Boston Region Transportation Improvement Program

Size: px
Start display at page:

Download "Boston Region Transportation Improvement Program"

Transcription

1 This is a complex table that has ot bee optimized for scree-readig software. If you would like to request this table i a alterative format, please cotact the Cetral Trasportatio Plaig Staff (CTPS) via at publicifo@ctps.org Fiscal Years (FFYs) -23 Trasportatio Improvemet (TIP) Edorsed May 24, 2018 DRAFT Amedmet Oe for Public Review Bosto Regio Trasportatio Improvemet Idicates a chage i project cost Idicates removed from TIP (cost ot reflected i total) Idicates a project moved i from aother TIP elemet Idicates a project moved out to aother TIP elemet (cost ot reflected i total) Idicates a ew additio to the TIP (actio take as deoted) Idicates a ew fudig category Amedmet / Adjustmet Type ID Metropolita Plaig Orgaizatio Muicipality Name Descriptio District Fudig Source med No- Additioal Iformatio Preset iformatio as follows, if applicable: a) Plaig / Desig / or Costructio; b) total project cost ad fudig sources used; c) advace costructio status; d) MPO project score; e) ame of etity receivig a trasfer; f) ame of etity payig the o-state o-federal match; g) earmark details; h) TAP project propoet; i) other iformatio Sectio 1A / Regioally Prioritized s Regioally Prioritized s Plaig / Adjustmets / Pass-throughs 1570 Bosto Regio Multiple GREEN LINE EXTENSION PROJECT- EXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR 6 CMAQ $ 28,184,400 $ 22,547,520 $ 5,636,880 Costructio; STP+CMAQ+Sectio 5309 (Trasit) MPO Cotributio = $190,000,000; AC Yr 4 of 6; fudig flexed to FTA; match provided by local cotributios Plaig / Adjustmets / Pass-throughs 1570 Bosto Regio Multiple Bosto Regio Multiple GREEN LINE EXTENSION PROJECT- EXTENSION TO COLLEGE AVENUE WITH THE UNION SQUARE SPUR 6 STP $ 28,184,400 $ 22,547,520 $ 5,636,880 6 CMAQ $ 3,500,000 $ 2,800,000 $ 700,000 Costructio; STP+CMAQ+Sectio 5309 (Trasit) MPO Cotributio = $190,000,000; AC Yr 4 of 6; fudig flexed to FTA; match provided by local cotributios Costructio; CMAQ+HSIP+TAP+STP Cost = $26,883,332; AC Yr 1 of 2; MPO Evaluatio Score = Bosto Regio Multiple 6 HSIP $ 2,875,199 $ 2,587,679 $ 287,520 Costructio; CMAQ+HSIP+TAP+STP Cost = $26,883,332; AC Yr 1 of 2; MPO Evaluatio Score = Bosto Regio Multiple 6 STP $ 5,519,974 $ 4,415,979 $ 1,103,995 Costructio; CMAQ+HSIP+TAP+STP Cost = $26,883,332; AC Yr 1 of 2; MPO Evaluatio Score = Bosto Regio Multiple Bosto Regio Natick Bosto Regio Natick Bosto Regio Natick NATICK- RECONSTRUCTION OF ROUTE 27 (NORTH MAIN STREET), FROM NORTH AVENUE TO THE WAYLAND T.L. NATICK- RECONSTRUCTION OF ROUTE 27 (NORTH MAIN STREET), FROM NORTH AVENUE TO THE WAYLAND T.L. NATICK- RECONSTRUCTION OF ROUTE 27 (NORTH MAIN STREET), FROM NORTH AVENUE TO THE WAYLAND T.L. 6 TAP $ 1,546,493 $ 1,237,194 $ 309,299 3 CMAQ $ 2,415,334 $ 1,932,267 $ 483,067 3 STP $ 8,352,877 $ 6,682,302 $ 1,670,575 3 TAP $ 1,318,933 $ 1,055,146 $ 263,787 Costructio; CMAQ+HSIP+TAP+STP Cost = $26,883,332; AC Yr 1 of 2; MPO Evaluatio Score = 75; TAP Propoet = Costructio; CMAQ+TAP+STP Cost = $12,087,144; MPO Evaluatio Score = 60 Costructio; CMAQ+TAP+STP Cost = $12,087,144; MPO Evaluatio Score = 60 Costructio; CMAQ+TAP+STP Cost = $12,087,144; MPO Evaluatio Score = Bosto Regio Multiple HOPEDALE- MILFORD- RESURFACING & INTERSECTION IMPROVEMENTS ON ROUTE 16 (MAIN STREET), FROM WATER STREET WEST TO APPROXIMATELY 120 FEET WEST OF THE MILFORD/HOPEDALE T.L AND THE INTERSECTION OF ROUTE CMAQ $ 1,000,000 $ 800,000 $ 200,000 Costructio; CMAQ+HSIP Cost = $2,967,944; MPO Evaluatio Score = Bosto Regio Multiple HOPEDALE- MILFORD- RESURFACING & INTERSECTION IMPROVEMENTS ON ROUTE 16 (MAIN STREET), FROM WATER STREET WEST TO APPROXIMATELY 120 FEET WEST OF THE MILFORD/HOPEDALE T.L AND THE INTERSECTION OF ROUTE HSIP $ 1,967,944 $ 1,771,150 $ 196,794 Costructio; CMAQ+HSIP Cost = $2,967,944; MPO Evaluatio Score = 54 Page 1 of 7

2 Fiscal Years (FFYs) -23 Trasportatio Improvemet (TIP) Edorsed May 24, 2018 DRAFT Amedmet Oe for Public Review Bosto Regio Trasportatio Improvemet Idicates a chage i project cost Idicates removed from TIP (cost ot reflected i total) Idicates a project moved i from aother TIP elemet Idicates a project moved out to aother TIP elemet (cost ot reflected i total) Idicates a ew additio to the TIP (actio take as deoted) Idicates a ew fudig category Amedmet / Adjustmet Type ID Metropolita Plaig Orgaizatio Muicipality Name Descriptio District Fudig Source med No- Additioal Iformatio Preset iformatio as follows, if applicable: a) Plaig / Desig / or Costructio; b) total project cost ad fudig sources used; c) advace costructio status; d) MPO project score; e) ame of etity receivig a trasfer; f) ame of etity payig the o-state o-federal match; g) earmark details; h) TAP project propoet; i) other iformatio Bosto Regio Bosto 6 STP $ 7,871,248 $ 6,296,998 $ 1,574,250 Costructio; STP+ Cost = $25,315,588 ; MPO Evaluatio Score = Bosto Regio Multiple MIDDLESEX 3 TMA - SECOND SHIFT AND WEEKEND SHUTTLE SERVICE BETWEEN LOWELL AND BURLINGTON 4 CMAQ $ 415,000 $ 290,000 $ 125,000 To use a portio of remaiig Bosto MPO target fuds Bosto Regio Beverly BEVERLY- INTERSECTION 3 LOCATIONS: CABOT STREET (ROUTE DODGE STREET (ROUTE 1A), COUNTY WAY, LONGMEADOW ROAD & SCOTT STREET, MCKAY BALCH STREET & VETERANS MEMORIAL BRIDGE (ROUTE 1A) AT RANTOUL, CABOT, WATER & FRONT STREETS 4 CMAQ $ 1,520,271 $ 1,216,217 $ 304,054 Costructio; HSIP+CMAQ Cost = $4,394,886; MPO Evaluatio Score = Bosto Regio Beverly BEVERLY- INTERSECTION 3 LOCATIONS: CABOT STREET (ROUTE DODGE STREET (ROUTE 1A), COUNTY WAY, LONGMEADOW ROAD & SCOTT STREET, MCKAY BALCH STREET & VETERANS MEMORIAL BRIDGE (ROUTE 1A) AT RANTOUL, CABOT, WATER & FRONT STREETS 4 HSIP $ 2,874,615 $ 2,587,154 $ 287,462 Costructio; HSIP+CMAQ Cost = $4,394,886; MPO Evaluatio Score = 63 Regioally Prioritized s subtotal $ 97,546,688 $ 78,767,126 $ 18,779,562 80% + 20% No- Sectio 1A / Fiscal Costrait Aalysis Sectio 1A istructios: MPO Template Name) Choose Regioal Name from dropdow list to populate header ad MPO colum; Colum C) Eter ID from Ifo; Colum E) Choose Muicipality Name from dropdow list; Colum H) Choose the Fudig Source beig used for the project - if multiple fudig sources are beig used eter multiple lies; Colum I) Eter the total amout of fuds beig programmed i this fiscal year ad for each fudig source; Colum J) fuds autocalculates. Please verify the amout ad oly chage if eeded for flex. Colum K) No-federal fuds autocalculates. Please verify the split/match - if matchig a FTA flex, coordiate with Rail & Trasit Divisio before programmig; Colum L) Eter Additioal Iformatio as Sectio 1B / or Discretioary Grat Fuded s Regioal Aid Fuds med STP programmed $ 97,546,688 $ 98,794,261 Budget $ 1,247,573 Target Fuds Available $ 49,928,499 $ 17,395,279 STP HSIP programmed $ 7,717,758 $ 6,945,982 HSIP CMAQ programmed $ 37,035,005 $ 29,586,004 CMAQ TAP programmed $ 2,865,426 $ 2,292,341 TAP Other Aid Discretioary Discretioary Discretioary Discretioary Bosto Regio Bosto Bosto Regio Bosto Bosto Regio Bosto Bosto Regio Bosto 6 HPP $ 5,007,375 $ 4,005,900 $ 1,001,475 6 HPP $ 2,703,983 $ 2,163,186 $ 540,797 6 HPP $ 6,259,219 $ 5,007,375 $ 1,251,844 6 HPP $ 3,473,764 $ 2,779,011 $ 694,753 Costructio; HPP 4284 (MA203); STP+s Cost = $25,315,588 Costructio; HPP 756 (MA126); STP+s Cost = $25,315,588 Costructio; (MA154); STP+s Cost = $25,315,588 Costructio; (MA194); STP+s Cost = $25,315,588 Page 2 of 7

