8" SOUTHRIDGE STORM SEWER CURB INLET S.RIM= I.E.= " 58 STORM SEWER CURB INLET E.RIM= I.E.= th STREET 8" 18" 30" 60
|
|
- Tyler Jackson
- 5 years ago
- Views:
Transcription
1
2
3
4
5
6
7
8
9
10
11
12 SOTHRIDGE S.RIM= I.E.= E.RIM= I.E.= th STREET 1 30" 60 S.RIM= I.E.= M I L L A R D H I G H L A N D S S O T H 2 N D. P L A T T I N G HIGHLAND BOLEVARD MILLARD HIGHLANDS SOTH " RCP F.E.S. I.E.= RIM= I.E.= BELLA LA VISTA REPLAT 1 1 CENTECH BSINESS PARK E.RIM= I.E.= CHANDLER ROAD S.RIM= I.E.= ND STREET BLDG. 1 TYPE C CLB HOSE LOT ACRES LOT ACRES PHASE 1 20' BLDG. 3 TYPE B BLDG. 2 TYPE A 11 BLDG. TYPE B BLDG. 5 TYPE B 5 BLDG. TYPE B 8 BLDG. 6 TYPE A PHASE 2 BLDG. 8 TYPE B BLDG. 9 TYPE A LOTS 1, 2 AND OTLOT A BEING A REPLATTING OF LOT 2, BELLA LA VISTA, A SBDIVISION IN SARPY CONTY, NEBRASKA PROJECT SITE thompson, dreessen & do er, inc Old Mill Rd Omaha, NE 6815 p Project Name Bella La Vista Apartments 0' 50' 100' 29 CENTECH BSINESS PARK TAX LOT 5B SE 1/ E.RIM= I.E.= S.RIM= I.E.= C O N C R E T E 1 S.RIM= I.E.= FTRE DEVELOPMENT I N T E R S T A T E I VICINITY MAP Client Name Garrison Development OTLOT A ACRES TYPICAL PARKING GARAGE WITH TANDEM PARKING IN FRONT STANDARD PARKING STALL STRIPING DETAIL SBDIVIDER 2 CENTECH BSINESS PARK I N T E R S T A T E H I G H W A Y 8 0 PHASE REQIRED GARAGES PARKING SMMARY PROVIDED GARAGES REQIRED STALLS PROVIDED STALLS TOTAL REQIRED SPACES TOTAL PROVIDED SPACES PHASE 1 *30 30 ** PHASE 2 *2 2 ** TOTAL * ** * = PER CITY OF LA VISTA ORDINANCE GARAGE STALLS ARE REQIRED AT A RATE OF 0.5 GARAGE STALLS PER NIT ENGINEER LEGAL DESCRIPTION Professional Seal S.RIM=102.1 I.E.= E.RIM=101.3 I.E.=106.6 CENTECH ROAD n d S T R E E T OTLOT "B" 1 T RIM ELEV.: I.E.(OT): I.E.(IN): 'x6' BOX CLVERT ELEV.: 10. CONCRETE HEADWALL S.W.RIM= I.E.= PHASE BILDINGS *OFFICE PARKING (1960 SQ. FT) ** = PER CITY OF LA VISTA ORDINANCE PARKING STALLS ARE REQIRED AT A RATE OF 1.0 STALLS PER BEDROOM (PHASE 1 ALSO INCLDES OFFICE PARKING) SITE SMMARY NITS BEDROOMS ACRES ACRES WITH R.O.W. DEDICATED DENSITY WITHOT R.O.W. DEDICATION DENSITY WITH DEDICATION PHASE 1 3 BILDINGS 10 STALLS 60 NITS 132 BEDROOMS 5.9 AC..5 AC NITS/AC NITS/AC. PHASE 2 6 BILDINGS 1 NITS 252 BEDROOMS AC AC NITS/AC NITS/AC. TOTAL 9 BILDINGS 10 STALLS 20 NITS 38 BEDROOMS 1.69 AC AC NITS/AC NITS/AC. * = PER CITY OF LA VISTA ORDINANCE ONE PARKING STALL IS REQIRED PER 200 SQARE FEET OF RESIDENTIAL OFFICE SPACE NOTES Revision Dates No. Description MM-DD-YY 1 PROJECT DENSITIES 1260 LEGEND EXISTING CONTORS Drawn By: RTM Reviewed By: DSD Job No.: Date: " CMP I.E.= OTLOT "A" T PHASE BILDINGS (SQ. FT) PAVING (SQ. FT) WITHOT RIGHT-OF-WAY DEDICATION TOTAL IMPERVIOS AREA (SQ. FT) TOTAL ACRES TOTAL SQARE FEET PERCENT IMPERVIOS BILDINGS (SQ. FT) PAVING (SQ. FT) WITH RIGHT-OF-WAY DEDICATION TOTAL IMPERVIOS AREA (SQ. FT) TOTAL ACRES TOTAL SQARE FEET PERCENT IMPERVIOS PHASE 1 2,20 69,500 96, AC. 239,1 0.53% 2,20 58,658 86,08.5 AC. 206, % PHASE 2 9,60 16,00 2, AC. 531, % 9,60 126, , AC. 5,65 3.3% TOTAL 10, ,900 30, AC. 0,56.25% 10, , , AC. 682, % 120 PROPOSED CONTORS PROPOSED PROPOSED PROPOSED PHASE LINE CONTROLLED ADVERTISING LINE EASEMENT GRANTED TO THE STATE OF NEBRASKA RECORDED IN BOOK 35 AT PAGE 160 OF THE SARPY CONTY RECORDS. PMP AND WELL HOSE EASEMENT AS DESCRIBED IN "RETRN OF APPRAISERS" RECORDED IN BOOK 3 AT PAGE 588 OF THE SARPY CONTY RECORDS. 20 FOOT WIDE EASEMENT GRANTED TO SANITARY AND IMPROVEMENT DISTRICT NO. 10 RECORDED IN BOOK 52 AT PAGE 386 OF THE SARPY CONTY RECORDS. Sheet Title Preliminary Planned nit Development Site Plan Sheet Number C1.0
13 th STREET 60 M I L L A R D H I G H L A N D S S O T H 2 N D. P L A T T I N G HIGHLAND BOLEVA MILLARD HIGHLANDS SOTH ' D 132ND STREET BLDG. 1 TYPE C PLAY AREA CLB HOSE 2 1 LOT ACRES PHASE 1 20' 2 BLDG. 3 TYPE B BLDG. 2 TYPE A 11 BLDG. TYPE B BLDG. 5 TYPE B BLDG. TYPE B BLDG. 6 TYPE A LOT ACRES PHASE 2 BLDG. 8 TYPE B BLDG. 9 TYPE A 0.0' thompson, dreessen & do er, inc Old Mill Rd Omaha, NE 6815 p Project Name Bella La Vista Apartments 5 8 Client Name Garrison Development C O N C R E T E FTRE DEVELOPMENT ' I N T E R S T A T E I ' 30' 60' Professional Seal Revision Dates No. Description MM-DD-YY Drawn By: RTM Reviewed By: DSD Job No.: Date: TH STREET EXTENSION PROFILE Sheet Title Site Grading and Street Profiles Sheet Number CHANDLER PLAZA PROFILE C2.0
14 58 E.RIM= I.E.= th STREET 1 30" 60 S.RIM= I.E.= M I L L A R D H I G H L A N D S S O T H 2 N D. P L A T T I N G HIGHLAND BOL MILLARD HIGHLANDS SOTH " RCP F.E.S. I.E.= WER T.60 C G C C C C C E C ' C C 132ND STREET 1 T T OE OE BLDG. 1 TYPE C PLAY AREA LOT ACRES PHASE 1 BLDG. 2 TYPE A BLDG. TYPE B PLAY AREA BLDG. 6 TYPE A PHASE 2 LOT ACRES BLDG. 8 TYPE B BLDG. 9 TYPE A thompson, dreessen & do er, inc Old Mill Rd Omaha, NE 6815 p Project Name Bella La Vista Apartments D OE OE G CLB HOSE 20' BLDG. 3 TYPE B BLDG. 5 TYPE B BLDG. TYPE B 0.0' OE T HP VALVE SIGN G Client Name Garrison Development C O N C R E T E 1 T T OE OE OE S.RIM= I.E.= FTRE DEVELOPMENT 50.95' ' I N T E R S T A T E I ' 30' 60' Professional Seal Revision Dates LEGEND PROPOSED CONTROLLED ADVERTISING LINE EASEMENT GRANTED TO THE STATE OF NEBRASKA RECORDED IN BOOK 35 AT PAGE 160 OF THE SARPY CONTY RECORDS. PMP AND WELL HOSE EASEMENT AS DESCRIBED IN "RETRN OF APPRAISERS" RECORDED IN BOOK 3 AT PAGE 588 OF THE SARPY CONTY RECORDS. 20 FOOT WIDE EASEMENT GRANTED TO SANITARY AND IMPROVEMENT DISTRICT NO. 10 RECORDED IN BOOK 52 AT PAGE 386 OF THE SARPY CONTY RECORDS. No. Description MM-DD-YY Drawn By: RTM Reviewed By: DSD Job No.: Date: Sheet Title Sanitary Sewer Plan Sheet Number C3.0
