MPERC TARIFF FORMS ANNEXURE

Size: px
Start display at page:

Download "MPERC TARIFF FORMS ANNEXURE"

Transcription

1 MPERC TARIFF FORMS ANNEXURE

2 SUMMARY SHEET Name of the Petitioner: MB Power (Madhya Pradesh) L FORM 1 Name of the Generation Station: Anuppur Thermal Power Station ( 2x 600 MW) (in Rs Crores) S.No. Particulars Unit Depreciation Form Interest on Loan Form 13A Return on Equity Form 1A Interest on Working Capital Form 13B O & M Expenses Secondary fuel oil cost Energy Charges Compensation Allowance (If applicable) Special allowance (If applicable) - ANNUAL CAPACITY (FIXED) CHARGES Rs Crore No. of days in Operation Share of MP 30% Energy Charge (Fuel) ex-bus (Paise/kWh) Rs/Unit 1.97

3 Statement showing claimed capital cost: Petitioner: MB Power (Madhya Pradesh) Limited FORM 1A Generating Station: Anuppur Thermal Power Station (2 x 600 MW) Sl.No. Particulars Unit Capital Cost (Less value of Railway siding capitalized post COD Rs. Cr FERV charged Revenue Rs. Cr Un-amortized Cost Borrowings Rs. Cr Opening Capital Cost Rs. Cr Add: Addition during the year/ period Rs. Cr Less: Decapitalisation during the year/period Less: Reversal during the year/period Rs. Cr Rs. Cr Add: Discharges during the year/period Rs. Cr Closing Capital Cost Rs. Cr Average Capital Cost Rs. Cr Statement showing Return on Equity Sl.No. Particulars Unit Opening Equity Rs. Cr Opening Equity Normative Rs. Cr Add: Increase due addition during the year/period Rs. Cr Less: Decrease due de-capitalisation during the year/period Rs. Cr Less: Decrease due reversal during the year/period Rs. Cr Add: Increase due discharges during the year/period Rs. Cr Closing equity Rs. Cr Average equity Rs. Cr Base rate of Return on Equity % 15.50% Tax Rate (MAT Rate) % 0.000% Rate of return on equity % % Return on equity Rs. Cr

4 Plant Characteristics Part-I FORM 2 Petitioner: MB Power (Madhya Pradesh) Limited Generating Station: Anuppur Thermal Power Station (2 x 600 MW) Unit(s)/Block(s) Parameters Unit-1 Unit-II Installed Capacity (MW) 600 MW 600 MW Schedule COD 5/20/2015 Nov 2015 Actual COD/Date of Taken Over (as applicable) 5/20/2015 4/7/2016 Pit Head or Non Pit Head Name of the Boiler Manufacture Name of Turbine Generar Manufacture Main Steams Pressure at Turbine inlet (kg/cm2) absl. Main Steam Temperature at Turbine inlet ( C)1 Reheat Steam Pressure at Turbine inlet (kg/cm2) 1 Reheat Steam Temperature at Turbine inlet ( C)1 Main Steam flow at Turbine inlet under MCR condition (ns/hr)2 Main Steam flow at Turbine inlet under VWO condition (ns/hr)2 Unit Gross electrical output under MCR /Rated condition (MW)2 Unit Gross electrical output under VWO condition (MW)2 Guaranteed Design Gross Turbine Cycle Heat Rate (kcal/kwh)3 Conditions on which design turbine cycle heat rate guaranteed % MCR % Makeup Water Consumption Design Capacity of Make up Water System Design Capacity of Inlet Cooling System Design Cooling Water Temperature (0C) Back Pressure Steam flow at super heater outlet under BMCR condition (ns/ hr) Steam Pressure at super heater outlet under BMCR condition) (kg/cm2) Steam Temperature at super heater outlet under BMCR condition (0C) Steam Temperature at Reheater outlet at BMCR condition (0C) Design / Guaranteed Boiler Efficiency (%) 4 Design Fuel with and without Blending of domestic/imported coal (Max/Min. Values) Type of Cooling Tower Type of cooling system 5 Type of Boiler Feed Pump 6 Fuel Details 7 -Primary Fuel -Secondary Fuel -Alternate Fuels Special Features/Site Specific Features Special Technological Features Environmental Regulation related features8 Any other special features Non-Pit Head Station M/S Harbin Boiler company Ltd. Turbine - M/S Harbin Turbine company Ltd % Ash (%) - 44/40, Moisture (%) - 16/12, Volatile Matter (%) - 26/20, Induced Draft Closed cycle Turbo Driven Coal LDO/ HFO

5 Normative Parameters Considered For Tariff Computation Part-I FORM 3 Petitioner: MB Power (Madhya Pradesh) Limited Generating Station: Anuppur Thermal Power Station (2 x 600 MW) Particulars Unit Guaranteed Design heat rate kcal/kwh 2260 Base Rate of Return on Equity % Tax Rate % 0.00 Target Availability % 85 Auxiliary Energy Consumption % 6.50 Gross Station Heat Rate kcal/kwh Specific Fuel Oil Consumption ml/kwh 1.0 Cost of Coal/Lignite for WC in Months 2.0 Cost of Main Secondary Fuel Oil for WC in Months 2.0 Fuel Cost for WC in Months Not Applicable. Liquid Fuel Sck for WC in Months Not Applicable. O & M expenses in Months 1.0 Maintenance Spares for WC % of O&M Charges 20% Receivables for WC in Months 2.0 Srage capacity of Primary Fuel Prime lending Rate of SBI as on Basis point Blending ratio of domestic coal/imported % 13.5

6 Petitioner: MB Power (Madhya Pradesh) Limited Generating Station: Anuppur Thermal Power Station (2 x 600 MW) Details of Foreign loans (Details only in respect of loans applicable the project under petition) PART-I FORM- 4 Financial Year (Starting from COD) S. No Date Amount (Foreign Currency) Exchange Rate Amount (Rs.) Date Amount (Foreign Currency) Exchange Rate Amount (Rs.) Date Amount (Foreign Currency) Exchange Rate Amount (Rs.) Date Amount (Foreign Currency) Exchange Rate Amount (Rs.) Total Loan in 'USD million million million million A.1 At the date of Drawl 2 14/12/ ,769, ,506, /01/ ,500, ,617,303, /2/ ,210, ,683,649, /03/2016 9,200, ,189, Scheduled repayment date of principal 1/5/ Scheduled payment date of interest 14/12/ /01/2016 1/2/ /03/ At the end of Financial year B In case of hedging 3 1 At the date of hedging 1/1/ ,769, /2/ ,500, ,609,399, /2/ ,210, ,691,241, /6/2016 9,200, ,759, Rate of Interest 11.10% 11.09% 11.13% 11.10% 2 Period of hedging 10 Years 10 Years 10 Years 10 Years 3 Cost of hedging

7 FORM TPS-5A Abstract of Equity Estimates And Schedule of Commissioning for the New Projects Petitioner: MB Power (Madhya Pradesh) Limited Generating Station: Anuppur Thermal Power Station (2 x 600 MW) New Projects Capital Cost Estimates Board of Direcr/ Agency approving the capital Cost estimates: Date of approval of the Revised Capital Cost estimates Price level of approved estimates Foreign Exchange rate considered for Capital cost estimates Capital Cost excluding IDC & FC Foreign Component, if any (In Million US $ or the relevant Currency) Domestic Component (Rs. Cr.) Capital cost excluding IDC, FC, FERV & Hedging Cost (Rs. Cr) IDC, FC, FERV & Hedging Cost Foreign Component, if any (In Million US $ or 16th Feb 2016 (Board Approval) Cost as per Investment Approval Completed Cost as on Scheduled COD of the Station (up Cutt-off Date) the relevant Currency) Domestic Component (Rs. Cr.) Total IDC, FC, FERV & Hedging Rate of taxes & duties considered Capital cost Including IDC, FC, FERV & Hedging Cost Foreign Component, if any (In Million US $ or the relevant Currency) Domestic Component (Rs. Cr.) Capital cost Including IDC & FC (Rs. Cr)* Schedule of Commissioning COD of Unit-I/Block-I COD of Unit-II/Block-II COD of last Unit/Block Note: 1. Copy of Investment approval letter should be enclosed 2. Details of Capital Cost are be furnished as per Form-5B 3. Details of IDC & Financing Charges are be formed as per FORM-14

8 Name of the Petitioner : MB POWER (MADHYA PRADESH) LIMITED Name of the Generating Station: ANUPPUR THERMAL POWER PROJECT S No Break Down Estimated Capital Expenditure as Submitted in Petition 19/2014 Total Estimated Capital Expenditure as per FS Capital Expenditure for Unit 1 as on 31st March 2016 as per FS Actual Cash Expenditure on COD of Unit 1 (up 20th May 2015) Undischarged Liability/Provisions (+) Advances (-) as on COD of Unit-I Actual Cash Expenditure on for Unit-I Undischarged Liability/Provisions (+) Advances (-) as on for Unit-I A B C E F 1 Cost of Land & Site Development 1.1 Free Hold Land incl. R&R Lease Hold Land Sub Total- Land & Site Development Plant & Equipment 2.1 Boiler, Turbine & Generar 2, , , , , Coal Handling System Ash Handling System (0.71) 2.4 Water System Fuel Handling & Other Mechanical Systems (0.69) 2.6 Switchyard & Other Electrical Systems Control & Instrumentation Systems (0.26) 2.8 Taxes & Duties (CD, ED & Other taxes) Raw Water Reservoir (5.28) (5.28) 2.10 Temp. Construction & Enabling works (other Assets) Barrage (Barrage + Pump House+Raw Water Pipeline) Railway Siding (0.02) 2.13 Taxes on Barrage & Railway Siding Mandary Spares (0.20) Sub Total - Plant & Machinery 4, , , , , Building & Civil Works FORMAT 5 B General Civil Works for Main Plant Building, Plant Roads and Drains & Other Misc. Civil Works etc As on As on Raw Water Reservoir Township (Boundary Wall, Roads & Parking, External Sewarage, Residential Quarters etc) Ash dyke Other Buildings (Admin Building, canteen watch Towers, Fire Stations, Time Office, Security House, Drivers Rest Room/Helipad) + BOUNDARY WALL Temp. Construction & Enabling works (other Assets) Transportation & Insurance for Non EPC Supplies Taxes on Non EPC items Sub Total - Civil Works 1, Pre-Operative Expenses/Pre-Commissioning Expenses IDC, FC, FERV, Hedging Cost & Contingency 1, , , , , Interest During Construction (IDC) 1, , , , , Financing Charges (FC) Contingency Sub Total - IDC, FERV & Contingency 1, , , , , PROJECT COST (wot CD/ED Provision) 7, , , , , Cusm & Excise Duty on Offshore/Onshore Equipments 8 Total Capital Expenditure 8, , , , , FERV Losses charged P&L Unamortized Cost Borrowings TOTAL 8, , , , ,

