1 Life Extension Overhead Distribution Fred Johnston Manager Distribution Engineering, Alliant Energy MEA May, 2015

2 Overview Company background What is Life Extension System life Life cycle cost and it s role with LE Budget tools and economic analysis Predicting future system condition Criteria/Guidelines of LE LE Results Obstacles and Lesson s Learned Closing Philosophical comments and observations

3 Company Background

4 What is Life Extension? LE is broadly defined as any technology or program applied to an existing, aging, or deteriorated infrastructure to increase it s original useful life. Must have defined time and years of life added Can apply to electric, civil, even off shore oil rigs Last few years, UG cable injection/testing became a capital expense (UG Life Extension)

5 Is LE really capital?

6 Utilities Capitalizing Pole Treatment Florida Power & Light Pennsylvania Power & Light Alliant Energy NIPSCO/NiSource Oncor Detroit Edison CLECO LGE/KU Idaho Power CenturyLink Guadalupe Valley EC 6

7 Distribution System Life A life cycle analysis considers not only the first (capital) cost but all subsequent costs associated with the change. This includes operating costs as well as the savings from any direct benefits, such as reduced outage costs.

8 First Step - Lifecycle Cost Material costs range from 11% to 32% of total cost

9 Rebuild costs - different construction

10 Planning Tools and Future System

11 Planning Tools and Future System

12 LE Criteria All circuits inspected on a 10 year cycle Total LEed Miles = Inspected Rebuild - <20 year Poles inspected and treated by contractor. Inspection and treatment data returned to Alliant by GIS layer. LEed section cost less than 20% of rebuild Age is no excuse for a rebuild Rebuilds are entertained with 20% defect rate

13 How do poles hold up?

14 Pole Reject Location

15 Condition by Age

16 LE Criteria LE is a capital program. All minor units are capitalized as part of the LE process If a circuit has no capital units inspection, treatment, and minor unit defects are charged to local maintenance O&M budget* Pre-capitalized equipment is changed with O&M labor (local budgets) Can do up to $25,000 in rebuilds

17 LE Criteria Bad Pole Reinforceable, Not reinforceable, split, or shell rot Power Violations Rotten Arms Damaged insulator Down guy Rusted off Anchor Rod Rusted off Loose Hardware Blown Arrester Broken/Damaged underground riser or exposed cable Damaged Conductor Slack Primary Broken Arrestor Lead Broken Ground Wire Bad Capacitor Washed out Pole straightened as part total line improvement 17

18 LE Criteria We have stopped projects and changed to rebuild Lightly loaded rural lines can be deenergized C-Truss poles where possible Techs required to do point by point design on oldest system

19

20 LE Criteria Add arresters as necessary Add wildlife protection where necessary Correct all code violations

21 LE Criteria Engineering may do fuse coordination LE is not a program to change out all old Copper or Copperweld. If most cross-arms are bad on a 3ph circuit with older poles should we rebuild?

22 Reviewable Reject poles: 77 Power Violations: 374 Non-Reject Poles: 288

23 Select Reviewable Reject Poles on a tab. Zoom in. Select just the 1ph tap in question. 70 s vintage line 1 shell rot, 2 BPT (bad pole tops), 1 hollow pole

24 Results Long term results are unknown but predictable Expect at least 20 additional years (hold IPL average age to 32 or less) Short term (reliability/outages) we have data to track

25 Results

26

27 Summary of Life Extension Benefits Improved customer satisfaction Enhanced reliability fewer and shorter outages Reduction in costs to customers Less call outs and overtime Extends the life of current assets Reducing rebuild capital budgets Poles under a scheduled treatment program Tune-up vs rebuild DG wait and see? UG costs down

28 Philosophical comments/observations Qualified Techs are a must Question Everything If you see a policy or someone say just do it question it Our job with Life Extension is to get the biggest bang for our buck by: Adding at least 20 years of problem free life No excessive work with little impact Local Ops expertise and input is invaluable in achieving these results

29 Questions?

OPERATIONAL INVESTMENTS

OPERATIONAL INVESTMENTS EB-0-0 Tab Schedule Page of OPERATIONAL INVESTMENTS REACTIVE CAPITAL Reactive capital investment includes funds for the replacement of failed distribution components and the restoration of system reliability.

More information

Power Workers' Union (PWU) INTERROGATORY #1. Ref (a): Participant Information Package: Exhibit C1-2-1, Page 5 of 6, Table 2 (OM&A Expenditures)

Power Workers' Union (PWU) INTERROGATORY #1. Ref (a): Participant Information Package: Exhibit C1-2-1, Page 5 of 6, Table 2 (OM&A Expenditures) Filed: 0-0- 0-0 Tx Rates Schedule Page of Power Workers' Union (PWU) INTERROGATORY # Ref (a): Participant Information Package: Exhibit C--, Page of, Table (OM&A Expenditures) Table : 0 Board Approved versus

More information

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical. Mechanical. Civil. Protection&Control. Transmission & Distribution

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical. Mechanical. Civil. Protection&Control. Transmission & Distribution A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES Electrical f s TJ GARDINER ' \\ Mechanical Civil )j Protection&Control \, Dt Transmission & Distribution 2t Telecontrol System Planning 2012 WOOD

More information

ASSET CONDITION ASSESSMENT & ANALYSIS

ASSET CONDITION ASSESSMENT & ANALYSIS Filed: August, 00 EB-00-0 Exhibit D Schedule Page of 0 0 0 ASSET CONDITION ASSESSMENT & ANALYSIS.0 INTRODUCTION This Schedule summarizes Hydro One Distribution s Asset Condition Assessment (ACA) practices,

More information

Results of Operations Volume 03 Depreciation Study

Results of Operations Volume 03 Depreciation Study Application No.: A.16-09- Exhibit No.: SCE-09, Vol. 03 A3 Witnesses: P. Joseph A. Varvis R. White (U 338-E) 3rd ERRATA Results of Operations Volume 03 Depreciation Study Before the Public Utilities Commission

More information

2018 General Rate Case

2018 General Rate Case Application No.: A.1-0- Exhibit No.: SCE-0, Vol. 1 (Appendix) Witnesses: R. Woods (U -E) 01 General Rate Case Transmission & Distribution (T&D) Volume 1 Appendix to Operational Overview and Risk-Informed

More information

IMPORTANT INFORMATION Invitation to Bid No. RTS2-S-17 Kindly acknowledge important revisions to the terms and conditions under the bidding documents in details as follows: 1. According to Article F-15.

