1 MEMORANDUM TO: FROM: BY: CITY COUNCIL TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR JILL MCPEEK, CAPITAL IMPROVEMENT PROJECT MANAGER SUBJECT: CONSIDERATION OF A FOURTH AMENDMENT TO AGREEMENT FOR CONSULTANT SERVICES WITH QUINCY ENGINEERING, INC. FOR THE BRIDGE STREET BRIDGE PROJECT DATE: APRIL 25, 2017 RECOMMENDATION: It is recommended the City Council: 1. Approve a Fourth Amendment to the Agreement for Consultant Services ("Fourth Amendment") with Quincy Engineering, Inc. to include additional services at no increased cost for the subject project; and 2. Authorize the Mayor to execute the Fourth Amendment. IMPACT ON FINANCIAL AND PERSONNEL RESOURCES: The City has been successful in securing 100% funding through the Local Highway Bridge Program (HBP) funds for the Bridge Street Bridge project. There are no additional impacts anticipated to staff time or resources. BACKGROUND: On May 22, 2012, the Council approved an agreement with Quincy Engineering, Inc. for design phase services for the Bridge Street Bridge project. Subsequently, three additional amendments to the Agreement for Consultant Services have been executed. ANALYSIS OF ISSUES: The original scope of services was geared more towards a bridge replacement project based on assumptions about the bridge at project initiation. Therefore, the original geotechnical investigation was centered around one boring at the abutment foundations. Now that the project has been identified to be a rehabilitation project and the intent is to keep the same span length of the historic truss, a pier will remain in the creek. This support type has a much higher axial load which requires the depth of the foundation to be deeper than was originally anticipated for the abutments. This required the geotechnical firm to revisit the site and extend the previous exploratory boring to a Item 9.h. - Page 1

2 CITY COUNCIL CONSIDERATION OF A FOURTH AMENDMENT TO AGREEMENT FOR CONSULTANT SERVICES WITH QUINCY ENGINEERING, INC. FOR THE BRIDGE STREET BRIDGE PROJECT APRIL 25, 2017 PAGE 2 deeper depth to capture important soil information and reduce potential risks to the City during construction. To allow for this additional geotechnical work, it was proposed that budget be reallocated from unspent budget from another task within the contract and does not change the total contract amount. ALTERNATIVES: The following alternatives are provided for the Council s consideration: 1. Approve a Fourth Amendment to the Agreement; 2. Do not approve a Fourth Amendment to the Agreement; or 3. Provide direction to staff. ADVANTAGES: Approval of the Fourth Amendment will allow for additional geotechnical work, which will provide important soil information during design which will help reduce potential risks to the City during construction. Bringing the Bridge Street Bridge up to standard loading conditions will remove the 3-ton maximum load limit and would allow fire and delivery trucks to utilize Bridge Street as a route. DISADVANTAGES: Some traffic related disruption within the Village will be present during construction activities. ENVIRONMENTAL REVIEW: The Preliminary Engineering work being requested in this staff report includes environmental studies and National Environmental Policy Act (NEPA) approval with Caltrans as the lead agency. The City will be the lead agency for California Environmental Quality Act (CEQA) approval. The respective environmental determinations and documents will be circulated for public review and presented to Council with the draft project report. PUBLIC NOTIFICATION AND COMMENTS: The Agenda was posted at City Hall and on the City s website in accordance with Government Code Section Item 9.h. - Page 2

3 Item 9.h. - Page 3

4 Jill McPeek March 16, 2017 Capital Improvement Project Manager City of Arroyo Grande Department of Community Development 300 East Branch Street Arroyo Grande, CA Re: Bridge Street Amendment 4 No cost change task reallocation to cover out of scope work Dear Ms. McPeek, As the City is aware, the original scope of work was geared more towards a Bridge Replacement Project, as that was the direction from Caltrans. Thus, the original geotechnical investigation was centered around placing one boring (To supplement the original Earth Systems Borings) to an assumed depth associated with abutment foundations. As the Bridge Rehabilitation Project gained momentum and the intent was to keep the same span length of the historic truss, this resulted in having to place a new pier down in the creek. This support type has a much higher axial load which requires the depth of the foundation to be deeper than was originally anticipated for abutments. Abutments utilize a pile footing that distributes load to many smaller piles. As a result, the load per pile is lower. High scour values prevent the use of a pile footing at the Pier so a single large diameter pile that takes all the load is necessary. Therefore, Fugro must go back out to the field and extend their previous exploratory boring to a deeper depth to capture important soil information and reduce potential risks to the City during construction. It is Caltrans practice to extend the test borings deeper than the proposed foundations which is not currently the case for the Pier 2 pile location. Quincy would like to propose reallocating budget that will be left over from an existing task to supplement this additional geotechnical work. Quincy proposes to reallocate funds in the manner outlined below. This will allow for out of scope work to be completed while not changing the total contact amount. Phase 1 Out of scope work has been requested for the following Phase 1 contact tasks: Task 5 Geotechnical Quincy has been coordinating with Fugro regarding existing boring information and how best to utilize this information in the design of the new pier located down in the creek. This will require additional analysis of the foundation as well coordination with the geotechnical subconsultant. This also requires extending one of the existing borings as defined in the memorandum dated March 13, 2017 from Fugro for extending DH 101. Fugro s extra scope of work is outlined in this memorandum. Though this additional scope of work could have been identified under Task 18 of Phase 2, it is suggested that this scope of work be added to Phase 1 Geotechnical so that the reallocation of dollars under Phase 1 results in the same total contract amount of Phase 1. Item 9.h. - Page Cobblerock, Drive Suite 100 Rancho Cordova, CA P: F:

5 Total Phase 1 out of scope request is $10,200 The following Phase 1 contract task will be delivered under budget: Task 7 Environmental Clearance Though we have not completed the environmental clearance phase, the project is at a point where it is clear that there will be budget leftover on this task. I have spoken with SWCA regarding their remaining deliverables under this task and at this point we have concluded its safe to reallocate the amount necessary. Quincy is requesting that $10,200 of SWCA s budget be reallocated to the other task specified above. Total Phase 1 under budget task reallocation request is $10,200 A detailed budget is attached to track the proposed budget supplements and reallocations. The total phase 1 contract amount remains unchanged. This supplemental agreement request represents extra work required to complete the project and a reallocation within the existing budgets. We are very sensitive to budgetary constraints facing public agencies and have always attempted to present the most efficient solution to the City on this project. Please give me a call to discuss any questions or comments you may have on this proposed addendum. I can be reached at (916) Sincerely, Quincy Engineering, Inc. Mark L. Reno, P.E. Project Manager Attachment Cc: File Item 9.h. - Page 5 Page 2 of 2

