shortfall occurred, cause the Letter of Credit to be replenished and reinstated to the extent specified in invoice. If dispute is resolved in favour of Seller, then GUVNL shall pay rest of the disputed amount within 3 business days with the interest of 1.5% from the date of the amount in Dispute was under the invoice until the date of payment. Similarly, if dispute is resolved in favour of GUVNL, the Seller shall pay the disputed amount plus interest of 1.5% from the date of the amount in Dispute was due under the invoice until date of payment. Rationale Provided: It will be a financial implication on Seller if in any case GUVNL dispute the invoice. In the event that the amount covered by the Letter of Credit is invoked by Seller at any time insufficient for recovery of payment due against the Monthly Invoice, GUVNL shall, within a period of 7 (seven) days from the date on which such shortfall occurred, cause the Letter of Credit to be replenished and reinstated to the extent specified in In case GUVNL fails to replenishment such amount under Letter of Credit within 7 days from invoke by Seller then it shall be directed No change is required. Page 28
29 Sr. 77 PPA & PPA Seller Event of Default c) Use of GSECL coal supply to third party without consent of to GUVNL s Event of Default. Rationale Provided: The Letter of Credit should be replenished by GUVNL within 7 days of invoking such amount/ shortfall in such amount otherwise it should be falls under GUVNL event of default. Also, similar clause needs to be added under 9.1.2: GUVNL/GSECL event of default (g) Non-grant of Open Access/quantum not granted open access to the Seller shall be treated as Force Majeure and there will be no liabilities on either side. Rationale Provided: As it is mentioned in of PPA that Non-grant of Open Access/quantum not granted open access to the Seller shall be treated as Force Majeure and there will be no liabilities on either parties therefore similar clause shall be mentioned under the Force Majeure Event clause in 8.1. We understand that in case of remaining excess energy after energy scheduled to GUVNL, the Seller shall have right to sell Accepted. The provision will be included in the of PPA. Use of GSECL coal for supply of power to third party is not allowed and it will be treated as Seller event of default. All the power generated Page 29
Auction of Coal Linkage for Non-Regulated Sector Tranche III
Auction of Coal Linkage for Non-Regulated Sector Tranche III List of Frequently Asked s Captive Power Plant Sub-Sector Date: October 17, 2017 1. What are the various subsectors under nonregulated sector?
More informationThe Singareni Collieries Company Limited (A Government Company) Auction of Coal Linkages for Non-Regulated Sector Tranche II
Date: January 13, 2016 The Singareni Collieries Company Limited (A Government Company) Auction of Coal Linkages for Non-Regulated Sector Tranche II List of Frequently Asked s Others sub-sector S. 1. What
More informationTELANGANA STATE POWER COORDINATION COMMITTEE Request for Proposal (RfP) NOTICE No. TSPCC (Commercial)/02/15-16
1 TELANGANA STATE POWER COORDINATION COMMITTEE Request for Proposal (RfP) NOTICE No. TSPCC (Commercial)/02/15-16 TSPCC on behalf of TSDISCOMs (TSSPDCL & TSNPDCL) intends to purchase 2000 MW power for the
More informationGUJARAT URJA VIKAS NIGAM LTD., VADODARA
GUJARAT URJA VIKAS NIGAM LTD., VADODARA INVITATION OF BIDS FOR PROCUREMENT OF POWER ON SHORT-TERM BASIS THROUGH TARIFF BASED COMPETITIVE BIDDING PROCESS Request for Proposal (As per Guidelines for short-term
More informationCOAL INDIA LIMITED. Auction of Coal Linkage of Coking Coal in the Steel sub-sector. Date: April 18, 2017
Date: April 18, 2017 COAL INDIA LIMITED Auction of Coal Linkage of Coking Coal in the Steel sub-sector List of Frequently Asked s - Steel Sub-Sector S. 1. What are the various sub-sectors under non-regulated
