1 PRESENT: Petition No of 2016 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order: Hon ble Sri Desh Deepak Verma, Chairman 2. Hon ble Sri S.K. Agarwal, Member IN THE MATTER OF: For approval of R&M scheme of BTG of Parichha Unit-1. AND IN THE MATTER OF Chief Engineer(R&M), U.P. Rajya Vidyut Utpadan Nigam Limited (UPRVUNL), Shakti Bhawan, 14-Ashok Marg, Lucknow Petitioner AND 1. UP Power Corporation Ltd., 14th Floor, Shakti Bhawan Extn., 14-Ashok Marg, Lucknow 2. Madhyanchal Vidyut Vitran Nigam Ltd., PN Road, Lucknow Purvanchal Vidyut Vitran Nigam Ltd., 132 KV S/S Bhikari Vidyut Nagar, Varanasi 4. Paschimanchal Vidyut Vitaran Nigam Ltd., Victoria Park, Meerut 5. Dakshinanchal Vidyut Vitaran Nigam Ltd., Galina Road, Agra Page 1 of 5

2 6. Kanpur Electricity Supply Co. Ltd., KESA House, Kanpur Respondents Following were presents: 1. Sri B.S. Tiwary, Dir. (T) 2. Sri V.P. Srivastava, CE PPA UPPCL 3. Sri Ashok Rathi, CE, UPRVUNL 4. Sri S.P. Chaubey, CE 5. Sri Vinod Asthana, SE UPPCL 6. Sri Krishna Mohan, SE, UPRVUNL 7. Sri R.K. Dagore, SE, UPRVUNL 8. Sri Haroon Aslam, EE UPPCL 9. Sri Manish Garg, Consultant, UPPCL ORDER (Date of Hearing ) 1. The petitioner, UPRVUNL, filed the petition to seek approval of R&M scheme of BTG of Unit-1 of Parichha TPS to reduce its down time arising out of various technical problems in BTG area systems. The other expected benefits are as follows: i. Annual PLF > 70% ii. Specific Oil Consumption < 2.60 KL/MU iii. Auxiliary Power Consumption < 10.7% iv. Specific Coal consumption < 0.80 Kg/Kwh v. Heat Rate < 2980 kcal/kwh 2. The petitioner submitted that the estimated cost of the R&M scheme, as also approved by ETF in March 2013, is Rs crore and is expected to be completed by October, The loan of Rs crore for funding the scheme has been sanctioned by the lending agency PFC and the rest Rs crore is to be equity funded by GoUP. 3. In last hearing UPPCL argued that under the prevailing Regulations, R&M scheme when sought should be accompanied with its DPR and there is nothing in the scheme to reduce variable charges post R&M to make the Units competitive. Therefore, requested the Commission to not to approve the above scheme. Page 2 of 5

3 4. UPRVUNL vide its letter dated submitted DPR of the R&M scheme which depicts total estimated cost of project as Rs crores and estimated payback period of one year. The total cost of supply and works stands at Rs crores (including taxes), contingency 5% stands at Rs crores and IDC@ 12.25% stands at Rs crores. 5. UPRVUNL also submitted as follows: I. In line with the Commission s order dated wherein R&M of BTG of Unit-2 of Parichha TPS and of Unit-1&2 of Parichha TPS were approved, they have had more than Rs crore on before the Commission s order dated for deletion of Unit-1. The approval for ESP work of Unit-1 was granted by the Commission through previous tariff order and Rs crores has been on it. II. So far as BTG of Unit-1 is concerned, subsequent to approval of R&M scheme of BTG Unit-1 for Rs crores by ETF on , they have Rs crores on BTG till the issuance of the directive of the Commission i.e III. Thus in total UPRVUNL have Rs crores on R&M scheme of Unit-1 before the issuance of the Commission s order. IV. It is submitted that scheme is implemented to achieve better operational performance and reduce variable cost of generation. It is also submitted that most of the work has been completed and rest of it shall be completed when Unit is under shut down. V. On account of poor environmental performance and deteriorating condition it was necessary to complete BTG, and ESP works. VI. The petitioner had filed review of the Commission s order dated The petitioner agreed that it should have sought prior approval of the Commission for starting R&M work but Page 3 of 5

4 since it was due to serious local opposition to running of machine as it was causing environmental problems, the petitioner was forced to shut the machine down on And since the equipment worth Rs crores were already procured by the petitioner before , the petitioner utilized the opportunity to undertake R&M work so as to complete the work within stipulated time. VII. The petitioner argued the argument of UPPCL that fixed cost of the plant is Rs. 7 per unit is misleading as it is due nonscheduling from plant. VIII. The petitioner submitted that it has undertaken various measures to reduce variable charges that include swapping of coal mines to reduce coal transportation cost, signing of MOU for third party sampling to ensure coal quality, reduction in demurrage charges and reduction in APC etc. The petitioner humbly requested the Commission to condone its behavior for initiating R&M work for BTG of Parichha Unit-1 without obtaining approval of the Commission and requested the Commission to kindly approve the scheme. 6. The submitted status of total expenditure made on R&M of Parichha Unit1 till June 2017 is as given below: Parichha Unit-1 Under R&M scheme submitted for approval BTG Electrical Civil Under R&M scheme approved previously ESP ( in Rs. ( in Rs. Already Yet to be Total Without taxes/duties Page 4 of 5

