Water Rates Rate Restructure and Rate Adjustments

Size: px
Start display at page:

Download "Water Rates Rate Restructure and Rate Adjustments"

Transcription

1 Water Rates Rate Restructure and Rate Adjustments Community Outreach Meeting

2 Questions We Will Address Why are water rates changing? Where does the water come from? Did the rain from last winter help? Is water conservation still needed? When were the rates last adjusted? How can I help control my water bill? Short video to answer some of these questions 2

3 Video 3

4 2016 Water Demand: Lowest Since 1952 Water Consumption in Acre feet Water Consumption (Sales) Service Territory Population 3

5 Making Sense of the Bill (Bi-monthly) 5

6 Making Sense of the Bill (Bi-monthly) Customer Type Meter Size Billing Units Used 6

7 Water Rate Components $6.00 $5.00 $4.00 CURRENT SYSTEM AVERAGE RATE Commodity (47%) $2.45 > Commodity Charge > Volumetric charge that covers costs of water delivered, includes the Purchased Water Adjustment Charge for changes in commodity cost $3.00 $2.00 $1.00 $0.00 $5.24 per Billing Unit Billing Unit = 748 gallons Distribution & Customer (34%) $1.78 Capital Improvement (19%) $1.005 > Distribution and Customer (D&C) > Fixed charge that covers operations and maintenance costs > Capital Improvement (CIC) > Volumetric charge that covers capital improvements and investments 7

8 The Value of a Billing Unit of Water > 1 billing unit of water from PWP = 748 gallons and costs $5.25 > 1 gallon of water at the grocery store dispenser costs $ gallons would cost $ > A 16 ounce bottle of water costs about $ gallons of bottled water would cost $5,984. 8

9 So what is going to change? Rate Structure How revenues are collected > Conservation impacts > Groundwater availability What is changing? > Water allocation > Water block prices > How customers are identified Rate Adjustments Amount of revenues collected > Costs have been cut but are still going up What is changing? > Distribution & Customer Charge > Commodity (water costs) > Capital Improvement Charge 9

10 How revenues are collected WATER RATE RESTRUCTURE 10

11 Why Cost of Service Study and Rate Redesign was Completed Cost of Service Analysis > Ensure revenue requirements are met > Ensure rates are equitable and fair > Ensure rates are responsive to changing resources and supply conditions Proposed Rate Design > Rate stability > Affordability & bill impact > Ease of understanding > Conservation and efficient use of water > Compliance with Proposition

12 Introduction to New Rate Components Rate Element Current Rate Structure Proposed Rate Structure Updates COMMODITY Water Allocation Monthly allocation based on meter size Monthly allocation based on customer groups and factors such as property size, count of dwelling units, historic usage Water Pricing 4 rate blocks priced based on source of supply (groundwater, MWD Tier 1 / Tier 2) 4 rate blocks priced based on blended supply sources including water efficiency Blended Supply Capital Improvement Charge Formula based, per billing unit Formula based per billing unit plus future fixed charge Current Variable CIC Charge Future Fixed CIC Charge

13 Proposed Customer Groups & Subgroups Single Family Residential Existing Customer Groups by Meter Connections 5/8 3/4 1 1 ½ Small Medium Large Multi Family Residential 2 Units 9 Units 36 Units Commercial Medium Restaurant Small Office Large Schools XLarge Golf Course

14 Water Allocation Methodology Change > In the current rate design, water blocks are sized and priced based on where water comes from and the size of your meter connection. > In the proposed rate design, water blocks are sized and priced based on where water comes from and how you use water. Water Blocks Current Rate Design Proposed Rate Design Block 1 Block 2 Block 3 Block 4 Groundwater Purchased water Purchased water + Conservation Costs Purchased water + Conservation Costs Minimal health and sanitation indoor use Continued indoor use + outdoor use Primarily Outdoor use + Conservation Costs Primarily Outdoor use + Conservation Costs 14

15 Water Pricing: 4 Block Structure > A 4-block water structure provides price signals and considers the cost differential between groundwater and MWD purchased water. Ground water Purchased water BLOCK1 Estimated % of Total Sales 40-45% Ground water Purchased water BLOCK % Purchased water Conservation BLOCK3 7-12% Purchased water Conservation BLOCK4 4-8% 15

16 Water Pricing: Current vs. Proposed Single Family Residential Commodity Block Rates > Note: Final rates adopted by City Council may differ $5.00 $4.00 $3.00 $2.00 $1.40 $1.25 $1.26 $2.99 $2.15 $2.48 $3.49 $3.26 $3.18 $4.24 $3.54 $4.00 $1.00 $0.00 Block 1 Block 2 Block 3 Block 4 Current Proposed FY 2018 Proposed FY 2019 Current Allocation in Billing Units Meter Size Block 1 Block 2 Block 3 Block 4 5/8 3/4" ½ Proposed Allocation in Billing Units Subclass Block 1 Block 2 Block 3 Block 4 Small Medium Large

17 Bill Impact SFR Small; 18 BU Bimonthly Current Distribution & Customer Charge with 3/4 meter: $ Commodity Charge: Block 1: $ Block 2: $ 5.98 Total Commodity $ CIC: $ Total Water Service: $ Proposed (FY18) Distribution & Customer Charge with 3/4 meter: $ Commodity Charge: Block 1: $ Block 2: $ 4.30 Total Commodity $ CIC: $ Total Water Service: $ $1.70 Increase (2.1%) 17

18 Bill Impact SFR Medium; 50 BU Bimonthly Current Distribution & Customer Charge with 1 meter: $ Commodity Charge: Block 1: $ Block 2: $ Total Commodity $ CIC: $ Total Water Service: $ Proposed (FY18) Distribution & Customer Charge with 1 meter: $ Commodity Charge: Block 1: $ Block 2: $ Block 3: $ Total Commodity $ CIC: $ Total Water Service: $ $2.99 Increase (1.3%) 18

