The Group met on 17th November 2015 for an update on approved projects progress and to consider further proposals.

Size: px
Start display at page:

Download "The Group met on 17th November 2015 for an update on approved projects progress and to consider further proposals."

Transcription

1 Item/Min Ref: 10 Title f Reprt: Capital prjects apprval Officer presenting: Lead Finance Officer Authr: Lead Finance Officer 1 Purpse f Reprt/Recmmendatins The purpse f this reprt is fr Members t apprve allcatin f capital funding twards a number f prjects fllwing cnsideratin by the Capital Prjects and Crprate Prgramme Planning Grup held n 17th Nvember Backgrund The Capital Prjects and Crprate Prgramme Planning Grup was set up as part f the gvernance arrangements f the new Cuncil as a cntrl mechanism t cnsider the financial implicatins f prjects and prvide versight in relatin t the prgress f prjects within Cuncil s capital plan. The grup will cnsider the full revenue implicatins f all prjects befre cmmencement, scrutinise the surces f financing fr the prjects, ensure business cases and ecnmic appraisals have been prepared, and will enable Members t priritise capital prjects in line with the finances available. The Grup is nt a decisin making bdy and will cnsider in full the financial implicatins f prjects befre prgressin t the Gvernance and Strategic Planning Cmmittee fr apprval. There are currently 2 lists f prjects. The first is prjects which are fully apprved and fully financed. These are updated fr each meeting t reflect new recmmendatins fr allcatin f funding by Cuncil thrugh this Cmmittee. The secnd is a cmprehensive list f aspiratinal prjects which are being cnsidered r develped by the relevant Directrate Senir Respnsible Officers and nce such prjects have been develped t a state f readiness, they will be brught frward t this Cmmittee fr allcatin f funds fllwing cnsideratin by the Capital Prjects and Crprate Prgramme Planning Grup. This list currently ttals 160m. The Grup met n 17th Nvember 2015 fr an update n apprved prjects prgress and t cnsider further prpsals. 3 Key Issues The fllwing prjects were cnsidered by the Grup fr advancement:-

2 SIF Invest In Play Brandywell - Detailed reprt attached (Appendix 2 CRG02/15)- This Cmmittee in September 2015 allcated a sum f 300,000 t cmplete the funding package in full fr 4 Play prjects (Brandywell, Ballymagrarty, Kilfennan and Ballyarnett) fllwing receipt f funding in the sum f 2,790,346 frm OFMDFM Scial Investment Fund. Csts fr the Brandywell prject have increased by 155,000 due t a number f issues as described in the attached reprt, mainly cnsisting f site relcatin, decntaminatin and demlitin csts. This additinal cst has been reduced thrugh value engineering withut impacting n the verall integrity f the prject and fficers will aim t recup this additinal cst ver the curse f the grant perid when firm price tenders are received fr all 4 f the prjects. This will bring Cuncil s ttal cntributin t these 4 prjects t 455,000 and maintain a significant external funding rati f 6.13 fr each 1 f Cuncil investment. Apprval is therefre sught fr the fllwing:- Cuncil apprve an additinal 155,000 twards the Invest in Play Prject t ensure a fully funded prject at this stage. Tendering and prcurement f prfessinal design teams and principle cntractrs in line with the verall revised prject budget. Irish Street, Rse Curt and Funtain Play Prjects and Curryneirn Play design csts- Detailed reprt attached (Appendix 3 CRG03/15)- A number f successful applicatins have been secured frm DSD fr a number f legacy Derry City Cuncil play prjects, as fllws:- Prject Title Estimated Ttal Prject Cst DSD funding Sught DSD funding Secured Cuncil funding Irish Street 330, , ,000 45,000 Rse Curt 330, , ,000 45,000 The Funtain 66,000 66,000 66,000 0 Curryneirn (design) 15,000 15,000 15,000 0 Ttal 741, , ,000 90,000

3 Frm Cuncils perspective this represents an external funding rati 7.23 fr each 1 f Cuncil investment. Cuncil has already cmmitted 42,000 twards these prjects, meaning that an additinal sum f 48,000 is nw required frm Cuncil's capital plan t ensure the prjects are funded in full. Apprval is therefre sught fr the fllwing:- Overall prject budget f 741,000 fr the abve prjects including Cuncil cntributin f 90,000 (additinal 48,000). Tendering and prcurement f a prfessinal design teams and principle cntractrs in line with the verall prject budget. Strategic Play Develpment- Detailed reprt attached (Appendix 4 CRG04/15)- A State f Play reprt was previusly prepared fr and presented t the Shadw Cuncil in March 2015 which set ut a range f recmmendatins pertaining t the management, maintenance and develpment f future fixed play prvisin district wide. There is a particular need t develp prjects t a state f readiness in the Strabane area t avail f upcming and future funding pprtunities (e.g. Rural Develpment Prgramme). The reprt recmmends the need t resurce a Play Develpment Officer in this regard. In additin, and aligned t the recmmendatins in the State f Play Reprt, there is nw a need t develp a new Plan Play fr the new Cuncil. Previusly bth frmer Cuncils had their wn respective Play Plans which are nw utdated The purpse f this new Play Plan will establish the strategic visin, directin, resurcing and management f fixed play prvisin ging frward. It is essential t develp this Plan in rder t secure external funding in making the 'case fr play' t meet the needs and aspiratins f ur cmmunity. It is mst likely that this will be an emerging theme thrugh the Cmmunity Plan prcess. 40,000 was used t appint Strategic Leisure t develp the frmer Derry City Cuncil's Play Plan in March 2010 and it is anticipated that a similar amunt will be required t develp the new plan. Apprval is therefre sught fr the fllwing:- Realignment f frmer Strabane District Cuncil Access Officer budget t appint a Play Develpment Officer fr the new Cuncil. A sum f 40,000 t prcure external supprt t develp a new Play Plan and authrise fficers t prceed t tender fr this service in line with this budget and in cmpliance with Cuncil purchasing prcedures. Cuncil has specific funding set aside within its' capital plan t fund business cases and ecnmic appraisals and this sum can be funded frm this surce.