3 Fiscal Years (FFYs) -23 Trasportatio Improvemet (TIP) Edorsed May 24, 2018 DRAFT Amedmet Oe for Public Review Bosto Regio Trasportatio Improvemet Idicates a chage i project cost Idicates removed from TIP (cost ot reflected i total) Idicates a project moved i from aother TIP elemet Idicates a project moved out to aother TIP elemet (cost ot reflected i total) Idicates a ew additio to the TIP (actio take as deoted) Idicates a ew fudig category Amedmet / Adjustmet Type ID Metropolita Plaig Orgaizatio Muicipality Name Descriptio District Fudig Source med No- Additioal Iformatio Preset iformatio as follows, if applicable: a) Plaig / Desig / or Costructio; b) total project cost ad fudig sources used; c) advace costructio status; d) MPO project score; e) ame of etity receivig a trasfer; f) ame of etity payig the o-state o-federal match; g) earmark details; h) TAP project propoet; i) other iformatio ADJUSTMENT: Reprogram Fudig Discretioary Bosto Regio Bosto BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 HPP $ 126,970 $ 101,576 $ 25,394 Demo ID MA183; reprogrammed from FFY To be used for desig. ADJUSTMENT: Reprogram Fudig Discretioary Bosto Regio Bosto BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 6 HPP $ 8,451,960 $ 6,761,568 $ 1,690,392 Demo ID MA210; reprogrammed from FFY To be used for desig. Discretioary Bosto Regio Milto MILTON- DECK RECONSTRUCTION OVER SE EXPRESSWAY (EAST MILTON SQUARE), INCLUDES PARKING & NEW LANDSCAPED AREA 4 HPP $ 1,502,213 $ 1,201,770 $ 300,443 Costructio; (MA125) Discretioary Discretioary Bosto Regio Milto Bosto Regio Brooklie MILTON- DECK RECONSTRUCTION OVER SE EXPRESSWAY (EAST MILTON SQUARE), INCLUDES PARKING & NEW LANDSCAPED AREA BROOKLINE- PEDESTRIAN BRIDGE REHABILITATION, B , OVER MBTA OFF CARLTON STREET 4 HPP $ 1,251,844 $ 1,001,475 $ 250,369 6 HPP $ 751,106 $ 600,885 $ 150,221 Costructio; (MA134) Demo ID: MA 149 Repurposed earmark, formerly desig ad costruct sigal crossig ad other safety improvemets to Emerald Necklace Greeway Bicycle Trail, Tow of Brooklie Discretioary SLGPH2 Bosto Regio CHELSEA CHELSEA - SILVERLINE GATEWAY PHASE 2 6 HPP $ 2,503,688 $ 2,002,950 $ 500,738 Repurposed earmark (MA 181). Origially programmed for "Chelsea Improvemets" has to be obligated by FFY. Fudig Source Discretioary Bosto Regio Somerville SOMERVILLE- SIGNAL AND INTERSECTION IMPROVEMENT ON I-93 AT MYSTIC AVENUE AND MCGRATH HIGHWAY (TOP 200 CRASH LOCATION) 4 HPP $ 500,738 $ 400,590 $ 100,148 (MA 128) repurposed i FFY 2017 from the Study ad Desig I-93/Mystic Ave. Iterchage ad ot obligated. Reprogrammig to FFY. has to be obligated by FFY. Bosto Regio Other Aid HPP $ - $ - $ - Other Aid subtotal $ 32,532,858 $ 26,026,286 $ 6,506,572 Fudig Split Varies by Fudig Source Sectio 2A / State Prioritized Reliability s / Ispectios Bosto Regio Ispectio $ - $ - $ - / Ispectios subtotal $ - $ - $ - Fudig Split Varies by Fudig Source / Off-System Bosto Regio SHARON Bosto Regio STOW SHARON- BRIDGE REPLACEMENT, S (40N), MASKWONICUT STREET OVER AMTRAK/MBTA 5 STP-BR- OFF $ 2,683,087 $ 2,146,469 $ 536,617 STOW- BRIDGE REPLACEMENT, S , BOX MILL ROAD STP-BR- 3 $ 3,612,223 $ 2,889,779 $ 722,445 OVER ELIZABETH BROOK OFF / Off-System subtotal $ 6,295,310 $ 5,036,248 $ 1,259,062 80% + 20% No- Page 3 of 7

4 Fiscal Years (FFYs) -23 Trasportatio Improvemet (TIP) Edorsed May 24, 2018 DRAFT Amedmet Oe for Public Review Bosto Regio Trasportatio Improvemet Idicates a chage i project cost Idicates removed from TIP (cost ot reflected i total) Idicates a project moved i from aother TIP elemet Idicates a project moved out to aother TIP elemet (cost ot reflected i total) Idicates a ew additio to the TIP (actio take as deoted) Idicates a ew fudig category Amedmet / Adjustmet Type ID Metropolita Plaig Orgaizatio Muicipality Name Descriptio District Fudig Source med No- Additioal Iformatio Preset iformatio as follows, if applicable: a) Plaig / Desig / or Costructio; b) total project cost ad fudig sources used; c) advace costructio status; d) MPO project score; e) ame of etity receivig a trasfer; f) ame of etity payig the o-state o-federal match; g) earmark details; h) TAP project propoet; i) other iformatio / O-System (NHS) Bosto Regio Multiple Bosto Regio BOSTON LYNN- SAUGUS- BRIDGE REPLACEMENT, L =S , ROUTE 107 OVER THE SAUGUS RIVER (AKA - BELDEN G. BLY BRIDGE) BOSTON- BRIDGE REPLACEMENT, B , NORTH WASHINGTON STREET OVER THE BOSTON INNER HARBOR 4 NHPP-O $ 14,894,228 $ 11,915,382 $ 2,978,846 6 NHPP-O $ 25,184,931 $ 20,147,945 $ 5,036,986 AC Year 1 of 5, Cost $74,471,140 AC Year 3 of 6, Cost = $193,058, Bosto Regio DANVERS DANVERS - BRIDGE REPLACEMENT, D , ST 128 OVER WATERS RIVER 4 NHPP-O $ 21,644,934 $ 17,315,947 $ 4,328,987 Origial programmed amout was obligated i FFY 2017 ad project was adverstised; did't advace. FFY 2017 obligated amout = $17.3 millio. Oly the cost differece ($4.3 millio) couts agaist the curret OA Bosto Regio CHELSEA CHELSEA- ROUTE 1 VIADUCT REHABILITATION (SB/NB) ON 6 NHPP-O $ 71,677,130 $ 57,341,704 $ 14,335,426 C & C / O-System (NHS) subtotal $ 133,401,223 $ 106,720,978 $ 26,680,245 AC Year 2 of 4, Cost $213,972,689 Fudig Split Varies by Fudig Source / O-System (No-NHS) Bosto Regio / O-System (No-NHS) $ - $ - $ - / O-System (No-NHS) subtotal $ - $ - $ - 80% + 20% No- / Systematic Maiteace Bosto Regio RANDOLPH RANDOLPH- BRIDGE PRESERVATION OF 2 BRIDGES: R-01-6 NHPP-O $ 4,984,738 $ 3,987,791 $ 996, & R / Systematic Maiteace subtotal $ 4,984,738 $ 3,987,791 $ 996,948 Fudig Split Varies by Fudig Source Iterstate Pavemet ADJUSTMENT:Chage Descriptio Iterstate Pavemet Bosto Regio Multiple READING- WAKEFIELD- RESURFACING AND RLATED WORK ON I-95 INTERSTATE MAINTENANCE AND RELATED WORK ON I-95 4 NHPP $ 4,123,392 $ 3,711,053 $ 412,339 Isterstate Pavemet subtotal $ 4,123,392 $ 3,711,053 $ 412,339 90% + 10% No- Page 4 of 7

