WATER AND SEWER RATE STUDY

Size: px
Start display at page:

Download "WATER AND SEWER RATE STUDY"

Transcription

1 FINAL WATER AND SEWER RATE STUDY B&V PROJECT NO PREPARED FOR City of Lynwood, CA JANUARY 11, 2017 Black & Veatch Holding Company All rights reserved.

2

3 City of Lynwood, CA WATER AND SEWER RATE STUDY Table of Contents 1 Introduction Background Scope of Work Disclaimer Water Rate Study Revenue and Revenue Requirements Customer and Water Usage Projections Revenue Under Existing Rates Other Revenue Operating and Maintenance Expenses Debt Service Requirements Capital Improvement Program Projected Operating Results Debt Service Requirements Test Year Revenue Requirements Cost of Service Allocation Functional Cost Components Allocation to Cost Components Allocation of Operating and Maintenance Expense Allocation of Capital Investments Units of Service Cost of Service Allocations Units Costs of Service Distribution of Costs of Service to Customer Classes Adequacy of Existing Rates to Meet Costs of Service Proposed Rate Adjustments Existing Rates Proposed Rates Readiness-to-Serve Charge Fire Service Revenue Recovery Under Proposed Rates Neighboring Water Utilities Sewer Rate Study Revenue and Revenue Requirements Customer Account Projections Revenue Under Existing Rates BLACK & VEATCH CORPORATION Table of Contents i

4 Water and Sewer Rate Study City of Lynwood, CA 5.4 Other Revenue Operating and Maintenance Expenses Debt Service Requirements Capital Improvement Program Projected Operating Results Test Year Revenue Requirements Cost of Service Allocation Functional Cost Components Allocation to Cost Components Allocation of Operating and Maintenance Expense Allocation of Capital Investments Units of Service Cost of Service Allocations Units Costs of Service Distribution of Costs of Service to Customer Classes Adequacy of Existing Rates to Meet Costs of Service Proposed Rate Adjustments Existing Rates Proposed Rates Revenue Recovery Under Proposed Rates Neighboring Utilities ii B&V PROJECT NO JANUARY 25, 2017

5 City of Lynwood, CA WATER AND SEWER RATE STUDY 1 Introduction This report was prepared for the City of Lynwood (City) to document the development of a multi-year financial plan, cost of service analysis and rate design for the City s water and sewer utilities. The specific objectives of the study were to: Review and evaluate existing policies and procedures affecting water and sewer rates; Develop an individual financial plans for water and sewer covering a five-year study period between Fiscal Year (FY) 2017 and FY 2021 for ongoing operations and planned capital improvements; Allocate the water and sewer projected FY 2017 revenue requirements to the various customer class in accordance with the respective service requirements; Develop a suitable 5-year rate schedule that produces revenues adequate to meet financial needs while recognizing customer costs of service and state policy considerations such as Proposition 218, the San Juan Capistrano Ruling and the Governor s Executive Order B for water conservation. 1.1 BACKGROUND Located in Los Angeles County, the City of Lynwood provides water and sewer services to an average of 9,150 residential, commercial, municipal, and fire connections. The City provides drinking water to its residents from local groundwater and import water. Groundwater is pumped from the Central Groundwater Basin through five active wells located throughout the City. Import water serves as a supplemental source and is purchased from Metropolitan Water District (MWD) via Central Basin Municipal Water District (CBMWD). Together these two sources meet the City s annual 5,600 acre-feet (AF) demand. The City distributes groundwater and import water through its 3.0 million gallon reservoir and 90 miles of distribution pipelines. In addition, the City provides sewer services by collecting and transporting sewage flow over its 81 miles of collection pipelines to the Sanitation District of Los Angeles County (LACSD). LACSD provides treatment and disposal services for the City s residents. In general, the City operates and maintains the water and sewer utilities as self-supporting enterprises. As such, consistent with the best management practices of most municipal utilities, water and sewer rates are developed to provide sufficient levels of revenue to meet all operation and maintenance expenses, debt service requirements, routine annual replacements of capital improvements to be funded from current revenues, and other revenue requirements. 1.2 SCOPE OF WORK The purpose of this study was to develop individual water and sewer financial plans that project operating revenue, expenses and capital financing costs for water and sewer operations over a five-year planning period beginning July 1, 2016 and ending June 30, As part of the plan, future revenues under existing rates, operation and maintenance (O&M) expense, principal and interest expense on bonded debt, establishment and/or maintenance of reserve funds, and capital improvement requirements are considered. Annual projections of customers, water use, revenues, and expenditures have been made using historical data and estimates based on SBx7-7 and Executive Order requirements for the next five years. BLACK & VEATCH CORPORATION Introduction 1

6 Water and Sewer Rate Study City of Lynwood, CA Using the financial plans, a cost of service analysis and rate design was performed for water and sewer. The water and sewer s costs of service were allocated to customer classes utilizing a cost causative approach endorsed by the American Water Works Association (AWWA) M1 manual and Water Environment Federation (WEF) Manual of Practice (MoP) No. 27. These allocation methodologies produce cost of service allocations recognizing the projected customer service requirements for the City. Proposed rates are designed in accordance with allocated cost of service and local policy considerations. The extent to which the existing rate structure recovers revenues from customer classes in accordance with cost of service allocations is also evaluated. 1.3 DISCLAIMER In conducting our study, we reviewed the books, records, agreements, capital improvement programs, and customer sales and financial projections of the Water and Sewer Enterprise Fund as we deemed necessary to express our opinion of the operating results and projections. While we consider such books, records, documents, and projections to be reliable, Black & Veatch has not verified the accuracy of these documents. The projections set forth in this report below are intended as forward-looking statements. In formulating these projections, Black & Veatch has made certain assumptions with respect to conditions, events, and circumstances that may occur in the future. The methodology utilized in performing the analyses follows generally accepted practices for such projections. Such assumptions and methodologies are reasonable and appropriate for the purpose for which they are used. While we believe the assumptions are reasonable and the projection methodology valid, actual results may differ materially from those projected, as influenced by the conditions, events, and circumstances that actually occur. Such factors may include the water and sewer utilities ability to execute the capital improvement program as scheduled and within budget, regional climate and weather conditions affecting the demand for water and production of sewer and adverse legislative, regulatory or legal decisions (including environmental laws and regulations) affecting the water and sewer utilities ability to manage the system and meet water quality requirements. 2 B&V PROJECT NO JANUARY 25, 2017

7 City of Lynwood, CA WATER AND SEWER RATE STUDY 2 Water Rate Study 2.1 REVENUE AND REVENUE REQUIREMENTS The water utility provides drinking water to its residential, commercial and industrial water customers. To cover the costs associated with providing water services to its customers, the water utility derives revenue from a variety of sources including readiness to serve charge, water sales charge, reconnection charges, tap fees, and interest earned from the investment of available funds. The level of future revenue generated in the study is projected through a combination of an analysis of historical and future system growth in terms of number of connections and consumption. With revenue derived from the various sources, the water utility meets the cash requirements of operation and maintenance; water supply costs; debt service and reserve payments on bond indebtedness; and recurring annual capital expenditures for replacements, system betterments, and extensions not debt financed. O&M expenses are those expenditures necessary to maintain the system in good working order. Water supply costs are those associated with pumping groundwater via the Water Replenishment District and purchasing import water from the Central Basin Municipal Water District. Routine annual capital expenditures, which include equipment replacements, consist of recurring annual replacements, minor extensions, and betterments which are normally revenue financed. Other capital costs include principal and interest payments, bond covenant-required payments, and the costs of major capital improvements are paid directly from annual operating revenues. 2.2 CUSTOMER AND WATER USAGE PROJECTIONS The water utility has three major customer classes. These customer classes are: 1) Residential, which consists of all single family accounts and multi-family accounts with less than four dwelling units; 2) Commercial, which consists of multi-family accounts with four or more dwelling units and all other non-residential classes 1 ; and 3) Fire, which consists of private fire lines that serve customers with specific fire protection needs. 2 Based on a detailed review of historical growth patterns and planning estimates in the City s 2010 Urban Water Management Plan, the number of customer connections is projected to increase by an average of 0.25 percent for the study period. The City is fairly built-out with most of the growth coming from high density expansion and commercial growth. Shown in Table 2-1 are the projected customer accounts. 1 These non-residential classes are commercial, industrial, hospitals, schools and municipal customers. 2 Fire customers may be residential or commercial. BLACK & VEATCH CORPORATION Water Rate Study 3

8 Water and Sewer Rate Study City of Lynwood, CA Table 2-1 Number of Water Customer Connections No. Projected water sales consumption for the study period is shown in Table 2-2. In determining the projected water sales consumption, historical patterns of water usage were analyzed in conjunction with the mandatory reduction issued by the Governor of California through Executive Orders. The Executive Orders affect each water utility throughout the State differently. Based on historical consumption within the City, the City was assigned a 16 percent water consumption reduction compared to the same time in Calendar Year (CY) 2013 for FY Given that the City s residents have understood and implemented cutback measures, it anticipated that consumption will rebound slowly in the study period. It is expected that FY 2017 consumption will increase by 4.75%, in FY 2018 by 2.25% and FY 2019 to FY 2021 by 0.25% per year. Table 2-2 Billed Water Consumption 2.3 REVENUE UNDER EXISTING RATES Fiscal Year Ending June 30, FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 (connections) (connections) (connections) (connections) (connections) Customer Class 1 Residential 7,764 7,783 7,802 7,821 7,841 2 Commercial 1,339 1,343 1,347 1,351 1,355 3 Fire Service Total 9,181 9,204 9,227 9,250 9,274 No. Description Description Fiscal Year Ending June 30, FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 (HCF) (HCF) (HCF) (HCF) (HCF) Customer Class 1 Residential 1,131,905 1,157,630 1,160,524 1,163,425 1,166,334 2 Commercial 909, , , , ,974 3 Total (HCF) 2,041,220 2,087,611 2,092,830 2,098,062 2,103,308 4 Total (AF) 4,686 4,792 4,804 4,816 4,829 The primary source of revenue for the water utility is derived from readiness to serve and water sales. The level of future revenue is projected based on an analysis of historical and projected system growth in terms of number of accounts and water consumption conducted in section 2.2. Using the accounts and water consumption, the applicable rates shown in Table 2-3 are applied to determine the total readiness to serve and water sales revenue. 4 B&V PROJECT NO JANUARY 25, 2017