6 Quincy Engineering Budget Status Report Phase 1 Project: A Bridge Street Bridge Replacement Project (City of Arroyo Grande) Job/ Task No. DESCRIPTION Task Budget Following July 2016 Reallocation Expenditures Job to Date Previously Billed Current Period Date: Consultant: Status Report For Project No.: Invoice Period (Date Ending): Summary Page #: Original Budget Remaining Existing Budget to be reallocated Revised Task Budget March 16, 2017 Quincy Engineering Inc. A /28/17 1 of 2 Revised Budget Remaining 1 Project Management $ 43, $ 43, $ 43, $ $ 3.88 $43, $ Topographic Survey Quincy $ 2, $ 2, $ 2, $ $ $2, $31.68 McMillan $ 23, $ 16, $ 16, $ - $ 6, $23, $6, Task 2 Subtotal $ 25, $ 18, $ 18, $ $ 6, $25, $ 6, Prelim Engr/Feasibility Study $ 80, $ 80, $ 80, $ - $ $80, $ Hydraulics Quincy $ 6, $ 6, $ 6, $ - $ $6, $17.39 WRECO $ 22, $ 21, $ 21, $ - $ $22, $ Task 4 Subtotal $ 28, $ 27, $ 27, $ - $ $28, $ Geotechnical Quincy $ 4, $ 4, $ 3, $ $ $2, $6, $2, Fugro $ 18, $ 17, $ 17, $ - $ $8, $26, $8, Task 5 Subtotal $ 22, $ 21, $ 21, $ $ $22, $11, Utility Coordination $ 7, $ 3, $ 2, $ $ 4, $7, $4, Environmental Clearance Quincy $ 19, $ 19, $ 18, $ $ $19, $ SWCA $ 192, $ 99, $ 99, $ - $ 92, ($10,200.00) $181, $82, Task 7 Subtotal $ 211, $ 118, $ 118, $ $ 92, $211, $82, Bridge Architecture Quincy $ 15, $ 15, $ 15, $ - $ 7.29 $15, $7.29 The HLA Group $ 2, $ 2, $ 2, $ - $ - $2, Donald McDonald $ 9, $ 7, $ 7, $ - $ 2, $9, $2, Task 8 Subtotal $ 27, $ 25, $ 25, $ - $ 2, $27, $2, Public Outreach Quincy $ 18, $ 18, $ 17, $ $ 4.33 $18, $4.33 Lisa Wise Consulting $ 6, $ 6, $ 6, $ - $ - $6, Task 9 Subtotal $ 24, $ 24, $ 24, $ $ 4.33 $24, $ Project Report $ 10, $ 10, $ 10, $ - $ $10, $ (ODC) QEI $ 7, $ 4, $ 4, $ - $ 2, $7, $2, TOTAL PHASE 1 INVOICE $ 489, $ 379, $ 376, $ 2, $ 109, $489, $109, Item 9.h. - Page 6 Budget Tracking_ February 2017 Phase 1 Addendum.xls 3/16/2017 2:28 PM

7 Quincy Engineering Budget Status Report Phase 2 Project: A Bridge Street Bridge Replacement Project (City of Arroyo Grande) Job/ Task No. DESCRIPTION Task Budget Following July 2016 Reallocation Expenditures Job to Date Previously Billed Current Period Date: Consultant: Status Report For Project No.: Invoice Period (Date Ending): Summary Page #: Budget Remaining Existing Budget to be reallocated Revised Task Budget March 16, 2017 Quincy Engineering Inc. A /28/17 2 of 2 Revised Budget Remaining 12 Project Management $ 44, $ 26, $ 25, $ $ 17, $44, $17, Utility Coordination $ 10, $ 2, $ 2, $ - $ 7, $10, $7, Environmental Clearance Quincy $ 5, $ 1, $ 1, $ - $ 3, $5, $3, SWCA $ 34, $ - $ - $ - $ 34, $34, $34, Task 14 Subtotal $ 39, $ 1, $ 1, $ - $ 37, $39, $37, Environmental Permits Quincy $ 2, $ $ - $ $ 1, $2, $1, SWCA $ 19, $ - $ - $ - $ 19, $19, $19, Task 15 Subtotal $ 21, $ $ - $ $ 20, $21, $20, Bridge Lighting Donald McDonald $ - $ - $ - $ - $ - 17 Public Meeting Quincy $ 10, $ 7, $ 7, $ - $ 2, $10, $2, Lisa Wise Consulting $ - $ - $ - $ - $ - Task 17 Subtotal $ 10, $ 7, $ 7, $ - $ 2, $10, $2, Geotechnical Quincy $ 1, $ - $ - $ - $ 1, $1, $1, Fugro $ 32, $ 30, $ 30, $ - $ 2, $32, $2, Task 18 Subtotal $ 34, $ 30, $ 30, $ - $ 3, $34, $3, % Design Quincy $ 156, $ 156, $ 156, $ - $ $156, $38.30 Custom CAD $ 16, $ 16, $ 16, $ - $ 5.00 $16, $5.00 Task 19 Subtotal $ 173, $ 173, $ 173, $ - $ $173, $ Bridge Architecture/Streetscape Quincy $ 3, $ $ $ - $ 2, $3, $2, The HLA Group, Inc. $ 22, $ - $ - $ - $ 22, $22, $22, Task 19 Subtotal $ 25, $ $ $ - $ 24, $25, $24, % Design $ 91, $ - $ - $ - $ 91, $91, $91, % Design $ 5, $ - $ - $ - $ 5, $5, $5, RE Pending File/Bid Support $ 6, $ - $ - $ - $ 6, $6, $6, (ODC) Quincy $ 6, $ $ $ - $ 6, $6, $6, TOTAL PHASE 2 INVOICE $ 468, $ 242, $ 241, $ 1, $ 225, $468, $225, Item 9.h. - Page 7 Budget Tracking_ February 2017 Phase 2 Addendum.xls 3/17/2017 2:08 PM

8 MEMORANDUM FUGRO USA LAND, INC McGrath Street, Suite 100 Tel: 805/ Ventura, CA Fax: 805/ To: Mark Reno, Greg Young (Quincy Engineering) Date: March 13, 2017 From: Loree Berry, Greg Denlinger (Fugro) Project No: Subject: Fee Estimate for Extending DH-101 Copy to: Introduction This memorandum provides two fee estimate options to extend DH-101 at the Bridge Street Bridge northern abutment. The work will be performed to confirm subsurface conditions at least 10 feet below the deepest proposed CIDH pile tip elevation of -6 feet MSL based on Fugro s draft Foundation Report, dated March 8, 2017 and the scope of services to extend DH-101 is provided below. Fugro is currently planning to mobilize drilling equipment to Arroyo Grande during the week of March 20, 2017 for the Swinging Bridge project (adjacent to the Bridge Street site). Option 1, below, provides the fee to perform the proposed boring extension under the same drilling mobilization as Swinging Bridge, provided the schedule can be met. Option 2 provides a fee estimate to extend the boring under a separate mobilization. Scope of Services Contact Underground Service Alert to clear/re-mark responding utility lines at DH-101 location. To expedite this task, we assume that a representative from the City of Arroyo Grande would be available to mark a box around the DH-101 drilling patch with white marking chalk. Once marked, Fugro staff will coordinate all other aspects of the utility clearance effort. Contact the City of Arroyo Grande to re-open/extend our encroachment permit to perform excavation at the DH-101 location. We anticipate no additional fees will be charged to reopen/extend the previous encroachment permit. A single lane of Bridge Street will need to be closed during drilling. Traffic control with flagmen will be utilized to manage traffic during site work. Excavation will entail drilling through backfill of DH-101 on northern side of existing bridge to the previous explored depth of 95-1/2 feet below ground surface (bgs) with no sampling. We will continue drilling through native soils below backfill and endeavor to obtain at least one modified California liner or one SPT sample every 10 feet from approximately 100 feet bgs to 130 feet bgs. A Fugro engineer will log the borehole extension, collect representative samples, and oversee backfill and site restoration. Proposed site work will be completed within 1 day onsite. Prevailing Wage rates apply. Although not anticipated, a practical refusal condition may be encountered. We would consider it practical refusal if we are unable to drill to 130 feet bgs within 8 hours of drilling onsite. A refusal condition would indicate that formational materials below the previous explored depth of 95-1/2 feet are the same or better as what was assumed in Fugro (2017). C:\USERS\LBERRY\DOCUMENTS\FUGRO\00HOMEWORK\BRIDGE STREET AG\BRIDGE ST.ADDBORING MEMO DOCX Item 9.h. - Page 8

