NEW INDOT Projects & Project Phases

Size: px
Start display at page:

Download "NEW INDOT Projects & Project Phases"

Transcription

1 Transportation Improvmnt Program for Lak, Portr, and LaPort Countis, Indiana Amndmnt #7 Dcmbr 2015 NEW INDOT Projcts & Projct Phass Fdral s DES Sponsor Projct s Phas Yar Total Fdral Fdral INDOT I 80 Bridg Dck Ovrlay, Bridg on Knndy Av ovr I80, 0.97 mi E of US 41 IM CE 2016 $ 200,000 $ 180,000 $ 20,000 Locatd in City of Hammond (Lak ). Cost to Complt: $1,276, INDOT SR 912 Bridg Dck Ovrlay, 0.83 mi W of US 12 (Marina Accss RD) Locatd in City of East (Aldis St to SR 912). Cost to Complt: $655, INDOT US 12 HMA Ovrlay (PM), From SR 912 E Jct to US 12/20 mrg at Bridg St. Lngth: 7.09 mils. Locatd in City of Gary. Cost to Complt: $2,050, INDOT US 41 HMA Ovrlay (PM), From Main St to Ridg Rd Lngth: 2.5 mils. Locatd in Town of Highland. Cost to Complt: $2,050,000. Intrstat Intrstat Intrstat CE 2016 $ 300,000 $ 240,000 $ 60,000 CE 2016 $ 200,000 $ 160,000 $ 40,000 CE 2016 $ 165,000 $ 132,000 $ 33, INDOT I-94 Intrchang Modification: EB I-94 to EB US 20/35 Ramp Rconstruction IM CE 2017 $ 700,000 $ 630,000 $ 70,000 Locatd in unincorporatd LaPort. Cost to Complt: $1,662,000.

2 NEW INDOT Projcts & Projct Phass Fdral s DES Sponsor Projct s Phas Yar Total Fdral Fdral I-80/94 HMA Ovrlay, INDOT Prvntiv Maintnanc: I-80 & Clay St Ramps E to Toll Road Ramps IM CE 2017 $ 220,000 $ 198,000 $ 22,000 Lngth: 2.1 mils. Locatd in Citis of Gary and Lak Station. Cost to Complt: $3,526,000. I-65 HMA Ovrlay, I-80/ INDOT IM CE 2017 $ 150,000 $ 135,000 $ 15,000 N to US12/20 Lngth: 1.4 mils. Locatd in City of Gary. Cost to Complt: $1,661, INDOT US 6 Bridg Rhabilitation Or Rpair: Bridg ovr CSX Railroad, 1.92 mils E of SR 49, (Supr Structur Rplacmnt) Locatd in unincorporatd Portr. Cost to Complt: $2,376,000. Intrstat CE 2017 $ 160,000 $ 128,000 $ 32, INDOT I 94 Road Rconstruction (3R/4R Standards): From 0.85 mils East of Salt Crk to.02 mils East of Chstrton Corporat Lin. IM CE 2017 $ 4,000,000 $ 3,600,000 $ 400,000 Lngth: 7.14 mils. Locatd in th Towns of Portr & Chstrton & unincorporatd Portr. Cost to Complt: $36,200, INDOT US 30 Intrsction Improvmnts: at Rhod Island Av., 0.4 Mils W of I-65 Locatd in Town of Mrrillvill. Cost to Complt: $750,000. Intrstat CE 2017 $ 130,000 $ 104,000 $ 26, INDOT US 20 Bridg Dck Rplacmnt: Ovr AMTRAK & Chandlr Rd, 0.88 Mils E of SR 520 Locatd in Town of Pins (Portr ). Cost to Complt: $3,100,000. Intrstat CE 2017 $ 165,000 $ 132,000 $ 33,000

3 NEW INDOT Projcts & Projct Phass Fdral s DES Sponsor Projct s Phas Yar Total Fdral Fdral INDOT US 12 Bridg Maintnanc & Rpair: Ovr Trail Crk, 0.21 Mils E of US 35 (N of Blu Chip Casino) Locatd in City of Michigan City. Cost to Complt: $2,400,000. Intrstat CE 2017 $ 240,000 $ 192,000 $ 48,000 I-94 Pip Lining: Locatd INDOT IM RW 2017 $ 25,000 $ 22,500 $ 2,500 Mils E of US 421 Locatd in unincorporatd LaPort. Cost to Complt: $332, INDOT I-94/I-65 Wigh Station Constr./Rconstr.: Rconstruct Scal Pit Walls (3) IM CN 2018 $ 750,000 $ 675,000 $ 75,000 Locatd in unincorporatd Lak (1) & Portr (2) Countis. Cost to Complt: $332, INDOT I-80/94 HMA Ovrlay, Prvntiv Maintnanc: US 30 to 93rd Av Locatd in Mrrillvill. Cost to Complt: $1,520,000. Intrstat PE 2016 $ 20,000 $ 16,000 $ 4,000

4 Transportation Improvmnt Program for Lak, Portr, and LaPort Countis, Indiana Amndmnt #8 Dcmbr 2015 DES Sponsor Projct Michigan City Urbanizd Ara & Urban LaPort Changs LaPort Supplmntal Local Bridg Inspctions Stat STP PE 2016 $ 7,400 $ 5,920 $ 1, Michigan City Singing Sands Trail P2. From Franklin St to E Strt. Changs mad administrativly wr not accptd by INDOT. Rstatmnt of s Programmd pr INDOT Rqust Mich City FHWA (Mich City) CN 2016 $ 652,220 $ 521,776 $ 130,444 CN 2017 $ 31,250 $ 25,000 $ 6,250 STP II CN 2018 $ 1,605,578 $ 1,284,462 $ 321, LaPort (City) Dvlop Pavmnt Managmnt Invntory & Plan Rstatmnt of s Programmd pr INDOT Rqust STP II PE 2016 $ 180,000 $ 144,000 $ 36,000 Chang mad administrativly was not accptd by INDOT LaPort Johnson Rd Intrsction Improvmnts at LaPort Road 400 North. Typ STP II RW 2016 $ 145,599 $ 116,479 $ 29,120 Mich City RW 2016 $ 118,701 $ 94,961 $ 23,740 Cost to Complt: $1,514,300.