More informationExpression of Interest. Procurement of Renewable Energy Under Short Term basis. Reliance Industries Limited In Gujarat and Maharashtra
Expression of Interest for Procurement of Renewable Energy Under Short Term basis To Reliance Industries Limited In Gujarat and Maharashtra Reliance Industries Limited Reliance Corporate Park, Thane-Belapur
More informationUttar Pradesh Electricity Regulatory Commission
Uttar Pradesh Electricity Regulatory Commission In exercise of the powers conferred under Section 181 of the Electricity Act, 2003 and all powers enabling it in this behalf, the Uttar Pradesh Electricity
More informationREQUEST FOR PROPOSAL (RfP) ASSAM POWER DISTRIBUTION COMPANY LTD
REQUEST FOR PROPOSAL (RfP) PROCUREMENT OF POWER ON SHORT-TERM BASIS THROUGH TARIFF BASED COMPETITIVE BIDDING PROCESS (As per Bidding Guidelines, issued by the Government of India for Determination of Tariff
More informationJHARKHAND BIJLI VITRAN NIGAM LIMITED
JHARKHAND BIJLI VITRAN NIGAM LIMITED BID DOCUMENTS FOR PURCHASE OF 150 MW POWER BY Jharkhand BIJLI VITRAN NIGAM LIMITED THROUGH: COMPETITIVE BIDDING COMMERCIAL AND GENERAL CONDITIONS TENDER NO: 80/PR/JBVNL/2014-15
More informationTENDER SPECIFICATION. Procurement of Emergency Power for Vedanta Limited, Jharsuguda
TENDER SPECIFICATION For Procurement of Emergency Power for Vedanta Limited, Jharsuguda This Document Contains: 1. NIT 2. General Terms and Conditions 3. BIDDERS COMPANY DATA (Annexure-A) 4. PERFORMA FOR
More informationUttar Pradesh Electricity Regulatory Commission
Uttar Pradesh Electricity Regulatory Commission Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696 Dated: 22.3.2010 In exercise of powers conferred under section 181 read with section 9, 61, 86
More informationProcedure for Scheduling
Short-Term Open Access in Inter-State Transmission (Bilateral Transaction) Procedure for Scheduling (As per CERC Open Access Regulations, 2008 (dated 25.01.2008) & subsequent (Amendment) Regulations, 2009
More informationSPOT E-AUCTION SCHEME,2007 FOR SALE OF COAL IN MCL FOR THE MONTH OF MAY, 2009
SPOT E-AUCTION SCHEME,2007 FOR SALE OF COAL IN MCL FOR THE MONTH OF MAY, 2009 Objective: Terms & Conditions of Spot e-auction Scheme 2007 Coal distribution through e-auction has been introduced with a
More informationCOAL INDIA LIMITED. Auction of Coal Linkage for Non-Regulated Sector Tranche II
Date: January 11, 2017 COAL INDIA LIMITED Auction of Coal Linkage for Non-Regulated Sector Tranche II List of Frequently Asked s - Sponge Iron Sub-Sector S. 1. What are the various sub-sectors under non-regulated
More informationTENDER SPECIFICATION
TENDER SPECIFICATION For Procurement of RTC Power by Vedanta Limited, Jharsuguda This Document Contains: 1. NIT 2. General Terms and Conditions 3. BIDDERS COMPANY DATA (Annexure-A) 4. PERFORMA FOR PRICE
More information1.1 These regulations shall extend to whole of the State of Punjab.
THE PUNJAB STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION The, 2018 No.PSERC/Secy/Regu. - In exercise of the powers conferred under Section 181of the Electricity Act, 2003 (36 of 2003), and all other
More informationGUJARAT ELECTRICITY REGULATORY COMMISSION. Notification No. 13 of 2005
GUJARAT ELECTRICITY REGULATORY COMMISSION OPEN ACCESS REGULATION Notification No. 13 of 2005 In exercise of the powers conferred on it by Section 181 read with Sections 39(2)(d), 40(c), 42 (2)(3)(4), 86(1)(c)
More informationRfS & Rs with compare to other states, there is no such charge
Replies to Queries of 1000 MW Solar Power Tender discussed during Pre-Bid Meeting on 19.12.2018 Sl. No. Clause No. Existing Clause Bidders' Query MSEDCL's Reply 1 Bid information sheet 2 Clause 1.2.2 of
More informationBEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AHMEDABAD. Petition No.1210/2012
BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AHMEDABAD In the Matter of: Petition No.1210/2012 Application under Article 13 (Change in Law) of the Power Purchase Agreement dated 02.02.2007 entered