19 Bill Impact SFR Large; 110 BU Bimonthly Current Distribution & Customer Charge with 1 1/2 meter: $ Commodity Charge: Block 1: $ Block 2: $ Total Commodity $ CIC: $ Total Water Service: $ Proposed (FY18) Distribution & Customer Charge with 1 1/2 meter: $ Commodity Charge: Block 1: $ Block 2: $ Block 3: $ Total Commodity $ CIC: $ Total Water Service: $ $42.12 Increase (8.4%) 19

20 Proposed Capital Improvement Charge Proposed Fixed Rate Component > Current CIC charge (100% volumetric) generates revenues to fund capital improvement projects and debt service payments. > Proposed fixed component would recover new bond financing costs PROPOSED CURRENT CIC RATE - VARIABLE long term infrastructure improvements and debt service payments CIC RATE VARIABLE long term infrastructure improvements and existing debt service payments + CIC RATE FIXED New debt service payments > Over time, all revenues to recover debt service financing would be fixed. 20

21 Amount of revenues collected WATER RATE ADJUSTMENTS 21

22 Proposed Water Rate Adjustments Rate Structure Rate Adjustments Rate adjustments are independent of water rate restructuring MWD $$$$ Commodity rate increases to pass through MWD increases Operating costs are higher > Cost reductions made to minimize rate impacts > Eliminated 8 full-time positions > Last D&C increase was July 2011 Sept 25th Capital Improvement Charge reduction Prop 218 notice and Public Hearing 22

23 $140 Sample Bill Impacts Single Family Residential Medium (34% of all Accounts) > Average Monthly Use = 15 BU > FY 2018 Average Monthly Change = 6.6% > FY 2019 Average Monthly Change = 7.5% Monthly SFR Medium Bill Impacts (1") $120 $100 $80 $60 $61.82 $69.35 $74.27 $73.74 $78.59 $84.52 $85.66 $87.83 $94.76 $97.58 $98.18 $ $ $ $ $40 $20 $0 12 BU 15 BU 18 BU 21 BU 24 BU Current Monthly Bill Proposed FY2018 Proposed FY

24 Monthly Bill Comparison - Residential $140 Residential $120 Estimated Monthly Bill $100 $80 $60 $40 $20 $0 3/4 Inch 8 BU 3/4 Inch 12 BU 1 Inch 20 BU Long Beach $35.38 $50.09 $99.28 Burbank $35.86 $47.64 $72.67 Pasadena $36.04 $48.57 $95.80 LADWP $45.37 $68.05 $ Glendale $50.95 $63.71 $ Crescenta Valley $51.37 $65.07 $

25 Schedule for Proposed Water Rate Restructure and Rate Adjustments Date Action Item Aug-Sep Community Outreach Meetings 9/25/17 Water Rates Public Hearing and 1 st Reading of Rate Ordinance 10/02/17 2 nd Reading of Rate Ordinance 11/01/17 New Water Rate Structure and Rate Adjustments effective 10/01/18 Year 2 Rate Adjustments effective PWPweb.com/WaterRates 25

Water Rates Adjustments Phase 2

Water Rates Adjustments Phase 2 Water Rates Adjustments Phase 2 Presented by Shana E. Epstein Director of Public Works, City of Beverly Hills Background Phase 1-Effective January 18, 2018 5-year revenue requirement 3% annual increase

More information

July 1, Tier Percent of Allocation Cost per ccf $0.91 $1.27 $2.86 $4.80 $ % % % % 201+%

July 1, Tier Percent of Allocation Cost per ccf $0.91 $1.27 $2.86 $4.80 $ % % % % 201+% 1 CHART EXAMPLES OF WATER RATES AND CHARGES OF MWD MEMBER AGENCIES AND THEIR SUBAGENCIES MWD Member Agencies shown: MWDOC, SDCWA, Calleguas, Las Virgenes, West Basin, LADWP, Eastern and Foothill Member

More information

Study Workshops are designed to be both educational and to seek broad direction from the Board

Study Workshops are designed to be both educational and to seek broad direction from the Board Study Workshops are designed to be both educational and to seek broad direction from the Board Workshop #1 Financial Forecast & Cost of Service Water, recycled water, & sewer services Revenue requirement

More information

2016 Water and Recycled Water Rate Study PUBLIC HEARING DECEMBER 12, 2016

2016 Water and Recycled Water Rate Study PUBLIC HEARING DECEMBER 12, 2016 2016 Water and Recycled Water Rate Study PUBLIC HEARING DECEMBER 12, 2016 Agenda Rate Study Overview Financial Plan Water Rate Design Recycled Water Rate Design Drought Rates Capacity Fees 12/12/2016 Public

More information

City of Benicia. Rate Study Update: Water & Wastewater Rates

City of Benicia. Rate Study Update: Water & Wastewater Rates City of Benicia Rate Study Update: Water & Wastewater Rates March 1, 2016 Prepared by: Karin Schnaider, Finance Director, City of Benicia Greg Clumpner, Director, NBS Carmen Narayanan, Consultant, NBS

More information

WATER AND SEWER UTILITIES RATE STUDY

WATER AND SEWER UTILITIES RATE STUDY WATER AND SEWER UTILITIES RATE STUDY RATE DESIGN WORKSHOP WITHCITYCOUNCIL / UTILITIES COMMISSION March 6, 2014 Agenda Overview of Rate Study Process Water / Sewer Developer Impact Fees Sewer Rates Water

More information

La Cañada Irrigation District

La Cañada Irrigation District La Cañada Irrigation District Water Rate Study Report - 2009 March, 2009 201 S. Lake Blvd, Suite 803 Pasadena CA 91101 Phone Fax 626 583 1894 626 583 1411 www.raftelis.com March 30, 2009 Mr. Douglas M.

More information

CITY OF ANN ARBOR WATER & SEWER COST OF SERVICE STUDY

CITY OF ANN ARBOR WATER & SEWER COST OF SERVICE STUDY 1 CITY OF ANN ARBOR WATER & SEWER COST OF SERVICE STUDY 12.20.2017 Overview 1. Sufficiency 2. Rate Classification 3. to Serve 4. Rate Structures 5. Customer Impacts 6. Affordability Program Foundation

More information

Notice of a public hearing

Notice of a public hearing Notice of a public hearing Dear Benicia Resident and/or Business Owner, You are receiving a revised Notice of a Public Hearing to increase the water and sewer rates and add water meter replacement fees.