9 Memorandum to Quincy Engineering March 13, 2017 Page 2 Previous slurry backfill and soil cuttings generated by the boring extension will be containerized in a rented waste management roll-off bin and disposed of as non-hazardous waste. The final boring excavation (total depth of approximately 130 feet bgs) will be backfilled with sand-cement slurry to within 6 inches of the existing asphalt surface and patched with asphalt cold patch to match adjacent grade. If subsurface soils encountered below 95 feet appear different than what was assumed in Fugro (2017), we will run limited laboratory tests to better characterize the material below 95 feet. The results of the additional exploration and limited laboratory testing work (if needed) will be incorporated into the final Foundation Report along with other comments that the design team may have on the draft report. We will also update any discussions or recommendations within the Foundation Report that is impacted by the newly acquired information. If the final Foundation Report is submitted prior to us performing the supplemental exploration, the results will be provided in an addendum to the Foundation Report. Estimated Fees A summary of the estimated fees to complete the proposed work is presented in the table below. For option 1, Fugro will utilize the same subcontracted driller and perform the work under the same equipment mobilization as the Swinging Bridge project. This approach will save several hours in subcontractor mobilization fees as well as Fugro professional staff travel time. Option 2 provides a fee estimate to extend boring DH-101 at a different date and time and assumes that standard mobilization and travel times will apply. Summary of Fee Options Task Option 1 Fees Option 2 Fees Planning and Exploration $5,850 $7,550 Laboratory Testing $250 $250 Evaluation and Reporting $2,000 $2,000 Totals: $8,100 $9,800 C:\USERS\LBERRY\DOCUMENTS\FUGRO\00HOMEWORK\BRIDGE STREET AG\BRIDGE ST.ADDBORING MEMO DOCX Item 9.h. - Page 9

10 City of Arroyo Grande Bridge Street Bridge Rehabilitation Additional Services for extending DH-101 exploratory boring FUGRO CONSULTANTS, INC. CONTRACT SUMMARY CONTRACT No. Quincy Subagreement #A H CONSULTANT COST PROPOSAL SUB CONSULTANT: Fugro Consultants, Inc. DIRECT LABOR Name Classification Hours Rate* Total Gregory Denlinger Principal Engineer 2.00 $ $ Loree Berry Associate Engineer 3.00 $ $ Tooraj Panah Project Geologist 2.00 $ $ Tristan Gebhart Project Engineer $ $ Marissa McCallum Word Processing 1.50 $ $ Total Hours *Raw labor rates as of March 2017 Rates will be charged at payroll rate at the time of work Subtotal Direct Labor Costs $ Anticipated Salary Increases $ - TOTAL - Direct Labor $ INDIRECT COSTS Rate* Total Overhead % $ 1, Fringe Benefit 36.10% $ General & Administrative 0.00% $ % *2015 audited rates. Latest available rate. TOTAL - Indirect Costs $ 1, FEE ( 10.00% ) TOTAL - Fee $ OTHER DIRECT COSTS Units Rate Total S/G Drilling including Materials Estimate - Billed At-Cost 1 $ 3, $ 3, Traffic Control Services - Flagging Control Estimate - Billed At-Cost 1 $ 1, $ 1, R&R Roll-off Bin Estimate - Billed At-Cost 1 $ $ Laboratory Testing Fee Schedule Unit Rates 1 $ $ Per Diam Fugro Staff Estimate - Billed At-Cost 1 $ $ TOTAL - Other Direct Costs $ 4, TOTAL COST $ 8, Item 9.h. - Page 10 LPP /16/2017

REQUEST FOR PROPOSALS For Geotechnical Engineering Services Citywide Failed Streets Geotechnical Studies CITY OF SAN MATEO, CALIFORNIA

REQUEST FOR PROPOSALS For Geotechnical Engineering Services Citywide Failed Streets Geotechnical Studies CITY OF SAN MATEO, CALIFORNIA REQUEST FOR PROPOSALS For Geotechnical Engineering Services Citywide Failed Streets Geotechnical Studies CITY OF SAN MATEO, CALIFORNIA The City of San Mateo hereby requests proposals for Geotechnical Investigation

More information

OHIO DEPARTMENT OF TRANSPORTATION. PROPOSAL for the GEOTECHNICAL EXPLORATION <COUNTY-ROUTE-SECTION> <PID>

OHIO DEPARTMENT OF TRANSPORTATION. PROPOSAL for the GEOTECHNICAL EXPLORATION <COUNTY-ROUTE-SECTION> <PID> OHIO DEPARTMENT OF TRANSPORTATION OFFICE OF GEOTECHNICAL ENGINEERING PROPOSAL for the GEOTECHNICAL EXPLORATION Instructions: Enter data in the shaded cells only. (Enter state route number, project description,county,

More information

TEC Proposal: Date Issued: April 18, 2017

TEC Proposal: Date Issued: April 18, 2017 1343 Rochester Road PO Box 249 Troy, Michigan 48099-0249 (248) 588-6200 or (313) T-E-S-T-I-N-G Fax (248) 588-6232 www.testingengineers.com Date Issued:, Director 167 Fourth Street Belleville, Michigan

More information

TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number:

TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number: TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number: APPLICATION DATE: ADDRESS OF WORK OR ENCROACHMENT: CROSS STREET: STARTING DATE: APN: - - No. Street City/Township ESTIMATED COST: $ COMPLETION

More information

BRIDGE ALTERNATE STUDY No. 1

BRIDGE ALTERNATE STUDY No. 1 BRIDGE ALTERNATE STUDY No. 1 RURAL STREAM CROSSING Prepared for U. S. Bridge Cambridge, Ohio Prepared by RICHLAND ENGINEERING LIMITED 29 North Park Street, Mansfield, Ohio 44902-1769 419/524-0074 FAX 419/524-1812

More information

FEDERAL LANDS ACCESS PROGRAM PROJECT MEMORANDUM OF AGREEMENT

FEDERAL LANDS ACCESS PROGRAM PROJECT MEMORANDUM OF AGREEMENT FEDERAL LANDS ACCESS PROGRAM PROJECT MEMORANDUM OF AGREEMENT Project / Facility Name: South Ocean Beach Trail Project Route: Bicycle Route 95 State: California City(ies): City and County of San Francisco

More information

Environmental Services, Inc Financial Way, Suite 100 Jacksonville, FL Phone * Fax

Environmental Services, Inc Financial Way, Suite 100 Jacksonville, FL Phone * Fax 7220 Financial Way, Suite 100 Jacksonville, FL 31402 Phone 904-470-2200 * Fax 904-470-2112 www.esinc.cc 1 December 2014 William H. Fishburne REO Manager / Asset Manager MTAG Services, LLC 8614 Westwood

More information

Local Assistance Procedures Manual EXHIBIT 10-H1 Cost Proposal. Consultant Project No. Contract No. Date

Local Assistance Procedures Manual EXHIBIT 10-H1 Cost Proposal. Consultant Project No. Contract No. Date ATTACHMENT D Local Assistance Procedures Manual EXHIBIT 10-H1 EXHIBIT 10-H1 COST PROPOSAL Page 1 of 3 ACTUAL COST-PLUS-FIXED FEE OR LUMP SUM (FIRM FIXED PRICE) CONTRACTS (DESIGN,ENGINEERING AND ENVIRONMENTAL

