1 Santa Ynez River Water Conservation District, ID No. 1 Water Rates & Finances December 13, 2016

2 Presentation Overview Objectives & Process District Finances Current & Projected Rates 2

3 Rate Study Objectives Independent review of District finances and rates Developed long-term financial projections to: Determine annual revenue requirements Evaluate financial scenarios & rate increase alternatives Proposed water rates designed to: Restore and maintain financial health Provide adequate funding for operating and capital needs Be fair and equitable to all customer classes Comply with the legal requirements of Proposition 218 3

4 Rate Study Process 2015 Initiate Rate Study Sept 15 Board Meeting, preliminary findings & intro to rate study 2016 Develop Rate Recommendations Jan 6 Oct 17 Oct 18 Oct 25 Oct 27 Dec 13 Board/Public Workshop, discuss findings & obtain input Public Workshop, present recommendations & obtain input Board Meeting, receive direction to move forward Board Meeting accepting and approving the Water Rate Study Mailed Prop 218 Notices (min. 45 days prior to hearing) Public Rate Hearing, consider rate increases 2017 Rates Become Effective 4 Feb 1 New rates become effective

5 5 DISTRICT FINANCES

6 Background District historically maintained good financial health with steady gradual rate increases each year Financial health has deteriorated Tax assessments suspended after 2010/11 for 5 years (rev loss = $3.75M) California hit with severe drought Cutback in water sales resulted in substantial revenue loss District operating in deficit mode for third year in a row, even with cutbacks in operations and deferred maintenance Stringent new Chromium 6 drinking water regulations took effect July 2014 District facing financial challenges that will require rate increases 6

7 7

8 Financial Challenges Eliminate budget deficits & restore financial stability Almost $1M deficit projected in current fiscal year (without rate increases) Chromium 6 project to address new regulations Capital costs: $8.5M to $12.7M (requires debt financing) Future O&M costs: $500,000 per year Maintenance & rehab/replacement of aging infrastructure Future capital investment projected at $500,000 per year Reduced water consumption = reduced revenues Water usage down almost 33% from 2013 benchmark year to 2015/16 Customer who are conserving have reduced their water bills Wholesale water supply costs increasing Need to comply with bond covenants (legal obligation) Ongoing operating cost inflation 8

9 Projected Rate Revenue Increases Projected overall level of rate increases Target level of rate increases excluding impact of changes in water sales Feb-1 Jan-1 Jan-1 Jan-1 Jan Overall Rate Increases 15% 15% 5% 5% 5% Rate increases phased in as gradually as possible District can re-evaluate need for rate increases each year Rate impacts will vary by customer class due to rate structure modifications 9

10 10 CURRENT WATER RATES

11 CURRENT WATER RATES MONTHLY METER CHARGES Meter Size Domestic, RR/Ltd Ag Agricultural 5/8" $ /4" " /2" " " " " 1, " 2, CONSUMPTION CHARGES ($/hcf) Domestic $3.81 Rural Residential/Limited Agriculture First 125 units 3.81 Over 125 units 1.31 Agriculture (No Domestic Use) 0.50 On-Demand 6.08 Temporary 6.25 Cachuma Park 1.38 Domestic rates in middle range of regional agencies Agricultural rates are lowest in region Fixed meter charges generate about 45% of total rate revenues Rate increases in recent years were largely offset by decline in water sales $0.51 per 100 gallons $0.18 per 100 gallons $0.07 per 100 gallons 11

12 12

13 13

14 14

15 Agricultural Rate Survey 15 Agency Ag Fixed Meter Charges Consumption Charges ($/hcf) SYRWCD ID#1 2" $ Ag $0.50 (Ag Rates) 4" Limited Ag " Carpenteria VWD 2" Irrigation 4" Tier 1 (standard demand) " 1, Tier Surcharge ( to 0.44 in pressure zones) Montecito WD 2" Ag <870 hcf/acre/year " Ag >870 hcf/acre/year " 1, Santa Barbara 2" Ag " Over Budget " Nipomo CSD 2" Ag " Supplemental Chg " Total 4.41 Goleta WD 2" Ag " Drought Surcharge " 1, Total 4.54

16 16 PROPOSED RATES

17 Fixed Meter Charge Modifications Small inflationary increases to fixed meter charges No change to fixed meter charges in first year Meter charges re-aligned with meter capacity Domestic meter charges Base 5/8-inch meter charge increases roughly 14% over 5 years Impacts on most other meter sizes vary from 14% to 16% over next 5 years Ag meter charges Remain substantially lower than domestic meter charges Lower cost water supply (no Dept of Water Resources supply) Fewer accounts, less admin cost per account Interruptible supply Assumes ag customers pay 50% of standard rate during periods offline Private fire service charges set at 10% of domestic meter charges 17

18 Monthly Meter Charges Proposed Water Rates Meter Current Proposed Rates Effective on or After Number of Meter Capacity Water Feb-1 Jan-1 Jan-1 Jan-1 Jan-1 Accounts Capacity Ratio Rates MONTHLY METER CHARGES Domestic, Commercial & Rural Res/Ltd Agriculture Meter Size 5/8" $38.78 $38.78 $39.86 $41.40 $42.98 $ /4" " /2" " " " " 0 1, , , , , , , " 0 1, , , , , , , Agricultural Meter Size 1-1/2" $62.40 $62.40 $66.16 $68.72 $71.34 $ " " " " 27 1,

19 Consumption Charge Modifications Domestic Water Rate Increases from $3.81 to $5.15 per hcf over next 5 years (approx. 35% increase) Larger increases in first 2 years to help eliminate budget deficit & restore stability Ag Water Rate Increase from $0.50 (below cost of water supply) to $1.87 per hcf over next 5 years Lower cost water supply (e.g. no Dept of Water Resources supply), however cost of USBR ag water supply is increasing Interruptible supply Ag rate to remain lowest compared to other regional agencies Limited Ag Water Rate Set at 25% Domestic rate and 75% Ag rate Supposed to be for commercial agriculture Some large lot properties benefitting by getting lower Limited Ag Rate for non-ag uses 19