More informationStandard Power Purchase Agreement. For
Standard Power Purchase Agreement For Procurement of Power on a Long-Term basis from the (insert capacity in MW) Ultra Mega Power Project to be set up at (specify location, district and State) sourcing
More information!" # $%&&!"# '++("%) " " $ % & ' # % # ' ) * +, -*. / # 1 2* 32 *4 # # !" 0 ' 3 " / 5 * ( 9 " ' %""!00%%35:
!# $%&&!# %+&0 $ % & ' # ( ' ) * +, -*. / # 1 2* 32 *4 # # 1 2'( '()& *%%'++%,-.%+'/%& '++(%)! # % #! 0 ' 3 4565758 / 5 * ( 9 ' %!00%%35: ! #$%$&'&$()*%+,*$ -$ ' &(()*%+,*$ '%&0%'++%# %+&0 % 6789 $ 67
More informationCoal India Limited. Auction of Coal Linkages to Power Producers/IPP(s) having already concluded long term PPAs under Clause B(ii) of SHAKTI Policy
Coal India Limited Auction of Coal Linkages to Power Producers/IPP(s) having already concluded long term PPAs under Clause B(ii) of SHAKTI Policy Pre Bid Presentation This presentation is for ease of understanding
More informationPTC INDIA LIMITED NEW DELHI
PTC INDIA LIMITED NEW DELHI Notice Inviting Tenders Date: 18 th May 2017 Tender ref. No. PTC/MTFG/NDMC/Tender/Banking/1195 Name of Work: Intra-Day Energy Banking Arrangement Date of release of Tender:
More informationCOMPETITIVE BIDDING FRAMEWORK IN INDIA MOHAN MENON
COMPETITIVE BIDDING FRAMEWORK IN INDIA MOHAN MENON PRESENTATION OUTLINE COMPETITIVE BIDDING - CASE 1 AND CASE 2 KEY PROVISIONS OF A PPA CHALLENGES OF COMPETITIVELY BID TARIFFS TYPICAL POWER SUPPLY AGREEMENT
More informationKERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM. PRESENT: Sri.T.M. Manoharan, Chairman
KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM PRESENT: Sri.T.M. Manoharan, Chairman Petition No. 1893/DD (T)/Jhabua/2016/KSERC in OP No. 13/2015 In the matter of Procurement of 865
More informationGUJARAT ELECTRICITY REGULATORY COMMISSION No. ---/---/---/GERC Dated: 13/01/2017. NOTIFICATION No. of 2017
GUJARAT ELECTRICITY REGULATORY COMMISSION -------- No. ---/---/---/GERC Dated: 13/01/2017 NOTIFICATION No. of 2017 In exercise of the powers conferred under Section 181 of the Electricity Act, 2003 (36
More informationGUJARAT STATE ELECTRICITY CORPORATION LIMITED
GUJARAT STATE ELECTRICITY CORPORATION LIMITED Tender Specification No.: GSECL/Fuel/Wash Coal/2011-12 (Revised) Bidding Document And Technical Specifications For Beneficiation of Coal And Supply of Beneficiated
More informationNotice Inviting e-tender
TENDER NO: UPSOI/FIN/ST-01/2018-19 Page 1 Notice Inviting e-tender 1. Indian Oil Corporation Ltd. invites bids through its website https://iocletenders.nic.in/ under single bid system. Tenderers can download
More informationTHE MYSORE PAPER MILLS LTD (A Government of Karnataka Undertaking)
THE MYSORE PAPER MILLS LTD (A Government of Karnataka Undertaking) No FFR/DF/RM/2017-18/109 CIN : L99999KA1936SGC000173 Office of the Director (Forests) MPM.Ltd., Paper Town, Bhadravathi Phone : (O) 08282
More informationCOAL DISTRIBUTION AND MARKETING
Chapter 7 COAL DISTRIBUTION AND MARKETING ANNUAL REPORT 2017-18 Ministry of Coal Coal Distribution and Marketing Coal Distribution and Marketing Allocation of coal to power, cement and steel plants. The
More informationMaharashtra State Electricity Distribution Company Limited
Maharashtra State Electricity Distribution Company Limited Model Power Purchase Agreement for Tariff Based Bidding Process for Procurement of Power on Long Term Basis from Power Stations where location,
More informationAA) Revised Chapter-VIII: Taxes and Other Duties Rev-01 dated 19/08/2017 of Volume IA TCC :
Ref: BHE/PW/PUR/MANUT-STR PHA (U-1 and 2) /1798/Corg-4 Date: 19/08/2017 ---------------------------------------------------------Page 1 of 5----------------------------------------------------- To ALL
More informationCASE No. 38 of Coram. Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member. Adani Power Maharashtra Ltd.