15 SOTHRIDGE S.RIM= I.E.= E.RIM= I.E.= th STREET 1 30" 60 S.RIM= I.E.= M I L L A R D H I G H L A N D S S O T H 2 N D. P L A T T I N G HIGHLAND BOL MILLARD HIGHLANDS SOTH " RCP F.E.S. I.E.= RIM= I.E.= BELLA LA VISTA REPLAT 1 1 CENTECH BSINESS PARK E.RIM= I.E.= ND STREET 1 20' LOTS 1, 2, AND 3 BEING A REPLATTING OF LOT 2, BELLA LA VISTA, A SBDIVISION IN SARPY CONTY, NEBRASKA PROJECT SITE thompson, dreessen & do er, inc Old Mill Rd Omaha, NE 6815 p Project Name CHANDLER ROAD S.RIM= I.E.= Bella La Vista Apartments 0' 50' 100' 29 CENTECH BSINESS PARK E.RIM= I.E.= C O N C R E T E 1 I N T E R S T A T E I TAX LOT 5B S.RIM= I.E.= S.RIM= I.E.= VICINITY MAP Client Name Garrison Development SE 1/ LEGEND EXISTING CONTORS SBDIVIDER 120 PROPOSED CONTORS PROPOSED 2 CENTECH BSINESS PARK I N T E R S T A T E H I G H W A Y 8 0 PMP AND WELL HOSE EASEMENT AS DESCRIBED IN "RETRN OF APPRAISERS" RECORDED IN BOOK 3 AT PAGE 588 OF THE SARPY CONTY RECORDS. 20 FOOT WIDE EASEMENT GRANTED TO SANITARY AND IMPROVEMENT DISTRICT NO. 10 RECORDED IN BOOK 52 AT PAGE 386 OF THE SARPY CONTY RECORDS. ENGINEER LEGAL DESCRIPTION Professional Seal S.RIM=102.1 I.E.= SEWER NLET D n d S T R E E T OTLOT "B" 1 T RIM ELEV.: I.E.(OT): I.E.(IN): 'x6' BOX CLVERT ELEV.: 10. CONCRETE HEADWALL S.W.RIM= I.E.= Revision Dates No. Description MM-DD-YY 1 Drawn By: RTM Reviewed By: DSD Job No.: Date: OTLOT "A" T Sheet Title Post Construction Stormwater Management Plan MP 50.3 Sheet Number C.0
16 SOTHRIDGE S.RIM= I.E.= E.RIM= I.E.= th STREET 1 30" 60 S.RIM= I.E.= M I L L A R D H I G H L A N D S S O T H 2 N D. P L A T T I N G HIGHLAND BOL MILLARD HIGHLANDS SOTH " RCP F.E.S. I.E.= RIM= I.E.= BELLA LA VISTA REPLAT 1 1 CENTECH BSINESS PARK E.RIM= I.E.= ND STREET 1 20' LOTS 1, 2, AND 3 BEING A REPLATTING OF LOT 2, BELLA LA VISTA, A SBDIVISION IN SARPY CONTY, NEBRASKA PROJECT SITE thompson, dreessen & do er, inc Old Mill Rd Omaha, NE 6815 p Project Name CHANDLER ROAD S.RIM= I.E.= Bella La Vista Apartments 0' 50' 100' 29 CENTECH BSINESS PARK E.RIM= I.E.= C O N C R E T E 1 I N T E R S T A T E I TAX LOT 5B S.RIM= I.E.= S.RIM= I.E.= VICINITY MAP Client Name Garrison Development SE 1/ LEGEND EXISTING CONTORS SBDIVIDER 120 PROPOSED CONTORS PROPOSED 2 CENTECH BSINESS PARK I N T E R S T A T E H I G H W A Y 8 0 PMP AND WELL HOSE EASEMENT AS DESCRIBED IN "RETRN OF APPRAISERS" RECORDED IN BOOK 3 AT PAGE 588 OF THE SARPY CONTY RECORDS. 20 FOOT WIDE EASEMENT GRANTED TO SANITARY AND IMPROVEMENT DISTRICT NO. 10 RECORDED IN BOOK 52 AT PAGE 386 OF THE SARPY CONTY RECORDS. ENGINEER LEGAL DESCRIPTION Professional Seal S.RIM=102.1 I.E.= SEWER NLET D n d S T R E E T OTLOT "B" 1 T RIM ELEV.: I.E.(OT): I.E.(IN): 'x6' BOX CLVERT ELEV.: 10. CONCRETE HEADWALL S.W.RIM= I.E.= Revision Dates No. Description MM-DD-YY 1 Drawn By: RTM Reviewed By: DSD Job No.: Date: OTLOT "A" T Sheet Title Storm Sewer Plan MP 50.3 Sheet Number C5.0
17 SOTHRIDGE S.RIM= I.E.= E.RIM= I.E.= th STREET 1 30" 60 S.RIM= I.E.= M I L L A R D H I G H L A N D S S O T H 2 N D. P L A T T I N G HIGHLAND BOL MILLARD HIGHLANDS SOTH " RCP F.E.S. I.E.= RIM= I.E.= BELLA LA VISTA REPLAT 1 1 CENTECH BSINESS PARK E.RIM= I.E.= CHANDLER ROAD S.RIM= I.E.= ND STREET LOT ACRES LOT ACRES 20' LOTS 1, 2, AND 3 BEING A REPLATTING OF LOT 2, BELLA LA VISTA, A SBDIVISION IN SARPY CONTY, NEBRASKA PROJECT SITE thompson, dreessen & do er, inc Old Mill Rd Omaha, NE 6815 p Project Name Bella La Vista Apartments 0' 50' 100' 29 CENTECH BSINESS PARK E.RIM= I.E.= C O N C R E T E 1 I N T E R S T A T E I TAX LOT 5B S.RIM= I.E.= S.RIM= I.E.= VICINITY MAP Client Name Garrison Development SE 1/ OTLOT A ACRES 1260 LEGEND EXISTING CONTORS SBDIVIDER 120 PROPOSED CONTORS PROPOSED SILT FENCE PROPOSED 2 CENTECH BSINESS PARK I N T E R S T A T E H I G H W A Y 8 0 CONTROLLED ADVERTISING LINE EASEMENT GRANTED TO THE STATE OF NEBRASKA RECORDED IN BOOK 35 AT PAGE 160 OF THE SARPY CONTY RECORDS. PMP AND WELL HOSE EASEMENT AS DESCRIBED IN "RETRN OF APPRAISERS" RECORDED IN BOOK 3 AT PAGE 588 OF THE SARPY CONTY RECORDS. 20 FOOT WIDE EASEMENT GRANTED TO SANITARY AND IMPROVEMENT DISTRICT NO. 10 RECORDED IN BOOK 52 AT PAGE 386 OF THE SARPY CONTY RECORDS. ENGINEER LEGAL DESCRIPTION Professional Seal S.RIM=102.1 I.E.= SEWER NLET D n d S T R E E T OTLOT "B" 1 T RIM ELEV.: I.E.(OT): I.E.(IN): 'x6' BOX CLVERT ELEV.: 10. CONCRETE HEADWALL S.W.RIM= I.E.= Revision Dates No. Description MM-DD-YY 1 Drawn By: RTM Reviewed By: DSD Job No.: Date: OTLOT "A" T Sheet Title Erosion Control Plan MP 50.3 Sheet Number C6.0
18 SOTHRIDGE S.RIM= I.E.= E.RIM= I.E.= th STREET 1 30" 60 S.RIM= I.E.= M I ' 15' 30' LEGEND EXISTING CONTORS PROPOSED CONTORS thompson, dreessen & do er, inc Old Mill Rd Omaha, NE 6815 p CENTECH BSINESS PARK 132ND STREET Project Name Bella La Vista Apartments E.RIM= I.E.= LOT ACRES 2 CHANDLER ROAD 2 20' 11 Client Name Garrison Development S.RIM= I.E.= C O N C R E T E 1 Professional Seal CENTECH BSINESS PARK E.RIM= I.E.= Revision Dates TAX LOT 5B S.RIM= I.E.= S.RIM= I.E.= No. Description MM-DD-YY SE 1/ Drawn By: RTM Reviewed By: DSD Job No.: Date: Sheet Title 132nd Street Improvements Sheet Number C.0