20 Consumption Charge Modifications 20 On-Demand Water Rate 2x standard Domestic Rate includes partial cost recovery for system capacity Have own local service areas and require access to District water on demand to supplement local supplies (typically during periods of peak demand) District incurs substantial costs maintaining the operational and water supply capacity to serve these accounts, yet only minimal cost recovery due to low water sales Pay a fixed meter charge based on master meter connection, which does not fully reflect underlying demand Never paid an equitable capacity charge to buy in to District facilities like other customers Alternative: levy a reduced fixed monthly service charge on each parcel Temporary Water Rate 3x standard Domestic Rate Includes cost recovery for District infrastructure and water supply Cachuma Park Receives untreated water directly from Lake Cachuma

21 Water Consumption Charges CONSUMPTION CHARGES Charge per hundred cubic feet (hcf) of metered water consumption. Current Proposed Rates Effective on or After Water Feb-1 Jan-1 Jan-1 Jan-1 Jan-1 Rates Domestic (Residential & Commercial) $3.81 $4.30 $4.80 $4.95 $5.05 $5.15 Rural Residential/Limited Agriculture First 125 units Over 125 units Agriculture (No Domestic Use) On-Demand (2x Domestic Rate) Temporary (3x Domestic Rate) Cachuma Park Note: One hundred cubic feet (hcf) = 748 gallons Proposed Water Rates 21

22 22

23 23 Average Annual Increase Since 2010 Ranges from 2.4% to 3.4%

24 Conclusion 24 District facing a number of financial challenges Revenue shortfalls for three consecutive years Declining reserve funds for five years State of California Mandates Chromium 6 Increased Costs of Providing Service Near and long-term costs of water purchases Deferring Maintenance and Improvement Projects Rate increases needed Eliminate Budget deficit Restore Financial Stability Maintain Credit Rating Meet Debt Obligations Continue Operations Purchases and Production of Water supplies Fund Maintenance and Capital Projects

25 25

Water Rate Study FINAL January 31, 2018

Water Rate Study FINAL January 31, 2018 Water Rate Study FINAL January 31, 2018 1889 Alcatraz Avenue Berkeley, CA 94703 Tel: 510 653 3399 www.bartlewells.com January 31, 2018 Joshua Basin Water District P.O. Box 675 / 61750 Chollita Road Joshua

More information

July 1, Tier Percent of Allocation Cost per ccf $0.91 $1.27 $2.86 $4.80 $ % % % % 201+%

July 1, Tier Percent of Allocation Cost per ccf $0.91 $1.27 $2.86 $4.80 $ % % % % 201+% 1 CHART EXAMPLES OF WATER RATES AND CHARGES OF MWD MEMBER AGENCIES AND THEIR SUBAGENCIES MWD Member Agencies shown: MWDOC, SDCWA, Calleguas, Las Virgenes, West Basin, LADWP, Eastern and Foothill Member

More information

Santa Clarita Water Division

Santa Clarita Water Division Santa Clarita Water Division Retail Water Rate Cost of Service Study Report September 2017 445 S Figueroa St Suite 2270 Los Angeles, CA 90039 Phone 213.262.9300 www.raftelis.com September 11, 2017 Mr.

More information

Water Rates Adjustments Phase 2

Water Rates Adjustments Phase 2 Water Rates Adjustments Phase 2 Presented by Shana E. Epstein Director of Public Works, City of Beverly Hills Background Phase 1-Effective January 18, 2018 5-year revenue requirement 3% annual increase

More information

La Cañada Irrigation District

La Cañada Irrigation District La Cañada Irrigation District Water Rate Study Report - 2009 March, 2009 201 S. Lake Blvd, Suite 803 Pasadena CA 91101 Phone Fax 626 583 1894 626 583 1411 www.raftelis.com March 30, 2009 Mr. Douglas M.

More information

3.1. Construction Meter Additional Charges for Temporary Meters OTHER FEES, CHARGES, AND DEPOSITS CAPACITY FEES...

3.1. Construction Meter Additional Charges for Temporary Meters OTHER FEES, CHARGES, AND DEPOSITS CAPACITY FEES... Table of Contents 1. CHARGES FOR WATER SERVICE... 3 1.1. Metered Service:... 3 1.2. Water Commodity Charge:... 3 1.3. SDCWA and Metropolitan Water District (MWD) Charges:... 4 1.4. Separate Private Fire

More information

Town of Hillsborough. City Council Public Hearing. Water Rate Cost-of-Service Study. February 13, 2017

Town of Hillsborough. City Council Public Hearing. Water Rate Cost-of-Service Study. February 13, 2017 City Council Public Hearing February 13, 2017 Public Hearing on Proposed Water Rates PRESENTED BY Kelly J. Salt Partner 2016 Best Best & Krieger LLP Article X, section 2 (1928) The general welfare requires

More information

Notice of a public hearing

Notice of a public hearing Notice of a public hearing Dear Benicia Resident and/or Business Owner, You are receiving a revised Notice of a Public Hearing to increase the water and sewer rates and add water meter replacement fees.

More information

Goleta Water District

Goleta Water District 201 S Lake Ave. Suite 301 Pasadena CA 91101 Phone 626 583 1894 www.raftelis.com Water Rates and Cost of Service Study Final Report / June 11, 2015 Water Cost of Service & Rate Study Report 2015 201 S Lake

More information

BODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study

BODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study BODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study FINAL REPORT March 22, 2018 BARTLE WELLS ASSOCIATES Independent Public Finance Advisors 1889 Alcatraz Avenue Berkeley, CA 94703-2714 Tel.