5 7. The figures of total expenditure incurred on Parichha Unit-2 under approved R&M scheme stands as given below: Parichha Unit-2 Boiler Under R&M scheme submitted for approval Turbine Electrical C&I Civil Misc. Already Yet to be NIL NIL Total All figures with taxes 8. At the outset, the Commission expressed its displeasure with UPRVUNL for having initiated R&M the work without getting prior approval from the Commission. The Commission sought from UPRVUNL to submit the rational for excluding BTG of Unit-1 of 2X110 MW under R&M scheme and going for R&M of BTG of Unit-2 only when BTG of both these Units had completed same life. 9. It is learnt that in respect of Parichha 2X110 MW Units, UPCL has asked UPRVUNL to not to declare capacity for scheduling. The Commission directs UPPCL and UPRVUNL to make their stand clear in respect of capacity declaration of this Unit (i.e. Parichha Unit no. 1) for scheduling. 10. The petition is kept in abeyance till submission of the above. Place: Lucknow Dated: (S.K. Agarwal) (Desh Deepak Verma) Member Chairman Page 5 of 5

1. Hon ble Sri Desh Deepak Verma, Chairman 2. Hon ble Smt Meenakshi Singh, Member 3. Hon ble Sri Indu Bhushan Pandey, Member

1. Hon ble Sri Desh Deepak Verma, Chairman 2. Hon ble Smt Meenakshi Singh, Member 3. Hon ble Sri Indu Bhushan Pandey, Member PRESENT: Petition No 1005 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order: 18.03.2015 1. Hon ble Sri Desh Deepak Verma, Chairman 2. Hon ble Smt Meenakshi Singh,

More information

Order Date of hearing

Order Date of hearing PRESENT Petition No. 1075 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order:07.03.2018 Hon ble Sri Suresh Kumar Agarwal, Chairman IN THE MATTER OF: Amendment of provisional

More information

Order ( date of hearing )

Order ( date of hearing ) BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of order : 16.09.2014 PRESENT: 1. Hon ble Sri Desh Deepak Verma, Chairman 2. Hon ble Smt. Meenakshi Singh, Member 3. Hon ble Sri

More information

THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Petition Nos. 1025, 1026 of 2015 FILED BY. UP Rajya Vidyut Utpadan Nigam Limited (UPRVUNL)

THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Petition Nos. 1025, 1026 of 2015 FILED BY. UP Rajya Vidyut Utpadan Nigam Limited (UPRVUNL) THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Petition Nos. 1025, 1026 of 2015 FILED BY UP Rajya Vidyut Utpadan Nigam Limited () IN THE MATTEROF: Determination of final true up for FY 2011-12

More information

OBRA B TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY TO

OBRA B TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY TO 2009 OBRA B TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009 10 TO 2013 14 UP RAJYA VIDYUT UTPADAN NIGAM LTD OBRA B _MYT Petition for Determination of Tariff FORM 1 (See Regulation 30) BEFORE THE

More information

Petition No. 975 of 2014 and 1017 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Date of Order:

Petition No. 975 of 2014 and 1017 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Date of Order: Petition No. 975 of 2014 and 1017 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order: 27.11.2015 IN THE MATTER OF: AND IN THE MATTER OF M/s Lalitpur Power Generation

More information

Petition No 1234 of 2017

Petition No 1234 of 2017 No 1234 of 2017 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PRESENT: Hon ble Sri. S. K. Agarwal, Chairman Hon ble Sri. K. K. Sharma, Member IN THE MATTER OF: AND IN THE MATTER OF:

More information

PARICHHA TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY TO

PARICHHA TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY TO 2009 PARICHHA TPS MYT PETITION FOR DETERMINATION OF TARIFF FOR FY 2009 10 TO 2013 14 UP RAJYA VIDYUT UTPADAN NIGAM LTD PARICHHA _MYT Petition for Determination of Tariff FORM 1 (See Regulation 30) BEFORE

More information

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Sub: Suo-moto proceedings in the matter of Uttar Pradesh Electricity Regulatory Commission (Terms & Conditions of Generation Tariff) Regulations

More information

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW. Petition Nos. 921, 917, 918, 919, 920, 885, 886, 887, 888, 889 / 2013

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW. Petition Nos. 921, 917, 918, 919, 920, 885, 886, 887, 888, 889 / 2013 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW Petition Nos. 921, 917, 918, 919, 920, 885, 886, 887, 888, 889 / 2013 and Petition Nos. 916, 894 / 2013 IN THE MATTER OF: Application

More information

Petition No. 816 of 2012

Petition No. 816 of 2012 Petition No. 816 of 2012 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order : 16.07.2015 PRESENT: 1. Hon ble Sri Desh Deepak Verma, Chairman 2. Hon ble Smt. Meenakshi Singh,