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:
More informationMinutes of Pre-bid meeting held on 29th June 2017 at GETRI, Vadodara with prospective bidders for Solar and Wind power tenders floated by GUVNL.
Minutes of Pre-bid meeting held on 29th June 2017 at GETRI, Vadodara with prospective bidders for Solar and Wind power tenders floated by GUVNL. GUVNL has floated two tenders for procurement of power from
More informationThe Brihan Mumbai Electric Supply & Transport Undertaking
The Brihan Mumbai Electric Supply & Transport Undertaking Divisional Engineer Power Management 1 st Flr, Multistoried Annex Building, BEST Marg, Colaba, MUMBAI 400 001 (OF THE BRIHANMUMBAI MAHANAGARPALIKA)
More informationThe Brihan Mumbai Electric Supply & Transport Undertaking
The Brihan Mumbai Electric Supply & Transport Undertaking Divisional Engineer Power Management 1 st Flr, Multistoried Annex Building, BEST Marg, Colaba, MUMBAI 400 001 (OF THE BRIHANMUMBAI MAHANAGARPALIKA)
More informationDraft MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION
Draft MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION No. / /2017/MPERC.- In exercise of the powers conferred under Section 181of the Electricity Act, 2003 (36 of 2003), and all other powers enabling
More informationGOVERNMENT OF KERALA
183 GOVERNMENT OF KERALA Kerala Small Hydro Power Policy 2012 1. Order G.O.(P) 25/2012/PD Dated: Thiruvananthapuram, 03.10.2012 2. Title Kerala Small Hydro Power Policy 2012 3. Objective To increase the
More informationCENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION (DRAFT)
CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI New Delhi, the 20 th of June 2013 NOTIFICATION (DRAFT) No.L-1/132/2013/CERC.- In exercise of the powers conferred under Section 178 of the Electricity
More informationNo.CBA / 1/2017-CBA2-Part(1) Government of India Ministry of Coal ORDER
No.CBA2-13011/ 1/2017-CBA2-Part(1) Government of India Ministry of Coal ORDER Shastri Bhawan, New Delhi, Dated the 11` gi February, 2018,2 Subject: Methodology for Auction of Coal Mines/Blocks for sale
More informationBhopal, Dated:
Bhopal, Dated: 08.12.2015 No. /MPERC /2015 - In exercise of powers conferred under sub-section zp of Section 181 of the Electricity Act, 2003 (36 of 2003), and all other powers enabling it in this behalf,
More informationASSAM ELECTRICITY REGULATORY COMMISSION
ASSAM ELECTRICITY REGULATORY COMMISSION NOTIFICATION The 28th December, 2010 No. AERC.23/2010: In exercise of the powers conferred under Section 61(d), 62(4), 86(1)(b) sub-section (1) of section 181 and
More informationRajasthan Electricity Regulatory Commission
Rajasthan Electricity Regulatory Commission Vidyut Viniyamak Bhawan, Near State Motor Garage, Sahkar Marg, JAIPUR -302001 Phone: EPBX 0141-2741299, Fax: 0141-2741018 Website: www.rerc.rajasthan.gov.in
More informationFuel and Power Purchase Price Adjust Formula Regulations DRAFT
Fuel and Power Purchase Price Adjust Formula Regulations DRAFT 2011 No. F.25/TERC/09/ Dated, 30 th March 2011 TRIPURA ELECTRICITY REGULATORY COMMISSION NOTIFICATION In exercise of the powers conferred
More informationCompetitive Bidding Guidelines for procurement of Electricity
Chapter 8 Competitive Bidding Guidelines for procurement of Electricity (Contains amendments dated 30.3.2006, 18.8.2006, 27.9.2007, 27.3.2009 and 21.7.2010) 345 346 Guidelines for Determination of Tariff
More informationCORRIGENDUM. Tender. For. Self-Inflating Bag. NIT Issue Date : September 09, 2013.