More information

CITY OF CITY OF SONOMA FULLERTON. Pricing Objectives Discussion Water Rate Study 2018 Water Rate Study

CITY OF CITY OF SONOMA FULLERTON. Pricing Objectives Discussion Water Rate Study 2018 Water Rate Study CITY OF CITY OF FULLERTON SONOMA Pricing Objectives Discussion Water Rate Study 2018 Water Rate Study Interview / September 21, 2017 City Council Meeting / January 17, 2018 Agenda 1. Introduction 2. City

More information

The City of Sierra Madre

The City of Sierra Madre The City of Sierra Madre Comprehensive Water and Wastewater Cost of Service Study Report / December 24, 2018 24640 Jefferson Avenue Suite 207 Murrieta, CA 92562 Phone 951.698.0145 www.raftelis.com December

More information

Sonoma County Service Area #41(CSA #41) Water Rate Study

Sonoma County Service Area #41(CSA #41) Water Rate Study Sonoma County Service Area #41(CSA #41) Water Rate Study September 13, 2016 Prepared by Greg Clumpner, Director, NBS Carmen Narayanan, Consultant, NBS 1 CSA #41 Zones of Benefit 2 Overview of Presentation

More information

Alameda County Water District. Financial Workshop Proposed Rates & Charges

Alameda County Water District. Financial Workshop Proposed Rates & Charges Alameda County Water District Financial Workshop Proposed Rates & Charges Month, October Day, Year 25, 2018 Presentation Overview Review Financial Workshops Timeline Proposed Development Charges Financial

More information

11/16/ November 16, 2015 TO: Honorable Mayor and City Council. THROUGH: Municipal Services Committee (November 10, 2015) FROM:

11/16/ November 16, 2015 TO: Honorable Mayor and City Council. THROUGH: Municipal Services Committee (November 10, 2015) FROM: TO: Honorable Mayor and City Council THROUGH: Municipal Services Committee (November 10, 2015) FROM: SUBJECT: Water and Power Department RECOMMENDATION TO SET THE DATE OF JANUARY 11,2016 TO CONDUCT A PUBLIC

More information

2017 WATER, RECYCLED WATER, AND WASTEWATER RATE STUDY REPORT

2017 WATER, RECYCLED WATER, AND WASTEWATER RATE STUDY REPORT 2017 WATER, RECYCLED WATER, AND WASTEWATER RATE STUDY REPORT Rancho California Water District [Type here] Table of Contents 1 Introduction... 5 1.1 About Rancho California Water District... 5 1.2 Background

More information

Water and Wastewater Utility Rates

Water and Wastewater Utility Rates Water and Wastewater Utility Rates March 1, 2016 Presented By: Diana Langley Public Works Director 1 OVERVIEW 2 Uses of Funds Capital Investment Debt Service Operating Cost = Revenue Requirement 3 Source

More information

LONG BEACH WATER DEPARTMENT COST OF SERVICE AND RATE STUDY

LONG BEACH WATER DEPARTMENT COST OF SERVICE AND RATE STUDY LONG BEACH WATER DEPARTMENT COST OF SERVICE AND RATE STUDY Final Report / February 1, 2017 445 S. Figueroa Street Suite 2270 Los Angeles, CA 90071 Phone Fax 213. 262. 9300 213. 262. 9303 www.raftelis.com

More information

2016 Water and Recycled Water Rate Study WEBINAR WITH DISTRICT STAFF JUNE 29, 2016

2016 Water and Recycled Water Rate Study WEBINAR WITH DISTRICT STAFF JUNE 29, 2016 2016 Water and Recycled Water Rate Study WEBINAR WITH DISTRICT STAFF JUNE 29, 2016 Agenda Financial Policy & Financial Plan Capacity Fees Preliminary Results Tier Definitions Next Steps 2016 Water & RW

More information

BODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study

BODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study BODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study FINAL REPORT March 22, 2018 BARTLE WELLS ASSOCIATES Independent Public Finance Advisors 1889 Alcatraz Avenue Berkeley, CA 94703-2714 Tel.

More information

WATER VALIDATION, COST OF SERVICE & RATE DESIGN ANALYSIS WASTEWATER VALIDATION & RATE ANALYSIS MISCELLANEOUS FEES & OVERHEAD RATE ANALYSIS

WATER VALIDATION, COST OF SERVICE & RATE DESIGN ANALYSIS WASTEWATER VALIDATION & RATE ANALYSIS MISCELLANEOUS FEES & OVERHEAD RATE ANALYSIS WATER VALIDATION, COST OF SERVICE & RATE DESIGN ANALYSIS WASTEWATER VALIDATION & RATE ANALYSIS MISCELLANEOUS FEES & OVERHEAD RATE ANALYSIS B&V PROJECT NO. 179801.0100 PREPARED FOR Vallecitos Water District,

More information

WATER AND WASTEWATER RATE STUDY

WATER AND WASTEWATER RATE STUDY WATER AND WASTEWATER RATE STUDY Draft July 3, 2013 Prepared by: Page 1 Page 2 201 S. Lake Avenue Suite 301 Pasadena, CA 91101 Phone 626. 583. 1894 Fax 626. 583. 1411 www.raftelis.com July 1, 2013 Mr. Don

More information

WATER ADJUSTMENT FACTOR OVERVIEW. March 21, 2017 LADWP BOARD BRIEFING

WATER ADJUSTMENT FACTOR OVERVIEW. March 21, 2017 LADWP BOARD BRIEFING WATER ADJUSTMENT FACTOR OVERVIEW March 21, 2017 LADWP BOARD BRIEFING Summary Water Supply Cost Adjustment Factor, which replaced the Water Procurement Adjustment Factor, including its Purchased Water component,

More information

April 6, Katherine Godbey Director of Finance, Coachella Valley Water District Hovley Lane East Palm Desert, CA 92260