More information

Sunnyside Unified School District No. 12 Governing Board Bond Advisory Committee Agenda

Sunnyside Unified School District No. 12 Governing Board Bond Advisory Committee Agenda Sunnyside Unified School District No. 12 Governing Board Bond Advisory Committee Agenda December 13, 2017 5:00 PM Governing Board Room, 2238 E. Ginter Rd, Tucson, AZ 85706 1. OPENING OF MEETING PROPOSED

More information

COUNTY OF SONOMA AGENDA ITEM SUMMARY REPORT

COUNTY OF SONOMA AGENDA ITEM SUMMARY REPORT COUNTY OF SONOMA AGENDA ITEM SUMMARY REPORT Clerk of the Board Use Only Meeting Date Held Until / / / / Agenda Item No: Agenda Item No: Department: Permit and Resource Management Department/Transportation

More information

AMENDMENT 1 TO REQUEST FOR PROPOSALS FOR ENGINEERING SERVICES FEBRUARY 21, 2017

AMENDMENT 1 TO REQUEST FOR PROPOSALS FOR ENGINEERING SERVICES FEBRUARY 21, 2017 AMENDMENT 1 TO REQUEST FOR PROPOSALS FOR ENGINEERING SERVICES FEBRUARY 21, 2017 The City of Huron issued a Request for Proposal for Engineering Services on February 1, 2017 ( RFP ). The following are amendments

More information

Florida Forestry Service October 6, 2015 Blackwater Forestry Center Proposal No.: P Munson Hwy Milton, FL 32570

Florida Forestry Service October 6, 2015 Blackwater Forestry Center Proposal No.: P Munson Hwy Milton, FL 32570 Panama City Office 7500 McElvey Road, Suite A Panama City Beach, FL 32408 Tel: (850) 769-4773 Fax: (850) 872-9967 www.soearth.com Geotechnical, Environmental & Construction Materials Testing FL Certificate

More information

REQUEST FOR QUALIFICATIONS (RFQ) Central Valley Opportunity Center Winton Vocational Training Center Project Proposals Due: February 21, 2014

REQUEST FOR QUALIFICATIONS (RFQ) Central Valley Opportunity Center Winton Vocational Training Center Project Proposals Due: February 21, 2014 REQUEST FOR QUALIFICATIONS (RFQ) Central Valley Opportunity Center Winton Vocational Training Center Project Proposals Due: February 21, 2014 The Central Valley Opportunity Center ( CVOC ) is soliciting

More information

CITY COUNCIL SUMMARY REPORT

CITY COUNCIL SUMMARY REPORT Agenda No. Key Words: Parkway Boulevard Consultant Services Amendment 5, T.V. Lin International Meeting Date: October 13, 2015 SUMMARY REPORT CITY COUNCIL PREPARED BY: Joseph M. Leach, P.E., City Engineer/Public

More information

Exhibit A DEFINITIONS AND ACRONYMS

Exhibit A DEFINITIONS AND ACRONYMS Exhibit A DEFINITIONS AND ACRONYMS Addenda/Addendum means supplemental additions, deletions, and modifications to the provisions of the RFP after the release date of the RFP. Additional Scope Component

More information

EXHIBIT A GENERAL ENGINEERING CONTRACT (GEC) - TRAFFIC AND REVENUE SCOPE OF SERVICES

EXHIBIT A GENERAL ENGINEERING CONTRACT (GEC) - TRAFFIC AND REVENUE SCOPE OF SERVICES EXHIBIT A GENERAL ENGINEERING CONTRACT (GEC) - TRAFFIC AND REVENUE SCOPE OF SERVICES Exhibit "A" SCOPE OF SERVICES General Engineering Contract - Traffic and Revenue FPN: TBD I. Purpose... A-1 II. Term

More information

CITY OF SIGNAL HILL SUBJECT: AUTHORIZE RELEASE OF REQUEST FOR PROPOSALS FOR ON- CALL ENGINEERING DESIGN SERVICES

CITY OF SIGNAL HILL SUBJECT: AUTHORIZE RELEASE OF REQUEST FOR PROPOSALS FOR ON- CALL ENGINEERING DESIGN SERVICES CITY OF SIGNAL HILL 2175 Cherry Avenue Signal Hill, CA 90755-3799 AGENDA ITEM TO: FROM: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL GRISSEL CHAVEZ DEPUTY DIRECTOR OF PUBLIC WORKS SUBJECT: AUTHORIZE

More information

Instructions to Bidders REF: I 805 North HOV / BRT DB Contract 11-2T2004

Instructions to Bidders REF: I 805 North HOV / BRT DB Contract 11-2T2004 Instructions to Bidders REF: I 805 North HOV / BRT DB Contract 11-2T2004 Design Documents Work Package Cast In Drilled Hole (CIDH) Pile installation Description Cast In Drilled Hole (CIDH) 05 Rose Canyon

More information

Good afternoon, For further details regarding the Don River Replacement Project, please refer to the attached project description.

Good afternoon, For further details regarding the Don River Replacement Project, please refer to the attached project description. Filed: 2018-07-04, EB-2018-0108, Exhibit F, Tab 1, Schedule 1, Attachment 1, Page 1 of 9 From: To: Cc: Subject: Date: Attachments: Stephanie Allman "emma.sharkey@ontario.ca" "zora.crnojacki@oeb.ca" Enbridge

More information

Encroachment Permit. Permit Fee: Receipt #: Bond Fee: Receipt #: Expiration Date: Phone# Mailing Address:

Encroachment Permit. Permit Fee: Receipt #: Bond Fee: Receipt #: Expiration Date: Phone# Mailing Address: A (Office Use Only) Encroachment Permit Permit #: City of Seaside Public Works 440 Harcourt Avenue Seaside, Ca 93955 Phone: (831) 899-6825, Fax: (831) 899-6211 All information except signature must be

More information

1 February 1, 2016 Item 07 City of Del Mar Staff Report TO: FROM: Honorable City Council Members Kathleen Garcia, Planning and Community Development D

1 February 1, 2016 Item 07 City of Del Mar Staff Report TO: FROM: Honorable City Council Members Kathleen Garcia, Planning and Community Development D 1 February 1, 2016 Item 07 City of Del Mar Staff Report TO: FROM: Honorable City Council Members Kathleen Garcia, Planning and Community Development Director Via Scott W. Huth, City Manager DATE: February

More information

COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO

COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO CECELIA H. STOWE, CPPO, C.P.M. PURCHASING DIRECTOR DEPARTMENT OF FINANCE ADDENDUM NO. 1 TO: Prospective Bidders and Others Concerned FROM: County of Henrico/URS

More information

Appendix E: Revenues and Cost Estimates

Appendix E: Revenues and Cost Estimates Appendix E: Revenues and Cost Estimates Photo Source: Mission Media Regional Financial Plan 2020-2040 Each metropolitan transportation plan must include a financial plan. In this financial plan, the region

More information

Contractor s Pollution Liability Application

Contractor s Pollution Liability Application 1550 Bedford Highway, Suite 815 Bedford, NS B4A 1E6 t: 1-877-343-8224 f: 1-877-432-9822 e: accounts@agileuw.ca agileuw.ca Contractor s Pollution Liability Application Applicant Information 1. First Named

More information

APPLICATION & PERMIT FOR CONSTRUCTION IN PUBLIC RIGHT OF WAY. Name of Owner: Name of Applicant: Address of Applicant: City: State: Zip:

APPLICATION & PERMIT FOR CONSTRUCTION IN PUBLIC RIGHT OF WAY. Name of Owner: Name of Applicant: Address of Applicant: City: State: Zip: Town of Chino Valley Public Works Department 1982 Voss Dr., #201 Chino Valley, AZ 86323 Phone: 928-636-7140 Fax: 928-636-7141 APPLICATION & PERMIT FOR CONSTRUCTION IN PUBLIC RIGHT OF WAY Date: Permit #:

More information

401 KAR 42:330. Small Owners Tank Removal Account.

401 KAR 42:330. Small Owners Tank Removal Account. 401 KAR 42:330. Small Owners Tank Removal Account. RELATES TO: KRS 224.60-105, 224.60-130(1)(a), (b), (j), 224.60-140, 224.60-150, 40 C.F.R. 280 Part H STATUTORY AUTHORITY: KRS 224.60-130(1)(j) NECESSITY,

More information

PATRICK ENGINEERING & SURVEYING

PATRICK ENGINEERING & SURVEYING PATRICK ENGINEERING & SURVEYING Patrick L. Brown, R.C.E. 18067 2110 Main Street, Suite A Post Office Box 442 Julian, California 92036 Office (760) 765-1343/Fax (760) 765-2081 E-mail: patrickeng@sbcglobal.net

More information

Article 23-6 FLOODPLAIN DISTRICT

Article 23-6 FLOODPLAIN DISTRICT AMENDING THE CODE OF THE CITY OF PITTSFIELD CHAPTER 23, ZONING ORDINANCE SECTION I That the Code of the City of Pittsfield, Chapter 23, Article 23-6 Floodplain District, shall be replaced with the following:

More information

Stephanie Smith, Project EngineerW

Stephanie Smith, Project EngineerW MEMORANDUM v TO: Paul Oehme, Director of Public Works/ City Engineer o FROM: Stephanie Smith, Project EngineerW 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 9522271100 Fax

More information

PN 126 (LPA) - 12/31/2012- REVISIONS TO THE 2013 C&MS FOR DESIGN BUILD PROJECTS

PN 126 (LPA) - 12/31/2012- REVISIONS TO THE 2013 C&MS FOR DESIGN BUILD PROJECTS PN 126 (LPA) - 12/31/2012- REVISIONS TO THE 2013 C&MS FOR DESIGN BUILD PROJECTS 101.01 On page 1, Add the following: NOTE: The fact that the bid items for this Design-Build project are general rather than

More information

s '13, NPR Design Engineering 2019

s '13, NPR Design Engineering 2019 CITY of NOVI CITY COUNCIL. Agenda Item J February 26, 2018 SUBJECT: Approval to award geotechnical engineering services to Testing Engineers & Consultants, Inc. (TEC) for geotechnical investigation of

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL Professional Engineering Services Franklin Blvd. Bridge Replacement at Lost Slough BR. No. 24C-0155 Federal Aid Project OCTOBER 2010 COUNTY OF SACRAMENTO MUNCIPAL SERVICES AGENCY DEPARTMENT

More information

CITY OF SOUTH SAN FRANCISCO GRADING PERMIT APPLICATION CHECKLIST

CITY OF SOUTH SAN FRANCISCO GRADING PERMIT APPLICATION CHECKLIST CITY OF SOUTH SAN FRANCISCO GRADING PERMIT APPLICATION CHECKLIST Applicant shall provide three (3) copies of the following attachments: Geotechnical Report (Soils Report with grading specifications and

More information

ADDENDUM No. 1 January 29, Paving Program Village of Milford

ADDENDUM No. 1 January 29, Paving Program Village of Milford ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for

More information

A Financial Impact Assessment of LD 1725: Stream Crossings

A Financial Impact Assessment of LD 1725: Stream Crossings A Financial Impact Assessment of LD 1725: Stream Crossings Prepared by: The New England Environmental Finance Center For the Maine Department of Transportation Office of Environmental Planning Edmund S.

More information

SOUND TRANSIT RESOLUTION NO. R99-14

SOUND TRANSIT RESOLUTION NO. R99-14 SOUND TRANSIT RESOLUTION NO. R99-14 A RESOLUTION of the Board of the Central Puget Sound Regional Transit Authority to reallocate $10 million (1995 dollars) from the East Everett Park and Ride Lot to the

More information

CONTRACTORS POLLUTION LIABILITY APPLICATION

CONTRACTORS POLLUTION LIABILITY APPLICATION CONTRACTORS POLLUTION LIABILITY APPLICATION SECTION I: APPLICANT NAME OF APPLICANT ADDRESS CITY STATE ZIP TELEPHONE WEB ADDRESS DATE Company is an: INDIVIDUAL PARTNERSHIP CORPORATION JOINT VENTURE OTHER

More information

a) Ensure public safety through reducing the threats to life and personal injury.

a) Ensure public safety through reducing the threats to life and personal injury. SECTION VII: FLOODPLAIN DISTRICT 7-1 Statement Of Purpose The purposes of the Floodplain District are to: a) Ensure public safety through reducing the threats to life and personal injury. b) Eliminate

More information

PROJECT DESCRIPTION SCOPE OF SERVICES

PROJECT DESCRIPTION SCOPE OF SERVICES ENGINEERING AND RELATED SERVICES OCTOBER 29, 2013 CONTRACT NO. 4400004357 RETAINER CONTRACT FOR TRAFFIC ENGINEERING MANAGEMENT ROADWAY PROJECTS STATEWIDE **DBE/WBE GOAL = 6% Under Authority granted by

More information

REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO

REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 OF THE CITY OF SAN JACINTO December 11, 2003 REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 CITY OF SAN JACINTO Prepared for CITY OF SAN

More information

Request for Proposal for Engineering Services. January 10, 2017 Sue Howard Closing Date: January 17,

Request for Proposal for Engineering Services. January 10, 2017 Sue Howard Closing Date: January 17, Request for Proposal for Sue Howard Closing Date: January 17, 2017 Email: sue.howard@wetaskiwin.ca Contents Purpose... 3 Background... 3 Terms of Reference... 4 1. General... 4 2. Key Dates... 5 Scope

More information

County of Sonoma Agenda Item Summary Report

County of Sonoma Agenda Item Summary Report Revision No. 20170501-1 County of Sonoma Agenda Item Summary Report Agenda Item Number: 20 (This Section for use by Clerk of the Board Only.) Clerk of the Board 575 Administration Drive Santa Rosa, CA

More information

Memorandum. Date: June 14, 2018 To: From:

Memorandum. Date: June 14, 2018 To: From: Agenda Item 4 Memorandum Date: June 14, 2018 To: From: Subject: Treasure Island Mobility Management Agency Committee Cynthia Fong Deputy Director for Finance & Administration Eric Cordoba Deputy Director

More information

Right-of-Way Utilization Permit Please complete a separate application for each road

Right-of-Way Utilization Permit Please complete a separate application for each road Right-of-Way Utilization Permit Please complete a separate application for each road Applicant Name: Date: / / Name Permit Will Be Returned To: Section Township Range Street Address Road Name / City, State,

More information

Fees: An application fee of one hundred dollars ($100) shall be included with the application submission.