5 LaPort Construct Lincoln Trail in/nar Wstvill Locatd in unincorporatd LaPort & in Town of Wstvill. Typ (LaPort) RW 2016 $ 75,000 $ 60,000 $ 15,000 CN 2017 $ 399,996 $ 319,997 $ 79, LaPort Marqutt Grnway (Singing Sands) Iintrstat Connctor Trail. Mr Rd to IN/MI Lin Typ FHWA (Mich City) Mich City PE 2016 $ 39,259 $ 31,407 $ 7,852 PE 2016 $ 68,040 $ 54,432 $ 13,608 Lngth: 1.03 mils. Locatd in unincorporatd LaPort. Cost to Complt: $1,064, LaPort Marqutt Grnway (Singing Sands) Iintrstat Connctor Trail. Mr Rd to IN/MI Lin. Projct ltting rschduld to 2020 (outsid of TIP). Eliminat s. Dlt Phas STP II CN 2018 $ 956,748 $ 765,398 $ 191, LaPort Franklin Strt Drawbridg Assssmnt & Plan Typ STP II PE 2016 $ 460,741 $ 368,593 $ 92,148 Mich City PE 2016 $ 39,259 $ 31,407 $ 7,852 Locatd in Michigan City LaPort Planning Corridor Study LaPort Economic Dvlopmnt Corridor Projct Phas I Typ Mich City PE 2016 $ 297,500 $ 238,000 $ 59,500 LaPort Johnson Rd Intrsction Dlt Phas STP II CN 2016 $ 576,500 $ 464,000 $ 112,500 Improvmnts at Pahs Rd Projct to b constructd with local funds. No fdral funds usd for PE & RW. Urbanizd Ara & Urban Lak/Portr Changs

6 Fdral s DES Sponsor Projct s Phas Yar Total Fdral Fdral Cdar Lak Clin Av Intrsction Improvmnts at Lak Shor Driv. Cost to Complt: $1,725,000. Typ RW 2016 $ 125,000 $ 100,000 $ 25, Chstrton Construct Wstchstr Librty Trail from ast boundary lin of 1650 W 1100 N to 5th St Typ FHWA CN 2017 $ 1,123,813 $ 899,050 $ 224, Crown Point 93rd Av Intrsction Imp at Chas St. Projct lt July No Purchas Ordrs issud. Typ STP I CN 2016 $ 1,689,253 $ 1,351,402 $ 337,851 CN 2016 $ 436,900 $ 349,520 $ 87, Crown Point 93rd Av Intrsction Imp at Chas St. Chang Yar (RW) & Fdral Typ (CN) STP I RW 2017 $ 250,000 $ 200,000 $ 50,000 STP I CN 2018 $ 1,370,519 $ 1,096,415 $ 274,104 Post-Ltting Adjustmnt Mrrillvill Rd Intrsction Crown Point Improvmnt at Summit St. Eligibility Dtrmination 09/21/2011. Typ CN 2016 $ 1,057,762 $ 846,209 $ 211, Crown Point 125th Av Safty Improvmnts: Court St to SR 55. Incras Award/Chang Ltting Yar CN 2019 $ 1,558,940 $ 1,403,046 $ 155, Crown Point Courthous Squar Intrsction & Pdstrian Crossing Upgrads Incras Award PE 2016 $ 80,000 $ 72,000 $ 8,000

7 Cost to Complt: $592, Gary 15th Av Intrsction Improvmnts at MLK Dr (includs rail crossing) Chang Yar STP 1 RW 2019 $ 200,000 $ 160,000 $ 40, Gary 15th Av Intrsction Improvmnts at MLK Dr (includs rail crossing) Projct ltting rschduld to 2020 (outsid of TIP). Dlt Phas STP I CN 2018 $ 896,000 $ 716,800 $ 179, Griffith Construct Oak Savannah Trail from Oak Ridg Prairi to Eri-Lackawanna Trail Dcras Award RW 2017 $ 80,000 $ 64,000 $ 16,000 CN 2017 $ 460,956 $ 368,765 $ 92, Griffith Cost to Complt: $923,120. Town-wid Warning & Rgulatory Sign Rplacmnt Incras Award Dlt Phas PE 2016 $ 60,000 $ 54,000 $ 6,000 PE 2017 $ 200,000 $ 8,000 $ 192, Griffith Cost to Complt: $196,375. Eri-Lackawanna Trail Crossing Improvmnts at Main St (Flashing Bacon) Incras Award PE 2016 $ 75,000 $ 67,500 $ 7, Hammond Rconstruct rlinquishd SR 312 from IN/IL Stat Lin to Marbl St. Cost to Complt: $11,750,000. Locatd in Hammond. Lngth: 1.0 mils. STP I RW 2016 $ 250,000 $ 200,000 $ 50, Hammond St Phas II Add Phas STP I RW 2016 $ 250,000 $ 200,000 $ 50,000 Cost to Complt: $8,362,750.

8 Hammond Construct Bik/Pd Bridg ovr Calumt Avnu (US 41) at Conky St. Chang Yar CN 2019 $ 5,268,000 $ 2,000,000 $ 3,268,000 Locatd in Hammond. Lngth: 0.1 mils. Advanc Claring (IN/IL Stat Hammond Lin to US 41) Locatd in Hammond. Lngth: 1.1 mils. Chang Yar STP I CN 2017 $ 990,792 $ 792,634 $ 198, Highland Eri-Lackawanna Trail Crossing Improvmnts at 45th Av (HAWK Pdstrian Crossing Systm) Incras Award PE 2016 $ 42,500 $ 38,250 $ 4,250 Cost to Complt: $187, Hobart Downtown Strtscaping along Third Strt from Main Strt to Cntr Strt. Incras Award STP I RW 2016 $ 223,600 $ 178,880 $ 44,720 Cost to Complt: $4,374, Hobart Lngth: 1.0 mils. Lin Rd from US 6 to Clvland Av. Cost to Complt: $5,712,750. RW 2019 $ 250,000 $ 200,000 $ 50, Hobart Colorado St Safty Improvmnts (North & South of US 30) 2015 PO: $180,000. Contract: $391,190 Cost to Complt: $1,202,690. Add Phas/Incras Award PE 2016 $ 191,190 $ 172,071 $ 19,119

9 Hobart Town-wid Warning & Rgulatory Sign Rplacmnt (Supplmntal PE) Contract: $29,000. Original PO: $18,900 Incras Award PE 2016 $ 80,000 $ 72,000 $ 8,000 Cost to Complt: $473, Hobart Lak Dp Rivr Stormwatr Outfall and BMP. 45th Av Intrsction Improvmnts at Colfax St. DES Corrction/ Chang Yar Chang Yar/ Typ PE 2017 $ 45,000 $ 36,000 $ 9,000 CN 2019 $ 308,100 $ 246,480 $ 61,620 STP I CN 2019 $ 527,880 $ 422,304 $ 105, Lak Station Intrsction Improvmnts: Cntral Fairviw (Roundabout) Chang Yar STP I PE 2018 $ 747,200 $ 225,000 $ 522,200 Chang Yar STP I CN 2019 $ 2,320,000 $ 2,088,000 $ 232, Mrrillvill Construct C&O Trail Phas 2 from SR 53 at 173rd Av, bnath I-65, to Mississippi St north of US 30 CN 2016 $ 1,024,050 $ 819,240 $ 204, Munstr Rconstruction of 45th St from 0.2 mi E of Calumt Av (ATL) STP I CN 2017 $ 3,917,488 $ 2,619,356 $ 1,298,132 CN 2017 $ 8,725,805 $ 6,980,644 $ 1,745,161 No Chang STP III CN 2017 $ 16,050,000 $ 9,000,000 $ 7,050,000