9 Break-up of Construction/Supply/Service packages PART-I FORM-5C Name of the Petitioner Name of the Generating Station MB Power (Madhya Pradesh) Limited 2 x 600 MW Anuppur Thermal Power Project S No Name/No. of Construction / Supply / Service Package Scope of works 1 (in line with head of cost break-ups as applicable) Whether awarded through ICB/DCB/ Depatmentally/ Deposit Work No. of bids received Date of Award Date of Start of work Date of Completion of Work Value of Award 2 Firm or With Escalation in in (Rs. prices Cr.) Actual expenditure till the completion or up COD whichever is earlier(rs.cr.) Taxes & Duties IDC, FC, FERV & hedging Cost Sub Total ( ) Supply of Off Shore Material - Boiler Turbine LoI Nov 10 Cusm Duty 1.0 Offshore Supply ICB 5 15-Dec-10 On Going USD 360 Mn Firm and Generar and their auxilliaries Contract - 20 Dec 10 Extra 2.0 Onshore Supply Supply of Material for all BoP Packages- Including AHP, CHP, Switchyard, IDCT, HVAC, C&I packages, Transformers etc. ICB 5 LoI Nov 10 Contract - 20 Dec Dec-10 On Going Firm ED and CST extra 3.0 Onshore Services Erection, testing and comisisong of main plant BTG and BoP packages ICB Onshore Civil Works Civil works of BTG and BoP package ICB 5 LoI Nov 10 Contract - 20 Dec 10 LoI Nov 10 Contract - 20 Dec Dec-10 On Going Firm ST extra 15-Dec-10 On Going Piling Piling works Cost plus basis 30-Dec Dec Jul Non EPC works - CPL (WO-17) Boundary Wall (part), Helipad, Site Grading, Nala Diversion, Ash Dyke, Water Reservoir, Pump House at River 4 17-Feb Feb-10 On Going Prices are firm but PV on steel and Cement be paid extra Prices are firm but PV on steel and Cement be paid extra Prices are firm but PV on steel and Cement be paid extra (incl 5% VAT) VAT and WCT extra 7.96 Service Tax Extra 7.0 Non EPC works - CPL (WO-19) Township (part) 4 17-Feb Feb-10 On Going Prices are firm but PV on steel and Cement be paid extra (incl 5% VAT) Service Tax Extra 8.0 Non EPC works - CPL (WO-18) External Road 4 17-Feb Feb-10 On Going 0.92 Prices are firm but PV on steel and Cement be paid extra (incl 5% VAT) Service Tax Extra 9.0 Non EPC works - HECL (WO-17) Boundary Wall (part), Fire Station, Time Office, Security Barrack, Administrative Building, Raw water Pipe Line 4 17-Feb Feb-10 On Going Prices are firm but PV on steel and Cement be paid extra (incl 5% VAT) Service Tax Extra 10.0 Non EPC works - HECL (WO-19) Township (part) 4 17-Feb Feb-10 On Going Prices are firm but PV on steel and Cement be paid extra (incl 5% VAT) Service Tax Extra 11.0 Barrage Civl Works Cosntruction of Barrage 3 28-Sep Nov-11 Almost Completed Prices are firm but PV on steel and Cement be paid extra VAT and WCT extra

10 S No Name/No. of Construction / Supply / Service Package Scope of works 1 (in line with head of cost break-ups as applicable) Whether awarded through ICB/DCB/ Depatmentally/ Deposit Work No. of bids received Date of Award Date of Start of work Date of Completion of Work Value of Award 2 Firm or With Escalation in in (Rs. prices Cr.) Actual expenditure till the completion or up COD whichever is earlier(rs.cr.) Taxes & Duties IDC, FC, FERV & hedging Cost Sub Total ( ) Barrage HM Works (Supply) Supply of material for HM works at Barrage 3 28-Sep Oct-11 Almost Completed Prices are firm but PV on steel be paid extra ED, CD, CST/VAT etc 13.0 Barrage HM Works (Services) Erection testing and commissioning of HM works at Barrage 3 28-Sep Oct-11 Almost Completed 3.36 Firm ST Etc 14.0 Railway Siding (Supply) Supply of material requried for construction of Raiwlay Siding 2 26-Dec Dec-11 Almost Completed Prices are firm but PV on Rail, steel and Cement be paid extra Taxes extra 15.0 Railway Siding (Services) Erection testing and commissioning of Railway Siidng 2 26-Dec Dec-11 Almost Completed Firm ST Extra 16.0 Locos Supply of Locomotives 3 23-Oct Jan-14 Completed 7.67 Firm ED, CST etc 17.0 Supply of HT Cable Supply of HT cable for Power supply Barrage 5 9-Mar-12 9-Mar-12 Completed 2.98 Firm ED extra 18.0 Raw Water Pump Supply of Raw Water Pump 3 13-Feb Feb-12 Completed 1.52 Firm CST & ED Included 19.0 HDPE Lining for reservoir Supply and installation of HDPE Lining 9 17-Apr Apr-12 Completed Firm VAT & ST Extra 20.0 Ash Dyke Supply af material and construction of ash dyke (part) 7 24-Sep Sep-13 Completed Firm VAT & ST Extra 21.0 Hospital Building & shopping complex Construction of Hospital Building & shopping complex 4 20-Sep Sep-13 On Going 3.1 Firm VAT & ST Extra 22.0 HVAC Admin Building Supply of material for HVAC of Admin Building 5 2-May-14 2-May-14 On Going 1.3 Firm ED & CST Extra Total Cost of all Packages & 360 Mn USD

11 Details of variables, parameters, optional package etc. for New Project FORM 5D Name of the Petitioner Name of the Generating Station MB Power (Madhya Pradesh) Limited 2 x 600 MW Anuppur Thermal Power Project Unit Size Number of Units 600 MW 2 in No. Greenfield Greenfield/Extension S. No. Variables 1 Coal Quality Calorific Value 3400 Kcal/kg 2 Ash Content 43% 3 Moisture Content 15% 4 Boiler Efficiency Suspended Particulate Matter mg/nm3 <=50 6 Ash Utilization As per applicable MOEF guidelines 7 Boiler Configuration Pulverised corner fired vertical boiler 8 Turbine Heat Rate CW Temperature Water Source Son River 11 Distance of Water Source 5.4 Km 12 Clarifier 2 (nos.) x 2030M 3 /hr 13 Mode of Unloading Oil Unloading by Tanker (by road) 14 Coal Unholding Mechanism Wagon Tippler / Track Hopper 15 Type of Fly Ash Disposal and Distance Lean Slurry / 4.5 kms 16 Type of Botm Ash Disposal and Distance Lean Slurry / 4.5 kms 17 Type of Soil Blackish Brown Colour silty clay 18 Foundation Type (Chimney) Bored Cast In-Situ Piles 19 Water Table Design Water Table-1m below G.L. 20 Seismic and Wind Zone Zone-III, Basic wind velocity 39m/s 21 Condensate Cooling Method IDCT 22 Desalination/RO Plant NIL 23 Evacuation Voltage Level 400KV 24 Type of Coal (Domestic/Imported) Domestic (However any shortfall in reqiurement is proposed meet through domestic/ e-auction / imported coal) Parameter/Variables Values Completion Schedule Terms of Payment Performance Guarantee Liability Basis of Price (Firm/Escalation-Linked) Equipment Supplier (Country of Origin) Optional Packages Desalination Plant/RO Plant MGR Railway Siding Unloading Equipment at Jetty Rolling Sck/Locomotive FGD Plant Length of Transmission Line till Tie Point (in km) Unit-1: 20th May 2015 Unit-2: 07th April, 2016 NA Lanco Infratech Limited (LITL) Firm 1. Steam generar - M/S Harbin Boiler Company Ltd., China 2. Steam turbine - M/S Harbin Turbine Company Ltd., China 3. Generar: M/S Harbin Generar Company Ltd., China Yes/No No. No Yes No 2nos. Of Diesel Loco No Nil (as power is evacuated at Plant bus-bar)

12 Financial Package up COD FORM- 6 Name of the Petitioner MB Power (Madhya Pradesh) Limited Name of the Generating Station 2 x 600 MW Anuppur Thermal Power Project (Rs.Cr) Financial Package Financial Package S. no. Lender as Approved as on Project COD As Admitted on COD Currency and Amount3 Currency and Amount3 Currency and Amount A DEBT A.1 State Bank of India INR 1, INR 1, A.2 AXIS Bank INR INR A.3 SBOP INR INR - A.4 PTC INR INR A.5 L&T INR INR A.6 PNB INR INR - A.7 LIC INR INR A.8 Federal Bank INR INR A.9 SBBJ INR INR - A.10 PFC INR 1, INR 1, A.11 REC INR INR A.12 Additional Debt appraised INR 1, INR - A.13 IIFCL UK* INR - INR A.14 Normative Debt at 70% for Rs Cr INR INR DEBT 6, , Less: Provision for WCM (199.53) (199.53) DEBT (net off provision for WCM) 6, , B EQUITY B.1 Foreign - B.2 Domestic INR 2, INR 2, B.3 Normative Equity at 30% of Rs Cr INR INR B.4 Additional Equity INR - INR TOTAL EQUITY 2, , Less: Provision for WCM (70.47) (70.47) EQUITY (net off provision for WCM) 2, , Debt : Equity Ratio TOTAL CAPITAL COST 8, , Total Debt 6, , Total Equity 2, , *$ 150 M SANCTIONED FROM IIFCL UK

13 Details of Project Specific Loans FORM 7 Name of the Company Name of the Power Station MB POWER (MADHYA PRADESH) LTD. ANUPPUR Thermal Power station (2x600 MW) Particulars Source of Loan 1 SBI Axis Bank SBOP PTC-PFS L&T Infra PNB LIC Federal SBBJ PFC REC IIFCL UK Currency 2 Amount of Loan sanctioned (after downselling of loans) 1, INR , Interest Type 6 Fixed Interest Rate, if applicable Floating NA Base Rate, if Floating Interest (based on Bankers certificate up Margin, if Floating Interest % 13.91% 14.50% 14.36% 14.07% 15.44% 13.24% 14.54% 15.58% 14.06% 13.10% 12.69% Are there any Caps/Floor 9 If above is yes,specify caps/floor Morarium Period 10 6 months Morarium effective from Repayment Period 11 Repayment effective from 10 years After the 6 months from the date of commercial operation of the station 1/5/2016 Repayment Frequency 12 Repayment Instalment 13,14 Base Exchange Rate 16 Are foreign currency loan hedged? Quarterly 40 Installements Yes If above is yes,specify details 17 NA FORM 4 * Based on Banker's Certificates of Outstanding Loans and Interest paid

14 Part-I FORM 9 Year wise Statement of Additional Capitalisation af ter COD Name of the Petitioner Name of the Generating Station MB POWER (MADHYA PRADESH) LTD. ANUPPUR Thermal Power station (2x600 MW) Sl. No. Head of Work / Equipment ACE Claimed (Actual / Projected) Regulations under Justification Un-discharged Liability Cash basis (Total Add Cap up IDC included in which claimed (net of advances) cut-off date) (1) (2) (3) (4) (5=3-4) (6) (7) (8) (9) 1 Railway Siding/Locomotives Date of completion alongwith locomotives June 30, Un-Discharged Liabilites TOTAL col. 3 Admitted Cost by the Commission, if any 1. In case the project has been completed and cost has already been admitted under any tariff notification(s) in the past, fill column 10 giving the cost as admitted for the purpose of 2. The above information needs be furnished separately for each y ear/ period of tariff period In case of de-capitalisation of assets separate details be furnished at Column 1,2,3 and 4. Further, the original book value and y ear of capitalisation of such asset be furnished at 4. Where any asset is rendered unserviceable the same shall be treated as de-capitalised during the y ear and original value of such asset be shown at Col. 3. And impaired value if 5. Justification against each asset of capitalization should be specific regulations under which claim has been made and the necessity of capitalization of that particular asset. Note: 1. Fill the form in chronological order y ear wise along with detailed justification clearly bringing out the necessity and the benefits accruing the beneficiaries. 2. In case initial spares are purchased along with any equipment, then the cost of such spares should be indicated separately e.g. Ror-50 Crs. Initial spares-5 Crs.