Fees: An application fee of one hundred dollars ($100) shall be included with the application submission. Town of Conway, NH Construction/Driveway Permit Adopted by the Board of Selectmen, November 26, 1996 Applicability: In accordance with NH RSA Chapter 236 and the legislative authority cited in 131-1, 131-67.C.8.(j),

More information

Request for Proposal For Design Engineering Services. Northwest Lansing Relief Sewer Project

Request for Proposal For Design Engineering Services. Northwest Lansing Relief Sewer Project Request for Proposal For Design Engineering Services City of Lansing, Kansas Wastewater Utility Department 800 First Terrace Lansing, Kansas 66043 February 14, 2018 Page 1 of 14 A. INTRODUCTION The City

More information

EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF PROGRAM MANAGER 1. BASIC SERVICES A-1 2. GENERAL PROGRAM SERVICES A-6

EXHIBIT A RESPONSIBILITIES AND SERVICES OF PROGRAM MANAGER 1. BASIC SERVICES A-1 2. GENERAL PROGRAM SERVICES A-6 EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF PROGRAM MANAGER 1. BASIC SERVICES A-1 2. GENERAL PROGRAM SERVICES A-6 3. PLANNING AND ADMINISTRATION A-6 OF THE PROJECT 4. PRECONSTRUCTION PHASE A-7 5. PRE-BIDDING

More information

EXCAVATION PERMIT GUIDELINES

EXCAVATION PERMIT GUIDELINES TOWN OF HANOVER, NEW HAMPSHIRE PUBLIC WORKS DEPARTMENT PO Box 483, 194 Lebanon St TEL. 643-3327 FAX. 643-0736 EXCAVATION PERMIT GUIDELINES 1. Application & Permit (Page 1 & 2): a. Application must be filled

More information

NOTICE OF VARIOUS BID RENEWALS

NOTICE OF VARIOUS BID RENEWALS NOTICE OF VARIOUS BID RENEWALS April 22, 2015 TO WHOM IT MAY CONCERN: This letter shall serve notice that the Board of Acquisition and Contract (BAC) approved the following bid renewal option on April

More information

SAN FRANCISCO PLANNING DEPARTMENT

SAN FRANCISCO PLANNING DEPARTMENT REMARKS Addendum #2 to Environmental Impact Report Addendum Date: June 11, 2015 Case No.: 2011.0558E Project Title: Transit Effectiveness Project, Modified TTRP.5 Moderate Alternative, McAllister Street

More information

REQUEST FOR PROPOSALS. Demolition

REQUEST FOR PROPOSALS. Demolition JEFFERSON COUNTY, WEST VIRGINIA Engineering Department 116 East Washington Street P.O. Box 716 Charles Town, West Virginia 25414 Phone: 304-728-3257 Email: engineering@jeffersouncountywv.org Fax: 304-728-3953

More information

Environmental Analysis, Chapter 4 Consequences, and Mitigation

Environmental Analysis, Chapter 4 Consequences, and Mitigation Environmental Analysis, Chapter 4 4.14 Economic and Fiscal Impacts This section evaluates potential impacts to local and regional economies during construction and operation of each project alternative.

More information

Applying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA

Applying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA Applying for a Kinder Morgan Canada Proximity Permit Design and Construction Guidelines CANADA A Guide to Applying for a Kinder Morgan Canada Proximity Permit Kinder Morgan Canada operates the Trans Mountain

More information

Questionnaire and Proposal for Contractor s All Risk Insurance

Questionnaire and Proposal for Contractor s All Risk Insurance Questionnaire and Proposal for Contractor s All Risk Insurance 1. Title of contract (If project consists of Several sections, specify Section(s) to be insured.). Site Country/Province/District City/Town/Village

More information

Memorandum. CITY OF DALLAS (Report No. A15-008) June 19, 2015

Memorandum. CITY OF DALLAS (Report No. A15-008) June 19, 2015 Memorandum CITY OF DALLAS (Report No. A15-008) DATE: June 19, 2015 TO: SUBJECT: Honorable Mayor and Members of the City Council Audit of the Paving and Maintenance Program / Capital Program 1 The Department

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL DRILLING SERVICES USEPA REMEDIAL ASSESSMENT AND EVALUATION SERVICES (RAES), FORMER KERR MCGEE ABANDONED URANIUM MINES (AUMS) PRIMARILY LOCATED WITHIN THE NORTHERN CHUSKA MOUNTAINS

More information

TULLAHOMA UTILITIES BOARD TULLAHOMA, TENNESSEE INVITATION TO BID FOR UNDERGROUND TRENCH LESS CONDUIT INSTALLATION

TULLAHOMA UTILITIES BOARD TULLAHOMA, TENNESSEE INVITATION TO BID FOR UNDERGROUND TRENCH LESS CONDUIT INSTALLATION TULLAHOMA UTILITIES BOARD TULLAHOMA, TENNESSEE INVITATION TO BID FOR UNDERGROUND TRENCH LESS CONDUIT INSTALLATION The Tullahoma Utilities Board is currently seeking sealed proposals for underground trench

More information

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates. , Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...

More information

FACILITIES PLAN STATUS REPORT July 21, 2014 SADDLEBACK COLLEGE 1. SCIENCES BUILDING

FACILITIES PLAN STATUS REPORT July 21, 2014 SADDLEBACK COLLEGE 1. SCIENCES BUILDING Page 1 of 11 FACILITIES PLAN STATUS REPORT July 21, 2014 SADDLEBACK COLLEGE 1. SCIENCES BUILDING Project Budget: $52,234,000 $8,308,000 $67,358,000 State Match: $36,564,000 ($36,564,000) - Basic Aid Allocation:

More information

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. Broad St., 4 th Floor, COLUMBUS, OHIO 43223

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. Broad St., 4 th Floor, COLUMBUS, OHIO 43223 RAILROAD AUDIT CIRCULAR No. 4V7-Draft OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. Broad St., 4 th Floor, COLUMBUS, OHIO 43223 SUBJECT: Subcontracted Costs (DRAFT FOR COMMENT PERIOD 2) Last

More information

Addendum to Environmental Impact Report

Addendum to Environmental Impact Report Lead Agency: Staff Contact: Addendum to Environmental Impact Report Addendum Date: Case No.: 2011.0558E Project Title:, EIR: 2011.0558E, certified March 27, 2014 Project Sponsor: Sean Kennedy, San Francisco

More information

PISMO BEACH COUNCIL AGENDA REPORT

PISMO BEACH COUNCIL AGENDA REPORT PISMO BEACH COUNCIL AGENDA REPORT SUBJECT/TITLE: FINANCING ALTERNATIVES FOR THE FIVE CITIES LIFT STATION REPLACEMENT PROJECT AND THE SLUDGE DEWATERING PROJECT RECOMMENDATION: Direct City staff to pursue

More information

BOARD OF COUNTY COMMISSIONERS GEOTECHNICAL DRILLING AND LABORATORY TESTING SERVICES CONTRACT- TERRACON CONSULTANTS, INC., VISION 2025 SUB- FUND 36

BOARD OF COUNTY COMMISSIONERS GEOTECHNICAL DRILLING AND LABORATORY TESTING SERVICES CONTRACT- TERRACON CONSULTANTS, INC., VISION 2025 SUB- FUND 36 TULSA COUNTY PURCHASING DEPARTMENT MEMO DATE: MARCH 4,2015 FROM: TO: SUBJECT: LINDA R. DORRELL PURCHASING DIRECTOR BOARD OF COUNTY COMMISSIONERS GEOTECHNICAL DRILLING AND LABORATORY TESTING SERVICES CONTRACT-

More information

Yes No. 7. Risk is operating as: (Definitions of italicized terms are provided on the last page) General Contractor % Prime Contractor %

Yes No. 7. Risk is operating as: (Definitions of italicized terms are provided on the last page) General Contractor % Prime Contractor % On-site waste treatment Operations conducted in an oil or natural gas producing field Pile driving for structure foundation Railroad construction Subway construction Septic system installation, service

More information

Discussion Paper: DAMAGE PREVENTION FRAMEWORK FOR FEDERALLY REGULATED POWER LINES

Discussion Paper: DAMAGE PREVENTION FRAMEWORK FOR FEDERALLY REGULATED POWER LINES Discussion Paper: DAMAGE PREVENTION FRAMEWORK FOR FEDERALLY REGULATED POWER LINES Discussion Paper: Damage Prevention Framework for Federally Regulated Power Lines Introduction Bill C-69, which creates

More information

STUDY SCHEDULE STUDY PURPOSE

STUDY SCHEDULE STUDY PURPOSE STUDY SCHEDULE This Open House is the last of three public meetings for the Route Centennial Bridge Study. The material presented previously at the second Open House in July 2015 focused upon Corridor

More information

TRENCH PERMIT. CITY OF SOMERSWORTH NH 18 Lilac Lane - (603) Please Fax at (603) Date: Permit# Dig Safe # Fee = $70.