Date: - 22/10/2013 CORRIGENDUM Tender For Self-Inflating Bag NIT Issue Date : September 09, 2013. Pre Bid Meeting held on : September 20, 2013 at 3:00 PM Initial Date of Submission : October 04, 2013 at
More informationNOTICE INVITING TENDER FOR SHORT TERM PURCHASE OF ENERGY TENDER SPECIFICATION NO. PPR 02/2014
Specn: PPR-02/2014 Office of CHIEF ENGINEER / PP&R D-3, Shakti Vihar, PSPCL, PATIALA -147001 TEL. NO 0175-2300534, FAX NO 0175-2308698 / 2200872 e-mail: ce-ppr@pspcl.in, se-pr-ppr@pspcl.in NOTICE INVITING
More informationAGREEMENT FOR SYNCHRONOUS OPERATION OF CAPTIVE POWER PLANTS OF.. WITH JHARKHAND STATE ELECTRICITY BOARD SYSTEM
AGREEMENT FOR SYNCHRONOUS OPERATION OF CAPTIVE POWER PLANTS OF.. WITH JHARKHAND STATE ELECTRICITY BOARD SYSTEM AN AGREEMENT FOR SYNCHRONOUS OPERATION OF Captive Power Plant of M/s.. of.. MW is made on
More informationBhopal: Dated 5 th May 2006
Bhopal: Dated 5 th May 2006 No. 1192/MPERC/2006. In exercise of the powers conferred by section 181 (g) read with section 32(3) of the Electricity Act, 2003 enacted by the parliament, the Madhya Pradesh
More informationNo. F.25/TERC/09/204 Dated, 11 th August 2011 TRIPURA ELECTRICITY REGULATORY COMMISSION NOTIFICATION
No. F.25/TERC/09/204 Dated, 11 th August 2011 TRIPURA ELECTRICITY REGULATORY COMMISSION NOTIFICATION In exercise of the powers conferred under Section 61(d),62(4), 86(1)(b) sub-section (1) of section 181
More informationJharkhand State Electricity Regulatory Commission
Order on True-Up for FY 2014-15 & FY 2015-16, Business Plan, Aggregate Revenue Requirement and Tariff for Multi Year Tariff Period from FY 2016-17 to FY 2020-21 for Adhunik Power and Natural Resources
More informationCoal India Limited. Auction of Coal Linkages in the Steel Sub-Sector Coking Coal Auction for Steel Sub-sector. Pre Bid Presentation
Coal India Limited Auction of Coal Linkages in the Steel Sub-Sector Coking Coal Auction for Steel Sub-sector Pre Bid Presentation This presentation is for ease of understanding of the Scheme by the Bidders.
More informationContract Specifications of Crude Oil CRUDEOIL
Contract Specifications of Crude Oil Annexure 1 Symbol CRUDEOIL Description Contract Listing Contract Start Day Last Trading Day Trading CRUDEOILMMMYY Contracts are available as per the Contract Launch
More informationCase No. 27 of In the matter of
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:
More informationContract Specifications of Mild Steel Ingots/ Billets
Contract Specifications of Mild Steel Ingots/ Billets Annexure 1 Symbol STEELGZB Description STEELGZBMMMYY Contracts Available for Trading 20 th January 2010 10 th October of the previous year to 20 th
More informationComments on proposed amendments in Electricity Rules (with respect to Captive Power Plants) issued by Ministry of Power on 22 nd May 2018
Comments on proposed amendments in Electricity Rules (with respect to Captive Power Plants) issued by Ministry of Power on 22 nd May 2018 S No. Existing provision/ Draft amended proposed Modified proposed
More informationChhattisgarh State Electricity Regulatory Commission
Øekad 62] jk;iqj]] 'kqøokj] fnukad 4 ekpz 2011 & QkYxqu 13] 'kd 1932 Chhattisgarh State Electricity Regulatory Commission Irrigation Colony, Shanti Nagar, Raipur Raipur, Dated March 04, 2011 No. 36/CSERC/2011
More informationCHAPTER I: PRELIMINARY Short title, commencement and interpretation
Notification dated 20.2.2009 Bhopal: dated 31 st January, 2009 No. 254-MPERC-2009. In exercise of the powers conferred by Section 181 read with Subsection (b) of Section 86 of the Electricity Act 2003
More informationCASE No. 73 of hours for a period of six months from 1 April, 2019 to 30 September, Coram. I. M. Bohari, Member Mukesh Khullar, Member
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:
More informationContract Specifications of Kapas. Monday to Friday: a.m. to 5.00 p.m. Saturday: a.m. to 2.00 p.m. 4 MT (200 maund of 20 kg each)