4 Strathfyle Play- Cuncil in partnership with RAPID, Enagh Yuth Frum, Strathfyle Wman's Grup and Strathfyle Cmmunity Assciatin recently submitted an applicatin t the Cmmunity Fundatin fr NI under their Places & Spaces Prgramme t develp new play prvisin at Strathfyle. Unfrtunately, this applicatin was unsuccessful. There has been extensive engagement undertaken ver the last number f mnths with the lcal cmmunity and stakehlders and, understandably, there is great disappintment given that the CFNI applicatin was rejected n the basis that the funder was nt satisfied with the infrmatin prvided in evidencing the case fr need. The verall cst breakdwn prvided as part f the Stage 2 applicatin is as fllws:- Capital 448,489 Prfessinal Fees 26,900 Cntingency 47,540 Ttal 522,938 It was envisined, that subject t the successful utcme f the CFNI applicatin in the sum f 350,000, Cuncil thrugh its capital plan wuld cntribute a further 172,938 t cmplete the funding package in full. Cuncil's Parks Develpment team has been extremely successful in the past in using Cuncil investment t lever funding frm external surces t maximise value fr ratepayers. Cuncil has received recent cmmunicatin frm the Office f the Minister f the Envirnment utlining a number f ptential funding pprtunities. These range frm 50,000 frm the DOE Envirnmental Grant Prgramme t the pssibility f 50,000 frm the DSD and ptentially a cntributin f 50,000 frm River Ridge Recycling thrugh the Landfill Cmmunities Fund ver the next tw quarters. It is als nted that RAPID are in dialgue with the NIHE Chesin Unit t see if further funds can be secured. This ptentially prvides a further minimum 150,000 f funding fr the prject. Officers are explring these ptential pprtunities further and are mindful that the Rural Develpment Prgramme will be pening next year and subject t prcess the Envirnmental Imprvements (under Village Renewal Scheme) up t 500,000 at 75% grant aid assistance may be an ptin wrth cnsidering.

5 Fllwing extensive discussin at the Capital and Crprate Prjects Planning Grup, the fllwing 2 ptins are cnsidered as the mst viable ptins t prgress the prject:- Optin 1- Cuncil prvides the necessary funding t deliver the prject in full and prgresses the prject t tender with immediate effect, whilst in the interim seeking cnfirmatin f the additinal 150,000 f immediate funding pprtunities identified abve. It is anticipated that this will enable the prject t be cmpleted by April 2017, hwever will remve the pssibility f external funding being secured thrugh the Rural Develpment Prgramme which will have the pprtunity cst f reduced funding being available fr ther prjects in the capital plan. Optin 2- Cuncil cnfirms 172,938 match funding fr the prject, seeks t cnfirm the additinal 150,000 f funding pprtunities identified abve, and makes a further applicatin t the Rural Develpment Prgramme when the prgramme pens (anticipated April t June 2016) t secure the balance f funding. This will ensure Cuncil investment secures the maximum additinal external funding leverage and maximises funding available fr ther prjects within Cuncil s capital plan. It is anticipated that this will allw the prject t be cmpleted by September/ Octber 2017 althugh dependent n the Rural Develpment Prgramme cmmencing as abve. Other prjects- Updates n the fllwing prjects have been/ will be prvided t the relevant Cmmittees:- Majr leisure develpment- Health & Cmmunity Cmmunity Centres- Health & Cmmunity Maritime Museum- Business & Culture As nted abve, in additin t the apprved prjects list, there is a further cmprehensive list f majr revenue prjects, capital prjects with funding nt yet secured and capital prjects t be scped/ csts nt yet cnfirmed. These include prjects ptentially transferring frm DSD and will require substantial further rates investment and funding t be secured t deliver in full. A medium term plan will be prvided t Members as part f the upcming rates estimates prcess with a view t prviding an achievable target.

6 The grup als discussed the linkages that exist between a number f prjects n Cuncil s capital plan e.g. Masterplans such as Tp f the Hill and Fyle Valley that have elements which fall within different Cuncil Directrates and therefre have differing Senir Respnsible Officers. It has been cnsidered that it wuld be beneficial in these instances t have an verall prject Senir Respnsible Officer as the accuntable fficer fr the verall prject prviding Members and stakehlders with a main cntact pint. The plan will therefre be updated in advance f the next meeting t address this issue. The list f prjects with Cuncil funding fully allcated has been updated t reflect the abve (Appendix 1). Members will nte that these prjects ttal ver 66m f which ver 32m has been r is anticipated t be secured externally. 4 Financial, Equality, Legal, HR and Other Implicatins All the capital prjects and recmmendatins identified abve are affrdable within Cuncil's available lan charge prvisin. Befre this reprt, Cuncil had an available MRP/ lan charge prvisin f 477k which wuld facilitate further investment f circa 7.0m (depending n prject lifespans) by the new Cuncil via lan charge financing in additin t the significant additinal external funding this wuld lever. A summary f the financial implicatins f the recmmendatins made in this reprt are prvided belw. Prject Capital funding requirement MRP prvisin Other SIF Invest in Play Brandywell 155,000 13,250 Irish Street, Rse Curt and Funtain Play Prjects and Curryneirn Play design csts 48,000 4,100 Strathfyle T be cnfirmed depending n ptin selected (mimimum 172,938, maximum 522,938) T be cnfirmed depending n ptin selected (minimum 15,000 maximum 44,500) Strategic Play Develpment 40,000 t be funded frm recurring revenue

7 budget within capital plan ( 56,000) fr develpment f business cases Ttal Minimum 375,938, Maximum 725,938 Minimum 32,350, Maximum 61,850 40,000 This will leave Cuncil with a minimum remaining available lan charge prvisin f 415k which wuld facilitate further investment f circa 6.275m (depending n prject lifespans) via lan charge financing in additin t the significant additinal external funding this wuld lever. 5 Recmmendatins It is recmmended that Members apprve the recmmendatins made abve in respect f the fllwing prjects:- SIF Invest in Play Brandywell Irish Street, Rse Curt and Funtain Play prjects and Curryneirn Play design csts Strategic Play Develpment Members are als asked t cnsider the 2 ptins identified abve in respect f the prgressin f the Strathfyle Play prject. Backgrund Papers Appendix 1 Apprved and fully funded capital prjects register Appendix 2 CRG 02/15 SIF Invest in Play- Brandywell Appendix 3 CRG 03/15 Irish Street, Rse Curt, Funtain & Curryneirn Play Appendix 4 CRG 04/15 Strategic Play Develpmemnt

Full Business Case. Installation of MRI at County Hospital

Full Business Case. Installation of MRI at County Hospital Full Business Case Installatin f MRI Scanner at Cunty Hspital April 2015 1 1 Executive Summary 1.1 Intrductin & Backgrund In February 2014 the Secretary f State apprved the Trust Special Administratrs

More information

ADMINISTRATIVE REPORT

ADMINISTRATIVE REPORT LATE DISTRIBUTION FOR COUNCIL JANUARY 20, 2009 RR-2 ADMINISTRATIVE REPORT Reprt Date: January 19, 2009 Cntact: Kenneth Bayne Cntact N.: 604.873.7223 RTS N.: 07877 VanRIMS N.: 08-2000-20 Meeting Date: January