5 Fiscal Years (FFYs) -23 Trasportatio Improvemet (TIP) Edorsed May 24, 2018 DRAFT Amedmet Oe for Public Review Bosto Regio Trasportatio Improvemet Idicates a chage i project cost Idicates removed from TIP (cost ot reflected i total) Idicates a project moved i from aother TIP elemet Idicates a project moved out to aother TIP elemet (cost ot reflected i total) Idicates a ew additio to the TIP (actio take as deoted) Idicates a ew fudig category Amedmet / Adjustmet Type ID Metropolita Plaig Orgaizatio Muicipality Name Descriptio District Fudig Source med No- Additioal Iformatio Preset iformatio as follows, if applicable: a) Plaig / Desig / or Costructio; b) total project cost ad fudig sources used; c) advace costructio status; d) MPO project score; e) ame of etity receivig a trasfer; f) ame of etity payig the o-state o-federal match; g) earmark details; h) TAP project propoet; i) other iformatio No-Iterstate Pavemet No-Iterstate Pavemet No-Iterstate Pavemet No-Iterstate Pavemet Bosto Regio Multiple Bosto Regio Topsfield Bosto Regio Dedham PEABODY- DANVERS- RESURFACING AND RELATED WORK ON ROUTE 1 4 NHPP $ 11,628,900 $ 9,303,120 $ 2,325,780 TOPSFIELD- RESURFACING AND RELATED WORK ON ROUTE 1 4 NHPP $ 9,086,000 $ 7,268,800 $ 1,817,200 DEDHAM- RESURFACING AND RELATED WORK ON ROUTE NHPP $ 5,525,503 $ 4,420,402 $ 1,105,101 No-Iterstate Pavemet subtotal $ 26,240,403 $ 20,992,322 $ 5,248,081 80% + 20% No- Improvemets Improvemets Improvemets Improvemets Bosto Regio Improvemets $ - $ - $ - Bosto Regio Improvemets $ - $ - $ - Bosto Regio Improvemets $ - $ - $ - Improvemets subtotal $ - $ - $ - 80% + 20% No- Safety Improvemets AMENDMENT:Icrease Cost Safety Improvemets Safety Improvemets Safety Improvemets Bosto Regio Multiple Bosto Regio Multiple Bosto Regio Braitree CHELSEA TO DANVERS- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF US ROUTE 1 READING TO LYNNFIELD- GUIDE AND TRAFFIC SIGN REPLACEMENT ON A SECTION OF I-95 (SR 128) BRAINTREE- HIGHWAY LIGHTING IMPROVEMENTS AT I- 93/ROUTE 3 INTERCHANGE 4 NHPP $ 7,195,084 $ 6,475,576 $ 719,508 4 NHPP $ 4,513,288 $ 4,061,959 $ 451,329 6 NHPP $ 9,697,229 $ 8,727,506 $ 969,723 Cost icrease. Origial programmed amout: $7,008,503 Safety Improvemets subtotal $ 21,405,601 $ 19,265,041 $ 2,140,560 Fudig Split Varies by Fudig Source Sectio 2B / State Prioritized Moderizatio s ADA Retrofits ADA Retrofits Bosto Regio ADA Retrofits $ - $ - $ - ADA Retrofits Bosto Regio ADA Retrofits $ - $ - $ - ADA Retrofits subtotal $ - $ - $ - 80% + 20% No- Itersectio Improvemets Itersectio Improvemets Itersectio Improvemets Bosto Regio Bosto Bosto Regio Sudbury BOSTON- INTERSECTION IMPROVEMENTS AT MORTON STREET AND HARVARD STREET 6 HSIP $ 1,500,000 $ 1,350,000 $ 150,000 SUDBURY- INTERSECTION ROUTE 20 & LANDHAM ROAD 3 HSIP $ 1,974,736 $ 1,777,263 $ 197,474 Itersectio Improvemets subtotal $ 3,474,736 $ 3,127,263 $ 347,474 Fudig Split Varies by Fudig Source Page 5 of 7

6 Fiscal Years (FFYs) -23 Trasportatio Improvemet (TIP) Edorsed May 24, 2018 DRAFT Amedmet Oe for Public Review Bosto Regio Trasportatio Improvemet Idicates a chage i project cost Idicates removed from TIP (cost ot reflected i total) Idicates a project moved i from aother TIP elemet Idicates a project moved out to aother TIP elemet (cost ot reflected i total) Idicates a ew additio to the TIP (actio take as deoted) Idicates a ew fudig category Amedmet / Adjustmet Type ID Metropolita Plaig Orgaizatio Muicipality Name Descriptio District Fudig Source med No- Additioal Iformatio Preset iformatio as follows, if applicable: a) Plaig / Desig / or Costructio; b) total project cost ad fudig sources used; c) advace costructio status; d) MPO project score; e) ame of etity receivig a trasfer; f) ame of etity payig the o-state o-federal match; g) earmark details; h) TAP project propoet; i) other iformatio Itelliget Trasportatio Systems Itelliget Trasportatio Systems Itelliget Trasportatio Systems Itelliget Trasportatio Systems Bosto Regio Itelliget Trasportatio Systems $ - $ - $ - Bosto Regio Itelliget Trasportatio Systems $ - $ - $ - Bosto Regio Itelliget Trasportatio Systems $ - $ - $ - Itelliget Trasportatio System subtotal $ - $ - $ - 80% + 20% No- Bosto Regio $ - $ - $ - Bosto Regio $ - $ - $ - Bosto Regio $ - $ - $ - Bosto Regio $ - $ - $ - subtotal $ - $ - $ - Fudig Split Varies by Fudig Source Sectio 2C / State Prioritized Expasio s Bicycles ad Pedestrias Bicycles ad Pedestrias Bosto Regio Multiple ACTON- CONCORD- BRUCE FREEMAN RAIL TRAIL CONSTRUCTION, INCLUDES REPLACING BRIDGE C , RAIL TRAIL OVER NASHOBA BROOK, NEW BRIDGE C , RAIL TRAIL OVER ROUTE 2 & NEW CULVERT C , ROUTE 2 OVER WILDLIFE CROSSING (PHASE II-B) 4 CMAQ $ 9,196,638 $ 7,357,311 $ 1,839,328 Costructio / PSAC score 31.5 Bicycles ad Pedestrias Bicycles ad Pedestrias Bosto Regio BROOKLINE BROOKLINE- PEDESTRIAN BRIDGE REHABILITATION, B , OVER MBTA OFF CARLTON STREET 6 CMAQ $ 2,939,404 $ 2,351,523 $ 587,881 Bosto Regio Bicycles ad Pedestrias $ - $ - $ - Costructio / Cost $ $3,690,510 w/ additioal fudig from earmark at $751,106 Bicycles ad Pedestrias subtotal $ 12,136,042 $ 9,708,834 $ 2,427,208 80% + 20% No- Page 6 of 7