More information

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW Petition Nos. 860, 864, 865, 866, 867, 868 / 2012 IN THE MATTER OF: Application for determination of Annual Revenue Requirement and Tariff

More information

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PETITION NO. 1058/2015

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PETITION NO. 1058/2015 UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PETITION NO. 1058/2015 DETERMINATION OF ANNUAL REVENUE REQUIREMENT (ARR) AND TARIFF FOR FY 2016-17 AND TRUE UP OF ARR AND REVENUE FOR FY 2013-14

More information

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION PETITION NO.: 735/2011 & 789/2012 FILED BY. Madhyanchal Vidyut Vitran Nigam Limited IN THE MATTER OF

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION PETITION NO.: 735/2011 & 789/2012 FILED BY. Madhyanchal Vidyut Vitran Nigam Limited IN THE MATTER OF UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION PETITION NO.: 735/2011 & 789/2012 FILED BY Madhyanchal Vidyut Vitran Nigam Limited IN THE MATTER OF DETERMINATION OF ANNUAL REVENUE REQUIREMENT (ARR) AND

More information

Approval of Final Capital Cost, True up FY and Multi Year Tariff of BEPL for FY 15-19

Approval of Final Capital Cost, True up FY and Multi Year Tariff of BEPL for FY 15-19 THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Petition Nos. 973 of 2014, 1036,1037,1038,1039 &1040 of 2015 1079, 1080, 1081, 1082 &1083 of 2016 FILED BY Bajaj Energy Private Ltd (BEPL) IN

More information

Petition No. 990/2014

Petition No. 990/2014 UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Petition No. 990/2014 DETERMINATION OF AGGREGATE REVENUE REQUIREMENT (ARR) AND TARIFF FOR FY 2015-16 AND TRUE-UP OF ARR AND REVENUE FOR THE FINANCIAL

More information

M/s Jaiprakash Power Ventures Ltd 113 Rajpur Road, Dehradun

M/s Jaiprakash Power Ventures Ltd 113 Rajpur Road, Dehradun BEFORE IN THE MATTER OF: AND IN THE MATTER OF: THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Petition No.443/2007 Approval of tariff for supply of electricity from 400 MW Vishnu Prayag Hydroelectric

More information

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION PETITION NO. : 624,625,626,627,628 OF 2009 FILED BY

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION PETITION NO. : 624,625,626,627,628 OF 2009 FILED BY UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION PETITION NO. : 624,625,626,627,628 OF 2009 FILED BY U. P. POWER TRANSMISSION CORPORATION LIMITED MADHYANCHAL VIDYUT VITARAN NIGAM LIMITED DAKSHINANCHAL VIDYUT

More information

(Pet. Nos. 830, 833, 838, 839, 840, 842, 845, 859 of 2012 and 897 of 2013)

(Pet. Nos. 830, 833, 838, 839, 840, 842, 845, 859 of 2012 and 897 of 2013) (Pet. Nos. 830, 833, 838, 839, 840, 842, 845, 859 of 2012 and 897 of 2013) BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Detailed Order : 3.11.2014 IN THE MATTER OF: Approval

More information

if'pekapy fo qr forj.k fuxe fy0

if'pekapy fo qr forj.k fuxe fy0 nwjhkk"k % 0121&2665734 QSDl % 0121&2666062 if'pekapy fo qr forj.k fuxe fy0 Paschimanchal Vidyut Vitran Nigam Ltd. ¼mRrj izns k ljdkj dk midze½ (U.P. Govt. Undertaking) fodvksfj;k ikdz] esjb Victoria Park,

More information

PRESENT: Hon ble Sri Suresh Kumar Agarwal, Chairman

PRESENT: Hon ble Sri Suresh Kumar Agarwal, Chairman BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Petition No.1110/2016, 1157/2016, 1171/2017, 1194/2017, 1220/2017, 1223/2017, 1225/2017 PRESENT: Hon ble Sri Suresh Kumar Agarwal, Chairman

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.16 of 2014 PRESENT: Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta, Member

More information

Petition No.: 482, 483, 484, 485, 486, 504, 505, 506, 507 & 508 of Filed by:

Petition No.: 482, 483, 484, 485, 486, 504, 505, 506, 507 & 508 of Filed by: UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Petition No.: 482, 483, 484, 485, 486, 504, 505, 506, 507 & 508 of 2007 Filed by: U. P. Power Transmission Corporation Limited Pashchimanchal Vidyut Vitaran

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.40 of 2012 PRESENT: Rakesh Sahni, Chairman IN THE MATTER OF: In the matter of determination

More information

And. ORDER (Hearing dated February 24, 2016)

And. ORDER (Hearing dated February 24, 2016) BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW Suo-Moto Proceeding PRESENT: 1. ShriDesh Deepak Verma, Chairman 2. Shri I. B. Pandey, Member 3. Shri Suresh Kumar Agarwal, Member IN

More information

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PETITION NO. 1169/2017 & 1170/2017