9 City of Lynwood, CA WATER AND SEWER RATE STUDY Table 2-3 Existing Water Rates Meter Size Ready To Serve Charge Fire Fees ($/monthly) ($/monthly) 3/4" NA 1" " " " " " " " NA Commodity Charge ($/HCF) All Customers 2.92 NA Table 2-4 represents a summary of projected readiness to serve and water sales revenue under existing rates. As shown, the revenue generated is anticipated to slowly increase over the study period in conjunction with the increase in number of accounts and water consumption. The projected water revenue increases from $8,053,400 in FY 2017 to $8,256,000 in FY Table 2-4 Revenue under Existing Water Rates No. Description 2.4 OTHER REVENUE FY 2016 In addition to revenue from rates, the water utility obtains revenue from other operating sources. Other revenue sources include; reconnection charges, tap fees, interest earned from the investment of available funds and miscellaneous revenues. In total, these revenues represent less than 1 percent of total water revenues. It is anticipated that these revenues will remain relatively constant for the duration of the study period. 2.5 OPERATING AND MAINTENANCE EXPENSES Fiscal Year Ending June 30, FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 ($) ($) ($) ($) ($) Customer Class 1 Residential 4,756,300 4,834,900 4,846,800 4,858,900 4,871,100 2 Commercial 3,273,100 3,335,100 3,343,700 3,352,300 3,360,900 3 Fire Service 24,000 24,000 24,000 24,000 24,000 4 Total $ 8,053,400 $ 8,194,000 $ 8,214,500 $ 8,235,200 $ 8,256,000 Table 2-5 summarizes the water utility s projected operating and maintenance expense for the study period. Within the eight major line items, expenses are further separated by costs categories such as salaries and benefits, contracts and professional services, services and supplies, utilities, etc. These O&M categories are projected to increase between 1.0 and 10.0 percent per year depending on the type of category. Table 2-6 shows the escalation factors. BLACK & VEATCH CORPORATION Water Rate Study 5

10 Water and Sewer Rate Study City of Lynwood, CA Table 2-5 Water Operating and Maintenance Expenses No. Description Fiscal Year Ending June 30, FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 ($) ($) ($) ($) ($) O&M Expenses 1 City Manager 2 Administration 57,800 60,700 63,500 66,500 69,600 3 Finance & Administration 4 Water Billing/Collections 476, , , , ,000 5 Human Resources 6 General Services 43,716 45,800 47,800 49,900 52,200 7 Employee Personnel Service 43,716 45,800 47,800 49,900 52,200 8 Public Works 9 Water Utility 4,716,900 4,946,900 5,285,100 5,434,900 5,590, Sewer Service Technology & Media Support Services 12 Marketing Division Information Technology 233, , , , , Total $ 5,571,932 $ 5,835,200 $ 6,207,400 $ 6,393,000 $ 6,586,400 6 B&V PROJECT NO JANUARY 25, 2017

11 City of Lynwood, CA WATER AND SEWER RATE STUDY Table 2-6 Water O&M Expenses Escalators No. O&M Expense Category Escalation Factor 1 Salaries and Wages 3.0% 2 Fringe Benefits 7.0% 3 OPEB 10.0% 4 Materials & Supplies 1.0% 5 Contract Services 1.0% 6 Utilities 3.0% 7 Equipment 1.0% 8 Administrative 2.0% The largest O&M expenditure that the water utility incurs is associated with water supply costs. The City pays a replenishment assessment to the Water Replenishment District for groundwater it pumps. In addition, the City purchases imported water from MWD via CBMWD when the local groundwater supply is not sufficient to meet the City s water demands. In order to minimize its costs, the City tries to obtain water leases from other agencies not using their full groundwater allocations. In the past, the City has been successful in obtaining leases such as the current lease with the City of Bell Gardens. The lease does come with a cost, but it is significantly less than purchasing imported water. Currently, the City is 99 percent groundwater reliant. The City uses import water when maintenance is performed on a well. With the uncertainty in local and imported water supply costs, the City anticipates that water costs will increase at a rate of 7 percent per year over the study period. The increase will mainly affect the variable fees from WRD and CBMWD. The fixed fee from CBMWD is relatively small and therefore remains relatively constant. 2.6 DEBT SERVICE REQUIREMENTS Table 2-7 represents the water utility s existing debt service obligations. This table shows the combined principal and interest requirements on the existing debt over the study period. It is common practice for utilities to utilize debt to finance large capital improvement projects. By financing the cost of the projects, the City is able to fund large projects immediately and spread the payment over a specified time frame, thereby helping to offset the impact on rate-payers. Table 2-7 Existing Water Debt Service No. Description Fiscal Year Ending June 30, FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 ($) ($) ($) ($) ($) Revenue Bonds A Revenue Bonds 638, , , , , A Revenue Bonds 361, , , , , A Revenue Bonds 410, , , , ,100 4 Total $ 1,409,900 $ 1,411,300 $ 1,401,500 $ 1,407,500 $ 1,407, CAPITAL IMPROVEMENT PROGRAM The City s Capital Improvement Program (CIP) for FY 2017 through FY 2021 is summarized in Table 2-8. The City developed this multi-year CIP covering its commitments identified in the BLACK & VEATCH CORPORATION Water Rate Study 7

12 Water and Sewer Rate Study City of Lynwood, CA 2005 Water Master Plan and the 2015 Needs Assessment. The 2015 Needs Assessment reexamined the projects listed in the Water Master Plan and reprioritized the schedule accordingly. Based on the Water Master Plan and Needs Assessment, it was determined that the City needs to address a total of $30.9 million in capital needs. While the City is cognizant of its needs, the City developed the capital program in Table 2-8 which reflects planned projects that can be designed and or constructed over the study period. The City is projecting a $22.9 million capital improvement program, which includes both capital and replacement projects. Major capital projects identified include water main rehabilitations, new water wells with treatment, and Advance Meter Infrastructure (AMI). AMI provides the water utility to communicate with the water meter in real time, which provides operational, customer service and financial benefits to both the utility and customer. Benefits includes but not limited to: increased meter reading accuracy, improved utility asset management, easier water theft detection, early detection of meter failures, billing accuracy improvements, faster service restoration, flexible billing cycles, and providing the customer the ability to examine usage on real time-based case. The City received an estimate cost of $4.5 million for implementation which would occur over 3 years in FY 2018 to FY Table 2-8 Water Capital Improvement Projects by Function No. Description 2.8 PROJECTED OPERATING RESULTS Fiscal Year Ending June 30, FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 ($) ($) ($) ($) ($) Capital Projects 1 Source of Supply 3,428, ,900 1,900,000 2,516,500 3,000,000 2 Transmission & Distribution 429,200 2,628,000 3,028,000 3,028,000 1,225,000 3 General Plant 642, , Total $ 4,500,000 $ 3,660,900 $ 4,928,000 $ 5,544,500 $ 4,225,000 The revenue requirements of the water utility consist of system O&M expense, water supply costs, debt service requirements, and transfers (capital contributions). In the analysis, it was important to identify the state of the water utility under no revenue increases, known as the status quo scenario. Under this scenario, the water utility will not impose any revenue increases over the study period. As shown in Figure 2-1, the status quo conditions means that the water utility will operate at an annual deficit position thus tapping into its operating reserves. In addition, since the water utility has debt service commitments, the City would need to reduced capital improvements or implement some type of rate increase. 8 B&V PROJECT NO JANUARY 25, 2017

13 City of Lynwood, CA WATER AND SEWER RATE STUDY Figure 2-1 Status Quo Projected Revenue and Revenue Requirements $20,000,000 $15,000,000 $10,000,000 $5,000,000 $0 -$5,000,000 -$10,000,000 -$15,000,000 -$20,000,000 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 O&M Expenses Water Supply Costs Debt Service Capital Projects Transfers Revenue Operating Reserves In order to avoid deficit positions, the water utility examined various options for revenue increases that would meet the revenue requirements. Based on the goals and objectives, the City arrived at the revenue adjustments shown in the operating cash flow on Table 2-9. The operating cash flow transitions the water utility to positive cash flow and meets its debt coverage requirement over the study period. The operating cash flow is separated into revenue and revenue requirements. In line 1 is the revenue under existing rates while lines 2 through 7 is the additional revenue generated from the required annual revenue increases. s 9 through 13 represent other revenues, which include reconnection charges, tap fees, interest earned from the investment of available funds and miscellaneous revenues. 14 represents the repayment of the inter-fund transfer from the sewer utility. In line 16, the total revenues generated from existing rates, revenue from increases and other operating revenue is summarized. The revenue requirements for O&M, water supply, debt service, and capital projects have been previously discussed. These revenue requirements are shown on lines 17 through 26 of Tables represents that total revenue requirement that will need to be met through revenue. The net cumulative balance is indicated in line 30. The City will transition from a minimum 16 percent of O&M expenses as an operating reserve balance to an industry standard of 90 days of O&M expenses (25 percent of O&M). The recommended revenue adjustments allow the water utility to reach a positive balance in FY 2022 while still incorporating capital improvement Debt Service Requirements Based on the operating cash flow, it is shown in line 32 that the City will not meet its debt service coverage requirement in FY 2017 and as noted by the City s Financial Advisor, will be in technical default. The City has directed Black & Veatch to proceed with not meeting the debt coverage requirements in FY 2017 as the City has informed Bond Counsel and its Financial Advisor that it intends immediate restoration of compliance with the described rate covenant through rate increases. BLACK & VEATCH CORPORATION Water Rate Study 9