19 RIM= S.RIM= I.E.= C G C C 12" 1 58 E.RIM= I.E.= " 1 30" 59 12" 130th STREET 1 30" 60 S.RIM= I.E.= M I L L A R D H I G H L A N D S S O T H 2 N D. P L A T T I N G C C C E C C HIGHLAND BOLEVARD C MILLARD HIGHLANDS SOTH " RCP F.E.S. I.E.= RIM= I.E.= " 61 12" 2" E.RIM= I.E.= OE 132ND STREET 1 T T OE OE OE G " / 1 20' 2 6" 2" 2" 2" thompson, dreessen & do er, inc Old Mill Rd Omaha, NE 6815 p Project Name Bella La Vista Apartments CHANDLER ROAD 2 11 S.RIM= I.E.= OE T HP VALVE SIGN G 5 8 BSINESS PARK E.RIM= I.E.= S.RIM= I.E.= C O N C R E T E 1 T T OE OE OE LIGHT POLE, TYP. 2" S.RIM= I.E.= " I N T E R S T A T E I Client Name Garrison Development TAX LOT 5B Professional Seal SE 1/ ' 0' 80' Revision Dates LEGEND PROPOSED ROADWAYS AND PARKING LOTS PROPOSED BILDINGS AND GARAGES PROPOSED RECREATION AREAS PROPOSED GREEN SPACE PROPOSED TREES No. Description MM-DD-YY Drawn By: JJP Reviewed By: DSD Job No.: Date: LANDSCAPE ARCHITECTRE SITE PLANNING ZONING COMPLIANCE STORMWATER CONSERVATION Sheet Title Preliminary Planned nit Development Landscape Plan Sheet Number L1.0
20 RIM= S.RIM= I.E.= C G C C 12" 1 58 E.RIM= I.E.= " 1 30" 59 12" 130th STREET 1 30" 60 S.RIM= I.E.= M I L L A R D H I G H L A N D S S O T H 2 N D. P L A T T I N G C C C E C C HIGHLAND BOLEVARD C MILLARD HIGHLANDS SOTH " RCP F.E.S. I.E.= RIM= I.E.= " 61 12" 2" E.RIM= I.E.= OE 132ND STREET 1 T T OE OE OE G " / 1 20' 2 6" 2" 2" 2" thompson, dreessen & do er, inc Old Mill Rd Omaha, NE 6815 p Project Name Bella La Vista Apartments CHANDLER ROAD 2 11 S.RIM= I.E.= OE T HP VALVE SIGN G 5 8 K E.RIM= I.E.= S.RIM= I.E.= C O N C R E T E 1 T T OE OE OE LIGHT POLE, TYP. 2" S.RIM= I.E.= " I N T E R S T A T E I Client Name Garrison Development B Professional Seal 11 0' 0' 80' Revision Dates LEGEND PROPOSED ROADWAYS AND PARKING LOTS PROPOSED BILDINGS AND GARAGES PROPOSED RECREATION AREAS PROPOSED GREEN SPACE PROPOSED TREES No. Description MM-DD-YY Drawn By: JJP Reviewed By: DSD Job No.: Date: LANDSCAPE ARCHITECTRE SITE PLANNING ZONING COMPLIANCE STORMWATER CONSERVATION Sheet Title Preliminary Planned nit Development Landscape Plan Sheet Number L1.0
21
22
23 Supplemental Memorandum #3 TO: FROM: SBJECT: Mark Meisinger (FH John Kottmann (LaVista) Gary Hassenflu (Garrison Development) Jim Jussel (Benesch), Austin Yates (Benesch) Doug Dreessen (TD2) Bella La Vista Traffic Impact Study DATE: February 2, 2012 Per the request of the City, Benesch has completed additional traffic analysis to address the concerns of the residents that live adjacent to the proposed Bella LaVista development. Highland Boulevard Traffic: Benesch reassigned all of the traffic that is destined to the northeast of the development (Harrison Street East external) to the intersection of Highland Boulevard & Harrison Street. This procedure was completed to analyze the possibility that 5 percent of the site-generated traffic will use Highland Boulevard to access Harrison Street, see the revised Figures 11 and 12. As part of our discussion with the SID 10 engineer, Don Heine, he made the observation that a growth rate was applied to the existing traffic on Highland Blvd. The existing neighborhood is fully developed; therefore no additional traffic growth should occur. The volumes illustrated in Figures 11 and 12 take into the account the removal of the growth traffic. A two percent growth rate was used in the previous traffic study. This growth rate was still applied to the through traffic on Harrison Street. The amount of site-generated traffic on Highland Blvd during the morning peak period is estimated to be about 9 vehicles per hour (vph) and the afternoon peak hour would be about 61 vph. Capacity Analysis: Benesch recalculated the capacity analysis for the study intersections. Figures 13 and 1 summarize the results of the capacity calculations. The results of the capacity analysis were similar to the January 2012 traffic study. During the AM peak period, the northbound right-turn movement would be expected to operate with a LOS F. This is not uncommon for an unsignalized intersection on an arterial street to experience a poor level of service during the peak commuter periods. The poor level of service is due to the limited number of acceptable gaps in the traffic. The traffic signal warrants were checked for the Peak Hour Warrant (Warrant 3) and the signal warrant would not be expected to be met. Even if the Peak Hour Warrant was met, a traffic signal at this location would not be approved by the City of Omaha or Douglas and Sarpy County Public Works Departments because it does not meet current access management guidelines for an urban arterial. In summary, there are no new recommendations based on the additional traffic analysis. recommendations originally identified in the January 2012 Traffic Study still stand. The Page 1