More information

2015 General Rate Case

2015 General Rate Case Application No.: Exhibit No.: SCE-0, Vol. 0, Part 1 Witnesses: M. Stark K. Trainor (U -E) 01 General Rate Case Transmission And Distribution (T&D) Volume, Part 1 Distribution Maintenance Before the Public

More information

STATE OF NEW HAMPSHIRE BEFORE THE PUBLIC UTILITIES COMMISSION. Docket No. DE

STATE OF NEW HAMPSHIRE BEFORE THE PUBLIC UTILITIES COMMISSION. Docket No. DE STATE OF NEW HAMPSHIRE BEFORE THE PUBLIC UTILITIES COMMISSION Liberty Utilities (Granite State Electric) Corp. d/b/a Liberty Utilities Distribution Service Rate Case DIRECT TESTIMONY OF CHRISTIAN P. BROUILLARD

More information

2018 General Rate Case

2018 General Rate Case Application No.: A.1-0- Exhibit No.: SCE-0, Vol. 0 Witnesses: J. Billingsley (U -E) 01 General Rate Case Transmission & Distribution (T&D) Volume 0 Transmission Construction & Maintenance Before the Public

More information

Jemena Electricity Networks (Vic) Ltd

Jemena Electricity Networks (Vic) Ltd Jemena Electricity Networks (Vic) Ltd 2016-20 Electricity Distribution Price Review Regulatory Proposal Forecast capital expenditure report for the 2016 regulatory period Public 30 April 2015 TABLE OF

More information

IMPORTANT INFORMATION Invitation to Bid No. TS12-S-10 Kindly acknowledge important revisions to the terms and conditions under the bidding documents in details as follows: Volume I of IV 1. TC-SUB-01 Data

More information

2018 General Rate Case

2018 General Rate Case Application No.: A.16-09- Exhibit No.: SCE-0, Vol. 08 Witnesses: J. R. Goizueta M. Flores A (U 338-E) 018 General Rate Case Transmission & Distribution (T&D) Volume 8 - Infrastructure Replacement Before

More information

Nelson Electricity Ltd Asset Management Plan Update

Nelson Electricity Ltd Asset Management Plan Update Nelson Electricity Ltd Asset Management Plan Update April 2017 March 2027 April 2017 Nelson Electricity Ltd central Nelson city view In accordance with the Commerce Act Electricity Distribution Information

More information

BANK OF INDIA, AHMEDABAD ZONE

BANK OF INDIA, AHMEDABAD ZONE BANK OF INDIA, AHMEDABAD ZONE TENDER FOR AIR CONDITIONING WORK FOR BANK OF INDIA AT VADTAL BRANCH, VADTAL. ISSUED TO :................ CLIENT ARCHITECT: CHIEF MANAGER WISTaaR Architects & Int. Designers

More information

NRECA Reliability Online Study

NRECA Reliability Online Study NRECA Reliability Online Study Survey Results June, Methodology/Response Rate 262 respondents participated in the reliability study (compared to 231 in and 299 in 2004). As in the past years, the study

More information

2018 General Rate Case. Transmission & Distribution (T&D) Volume 9 - Poles

2018 General Rate Case. Transmission & Distribution (T&D) Volume 9 - Poles Application No.: A.1-0- Exhibit No.: SCE-0, Vol. Witnesses: C. Fanous (U -E) 01 General Rate Case Transmission & Distribution (T&D) Volume - Poles Before the Public Utilities Commission of the State of

More information

Independent Review of Aurora Network summary of findings. Michael Van Doornik, Manager Advisory (VIC) 31 October 2018

Independent Review of Aurora Network summary of findings. Michael Van Doornik, Manager Advisory (VIC) 31 October 2018 Independent Review of Aurora Network summary of findings Michael Van Doornik, Manager Advisory (VIC) 31 October 2018 Agenda 1. Terms of reference 2. Limitations of the review 3. Our approach to undertaking

More information

ROCKLAND ELECTRIC COMPANY B.P.U. NO. 3 - ELECTRICITY. 1st Revised Leaf No. 18 Superseding Original Leaf No. 18 GENERAL INFORMATION

ROCKLAND ELECTRIC COMPANY B.P.U. NO. 3 - ELECTRICITY. 1st Revised Leaf No. 18 Superseding Original Leaf No. 18 GENERAL INFORMATION 1st Revised Leaf No. 18 Superseding Original Leaf No. 18 No. 15 IDENTIFICATION OF EMPLOYEES Company employees or agents authorized to enter upon its customers premises are provided with photo identification

More information

Investor Relations Contact: Media Inquiries Contact:

Investor Relations Contact: Media Inquiries Contact: Investor Relations Contact: 415.972.7080 Media Inquiries Contact: 415.973.5930 www.pgecorp.com February 28, 2019 PG&E Corporation Provides Update on Financial Impact of 2017 and 2018 Wildfires; Reports