10 Munstr Bik/Pd Trail Connctor: Eri- Lackawanna & Pnnsy Grnway Trails at Cady Ditch and Marsh Ditch Chang Yar CN 2019 $ 980,100 $ 784,080 $ 196, NIRPC Production of Guid for Standardizd Trail Signag Incras Award STP I PL 2016 $ 12,000 $ 9,600 $ 2, Portag Construct Iron Hors Hritag Trail, Hamstrom Rd to Portr Av Chang Typ/Yar CN 2017 $ 205,850 $ 164,680 $ 41, Portag Willowcrk Rd Intrsction Improvmnts at Cntral Av. CN 2017 $ 1,362,200 $ 1,089,760 $ 272, Portag Cntral Av Rconstruction ( Lin Rd to Willowcrk Rd) Chang Typ/Yar STP I RW 2018 $ 750,000 $ 200,000 $ 550,000 CN 2019 $ 2,600,000 $ 2,080,000 $ 520, Portag Construct Marqutt Grnway along Amriplx Driv from SR 249 ast to Salt Crk. Lngth: 2.1 mils. Cost to Complt: $1,997,950. Chang Yar/ Typ/Award PE 2016 $ 250,000 $ 200,000 $ 50, Portr Lngth: 1.4 mils. Calumt Trail Rhab, P1 & P2 (from Minral Springs Rd to SR 49) Chang Yar CN 2019 $ 2,000,000 $ 1,600,000 $ 400, Portr Intrsction Improvmnt, CN 2016 $ 722,554 $ 650,299 $ 72,255

11 Portr Division and Smok Road INDOT CN 2016 $ 667,129 $ 600,416 $ 66, Schrrvill Lngth: 1.5 mils. Pnnsy Grnway P2. Main St to 137th Av. CN 2018 $ 483,753 $ 387,002 $ 96,751 STP I CN 2018 $ 1,000,000 $ 800,000 $ 200, Valparaiso Calumt Av Intrsction Imp at Burlington Bach Rd. Includs Bik/Pd Trail from Calumt Av to Silhavy Rd. CN 2016 $ 1,840,000 $ 1,472,000 $ 368, Valparaiso Burlington Bach Rd. Intrsction SR 49. CN 2016 $ 736,000 $ 588,000 $ 148, Valparaiso Silhavy Rd from LaPort Av to Evans Av. No Addd Travl Lans. STP I CN 2018 $ 4,448,451 $ 3,558,760 $ 889,691

12 Val Park Pathway from currnt W trminus of Val Valparaiso Park Rd (Valparaiso) to E trminus of Val Park Rd (uninc Portr ). Eligibility Dtrmination 09/21/2011. Add Phas RW 2016 $ 346,460 $ 277,168 $ 69,292 CN 2016 $ 1,025,980 $ 820,784 $ 205, Valparaiso Silhavy Rd Roundabout at LaPort Av Chang Typ/Rduc Award RW 2016 $ 278,540 $ 222,832 $ 55, Valparaiso Eldr/ADA Traffic Signal Modifications. City-wid Post-Ltting Award Adjustmnt CN 2016 $ 378,888 $ 303,110 $ 75, Valparaiso From Burlington Bach Rd to Bullsy Lak Rd. Construct Turn Lans and Bik Path STP I CN 2017 $ 1,478,278 $ 1,182,622 $ 295, Mrrillvill Multi-LPA Signal Pr-mption Projct Add nw Phass PE 2016 $ 219,400 $ 197,460 $ 21,940 CN 2019 $ 1,725,140 $ 1,552,626 $ 172, Portr (Town) Sign Invntory & Upgrad Add nw Phass Schrrvill Sign Invntory & Upgrad Add nw Phass Lowll Sign Invntory & Upgrad Add nw Phass PE 2016 $ 60,000 $ 54,000 $ 6,000 CN 2017 $ 40,000 $ 36,000 $ 4,000 PE 2016 $ 74,309 $ 26,880 $ 47,429 CN 2017 $ 432,300 $ 100,000 $ 332,300 PE 2016 $ 40,000 $ 36,000 $ 4,000 CN 2017 $ 60,000 $ 54,000 $ 6, Portag Cntral Av Intrsction Improvmnts at Lin Rd Add Phas RW 2016 $ 62,698 $ 56,428 $ 6,270

13 Lowll SR 2 Sidwalks from Frmont to Burr St. (Curb & Sidwalks). Add Phas STP III PE 2016 $ 60,700 $ 48,560 $ 12, East Aldis Av Roundabout Chang Yar FHWA STP (Stat) CN 2017 $ 3,000,000 $ 2,000,000 $ 1,000,000

Michigan City Urbanized Area & Non-Urban LaPorte County Changes

Michigan City Urbanized Area & Non-Urban LaPorte County Changes 2016-2019 Transportation Improvement Program for Lake, Porter, and Counties, Indiana Amendment #8 December 2015 Michigan City Urbanized Area & Non-Urban Changes 1297092 Supplemental Local Bridge Inspections

More information

Bike/Pedestrian Facilities Stellar Trail St Joseph TAP (INDOT) RW $ 346,640 $ 86,660 $ 433,300

Bike/Pedestrian Facilities Stellar Trail St Joseph TAP (INDOT) RW $ 346,640 $ 86,660 $ 433,300 Match 2018 2019 2020 M08-19 Goshen 1900739 Added Travel Lanes College Ave from US 33 to NS Railroad Line (East Entrance of parking lot) STBG PE $ 300,000 $ 75,000 $ 375,000 Add Des to TIP M07-19 MACOG

More information

INCREASING. APPROPRIATIONS AND DECREASING OTHER APPROPRIATIONS IN THE HIGHLANDS PAR FACILITIES FUND NO. 390;

INCREASING. APPROPRIATIONS AND DECREASING OTHER APPROPRIATIONS IN THE HIGHLANDS PAR FACILITIES FUND NO. 390; - ORDINANCE NO. 2540 AN ORDINANCE OF THE CITY OF ISSAQUAH, WASHINGTON, AMENDING THE 2008 BUDGET ADOPTED BY ORDINANCE NO. 2512 BY INCREASING APPROPRIATIONS AND DECREASING ENDING FUND BALANCE IN THE GENERAL

More information

STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION

STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION City of Staunton County of Augusta City of Waynesboro 112 MTANLY PLE STAUNTON, VIRGINIA 24401 PHONE (540) 885-5174 FAX (540) 885-2687 July

More information

BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION

BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION Amendment # 2 FY 2017-2020 Transportation Improvement Program Amendment Summary: The Transportation Improvement Program (TIP)

More information

MEMORANDUM. Requested Action Provide comments and questions to staff regarding the proposed TIP projects funding scenario.