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PETITION NO. 1169/2017 & 1170/2017 UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PETITION NO. 1169/2017 & 1170/2017 APPROVAL OF BUSINESS PLAN, DETERMINATION OF MULTI YEAR AGGREGATE REVENUE REQUIREMENT (ARR) AND TARIFF FOR THE

More information

MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED (MSPGCL/MAHAGENCO)

MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED (MSPGCL/MAHAGENCO) MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED (MSPGCL/MAHAGENCO) PETITION FOR CAPITAL COST AND TARIFF DETERMINATION FOR FY 2012-13 TO FY 2015-16 INCLUDING TRUE UP FOR FY 2012-13 &FY 2013-14 OF BHUSAWAL

More information

Bihar Electricity Regulatory Commission Vidyut Bhawan-II, J.L. Nehru Marg, Patna

Bihar Electricity Regulatory Commission Vidyut Bhawan-II, J.L. Nehru Marg, Patna Bihar Electricity Regulatory Commission Vidyut Bhawan-II, J.L. Nehru Marg, Patna 800 021 In the matter of: Case No.:- 27/2016 Signing of fresh PPA on reduced Tariff for 5 MW Solar Power Plant of M/s Sri

More information

TABLE OF CONTENTS. S. No. PARTICULARS Page No. I TRUE UP TARIFF PETITION FOR FY II PRAYER 09 III AFFIDAVIT IV AUTHORIZATION 12

TABLE OF CONTENTS. S. No. PARTICULARS Page No. I TRUE UP TARIFF PETITION FOR FY II PRAYER 09 III AFFIDAVIT IV AUTHORIZATION 12 TABLE OF CONTENTS S. No. PARTICULARS Page No. I TRUE UP TARIFF PETITION FOR FY 2013-14 3-8 II PRAYER 09 III AFFIDAVIT 10-11 IV AUTHORIZATION 12 V SUB INDEX OF TRUE UP TARIFF PROPOSAL 1 CAPACITY 13-16 2

More information

ANNUAL REVENUE REQUIREMENT & FY

ANNUAL REVENUE REQUIREMENT & FY ANNUAL REVENUE REQUIREMENT & TARIFF APPLICATION FY 2009-10 Uttar Pradesh Power Transmission Corporation Limited LUCKNOW Table of Contents 1. Introduction... 1-1 1.1. U P Power Transmission Corporation

More information

Executive Summary of Tata Power Generation True up Petition for FY as well as MYT Petition for FY to FY

Executive Summary of Tata Power Generation True up Petition for FY as well as MYT Petition for FY to FY Executive Summary of Tata Power Generation True up Petition for FY 2011-12 as well as MYT Petition for FY 2012-13 to FY 2015-16 Tata Power G Page 1 TABLE OF CONTENTS TABLE OF CONTENTS... 2 LIST OF TABLES...

More information

Summary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar

Summary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar Summary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar In terms of sections 61, 62, 64 and 86 of the Electricity Act, 2003, the tariff for the generation and sale

More information

BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AHMEDABAD. Petition No.1210/2012

BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AHMEDABAD. Petition No.1210/2012 BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AHMEDABAD In the Matter of: Petition No.1210/2012 Application under Article 13 (Change in Law) of the Power Purchase Agreement dated 02.02.2007 entered

More information

BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL

BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL IN THE MATTER OF Provisional approval of Generation tariff of M.P. s 57% share of power in Sardar Sarovar Project (6x200+5x50

More information

Case No. 27 of In the matter of

Case No. 27 of In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Petition No. 05 of 2016

Petition No. 05 of 2016 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No. 05 of 2016 PRESENT: Dr. Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta, Member

More information

Madhya Pradesh Poorv Ksthera Vidyut Vitaran Company Limited

Madhya Pradesh Poorv Ksthera Vidyut Vitaran Company Limited MYT ARR Filing for 10-11 to 12-13 AGGREGATE REVENUE REQUIREMENT AND TARIFF PROPOSAL PETITION FOR FY 2010-11 Madhya Pradesh Poorv Ksthera Vidyut Vitaran Company Limited Block No. 7, Shakti Bhawan, Vidyut

More information

BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI 1 BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI PETITION NO:.OF 2014 Petition under section 62 and 79(1) (a) of the Electricity Act, 2003, read with Chapter V of the Central Electricity

More information

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW Petition No.: 1086 / 2016 PRESENT:

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW Petition No.: 1086 / 2016 PRESENT: BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW Petition No.: 1086 / 2016 PRESENT: 1. Hon ble Sri Desh Deepak Verma, Chairman 2. Hon ble Sri InduBhushanPandey, Member IN THE MATTER

More information

SMP-10/2016 M.P. Electricity Regulatory Commission Bhopal

SMP-10/2016 M.P. Electricity Regulatory Commission Bhopal SMP-10/2016 M.P. Electricity Regulatory Commission Bhopal Tariff Order for procurement of power from Municipal Solid Waste based power generating plants in Madhya Pradesh June 2016 1. LEGISLATIVE PROVISIONS

More information

BIHAR ELECTRICITY REGULATORY COMMISSION. Case No. 54 of for BIHAR STATE POWER TRANSMISSION COMPANY LIMITED (BSPTCL)