More information

AGENDA CITY COUNCIL MEETING March 1, The City Council will be hearing public comments on the following agenda items:

AGENDA CITY COUNCIL MEETING March 1, The City Council will be hearing public comments on the following agenda items: AGENDA CITY COUNCIL MEETING March 1, 2016 1. Approval of Minutes February 16, 2016 2. Approval of Claims The City Council will be hearing public comments on the following agenda items: Anyone desiring

More information

Right-of-Way Construction Permit Application

Right-of-Way Construction Permit Application Address Permit # Date Approved: Right-of-Way Construction Permit Application APPLICANT INFORMATION Company s Legal Name (Owner of Facilities) Address City State Zip (Area Code) Telephone # 24-Hour Emergency

More information

EDISON An EDISON INTERNATIONAL Company

EDISON An EDISON INTERNATIONAL Company SOUTHERN CALIFORNIA EDISON An EDISON INTERNATIONAL Company (U 338-E) 2015 General Rate Case APPLICATION Workpapers Transmission & Distribution Customer Driven Programs and Distribution Construction SCE-03

More information

Workpapers. Transmission & Distribution Grid Operations SCE-03 Volume General Rate Case APPLICATION. An EDISON INTERNATIONAL Company

Workpapers. Transmission & Distribution Grid Operations SCE-03 Volume General Rate Case APPLICATION. An EDISON INTERNATIONAL Company An EDISON INTERNATIONAL Company (U 338-E) 215 General Rate Case APPLICATION Workpapers Transmission & Distribution Grid Operations SCE-3 Volume 7 N ovem ber 213 1 Workpaper - Southern California Edison

More information

A. Typical Cost Data Sheet for preparation of estimates on LABOUR CONTRACT

A. Typical Cost Data Sheet for preparation of estimates on LABOUR CONTRACT A. Typical Cost Data Sheet for preparation of estimates on LABOUR CONTRACT Amount (in Rs.) 1 Materials Cost 2 Labour Charges 3 Special Locality Allowance @..% on on Sl. 2 above (applicable for areas mentioned

More information

DIRECT TESTIMONY OF PAUL E. HAERING (CAPITAL PLAN)

DIRECT TESTIMONY OF PAUL E. HAERING (CAPITAL PLAN) BEFORE THE NEW YORK STATE PUBLIC SERVICE COMMISSION ----------------------------------------------------------------------------x Proceeding on Motion of the Commission as to the Rates, Charges, Rules

More information

MINIMUM INSPECTION PROCEDURAL GUIDELINES FOR BUILDING ELECTRICAL RECERTIFICATION

MINIMUM INSPECTION PROCEDURAL GUIDELINES FOR BUILDING ELECTRICAL RECERTIFICATION CITY OF DORAL BUILDING DEPARTMENT MINIMUM INSPECTION PROCEDURAL GUIDELINES FOR BUILDING ELECTRICAL RECERTIFICATION INSPECTION COMMENCED Date: INSPECTION COMPLETED Date: INSPECTION MADE BY: SIGNATURE: PRINT

More information

ARRANGEMENT OF REGULATIONS

ARRANGEMENT OF REGULATIONS L.I.1935 ELECTRICITY SUPPLY AND DISTRIBUTION (STANDARDS OF PERFORMANCE) REGULATIONS, 2008 Regulation 1. Purpose 2. Application ARRANGEMENT OF REGULATIONS Purpose and Application Application for new service

More information

MASSDEVELOPMENT UTILITIES DEPARTMENT 33 Andrews Parkway Devens, MA CURRENT TERMS AND CONDITIONS FOR UTILITY SERVICES Revised 5/23/2016

MASSDEVELOPMENT UTILITIES DEPARTMENT 33 Andrews Parkway Devens, MA CURRENT TERMS AND CONDITIONS FOR UTILITY SERVICES Revised 5/23/2016 MASSDEVELOPMENT UTILITIES DEPARTMENT 33 Andrews Parkway Devens, MA 01434 CURRENT TERMS AND CONDITIONS FOR UTILITY SERVICES Revised 5/23/2016 The following Terms and Conditions are a part of all rates,

More information

Jemena Electricity Networks (Vic) Ltd

Jemena Electricity Networks (Vic) Ltd Jemena Electricity Networks (Vic) Ltd 2016-20 Electricity Distribution Price Review Regulatory Proposal Attachment 7-11 - Independent analysis of replacement expenditure Public 30 April 2015 AER repex

More information

RURAL ELECTRIFICATION PROGRAM. This prooorsal calls for a reorganisation of the present. Kural Kleetrlficatlon administration, *hieh would #ive that

RURAL ELECTRIFICATION PROGRAM. This prooorsal calls for a reorganisation of the present. Kural Kleetrlficatlon administration, *hieh would #ive that RURAL ELECTRIFICATION PROGRAM This prooorsal calls for a reorganisation of the present Kural Kleetrlficatlon administration, *hieh would #ive that agency the authority to borrow in the open market and

More information

ASSET RISK MANAGEMENT Asset Health Framework

ASSET RISK MANAGEMENT Asset Health Framework ASSET RISK MANAGEMENT Asset Health Framework 15 C O P Y R I G H T 2013 T R A N S P O W E R N E W Z E A L A N D L I M I T E D. A L L R I G H T S R E S E R V E D Preface This document has been prepared to

More information

COMMONWEALTH ELECTRIC COMPANY Cancels M.D.T.E. No. 300 Appendix B-3 Page 1 of 9 TERMS AND CONDITIONS - DISTRIBUTION SERVICE