MEMORANDUM. Requested Action Provide comments and questions to staff regarding the proposed TIP projects funding scenario. MEMORANDUM To: MPO Technical and Citizens Advisory Committees From: Joshua Desmond, AICP BMCMPO Director Date: March 15, 2017 Re: FY 20182021 TIP s Proposal The MPO is developing the s 2018 through 2021

More information

BHJTS TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL, STATE & LOCAL PROJECTS 2016 THROUGH 2019 FOUR-YEAR SHORT RANGE PROGRAM

BHJTS TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL, STATE & LOCAL PROJECTS 2016 THROUGH 2019 FOUR-YEAR SHORT RANGE PROGRAM TOTAL PROJECT ESTIMATE ($) STATE ALLOCATION CODE (SAC) FUND TYPE ENCUMBERED FROM BEFORE FY 2011 PE/RW PRIOR TO FY 2016 LOCAL MATCH LOCAL LABOR STATE LABOR FED LABOR & TSKF LINE ITEM # ST. LINE ITEM

More information

Programed Totals $39,761 $35,676 $75,437 $73,111 $2,326 $0 $17,109 $17,109 $17,109 $0 $0 $14,580 $14,580 $14,580 $0

Programed Totals $39,761 $35,676 $75,437 $73,111 $2,326 $0 $17,109 $17,109 $17,109 $0 $0 $14,580 $14,580 $14,580 $0 WCOG Managed WHATCOM COUNCIL OF GOVERNMENTS 2014 Transportation Improvement Program Amendment #1 (1401) MPO Financial Feasibility Summary Anticipated Federal Funding* & Programmed Expenditures (in Thousands)

More information

Transportation Improvement Program

Transportation Improvement Program Transportation Improvement Program Transportation Conformity Check List The Transportation Improvement Program (TIP) and all amendments must include a conformity report. The conformity report must address

More information

Approved STIP Formal Amendments for the Period of 11/01/2018-3/15/2019

Approved STIP Formal Amendments for the Period of 11/01/2018-3/15/2019 3116-151 Hwy 169 from Taconite to Pengilly, Safety Improvements 5409-32 Concrete resurface, raise grade at levee's, install lighting, improve drainage and pedestrian accessibility on Hwy 75 in Halstad

More information

JACKSON METROPOLITAN PLANNING ORGANIZATION (MPO) TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

JACKSON METROPOLITAN PLANNING ORGANIZATION (MPO) TRANSPORTATION IMPROVEMENT PROGRAM (TIP) HINDS Project: 480001 Responsible Agency: CITY OF CLINTON Total Project Cost: $6,068,000 Route: PINEHAVEN/NORTHSIDE DR Fund Source: EARMARK Project Length: 1.25 Pinehaven Dr from Northside Dr to 400' N

More information

CITY OF BOCA RATON. Overview Map. Commuter Mode of Choice QUICK FACTS. 46 Median Age. 91,797 Residents. 18.8% Traditionally Underserved

CITY OF BOCA RATON. Overview Map. Commuter Mode of Choice QUICK FACTS. 46 Median Age. 91,797 Residents. 18.8% Traditionally Underserved CITY OF $72,970 Mdian Incom 188% Traditionally Undrsrvd 400% Growth from 2010 959% H/GED 524% Bachlors 38,041 Housholds 621% Labor Forc Lak Okchob Palm Bach County Boca Raton Commutr Mod of Choic 46 Mdian

More information

11Administrative items. 21Action items. 31Informational items. 41Public Comment. 51New business items. 61Adjournment. July 27, 2017; 12:00 pm

11Administrative items. 21Action items. 31Informational items. 41Public Comment. 51New business items. 61Adjournment. July 27, 2017; 12:00 pm July 27, 2017; 12:00 pm Chapman Room 401 S. Park Ave. 2 nd Floor 11Administrative items A. Approval of the Meeting Minutes from 6-22-17 21Action items A. Railroad Crossing Minnesota Avenue 31Informational

More information

CITY OF SPOKANE VALLEY Request for Council Action

CITY OF SPOKANE VALLEY Request for Council Action CITY OF OKANE VALLEY Request for Council Action Meeting Date: May 23, 2017 Department Director Approval: Check all that apply: consent old business new business public hearing information admin. report

More information

CAPITAL IMPROVEMENTS PLAN FINAL

CAPITAL IMPROVEMENTS PLAN FINAL CAPITAL IMPROVEMENTS PLAN FINAL 2017-2022 CAPITAL IMPROVEMENTS PLAN 2017-2022 TABLE OF CONTENTS CIP OVERVIEW... 2 What is a Capital ImprovementS Plan (CIP)?... 2 What are Capital Improvements?... 2 What

More information

Region XII Planning Affiliation Transportation Improvement Program

Region XII Planning Affiliation Transportation Improvement Program Region XII Planning Affiliation 2018-2021 Transportation Improvement Program Approved July 13, 2017 2018-2021 Transportation Program Executive Summary The Fixing America s Surface Transportation Act or

More information

April 24, Subject: Amendments to the FY Transportation Improvement Program

April 24, Subject: Amendments to the FY Transportation Improvement Program CAMPO Capital Area Metropolitan Planning Organization April 24, 2006 Mr. Robert Daigh District Engineer Texas Department of Transportation - Austin District PO Drawer 15426 Austin, TX 78761 Subject: Amendments

More information

FOUR SEASONS POOL FIRE HALL #1 REFERENDUM TO RE-BUILD THE FOUR SEASONS LEISURE POOL AND FIRE HALL #1

FOUR SEASONS POOL FIRE HALL #1 REFERENDUM TO RE-BUILD THE FOUR SEASONS LEISURE POOL AND FIRE HALL #1 REFERENDUM TO RE-BUILD THE FOUR SEASONS LEISURE POOL AND FIRE HALL #1 Th City of Princ Gorg will b holing a rfrnum on Octobr 28, 2017, concrning th r-builing of th Four Sasons Lisur Pool an Fir Hall #1.

More information

Water Supply Capital Improvements

Water Supply Capital Improvements Watr Supply Capital Improvmnts WATER SUPPLY OVERVIEW Th District manags and oprats a complx and intgratd watr supply infrastructur, including storag, transmission, tratmnt, and rcycld watr facilitis, to

More information

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016 City of Des Moines Citizen Engagement Capital Improvement Program November 29, 2016 Goals of Citizen Engagement Goal Focus on service levels Department definitions of adequate service and opportunities

More information

Indiana s Constitutional Referendum On Tax Caps, November 2010

Indiana s Constitutional Referendum On Tax Caps, November 2010 Purdue Cooperative Extension Service Indiana s Constitutional Referendum On Tax Caps, November 2010 Larry DeBoer Department of Agricultural Economics Purdue University September 2010 For more information

More information

LAKE~SUMTER MPO - COST FEASIBLE PROJECTS

LAKE~SUMTER MPO - COST FEASIBLE PROJECTS - COST FEASIBLE PROJECTS TABLE 1 - STATE PROJECTS (STRATEGIC INTERMODAL SYSTEM / FLORIDA'S TURNPIKE / CENTRAL FLORIDA EXPRESSWAY AUTHORITY) Facility From To Project Current Year Cost Estimates M-SIS M-SIS

More information

April 11, (Approved by the Area Transportation Partnership (ATP) on 4/8/11)

April 11, (Approved by the Area Transportation Partnership (ATP) on 4/8/11) April 11, 2011 (Approved by the Area Transportation Partnership (ATP) on 4/8/11) Fiscal Year: 2012 DRAFT ATIP for FY 2012-2015 1 BB MNDOT SECT 5311: LINCOLN CO TRANSIT OPERATING 0 LINCOLN OB TRAN - TRANSIT

