1 CITY OF REDLANDS WATER AND WASTEWATER RATE STUDY Prepared by: August 30, 2010

2 201 S. Lake Blvd, Suite 301 Pasadena CA Phone Fax August 30, 2010 Mr. Chris Diggs Assistant Utilities Director City of Redlands 35 Cajon St., Ste 15 A Redlands, CA DRAFT Subject: Water and Wastewater Rate Study Report Dear Mr. Diggs: Raftelis Financial Consultants, Inc. (RFC) is pleased to present this report on the water and wastewater rate study (Study) to the City of Redlands (City). We are confident that the results based on a cost of service analysis and Utility Advisory Committee (UAC) input, when implemented, will result in fair and equitable water and wastewater rates to the City s customers. The Study involved a comprehensive review of the City s financial plan, user classifications and rate structures. An important feature of this Study was the participation of the UAC representing various business and residential interests. The resulting rate adjustments in this Study reflect the UAC s input. The assumptions and the resulting recommended rates are presented in Section 1 of the report. The various tables describing the calculation of the rates are presented in Sections 2 4. It was a pleasure working with you and we wish to express our thanks to Ms. Patty Baker, Ms. Cindy Tryon, Ms. Rosemary Hoerning, and other staff members of the City for the support and cooperation extended throughout the Study. We would also like to acknowledge the participation of and input provided by the City s UAC. If you have any questions, please call me at (626) Sincerely, Sudhir Pardiwala Project Manager Hannah Phan Senior Consultant

3 TABLE OF CONTENTS SECTION SUMMARY AND OVERVIEW... 2 PROCESS... 2 RESULTS... 2 Water... 3 Water Rate Structure... 7 Wastewater... 9 Wastewater Rate Structure SECTION WATER RATE STUDY SECTION WASTEWATER RATE STUDY SECTION OUTSIDE-CITY SURCHARGE

4 SECTION 1 SUMMARY AND OVERVIEW This Summary presents the water and wastewater rate analyses for the City of Redlands (City). The City s last rate study was conducted in 2008 by Raftelis Financial Consultants, Inc. (RFC) and the recommended rates for 2009 and 2010 have been implemented. In accordance with the Redlands Municipal Code, the City is committed to reviewing its rates and rate structure every two years to ensure fairness and equity to its customers and the financial stability of the water and wastewater enterprises. This Summary contains a description of the process, methodology, findings and recommendations for the City s water and wastewater rates (including outside-city rates). Process The rate setting process involved active participation from the Utilities Advisory Committee (UAC) appointed by the City Council to provide input and guidance on various water and wastewater rate issues. The UAC met with staff and the consultants in a series of public meetings, noticed according to the Brown Act requirements, to understand utility issues and to provide input and guidance in order to finalize the rate recommendations. RFC made presentations showing the assumptions, financial data, usage characteristics of City customers, and the concepts of rate making; and designed rate models used to analyze various scenarios and resulting rate and customer impacts, to promote discussion and build consensus among UAC committee members, City staff and RFC. The revenue adjustments and rates presented in this report are a result of this process. In previous rate studies, the City s goal has been to establish fair and equitable rates that accomplished the following goals: Ability to meet the fiscal needs of the City s water and wastewater utilities in the context of the City s overall policy objectives, and Easy of customer understanding and ease of implementation and update in future years by City staff. The City has conserved water over the last couple of years with the inclining tiered rate structure. Recognizing the importance of conservation, the UAC has retained the current water rate structure. The current wastewater rate structure complies with the State Water Resources Board revenue guidelines and has been retained as well to account for wastewater flow and strength. Results During the committee meetings, RFC presented the UAC members with the assumptions and methodologies used to determine rates. Consensus was obtained regarding the assumptions and methodologies to be used and the resulting rates were determined. Final Report August 30, 2010 Page 2

5 The following summarizes the basis on which the City s water and wastewater rates, including inside and outside-city rates, were established. Water A cost of service approach was used to determine water rates. This approach determines rate revenue requirements based on operating costs and a capital improvement program. The following factors contributed to a necessary enhancement to the City s water rates: Inflationary Cost Pressures for Labor and Materials. The following escalation factors were used in the model: General 3 percent per year Personnel 0 percent until fiscal year (FY) 2013, then 3 percent starting in FY 2014 Fringe Benefits 5 percent per year Capital 0 percent until FY 2012, then 3 percent starting FY 2013 Regulatory Impacts. Capital projects are necessary to allow the City to comply with US Environmental Protection Agency and Department of Public Health regulations. System Improvements. Deferred costs for replacement and system improvement projects are required to provide reliable service. Funding of Reserves. Reserves required to meet minimum recommended levels for fiscal stability are planned to be funded on a phased-stepped basis over a period of five years. It is good practice to establish reserves so that the water utility can provide funding for emergencies and unexpected expenditures. Funding of the reserves will be accomplished over the planning period. Reduced Sales. The number of active accounts and water sales have decreased due to conservation and economic conditions. As a result, the fixed costs have to be spread over a smaller base. A breakdown of the revenue requirements by year is shown in the Figures 1-1 and 1-2. A significant capital project, the Hinckley Regulatory Upgrade, will be mostly funded by a State Revolving Fund (SRF) loan, a low-interest loan program offered by the state, as shown in Figure 1-2. Other capital improvement projects will be funded through the water rates. A detailed capital improvement plan is provided in Section 2, Table 2-6. Final Report August 30, 2010 Page 3

6 Figure 1 1 Projected Operations and Maintenance Expense Millions $20 $18 $16 $14 $12 $10 $8 $6 $4 $2 $ O&M Expenses Projections FY 2011 FY 2013 FY 2015 FY 2017 FY 2019 Salaries and Benefits Services Supplies Fixed Assets Figure 1 2 Projected Capital Improvement Expense Millions $20 $18 $16 $14 $12 $10 $8 $6 $4 $2 Water Capital Financing Plan DIF Funded Rate Funded Debt Funded $ FY 2011 FY 2013 FY 2015 FY 2017 FY 2019 DIF Development Impact Fees Figure 1-3 shows the recommended revenue increases needed for the next ten years. Increases for the first four years are 6.5 percent per year and the fifth year increase is 5 percent. There are no subsequent increases projected at this time. However, as the CIP is updated the future projections may change. All increases are projected to become effective for all bills on January 1 st of each year. With the recommended revenue enhancements, the water utility will meet both operating and capital needs, along with existing debt service coverage requirements on previously issued debt. Final Report August 30, 2010 Page 4

7 Figure 1 3 Water Revenue Adjustments and Debt Coverage Revenue Adjustments 10% 9% 8% 7% 6% 5% 4% 3% 2% 1% 0% Water Revenue Adjustments and Debt Coverage 500% 450% 400% 350% 300% 250% 200% 150% 100% 50% 0% FY 2011 FY 2013 FY 2015 FY 2017 FY 2019 Revenue Adjustments Debt Coverage Req'd Debt Coverage 125% Debt Coverage Figure 1-4 shows how the revenue under existing and proposed rates meets revenue requirements over the planning period. Revenue requirements including operational and capital expenses, debt service and transfers to and from unrestricted cash balances and reserves are depicted by the bars. The flat red horizontal line depicts revenue under existing rates. As shown, revenues under existing rates are inadequate to meet the revenue requirements over the planning period. Revenues from the proposed rates are depicted by the green line. Revenues from the proposed rates are adequate to meet the revenue requirements during most of the forecast period. However, reserves will be used in fiscal years 2011 to 2013 to fund the shortfall in revenues. Over the subsequent years, the proposed rates meet the revenue requirements, including restoring reserves and unrestricted cash up to the recommended levels as shown in Figure 1-5. Final Report August 30, 2010 Page 5

8 Figure 1 4 Water Operating Financial Plan $30 Water Operating Financial Plan $25 $20 Millions $15 $10 $5 $ $(5) $(10) FY 2011 FY 2013 FY 2015 FY 2017 FY 2019 Capital Projects Reserves Transfers Out Transfers In Debt Service O&M Revenue Current Revenue Proposed Figure 1 5 Water Reserve Balance Millions $10 $9 $8 $7 $6 $5 $4 $3 $2 $1 $ Water Reserves Water Reserves Reserve for DIF Funded Debt Target 37% of O&M FY 2011 FY 2013 FY 2015 FY 2017 FY 2019 The water reserves are used for working capital requirements, unanticipated or larger than anticipated operating and/or capital expense, and as a rate stabilization reserve for anticipated expenses in excess of revenues during the year. The recommended balance in this fund is to maintain 37 percent of the City s annual water operating and maintenance (O&M) expenses. The orange bars represent a reserve for the development impact fees funded portion of the current debt service, in case the City does not collect sufficient revenue to pay for that portion of the debt. Figure 1-5 shows that the reserve will meet the target in all forecast years. Final Report August 30, 2010 Page 6

9 Water Rate Structure During the 2008 study, the UAC recommended the addition of the third tier for building usage rate and a second tier for the non-building usage rate in order to promote conservation. For this planning period, the UAC did not recommend changing the water rate structure since the tiers were expanded during a previous study, and since the rate structure is effective in promoting conservation. The current water rate structure consists of a bi-monthly service charge varying with meter size and a three-tier water usage rate for all building usage and a two-tier rate for all non-building or irrigation usage, as shown in Table 1-1. In order to meet the revenue requirements of the water utility, both volumetric and bimonthly service fees are increased. The volume rate adjustment is approximately six percent for FY 2011 but varies slightly based on tiers. However, the water bi-monthly service charges increase approximately four percent, depending on the meter size. Table 1-1 summarizes the existing and proposed rates. Private fire protection rates are shown in Table 1-2. Table 1 1 Existing and Proposed Bimonthly Water Rate Schedule Bi Monthly Service Charge Meter Size Current Rates Proposed January 2011 Proposed January 2012 Inside City Outside City Inside City Outside City Inside City Outside City 5/8" $ $ $ $ $ $ /4" $ $ $ $ $ $ " $ $ $ $ $ $ /2" $ $ $ $ $ $ " $ $ $ $ $ $ " $ $ $ $ $ $ " $ $ $ $ $ $ " $ $ $ $ $ $ " $ $ 1, $ $ 1, $ 1, $ 1, Building Usage Rate (in 100 cu ft, ccf) Inside City Outside City Inside City Outside City Inside City Outside City Tier 1 1 to 10 $ 0.74 $ 0.75 $ 0.77 $ 0.78 $ 0.83 $ 0.84 Tier 2 11 to 60 $ 1.24 $ 1.27 $ 1.33 $ 1.36 $ 1.42 $ 1.45 Tier 3 61 & up $ 1.31 $ 1.34 $ 1.47 $ 1.50 $ 1.57 $ 1.60 Non Building Usage Rate (in 100 cu ft, ccf) Inside City Outside City Inside City Outside City Inside City Outside City Tier 1 1 to 60 $ 1.24 $ 1.27 $ 1.33 $ 1.36 $ 1.42 $ 1.45 Tier 2 60 & up $ 1.31 $ 1.34 $ 1.47 $ 1.50 $ 1.57 $ 1.60 Final Report August 30, 2010 Page 7

10 Table 1 2 Existing and Proposed Private Fire Protection Rate Schedule Bi Monthly Service Charge Current Proposed Proposed Meter Size Rates January 2011 January " $ $ $ " $ $ $ " $ $ $ " $ $ $ " $ $ $ " $ $ $ " $ $ $ Fire Usage Rate (in 100 cu ft, ccf) All $ 1.31 $ 1.47 $ 1.57 Figure 1-6 compares how the proposed rate structure will impact customers with a 3/4-inch meter, the common size for single-family residence. As shown in Figure 1-6, as more water is consumed, the increase in the bi-monthly bill becomes larger. The average singlefamily residence uses 24 hcf of per month. The impact to the average single-family residence using a 3/4-in meter is an increase of $5.09 in the bi-monthly bill or $2.55 monthly. The impact for a single-family residence using 15 hcf per month will be an increase of $3.47 in the bi-monthly bill or $1.74 monthly. The bi-monthly increase for a single-family residence using 10 hcf per month is $2.57 or $1.29 monthly. These charges are based on a 3/4-in meter. Figure 1 6 Comparison of Existing and Proposed Bi monthly Water Bills $175 $150 $125 $100 $75 $50 Usage Charge Service Charge Current Bill % change Monthly Bill for Different Usage 12% 10% 8% 6% 4% $25 2% $ 0% Montly Usage (HCF) Final Report August 30, 2010 Page 8