More information

AUDIT, RISK MANAGEMENT AND COMPLIANCE COMMITTEE CHARTER

AUDIT, RISK MANAGEMENT AND COMPLIANCE COMMITTEE CHARTER AUDIT, RISK MANAGEMENT AND COMPLIANCE COMMITTEE CHARTER August 2012 OPUS Grup Limited Audit, Risk Management and Cmpliance Cmmittee 1. GENERAL PURPOSE The primary bjective f the Audit, Risk Management

More information

UPDATE ON INTERNAL CONTROL ENVIRONMENT REPORT OF DIRECTOR OF EDUCATION AND LIFELONG LEARNING AGENDA ITEM: 4.1.1

UPDATE ON INTERNAL CONTROL ENVIRONMENT REPORT OF DIRECTOR OF EDUCATION AND LIFELONG LEARNING AGENDA ITEM: 4.1.1 CARDIFF COUNCIL CYNGOR CAERDYDD AUDIT COMMITTEE: 18 th SEPTEMBER 2018 UPDATE ON INTERNAL CONTROL ENVIRONMENT REPORT OF DIRECTOR OF EDUCATION AND LIFELONG LEARNING AGENDA ITEM: 4.1.1 Reasn fr this Reprt

More information

Tourism Development Fund ( TDF ) Guidelines for Grant Applicants

Tourism Development Fund ( TDF ) Guidelines for Grant Applicants Turism Develpment Fund ( TDF ) Guidelines fr Grant Applicants Cntents 1. Abut the TDF 2. Applicant Eligibility 3. Grant Assessment Criteria 4. Business Plans & Accunts 5. Applicatin Prcedures 6. Agreements

More information

TERMS OF REFERENCE. Audit and Risk Committee (the "Committee") of Wilmcote Holdings Plc (the "Company")

TERMS OF REFERENCE. Audit and Risk Committee (the Committee) of Wilmcote Holdings Plc (the Company) References t the "Bard" shall mean the full Bard f Directrs. MEMBERSHIP - The Bard has reslved t establish a cmmittee f the Bard t be knwn as the Audit and Risk Cmmittee. - The Cmmittee shall cmprise at

More information

1 This paper seeks agreement to the final Terms of Reference (the Terms) for the Welfare Expert Advisory Group (WEAG). The final Terms are attached.

1 This paper seeks agreement to the final Terms of Reference (the Terms) for the Welfare Expert Advisory Group (WEAG). The final Terms are attached. Office f the Minister fr Scial Develpment Chair Cabinet Scial Wellbeing Cmmittee WELFARE EXPERT ADVISORY GROUP TERMS OF REFERENCE Prpsal 1 This paper seeks agreement t the final Terms f Reference (the

More information

CHAIR AND MEMBERS COMMUNITY AND PROTECTIVE SERVICES NOVEMBER 15, 2016 ART ZUIDEMA CITY MANAGER COMMUNITY DIVERSITY AND INCLUSION STRATEGY UPDATE

CHAIR AND MEMBERS COMMUNITY AND PROTECTIVE SERVICES NOVEMBER 15, 2016 ART ZUIDEMA CITY MANAGER COMMUNITY DIVERSITY AND INCLUSION STRATEGY UPDATE TO: FROM: CHAIR AND MEMBERS COMMUNITY AND PROTECTIVE SERVICES NOVEMBER 15, 2016 ART ZUIDEMA CITY MANAGER SUBJECT: COMMUNITY DIVERSITY AND INCLUSION STRATEGY UPDATE RECOMMENDATION That, n the recmmendatin

More information

THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES

THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES TITLE: Capital Budget Applicatin Guidelines PAGE 1 f 11 DATE ISSUED: June 2, 2005 (Prvisinal) REVISION DATE: Octber 2007 This plicy is designed t prvide directin as t general administrative prcess utilized

More information

AUDIT & RISK COMMITTEE CHARTER

AUDIT & RISK COMMITTEE CHARTER AUDIT & RISK COMMITTEE CHARTER Rle and Respnsibilities The Bard f The Institute f Internal Auditrs Australia (IIA-Australia) has established a Bard Audit & Risk Cmmittee as part f its respnsibilities in

More information

Audit and Risk Management Committee Charter

Audit and Risk Management Committee Charter Audit and Risk Management Cmmittee Charter Pivtal Systems Crpratin ("Cmpany") 1. Objectives The Audit and Risk Management Cmmittee (Cmmittee) has been established by the bard f directrs (Bard) f the Cmpany.

More information

Audit Committee Charter. St Andrew s Insurance (Australia) Pty Ltd St Andrew s Life Insurance Pty Ltd St Andrew s Australia Services Pty Ltd

Audit Committee Charter. St Andrew s Insurance (Australia) Pty Ltd St Andrew s Life Insurance Pty Ltd St Andrew s Australia Services Pty Ltd Audit Cmmittee Charter St Andrew s Insurance (Australia) Pty Ltd St Andrew s Life Insurance Pty Ltd St Andrew s Australia Services Pty Ltd Versin 3.0, 19 February 2018 Apprver Bard f Directrs St Andrew

More information

AUDIT and ASSURANCE COMMITTEE TERMS OF REFERENCE

AUDIT and ASSURANCE COMMITTEE TERMS OF REFERENCE AUDIT and ASSURANCE COMMITTEE TERMS OF REFERENCE P U R P O S E The Cmmittee is an perating Cmmittee f the Grup Bard and is charged with the respnsibility f gaining assurance fr the Grup Bard that the rganisatin

More information

Elr\-\ Compensation Rates for the Mayor and Members of Council. Michael Pitoscia, Acting Executive Director, Human Resources

Elr\-\ Compensation Rates for the Mayor and Members of Council. Michael Pitoscia, Acting Executive Director, Human Resources BRAMPTON Elr\-\ Reprt Cmmittee f Cuncil bramptn.ca FlOWef City Cmmittee f the Cuncil f The Crpratin f the City f Bramptn Date: December 9, 2013 COMMITTEE OF COUNCIL File: Subject: Cntact: H20 Cuncil Cmpensatin

More information

FUNDING GUIDELINES PREVENTION GRANTS FOR CULTURALLY AND LINGUISTICALLY DIVERSE COMMUNITIES

FUNDING GUIDELINES PREVENTION GRANTS FOR CULTURALLY AND LINGUISTICALLY DIVERSE COMMUNITIES FUNDING GUIDELINES PREVENTION GRANTS FOR CULTURALLY AND LINGUISTICALLY DIVERSE COMMUNITIES CODE FOR APPLICATION COVER: CALD18 ISSUE DATE: 24 Octber 2017 PLACE FOR LODGEMENT: Please ldge yur applicatin

More information

Academic and Administrative and Other Related Staff Annual Review

Academic and Administrative and Other Related Staff Annual Review Academic and Administrative and Other Related Staff Annual Review Intrductin Heads f Cllege/Budget Centre (r nminated representative) have the pprtunity t cnsider and t make the fllwing recmmendatins fr