24 N Not to Scale Chandler Rd (+2) (+) (+6) 80 (+1) 18 10% (+0) 20% 5% 5% 200 (+18) 389 (+9) 325 (+0) (+2) (+) (+18) (+) Harrison St Proposed Bella La Vista Apartments New AM Trips: 110 In: 22 Out: [-8] 0 21 [-13] [-2] 2925 (+0) [-2] Highland Blvd 0% 10 [-6] 133 (+0) (+10)[-9] 132 nd St 1 [-1] 0 1 (+39)[-35] Y:\omaha\120000S\ \Office_Docs\Exhibits\Exhibits \Bella La Vista Fig 11 F+Dev AM Vol Revised.vsd, 2/2/2012 W Giles Rd (West) Traffic Impact Study Bella La Vista Apartments La Vista, NE 151 (+9) 286 (+9) 5% 53 (+1) (+) 519 (+5) 132 nd St 5% 152 (+2) (+1) 5 (+2) 65 10% Legend 22 (+22) [-22] 22% W Giles Rd (East) AM Peak Hour Traffic Volume (vph) Additional AM Peak Hour Traffic Volume (vph) AM Peak Growth Adjustment (vph) Lane Group Signalized Intersection nsignalized Intersection Trip Distribution Percentage Year 2035 Future plus Full Development AM Peak Hour Traffic Volumes - Revised Figure 11 Page 2
25 N Not to Scale Chandler Rd 6 13 (+9) (+18) 29 (+2) 15 (+) 26 10% (+0) 20% 5% 5% 159 (+10) 30 (+5) 22 (+0) (+15) (+2) (+10) (+18) Harrison St Proposed Bella La Vista Apartments New PM Trips: 136 In: 89 Out: 8 5 [-3] 0 5 [-3] 6 [-] 155 (+0) 28 [-1] Highland Blvd 0% 3 [-23] 2892 (+0) 221 (+0)[-62] 132 nd St (+) Y:\omaha\120000S\ \Office_Docs\Exhibits\Exhibits \Bella La Vista Fig 12 F+Dev PM Vol Revised.vsd, 2/2/2012 W Giles Rd (West) Traffic Impact Study Bella La Vista Apartments La Vista, NE 89 (+5) 31 (+5) 5% 396 (+) (+2) 392 (+3) 132 nd St 5% 28 (+9) (+5) 115 (+9) % Legend 22 (+22) [-22] 22% W Giles Rd (East) PM Peak Hour Traffic Volume (vph) Additional PM Peak Hour Traffic Volume (vph) PM Peak Growth Adjustment (vph) Lane Group Signalized Intersection nsignalized Intersection Trip Distribution Percentage Year 2035 Future plus Full Development PM Peak Hour Traffic Volumes - Revised Figure 12 Page 3
26 N Not to Scale Chandler Rd B(5') F(350') B(100') Proposed Signal Proposed NB/SB left turn lanes D(125') F(1325') B(200') A(25') F B E(225') D(250') A(25') A(5') B(25') C(00') F(25') A(25') A(25') Harrison St C(25') Highland Blvd F(Err) C(5') A(0') Proposed Bella La Vista Apartments F(Err) F(525') A(0') F(100') 132 nd St Y:\omaha\120000S\ \Office_Docs\Exhibits\Exhibits \Bella La Vista Fig 13 F+Dev AM LOSQ Revised.vsd, 2/2/2012 F(105') W Giles Rd (West) F(Err) Traffic Impact Study Bella La Vista Apartments La Vista, NE A(0') 132 nd St A(25') A(25') F(Err) Err - Queue Length cannot be calculated due to the limits of HCM methodology W Giles Rd (East) Legend B (22') B AM Peak Hour Level of Service AM Peak Hour 95 th Percentile Queue Length (ft) Existing Lane Proposed Lane Signalized Intersection Level of Service nsignalized Intersection Year 2035 Future plus Full Development AM Peak Hour Level of Service and Queue Length - Revised Figure 13 Page
27 N Not to Scale Chandler Rd C(15') F(25') B(125') Proposed Signal Proposed NB/SB left turn lanes C(50') C(550') A(15') A(50') F B D(200') C(150') A(25') B(125') B(150') F(1200') F(35') A(25') A(25') Harrison St E(25') Highland Blvd F(Err) E(25') A(0') Proposed Bella La Vista Apartments F(Err) C(50') A(0') D(125') 132 nd St Y:\omaha\120000S\ \Office_Docs\Exhibits\Exhibits \Bella La Vista Fig 1 F+Dev PM LOSQ Revised.vsd, 2/2/2012 F(25') W Giles Rd (West) F(Err) Traffic Impact Study Bella La Vista Apartments La Vista, NE A(0') 132 nd St A(25') A(25') F(Err) Err - Queue Length cannot be calculated due to the limits of HCM methodology W Giles Rd (East) Legend B (22') B PM Peak Hour Level of Service PM Peak Hour 95 th Percentile Queue Length (ft) Existing Lane Proposed Lane Signalized Intersection Level of Service nsignalized Intersection Year 2035 Future plus Full Development PM Peak Hour Level of Service and Queue Length - Revised Figure 1 Page 5
28
29
30
Chapter 9 ANNEXATION PLAN
Chapter 9 ANNEXATION PLAN INTRODUCTION Annexation is a means of bringing unincorporated property into the corporate limits of the city and extending municipal services, regulations, voting privileges and
More informationTYSONS CORNER. Neighborhood Traffic Impact Study. Traffic Analysis Report. Task Order No Prepared by: Prepared for:
TYSONS CORNER Neighborhood Traffic Impact Study Traffic Analysis Report Task Order No. 07 077 03 Prepared by: Prepared for: December 2010 Tysons Corner Neighborhood Impact Study Page 2 TABLE OF CONTENTS
More informationAMENDMENT TO SUBDIVISION AGREEMENT
SECOND AMENDMENT TO SUBDIVISION AGREEMENT THIS SECOND AMENDMENT TO SUBDIVISION AGREEMENT ( Second Amendment ) is made this day of, 2007 ( Effective Date ), by and among HILLCREST DEVELOPMENT COMPANY, L.L.C.,
More informationINSPECTION SERVICES DIVISION FEE SCHEDULE
BUILDING INSPECTION SERVICES DIVISION FEE SCHEDULE Effective January 1, 2017 ** To calculate fees for building projects use the higher of the fees by valuation or square footage ** New Buildings, Additions
More informationNorth Fair Oaks Zoning Workgroup Fair Oaks Community Center February 15, 2017
North Fair Oaks Zoning Workgroup Fair Oaks Community Center February 15, 2017 1 M e e t i n g P u r p o s e a n d O b j e c t i v e s PURPOSE: Present project timeline and next steps Present Proposed Improvements
More informationTOOELE COUNTY PLANNING COMMISSION 47 SOUTH MAIN STREET, TOOELE, UTAH (435) BUSINESS MEETING February 2, 2005
TOOELE COUNTY PLANNING COMMISSION 47 SOUTH MAIN STREET, TOOELE, UTAH 84074 (435) 843-3160 BUSINESS MEETING February 2, 2005 The Tooele County Planning Commission Meeting was called to order at 7:00p.m.