11 Wastewater A cost of service approach was used to update the wastewater service rate. The primary revenue requirements include capital projects, increased costs of operation due to inflationary effects and increased electricity costs, and debt service payments. The following elements have impacted the City s wastewater rates: Power Costs. The cogeneration facilities at the wastewater treatment plant no longer meet regulatory guidelines. The City s cost to purchase power has doubled. Inflationary Cost Pressures for Labor and Materials. The following escalation factors were used in the model: General 3 percent per year Personnel 0 percent until fiscal year (FY) 2013, then 3 percent starting in FY 2014 Fringe Benefits 5 percent per year Capital 0 percent until FY 2012, then 3 percent starting FY 2013 System Improvements. Deferred costs for replacement and system improvement projects are required for reliable service. The recommended revenue enhancements for the wastewater utility are 5 percent per year in 2011 and The revenue adjustments are required to meet all financial obligations of the wastewater utility. Because of the replacement and refurbishment nature of the capital improvements, the UAC opted to fund capital improvements on a pay-as-you-go basis from rates instead of debt funding. Figures 1-7 and 1-8 show the projected O&M and capital expenses in the City during the forecast period. Figure 1 7 Projected Operations and Maintenance Expense Millions $9 $8 $7 $6 $5 $4 $3 $2 $1 $ O&M Expenses Projections FY 2011 FY 2013 FY 2015 FY 2017 FY 2019 Salaries and Benefits Services Supplies Fixed Assets Figure 1 8 Projected Capital Improvement Expense Final Report August 30, 2010 Page 9

12 Millions $5.0 $4.5 $4.0 $3.5 $3.0 $2.5 $2.0 $1.5 $1.0 $0.5 $ WW Capital Financing Plan DIF Funded Rate Funded Debt Funded FY 2011 FY 2013 FY 2015 FY 2017 FY 2019 Figure 1-9 shows the revenue adjustments needed to meet all the City s financial obligations for the next ten years, as well as the calculated debt service coverage. Figure 1 9 Wastewater Revenue Adjustments and Debt Coverage 10% ts 9% n e 8% s tm 7% ju d 6% A e 5% u n 4% v e e R 3% 2% 1% 0% WW Rate Adjustments and Debt Coverage 500% 450% 400% 350% 300% 250% 200% 150% 100% 50% 0% FY 2011 FY 2013 FY 2015 FY 2017 FY 2019 Revenue Adjustments Debt Coverage Req'd Debt Cvg 125% g e ra v e o t C b e D Figure 1-10 shows how the wastewater revenues under the current and proposed rates meet revenue requirements over the planning period. The flat red horizontal line depicts revenue under existing rates. As shown, revenues under existing rates are inadequate to meet the revenue requirements over the planning period. Revenues from proposed rates are depicted by the green line. Revenues from proposed rates are adequate to meet revenue requirements during most of the forecast period. However, reserves will be used in fiscal years 2012 to 2018 to fund the shortfall in revenues. Over the subsequent years, the proposed rates meet revenue requirements, including restoring reserves to the recommended levels as shown in Figure Final Report August 30, 2010 Page 10

13 Figure 1 10 Wastewater Operating Financial Plan Millions $14 $12 $10 $8 $6 $4 $2 $ $(2) $(4) WW Operating Financial Plan FY 2011 FY 2013 FY 2015 FY 2017 FY 2019 Capital Projects Reserves Transfers Out Transfers In Debt Service O&M Revenue Current Revenue Proposed Figure 1 11 Wastewater Reserve Balance Millions $5.0 $4.5 $4.0 $3.5 $3.0 $2.5 $2.0 $1.5 $1.0 $0.5 $ Wastewater Reserves Reserve for DIF funded Debt Wastewater Reserves Target 37% of O&M FY 2011 FY 2013 FY 2015 FY 2017 FY 2019 The wastewater reserves are used for working capital requirements, unanticipated or larger than anticipated operating and/or capital expense, and as a rate stabilization reserve for anticipated expenses in excess of revenues during the year. The recommended balance in this fund is to maintain 37 percent of the City s annual wastewater operating and maintenance (O&M) expenses. The orange bars represent a reserve for the development impact fees funded portion of the current debt service, in case the City does not collect sufficient DIF revenue to pay for that portion of the debt. Figure 1-11 shows that the reserve will meet the target in all forecast years. Final Report August 30, 2010 Page 11

14 Wastewater Rate Structure The current wastewater rate structure consists of a flat bi-monthly charge for residential customers and a rate based on water usage for non-residential customers, varying depending on the wastewater strength. During the 2004 rate study, RFC recommended changes to the City s wastewater rate structure based on input from the UAC. The changes included expanding the classification of non-residential customers from three categories to eight. This new classification included three classifications of low strength users, three classifications of medium strength users, and two classifications of high strength users, as shown in Table 1-3 below. For this planning period, the UAC retained the existing wastewater rate structure. Table 1 3 Wastewater Strengths for Non Residential Customers Category BOD + SS (mg/l) Low Strength Medium Strength ,000 1,001-1,200 High Strength 1,201-1,400 >1,400 Table 1-4 summarizes the proposed rates under the wastewater rate structure. Final Report August 30, 2010 Page 12

15 Table 1 4 Proposed Wastewater Rate Schedule Current Proposed Proposed Bi Monthly Charges Rates January 2011 January 2012 SFR (per unit) $ $ $ MFR (per unit) $ $ $ Non residential Customers (per hcf of water) Minimum Charge $ $ $ Low Strength I $ 1.61 $ 1.70 $ 1.79 Low Strength II $ 1.71 $ 1.80 $ 1.89 Low Strength III $ 2.09 $ 2.20 $ 2.31 Medium Strength I $ 2.50 $ 2.63 $ 2.77 Medium Strength II $ 2.87 $ 3.02 $ 3.18 Medium Strength III $ 3.25 $ 3.42 $ 3.60 High Strength I $ 3.63 $ 3.82 $ 4.02 High Strength II $ 3.96 $ 4.16 $ 4.37 Large Volume User* $ 2.18 $ 2.29 $ 2.41 School (per 100 ADA) Elementary $ $ $ Secondary & High $ $ $ Septage Customers (per gallon) $ 0.07 $ 0.08 $ 0.09 Minimum Charge $ $ $ * Large Volume Users are user with greater than 25,000 gallons per day discharge. Table 1-4 shows that single-family customers will experience an increase of $1.99 bimonthly or about $1.00 per month. Multi-family users will experience an increase of $1.50 bi-monthly or $0.75 on a monthly basis. Non-residential customers rates will increase by six percent; however, their actual bill will vary depend on their water usage. Figure 1-12 shows how the City s current and proposed water and wastewater bills for a single family residential customer with a 3/4-in meter using 24 hcf of water per month compare with those of nearby agencies. Redlands is at the low end even with the proposed rate adjustments. Final Report August 30, 2010 Page 13

16 Figure 1 12 Comparison of Monthly Water and Wastewater Bills $90 $80 Monthly Water and Wastewater Rate Survey Water Wastewater $70 $60 $50 $40 $30 $63 $65 $67 $70 $71 $82 $83 $50 $43 $46 $46 $45 $43 $44 $20 $10 $ Redlands C $20 $19 $21 $24 $28 $38 $33 San Bernardino Redlands P Loma Linda EVWD Yucaipa Colton Final Report August 30, 2010 Page 14

17 SECTION 2 WATER RATE STUDY The detailed output of the water rate study is contained in this section of the report. Table 2-1 shows the existing water rate schedule. Table 2 1 Existing Water Rate Schedule Service Charge Bi Monthly Effective 1/1/2010 Meter Size Inside City Outside City Fire Non Potable 5/8" $ $ /4" $ $ $ " $ $ $ /2" $ $ $ " $ $ $ $ " $ $ $ $ " $ $ $ $ " $ $ $ $ " $ $ 1, $ $ " $ " $ Fire Hydrant Construction $ $ Water Usage Rate Bi Monthly ($/hcf) Building Usage Inside City Outside City Tier $ 0.74 $ 0.75 Tier $ 1.24 $ 1.27 Tier 3 over 60 $ 1.31 $ 1.34 Non Building Usage Tier $ 1.24 $ 1.27 Tier 2 over 60 $ 1.31 $ 1.34 Fire Hydrant Construction $ 1.31 $ 1.31 Non Potable Water $ 0.99 $ 0.99 Final Report August 30, 2010 Page 15

18 Table 2-2 presents the projected number of water accounts. Table 2 2 Summary of Water Accounts Line Budgeted Projected Projected Projected Projected Projected No. FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 Accounts Summary 1 5/8" /4" 8,006 8,006 8,006 8,006 8,006 8, " 10,634 10,634 10,634 10,634 10,634 10, /2" " " " " " " " 12 Total Accounts Summary 20,737 20,737 20,737 20,737 20,737 20,737 Table 2-3 shows the breakdown of projected volume of water used while Table 2-4 shows the revenues under existing rates. Table 2 3 Summary of Water Accounts Line Budgeted Projected Projected Projected Projected Projected No. FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 Inside City Customers 1 SFR 6,045,147 6,045,147 6,045,147 6,045,147 6,045,147 6,045,147 2 MFR 1,150,362 1,150,362 1,150,362 1,150,362 1,150,362 1,150,362 3 Non Residential 882, , , , , ,550 4 School 219, , , , , ,352 5 Municipal 46,221 46,221 46,221 46,221 46,221 46,221 6 Non Building 1,215,090 1,215,090 1,215,090 1,215,090 1,215,090 1,215,090 7 Fire Service 33,534 33,534 33,534 33,534 33,534 33,534 8 Subtotal 9,592,256 9,592,256 9,592,256 9,592,256 9,592,256 9,592,256 Outside City Customers 9 SFR 672, , , , , , MFR 126, , , , , , Non Residential 84,643 84,643 84,643 84,643 84,643 84, School 128, , , , , , Non Building 101, , , , , , Fire Service 3,625 3,625 3,625 3,625 3,625 3, Subtotal 1,117,341 1,117,341 1,117,341 1,117,341 1,117,341 1,117, TOTAL USAGE (HCF) 10,709,597 10,709,597 10,709,597 10,709,597 10,709,597 10,709,597 Final Report August 30, 2010 Page 16