15 Financing of Additional Capitalisation FORM 10 Name of the Petitioner Name of the Generating Station MB POWER (MADHYA PRADESH) LTD. ANUPPUR Thermal Power station (2x600 MW) Actual / Anticipated Admitted (Rs. Cr) Financial Year (Starting from COD) FY Year 2 Year 3 Year 4 Year 5 Year 1 Year 2 Year 3 Year 4 Year Amount Captalized in Work/Equipment Financing Details Loan 1 Loan 2 Loan 3 & so on Total Loan Equity* Internal Resources Others Total

16 Calculation of Depreciation FORM 11 Name of the Petitioner MB POWER (MADHYA PRADESH) LTD. Name of the Generating StaANUPPUR Thermal Power station (2x600 MW) Sl. no. Name of the Assets1 Gross Block as on COD of Unit 1 Cash Basis Gross Block as on Cash Basis Average Gross Block as on Depreciation Rates as per MPERC's Depreciation Rate Schedule Depreciation Amount for FY Free Hold Land % - 2 Lease Hold Land % Civil & structure % Plant & equipments 3, , , % Misc. Fixed Asset TOTAL 4, , , Weighted Average Rate of Depreciation (%) 4.79%

17 Statement of Depreciation FO RM 12 Name of the Petitioner : MB Power (Madhya Pradesh) Limited Name of the Generating Station: Anuppur Thermal Power Station (2 x 600 MW) (Amount in Rs. Crores) Financial Ye ar Opening Capital Cost Closing Capital Cost Ave rage Capital Cost Freehold land Rate of depreciation 4.79% Depreciable value Balance useful life at the beginning of the period Remaining depreciable value Depreciation (for the period) Depreciation (annualized) Cumulative depreciation at the end of the period Less: Cumulative depreciation adjustment on account of un-discharged liabilities deducted as on / Station COD Less: Cumulative depreciation adjustment on account of de-capitalization Net Cumulative depreciation at the end of the period PETITIO NER

18 Calculation of Weighted average rate of Interest on Actual Loan Outstanding FORM- 13 Name of The Generating Company :- MB Power (Madhya Pradesh) Limited Name of The Power Station :- 2 x 600 MW Anuppur Thermal Power Project (Amount in Rs Cr.) PTC India Financial Services Limited As per BC As per BC As per BC As per BC As per BC Opening Balance Addition of Loan Downselling of Loan Net Addition of Loan Repayment of Loan Closing Balance Average Loan Actual Interest Paid Rate of Interest 15.99% 13.68% 13.53% 14.59% 14.36% Power Finance Corporation Limited As per BC As per BC As per BC As per BC As per BC Opening Balance , Addition of Loan Downselling of Loan Net Addition of Loan Repayment of Loan Closing Balance , , Average Loan , Actual Interest Paid Rate of Interest 0.00% 0.00% 1.21% 11.29% 14.06% Rural Electrification Corporation Limited As per BC As per BC As per BC As per BC As per BC Opening Balance Addition of Loan Downselling of Loan Net Addition of Loan Repayment of Loan Closing Balance Average Loan Actual Interest Paid Rate of Interest 0.00% 0.00% 0.00% 14.50% 13.10% State Bank of Patiala As per BC As per BC As per BC As per BC As per BC Opening Balance Addition of Loan Downselling of Loan Net Addition of Loan Repayment of Loan Closing Balance Average Loan Actual Interest Paid Rate of Interest 17.97% 14.24% 14.80% 15.11% 14.50% SBBJ As per BC As per BC As per BC As per BC As per BC Opening Balance Addition of Loan Downselling of Loan Net Addition of Loan Repayment of Loan Closing Balance Average Loan Actual Interest Paid Rate of Interest 7.07% 15.41% 15.30% 15.07% 15.58% SBI As per BC As per BC As per BC As per BC As per BC Opening Balance , , Addition of Loan Downselling of Loan Net Addition of Loan Repayment of Loan Closing Balance , , , Average Loan , , Actual Interest Paid Rate of Interest 13.27% 13.16% 15.00% 14.02% 14.61%

19 Calculation of Weighted average rate of Interest on Actual Loan Outstanding FORM- 13 Name of The Generating Company :- Name of The Power Station :- PTC India Financial Services Limited MB Power (Madhya Pradesh) Limited 2 x 600 MW Anuppur Thermal Power Project (Amount in Rs Cr.) Federal Bank As per BC As per BC As per BC As per BC As per BC Opening Balance Addition of Loan Downselling of Loan Net Addition of Loan Repayment of Loan Closing Balance Average Loan Actual Interest Paid Rate of Interest 7.41% 13.75% 14.50% 14.56% 14.54% L&T As per BC As per BC As per BC As per BC As per BC Opening Balance Addition of Loan Downselling of Loan Net Addition of Loan Repayment of Loan Closing Balance Average Loan Actual Interest Paid Rate of Interest 17.56% 13.83% 13.74% 14.30% 14.07% PNB As per BC As per BC As per BC As per BC As per BC Opening Balance Addition of Loan Downselling of Loan Net Addition of Loan Repayment of Loan Closing Balance Average Loan Actual Interest Paid Rate of Interest 13.96% 13.77% 13.49% 15.53% 15.44% AXIS As per BC As per BC As per BC As per BC As per BC Opening Balance Addition of Loan Downselling of Loan Net Addition of Loan Repayment of Loan Closing Balance Average Loan Actual Interest Paid Rate of Interest 14.83% 14.07% 15.89% 14.87% 13.91% LIC As per BC As per BC As per BC As per BC As per BC Opening Balance Addition of Loan Downselling of Loan Net Addition of Loan Repayment of Loan Closing Balance Average Loan Actual Interest Paid Rate of Interest 9.77% 14.47% 14.32% 13.72% 13.24% HPPPL Opening Balance Addition of Loan Downselling of Loan Net Addition of Loan Repayment of Loan Closing Balance Average Loan Actual Interest Paid Rate of Interest 0.00% 0.00% 0.00% 14.00% 14.00%

20 Calculation of Weighted average rate of Interest on Actual Loan Outstanding FORM- 13 Name of The Generating Company :- Name of The Power Station :- PTC India Financial Services Limited IIFCL-UK MB Power (Madhya Pradesh) Limited 2 x 600 MW Anuppur Thermal Power Project (Amount in Rs Cr.) Opening Balance Addition of Loan Downselling of Loan Net Addition of Loan Repayment of Loan Closing Balance Average Loan Actual Interest Paid Rate of Interest 0.00% 0.00% 0.00% 0.00% 12.69% Total As per BC As per BC As per BC As per BC As per BC Opening Balance - 1, , , , Addition of Loan 1, , , , , Downselling of Loan Net Addition of Loan 1, , , , Repayment of Loan Closing Balance 1, , , , , Average Loan , , , , Actual Interest Paid Rate of Interest 13.89% 13.72% 12.43% 13.89% 13.27%

21 Form 13-A Calculation of Interest on Normative Loan Name of the Company: MB Power (Madhya Pradesh) Limited Name of the Power S tation: Anuppur Thermal Power S tation (2 x 600 MW) Particulars Loan Opening (On COD) 3, Excess Equity Considered as Loan Gross Normative loan Opening (On COD) 3, Cumulative repayment of Normative Loan up previous Year - Net Normative loan Opening 3, Add: Increase due addition during the year/period Less: Decrease due de-capitalization during the year/ period Add: Increase due discharges during the year/period Less: Decrease due reversal during the year/period Net Normative loan Closing 3, Average Normative Loan 3, Weighted average Rate of Interest of actual Loans 13.27% Interest on Normative loan

22 FO RM 13 B Calculation of Inte re st on Working Capital Name of the Company: MB Power (Madhya Pradesh) Limited Name of the Power Station: Anuppur Thermal Power Station (2 x 600 MW) Sl. No. Particulars Cost of Coal/Lignite Cost of Secondary Fuel Oil Fuel Cost NA 4 Liquid Fuel Sck NA 5 O & M Expenses Maintenance Spares Receivables Total Working Capital Working capital Margin as on Total Working Capital allowe d Rate of Interest 13.50% 12 Inte re st on allowe d Working Capital WCM funded by Debt as per FS % WCM funded by Equity as per FS % Interest on WCM funded by Long term loans 13.27% Return on WCM 15.50% 1.94 Total Inte re st on Working Capital PETITIO NER