More informationIMPACT FEE CREDIT APPLICATION & GUIDELINES
IMPACT FEE CREDIT APPLICATION & GUIDELINES Land Development Division City of Kansas City, Missouri Updated on January 2009 TABLE OF CONTENTS I. Introduction II. III. IV. Defined terms Formulas Items Not
More informationPlanning Commission Staff Report
Staff Recommendation Planning Commission Staff Report February 5, 2015 Project: Southeast Policy Area, Amendment 1 File: PL0016 and EG-13-030 Request: General Plan Amendment, Community Plan Amendment,
More informationSpecial Conditions, Regulations and Instructions for Right of Way Permit Applications
Special Conditions, Regulations and Instructions for Right of Way Permit Applications The Department of Environmental Services (DES) issues public right of way (PROW) permits to contractors with a valid
More information2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)
2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion
More informationPLEASANT GROVE, UTAH TRANSPORTATION IMPACT FEE FACILITIES PLAN AND ANALYSIS
PLEASANT GROVE, UTAH TRANSPORTATION IMPACT FEE FACILITIES PLAN AND OCTOBER 2012 PREPARED BY: LEWIS YOUNG ROBERTSON & BURNINGHAM IMPACT FEE CERTIFICATION Impact Fee Facilities Plan (IFFP) Certification
More informationPolicy CIE The following are the minimum acceptable LOS standards to be utilized in planning for capital improvement needs:
Vision Statement: Provide high quality public facilities that meet and exceed the minimum level of service standards. Goals, Objectives and Policies: Goal CIE-1. The City shall provide for facilities and
More informationTAX INCREMENTAL PROJECT PLAN
TAX INCREMENTAL PROJECT PLAN TAX INCREMENT DISTRICT #77 RUSHMORE GATEWAY CORRIDOR CITY OF RAPID CITY Prepared by the Rapid City Community Planning and Development Services Department April 2016 INTRODUCTION
More informationCAPITAL IMPROVEMENTS ELEMENT
GOALS, OBJECTIVES AND POLICIES Goal 1.0.0. To annually adopt and utilize a 5-Year Capital Improvements Program and Annual Capital Budget to coordinate the timing and to prioritize the construction and
More informationSystem Development Charge Methodology
City of Springfield System Development Charge Methodology Stormwater Local Wastewater Transportation Prepared By City of Springfield Public Works Department 225 Fifth Street Springfield, OR 97477 November
More information1. identifies the required capacity of capital improvements to serve existing and future development based on level-of-service (LOS) standards;
DIVISION 4.200 CAPITAL IMPROVEMENTS ELEMENT SECTION 4.201 INTRODUCTION The purpose of the Capital Improvements Element (CIE) is to tie the capital improvement needs identified in the other elements to
More informationCAPITAL IMPROVEMENTS ELEMENT:
CAPITAL IMPROVEMENTS ELEMENT: Goals, Objectives and Policies Goal 1. The provision of needed public facilities in a timely manner, which protects investments in existing facilities, maximizes the use of
More informationFROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: SEPTEMBER 11, 2006 CMR: 346:06
21a TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: SEPTEMBER 11, 2006 CMR: 346:06 SUBJECT: 901 SAN ANTONIO ROAD [06PLN-00031, 06PLN-00050]: REQUEST BY
More informationStephanie Smith, Project EngineerW
MEMORANDUM v TO: Paul Oehme, Director of Public Works/ City Engineer o FROM: Stephanie Smith, Project EngineerW 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 9522271100 Fax
More informationChapter CONCURRENCY
Chapter 14.28 CONCURRENCY Sections: 14.28.010 Purpose. 14.28.020 Development exempt from project concurrency review. 14.28.030 Concurrency facilities and services. 14.28.040 Project concurrency review.