More information

Water Consultancy. Montecito Sanitary District Wastewater Rate Study Report. Montecito Sanitary District

Water Consultancy. Montecito Sanitary District Wastewater Rate Study Report. Montecito Sanitary District 3585 Maple Street, Suite 250 Ventura, CA 93003 805-404-1467 Montecito Sanitary District Wastewater Rate Study Report March 2016 Montecito Sanitary District 1042 Monte Cristo Lane Santa Barbara CA 93108

More information

Study Workshops are designed to be both educational and to seek broad direction from the Board

Study Workshops are designed to be both educational and to seek broad direction from the Board Study Workshops are designed to be both educational and to seek broad direction from the Board Workshop #1 Financial Forecast & Cost of Service Water, recycled water, & sewer services Revenue requirement

More information

Final COST OF SERVICE STUDY SEPTEMBER City of San Clemente

Final COST OF SERVICE STUDY SEPTEMBER City of San Clemente Final COST OF SERVICE STUDY SEPTEMBER 2017 City of San Clemente Contents CONTENTS Executive Summary... 1 Study Goals and Drivers... 1 Water Rate Analysis & Adoption... 2 Recycled Water Rate Analysis &

More information

WATER USER RATES & FEE STUDY

WATER USER RATES & FEE STUDY WATER USER RATES & FEE STUDY FINAL REPORT February 2016 BARTLE WELLS ASSOCIATES Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com Tel: 510/653-3399

More information

STAFF REPORT. ITEM NO. 4 MEETING DATE: March 7, 2017 MEETING: Board of Directors SUBJECT:

STAFF REPORT. ITEM NO. 4 MEETING DATE: March 7, 2017 MEETING: Board of Directors SUBJECT: ITEM NO. 4 MEETING DATE: MEETING: Board of Directors STAFF REPORT SUBJECT: SUBMITTED BY: RECOMMENDED ACTION: Proposition 218 Customer Notification of Proposed Rate Increases Krishna Kumar, General Manager

More information

WATER AND SEWER RATE STUDY

WATER AND SEWER RATE STUDY FINAL WATER AND SEWER RATE STUDY B&V PROJECT NO. 179322.0100 PREPARED FOR City of Lynwood, CA JANUARY 11, 2017 Black & Veatch Holding Company 2011. All rights reserved. City of Lynwood, CA WATER AND SEWER

More information

Council Bill No WATER RATES General Ordinance 6318 Sheet No. 3 (Page 1 of 6)

Council Bill No WATER RATES General Ordinance 6318 Sheet No. 3 (Page 1 of 6) (Page 1 of 6) This rate is applicable during Stage One Water Shortage, Stage Two Water Emergency, and Stage Three Water Crisis of the Emergency Water Conservation Plan. Section A. Availability Available

More information

Rainbow Municipal Water District

Rainbow Municipal Water District Rainbow Municipal Water District Potable Water Cost of Service Study November 10, 2015 201 S Lake Ave. Suite 301 Pasadena CA 91101 Phone 626.583.1894 Fax 626.583.1411 www.raftelis.com November 10, 2015

More information

Meeting & Outreach efforts

Meeting & Outreach efforts May 30, 2014 Meeting & Outreach efforts February 27th Proposed Compensation Plan Distributed to Joint Admin/WWOC March 5th Joint Admin/WWOC Meeting First discussion on proposed Compensation Plan April

More information

Water Rates Rate Restructure and Rate Adjustments

Water Rates Rate Restructure and Rate Adjustments Water Rates Rate Restructure and Rate Adjustments Community Outreach Meeting Questions We Will Address Why are water rates changing? Where does the water come from? Did the rain from last winter help?

More information

MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT. September 2013

MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT. September 2013 MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT September 2013 10540 TALBERT AVENUE, SUITE 200 EAST FOUNTAIN VALLEY, CALIFORNIA 92708 P. 714.593.5100 F. 714.593.5101 MARINA

More information

The City of Sierra Madre

The City of Sierra Madre The City of Sierra Madre Comprehensive Water and Wastewater Cost of Service Study Report / December 24, 2018 24640 Jefferson Avenue Suite 207 Murrieta, CA 92562 Phone 951.698.0145 www.raftelis.com December

More information

Water Rate Study for City of Lemoore

Water Rate Study for City of Lemoore Water Rate Study for City of Lemoore June 17, 2016 Prepared by: Dan Bergmann, Principal 15 Shasta Lane, Walnut Creek, CA 94597 Email: dan@igservice.com Office: 925-946-9090 Water Rate Study for City of

More information

WATER AND SEWER UTILITIES RATE STUDY

WATER AND SEWER UTILITIES RATE STUDY WATER AND SEWER UTILITIES RATE STUDY RATE DESIGN WORKSHOP WITHCITYCOUNCIL / UTILITIES COMMISSION March 6, 2014 Agenda Overview of Rate Study Process Water / Sewer Developer Impact Fees Sewer Rates Water

More information

SAN ANTONIO WATER SYSTEM (SAWS) RATE ADVISORY COMMITTEE: MEETING 3

SAN ANTONIO WATER SYSTEM (SAWS) RATE ADVISORY COMMITTEE: MEETING 3 01 April, 2014 SAN ANTONIO WATER SYSTEM (SAWS) RATE ADVISORY COMMITTEE: MEETING 3 Bill Zieburtz Richard Campbell Robert Chambers RATE SETTING PROCESS STUDY APPROACH RATE SETTING OBJECTIVES FINANCIAL PLAN

More information

Richard Pearson, Community Development Director Tim Tucker, City Engineer

Richard Pearson, Community Development Director Tim Tucker, City Engineer CITY OF MARTINEZ CITY COUNCIL AGENDA February 21, 2007 TO: FROM: PREPARED BY: SUBJECT: Mayor and City Council Don Blubaugh, City Manager Richard Pearson, Community Development Director Tim Tucker, City

More information

City of San Carlos Sewer Financial Plan & Rate Update

City of San Carlos Sewer Financial Plan & Rate Update City of San Carlos Sewer Financial Plan & Rate Update Revised 06/13/16 1889 Alcatraz Avenue Berkeley, CA 94703 Tel: 510 653 3399 www.bartlewells.com June 13, 2016 City of San Carlos Department of Public

More information

SANTA FE IRRIGATION DISTRICT

SANTA FE IRRIGATION DISTRICT SANTA FE IRRIGATION DISTRICT Water Rate Study FINAL Report/March 2016 445 S Figueroa Street Suite 2270 Los Angeles, CA 90071 Phone 213 262 9300 Fax 213 262 9303 www.raftelis.com March 21, 2016 Ms. Jeanne