7 Fiscal Years (FFYs) -23 Trasportatio Improvemet (TIP) Edorsed May 24, 2018 DRAFT Amedmet Oe for Public Review Bosto Regio Trasportatio Improvemet Idicates a chage i project cost Idicates removed from TIP (cost ot reflected i total) Idicates a project moved i from aother TIP elemet Idicates a project moved out to aother TIP elemet (cost ot reflected i total) Idicates a ew additio to the TIP (actio take as deoted) Idicates a ew fudig category Amedmet / Adjustmet Type ID Metropolita Plaig Orgaizatio Muicipality Name Descriptio District Fudig Source med No- Additioal Iformatio Preset iformatio as follows, if applicable: a) Plaig / Desig / or Costructio; b) total project cost ad fudig sources used; c) advace costructio status; d) MPO project score; e) ame of etity receivig a trasfer; f) ame of etity payig the o-state o-federal match; g) earmark details; h) TAP project propoet; i) other iformatio Capacity Capacity Bosto Regio Capacity $ - $ - $ - Capacity Bosto Regio Capacity $ - $ - $ - Capacity subtotal $ - $ - $ - Fudig Split Varies by Fudig Source Sectio 3 / Plaig / Adjustmets / Pass-throughs Plaig / Adjustmets / Pass-throughs Plaig/Adju stmets/passthroughs BN0008 Bosto Regio Newburyport Parker River Natioal Wildlife Refuge - Replace Hellcat Trail Boardwalk 4 Other FA $ 1,200,000 $ 960,000 $ 240,000 Bosto Regio ABP GANS Repaymet Multiple $ - $ - $ - Bosto Regio ABP GANS Repaymet Multiple $ - $ - $ - Bosto Regio Award adjustmets, chage orders, etc. Multiple $ - $ - $ - Bosto Regio Award adjustmets, chage orders, etc. Multiple $ - $ - $ - Bosto Regio Award adjustmets, chage orders, etc. Multiple $ - $ - $ - Bosto Regio Metropolita Plaig Multiple $ - $ - $ - Bosto Regio Metropolita Plaig Multiple $ - $ - $ - Bosto Regio State Plaig ad Research Work I, (SPR I), Plaig Multiple $ - $ - $ - Bosto Regio State Plaig ad Research Work II, (SPR II), Research Multiple $ - $ - $ - Bosto Regio Railroad Crossigs Multiple $ - $ - $ - Bosto Regio Railroad Crossigs Multiple $ - $ - $ - Bosto Regio Recreatioal Trails Multiple $ - $ - $ - Other Statewide Items subtotal $ 1,200,000 $ 960,000 $ 240,000 Fudig Split Varies by Fudig Source Sectio 4 / No-ly Aided s No-ly Aided s No Aid No-ly Aided s Bosto Regio No- Aid $ - $ - Bosto Regio No- Aid $ - $ - No- Aid subtotal $ - $ - 100% No- Summary Fuds No- Fuds TIP Sectio 1-3: TIP Sectio 4: of All s $ 343,340,992 $ - $ 343,340,992 $ 278,302,942 $ 278,302,942 $ 65,038,050 $ - $ 65,038,050 Spedig i Regio Spedig i Regio No- Spedig i Regio 701 CMR 7.00 Use of Road Flaggers ad Police Details o Public Works s / 701 CMR 7.00 (the Regulatio) was promulgated ad became law o October 3, Uder this Regulatio, the CMR is applicable to ay Public works that is performed withi the limits of, or that impact traffic o, ay Public Road. The Muicipal Limitatio refereced i this Regulatio is applicable oly to projects where the Muicipality is the Awardig Authority. For all projects cotaied i the TIP, the Commowealth is the Awardig Authority. Therefore, all projects must be cosidered ad implemeted i accordace with 701 CMR 7.00, ad the Road Flagger ad Police Detail Guidelies. By placig a project o the TIP, the Muicipality ackowledges that 701 CMR 7.00 is applicable to its project ad desig ad costructio will be fully compliat with this Regulatio. This iformatio, ad additioal iformatio relative to guidace ad implemetatio of the Regulatio ca be foud at the followig lik o the Highway Divisio website: Page 7 of 7

Boston Region Transportation Improvement Program

Boston Region Transportation Improvement Program This is a complex table that has ot bee optimized for scree-readig software. If you would like to request this table i a alterative format, please cotact the Cetral Trasportatio Plaig Staff (CTPS) via

More information

Boston Region Transportation Improvement Program

Boston Region Transportation Improvement Program This is a complex table that has not been optimized for screen-reading software. If you would like to request this table in a alternative format, please contact the Central Transportation Planning Staff

More information

DRAFT FFYs Transportation Improvement Program (TIP)

DRAFT FFYs Transportation Improvement Program (TIP) 2019 Boston Region Transportation Improvement Program Metropolitan ID Planning Municipality Name District Funding Source Total Programmed Non- Present information as follows, if applicable: a) Planning

More information

2018 Boston Region Transportation Improvement Program Amendment / Adjustment Type

2018 Boston Region Transportation Improvement Program Amendment / Adjustment Type 2018 Boston Region Transportation Improvement Program Adjustment Type ID Planning Name Funding Present as follows, if applicable: a) Design / or ; b) total project cost and funding sources used; c) Section

More information

2018 Boston Region Transportation Improvement Program Amendment / Adjustment Type

2018 Boston Region Transportation Improvement Program Amendment / Adjustment Type 2018 Boston Region Transportation Improvement Program Metropolitan Municipality ID Planning Name Organization Funding Present as follows, if applicable: a) Design / or ; b) total project cost and funding

More information

2017 Boston Region MPO Transportation Improvement Program

2017 Boston Region MPO Transportation Improvement Program The file you have accessed is entitled Draft Amendment Four to the FFYs 2017 2021 Transportation Improvement Program (TIP) and contains a table list of projects. (This table is also known as the TIP tables.)

More information

2018 Boston Region Transportation Improvement Program

2018 Boston Region Transportation Improvement Program 2018 Boston Region Transportation Improvement Program Indicates a change in project cost Indicates removed from TIP (cost not reflected in total) Indicates a project moved in from another TIP element Indicates

More information

Funding Source. MassDOT Project Description ON DERBY STREET, FROM POND PARK ROAD TO CUSHING STREET

Funding Source. MassDOT Project Description ON DERBY STREET, FROM POND PARK ROAD TO CUSHING STREET 2017 Boston Region MPO Transportation Improvement Program Adjustment Type Project ID MPO Municipality Name Project Description Funding District Source Information Section 1A / Federal Aid Target Projects

More information

2017 Boston Region MPO Transportation Improvement Program

2017 Boston Region MPO Transportation Improvement Program 2017 Boston Region MPO Transportation Improvement Program Adjustment Type Project ID MPO Municipality Name Project Description Funding District Source Information Section 1A / Federal Aid Target Projects

More information

Boston Region MPO Transportation Improvement Program

Boston Region MPO Transportation Improvement Program The file you have accessed is entitled Draft Amendment Two to the FFYs 2017 21 Transportation Improvement Program and contains a table list of projects. (This table is also known as the TIP tables.) Contained

More information

2012 Boston MPO Transportation Improvement Program

2012 Boston MPO Transportation Improvement Program Non- Indicates a change in project cost Indicates removed from TIP (cost not reflected in total) Indicates a project moved in from another TIP element Indicates a project moved out to another TIP element

More information

2016 Boston Region MPO Transportation Improvement Program

2016 Boston Region MPO Transportation Improvement Program Adjustment Type Project ID Project Description Funding District Source Information Section 1A / Federal Aid Target Projects Indicates a change in project cost Indicates removed from TIP (cost not reflected

More information

Action on Amendment One to the FFYs TIP Page 1 of 33 Boston Region MPO Staff - 11/6/2014

Action on Amendment One to the FFYs TIP Page 1 of 33 Boston Region MPO Staff - 11/6/2014 2015 Boston Region MPO Transportation Improvement Program Adjustment Type Project ID Project Description Funding District Source Funds Funds Information Indicates a change in project cost Indicates removed

More information

2016 Boston Region MPO Transportation Improvement Program

2016 Boston Region MPO Transportation Improvement Program 2016 Boston Region MPO Transportation Improvement Program Funding Information Section 1A / Federal Aid Target s Indicates a change in project cost Indicates removed from TIP (cost not reflected in total)