19 Table 2 4 Revenues under Existing Rates Line Estimated Budgeted Projected Projected Projected Projected No. FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 Account Description 80% 4.00% Operating Revenue Water Usage $ 15,387,952 $ 16,003,470 $ 16,003,470 $ 16,003,470 $ 16,003,470 $ 16,003, Irrigation Water Usage $ 1,467,080 $ 1,525,763 $ 1,525,763 $ 1,525,763 $ 1,525,763 $ 1,525, Fire Hydrant Water Usage $ 38,279 $ 39,810 $ 39,810 $ 39,810 $ 39,810 $ 39, "B" Contract Water Usage $ 136,056 $ 136,056 $ 136,056 $ 136,056 $ 136,056 $ 136, Fire Protection Water Usage $ 250,616 $ 260,641 $ 260,641 $ 260,641 $ 260,641 $ 260,641 6 Subtotal Operating Revenue $ 17,279,984 $ 17,965,741 $ 17,965,741 $ 17,965,741 $ 17,965,741 $ 17,965,741 Other Operating Revenue Cost Recover/Reimb Exp. $ 16,511 $ $ $ $ $ Water Meter Install $ 12,327 $ 9,000 $ 9,000 $ 9,000 $ 9,000 $ 9, Frontage Charge $ 1,253 $ $ $ $ $ Rental Income $ 85,000 $ 85,000 $ 85,000 $ 85,000 $ 85,000 $ 85, Miscellaneous Receipts $ 160,000 $ 160,000 $ 160,000 $ 160,000 $ 160,000 $ 160, Bad Debt Recovery $ $ $ $ $ $ 13 Subtotal Other Operating Revenue $ 275,091 $ 254,000 $ 254,000 $ 254,000 $ 254,000 $ 254,000 Non Operating Revenue Investment Income $ 92,419 $ 89,490 $ 70,216 $ 91,724 $ 117,593 $ 161, Sale of Surplus Property $ 35,870 $ $ $ $ $ Misc Taxable Sales $ 3,245 $ $ $ $ $ 17 Subtotal Non Operating Revenue $ 131,534 $ 89,490 $ 70,216 $ 91,724 $ 117,593 $ 161, TOTAL WATER REVENUE $ 17,686,609 $ 18,309,231 $ 18,289,957 $ 18,311,465 $ 18,337,333 $ 18,380,889 Table 2-5 summarizes the projected O&M costs by program. O&M costs have been inflated at 3.0 percent for most of the costs. Table 2 5 Operations and Maintenance Expense Projections Line Estimated Budgeted Projected Projected Projected Projected No. FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 WATER 1 Salaries and Benefits $ 4,288,643 $ 4,357,307 $ 4,440,619 $ 4,647,675 $ 4,823,989 $ 5,007,436 2 Services $ 6,286,184 $ 6,757,074 $ 6,959,786 $ 7,168,580 $ 7,383,637 $ 7,605,146 3 Supplies $ 1,569,800 $ 2,290,601 $ 2,359,319 $ 2,430,099 $ 2,503,002 $ 2,578,092 4 Fixed Assets $ 858,983 $ $ $ $ $ 5 TOTAL WATER O&M EXPENSES $ 13,003,610 $ 13,404,982 $ 13,759,725 $ 14,246,353 $ 14,710,628 $ 15,190,674 Final Report August 30, 2010 Page 17

20 Table 2-6 shows the capital improvement projects in detail. Costs are shown by project and by year in inflated dollars. Capital improvement projects are categorized as replacement and/or expansion-related projects. Table 2 6 Capital Improvement Projects Line Projected Projected Projected Projected Projected No. FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 Replacement Projects 1 Hinckley regulatory upgrades $ 12,000,000 $ $ $ $ 2 New well/treatment $ $ $ 1,030,000 $ $ 3 Dearborn , (add'l booster) $ $ 250,000 $ $ $ 4 Texas Street Rehab existing boosters $ $ $ 257,500 $ $ 5 Smiley (add'l booster) $ $ $ $ 79,568 $ 6 Agate (add'l booster) $ $ $ $ $ 218,545 7 Country Club Reservoir Replacement $ 500,000 $ $ $ $ 8 SCADA system $ 950,000 $ $ $ $ 9 Water Production Annual Replacement $ 433,000 $ 433,000 $ 445,990 $ 459,370 $ 473, Water System Improvements $ 333,000 $ 300,000 $ 309,000 $ 318,270 $ 327, Highline Replacement $ 280,000 $ 1,200,000 $ 1,236,000 $ $ 12 Master Planned Water Mains $ $ 200,000 $ 206,000 $ 212,180 $ 218, Local Water Mains $ 1,400,000 $ 2,000,000 $ 2,060,000 $ 2,121,800 $ 3,278, Utilities Building Improvements $ 111,000 $ 111,000 $ 114,330 $ 117,760 $ 121, Reservoir Recoat/Rehab $ $ 350,000 $ 489,250 $ 530,450 $ 573, Dearborne Roof Replacement (reservoir) $ 2,500,000 $ $ $ $ 17 Water Studies and Projects $ 180,000 $ 180,000 $ 185,400 $ 190,962 $ 196, Subtotal Replacement Projects $ 18,687,000 $ 5,024,000 $ 6,333,470 $ 4,030,359 $ 5,407,906 Expansion Projects (DIF Funded) 19 SCADA system $ 50,000 $ $ $ $ 20 Highline Replacement $ 70,000 $ 300,000 $ 309,000 $ $ 21 Master Planned Water Mains $ $ 200,000 $ 206,000 $ 212,180 $ 218, Water Studies and Projects $ 20,000 $ 20,000 $ 20,600 $ 21,218 $ 21, Subtotal Expansion Projects (DIF Funded) $ 140,000 $ 520,000 $ 535,600 $ 233,398 $ 240, TOTAL CIP PROJECTS $ 18,827,000 $ 5,544,000 $ 6,869,070 $ 4,263,757 $ 5,648,306 Final Report August 30, 2010 Page 18

21 Table 2-7 shows the operating cash flow for the Water Service Fund (501) and includes projected costs and revenues. Revenue under existing rates is generated by meter service fees and water sales for the fiscal year. In addition, miscellaneous revenues, bond proceeds, and transfers are used to offset O&M costs, purchased water costs, debt service payments, transfers to funds and reserves, and routine capital outlays. The overall revenue increases are shown by year and the month effective during the fiscal year is shown alongside. The net working capital cash balance is shown on line 28 of Table 2-7. Line 29 shows the calculated debt service coverage. The debt service coverage requirement of 125 percent is met throughout the planning period. Table 2 7 Water Operating Cash Flow Line Projected Projected Projected Projected Projected No. FY 2011 FY 2012 FY 2013 FY 2014 FY Revenues under Existing Rates $ 17,665,289 $ 17,665,289 $ 17,665,289 $ 17,665,289 $ 17,665,289 2 Fire Service Charges $ 300,451 $ 300,451 $ 300,451 $ 300,451 $ 300,451 Additional Revenue Needed: Year % Adj. Effective 3 FY % January 6 $ 583,887 $ 1,167,773 $ 1,167,773 $ 1,167,773 $ 1,167,773 4 FY % January 6 $ 621,839 $ 1,243,678 $ 1,243,678 $ 1,243,678 5 FY % January 6 $ 662,259 $ 1,324,518 $ 1,324,518 6 FY % January 6 $ 705,306 $ 1,410,611 7 FY % January 6 $ 577,808 8 Total Additional Revenues $ 583,887 $ 1,789,612 $ 3,073,710 $ 4,441,275 $ 5,724,388 9 Total Revenue from Rates $ 18,549,627 $ 19,755,353 $ 21,039,451 $ 22,407,015 $ 23,690, Other Operating Revenue $ 254,000 $ 254,000 $ 254,000 $ 254,000 $ 254, Non Operating Revenue $ $ $ $ $ 12 Loan Payment from Cemetery Fund $ 61,000 $ 61,000 $ 61,000 $ 61,000 $ 61, Investment/Interest Income $ 89,490 $ 70,216 $ 91,724 $ 117,593 $ 161, Transfer from Source Acquisition Fund (508) $ $ $ $ $ 15 Transfer from Water Capital Improv Fund (509) $ 1,427,670 $ $ $ $ 16 Transfer from Water Reserves $ 600,000 $ $ $ $ 17 TOTAL REVENUE $ 20,981,788 $ 20,140,569 $ 21,446,175 $ 22,839,608 $ 24,166, Water O&M Expenses $ 13,404,982 $ 13,759,725 $ 14,246,353 $ 14,710,628 $ 15,190, Transfer to Water Projects (503) $ 8,210,900 $ 5,024,000 $ 6,333,470 $ 4,030,359 $ 5,407, Transfer to Water Debt Service (506) $ 1,621,808 $ 1,621,271 $ 2,359,164 $ 2,354,338 $ 2,355, Transfer to Source Acquisition Fund (508) $ 1,400,000 $ $ $ $ 22 Loan to Water Capital Improv Fund (509) $ $ 1,506,986 $ 1,521,870 $ 1,166,581 $ 1,174, Transfer to Non Potable Water Fund (541) 24 Transfer to Reserves $ $ 1,150,000 $ 150,000 $ 200,000 $ 200, Transfer to General Fund $ 122,844 $ 122,844 $ 122,844 $ 122,844 $ 122, Loan to General Fund $ 150,000 $ (50,750) $ (51,000) 27 TOTAL REVENUE REQUIREMENTS $ 24,910,534 $ 23,184,826 $ 24,733,701 $ 22,534,000 $ 24,399, Annual Cash Balance $ (3,928,746) $ (3,044,257) $ (3,287,526) $ 305,608 $ (233,693) 29 Debt Coverage 268% 308% 348% 394% 435% 30 Req'd Debt Coverage 125% 125% 125% 125% 125% 125% Final Report August 30, 2010 Page 19

22 Table 2-9 shows the flow of funds for all the different funds within the water enterprise. A brief description of each of the listed fund follows. The Water Service Fund (501) shows the unrestricted cash balance available for water related expenses. The Water Project Fund (503) is used to fund capital projects and ongoing projects and improvements including utilities building improvements, water facilities master plans, water resources management plans, water facilities database maintenance, and water resources and information systems maintenance. Transfers from the Water Service Fund (501) and the Water Capital Improvement Fund (509) are used to offset expenditures. The Water Bond Fund (505) shows the receipt of the $10.5 million SRF loan for the Hinckley Regulatory Upgrade. The money is transferred into the Water Project Fund (503) to pay for the project costs. The Water Debt Service Fund (506) is used to pay existing debt service payments. The existing debt service payment for the 1999A Water Revenue Bonds has been allocated 45 percent to new users; the Agricultural Drainage Loan Program (ADLP) and the SRF loan are allocated 50 percent and 10 percent to new users, respectively. These debt service payments are recovered by transfers from the Water Capital Improvement Fund (509) and the Water Service Fund (501). Other revenues are derived from interest earned on the Debt Service Reserve Fund. The Water Source Acquisition Fund (508) is used to purchase water stock and obtain water rights to serve development. Revenue for this fund is derived from Water Source Acquisition Fees. The Water Capital Improvement Fund (509) is a special revenue fund used for capital projects that are related to expansion of the City s water system to serve new users, and that portion of the debt service payments related to new growth. Water Capital Improvement fees (development impact fees) are the main revenue source for this fund. Since there is minimal growth in the system at the current time, the fund borrows cash from the Water Service Fund (501) to make up the shortfall. Final Report August 30, 2010 Page 20