14 Water and Sewer Rate Study City of Lynwood, CA With implementation of the proposed revenue adjustments and monitoring of O&M expenses, the City should be able to meet the coverage ratio of 1.25x in FY 2018 and forward. The exact debt service coverage ratio for each year is subject to verification by the City s Financial Advisor. Figure 2-2 presents the major components of the operating cash flow. Table 2-9 Water Operating Cash Flow No. Description Fiscal Year Ending June 30, FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 ($) ($) ($) ($) ($) Revenue Rate Revenue 1 Revenue from Existing Rates 8,053,400 8,194,000 8,214,500 8,235,200 8,256,000 Months Year Effective Rate Adj 2 FY % 201,300 1,229,100 1,232,200 1,235,300 1,238,400 3 FY % 706,700 1,417,000 1,420,600 1,424,200 4 FY % 814,800 1,633,700 1,637,800 5 FY % 939,400 1,883,500 6 FY % 1,083,000 7 Increased Revenue Due to Adjustments 201,300 1,935,800 3,464,000 5,229,000 7,266,900 8 Subtotal $ 8,254,700 $ 10,129,800 $ 11,678,500 $ 13,464,200 $ 15,522,900 Other Operating Revenue 9 Water Reconnection Charge 21,500 21,500 21,500 21,500 21, Tap & Meter Fee Charges Miscellaneous Revenue 1,800 1,800 1,800 1,800 1, Interest Income 60,800 63,100 56,600 31,900 39, Subtotal $ 84,200 $ 86,500 $ 80,000 $ 55,300 $ 63,000 Transfers 14 From Sewer Utility 19,500 19,500 19,500 19,500 19, Subtotal $ 19,500 $ 19,500 $ 19,500 $ 19,500 $ 19, Total Revenue $ 8,358,400 $ 10,235,800 $ 11,778,000 $ 13,539,000 $ 15,605,400 Revenue Requirements Operating & Maintenance 17 O&M Expenses 5,571,932 5,835,200 6,207,400 6,393,000 6,586, Water Supply 1,713,100 1,970,100 2,110,700 2,261,600 2,423, Subtotal $ 7,285,032 $ 7,805,300 $ 8,318,100 $ 8,654,600 $ 9,009,800 Debt Service 20 Existing Revenue Bonds 1,409,900 1,411,300 1,401,500 1,407,500 1,407, Proposed Revenue Bonds Subtotal $ 1,409,900 $ 1,411,300 $ 1,401,500 $ 1,407,500 $ 1,407,000 Transfers 23 To Capital Projects Fund 4,500,000 3,660,900 4,928,000 5,544,500 4,225, To Sewer Utility To Other Fund Subtotal $ 4,500,000 $ 3,660,900 $ 4,928,000 $ 5,544,500 $ 4,225, Total Revenue Requirements $ 13,194,932 $ 12,877,500 $ 14,647,600 $ 15,606,600 $ 14,641, Net Annual Cash Balance (4,836,532) (2,641,700) (2,869,600) (2,067,600) 963, Beginning Fund Balance 14,585,484 9,748,952 7,107,252 4,237,652 2,170, Net Cumulative Fund Balance $ 9,748,952 $ 7,107,252 $ 4,237,652 $ 2,170,052 $ 3,133, Working Capital Reserves - Target (90 days of O $ 1,796,300 $ 1,924,600 $ 2,051,000 $ 2,134,000 $ 2,221, Debt Service Coverage - Senior (1.25x) B&V PROJECT NO JANUARY 25, 2017

15 City of Lynwood, CA WATER AND SEWER RATE STUDY Figure 2-2 Operating Cash Flow Projected Revenue and Revenue Requirements $18,000,000 $16,000,000 $14,000,000 $12,000,000 $10,000,000 $8,000,000 $6,000,000 $4,000,000 $2,000,000 $0 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 O&M Expenses Water Supply Costs Debt Service Capital Projects Transfers Revenue Operating Reserves Test Year Revenue Requirements In analyzing the water utility s cost of service for allocation to its customer classes, the annual revenue requirements for FY 2017 is selected as the Test Year (TY) requirements to demonstrate the development of cost-of-service water rates. Based on achieving the water utility s principal goals within the study period, the cash flow in Tables 2-9 serves as the basis for the cost of service analyses. BLACK & VEATCH CORPORATION Water Rate Study 11

16 Water and Sewer Rate Study City of Lynwood, CA 3 Cost of Service Allocation The revenue requirements to be derived from rates for water utility are synonymous with the definition of the Cost of Service (COS). In developing equitable rate structures, revenue requirements are allocable to the various customer classifications according to the service rendered. Allocations of these requirements to customer classes should take into account the quantity of water consumed, peak flows, number of customers, and other relevant factors. The total costs of service to be recovered from water user rates for the TY 2017 are summarized in Tables 3-1. Table 3-1 Water Cost of Service No. Description Shown in line 5 is the total revenue requirement that corresponds with the Table 2-9 line 27. In order to derive the revenue requirement that will need to be recovered by the rates, it is necessary to deduct revenues from other sources as shown in lines 8 and represents the other operating revenues not associated with rates. 11 represents the net annual cash balance for the water utility during the Test Year. In this case, the $3,829,832 indicates that the water utility is projecting a negative cash balance for the year even after you receive the partial rate increase in May. 12 represents the total costs that are to be recovered from rates. 3.1 FUNCTIONAL COST COMPONENTS Operating Capital Total Expense Cost Cost ($) ($) ($) Revenue Requirements 1 O&M Expenses 5,571, ,571,932 2 Water Supply 1,713, ,713,100 3 Debt Service 0 1,409,900 1,409,900 4 Transfers 0 4,500,000 4,500,000 5 Subtotal $ 7,285,032 $ 5,909,900 $ 13,194,932 Less Revenue Requirements Met from Other Sources 6 Other Operating Revenue 84, ,200 7 Transfers 19, ,500 8 Subtotal $ 103,700 $ 0 $ 103,700 Adjustments 9 Adj for Annual Cash Balance 4,836, ,836, Adj to Annualize Rate Increase (1,006,700) 0 (1,006,700) 11 Subtotal $ 3,829,832 $ 0 $ 3,829, COS to be Recovered from Rates $ 3,351,500 $ 5,909,900 $ 9,261,400 The cost of providing water service should be analyzed by system function in order to properly allocate the costs to the various classes of customers and subsequently design rates. As a basis for allocating costs of service among customer classes, costs may be separated into the following four basic functional cost components: (1) Base ; (2) Extra Capacity ; (3) Customer ; and (4) Direct Assignment. Base costs represent operating and capital costs of the system associated with service to customers to the extent required for a constant, or average annual rate of use. 12 B&V PROJECT NO JANUARY 25, 2017

17 City of Lynwood, CA WATER AND SEWER RATE STUDY Extra Capacity costs represent those operating costs incurred in meeting demands in excess of average, and capital related costs for additional plant and system capacity beyond that required for the average rate of use. Customer costs are defined as those that tend to vary in proportion to the number of customers connected to the system. These include meter reading, billing, collecting and accounting, and maintenance and capital costs associated with meters and services. Directly assigned costs are costs specifically identified as those incurred to serve a specific customer group(s). The separation of costs of service into these principal categories facilitates allocating such costs to the various customer classes on the basis of the respective service requirements of each class. 3.2 ALLOCATION TO COST COMPONENTS Each element of cost is allocated to functional cost components on the basis of the parameter(s) having the most significant influence on the magnitude of that element of cost. O&M expense items are allocated directly to appropriate cost components, while the allocation of capital and replacement costs is based upon a detailed allocation of related capital investment. The separation of costs into functional components provides a means for distributing such costs to the various classes of customers on the basis of their respective responsibilities for each particular type of service. Black & Veatch performed the following steps to derive the allocation percentages for apportioning the City s O&M and capital costs. As noted above, elements that are allocated directly to their cost component include customer costs and direct assigned costs. For volume-related cost allocations, the first step in determining the allocation percentages is to assign system peaking factors. The base element is equal to the average daily demand (ADD) and assigned a value of 1.0. The City s maximum day (max day) demand is estimated to be 1.80 times the ADD. Thus, the max day is assigned a value of The maximum instantaneous usage is approximated by the maximum hourly (max hour) usage and is estimated to be 2.70 times the ADD. Thus, max hour is assigned a value of These peaking factors are based on the City s 2005 Water Master Plan. Cost components that are solely base-related, are allocated 100 percent to base. Cost components that are designed to meet max day requirements, such as reservoirs, are allocated to base and max day factors as follows: Base = (1.0/1.8) x 100 = 55.6% Max Day = ( )/1.8 x 100 = 44.4% Cost components that are designed to meet max hour design requirements, such as Distribution, are allocated in a similar fashion, as follows: Base = (1.0/2.70) x 100 = 37.0% Max Day = ( )/2.70 x 100 = 29.6% Max Hour = ( )/2.70 x 100 = 33.3% BLACK & VEATCH CORPORATION Cost of Service Allocation 13

18 Water and Sewer Rate Study City of Lynwood, CA Allocation of Operating and Maintenance Expense In the allocation of O&M expense, costs are allocated directly to cost components to the extent possible. Expenses such as City Manager, Finance, Human Resources and Technology & Media are allocated on the basis of customer while water billing is allocated on the basis of meters and customer. Public works which represents water operations is allocated based on max hour design requirements as described in Section 3.2. Table 3-2 represents the allocation of O&M to the functional cost components. Upon allocation to function cost components, revenues from other sources as shown in Table 3-1 lines 8 and 11 are subtracted Allocation of Capital Investments In the allocation of capital expenses, costs are allocated to cost components to the extent possible. Capital expenses are made up of two components: capital expenditures and debt service. Capital expenditures represent future capital investment into the water system. These costs are allocated on the basis of total existing assets. A distribution of the new water investment is shown in Table 3-3. Debt service represents payment for old capital investment made into the system. Since there was not definitive records showing the exact projects paid for by existing debt, and because there is a fixed element of cost associated with debt service, debt costs are allocated 30 percent to customers and 70 percent to volume (base). 14 B&V PROJECT NO JANUARY 25, 2017