April 6, Katherine Godbey Director of Finance, Coachella Valley Water District Hovley Lane East Palm Desert, CA 92260 April 6, 2016 Katherine Godbey Director of Finance, Coachella Valley Water District 75515 Hovley Lane East Palm Desert, CA 92260 Dear Ms. Godbey: Hawksley Consulting (a subsidiary of MWH Global) is pleased

More information

Council Bill No WATER RATES General Ordinance 6318 Sheet No. 3 (Page 1 of 6)

Council Bill No WATER RATES General Ordinance 6318 Sheet No. 3 (Page 1 of 6) (Page 1 of 6) This rate is applicable during Stage One Water Shortage, Stage Two Water Emergency, and Stage Three Water Crisis of the Emergency Water Conservation Plan. Section A. Availability Available

More information

3.1. Construction Meter Additional Charges for Temporary Meters OTHER FEES, CHARGES, AND DEPOSITS CAPACITY FEES...

3.1. Construction Meter Additional Charges for Temporary Meters OTHER FEES, CHARGES, AND DEPOSITS CAPACITY FEES... Table of Contents 1. CHARGES FOR WATER SERVICE... 3 1.1. Metered Service:... 3 1.2. Water Commodity Charge:... 3 1.3. SDCWA and Metropolitan Water District (MWD) Charges:... 4 1.4. Separate Private Fire

More information

Water Conservation Rates. January 26, 2010

Water Conservation Rates. January 26, 2010 Water Conservation Rates January 26, 2010 1 Purpose of Conservation Rates Why look at Conservation Rates Now? Southwest Florida Water Management District (SWFWMD) Requirement of PCU Consumptive Use Permit

More information

Unfunded Pension Liability Accelerated Funding Options

Unfunded Pension Liability Accelerated Funding Options Unfunded Pension Liability Accelerated Funding Options 131253 May 29, 2018 DISTRICT S CURRENT PENSION FUNDING STATUS $2,000,000 $1,800,000 $1,600,000 $1,400,000 $1,200,000 Annual UAL Payments Status Quo

More information

Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 MEMORANDUM

Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 MEMORANDUM TO: FROM: Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 SUBJECT: - MEMORANDUM Introduction The (City) provides sewer sanitary collection services

More information

VENTURA COUNTY WATERWORKS DISTRICTS Representing: Ventura County Waterworks Districts No. 1, 16, 17 & 19

VENTURA COUNTY WATERWORKS DISTRICTS Representing: Ventura County Waterworks Districts No. 1, 16, 17 & 19 VENTURA COUNTY WATERWORKS DISTRICTS Representing: Ventura County Waterworks Districts No. 1, 16, 17 & 19 Board of Ventura County Waterworks District No. 1 800 S. Victoria Avenue Ventura, CA 93009 Subject:

More information

Sewer Rates. General Information Sheet. July 18, 2017

Sewer Rates. General Information Sheet. July 18, 2017 Sewer Rates General Information Sheet July 18, 2017 Welcome to the City of O'Fallon's sewer rates public hearing. This meeting presents the preliminary findings to revise the sewer rates. In this public

More information

WATER USER RATES & FEE STUDY

WATER USER RATES & FEE STUDY WATER USER RATES & FEE STUDY FINAL REPORT February 2016 BARTLE WELLS ASSOCIATES Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com Tel: 510/653-3399

More information

ES.1 Findings and Recommendations... ES Overview Current Rates Rate Making Objectives

ES.1 Findings and Recommendations... ES Overview Current Rates Rate Making Objectives Table of Contents Executive Summary ES.1 Findings and Recommendations... ES-1 Chapter 1. Introduction 1.1 Overview... 1-1 1.2 Current Rates... 1-1 1.3 Rate Making Objectives... 1-1 Chapter 2. Revenue Requirement

More information

Water Rate Study for City of Lemoore

Water Rate Study for City of Lemoore Water Rate Study for City of Lemoore June 17, 2016 Prepared by: Dan Bergmann, Principal 15 Shasta Lane, Walnut Creek, CA 94597 Email: dan@igservice.com Office: 925-946-9090 Water Rate Study for City of

More information

Rainbow Municipal Water District

Rainbow Municipal Water District Rainbow Municipal Water District Potable Water Cost of Service Study November 10, 2015 201 S Lake Ave. Suite 301 Pasadena CA 91101 Phone 626.583.1894 Fax 626.583.1411 www.raftelis.com November 10, 2015

More information

City of Riverbank. Water Rate Study FINAL 6/18/2015

City of Riverbank. Water Rate Study FINAL 6/18/2015 Water Rate Study FINAL 6/18/2015 Bartle Wells Associates Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com Tel: 510-653-3399 June 18, 2015 6707

More information

1. Accept staff report on the updated study of cost of service to provide potable water to San Jose Municipal Water System (SJMWS) customers; and

1. Accept staff report on the updated study of cost of service to provide potable water to San Jose Municipal Water System (SJMWS) customers; and CITY OF Cr SAN IPSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL SUBJECT: MUNICIPAL WATER SYSTEM COST OF SERVICE STUDY COUNCIL AGENDA: 05/09/17 ITEM: 7.2 Memorandum FROM: Kerrie Romanow

More information

WHEREAS, the rates of the Proposed Ordinance take into account the cost of service study recently completed by LADWP; and

WHEREAS, the rates of the Proposed Ordinance take into account the cost of service study recently completed by LADWP; and RESOLUTION NO. WHEREAS, the City of Los Angeles (City) is at a crossroads with regard to its water future in light of what may be the new normal of prolonged drought and due to its rapidly aging water

More information

RANCHO CALIFORNIA WATER DISTRICT

RANCHO CALIFORNIA WATER DISTRICT RANCHO CALIFORNIA WATER DISTRICT Two-Year Rate Study Final Report / June 4, 2018 June 4, 2018 Mr. Richard Aragon Assistant General Manager CFO/Treasurer Rancho California Water District 42135 Winchester

More information

Santa Ynez River Water Conservation District, ID No. 1. Water Rates & Finances. December 13, 2016

Santa Ynez River Water Conservation District, ID No. 1. Water Rates & Finances. December 13, 2016 Santa Ynez River Water Conservation District, ID No. 1 Water Rates & Finances December 13, 2016 Presentation Overview Objectives & Process District Finances Current & Projected Rates 2 Rate Study Objectives

More information

Santa Clarita Water Division

Santa Clarita Water Division Santa Clarita Water Division Retail Water Rate Cost of Service Study Report September 2017 445 S Figueroa St Suite 2270 Los Angeles, CA 90039 Phone 213.262.9300 www.raftelis.com September 11, 2017 Mr.