23 Table 2 8 Water Fund Balances Line Projected Projected Projected Projected Projected No. FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 Water Service Fund (501) 1 Beginning Balance $ 11,581,337 $ 7,652,591 $ 4,608,334 $ 1,320,807 $ 1,626,416 2 Annual Cash Balance $ (3,928,746) $ (3,044,257) $ (3,287,526) $ 305,608 $ (233,693) 3 Ending Balance $ 7,652,591 $ 4,608,334 $ 1,320,807 $ 1,626,416 $ 1,392,723 4 Interest $ 57,606 $ 36,682 $ 29,334 $ 21,383 $ 28,869 Water Projects Fund (503) 5 Beginning Balance $ $ $ $ $ 6 Transfer from Water Service Fund (501) $ 8,210,900 $ 5,024,000 $ 6,333,470 $ 4,030,359 $ 5,407,906 7 Transfer from Water Bond Fund (505) $ 10,476,100 $ $ $ $ 8 Transfer from Water Cap Improv Fund (509) $ $ $ $ $ 9 Expenses $ (18,687,000) $ (5,024,000) $ (6,333,470) $ (4,030,359) $ (5,407,906) 10 Ending Balance $ $ $ $ $ 11 Interest $ $ $ $ $ Water Bond Fund (505) 12 Beginning Balance $ $ $ $ $ 13 New Bond Issues $ 10,476,100 $ $ $ $ 14 Transfer to Water Projects Fund (503) $ (10,476,100) $ $ $ $ 15 Ending Balance $ $ $ $ $ 16 Interest $ $ $ $ $ Water Debt Service Fund (506) 17 Beginning Balance $ $ $ $ $ 18 Revenue $ 2,525, Transfer from Water Service Fund (501) $ 1,621,808 $ 1,621,271 $ 2,359,164 $ 2,354,338 $ 2,355, Transfer from/(to) Water Cap Improv Fund (509) $ (1,487,670) $ 1,036,986 $ 1,036,270 $ 1,033,183 $ 1,033, Existing Debt Service $ (2,659,138) $ (2,658,258) $ (3,395,434) $ (3,387,521) $ (3,389,146) 22 Proposed Debt Service $ $ $ $ $ 23 Ending Balance $ $ $ $ $ 24 Interest $ $ $ $ $ Water Source Acquisition Fund (508) 25 Beginning Balance $ 274,716 $ 46,216 $ 57,716 $ 69,216 $ 80, Revenue $ 11,500 $ 11,500 $ 11,500 $ 11,500 $ 11, Transfer from/(to) Water Service Fund (501) $ 1,400,000 $ $ $ $ 28 Expenses $ (1,640,000) $ $ $ $ Ending Balance $ 46,216 $ 57,716 $ 69,216 $ 80,716 $ 92, Interest $ 963 $ 312 $ 635 $ 1,124 $ 1,729 Water Capital Improvement Fund (509) 32 Beginning Balance $ $ $ $ $ 33 Revenue (Development Impact Fee) $ 80,000 $ 50,000 $ 50,000 $ 100,000 $ 100, Loan from Water Service Fund (501) $ (1,427,670) $ 1,506,986 $ 1,521,870 $ 1,166,581 $ 1,174, Expenses (Development Impact Fee CIP) $ (140,000) $ (520,000) $ (535,600) $ (233,398) $ (240,400) 36 Transfer to Water Projects Fund (503) $ $ $ $ $ 37 Transfer from/(to) Water Debt Service Fund (506 $ 1,487,670 $ (1,036,986) $ (1,036,270) $ (1,033,183) $ (1,033,817) 38 Ending Balance $ $ $ $ $ 39 Interest $ $ $ $ $ Final Report August 30, 2010 Page 21

24 Tables 2-9 and 2-10 show the proposed water rate schedule to be implemented on January 1 st, 2011 and 2012, including private fire protection fees and rates. Table 2 9 Proposed Water Rate Schedule Bi Monthly Service Charge Current Proposed Proposed Meter Size Rates January 2011 January 2012 Inside City Outside City Inside City Outside City Inside City Outside City 5/8" $ $ $ $ $ $ /4" $ $ $ $ $ $ " $ $ $ $ $ $ /2" $ $ $ $ $ $ " $ $ $ $ $ $ " $ $ $ $ $ $ " $ $ $ $ $ $ " $ $ $ $ $ $ " $ $ 1, $ $ 1, $ 1, $ 1, Building Usage Rate (in 100 cu ft, ccf) Inside City Outside City Inside City Outside City Inside City Outside City Tier 1 1 to 10 $ 0.74 $ 0.75 $ 0.77 $ 0.78 $ 0.83 $ 0.84 Tier 2 11 to 60 $ 1.24 $ 1.27 $ 1.33 $ 1.36 $ 1.42 $ 1.45 Tier 3 61 & up $ 1.31 $ 1.34 $ 1.47 $ 1.50 $ 1.57 $ 1.60 Non Building Usage Rate (in 100 cu ft, ccf) Inside City Outside City Inside City Outside City Inside City Outside City Tier 1 1 to 60 $ 1.24 $ 1.27 $ 1.33 $ 1.36 $ 1.42 $ 1.45 Tier 2 60 & up $ 1.31 $ 1.34 $ 1.47 $ 1.50 $ 1.57 $ 1.60 Table 2 10 Proposed Private Fire Protection Rate Schedule Bi Monthly Service Charge Current Proposed Proposed Meter Size Rates January 2011 January " $ $ $ " $ $ $ " $ $ $ " $ $ $ " $ $ $ " $ $ $ " $ $ $ Fire Usage Rate (in 100 cu ft, ccf) All $ 1.31 $ 1.47 $ 1.57 Final Report August 30, 2010 Page 22

25 SECTION 3 WASTEWATER RATE STUDY The detailed output of the wastewater rate study is contained in this section of the report. Table 3-1 shows the existing wastewater rate schedule. Table 3 1 Existing Water Rate Schedule Effective 1/1/2010 Bi Monthly Service Charge SFR per unit $ $ MFR per unit $ $ Non residential Customers Minimum Charge $ $ Low Strength I per HCF of water $ 1.61 $ 1.61 Low Strength II per HCF of water $ 1.71 $ 1.71 Low Strength III per HCF of water $ 2.09 $ 2.09 Medium Strength I per HCF of water $ 2.50 $ 2.50 Medium Strength II per HCF of water $ 2.87 $ 2.87 Medium Strength III per HCF of water $ 3.25 $ 3.25 High Strength I per HCF of water $ 3.63 $ 3.63 High Strength II per HCF of water $ 3.96 $ 3.96 Large Volume User* per HCF of water $ 2.18 $ 2.18 School Elementary per 100 ADA $ $ Secondary & High per 100 ADA $ $ Septage Customers per gall(min $10) $ $ * Large Volume Users are user with greater than 25,000 gallons per day discharge. Final Report August 30, 2010 Page 23

26 Table 3-2 contains the projected number of residential wastewater accounts. Table 3 2 Summary of Residential Wastewater Accounts Line Budgeted Projected Projected Projected Projected Projected No. FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 Inside City Customers 1 SFR 14,748 14,748 14,748 14,748 14,748 14,748 2 MFR Units 8,736 8,736 8,736 8,736 8,736 8,736 3 Subtotal 23,484 23,484 23,484 23,484 23,484 23,484 Outside City Customers 4 SFR MFR Units Subtotal 1,191 1,191 1,191 1,191 1,191 1,191 7 Total Residential Accounts 24,676 24,676 24,676 24,676 24,676 24,676 Final Report August 30, 2010 Page 24

27 Table 3-3 shows the volume of water used by non-residential customers as well as the average daily attendance (ADA) for the schools within the City. Table 3 3 Non Residential Water Usage/Units Line Budgeted Projected Projected Projected Projected Projected No. FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 Inside City Non residential Customers 1 Low Strength I 15,081 15,081 15,081 15,081 15,081 15,081 2 Low Strength II 475, , , , , ,347 3 Low Strength III 95,142 95,142 95,142 95,142 95,142 95,142 4 Medium Strength I 41,016 41,016 41,016 41,016 41,016 41,016 5 Medium Strength II 36,277 36,277 36,277 36,277 36,277 36,277 6 Medium Strength III 21,057 21,057 21,057 21,057 21,057 21,057 7 High Strength I 11,090 11,090 11,090 11,090 11,090 11,090 8 High Strength II 121, , , , , ,769 9 Large Volume User 41,899 41,899 41,899 41,899 41,899 41, School 11 Elementary (ADA) 4,901 4,901 4,901 4,901 4,901 4, Secondary & High (ADA) 6,685 6,685 6,685 6,685 6,685 6, Total Usage Inside City 858, , , , , ,678 Outside City Non residential Customers 14 Low Strength I 15 Low Strength II 12,210 12,210 12,210 12,210 12,210 12, Low Strength III 4,472 4,472 4,472 4,472 4,472 4, Medium Strength I 4,694 4,694 4,694 4,694 4,694 4, Medium Strength II 19 Medium Strength III 20 High Strength I 21 High Strength II 19,201 19,201 19,201 19,201 19,201 19, Large Volume User 23 School 24 Elementary (ADA) Secondary & High (ADA) 8,502 8,502 8,502 8,502 8,502 8, Total Usage Outside City 40,577 40,577 40,577 40,577 40,577 40, TOTAL USAGE 899, , , , , ,255 Final Report August 30, 2010 Page 25

28 Table 3-4 shows wastewater revenue under existing rates. Table 3 4 Summary of Residential Wastewater Accounts Line Estimated Projected Projected Projected Projected Projected No. FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY % Operating Revenues 0.6% Sewer Residential ##### $ 5,012,901 $ 5,345,459 $ 5,345,459 $ 5,345,459 $ 5,345,459 $ 5,345, Sewer Non Residential ##### $ 1,853,354 $ 2,072,280 $ 2,072,280 $ 2,072,280 $ 2,072,280 $ 2,072, Septage Charge $ 85,341 $ 90,336 $ 90,336 $ 90,336 $ 90,336 $ 90, Recycled Water Usage $ 219,570 $ 219,570 $ 219,570 $ 219,570 $ 219,570 $ 219,570 5 Total Operating Revenues $ 7,171,166 $ 7,727,646 $ 7,727,646 $ 7,727,646 $ 7,727,646 $ 7,727, % Other Operating Revenues Frontage Charge $ $ $ $ $ $ Joint Lab Water Charges $ 90,000 $ 202,714 $ 206,768 $ 210,904 $ 215,122 $ 219, Joint Lab Solid Wst Charges $ 30,000 $ $ $ $ $ Rental Income $ 10,000 $ $ $ $ $ Miscellaneous Receipts $ 3,891 $ 4,000 $ 4,080 $ 4,162 $ 4,245 $ 4, Bad Debt Recovery $ $ $ $ $ $ Cost Recover/Reimb Expenditure $ $ $ $ $ $ 13 Total Other Operating Revenues $ 133,891 $ 206,714 $ 210,848 $ 215,065 $ 219,367 $ 223,754 Non Operating Revenues Investment Income $ 53,893 $ 57,574 $ 53,134 $ 73,009 $ 87,454 $ 97, Land Sale Proceeds $ $ $ $ $ $ Misc. Taxable Sales $ 1,880 $ $ $ $ $ 17 Total Non Operating Revenues $ 55,773 $ 57,574 $ 53,134 $ 73,009 $ 87,454 $ 97, TOTAL REVENUES $ 7,360,829 $ 7,991,934 $ 7,991,628 $ 8,015,720 $ 8,034,467 $ 8,048,506 Table 3-5 summarizes the projected O&M costs by program. O&M costs have been inflated at 3 percent annually for most of the costs. Table 3 5 Operations and Maintenance Expense Projections Line Estimated Budgeted Projected Projected Projected Projected No. FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY Salaries and Benefits $ 2,528,906 $ 2,592,146 $ 2,636,776 $ 2,764,081 $ 2,866,925 $ 2,973,850 2 Services $ 2,418,167 $ 2,759,065 $ 2,741,837 $ 2,824,092 $ 2,908,815 $ 2,996,079 3 Supplies $ 688,454 $ 788,410 $ 812,062 $ 836,424 $ 861,517 $ 887,362 4 Fixed Assets $ 116,000 $ 195,000 $ 200,850 $ 206,876 $ 213,082 $ 219,474 5 TOTAL O&M EXPENSES $ 5,751,527 $ 6,334,621 $ 6,391,525 $ 6,631,473 $ 6,850,339 $ 7,076,766 Final Report August 30, 2010 Page 26