BIHAR ELECTRICITY REGULATORY COMMISSION. Case No. 54 of for BIHAR STATE POWER TRANSMISSION COMPANY LIMITED (BSPTCL) BIHAR ELECTRICITY REGULATORY COMMISSION Case 54 of 2015 Tariff Order Truing-up for FY 2014-15, Annual Performance Review (APR) for FY 2015-16, Annual Revenue Requirement (ARR) for FY 2016-17 to FY 2018-19

More information

RInfra-G Multi Year Tariff Petition for FY to FY Executive Summary 1

RInfra-G Multi Year Tariff Petition for FY to FY Executive Summary 1 TABLE OF CONTENTS 1. BACKGROUND... 4 1.1. Introduction... 4 1.2. Objective of the present MYT Petition... 4 2. TRUING UP OF FY 2014-15... 4 2.1. Operational Performance for FY 2014-15... 5 2.2. Fuel Cost

More information

THE JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION, RANCHI. Case No. 25 of JHARKHAND BIJLI VITRAN NIGAM LIMITED Petitioner P R E S E N T

THE JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION, RANCHI. Case No. 25 of JHARKHAND BIJLI VITRAN NIGAM LIMITED Petitioner P R E S E N T THE JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION, RANCHI. Case No. 25 of 2015. JHARKHAND BIJLI VITRAN NIGAM LIMITED Petitioner P R E S E N T Hon ble Mr. Justice N.N. Tiwari, Chairperson Hon ble Mr.

More information

State Distribution Utilites Fifth Annual Integrated Rating

State Distribution Utilites Fifth Annual Integrated Rating State Distribution Utilites Fifth Annual Integrated Rating MAY, 2017 State Distribution Utilities Fifth Annual Integrated Rating MAY, 2017 fo qr] dks;yk,oa uohu vksj uohdj.kh; ÅtkZ,oa [kku jkt; ea=kh

More information

Before the MP Electricity Regulatory Commission 5 TH Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market : BHOPAL.

Before the MP Electricity Regulatory Commission 5 TH Floor, Metro Plaza, E-5, Arera Colony, Bittan Market : BHOPAL. In the Matter of - Before the MP Electricity Regulatory Commission 5 TH Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market : BHOPAL. Petition 53 of 2013 Filing of application for True-up of the Transmission

More information

Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited Block No. 7, Shakti Bhawan, Vidyut Nagar, Jabalpur

Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited Block No. 7, Shakti Bhawan, Vidyut Nagar, Jabalpur ANNUAL REVENUE REQUIREMENT AND TARIFF PROPOSAL PETITION FOR FY 2015-16 Submitted By: Madhya Pradesh Power Management Company Limited Shakti Bhawan, Vidyut Nagar, Jabalpur Madhya Pradesh Poorv Kshetra Vidyut

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on True-Up for FY 2014-15 & FY 2015-16, Business Plan, Aggregate Revenue Requirement and Tariff for Multi Year Tariff Period from FY 2016-17 to FY 2020-21 for Adhunik Power and Natural Resources

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal (M.P.) - 462 016 Petition No. 62 of 2016 PRESENT: Dr. Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok

More information

POWER PURCHASE AGREEMENT FOR SUPPLY OF ---- MW SOLAR POWER FROM GRID CONNECT SOLAR PV POWER PLANT FOR 12 YEARS

POWER PURCHASE AGREEMENT FOR SUPPLY OF ---- MW SOLAR POWER FROM GRID CONNECT SOLAR PV POWER PLANT FOR 12 YEARS POWER PURCHASE AGREEMENT FOR SUPPLY OF ---- MW SOLAR POWER FROM GRID CONNECT SOLAR PV POWER PLANT FOR 12 YEARS By [--------------------------------------------------------------] With Uttar Pradesh Power

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL under Coal Mines (Special Provisions) Second Ordinance, 2014 and Rules framed SMP No. 50 of 2015 DAILY ORDER (Date of Hearing: 24 th November, 2015)

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal - 462016 Petition 24/2014 PRESENT: IN THE MATTER OF: Dr. Dev Raj Birdi, Chairman A.

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No. 70 of 2015 PRESENT: Dr. Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta, Member

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal - 462016 Petition No75/2012 PRESENT: Rakesh Sahni, Chairman A. B. Bajpai, Member Alok

More information

DRAFT (To be signed on Non-judicial stamp paper of Rs.100/-)

DRAFT (To be signed on Non-judicial stamp paper of Rs.100/-) DRAFT (To be signed on Non-judicial stamp paper of Rs.100/-) Memorandum of Understanding between NTPC Vidyut Vyapar Nigam Limited and solar power developer willing to migrate to National Solar Mission