More information

NASHVILLE AREA MPO. ADJUSTMENT to The Fiscal Years Transportation Improvement Program. Adjustment Number: TIP Number:

NASHVILLE AREA MPO. ADJUSTMENT to The Fiscal Years Transportation Improvement Program. Adjustment Number: TIP Number: NASHVILLE AREA MPO ADJUSTMENT to The Fiscal Years 20082011 Transportation Improvement Program Adjustment Number: 2009019 TIP Number: 200852034 FROM: TIP# 200852034 Jurisdiction: Hendersonville Project:

More information

Terre Haute Seelyville West Terre Haute Vigo County. Brazil Harmony Knightsville Clay County

Terre Haute Seelyville West Terre Haute Vigo County. Brazil Harmony Knightsville Clay County TRANSPORTATION IMPROVEMENT PROGRAM Terre Haute Seelyville West Terre Haute Vigo County Brazil Harmony Knightsville Clay County SFY 2018 2021 Metropolitan Planning Organization West Central Indiana Economic

More information

DRAFT UTP November Update - Funding Adjustments Summary EXHIBIT A REVISION DATE 11/7/14. (Amounts in millions) Sum $0

DRAFT UTP November Update - Funding Adjustments Summary EXHIBIT A REVISION DATE 11/7/14. (Amounts in millions) Sum $0 UTP November Update - Funding Adjustments Summary (Amounts in millions) District/Division//TMA Fiscal Year Adjusted Amount Post Public Meeting Adjustments Austin 3 SH 130 Concession FY $6,500,000 3 SH

More information

Columbia Area Metropolitan Planning Organization

Columbia Area Metropolitan Planning Organization Columbia Area Metropolitan Planning Organization FY 2009 Annual Listing of Obligated Projects October 1, 2008 September 30, 2009 Approved by the CMCOG Board June 24, 2010 The preparation of this report

More information

DRAFT. Hominy Indian Village ON $1,080,000 $0 $0 $0 $0 $1,080,000 $0 $60,000 $0 $600,000 $0 $660,000

DRAFT. Hominy Indian Village ON $1,080,000 $0 $0 $0 $0 $1,080,000 $0 $60,000 $0 $600,000 $0 $660,000 Summary of Projects List Osage Nation Project Name Project No. Const. Yr 2018 2019 2020 2021 2022 Total Hominy Indian Village ON-1062 2018 $1,080,000 $0 $0 $0 $0 $1,080,000 Tallgrass Prairie Chip Seal

More information

DRAFT. Summary of Projects List UNOFFICIAL. UNOFFICIAL Project Name Project No. Const. Yr Total UNOFFICIAL.

DRAFT. Summary of Projects List UNOFFICIAL. UNOFFICIAL Project Name Project No. Const. Yr Total UNOFFICIAL. Summary of Projects List Osage Nation Project Name Project No. Const. Yr 2019 2020 2021 2022 2023 Total Wildland Fire Management Building 2018 $0 $50,000 $0 $0 $0 $50,000 Dog Thresher Creek BR176 2018

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information

Columbia River Crossing Project Vancouver, Washington Engineering (Rating Assigned November 2012)

Columbia River Crossing Project Vancouver, Washington Engineering (Rating Assigned November 2012) Columbia River Crossing Project Vancouver, Washington Engineering (Rating Assigned November 2012) Summary Description Proposed Project: Light Rail Transit 2.9 Miles, 5 Stations Total Capital Cost ($YOE):

More information

ALL Counties. ALL Districts

ALL Counties. ALL Districts TEXAS TRANSPORTATION COMMISSION ALL Counties rhnute ORDER Page of ALL Districts The Texas Transportation Commission (commission) finds it necessary to propose amendments to. and., relating to Transportation

More information

How to Read the Project Modification Listings Roadway Section

How to Read the Project Modification Listings Roadway Section How to Read the Project Modification Listings Roadway Section The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation Improvement

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information

Steve Cook, Acting Director, Transportation Planning and Operations. Administrative Modifications to the Transportation Improvement Program

Steve Cook, Acting Director, Transportation Planning and Operations. Administrative Modifications to the Transportation Improvement Program To: From: Subject: TIP Notification List Steve Cook, Acting Director, Transportation Planning and Operations Administrative Modifications to the 2012-2017 Transportation Improvement Program Date: May 16,

More information

Attachment #1. Statement of Change to the 2013 FTIP

Attachment #1. Statement of Change to the 2013 FTIP Attachment #1 Statement of Change to the 2013 FTIP Agency: Various Amendment Type: Administrative Modification Amendment #: 4 2013 FTIP STATEMENT OF CHANGE Existing or New Project MPO FTIP ID (CTIPS ID#)

More information

Innovative But Familiar: Delivering Chisholm Trail Parkway

Innovative But Familiar: Delivering Chisholm Trail Parkway Innovative But Familiar: Delivering Chisholm Trail Parkway Mark A. Bouma, P.E. Te c h n i c a l O v e r s i g h t L e a d e r N o r t h Te x a s To l l w a y A u t h o r i t y O c t o b e r 1 7, 2 0 1

More information

...;..;...;.;;..;.. Additional preservation and safety needs have been identified and recommend to be programmed with funding available in FY2019.

...;..;...;.;;..;.. Additional preservation and safety needs have been identified and recommend to be programmed with funding available in FY2019. DOT-1208 (6/09) (PROGRAM FISCAL YEAR IS OCTOBER 1 - SEPTEMBER 30) REVISION NUMBER: 19-001...;..;...;.;;..;.. J USTI FICA TION: Additional preservation and safety needs have been identified and recommend

More information

FFY 2009 OBLIGATED AND GRANTED PROJECTS LIST

FFY 2009 OBLIGATED AND GRANTED PROJECTS LIST Note: Yellow highlighted entries are bicycle and pedestrian facilities projects. CAPITOL 10 0400-0043 CON FTA SEC 5309RR RECOVERY & REINVESTMENT 10 0426-0049 ACQ FTA SEC 5307C CAPITAL 10 0426-0050 CON

More information

City of Winnipeg s Functional Design Study and Public Consultation for Marion Street Widening and Grade Separation

City of Winnipeg s Functional Design Study and Public Consultation for Marion Street Widening and Grade Separation WL Wlcom to th scond Opn Hous for th City of Winnipg s Functional Dsign Study and Public Consultation for arion Strt Widning and Grad Sparation W want to har from you. Plas fl fr to: Viw th rcommndd dsign

More information

Capital District Transportation Committee March 3, Amendments to the TIP

Capital District Transportation Committee March 3, Amendments to the TIP Capital District Transportation Committee March 3, 2017 Amendments to the 2016-21 TIP At its March 1, 2017 and March 2, 2017 meetings, CDTC made the following amendments to the Transportation Improvement

More information

Executive Summary. Prepared by: The Ohio Department of Transportation

Executive Summary. Prepared by: The Ohio Department of Transportation Executive Summary Prepared by: The Ohio Department of Transportation Table of Contents Executive Summary 1 Project History 1 Purpose and Need 1 Alternatives Analysis 1 Recommendations 3 Subdivision of

More information

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2019-2023 MANATEE COUNTY FLORIDA DEPARTMENT OF TRANSPORTATION - DISTRICT ONE MISSION STATEMENT The Department will provide a safe, interconnected statewide

More information

Military Highway Continuous Flow Intersection (CFI) Initial Financial Plan

Military Highway Continuous Flow Intersection (CFI) Initial Financial Plan Military Highway Continuous Flow Intersection (CFI) Initial Financial Plan State Project Number(s): 0013-122-V03, 0165-122-V04, 0165-122-181 UPC(s): 9783, 1765, 84243 1 Table of Contents 1. Project Description...