More information

Squaw Valley PSD. Water & Sewer Rate and Connection Fee Study. Presented by: Shawn Koorn Associate Vice President HDR Engineering, Inc.

Squaw Valley PSD. Water & Sewer Rate and Connection Fee Study. Presented by: Shawn Koorn Associate Vice President HDR Engineering, Inc. Squaw Valley PSD Water & Sewer Rate and Connection Fee Study February 15, 2017 Presented by: Shawn Koorn Associate Vice President HDR Engineering, Inc. Purpose of the District s Study Provide sufficient

More information

Meeting #1 June 29, 2012

Meeting #1 June 29, 2012 Meeting #1 June 28, 2012 Rate Refinement Workgroup Meeting 1 Key Issues Overview Existing Purchase OrderReview Existing Rate Structure Review Replenishment Rate Options Ad Valorem Tax Rate Treatment Cost

More information

Sewer Rate Study July 2016

Sewer Rate Study July 2016 July 2016 Prepared By The Finance Division TABLE OF CONTENTS SECTION 1: EXECUTIVE SUMMARY... 1 1.1 Background... 1 1.2 Purpose... 1 1.3 Current Sewer Rates... 1 1.4 Five Year Financial Projection... 1

More information

Goleta Water District

Goleta Water District 201 S Lake Ave. Suite 301 Pasadena CA 91101 Phone 626 583 1894 www.raftelis.com Water Rates and Cost of Service Study Final Report / June 11, 2015 Water Cost of Service & Rate Study Report 2015 201 S Lake

More information

7/25/2012. July 25, Rate Refinement Workgroup Page 1 July 25, 2012

7/25/2012. July 25, Rate Refinement Workgroup Page 1 July 25, 2012 July 25, 2012 Rate Refinement Workgroup Page 1 July 25, 2012 Linking rate structure and water management actions: Tier 1 Baseline alternatives Timing to implement sales year type Defining the conditions

More information

ORDINANCE NO AN ORDINANCE To Be Entitled:

ORDINANCE NO AN ORDINANCE To Be Entitled: AN ORDINANCE To Be Entitled: AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF FORT MYERS, FLORIDA, AMENDING THE CITY CODE, CHAPTER 90, UTILITIES, ARTICLE II WATER, SECTION 90-35 RATES AND CHARGES ESTABLISHED;

More information

Town of Hillsborough. City Council Public Hearing. Water Rate Cost-of-Service Study. February 13, 2017

Town of Hillsborough. City Council Public Hearing. Water Rate Cost-of-Service Study. February 13, 2017 City Council Public Hearing February 13, 2017 Public Hearing on Proposed Water Rates PRESENTED BY Kelly J. Salt Partner 2016 Best Best & Krieger LLP Article X, section 2 (1928) The general welfare requires

More information

Frequently Asked Questions from Claremont Customers

Frequently Asked Questions from Claremont Customers Frequently Asked Questions from Claremont Customers Why are Golden State s rates higher in Claremont than the neighboring communities of Rancho Cucamonga, Upland or La Verne? Golden State's rates reflect

More information

CITY OF CALISTOGA WATER RATE STUDY FINAL REPORT

CITY OF CALISTOGA WATER RATE STUDY FINAL REPORT CITY OF CALISTOGA WATER RATE STUDY FINAL REPORT February 2, 218 This page was intentionally left blank. City of Calistoga Water Rate Study Report Page 2 February 2, 218 Dylan Feik City Manager City of

More information

WATER AND SEWER RATE STUDY

WATER AND SEWER RATE STUDY FINAL WATER AND SEWER RATE STUDY B&V PROJECT NO. 179322.0100 PREPARED FOR City of Lynwood, CA JANUARY 11, 2017 Black & Veatch Holding Company 2011. All rights reserved. City of Lynwood, CA WATER AND SEWER

More information

City of Napa Modification of Water Rates. September, City of Napa Water Rates. Service Area. >75,000 customers. 25,000 connections

City of Napa Modification of Water Rates. September, City of Napa Water Rates. Service Area. >75,000 customers. 25,000 connections City of Napa 2011 Modification of Water Rates Service Area >75,000 customers 25,000 connections 2 1 Approach for Cost Of Service Analysis What Who How Why Revenue Requirements Operating Costs Capital Investments

More information

Sanitation Rate Study Final Report

Sanitation Rate Study Final Report Sanitation Rate Study Final Report City of Simi Valley April 24, 2015 Prepared by: Page 1 201 S. Lake Avenue Suite 301 Pasadena, CA 91101 Phone 626.583.1894 Fax 626.583.1411 www.raftelis.com April 24,

More information

Utility Rates. October 13, 2015

Utility Rates. October 13, 2015 Utility Rates October 13, 2015 Agenda Summary Process Background Policy Rates Next Steps 2 Financial Needs Driving Rates 1. Bond coverage 2. Reserves Policy 3. Infrastructure - Asset management 3 Rate

More information

Lorie Tinfow, City Manager, City of Pacifica Lorenzo Hines Jr., Assistant City Manager, City of Pacifica

Lorie Tinfow, City Manager, City of Pacifica Lorenzo Hines Jr., Assistant City Manager, City of Pacifica DATE: March 7, 2017 TO: FROM: SUBJECT: Lorie Tinfow, City Manager, Lorenzo Hines Jr., Assistant City Manager, Douglas Dove, President Michael DeGroot, Financial Analyst Abigail Seaman, Financial Analyst