29 Table 3-6 shows the capital improvement projects in detail. Costs are shown by project and by year; capital improvement projects are shown as inflated replacement and/or expansion-related projects. Table 3 6 Capital Improvement Projects Line Projected Projected Projected Projected Projected No. FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 Replacement Projects 1 Sludge Removal Imhoff Tanks $ $ $ $ 79,568 $ 2 WWTP Annual Replacement $ 300,000 $ 300,000 $ 309,000 $ 318,270 $ 327,818 3 Master Planned Sewer Mains $ $ 92,400 $ 95,172 $ 98,027 $ 100,968 4 Local Collection Mains $ $ 936,360 $ 964,451 $ 993,384 $ 1,023,186 5 Utilities Building Improvements $ 67,000 $ 67,000 $ 69,010 $ 71,080 $ 73,213 6 Master Planning and Study $ 109,800 $ 109,800 $ 113,094 $ 116,487 $ 119,981 7 Electrical Plant Grounding $ 90,000 $ $ $ $ 8 Zenon Filter replacements $ $ $ 515,000 $ 530,450 $ 546,364 9 SCADA Upgrades $ $ $ 61,800 $ $ 10 Solar Panels $ 678,400 $ $ $ $ 11 Subtotal Replacement Projects $ 1,245,200 $ 1,505,560 $ 2,127,527 $ 2,207,266 $ 2,191,530 Expansion Projects (DIF Funded) 12 Master Planned Sewer Mains $ $ 92,400 $ 95,172 $ 98,027 $ 100, Master Planning and Study $ 12,200 $ 13,200 $ 14,626 $ 16,126 $ 17, Subtotal Expansion Projects (DIF Funded) $ 12,200 $ 105,600 $ 109,798 $ 114,153 $ 118, TOTAL CIP PROJECTS $ 1,257,400 $ 1,611,160 $ 2,237,325 $ 2,321,419 $ 2,310,200 Final Report August 30, 2010 Page 27

30 Table 3-7 shows the flow of funds for the Wastewater Service Fund (521) and shows projected costs and revenues. Revenue under existing rates is generated by wastewater user fees for the fiscal year. In addition, miscellaneous revenues, and transfers are used to offset O&M costs, debt service payments, transfers to funds and reserves, and routine capital expenditures. The overall revenue increases are shown by year and the month effective during the fiscal year is shown alongside. The net working cash balance is shown on line 23 of Table 3-7. Line 24 shows the calculated debt service coverage. The debt service coverage requirement of 125 percent is met throughout the planning period. Table 3 7 Wastewater Operating Cash Flow Line Projected Projected Projected Projected Projected No. FY 2011 FY 2012 FY 2013 FY 2014 FY Revenues under Existing Rates $ 7,508,076 $ 7,508,076 $ 7,508,076 $ 7,508,076 $ 7,508, Additional Revenue Needed: 4 Year % Adj. Effective 5 FY % January 6 $ 187,702 $ 375,404 $ 375,404 $ 375,404 $ 375,404 6 FY % January 6 $ 197,087 $ 394,174 $ 394,174 $ 394,174 7 FY % January 6 $ 248,330 $ 496,659 $ 496,659 8 FY % January 6 $ 263,229 $ 526,459 9 FY % January 6 $ 279, Total Additional Revenues $ 187,702 $ 572,491 $ 1,017,907 $ 1,529,466 $ 2,071, Total Revenue from Rates $ 7,695,778 $ 8,080,567 $ 8,525,983 $ 9,037,542 $ 9,579, Recycled Water Usage $ 219,570 $ 219,570 $ 219,570 $ 219,570 $ 219, Other Operating Revenue $ 206,714 $ 210,848 $ 215,065 $ 219,367 $ 223, Non Operating Revenue $ $ $ $ $ 15 Investment/Interest Income $ 57,461 $ 53,965 $ 77,350 $ 96,266 $ 108, Loan Payment from General Fund $ 11,333 $ 11,333 $ 11,333 $ 11,333 $ 11, Cost to cover lab work done for water $ 202, Transfer from Reserves $ 1,400,000 $ $ $ $ 19 TOTAL REVENUE $ 9,793,570 $ 8,576,282 $ 9,049,301 $ 9,584,078 $ 10,142, O&M Expenses $ 6,334,621 $ 6,391,525 $ 6,631,473 $ 6,850,339 $ 7,076, Transfer to Sewer Projects Fund (523) $ 566,800 $ 1,505,560 $ 2,127,527 $ 2,207,266 $ 2,191, Transfer to Debt Service Fund (526) $ 774,694 $ 774,694 $ 774,694 $ 774,694 $ 774, Loan to Capital Improv Fund (529) $ $ $ 375,502 $ 920,441 $ 924, Transfer to Reserves $ $ 50,000 $ 100,000 $ 100,000 $ 100, TOTAL REVENUE REQUIREMENTS $ 7,676,115 $ 8,721,779 $ 10,009,196 $ 10,852,739 $ 11,067, Annual Cash Balance $ 2,117,455 $ (145,497) $ (959,895) $ (1,268,662) $ (925,274) 27 Debt Coverage 168% 178% 196% 220% 245% 28 Req'd Debt Coverage 125% 125% 125% 125% 125% 125% Final Report August 30, 2010 Page 28

31 Table 3-8 shows the flow of funds for all the different funds within the water enterprise. A brief description of each of the listed fund follows. The Wastewater Bond Project Fund (525) currently has no balance, inflows or outflows. The Wastewater Project Fund (523) is used to finance capital projects. Transfers from the Wastewater Service Fund (521) and the Wastewater Capital Improvement Fund (529) are used to offset expenditures. The Wastewater Debt Service Fund (526) is used to pay debt service payments. The existing debt service payment for the 1999A Wastewater Revenue Bonds has been allocated 55 percent to new users, the SRF debt for recycled water is allocated 50 percent to new users and is recovered by a transfer from the Capital Improvement Fund (529) and the Wastewater Service Fund (521). Other revenues are derived from interest earned on the Debt Service Reserve Fund. The Wastewater Capital Improvement Fund (529) is a special revenue fund used for capital projects that are related to expansion of the City s wastewater system to serve new users, and the portion of the existing debt service payments related to new growth. Wastewater development improvement fees are the revenue sources for this fund. Loans are required from the wastewater service fund when there is not enough cash to cover the expenses. Final Report August 30, 2010 Page 29

32 Table 3 8 Wastewater Fund Balances Line Projected Projected Projected Projected Projected No. FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 Wastewater Service Fund (521) 1 Beginning Balance $ 2,604,984 $ 4,722,439 $ 4,576,942 $ 3,617,047 $ 2,348,386 2 Annual Cash Balance $ 2,117,455 $ (145,497) $ (959,895) $ (1,268,662) $ (925,274) 3 Ending Balance $ 4,722,439 $ 4,576,942 $ 3,617,047 $ 2,348,386 $ 1,423,112 4 Interest $ 21,876 $ 27,820 $ 40,787 $ 44,351 $ 37,003 Wastewater Bond Fund (525) 5 Beginning Balance $ $ $ $ $ 6 New Bond Proceeds $ $ $ $ $ 7 Transfer to Wastewater Projects Fund (523) $ $ $ $ $ 8 Transfer from WW Cap Improv Fund (529) 9 Ending Balance $ $ $ $ $ 10 Interest $ $ $ $ $ Wastewater Projects Fund (523) 11 Beginning Balance $ $ $ $ $ 12 Revenue $ 678, Transfer from Wastewater Service Fund (521) $ 566,800 $ 1,505,560 $ 2,127,527 $ 2,207,266 $ 2,191, Transfer from WW Cap Improv Fund (529) $ 12,200 $ 105,600 $ 109,798 $ 114,153 $ 118, Transfer from WW Bond Fund (525) $ $ $ $ $ 16 Capital Projects $ (1,257,400) $ (1,611,160) $ (2,237,325) $ (2,321,419) $ (2,310,200) 17 Ending Balance $ $ $ $ $ 18 Interest $ $ $ $ $ Wastewater Debt Service Fund (526) 19 Beginning Balance $ $ $ $ $ 20 Revenue $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25, Transfer from WW Service Fund (521) $ 774,694 $ 774,694 $ 774,694 $ 774,694 $ 774, Transfer from WW Cap Improv Fund (529) $ 906,288 $ 906,288 $ 906,288 $ 906,288 $ 906, Existing Debt Service $ (1,705,982) $ (1,705,982) $ (1,705,982) $ (1,705,982) $ (1,705,982) 24 Proposed Debt Service $ $ $ $ $ 25 Ending Balance $ $ $ $ $ 26 Interest $ $ $ $ $ Wastewater Capital Improvement Fund (529) 27 Beginning Balance $ 2,387,460 $ 1,552,472 $ 590,584 $ $ 28 Revenue (Development Impact Fee) $ 83,500 $ 50,000 $ 50,000 $ 100,000 $ 100, Loan from Wastewater Service Fund (521) $ $ $ 375,502 $ 920,441 $ 924, Transfer to Wastewater Projects Fund (523) $ (12,200) $ (105,600) $ (109,798) $ (114,153) $ (118,670) 31 Transfer to Wastewater Debt Service (526) $ (906,288) $ (906,288) $ (906,288) $ (906,288) $ (906,288) 32 Ending Balance $ 1,552,472 $ 590,584 $ $ $ 33 Interest $ 11,820 $ 6,429 $ 2,953 $ $ Final Report August 30, 2010 Page 30

WATER AND WASTEWATER RATE STUDY

WATER AND WASTEWATER RATE STUDY WATER AND WASTEWATER RATE STUDY Draft July 3, 2013 Prepared by: Page 1 Page 2 201 S. Lake Avenue Suite 301 Pasadena, CA 91101 Phone 626. 583. 1894 Fax 626. 583. 1411 www.raftelis.com July 1, 2013 Mr. Don

More information

Sanitation Rate Study Final Report

Sanitation Rate Study Final Report Sanitation Rate Study Final Report City of Simi Valley April 24, 2015 Prepared by: Page 1 201 S. Lake Avenue Suite 301 Pasadena, CA 91101 Phone 626.583.1894 Fax 626.583.1411 www.raftelis.com April 24,

More information

WASTEWATER FINANCIAL PLAN STUDY REPORT

WASTEWATER FINANCIAL PLAN STUDY REPORT WASTEWATER FINANCIAL PLAN STUDY REPORT FINAL October 7, 2013 Prepared by: Page 1 201 S. Lake Avenue Suite 301 Pasadena, CA 91101 Phone 626.583. 1894 Fax 626.583. 1411 www.raftelis.com October 7, 2013 Mr.

More information

La Cañada Irrigation District

La Cañada Irrigation District La Cañada Irrigation District Water Rate Study Report - 2009 March, 2009 201 S. Lake Blvd, Suite 803 Pasadena CA 91101 Phone Fax 626 583 1894 626 583 1411 www.raftelis.com March 30, 2009 Mr. Douglas M.