More information

~ FINANCIAL ACTION SUMMARY / Expenditure Required Amount Budgeted/Approved (Over)/Under Approved Amount

~ FINANCIAL ACTION SUMMARY / Expenditure Required Amount Budgeted/Approved (Over)/Under Approved Amount CITYOFWOODINVILLE, WA REPORT TO THE CITY COUNCIL 17301 133rct Avenue NE, Woodinville, WA 98072 WWW.Cl.WOODINVILLE.WA.US To: Honorable City Council Date: April 5, 2016 By Thomas E Hansen P E., Public Works

More information

Transportation Improvement Program

Transportation Improvement Program Transportation Improvement Program Transportation Conformity Check List The Transportation Improvement Program (TIP) and all amendments must include a conformity report. The conformity report must address

More information

30/04/2014 TOWNSHIP OF EDWARDSBURGH/CARDINAL 2014 BUDGET. BUDGET SUMMARY Page Variance Budget Refer Description Budget Actual

30/04/2014 TOWNSHIP OF EDWARDSBURGH/CARDINAL 2014 BUDGET. BUDGET SUMMARY Page Variance Budget Refer Description Budget Actual 30/04/2014 TOWNSHIP OF EDWARDSBURGH/CARDINAL 2014 BUDGET BUDGET SUMMARY Pag 16 2013 2013 Rfr Dscription Budgt Actual Unauditd 2 Taxation (4,001,000) (4,047,385) 2 Grants & GIL {1,200,000~ {1,219,434~ TOTAL

More information

Metropolitan Council. May 30, 2018

Metropolitan Council. May 30, 2018 Metropolitan Council May 30, 2018 1 Today s Topics Revised Project Budget and Schedule Third Amendment to Cooperative Funding Agreement with HCRRA Fourth Amendment to 2017 CTIB Capital Grant Agreement

More information

CAPITAL PROJECTS Department Expenditures By Cost Center FY03 Actual FY04 Budget FY05 Request

CAPITAL PROJECTS Department Expenditures By Cost Center FY03 Actual FY04 Budget FY05 Request CAPITAL PROJECTS Capital Projects encompass governmental projects including transportation, criminal courts and jail facilities, law enforcement communications, drainage improvements, park additions, beach

More information

Updated TIP Project Pages as of March 22, 2018

Updated TIP Project Pages as of March 22, 2018 Updated TIP Project Pages as of March 22, 2018 Index of Projects PI # DESCRIPTION FUNDING SPONSOR FY CST PAGE 0012757 I-16 FROM I-95 TO I-516 Z001 GDOT 2018-2021 3 0012758 I-16 @ I-95 INTERCHANGE RECONSTRUCTION

More information

CITY OF JOPLIN FY 2018 PROPOSED BUDGET

CITY OF JOPLIN FY 2018 PROPOSED BUDGET CITY OF JOPLIN FY 2018 PROPOSED BUDGET CITY OF JOPLIN ESTIMATE OF NEEDS PROJECTED FUND BALANCES FOR FISCAL YEAR 2017-2018 Audited Projected Projected Fund Projected 2016-2017 Activity Fund Projected 2017-2018

More information

MAKE YOUR TRIP START AT HOME

MAKE YOUR TRIP START AT HOME D St N W H Street S W Ohio Drive 29 G Street S W 0 250 m Virginia Avenue S E West Basin Drive New Jersey Av S E 8 12th St Expwy 10th Street S W E Street S W E Street S E School St D Street S W D Street

More information

Town of Brunswick, Maine

Town of Brunswick, Maine Town of Brunswick, Maine Municipal Budget July 1, 2017- June 30, 2018 Proposed Maintain Current Services Structural Balance Town Programs and Policies Capital Improvement Program Infrastructure and Facilities

More information

BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2012

BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2012 FY A + B = C D + E = F C + F = G G - H = I A B C D E F G H I Balance Carryover from FY 11 FY (includes all adjustments) CATEGORY 7 RECAP FY 2012 Total Available FTA Transfer of Funds Funds Obligated On

More information

University Link LRT Extension

University Link LRT Extension (November 2007) The Central Puget Sound Regional Transit Authority, commonly known as Sound Transit, is proposing to implement an extension of the Central Link light rail transit (LRT) Initial Segment

More information

Investment Property for Sale Euclid Avenue, Euclid, Ohio 44117

Investment Property for Sale Euclid Avenue, Euclid, Ohio 44117 INDX City Map 3 Floor Plan 4 Investment Snapshot 5 Rent Roll 6 Disclaimer 7 # U SISTR OR RPLAC 25% OF ROOF PURLINS AT THIS LOADING DOCK ARA SAL PROJCT NAM PROJCT ADDRSS NO. DAT DSCRIPTION DRAWN BY CHCKD

More information

S/TIP LIST OF PROJECTS

S/TIP LIST OF PROJECTS Page: 1 of 12 2017 132706 Berrien MDOT S/TIP Line items M-139 M-139, I-196 6.861 Traffic Traffic Signal CON $39,333 $0 $0 $39,333 CMG 11/21/2016 11/21/2016 BL, and M-40 Optimization Signalized Corridors

More information

Capital Investment Program (CIP) About CIP

Capital Investment Program (CIP) About CIP Capital Investment Program (CIP) About CIP The Capital Investment Program (CIP) is a multi-year program aimed at upgrading and expanding City facilities, buildings, grounds, streets, parks and roads. The

More information

More than a Bandage for New Jersey s Crumbling Bridges

More than a Bandage for New Jersey s Crumbling Bridges More than a Bandage for New Jersey s Crumbling Bridges Making the Case for a Long-Term and Sustainable TTF Image created by TSTC based on images from the Hoboken Journal and FCIT. December 2010 2 This

More information

Indiana Transportation Funding Update

Indiana Transportation Funding Update Indiana Transportation Funding Update Presented at the 2016 Purdue Road School Dan Brassard Chief Financial Officer, INDOT March 8, 2016 Transportation Funding Proposals: Indiana is NOT Unique Across the

More information

Financial Capacity Analysis

Financial Capacity Analysis FINANCIAL CAPACITY ANALYSIS Introduction Federal transportation planning rules require that metropolitan area transportation plans include a financial capacity analysis to demonstrate that the plan is