More informationEXHIBIT A CITY OF OLDSMAR PERMIT, INSPECTION AND PLANS EXAMINATION FEE SCHEDULE
1. Building Permit EXHIBIT A CITY OF OLDSMAR PERMIT, INSPECTION AND PLANS EXAMINATION FEE SCHEDULE a. This fee schedule is applicable to all building permits issued by the City of Oldsmar, Building Division
More informationIndiana LTAP Road School 2007 Purdue University West Lafayette, Indiana March 7, 2007
Review of GASB Statement No. 34 capital asset provisions and discussion of the Indiana LTAP and Government Fixed Asset Services, Inc. Procedure Manual for Implementation of GASB Statement No. 34 Indiana
More informationCAPITAL IMPROVEMENTS ELEMENT
[COMPREHENSIVE PLAN] 2025 INTRODUCTION EXHIBIT F CAPITAL IMPROVEMENTS ELEMENT A primary purpose of the Capital Improvements Element (CIE) is to assess and demonstrate the financial feasibility of the Clay
More informationExhibit "B" TAX INCREMENT REINVESTMENT ZONE, NUMBER ONE CITY OF BAYTOWN. July 8, 2015
Exhibit "B" TAX INCREMENT REINVESTMENT ZONE, NUMBER ONE CITY OF BAYTOWN July 8, 2015 2015 AMENDMENT TO THE PROJECT PLAN AND REINVESTMENT ZONE FINANCING PLAN PROJECT PLAN Page I. Existing uses and conditions
More informationCITY OF BLUE ASH Interoffice Memo City Manager's Office
TO: FROM: SUBJECT: CITY OF BLUE ASH Interoffice Memo City Manager's Office City Council City Manager and Department Directors Agenda Items for the November 9 th Council Meeting DATE: November 7, 2017 COPIES:
More informationCITY OF JENKS COMMERCIAL BUILDING PERMIT P.O. Box N. Elm Jenks, OK 74037(918)
CITY OF JENKS COMMERCIAL BUILDING PERMIT P.O. Box 2007 211 N. Elm Jenks, OK 74037(918) 299-5883 CERTIFICATE OF OCCUPANCY: DATE RECEIVED: BUILDING ADDRESS: LOT: BLOCK: ADDITION: SECTION: TOWNSHIP: RANGE:
More informationCITY OF BRENTWOOD DEVELOPMENT IMPACT FEE PROGRAM 2015
CITY OF BRENTWOOD DEVELOPMENT IMPACT FEE PROGRAM 2015 TABLE OF CONTENTS Page Introduction. 1 Program Overview. 1 Fee Summary 2 Land Use Categories and Growth Projections. 3 Administration 5 Community Facilities
More informationAppendix B Example Project Designs and Engineers Opinion of Costs
Appendix B Example Project Designs and Engineers Opinion of Costs 32 nd Street from E. 2 nd to Main Avenue CR 251 and CR 250 9 th Street Sidewalk Improvements 15 th Street Improvements Intermodal Facility
More informationCity of Redding, California Development Impact Mitigation Fee Nexus Study
, California Development Impact Mitigation Fee Nexus Study December 5, 2017 Prepared by helping communities fund to morrow This page intentionally left blank. TABLE OF CONTENTS Executive Summary...1 Background
More informationSUBDIVISION IMPROVEMENTS AGREEMENT
SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El
More informationJune 24, Lely Resort (PUD) Insubstantial Change (PDI) PL Dear Ms. Beasley:
June 24, 2016 Ms. Rachel Beasley Zoning & Land Development Review Department Community Development & Environmental Services 2800 North Horseshoe Drive Naples, Florida 34104 RE: Lely Resort (PUD) Insubstantial
More informationTraffic Impact Analysis Guidelines Methodology
York County Government Traffic Impact Analysis Guidelines Methodology Implementation Guide for Section 154.037 Traffic Impact Analysis of the York County Code of Ordinances 11/1/2017 TABLE OF CONTENTS
More informationCAPITAL IMPROVEMENTS ELEMENT GOALS, OBJECTIVES AND POLICIES. Goal 1: [CI] (EFF. 7/16/90)
CAPITAL IMPROVEMENTS ELEMENT GOALS, OBJECTIVES AND POLICIES Goal 1: [CI] (EFF. 7/16/90) To use sound fiscal policies to provide adequate public facilities concurrent with, or prior to development in order
More informationMINUTES ADJOURNED PLANNING COMMISSION MEETING JANUARY 9, 2017
MINUTES ADJOURNED PLANNING COMMISSION MEETING JANUARY 9, 2017 A adjourned meeting of the Planning Commission of the City of Rolling Hills Estates was called to order at 7:00 p.m. in the City Hall Council
More informationCAPITAL IMPROVEMENTS ELEMENT
Goals, Objectives and Policies CAPITAL IMPROVEMENTS ELEMENT GOAL 9.1.: USE SOUND FISCAL POLICIES TO PROVIDE ADEQUATE PUBLIC FACILITIES TO ALL RESIDENTS WITHIN THE CITY. FISCAL POLICIES MUST PROTECT INVESTMENTS
More informationFY 2018 FY 2022 Capital Improvement Program (CIP) Executive Summary
FY 2018 FY 2022 Capital Improvement Program (CIP) Executive Summary The adopted FY 2018 FY 2022 CIP is $138 million (including prior year expenditures) and is $100 million lower than the previous CIP due
More informationLEGEND Bridges Parks Fire Stations Project Locations Libraries Schools A
LEGEND Bridges Parks Fire Stations Project Locations Libraries Schools A Aid to Construction Fund The Aid to Construction Fund (Water) are funds received from customers for requested water service and
More informationCITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $
RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement
More informationTAX INCREMENT PROJECT PLAN
TAX INCREMENT PROJECT PLAN THE VILLAGE ON MONROE CITY OF RAPID CITY Prepared by the Rapid City Community Planning and Development Services Department May 2017 INTRODUCTION Tax Increment Financing is a
More informationORDINANCE NO
ORDINAE NO. 12 094 Introduced by: Mr. Reda, Mr. Tackett Date of introduction: September 4, 2012 TO REVISE CHAPTER 40 OF THE NEW CASTLE COUNTY CODE (ALSO KNOWN AS THE UNIFIED DEVELOPMENT CODE OR UDC ) REGARDING
More informationCHECKLIST FOR CONSTRUCTION STAGING PLAN IN CORAL GABLES
CHECKLIST FOR CONSTRUCTION STAGING PLAN IN CORAL GABLES _ A Construction Staging Plan is required prior to permit issuance for all commercial and multi-family residential projects. It is intended to reduce
More informationGRASS VALLEY TRANSPORTATION IMPACT FEE PROGRAM NEXUS STUDY
HEARING REPORT GRASS VALLEY TRANSPORTATION IMPACT FEE PROGRAM NEXUS STUDY Prepared for: City of Grass Valley Prepared by: Economic & Planning Systems, Inc. March 2008 EPS #17525 S A C R A M E N T O 2150
More informationLETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY
LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY January 5, 205 2 Partially Completed Single Family Lots (65' x 5' typical) 46 Completed Townhome Pads (22' x 50' typical) Sale. This letter of intent outlines
More informationMARION COUNTY GROWTH SERVICES
MARION COUNTY GROWTH SERVICES Date: 6/27/2017 1 st PH - P&Z (LPA): 6/26/2017 2 nd PH - BCC: 7/18/2017 Application No: 2017-DT3 Type of Application: Developer s Agreement Termination Developer s Agreement:
More informationOak Island 1999 Hurricane Floyd
Oak Island 1999 Hurricane Floyd Topics to be Discussed What is a flood zone Flood zones in Oak Island Special Flood Hazard Areas (SFHA) Flood insurance Base Flood Elevations (BFEs) Building in flood zones
More informationRock Chalk Park - Infrastructure Report. July 2013
Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the
More informationDORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates
DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial
More informationTABLE OF CONTENTS LIST OF TABLES
TABLE OF CONTENTS A. GOALS, OBJECTIVES, AND POLICIES... 3 B. SUMMARY... 17 LIST OF TABLES Table IX 1: City of Winter Springs Five-Year Schedule of Capital Improvements (SCI) FY 2013/14-2017/18... 11 Table
More informationbae urban economics Memorandum Fee Analysis for General Plan Update Cost Recovery and for General Plan Implementation
bae urban economics Memorandum To: Vacaville City Council From: Matt Kowta, Principal, MCP Date: July 10, 2016 Re: Fee Analysis for General Plan Update Cost Recovery and for General Plan Implementation
More informationAlso Present: Malcolm O Hara, Attorney for the Town and Joe Patricke, Building Inspector.