More information

CITY OF CALISTOGA WATER RATE STUDY FINAL REPORT

CITY OF CALISTOGA WATER RATE STUDY FINAL REPORT CITY OF CALISTOGA WATER RATE STUDY FINAL REPORT February 2, 218 This page was intentionally left blank. City of Calistoga Water Rate Study Report Page 2 February 2, 218 Dylan Feik City Manager City of

More information

Sonoma County Service Area #41(CSA #41) Water Rate Study

Sonoma County Service Area #41(CSA #41) Water Rate Study Sonoma County Service Area #41(CSA #41) Water Rate Study September 13, 2016 Prepared by Greg Clumpner, Director, NBS Carmen Narayanan, Consultant, NBS 1 CSA #41 Zones of Benefit 2 Overview of Presentation

More information

Water Connections Guidelines & Application October 2017

Water Connections Guidelines & Application October 2017 Public Works Menlo Park Municipal Water Water Connections Guidelines & Application October 2017 There will be additional fees to install a new water meter or to upsize an existing water meter. Submit your

More information

City of Benicia. Rate Study Update: Water & Wastewater Rates

City of Benicia. Rate Study Update: Water & Wastewater Rates City of Benicia Rate Study Update: Water & Wastewater Rates March 1, 2016 Prepared by: Karin Schnaider, Finance Director, City of Benicia Greg Clumpner, Director, NBS Carmen Narayanan, Consultant, NBS

More information

City of Riverbank. Water Rate Study FINAL 6/18/2015

City of Riverbank. Water Rate Study FINAL 6/18/2015 Water Rate Study FINAL 6/18/2015 Bartle Wells Associates Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com Tel: 510-653-3399 June 18, 2015 6707

More information

Valencia Water Company. Cost of Service Study

Valencia Water Company. Cost of Service Study Valencia Water Company Cost of Service Study 2018 2020 Prepared By: Kenneth J. Petersen, P.E. Beverly Johnson, CPA John Garon, Consultant September 2017 1 P age Contents EXECUTIVE SUMMARY... 1 INTRODUCTION...

More information

WATER AND WASTEWATER RATE STUDY

WATER AND WASTEWATER RATE STUDY WATER AND WASTEWATER RATE STUDY Draft July 3, 2013 Prepared by: Page 1 Page 2 201 S. Lake Avenue Suite 301 Pasadena, CA 91101 Phone 626. 583. 1894 Fax 626. 583. 1411 www.raftelis.com July 1, 2013 Mr. Don

More information

Agenda Rio Linda / Elverta Community Water District Planning Committee

Agenda Rio Linda / Elverta Community Water District Planning Committee Agenda Rio Linda / Elverta Community Water District Planning Committee Sacramento Metro Fire Dept. Friday, February 5, 2015 6609 Rio Linda Blvd. 2:00 pm Rio Linda, CA 95673 Public documents relating to

More information

WATER RATE AND FINANCIAL POLICY TACOMA PUBLIC UTILITIES WATER DIVISION

WATER RATE AND FINANCIAL POLICY TACOMA PUBLIC UTILITIES WATER DIVISION WATER RATE AND FINANCIAL POLICY TACOMA PUBLIC UTILITIES WATER DIVISION March 2017 Adopted by Public Utility Board Resolution U-10910 on February 22, 2017 Adopted by City Council Ordinance No. 28413 on

More information

April 6, Katherine Godbey Director of Finance, Coachella Valley Water District Hovley Lane East Palm Desert, CA 92260

April 6, Katherine Godbey Director of Finance, Coachella Valley Water District Hovley Lane East Palm Desert, CA 92260 April 6, 2016 Katherine Godbey Director of Finance, Coachella Valley Water District 75515 Hovley Lane East Palm Desert, CA 92260 Dear Ms. Godbey: Hawksley Consulting (a subsidiary of MWH Global) is pleased

More information

Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 MEMORANDUM

Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 MEMORANDUM TO: FROM: Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 SUBJECT: - MEMORANDUM Introduction The (City) provides sewer sanitary collection services

More information

Water & Sewer Rate Study. Water & Sewer Cost of Service Rate Study. City of Norco, CA. Draft Report for

Water & Sewer Rate Study. Water & Sewer Cost of Service Rate Study. City of Norco, CA. Draft Report for Water & Sewer Cost of Service Rate Study for City of Norco, CA October 11, 2016 Table of Contents October 11, 2016 Chad Blais Director of Public Works City of Norco 2870 Clark Avenue Norco, CA 92860 Re:

More information

Water and Sewer Utility Rate Studies

Water and Sewer Utility Rate Studies Final Report Water and Sewer Utility Rate Studies July 2012 Prepared by: HDR Engineering, Inc. July 27, 2012 Mr. Mark Brannigan Director of Utilities 591 Martin Street Lakeport, CA 95453 Subject: Comprehensive

More information

Water Rate Study Final Report

Water Rate Study Final Report Phelan Pinon Hills Community Services District March 6, 2013 Water Rate Study Final Report Corporate Office: Anaheim, California Temecula Office: 27368 Via Industria, Suite 110 Temecula, California 92590

More information

THIS ANNUAL REPORT IS INTENDED TO COMPLY WITH THE AUTHORITY S LIMITED OBLIGATIONS UNDER RULE 15C1-12. THIS ANNUAL REPORT SPEAKS ONLY AS OF

THIS ANNUAL REPORT IS INTENDED TO COMPLY WITH THE AUTHORITY S LIMITED OBLIGATIONS UNDER RULE 15C1-12. THIS ANNUAL REPORT SPEAKS ONLY AS OF THIS ANNUAL REPORT IS INTENDED TO COMPLY WITH THE AUTHORITY S LIMITED OBLIGATIONS UNDER RULE 15C1-12. THIS ANNUAL REPORT SPEAKS ONLY AS OF ITS DATE AND WILL NOT BE UPDATED FROM TIME-TO- TIME. THE INFORMATION