More information

NOTICE OF PUBLIC HEARING ON PROPOSED NEW/INCREASED WATER RATES

NOTICE OF PUBLIC HEARING ON PROPOSED NEW/INCREASED WATER RATES NOTICE OF PUBLIC HEARING ON PROPOSED NEW/INCREASED WATER RATES WHERE: WHEN: PURPOSE: Rohnert Park City Hall Council Chamber 130 Avram Avenue Rohnert Park, California Tuesday, April 14, 2015 not before

More information

PREFERRED FINANCIAL PLAN SCENARIO & WATER RATE DESIGN ALTERNATIVE

PREFERRED FINANCIAL PLAN SCENARIO & WATER RATE DESIGN ALTERNATIVE Mid Flat Rate Increases Limited CIP through Year 5 Reserves recover by Year 10 Phased In CIP Spending 2. 10 Year Phase In 100% of CIP by Year 10 100% of Reserves by Year 10 3. 5 Year Phase In 100% of CIP

More information

CITY OF BEVERLY HILLS. BEVERY III U.S cx PUBLIC WORKS SERVICES DEPARTMENT MEMORANDUM TO: Public Works Commission FROM:

CITY OF BEVERLY HILLS. BEVERY III U.S cx PUBLIC WORKS SERVICES DEPARTMENT MEMORANDUM TO: Public Works Commission FROM: BEVERY III U.S cx CITY OF BEVERLY HILLS PUBLIC WORKS SERVICES DEPARTMENT MEMORANDUM TO: FROM: Public Works Commission Shana Epstein, Public Works Director Trish Rhay, Assistant Director of Public Works

More information

General Provisions (CY 12-mo Components)

General Provisions (CY 12-mo Components) WATER RATE HISTORICAL DATA Prop Prop Prop Prop Prop Prop Prop Prop Prop Prop Prop Prop General Provision Tier Classes Description Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Apr-18 May-18

More information

Rate Structure Administrative Procedures Handbook FY 2017/18

Rate Structure Administrative Procedures Handbook FY 2017/18 FY 2017/18 Page i Table of Contents 1 OVERVIEW... 1 2 RATE STRUCTURE AT-A-GLANCE... 2 2.1 CURRENT RATES... 2 2.2 TWO-YEAR RATE CYCLE & BILLING CYCLE MILESTONES... 3 2.3 WATER SERVICES AND PROGRAMS AND

More information

STAFF REPORT. ITEM NO. 4 MEETING DATE: March 7, 2017 MEETING: Board of Directors SUBJECT:

STAFF REPORT. ITEM NO. 4 MEETING DATE: March 7, 2017 MEETING: Board of Directors SUBJECT: ITEM NO. 4 MEETING DATE: MEETING: Board of Directors STAFF REPORT SUBJECT: SUBMITTED BY: RECOMMENDED ACTION: Proposition 218 Customer Notification of Proposed Rate Increases Krishna Kumar, General Manager

More information

Pricing Objectives Exercise Worksheet

Pricing Objectives Exercise Worksheet 201 S. Lake Avenue Suite 301 Pasadena, CA 91101 Phone 626. 583. 1894 www.raftelis.com Fax 626 583. 1411 IINMl CI/. l to/os Uilt.N TS I... I.' Pricing Objectives Exercise Worksheet 1. BACKGROUND The below

More information

The series 2008 Water & Sewer Revenue Bonds Feasibility Report recommended the City perform and implement a rate study for the following reasons:

The series 2008 Water & Sewer Revenue Bonds Feasibility Report recommended the City perform and implement a rate study for the following reasons: Additional Background Information Water and Wastewater The City of Fort Lauderdale supplies water and sewer services on a regional basis to over 250,000 residents of central Broward County. The areas serviced

More information

Rate Structure Administrative Procedures Handbook FY 2018/19

Rate Structure Administrative Procedures Handbook FY 2018/19 FY 2018/19 Page i Table of Contents 1 OVERVIEW... 1 2 RATE STRUCTURE AT-A-GLANCE... 2 2.1 CURRENT RATES... 2 2.2 TWO-YEAR RATE CYCLE & BILLING CYCLE MILESTONES... 3 2.3 WATER SERVICES AND PROGRAMS AND

More information

SAN ANTONIO WATER SYSTEM (SAWS) RATE ADVISORY COMMITTEE: MEETING 3

SAN ANTONIO WATER SYSTEM (SAWS) RATE ADVISORY COMMITTEE: MEETING 3 01 April, 2014 SAN ANTONIO WATER SYSTEM (SAWS) RATE ADVISORY COMMITTEE: MEETING 3 Bill Zieburtz Richard Campbell Robert Chambers RATE SETTING PROCESS STUDY APPROACH RATE SETTING OBJECTIVES FINANCIAL PLAN

More information

West Valley Sanitation District FINANCIAL PLAN & RATE STUDY. January 2018

West Valley Sanitation District FINANCIAL PLAN & RATE STUDY. January 2018 West Valley Sanitation District FINANCIAL PLAN & RATE STUDY January 2018 BARTLE WELLS ASSOCIATES Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com

More information

FORT COLLINS- LOVELAND WATER DISTRICT

FORT COLLINS- LOVELAND WATER DISTRICT FORT COLLINS- LOVELAND WATER DISTRICT Water Financial Planning and Rate Study Report March 16, 2018 District of Thousand Oaks Water and Wastewater Financial Plan Study Report March 16, 2018 Board of Directors

More information

MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT. September 2013

MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT. September 2013 MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT September 2013 10540 TALBERT AVENUE, SUITE 200 EAST FOUNTAIN VALLEY, CALIFORNIA 92708 P. 714.593.5100 F. 714.593.5101 MARINA

More information

County Of Sonoma Agenda Item Summary Report

County Of Sonoma Agenda Item Summary Report County Of Sonoma Agenda Item Summary Report Department: Sonoma County Water Agency, and County Sanitation Districts Name and Phone Number: Board Date: Candi Bryon - (707) 521-6212 5/22/2012 AGENDA SHORT