More information

Programme Development Funding Phase

Programme Development Funding Phase Prgramme Develpment Funding Phase Backgrund The Tees Valley Eurpean Structural & Investment Funds Strategy (ESIFS) 2014 2020 was submitted t Gvernment in January 2014 (available n the TVU website). It

More information

Policy Coversheet. Link Tutors: appointment and responsibilities

Policy Coversheet. Link Tutors: appointment and responsibilities Plicy Cversheet Name f Plicy: Link Tutrs: appintment and respnsibilities Purpse f Plicy: Intended audience(s): Apprval fr this plicy given by: T utline the arrangements fr the appintment f University Link

More information

Rural Tourism Infrastructure Fund Criteria, Conditions and Guidelines 2018

Rural Tourism Infrastructure Fund Criteria, Conditions and Guidelines 2018 Rural Turism Infrastructure Fund Criteria, Cnditins and Guidelines 2018 1 Rural Turism Infrastructure Fund - Criteria, Cnditins and Guidelines INTRODUCTION Turism is ne f Sctland s seven key ecnmic sectrs

More information

ABORIGINAL ECONOMIC PARTNERSHIPS Program Grant Application Guidelines

ABORIGINAL ECONOMIC PARTNERSHIPS Program Grant Application Guidelines ABORIGINAL ECONOMIC PARTNERSHIPS Prgram Grant Applicatin Guidelines Abriginal Ecnmic Partnerships Prgram (AEPP) grant funding supprts Indigenus cmmunities, cmmunity-wned businesses and nt-fr-prfit nn-gvernmental

More information

TASSAL GROUP LIMITED ABN Procedures for the Oversight and Management of Material Business Risks. (Approved by the Board 28 May 2015)

TASSAL GROUP LIMITED ABN Procedures for the Oversight and Management of Material Business Risks. (Approved by the Board 28 May 2015) Prcedures fr the Oversight and Management f Material Business Risks TASSAL GROUP LIMITED ABN 15 106 067 270 Prcedures fr the Oversight and Management f Material Business Risks (Apprved by the Bard 28 May

More information

NARACOORTE LUCINDALE COUNCIL COUNCIL POLICY 94 PUBLIC CONSULTATION AND COMMUNITY ENGAGEMENT

NARACOORTE LUCINDALE COUNCIL COUNCIL POLICY 94 PUBLIC CONSULTATION AND COMMUNITY ENGAGEMENT RESPONSIBLE OFFICER: RELEVANT DELEGATIONS: Chief Executive Officer Manager Gvernance and Cmmunity Develpment LEGISLATION AND REFERENCES: Lcal Gvernment Act 1999 sectins 12, 50, 92, 122,123, 151, 156, 193,

More information

Cost Estimate for Bill C-364: An Act to amend the Canada Elections Act and to make a consequential amendment to another Act (political financing)

Cost Estimate for Bill C-364: An Act to amend the Canada Elections Act and to make a consequential amendment to another Act (political financing) Cst Estimate fr Bill C-364: An Act t amend the Canada Electins Act and t make a cnsequential amendment t anther Act (plitical financing) Ottawa, Canada 30 January 2018 www.pb-dpb.gc.ca The Parliamentary

More information

Public Sector Executive Compensation Reporting Form

Public Sector Executive Compensation Reporting Form Public Sectr Executive Cmpensatin Reprting Frm British Clumbia Lttery Crpratin Reprting fr Fiscal Year 2015/16 Statement f Executive Cmpensatin May 2016 Table f Cntents Attestatin Letter Item 1 General

More information

Wanganui District Council. Waste Minimisation Fund Policy 2014

Wanganui District Council. Waste Minimisation Fund Policy 2014 Wanganui District Cuncil Waste Minimisatin Fund Plicy 2014 Table f Cntents: 1.0 Intrductin 2 2.0 Backgrund 2 3.0 Purpse 3 4.0 Eligibility and Assessment Criteria 4 5.0 Assessing the Applicatin 5 6.0 Funding

More information

APPLICATION FORM FOR ASSISTANCE FROM THE AFRICAN WORLD HERITAGE FUND

APPLICATION FORM FOR ASSISTANCE FROM THE AFRICAN WORLD HERITAGE FUND APPLICATION FORM FOR ASSISTANCE FROM THE AFRICAN WORLD HERITAGE FUND This template is the riginal assistance request frm which when sent shuld cver all the questins asked. It can be adjusted t accmmdate

More information

TASSAL GROUP LIMITED ABN

TASSAL GROUP LIMITED ABN Plicy fr the Selectin and Appintment f Directrs TASSAL GROUP LIMITED ABN 15 106 067 270 Plicy fr the Selectin and Appintment f Directrs (Reviewed by the Bard 25 June 2013) 1 Reviewed by the Bard - 25 June

More information

Policy and Procedures Date: April 23, Subject: Policy and Procedures for Establishment of New Schools at Virginia Tech

Policy and Procedures Date: April 23, Subject: Policy and Procedures for Establishment of New Schools at Virginia Tech Virginia Plytechnic Institute and State University N. 6150 Rev.: 1 Plicy and Prcedures Date: April 23, 2002 Subject: Plicy and Prcedures fr Establishment f New Schls at Virginia Tech 1. Purpse...1 2. Plicy...1

More information

Pensions Committee 5 September 2018

Pensions Committee 5 September 2018 Pensins Cmmittee 5 September 2018 Reprt Title Originating service Custmer Engagement Update Pensin Services Accuntable emplyee(s) Reprt t be/has been cnsidered by Simn Taylr Tel Email Rachel Brthwd Tel

More information

The Veolia Environmental Trust Online Application Form

The Veolia Environmental Trust Online Application Form The Velia Envirnmental Trust Online Applicatin Frm Stage 2 questins Please nte: this is nt the Stage 2 applicatin frm 1. Cntact and Organisatin Details a. Main Cntact 1.1 Title 1.2 First Name 1.3 Surname

More information

Approval Process and Arrangements for University Consultancy Work

Approval Process and Arrangements for University Consultancy Work Apprval Prcess and Arrangements fr University Cnsultancy Wrk 1 Intrductin Cnsultancy activities can be separated int tw types: thse undertaken in City s name (University cnsultancy) and thse undertaken

More information

*** A DRAFT starting point *** South Central Fresno Community Steering Committee Charter

*** A DRAFT starting point *** South Central Fresno Community Steering Committee Charter *** A DRAFT starting pint *** Suth Central Fresn Cmmunity Steering Cmmittee Charter 1. Cmmittee Objectives The Suth Central Fresn Cmmunity Steering Cmmittee is a special cmmittee that will be respnsible

More information

CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS OF ON DECK CAPITAL, INC.

CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS OF ON DECK CAPITAL, INC. CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS OF ON DECK CAPITAL, INC. (Adpted n September 15, 2014, amended thrugh July 29, 2016) PURPOSE The purpse f the Cmpensatin Cmmittee f the Bard

More information

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council June 5, 2018

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council June 5, 2018 P.O. Bx 1749 Halifax, Nva Sctia B3J 3A5 Canada Item N. 14.1.2 Halifax Reginal Cuncil June 5, 2018 TO: Mayr Savage and Members f Halifax Reginal Cuncil SUBMITTED BY: Brad Anguish, A/Chief Administrative

More information

Local Code Of Corporate Governance

Local Code Of Corporate Governance Lcal Cde Of Crprate Gvernance Apprved by Jint Cmmittee 26 June 2017 Reprt N JC 09/2017 LOCAL CODE OF CORPORATE GOVERNANCE INTRODUCTION Crprate gvernance is the cmbinatin f prcesses and structures implemented

More information

The Lockwood Foundation Grant Application Instructions

The Lockwood Foundation Grant Application Instructions The Lckwd Fundatin Grant Applicatin Instructins 2017-2018 Applicatin Opens January 22, 2018 Applicatins due March 5, 2018 The Bellevue Cllege Fundatin and The Lckwd Fundatin are pleased t annunce the 2017-2018

More information

Agenda Item 5 Commissioners Meeting Memo No 11/15. 1 October 2015

Agenda Item 5 Commissioners Meeting Memo No 11/15. 1 October 2015 Agenda Item 5 Cmmissiners Meeting Mem N 11/15 1 Octber 2015 Frest Hlidays Gvernance 1. Purpse T update Cmmissiners n the fllwing matters: a) The creatin f a Crss Brder, Executive level, Gvernance Grup

More information

Grant Application Guidelines

Grant Application Guidelines Grant Applicatin Guidelines The prgram staff f the Cmmunity Fundatin f Greater New Britain lks frward t wrking with yu. This frm is fr rganizatins that have submitted a Letter f Intent t us and were invited

More information

Sirtex Medical Limited Senior Executive Short Term Incentive Policy and Procedure

Sirtex Medical Limited Senior Executive Short Term Incentive Policy and Procedure Sirtex Medical Limited Senir Executive Shrt Term Incentive Plicy and Prcedure 1 Sirtex Medical Limited Shrt Term Incentive 1 Plicy 1.1 Purpse The primary purpse f the shrt term incentive (STI) is t acknwledge

More information

AUDIT & RISK COMMITTEE (ARC)

AUDIT & RISK COMMITTEE (ARC) AUDIT & RISK COMMITTEE (ARC) The Audit and Risk Cmmittee is an independent appraisal bdy appinted by the chapter bard t assist the bard in fulfilling its versight respnsibilities pertaining t the integrity

More information

Regulation Committee Meeting 20 Minutes September 21 st, 2017.

Regulation Committee Meeting 20 Minutes September 21 st, 2017. Regulatin Cmmittee Meeting 20 Date 21 st September 2017 Venue Husing Agency, Munt Street Upper Time 11.00am 1.00pm Chaired by Mary Lee Rhdes (M.L.R.) Cmmittee Members Present In attendance Agenda Items

More information

National Management Group

National Management Group Jb card Natinal Management Grup Natinal Management Grup This jb card utlines the rles and respnsibilities f the Natinal Management Grup (NMG) during all phases f a respnse t an Emergency Plant Pest (EPP)

More information

Terms of Reference - Board of Directors (approved by the Board on 12 April 2018)

Terms of Reference - Board of Directors (approved by the Board on 12 April 2018) Terms f Reference - Bard f Directrs (apprved by the Bard n 12 April 2018) 1. Respnsibility and Principal Duties The Bard f Directrs has the verall respnsibility fr the gvernance f the Cmpany and fr supervising

More information

CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS OF PLURALSIGHT, INC. Adopted May 3, 2018

CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS OF PLURALSIGHT, INC. Adopted May 3, 2018 CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS OF PLURALSIGHT, INC. Adpted May 3, 2018 PURPOSE The purpse f the Cmpensatin Cmmittee (the Cmpensatin Cmmittee ) f the Bard f Directrs (the

More information

ABORIGINAL ECONOMIC PARTNERSHIPS Program Application Guidelines

ABORIGINAL ECONOMIC PARTNERSHIPS Program Application Guidelines ABORIGINAL ECONOMIC PARTNERSHIPS Prgram Applicatin Guidelines The Abriginal Ecnmic Partnerships Prgram (AEPP) supprts Abriginal cmmunities, businesses and rganizatins t increase participatin in ecnmic

More information

Community Planning Association of Southwest Idaho FY Strategic Plan Report No Approved by the COMPASS Board, December 16, 2013

Community Planning Association of Southwest Idaho FY Strategic Plan Report No Approved by the COMPASS Board, December 16, 2013 Cmmunity Planning Assciatin f Suthwest Idah FY2015-2017 Strategic Plan Reprt N. 01-2014 Apprved by the COMPASS Bard, December 16, 2013 FINAL COMPASS FY2015 FY2017 Strategic Plan Page 1 Cmmunity Planning

More information

Audit & Risk Committee Charter

Audit & Risk Committee Charter Audit & Risk Cmmittee Charter AUDIT & RISK COMMITTEE CHARTER The Audit & Risk Cmmittee has been established by reslutin f the Bard f Macmahn Hldings Limited ( Macmahn r the Cmpany ). Membership The Audit

More information

PSNC Briefing on the NHS Complaints procedure (from 1 April 2009)

PSNC Briefing on the NHS Complaints procedure (from 1 April 2009) PSNC Briefing n the NHS Cmplaints prcedure (frm 1 April 2009) Under the prvisins f the Natinal Health Service (Pharmaceutical Services) Regulatins 2005 1 pharmacy cntractrs are required t make arrangements

More information

Sound Management of Electronic Wastes in North America Operating Year(s):

Sound Management of Electronic Wastes in North America Operating Year(s): 2011 2012 Operatinal Plan Prject Descriptin Sund Management f Electrnic Wastes in Nrth America Operating Year(s): 2011 2012 Planned Budget: C$400,000.00 2011: C$165,000.00 2012: C$235,000.00 Strategic

More information

REPORT TO CABINET. 18 April 2018

REPORT TO CABINET. 18 April 2018 Agenda Item 8 REPORT TO CABINET 18 April 2018 Subject: The Energy Cmpanies Obligatin (ECO) ECO Flexibility Arrangements Presenting Cabinet Member: Cuncillr Kerrie Carmichael - Cabinet Member fr Husing

More information

How to Become a Delaware Public Benefit Corporation

How to Become a Delaware Public Benefit Corporation Hw t Becme a Delaware Public Benefit Crpratin This utline describes the majr steps required fr an existing Delaware crpratin t becme a Delaware public benefit crpratin. 1. Summary. In rder t becme a public