More information

FY 2016/17 CONTINUING DISCLOSURE ANNUAL REPORT

FY 2016/17 CONTINUING DISCLOSURE ANNUAL REPORT CENTRAL COAST WATER AUTHORITY FY 2016/17 CONTINUING DISCLOSURE ANNUAL REPORT $45,470,000 REFUNDING REVENUE BONDS (STATE WATER PROJECT REGIONAL FACILITIES) SERIES 2016A DISCLOSURE ANNUAL REPORT Transmittal

More information

Utility Rates. October 13, 2015

Utility Rates. October 13, 2015 Utility Rates October 13, 2015 Agenda Summary Process Background Policy Rates Next Steps 2 Financial Needs Driving Rates 1. Bond coverage 2. Reserves Policy 3. Infrastructure - Asset management 3 Rate

More information

SANTA MONICA RENT CONTROL BOARD ADMINISTRATION MEMORANDUM

SANTA MONICA RENT CONTROL BOARD ADMINISTRATION MEMORANDUM SANTA MONICA RENT CONTROL BOARD ADMINISTRATION MEMORANDUM DATE: May 10, 2005 TO: FROM: Santa Monica Rent Control Board Mary Ann Yurkonis, Administrator FOR MEETING OF: May 12, 2005 RE: Annual General Adjustment

More information

VENTURA COUNTY WATERWORKS DISTRICTS Representing: Ventura County Waterworks Districts No. 1, 16, 17 & 19

VENTURA COUNTY WATERWORKS DISTRICTS Representing: Ventura County Waterworks Districts No. 1, 16, 17 & 19 VENTURA COUNTY WATERWORKS DISTRICTS Representing: Ventura County Waterworks Districts No. 1, 16, 17 & 19 Board of Ventura County Waterworks District No. 1 800 S. Victoria Avenue Ventura, CA 93009 Subject:

More information

Table 2-2 Projected Water Production and Costs

Table 2-2 Projected Water Production and Costs Table 2-2 Projected Water Production and Costs Recorded Estimated Budget Forecast Description FY 2007-08 FY 2008-09 FY 2009-10 FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 Well Production (OCWD, A-F, a)

More information

YORBA LINDA WATER DISTRICT

YORBA LINDA WATER DISTRICT YORBA LINDA WATER DISTRICT 2015 Water and Sewer Rate Study Report FINAL August 25, 2015 City of Thousand Oaks Water and Wastewater Financial Plan Study Report 445 S. Figueroa Street Suite #227 Los Angeles,

More information

Comprehensive Rate Study & Cost Allocation Analysis. Public Workshop December 4, 2017

Comprehensive Rate Study & Cost Allocation Analysis. Public Workshop December 4, 2017 Comprehensive Rate Study & Cost Allocation Analysis Public Workshop December 4, 2017 Today s Workshop: Present findings and solicit Board input on rate design and fiscal policy considerations Financial

More information

CITY OF ANN ARBOR WATER & SEWER COST OF SERVICE STUDY

CITY OF ANN ARBOR WATER & SEWER COST OF SERVICE STUDY 1 CITY OF ANN ARBOR WATER & SEWER COST OF SERVICE STUDY 12.20.2017 Overview 1. Sufficiency 2. Rate Classification 3. to Serve 4. Rate Structures 5. Customer Impacts 6. Affordability Program Foundation

More information

City of Napa Modification of Water Rates. September, City of Napa Water Rates. Service Area. >75,000 customers. 25,000 connections

City of Napa Modification of Water Rates. September, City of Napa Water Rates. Service Area. >75,000 customers. 25,000 connections City of Napa 2011 Modification of Water Rates Service Area >75,000 customers 25,000 connections 2 1 Approach for Cost Of Service Analysis What Who How Why Revenue Requirements Operating Costs Capital Investments

More information

Public Hearing on Water and Sewer Rates. September 20, 2017

Public Hearing on Water and Sewer Rates. September 20, 2017 Public Hearing on Water and Sewer Rates September 20, 2017 Agenda Discuss Proposed Rates Impacts to Reserves and Financial Performance Rate Protest Comments Cost of Service and Rate Structure Study Recommendation

More information

City of Fridley Water and Sewer Rate Study. Jessica Cook 9/25/17

City of Fridley Water and Sewer Rate Study. Jessica Cook 9/25/17 City of Fridley Water and Sewer Rate Study Jessica Cook 9/25/17 1 Utility Funds They are Enterprise Funds 1. Should pay for Capital Outlays Operations Replacement Reserves Debt 2. Should be flush with

More information

Temescal Valley Water District

Temescal Valley Water District Temescal Valley Water District Comprehensive Water, Recycled Water, and Wastewater Cost of Service Study Draft Report / December 7, 2016 24640 Jefferson Avenue Suite 207 Murrieta, CA 92562 Phone 951.698.0145

More information

RATE INFORMATION. A. The rates adopted by the Authority will be in accordance with of the Code of Virginia, as amended.

RATE INFORMATION. A. The rates adopted by the Authority will be in accordance with of the Code of Virginia, as amended. Page 1 of 8 Section 1. PURPOSE The purpose of this policy to explain how the Bedford Regional Water Authority ( Authority ) implements the adopted Rates policy and to provide explanation for each of the

More information

Administrative and Finance Committee June 23, 2011

Administrative and Finance Committee June 23, 2011 Administrative and Finance Committee June 23, 2011 Timeline Rate and Charge Drivers Recommendation Financial Performance Metrics Estimated Impacts 2 Board adopts the Deferral of 14 CIP Projects High/Low

More information

WHEREAS, the rates of the Proposed Ordinance take into account the cost of service study recently completed by LADWP; and

WHEREAS, the rates of the Proposed Ordinance take into account the cost of service study recently completed by LADWP; and RESOLUTION NO. WHEREAS, the City of Los Angeles (City) is at a crossroads with regard to its water future in light of what may be the new normal of prolonged drought and due to its rapidly aging water