COMMONWEALTH ELECTRIC COMPANY Cancels M.D.T.E. No. 300 Appendix B-3 Page 1 of 9 TERMS AND CONDITIONS - DISTRIBUTION SERVICE Page 1 of 9 I. Applicability Appendix B - Line Extension Policy Commercial - Industrial This Policy applies to single-phase or three-phase Line Extensions necessary to serve all Commercial and Industrial

More information

BANK OF INDIA ZONAL OFFICE RAJASTHAN ZONE JAIPUR

BANK OF INDIA ZONAL OFFICE RAJASTHAN ZONE JAIPUR BANK OF INDIA ZONAL OFFICE RAJASTHAN ZONE JAIPUR QUOTATION FOR AIR-CONDITIONING WORK FOR BANK OF INDIA AT Sawaimadhopur BRANCH BIDDER/FIRMS NAME & ADDRESS:.... CLIENT ZONAL MANAGER Bank of India Zonal

More information

THE NARRAGANSETT ELECTRIC COMPANY TERMS AND CONDITIONS FOR DISTRIBUTION SERVICE

THE NARRAGANSETT ELECTRIC COMPANY TERMS AND CONDITIONS FOR DISTRIBUTION SERVICE THE NARRAGANSETT ELECTRIC COMPANY TERMS AND CONDITIONS FOR DISTRIBUTION SERVICE RIPUC No. 2217 Sheet 1 The following Terms and Conditions where not inconsistent with the rates are a part of all rates.

More information

BUDGET AND CAPITAL WORK PLAN

BUDGET AND CAPITAL WORK PLAN 2018 BUDGET AND CAPITAL WORK PLAN The following pages include the supporting documentation for the 2018 Budget, 20192022 Forecast and 10year capital work plan. It includes a review of 2017, executive summary

More information

2003 Full Year Results February 2, Gérard Hauser

2003 Full Year Results February 2, Gérard Hauser 2003 Full Year Results February 2, 2004 Gérard Hauser Safe Harbor This presentation contains forward-looking statements relating to the Company's expectations for future financial performance, including

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Maharashtra Electricity Regulatory Commission (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation)

More information

Revised Cal. P.U.C. Sheet No E Cancelling Original Cal. P.U.C. Sheet No E. ELECTRIC RULE NO. 15 Sheet 1 DISTRIBUTION LINE EXTENSIONS

Revised Cal. P.U.C. Sheet No E Cancelling Original Cal. P.U.C. Sheet No E. ELECTRIC RULE NO. 15 Sheet 1 DISTRIBUTION LINE EXTENSIONS Revised Cal. P.U.C. Sheet No. 20093-E Cancelling Original Cal. P.U.C. Sheet No. 15575-E ELECTRIC RULE NO. 15 Sheet 1 APPLICABILITY: This rule is applicable to extension of electric Distribution Lines*

More information

2018 General Rate Case. Transmission & Distribution (T&D) Volume 3 R System Planning

2018 General Rate Case. Transmission & Distribution (T&D) Volume 3 R System Planning Application No.: Exhibit No.: Witnesses: A.1-0- A SCE-0, Vol. 0 R A E. Takayesu (U -E) 01 General Rate Case rd Errata ERRATA Transmission & Distribution (T&D) Volume R System Planning Before the Public

More information

TRANSMISSION CHARGING STATEMENT

TRANSMISSION CHARGING STATEMENT TRANSMISSION CHARGING STATEMENT 1 September 2016 1 September 2016 TABLE OF CONTENTS Page 1 Introduction... 1 2 General System Charges... 4 3 Site Specific Charges... 5 4 Connection Assets... 8 5 Least

More information

$128, OR $109,926.64

$128, OR $109,926.64 June 8, 212 Johanna Ferriera CITY OF MANTECA TRANSIT 11 W CENTER ST MANTECA, CA 95337 RE: Contract ID: 1141754: 2 MOFFAT BLVD Dear Johanna Ferriera, Enclosed are gas and/or electric agreements for your

More information

FLORIDA LEAGUE OF CITIES 2017 ANNUAL CONFERENCE

FLORIDA LEAGUE OF CITIES 2017 ANNUAL CONFERENCE FLORIDA LEAGUE OF CITIES 2017 ANNUAL CONFERENCE Attack of the Mini Cell Towers in Public Rights-of-Way August 17, 2017 GARY I. RESNICK GrayRobinson 401 East Las Olas Blvd., Suite 1000 Fort Lauderdale,

More information

SECTION III GENERAL INFORMATION AND REQUIREMENT

SECTION III GENERAL INFORMATION AND REQUIREMENT SECTION III GENERAL INFORMATION AND REQUIREMENT 1. APPLICATION FOR SERVICE Application for service may be made by mail, fax or by using our web site at www.coned.com/es/. However, written confirmation

More information

Attachement A Unit Pricing Williamson County Fiber Optic OSP Maintenance Contract BRYCOMM: DIR-SDD-1901 OSP (Outside Plant) Cabling Services Price Sheet - Labor Only The following is a list of services

More information

MainPower New Zealand Limited. Asset Management Plan

MainPower New Zealand Limited. Asset Management Plan MainPower New Zealand Limited. Asset Management Plan 2015 2025 MAINPOWER NEW ZEALAND LIMITED ASSET MANAGEMENT PLAN UPDATE 2015-2025 MainPower New Zealand Limited Asset Management Plan Update 2015-2025

More information

Vendor Development Policy Revision II (May 13)

Vendor Development Policy Revision II (May 13) Vendor Development Policy Revision II (May 13) I. Objective: I. During the conclave held by CBIP jointly with CEA & MOP at Delhi, a view was taken to develop new vendors considering the limited manufacturing

More information

Interactive [Delete if non interactive]