TRENCH PERMIT. CITY OF SOMERSWORTH NH 18 Lilac Lane - (603) Please Fax at (603) Date: Permit# Dig Safe # Fee = $70. TRENCH PERMIT CITY OF SOMERSWORTH NH 18 Lilac Lane - (603) 692-4266 - Please Fax at (603) 692-4281 Date: Permit# Dig Safe # Fee = $70.00 Name of Applicant Address of Applicant Phone Number Reason for Excavation

More information

NOTICE AND AGENDA SPECIAL TOWN COUNCIL MEETING TOWN OF CAVE CREEK, ARIZONA MONDAY, AUGUST 22, 2016

NOTICE AND AGENDA SPECIAL TOWN COUNCIL MEETING TOWN OF CAVE CREEK, ARIZONA MONDAY, AUGUST 22, 2016 Americans with Disabilities Act Notification: In accordance with the Americans with Disabilities Act (ADA) and Section 504 of the Rehabilitation Act of 1973 (Section 504), the Town of Cave Creek does not

More information

Addendum to Enbridge s 2013 Corporate Social Responsibility Report (with a focus on 2013 data)

Addendum to Enbridge s 2013 Corporate Social Responsibility Report (with a focus on 2013 data) Addendum to Enbridge s 2013 Corporate Social Responsibility Report (with a focus on 2013 data) Spills, Leaks and Releases Performance Data Sheet This performance data sheet relates to the following Global

More information

Submitted by: Jeffrey Egeberg, Secretary, Public Works Commission. Street Repair Policy Update and Permeable Paver Trial Project

Submitted by: Jeffrey Egeberg, Secretary, Public Works Commission. Street Repair Policy Update and Permeable Paver Trial Project Public Works Commission ACTION CALENDAR July 14, 2009 To: From: Honorable Mayor and Members of the City Council Public Works Commission Submitted by: Jeffrey Egeberg, Secretary, Public Works Commission

More information

Disclaimer for Review of Plans

Disclaimer for Review of Plans Disclaimer for Review of Plans The San Francisco Planning Code requires that the plans of certain proposed projects be provided to members of the public prior to the Cityʹs approval action on the project.

More information

PennDOT Rapid Bridge Replacement Project

PennDOT Rapid Bridge Replacement Project PennDOT Rapid Bridge Replacement Project Ohio Transportation Engineering Conference October 27 28,2015 Agenda Project Overview Project Development and Scoping Procurement Process Technical Requirements

More information

REQUEST FOR QUALIFICATIONS. For ON-CALL DESIGN ENGINEERING SUPPORT SERVICES. For DESIGN ENGINEERING DIVISION STOCKTON, CALIFORNIA MAY 21, 2018

REQUEST FOR QUALIFICATIONS. For ON-CALL DESIGN ENGINEERING SUPPORT SERVICES. For DESIGN ENGINEERING DIVISION STOCKTON, CALIFORNIA MAY 21, 2018 REQUEST FOR QUALIFICATIONS For ON-CALL DESIGN ENGINEERING SUPPORT SERVICES For DESIGN ENGINEERING DIVISION STOCKTON, CALIFORNIA MAY 21, 2018 San Joaquin County Department of Public Works 1810 East Hazelton

More information

Contract task assignment to CDM Smith, Inc., for utility engineering services for southwest interconnect services area...

Contract task assignment to CDM Smith, Inc., for utility engineering services for southwest interconnect services area... 31-1 31-1 31-2 31-2 31-3 31-3 31-4 31-4 2301 Maitland Center Parkway, Suite 300 Maitland, Florida 32751 tel: 407 660-2552 fax: 407 875-1161 Volusia County Water Resources and Utilities 123 West Indiana

More information

Spartanburg County Roads & Bridges 9039 Fairforest Road Spartanburg, South Carolina Telephone Fax

Spartanburg County Roads & Bridges 9039 Fairforest Road Spartanburg, South Carolina Telephone Fax Spartanburg County Roads & Bridges 9039 Fairforest Road Spartanburg, South Carolina 29301 Telephone 864-595-5320 Fax 864-595-5364 ENCROACHMENT PERMIT APPLICATION Applicant s Name Address City, State, Zip

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Committee of the Whole November 28, 2016 City Council December 5, 2016 Agenda Item: Federal Transportation Funding Request Urban Roads Program Submitted by: Engineering

More information

GENERAL PROVISIONS I. WORK REQUIREMENTS

GENERAL PROVISIONS I. WORK REQUIREMENTS GENERAL PROVISIONS I. WORK REQUIREMENTS 1. Inspection The Permittee shall request initial inspection from the County at 408-573-2429 a minimum of twenty-four (24) hours prior to any work being performed.

More information

COUNTY ADMINISTRATOR PUBLIC WORKS

COUNTY ADMINISTRATOR PUBLIC WORKS COUNTY ADMINISTRATOR PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm

More information

Corridor Management Committee. May 6, 2015

Corridor Management Committee. May 6, 2015 Corridor Management Committee May 6, 2015 1 Today s Topics Project Budget and Schedule Update Project Options Work Plan Upcoming Meeting Schedule 2 Project Budget and Schedule Update 3 Project Updates:

More information

Questionnaire and proposal for contractors all risks insurance No.

Questionnaire and proposal for contractors all risks insurance No. Questionnaire and proposal for contractors all risks insurance No. 1. Title of contract (If project consists of several sections, specify section(s) to be insured.) 2. Site County/Province/District City/Town/Village

More information

KANSAS CITY POWER & LIGHT COMPANY P.S.C. MO. No. 2 Fourth Revised Sheet No Canceling P.S.C. MO. No. 2 Third Revised Sheet No. 1.

KANSAS CITY POWER & LIGHT COMPANY P.S.C. MO. No. 2 Fourth Revised Sheet No Canceling P.S.C. MO. No. 2 Third Revised Sheet No. 1. P.S.C. MO. No. 2 Fourth Revised 1.30 2 Third Revised 1.30 9. EXTENSION OF FACILITIES SECTIONS 9.01 THROUGH 9.11 SHALL BE APPLICABLE TO FACILITY EXTENSION AGREEMENTS EXECUTED ON AND AFTER JANUARY 1, 2018.