More information

STATUS OF THE CASES OF PRE 2006 PENSIONERS IN VARIOUS COURTS : AS ON COMPILED BY M. L. KANAUJIA, IRSSE

STATUS OF THE CASES OF PRE 2006 PENSIONERS IN VARIOUS COURTS : AS ON COMPILED BY M. L. KANAUJIA, IRSSE STATUS OF THE CASES OF PRE 2006 PENSIONERS IN VARIOUS COURTS : AS ON 01.07.2 COMPILED BY M. L. KANAUJIA, IRSSE / Chief Communication Engineer, N.E. Railway, (Rtd.) Ite m HEARD BY 1 CAT-PB Delhi PETITION

More information

AGGREGATE REVENUE REQUIREMENT AND TARIFF PETITION FOR FY *********

AGGREGATE REVENUE REQUIREMENT AND TARIFF PETITION FOR FY ********* AGGREGATE REVENUE REQUIREMENT AND TARIFF PETITION FOR FY 2016-17 ********* Submitted by: - Madhya Pradesh Power Management Company Limited, Shakti Bhawan, Vidyut Nagar, JABALPUR Madhya Pradesh Poorva Kshetra

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.28 of 2012 PRESENT: Rakesh Sahni, Chairman IN THE MATTER OF: C.S. Sharma, Member

More information

Tenughat Vidyut Nigam Limited (TVNL) Annual Revenue Requirement FY

Tenughat Vidyut Nigam Limited (TVNL) Annual Revenue Requirement FY POWERING JHARKHAND Tenughat Vidyut Nigam Limited (TVNL) (A Government of Jharkhand Undertaking) Hinoo, Doranda,Ranchi-834 002 Annual Revenue Requirement FY 2007-08 Submitted to Jharkhand State Electricity

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION Urja Bhawan, Shivaji Nagar, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION Urja Bhawan, Shivaji Nagar, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION Urja Bhawan, Shivaji Nagar, Bhopal-462 016 (Email: secmperc@sancharnet.in) (Website : www.mperc.org) ORDER Dated : 29 th November 2002 Petition No. 99/2002

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal - 462016 Petition 06/2013 PRESENT: Rakesh Sahni, Chairman A. B. Bajpai, Member Alok

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No. 11 of 2017 PRESENT: Dr. Dev Raj Birdi, Chairman A. B. Bajpai, Member Alok Gupta,

More information

MPERC TARIFF FILING FORMS UNIT -1 (TRUE UP PETITION) (For Financial Years: & )

MPERC TARIFF FILING FORMS UNIT -1 (TRUE UP PETITION) (For Financial Years: & ) MPERC TARIFF FILING FORMS UNIT -1 (TRUE UP PETITION) (For Financial Years: 2017-18 & 2018-19) FORM-TPS-1 SUMMARY SHEET Place Anuppur, Madhya Pradesh S. No. Particulars Remarks 2017-18 2018-19 (1) (2) (3)

More information

Sub: In the matter of petition for non-compliance of solar RPO by obligated entities for FY to FY

Sub: In the matter of petition for non-compliance of solar RPO by obligated entities for FY to FY ORDER (Date of hearing: 14 th October,2014) (Date of order: 20 th October,2014) M/s Green Energy Association, - Petitioner Sargam,143,Taqdir Terrace, Near Shirodkar High School, Dr. E. Borjes Road, Parel(E),

More information

Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited Block No. 7, Shakti Bhawan, Vidyut Nagar, Jabalpur

Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited Block No. 7, Shakti Bhawan, Vidyut Nagar, Jabalpur AGGREGATE REVENUE REQUIREMENT FOR MYT FY 2017 TO FY 2019 AND TARIFF PROPOSAL PETITION FOR FY 2017-18 Submitted By: Madhya Pradesh Power Management Company Limited Shakti Bhawan, Vidyut Nagar, Jabalpur

More information

Vidarbha Industries Power Limited - Transmission

Vidarbha Industries Power Limited - Transmission Vidarbha Industries Power Limited - Transmission Revised Petition towards: Approval of Capital Cost and Determination of Aggregate Revenue Requirement ( ARR ) for the period FY 14-15 to FY 15-16 Filed

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on Approval of Business Plan And ARR for MYT Control Period FY 2016-17 to FY 2020-21 And Transmission and SLDC Tariff for FY 2016-17 for Jharkhand Urja Sancharan Nigam Ltd (JUSNL) Ranchi February

More information

CASE No. 105 of Coram Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Transmission Co. Ltd.

CASE No. 105 of Coram Shri Azeez M. Khan, Member Shri Deepak Lad, Member. Maharashtra State Electricity Transmission Co. Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai 400 005 Tel. No. 022 22163964/ 65/ 69 Fax No. 022 22163976 Email: mercindia@merc.gov.in

More information

BEFORE THE KERALA STATE ELECTRICITY REGULATORY COMMISSION

BEFORE THE KERALA STATE ELECTRICITY REGULATORY COMMISSION BEFORE THE KERALA STATE ELECTRICITY REGULATORY COMMISSION IN THE MATTER OF: Proposals to introduce Fuel Price Adjustment Charges on all consumers including Bulk Consumers/ Other Licensees to recover the

More information

Scanned by CamScanner

Scanned by CamScanner Scanned by CamScanner BEFORE THE HARYANA ELECTRICITY REGULATORY COMMISSION PANCHKULA Case No. HERC/PRO- 65 of 2014 Date of Hearing : 08.01.2015 Date of Order : 05.02.2015 In the matter of Filing of Petition