More information

2016 Boston Region MPO Transportation Improvement Program

2016 Boston Region MPO Transportation Improvement Program 2016 Boston Region MPO Transportation Improvement Program Adjustment Type ID Description Funding District Source Information Section 1A / Federal Aid Target s Indicates a change in project cost Indicates

More information

2016 Boston Region MPO Transportation Improvement Program

2016 Boston Region MPO Transportation Improvement Program 2016 Boston Region MPO Transportation Improvement Program Funding Information Section 1A / Federal Aid Target s Indicates a change in project cost Indicates removed from TIP (cost not reflected in total)

More information

2016 Boston Region MPO Transportation Improvement Program

2016 Boston Region MPO Transportation Improvement Program 2016 Boston Region MPO Transportation Improvement Program Adjustment Type Project ID Project Description Funding District Source Information Section 1A / Federal Aid Target Projects Indicates a change

More information

2016 Boston Region MPO Transportation Improvement Program

2016 Boston Region MPO Transportation Improvement Program 2016 Boston Region MPO Transportation Improvement Program Adjustment Type Project ID Project Description Funding District Source Information Section 1A / Federal Aid Target Projects HSIP Highway Safety

More information

Pioneer Valley Transportation Improvement Program (TIP) Proposed Amendments January 2017

Pioneer Valley Transportation Improvement Program (TIP) Proposed Amendments January 2017 2017-2021 Pioneer Valley Transportation Improvement Program (TIP) Proposed Amendments January 2017 HIGHWAY AMENDMENTS FEDERAL FISCAL YEAR 2017 Part 1A: Federal Aid Target Projects Increase cost of (604033)

More information

2016 Boston Region MPO Transportation Improvement Program

2016 Boston Region MPO Transportation Improvement Program 2016 Boston Region MPO Transportation Improvement Program Funding Information Section 1A / Federal Aid Target Projects Indicates a change in project cost Indicates removed from TIP (cost not reflected

More information

Summary Narrative of Amendment 3 to the FFY Transportation Improvement Program for the Northern Middlesex Region

Summary Narrative of Amendment 3 to the FFY Transportation Improvement Program for the Northern Middlesex Region Summary Narrative of Amendment 3 to the FFY 2017 2021 Transportation Improvement Program for the Northern Middlesex Region The following summarizes a proposed amendment to Fiscal Year 2017 of the FFY 2017

More information

2012 Boston MPO Transportation Improvement Program

2012 Boston MPO Transportation Improvement Program 2012 Boston MPO Transportation Improvement Program MassDOT Funding District Source Programmed Non- Additional Information Section 1A / Aid Target Projects STP - Surface Transportation Program 604688 BELMONT-

More information

Potential Changes to the 2015 to 2018 TIP Highway List. Proposed Administrative Adjustment #3

Potential Changes to the 2015 to 2018 TIP Highway List. Proposed Administrative Adjustment #3 Potential Changes to the 2015 to 2018 TIP Highway List Proposed Administrative Adjustment # PROJECT #60644, WORCESTER CENTRAL BUSINESS DISTRICT STREETSCAPE IMPROVEMENTS Move the FY 2015 Statewide Transportation

More information

Funding Source. Total Programmed Funds 4 STP $ - $ - $ - 4 STP-AC $ 11,775,130 $ 9,420,104 $ 2,355,026 4 STP $ 8,836,648 $ 7,069,318 $ 1,767,330

Funding Source. Total Programmed Funds 4 STP $ - $ - $ - 4 STP-AC $ 11,775,130 $ 9,420,104 $ 2,355,026 4 STP $ 8,836,648 $ 7,069,318 $ 1,767,330 District Source Funds Funds Funds Information Indicates a change in project cost Indicates removed from TIP (cost not reflected in total) Indicates a project moved in from another TIP element Indicates

More information

Annual Listing of Obligated Projects Federal Fiscal Year 2013

Annual Listing of Obligated Projects Federal Fiscal Year 2013 Annual Listing of Obligated Projects Federal Fiscal Year 2013 Nashua Regional Planning Commission 9 Executive Park Drive Suite 201 Merrimack, NH 03054 (603) 424-2240 www.nashuarpc.org A N N U A L L I S

More information

NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY

NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY 2008-2011 Amendment Conformity Report for August 20, 2008 Amendments (Amendment # 2008-028 thru 2008-030) On August 20, 2008 the Executive Board

More information

BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION

BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION Amendment # 2 FY 2017-2020 Transportation Improvement Program Amendment Summary: The Transportation Improvement Program (TIP)

More information

Guide for. Plan Sponsors. Roth 401(k) get retirement right

Guide for. Plan Sponsors. Roth 401(k) get retirement right Uited of Omaha Life Isurace Compay Compaio Life Isurace Compay mutual of omaha retiremet services Roth 401(k) Guide for Pla Sposors MUGC8764_0210 get retiremet right roth 401(k) expads your optios Drive

More information

PENNSYLVANIA S 2017 TRANSPORTATION PROGRAM FINANCIAL GUIDANCE

PENNSYLVANIA S 2017 TRANSPORTATION PROGRAM FINANCIAL GUIDANCE November 20, 2015 Revised December 18, 2015 to reflect FAST Act PENNSYLVANIA S 2017 TRANSPORTATION PROGRAM FINANCIAL GUIDANCE This is a collaborative product jointly developed by the Pennsylvania Planning

More information

0.07. i PV Qa Q Q i n. Chapter 3, Section 2

0.07. i PV Qa Q Q i n. Chapter 3, Section 2 Chapter 3, Sectio 2 1. (S13HW) Calculate the preset value for a auity that pays 500 at the ed of each year for 20 years. You are give that the aual iterest rate is 7%. 20 1 v 1 1.07 PV Qa Q 500 5297.01

More information

STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION

STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION City of Staunton County of Augusta City of Waynesboro 112 MTANLY PLE STAUNTON, VIRGINIA 24401 PHONE (540) 885-5174 FAX (540) 885-2687 July

More information

Looking Ahead. Get Ready for NAF Open Enrollment November 4 29, News and Updates to Help You Prepare for Open Enrollment FSC

Looking Ahead. Get Ready for NAF Open Enrollment November 4 29, News and Updates to Help You Prepare for Open Enrollment FSC Att: FA-T (Beefits) PO Box 650428 Dallas, Texas 75265-0428 Get Ready for NAF Ope Erollmet November 4 29, 2013 FSC CCG DoDAAFES-0007-A (10/13) 2013 Aeta Ic. Lookig Ahead News ad Updates to Help You Prepare

More information

Transportation Improvement Program

Transportation Improvement Program Transportation Improvement Program Transportation Conformity Check List The Transportation Improvement Program (TIP) and all amendments must include a conformity report. The conformity report must address

More information

Supersedes: 1.3 This procedure assumes that the minimal conditions for applying ISO 3301:1975 have been met, but additional criteria can be used.

Supersedes: 1.3 This procedure assumes that the minimal conditions for applying ISO 3301:1975 have been met, but additional criteria can be used. Procedures Category: STATISTICAL METHODS Procedure: P-S-01 Page: 1 of 9 Paired Differece Experiet Procedure 1.0 Purpose 1.1 The purpose of this procedure is to provide istructios that ay be used for perforig

More information

T4032-MB, Payroll Deductions Tables CPP, EI, and income tax deductions Manitoba Effective January 1, 2016

T4032-MB, Payroll Deductions Tables CPP, EI, and income tax deductions Manitoba Effective January 1, 2016 T4032-MB, Payroll Deductios Tables CPP, EI, ad icome tax deductios Maitoba Effective Jauary 1, 2016 T4032-MB What s ew as of Jauary 1, 2016 The major chages made to this guide sice the last editio are

More information

Receipt Date. You must answer all questions in ink and the application must be signed and notarized, or it will be rejected.