Acting Chairman Bergman called the meeting to order at 7:00 p.m. Present: Erik Bergman Keith Oborne Chris Barden John Arnold David Paska Linda Riggi Ronald Zimmerman Tricia Andrews Acting Chairman Alternate
More informationFY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary
FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary The adopted FY 2017 FY 2021 CIP is $235.8 million (including prior year expenditures) and is $28 million higher than the previous CIP
More informationSummary of Findings. Elevated Viaduct "Alternative V-2" Tax Parcels
The New York State Department of Transportation (NYSDOT) is currently considering three elevated roadway and three street-level boulevard options for replacing the Interstate 81 viaduct between the University
More informationGary Godfrey, Chairperson. Invocation: Ron Anderson Pledge of Allegiance: Sharon Call
1 1 1 1 0 3 3 3 3 0 The Lindon City Planning Commission held a regularly scheduled meeting beginning at 7:00 p.m. on Wednesday, April, 009 in the Lindon City Center, City Council Chambers, 0 North State
More informationCOUNCIL ACTION FORM Meeting Date: June 11, 2015 Staff Contact: Fred Sherman, City Clerk
COUNCIL ACTION FORM Meeting Date: June 11, 2015 Staff Contact: Fred Sherman, City Clerk Agenda Item: Consider passing an ordinance to approve a special use permit request (SUP- 2015-03 to allow for the
More informationThe $1.620 million Commercial Container Acquisition CIP project is planned through Solid Waste funds.
I. CAPITAL IMPROVEMENTS ELEMENT INTRODUCTION The intent of the capital improvements element is to provide a component that outlines principles for construction, extension, or increase in capacity of public
More information8. CAPITAL IMPROVEMENT ELEMENT Goals, Objectives, and Policies
8. Goals, Objectives, and Policies GOAL 8-1: TO USE SOUND FISCAL POLICIES TO PROVIDE PUBLIC FACILITIES AND SERVICES CONCURRENT WITH DEVELOPMENT/REDEVELOPMENT IN ORDER TO ACHIEVE AND MAINTAIN ADOPTED STANDARDS
More informationSECTION 7100 GENERAL REQUIREMENTS & PROCEDURES FOR DEVELOPMENT
SECTION 7100 GENERAL REQUIREMENTS & PROCEDURES FOR DEVELOPMENT 7100 GENERAL REQUIREMENTS & PROCEDURES FOR DEVELOPMENTS... 1 7101 APPROVAL PROCESS... 1 7101.1 GENERAL... 1 7101.2 FLOW CHART... 1 7101.3
More informationGeorgia Funders Forum June 20, Impact Fees. Georgia s Most Ignored State Law? Bill Ross ROSS+associates
Georgia Funders Forum June 20, 2018 Impact Fees Georgia s Most Ignored State Law? Bill Ross ROSS+associates Who Is ROSS+associates? Comprehensive Planning Long-Range Comprehensive Plans Land Use and Neighborhood
More informationTOWNSHIP OF UPPER ST. CLAIR LONG-TERM PLAN
FIVE YEAR PROJECTION FIVE YEAR PROJECTION OVERVIEW The Five Year Projection for all Township Funds is a tool in which the Board of Commissioners and Township Staff can monitor potential funding impacts
More informationMarket and Financial Inputs to Neighbourhood Centres Policy
Appendix E of PB-01-17 Market and Financial Inputs to Neighbourhood Centres Policy November 2016 Prepared for: City of Burlington By: Table of Contents 1.0 Introduction... 1 1.1 Background... 1 1.2 Approach...
More informationMINUTES OF MEETING ALAMEDA COUNTY PLANNING COMMISSION MAY 4, 2009 (Approved May 18, 2009)
FIELD TRIP: MINUTES OF MEETING MAY 4, 2009 (Approved May 18, 2009) MEMBERS PRESENT: Commissioners Kathie Ready and Richard Rhodes. MEMBERS EXCUSED: Commissioners Ken Carbone, Chair; Frank Imhof; Mike Jacob,
More informationThe City of La Vista is dedicated to providing exceptional municipal services with the highest level of integrity, professionalism and excellence.
The City of La Vista is dedicated to providing exceptional municipal services with the highest level of integrity, professionalism and excellence. A ACCOUNTABILITY We will be responsible for our decisions
More informationSTORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES
DEPARTMENT OF ENVIRONMENTAL SERVICES Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,
More informationMONTE SERENO BETTER STREETS COMMISSION AGENDA 7:00 P.M. Thursday March 8, 2018 Regular Meeting
MONTE SERENO BETTER STREETS COMMISSION AGENDA 7:00 P.M. Thursday March 8, 2018 Regular Meeting Monte Sereno City Council Chambers 18041 Saratoga-Los Gatos Road, Monte Sereno, CA 95030 MEETING CALLED TO
More informationCounty Barn Road RPUD. Deviation Justification
1. Deviation 1 seeks relief from LDC Section 6.06.02.A.2 which requires dual sidewalks on local roads internal to the site, to allow a sidewalk on one side of the roadway where the property is permitted
More informationMaster Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.
, Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...
More informationRevised Public Review Draft Report
Revised Public Review Draft Report Central City Specific Plan Public Facilities Finance Plan Prepared for: City of Sacramento Prepared by: Economic & Planning Systems, Inc. (EPS) February 6, 2018 EPS #152140
More informationNOVATO GENERAL PLAN 2035 ENVIRONMENTAL IMPACT REPORT CONSULTANT SERVICES AGREEMENT AMENDMENT
G-3 STAFF REPORT MEETING DATE: September 26, 2017 TO: FROM: City Council Steve Marshall, Planning Manager 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213 www.novato.org SUBJECT: NOVATO
More informationFor Sale/Lease 800 NEW HOLLAND AVENUE LANCASTER, PA Ruth M. Devenney, CCIM, SIOR
For Sale/Lease 717.293.4477 800 NEW HOLLAND AVENUE LANCASTER, PA 17602 Ruth M. Devenney, CCIM, SIOR 717.293.4552 rdevenney@high.net 1853 William Penn Way Lancaster, PA 17601 717.293.4477 www.highassociates.com
More informationStormwater System Development Charges
Methodology Report Stormwater System Development Charges Prepared For City of Springfield April 20, 2009 GALARDI CONSULTING, LLC PAGE 1 OF 9 SECTION 1 Introduction Oregon legislation establishes guidelines
More informationYear 2014 Engineer s Report regarding the Status of ownership, Working order and Condition of the Public Infrastructure.