Interactive [Delete if non interactive] [Customer Address line 1] [Customer Address line 2] [Customer Address line 3] [Customer Address line 4] [Customer Address line 5] Our ref Your ref Extension Date [enquiry no.] [customer ref] [ ] [ ] Primary

More information

Fort Valley Utility Commission 500 Anthoine Street PO Box 1529 Fort Valley GA 31030

Fort Valley Utility Commission 500 Anthoine Street PO Box 1529 Fort Valley GA 31030 Fort Valley Utility Commission 500 Anthoine Street PO Box 1529 Fort Valley GA 31030 NEW CUSTOMER INFORMATION Office Hours: Monday Friday (8:00 AM 5:00 PM. Our office is open until 6:00 PM on payment due

More information

EMERA MAINE TERMS AND CONDITIONS OF SERVICE TABLE OF CONTENTS

EMERA MAINE TERMS AND CONDITIONS OF SERVICE TABLE OF CONTENTS EMERA MAINE TERMS AND CONDITIONS OF SERVICE TABLE OF CONTENTS Section Title Page No. Revision Effective Date 1 Classification of Service 1.1 Original January 1, 2014 1-A Residential Service 1.1 First August

More information

Overhead to Underground Conversion Programs. Grid Planning & Reliability Section Energy Division, California Public Utilities Commission

Overhead to Underground Conversion Programs. Grid Planning & Reliability Section Energy Division, California Public Utilities Commission Overhead to Underground Conversion Programs Grid Planning & Reliability Section Energy Division, California Public Utilities Commission What is Undergrounding? Convert Overhead Electric, Communication,

More information

WISCONSIN PUBLIC SERVICE CORPORATION. C4. Standard Rules & Regulations Construction Policy RIIIM

WISCONSIN PUBLIC SERVICE CORPORATION. C4. Standard Rules & Regulations Construction Policy RIIIM Original Sheet No. C-48.01 EFFECTIVE IN All territory served. 1. DEFINITIONS a. Extension An extension is defined to include right-of-way, permits, easements, poles, conductors and appurtenances used in

More information

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 2nd Revised CPUC Sheet No. 224 Canceling 1 st Revised CPUC Sheet No.

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 2nd Revised CPUC Sheet No. 224 Canceling 1 st Revised CPUC Sheet No. SOUTH LAKE TAHOE, CALIFORNIA 2nd Revised CPUC Sheet No. 224 Canceling 1 st Revised CPUC Sheet No. 224 A. Applicability Under the provisions of this rule Utility shall make extensions and alterations of

More information

RULE H NEW SERVICE ATTACHMENTS AND DISTRIBUTION LINE INSTALLATIONS OR ALTERATIONS (Continued)

RULE H NEW SERVICE ATTACHMENTS AND DISTRIBUTION LINE INSTALLATIONS OR ALTERATIONS (Continued) IDAHO POWER COMPANY NINTH REVISED SHEET NO. H-5 CANCELS P.U.C. ORE. NO. E-27 EIGHTH REVISED SHEET NO. H-5 2. General Provisions (Continued) RULE H NEW SERVICE ATTACHMENTS AND DISTRIBUTION LINE INSTALLATIONS

More information

Warranty Service Authorization Policy

Warranty Service Authorization Policy Warranty Service Authorization Policy As part of continuous improvement program for Albany High Performance Door Solutions, and to facilitate the payment process of warranty claims, we have developed this

More information

EDISON ELECTRIC INSTITUTE SAFETY AND HEALTH COMMITTEE OSHA UPDATE. Stephen C. Yohay April 22, 2009 Alexandria, Virginia

EDISON ELECTRIC INSTITUTE SAFETY AND HEALTH COMMITTEE OSHA UPDATE. Stephen C. Yohay April 22, 2009 Alexandria, Virginia EDISON ELECTRIC INSTITUTE SAFETY AND HEALTH COMMITTEE OSHA UPDATE Stephen C. Yohay April 22, 2009 Alexandria, Virginia ISSUES TO ADDRESS TODAY 3d Circuit decision in hexavalent chromium case OSHA Rulemaking

More information

RESOLUTION NO. WHEREAS, pursuant to Santa Clara City Code Section , all electric energy and power

RESOLUTION NO. WHEREAS, pursuant to Santa Clara City Code Section , all electric energy and power RESOLUTION NO. A RESOLUTION OF THE CITY OF SANTA CLARA, CALIFORNIA SETTING THE SMALL CELL ATTACHMENT RATE TO CITY OWNED ELECTRIC WOODEN UTILITY POLES BY THIRD PARTY COMMUNICATIONS SERVICE PROVIDERS BE

More information

CenturyTel of Ohio, Inc. d/b/a CenturyLink Pole Attachment And Conduit Occupancy Tariff P.U.C.O. No. 1 ISSUING CARRIER

CenturyTel of Ohio, Inc. d/b/a CenturyLink Pole Attachment And Conduit Occupancy Tariff P.U.C.O. No. 1 ISSUING CARRIER Original Title Sheet 1 ISSUING CARRIER CENTURYTEL OF OHIO, INC. D/B/A CENTURYLINK POLE ATTACHMENT AND CONDUIT OCCUPANCY TARIFF P.U.C.O. NO. 1 INCLUDING RATES, RULES AND REGULATIONS FOR ALL EXCHANGE AREAS

More information

Excerpt of D On Test Year 2012 General Rate Case For Southern California Edison Company (Pages 1-5, 13-14, , & )

Excerpt of D On Test Year 2012 General Rate Case For Southern California Edison Company (Pages 1-5, 13-14, , & ) Application No.: Exhibit No.: Witnesses: A.13-11-003 SCE-45 T. Godfrey (U 338-E) Excerpt of D.12-11-051 On Test Year 2012 General Rate Case For Southern California Edison Company (Pages 1-5, 13-14, 209-211,