23 Name of the Company MB POWER (MADHYA PRADESH) LIMITED Name of the Power Station ANUPPUR THERMAL POWER STATION (2 * 600 MW) Name of the Bank Description Q4 (01- Jan Mar-10) (01 APR 09 TO 31MAR 10) Q1 (01- Apr Jun-10) Q2 (01- Jul Sep-10) Q3 (01- oct Dec-10) Q4 (01-Jan Mar-11) (01 APR 10 TO 31MAR 11) Q1 (01- Apr jun-11) Q2 (01- JuL Sep-11) Q3 (01- Oct Dec-11) Q4 (01- Jan Mar-12) (01 APR 11 TO 31 MAR 12) Q1 (01- Apr jun-12) Q2 (01- JuL Sep-12) Q3 (01- Oct Dec-12) Q4 (01- Jan Mar-13) (01 APR 12 TO 31 MAR 13) SBI - - 3,138,800,000-1,475,400,069 4,614,200, ,706,259 1,688,081,479 1,285,173,564 87,962,220 3,476,923,522 1,617,441, ,342, ,716, ,780, ,839, ,286, ,792, ,483, ,440, ,002, ,875,193 Axis - - 3,603,100, ,704, ,130,839 4,316,934,872 1,486,082, ,391, ,255,436 1,326,749,581 3,624,478, ,932, ,640, ,840, ,312, ,793, ,658, ,306, ,188, ,356, ,509, ,390,807 SBOP ,600, ,600, ,700, ,723,009 50,000, ,423, ,800, ,244,186 6,783,299 6,709,567 16,737,052 6,709,567 11,580,929 15,281,760 17,545,853 51,118,110 19,932,324 PTC-PFS ,500,000 22,132,214 51,451, ,083, ,164,586 88,055,134 70,750, ,786, ,757,057 83,243, ,396,921 13,490,357 14,681,975 35,569,253 19,280,636 22,354,533 25,088,198 29,592,829 96,316,195 36,317,832 L&T Infra ,300, ,300, ,800, ,000, ,500, ,100, ,400, ,009,022 16,969,211 16,784,763 40,762,996 16,996,900 30,463,854 35,279,174 41,893, ,633,538 47,576,484 PNB ,600, ,600, ,100,000 80,200, ,700, ,000,000 58,300, ,030 10,182,258 10,071,581 20,585,868 10,071,581 17,808,181 20,695,374 25,092,719 73,667,854 28,812,539 LIC ,500, ,500, ,300, ,500, ,800, ,900, ,638,027 24,564,390 33,202,418 28,203,930 35,225,240 34,689,419 43,846, ,965,352 45,784,690 Federal ,900,000-92,900,000-98,400,000 26,700,000 50,200, ,300,000 32,800, ,716 3,358,399 3,469,115 3,358,399 6,067,961 7,204,644 8,381,233 25,012,236 9,984,740 SBBJ ,700, ,700, ,000,000 42,700, ,700, ,400, ,565,640 6,565,640 6,713,182 10,445,363 13,218,183 13,407,049 43,783,776 15,256,636 PFC REC SBI- Short Term Loan - 4,000,000,000 4,000,000,000 (4,000,000,000) (4,000,000,000) ,500,932 64,500, ,381,441 48,904, ,285, Q1 (01- Apr jun-13) PTC-PFS - Short Term Loan Axis STL - Short Term Loan HPPPL- Short Term Loan SBI_Interim Facility- Short Term Loan 350,000, ,000, ,000, ,000,000 (1,200,000,000) (1,200,000,000) , ,644 13,898,630 43,101,370 42,164,384-99,164, TOTAL (Short-Term and Long Term Loan) (A) 350,000, ,000, ,000, ,000,000,000 4,850,000,000 (1,200,000,000) 8,041,900,000 (2,990,763,753) 2,211,682,528 6,062,818,775 2,448,053,329 3,105,728,001 2,353,002,511 2,447,998,636 10,354,782,477 2,831,817, , ,644 13,898,630 43,101,370 42,164,384 64,500, ,665, ,381, ,869, ,731, ,829, ,811, ,279, ,044, ,128, ,557,249 2,343,009, ,931,244 Buyer's Credit and Bills Discounting (B) 1,961,172,053 1,961,172,053 2,269,288,460 (997,423,805) (370,220,015) 215,972,819 1,117,617,460 1,533,395,569 99,704, ,704, ,548, ,528, ,806, ,527, ,411, ,635, ECB Facility from IIFCL- UK (C) Interest pertaining O&M of the Project (D) Financial charges 398, ,787, ,366, ,180, Total (A+B+C-D) 350,000, ,000, ,000, ,000,000,000 4,850,000,000 (1,200,000,000) 8,041,900,000 (2,990,763,753) 4,172,854,581 8,023,990,828 4,717,341,789 2,108,304,197 1,982,782,496 2,663,971,456 11,472,399,938 4,365,212, , ,644 13,898,630 43,101,370 42,164,384 64,500, ,665, ,381, ,869, ,731, ,533,463 1,071,515, ,828, ,572, ,934, ,084,546 2,583,420, ,566,425 Page 1 of 2

24 Name of the Company MB POWER (MADHYA PR Name of the Power Station ANUPPUR THERMAL POW SBI Name of the Bank Description Q2 (01- JuL Sep-13) Q3 (01- Oct Dec-13) Q4 (01- Jan Mar-14) (01 APR 13 TO 31 MAR 14) Q1 (01- Apr jun-14) Q2 (01- JuL Sep-14) Q3 (01- Oct Dec-14) Q4 (01-Jan Mar-15) 789,296, ,111,500 (40,678,004) 3,027,171,355 5,468, ,970, ,309,703 1,219,444,398 1,456,193,429 2,212,838,521 1,392,884,284 (235,146,760) 3,654,589,810 16,229,078, ,608, ,571, ,128,350 1,457,182, ,656, ,227, ,248, ,472,920 1,674,605, ,588, ,829, ,181, ,185, ,048,247 2,158,833,904 6,511,600, Q1 (01-Apr ) Q2 (01-July ) Q3 (01-Oct ) Q3 (21-Nov ) 284,013, Q4 (01-Jan Mar 2016) (Total) (01-Apr ) Form-14 (Amt. in Rupees) Total Axis SBOP PTC-PFS L&T Infra PNB LIC Federal SBBJ PFC REC SBI- Short Term Loan PTC-PFS - Short Term Loan Axis STL - Short Term Loan HPPPL- Short Term Loan SBI_Interim Facility- Short Term Loan 122,003,414 1,304,235,523 (3,369,850,265) (1,321,678,877) (2,533,676,015) 44,839,739 15,509,251 (2,121,359,271) (4,594,686,296) 297,962,038 2,827,189, ,915,911-3,888,067,612 5,913,116, ,394, ,719, ,593,436 1,173,099, ,498, ,130, ,679, ,782, ,089,851 44,999, ,602, ,411,112 85,546, ,851, ,411,249 3,587,903,202 38,900, ,758,726 31,218, ,677,484 31,207, ,704 19,644,668 10,221,227 61,397, ,464,525 2,464, ,562, ,613,387 27,548,982 29,610, ,705,529 66,136,422 70,183,932 71,338,458 71,241, ,900,564 32,293,944 32,236,958 17,397,311 13,986,074 33,102, ,016, ,477,606 11,138, ,665, ,054, ,101, ,263,053 53,824,103 15,104,909 68,701, ,893,990 1,308, ,308,283 1,967,145, ,190,208 48,448,080 57,732, ,688,524 66,136,422 69,738,932 71,330,056 70,091, ,297,134 71,577,125 71,647,196 38,665,824 31,084,290 68,813, ,787, ,658, ,196, ,150, ,000,000 1,082,346, ,700,000 76,700, (7,132) (7,132) 2,499,739, ,779,074 73,449,802 84,474, ,280,103 90,615,310 91,611,083 91,611,083 89,229, ,066,747 90,846,961 91,045,571 49,134,540 39,500,316 87,563, ,090,436 1,151,833, ,300,000 76,435, ,808, ,843,884 71,784,820 20,424, ,878 8,500, ,094, , ,579 1,423,160, ,079,047 40,714,869 42,484, ,091,177 50,905,449 53,138,832 53,460,371 51,753, ,257,921 51,698,549 51,811,572 27,961,138 22,478,562 57,006, ,956, ,558, ,600, ,800, ,300, ,400, ,400,000 1,423,160, ,887,762 63,996,288 66,301, ,970,056 72,498,329 73,295,014 73,295,014 70,918, ,006,593 70,842,427 72,843,836 39,311,614 31,603,454 70,057, ,658, ,803,284 62,494,198 32,854,874 38,200, ,349,072-29,794,973 10,308,489 8,218,635 48,322, (81,017) (81,017) 482,790, ,301,341 14,028,480 15,017,801 51,332,362 16,250,945 16,814,125 17,827,149 17,551,974 68,444,192 17,548,729 17,587,094 9,491,223 7,630,198 16,914,382 69,171, ,429,530 92,200,000 2,066, ,666,400 12,892,259 54,529,849 40,152,367 15,693, ,267, ,496, ,622, ,119, ,453, ,699,580 19,141,076 21,283,258 73,380,550 21,834,597 23,747,653 25,173,577 25,509,588 96,265,415 26,411,655 31,389,518 16,939,973 13,618,410 32,899, ,258, ,254,253 6,401,800,000 6,401,800, ,500,000 3,517,700,000 4,048,200, ,450,000, ,638, ,638, ,419, ,006, ,006, ,703, ,136, ,159, ,811, ,784, ,277, ,713,470 1,555,746,173 2,639,520,858 4,250,000,000 4,250,000,000-2,899,000, ,899,000,000 7,149,000, ,688,356 1,688, ,640, ,328, ,328, ,952, ,250, ,891, ,281, ,840, ,440, ,592,904 1,006,046,945 1,623,985, ,786, ,301,027-1,500,000,000 1,500,000,000 (1,500,000,000) - - (1,500,000,000) ,237,416 54,501,370 53,260, ,999,060 35,695,890 16,410, ,105, ,105,056-1,500,000,000 1,500,000,000 (1,500,000,000) (1,500,000,000) ,054,795 52,356,164 52,931,507 53,263, ,606,139 52,356,165 36,196,711-88,552, ,159, ,000,000 40,309, ,288,888 1,166,598,609 (1,166,598,609) (1,166,598,609) ,461,918 34,017,926 51,076,926 86,556,770 30,826, ,826, ,383,752 TOTAL (Short-Term and Long Term Loan) (A) 1,618,329,013 9,770,811,868 1,787,619,873 16,008,577,983 (802,059,868) 2,738,708, ,223,986 3,010,109,116 5,734,981,289 1,467,406,498 4,220,073,947 1,046,929,676 (229,524,974) 6,504,885,147 49,866,045, ,553,779 1,033,618,427 1,190,953,243 3,955,056,693 1,336,646,608 1,479,278,051 1,521,749,914 1,371,807,833 5,709,482,405 1,521,738,015 1,784,693, ,119, ,350,974 1,877,562,267 6,957,464,038 20,098,761,393 Buyer's Credit and Bills Discounting (B) 1,089,636, ,702, ,620,109 3,829,355,260 (137,737,525) 710,539, ,120, ,589,346 1,510,511,850 (453,638,038) (410,032,118) (794,536,485) (6,760,449,982) (8,418,656,623) ,558, ,918, ,785, ,897,814 6,059, ,201, ,734, ,636, ,631,042 13,102,656 9,642,447 8,724,084 7,013,480 13,022,640 51,505, ,149,482 ECB Facility from IIFCL- UK (C) 721,571,472 7,747,881,570 8,469,453,043 8,469,453, , , ,704, ,041, ,041,724 Interest pertaining O&M of the Project (D) 453,017, ,788, ,521, ,758,554 1,768,043,354 3,993,129,078 3,993,129,078 Total (A+B+C-D) Financial charges 334,610, ,654, ,053, ,421,051, ,707,965,958 10,427,514,505 2,337,239,982 19,837,933,243 (939,797,393) 3,449,247,523 1,494,344,546 3,241,698,462 7,245,493,139 1,013,768,460 3,810,041, ,964, ,906,615 6,555,681,567 58,335,498, ,112,432 1,051,537,010 1,220,738,641 4,060,954,508 1,342,705,610 1,506,479,277 1,523,484,318 1,395,444,243 5,768,113,447 1,081,823, ,546, ,063, ,202, ,245,679 3,175,881,991 16,821,823,522 Page 2 of 2