More information

Comprehensive Water Rate Study

Comprehensive Water Rate Study Final Report Dublin San Ramon Services District Comprehensive Water Rate Study January 213 Prepared by: HDR Engineering, Inc. January 1, 213 Ms. Lori Rose Financial Services Manager Dublin San Ramon Services

More information

2016 Water and Recycled Water Rate Study PUBLIC HEARING DECEMBER 12, 2016

2016 Water and Recycled Water Rate Study PUBLIC HEARING DECEMBER 12, 2016 2016 Water and Recycled Water Rate Study PUBLIC HEARING DECEMBER 12, 2016 Agenda Rate Study Overview Financial Plan Water Rate Design Recycled Water Rate Design Drought Rates Capacity Fees 12/12/2016 Public

More information

2019 CITRUS HEIGHTS WATER DISTRICT BUDGET, CAPITAL IMPROVEMENT PROGRAM (CIP) AND RATE PRESENTATION

2019 CITRUS HEIGHTS WATER DISTRICT BUDGET, CAPITAL IMPROVEMENT PROGRAM (CIP) AND RATE PRESENTATION 2019 CITRUS HEIGHTS WATER DISTRICT BUDGET, CAPITAL IMPROVEMENT PROGRAM (CIP) AND RATE PRESENTATION 1 Mission Statement It is the mission of the Citrus Heights Water District to furnish a dependable supply

More information

Metropolitan Water District s 2010/11 Proposed Rates and Charges. Imported Water Committee January 28, 2010

Metropolitan Water District s 2010/11 Proposed Rates and Charges. Imported Water Committee January 28, 2010 Metropolitan Water District s 2010/11 Proposed Rates and Charges Imported Water Committee January 28, 2010 MWD 2010/11 Budget o o o MWD sales and exchanges 2010: 1.9 maf, includes 150 taf SDCWA exchanged

More information

CITY OF SANTA CRUZ WATER DEPARTMENT LONG RANGE FINANCIAL PLAN

CITY OF SANTA CRUZ WATER DEPARTMENT LONG RANGE FINANCIAL PLAN CITY OF SANTA CRUZ WATER DEPARTMENT LONG RANGE FINANCIAL PLAN JUNE 2016 1 LONG RANGE FINANCIAL PLAN TABLE OF CONTENTS Table of Contents... 2 Executive Summary... 4 1. Introduction... 6 2. Background...

More information

Water and Wastewater Utility Rates

Water and Wastewater Utility Rates Water and Wastewater Utility Rates March 1, 2016 Presented By: Diana Langley Public Works Director 1 OVERVIEW 2 Uses of Funds Capital Investment Debt Service Operating Cost = Revenue Requirement 3 Source

More information

NOTICE OF PUBLIC HEARING ON PROPOSED NEW/INCREASED WATER RATES

NOTICE OF PUBLIC HEARING ON PROPOSED NEW/INCREASED WATER RATES NOTICE OF PUBLIC HEARING ON PROPOSED NEW/INCREASED WATER RATES WHERE: WHEN: PURPOSE: Rohnert Park City Hall Council Chamber 130 Avram Avenue Rohnert Park, California Tuesday, April 14, 2015 not before

More information

Alameda County Water District. Financial Workshop Proposed Rates & Charges

Alameda County Water District. Financial Workshop Proposed Rates & Charges Alameda County Water District Financial Workshop Proposed Rates & Charges Month, October Day, Year 25, 2018 Presentation Overview Review Financial Workshops Timeline Proposed Development Charges Financial

More information

Title 6 WATER AND SEWER FEES AND CHARGES

Title 6 WATER AND SEWER FEES AND CHARGES Title 6 WATER AND SEWER FEES AND CHARGES Chapter 6.04 - GENERAL PROVISIONS Chapter 6.08 - WATER SERVICE CHARGES Chapter 6.12 - SEWER SERVICE CHARGES Chapter 6.16 - OTHER FEES AND CHARGES Chapter 6.04 GENERAL

More information

LONG BEACH WATER DEPARTMENT COST OF SERVICE AND RATE STUDY

LONG BEACH WATER DEPARTMENT COST OF SERVICE AND RATE STUDY LONG BEACH WATER DEPARTMENT COST OF SERVICE AND RATE STUDY Final Report / February 1, 2017 445 S. Figueroa Street Suite 2270 Los Angeles, CA 90071 Phone Fax 213. 262. 9300 213. 262. 9303 www.raftelis.com

More information

2017 WATER, RECYCLED WATER, AND WASTEWATER RATE STUDY REPORT

2017 WATER, RECYCLED WATER, AND WASTEWATER RATE STUDY REPORT 2017 WATER, RECYCLED WATER, AND WASTEWATER RATE STUDY REPORT Rancho California Water District [Type here] Table of Contents 1 Introduction... 5 1.1 About Rancho California Water District... 5 1.2 Background

More information

TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009

TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009 TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009 EXECUTIVE SUMMARY The functions and duties of the Oro Valley Water Utility Commission include reviewing and developing

More information

County Of Sonoma Agenda Item Summary Report

County Of Sonoma Agenda Item Summary Report County Of Sonoma Agenda Item Summary Report Department: Sonoma County Water Agency, and County Sanitation Districts Name and Phone Number: Board Date: Candi Bryon - (707) 521-6212 5/22/2012 AGENDA SHORT

More information

TOWN OF HILLSBOROUGH. Water Rate Cost-of-Service Study

TOWN OF HILLSBOROUGH. Water Rate Cost-of-Service Study TOWN OF HILLSBOROUGH December 12, 2016 TOWN OF HILLSBOROUGH 1600 Floribunda Avenue Hillsborough, CA 94010 WATER RATE COST-OF-SERVICE STUDY December 12, 2016 HF&H CONSULTANTS, LLC 201 North Civic Drive,

More information

1. Accept staff report on the updated study of cost of service to provide potable water to San Jose Municipal Water System (SJMWS) customers; and

1. Accept staff report on the updated study of cost of service to provide potable water to San Jose Municipal Water System (SJMWS) customers; and CITY OF Cr SAN IPSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL SUBJECT: MUNICIPAL WATER SYSTEM COST OF SERVICE STUDY COUNCIL AGENDA: 05/09/17 ITEM: 7.2 Memorandum FROM: Kerrie Romanow