More information

10 Errors to Avoid When Refinancing

10 Errors to Avoid When Refinancing 10 Errors to Avoid When Refinancing I just refinanced from a 3.625% to a 3.375% 15 year fixed mortgage with Rate One (No financial relationship, but highly recommended.) If you are paying above 4% and

More information

No. 542-W-14/12/MH/2013 DT TENDER NOTICE

No. 542-W-14/12/MH/2013 DT TENDER NOTICE MODEL AND SUPER SPECIALITY HOSPITAL EMPLOYEES STATE INSURANCE CORPORATION ASRAMAM, KOLLAM, KERALA -691002 Website: www.esichsuperspecialitykollam.com Email: mh-ashramam@esic.nic.in Ph: 0474 2742833, 2766618(MS)

More information

ROCKY MOUNTAIN POWER First Revision of Sheet No. R12-1 Canceling Original Sheet No. R12-1

ROCKY MOUNTAIN POWER First Revision of Sheet No. R12-1 Canceling Original Sheet No. R12-1 First Revision of Sheet No. R12-1 Canceling Original Sheet No. R12-1 I. - Conditions and Definitions A. Contracts Before building an Extension, the Company may require the Applicant to sign a contract.

More information

Information Disclosure Reports prepared according to Part 4 of the Commerce Act 1986

Information Disclosure Reports prepared according to Part 4 of the Commerce Act 1986 Information Disclosure Reports prepared according to Part 4 of the Commerce Act 1986 For the Year Ended CONTENTS INTRODUCTION REPORTS DESCRIPTION 1 ANALYTICAL RATIOS 2 REPORT ON RETURN ON INVESTMENT 3

More information

UK Power Networks. Overall Cost Benefit Analysis

UK Power Networks. Overall Cost Benefit Analysis UK Power Networks Overall Cost Benefit Analysis Contents 1 Executive Summary 3 1.1 Analysis Conclusions 3 1.2 Summary Table 4 2 Introduction 5 2.1 Scope 5 2.2 Input Parameters 6 2.3 Asset Replacement/Refurbishment

More information

Directlink Joint Venture. Transmission Network Service Provider Annual Performance Report

Directlink Joint Venture. Transmission Network Service Provider Annual Performance Report Directlink Joint Venture Transmission Network Service Provider August 2017 TABLE OF CONTENTS 1. ANNUAL COMPLIANCE REPORTING... 3 1.1 NETWORK SAFETY AND RELIABILITY 3 1.1.1 Improvement Programs and Activites

More information

Housing Market Index (HMI)

Housing Market Index (HMI) Housing Market Index (HMI) Special Questions on Availability of Materials and Change in Material Prices May 2018 Economics & Housing Policy Group Table of Contents Introduction...1 Q4. How would you describe

More information

Pacific Gas & Electric Company REFERENCES: *GENERAL TERMS AND CONDITIONS FOR GAS AND ELECTRIC EXTENSION AND SERVICE CONSTRUCTION BY APPLICANT SUBMITTED TO APPLICANT BY: GENERAL TERMS AND CONDITIONS FOR

More information

ELECTRIC UTILITY OPERATING BUDGET. Presented by: Eric Livolsi Electric Utility Operations Manager

ELECTRIC UTILITY OPERATING BUDGET. Presented by: Eric Livolsi Electric Utility Operations Manager ELECTRIC UTILITY OPERATING BUDGET Presented by: Eric Livolsi Electric Utility Operations Manager City of Penticton Budget 2012 1 Electric Utility Overview Electrical Distribution System: 4150 power poles

More information

REQUEST FOR PROPOSAL (RFP) FOR SYSTEM AUDIT 2017

REQUEST FOR PROPOSAL (RFP) FOR SYSTEM AUDIT 2017 REQUEST FOR PROPOSAL (RFP) FOR SYSTEM AUDIT 2017 RFP Title: System Audit 2017 RFP Response Due Date and Time: 2:00 pm Pacific, April 28, 2017 ISSUING AGENCY INFORMATION Number of Pages (including cover

More information

The Four E s of Great Governance: A Precarious Balancing Act

The Four E s of Great Governance: A Precarious Balancing Act The Four E s of Great Governance: A Precarious Balancing Act Kris Norman-Major Professor and Director of Public Administration Programs Hamline University School of Business December 17, 2014 The last

More information

Public Utility District #1 of Ferry County Budget. December 17, 2018

Public Utility District #1 of Ferry County Budget. December 17, 2018 Public Utility District #1 of Ferry County 2019 Budget December 17, 2018 The Approved Budget for 2019 reflects an overall reduction of approximately 3.2 percent from the 2018 Budget. The District is predicting

More information

TURN DATA REQUEST-014 SDG&E-SOCALGAS 2019 GRC A /8 SDG&E_SOCALGAS RESPONSE DATE RECEIVED: FEBRUARY 8, 2018 DATE RESPONDED: FEBRUARY 27, 2018

TURN DATA REQUEST-014 SDG&E-SOCALGAS 2019 GRC A /8 SDG&E_SOCALGAS RESPONSE DATE RECEIVED: FEBRUARY 8, 2018 DATE RESPONDED: FEBRUARY 27, 2018 The following questions relate to SDG&E-15, electric distribution O&M. Workpapers relate to the relevant workpapers for this Chapter, SDG&E-15-WP WSpeer. 1. Regarding SDG&E s response to DR-TURN-04, Excel

More information

Public Utility District #1 of Ferry County Budget. December 19, 2016

Public Utility District #1 of Ferry County Budget. December 19, 2016 Public Utility District #1 of Ferry County 2017 Budget December 19, 2016 The Approved Budget for 2017 is $7,688,400 which reflects an overall decrease of 3.86% from the 2016 Budget; this is a reduction