19 City of Lynwood, CA WATER AND SEWER RATE STUDY Table 3-2 Allocation of Water O&M Expenses Common to All Customers Base Extra Capacity Customer Fire No. Description Total Costs Base Max. Day Max. Hour Meters Cust/Bill. Protection ($) ($) ($) ($) ($) ($) ($) Operating Expenses 1 City Manager 57, , Finance & Administration 476, , , Human Resources 87, , Public Works 6,430,000 2,027,800 1,905,200 2,143, , ,200 5 Technology & Media Support Servic 233, , Transfers Subtotal $ 7,285,000 $ 2,027,800 $ 1,905,200 $ 2,143,300 $ 416,700 $ 759,800 $ 32,200 Less Other Revenue 8 Miscellaneous Revenues 103,700 28,900 27,100 30,500 5,900 10, Other Adjustments 3,829,800 1,066,000 1,001,600 1,126, , ,400 16, Net Operating Expenses $ 3,351,500 $ 932,900 $ 876,500 $ 986,000 $ 191,700 $ 349,600 $ 14,800 Table 3-3 Allocation of Water Capital Costs Common to All Customers Base Extra Capacity Customer Fire No. Description Total Costs Base Max. Day Max. Hour Meters Cust/Bill. Protection ($) ($) ($) ($) ($) ($) ($) Plant Assets 1 Source of Supply 1,332,000 1,332, Pumping 437, , , Treatment 216, ,300 96, T&D 2,143, , , , Meters & Service 216, , Hydrants 21, ,600 7 General Plant 132,200 75,400 28,000 21,600 6, Net Capital Expenses $ 4,500,000 $ 2,564,600 $ 953,900 $ 736,200 $ 223,000 $ 0 $ 22,300 BLACK & VEATCH CORPORATION Cost of Service Allocation 15

20 Water and Sewer Rate Study City of Lynwood, CA 3.3 UNITS OF SERVICE The total cost responsibility for each customer class may be established by developing unit costs of service for each cost function and subsequently assigning those costs to the customer classes based on the respective service requirements of each. To properly recognize the cost of service, each customer class is allocated its share of base, maximum day and maximum hour costs. The number of units of service required by each customer class provides a means for the proportionate distribution of costs previously allocated to respective cost categories. Table 3-4 is a summary of the estimated units of service for the various customer classes. Base costs vary with the volume of water used and are distributed to customer classes on that basis. Extra Capacity costs are those associated with meeting maximum rates of water use, and is distributed to customer classes on the basis of the respective class capacity requirements in excess of average rates of use. Customer costs, which consist of meter related, billing, collection and accounting costs, are allocated to the various classes on the basis of the number of bills and equivalent meters. Equivalent meter ratios are established by the American Water Works Association annual M6; Water Meters - Selection, Installation, Testing and Maintenance. The estimated number of equivalent meters for each customer class is based on the total number of various sizes of meters serving respective classes and the ratio of the cost of meters for the various sizes to the cost of 5/8-inch meters. Private fire protection costs are allocated on the basis of equivalent fire hydrants. The extra capacity units are determined based on a capacity factor between maximum day and maximum hour to average day. Generally, residential customers experience a higher maximum to average demand ratio than the industrial customer class. Maximum hour usage information by individual customer class is not available. As such, assumptions for maximum day and maximum hour ratios for each customer class have been made based on experience with other water utilities with similar characteristics. 3.4 COST OF SERVICE ALLOCATIONS The costs of service are distributed to the various customer classes by applying the unit costs of service to respective service requirements. The total unit costs of service applied to the respective requirements for each customer class results in the total cost of service for each customer class Units Costs of Service The Test Year unit cost of service for each functional cost component is based on the total cost divided by the applicable units of service as shown in Tables 3-5. In lines 1 and 2, the total costs represent the cost to be recovered from rates shown in Table 3-1 lines on Table 3-5 represents the unit costs that are used in allocating the costs to the specific customer classes Distribution of Costs of Service to Customer Classes The customer class responsibility for service is obtained by applying the unit costs of service to the number of units for which the customer class is responsible. This process is illustrated in Tables 3-6, in which the unit costs of service are applied to the customer class units of service. 16 B&V PROJECT NO JANUARY 25, 2017

21 City of Lynwood, CA WATER AND SEWER RATE STUDY Table 3-4 Water Units of Service Consumption Maximum Day Maximum Hour Fire No. Description Annual Avg. Day Factor Total Extra Factor Total Extra Meters Bills Protection (HCF) (HCF/day) (HCF/day) (HCF/day) (HCF/day) (HCF/day) (EMs) (Bills) (EHs) 1 All Customer 2,041,220 5, % 12,303 6, % 20,356 8,053 12, ,236 2 Subtotal 2,041,220 5,592 12,303 6,711 20,356 8,053 12, ,236 3 Public Fire ,397 4,722 1,100 4 Private Fire Subtotal ,775 5, ,177 6 Total Water System 2,041,220 5,592 13,025 7,433 26,132 13,107 12, ,172 1,177 Table 3-5 Water Unit Cost of Service Common to All Customers Base Extra Capacity Customer Fire No. Description Total Costs Base Max. Day Max. Hour Meters Cust/Bill. Protection ($) ($) ($) ($) ($) ($) ($) Unit Cost of Service 1 Net Operating Expense 3,351, , , , , ,600 14,800 2 Capital Costs 4,500,000 2,564, , , , ,300 3 Debt Service 1,409, , , Total $ 9,261,400 $ 4,484,300 $ 1,830,400 $ 1,722,200 $ 414,800 $ 772,600 $ 37,100 5 Units of Service (Total) 2,041,220 7,433 13,107 12, ,172 1,177 6 Cost per Unit $ 2.20 $ $ $ $ 7.01 $ per Unit per HCF per HCF/Day per HCF/Day Per Eq. Meter per Bill per Eq. Hyd BLACK & VEATCH CORPORATION Cost of Service Allocation 17

22 Water and Sewer Rate Study City of Lynwood, CA Table 3-6 Distribution of Water Cost to Customer Classes Common to All Customers Base Extra Capacity Customer Fire No. Description Total Costs Base Max. Day Max. Hour Meters Cust/Bill. Protection ($) ($) ($) ($) ($) ($) ($) per HCF per HCF/Day per HCF/Day Per Eq. Meter per Bill per Eq. Hyd 1 Cost per Unit $ 2.20 $ $ $ $ 7.01 $ Customer Class All Customers 2 Units 2,041,220 6,711 8,053 12, , Allocation of costs of service 8,376,000 4,484,300 1,652,700 1,058, , ,000 0 Public Fire 4 Units , ,100 5 Allocation of costs of service 821, , , ,700 Private Fire 6 Units Allocation of costs of service 64, ,600 43, ,600 2,400 8 Total $ 9,261,400 $ 4,484,300 $ 1,830,400 $ 1,722,200 $ 414,800 $ 772,600 $ 37, B&V PROJECT NO JANUARY 25, 2017

23 City of Lynwood, CA WATER AND SEWER RATE STUDY 3.5 ADEQUACY OF EXISTING RATES TO MEET COSTS OF SERVICE Presented in Tables 3-7 is a comparison of the allocated cost of service and revenue under existing rates by individual customer class and for the system in total. The indicated revenue increase required over existing rates for each user class indicates where the emphasis should be directed in the subsequent rate design of water service user rates. The 15.0 percent, overall increase is considered necessary to meet the projected revenue requirements for the FY 2017 Test Year. This overall level of revenue needs to be produced by the proposed rates developed and presented in subsequent sections of this report. Table 3-7 Comparison of Water Cost of Service to Existing Revenue Allocated Beneficial Use Adjusted Rev under Indicated No. Description COS Allocation COS Exst Rates Rev Increase ($) ($) ($) ($) (%) Customer Class 1 All Customers 8,376, ,300 9,197,300 8,029, % 2 Public Fire 821,300 (821,300) % 3 Private Fire 64, ,100 24, % 4 Total $ 9,261,400 $ 0 $ 9,261,400 $ 8,053, % BLACK & VEATCH CORPORATION Cost of Service Allocation

24 Water and Sewer Rate Study City of Lynwood, CA 4 Proposed Rate Adjustments The initial consideration in the derivation of rate schedules for water service is the establishment of equitable charges to the customers commensurate with the cost of providing that service. While the cost of service allocations to customer classes should not be construed as literal or exact determinations, they offer a guide to the necessity for, and the extent of, rate adjustments. Practical considerations sometimes modify rate adjustments by taking into account additional factors such as the extent of bill impacts, and local policies and practices. 4.1 EXISTING RATES The water utility s existing rates consists of a readiness to serve charge and a commodity charge which is a uniform commodity rate for all customer classes. In addition, there is a fire line charge for fire service connections based on meter size. A summary of existing water rates was presented earlier in this report in Table PROPOSED RATES The costs of service analysis described in preceding sections of this report provide a basis for the design of water rates. As observed in Table 3-6, the cost of providing service compared to the revenues received from different customer classes is not uniform. That is, for some customer classes the cost of providing service is greater than the revenues received. The 5-year rate schedule is shown in Table 4-1 which takes into consideration water utility objectives. The water rates for all customer classes will keep the current rate structure which consists of a readiness to serve charge plus a commodity rate. The readiness to serve charge will be based on meter size. The commodity rates incorporate the amount of water consumed. A unit represents 100 cubic feet of water. Under the uniform rate structure, users pay the same commodity rate regardless of usage amounts. Table 4-1 Proposed Water Rates Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Description ($/month) ($/month) ($/month) ($/month) ($/month) Readiness To Serve Charge 3/4" " " " " " " " Commodity Charge ($/HCF) ($/HCF) ($/HCF) ($/HCF) ($/HCF) All Customers B&V PROJECT NO JANUARY 25, 2017

25 City of Lynwood, CA WATER AND SEWER RATE STUDY Readiness-to-Serve Charge The readiness to serve charge includes a portion of the cost of meter maintenance, reading customer meters, issuing bills, general fire protection costs, and accounting/financial administrative costs associated with customer account. As noted previously, the meter service charge increases with increasing meter size. The meter ratio used follows those recommended by AWWA and recognizes that as meter size increases, so does the capacity. For example, customers with a 4 meter have an expectation of being able to use more water (at a higher flow capacity) than customers are with a 3/4 meter. Consequently, the City s water system must be prepared to provide each customer the level of service expected from his or her meter connection when the tap is turned on. Table 4-2 demonstrates the development of readiness-to-serve charges. Table 4-2 Readiness-to-Serve Development Meter Billing Public Fire Service Total Unit Meter Adjusted Adjusted Adjusted Service Description Cost Ratio Unit Cost Unit Cost Bill Ratio Unit Cost Unit Cost Ratio Unit Cost Charge per EM $ per Bill $ per EM $ $/Monthly 3/4" $ $2.80 $ $7.01 $ $5.53 $ " /2" " " " " " Fire Service As part of the services provided by the water utility, 92 accounts that have a private water line connection as well as 1,100 fire hydrants that are tied to the water system for fire protection. To meet fire protection demands, the City must design, operate and maintain a water system that can meet peak fire demand requirements. Public hydrants are of beneficial use for all customers therefore costs are allocated to each customer class. Private fire services are charged based on the diameter of the line that connects to the water system. The results of the cost-of-service analysis conducted herein indicate that an increase from current fire service charges is necessary in order to achieve full cost recovery as shown in Table 4-3. Table 4-4 demonstrates the development of fire line charges. Table 4-3 Proposed Fire Service Rates Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Description ($/month) ($/month) ($/month) ($/month) ($/month) Fire Charge 1" " " " " " " " BLACK & VEATCH CORPORATION Proposed Rate Adjustments