Contract Specifications of Kapas Annexure 1 Symbol Description Contract available for trading April Trading period Trading session KAPAS KAPASMMMYY 1 st May of the previous year to 30 th April of the contract
More informationSummary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar
Summary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar In terms of sections 61, 62, 64 and 86 of the Electricity Act, 2003, the tariff for the generation and sale
More informationContract Specifications of Imported Thermal Coal
Contract Specifications of Imported Thermal Coal Annexure 1 Symbol TCOAL Description TCOALMMMYY Trading Months All Calendar Months for July 2010 to December 2010 Duration of Contract 4 months (4 near month
More informationSECTION - II. SPECIAL TERMS AND CONDITIONS (Transformer)
SECTION - II SPECIAL TERMS AND CONDITIONS (Transformer) 1. INTRODUCTION 1.1. The terms and conditions mentioned in this section are in addition to what are stated in Section I (General Conditions of Contract)
More informationAuction of Schedule II Coal Mines
Auction of Schedule II Coal Mines Queries & Responses To Standard Tender Document Dated December 27, 2014 Part V (Iron & Steel, Cement and Captive Power Sector specific queries) Nominated Authority Ministry
More informationTender For. Supply, Installation & commissioning APC/HITACHI MAKE UPS. SLDC-Vadodara
1 of 11 STATE LOAD DESPATCH CENTRE 132 KV GOTRI S/S Compound, Nr. TB Hospital, Gotri Road, Vadodara-390021 Fax (0265)2352019 Ph. 0265-232 2206 Website: www.sldcguj.com Email : sldcscada.getco@gmail.com
More informationPOLICY ON DEVELOPMENT OF HYDRO POWER PROJECT. Energy Department Government of Bihar
POLICY ON DEVELOPMENT OF HYDRO POWER PROJECT Energy Department Government of Bihar 2012 ( 1 ) Table of Content 1. Objective 2. Title and Enforcement 3. Scope and Coverage 4. Nodal Agency 5. Classification
More informationUTTAR PRADESH ELECTRICITY REGULATORY COMMISSION. No. UPERC/Secy/Regulation/ Lucknow : Dated, 17 th August, 2010
UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION No. UPERC/Secy/Regulation/10-787 Lucknow : Dated, 17 th August, 2010 In exercise of powers conferred under sections 61, 66, 86(1)(e) and 181 of the Electricity
More information(Collective Transaction) Procedure for Scheduling
Annexure-II Short-Term Open Access in Inter-State Transmission (Collective Transaction) Procedure for Scheduling [As per CERC Open Access Regulations, 2008 (dated 25.01.2008) & subsequent (Amendment) Regulations,
More informationम झग व ड क शप ब डस ल मट ड MAZAGON DOCK SHIPBUILDERS LIMITED
A10. BLANK GENERAL TERMS & CONDITIONS (GT&C) FOR ITEMS & SERVICES (EXCLUDING CIVIL WORKS) A20. SECURITY DEPOSIT. A21. The successful bidder shall submit a Security Deposit @ 5 % of the contract / order
More informationThe Singareni Collieries Company Limited
The Singareni Collieries Company Limited Auction of Coal Linkages in the Sub-Sectors of Sponge Iron (Phase III of Tranche I) and Others (Phase IV of Tranche I) Pre-Bid Presentation This presentation is
More informationHIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. (Date of Order: )
HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA IN THE MATTER OF:- (Date of Order: 25.07.2018) Petition No.: 26/2018(Suo-Moto) CORAM Sh. S.K.B.S. Negi Chairman Sh. Bhanu Pratap Singh Member
More informationScanned by CamScanner
Scanned by CamScanner Maharashtra Electricity Regulatory Commission intends to enact MERC (Forecasting, Scheduling and Deviation. Accordingly, the Hon ble Commission has circulated the draft of the proposedmerc
More informationCross Border Electricity Trade
Cross Border Electricity Trade Afghanistan Pakistan Nepal Bhutan India First meeting of core team on South Asian Regional Power Exchange (SARPEX) Bangladesh 7 th - 9 th February, 2017 New Delhi, India