More information

SP Energy Networks Business Plan

SP Energy Networks Business Plan Environmental Discretionary Reward Scheme 16 SP Energy Networks 2015 2023 Business Plan Updated March 2014 Annex Regulatory Reporting Pack Wooden Poles Guidance Document SP Energy Networks June 2013 Regulatory

More information

City of Jacksonville Beach Property & Procurement Division 1460A Shetter Ave., Jacksonville Beach, FL Tel:

City of Jacksonville Beach Property & Procurement Division 1460A Shetter Ave., Jacksonville Beach, FL Tel: City of Jacksonville Beach Invitation to Bid #: 1617-16 Beaches Energy Services Kings Road Transmission Relocation Date: 07/31/2017 City of Jacksonville Beach Property & Procurement Division 1460A Shetter

More information

Gas Sample Form No General Terms and Conditions for Gas and Electric Extension and Service Construction by Applicant

Gas Sample Form No General Terms and Conditions for Gas and Electric Extension and Service Construction by Applicant Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 29280-G Cancelling Revised Cal. P.U.C. Sheet No. 27713-G Gas Sample Form No. 79-716 General Terms and Conditions

More information

Northampton County County-Wide Housing Rehabilitation Program. Frequently Asked Questions

Northampton County County-Wide Housing Rehabilitation Program. Frequently Asked Questions Frequently Asked Questions What is Northampton County s County-Wide Housing Rehabilitation Program? This program could provide you with a loan to complete repairs to your home, if you live in Northampton

More information

COST ALLOCATION. Filed: EB Exhibit G1 Tab 3 Schedule 1 Page 1 of INTRODUCTION

COST ALLOCATION. Filed: EB Exhibit G1 Tab 3 Schedule 1 Page 1 of INTRODUCTION Filed: 0-- EB-0-0 Exhibit G Tab Schedule Page of COST ALLOCATION.0 INTRODUCTION 0 Hydro One Networks Inc s total revenue requirement for each of the five years of the Custom Cost of Service (COS) period,

More information

CENTRAL ELECTRIC COOPERATIVE, INC.

CENTRAL ELECTRIC COOPERATIVE, INC. CETL ELECTIC COOPETIVE, IC. 29 Wired in the Past, Grounded in the Present and Energizing the Future P.O. Box 329 716 oute 368 Parker, P 1649 329 1-8-521-57 www.central.coop President, and CEO & General

More information

PIPELINE / WIRE LINE PROCESS INSTRUCTIONS

PIPELINE / WIRE LINE PROCESS INSTRUCTIONS PIPELINE / WIRE LINE PROCESS INSTRUCTIONS Licensing Process: 1. Once the application package is received by Jones Lang LaSalle Brokerage, Inc. (JLL), the application and drawing will be forwarded to the

More information

BUSINESS PROCEDURE STREET LIGHTING: MUNICIPAL- OWNED EQUIPMENT DATE EFFECTIVE. January 1, 2015

BUSINESS PROCEDURE STREET LIGHTING: MUNICIPAL- OWNED EQUIPMENT DATE EFFECTIVE. January 1, 2015 BUSINESS PROCEDURE SUBJECT STREET LIGHTING: MUNICIPAL- OWNED EQUIPMENT NUMBER DATE REVISED June 2014 DATE EFFECTIVE January 1, 2015 ISSUED BY Director-Distribution Design I. PURPOSE To set forth a policy

More information

ENMAX POWER CORPORATION Distribution AUC Rule 005: ANNUAL OPERATIONS FINANCIAL AND OPERATING REPORTING For the Year Ended December 31, 2017 $M

ENMAX POWER CORPORATION Distribution AUC Rule 005: ANNUAL OPERATIONS FINANCIAL AND OPERATING REPORTING For the Year Ended December 31, 2017 $M ENMAX POWER CORPORATION Distribution AUC Rule 005: ANNUAL OPERATIONS FINANCIAL AND OPERATING REPORTING For the Year Ended December 31, 2017 $M TABLE OF CONTENTS Schedule Schedule Name Page Sch 1 Summary

More information

s (Street Light OQeratlng Costs}

s (Street Light OQeratlng Costs} CITY of NOVI CITY COUNCIL Agenda Item P November 14,2016 SUBJECT: Approval of a Street Light Purchase Agreement with Detroit Edison Company for the installation and ongoing operation costs of one street

More information

ORDER NO * * * * * * Pursuant to the Maryland Electricity Service Quality and Reliability Act 1 and the

ORDER NO * * * * * * Pursuant to the Maryland Electricity Service Quality and Reliability Act 1 and the ORDER NO. 88406 IN THE MATTER OF THE REVIEW OF ANNUAL PERFORMANCE REPORTS ON ELECTRIC SERVICE RELLIABILITY FILED PURSUANT TO COMAR 20.50.12.11 * * * * * * BEFORE THE PUBLIC SERVICE COMMISSION OF MARYLAND

More information

SCHEDULE 72 INTERCONNECTIONS TO NON-UTILITY GENERATION

SCHEDULE 72 INTERCONNECTIONS TO NON-UTILITY GENERATION Idaho Power Company Second Revised Sheet No. 72-1 I.P.U.C. No. 29, Tariff No. 101 First Revised Sheet No. 72-1 PUBLIC UTILITIES COMMISSION AVAILABILITY Service under this schedule is available throughout

More information

The Narragansett Electric Company d/b/a National Grid Tariff Advice Filing to Amend R.I.P.U.C. No Docket No.