More information

FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary

FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary FY 2016 FY 2020 Capital Improvement Program (CIP) Executive Summary The adopted FY 2016 FY 2020 CIP is $205.3 million (including prior year expenditures) and is $2.9 million lower than the previous CIP

More information

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET CITY OF PLACERVILLE ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET 2014/2015 CAPITAL IMPROVEMENT PROGRAM POLICY Each year the City faces the challenge of meeting infrastructure and equipment needs with limited

More information

2016 RECOMMENDED CITY BUDGET. Presented by Scott Fadness, Mayor

2016 RECOMMENDED CITY BUDGET. Presented by Scott Fadness, Mayor 2016 RECOMMENDED CITY BUDGET Presented by Scott Fadness, Mayor 2016 Recommended Budget Fishers fiscal health 2016 objectives and investments 2016 recommended budget Overview 2016 Recommended City Budget

More information

Region 5 Upcoming Projects for Summer/Fall 2018

Region 5 Upcoming Projects for Summer/Fall 2018 Region 5 Upcoming Projects for Summer/Fall 2018 The budget amount provided does not reflect the construction costs for projects. The amounts may include ROW, engineering, design, and utility costs. The

More information

Pennsylvania Department of Transportation s Statewide Procedures for STIP and TIP Revisions

Pennsylvania Department of Transportation s Statewide Procedures for STIP and TIP Revisions MEMORANDUM OF UNDERSTANDING Pennsylvania Department of Transportation s Statewide Procedures for 2017-2020 STIP and TIP Revisions Purpose This Memorandum of Understanding (MOU) establishes a set of procedures

More information

Development of the Cost Feasible Plan

Development of the Cost Feasible Plan March 15, 2012 TPO Board and Advisory Committee Meetings Development of the Cost Feasible Plan Transportation Outlook 2035 LRTP Update Atkins Development of the Cost Feasible Plan P a g e 1 Development

More information

Portal North Bridge Project Hudson County, New Jersey Core Capacity Project Development (Rating Assigned February 2017)

Portal North Bridge Project Hudson County, New Jersey Core Capacity Project Development (Rating Assigned February 2017) Portal North Bridge Project Hudson County, New Jersey Core Capacity Project Development (Rating Assigned February 2017) Summary Description Proposed Project: Commuter Rail Capacity Improvement 2.3 Miles

More information

November 2018 Labor Market Review Reported by: Kathy Jaworski

November 2018 Labor Market Review Reported by: Kathy Jaworski November 2018 Labor Market Review Reported by: Kathy Jaworski Regional Workforce Analyst Tel: 219-841-6347 Email Kathy kjaworski@dwd.in.gov Economic Growth Region 1 Statistical Data Report for November

More information

2014 State Equalized Market Minimum Parcel Number Property Legal Description Value Value Bid

2014 State Equalized Market Minimum Parcel Number Property Legal Description Value Value Bid Cass County Properties Foreclosed for Nonpayment of 2012 and/or Prior Years Taxes. No July Sale Sale Guidelines - State of Michigan is required to pay greater of full Market Value or Mimimum Bid on or

More information

Case LSS Doc 347 Filed 06/05/17 Page 1 of 5 UNITED STATES BANKRUPTCY COURT DISTRICT OF DELAWARE

Case LSS Doc 347 Filed 06/05/17 Page 1 of 5 UNITED STATES BANKRUPTCY COURT DISTRICT OF DELAWARE Case 17-10993-LSS Doc 347 Filed 06/05/17 Page 1 of 5 UNITED STATES BANKRUPTCY COURT DISTRICT OF DELAWARE ------------------------------------------------------------ x In re : Chapter 11 : CENTRAL GROCERS,

More information

Attachment B. Project Cost Estimates. Ridge Road Extension Alternatives Analysis

Attachment B. Project Cost Estimates. Ridge Road Extension Alternatives Analysis Attachment B Project Cost Estimates for: Ridge Road Extension Alternatives Analysis PREPARED FOR: Pasco County Engineering Services Department PREPARED BY: NV5, INC. 6989 E. FOWLER AVENUE TAMPA, FLORIDA

More information

Kane County Transportation Planning Area Study. Sugar Grove, Aurora, Montgomery Planning Area Transportation Improvement Plan

Kane County Transportation Planning Area Study. Sugar Grove, Aurora, Montgomery Planning Area Transportation Improvement Plan Kane County Transportation Planning Area Study Sugar Grove, Aurora, Montgomery Planning Area Transportation Improvement Plan April 24 Submitted to: April 24 Submitted by: ! "! " #$%! & ' & # ()* +!, -.$

More information

RIDOA STATEWIDE PLANNING PROGRAM Transportation Planning

RIDOA STATEWIDE PLANNING PROGRAM Transportation Planning RIDOA STATEWIDE PLANNING PROGRAM Transportation Planning Land & Water Conservation Summit March 10, 2012 Statewide Planning Framework Department of Administration Statewide Planning Program State Planning

More information

$+ 121 $+ 120 $+ 122 $+ 155 $+ 155 $+ 109 $+ 139 $+ 136 $+ 111 $+ 124 $ MINNEHAHA COUNTY TIP Projects !.!. !.!. Dell Rapids.

$+ 121 $+ 120 $+ 122 $+ 155 $+ 155 $+ 109 $+ 139 $+ 136 $+ 111 $+ 124 $ MINNEHAHA COUNTY TIP Projects !.!. !.!. Dell Rapids. ST AVE TH AVE TH AVE BIG SIOUX RD TH AVE TH AVE TH AVE TH AVE TH AVE 9 9 0 Miles TH AVE $+ 0 $+ 0 TH AVE TH AVE 9 Humboldt TH ST TH AVE $+ 0 0 0-0-00 0 Construction 09 Construction 00 Construction 0 Construction

More information

Transportation CIP Prioritization Criteria. Lee County Board of County Commissioners Work Session

Transportation CIP Prioritization Criteria. Lee County Board of County Commissioners Work Session Transportation CIP Prioritization Criteria Lee County Board of County Commissioners Work Session 12.1.2015 1 GOALS CRITERIA Ranking Tool Will Look at Various Options Seeking Consensus on Criteria for CIP

More information

Board Policy No. 18 Railroad Crossing Quiet Zones and Wayside Horn Systems

Board Policy No. 18 Railroad Crossing Quiet Zones and Wayside Horn Systems Board Policy No. 18 Railroad Crossing Quiet Zones and Wayside Horn Systems Summary This policy addresses accountability and liability for specific areas of quiet zones and wayside horn systems implementation.