25 Name of the Company: MB POWER (MADHYA PRADESH) LIMITED Name of the Project: ANUPPUR THERMAL POWER STATION (2 x 600 MW) FORM-14A (Rs. In Actual figures) Quarter wise Equity and Debt Deployment D/E ratio Year Quarter Debt BD and BC Total (Debt +BD and BC) Cummulative Debt Equity Cummulative Equity Total Expenditure Total Expenditure (Cummulative) Debt Equity Q , , , , % Q , , % Q , , % Q , , % Q , , % Q , , % Q ,000, ,500, ,000, ,500, % Q4 350,000, ,000, ,000, ,000,000 1,276,500,000 1,325,000,000 1,626,500, % 78.48% Q1 850,000, ,000,000 1,200,000, ,600,000 1,789,100,000 1,362,600,000 2,989,100, % 59.85% Q ,200,000,000-1,789,100,000-2,989,100, % 59.85% Q ,200,000,000-1,789,100,000-2,989,100, % 59.85% Q4 4,000,000,000-4,000,000,000 5,200,000,000 4,370,900,000 6,160,000,000 8,370,900,000 11,360,000, % 54.23% Q1 (1,200,000,000) - (1,200,000,000) 4,000,000,000-6,160,000,000 (1,200,000,000) 10,160,000, % 60.63% Q2 8,041,900,000-8,041,900,000 12,041,900, ,900,000 6,686,900,000 8,568,800,000 18,728,800, % 35.70% Q3 (2,990,763,753) - (2,990,763,753) 9,051,136, ,000,000 7,636,900,000 (2,040,763,753) 16,688,036, % 45.76% Q4 2,211,682,528 1,961,172,053 4,172,854,581 13,223,990,828-7,636,900,000 4,172,854,581 20,860,890, % 36.61% Q1 2,448,053,329 2,269,288,460 4,717,341,789 17,941,332,617 23,772,500 7,660,672,500 4,741,114,289 25,602,005, % 29.92% Q2 3,105,728,001 (997,423,805) 2,108,304,197 20,049,636,814 2,489,327,500 10,150,000,000 4,597,631,697 30,199,636, % 33.61% Q3 2,353,002,511 (370,220,015) 1,982,782,496 22,032,419,310 7,500,000 10,157,500,000 1,990,282,496 32,189,919, % 31.55% Q4 2,447,998, ,972,819 2,663,971,456 24,696,390,766 1,769,000,000 11,926,500,000 4,432,971,456 36,622,890, % 32.57% Q1 2,831,817,229 1,533,395,569 4,365,212,799 29,061,603,564 1,211,000,000 13,137,500,000 5,576,212,799 42,199,103, % 31.13% Q2 1,618,329,013 1,089,636,945 2,707,965,958 31,769,569,522 1,427,000,000 14,564,500,000 4,134,965,958 46,334,069, % 31.43% Q3 9,770,811, ,702,637 10,427,514,505 42,197,084, ,300,000 15,280,800,000 11,143,814,505 57,477,884, % 26.59% Q4 1,787,619, ,620,109 2,337,239,982 44,534,324, ,600,000 16,105,400,000 3,161,839,982 60,639,724, % 26.56% Q1 (802,059,868) (137,737,525) (939,797,393) 43,594,526, ,500,000 16,881,900,000 (163,297,393) 60,476,426, % 27.91% Q2 2,738,708, ,539,468 3,449,247,523 47,043,774,139 3,007,500,000 19,889,400,000 6,456,747,523 66,933,174, % 29.72% Q3 788,223, ,120,560 1,494,344,546 48,538,118, ,370,000 20,039,770,000 1,644,714,546 68,577,888, % 29.22% Q4 3,010,109, ,589, ,241,698,462 51,779,817,148 69,640, ,109,410, ,311,338,462 71,889,227, % 27.97% Q1 ( ) 848,629, (6,302,396) 842,327,344 52,622,144, ,800,000 20,214,210, ,127,344 72,836,354, % 27.75% Q1 ( ) 618,776, ,335, ,441,116 52,793,585, ,700,000 20,392,910, ,141,116 Q2 4,220,073, ,032,118 3,810,041,829 56,603,627, ,570,100 20,747,480,100 4,164,611,929 77,000,966, % 26.94% Q3 1,768,501, ,536, ,964,664 57,577,592, ,974,000 20,957,454,100 1,183,938,664 78,184,905, % 26.80% Q4 7,518,356,581-6,760,449, ,906,599 58,335,498,699 30,000,000 20,987,454, ,906,599 78,972,811, % 26.58% Total Loan and Equity 58,335,498, ,335,498,699 20,987,454,100 79,322,952, % 26.46%

26 FORM 15 Name of the Petitioner: MB Power (Madhya Pradesh) Limited Details/Information be Submitted in respect of Fuel for Computation of Energy Charges 1 Name of the Generating Station: Anuppur Thermal Power Station (2 x 600 MW) For preceding S No. Month Unit 3rd Month (from COD or from as the case may be ) Jan nd Month (from COD or from as the case may be ) Feb st Month (from COD or from as the case may be ) Mar Quantity of Coal/ Lignite supplied by Coal/Lignite Company (MMT) FSA Non-FSA FSA Non-FSA FSA Non-FSA 2 Adjustment (+/-) in quantity supplied made by Coal/Lignite Company (MMT) 3 Coal supplied by Coal/Lignite Company (1+2) (MMT) 4 Normative Transit & Handling Losses (For coal/lignite based Projects) (MMT) 5 Net coal / LigniteSupplied (3-4) (MMT) 6 Amount charged by the Coal/Lignite Company (Rs.) 7 Adjustment (+/-) in amount charged made by Coal/ LigniteCompany (Rs.) 8 Total amount Charged (6+7) (Rs.) 9 Transportation charges by rail/ship/road transport ( Rs.) 10 Adjustment (+/-) in amount charged made by Railways/Transport Company ( Rs.) 11 Demurrage Charges, if any ( Rs.) 12 Cost of diesel in transporting coal through MGR system, if applicable ( Rs.) 13 Total Transportation Charges (9+/ ) ( Rs.) 14 Total amount Charged for coal/ supplied including Transportation (8+13) ( Rs.) 15 Landed cost of coal Rs/MT 2, , , , , , Blending Ratio (Domestic/Imported) 17 Weighted average cost of coal for preceding three months Rs./MT 18 GCV of Domestic Coal as per bill of Coal Company 19 GCV of Imported Coal as per bill Coal Company 20 Weighted average GCV of coal/ Lignite as Billed (kcal/kg) 21 GCV if Domestic Coal as received at Station 22 GCV if Imported Coal as received at Station 23 Weighted average GCV of coal as Fired 3,584 3,589 3,592

MPERC TARIFF FORMS FY , FY , FY

MPERC TARIFF FORMS FY , FY , FY MPERC TARIFF FORMS FY 2016-17, FY 2017-18, FY 2018-19 FORM 1 SUMMARY SHEET Name of the Petitioner Name of the Generation Station Place (Region/District/State) MB POWER (MADHYA PRADESH) LIMITED ANUPPUR

More information

MPERC TARIFF FILING FORMS UNIT -1 (TRUE UP PETITION) (For Financial Years: & )

MPERC TARIFF FILING FORMS UNIT -1 (TRUE UP PETITION) (For Financial Years: & ) MPERC TARIFF FILING FORMS UNIT -1 (TRUE UP PETITION) (For Financial Years: 2017-18 & 2018-19) FORM-TPS-1 SUMMARY SHEET Place Anuppur, Madhya Pradesh S. No. Particulars Remarks 2017-18 2018-19 (1) (2) (3)

More information

Summary Sheet. From to

Summary Sheet. From to Summary Sheet FORM-TPS-1 Name of the Generating Company Jaiprakash Power Ventures Limited Name of the Power Station : Jaypee Nigrie Super Thermal Power Plant S. No. Particulars Unit From 03-09-2014 to

More information

Regulatory formats for Multi Year Annual Revenue Requirement for the Control Period from FY to FY and determination of retail tariff

Regulatory formats for Multi Year Annual Revenue Requirement for the Control Period from FY to FY and determination of retail tariff Regulatory formats for Multi Year Annual Revenue Requirement for the Control Period from FY 2016-17 to FY 2020-21 and determination of retail tariff for FY 2018-19 along with trueup of the FY 2012-13,

More information

REGULATORY FORMATS FOR ARR & TARIFF FILING BY GENERATION LICENSEE

REGULATORY FORMATS FOR ARR & TARIFF FILING BY GENERATION LICENSEE REGULATORY FORMATS FOR ARR & TARIFF FILING BY GENERATION LICENSEE Name of Plant/ Station INDEX OF FORMATS Formats 1 Form F1 Annual Revenue Requirement Summary 2 Form F2a Plant Charateristics-Thermal 3

More information

MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED (MSPGCL/MAHAGENCO)

MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED (MSPGCL/MAHAGENCO) MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED (MSPGCL/MAHAGENCO) PETITION FOR CAPITAL COST AND TARIFF DETERMINATION FOR FY 2012-13 TO FY 2015-16 INCLUDING TRUE UP FOR FY 2012-13 &FY 2013-14 OF BHUSAWAL

More information

Summary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar

Summary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar Summary of Tariff Petition for BECL 2 x 250 MW Lignite based Thermal Power Plant at Bhavnagar In terms of sections 61, 62, 64 and 86 of the Electricity Act, 2003, the tariff for the generation and sale

More information

Tenughat Vidyut Nigam Limited (TVNL) Annual Revenue Requirement FY

Tenughat Vidyut Nigam Limited (TVNL) Annual Revenue Requirement FY POWERING JHARKHAND Tenughat Vidyut Nigam Limited (TVNL) (A Government of Jharkhand Undertaking) Hinoo, Doranda,Ranchi-834 002 Annual Revenue Requirement FY 2007-08 Submitted to Jharkhand State Electricity

More information

Gujarat State Electricity Corporation Ltd. MYT Petition, True-up Petition Formats - Generation Dhuvaran CCPP 2 Sr. Title Reference No.