More information

RIGHT-OF-WAY PERMIT APPLICATION

RIGHT-OF-WAY PERMIT APPLICATION PERMIT EXPIRES 180 DAYS AFTER DATE OF ISSUANCE. RIGHT-OF-WAY PERMIT APPLICATION DESCRIPTION OF WORK: (Mark all applicable) Pavement Cut: Directional Bore: Sewer / Water Connection: Driveway Apron: Sidewalk

More information

Request for Statement of Qualifications (SOQ)

Request for Statement of Qualifications (SOQ) Request for Statement of Qualifications (SOQ) For On-Call Services For Various Tasks In the City of Concord By the City of Concord RESPONSES DUE: 5:00 p.m., Monday, March 9, 2015 City of Concord Department

More information

PIPELINE / WIRE LINE PROCESS INSTRUCTIONS

PIPELINE / WIRE LINE PROCESS INSTRUCTIONS PIPELINE / WIRE LINE PROCESS INSTRUCTIONS Licensing Process: 1. Once the application package is received by Jones Lang LaSalle Brokerage, Inc. (JLL), the application and drawing will be forwarded to the

More information

LAKE WHATCOM WATER AND SEWER DISTRICT REQUEST FOR PROPOSALS RESERVOIR SEISMIC VULNERABILITY ASSESSMENT AUGUST 2015

LAKE WHATCOM WATER AND SEWER DISTRICT REQUEST FOR PROPOSALS RESERVOIR SEISMIC VULNERABILITY ASSESSMENT AUGUST 2015 LAKE WHATCOM WATER AND SEWER DISTRICT REQUEST FOR PROPOSALS RESERVOIR SEISMIC VULNERABILITY ASSESSMENT AUGUST 2015 I. INTRODUCTION 1. This Request for Proposals ( RFP ) outlines the information necessary

More information

THREE RIVERS AREA YOUTH SPORTS COMPLEX. Request for PROPOSALS. 333 West Michigan Ave. Three Rivers, Michigan,

THREE RIVERS AREA YOUTH SPORTS COMPLEX. Request for PROPOSALS. 333 West Michigan Ave. Three Rivers, Michigan, City of Three Rivers THREE RIVERS AREA YOUTH SPORTS COMPLEX Request for PROPOSALS 333 West Michigan Ave. Three Rivers, Michigan, 49093 269 273 1075 www.threeriversmi.org Engineering Services for the Youth

More information

APPLICATION FOR RIGHT-OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI

APPLICATION FOR RIGHT-OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI APPLICATION FOR RIGHT-OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: _100.00 Date: / / Receipt No: APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE,

More information

City of Palmer Action Memorandum No Originator Information:

City of Palmer Action Memorandum No Originator Information: City of Palmer Action Memorandum No. 18-003 Subject: Authorize the City Manager to Negotiate and Execute a Three (3) year Contract with Two (2), One (1) year Extensions with HDL Engineering Consultants,

More information

City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE

City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE I. INTRODUCTION City of Arroyo Grande Department of Public Works REQUEST FOR PROPOSAL WATER AND WASTEWATER RATE STUDY UPDATE The City of Arroyo Grande, California (the City ) was incorporated as a general

More information

3) day of ----'~'---''"'(A'-'-1{-'--'-uhLC---'------'' 2014 (hereinafter the "Effective Date"), by and between

3) day of ----'~'---'''(A'-'-1{-'--'-uhLC---'------'' 2014 (hereinafter the Effective Date), by and between SECOND AMENDMENT TO AGREEMENT BETWEEN THE CITY OF JACKSONVILLE AND TAYLOR ENGINEERING, INC. FOR ENGINEERING SERVICES FOR CRYSTAL SPRINGS DRAINAGE IMPROVEMENTS THIS SECOND AMENDMENT to Agreement is made

More information

CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT

CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT BEFORE YOU CAN PERFORM ANY CONSTRUCTION OR MAINTENANCE WORK IN THE PUBLIC RIGHT-OF-WAY, YOU MUST HAVE A VALID ENCROACHMENT PERMIT ISSUED BY THIS DEPARTMENT This work includes but is not limited to driveway

More information

THE SOUTHERN GATEWAY PROJECT DRAFT CAPITAL MAINTENANCE AGREEMENT TERM SHEET

THE SOUTHERN GATEWAY PROJECT DRAFT CAPITAL MAINTENANCE AGREEMENT TERM SHEET THE SOUTHERN GATEWAY PROJECT DRAFT CAPITAL MAINTENANCE AGREEMENT TERM SHEET This document provides background information and summarizes certain major terms of the Capital Maintenance Agreement ( CMA )

More information

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer G-7 STAFF REPORT MEETING DATE: November 27, 2018 TO: FROM: City Council Petr Skala, Associate Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213 www.novato.org PRESENTER: Christopher

More information

EXHIBIT 10-J STANDARD AGREEMENT FOR SUBCONTRACTOR/DBE PARTICIPATION

EXHIBIT 10-J STANDARD AGREEMENT FOR SUBCONTRACTOR/DBE PARTICIPATION EXHIBIT 10-J STANDARD AGREEMENT FOR SUBCONTRACTOR/DBE PARTICIPATION 1. Subcontractors A. Nothing contained in this Agreement or otherwise, shall create any contractual relation between the Agency and any

More information

Town of Douglas Community Development Department 29 Depot Street, Douglas, MA T: (508) TTY: (508) F: (508)

Town of Douglas Community Development Department 29 Depot Street, Douglas, MA T: (508) TTY: (508) F: (508) Town of Douglas Community Development Department 29 Depot Street, 01516 T: (508) 476-4000 TTY: (508) 476-1619 F: (508) 476-4012 Mr. Benjamin F. Tully, Jr. Tully Construction Corp. 69 Bruce Lane Southbridge,

More information

Railroad-DOT Mitigation Strategies (R16) Resurfacing Agreements

Railroad-DOT Mitigation Strategies (R16) Resurfacing Agreements Railroad-DOT Mitigation Strategies (R16) Resurfacing Agreements Resurfacing projects are among the most common and routine types of projects regularly conducted by highway agencies. When resurfacing projects

More information

EVALUATION OF EXPENDITURES ON RURAL INTERSTATE PAVEMENTS IN KANSAS

EVALUATION OF EXPENDITURES ON RURAL INTERSTATE PAVEMENTS IN KANSAS EXECUTIVE SUMMARY EVALUATION OF EXPENDITURES ON RURAL INTERSTATE PAVEMENTS IN KANSAS by Stephen A. Cross, P.E. Associate Professor University of Kansas Lawrence, Kansas and Robert L. Parsons, P.E. Assistant

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS FOR SERVICES of a REGISTERED PROFESSIONAL FORESTER to the PLUMAS COUNTY FIRE SAFE COUNCIL and PLUMAS CORPORATION PC FSC Fuel Hazard Reduction Project Development & Implementation

More information

Village of Fife Lake 616 Bates/Box 298 Fife Lake, MI Phone: (231) Fax: (231)

Village of Fife Lake 616 Bates/Box 298 Fife Lake, MI Phone: (231) Fax: (231) Village of Fife Lake 616 Bates/Box 298 Fife Lake, MI 49633 Phone: (231)879-4291 Fax: (231)879-5153 RIGHT OF WAY PERMIT APPLICATION APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE AND/OR MAINTAIN WITHIN

More information

FOR OFFICE USE ONLY CONTRACTOR/DEVELOPER APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE AND/OR MAINTAIN WITHIN THE RIGHT-OF-WAY/EASEMENT

FOR OFFICE USE ONLY CONTRACTOR/DEVELOPER APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE AND/OR MAINTAIN WITHIN THE RIGHT-OF-WAY/EASEMENT 40555 Utica Road P.O. Box 8009 Sterling Heights, MI 48311-8009 TEL 586-446-2720 FAX 586-276-4061 CONTRACTOR/DEVELOPER APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE AND/OR MAINTAIN WITHIN THE RIGHT-OF-WAY/EASEMENT

More information