26 Water and Sewer Rate Study City of Lynwood, CA Table 4-4 Readiness-to-Serve Development Billing Public Fire Service Total Adjusted Adjusted Service Description Unit Cost Bill Ratio Unit Cost Unit Cost Ratio Unit Cost Charge per Bill $ per EM $ $/Monthly 3/4" $ $7.01 $ $3.33 $ " /2" " " " " " REVENUE RECOVERY UNDER PROPOSED RATES As previously discussed, the proposed rate schedule shown in Table 2-9 would increase rate revenues by the average system-wide cumulative increase of percent over the study period and maintain current cost recovery by customer class, as indicated in Tables 4-5. Table 4-5 Comparison of Water Cost of Service to Proposed Revenue Adjusted Rev under Percent No. Description COS Proposed Rates Recovery ($) ($) (%) Customer Class 1 All Customers 9,197,300 9,197, % 2 Private Fire 64,100 64, % 3 Total $ 9,261,400 $ 9,261, % 4.4 NEIGHBORING WATER UTILITIES Presented in Table 4-6 are the proposed rates compared to rates of neighboring cities/agencies, for a single family residential customer with a 5/8 or 3/4 meter consuming 12 hundred cubic feet monthly. Based on the comparison, the City is currently in the bottom of water providers in the area, but with the proposed rate increases, the City moves to the middle of water providers. All surveyed community rates are current as of September The City existing bill for 12 units is $49.77 and is anticipated to increase to $ B&V PROJECT NO JANUARY 25, 2017

WATER VALIDATION, COST OF SERVICE & RATE DESIGN ANALYSIS WASTEWATER VALIDATION & RATE ANALYSIS MISCELLANEOUS FEES & OVERHEAD RATE ANALYSIS

WATER VALIDATION, COST OF SERVICE & RATE DESIGN ANALYSIS WASTEWATER VALIDATION & RATE ANALYSIS MISCELLANEOUS FEES & OVERHEAD RATE ANALYSIS WATER VALIDATION, COST OF SERVICE & RATE DESIGN ANALYSIS WASTEWATER VALIDATION & RATE ANALYSIS MISCELLANEOUS FEES & OVERHEAD RATE ANALYSIS B&V PROJECT NO. 179801.0100 PREPARED FOR Vallecitos Water District,

More information

La Cañada Irrigation District

La Cañada Irrigation District La Cañada Irrigation District Water Rate Study Report - 2009 March, 2009 201 S. Lake Blvd, Suite 803 Pasadena CA 91101 Phone Fax 626 583 1894 626 583 1411 www.raftelis.com March 30, 2009 Mr. Douglas M.

More information

Santa Clarita Water Division

Santa Clarita Water Division Santa Clarita Water Division Retail Water Rate Cost of Service Study Report September 2017 445 S Figueroa St Suite 2270 Los Angeles, CA 90039 Phone 213.262.9300 www.raftelis.com September 11, 2017 Mr.

More information

The City of Sierra Madre

The City of Sierra Madre The City of Sierra Madre Comprehensive Water and Wastewater Cost of Service Study Report / December 24, 2018 24640 Jefferson Avenue Suite 207 Murrieta, CA 92562 Phone 951.698.0145 www.raftelis.com December

More information

Water Rates Adjustments Phase 2

Water Rates Adjustments Phase 2 Water Rates Adjustments Phase 2 Presented by Shana E. Epstein Director of Public Works, City of Beverly Hills Background Phase 1-Effective January 18, 2018 5-year revenue requirement 3% annual increase

More information

MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT. September 2013

MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT. September 2013 MARINA COAST WATER DISTRICT FINANCIAL PLAN AND RATE AND FEE STUDY FINAL REPORT September 2013 10540 TALBERT AVENUE, SUITE 200 EAST FOUNTAIN VALLEY, CALIFORNIA 92708 P. 714.593.5100 F. 714.593.5101 MARINA

More information

YORBA LINDA WATER DISTRICT

YORBA LINDA WATER DISTRICT YORBA LINDA WATER DISTRICT 2015 Water and Sewer Rate Study Report FINAL August 25, 2015 City of Thousand Oaks Water and Wastewater Financial Plan Study Report 445 S. Figueroa Street Suite #227 Los Angeles,

More information

WATER AND WASTEWATER RATE STUDY

WATER AND WASTEWATER RATE STUDY WATER AND WASTEWATER RATE STUDY Draft July 3, 2013 Prepared by: Page 1 Page 2 201 S. Lake Avenue Suite 301 Pasadena, CA 91101 Phone 626. 583. 1894 Fax 626. 583. 1411 www.raftelis.com July 1, 2013 Mr. Don

More information

Table 2-2 Projected Water Production and Costs

Table 2-2 Projected Water Production and Costs Table 2-2 Projected Water Production and Costs Recorded Estimated Budget Forecast Description FY 2007-08 FY 2008-09 FY 2009-10 FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 Well Production (OCWD, A-F, a)

More information

Temescal Valley Water District

Temescal Valley Water District Temescal Valley Water District Comprehensive Water, Recycled Water, and Wastewater Cost of Service Study Draft Report / December 7, 2016 24640 Jefferson Avenue Suite 207 Murrieta, CA 92562 Phone 951.698.0145

More information

Final Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY

Final Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY Final Report COMPREHENSIVE WATER AND WASTEWATER COST OF SERVICE AND RATE STUDY Phase 2 Cost of Service and Rate Design BLACK & VEATCH PROJECT NO. 192366 Black & Veatch Holding Company 2017. All rights

More information

LONG BEACH WATER DEPARTMENT COST OF SERVICE AND RATE STUDY

LONG BEACH WATER DEPARTMENT COST OF SERVICE AND RATE STUDY LONG BEACH WATER DEPARTMENT COST OF SERVICE AND RATE STUDY Final Report / February 1, 2017 445 S. Figueroa Street Suite 2270 Los Angeles, CA 90071 Phone Fax 213. 262. 9300 213. 262. 9303 www.raftelis.com

More information

Final COST OF SERVICE STUDY SEPTEMBER City of San Clemente

Final COST OF SERVICE STUDY SEPTEMBER City of San Clemente Final COST OF SERVICE STUDY SEPTEMBER 2017 City of San Clemente Contents CONTENTS Executive Summary... 1 Study Goals and Drivers... 1 Water Rate Analysis & Adoption... 2 Recycled Water Rate Analysis &

More information

Water & Sewer Rate Study. Water & Sewer Cost of Service Rate Study. City of Norco, CA. Draft Report for

Water & Sewer Rate Study. Water & Sewer Cost of Service Rate Study. City of Norco, CA. Draft Report for Water & Sewer Cost of Service Rate Study for City of Norco, CA October 11, 2016 Table of Contents October 11, 2016 Chad Blais Director of Public Works City of Norco 2870 Clark Avenue Norco, CA 92860 Re:

More information

Rainbow Municipal Water District

Rainbow Municipal Water District Rainbow Municipal Water District Potable Water Cost of Service Study November 10, 2015 201 S Lake Ave. Suite 301 Pasadena CA 91101 Phone 626.583.1894 Fax 626.583.1411 www.raftelis.com November 10, 2015

More information

Town of Hillsborough. City Council Public Hearing. Water Rate Cost-of-Service Study. February 13, 2017

Town of Hillsborough. City Council Public Hearing. Water Rate Cost-of-Service Study. February 13, 2017 City Council Public Hearing February 13, 2017 Public Hearing on Proposed Water Rates PRESENTED BY Kelly J. Salt Partner 2016 Best Best & Krieger LLP Article X, section 2 (1928) The general welfare requires

More information

Water and Sewer Utility Rate Studies

Water and Sewer Utility Rate Studies Final Report Water and Sewer Utility Rate Studies July 2012 Prepared by: HDR Engineering, Inc. July 27, 2012 Mr. Mark Brannigan Director of Utilities 591 Martin Street Lakeport, CA 95453 Subject: Comprehensive

More information

April 6, Katherine Godbey Director of Finance, Coachella Valley Water District Hovley Lane East Palm Desert, CA 92260

April 6, Katherine Godbey Director of Finance, Coachella Valley Water District Hovley Lane East Palm Desert, CA 92260 April 6, 2016 Katherine Godbey Director of Finance, Coachella Valley Water District 75515 Hovley Lane East Palm Desert, CA 92260 Dear Ms. Godbey: Hawksley Consulting (a subsidiary of MWH Global) is pleased

More information

Water Consultancy. Montecito Sanitary District Wastewater Rate Study Report. Montecito Sanitary District

Water Consultancy. Montecito Sanitary District Wastewater Rate Study Report. Montecito Sanitary District 3585 Maple Street, Suite 250 Ventura, CA 93003 805-404-1467 Montecito Sanitary District Wastewater Rate Study Report March 2016 Montecito Sanitary District 1042 Monte Cristo Lane Santa Barbara CA 93108

More information

Capital Region Water. Water and Wastewater Rate Study Report. November 22, Capital Region Water Water and Wastewater Rate Study

Capital Region Water. Water and Wastewater Rate Study Report. November 22, Capital Region Water Water and Wastewater Rate Study Capital Region Water Water and Wastewater Rate Study Report November 22, 2017 Capital Region Water Water and Wastewater Rate Study TABLE OF CONTENTS 1. INTRODUCTION...1 1.1 RATE STUDY SCOPE AND OBJECTIVES...1

More information

Water Rate Study FINAL January 31, 2018

Water Rate Study FINAL January 31, 2018 Water Rate Study FINAL January 31, 2018 1889 Alcatraz Avenue Berkeley, CA 94703 Tel: 510 653 3399 www.bartlewells.com January 31, 2018 Joshua Basin Water District P.O. Box 675 / 61750 Chollita Road Joshua

More information

COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS

COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS Black & Veatch Holding Company 2011. All rights reserved. COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS San Antonio Water System PREPARED FOR San Antonio Water System 26 MAY 2015 B&V PROJECT NO.