More information

FILED BY MEGHALAYA POWER DISTRIBUTION CORPORATION LIMITED. Lum Jingshai, Short Round Road, Shillong

FILED BY MEGHALAYA POWER DISTRIBUTION CORPORATION LIMITED. Lum Jingshai, Short Round Road, Shillong BEFORE MEGHALAYA STATE ELECTRICITY REGULATORY COMMISSION, SHILLONG PETITION FOR APPROVAL OF DISTRIBUTION OPEN ACCESS CHARGES FOR FY 2015-16 FILED BY MEGHALAYA POWER DISTRIBUTION CORPORATION LIMITED Lum

More information

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO. 220-221, SECTOR 34-A, CHANDIGARH Petition No. 10 of 2013 Date of Order: 28.03.2013 In the matter of : Regarding filing of review petition against

More information

Benchmarking of performance parameters for Kanpur Electricity Supply Company Limited (KESCO)

Benchmarking of performance parameters for Kanpur Electricity Supply Company Limited (KESCO) Benchmarking of performance parameters in compliance with the Uttar Pradesh Electricity Regulatory Commission (Multi-Year Distribution Tariff) Regulations 2014 Report on the Benchmarking of performance

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on approval of Business plan and determination of ARR for the control period to (including True up for 2015-16 ) for Tata Power Company Limited (TPCL) Ranchi 19 February 2018 to (including True up

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, "Metro Plaza", Bittan Market, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, Metro Plaza, Bittan Market, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No. 02 of 2018 PRESENT: Dr. Dev Raj Birdi, Chairman Mukul Dhariwal, Member Anil Kumar

More information

Appellate Tribunal for Electricity (Appellate Jurisdiction) APPEAL No.25 of 2012

Appellate Tribunal for Electricity (Appellate Jurisdiction) APPEAL No.25 of 2012 Appellate Tribunal for Electricity (Appellate Jurisdiction) Dated: 19 th November, 2012 APPEAL No.25 of 2012 Appeal No.25 of 2012 Present : HON BLE MR. JUSTICE M KARPAGA VINAYAGAM, CHAIRPERSON HON BLE

More information

UTTAR PRADESH POWER CORPORATION LIMITED

UTTAR PRADESH POWER CORPORATION LIMITED REQUEST FOR PROPOSAL (RFP) For selection of Consultant to assist UPPCL in implementing end to end business solution for (1) Analyzing various parameters emanating from R-APDRP system and providing actionable

More information

Report on the Benchmarking of performance (Electricity Distribution in India) parameters.

Report on the Benchmarking of performance (Electricity Distribution in India) parameters. Benchmarking of performance parameters in compliance with the Uttar Pradesh Electricity Regulatory Commission (Multi-Year Distribution Tariff) Regulations 2014 Report on the Benchmarking of performance

More information

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PETITION NO. : 984/2014 FILED BY NOIDA POWER COMPANY LIMITED IN THE MATTER OF

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PETITION NO. : 984/2014 FILED BY NOIDA POWER COMPANY LIMITED IN THE MATTER OF UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PETITION NO. : 984/2014 FILED BY NOIDA POWER COMPANY LIMITED IN THE MATTER OF APPROVAL OF ANNUAL REVENUE REQUIREMENT AND DETERMINATION OF TARIFF

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No. 1, 13th floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/ 65/ 69; Fax 022 22163976 E-mail: mercindia@merc.gov.in

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No. 16 of 2016 PRESENT: Dr. Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta,

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in

More information

Order on. Petition No. 21/2014

Order on. Petition No. 21/2014 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 4 th and 5 th Floor, Metro Plaza, Bittan Market, Bhopal - 462 016 Order on ARR & Retail Power Supply Tariff for Electricity Distribution Business of Special

More information

ORDER ON TRUE-UP OF ARR FOR FINANCIAL YEAR Period From April 2007 to March 2008

ORDER ON TRUE-UP OF ARR FOR FINANCIAL YEAR Period From April 2007 to March 2008 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 4 th and 5 th Floor, Metro Plaza, Bittan Market, Bhopal - 462 016 ORDER ON TRUE-UP OF ARR FOR FINANCIAL YEAR 2007-08 Period From April 2007 to March 2008

More information

Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail: mercindia@mercindia.org.in

More information

Maharashtra State Power Generation Company Limited

Maharashtra State Power Generation Company Limited MSPGCL s Petition for True up of FY 2014-15, Provisional True up for FY 2015-16 and MYT Tariff Petition for the Period from FY 2016-17 to 2019-20 Maharashtra State Power Generation Company Limited Executive

More information

Before the MP Electricity Regulatory Commission

Before the MP Electricity Regulatory Commission Before the MP Electricity Regulatory Commission Filling No. Petition No. IN THE MATTER OF LEVY AND COLLECTION OF FEE AND CHARGES BY STATE LOAD DESPATCH CENTRE (SLDC) JABALPUR FOR THE YEAR 2019-20 AND IN