More information

General Provisions (CY 12-mo Components)

General Provisions (CY 12-mo Components) WATER RATE HISTORICAL DATA Prop Prop Prop Prop Prop Prop Prop Prop Prop Prop Prop Prop General Provision Tier Classes Description Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Apr-18 May-18

More information

Consideration of Adjustments to the San Dieguito Water District' s Water Rates and Meter

Consideration of Adjustments to the San Dieguito Water District' s Water Rates and Meter A AGENDA REPORT San Dieguito Water District MEETING DATE: May 21, 2014 GENERAL MANAGER: Glenn Pruim PREPARED BY: Jeff Umbrasas, Administrative DISTRICT SECRETARY: Gus Vina Services Manager SUBJECT: Consideration

More information

COST OF SERVICE AND RATE STRUCTURE STUDY

COST OF SERVICE AND RATE STRUCTURE STUDY . COST OF SERVICE AND RATE STRUCTURE STUDY 2017 Draft in Progress Not for Public release TABLE OF CONTENTS Executive Summary and Recommendations 1 Objectives 3 Vallecitos Water District Water Rate Structure

More information

Frequently Asked Questions from Claremont Customers

Frequently Asked Questions from Claremont Customers Frequently Asked Questions from Claremont Customers Why are Golden State s rates higher in Claremont than the neighboring communities of Rancho Cucamonga, Upland or La Verne? Golden State's rates reflect

More information

THIS ANNUAL REPORT IS INTENDED TO COMPLY WITH THE AUTHORITY S LIMITED OBLIGATIONS UNDER RULE 15C1-12. THIS ANNUAL REPORT SPEAKS ONLY AS OF

THIS ANNUAL REPORT IS INTENDED TO COMPLY WITH THE AUTHORITY S LIMITED OBLIGATIONS UNDER RULE 15C1-12. THIS ANNUAL REPORT SPEAKS ONLY AS OF THIS ANNUAL REPORT IS INTENDED TO COMPLY WITH THE AUTHORITY S LIMITED OBLIGATIONS UNDER RULE 15C1-12. THIS ANNUAL REPORT SPEAKS ONLY AS OF ITS DATE AND WILL NOT BE UPDATED FROM TIME-TO- TIME. THE INFORMATION

More information

NALDRAFT SEPTEMBER2015 WASTEWATE

NALDRAFT SEPTEMBER2015 WASTEWATE FI NALDRAFT SEPTEMBER2015 Cos tof S e r v i c e s S T UDY WATE R WASTEWATE R RE CY CL E DWATE R ST ORMWATE R E NVI RONME NT ALRE SOURCE S CITY OF OXNARD PUBLIC WORKS INTEGRATED MASTER PLAN COST OF SERVICE

More information

Sewer Rate Study July 2016

Sewer Rate Study July 2016 July 2016 Prepared By The Finance Division TABLE OF CONTENTS SECTION 1: EXECUTIVE SUMMARY... 1 1.1 Background... 1 1.2 Purpose... 1 1.3 Current Sewer Rates... 1 1.4 Five Year Financial Projection... 1

More information

Long-Term Financial Stability Workshop #4. Capital Investment & Financing. Board of Directors September 23, 2014

Long-Term Financial Stability Workshop #4. Capital Investment & Financing. Board of Directors September 23, 2014 Long-Term Financial Stability Workshop #4 Capital Investment & Financing Board of Directors September 23, 2014 Agenda Introduction Capital Investment & Financing Seismic Surcharge 2 Workshop Topics Workshop

More information

PREFERRED FINANCIAL PLAN SCENARIO & WATER RATE DESIGN ALTERNATIVE

PREFERRED FINANCIAL PLAN SCENARIO & WATER RATE DESIGN ALTERNATIVE Mid Flat Rate Increases Limited CIP through Year 5 Reserves recover by Year 10 Phased In CIP Spending 2. 10 Year Phase In 100% of CIP by Year 10 100% of Reserves by Year 10 3. 5 Year Phase In 100% of CIP

More information

CITY OF CITY OF SONOMA FULLERTON. Pricing Objectives Discussion Water Rate Study 2018 Water Rate Study

CITY OF CITY OF SONOMA FULLERTON. Pricing Objectives Discussion Water Rate Study 2018 Water Rate Study CITY OF CITY OF FULLERTON SONOMA Pricing Objectives Discussion Water Rate Study 2018 Water Rate Study Interview / September 21, 2017 City Council Meeting / January 17, 2018 Agenda 1. Introduction 2. City

More information

RANCHO CALIFORNIA WATER DISTRICT

RANCHO CALIFORNIA WATER DISTRICT RANCHO CALIFORNIA WATER DISTRICT Two-Year Rate Study Final Report / June 4, 2018 June 4, 2018 Mr. Richard Aragon Assistant General Manager CFO/Treasurer Rancho California Water District 42135 Winchester

More information

Stakeholder Advisory Group

Stakeholder Advisory Group Slide 1 Stakeholder Advisory Group Board of Water Supply City & County of Honolulu Tuesday October 17, 2017 Slide 2 Dave Ebersold Facilitator WELCOME Slide 3 WELCOME NEW STAKEHOLDER Brian Uemori Executive

More information

RESOLUTION CONNECTION CHARGES, PLANT INVESTMENT FEES, AND UTILITY RATES FOR WATER AND SEWER SERVICE

RESOLUTION CONNECTION CHARGES, PLANT INVESTMENT FEES, AND UTILITY RATES FOR WATER AND SEWER SERVICE RESOLUTION 30-17 CONNECTION CHARGES, PLANT INVESTMENT FEES, AND UTILITY RATES FOR WATER AND SEWER SERVICE A RESOLUTION establishing and directing the levy, charge and collection of connection charges,