More informationCorrigendum No. 2 to Scheme Document uploaded on June 22, 2016 For Auction of Coal Linkages in the Captive Power Plant Sub-sector
Date: July 1, 2016 Corrigendum 2 uploaded on June 22, 2016 For Auction of s in the Captive Power Plant Sub-sector The following amendments are applicable to the Scheme dated June 22, 2016 for auction of
More informationCOAL PRODUCTION, MARKETING & DISTRIBUTION
Chapter - 7 COAL PRODUCTION, MARKETING & DISTRIBUTION 7.1 COAL PRODUCTION 7.1.1 The Coal production all over India during the period 1st January, 2013 to 31st March 2013 was 173.225 MT. During the period
More informationNew and Renewable Energy Department Vallabh Bhavan, Bhopal
New and Renewable Energy Department Vallabh Bhavan, Bhopal English Translation of Policy for implementation of Small Hydel-Power based Electricity Projects in Madhya Pradesh, 2011 (As Amended on 15th February
More informationTORRENT POWER LIMITED. INVITATION TO OFFER For Supply Of LNG (CY-2017 To CY-2021) Dated 21st October 2016
TORRENT POWER LIMITED INVITATION TO OFFER For Supply Of LNG (CY-07 To CY-0) Dated st October 06 Response by TPL to Clarifications Uploaded on TPL's website on 7th November 06 In response to the above referred
More informationPower Procurement Strategy
Power Procurement Strategy 01.03.16 IIT-Kanpur For Public Use POWER SECTOR OVERVIEW Source: Executive Summary of October 2015, CEA *including renewable generation Installed Capacity (All) Category Installed
More informationCoal India Limited. Pre Bid Presentation
Coal India Limited Auction of Coal Linkages in the Sub-sectors of CPP (Phase IV of Tranche II) and Others (Phase III of Tranche II) Pre Bid Presentation This presentation is for ease of understanding of
More informationAuction of Coal Mines for Production of Iron & Steel 5 th Tranche. SCOPE Complex, New Delhi April 24, 2017
Auction of Coal Mines for Production of Iron & Steel 5 th Tranche SCOPE Complex, New Delhi April 24, 2017 Background Apr 17 Sep 14 Cancellation of allocation of 204 coal blocks by Hon ble Supreme Court
More information(1) Any buyer can participate in the e-auction for procurement of coal.
NORTHERN COALFIELDS LIMITED P.O. SINGRAULI, DIST. SINGRAULI (M.P) e-auction Scheme 2007 (for spot e-auctions) for sale of coal with effect from November 2007. Introduction: As per New Coal Distribution
More informationEngineering Projects (India) Limited Contracts Division- CO, New Delhi DLI/CON/686B/
Engineering Projects (India) Limited Contracts Division- CO, New Delhi DLI/CON/686B/618 23.06.2018 Subject: Tender for Construction of G+7 RCC Framed Structure tenements blocks with Bus bar rooms including
More informationCorrigendum No. 2 to Standard Tender Document (Schedule III Coal Mines) (For iron and steel, cement and captive power plant sector)
Corrigendum 2 to Standard Tender (Schedule III Coal Mines) (For iron and steel, cement and captive power plant sector) Date: February 10, 2015 1. The amendments/ additions mentioned in a. Corrigendum to
More informationSTANDARD IMPLEMENTATION AND SERVICE AGREEMENT FOR DEVELOPMENT AND OPERATION OF INTRA-STATE TRANSMISSION SYSTEM
STANDARD IMPLEMENTATION AND SERVICE AGREEMENT FOR DEVELOPMENT AND OPERATION OF INTRA-STATE TRANSMISSION SYSTEM FOR TRANSMISSION OF ELECTRICITY THROUGH TARIFF BASED COMPETITIVE BIDDING FOR. [INSERT THE
More informationGST NO: 36AAACT8873F1Z1
THE SINGARENI COLLIERIES COMPANY LIMITED (A GOVERNMENT COMPANY) PURCHASE DEPARTMENT RAMGUNDAM AREA -1 GODAVARIKHANI DIST: PEDDAPALLI TELANGANA (STATE) 505 209 TELEPHONE: 91-08728-244254, 244216 TELE FAX:
More informationAnnexure - C to TENDER STANDARD COMMERCIAL TERMS & CONDITIONS [FORMAT TO BE FILLED-UP BY THE SUPPLIER]
S No. BHEL Standard Terms Supplier Confirmation Deviation 01 Price: Supplier shall be quoted on "FIRM PRICE" basis only. No price variation clause will be entertained. 02 Terms of Delivery: (a) Indigenous