More information

CITY OF LOS ANGELES CALIFORNIA ERIC GARCETTI MAYOR

CITY OF LOS ANGELES CALIFORNIA ERIC GARCETTI MAYOR FREDERICK H. PICKEL, Ph.D. EXECUTIVE DIRECTOR/RATEPAYER ADVOCATE (213) 978-0220 Fred.Pickel@lacity.org CITY OF LOS ANGELES CALIFORNIA OFFICE OF PUBLIC ACCOUNTABILITY 200 N. SPRING STREET, ROOM 1736 CITY

More information

COST OF SERVICES STUDY

COST OF SERVICES STUDY COST OF SERVICES STUDY November 14, 2011 AGENDA Board direction Cost of Services (COS) Study recommendation 50-50 variable vs. fixed cost recovery 70-30 variable vs. fixed cost recovery El Dorado County

More information

LAS VIRGENES MUNICIPAL WATER DISTRICT 4232 Las Virgenes Road, Calabasas, California 91302

LAS VIRGENES MUNICIPAL WATER DISTRICT 4232 Las Virgenes Road, Calabasas, California 91302 LAS VIRGENES MUNICIPAL WATER DISTRICT 4232 Las Virgenes Road, Calabasas, California 91302 REQUEST FOR PROPOSALS For FINANCIAL ANALYSIS & RATE STUDY Proposal Issue Date April 9, 2014 Proposal Submittal

More information

Comprehensive Rate Study & Cost Allocation Analysis. Public Workshop December 4, 2017

Comprehensive Rate Study & Cost Allocation Analysis. Public Workshop December 4, 2017 Comprehensive Rate Study & Cost Allocation Analysis Public Workshop December 4, 2017 Today s Workshop: Present findings and solicit Board input on rate design and fiscal policy considerations Financial

More information

Section 575 Public Utilities Department Fees

Section 575 Public Utilities Department Fees Section 575 Public Utilities Department Fees Section 575:00. Purpose and Policy. The purpose of this ordinance is to set and recover fees from users of the St. Cloud Public Utilities System, on an equitable

More information

CITY OF OXNARD PUBLIC WORKS INTEGRATED MASTER PLAN DRAFT WATER COST OF SERVICE STUDY. FINAL July 2017

CITY OF OXNARD PUBLIC WORKS INTEGRATED MASTER PLAN DRAFT WATER COST OF SERVICE STUDY. FINAL July 2017 CITY OF OXNARD PUBLIC WORKS INTEGRATED MASTER PLAN DRAFT WATER COST OF SERVICE STUDY FINAL July 2017 2700 YGNACIO VALLEY ROAD, SUITE 300 WALNUT CREEK, CALIFORNIA 94598 P. 925.932.1710 F. 925.930.0208 CITY

More information

Temescal Valley Water District

Temescal Valley Water District Temescal Valley Water District Comprehensive Water, Recycled Water, and Wastewater Cost of Service Study Draft Report / December 7, 2016 24640 Jefferson Avenue Suite 207 Murrieta, CA 92562 Phone 951.698.0145

More information

Water and Sewer Rates in the Carson River Watershed

Water and Sewer Rates in the Carson River Watershed Water and Sewer Rates in the Carson River Watershed April 20, 2016 Advisory Report prepared by: Contents Introduction... 4 Summary of Water Rate Changes... 6 Summary of Sewer Rate Changes... 7 Carson

More information

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY DC Retail Water and Sewer Rates Committee - 1. Call to Order - Alan Roth, Chairman DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Board of Directors DC Retail Water and Sewer Rates Committee Tuesday July

More information

Long-Term Financial Stability Workshop #4. Capital Investment & Financing. Board of Directors September 23, 2014

Long-Term Financial Stability Workshop #4. Capital Investment & Financing. Board of Directors September 23, 2014 Long-Term Financial Stability Workshop #4 Capital Investment & Financing Board of Directors September 23, 2014 Agenda Introduction Capital Investment & Financing Seismic Surcharge 2 Workshop Topics Workshop

More information

Meeting & Outreach efforts

Meeting & Outreach efforts May 30, 2014 Meeting & Outreach efforts February 27th Proposed Compensation Plan Distributed to Joint Admin/WWOC March 5th Joint Admin/WWOC Meeting First discussion on proposed Compensation Plan April

More information

Table 2-2 Projected Water Production and Costs

Table 2-2 Projected Water Production and Costs Table 2-2 Projected Water Production and Costs Recorded Estimated Budget Forecast Description FY 2007-08 FY 2008-09 FY 2009-10 FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 Well Production (OCWD, A-F, a)

More information

Water and Sewer Rate Study

Water and Sewer Rate Study Water and Sewer Rate Study Presentation to the Village Board April 26, 2016 Presented by: Eric Callocchia Manager Contents 1 2 3 4 5 6 7 8 Rate Study Background and Purpose Projected Expenses Projected

More information

FY 2018 and FY 2019 Public Hearing, Rates & Charges. Board of Directors Meeting July 11, 2017

FY 2018 and FY 2019 Public Hearing, Rates & Charges. Board of Directors Meeting July 11, 2017 FY 2018 and FY 2019 Public Hearing, Rates & Charges Board of Directors Meeting July 11, 2017 FY18 & FY19 Public Hearing, Rates & Charges Agenda Item 14 Conduct a public hearing to consider Water System

More information

NALDRAFT SEPTEMBER2015 WASTEWATE

NALDRAFT SEPTEMBER2015 WASTEWATE FI NALDRAFT SEPTEMBER2015 Cos tof S e r v i c e s S T UDY WATE R WASTEWATE R RE CY CL E DWATE R ST ORMWATE R E NVI RONME NT ALRE SOURCE S CITY OF OXNARD PUBLIC WORKS INTEGRATED MASTER PLAN COST OF SERVICE

More information

Water Rate Study FINAL January 31, 2018

Water Rate Study FINAL January 31, 2018 Water Rate Study FINAL January 31, 2018 1889 Alcatraz Avenue Berkeley, CA 94703 Tel: 510 653 3399 www.bartlewells.com January 31, 2018 Joshua Basin Water District P.O. Box 675 / 61750 Chollita Road Joshua