More information

Sempra Energy Environmental, Health, Safety and Technology Committee Charter

Sempra Energy Environmental, Health, Safety and Technology Committee Charter Sempra Energy Envirnmental, Health, Safety and Technlgy Cmmittee Charter As adpted by the Bard f Directrs f Sempra Energy n September 5, 2000 and amended thrugh Nvember 9, 2015. I. Purpse The purpse f

More information

Board Committee Charters

Board Committee Charters Charter Released by the Bard f Directrs f Snva Hlding AG n June 17, 2014. Audit Cmmittee ( AC ) Charter Art. 1: Purpse The Audit Cmmittee ( AC ) reviews n behalf f the Bard the wrk and effectiveness f

More information

Student Government Association Funding Guidelines

Student Government Association Funding Guidelines Student Gvernment Assciatin Funding Guidelines What is the surce f SGA funding? Each year, a prtin f the Student Activity Fee is alltted t the Student Gvernment Assciatin (SGA). This fee is separate frm

More information

~RLY AGENDA REPORT. Meeting Date: September 10, 2013 Item Number: F 15

~RLY AGENDA REPORT. Meeting Date: September 10, 2013 Item Number: F 15 ~RLY Meeting Date: September 10, 2013 Item Number: F 15 T: Frm: Subject: AGENDA REPORT Hnrable Mayr & City Cuncil Chad Lynn, Directr f Parking Operatins SECOND AMENDMENT TO THE AGREEMENT BETWEEN THE CITY

More information

BOARD OF DIRECTORS. Trust Quality Governance Structure Review

BOARD OF DIRECTORS. Trust Quality Governance Structure Review P March BOARD OF DIRECTORS th Thursday 30P 2017 Trust Quality Gvernance Structure Review Intrductin The purpse f this paper is t utline fr the Trust Bard the nward Quality Gvernance Structure. At the request

More information

CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS OF DROPBOX, INC.

CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS OF DROPBOX, INC. CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS OF DROPBOX, INC. (Adpted n February 22, 2018, Effective upn the effectiveness f the registratin statement relating t the Cmpany s initial

More information

Information concerning the constitution, goals and functions of the agency, including 1 :

Information concerning the constitution, goals and functions of the agency, including 1 : Annual Reprt cmpliance checklist This checklist utlines the gvernance, perfrmance, reprting cmpliance and prcedural requirements f the Financial Administratin and Audit Act 1977 and the Financial Management

More information

May 1, Christina Zacharuk President and CEO Public Sector Employers Council Secretariat 2 nd Floor, 880 Douglas Street Victoria, BC V8W 2B7

May 1, Christina Zacharuk President and CEO Public Sector Employers Council Secretariat 2 nd Floor, 880 Douglas Street Victoria, BC V8W 2B7 May 1, 2017 Christina Zacharuk President and CEO Public Sectr Emplyers Cuncil Secretariat 2 nd Flr, 880 Duglas Street Victria, BC V8W 2B7 Re: Attestatin letter fr Executive British Clumbia Lttery Crpratin,

More information

Automotive Diversification Programme Round 3

Automotive Diversification Programme Round 3 Autmtive Diversificatin Prgramme Rund 3 Versin July 2015 Cntents Purpse f this Guide... 3 Eligibility Test... 3 Eligible Perid... 4 Capital Equipment Items... 4 Recnfiguratin... 4 Activities Undertaken

More information

PRIMARY GROWTH PARTNERSHIP FINANCIAL MANAGEMENT: ASSURANCE ON BALLANCE S USE OF PGP FUNDING

PRIMARY GROWTH PARTNERSHIP FINANCIAL MANAGEMENT: ASSURANCE ON BALLANCE S USE OF PGP FUNDING Assurance and Evaluatin Office f the Directr-General PRIMARY GROWTH PARTNERSHIP FINANCIAL MANAGEMENT: ASSURANCE ON BALLANCE S USE OF PGP FUNDING Final reprt issued: 19 December 2013 www.mpi.gvt.nz Cntents

More information

PARENT PAYMENT POLICY

PARENT PAYMENT POLICY PARENT PAYMENT POLICY RATIONALE The Victrian cmmunity shares a visin t build an educatin system that champins excellence and ensures that every child and yung persn has access t the pprtunities t succeed

More information

NANOSTRING TECHNOLOGIES, INC. COMPENSATION COMMITTEE CHARTER. (Adopted as of October 16, 2012 and amended as of April 26, 2017)

NANOSTRING TECHNOLOGIES, INC. COMPENSATION COMMITTEE CHARTER. (Adopted as of October 16, 2012 and amended as of April 26, 2017) NANOSTRING TECHNOLOGIES, INC. COMPENSATION COMMITTEE CHARTER (Adpted as f Octber 16, 2012 and amended as f April 26, 2017) PURPOSE The purpse f the Cmpensatin Cmmittee (the Cmmittee ) f the Bard f Directrs

More information

HUMAN RESOURCES AND COMPENSATION COMMITTEE CHARTER

HUMAN RESOURCES AND COMPENSATION COMMITTEE CHARTER HUMAN RESOURCES AND COMPENSATION COMMITTEE CHARTER PURPOSE The Human Resurces and Cmpensatin Cmmittee (the Cmmittee ) f Precisin Drilling Crpratin (the Crpratin ) is a standing cmmittee f the bard f directrs

More information

APPLIED INDUSTRIAL TECHNOLOGIES, INC. EXECUTIVE ORGANIZATION & COMPENSATION COMMITTEE CHARTER

APPLIED INDUSTRIAL TECHNOLOGIES, INC. EXECUTIVE ORGANIZATION & COMPENSATION COMMITTEE CHARTER APPLIED INDUSTRIAL TECHNOLOGIES, INC. EXECUTIVE ORGANIZATION & COMPENSATION COMMITTEE CHARTER Primary respnsibility fr the rganizatin and cmpensatin f the Crpratin s executive management is vested in the

More information

A Civil Society Agenda for the OECD

A Civil Society Agenda for the OECD A Civil Sciety Agenda fr the OECD Fr the CFA-DAC and Glbal Frum n Develpment meetings, January 2010 A Civil Sciety Agenda fr the OECD Page 2 Backgrund In 2010, the wrld s gvernments will review prgress

More information

Partner Agency Application Toque Campaign 2017/18

Partner Agency Application Toque Campaign 2017/18 Partner Agency Applicatin Tque Campaign 2017/18 Allcatin f Tque Campaign Funds Partner Agencies receive 50% f the sale price f each item they sell (example: $7.50 frm every $15.00 tque). Apprximately 40%

More information

Board Meeting Minutes Tuesday, November 14, 2017

Board Meeting Minutes Tuesday, November 14, 2017 Bard Meeting Minutes Tuesday, Nvember 14, 2017 WRWC Bard Members r Alternates present: Richard Burke, WRWC Bard Chair Tualatin Valley Water District (TVWD) (arrived 5:33pm) Kim Yung City f Sherwd Frank

More information

Engineering IT Application Development Governance Workflow

Engineering IT Application Development Governance Workflow Apprved April 6, 2018 Engineering IT Applicatin Develpment Gvernance Wrkflw This dcument is intended t define the gvernance structure and prcesses t be used in guiding the activities f the Engineering

More information

Design Council CONSULTANT GUIDELINES

Design Council CONSULTANT GUIDELINES Design Cuncil CONSULTANT GUIDELINES Intrductin: The Design Cuncil s missin is t advise and make recmmendatins t the City Manager and City staff n matters f aesthetic quality related t the built envirnment.