More information

City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE

City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE I. INTRODUCTION City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE The City of Arroyo Grande, California (the City ) was incorporated as a general

More information

SANTA FE IRRIGATION DISTRICT

SANTA FE IRRIGATION DISTRICT SANTA FE IRRIGATION DISTRICT Water Rate Study FINAL Report/March 2016 445 S Figueroa Street Suite 2270 Los Angeles, CA 90071 Phone 213 262 9300 Fax 213 262 9303 www.raftelis.com March 21, 2016 Ms. Jeanne

More information

Water Rate Study Final Report

Water Rate Study Final Report Phelan Pinon Hills Community Services District March 6, 2013 Water Rate Study Final Report Corporate Office: Anaheim, California Temecula Office: 27368 Via Industria, Suite 110 Temecula, California 92590

More information

DRAFT COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS. San Antonio Water System. San Antonio Water System 21 MAY 2015 PREPARED FOR

DRAFT COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS. San Antonio Water System. San Antonio Water System 21 MAY 2015 PREPARED FOR Black & Veatch Holding Company 2011. All rights reserved. DRAFT COMPREHENSIVE COST OF SERVICE AND RATE DESIGN ANALYSIS San Antonio Water System PREPARED FOR San Antonio Water System 21 MAY 2015 B&V PROJECT

More information

TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009

TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009 TOWN OF ORO VALLEY WATER UTILITY COMMISSION WATER RATES ANALYSIS REPORT OCTOBER 7, 2009 EXECUTIVE SUMMARY The functions and duties of the Oro Valley Water Utility Commission include reviewing and developing

More information

CITY OF BEVERLY HILLS

CITY OF BEVERLY HILLS January 5, 2019 Final Report CITY OF BEVERLY HILLS Water Rate Study CITY OF BEVERLY HILLS 345 Foothill Road Beverly Hills, CA 90210 FINAL REPORT WATER RATE STUDY January 5, 2019 HF&H CONSULTANTS, LLC

More information

Valencia Water Company. Cost of Service Study

Valencia Water Company. Cost of Service Study Valencia Water Company Cost of Service Study 2018 2020 Prepared By: Kenneth J. Petersen, P.E. Beverly Johnson, CPA John Garon, Consultant September 2017 1 P age Contents EXECUTIVE SUMMARY... 1 INTRODUCTION...

More information

City of La Palma Agenda Item No. 5

City of La Palma Agenda Item No. 5 City of La Palma Agenda Item No. 5 MEETING DATE: January 19, 2016 TO: FROM: SUBMITTED BY: CITY COUNCIL CITY MANAGER Mike Belknap, Community Services Director AGENDA TITLE: Adopt a Resolution Approving

More information

WATER AND SEWER UTILITIES RATE STUDY

WATER AND SEWER UTILITIES RATE STUDY WATER AND SEWER UTILITIES RATE STUDY RATE DESIGN WORKSHOP WITHCITYCOUNCIL / UTILITIES COMMISSION March 6, 2014 Agenda Overview of Rate Study Process Water / Sewer Developer Impact Fees Sewer Rates Water

More information

FORT COLLINS- LOVELAND WATER DISTRICT

FORT COLLINS- LOVELAND WATER DISTRICT FORT COLLINS- LOVELAND WATER DISTRICT Water Financial Planning and Rate Study Report March 16, 2018 District of Thousand Oaks Water and Wastewater Financial Plan Study Report March 16, 2018 Board of Directors

More information

Notice of a public hearing

Notice of a public hearing Notice of a public hearing Dear Benicia Resident and/or Business Owner, You are receiving a revised Notice of a Public Hearing to increase the water and sewer rates and add water meter replacement fees.

More information

YORK COUNTY, SOUTH CAROLINA

YORK COUNTY, SOUTH CAROLINA YORK COUNTY, SOUTH CAROLINA Water and Sewer Financial Planning and Rate Study Report October 25, 2017 1031 S. Caldwell Street Suite 100 Charlotte, NC 28203 Phone 704.373.1199 Fax 704.373.1113 www.raftelis.com

More information

NALDRAFT SEPTEMBER2015 WASTEWATE

NALDRAFT SEPTEMBER2015 WASTEWATE FI NALDRAFT SEPTEMBER2015 Cos tof S e r v i c e s S T UDY WATE R WASTEWATE R RE CY CL E DWATE R ST ORMWATE R E NVI RONME NT ALRE SOURCE S CITY OF OXNARD PUBLIC WORKS INTEGRATED MASTER PLAN COST OF SERVICE

More information

SAN ANTONIO WATER SYSTEM (SAWS) RATE ADVISORY COMMITTEE: MEETING 3

SAN ANTONIO WATER SYSTEM (SAWS) RATE ADVISORY COMMITTEE: MEETING 3 01 April, 2014 SAN ANTONIO WATER SYSTEM (SAWS) RATE ADVISORY COMMITTEE: MEETING 3 Bill Zieburtz Richard Campbell Robert Chambers RATE SETTING PROCESS STUDY APPROACH RATE SETTING OBJECTIVES FINANCIAL PLAN

More information

Goleta Water District

Goleta Water District 201 S Lake Ave. Suite 301 Pasadena CA 91101 Phone 626 583 1894 www.raftelis.com Water Rates and Cost of Service Study Final Report / June 11, 2015 Water Cost of Service & Rate Study Report 2015 201 S Lake

More information

VENTURA COUNTY WATERWORKS DISTRICTS Representing: Ventura County Waterworks Districts No. 1, 16, 17 & 19

VENTURA COUNTY WATERWORKS DISTRICTS Representing: Ventura County Waterworks Districts No. 1, 16, 17 & 19 VENTURA COUNTY WATERWORKS DISTRICTS Representing: Ventura County Waterworks Districts No. 1, 16, 17 & 19 Board of Ventura County Waterworks District No. 1 800 S. Victoria Avenue Ventura, CA 93009 Subject:

More information

2016 Water and Recycled Water Rate Study PUBLIC HEARING DECEMBER 12, 2016

2016 Water and Recycled Water Rate Study PUBLIC HEARING DECEMBER 12, 2016 2016 Water and Recycled Water Rate Study PUBLIC HEARING DECEMBER 12, 2016 Agenda Rate Study Overview Financial Plan Water Rate Design Recycled Water Rate Design Drought Rates Capacity Fees 12/12/2016 Public

More information

Alameda County Water District. Financial Workshop Proposed Rates & Charges

Alameda County Water District. Financial Workshop Proposed Rates & Charges Alameda County Water District Financial Workshop Proposed Rates & Charges Month, October Day, Year 25, 2018 Presentation Overview Review Financial Workshops Timeline Proposed Development Charges Financial

More information

Squaw Valley PSD. Water & Sewer Rate and Connection Fee Study. Presented by: Shawn Koorn Associate Vice President HDR Engineering, Inc.

Squaw Valley PSD. Water & Sewer Rate and Connection Fee Study. Presented by: Shawn Koorn Associate Vice President HDR Engineering, Inc. Squaw Valley PSD Water & Sewer Rate and Connection Fee Study February 15, 2017 Presented by: Shawn Koorn Associate Vice President HDR Engineering, Inc. Purpose of the District s Study Provide sufficient

More information

WATER USER RATES & FEE STUDY

WATER USER RATES & FEE STUDY WATER USER RATES & FEE STUDY FINAL REPORT February 2016 BARTLE WELLS ASSOCIATES Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com Tel: 510/653-3399

More information

Comprehensive Water Rate Study

Comprehensive Water Rate Study Final Report Dublin San Ramon Services District Comprehensive Water Rate Study January 213 Prepared by: HDR Engineering, Inc. January 1, 213 Ms. Lori Rose Financial Services Manager Dublin San Ramon Services

More information

Table of Contents. Page Witness Background and Experience General Matters Major Wastewater Rate Changes Wastewater Revenue...

Table of Contents. Page Witness Background and Experience General Matters Major Wastewater Rate Changes Wastewater Revenue... MSD Exhibit No. MSD H 0 Rate Change Proceeding WILLIAM STANNARD Direct Testimony Metropolitan St. Louis Sewer District February, 0 Table of Contents Page Witness Background and Experience... General Matters...

More information

Sanitation Rate Study Final Report

Sanitation Rate Study Final Report Sanitation Rate Study Final Report City of Simi Valley April 24, 2015 Prepared by: Page 1 201 S. Lake Avenue Suite 301 Pasadena, CA 91101 Phone 626.583.1894 Fax 626.583.1411 www.raftelis.com April 24,

More information

CITY OF ANAHEIM WATER UTILITY FUND. Financial Statements. June 30, 2014 and (With Independent Auditors Report Thereon)

CITY OF ANAHEIM WATER UTILITY FUND. Financial Statements. June 30, 2014 and (With Independent Auditors Report Thereon) Financial Statements (With Independent Auditors Report Thereon) Table of Contents Page Independent Auditors Report 1 Management s Discussion and Analysis (Unaudited) 3 Financial Statements: Statements

More information

1. Accept staff report on the updated study of cost of service to provide potable water to San Jose Municipal Water System (SJMWS) customers; and

1. Accept staff report on the updated study of cost of service to provide potable water to San Jose Municipal Water System (SJMWS) customers; and CITY OF Cr SAN IPSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL SUBJECT: MUNICIPAL WATER SYSTEM COST OF SERVICE STUDY COUNCIL AGENDA: 05/09/17 ITEM: 7.2 Memorandum FROM: Kerrie Romanow

More information

BOARD OF PUBLIC UTILITIES KANSAS CITY, KANSAS

BOARD OF PUBLIC UTILITIES KANSAS CITY, KANSAS BOARD OF PUBLIC UTILITIES KANSAS CITY, KANSAS Electric Utility Revenues, Revenue Requirements, Cost of Service, And Rates Draft Final Report (As Updated) February 2010 February 1, 2010 Kansas City Board

More information

City of Signal Hill Cherry Avenue Signal Hill, CA RESOLUTION DECLARING INTENTION TO AMEND SIGNAL HILL