More information

CITY OF REDLANDS WATER AND WASTEWATER RATE STUDY. Prepared by:

CITY OF REDLANDS WATER AND WASTEWATER RATE STUDY. Prepared by: CITY OF REDLANDS WATER AND WASTEWATER RATE STUDY Prepared by: August 30, 2010 201 S. Lake Blvd, Suite 301 Pasadena CA 91101 Phone Fax 626 583 1894 626 583 1411 www.raftelis.com August 30, 2010 Mr. Chris

More information

WATER, WASTEWATER AND STORM DRAIN RATE STUDY

WATER, WASTEWATER AND STORM DRAIN RATE STUDY CITY OF FORT BRAGG WATER, WASTEWATER AND STORM DRAIN RATE STUDY January 2012 Main Office 32605 Temecula Parkway, Suite 100 Temecula, CA 92592 Toll free: 800.676.7516 Fax: 951.296.1998 Regional Office 870

More information

City of San Carlos Sewer Financial Plan & Rate Update

City of San Carlos Sewer Financial Plan & Rate Update City of San Carlos Sewer Financial Plan & Rate Update Revised 06/13/16 1889 Alcatraz Avenue Berkeley, CA 94703 Tel: 510 653 3399 www.bartlewells.com June 13, 2016 City of San Carlos Department of Public

More information

Revenue Plan. August 12, Dennis Davies Deputy Director of Public Works 200 Civic Center Way El Cajon, CA 92020

Revenue Plan. August 12, Dennis Davies Deputy Director of Public Works 200 Civic Center Way El Cajon, CA 92020 1925 Palomar Oaks Way, Suite 3 Carlsbad, California 928 tel: 76 438 7755 fax: 76 438 7411 Dennis Davies Deputy Director of Public Works 2 Civic Center Way El Cajon, CA 922 Subject: Six Year Revenue Plan

More information

City of Fridley Water and Sewer Rate Study. Jessica Cook 9/25/17

City of Fridley Water and Sewer Rate Study. Jessica Cook 9/25/17 City of Fridley Water and Sewer Rate Study Jessica Cook 9/25/17 1 Utility Funds They are Enterprise Funds 1. Should pay for Capital Outlays Operations Replacement Reserves Debt 2. Should be flush with

More information

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY DC Retail Water and Sewer Rates Committee - 1. Call to Order - Alan Roth, Chairman DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Board of Directors DC Retail Water and Sewer Rates Committee Tuesday November

More information

Drought Allocation Plan for the Western Municipal Water District of Riverside County. Updated May 2015

Drought Allocation Plan for the Western Municipal Water District of Riverside County. Updated May 2015 Drought Allocation Plan for the Western Municipal Water District of Riverside County Updated May 2015 Table of Contents Section 1 Introduction... 1 Section 2 Drought Allocation Plan Preparation... 2 Section

More information

General Provisions (CY 12-mo Components)

General Provisions (CY 12-mo Components) WATER RATE HISTORICAL DATA Prop Prop Prop General Provision Tier Classes Description Apr-16 May-16 Jun-16 General Provisions (CY 12-mo Components) Provision F Water Procurement Adj (WPA) F 1 (FA) 1 Not

More information

Rate Fairness Board. Review of Staff Rate Proposals for FY April 10, 2018

Rate Fairness Board. Review of Staff Rate Proposals for FY April 10, 2018 Rate Fairness Board Review of Staff Rate Proposals for FY 2019-2022 April 10, 2018 Rate Fairness Board Members (per Charter, Article 8B) Name Position / Title Appointed / Designated By Howard Ash Chair,

More information

WORKSHOP BRIEFING DOCUMENT: Comprehensive Water and Wastewater Rate and Charge Study

WORKSHOP BRIEFING DOCUMENT: Comprehensive Water and Wastewater Rate and Charge Study WORKSHOP BRIEFING DOCUMENT: Comprehensive Water and Wastewater Rate and Charge Study July 31, 2007 HCD/GAI# A070574.01 Purpose of Rate Study Provide For Revenue Sufficiency Charge Customers Based On Costs

More information

2019 CITRUS HEIGHTS WATER DISTRICT BUDGET, CAPITAL IMPROVEMENT PROGRAM (CIP) AND RATE PRESENTATION

2019 CITRUS HEIGHTS WATER DISTRICT BUDGET, CAPITAL IMPROVEMENT PROGRAM (CIP) AND RATE PRESENTATION 2019 CITRUS HEIGHTS WATER DISTRICT BUDGET, CAPITAL IMPROVEMENT PROGRAM (CIP) AND RATE PRESENTATION 1 Mission Statement It is the mission of the Citrus Heights Water District to furnish a dependable supply

More information

Water and Sewer Rates

Water and Sewer Rates Santa Margarita Water District - Water and Sewer Rates Home Live Chat Sitemap Phone: (949) 459-6420 Your Water Conservation Operations Doing Business News About Us Community Contact Us Your Water Water

More information

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY DC Retail Water and Sewer Rates Committee - 1. Call to Order - Alan Roth, Chairman DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Board of Directors DC Retail Water and Sewer Rates Committee Tuesday March

More information

TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009

TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009 TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009 EXECUTIVE SUMMARY The functions and duties of the Oro Valley Water Utility Commission include reviewing and developing

More information

Note: Letter has been updated to reflect changes to proposed rates as ordered by the Board of Directors.

Note: Letter has been updated to reflect changes to proposed rates as ordered by the Board of Directors. February 21, 2019 Board of Directors County Sanitation District No. 20 of Los Angeles County Note: Letter has been updated to reflect changes to proposed rates as ordered by the Board of Directors. Dear

More information

Managing Revenue in Water Systems

Managing Revenue in Water Systems Managing Revenue in Water Systems Monday, June 1, 2015 2:40 3:55 1.5 CPE Moderator: Speakers: Rodney Greek, San Diego County Water Authority Debby Cherney, Eastern Municipal Water District Jeffrey Hughes,

More information