Receipt Date. You must answer all questions in ink and the application must be signed and notarized, or it will be rejected. Office of the New York State Comptroller New York State ad Local Retiremet System Mail completed form to: NEW YORK STATE AND LOCAL RETIREMENT SYSTEM 110 STATE STREET - MAIL DROP 5-9 ALBANY NY 12244-0001

More information

Capital District Transportation Committee March 3, Amendments to the TIP

Capital District Transportation Committee March 3, Amendments to the TIP Capital District Transportation Committee March 3, 2017 Amendments to the 2016-21 TIP At its March 1, 2017 and March 2, 2017 meetings, CDTC made the following amendments to the Transportation Improvement

More information

Financial Analysis of Public- Private Partnership (PPP) Projects in Highways

Financial Analysis of Public- Private Partnership (PPP) Projects in Highways Trasport Forum ad Learig Week 2006 Workshop o HDM-4 Fiacial Aalysis of Public- Private Partership (PPP) Projects i Highways Cesar Queiroz Highway Advisor TUDTR World Bak, 24 March 2006 Presetatio Outlie

More information

T4032-ON, Payroll Deductions Tables CPP, EI, and income tax deductions Ontario Effective January 1, 2016

T4032-ON, Payroll Deductions Tables CPP, EI, and income tax deductions Ontario Effective January 1, 2016 T4032-ON, Payroll Deductios Tables CPP, EI, ad icome tax deductios Otario Effective Jauary 1, 2016 T4032-ON What s ew as of Jauary 1, 2016 The major chages made to this guide sice the last editio are outlied.

More information

Helping you reduce your family s tax burden

Helping you reduce your family s tax burden The RBC Do m i i o Se c u r i t i e s Family Trust Helpig you reduce your family s tax burde Professioal Wealth Maagemet Sice 1901 1 RBC Domiio Securities Charitable Gift Program Who should cosider a RBC

More information

WASATCH FRONT REGIONAL TRANSPORTATION PLAN FINANCIAL PLAN. Technical Report 47 May 2007 DAVIS MORGAN SALT LAKE TOOELE WEBER

WASATCH FRONT REGIONAL TRANSPORTATION PLAN FINANCIAL PLAN. Technical Report 47 May 2007 DAVIS MORGAN SALT LAKE TOOELE WEBER WASATCH FRONT REGIONAL TRANSPORTATION PLAN 2007-2030 FINANCIAL PLAN Technical Report 47 May 2007 DAVIS MORGAN SALT LAKE TOOELE WEBER 2030 RTP Financial Plan WASATCH FRONT REGIONAL TRANSPORTATION PLAN

More information

INVESTMENT STRATEGIES

INVESTMENT STRATEGIES 3 INVESTMENT STRATEGIES 70 INVESTMENT STRATEGIES 71 A key role of Mobilizing Tomorrow is to outline a strategy for how the region will invest in transportation infrastructure over the next 35 years. This

More information

10-Year Capital Highway Investment Plan DRAFT

10-Year Capital Highway Investment Plan DRAFT This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 10-Year Capital Highway

More information

Prioritization and Programming Process. NCDOT Division of Planning and Programming November 16, 2016

Prioritization and Programming Process. NCDOT Division of Planning and Programming November 16, 2016 Prioritization and Programming Process NCDOT Division of Planning and Programming November 16, 2016 Today s Roadmap 1. Planning and Programming Division Overview 2. Strategic Investments (STI) Law 3. Prioritization

More information

Financial Capacity Analysis

Financial Capacity Analysis FINANCIAL CAPACITY ANALYSIS Introduction Federal transportation planning rules require that metropolitan area transportation plans include a financial capacity analysis to demonstrate that the plan is

More information

Auburn Transit Triennial Performance Audit

Auburn Transit Triennial Performance Audit Aubur Trasit For Fiscal Years 2009/10 through 2011/12 Fial Report Prepared for the Placer Couty Trasportatio Plaig Agecy Prepared by AUBURN TRANSIT TRIENNIAL PERFORMANCE AUDIT For Fiscal Years 2009/10

More information

FFY 2009 OBLIGATED AND GRANTED PROJECTS LIST

FFY 2009 OBLIGATED AND GRANTED PROJECTS LIST Note: Yellow highlighted entries are bicycle and pedestrian facilities projects. CAPITOL 10 0400-0043 CON FTA SEC 5309RR RECOVERY & REINVESTMENT 10 0426-0049 ACQ FTA SEC 5307C CAPITAL 10 0426-0050 CON

More information

Wednesday, June 6, 2018

Wednesday, June 6, 2018 Wednesday, June 6, 2018 Excellence in Program Administration Award 2018 AASHTO Civil Rights Training Symposium Excellence in Program Administration Award Joanna McFadden EEO/DBE Section Head APRIL 2017-2018

More information

FEDERAL FISCAL YEAR TRANSPORTATION IMPROVEMENT PROGRAM

FEDERAL FISCAL YEAR TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL FISCAL YEAR 2019-2022 TRANSPORTATION IMPROVEMENT PROGRAM A regional program of surface transportation improvement projects to enhance the movement of goods and people along the greater Des Moines

More information

T4032-BC, Payroll Deductions Tables CPP, EI, and income tax deductions British Columbia Effective January 1, 2016

T4032-BC, Payroll Deductions Tables CPP, EI, and income tax deductions British Columbia Effective January 1, 2016 T4032-BC, Payroll Deductios Tables CPP, EI, ad icome tax deductios British Columbia Effective Jauary 1, 2016 T4032-BC What s ew as of Jauary 1, 2016 The major chages made to this guide, sice the last editio,

More information

Estimating and monitoring the costs of building roads in England

Estimating and monitoring the costs of building roads in England departmet for trasport Estimatig ad moitorig the costs of buildig roads i Eglad REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 321 Sessio 26-27 15 March 27 The Natioal Audit Office scrutiises public

More information

FEHB. Health Benefits Coverage for Noncareer Employees

FEHB. Health Benefits Coverage for Noncareer Employees FEHB Health Beefits Coverage for Nocareer Employees Notice 426 September 2005 The Federal Employees Health Beefits (FEHB) Program permits certai ocareer (temporary) employees to obtai health isurace, if

More information

TERMS OF REFERENCE. Project: Reviewing the Capital Adequacy Regulation

TERMS OF REFERENCE. Project: Reviewing the Capital Adequacy Regulation TERMS OF REFERENCE Project: Reviewig the Capital Adequacy Regulatio Project Ower: Project Maager: Deputy Project Maagers: Techical Achor (TAN): Mr. Idrit Bak, Bak of Albaia, Supervisio Departmet. Mrs.

More information

Additionally, the UPWP serves as a source for the following information:

Additionally, the UPWP serves as a source for the following information: Executive Summary ES.1 WHAT IS THE UPWP? The Unified Planning Work Program (UPWP) produced by the Boston Region Metropolitan Planning Organization (MPO) explains how the Boston region s federal transportation

More information

FY Work Funding Total Fed State Local

FY Work Funding Total Fed State Local NASHVILLE AREA MPO ADJUSTMENT to The Fiscal Years 20082011 Transportation Improvement Program Adjustment Number: 2010024 TIP Number: 2006201 FROM: TIP# 2006201 Jurisdiction: City of Murfreesboro Project:

More information

Claims. At a glance. Claims Contact Information. Coordination of Benefits Health Reserve Account Claims Making Oxford MyPlan sm Work for You

Claims. At a glance. Claims Contact Information. Coordination of Benefits Health Reserve Account Claims Making Oxford MyPlan sm Work for You At a glace Medical Claim Submissio Basics Usual, Customary ad Reasoable Allowaces Deductibles, Coisurace ad Out-of-Pocket Maximums Coordiatio of Beefits Health Reserve Accout Claims Makig Oxford MyPla

More information

Regional Equity Analysis Of Current Funding (Highway STIP and CIP) Project Selection Advisory (PSA) Council

Regional Equity Analysis Of Current Funding (Highway STIP and CIP) Project Selection Advisory (PSA) Council Regional Equity Analysis Of Current Funding (Highway STIP and CIP) Project Selection Advisory (PSA) Council TABLE OF CONTENTS 1 Introduction and Analysis Framework... 1-1 1.1 The Project Selection Advisory

More information

LONG-TERM FINANCIAL SUSTAINABILITY FRAMEWORK

LONG-TERM FINANCIAL SUSTAINABILITY FRAMEWORK LONG-TERM FINANCIAL SUSTAINABILITY FRAMEWORK Prepared by Corporate Fiace ad Corporate Plaig March 2018 Log-Term Fiacial Sustaiability Framework a CONTENTS b b Fiacial Services EXECUTIVE SUMMARY 1 LONG-TERM

More information

FEDERAL FISCAL YEARS TRANSPORTATION IMPROVEMENT PROGRAM REVISION #1 PRE-APPROVED ADMINISTRATIVE MODIFICATION.