More information- 1 - WEST BENGAL MINERAL DEVELOPMENT AND TRADING CORPORATION LIMITED (WBMDTCL) (Govt. of West Bengal Undertaking)
- 1 - WEST BENGAL MINERAL DEVELOPMENT AND TRADING CORPORATION LIMITED (WBMDTCL) (Govt. of West Bengal Undertaking) Revised scheme of Spot e-auction for sale of coal to Micro and Small industrial units
More informationContract Specifications of Pre-certified Cotton Bales Mumbai Delivery Contract
Contract Specifications of Pre-certified Cotton Bales Mumbai Delivery Contract Commodity Symbol Contract Daily contract Trading period Trading session Cotton Bales COTNMUM8 Buying and selling on intra
More informationJawaharlal Nehru National Solar Mission
JNNSM: Guidelines for Selection of New Grid Connected Solar Power Projects (Phase 1, Batch 2) The present set of guidelines is applicable to the Second Batch of the photovoltaic projects to be selected
More informationKey Processes in Power Exchange Presented By: Prasanna Rao Shalabh Shrivastava
Key Processes in Power Exchange Presented By: Prasanna Rao Shalabh Shrivastava www.iexindia.com Day Ahead Market-Collective Transaction Features A closed double-sided anonymous auction for each 15-min
More informationThe Singareni Collieries Company Limited
The Singareni Collieries Company Limited Auction of Coal Linkages in the Sub-Sectors of Cement, CPP, and Sponge Iron (Phases I,II, and III respectively of Tranche II) Pre-Bid Presentation This presentation
More informationTrading at Power Exchange - IEX
Trading at Power Exchange - IEX February 2016 Prasanna Rao Market Operations In this presentation Product Portfolio Trading Mechanism & Process Flow- Day-Ahead Market Trading Mechanism-Term-Ahead Market
More informationGOVERNMENT OF PUNJAB DEPARTMENT OF POWER (Power Reforms Wing) NOTIFICATION The 21 st June, 2010
GOVERNMENT OF PUNJAB DEPARTMENT OF POWER (Power Reforms Wing) NOTIFICATION The 21 st June, 2010 No. 1/17/09-EB(PR)/450.- Whereas the State of Punjab is presently facing acute power shortages. And therefore,
More informationMeghalaya State Electricity Regulatory Commission
Meghalaya State Electricity Regulatory Commission SHILLONG Notification Dated: 12 th March, 2015 No.MSERC/RPO/2015/02: In exercise of power conferred under section 61, 66, 86(1)(e) and 181 of the Electricity
More informationNOTICE INVITING TENDER
UNIVERSITY OF CALICUT NOTICE INVITING TENDER No.51379/PURCHASE-ASST-B1/2014/2 Calicut University (P.O.) Dated, 3.11.2016. The Registrar, University of Calicut invites online tender for the Purchase of
More information[Insert Name]Coal Mine
5 TH TRANCHE OF AUCTION STANDARD TENDER DOCUMENT (AUCTION OF COAL MINES FOR IRON AND STEEL SECTOR) [Insert Name]Coal Mine Nominated Authority Ministry of Coal Government of India New Delhi April 10, 2017
More informationCoal Production, Marketing & Distribution
Chapter-7 Coal Production, Marketing & Distribution 7.1 Coal Production 7.1.1 Coal India Ltd. and its subsidiaries are the major producer of coal. 299.52 Million Tonnes of coal was produced by Coal India
More informationCoal India Limited. Auction of Coking Coal Linkages in the Others Sub-Sector- Coking Coal Auction. Pre Bid Presentation
Coal India Limited Auction of Coking Coal Linkages in the Others Sub-Sector- Coking Coal Auction Pre Bid Presentation This presentation is for ease of understanding of the Scheme by the Bidders. In case
More informationWest Bengal Renewable Energy Development Agency. Draft General Terms & Conditions of the Tender
West Bengal Renewable Energy Development Agency Draft General Terms & Conditions of the Tender (1) (a) The Tender shall be submitted in triplicate in 3 (three) separate Sealed Covers (COVER-I, II & III)
More informationTENDER FOR SALE OF CARGO OF PULSES (Green Moong)
THE STATE TRADING CORPORATION OF INDIA LTD. (A Govt. of India enterprise) B-1-201 IInd Floor Marathon Nextgen Innova, Opp.Peninsula Corporate Park, Off Ganapatrao Kadam Marg, Lower Parel(W), Mumbai 400
More information