More information

TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Tariff Order No 1 of 2010 dated

TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Tariff Order No 1 of 2010 dated TAMIL NADU ELECTRICITY REGULATORY COMMISSION Tariff Order No 1 of 2010 dated 27.05.2010 Sl.No Description Summary of Regulations 1 Title Tariff order for projects covered by Jawaharlal Nehru National Solar

More information

BEFORE THE KARNATAKA ELECTRICITY REGULATORY COMMISSION, BENGALURU. Dated 16 th, May,2018

BEFORE THE KARNATAKA ELECTRICITY REGULATORY COMMISSION, BENGALURU. Dated 16 th, May,2018 No. S/01/18 BEFORE THE KARNATAKA ELECTRICITY REGULATORY COMMISSION, BENGALURU Present: Dated 16 th, May,2018 Sri. M.K. Shankaralinge Gowda - Chairman Sri. H.D. Arun Kumar - Member Sri. D.B. Manival Raju

More information

F.No /2010-Appeal NATIONAL COUNCIL FOR TEACHER EDUCATION Hans Bhawan, Wing II, 1, Bahadurshah Zafar Marg, New Delhi /01/2011

F.No /2010-Appeal NATIONAL COUNCIL FOR TEACHER EDUCATION Hans Bhawan, Wing II, 1, Bahadurshah Zafar Marg, New Delhi /01/2011 F.No.89-903/2010-Appeal NATIONAL COUNCIL FOR TEACHER EDUCATION Hans Bhawan, Wing II, 1, Bahadurshah Zafar Marg, New Delhi - 110 002 20/01/2011 O R D E R WHEREAS the appeal of Shri Mahavir Singh Bahuuddesiya

More information

CASE No. 113 of Coram. Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member

CASE No. 113 of Coram. Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY Petition Nos.

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY Petition Nos. MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 TH Floor Metro Plaza, Bittan Market", Bhopal - 462 016 AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY 2012-13 Petition Nos. 72/2011

More information

Uttar Pradesh Electricity Regulatory Commission

Uttar Pradesh Electricity Regulatory Commission Uttar Pradesh Electricity Regulatory Commission Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696 Dated: 22.3.2010 In exercise of powers conferred under section 181 read with section 9, 61, 86

More information

BEFORE THE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL PETITION NO. 10 OF 2018

BEFORE THE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL PETITION NO. 10 OF 2018 1 BEFORE THE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL PETITION NO. 10 OF 2018 IN THE MATTER OF : Petition under Section 62 and Section 86(1)(a) of the Electricity Act, 2003 read with Part

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM. PRESENT: Sri.T.M. Manoharan, Chairman

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM. PRESENT: Sri.T.M. Manoharan, Chairman KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM PRESENT: Sri.T.M. Manoharan, Chairman Petition No. 1893/DD (T)/Jhabua/2016/KSERC in OP No. 13/2015 In the matter of Procurement of 865

More information

F.No /2012 Appeal/8th Meeting-2012 NATIONAL COUNCIL FOR TEACHER EDUCATION Hans Bhawan, Wing II, 1, Bahadurshah Zafar Marg, New Delhi

F.No /2012 Appeal/8th Meeting-2012 NATIONAL COUNCIL FOR TEACHER EDUCATION Hans Bhawan, Wing II, 1, Bahadurshah Zafar Marg, New Delhi F.No.89-417/2012 Appeal/8th Meeting-2012 NATIONAL COUNCIL FOR TEACHER EDUCATION Hans Bhawan, Wing II, 1, Bahadurshah Zafar Marg, New Delhi - 110 002 24/08/2012 O R D E R WHEREAS the appeal of Murlidhar

More information

CASE NO. 196 OF In the matter of

CASE NO. 196 OF In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No. 1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022-22163964/65/69 Fax No. 022-22163976 Email: mercindia@merc.gov.in

More information

CASE No. 103 of CASE No. 104 of 2016

CASE No. 103 of CASE No. 104 of 2016 Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on Annual Performance Review for FY 2016-17 and Determination of Revised ARR and Tariff for the FY 2017-18 & FY 2018-19 for Jharkhand Bijli Vitran Nigam Limited (JBVNL) Ranchi 27.04.2018 TABLE OF

More information

Gujarat State Electricity Corporation Ltd. MYT Petition, True-up Petition Formats - Generation Dhuvaran CCPP 2 Sr. Title Reference No.

Gujarat State Electricity Corporation Ltd. MYT Petition, True-up Petition Formats - Generation Dhuvaran CCPP 2 Sr. Title Reference No. Title Reference 1 Aggregate Revenue Requirement - Summary Sheet Form 1 2 Summary of Tariff Proposal Form 1.1 3 Operational Parameters - Thermal Generation Form 2.1 4 Energy Charges - Thermal Generation

More information

Case No. 24 of In the matter of Application of Reliance Infrastructure Ltd. for Amendment of Transmission Licence No.

Case No. 24 of In the matter of Application of Reliance Infrastructure Ltd. for Amendment of Transmission Licence No. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information