Gujarat State Electricity Corporation Ltd. MYT Petition, True-up Petition Formats - Generation Dhuvaran CCPP 2 Sr. Title Reference No. Title Reference 1 Aggregate Revenue Requirement - Summary Sheet Form 1 2 Summary of Tariff Proposal Form 1.1 3 Operational Parameters - Thermal Generation Form 2.1 4 Energy Charges - Thermal Generation

More information

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED MYT Petition, True-up Petition Formats - Transmission

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED MYT Petition, True-up Petition Formats - Transmission Title Reference 1 Aggregate Revenue Requirement - Summary Sheet Form 1 2 Normative Operation and Maintenance Expenses Form 2 3 Operations and Maintenance Expenses Form 2.1 4 Transmission Network Details

More information

Tariff Regulation in India

Tariff Regulation in India Department of Industrial and Management Engineering Indian Institute of Technology Kanpur 4 th Capacity Building Programme for Officers of Electricity Regulatory Commissions 18 23 July, 2011 Forum of Regulators

More information

RInfra-G Multi Year Tariff Petition for FY to FY Executive Summary 1

RInfra-G Multi Year Tariff Petition for FY to FY Executive Summary 1 TABLE OF CONTENTS 1. BACKGROUND... 4 1.1. Introduction... 4 1.2. Objective of the present MYT Petition... 4 2. TRUING UP OF FY 2014-15... 4 2.1. Operational Performance for FY 2014-15... 5 2.2. Fuel Cost

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, Bittan Market, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.16 of 2014 PRESENT: Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta, Member

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI No. Dated 6 th December, 2013 DRAFT NOTIFICATION In exercise of powers conferred under section 178 of the Electricity Act, 2003 (36 of 2003) read with

More information

I N V O I C E S U M M A R Y

I N V O I C E S U M M A R Y I N V O I C E S U M M A R Y Send To: SE(RDPPC) Copy To: 220 KV substation Heerapura Ajmer Road Jaipur 302005 (On behalf of Aravali Power Company Pvt. Ltd.) Beneficiary: Bill Date 9-Mar-2017 Sl. No. Bill

More information

I N V O I C E S U M M A R Y

I N V O I C E S U M M A R Y I N V O I C E S U M M A R Y Send To: SE(RDPPC) Copy To: 220 KV substation Heerapura Ajmer Road Jaipur 302005 (On behalf of Aravali Power Company Pvt. Ltd.) Beneficiary: Bill Date 9-Mar-2017 Sl. No. Bill

More information

2018 Results Conference Call. March 27, 2019

2018 Results Conference Call. March 27, 2019 2018 Results Conference Call March 27, 2019 Disclaimer This earnings presentation contains forward-looking statements that are based on our current expectations, assumptions, estimates and projections

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No. 70 of 2015 PRESENT: Dr. Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta, Member

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on True-Up for FY 2014-15 & FY 2015-16, Business Plan, Aggregate Revenue Requirement and Tariff for Multi Year Tariff Period from FY 2016-17 to FY 2020-21 for Adhunik Power and Natural Resources

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.28 of 2012 PRESENT: Rakesh Sahni, Chairman IN THE MATTER OF: C.S. Sharma, Member

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal (M.P.) - 462 016 Petition No. 62 of 2016 PRESENT: Dr. Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok

More information

COMPONENTS OF REVENUE REQUIREMENT

COMPONENTS OF REVENUE REQUIREMENT COMPONENTS OF REVENUE REQUIREMENT A typical Tariff Application of Discom has to include Demand Forecast Annual Revenue Requireme nt to meet the Cost of Supply to cater to the demand Power Procurement (Self+Purchase)

More information

Petition No. 05 of 2016

Petition No. 05 of 2016 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No. 05 of 2016 PRESENT: Dr. Dev Raj Birdi, Chairman A.B. Bajpai, Member Alok Gupta, Member

More information

SECTOR UPDATE KEY HIGHLIGHTS: FY 2011 FINANCIAL RESULTS SITE PHOTOGRAPHS

SECTOR UPDATE KEY HIGHLIGHTS: FY 2011 FINANCIAL RESULTS SITE PHOTOGRAPHS FY 2011 SECTOR UPDATE KEY HIGHLIGHTS: FY 2011 FINANCIAL RESULTS PROJECT UPDATE STRATEGIC PRIORITIES SITE PHOTOGRAPHS 2 Capacity Build up (GW) Peak Demand/Supply (GW) FY 2011 India: World s 6 th largest

More information

Tariff Filing. Sri Damodaram Sanjeevaiah Thermal Power Station (2 x 800 MW)

Tariff Filing. Sri Damodaram Sanjeevaiah Thermal Power Station (2 x 800 MW) Tariff Filing Sri Damodaram Sanjeevaiah Thermal Power Station (2 x 800 MW) For the control period 2014-2019 INDEX Annex Description Page Application with supporting affidavit 1-16 A-1 Capital Cost 17-19

More information

Order on. Petition No. 21/2014

Order on. Petition No. 21/2014 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 4 th and 5 th Floor, Metro Plaza, Bittan Market, Bhopal - 462 016 Order on ARR & Retail Power Supply Tariff for Electricity Distribution Business of Special

More information

(INTERNATIONAL COMPETITIVE BIDDING)

(INTERNATIONAL COMPETITIVE BIDDING) D B POWER (MADHYA PRADESH) LIMITED (DBP(MP)L) INVITAION FOR BIDS FOR COAL BASED 2 X 660 MW SUPER CRITICAL BOILER, TURBINE & GENERATOR PACKAGE WITH ASSOCIATED AUXILIAIRES (BTG) ALONGWITH SUPPLY OF MANDATORY

More information

Jharkhand State Electricity Regulatory Commission

Jharkhand State Electricity Regulatory Commission Order on approval of Business plan and determination of ARR for the control period to (including True up for 2015-16 ) for Tata Power Company Limited (TPCL) Ranchi 19 February 2018 to (including True up

More information

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA

BIHAR ELECTRICITY REGULATORY COMMISSION PATNA BIHAR ELECTRICITY REGULATORY COMMISSION PATNA NOTIFICATION 2 nd August, 2010 No. BERC-Regl/Solar-2/2010-03 In exercise of powers conferred under Section 61 read with Section 181(2)(zd) of the Electricity

More information

EXTRA ORDINARY 13 SHRAVANA (S) BIHAR ELECTRICITY REGULATORY COMMISSION

EXTRA ORDINARY 13 SHRAVANA (S) BIHAR ELECTRICITY REGULATORY COMMISSION REGISTERED NO. PT.-40 The B Bihar Gazett te EXTRA ORDINARY PUBLISHED BY AUTHORITY 13 SHRAVANA (S) (NO.PATNA 541) PATNA, WEDNESDAY, 4TH AUGUST 2010 BIHAR ELECTRICITY REGULATORY COMMISSION NOTIFICATION The

More information

PUBLIC NOTICE. O. P. No. 9 of 2016

PUBLIC NOTICE. O. P. No. 9 of 2016 TELANGANA STATE ELECTRICITY REGULATORY COMMISSION 11-4-660, 5 th Floor, Singareni Bhavan, Red Hills, Hyderabad. Phone Nos. (040) 23397625/ 23311125 to 28 Fax No.(040)23397489 Website www.tserc.gov.in PUBLIC

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No. 1, 13th floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/ 65/ 69; Fax 022 22163976 E-mail: mercindia@merc.gov.in

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.55 of 2012 PRESENT: Rakesh Sahni, Chairman IN THE MATTER OF: C.S. Sharma, Member

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL under Coal Mines (Special Provisions) Second Ordinance, 2014 and Rules framed SMP No. 50 of 2015 DAILY ORDER (Date of Hearing: 24 th November, 2015)

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", Bittan Market, Bhopal - 462 016 Petition No.40 of 2012 PRESENT: Rakesh Sahni, Chairman IN THE MATTER OF: In the matter of determination

More information

Muskrat Falls Project Oversight Committee

Muskrat Falls Project Oversight Committee Muskrat Falls Project Oversight Committee Quarterly Department Report Name Period Ending September 30, 2017 November 3, 2017 Table of Contents 1. September Project Summary 2. Oversight Committee Reporting

More information

Executive Summary of Tata Power Generation True up Petition for FY as well as MYT Petition for FY to FY

Executive Summary of Tata Power Generation True up Petition for FY as well as MYT Petition for FY to FY Executive Summary of Tata Power Generation True up Petition for FY 2011-12 as well as MYT Petition for FY 2012-13 to FY 2015-16 Tata Power G Page 1 TABLE OF CONTENTS TABLE OF CONTENTS... 2 LIST OF TABLES...

More information

Summary Sheet. 3 Variable Charges recoverable ECR Calculation

Summary Sheet. 3 Variable Charges recoverable ECR Calculation Summary Sheet FORM-TPS-1 Name of the Generatg Company Name of the Power Station : Jaiprakash Power Ventures Limited Jaypee Ba Thermal Power Plant (Rs. Crs) S. No. Particulars Ref. Form 2017-18 1 2 3 4

More information

Energy Q1 FY 2012 Lighting up the Future 1

Energy Q1 FY 2012 Lighting up the Future 1 Energy Q1 FY 2012 Lighting up the Future 1 SECTOR UPDATE KEY HIGHLIGHTS FINANCIAL RESULTS PROJECT UPDATE STRATEGIC PRIORITIES SITE PHOTOGRAPHS 2 Capacity Build up (GW) Peak Demand/Supply (GW) Q1 FY 12

More information

BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL)

BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL) BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION, MUMBAI JAIGAD POWERTRANSCO LIMITED (JPTL) REVISED PETITION FOR APPROVAL OF TRUE UP OF FY 2015-16 & FY 2016 17 AND PROVISIONAL TRUE UP of FY 2017-18

More information

The Bihar Gazette E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY BIHAR ELECTRICITY REGULATORY COMMISSION, PATNA

The Bihar Gazette E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY BIHAR ELECTRICITY REGULATORY COMMISSION, PATNA REGISTERED NO. PT-40 The Bihar Gazette E X T R A O R D I N A R Y PUBLISHED BY AUTHORITY 7 VAISHAKHA 1929 (S) (NO. PATNA 426) PATNA, FRIDAY 27TH APRIL 2007 BIHAR ELECTRICITY REGULATORY COMMISSION, PATNA

More information

Petition No. 975 of 2014 and 1017 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Date of Order:

Petition No. 975 of 2014 and 1017 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Date of Order: Petition No. 975 of 2014 and 1017 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order: 27.11.2015 IN THE MATTER OF: AND IN THE MATTER OF M/s Lalitpur Power Generation

More information

Accounts Manual Updated Upto Amendment Slip 215. Bharat Heavy Electricals Limited

Accounts Manual Updated Upto Amendment Slip 215. Bharat Heavy Electricals Limited Accounts Manual Updated Upto Amendment Slip 215 Bharat Heavy Electricals Limited 00 SHARE CAPITAL 0010 Equity Share Capital On allotment of equity shares by the Company to the shareholders, this account

More information

UTTAR GUJARAT VIJ COMPANY LIMITED MEHSANA MYT Petition, True-up Petition Formats - Distribution & Retail Supply