More information

The City of Sierra Madre

The City of Sierra Madre The City of Sierra Madre Comprehensive Water and Wastewater Cost of Service Study Report / December 24, 2018 24640 Jefferson Avenue Suite 207 Murrieta, CA 92562 Phone 951.698.0145 www.raftelis.com December

More information

Goleta Water District

Goleta Water District 201 S Lake Ave. Suite 301 Pasadena CA 91101 Phone 626 583 1894 www.raftelis.com Water Rates and Cost of Service Study Final Report / June 11, 2015 Water Cost of Service & Rate Study Report 2015 201 S Lake

More information

CITY OF THOUSAND OAKS

CITY OF THOUSAND OAKS CITY OF THOUSAND OAKS 2018 Wastewater Financial Plan Update Final Report / June 23, 2017 445 S. Figueroa Street Suite #2270 Los Angeles, CA 90071 Phone 213.262.9300 Fax 213.262.9303 www.raftelis.com June

More information

Rainbow Municipal Water District

Rainbow Municipal Water District Rainbow Municipal Water District Potable Water Cost of Service Study November 10, 2015 201 S Lake Ave. Suite 301 Pasadena CA 91101 Phone 626.583.1894 Fax 626.583.1411 www.raftelis.com November 10, 2015

More information

YORK COUNTY, SOUTH CAROLINA

YORK COUNTY, SOUTH CAROLINA YORK COUNTY, SOUTH CAROLINA Water and Sewer Financial Planning and Rate Study Report October 25, 2017 1031 S. Caldwell Street Suite 100 Charlotte, NC 28203 Phone 704.373.1199 Fax 704.373.1113 www.raftelis.com

More information

City of Vista Wastewater Final Report Financial Plan. January 2013

City of Vista Wastewater Final Report Financial Plan. January 2013 Wastewater Final Report Financial Plan January 2013 201 S. Lake Avenue Suite 301 Pasadena, CA 91101 Phone 626. 583. 1894 Fax 626. 583. 1411 www.raftelis.com January 15, 2013 Robin Putnam Director of Community

More information

WATER AND SEWER UTILITIES RATE STUDY

WATER AND SEWER UTILITIES RATE STUDY WATER AND SEWER UTILITIES RATE STUDY RATE DESIGN WORKSHOP WITHCITYCOUNCIL / UTILITIES COMMISSION March 6, 2014 Agenda Overview of Rate Study Process Water / Sewer Developer Impact Fees Sewer Rates Water

More information

Revenue Plan. August 12, Dennis Davies Deputy Director of Public Works 200 Civic Center Way El Cajon, CA 92020

Revenue Plan. August 12, Dennis Davies Deputy Director of Public Works 200 Civic Center Way El Cajon, CA 92020 1925 Palomar Oaks Way, Suite 3 Carlsbad, California 928 tel: 76 438 7755 fax: 76 438 7411 Dennis Davies Deputy Director of Public Works 2 Civic Center Way El Cajon, CA 922 Subject: Six Year Revenue Plan

More information

Squaw Valley PSD. Water & Sewer Rate and Connection Fee Study. Presented by: Shawn Koorn Associate Vice President HDR Engineering, Inc.

Squaw Valley PSD. Water & Sewer Rate and Connection Fee Study. Presented by: Shawn Koorn Associate Vice President HDR Engineering, Inc. Squaw Valley PSD Water & Sewer Rate and Connection Fee Study February 15, 2017 Presented by: Shawn Koorn Associate Vice President HDR Engineering, Inc. Purpose of the District s Study Provide sufficient

More information

COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS

COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS Black & Veatch Holding Company 2011. All rights reserved. COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS San Antonio Water System PREPARED FOR San Antonio Water System 26 MAY 2015 B&V PROJECT NO.

More information

Santa Clarita Water Division

Santa Clarita Water Division Santa Clarita Water Division Retail Water Rate Cost of Service Study Report September 2017 445 S Figueroa St Suite 2270 Los Angeles, CA 90039 Phone 213.262.9300 www.raftelis.com September 11, 2017 Mr.

More information

Temescal Valley Water District

Temescal Valley Water District Temescal Valley Water District Comprehensive Water, Recycled Water, and Wastewater Cost of Service Study Draft Report / December 7, 2016 24640 Jefferson Avenue Suite 207 Murrieta, CA 92562 Phone 951.698.0145

More information

DRAFT COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS. San Antonio Water System. San Antonio Water System 21 MAY 2015 PREPARED FOR

DRAFT COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS. San Antonio Water System. San Antonio Water System 21 MAY 2015 PREPARED FOR Black & Veatch Holding Company 2011. All rights reserved. DRAFT COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS San Antonio Water System PREPARED FOR San Antonio Water System 21 MAY 2015 B&V PROJECT

More information

SANTA FE IRRIGATION DISTRICT

SANTA FE IRRIGATION DISTRICT SANTA FE IRRIGATION DISTRICT Water Rate Study FINAL Report/March 2016 445 S Figueroa Street Suite 2270 Los Angeles, CA 90071 Phone 213 262 9300 Fax 213 262 9303 www.raftelis.com March 21, 2016 Ms. Jeanne

More information

Water and Sewer Utility Rate Studies

Water and Sewer Utility Rate Studies Final Report Water and Sewer Utility Rate Studies July 2012 Prepared by: HDR Engineering, Inc. July 27, 2012 Mr. Mark Brannigan Director of Utilities 591 Martin Street Lakeport, CA 95453 Subject: Comprehensive

More information

From: Lex Warmath and Elaine Conti, Raftelis Financial Consultants, Inc.

From: Lex Warmath and Elaine Conti, Raftelis Financial Consultants, Inc. 227 West Trade Street Phone 704 373 1199 www.raftelis.com Suite 1400 Fax 704 373 1113 Charlotte, NC 28202 Date: June 21, 2016 To: Mr. Bob Walker, Executive Director From: Lex Warmath and Elaine Conti,

More information

YORBA LINDA WATER DISTRICT

YORBA LINDA WATER DISTRICT YORBA LINDA WATER DISTRICT 2015 Water and Sewer Rate Study Report FINAL August 25, 2015 City of Thousand Oaks Water and Wastewater Financial Plan Study Report 445 S. Figueroa Street Suite #227 Los Angeles,

More information

City of Riverbank. Water Rate Study FINAL 6/18/2015

City of Riverbank. Water Rate Study FINAL 6/18/2015 Water Rate Study FINAL 6/18/2015 Bartle Wells Associates Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com Tel: 510-653-3399 June 18, 2015 6707

More information

City of La Palma Agenda Item No. 5

City of La Palma Agenda Item No. 5 City of La Palma Agenda Item No. 5 MEETING DATE: January 19, 2016 TO: FROM: SUBMITTED BY: CITY COUNCIL CITY MANAGER Mike Belknap, Community Services Director AGENDA TITLE: Adopt a Resolution Approving

More information

Shelley Burgett, Manager of Finance, Alameda County Water District. 1 Key Changes from Board Directions during the Public Hearing

Shelley Burgett, Manager of Finance, Alameda County Water District. 1 Key Changes from Board Directions during the Public Hearing MEMORANDUM To: Shelley Burgett, Manager of Finance, Alameda County Water District From:Sanjay Gaur, Vice President / Khanh Phan, Sr. Consultant, Raftelis Financial Consultants, Inc. Date: March 7, 2017

More information

CITY OF TACOMA. Wastewater, Surface Water, and Solid Waste Cost of Service Rate Study December 31, 2016

CITY OF TACOMA. Wastewater, Surface Water, and Solid Waste Cost of Service Rate Study December 31, 2016 CITY OF TACOMA Wastewater, Surface Water, and Solid Waste Cost of Service Rate Study December 31, 2016 TABLE OF CONTENTS SECTION ES EXECUTIVE SUMMARY... 1 Background... 1 Objectives... 1 Rate Development

More information

WATER VALIDATION, COST OF SERVICE & RATE DESIGN ANALYSIS WASTEWATER VALIDATION & RATE ANALYSIS MISCELLANEOUS FEES & OVERHEAD RATE ANALYSIS

WATER VALIDATION, COST OF SERVICE & RATE DESIGN ANALYSIS WASTEWATER VALIDATION & RATE ANALYSIS MISCELLANEOUS FEES & OVERHEAD RATE ANALYSIS WATER VALIDATION, COST OF SERVICE & RATE DESIGN ANALYSIS WASTEWATER VALIDATION & RATE ANALYSIS MISCELLANEOUS FEES & OVERHEAD RATE ANALYSIS B&V PROJECT NO. 179801.0100 PREPARED FOR Vallecitos Water District,

More information

Town of Yountville Wastewater Rate Study Update 2017/18

Town of Yountville Wastewater Rate Study Update 2017/18 Town of Yountville Wastewater Rate Study Update 2017/18 Draft Report 11/22/2017 BARTLE WELLS ASSOCIATES Independent Public Finance Advisors Town of Yountville: Wastewater Rate Study Executive Summary Bartle

More information

WATER AND SEWER RATE STUDY

WATER AND SEWER RATE STUDY FINAL WATER AND SEWER RATE STUDY B&V PROJECT NO. 179322.0100 PREPARED FOR City of Lynwood, CA JANUARY 11, 2017 Black & Veatch Holding Company 2011. All rights reserved. City of Lynwood, CA WATER AND SEWER

More information

Sewer Rate Study CRESCENT CITY CALIFORNIA

Sewer Rate Study CRESCENT CITY CALIFORNIA CRESCENT CITY CALIFORNIA Sewer Rate Study 27368 Via Industria, Suite 110, Temecula, California 925904856 T 951.587.3500 800.755.6864 F 888.326.6864 www.willdan.com Mr. Eugene Palazzo City Manager City

More information

CITY OF CALISTOGA WATER RATE STUDY FINAL REPORT

CITY OF CALISTOGA WATER RATE STUDY FINAL REPORT CITY OF CALISTOGA WATER RATE STUDY FINAL REPORT February 2, 218 This page was intentionally left blank. City of Calistoga Water Rate Study Report Page 2 February 2, 218 Dylan Feik City Manager City of

More information

SAN ANTONIO WATER SYSTEM (SAWS) RATE ADVISORY COMMITTEE: MEETING 3

SAN ANTONIO WATER SYSTEM (SAWS) RATE ADVISORY COMMITTEE: MEETING 3 01 April, 2014 SAN ANTONIO WATER SYSTEM (SAWS) RATE ADVISORY COMMITTEE: MEETING 3 Bill Zieburtz Richard Campbell Robert Chambers RATE SETTING PROCESS STUDY APPROACH RATE SETTING OBJECTIVES FINANCIAL PLAN

More information

Water and Sewer Rates

Water and Sewer Rates Santa Margarita Water District - Water and Sewer Rates Home Live Chat Sitemap Phone: (949) 459-6420 Your Water Conservation Operations Doing Business News About Us Community Contact Us Your Water Water

More information

Water Rate Study FINAL January 31, 2018

Water Rate Study FINAL January 31, 2018 Water Rate Study FINAL January 31, 2018 1889 Alcatraz Avenue Berkeley, CA 94703 Tel: 510 653 3399 www.bartlewells.com January 31, 2018 Joshua Basin Water District P.O. Box 675 / 61750 Chollita Road Joshua

More information

Water Consultancy. Montecito Sanitary District Wastewater Rate Study Report. Montecito Sanitary District

Water Consultancy. Montecito Sanitary District Wastewater Rate Study Report. Montecito Sanitary District 3585 Maple Street, Suite 250 Ventura, CA 93003 805-404-1467 Montecito Sanitary District Wastewater Rate Study Report March 2016 Montecito Sanitary District 1042 Monte Cristo Lane Santa Barbara CA 93108

More information

SUMMERLAND SANITARY DISTRICT

SUMMERLAND SANITARY DISTRICT SUMMERLAND SANITARY DISTRICT Financial Plan and Rate Study December 6, 2017 445 S. Figueroa Street Suite #2270 Los Angeles, CA 90071 Phone 213.262.9300 Fax 213.262.9303 www.raftelis.com December 6, 2017

More information

Capital Region Water. Water and Wastewater Rate Study Report. November 22, Capital Region Water Water and Wastewater Rate Study

Capital Region Water. Water and Wastewater Rate Study Report. November 22, Capital Region Water Water and Wastewater Rate Study Capital Region Water Water and Wastewater Rate Study Report November 22, 2017 Capital Region Water Water and Wastewater Rate Study TABLE OF CONTENTS 1. INTRODUCTION...1 1.1 RATE STUDY SCOPE AND OBJECTIVES...1

More information

PREFERRED FINANCIAL PLAN SCENARIO & WATER RATE DESIGN ALTERNATIVE

PREFERRED FINANCIAL PLAN SCENARIO & WATER RATE DESIGN ALTERNATIVE Mid Flat Rate Increases Limited CIP through Year 5 Reserves recover by Year 10 Phased In CIP Spending 2. 10 Year Phase In 100% of CIP by Year 10 100% of Reserves by Year 10 3. 5 Year Phase In 100% of CIP