City of Signal Hill Cherry Avenue Signal Hill, CA RESOLUTION DECLARING INTENTION TO AMEND SIGNAL HILL City of Signal Hill 2175 Cherry Avenue Signal Hill, CA 90755-3799 AGENDA ITEM TO: FROM: SUBJECT: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL BARBARA MUÑOZ DIRECTOR OF PUBLIC WORKS RESOLUTION DECLARING

More information

3.1. Construction Meter Additional Charges for Temporary Meters OTHER FEES, CHARGES, AND DEPOSITS CAPACITY FEES...

3.1. Construction Meter Additional Charges for Temporary Meters OTHER FEES, CHARGES, AND DEPOSITS CAPACITY FEES... Table of Contents 1. CHARGES FOR WATER SERVICE... 3 1.1. Metered Service:... 3 1.2. Water Commodity Charge:... 3 1.3. SDCWA and Metropolitan Water District (MWD) Charges:... 4 1.4. Separate Private Fire

More information

CITY OF CALISTOGA WATER RATE STUDY FINAL REPORT

CITY OF CALISTOGA WATER RATE STUDY FINAL REPORT CITY OF CALISTOGA WATER RATE STUDY FINAL REPORT February 2, 218 This page was intentionally left blank. City of Calistoga Water Rate Study Report Page 2 February 2, 218 Dylan Feik City Manager City of

More information

CITY OF REDLANDS WATER AND WASTEWATER RATE STUDY. Prepared by:

CITY OF REDLANDS WATER AND WASTEWATER RATE STUDY. Prepared by: CITY OF REDLANDS WATER AND WASTEWATER RATE STUDY Prepared by: August 30, 2010 201 S. Lake Blvd, Suite 301 Pasadena CA 91101 Phone Fax 626 583 1894 626 583 1411 www.raftelis.com August 30, 2010 Mr. Chris

More information

BODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study

BODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study BODEGA BAY PUBLIC UTILITY DISTRICT Water and Wastewater Rate Study FINAL REPORT March 22, 2018 BARTLE WELLS ASSOCIATES Independent Public Finance Advisors 1889 Alcatraz Avenue Berkeley, CA 94703-2714 Tel.

More information

Santa Ynez River Water Conservation District, ID No. 1. Water Rates & Finances. December 13, 2016

Santa Ynez River Water Conservation District, ID No. 1. Water Rates & Finances. December 13, 2016 Santa Ynez River Water Conservation District, ID No. 1 Water Rates & Finances December 13, 2016 Presentation Overview Objectives & Process District Finances Current & Projected Rates 2 Rate Study Objectives

More information

City and Borough of Juneau, AK WATER UTILITY AND WASTEWATER UTILITY RATE STUDY

City and Borough of Juneau, AK WATER UTILITY AND WASTEWATER UTILITY RATE STUDY City and Borough of Juneau, AK WATER UTILITY AND WASTEWATER UTILITY RATE STUDY Summary of Findings October 2003 Financial Consulting Solutions Group, Inc. 8201 -- 164th Ave. NE, Suite 300, Redmond, WA

More information

City of San Carlos Sewer Financial Plan & Rate Update

City of San Carlos Sewer Financial Plan & Rate Update City of San Carlos Sewer Financial Plan & Rate Update Revised 06/13/16 1889 Alcatraz Avenue Berkeley, CA 94703 Tel: 510 653 3399 www.bartlewells.com June 13, 2016 City of San Carlos Department of Public

More information

WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY

WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY REPORT January 2017 WATER, WASTEWATER, STORMWATER, AND MUNICIPAL SOLID WASTE COST OF SERVICE AND RATE DESIGN STUDY PREPARED BY: ECONOMICS STRATEGY STAKEHOLDERS SUSTAINABILITY www.newgenstrategies.net 3420

More information

COST OF SERVICE AND RATE STRUCTURE STUDY

COST OF SERVICE AND RATE STRUCTURE STUDY . COST OF SERVICE AND RATE STRUCTURE STUDY 2017 Draft in Progress Not for Public release TABLE OF CONTENTS Executive Summary and Recommendations 1 Objectives 3 Vallecitos Water District Water Rate Structure

More information

City of Benicia. Rate Study Update: Water & Wastewater Rates

City of Benicia. Rate Study Update: Water & Wastewater Rates City of Benicia Rate Study Update: Water & Wastewater Rates March 1, 2016 Prepared by: Karin Schnaider, Finance Director, City of Benicia Greg Clumpner, Director, NBS Carmen Narayanan, Consultant, NBS

More information

Water Services Rate Study

Water Services Rate Study Report on the Water Services Rate Study Town of Telluride, Colorado Project No. 72447 August 2013 Water Services Rate Study prepared for Town of Telluride, Colorado August 2013 Project No. 72447 prepared

More information

Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee. Residential Water

Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee. Residential Water Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee Residential Water $10.82 Minimum Bill 1,501 gallons through 8,000 gallons $ 2.86 per 1,000 gallons 8,001 gallons through

More information

July 1, Tier Percent of Allocation Cost per ccf $0.91 $1.27 $2.86 $4.80 $ % % % % 201+%

July 1, Tier Percent of Allocation Cost per ccf $0.91 $1.27 $2.86 $4.80 $ % % % % 201+% 1 CHART EXAMPLES OF WATER RATES AND CHARGES OF MWD MEMBER AGENCIES AND THEIR SUBAGENCIES MWD Member Agencies shown: MWDOC, SDCWA, Calleguas, Las Virgenes, West Basin, LADWP, Eastern and Foothill Member

More information

CITY OF RAPID CITY. Financial and Rate Setting Policies for the Water and Water Reclamation Utilities

CITY OF RAPID CITY. Financial and Rate Setting Policies for the Water and Water Reclamation Utilities CITY OF RAPID CITY Financial and Rate Setting Policies for the Water and Water Reclamation Utilities Financial and Rate Setting Policies i City of Rapid City Financial/Rate Setting Policies for the Water

More information

WATER UTILITY FINANCIAL PLAN AND RATE STUDY CITY OF WHITEFISH, MT MARCH 2016

WATER UTILITY FINANCIAL PLAN AND RATE STUDY CITY OF WHITEFISH, MT MARCH 2016 WATER UTILITY FINANCIAL PLAN AND RATE STUDY CITY OF WHITEFISH, MT MARCH 2016 The Financial Link Executive Summary - Water In May 2015, the City of Whitefish (City) retained AE2S to complete a Water and

More information

San Francisco Public Utilities Commission

San Francisco Public Utilities Commission San Francisco Public Utilities Commission Water & Wastewater Rate Study Report March 6, 2009 Prepared by: Table of Contents I. EXECUTIVE SUMMARY...1 A. Pricing Objectives...2 B. Review of Findings Water...2

More information

City of Riverbank. Water Rate Study FINAL 6/18/2015

City of Riverbank. Water Rate Study FINAL 6/18/2015 Water Rate Study FINAL 6/18/2015 Bartle Wells Associates Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com Tel: 510-653-3399 June 18, 2015 6707

More information

Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee. Residential Water

Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee. Residential Water Schedule of Water and Sewer Rates of First Utility District of Knox County, Tennessee Residential Water $11.14 Minimum Bill 1,501 gallons through 8,000 gallons $ 2.95 per 1,000 gallons 8,001 gallons through

More information

Beaumont-Cherry Valley Water District 2018 Operating Budget

Beaumont-Cherry Valley Water District 2018 Operating Budget Beaumont-Cherry Valley Water District 2018 Operating Budget Table of Contents Introduction Section... 1 Executive Summary... 2 Background... 4 Organization... 5 Basis of Budgeting and Accounting... 6 Budget

More information

Sewer Rate Study CRESCENT CITY CALIFORNIA

Sewer Rate Study CRESCENT CITY CALIFORNIA CRESCENT CITY CALIFORNIA Sewer Rate Study 27368 Via Industria, Suite 110, Temecula, California 925904856 T 951.587.3500 800.755.6864 F 888.326.6864 www.willdan.com Mr. Eugene Palazzo City Manager City

More information

TEN YEAR FINANCIAL FORECAST

TEN YEAR FINANCIAL FORECAST TEN YEAR FINANCIAL FORECAST The ability to ensure a reliable supply of high quality water for Metropolitan s 26 member agencies depends on Metropolitan s ongoing ability to fund operations and maintenance,

More information

CITY OF THOUSAND OAKS

CITY OF THOUSAND OAKS CITY OF THOUSAND OAKS 2018 Wastewater Financial Plan Update Final Report / June 23, 2017 445 S. Figueroa Street Suite #2270 Los Angeles, CA 90071 Phone 213.262.9300 Fax 213.262.9303 www.raftelis.com June

More information

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d.

RATE STUDY. Town of Midland. HEMSON C o n s u l t i n g L t d. WATER AND WASTEWATER RATE STUDY Town of Midland C o n s u l t i n g L t d. December 2010 TABLE OF CONTENTS EXECUTIVE SUMMARY.........1 I BACKGROUND AND STUDY OBJECTIVES.........9 ll ASSOCIATED LEGISLATION.........13

More information

CITY OF BEVERLY HILLS. BEVERY III U.S cx PUBLIC WORKS SERVICES DEPARTMENT MEMORANDUM TO: Public Works Commission FROM:

CITY OF BEVERLY HILLS. BEVERY III U.S cx PUBLIC WORKS SERVICES DEPARTMENT MEMORANDUM TO: Public Works Commission FROM: BEVERY III U.S cx CITY OF BEVERLY HILLS PUBLIC WORKS SERVICES DEPARTMENT MEMORANDUM TO: FROM: Public Works Commission Shana Epstein, Public Works Director Trish Rhay, Assistant Director of Public Works

More information

Water Rates Rate Restructure and Rate Adjustments

Water Rates Rate Restructure and Rate Adjustments Water Rates Rate Restructure and Rate Adjustments Community Outreach Meeting Questions We Will Address Why are water rates changing? Where does the water come from? Did the rain from last winter help?

More information

2018 Water Connection Fee Update August 17, 2018 Page 4 environmental effect. Further, the incremental fee increase will not to fund capital projects for the expansion of the existing infrastructure system.