More information

Active Sussex. Trustee Recruitment Pack

Active Sussex. Trustee Recruitment Pack Active Sussex Trustee Recruitment Pack Our main aim is t imprve lcal peple s health and wellbeing thrugh the prmtin f sprt and physical activity fr all members f the cmmunity, n matter their level f activity.

More information

RISK INFORMATION CHURCHES CHURCH RISK MANAGEMENT

RISK INFORMATION CHURCHES CHURCH RISK MANAGEMENT The infrmatin prvided in this paper is intended t assist church staff in develpment f suitable Risk Management prcesses. Intrductin t Risk Management Risk is the expsure t the pssibility f such things

More information

University of Maine System

University of Maine System University f Maine System Nvember 6, 2014 EXECUTIVE SUMMARY AUDIT RESULTS JUNE 30, 2014 COMMON TERMS GASB Gvernmental Accunting Standards Bard. This bard is respnsible fr establishing standards f accunting

More information

CYBG PLC BOARD REMUNERATION COMMITTEE. Charter

CYBG PLC BOARD REMUNERATION COMMITTEE. Charter Charter Cmmittee Rle The Bards Remuneratin Cmmittee will act as the bard level Remuneratin Cmmittee fr Clydesdale and Yrkshire Banking Grup ( CYBG ) PLC and its subsidiaries, including fr the avidance

More information

Park Square Capital, LLP (the Firm, Park Square ) Remuneration Policy Statement

Park Square Capital, LLP (the Firm, Park Square ) Remuneration Policy Statement Park Square Capital, LLP (the Firm, Park Square ) Remuneratin Plicy Statement Overview The Remuneratin Plicy is designed t supprt Park Square s business bjectives, strategy and align risk appetite with

More information

o Continue to be a 'University of choice and opportunity' reaching out to students of all ages and backgrounds

o Continue to be a 'University of choice and opportunity' reaching out to students of all ages and backgrounds PROCUREMENT STRATEGY 1. The University Visin 1.1. The Strategic Prcurement Department will prvide a centre f prcurement expertise fr the University f West Lndn, minimising risks and delivering a psitive

More information

Ramsey Million Partnership

Ramsey Million Partnership Ramsey Millin Partnership General Pints GUIDANCE FOR APPLICATIONS FOR FUNDING GENERAL GRANTS POT 2019 (i) Opening Statement Yur grant applicatin must meet the criteria as established by the Big Lcal and

More information

Community Hubs in Ontario: A Strategic Framework and Action Plan

Community Hubs in Ontario: A Strategic Framework and Action Plan Cmmunity Hubs in Ontari: A Strategic Framewrk and Actin Plan The Ontari Assciatin f Adult and Cntinuing Educatin Schl Bard Administratrs December 2015 Cntext The mandate f the Advisry Grup: Review prvincial

More information

PROJECT CHARTER PLAN VERSION: 1A (DRAFT) <DD-MM-YY> <SECTION NAME>

PROJECT CHARTER PLAN VERSION: 1A (DRAFT) <DD-MM-YY> <SECTION NAME> The fllwing dcument is a sample Wrd template fr the creatin f a prject charter and r prject plan, which will demnstrate hw t apprach any type f prject and manage it effectively. The frmat is very basic

More information

CHARTER OF RESERVES, HEALTH, SAFETY, ENVIRONMENT AND SOCIAL RESPONSIBILITY COMMITTEE 2018

CHARTER OF RESERVES, HEALTH, SAFETY, ENVIRONMENT AND SOCIAL RESPONSIBILITY COMMITTEE 2018 CHARTER OF RESERVES, HEALTH, SAFETY, ENVIRONMENT AND SOCIAL RESPONSIBILITY COMMITTEE 2018 The Reserves, Health, Safety, Envirnment and Scial Respnsibility Cmmittee Charter utlines the specific rles and

More information

Overview of Statements of Investment Policies and Procedures (SIPP) Requirements

Overview of Statements of Investment Policies and Procedures (SIPP) Requirements Financial Services Cmmissin f Ontari Cmmissin des services financiers de l Ontari SECTION: INDEX NO.: TITLE: APPROVED BY: PUBLISHED: Investment Guidance Ntes IGN-005 Overview f Statements f Investment

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL ENVIRONMENT Directorate B - Natural Capital ENV.B.2 - Biodiversity ENV.B.3 - Nature CGBN.

EUROPEAN COMMISSION DIRECTORATE-GENERAL ENVIRONMENT Directorate B - Natural Capital ENV.B.2 - Biodiversity ENV.B.3 - Nature CGBN. EUROPEAN COMMISSION DIRECTORATE-GENERAL ENVIRONMENT Directrate B - Natural Capital ENV.B.2 - Bidiversity ENV.B.3 - Nature CGBN C-rdinatin Grup fr Bidiversity and Nature 22 nd meeting 15/03/2017 Agenda

More information

Job Description. Division/Company: Risk Function, Faster Payments Scheme Limited & Mobile Payments Service Limited

Job Description. Division/Company: Risk Function, Faster Payments Scheme Limited & Mobile Payments Service Limited Jb Descriptin Jb Title: Auditr Divisin/mpany: Risk Functin, Faster Payments Scheme Limited & Mbile Payments Service Limited Reprting T: Head f Risk Assessment & Assurance Salary and: D Faster Payments

More information

Alberta Indigenous Community Energy Program Guidelines

Alberta Indigenous Community Energy Program Guidelines Alberta Indigenus Cmmunity Energy Prgram Guidelines The Alberta Indigenus Cmmunity Energy Prgram (AICEP) is a prgram that prvides tls and funding t help Indigenus cmmunities and Indigenus rganizatins understand