More information

LONG BEACH WATER DEPARTMENT COST OF SERVICE AND RATE STUDY

LONG BEACH WATER DEPARTMENT COST OF SERVICE AND RATE STUDY LONG BEACH WATER DEPARTMENT COST OF SERVICE AND RATE STUDY Final Report / February 1, 2017 445 S. Figueroa Street Suite 2270 Los Angeles, CA 90071 Phone Fax 213. 262. 9300 213. 262. 9303 www.raftelis.com

More information

FORT COLLINS- LOVELAND WATER DISTRICT

FORT COLLINS- LOVELAND WATER DISTRICT FORT COLLINS- LOVELAND WATER DISTRICT Water Financial Planning and Rate Study Report March 16, 2018 District of Thousand Oaks Water and Wastewater Financial Plan Study Report March 16, 2018 Board of Directors

More information

Final Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY

Final Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY Final Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY Phase 2 Cost of Service and Rate Design BLACK & VEATCH PROJECT NO. 192366 Black & Veatch Holding Company 2017. All rights

More information

Comprehensive Water Rate Study

Comprehensive Water Rate Study Final Report Dublin San Ramon Services District Comprehensive Water Rate Study January 213 Prepared by: HDR Engineering, Inc. January 1, 213 Ms. Lori Rose Financial Services Manager Dublin San Ramon Services

More information

San Francisco Public Utilities Commission

San Francisco Public Utilities Commission San Francisco Public Utilities Commission Water & Wastewater Rate Study Report March 6, 2009 Prepared by: Table of Contents I. EXECUTIVE SUMMARY...1 A. Pricing Objectives...2 B. Review of Findings Water...2

More information

Study Workshops are designed to be both educational and to seek broad direction from the Board

Study Workshops are designed to be both educational and to seek broad direction from the Board Study Workshops are designed to be both educational and to seek broad direction from the Board Workshop #1 Financial Forecast & Cost of Service Water, recycled water, & sewer services Revenue requirement

More information

Notice of a public hearing

Notice of a public hearing Notice of a public hearing Dear Benicia Resident and/or Business Owner, You are receiving a revised Notice of a Public Hearing to increase the water and sewer rates and add water meter replacement fees.

More information

Water and Wastewater Utility Rates

Water and Wastewater Utility Rates Water and Wastewater Utility Rates March 1, 2016 Presented By: Diana Langley Public Works Director 1 OVERVIEW 2 Uses of Funds Capital Investment Debt Service Operating Cost = Revenue Requirement 3 Source

More information

The series 2008 Water & Sewer Revenue Bonds Feasibility Report recommended the City perform and implement a rate study for the following reasons:

The series 2008 Water & Sewer Revenue Bonds Feasibility Report recommended the City perform and implement a rate study for the following reasons: Additional Background Information Water and Wastewater The City of Fort Lauderdale supplies water and sewer services on a regional basis to over 250,000 residents of central Broward County. The areas serviced

More information

Wastewater Rate Study. Villa Park, Illinois

Wastewater Rate Study. Villa Park, Illinois Wastewater Rate Study Villa Park, Illinois June 2013 Executive Summary General The Village of Villa Park s Wastewater Utility is responsible for operation and maintenance of the Village s separate sanitary

More information

BODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study

BODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study BODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study FINAL REPORT March 22, 2018 BARTLE WELLS ASSOCIATES Independent Public Finance Advisors 1889 Alcatraz Avenue Berkeley, CA 94703-2714 Tel.

More information

WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY

WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY REPORT January 2017 WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY PREPARED BY: ECONOMICS STRATEGY STAKEHOLDERS SUSTAINABILITY www.newgenstrategies.net 3420

More information

July 1, Tier Percent of Allocation Cost per ccf $0.91 $1.27 $2.86 $4.80 $ % % % % 201+%

July 1, Tier Percent of Allocation Cost per ccf $0.91 $1.27 $2.86 $4.80 $ % % % % 201+% 1 CHART EXAMPLES OF WATER RATES AND CHARGES OF MWD MEMBER AGENCIES AND THEIR SUBAGENCIES MWD Member Agencies shown: MWDOC, SDCWA, Calleguas, Las Virgenes, West Basin, LADWP, Eastern and Foothill Member

More information

City of Sanibel. Sewer Expansion Feasibility Study Update GAI #A

City of Sanibel. Sewer Expansion Feasibility Study Update GAI #A City of Sanibel Sewer Expansion Feasibility Study 2011 Update GAI # July 2011 July 12, 2011 GAI Proj. # Mr. Gates Castle Utility Director City of Sanibel 800 Dunlop Road Sanibel, FL 33957 Subject: Sewer

More information

Table 2-2 Projected Water Production and Costs

Table 2-2 Projected Water Production and Costs Table 2-2 Projected Water Production and Costs Recorded Estimated Budget Forecast Description FY 2007-08 FY 2008-09 FY 2009-10 FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 Well Production (OCWD, A-F, a)

More information

SAUSALITO-MARIN CITY SANITARY DISTRICT 1 EAST ROAD SAUSALITO, CALIFORNIA Telephone: (415) Fax: (415)

SAUSALITO-MARIN CITY SANITARY DISTRICT 1 EAST ROAD SAUSALITO, CALIFORNIA Telephone: (415) Fax: (415) 1 EAST ROAD SAUSALITO, CALIFORNIA Telephone: (415) 332-0244 Fax: (415) 332-0453 Budget FY 2017/18 Adopted by Board on June 5, 2017 BUDGET EXECUTIVE SUMMARY FISCAL YEAR 2017/18 DISTRICT OVERVIEW The Sausalito-Marin

More information

City of Cocoa FY 2010 Utility Rate Study. Final Report. Water, Sewer & Reclaimed Water Rates, Fees & Charges Study. Prepared by:

City of Cocoa FY 2010 Utility Rate Study. Final Report. Water, Sewer & Reclaimed Water Rates, Fees & Charges Study. Prepared by: p FY 2010 Utility Rate Study Water, Sewer & Reclaimed Water Rates, Fees & Charges Study June 29, 2010 Prepared by: June 29, 2010 W.E. Mack Finance Director 65 Stone Street Cocoa, FL 32922 Re: FY 2010

More information

City of San Carlos Sewer Financial Plan & Rate Update

City of San Carlos Sewer Financial Plan & Rate Update City of San Carlos Sewer Financial Plan & Rate Update Revised 06/13/16 1889 Alcatraz Avenue Berkeley, CA 94703 Tel: 510 653 3399 www.bartlewells.com June 13, 2016 City of San Carlos Department of Public

More information

Water & Sewer Rate Study. Water & Sewer Cost of Service Rate Study. City of Norco, CA. Draft Report for

Water & Sewer Rate Study. Water & Sewer Cost of Service Rate Study. City of Norco, CA. Draft Report for Water & Sewer Cost of Service Rate Study for City of Norco, CA October 11, 2016 Table of Contents October 11, 2016 Chad Blais Director of Public Works City of Norco 2870 Clark Avenue Norco, CA 92860 Re:

More information

City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE

City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE I. INTRODUCTION City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE The City of Arroyo Grande, California (the City ) was incorporated as a general

More information

MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT. September 2013

MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT. September 2013 MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT September 2013 10540 TALBERT AVENUE, SUITE 200 EAST FOUNTAIN VALLEY, CALIFORNIA 92708 P. 714.593.5100 F. 714.593.5101 MARINA

More information

City of Benicia. Rate Study Update: Water & Wastewater Rates

City of Benicia. Rate Study Update: Water & Wastewater Rates City of Benicia Rate Study Update: Water & Wastewater Rates March 1, 2016 Prepared by: Karin Schnaider, Finance Director, City of Benicia Greg Clumpner, Director, NBS Carmen Narayanan, Consultant, NBS

More information

Water Rate Study for City of Lemoore

Water Rate Study for City of Lemoore Water Rate Study for City of Lemoore June 17, 2016 Prepared by: Dan Bergmann, Principal 15 Shasta Lane, Walnut Creek, CA 94597 Email: dan@igservice.com Office: 925-946-9090 Water Rate Study for City of

More information

GREAT OAKS WATER COMPANY P.O. Box San Jose, California (408)

GREAT OAKS WATER COMPANY P.O. Box San Jose, California (408) GREAT OAKS WATER COMPANY P.O. Box 23490 San Jose, California 95153 (408) 227-9540 tguster@greatoakswater.com California Public Utilities Commission Water Division Room 3102 505 Van Ness Avenue San Francisco,

More information

Town of Orange Park Water & Wastewater Rate Study. Town Council Meeting. March 19, 2019

Town of Orange Park Water & Wastewater Rate Study. Town Council Meeting. March 19, 2019 Town of Orange Park Water & Wastewater Rate Study Town Council Meeting March 19, 2019 Rate Setting Rate Setting Rate Making Process Revenue Requirements Cost Allocation Rate Design Communication Operating

More information

WATER AND WASTEWATER FUND REVENUES

WATER AND WASTEWATER FUND REVENUES WATER AND WASTEWATER FUND REVENUES Water revenues comprise $12.11 million, or 70.6% of total revenues of the fund, while wastewater (sewer) charges comprise $4.25 million, or 24.7% of total revenues. Water

More information

Agenda Rio Linda / Elverta Community Water District Planning Committee

Agenda Rio Linda / Elverta Community Water District Planning Committee Agenda Rio Linda / Elverta Community Water District Planning Committee Sacramento Metro Fire Dept. Friday, February 5, 2015 6609 Rio Linda Blvd. 2:00 pm Rio Linda, CA 95673 Public documents relating to

More information

CITY OF CITY OF SONOMA FULLERTON. Pricing Objectives Discussion Water Rate Study 2018 Water Rate Study

CITY OF CITY OF SONOMA FULLERTON. Pricing Objectives Discussion Water Rate Study 2018 Water Rate Study CITY OF CITY OF FULLERTON SONOMA Pricing Objectives Discussion Water Rate Study 2018 Water Rate Study Interview / September 21, 2017 City Council Meeting / January 17, 2018 Agenda 1. Introduction 2. City

More information

FINANCIAL PLAN REVIEW AND FORECAST

FINANCIAL PLAN REVIEW AND FORECAST Napa Sanitation District Cost of Service Rate and Capacity Charge Study Technical Memorandum #2 FINANCIAL PLAN REVIEW AND FORECAST DRAFT March 2018 Contents 1 Introduction 1 1.1 Project Background 1 1.1.1

More information

NALDRAFT SEPTEMBER2015 WASTEWATE

NALDRAFT SEPTEMBER2015 WASTEWATE FI NALDRAFT SEPTEMBER2015 Cos tof S e r v i c e s S T UDY WATE R WASTEWATE R RE CY CL E DWATE R ST ORMWATE R E NVI RONME NT ALRE SOURCE S CITY OF OXNARD PUBLIC WORKS INTEGRATED MASTER PLAN COST OF SERVICE

More information

Wastewater Utilities. FY Budget Presentation

Wastewater Utilities. FY Budget Presentation Utilities FY 2018-19 Budget Presentation 1 Volume Forecast Wastewater Customers by Class Fiscal Year Residential Commercial Wholesale Total Growth 2013 26,995 1.1% 3,091 0.8% 4 30,090 1.1% 2014 27,548

More information

STORM WATER USER RATE STUDY

STORM WATER USER RATE STUDY LY STORM WATER USER RATE STUDY STORM WATER UTILITY OREM CITY, UTAH JANUARY 2016 PREPARED BY LEWIS YOUNG ROBERTSON & BURNINGHAM, INC. TABLE OF CONTENTS SECTION I: EXECUTIVE SUMMARY... 3 SECTION II: OVERVIEW

More information

1. Accept staff report on the updated study of cost of service to provide potable water to San Jose Municipal Water System (SJMWS) customers; and