FEDERAL FISCAL YEARS TRANSPORTATION IMPROVEMENT PROGRAM REVISION #1 PRE-APPROVED ADMINISTRATIVE MODIFICATION. FEDERAL FISCAL YEARS 2015-2018 TRANSPORTATION IMPROVEMENT PROGRAM REVISION #1 PRE-APPROVED ADMINISTRATIVE MODIFICATION January 2015 Oahu Metropolitan Planning Organization 707 Richards Street, Suite 200

More information

Bike/Pedestrian Facilities Stellar Trail St Joseph TAP (INDOT) RW $ 346,640 $ 86,660 $ 433,300

Bike/Pedestrian Facilities Stellar Trail St Joseph TAP (INDOT) RW $ 346,640 $ 86,660 $ 433,300 Match 2018 2019 2020 M08-19 Goshen 1900739 Added Travel Lanes College Ave from US 33 to NS Railroad Line (East Entrance of parking lot) STBG PE $ 300,000 $ 75,000 $ 375,000 Add Des to TIP M07-19 MACOG

More information

Internal Control Framework

Internal Control Framework Iteral Cotrol Framework NMASBO Boot Camp October 2017 Make up of participats Superitedets Aspirig Superitedets School Districts Charter Schools Former Coaches 1 Take Away Items A iteral cotrol system is

More information

SEC Adopts. Amendments. To The Advisers Act Custody Rule SECURITIES LAW ALERT MARCH 2010

SEC Adopts. Amendments. To The Advisers Act Custody Rule SECURITIES LAW ALERT MARCH 2010 MARCH 2010 SEC Adopts Amedmets To The Advisers Act Custody Rule The Securities Exchage Commissio ( SEC ) has adopted amedmets to Rule 206(4)-2 (the Custody Rule ) uder the Ivestmet Advisers Act of 1940

More information

When you click on Unit V in your course, you will see a TO DO LIST to assist you in starting your course.

When you click on Unit V in your course, you will see a TO DO LIST to assist you in starting your course. UNIT V STUDY GUIDE Percet Notatio Course Learig Outcomes for Uit V Upo completio of this uit, studets should be able to: 1. Write three kids of otatio for a percet. 2. Covert betwee percet otatio ad decimal

More information

Section 3.3 Exercises Part A Simplify the following. 1. (3m 2 ) 5 2. x 7 x 11

Section 3.3 Exercises Part A Simplify the following. 1. (3m 2 ) 5 2. x 7 x 11 123 Sectio 3.3 Exercises Part A Simplify the followig. 1. (3m 2 ) 5 2. x 7 x 11 3. f 12 4. t 8 t 5 f 5 5. 3-4 6. 3x 7 4x 7. 3z 5 12z 3 8. 17 0 9. (g 8 ) -2 10. 14d 3 21d 7 11. (2m 2 5 g 8 ) 7 12. 5x 2

More information

INVESTING STRATEGICALLY

INVESTING STRATEGICALLY 11 INVESTING STRATEGICALLY Federal transportation legislation (Fixing America s Surface Transportation Act FAST Act) requires that the 2040 RTP be based on a financial plan that demonstrates how the program

More information

NASHVILLE AREA MPO. ADJUSTMENT to The Fiscal Years Transportation Improvement Program. Adjustment Number: TIP Number:

NASHVILLE AREA MPO. ADJUSTMENT to The Fiscal Years Transportation Improvement Program. Adjustment Number: TIP Number: NASHVILLE AREA MPO ADJUSTMENT to The Fiscal Years 20082011 Transportation Improvement Program Adjustment Number: 2009019 TIP Number: 200852034 FROM: TIP# 200852034 Jurisdiction: Hendersonville Project:

More information

1031 Tax-Deferred Exchanges

1031 Tax-Deferred Exchanges 1031 Tax-Deferred Exchages About the Authors Arold M. Brow Seior Maagig Director, Head of 1031 Tax-Deferred Exchage Services, MB Fiacial Deferred Exchage Corporatio Arold M. Brow is the Seior Maagig Director

More information

Innovations and Emerging Practices in Local Government 2016 Survey Summary Report of Results

Innovations and Emerging Practices in Local Government 2016 Survey Summary Report of Results Iovatios ad Emergig Practices i Local Govermet 2016 Survey Summary Report of Results Itroductio The Iovatios ad Emergig Practices i Local Govermet 2016 Survey is part of a ogoig research partership betwee

More information

Terre Haute Seelyville West Terre Haute Vigo County. Brazil Harmony Knightsville Clay County

Terre Haute Seelyville West Terre Haute Vigo County. Brazil Harmony Knightsville Clay County TRANSPORTATION IMPROVEMENT PROGRAM Terre Haute Seelyville West Terre Haute Vigo County Brazil Harmony Knightsville Clay County SFY 2018 2021 Metropolitan Planning Organization West Central Indiana Economic

More information

This article is part of a series providing

This article is part of a series providing feature Bryce Millard ad Adrew Machi Characteristics of public sector workers SUMMARY This article presets aalysis of public sector employmet, ad makes comparisos with the private sector, usig data from

More information

APPLICATION FORM. Janus Henderson Investors. Valid from 30 May SECTION 1 About yourself

APPLICATION FORM. Janus Henderson Investors. Valid from 30 May SECTION 1 About yourself Jaus Hederso Ivestors APPLICATION FORM Valid from 30 May 2017 You should use this form if you wish to ivest i the Hederso Ivestmet Fuds Limited rage. Further iformatio is cotaied i the Prospectus, the

More information

Joplin Area Transportation Study Organization

Joplin Area Transportation Study Organization Joplin Area Transportation Study Organization 2018-2021 Transportation Improvement Program 602 SOUTH MAIN STREET JOPLIN, MISSOURI 64801 (417) 624-0820 CONTENTS INTRODUCTION... 3 AVIATION... 9 HIGHWAY...

More information

Individual Retirement Account (IRA)

Individual Retirement Account (IRA) Logleaf Parters Fuds Idividual Retiremet Accout (IRA) Simple IRA Cotets BNY Mello Ivestmet Servicig Trust Compay 2 SIMPLE Idividual Retiremet Accout (IRA) Disclosure Statemet 4 SIMPLE Idividual Retiremet

More information

Setting up records for customers and suppliers

Setting up records for customers and suppliers 3 Settig up records for customers ad suppliers this chapter covers... The term Customers meas people to whom a busiess sells o credit. I other words, the goods or services are supplied straightaway ad

More information

Chapter 4: Regional Transportation Finance

Chapter 4: Regional Transportation Finance 4.1 Chapter 4: Regional Transportation Finance 2040 4.2 CONTENTS Chapter 4: Transportation Finance Overview 4.3 Two Funding Scenarios 4.4 Current Revenue Scenario Assumptions 4.5 State Highway Revenues

More information

CAPITAL PROJECT SCREENING AND SELECTION

CAPITAL PROJECT SCREENING AND SELECTION CAPITAL PROJECT SCREEIG AD SELECTIO Before studyig the three measures of ivestmet attractiveess, we will review a simple method that is commoly used to scree capital ivestmets. Oe of the primary cocers

More information

Summary of Benefits RRD

Summary of Benefits RRD Summary of Beefits RRD All Eligible Employees Basic Term Life, Optioal Term Life, Optioal Depedet Term Life ad Optioal Accidetal Death & Dismembermet Issued by The Prudetial Isurace Compay of America Effective:

More information

MEMORANDUM. Requested Action Provide comments and questions to staff regarding the proposed TIP projects funding scenario.