UTTAR GUJARAT VIJ COMPANY LIMITED MEHSANA MYT Petition, True-up Petition Formats - Distribution & Retail Supply Title Reference 1 Aggregate Revenue Requirement - Summary Sheet ARR-Summary 2 Customer Sales Forecast Form 1 3 Power Purchase Expenses Form 2 4 Summary of Operations and Maintenance Expenses Form 3 5 Normative

More information

BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL

BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL BEFORE THE HON BLE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (MPERC) BHOPAL IN THE MATTER OF Provisional approval of Generation tariff of M.P. s 57% share of power in Sardar Sarovar Project (6x200+5x50

More information

Bhopal: Dated 5 th May 2006

Bhopal: Dated 5 th May 2006 Bhopal: Dated 5 th May 2006 No. 1192/MPERC/2006. In exercise of the powers conferred by section 181 (g) read with section 32(3) of the Electricity Act, 2003 enacted by the parliament, the Madhya Pradesh

More information

1 Type of Issue (IPO/FPO) IPO. 2 Issue Size (Rs. Cr) *Source: Final Post Issue Monitoring Report dated August 31, *

1 Type of Issue (IPO/FPO) IPO. 2 Issue Size (Rs. Cr) *Source: Final Post Issue Monitoring Report dated August 31, * Name of the Issue: 1 Type of Issue (IPO/FPO) IPO 2 Issue Size (Rs. Cr) *Source: Final Post Issue Monitoring Report dated August 31, 2015 273.216* 3 Grade of issue along with name of the rating agency Name

More information

TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Tariff Order No 1 of 2010 dated

TAMIL NADU ELECTRICITY REGULATORY COMMISSION. Tariff Order No 1 of 2010 dated TAMIL NADU ELECTRICITY REGULATORY COMMISSION Tariff Order No 1 of 2010 dated 27.05.2010 Sl.No Description Summary of Regulations 1 Title Tariff order for projects covered by Jawaharlal Nehru National Solar

More information

BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI 1 BEFORE THE CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI PETITION NO:.OF 2014 Petition under section 62 and 79(1) (a) of the Electricity Act, 2003, read with Chapter V of the Central Electricity

More information

Uttar Pradesh Electricity Regulatory Commission

Uttar Pradesh Electricity Regulatory Commission Uttar Pradesh Electricity Regulatory Commission Notification no. UPERC / Secy / CNCE Regulation, 2009/ 696 Dated: 22.3.2010 In exercise of powers conferred under section 181 read with section 9, 61, 86

More information

M.P. Electricity Regulatory Commission Bhopal

M.P. Electricity Regulatory Commission Bhopal SMP-20/2010 M.P. Electricity Regulatory Commission Bhopal Tariff Order for procurement of power from Wind Electric Generators 1. LEGISLATIVE PROVISIONS 1.1 Section 86(1) (e) of the Electricity Act 2003

More information

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED MYT Petition, True-up Petition Formats - Transmission

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED MYT Petition, True-up Petition Formats - Transmission Title Reference 1 Aggregate Revenue Requirement - Summary Sheet Form 1 2 Normative Operation and Maintenance Expenses Form 2 3 Operations and Maintenance Expenses Form 2.1 4 Transmission Network Details

More information

Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail: mercindia@mercindia.org.in

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION (DRAFT)

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION (DRAFT) CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI New Delhi, the 20 th of June 2013 NOTIFICATION (DRAFT) No.L-1/132/2013/CERC.- In exercise of the powers conferred under Section 178 of the Electricity

More information

MONNET POWER COMPANY LIMITED List of Creditors (Version 1: Pursuant to claims received and updated as on )

MONNET POWER COMPANY LIMITED List of Creditors (Version 1: Pursuant to claims received and updated as on ) MONNET POWER COMPANY LIMITED List of Creditors (Version 1: Pursuant to claims received and updated as on 11.04.2018) Sl. No. Category of Creditor Amount Claimed (in INR) Amounts of Claims admitted (in

More information

Before the Karnataka Electricity Regulatory Commission, Bangalore. In the matter of Determination of Tariff in respect of Renewable Sources of Energy

Before the Karnataka Electricity Regulatory Commission, Bangalore. In the matter of Determination of Tariff in respect of Renewable Sources of Energy Before the Karnataka Electricity Regulatory Commission, Bangalore Dated 18 th January 2005 Present: 1. K.P. Pandey, Chairman 2. Sri H.S.Subramanya, Member 3. Sri S.D.Ukkali, Member In the matter of Determination

More information

IndiabullsGroup. Total Group Networth Rs. 19,356 Cr. Total Group PAT for H1 FY Rs. 885 Cr.

IndiabullsGroup. Total Group Networth Rs. 19,356 Cr. Total Group PAT for H1 FY Rs. 885 Cr. 1 Indiabulls Group IndiabullsGroup Total Group Networth Rs. 19,356 Cr Total Group PAT for H1 FY 13-14 Rs. 885 Cr. Total Group Capital Expenditure Rs. 6,200 Cr. (US $ 1.2 bn.) capexin FY 10-11. Planned

More information

Eskom Presentation Standing Committee on Appropriations

Eskom Presentation Standing Committee on Appropriations Eskom Presentation Standing Committee on Appropriations 12 June 2015 Contents Content 1. Introduction 2. Financial situation 3. Eliminating Load shedding 2 Executive summary (1 of 2) Eskom is a fully integrated

More information

Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009

Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009 Notified on : 22 January 2010 Bhopal, Dated: 9 th December, 2009 No. 2734/MPERC/2009. In exercise of powers conferred under Section 181(2) (zd) read with Section 45 and 61 of the Electricity Act, 2003

More information

Tariff Determination : Generation and Transmission (Case Study)

Tariff Determination : Generation and Transmission (Case Study) Department of Industrial and Management Engineering Indian Institute of Technology Kanpur 3 rd Capacity Building Programme for Officers of Electricity Regulatory Commissions 23 28 August, 2010 Tariff Determination

More information

CRISIS IN THE INDIAN SUGAR INDUSTRY: INDIAN SUGAR MILLS ASSOCIATION

CRISIS IN THE INDIAN SUGAR INDUSTRY: INDIAN SUGAR MILLS ASSOCIATION CRISIS IN THE INDIAN SUGAR INDUSTRY: INDIAN SUGAR MILLS ASSOCIATION Indian sugar industry: contribution to the economy 2 5 crore farmers and their families directly dependent Rs.65,000 crore of cane price

More information

OF ARR & TARIFF FILING FORMATS FOR DISTRIBUTION AND RETAIL SUPPLY LICENSEES

OF ARR & TARIFF FILING FORMATS FOR DISTRIBUTION AND RETAIL SUPPLY LICENSEES ANNEXURE - I Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited, Indore INDEX OF ARR & TARIFF FILING FORMATS FOR DISTRIBUTION AND RETAIL SUPPLY LICENSEES Financial Formats 1 Sheet S1 Profit

More information

SMP-10/2016 M.P. Electricity Regulatory Commission Bhopal

SMP-10/2016 M.P. Electricity Regulatory Commission Bhopal SMP-10/2016 M.P. Electricity Regulatory Commission Bhopal Tariff Order for procurement of power from Municipal Solid Waste based power generating plants in Madhya Pradesh June 2016 1. LEGISLATIVE PROVISIONS

More information

NIT FOR GTG & HRSG PROJECT NFL, NANGAL SCHEDULE OF PRICES

NIT FOR GTG & HRSG PROJECT NFL, NANGAL SCHEDULE OF PRICES REV. 02 Page 1 of 13 (TO BE SUBMITTED ON BIDDER'S LETTER HEAD) SUBJECT : GTG & HRSG PROJECT - Attn.:- Dear Sirs, We have examined the NIT Ref. No. for GT-HRSG PROJECT dated ----------- the scope of work,

More information

Order Date of hearing

Order Date of hearing PRESENT Petition No. 1075 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order:07.03.2018 Hon ble Sri Suresh Kumar Agarwal, Chairman IN THE MATTER OF: Amendment of provisional

More information

Vidarbha Industries Power Limited - Transmission

Vidarbha Industries Power Limited - Transmission Vidarbha Industries Power Limited - Transmission Revised Petition towards: Approval of Capital Cost and Determination of Aggregate Revenue Requirement ( ARR ) for the period FY 14-15 to FY 15-16 Filed

More information

Muskrat Falls Project Oversight Committee

Muskrat Falls Project Oversight Committee Muskrat Falls Project Oversight Committee Quarterly Project Update Period Ending December 31, 2017 February 12, 2018 Table of Contents 1. Total Project Summary as of December 31, 2017 2. 2017 Performance

More information

M/s Jaiprakash Power Ventures Ltd 113 Rajpur Road, Dehradun

M/s Jaiprakash Power Ventures Ltd 113 Rajpur Road, Dehradun BEFORE IN THE MATTER OF: AND IN THE MATTER OF: THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Petition No.443/2007 Approval of tariff for supply of electricity from 400 MW Vishnu Prayag Hydroelectric

More information

TARIFF ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION CASE NO: TP 31 / IN RE THE TARIFF PETITION OF THE WEST BENGAL

TARIFF ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION CASE NO: TP 31 / IN RE THE TARIFF PETITION OF THE WEST BENGAL TARIFF ORDER OF THE WEST BENGAL ELECTRICITY REGULATORY COMMISSION IN CASE NO: TP 31 / 07 08 IN RE THE TARIFF PETITION OF THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED FOR THE YEAR 2007 2008 UNDER

More information

ODISHA ELECTRICITY REGULATORY COMMISSION UNIT VIII, BHUBANESWAR

ODISHA ELECTRICITY REGULATORY COMMISSION UNIT VIII, BHUBANESWAR ODISHA ELECTRICITY REGULATORY COMMISSION UNIT VIII, BHUBANESWAR 751012 NOTIFICATION The 8 th September, 2014 No. OERC/RA/AMEND. REGU. 8/2013 (Vol-I)/1251 - In exercise of powers conferred by Section 61

More information

GMR Chhattisgarh Energy Limited

GMR Chhattisgarh Energy Limited Sr. GMR Chhattisgarh Energy Limited 1 RfS - Bid Informati on Sheet 2 RfS - 1.2.2 Ceiling tariff of Rs. 2.82/kWh 1.2.2: The Gross Station Heat Rate (SHR) quoted by Bidder has to be less than or equal to

More information

MEMORANDUM OF UNDERSTANDING BETWEEN MINISTRY OF POWER, GOVERNMENT OF INDIA AND NORTH EASTERN ELECTRIC POWER CORPORATION LIMITED PART-I

MEMORANDUM OF UNDERSTANDING BETWEEN MINISTRY OF POWER, GOVERNMENT OF INDIA AND NORTH EASTERN ELECTRIC POWER CORPORATION LIMITED PART-I MEMORANDUM OF UNDERSTANDING BETWEEN MINISTRY OF POWER, GOVERNMENT OF INDIA AND NORTH EASTERN ELECTRIC POWER CORPORATION LIMITED 2009-2010 PART-I MISSION AND OBJECTIVES OF NORTH EASTERN ELECTRIC POWER CORPORATION