1. Accept staff report on the updated study of cost of service to provide potable water to San Jose Municipal Water System (SJMWS) customers; and CITY OF Cr SAN IPSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL SUBJECT: MUNICIPAL WATER SYSTEM COST OF SERVICE STUDY COUNCIL AGENDA: 05/09/17 ITEM: 7.2 Memorandum FROM: Kerrie Romanow

More information

CITY OF. Dixon. Water Enterprise Financial Plan Overview. City Council Meeting - March 27, 2018

CITY OF. Dixon. Water Enterprise Financial Plan Overview. City Council Meeting - March 27, 2018 t CITY OF Dixon Water Enterprise Financial Plan Overview City Council Meeting - March 27, 2018 1 STEPS IN CONDUCTING A RATE STUDY Financial Plan Evaluation of CIP and financing options Cash flow analysis

More information

Great Lakes Water Authority/ Detroit Water and Sewerage Department Five-year Financial Forecast Cash Basis. July 1, 2015 through June 30, 2020

Great Lakes Water Authority/ Detroit Water and Sewerage Department Five-year Financial Forecast Cash Basis. July 1, 2015 through June 30, 2020 Great Lakes Water Authority/ Detroit Water and Sewerage Department Cash Basis July 1, 2015 through June 30, 2020 Table of Contents Report Letter... 1 Project Summary... 2-3 Executive Summary... 4 Financial

More information

City of Cape Coral FY 2011 Utility Revenue Sufficiency Analysis. Final Report

City of Cape Coral FY 2011 Utility Revenue Sufficiency Analysis. Final Report FY 211 Utility Revenue Sufficiency Analysis Water, Sewer & Irrigation Rate Study September 1, 211 Prepared by: September 1, 211 Ms. Sheena Milliken Management/Budget Administrator PO Box 1527 Cape Coral,

More information

City of Ann Arbor, MI Water and Sewer Cost of Service Study Final Draft Report

City of Ann Arbor, MI Water and Sewer Cost of Service Study Final Draft Report City of Ann Arbor, MI Water and Sewer Cost of Service Study Final Draft Report June 15, 2018 June 15, 2018 Ms. Lynne Chaimowitz Budget and Finance Supervisor City of Ann Arbor 301 E. Huron Street Ann Arbor,

More information

ES.1 Findings and Recommendations... ES Overview Current Rates Rate Making Objectives

ES.1 Findings and Recommendations... ES Overview Current Rates Rate Making Objectives Table of Contents Executive Summary ES.1 Findings and Recommendations... ES-1 Chapter 1. Introduction 1.1 Overview... 1-1 1.2 Current Rates... 1-1 1.3 Rate Making Objectives... 1-1 Chapter 2. Revenue Requirement

More information

Capital Finance Overview: Dealing with the New Normal

Capital Finance Overview: Dealing with the New Normal Capital Finance Overview: Dealing with the New Normal Jeff Hughes Director Environmental Finance Center at the University of North Carolina efc.unc.edu jhughes@sog.unc.edu (919) 843-4956 www.efc.unc.edu

More information

TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009

TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009 TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009 EXECUTIVE SUMMARY The functions and duties of the Oro Valley Water Utility Commission include reviewing and developing

More information

Final COST OF SERVICE STUDY SEPTEMBER City of San Clemente

Final COST OF SERVICE STUDY SEPTEMBER City of San Clemente Final COST OF SERVICE STUDY SEPTEMBER 2017 City of San Clemente Contents CONTENTS Executive Summary... 1 Study Goals and Drivers... 1 Water Rate Analysis & Adoption... 2 Recycled Water Rate Analysis &

More information

Water Rates Rate Restructure and Rate Adjustments

Water Rates Rate Restructure and Rate Adjustments Water Rates Rate Restructure and Rate Adjustments Community Outreach Meeting Questions We Will Address Why are water rates changing? Where does the water come from? Did the rain from last winter help?

More information

Water Rate Study Final Report

Water Rate Study Final Report Phelan Pinon Hills Community Services District March 6, 2013 Water Rate Study Final Report Corporate Office: Anaheim, California Temecula Office: 27368 Via Industria, Suite 110 Temecula, California 92590

More information

West Valley Sanitation District FINANCIAL PLAN & RATE STUDY. January 2018

West Valley Sanitation District FINANCIAL PLAN & RATE STUDY. January 2018 West Valley Sanitation District FINANCIAL PLAN & RATE STUDY January 2018 BARTLE WELLS ASSOCIATES Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com

More information

UNION SANITARY DISTRICT

UNION SANITARY DISTRICT UNION SANITARY DISTRICT WASTEWATER RATE AND COST OF SERVICE STUDY December 8, 2015 HF&H Consultants, LLC This page intentionally left blank UNION SANITARY DISTRICT 5072 Benson Road Union City, CA 94587

More information

SAWPA. Audit Services Contract

SAWPA. Audit Services Contract SAWPA Audit Services Contract Recommendation That the Commission award the contract for Audit Services for FYE 2018, 2019, and 2020, to Teaman, Ramirez & Smith, Inc. with an option for 2 additional years.

More information

WATER UTILITY FINANCIAL PLAN AND RATE STUDY CITY OF WHITEFISH, MT MARCH 2016

WATER UTILITY FINANCIAL PLAN AND RATE STUDY CITY OF WHITEFISH, MT MARCH 2016 WATER UTILITY FINANCIAL PLAN AND RATE STUDY CITY OF WHITEFISH, MT MARCH 2016 The Financial Link Executive Summary - Water In May 2015, the City of Whitefish (City) retained AE2S to complete a Water and

More information

Water Services Rate Study

Water Services Rate Study Report on the Water Services Rate Study Town of Telluride, Colorado Project No. 72447 August 2013 Water Services Rate Study prepared for Town of Telluride, Colorado August 2013 Project No. 72447 prepared

More information

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d.

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d. WATER AND WASTEWATER RATE STUDY Town of Midland C o n s u l t i n g L t d. December 2010 TABLE OF CONTENTS EXECUTIVE SUMMARY.........1 I BACKGROUND AND STUDY OBJECTIVES.........9 ll ASSOCIATED LEGISLATION.........13

More information

CITY OF ANN ARBOR WATER & SEWER COST OF SERVICE STUDY

CITY OF ANN ARBOR WATER & SEWER COST OF SERVICE STUDY 1 CITY OF ANN ARBOR WATER & SEWER COST OF SERVICE STUDY 12.20.2017 Overview 1. Sufficiency 2. Rate Classification 3. to Serve 4. Rate Structures 5. Customer Impacts 6. Affordability Program Foundation

More information

WATER USER RATES & FEE STUDY

WATER USER RATES & FEE STUDY WATER USER RATES & FEE STUDY FINAL REPORT February 2016 BARTLE WELLS ASSOCIATES Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com Tel: 510/653-3399

More information

WORKSHOP BRIEFING DOCUMENT: Comprehensive Water and Wastewater Rate and Charge Study

WORKSHOP BRIEFING DOCUMENT: Comprehensive Water and Wastewater Rate and Charge Study WORKSHOP BRIEFING DOCUMENT: Comprehensive Water and Wastewater Rate and Charge Study July 31, 2007 HCD/GAI# A070574.01 Purpose of Rate Study Provide For Revenue Sufficiency Charge Customers Based On Costs

More information

CITY OF SANTA CRUZ WATER DEPARTMENT LONG RANGE FINANCIAL PLAN

CITY OF SANTA CRUZ WATER DEPARTMENT LONG RANGE FINANCIAL PLAN CITY OF SANTA CRUZ WATER DEPARTMENT LONG RANGE FINANCIAL PLAN JUNE 2016 1 LONG RANGE FINANCIAL PLAN TABLE OF CONTENTS Table of Contents... 2 Executive Summary... 4 1. Introduction... 6 2. Background...

More information

Enclosed are copies of the following revised tariff sheets for the utility s files:

Enclosed are copies of the following revised tariff sheets for the utility s files: STATE OF CALIFORNIA PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 EDMUND G. BROWN JR., Governor April 1, 2015 Jennifer Lukins Lukins Brothers Water Company, Inc. 2031 West

More information

Comprehensive Rate Study & Cost Allocation Analysis. Public Workshop December 4, 2017

Comprehensive Rate Study & Cost Allocation Analysis. Public Workshop December 4, 2017 Comprehensive Rate Study & Cost Allocation Analysis Public Workshop December 4, 2017 Today s Workshop: Present findings and solicit Board input on rate design and fiscal policy considerations Financial

More information

2016 Water and Recycled Water Rate Study PUBLIC HEARING DECEMBER 12, 2016

2016 Water and Recycled Water Rate Study PUBLIC HEARING DECEMBER 12, 2016 2016 Water and Recycled Water Rate Study PUBLIC HEARING DECEMBER 12, 2016 Agenda Rate Study Overview Financial Plan Water Rate Design Recycled Water Rate Design Drought Rates Capacity Fees 12/12/2016 Public

More information

CITY OF HEALDSBURG RESOLUTION NO

CITY OF HEALDSBURG RESOLUTION NO CITY OF HEALDSBURG RESOLUTION NO. 49-2012 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HEALDSBURG DETERMINING THAT THERE WAS NO MAJORITY PROTEST OF THE PROPOSED WATER AND WASTEWATER SERVICES RATE INCREASE

More information

City of Riverbank. Sewer Rate Study June 18, 2015 FINAL

City of Riverbank. Sewer Rate Study June 18, 2015 FINAL Sewer Rate Study June 18, 2015 Bartle Wells Associates Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com Tel: 510-653-3399 FINAL Historical & Current

More information

City and Borough of Juneau, AK WATER UTILITY AND WASTEWATER UTILITY RATE STUDY

City and Borough of Juneau, AK WATER UTILITY AND WASTEWATER UTILITY RATE STUDY City and Borough of Juneau, AK WATER UTILITY AND WASTEWATER UTILITY RATE STUDY Summary of Findings October 2003 Financial Consulting Solutions Group, Inc. 8201 -- 164th Ave. NE, Suite 300, Redmond, WA

More information

Table of Contents. Page Witness Background and Experience General Matters Major Wastewater Rate Changes Wastewater Revenue...

Table of Contents. Page Witness Background and Experience General Matters Major Wastewater Rate Changes Wastewater Revenue... MSD Exhibit No. MSD H 0 Rate Change Proceeding WILLIAM STANNARD Direct Testimony Metropolitan St. Louis Sewer District February, 0 Table of Contents Page Witness Background and Experience... General Matters...

More information

CITY OF OXNARD PUBLIC WORKS INTEGRATED MASTER PLAN DRAFT WATER COST OF SERVICE STUDY. FINAL July 2017

CITY OF OXNARD PUBLIC WORKS INTEGRATED MASTER PLAN DRAFT WATER COST OF SERVICE STUDY. FINAL July 2017 CITY OF OXNARD PUBLIC WORKS INTEGRATED MASTER PLAN DRAFT WATER COST OF SERVICE STUDY FINAL July 2017 2700 YGNACIO VALLEY ROAD, SUITE 300 WALNUT CREEK, CALIFORNIA 94598 P. 925.932.1710 F. 925.930.0208 CITY

More information

Cost Accounting for Rate & Fee Setting: Calculating Defensible Rates and Charges

Cost Accounting for Rate & Fee Setting: Calculating Defensible Rates and Charges Cost Accounting for Rate & Fee Setting: Calculating Defensible Rates and Charges UNC School of Government EFC 2017 Water & Wastewater Finance Workshop February 28 March 1, 2017 The William & Ida Friday

More information

COUNTY SANITATION. DISTRICTS OF LOS ANGELES COUNTY

COUNTY SANITATION. DISTRICTS OF LOS ANGELES COUNTY COUNTY SANITATION. DISTRICTS OF LOS ANGELES COUNTY 1955 Workman Mill Road, Whittier, CA 90601-1400 Mailing Address: P.O. Box 4998, Whittier, CA 90607-4998 Telephone: (562) 699-7411, FAX: (562) 699-5422

More information