The Narragansett Electric Company d/b/a National Grid Tariff Advice Filing to Amend R.I.P.U.C. No Docket No. Jennifer Brooks Hutchinson Senior Counsel July 13, 2012 Luly E. Massaro, Commission Clerk Rhode Island Public Utilities Commission 89 Jefferson Boulevard Warwick, RI 02888 RE: The Narragansett Electric

More information

The second effective date allows entities time to comply with Requirements R1, R2, R4, R5, R6, and R7.

The second effective date allows entities time to comply with Requirements R1, R2, R4, R5, R6, and R7. Effective Dates Generator Owners There are two effective dates associated with this standard. The first effective date allows Generator Owners time to develop documented maintenance strategies or procedures

More information

Rules Prescribing Standards for Electric Utilities

Rules Prescribing Standards for Electric Utilities Rules Prescribing Standards for Electric Utilities STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DIVISION OF PUBLIC UTILITIES AND CARRIERS RULES PRESCRIBING STANDARDS FOR ELECTRIC UTILITIES Date of

More information

GENERAL RULES AND REGULATIONS

GENERAL RULES AND REGULATIONS CITY OF ORRVILLE, OHIO ELECTRIC DIVISION GENERAL RULES AND REGULATIONS COVERING THE FURNISHING OF ELECTRIC SERVICE TO CUSTOMERS OF ORRVILLE UTILITIES ELECTRIC DIVISION AUTHORIZED UNDER RESOLUTION NO. U-10-01

More information

Document No Amendment No Approved By Approval Date Review Date

Document No Amendment No Approved By Approval Date Review Date Company Policy NETWORK Document No Amendment No Approved By Approval Date Review Date : : : : : NW000-Y0045 2 CEO 02/02/2017 02/02/2020 (Supersedes Company Policy (Network) NW000-Y0045 Amendment No. 1)

More information

FAC Transmission Vegetation Management. A. Introduction

FAC Transmission Vegetation Management. A. Introduction A. Introduction 1. Title: Transmission Vegetation Management 2. Number: FAC-003-4 3. Purpose: To maintain a reliable electric transmission system by using a defensein-depth strategy to manage vegetation

More information

Issued: April 14, 2004 Effective: April 22, 2004 Issued by: Dennis Williams, Regulatory Services

Issued: April 14, 2004 Effective: April 22, 2004 Issued by: Dennis Williams, Regulatory Services STATE OF MISSOURI, PUBLIC SERVICE COMMISSION P.S.C. MO. No. 1 Original R-31 Aquila, Inc., dba AQUILA NETWORKS For All Territory Served by Aquila Networks L&P and Aquila Networks MPS KANSAS CITY, MO 64138

More information

Case No.07/2017 Date of Grievance : Date of Order :

Case No.07/2017 Date of Grievance : Date of Order : 1 07/2017 CONSUMER GRIEVANCE REDRESSAL FORUM M.S.E.D.C.L., PUNE ZONE, PUNE Case No.07/2017 Date of Grievance : 16.01.2017 Date of Order : 03.03.2017 In the matter of recovery of arrears in the event of

More information

Cost Estimation for Regional Transmission Overlay Study (RTOS)

Cost Estimation for Regional Transmission Overlay Study (RTOS) Cost Estimation for Regional Transmission Overlay Study (RTOS) Purpose & Key Takeaways Purpose: To provide detail for MISO s cost estimation approach Key Takeaways: Planning-Level and Scoping-Level MISO

More information

Losses on the low voltage underground cable network due to contact voltage. 6 th July 2017

Losses on the low voltage underground cable network due to contact voltage. 6 th July 2017 Losses on the low voltage underground cable network due to contact voltage 6 th July 2017 Jeremy Wright BEng(Hons), MBA(Open), CEng, FIET, FCMI, MIAM UK Power Networks Asset Inspection, Maintenance & Compliance

More information

2013 Annual Report and Meeting Notice

2013 Annual Report and Meeting Notice 2013 Annual Report and Meeting Notice Attend Lincoln Electric s Annual Meeting of the Members March 22, 2014 Lincoln County High School Auditorium 312 9th Street East, Eureka, MT Registration begins at

More information

POCATELLO/CHUBBUCK SCHOOL DISTRICT NO. 25 Bannock County. Administration Office 3115 Pole Line Road Pocatello, Idaho SPECIFICATIONS FOR

POCATELLO/CHUBBUCK SCHOOL DISTRICT NO. 25 Bannock County. Administration Office 3115 Pole Line Road Pocatello, Idaho SPECIFICATIONS FOR POCATELLO/CHUBBUCK SCHOOL DISTRICT NO. 25 Bannock County Administration Office 3115 Pole Line Road Pocatello, Idaho SPECIFICATIONS FOR REPLACEMENT OF HVAC EQUIPMENT AT Highland High School, 1800 Bench

More information

BUYING YOUR FIRST HOME

BUYING YOUR FIRST HOME BUYING YOUR FIRST HOME Finding the home of your dreams is the tough part, the mortgage process shouldn t be. That s why we ve created a guide to make your first-time home buying experience easier. This

More information

Auditor Debrief November 9, 2018

Auditor Debrief November 9, 2018 Auditor Debrief November 9, 2018 Electrical Distribution Safety Disclaimer The information in this presentation was prepared as discussion points for the auditor meeting. In some cases more information

More information

Yurok Tribe Planning and Community Development Department Wautec Home Electrical Rehabilitation Project - Phase II. Invitation for Bid

Yurok Tribe Planning and Community Development Department Wautec Home Electrical Rehabilitation Project - Phase II. Invitation for Bid Invitation for Bid INTRODUCTION The Yurok Tribe is currently extending PG&E powerline for approximately 6.8 miles, from Mettah to Wautec, (Johnson s) California located on Highway 169, off Highway 96 near

More information