Year 2014 Engineer s Report regarding the Status of ownership, Working order and Condition of the Public Infrastructure. Project: MEADOW PINES (AKA COBBLESTONE) PEMBROKE PINES, FL Prepared for: MEADOW
More informationFunding Source: Highway Safety Improvement Program (HSIP) Grant - $315,100; Measure I - $60,500
FY 2017-18 Capital Improvement Program Detail STREETS Raised Median on Pipeline Avenue S14009 Program Year Initiated: FY 2013-14 Construction Year: FY 2016-17 Project Description: Install raised median
More informationJANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,
ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT
More informationLocated at the corner of Weddington Road and Pitts School Road Concord
6.71 ACRES RETAIL/OFFICE LAND FOR SALE Located at the corner of Weddington Road and Pitts School Road Concord BANK OWNED Property Highlights 6.71 Acres Zoned C 2, Conditional Water and sewage are nearby
More informationTOWN OF LIBERTY PLANNING BOARD MINUTES March 2, 2010
TOWN OF LIBERTY PLANNING BOARD MINUTES March 2, 2010 MEMBERS PRESENT Diane S. Deutsch, Chairman Ray Kelly Lynn Dowe Dean Farrand John Van Etten Peter Stettner, Alternate Denise Birmingham, Alternate ABSENT
More informationFloodplain Development Permit Application
Floodplain Development Permit Application City of Jonesboro, AR This is an application packet for a Floodplain Development Permit. Certain sections are to be completed by the Applicant, and certain sections
More informationTOWN HALL MEETING. Neighborhood Connector Street Projects. February 7, 2016
TOWN HALL MEETING Neighborhood Connector Street Projects February 7, 2016 Neighborhood Connector Street Projects Overview April 17 2014 May 17 2014 November 20 2014 January 29 2015 March 5 2015 March 19
More informationJORDAN DOWNS SPECIFIC PLAN DRAFT ENVIRONMENTAL IMPACT REPORT
JORDAN DOWNS SPECIFIC PLAN DRAFT ENVIRONMENTAL IMPACT REPORT STATE CLEARINGHOUSE NO. 2010021007 ENVIRONMENTAL CASE NO. ENV-2010-0032-EIR Prepared for CITY OF LOS ANGELES Department of City Planning Environmental
More informationFiscal Impact Analysis
May 12, 2017 Fiscal Impact Analysis Westport Cupertino Development Prepared for: KT Urban, LLC Prepared by: Applied Development Economics, Inc. 1756 Lacassie Avenue, #100, Walnut Creek, CA 94596 925.934.8712
More informationMemo. To: Mayor Lee Gray Members of Council City Manager Bill Vance. From: Scott Tourville. Project: 2015 CIP Budget Update CC:
To: Mayor Lee Gray Members of Council City Manager Bill Vance Memo From: Scott Tourville Project: 2015 CIP Budget Update CC: C. Schornack S. Spencer File Date: November 21, 2014 RE: Updated 2015 CIP Plan
More informationCapital Investment Program (CIP) About CIP
Capital Investment Program (CIP) About CIP The Capital Investment Program (CIP) is a multi-year program aimed at upgrading and expanding City facilities, buildings, grounds, streets, parks and roads. The
More informationMaintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION
Maintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION Funding Allocations Routine State $ 166 Million Resurfacing Federal $ 260 Million
More informationCity of New Smyrna Beach Permit Fee Schedule
Fifty percent of the permit fee will be paid in advance for plan review and shall not be eligible for refund. ALL PERMITS ARE CHARGED A STATE OF FLORIDA SURCHARGE OF 2.5% OR $4.00 WHICH EVER IS GREATER.
More informationDEVELOPMENT CHARGES BACKGROUND STUDY
DEVELOPMENT CHARGES BACKGROUND STUDY Revised City of Mississauga C o n s u l t i n g L t d. September 2009 TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 I INTRODUCTION... 10 II METHODOLOGY IS BASED ON A CITY-WIDE
More informationSPECIAL REVENUE FUNDS
SPECIAL REVENUE FUNDS INTEGRITY INNOVATION ACCOUNTABILITY COMMITMENT TO EXCELLENCE TEAMWORK This section provides a detailed spending plan to account for proceeds of specific revenue sources that are legally
More informationDEBT SERVICE FUNDS & DEBT SCHEDULES
DEBT SERVICE FUNDS & DEBT SCHEDULES INTEGRITY INNOVATION ACCOUNTABILITY COMMITMENT TO EXCELLENCE TEAMWORK This section provides a summary of the annual principal and interest payments for all outstanding
More informationRegion 5 Upcoming Projects for Summer/Fall 2018
Region 5 Upcoming Projects for Summer/Fall 2018 The budget amount provided does not reflect the construction costs for projects. The amounts may include ROW, engineering, design, and utility costs. The
More informationDebt Service FunDS & Debt ScheDuleS
Debt Service Funds & Debt Schedules The City issues general obligation bonds, certificates of obligation, combination tax and revenue certificates of obligation and tax notes to provide for the acquisition
More informationEast of Merle Hay Road
East of Merle Hay Road Johnston, Iowa 2017 APWA Spring Conference March 2017 Oldest neighborhood in the City Settled in 1846 Narrow rural corridor with aging or non-existent infrastructure Inadequate
More informationCITY OF COLORADO SPRINGS PLANNING COMMISSION RECORD-OF-DECISION
CITY OF COLORADO SPRINGS PLANNING COMMISSION RECORD-OF-DECISION January 20, 2011 Page 16 NEW BUSINESS CALENDAR MEETING: JANUARY 20, 2011 ITEM: 5 STAFF: FILE NO: PROJECT : BRETT VELTMAN CPC NV 10-00098(RF)
More informationCommitted to Service
Committed to Service Paul Woods, President Rebecca W. Arnold, Vice President Sara M. Baker, Commissioner Jim D. Hansen, Commissioner Kent Goldthorpe, Commissioner September 5, 2017 Development Services
More information2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.
ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense
More informationInfrastructure Financing Programs. January 2016
Infrastructure Financing Programs January 2016 MassDevelopment Works with businesses, nonprofits, financial institutions, and communities to stimulate economic growth throughout Massachusetts. Promotes
More informationSchlager, Simon, Lesser, Bohner, Chairperson Savikas
0 CITY OF MANHATTAN BEACH MINUTES OF THE REGULAR MEETING OF THE PLANNING COMMISSION JUNE, 00 A regular meeting of the Planning Commission of the City of Manhattan Beach was held on Wednesday, June, 00,
More informationARTICLE 12 TRAFFIC PERFORMANCE STANDARDS
ARTICLE 12 TRAFFIC PERFORMANCE STANDARDS CHAPTER A GENERAL... 9 Section 1 Intent and Authority... 9 A. Intent... 9 B. Authority... 9 Section 2 Definitions... 9 A. Other Definitions... 9 Section 3 Applicability...
More informationSTORMWATER MANAGEMENT FUND Department of Environmental Services
Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,
More informationLetter of Transmittal
Letter of Transmittal November 15, 2017 To: New Hanover Township Board of Supervisors Introduction I am pleased to submit the proposed 2018 Budget for your consideration. The budget document consists of
More informationFY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary
FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary The adopted FY 2016 FY 2020 CIP is $205.3 million (including prior year expenditures) and is $2.9 million lower than the previous CIP
More informationRECEIVE A REPORT AND APPROVE PROPOSED PUBLIC ENGAGEMENT POLICIES AND PRACTICES FOR THE PUBLIC
J-17 STAFF REPORT MEETING DATE: October 24, 2017 TO: City Council FROM: Russ Thompson, Public Works Director PRESENTER: Russ Thompson, Public Works Director SUBJECT: RECEIVE A REPORT AND APPROVE PROPOSED
More informationReport and Recommendations Reviewed and Approved. City Manager. AGENDA ITEM December 15, 2015, Meeting
Report and Recommendations Reviewed and Approved 5.1 City Manager AGENDA ITEM December 15, 2015, Meeting TO: FROM: John N. Duckett, Jr., City Manager Carla L. Thompson, AICP, Development Services Director
More information