More information

1200kV AC Sub-station at Bina. Delivering Smart Grid/ Distribution Solutions `

1200kV AC Sub-station at Bina. Delivering Smart Grid/ Distribution Solutions ` 1200kV AC Sub-station at Bina Delivering Smart Grid/ Distribution Solutions ` Press Meet 12 th February, 2013 Disclaimer By attending the meeting where this presentation is made, or by reading the presentation

More information

Investor s Meet August 17

Investor s Meet August 17 Investor s Meet August 17 GROWTH CHART CAPACITY & PRODUCTION JKLC Mn. MT. As on 31 st March 2011 2012 2013 2014 2015 2016 2017 Sep 18(E) Clinker Capacity * 3.96 4.13 4.29 4.62 6.27 6.27 6.60 6.77 Cement

More information

Sunil Hitech Engineers

Sunil Hitech Engineers Visit us at www.sharekhan.com Powering ahead March 12, 2010 Ugly Duckling Buy; CMP: Rs211 Price target: Market cap: Company details 52-week high/low: Rs295 Rs259 cr Rs254/49 NSE volume: 43,138 (No of shares)

More information

TCN 01. Ref: PSER:SCT:KLN-C1875:TCN-01 Date:

TCN 01. Ref: PSER:SCT:KLN-C1875:TCN-01 Date: TCN 01 Ref: PSER:SCT:KLN-C1875:TCN-01 Date: 09-02-2018 Sub Tender Change Notice (TCN) - 01. Job Package-9A: Civil Works for (Pile, Pile Cap, Pedestal etc. for) CHP, AHP and Misc. Work for 2x660 MW Maitree

More information

Name of the Issuer: TD Power Systems Limited. 1 Type of Issue (IPO/FPO) IPO. 2 Issue Size (Rs. Cr) 227

Name of the Issuer: TD Power Systems Limited. 1 Type of Issue (IPO/FPO) IPO. 2 Issue Size (Rs. Cr) 227 Name of the Issuer: TD Power Systems Limited 1 Type of Issue (IPO/FPO) IPO 2 Issue Size (Rs. Cr) 227 3 Grade of issue alongwith name of the rating agency Name Credit Analysis and Research Limited Grade

More information

By order of the Commission Sd/- (G. K. Dhall) Secretary

By order of the Commission Sd/- (G. K. Dhall) Secretary ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN UNIT-VIII, BHUBANESWAR 751 012 Tel. No.[0674] 2396117/2393097 Fax: 2395781/2393306, E-mail: orierc@rediffmail.com, Website: www.orierc.org

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, Metro Plaza, E-5, Arera Colony, Bittan Market, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal - 462016 Petition No.02/2013 PRESENT: Rakesh Sahni, Chairman A. B. Bajpai, Member Alok

More information

Petition No 1234 of 2017

Petition No 1234 of 2017 No 1234 of 2017 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PRESENT: Hon ble Sri. S. K. Agarwal, Chairman Hon ble Sri. K. K. Sharma, Member IN THE MATTER OF: AND IN THE MATTER OF:

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 5 th Floor, "Metro Plaza", E-5, Arera Colony, Bittan Market, Bhopal - 462016 Petition No75/2012 PRESENT: Rakesh Sahni, Chairman A. B. Bajpai, Member Alok

More information

Think Of Us Before You Invest

Think Of Us Before You Invest Think Of Us Before You Invest DATE OF ALLOTMENT March 31,1996 BENCHMARK S&P BSE Sensex FUND SIZE Rs.679.21 (Rs. in Cr.) MONTHLY AVERAGE AUM Rs.668.51 (Rs. in Cr.) EXIT LOAD Nil (Compulsory lock-in period

More information

Muskrat Falls Project Oversight Committee. Period Ending June 2017

Muskrat Falls Project Oversight Committee. Period Ending June 2017 Muskrat Falls Project Oversight Committee Quarterly Department Report Name Period Ending June 2017 1 Overview 1. Summary 2. Project Capital Budget 3. Operations and Maintenance Update 4. June 2017 Reporting

More information

IFLR India Awards "Team of the Year" in the Indian Investment Banks category. Primary and Secondary Issuance Process

IFLR India Awards Team of the Year in the Indian Investment Banks category. Primary and Secondary Issuance Process IFLR India Awards 2011 - "Team of the Year" in the Indian Investment Banks category Primary and Secondary Issuance Process May 2012 Table of Contents Section 1 Section 2 Capital Markets Overview Trends

More information

CHAPTER 9 CAPITAL COST ESTIMATES & FINANCIAL ANALYSIS

CHAPTER 9 CAPITAL COST ESTIMATES & FINANCIAL ANALYSIS CHAPTER 9 CAPITAL COST ESTIMATES & FINANCIAL ANALYSIS TATA Consulting Engineers Limited Capital Cost Estimation Sr. No. COST ESTIMATION FOR PLANTS / UTILITIES AND OTHERS UNIT / SYSTEM BASIS COST (INR Lakhs)

More information

CASE No. 150 of Coram. Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member. Vidarbha Industries Power Limited ORDER

CASE No. 150 of Coram. Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member. Vidarbha Industries Power Limited ORDER Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION 13 th Floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai- 400 005 Tel: 022-22163964/65/69 Fax: 022-22163976 E-mail: mercindia@merc.gov.in

More information

Compensatory Tariff Orders...A Fine Balancing Act by CERC

Compensatory Tariff Orders...A Fine Balancing Act by CERC Impact Analysis: Compensatory Tariff Orders...A Fine Balancing Act by CERC March 11, 2014 CERC has finally notified the long awaited Compensatory Tariff orders on imported coal based Tata and Adani Mundra

More information

Draft MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

Draft MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION Draft MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION No. / /2017/MPERC.- In exercise of the powers conferred under Section 181of the Electricity Act, 2003 (36 of 2003), and all other powers enabling

More information

Company Overview. Performance Highlights. Major Developments. Status of Projects

Company Overview. Performance Highlights. Major Developments. Status of Projects FY 2011 Power Drivers Company Overview Performance Highlights Major Developments Status of Projects Way Forward 2 3 Share of World Population Share of World Energy Consumption India makes up 17% of the

More information

Monthly Financial Report

Monthly Financial Report AGENDA ITEM NO: 4.C.1 Monthly Financial Report with data through October 2017 (Unaudited) The data contained in this report has not been independently audited. Alameda Municipal Power Financial Report

More information

41 st Annual Report MANAGEMENT DISCUSSION AND ANALYSIS. Management Discussion and Analysis Annexure - I to Directors Report

41 st Annual Report MANAGEMENT DISCUSSION AND ANALYSIS. Management Discussion and Analysis Annexure - I to Directors Report ECONOMIC AND SECTOR OUTLOOK MANAGEMENT DISCUSSION AND ANALYSIS A Maharatna Company Annexure-I to Directors Report Existing Installed Capacity Total Capacity (MW) % share 32 24 44 Total* 326848.54 100 INDUSTRY

More information

Aims to achieve the right blend of Growth and Tax Saving

Aims to achieve the right blend of Growth and Tax Saving Aims to achieve the right blend of Growth and Tax Saving DATE OF ALLOTMENT March 31,1996 BENCHMARK S&P BSE Sensex FUND SIZE Rs.981.23 (Rs. in Cr.) MONTHLY AVERAGE AUM Rs.939.37 (Rs. in Cr.) EXIT LOAD Nil

More information

Muskrat Falls Project Oversight Committee

Muskrat Falls Project Oversight Committee Muskrat Falls Project Oversight Committee Quarterly Project Update Period Ending June 30, 2018 August 20, 2018 Table of Contents 1. Q2 2018 Cumulative Project Progress 2. Q2 2018 Performance Summary 3.

More information

Before the. Case No. 115 of In the matter of

Before the. Case No. 115 of In the matter of Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Email: mercindia@merc.gov.in Website: www.mercindia.org.in/ www.merc.gov.in

More information

Corrigendum No. 2 to Standard Tender Document (Schedule III Coal Mines) (For iron and steel, cement and captive power plant sector)

Corrigendum No. 2 to Standard Tender Document (Schedule III Coal Mines) (For iron and steel, cement and captive power plant sector) Corrigendum 2 to Standard Tender (Schedule III Coal Mines) (For iron and steel, cement and captive power plant sector) Date: February 10, 2015 1. The amendments/ additions mentioned in a. Corrigendum to

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION Urja Bhawan, Shivaji Nagar, Bhopal

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION Urja Bhawan, Shivaji Nagar, Bhopal MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION Urja Bhawan, Shivaji Nagar, Bhopal-462 016 (Email: secmperc@sancharnet.in) (Website : www.mperc.org) ORDER Dated : 29 th November 2002 Petition No. 99/2002

More information

Funding for a Brighter Tomorrow. Power Finance Corporation Limited A Navratna PSU

Funding for a Brighter Tomorrow. Power Finance Corporation Limited A Navratna PSU Power Finance Corporation Limited A Navratna PSU Performance Highlights Quarter/Year Ended (Standalone, Audited) 31 st March, 2017 Realignment with RBI s RRR norms PFC has been following MoP, GoI approved

More information

Inox Wind BUY. Performance Highlights. CMP Target Price `242 `286. 4QFY2016 Result Update Capital Goods. 3 year price chart

Inox Wind BUY. Performance Highlights. CMP Target Price `242 `286. 4QFY2016 Result Update Capital Goods. 3 year price chart 4QFY216 Result Update Capital Goods May 11, 216 Inox Wind Performance Highlights Quarterly Data (Consolidated) ( ` cr) 4QFY16 4QFY15 % chg (yoy) 3QFY16 % chg (qoq) Total Income 1,829 93 96.6 941 94.2 EBITDA

More information

COMPREHENSIVE PERFORMANCE AWARD SCHEME FOR THERMAL POWER STATIONS

COMPREHENSIVE PERFORMANCE AWARD SCHEME FOR THERMAL POWER STATIONS Revision-3/August 2012 COMPREHENSIVE PERFORMANCE AWARD SCHEME FOR THERMAL POWER STATIONS YEAR 2016-17 - 1 - THERMAL POWER STATIONS PERFORMANCE AWARD SCHEME 1.0 PREAMBLE The incentive award scheme in force

More information

BEFORE THE KARNATAKA ELECTRICITY REGULATORY COMMISSION, BENGALURU. Dated 16 th, May,2018

BEFORE THE KARNATAKA ELECTRICITY REGULATORY COMMISSION, BENGALURU. Dated 16 th, May,2018 No. S/01/18 BEFORE THE KARNATAKA ELECTRICITY REGULATORY COMMISSION, BENGALURU Present: Dated 16 th, May,2018 Sri. M.K. Shankaralinge Gowda - Chairman Sri. H.D. Arun Kumar - Member Sri. D.B. Manival Raju

More information