More information

GREAT OAKS WATER COMPANY P.O. Box San Jose, California (408)

GREAT OAKS WATER COMPANY P.O. Box San Jose, California (408) GREAT OAKS WATER COMPANY P.O. Box 23490 San Jose, California 95153 (408) 227-9540 tguster@greatoakswater.com California Public Utilities Commission Water Division Room 3102 505 Van Ness Avenue San Francisco,

More information

OPERATING BUDGET. Fiscal Year Dedicated to Satisfying our Community s Water Needs. MesaWater.org. Mesa Water District, Costa Mesa, California

OPERATING BUDGET. Fiscal Year Dedicated to Satisfying our Community s Water Needs. MesaWater.org. Mesa Water District, Costa Mesa, California C OPERATING BUDGET Fiscal Year 2017 Mesa Water District, Costa Mesa, California Dedicated to Satisfying our Community s Water Needs MesaWater.org ADOPTED BUDGET FISCAL YEAR 2017 Dedicated to Satisfying

More information

Focused Water Rate Study

Focused Water Rate Study FINAL Report for: Focused Water Rate Study (Includes Connection Fees & Sewer Rates) June 2017 OFFICE LOCATIONS: Temecula Corporate Headquarters 32605 Temecula Parkway, Suite 100 Temecula, CA 92592 San

More information

Meeting & Outreach efforts

Meeting & Outreach efforts May 30, 2014 Meeting & Outreach efforts February 27th Proposed Compensation Plan Distributed to Joint Admin/WWOC March 5th Joint Admin/WWOC Meeting First discussion on proposed Compensation Plan April

More information

Maureen A. Stapleton, General Manager May 23, 2013

Maureen A. Stapleton, General Manager May 23, 2013 M A St l t G l M Maureen A. Stapleton, General Manager May 23, 2013 Two-Year Budget First time Water Authority Implemented a twoyear budget: Fiscal Years 2004 and 2005 2 Increasing San Diego County's Water

More information

Water Rate Study for City of Lemoore

Water Rate Study for City of Lemoore Water Rate Study for City of Lemoore June 17, 2016 Prepared by: Dan Bergmann, Principal 15 Shasta Lane, Walnut Creek, CA 94597 Email: dan@igservice.com Office: 925-946-9090 Water Rate Study for City of

More information

WASTEWATER FINANCIAL PLAN STUDY REPORT

WASTEWATER FINANCIAL PLAN STUDY REPORT WASTEWATER FINANCIAL PLAN STUDY REPORT FINAL October 7, 2013 Prepared by: Page 1 201 S. Lake Avenue Suite 301 Pasadena, CA 91101 Phone 626.583. 1894 Fax 626.583. 1411 www.raftelis.com October 7, 2013 Mr.

More information

City of Newport News Virginia. Waterworks Ratings Presentation. April 27, 2017

City of Newport News Virginia. Waterworks Ratings Presentation. April 27, 2017 City of Newport News Virginia Waterworks Ratings Presentation April 27, 2017 I. Overview Newport News Waterworks Mission Statement: To provide high quality drinking water and support public health, safety,

More information

Marina Coast Water District Marina, California

Marina Coast Water District Marina, California Marina Coast Water District Marina, California Comprehensive Annual Financial Report For The Fiscal Years Ended June 30, 2014 and 2013 11 Reservation Road, Marina California 93933 Marina Coast Water District

More information

SAN DIEGUITO WATER DISTRICT AGENDA REPORT

SAN DIEGUITO WATER DISTRICT AGENDA REPORT ~ SAN DIEGUITO WATER DISTRICT AGENDA REPORT Meeting Date: August 21, 2013 TO: VIA: FROM: SUBJECT: Board Members Gus Vina, Distrct Sectar ~7'.. Glenn Pruim, General Manager Tim Nash, Director of Finance

More information

Frequently Asked Questions from Claremont Customers

Frequently Asked Questions from Claremont Customers Frequently Asked Questions from Claremont Customers Why are Golden State s rates higher in Claremont than the neighboring communities of Rancho Cucamonga, Upland or La Verne? Golden State's rates reflect

More information

City of Rohnert Park SEWER FINANCIAL PLAN

City of Rohnert Park SEWER FINANCIAL PLAN City of Rohnert Park SEWER FINANCIAL PLAN AND RATE STUDY February 17, 2011 3053 Freeport Boulevard #158 Sacramento, CA 95818-4346 (916) 444-9622 www.thereedgroup.org TABLE OF CONTENTS I. EXECUTIVE SUMMARY...1

More information

CITY OF OXNARD PUBLIC WORKS INTEGRATED MASTER PLAN DRAFT WATER COST OF SERVICE STUDY. FINAL July 2017

CITY OF OXNARD PUBLIC WORKS INTEGRATED MASTER PLAN DRAFT WATER COST OF SERVICE STUDY. FINAL July 2017 CITY OF OXNARD PUBLIC WORKS INTEGRATED MASTER PLAN DRAFT WATER COST OF SERVICE STUDY FINAL July 2017 2700 YGNACIO VALLEY ROAD, SUITE 300 WALNUT CREEK, CALIFORNIA 94598 P. 925.932.1710 F. 925.930.0208 CITY

More information

RANCHO CALIFORNIA WATER DISTRICT

RANCHO CALIFORNIA WATER DISTRICT RANCHO CALIFORNIA WATER DISTRICT Two-Year Rate Study Final Report / June 4, 2018 June 4, 2018 Mr. Richard Aragon Assistant General Manager CFO/Treasurer Rancho California Water District 42135 Winchester

More information

Glacial Lakes Sanitary Sewer & Water District Utility Rate Study. Shelly Eldridge Ehlers Jeanne Vogt - Ehlers

Glacial Lakes Sanitary Sewer & Water District Utility Rate Study. Shelly Eldridge Ehlers Jeanne Vogt - Ehlers Glacial Lakes Sanitary Sewer & Water District Utility Rate Study Shelly Eldridge Ehlers Jeanne Vogt - Ehlers 05/30/2017 1 Background What are Utility Funds Utility funds are used to pay for operations,

More information

SQUAW VALLEY PUBLIC SERVICE DISTRICT

SQUAW VALLEY PUBLIC SERVICE DISTRICT EXHIBIT # F-4 21 pages SQUAW VALLEY PUBLIC SERVICE DISTRICT PROFESSIONAL SERVICES AGREEMENT WITH HDR ENGINEERING, INC. DATE: July 28, 2015 TO: FROM: SUBJECT: District Board Members Tom Campbell, Finance

More information

Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 MEMORANDUM

Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 MEMORANDUM TO: FROM: Maurice Kaufman, Director of Public Works / City Engineer Bartle Wells Associates DATE: September 7, 2016 SUBJECT: - MEMORANDUM Introduction The (City) provides sewer sanitary collection services

More information

Page 2 of 11. Operating Fund Current Plan Last Plan Target 25. Rev vs. Exp 50 CIP. Long-Term Borrowing Current Plan Last Plan

Page 2 of 11. Operating Fund Current Plan Last Plan Target 25. Rev vs. Exp 50 CIP. Long-Term Borrowing Current Plan Last Plan Ann Arbor Water and Wastewater Cost of Service Study and Rate Analysis Advisory Committee Meeting Summary Tuesday, September 19, 2017 4:00 p.m. to 6:00 p.m. 1. Participant List See Attachment #1 2. Welcome

More information

FINANCIAL PLAN REVIEW AND FORECAST

FINANCIAL PLAN REVIEW AND FORECAST Napa Sanitation District Cost of Service Rate and Capacity Charge Study Technical Memorandum #2 FINANCIAL PLAN REVIEW AND FORECAST DRAFT March 2018 Contents 1 Introduction 1 1.1 Project Background 1 1.1.1

More information

Great Lakes Water Authority/ Detroit Water and Sewerage Department Five-year Financial Forecast Cash Basis. July 1, 2015 through June 30, 2020

Great Lakes Water Authority/ Detroit Water and Sewerage Department Five-year Financial Forecast Cash Basis. July 1, 2015 through June 30, 2020 Great Lakes Water Authority/ Detroit Water and Sewerage Department Cash Basis July 1, 2015 through June 30, 2020 Table of Contents Report Letter... 1 Project Summary... 2-3 Executive Summary... 4 Financial

More information

West Valley Sanitation District FINANCIAL PLAN & RATE STUDY. January 2018

West Valley Sanitation District FINANCIAL PLAN & RATE STUDY. January 2018 West Valley Sanitation District FINANCIAL PLAN & RATE STUDY January 2018 BARTLE WELLS ASSOCIATES Independent Public Finance Consultants 1889 Alcatraz Avenue Berkeley, California 94703 www.bartlewells.com

More information

2016 Water and Recycled Water Rate Study WEBINAR WITH DISTRICT STAFF JUNE 29, 2016

2016 Water and Recycled Water Rate Study WEBINAR WITH DISTRICT STAFF JUNE 29, 2016 2016 Water and Recycled Water Rate Study WEBINAR WITH DISTRICT STAFF JUNE 29, 2016 Agenda Financial Policy & Financial Plan Capacity Fees Preliminary Results Tier Definitions Next Steps 2016 Water & RW

More information

Revenue Plan. August 12, Dennis Davies Deputy Director of Public Works 200 Civic Center Way El Cajon, CA 92020

Revenue Plan. August 12, Dennis Davies Deputy Director of Public Works 200 Civic Center Way El Cajon, CA 92020 1925 Palomar Oaks Way, Suite 3 Carlsbad, California 928 tel: 76 438 7755 fax: 76 438 7411 Dennis Davies Deputy Director of Public Works 2 Civic Center Way El Cajon, CA 922 Subject: Six Year Revenue Plan

More information

Title 6 WATER AND SEWER FEES AND CHARGES

Title 6 WATER AND SEWER FEES AND CHARGES Title 6 WATER AND SEWER FEES AND CHARGES Chapter 6.04 - GENERAL PROVISIONS Chapter 6.08 - WATER SERVICE CHARGES Chapter 6.12 - SEWER SERVICE CHARGES Chapter 6.16 - OTHER FEES AND CHARGES Chapter 6.04 GENERAL

More information

Wastewater Rate Study. Villa Park, Illinois

Wastewater Rate Study. Villa Park, Illinois Wastewater Rate Study Villa Park, Illinois June 2013 Executive Summary General The Village of Villa Park s Wastewater Utility is responsible for operation and maintenance of the Village s separate sanitary

More information