MEMORANDUM. Requested Action Provide comments and questions to staff regarding the proposed TIP projects funding scenario. MEMORANDUM To: MPO Technical and Citizens Advisory Committees From: Joshua Desmond, AICP BMCMPO Director Date: March 15, 2017 Re: FY 20182021 TIP s Proposal The MPO is developing the s 2018 through 2021

More information

A New Approach to Obtain an Optimal Solution for the Assignment Problem

A New Approach to Obtain an Optimal Solution for the Assignment Problem Iteratioal Joural of Sciece ad Research (IJSR) ISSN (Olie): 231-7064 Idex Copericus Value (2013): 6.14 Impact Factor (2015): 6.31 A New Approach to Obtai a Optimal Solutio for the Assigmet Problem A. Seethalakshmy

More information

Summary of Benefits. Management Consulting & Research, LLC

Summary of Benefits. Management Consulting & Research, LLC Summary of Beefits Maagemet Cosultig & Research, LLC All MCR Full Time Employees ad all other Full Time Employees Basic Term Life, Basic Accidetal Death & Dismembermet, Optioal Term Life, Optioal Depedet

More information

KEY INFORMATION DOCUMENT CFD s Generic

KEY INFORMATION DOCUMENT CFD s Generic KEY INFORMATION DOCUMENT CFD s Geeric KEY INFORMATION DOCUMENT - CFDs Geeric Purpose This documet provides you with key iformatio about this ivestmet product. It is ot marketig material ad it does ot costitute

More information

We learned: $100 cash today is preferred over $100 a year from now

We learned: $100 cash today is preferred over $100 a year from now Recap from Last Week Time Value of Moey We leared: $ cash today is preferred over $ a year from ow there is time value of moey i the form of willigess of baks, busiesses, ad people to pay iterest for its

More information

2008 UTILITIES STP 2,200,000 1,760, , CONST ES 11,200,000 11,200,000. FY Work Funding Total Fed State Local

2008 UTILITIES STP 2,200,000 1,760, , CONST ES 11,200,000 11,200,000. FY Work Funding Total Fed State Local NASHVILLE AREA MPO ADJUSTMENT to The Fiscal Years 20082011 Adjustment Number: 2009022 TIP Number: 2004068a FROM: TIP# 2004068a Agency/Jurisdiction: TDOT / Mt. Juliet Project: SR171 / Mt. Juliet Road Termini:

More information

Project Programmed / budgeted in pool. Project's funds have been rolled forward TOTAL FY HIGHWAYS BRIDGE - ON STATE SYSTEM.

Project Programmed / budgeted in pool. Project's funds have been rolled forward TOTAL FY HIGHWAYS BRIDGE - ON STATE SYSTEM. Transportation Improvement FY 2016 - FY 2019 med / budgeted in pool 's funds have been rolled forward Description/Location HIGHWAYS BRIDGE - ON STATE SYSTEM Revised Entry Increased Funding & Lists s SR46598

More information

Project Programmed / budgeted in pool. Project's funds have been rolled forward. Project Sponsor TOTAL FY HIGHWAYS BRIDGE - ON STATE SYSTEM

Project Programmed / budgeted in pool. Project's funds have been rolled forward. Project Sponsor TOTAL FY HIGHWAYS BRIDGE - ON STATE SYSTEM Transportation Improvement FY 2016 - FY 2019 med / budgeted in pool 's funds have been rolled forward Description/Location HIGHWAYS BRIDGE - ON STATE SYSTEM SR46598 Region 4 Bridge - On System Pool CDOT

More information

Collections & Recoveries policy

Collections & Recoveries policy Collectios & Recoveries policy The purpose of this policy is to set out the actio Ledy takes to ecourage borrowers to repay their loas withi term. This policy also serves to set out the actio Ledy takes

More information

. (The calculated sample mean is symbolized by x.)

. (The calculated sample mean is symbolized by x.) Stat 40, sectio 5.4 The Cetral Limit Theorem otes by Tim Pilachowski If you have t doe it yet, go to the Stat 40 page ad dowload the hadout 5.4 supplemet Cetral Limit Theorem. The homework (both practice

More information

Programed Totals $39,761 $35,676 $75,437 $73,111 $2,326 $0 $17,109 $17,109 $17,109 $0 $0 $14,580 $14,580 $14,580 $0

Programed Totals $39,761 $35,676 $75,437 $73,111 $2,326 $0 $17,109 $17,109 $17,109 $0 $0 $14,580 $14,580 $14,580 $0 WCOG Managed WHATCOM COUNCIL OF GOVERNMENTS 2014 Transportation Improvement Program Amendment #1 (1401) MPO Financial Feasibility Summary Anticipated Federal Funding* & Programmed Expenditures (in Thousands)

More information

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2019-2023 SARASOTA COUNTY FLORIDA DEPARTMENT OF TRANSPORTATION - DISTRICT ONE MISSION STATEMENT The Department will provide a safe, interconnected statewide

More information

Accelerated Access Solution. Chronic Illness Protection Rider. Access your death benefits while living.

Accelerated Access Solution. Chronic Illness Protection Rider. Access your death benefits while living. Chroic Illess Protectio Rider Access your death beefits while livig. Accelerated Access Solutio Optioal Livig Beefit Rider for Secure Lifetime GUL 3; Value+ Protector ; Max Accumulator+ Policies issued

More information

TRANSPORTATION IMPROVEMENT PROGRAM REVISION 19 F E D E R A L F I S C A L Y E A R S Expedited Administrative Modifications

TRANSPORTATION IMPROVEMENT PROGRAM REVISION 19 F E D E R A L F I S C A L Y E A R S Expedited Administrative Modifications TRANSPORTATION IMPROVEMENT PROGRAM F E D E R A L F I S C A L Y E A R S 2 0 1 5 2 0 1 8 REVISION 19 Expedited Administrative Modifications TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL FISCAL YEARS 2015-2018

More information

OHIO MPO AND LARGE CITY CAPITAL PROGRAM SFY 2015 SUMMARY

OHIO MPO AND LARGE CITY CAPITAL PROGRAM SFY 2015 SUMMARY OHIO MPO AND LARGE CITY CAPITAL PROGRAM SFY 2015 SUMMARY TABLE OF CONTENTS MPO AND LARGE CITY PROGRAM OVERVIEW.. 3 MPO AND LARGE CITY SFY 2015 STP BUDGET SUMMARY......... 4 MPO AND LARGE CITY SFY 2015

More information

living well in retirement Adjusting Your Annuity Income Your Payment Flexibilities

living well in retirement Adjusting Your Annuity Income Your Payment Flexibilities livig well i retiremet Adjustig Your Auity Icome Your Paymet Flexibilities what s iside 2 TIAA Traditioal auity Icome 4 TIAA ad CREF Variable Auity Icome 7 Choices for Adjustig Your Auity Icome 7 Auity

More information

PX Index Manual (1) M(0) = CZK 379,786,853,620.0 is the market capitalisation of the base on the starting date of 5 April 1994

PX Index Manual (1) M(0) = CZK 379,786,853,620.0 is the market capitalisation of the base on the starting date of 5 April 1994 PX Idex aual I. Itroductio The PX idex is the official idex of the Prague Stock Exchage (hereiafter referred to as the Stock Exchage ). The PX idex was calculated for the first time o 20 arch 2006 whe

More information

Osborne Books Update. Financial Statements of Limited Companies Tutorial

Osborne Books Update. Financial Statements of Limited Companies Tutorial Osbore Books Update Fiacial Statemets of Limited Compaies Tutorial Website update otes September 2018 2 f i a c i a l s t a t e m e t s o f l i m i t e d c o m p a i e s I N T R O D U C T I O N The followig

More information

FEDERAL FISCAL YEAR TRANSPORTATION IMPROVEMENT PROGRAM

FEDERAL FISCAL YEAR TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL FISCAL YEAR 2016 2019 TRANSPORTATION IMPROVEMENT PROGRAM A regional program of surface transportation improvement projects to enhance the movement of goods and people along the greater Des Moines

More information

Ozarks Transportation Organization Transportation Improvement Program Amendment 4

Ozarks Transportation Organization Transportation Improvement Program Amendment 4 FR125 Ozarks Transportation Organization 2014-2017 Transportation Improvement Program Amendment 4 SHUU FARMER EN1401 2014 JACKSON WILLARD FR84 FR129 SHO SH13 FR141 HUNT TIP Project Road FR94 County Line

More information

Driver s. 1st Gear: Determine your asset allocation strategy.

Driver s. 1st Gear: Determine your asset allocation strategy. Delaware North 401(k) PLAN The Driver s Guide The fial step o your road to erollig i the Delaware North 401(k) Pla. At this poit, you re ready to take the wheel ad set your 401(k) i motio. Now all that

More information

SKATS FY 2018-FY 2023

SKATS FY 2018-FY 2023 SKATS FY 2018-FY 2023 Metropolitan Transportation Improvement Program and Air Quality Conformity Determination PUBLIC REVIEW Salem-Keizer Area Transportation Study Cover Photos Top left: 45th Avenue NE

More information