More information

3/1/2013. Indiana Motor Vehicle Highway Fund A Discussion on Revenues, Distributions and Expenses

3/1/2013. Indiana Motor Vehicle Highway Fund A Discussion on Revenues, Distributions and Expenses Indiana Motor Vehicle Highway Fund A Discussion on Revenues, Distributions and Expenses Auditor of State s Office Presentation Settlement Director Dan Bastin 99 th Annual Purdue Road School March 6, 2013

More information

Index of Projects CS 602/CS 650/GRANGE ROAD FROM SR 21 TO E OF SR 25 Z001 GDOT

Index of Projects CS 602/CS 650/GRANGE ROAD FROM SR 21 TO E OF SR 25 Z001 GDOT 0002923 Index of Projects PI # DESCRIPTION FUNDING SR 25 CONN/BAY STREET FROM I-516 TO THE BAY STREET VIADUCT CURRENT SPONSOR FY CST PAGE Z001, Z230 Chatham County 2016 3 0007885 CS 602/CS 650/GRANGE ROAD

More information

BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2013

BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2013 BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2013 Total Uncommitted Funds FY 2013 A + B = C C + D = E E - F = G A B C D E F G Balance Carryover from FY 12 FY (includes all adjustments) Total Available Total Obligations

More information

A Summary of Highway Revenues, Distributions, & Expenses for Indiana Counties, Cities & Towns 1999

A Summary of Highway Revenues, Distributions, & Expenses for Indiana Counties, Cities & Towns 1999 Purdue University Purdue e-pubs Indiana Local Technical Assistance Program (LTAP) Publications Indiana Local Technical Assistance Program (LTAP) 12-1999 A Summary of Highway Revenues, Distributions, &

More information

Appendix D Total Project Cost and Year of Expenditure Breakdown

Appendix D Total Project Cost and Year of Expenditure Breakdown Total Project Cost and Year of Expenditure Breakdown p. D -1 Total Project Cost and Year of Expenditure Breakdown Financial Constraint Methodology using Total Project Cost and Year of Expenditure Dollars

More information

City of Des Moines. Budget Workshop. December 7, 2015

City of Des Moines. Budget Workshop. December 7, 2015 City of Des Moines Budget Workshop December 7, 2015 Today s Agenda SSMID Review Sanitary and Storm Sewer 2 Self-Supported Municipal Improvement Districts 3 Operation and Terms Each SSMID has a separate

More information

How to Read the Project Modification Listings - Roadway Section

How to Read the Project Modification Listings - Roadway Section How to Read the Project Modification Listings - Roadway Section Sa m pl e The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation dvisory Board of the Metropolitan Council of the Twin Cities DTE: December 6, 2017 TO: CTION TRNSMITTL No. 2018-07 TC Funding and Programming Committee PREPRED BY: Joe Barbeau, Senior Planner

More information

City of Saratoga Springs

City of Saratoga Springs City of Saratoga Springs Proposed Capital Program 2019 2024 Submitted by Mayor Meg Kelly and the 2019 Capital Program Committee Office of the Mayor City Hall 474 Broadway, Saratoga Springs, NY 12866 518.587.3550

More information

The following is a summary of General Fund revenue by major category as of April 30, 2017: Revenues: Budget* Actual Variance % of Budget

The following is a summary of General Fund revenue by major category as of April 30, 2017: Revenues: Budget* Actual Variance % of Budget General Fund Revenues The following is a summary of General Fund revenue by major category as of April 30, 2017: Revenues: Budget* Actual Variance % of Budget Property Taxes 1,174,200 1,264,609 90,409

More information

The following is a summary of General Fund revenue by major category as of May 31, 2017: Revenues: Budget* Actual Variance % of Budget

The following is a summary of General Fund revenue by major category as of May 31, 2017: Revenues: Budget* Actual Variance % of Budget General Fund Revenues The following is a summary of General Fund revenue by major category as of May 31, 2017: Revenues: Budget* Actual Variance % of Budget Property Taxes 1,174,200 1,266,578 92,378 107.9%

More information

** The due date has been extended to June 16, 2017 at 3:00 p.m. **

** The due date has been extended to June 16, 2017 at 3:00 p.m. ** June 8, 2017 To: All Potential Proposers Subject: RFP 17-Q Butterfly Lane Realignment Project Consisting of: RFIs and City Response, 3 PDFs Butterfly Ridge Elementary, Roadway Plan Sheet, Forest WRP This

More information

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary The adopted FY 2017 FY 2021 CIP is $235.8 million (including prior year expenditures) and is $28 million higher than the previous CIP

More information

NOTICE OF ELECTION 2021 $10,000, $10,000, $10,000, $10,000,000

NOTICE OF ELECTION 2021 $10,000, $10,000, $10,000, $10,000,000 NOTICE OF ELECTION TO THE QUALIFIED VOTERS OF DEKALB COUNTY, GEORGIA NOTICE IS HEREBY GIVEN that on the 7 th day of November, 2017, an election will be held at the regular polling places in all of the

More information

TEXAS DEPARTMENT OF TRANSPORTATION BRYAN DISTRICT T I P

TEXAS DEPARTMENT OF TRANSPORTATION BRYAN DISTRICT T I P TEXAS DEPARTMENT OF TRANSPORTATION S T A T E W I D E T R A N S P O R T A T I O N I M P R O V E M E N T P R O G R A M S T I P 2 015201 8 BRYAN DISTRICT 2 0 1 5 2 0 1 8 T I P H I G H W AY I n i t i a l 2015

More information

City County Building, Suite Main Street Knoxville, Tennessee (865)

City County Building, Suite Main Street Knoxville, Tennessee (865) City County Building, Suite 403 400 Main Street Knoxville, Tennessee 37902 (865) 215-2500 www.knoxtrans.org January 12, 2017 Tennessee Department of Transportation James K. Polk Building, Suite 600 505

More information

Receive and file capital works report CW providing an update on the Burloak grade separation.

Receive and file capital works report CW providing an update on the Burloak grade separation. Page 1 of Report CW-13-17 SUBJECT: Burloak Grade Separation Project Update TO: FROM: Committee of the Whole Capital Works Report Number: CW-13-17 Wards Affected: 5 File Numbers: 570.02-818 Date to Committee:

More information

Risk Based Estimating and Management at

Risk Based Estimating and Management at Risk Based Estimating and Management at 2010 Capacity Building peer exchange August 11-13, 2010 Terry Berends, PE 1 Assistant State Design Engineer 2 Overview Risk Based Estimating @ WSDOT Risk Management

More information

Chapter 6: Financial Resources

Chapter 6: Financial Resources Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation

More information

Studies, Initiatives and Reserve Transfers

Studies, Initiatives and Reserve Transfers Asset Overview, Initiatives and Reserve Transfers Includes Corporate Accessibility Reserve Contribution Downtown Improvement Reserve Contribution Other Reserve Transfers External Contributions Asset Overview

More information

MEMORANDUM OF UNDERSTANDING Lehigh Valley Transportation Study's Procedures for TIP M odifications

MEMORANDUM OF UNDERSTANDING Lehigh Valley Transportation Study's Procedures for TIP M odifications MEMORANDUM OF UNDERSTANDING Lehigh Valley Transportation Study's Procedures for 2017-2020 TIP M odifications Purpose This Memorandum of Understanding (MOU) establishes a set of procedures to be used by

More information

NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM

NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM TO: FROM: NOACA Board of Directors Grace Gallucci, Executive Director DATE: October 3, 2014 RE: Resolution No. 2014-045 Plan and TIP Amendments 1

More information