More information

HSBC USA INC. HSBC BANK USA, N.A. CHARTER OF THE COMPLIANCE COMMITTEE

HSBC USA INC. HSBC BANK USA, N.A. CHARTER OF THE COMPLIANCE COMMITTEE HSBC USA INC. HSBC BANK USA, N.A. CHARTER OF THE COMPLIANCE COMMITTEE I. Cmmittee Purpse The Cmpliance Cmmittee (the Cmmittee ) is appinted by the Bards f Directrs f HSBC USA Inc. (the Crpratin ) and HSBC

More information

RE: SUBMISSION TO INFRASTRUCTURE VICTORIA S LAYING THE FOUNDATIONS PAPER

RE: SUBMISSION TO INFRASTRUCTURE VICTORIA S LAYING THE FOUNDATIONS PAPER 16 March 2016 Michel Massn Chief Executive Infrastructure Victria Level 34, 121 Exhibitin Street Melburne, VIC 3000 Dear Mr Massn, RE: SUBMISSION TO INFRASTRUCTURE VICTORIA S LAYING THE FOUNDATIONS PAPER

More information

16-18Co(17)97 Appendix 2. Panel Consideration Practice Statement. Introduction. This document has been produced to:

16-18Co(17)97 Appendix 2. Panel Consideration Practice Statement. Introduction. This document has been produced to: 16-18C(17)97 Appendix 2 Panel Cnsideratin Practice Statement Intrductin This dcument has been prduced t: Supprt the cnsistent cnsideratin f fitness t teach cnduct cases by Panels in line with the GTCS

More information

I-SEM Project Managers Group (PMG) 12 April 2018 Key Notes, Actions & Decisions

I-SEM Project Managers Group (PMG) 12 April 2018 Key Notes, Actions & Decisions I-SEM Prject Managers Grup (PMG) 12 April 2018 Key Ntes, Actins & Decisins Meeting Details Meeting Purpse Lcatin Chair Secretariat I-SEM Prject Managers Grup (PMG) EirGrid, Dublin - Cnference Call Simn

More information

UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) INTERNAL AUDIT REPORT 3 JUNE 2014

UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) INTERNAL AUDIT REPORT 3 JUNE 2014 UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) INTERNAL AUDIT REPORT 3 JUNE 2014 PROJECT NAME: PROJECT NUMBER: 00075434 COUNTRY: AUDITOR: SECOND CUSTOMS REFORM AND TRADE FACILITATION PROJECT AFGHANISTAN

More information

Call for nomination for members of the CSEM (civil society engagement mechanism) Advisory group in UHC2030

Call for nomination for members of the CSEM (civil society engagement mechanism) Advisory group in UHC2030 Call fr nminatin fr members f the CSEM (civil sciety engagement mechanism) Advisry grup in UHC2030 The Civil Sciety Engagement Mechanisms (CSEM) fr UHC2030 is lking fr vlunteers t becme members f the Advisry

More information

ESB s HUNTERS HILL WIND FARM COMMUNITY FUND

ESB s HUNTERS HILL WIND FARM COMMUNITY FUND ESB s HUNTERS HILL WIND FARM COMMUNITY FUND 2018 HOW TO APPLY GUIDE THIS DOCUMENT OUTLINES: Sectin 1: Abut Our Funds Sectin 2: The Eligibility Criteria Sectin 3: The Applicatin Prcess Sectin 4: The Decisin

More information

DEFINITIONS These CIFOR Bylaws incorporate a number of terms defined below:

DEFINITIONS These CIFOR Bylaws incorporate a number of terms defined below: Cuncil t Imprve Fdbrne Outbreak Respnse (CIFOR) Bylaws Apprved by Cuncil: September 14, 2017 I. NAME This dcument reflects the apprved Bylaws f the Cuncil t Imprve Fdbrne Outbreak Respnse, hereafter and

More information

Bursary Policy 1 REVIEWED NOV16 NEXT REVIEWED NOV 17 1 DBA

Bursary Policy 1 REVIEWED NOV16 NEXT REVIEWED NOV 17 1 DBA Bursary Plicy 1 REVIEWED NOV16 NEXT REVIEWED NOV 17 1 DBA MEANS -TESTED BURSARIES General The Gvernrs f St Jseph s Cllege are cmmitted t bradening access t the Cllege by ffering t eligible parents/guardians

More information

EPPA Update Issued September 2012 / Updated October, 2012 Defined Benefit Funding Relief Provisions

EPPA Update Issued September 2012 / Updated October, 2012 Defined Benefit Funding Relief Provisions EPPA Update 12-01 Issued September 2012 / Updated Octber, 2012 Defined Benefit Funding Relief Prvisins - 2012 In respnse t the decline f slvency discunt rates, the Emplyment Pensin Plans (Partial Exemptin

More information

Employee Hardship Assistance Policy

Employee Hardship Assistance Policy Emplyee Hardship Assistance Plicy Functinal Area: Human Resurces Applies T: All Faculty and Staff Plicy Reference(s): N/A Number: TBD Date Issued: March 4, 2013 Page(s): 6 Respnsible Persn The Directr

More information

Investor Money Regulations

Investor Money Regulations Investr Mney Regulatins A new regime fr fund service prviders in Ireland On the 30 th March 2015, the new Investr Mney Regulatins were brught int effect by Statutry Instrument 105 f 2015, with crrespnding

More information

SOUTH AFRICAN NATIONAL BOXING ORGANISATION. Olympic Style Boxing

SOUTH AFRICAN NATIONAL BOXING ORGANISATION. Olympic Style Boxing SOUTH AFRICAN NATIONAL BOXING ORGANISATION Olympic Style Bxing HIGH PERFORMANCE BUSINESS PLAN 2009 2012 Suth African Natinal Bxing Organisatin (SANABO) 4-Year High Perfrmance Business Plan Index Page 1.

More information

Policy Planning and Analysis Team (PAT) Charter

Policy Planning and Analysis Team (PAT) Charter Plicy Planning and Analysis Team (PAT) Charter Purpse f this Charter Dcument This charter defines the missin, guiding principles, scpe, rles, membership, and peratins fr the Plicy Planning and Analysis

More information

National Paramedic Re-banding update

National Paramedic Re-banding update MEETING TITLE Trust Bard in Public TITLE f PAPER Natinal Paramedic Re-banding update MEETING DATE 27/03/2018 PAPER REF 4.2 STRATEGIC OBJECTIVE(S) PURPOSE OF THE PAPER Develp and retain a highly skilled,

More information

The Commissioner of Engineering and Public Works in consultation with the Commissioner of Planning recommends:

The Commissioner of Engineering and Public Works in consultation with the Commissioner of Planning recommends: COMMITTEE OF THE WHOLE - MAY 5, 2008 TERMS OF REFERENCE CITY-WIDE TRANSPORTATION MASTER PLAN Recmmendatins The Cmmissiner f Engineering and Public Wrks in cnsultatin with the Cmmissiner f Planning recmmends:

More information