More information

Unfunded Pension Liability Accelerated Funding Options

Unfunded Pension Liability Accelerated Funding Options Unfunded Pension Liability Accelerated Funding Options 131253 May 29, 2018 DISTRICT S CURRENT PENSION FUNDING STATUS $2,000,000 $1,800,000 $1,600,000 $1,400,000 $1,200,000 Annual UAL Payments Status Quo

More information

MONROE CITY COUNCIL. Agenda Bill No

MONROE CITY COUNCIL. Agenda Bill No MONROE CITY COUNCIL Agenda Bill No. 15-145 TITLE: Discussion: Utility Rates (Postponed from August 18, 2015) 1 DATE: DEPT: CONTACT: PRESENTER: ITEM: 08/18/2015 Public Works Brad Feilberg Brad Feilberg

More information

CITY OF REDLANDS WATER AND WASTEWATER RATE STUDY. Prepared by:

CITY OF REDLANDS WATER AND WASTEWATER RATE STUDY. Prepared by: CITY OF REDLANDS WATER AND WASTEWATER RATE STUDY Prepared by: August 30, 2010 201 S. Lake Blvd, Suite 301 Pasadena CA 91101 Phone Fax 626 583 1894 626 583 1411 www.raftelis.com August 30, 2010 Mr. Chris

More information

WATER VALIDATION, COST OF SERVICE & RATE DESIGN ANALYSIS WASTEWATER VALIDATION & RATE ANALYSIS MISCELLANEOUS FEES & OVERHEAD RATE ANALYSIS

WATER VALIDATION, COST OF SERVICE & RATE DESIGN ANALYSIS WASTEWATER VALIDATION & RATE ANALYSIS MISCELLANEOUS FEES & OVERHEAD RATE ANALYSIS WATER VALIDATION, COST OF SERVICE & RATE DESIGN ANALYSIS WASTEWATER VALIDATION & RATE ANALYSIS MISCELLANEOUS FEES & OVERHEAD RATE ANALYSIS B&V PROJECT NO. 179801.0100 PREPARED FOR Vallecitos Water District,

More information

MONTECITO WATER DISTRICT FISCAL YEAR 2017/18 BUDGET

MONTECITO WATER DISTRICT FISCAL YEAR 2017/18 BUDGET MONTECITO WATER DISTRICT FISCAL YEAR 2017/18 BUDGET Adopted: June 28, 2017 CONTENTS MISSION STATEMENT... 2 EXECUTIVE SUMMARY... 3 DISTRICT OVERVIEW... 8 ORGANIZATIONAL CHART - FIGURE 1... 9 MAP OF DISTRICT

More information

West Valley Sanitation District FINANCIAL PLAN & RATE STUDY. January 2018

West Valley Sanitation District FINANCIAL PLAN & RATE STUDY. January 2018 West Valley Sanitation District FINANCIAL PLAN & RATE STUDY January 2018 BARTLE WELLS ASSOCIATES Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com

More information

Defining a Resilient Business Model for Water Utilities

Defining a Resilient Business Model for Water Utilities Defining a Resilient Business Model for Water Utilities Water Research Foundation Project #4366 Shadi Eskaf, Environmental Finance Center at UNC eskaf@sog.unc.edu www.efc.unc.edu National Water & Wastewater

More information

Phase 1: Water Budget Based Rate Structure Feasibility Analysis

Phase 1: Water Budget Based Rate Structure Feasibility Analysis Attachment #1 SCOPE OF WORK NOTE: All references to meeting(s) will mean face-to-face meetings and not conference calls. Phase 1: Water Budget Based Rate Structure Feasibility Analysis Task 1: Kick-off

More information

Note: Letter has been updated to reflect changes to proposed rates as ordered by the Board of Directors.

Note: Letter has been updated to reflect changes to proposed rates as ordered by the Board of Directors. February 21, 2019 Board of Directors County Sanitation District No. 20 of Los Angeles County Note: Letter has been updated to reflect changes to proposed rates as ordered by the Board of Directors. Dear

More information

Surcharges and Surcredits

Surcharges and Surcredits Surcharges and Surcredits Please click on the surcharge or surcredit below for full details including customer bill impact, surcharge/ surcredit description and expiration dates, if applicable. Table of

More information

City of Signal Hill Cherry Avenue Signal Hill, CA RESOLUTION DECLARING INTENTION TO AMEND SIGNAL HILL

City of Signal Hill Cherry Avenue Signal Hill, CA RESOLUTION DECLARING INTENTION TO AMEND SIGNAL HILL City of Signal Hill 2175 Cherry Avenue Signal Hill, CA 90755-3799 AGENDA ITEM TO: FROM: SUBJECT: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL BARBARA MUÑOZ DIRECTOR OF PUBLIC WORKS RESOLUTION DECLARING

More information

Hamilton County, Ohio The Metropolitan Sewer District of Greater Cincinnati Rate Structure and Comparisons. October 21, 2015

Hamilton County, Ohio The Metropolitan Sewer District of Greater Cincinnati Rate Structure and Comparisons. October 21, 2015 Hamilton County, Ohio The Metropolitan Sewer District of Greater Cincinnati Rate Structure and Comparisons October 21, 2015 Table of Contents I. MSD Rate Structure II. Rate Structures I. Akron II. III.

More information

11/16/ November 16, 2015 TO: Honorable Mayor and City Council. THROUGH: Municipal Services Committee (November 10, 2015) FROM:

11/16/ November 16, 2015 TO: Honorable Mayor and City Council. THROUGH: Municipal Services Committee (November 10, 2015) FROM: TO: Honorable Mayor and City Council THROUGH: Municipal Services Committee (November 10, 2015) FROM: SUBJECT: Water and Power Department RECOMMENDATION TO SET THE DATE OF JANUARY 11,2016 TO CONDUCT A PUBLIC

More information

FORT COLLINS- LOVELAND WATER DISTRICT

FORT COLLINS- LOVELAND WATER DISTRICT FORT COLLINS- LOVELAND WATER DISTRICT Water Financial Planning and Rate Study Report March 16, 2018 District of Thousand Oaks Water and Wastewater Financial Plan Study Report March 16, 2018 Board of Directors

More information